Name Billing Class Employee No. Item Line Class Transaction Date Job No. Customer Service Item Notes Payroll Item Billable Employee Paid Day Rate Duration Days Remarks Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 8 0 Gathering information on Berkut ,orlan and comparing with Minkit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 1. TD BoD document preparation. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Gathering information on Berkut ,orlan and comparing with Minkit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 1. TD BoD document preparation. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-26 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Meetings, Timesheet updates, biweekly report, BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Meetings, Timesheet updates, biweekly report, BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Meetings, Timesheet updates, biweekly report, BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 3 0 BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Meetings, Timesheet updates, biweekly report, BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-02 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 3 0 BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Meetings, Timesheet updates, biweekly report, BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 7 0 1.Electrical Power System Studies 2. BoD modification 3. Action Tracker 4. Timesheet and Weekly report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 1. Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-07 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 7 0 1.Electrical Power System Studies 2. BoD modification 3. Action Tracker 4. Timesheet and Weekly report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 9 0 1.Electrical Power System Studies 2. BoD modification 3. Action Tracker 4. Timesheet and Weekly report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-09 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 1.Electrical Power System Studies 2. BoD modification 3. Action Tracker 4. Timesheet and Weekly report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Revised Power System PPT 2. Revised BoD to add option 6 3. Risk register and action tracker 4. Weekly report and timesheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 1, Weekly meetings 2. Document review Weight , CG. 3 Document review Scope split 4 Requisition update 5 GE invoice receiving Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Revised Power System PPT 2. Revised BoD to add option 6 3. Risk register and action tracker 4. Weekly report and timesheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 1, Weekly meetings 2. Document review Weight , CG. 3 Document review Scope split 4 Requisition update 5 GE invoice receiving Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Revised Power System PPT 2. Revised BoD to add option 6 3. Risk register and action tracker 4. Weekly report and timesheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 1, Weekly meetings 2. Document review Weight , CG. 3 Document review Scope split 4 Requisition update 5 GE invoice receiving Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-15 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Revised Power System PPT 2. Revised BoD to add option 6 3. Risk register and action tracker 4. Weekly report and timesheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-15 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 1, Weekly meetings 2. Document review Weight , CG. 3 Document review Scope split 4 Requisition update 5 GE invoice receiving Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-16 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 1. Revised Power System PPT 2. Revised BoD to add option 6 3. Risk register and action tracker 4. Weekly report and timesheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-16 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 1, Weekly meetings 2. Document review Weight , CG. 3 Document review Scope split 4 Requisition update 5 GE invoice receiving Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly report and timesheet 2. Review of Screening and RAC matrix 3. Scope split ppt Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly report and timesheet 2. Review of Screening and RAC matrix 3. Scope split ppt Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly report and timesheet 2. Review of Screening and RAC matrix 3. Scope split ppt Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 1. Weekly meetings 2. RIsk matrix 3. Topsides Philosophies 4. Electrical Capex 5. Metocean PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly report and timesheet 2. Review of Screening and RAC matrix 3. Scope split ppt Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 1. Weekly meetings 2. RIsk matrix 3. Topsides Philosophies 4. Electrical Capex 5. Metocean PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 6 0 1. Weekly meetings 2. RIsk matrix 3. Topsides Philosophies 4. Electrical Capex 5. Metocean PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 3 0 1. Weekly report and timesheet 2. RIsk matrix 3. Topsides Philosophies Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 1. Weekly meetings 2. RIsk matrix meeting 3. Topsides Philosophies review 4 Project meetings 5. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 3 0 1. Weekly report and timesheet 2. RIsk matrix 3. Topsides Philosophies Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 1. Weekly meetings 2. RIsk matrix meeting 3. Topsides Philosophies review 4 Project meetings 5. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly report and timesheet 2. RIsk matrix 3. Topsides Philosophies Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 1. Weekly meetings 2. RIsk matrix meeting 3. Topsides Philosophies review 4 Project meetings 5. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 3 0 1. Weekly report and timesheet 2. RIsk matrix 3. Topsides Philosophies Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 1. Weekly meetings 2. RIsk matrix meeting 3. Topsides Philosophies review 4 Project meetings 5. