Name	Billing Class	Employee No.	Item Line Class	Transaction Date	Job No.	Customer	Service Item	Notes	Payroll Item	Billable	Employee Paid Day Rate	Duration	Days	Remarks
Anatra, Mike	Site Manager	MIKEANATRA	Anatra, Mike:Site Manager	2018-01-31	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		1	0	Revised and reviewed heat exchanger PM Plan for c101-17-10B, Draw works components. 
Anatra, Mike	Site Manager	MIKEANATRA	Anatra, Mike:Site Manager	2018-02-01	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		3	0	Revised and reviewed heat exchanger PM Plan for c101-17-10B, Draw works components. 
Anatra, Mike	Site Manager	MIKEANATRA	Anatra, Mike:Site Manager	2018-02-05	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		2	0	complete long text updates on the upload template. test the upload and revise the data as required to facilitate proper loading. 
Anatra, Mike	Site Manager	MIKEANATRA	Anatra, Mike:Site Manager	2018-02-06	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		1	0	complete long text updates on the upload template. test the upload and revise the data as required to facilitate proper loading. 
Anatra, Mike	Site Manager	MIKEANATRA	Anatra, Mike:Site Manager	2018-02-08	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		1	0	complete long text updates on the upload template. test the upload and revise the data as required to facilitate proper loading. 
Anatra, Mike	Site Manager	MIKEANATRA	Anatra, Mike:Site Manager	2018-02-12	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		1	0	Weekly meeting, revise docs for easier management. 
Anatra, Mike	Site Manager	MIKEANATRA	Anatra, Mike:Site Manager	2018-02-13	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		1	0	Weekly meeting, revise docs for easier management. 
Anatra, Mike	Site Manager	MIKEANATRA	Anatra, Mike:Site Manager	2018-02-14	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		4	0	Went through C101-17-10A and began cleaning up procedures and populating the Task List Long Text Upload templates,   in preparation for loading into SAP
Anatra, Mike	Site Manager	MIKEANATRA	Anatra, Mike:Site Manager	2018-02-15	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		4	0	Went through C101-17-10A and began cleaning up procedures and populating the Task List Long Text Upload templates,   in preparation for loading into SAP
Anatra, Mike	Site Manager	MIKEANATRA	Anatra, Mike:Site Manager	2018-02-16	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		1	0	Went through C101-17-10A and began cleaning up procedures and populating the Task List Long Text Upload templates,   in preparation for loading into SAP
Carmichael, Steve	Manager/Staff Consultant		Carmichael, Steve:Manager/Staff Consultant	2018-01-29	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		4	0	Review and update PM task, reducing PM task procedures to 132 characters or less per line item
Carmichael, Steve	Manager/Staff Consultant		Carmichael, Steve:Manager/Staff Consultant	2018-01-30	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		3	0	Review and update PM task, reducing PM task procedures to 132 characters or less per line item
Carmichael, Steve	Manager/Staff Consultant		Carmichael, Steve:Manager/Staff Consultant	2018-01-31	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		5	0	Review and update PM task, reducing PM task procedures to 132 characters or less per line item
Carmichael, Steve	Manager/Staff Consultant		Carmichael, Steve:Manager/Staff Consultant	2018-02-01	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		4	0	Review and update PM task, reducing PM task procedures to 132 characters or less per line item
Carmichael, Steve	Manager/Staff Consultant		Carmichael, Steve:Manager/Staff Consultant	2018-02-02	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		2	0	Review and update PM task, reducing PM task procedures to 132 characters or less per line item
Carmichael, Steve	Manager/Staff Consultant		Carmichael, Steve:Manager/Staff Consultant	2018-02-03	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		3	0	Review and update PM task, reducing PM task procedures to 132 characters or less per line item
Carmichael, Steve	Manager/Staff Consultant		Carmichael, Steve:Manager/Staff Consultant	2018-02-05	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		3	0	Review and update PM task and reduce PM task procedures to 132 characters or less per line item
Carmichael, Steve	Manager/Staff Consultant		Carmichael, Steve:Manager/Staff Consultant	2018-02-06	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		2	0	Review and update PM task and reduce PM task procedures to 132 characters or less per line item
Carmichael, Steve	Manager/Staff Consultant		Carmichael, Steve:Manager/Staff Consultant	2018-02-07	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		3	0	Review and update PM task and reduce PM task procedures to 132 characters or less per line item
Carmichael, Steve	Manager/Staff Consultant		Carmichael, Steve:Manager/Staff Consultant	2018-02-08	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		2	0	Review and update PM task and reduce PM task procedures to 132 characters or less per line item
Carmichael, Steve	Manager/Staff Consultant		Carmichael, Steve:Manager/Staff Consultant	2018-02-09	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		2	0	Review and update PM task and reduce PM task procedures to 132 characters or less per line item
Carmichael, Steve	Manager/Staff Consultant		Carmichael, Steve:Manager/Staff Consultant	2018-02-12	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		1	0	Review and update PM task – Reduce PM task procedures to 132 characters or less per line item
Carmichael, Steve	Manager/Staff Consultant		Carmichael, Steve:Manager/Staff Consultant	2018-02-13	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		2	0	Review and update PM task – Reduce PM task procedures to 132 characters or less per line item
Carmichael, Steve	Manager/Staff Consultant		Carmichael, Steve:Manager/Staff Consultant	2018-02-14	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		3	0	Review and update PM task – Reduce PM task procedures to 132 characters or less per line item
Carmichael, Steve	Manager/Staff Consultant		Carmichael, Steve:Manager/Staff Consultant	2018-02-15	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		2	0	Review and update PM task – Reduce PM task procedures to 132 characters or less per line item
Carmichael, Steve	Manager/Staff Consultant		Carmichael, Steve:Manager/Staff Consultant	2018-02-16	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		2	0	Review and update PM task – Reduce PM task procedures to 132 characters or less per line item
Ghadge, Sachin	Senior Engineer	34418	Ghadge, Sachin:Senior Engineer	2018-01-22	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		1	0	1. Research on Hibernia documentation for DC field and area class issue. 2. Meeting action item resolution.  
Ghadge, Sachin	Senior Engineer	34418	Ghadge, Sachin:Senior Engineer	2018-01-23	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		2	0	1. Research on Hibernia documentation for DC field and area class issue. 2. Meeting action item resolution.  
Ghadge, Sachin	Senior Engineer	34418	Ghadge, Sachin:Senior Engineer	2018-01-24	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP	Top Drive & Control System Upgrade	Regular Pay	N		2	0	1. Review on HM wirth document for new DC top drive 
Ghadge, Sachin	Senior Engineer	34418	Ghadge, Sachin:Senior Engineer	2018-01-24	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		2	0	1. Research on Hibernia documentation for DC field and area class issue. 2. Meeting action item resolution.  
Ghadge, Sachin	Senior Engineer	34418	Ghadge, Sachin:Senior Engineer	2018-01-25	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP	Top Drive & Control System Upgrade	Regular Pay	N		1	0	1. Review on HM wirth document for new DC top drive 
Ghadge, Sachin	Senior Engineer	34418	Ghadge, Sachin:Senior Engineer	2018-01-25	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		1	0	1. Research on Hibernia documentation for DC field and area class issue. 2. Meeting action item resolution.  
Ghadge, Sachin	Senior Engineer	34418	Ghadge, Sachin:Senior Engineer	2018-01-26	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		2	0	1. Research on Hibernia documentation for DC field and area class issue. 2. Meeting action item resolution.  