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly Report and Timesheet 2. RIsk Register 3 Screening Document 4. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 6 0 1. Weekly meetings 2. RIsk Register 3 Screening Document 4. Action register changes Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly Report and Timesheet 2. RIsk Register 3 Screening Document 4. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 6 0 1. Weekly meetings 2. RIsk Register 3 Screening Document 4. Action register changes Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly Report and Timesheet 2. RIsk Register 3 Screening Document 4. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 6 0 1. Weekly meetings 2. RIsk Register 3 Screening Document 4. Action register changes Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly Report and Timesheet 2. RIsk Register 3 Screening Document 4. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 1. Weekly meetings 2. RIsk Register 3 Screening Document 4. Action register changes Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly Report and Timesheet 2. RIsk Register 3 Screening Document 4. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 1. Weekly meetings 2. RIsk Register 3 Screening Document 4. Action register changes Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-07 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Review of TSR-01629-PT-MU-00003-RevA-Electrical System Sizing and Comparison, Concept 3 Concrete MODU 3D Block Model and GA 03.09.2018– PDF (3D Manipulate), -Concept 3 Concrete MODU 3D Block Model and GA 03.09.2018- PPT Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Review of TSR-01629-PT-MU-00003-RevA-Electrical System Sizing and Comparison, Concept 3 Concrete MODU 3D Block Model and GA 03.09.2018– PDF (3D Manipulate), -Concept 3 Concrete MODU 3D Block Model and GA 03.09.2018- PPT Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-02-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 8 0 Setup cost report template, support Genesis access to PKD systems and facility, researching files for reference, weekly meeting with Kvaerner and ENL, invoicing procedure, setup project risk template, discussions on concept, Email approval for steel CVN testing, Combining powerpoints for BoD Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-02-21 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 Basis of Design Presentation, Weekly Report Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-02-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Setup cost report template, support Genesis access to PKD systems and facility, researching files for reference, weekly meeting with Kvaerner and ENL, invoicing procedure, setup project risk template, discussions on concept, Email approval for steel CVN testing, Combining powerpoints for BoD Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 7 0 Basis of Design Presentation, Weekly Report Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Setup cost report template, support Genesis access to PKD systems and facility, researching files for reference, weekly meeting with Kvaerner and ENL, invoicing procedure, setup project risk template, discussions on concept, Email approval for steel CVN testing, Combining powerpoints for BoD Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 Basis of Design Presentation, Weekly Report Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Setup cost report template, support Genesis access to PKD systems and facility, researching files for reference, weekly meeting with Kvaerner and ENL, invoicing procedure, setup project risk template, discussions on concept, Email approval for steel CVN testing, Combining powerpoints for BoD Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-02-26 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 7 0 Basis of Design Presentation initial submittal and revision, review of 3D block layouts, Clarifications to Kvaerner Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-02-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Weekly XOM meeting, KV alignment meeting, training Sachin on timesheets and weekly report, Research into go-bys, Internal coordination meeting, Invoicing procedure, Invoicing procedure, steering commitee, Revised CTR, Genesis timesheet approval Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 Basis of Design Presentation initial submittal and revision, review of 3D block layouts, Clarifications to Kvaerner Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Weekly XOM meeting, KV alignment meeting, training Sachin on timesheets and weekly report, Research into go-bys, Internal coordination meeting, Invoicing procedure, Invoicing procedure, steering commitee, Revised CTR, Genesis timesheet approval Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 Basis of Design Presentation initial submittal and revision, review of 3D block layouts, Clarifications to Kvaerner Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Weekly XOM meeting, KV alignment meeting, training Sachin on timesheets and weekly report, Research into go-bys, Internal coordination meeting, Invoicing procedure, Invoicing procedure, steering commitee, Revised CTR, Genesis timesheet approval Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 3 0 Basis of Design Presentation initial submittal and revision, review of 3D block layouts, Clarifications to Kvaerner Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Weekly XOM meeting, KV alignment meeting, training Sachin on timesheets and weekly report, Research into go-bys, Internal coordination meeting, Invoicing procedure, Invoicing procedure, steering commitee, Revised CTR, Genesis timesheet approval Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Weekly XOM meeting, KV alignment meeting, training Sachin on timesheets and weekly report, Research into go-bys, Internal coordination meeting, Invoicing procedure, Invoicing procedure, steering commitee, Revised CTR, Genesis timesheet approval Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 9.5 0 03.05 Concept study block layout option 1 and 2 review, coordination meeting to guide the team, Revise BOD per initial comments, clarifications to Kvaerner, RFI--002 seismic assessment 03.06-Review weekly report, technical BOD review with XOM, update action and decision register, update BOD, Review responsibility matrix 03.07- Equipment weight research, 3d model reviews, clarifications on seismic and weights 03.08-Power sizing review, winterization discussion and review, 3d model review, RFI-002 seismic, concept 6 incorporation to BoD, review execution and level 1 schedule 03.09-3D model review, seismic technical discussion, issue execution and level 1 schedule, update histogram cost tracker Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 Internal meetings, research into go-bys, weekly status meeting with XOM, travel to and from XOM, clarification for XOM SME on seismic, invoicing alignment Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 10.5 0 03.05 Concept study block layout option 1 and 2 review, coordination meeting to guide the team, Revise BOD per initial comments, clarifications to Kvaerner, RFI--002 seismic assessment 03.06-Review weekly report, technical BOD review with XOM, update action and decision register, update BOD, Review responsibility matrix 03.07- Equipment weight research, 3d model reviews, clarifications on seismic and weights 03.08-Power sizing review, winterization discussion and review, 3d model review, RFI-002 seismic, concept 6 incorporation to BoD, review execution and level 1 schedule 03.09-3D model review, seismic technical discussion, issue execution and level 1 schedule, update histogram cost tracker Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 Internal meetings, research into go-bys, weekly status meeting with XOM, travel to and from XOM, clarification for XOM SME on seismic, invoicing alignment Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-07 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 6 0 03.05 Concept study block layout option 1 and 2 review, coordination meeting to guide the team, Revise BOD per initial comments, clarifications to Kvaerner, RFI--002 seismic assessment 03.06-Review weekly report, technical BOD review with XOM, update action and decision register, update BOD, Review responsibility matrix 03.07- Equipment weight research, 3d model reviews, clarifications on seismic and weights 03.08-Power sizing review, winterization discussion and review, 3d model review, RFI-002 seismic, concept 6 incorporation to BoD, review execution and level 1 schedule 03.09-3D model review, seismic technical discussion, issue execution and level 1 schedule, update histogram cost tracker Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-07 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 Internal meetings, research into go-bys, weekly status meeting with XOM, travel to and from XOM, clarification for XOM SME on seismic, invoicing alignment Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 03.05 Concept study block layout option 1 and 2 review, coordination meeting to guide the team, Revise BOD per initial comments, clarifications to Kvaerner, RFI--002 seismic assessment 03.06-Review weekly report, technical BOD review with XOM, update action and decision register, update BOD, Review responsibility matrix 03.07- Equipment weight research, 3d model reviews, clarifications on seismic and weights 03.08-Power sizing review, winterization discussion and review, 3d model review, RFI-002 seismic, concept 6 incorporation to BoD, review execution and level 1 schedule 03.09-3D model review, seismic technical discussion, issue execution and level 1 schedule, update histogram cost tracker Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Internal meetings, research into go-bys, weekly status meeting with XOM, travel to and from XOM, clarification for XOM SME on seismic, invoicing alignment Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-09 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 6 0 03.05 Concept study block layout option 1 and 2 review, coordination meeting to guide the team, Revise BOD per initial comments, clarifications to Kvaerner, RFI--002 seismic assessment 03.06-Review weekly report, technical BOD review with XOM, update action and decision register, update BOD, Review responsibility matrix 03.07- Equipment weight research, 3d model reviews, clarifications on seismic and weights 03.08-Power sizing review, winterization discussion and review, 3d model review, RFI-002 seismic, concept 6 incorporation to BoD, review execution and level 1 schedule 03.09-3D model review, seismic technical discussion, issue execution and level 1 schedule, update histogram cost tracker Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-09 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Internal meetings, research into go-bys, weekly status meeting with XOM, travel to and from XOM, clarification for XOM SME on seismic, invoicing alignment Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 Guide, coordinate and expedite the team. 03.12 - Winterization BoD, Weight Clarification, Coordinate deliverable responsibility for team, issues informal weekly report, Costing template for GustoMSC, review concept 6 3D model 03.13 - Review and issue weekly report, coordinate with team to start risk register, weight clarification, J/U weight estimate and unit costs for GustoMSC, Research J/U mast test temps, concept screening and scoring 03.14 Screening matrix review, Review lifting feasibility and updated concept 1 3D model, coordinate team reviews for topsides philosophy, review weight report and CG 03.15 - Lifting feasibility review, review and issue electrical sizing, review concept 6 3D model, review weight and CGs, issue clarification to KBR, electrical clarifications 03.16-LQ weight clarification, request estimated pricing differences for low-temp steel, request budgetary pricing for platform cranes, issue weight and cg report, KBR scope split, BoD concept 6 update, issue updated 