Ghadge, Sachin	Senior Engineer	34418	Ghadge, Sachin:Senior Engineer	2018-01-30	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		3	0	1. Top drive certification and DC field amp research  2. Area class native file research  3. Review of MH Wirth DC top drive documents 
Ghadge, Sachin	Senior Engineer	34418	Ghadge, Sachin:Senior Engineer	2018-01-31	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		2	0	1. Top drive certification and DC field amp research  2. Area class native file research  3. Review of MH Wirth DC top drive documents 
Ghadge, Sachin	Senior Engineer	34418	Ghadge, Sachin:Senior Engineer	2018-02-06	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		4	0	1. Review MH Wirth quote  2. Top Drive Comparison 
Ghadge, Sachin	Senior Engineer	34418	Ghadge, Sachin:Senior Engineer	2018-02-07	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		2	0	1. Review MH Wirth quote  2. Top Drive Comparison 
Ghadge, Sachin	Senior Engineer	34418	Ghadge, Sachin:Senior Engineer	2018-02-08	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		2	0	1. Review MH Wirth quote  2. Top Drive Comparison 
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-01-22	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		2	0	Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-01-23	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		2	0	Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-01-24	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		2	0	Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-01-25	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP	Top Drive & Control System Upgrade	Regular Pay	N		2	0	Review NOV Field Service Report regarding torque control for TD and reply back via email to JL
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-01-25	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		2	0	Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-01-26	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		3	0	Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-01-29	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		4	0	 Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-01-30	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		4	0	Reviewing MH Wirth TD & Traveling Block information & Drawings.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-01-30	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		4	0	 Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-01-31	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		2	0	Reviewing MH Wirth TD & Traveling Block information & Drawings.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-01-31	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		4	0	 Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-02-05	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		2	0	Reviewing MH Wirth TD & Traveling Block information & Drawings. Reviewing the information that Billy Arnold with NOV sent.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-02-05	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		3	0	Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Visiting with RR regarding 7838 Brake Maintenance Procedures.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-02-06	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		2	0	Reviewing MH Wirth TD & Traveling Block information & Drawings. Reviewing the information that Billy Arnold with NOV sent.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-02-06	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		3	0	Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Visiting with RR regarding 7838 Brake Maintenance Procedures.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-02-07	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		2	0	Reviewing MH Wirth TD & Traveling Block information & Drawings. Reviewing the information that Billy Arnold with NOV sent.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-02-07	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		4	0	Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Visiting with RR regarding 7838 Brake Maintenance Procedures.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-02-08	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		2	0	Reviewing MH Wirth TD & Traveling Block information & Drawings. Reviewing the information that Billy Arnold with NOV sent.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-02-08	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		4	0	Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Visiting with RR regarding 7838 Brake Maintenance Procedures.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-02-09	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		3	0	Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Visiting with RR regarding 7838 Brake Maintenance Procedures.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-02-12	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		4	0	Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Attending conference call meetings.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-02-13	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		2	0	Reviewing MH Wirth TD & Traveling Block information & Drawings. Reviewing the information that Billy Arnold with NOV sent. Attending NOV - Survey Report Review conference meeting call.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-02-13	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		4	0	Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Attending conference call meetings.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-02-14	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		2	0	Reviewing MH Wirth TD & Traveling Block information & Drawings. Reviewing the information that Billy Arnold with NOV sent. Attending NOV - Survey Report Review conference meeting call.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-02-14	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		4	0	Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Attending conference call meetings.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-02-15	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		3	0	Reviewing MH Wirth TD & Traveling Block information & Drawings. Reviewing the information that Billy Arnold with NOV sent. Attending NOV - Survey Report Review conference meeting call.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-02-15	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		2	0	Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Attending conference call meetings.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2018-02-16	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		4	0	Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Attending conference call meetings.