3D models, coordinate review for KBR topsides, Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Internal meetings and discussions, man-hour forecast, research offshore crane options, NDA with KBR Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 7 0 Guide, coordinate and expedite the team. 03.12 - Winterization BoD, Weight Clarification, Coordinate deliverable responsibility for team, issues informal weekly report, Costing template for GustoMSC, review concept 6 3D model 03.13 - Review and issue weekly report, coordinate with team to start risk register, weight clarification, J/U weight estimate and unit costs for GustoMSC, Research J/U mast test temps, concept screening and scoring 03.14 Screening matrix review, Review lifting feasibility and updated concept 1 3D model, coordinate team reviews for topsides philosophy, review weight report and CG 03.15 - Lifting feasibility review, review and issue electrical sizing, review concept 6 3D model, review weight and CGs, issue clarification to KBR, electrical clarifications 03.16-LQ weight clarification, request estimated pricing differences for low-temp steel, request budgetary pricing for platform cranes, issue weight and cg report, KBR scope split, BoD concept 6 update, issue updated 3D models, coordinate review for KBR topsides, Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 Guide, coordinate and expedite the team. 03.12 - Winterization BoD, Weight Clarification, Coordinate deliverable responsibility for team, issues informal weekly report, Costing template for GustoMSC, review concept 6 3D model 03.13 - Review and issue weekly report, coordinate with team to start risk register, weight clarification, J/U weight estimate and unit costs for GustoMSC, Research J/U mast test temps, concept screening and scoring 03.14 Screening matrix review, Review lifting feasibility and updated concept 1 3D model, coordinate team reviews for topsides philosophy, review weight report and CG 03.15 - Lifting feasibility review, review and issue electrical sizing, review concept 6 3D model, review weight and CGs, issue clarification to KBR, electrical clarifications 03.16-LQ weight clarification, request estimated pricing differences for low-temp steel, request budgetary pricing for platform cranes, issue weight and cg report, KBR scope split, BoD concept 6 update, issue updated 3D models, coordinate review for KBR topsides, Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Internal meetings and discussions, man-hour forecast, research offshore crane options, NDA with KBR Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-15 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 9.5 0 Guide, coordinate and expedite the team. 03.12 - Winterization BoD, Weight Clarification, Coordinate deliverable responsibility for team, issues informal weekly report, Costing template for GustoMSC, review concept 6 3D model 03.13 - Review and issue weekly report, coordinate with team to start risk register, weight clarification, J/U weight estimate and unit costs for GustoMSC, Research J/U mast test temps, concept screening and scoring 03.14 Screening matrix review, Review lifting feasibility and updated concept 1 3D model, coordinate team reviews for topsides philosophy, review weight report and CG 03.15 - Lifting feasibility review, review and issue electrical sizing, review concept 6 3D model, review weight and CGs, issue clarification to KBR, electrical clarifications 03.16-LQ weight clarification, request estimated pricing differences for low-temp steel, request budgetary pricing for platform cranes, issue weight and cg report, KBR scope split, BoD concept 6 update, issue updated 3D models, coordinate review for KBR topsides, Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-15 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Internal meetings and discussions, man-hour forecast, research offshore crane options, NDA with KBR Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-16 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5.5 0 Guide, coordinate and expedite the team. 03.12 - Winterization BoD, Weight Clarification, Coordinate deliverable responsibility for team, issues informal weekly report, Costing template for GustoMSC, review concept 6 3D model 03.13 - Review and issue weekly report, coordinate with team to start risk register, weight clarification, J/U weight estimate and unit costs for GustoMSC, Research J/U mast test temps, concept screening and scoring 03.14 Screening matrix review, Review lifting feasibility and updated concept 1 3D model, coordinate team reviews for topsides philosophy, review weight report and CG 03.15 - Lifting feasibility review, review and issue electrical sizing, review concept 6 3D model, review weight and CGs, issue clarification to KBR, electrical clarifications 03.16-LQ weight clarification, request estimated pricing differences for low-temp steel, request budgetary pricing for platform cranes, issue weight and cg report, KBR scope split, BoD concept 6 update, issue updated 3D models, coordinate review for KBR topsides, Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.19 Liehberr RFQ, KBR Scope split PPT, Revise BoD for Concept 6 and winterization, concept ranking system 03.20 Screening matrix review and ranking, scope split PPT 03.21 Review and revise weight and CG PPT, scope split review and document update 03.22 Review KBR sketches for topsides, revised weight and CG for concept 6, review topsides philosophy by KBR, send capex template, CAPEX deliverable Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Concept screening and scoring, weekly status meeting with Kvaerner and XOM, research industry offshore lifts, internal discussions, NDA with KBR, research on Berkut weather conditions, update weight and CG based on internal comments, NDA coordination Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 10.5 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.19 Liehberr RFQ, KBR Scope split PPT, Revise BoD for Concept 6 and winterization, concept ranking system 03.20 Screening matrix review and ranking, scope split PPT 03.21 Review and revise weight and CG PPT, scope split review and document update 03.22 Review KBR sketches for topsides, revised weight and CG for concept 6, review topsides philosophy by KBR, send capex template, CAPEX deliverable Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Concept screening and scoring, weekly status meeting with Kvaerner and XOM, research industry offshore lifts, internal discussions, NDA with KBR, research on Berkut weather conditions, update weight and CG based on internal comments, NDA coordination Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.19 Liehberr RFQ, KBR Scope split PPT, Revise BoD for Concept 6 and winterization, concept ranking system 03.20 Screening matrix review and ranking, scope split PPT 03.21 Review and revise weight and CG PPT, scope split review and document update 03.22 Review KBR sketches for topsides, revised weight and CG for concept 6, review topsides philosophy by KBR, send capex template, CAPEX deliverable Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Concept screening and scoring, weekly status meeting with Kvaerner and XOM, research industry offshore lifts, internal discussions, NDA with KBR, research on Berkut weather conditions, update weight and CG based on internal comments, NDA coordination Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 7 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.19 Liehberr RFQ, KBR Scope split PPT, Revise BoD for Concept 6 and winterization, concept ranking system 03.20 Screening matrix review and ranking, scope split PPT 03.21 Review and revise weight and CG PPT, scope split review and document update 03.22 Review KBR sketches for topsides, revised weight and CG for concept 6, review topsides philosophy by KBR, send capex template, CAPEX deliverable Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Concept screening and scoring, weekly status meeting with Kvaerner and XOM, research industry offshore lifts, internal discussions, NDA with KBR, research on Berkut weather conditions, update weight and CG based on internal comments, NDA coordination Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-23 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 6.5 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.19 Liehberr RFQ, KBR Scope split PPT, Revise BoD for Concept 6 and winterization, concept ranking system 03.20 Screening matrix review and ranking, scope split PPT 03.21 Review and revise weight and CG PPT, scope split review and document update 03.22 Review KBR sketches for topsides, revised weight and CG for concept 6, review topsides philosophy by KBR, send capex template, CAPEX deliverable Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Concept screening and scoring, weekly status meeting with Kvaerner and XOM, research industry offshore lifts, internal discussions, NDA with KBR, research on Berkut weather conditions, update weight and CG based on internal comments, NDA coordination Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.26-Review screening summary, draft of CAPEX estimates, clarifications on CAPEX, review schedule, draft of screening comparison 03.27-Dimensional clarifications, update concept 6 3D model, clarification for concept 4 float-over, seismic benchmark, topsides philosophy review 03.28-Technical meeting with KBR and Kvaerner, research alternative Jack-Ups, RFQ for Pioneering Spirit, CAPEX summary, CAPEX Concept 4 03.29-CAPEX estimate, clarification for float-over, risk and HSE register and PPT Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Internal discussions and meetings, float-over feasibility, pioneering spirit RFQ, electric versus diesel crane, time tracker update, timesheet Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 7 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.26-Review screening summary, draft of CAPEX estimates, clarifications on CAPEX, review schedule, draft of screening comparison 03.27-Dimensional clarifications, update concept 6 3D model, clarification for concept 4 float-over, seismic benchmark, topsides philosophy review 03.28-Technical meeting with KBR and Kvaerner, research alternative Jack-Ups, RFQ for Pioneering Spirit, CAPEX summary, CAPEX Concept 4 03.29-CAPEX estimate, clarification for float-over, risk and HSE register and PPT Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Internal discussions and meetings, float-over feasibility, pioneering spirit RFQ, electric versus diesel crane, time tracker update, timesheet Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.26-Review screening summary, draft of CAPEX estimates, clarifications on CAPEX, review schedule, draft of screening comparison 03.27-Dimensional clarifications, update concept 6 3D model, clarification for concept 4 float-over, seismic benchmark, topsides philosophy review 03.28-Technical meeting with KBR and Kvaerner, research alternative Jack-Ups, RFQ for Pioneering Spirit, CAPEX summary, CAPEX Concept 4 03.29-CAPEX estimate, clarification for float-over, risk and HSE register and PPT Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Internal discussions and meetings, float-over feasibility, pioneering spirit RFQ, electric versus diesel crane, time tracker update, timesheet Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 7 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.26-Review screening summary, draft of CAPEX estimates, clarifications on CAPEX, review schedule, draft of screening comparison 03.27-Dimensional clarifications, update concept 6 3D model, clarification for concept 4 float-over, seismic benchmark, topsides philosophy review 03.28-Technical meeting with KBR and Kvaerner, research alternative Jack-Ups, RFQ for Pioneering Spirit, CAPEX summary, CAPEX Concept 4 03.29-CAPEX estimate, clarification for float-over, risk and HSE register and PPT Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Internal discussions and meetings, float-over feasibility, pioneering spirit RFQ, electric versus diesel crane, time tracker update, timesheet Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report, CAPEX, Risk