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-01-22	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP	Top Drive & Control System Upgrade	Regular Pay	N		1	0	MHWirth technical clarifications, update technical comparison, Provide feedback for 2012 test machine, Update MHWirth action tracker and clarification list
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-01-22	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		1	0	Update NDA with MHWirth, TDS6S technical comparison, Review Bardex survey report, review NOV survey report, Discuss torque testing scope with David, Update email to David
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-01-23	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		2	0	Update NDA with MHWirth, TDS6S technical comparison, Review Bardex survey report, review NOV survey report, Discuss torque testing scope with David, Update email to David
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-01-23	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		1	0	Biweekly Meeting and action items, Mass PM plan upload template meetings, travel to XOM campus
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-01-24	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP	Top Drive & Control System Upgrade	Regular Pay	N		1	0	MHWirth technical clarifications, update technical comparison, Provide feedback for 2012 test machine, Update MHWirth action tracker and clarification list
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-01-24	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		1	0	Update NDA with MHWirth, TDS6S technical comparison, Review Bardex survey report, review NOV survey report, Discuss torque testing scope with David, Update email to David
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-01-24	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		1	0	Biweekly Meeting and action items, Mass PM plan upload template meetings, travel to XOM campus
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-01-25	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP	Top Drive & Control System Upgrade	Regular Pay	N		0.5	0	MHWirth technical clarifications, update technical comparison, Provide feedback for 2012 test machine, Update MHWirth action tracker and clarification list
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-01-25	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		1.5	0	Update NDA with MHWirth, TDS6S technical comparison, Review Bardex survey report, review NOV survey report, Discuss torque testing scope with David, Update email to David
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-01-25	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		4.5	0	Biweekly Meeting and action items, Mass PM plan upload template meetings, travel to XOM campus
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-01-26	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP	Top Drive & Control System Upgrade	Regular Pay	N		1	0	MHWirth technical clarifications, update technical comparison, Provide feedback for 2012 test machine, Update MHWirth action tracker and clarification list
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-01-26	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		3	0	Update NDA with MHWirth, TDS6S technical comparison, Review Bardex survey report, review NOV survey report, Discuss torque testing scope with David, Update email to David
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-01-29	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP	Top Drive & Control System Upgrade	Regular Pay	N		2	0	Create template for technical and commercial evaluation, Torque limitation electrical clarification, TD comparison PPT, MH Wirth Clarifications
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-01-29	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		0.5	0	 Distribute FIMS documents, Review tracker update to align with percent complete
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-01-29	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		1.5	0	Clarification to how project percent complete is calculated, Update action tracker, Template meeting follow ups
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-01-30	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		1	0	Disucssions on integration of MHWirth TD into Derrick, Survey report reviews
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-01-31	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP	Top Drive & Control System Upgrade	Regular Pay	N		0.5	0	Create template for technical and commercial evaluation, Torque limitation electrical clarification, TD comparison PPT, MH Wirth Clarifications
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-01-31	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		2	0	Disucssions on integration of MHWirth TD into Derrick, Survey report reviews
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-01-31	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		0.5	0	Clarification to how project percent complete is calculated, Update action tracker, Template meeting follow ups
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-02-02	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		1	0	 Distribute FIMS documents, Review tracker update to align with percent complete
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-02-02	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		2	0	Clarification to how project percent complete is calculated, Update action tracker, Template meeting follow ups
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-02-07	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		1	0	WebEx bi-weekly meeting
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-02-08	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP	Top Drive & Control System Upgrade	Regular Pay	N		3	0	Technical and commercial evaluation for MHWirth TD, DC TD clarifications
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-02-08	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		1	0	Planning survey review meetin
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-02-09	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP	Top Drive & Control System Upgrade	Regular Pay	N		0.5	0	Technical and commercial evaluation for MHWirth TD, DC TD clarifications
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-02-12	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP	Top Drive & Control System Upgrade	Regular Pay	N		1	0	MHWirth technical clarifications and analysis, NOV survey review meeting
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-02-12	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		1	0	Discussion with david, NOV, survey review meeting, discussion with MHWirth
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-02-13	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP	Top Drive & Control System Upgrade	Regular Pay	N		0.5	0	MHWirth technical clarifications and analysis, NOV survey review meeting
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-02-14	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP	Top Drive & Control System Upgrade	Regular Pay	N		1.5	0	MHWirth technical clarifications and analysis, NOV survey review meeting
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-02-14	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		1	0	Discussion with david, NOV, survey review meeting, discussion with MHWirth
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-02-15	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		0.5	0	Discussion with david, NOV, survey review meeting, discussion with MHWirth
Lambert, Joshua	Asst PM	JOSHLAMBERT	Lambert, Joshua:Asst PM	2018-02-16	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		0.5	0	Update percent complete in template
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2018-01-26	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		0.75	0	Top Drive drawing updates for MHWirth
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2018-01-29	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP	Top Drive & Control System Upgrade	Regular Pay	N		1	0	update CAD drawings for traveling block and top drive arrangement
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2018-01-30	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP	Top Drive & Control System Upgrade	Regular Pay	N		0.25	0	update CAD drawings for traveling block and top drive arrangement
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2018-01-31	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP	Top Drive & Control System Upgrade	Regular Pay	N		0.25	0	update CAD drawings for traveling block and top drive arrangement
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2018-01-22	Hibernia Platform	:Hibernia Platform	TSR-01583-HIBP.	(Non-Billable): Top Drive & Control System Upgrade	Regular Pay	N		1	0	On 1/22, review Top Drive quotes and provide comments.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2018-01-22	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		1	0	On 1/22, prep for PM refresh mtgs.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2018-02-14	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		1	0	On 2/14-2/16, PM review mtg, bi-weekly report.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2018-02-15	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		2	0	On 2/14-2/16, PM review mtg, bi-weekly report.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2018-02-16	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		2	0	On 2/14-2/16, PM review mtg, bi-weekly report.