and HSE Register, report out presentation, estimate, weight and CG revision, risk register revision, concept screening review, screening report review, revised BoD, draft close-out letter Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Internal meeting and disucssions, time tracking Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 9 0 Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report, CAPEX, Risk and HSE Register, report out presentation, estimate, weight and CG revision, risk register revision, concept screening review, screening report review, revised BoD, draft close-out letter Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Internal meeting and disucssions, time tracking Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 9 0 Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report, CAPEX, Risk and HSE Register, report out presentation, estimate, weight and CG revision, risk register revision, concept screening review, screening report review, revised BoD, draft close-out letter Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2.5 0 Internal meeting and disucssions, time tracking Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report, CAPEX, Risk and HSE Register, report out presentation, estimate, weight and CG revision, risk register revision, concept screening review, screening report review, revised BoD, draft close-out letter Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3.5 0 Internal meeting and disucssions, time tracking Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 6 0 Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report, CAPEX, Risk and HSE Register, report out presentation, estimate, weight and CG revision, risk register revision, concept screening review, screening report review, revised BoD, draft close-out letter Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Internal meeting and disucssions, time tracking Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.25 0 Document reviews incl. BOD KanBan Board Meeting Emails regarding storage on platform Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Document reviews incl. BOD KanBan Board Meeting Emails regarding storage on platform Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 BOD Presentation review and comment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Document reviews incl. BOD KanBan Board Meeting Emails regarding storage on platform Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.5 0 BOD Presentation review and comment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Document reviews incl. BOD KanBan Board Meeting Emails regarding storage on platform Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Model Review(s) BOD Reviews Exxon Meeting Internal Meetings KV Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 Option "1" Model Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2.5 0 Model Review(s) BOD Reviews Exxon Meeting Internal Meetings KV Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2.5 0 Model Review(s) BOD Reviews Exxon Meeting Internal Meetings KV Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Model Review(s) BOD Reviews Exxon Meeting Internal Meetings KV Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 Minkit 3D model review Minkit Seismic meeting with KV Weekly Meeting with Exxon/KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Model Reviews, general meetings, BOD review. general documentation review. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 Minkit 3D model review Minkit Seismic meeting with KV Weekly Meeting with Exxon/KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Model Reviews, general meetings, BOD review. general documentation review. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-07 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Model Reviews, general meetings, BOD review. general documentation review. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 Model Reviews, general meetings, BOD review. general documentation review. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-09 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Minkit 3D model review Minkit Seismic meeting with KV Weekly Meeting with Exxon/KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Documentation Review (BoD slides, Electrical Slides, 3D models) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Review Weight and CG Documents 3D Modeling Revisions 3D file conversions Various documentation review meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Review Weight and CG Documents 3D Modeling Revisions 3D file conversions Various documentation review meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Review Weight and CG Documents 3D Modeling Revisions 3D file conversions Various documentation review meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-15 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 Documentation Review (BoD slides, Electrical Slides, 3D models) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-15 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Review Weight and CG Documents 3D Modeling Revisions 3D file conversions Various documentation review meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-16 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Documentation Review (BoD slides, Electrical Slides, 3D models) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-16 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Review Weight and CG Documents 3D Modeling Revisions 3D file conversions Various documentation review meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1.5 0 review and revise latest revision of BoD; review pipe barn proposal for Concept 6 weight/CG PowerPoint slide review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Berkut/Orlan reference documentation; scope split meeting meeting to discuss scoring of concepts weekly meetings with Exxon and KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 review and revise latest revision of BoD; review pipe barn proposal for Concept 6 weight/CG PowerPoint slide review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Berkut/Orlan reference documentation; scope split meeting meeting to discuss scoring of concepts weekly meetings with Exxon and KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.5 0 review and revise latest revision of BoD; review pipe barn proposal for Concept 6 weight/CG PowerPoint slide review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2.75 0 Berkut/Orlan reference documentation; scope split meeting meeting to discuss scoring of concepts weekly meetings with Exxon and KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.5 0 review and revise latest revision of BoD; review pipe barn proposal for Concept 6 weight/CG PowerPoint slide review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 Berkut/Orlan reference documentation; scope split meeting meeting to discuss scoring of concepts weekly meetings with Exxon and KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Screening matrix review Seismic conf call with Genesis weekly conf call with Exxon weekly conf call with KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Risk register review / workshop topside philosophy document review and comments Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2.25 0 Screening matrix review Seismic conf call with Genesis weekly conf call with Exxon weekly conf call with KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Risk register review / workshop topside philosophy document review and comments Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Screening matrix review Seismic conf call with Genesis weekly conf call with Exxon weekly conf call with KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.5 0 Risk register review / workshop topside philosophy document review and comments Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Screening matrix review Seismic conf call with Genesis weekly conf call with Exxon weekly conf call with KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 final review of screening report and other deliverables Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 concept 3 - cost and execution meeting review of final deliverables and preparation for closeout mtg at Exxon weekly meeting(s) mtg to review report out slides Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 final review of screening report and other deliverables Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 concept 3 - cost and execution meeting review of final deliverables and preparation for closeout mtg at Exxon weekly meeting(s) mtg to review report out slides Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 final review of screening report and other deliverables Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 concept 3 - cost and execution meeting review of final deliverables and preparation for closeout mtg at Exxon weekly meeting(s) mtg to review report out slides Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1.5 0 final review of screening report and other deliverables Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 final review of screening report and other deliverables Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 concept 3 - cost and execution meeting review of final deliverables and preparation for closeout mtg at Exxon weekly meeting(s) mtg to review report out slides Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-21 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 02/21: verify BoD dimensions and tank capacities 02/22: KanBan alignment meeting; build model Concept D: CJ50 on GBS and created 3D PDF file. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4.5 0 02/21: verify BoD dimensions and tank capacities 02/22: KanBan alignment meeting; build model Concept D: CJ50 on GBS and created 3D PDF file. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-26 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2.5 0 02/26-03/01: model updates of option 1 and support for BOD updates. 03/01-03/02: model update for option 2 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2.5 0 02/26-03/01: model updates of option 1 and support for BOD updates. 03/01-03/02: model update for option 2 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 02/27: meeting for Brainstorm Plan for Bocks Layouts and 3D models 02/28: meeting for 3D model Layouts 03/01: Kan-Ban board meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 3.25 0 02/26-03/01: model updates of option 1 and support for BOD updates. 03/01-03/02: model update for option 2 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 02/27: meeting for Brainstorm Plan for Bocks Layouts and 3D models 02/28: meeting for 3D model Layouts 03/01: Kan-Ban board meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5.5 0 02/26-03/01: model updates of option 1 and support for BOD updates. 03/01-03/02: model update for option 2 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 02/27: meeting for Brainstorm Plan for Bocks Layouts and 3D models 02/28: meeting for 3D model Layouts 03/01: Kan-Ban board meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-02 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 02/26-03/01: model updates of option 1 and support for BOD updates. 03/01-03/02: model update for option 2 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5.75 0 03/05: update models; export PPT slides; create 3D PDF files. 03/06: updated model concepts options 2 & 4 (3D PDF & PPT slides) 03/07: create concept model option 3 (3D PDF & PPT slides) 03/08: create option 6A&B for review and discussion 03/09: update option 6B to include living quarters and helideck Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 03/05: meeting to review 3D concept models Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4.5 0 03/05: update models; export PPT slides; create 3D PDF files. 