Rouse, Roger	Maintenance Supervisor	ROGERROUSE	Rouse, Roger:Maintenance Supervisor	2018-01-24	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		3	0	1/24 - Review SAP Data templates and user guide. 1/25 - Travel to Exxon office & participate in meeting for use of data templates for mass loading data.
Rouse, Roger	Maintenance Supervisor	ROGERROUSE	Rouse, Roger:Maintenance Supervisor	2018-01-25	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		4	0	1/24 - Review SAP Data templates and user guide. 1/25 - Travel to Exxon office & participate in meeting for use of data templates for mass loading data.
Rouse, Roger	Maintenance Supervisor	ROGERROUSE	Rouse, Roger:Maintenance Supervisor	2018-02-01	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		2	0	Updating reviewed maintenance tasks to meet template requirements.
Rouse, Roger	Maintenance Supervisor	ROGERROUSE	Rouse, Roger:Maintenance Supervisor	2018-02-02	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		2	0	Compiling revised LTV Energy FC-1600 maintenance tasks.
Rouse, Roger	Maintenance Supervisor	ROGERROUSE	Rouse, Roger:Maintenance Supervisor	2018-02-02	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		2	0	Updating reviewed maintenance tasks to meet template requirements.
Rouse, Roger	Maintenance Supervisor	ROGERROUSE	Rouse, Roger:Maintenance Supervisor	2018-02-05	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		1	0	Two hours for project meetings. Create and submit templates for tong text updates. (No issues) Reviewing task list update template. Reviewing submitted maintenance updates.
Rouse, Roger	Maintenance Supervisor	ROGERROUSE	Rouse, Roger:Maintenance Supervisor	2018-02-07	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		1	0	Two hours for project meetings. Create and submit templates for tong text updates. (No issues) Reviewing task list update template. Reviewing submitted maintenance updates.
Rouse, Roger	Maintenance Supervisor	ROGERROUSE	Rouse, Roger:Maintenance Supervisor	2018-02-08	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		2	0	Updating Aux Brake proposed maintenance tasks.
Rouse, Roger	Maintenance Supervisor	ROGERROUSE	Rouse, Roger:Maintenance Supervisor	2018-02-08	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		3	0	Two hours for project meetings. Create and submit templates for tong text updates. (No issues) Reviewing task list update template. Reviewing submitted maintenance updates.
Rouse, Roger	Maintenance Supervisor	ROGERROUSE	Rouse, Roger:Maintenance Supervisor	2018-02-09	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		3	0	Two hours for project meetings. Create and submit templates for tong text updates. (No issues) Reviewing task list update template. Reviewing submitted maintenance updates.
Rouse, Roger	Maintenance Supervisor	ROGERROUSE	Rouse, Roger:Maintenance Supervisor	2018-02-13	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		2	0	Research O&M manuals for LTV Energy FC-1600 Mud Pumps
Rouse, Roger	Maintenance Supervisor	ROGERROUSE	Rouse, Roger:Maintenance Supervisor	2018-02-15	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP.	(Non-Billable): PM Review Change Order 5	Regular Pay	N		3	0	Research O&M manuals for LTV Energy FC-1600 Mud Pumps
Rouse, Roger	Maintenance Supervisor	ROGERROUSE	Rouse, Roger:Maintenance Supervisor	2018-02-16	Hibernia Platform	:Hibernia Platform	TSR-01606-HIBP	PM Review Change Order 5	Regular Pay	N		3	0	Revising maintenance plans 10080279, 10080294, & 10080309 on the FC-1600 Mud Pumps.