03/06: updated model concepts options 2 & 4 (3D PDF & PPT slides) 03/07: create concept model option 3 (3D PDF & PPT slides) 03/08: create option 6A&B for review and discussion 03/09: update option 6B to include living quarters and helideck Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-07 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 6 0 03/05: update models; export PPT slides; create 3D PDF files. 03/06: updated model concepts options 2 & 4 (3D PDF & PPT slides) 03/07: create concept model option 3 (3D PDF & PPT slides) 03/08: create option 6A&B for review and discussion 03/09: update option 6B to include living quarters and helideck Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 03/05: update models; export PPT slides; create 3D PDF files. 03/06: updated model concepts options 2 & 4 (3D PDF & PPT slides) 03/07: create concept model option 3 (3D PDF & PPT slides) 03/08: create option 6A&B for review and discussion 03/09: update option 6B to include living quarters and helideck Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 03/05: meeting to review 3D concept models Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-09 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 03/05: update models; export PPT slides; create 3D PDF files. 03/06: updated model concepts options 2 & 4 (3D PDF & PPT slides) 03/07: create concept model option 3 (3D PDF & PPT slides) 03/08: create option 6A&B for review and discussion 03/09: update option 6B to include living quarters and helideck Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.75 0 complete 3D model of options 6B (symmetrical two-shaft GBS). 03/16: added max skidding slides for options 3 & 4. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 Minkit Kanban update meeting; support for Minkit Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1.25 0 complete 3D model of options 6B (symmetrical two-shaft GBS). 03/16: added max skidding slides for options 3 & 4. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Minkit Kanban update meeting; support for Minkit Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 complete 3D model of options 6B (symmetrical two-shaft GBS). 03/16: added max skidding slides for options 3 & 4. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Minkit Kanban update meeting; support for Minkit Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-15 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5.5 0 complete 3D model of options 6B (symmetrical two-shaft GBS). 03/16: added max skidding slides for options 3 & 4. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-16 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2.5 0 complete 3D model of options 6B (symmetrical two-shaft GBS). 03/16: added max skidding slides for options 3 & 4. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.25 0 verifications between current model and updated Kvaerner GBS specs 03/22: updated concept 6 with 21m capping beam spacing/Kyle's PBM dimensions. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.25 0 Minkit Kanban update meeting; support for Minkit Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.25 0 Minkit Kanban update meeting; support for Minkit Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.5 0 verifications between current model and updated Kvaerner GBS specs 03/22: updated concept 6 with 21m capping beam spacing/Kyle's PBM dimensions. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-23 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 verifications between current model and updated Kvaerner GBS specs 03/22: updated concept 6 with 21m capping beam spacing/Kyle's PBM dimensions. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.25 0 Minkit Kanban update meeting; support for Minkit Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.5 0 concept 3 verification of Kvaerner's GBS with topside arrangement. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.25 0 Minkit Kanban update meeting; support for Minkit Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.25 0 Minkit Kanban update meeting; support for Minkit Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.75 0 update presentation material for concepts 2-6 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 3 0 update presentation material for concepts 2-6 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-20 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/20-2/23, support and review BOD Deliverable. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 2/20-2/23, support and review BOD Deliverable. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-21 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/20-2/23, support and review BOD Deliverable. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 2/20-2/23, support and review BOD Deliverable. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/20-2/23, support and review BOD Deliverable. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 8 0 On 2/20-2/23, support and review BOD Deliverable. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/20-2/23, support and review BOD Deliverable. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 On 2/20-2/23, support and review BOD Deliverable. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 6 0 On 2/26-3/2, present at Project Sponsor mtg. Attend KV weekly mtg. Review and comment BODs and 3D GAs. Review and edit KV Simple Engineering t's and c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/26-3/2, review and edit 3d GA's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 2/26-3/2, present at Project Sponsor mtg. Attend KV weekly mtg. Review and comment BODs and 3D GAs. Review and edit KV Simple Engineering t's and c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/26-3/2, review and edit 3d GA's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 8 0 On 2/26-3/2, present at Project Sponsor mtg. Attend KV weekly mtg. Review and comment BODs and 3D GAs. Review and edit KV Simple Engineering t's and c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/26-3/2, review and edit 3d GA's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 2/26-3/2, present at Project Sponsor mtg. Attend KV weekly mtg. Review and comment BODs and 3D GAs. Review and edit KV Simple Engineering t's and c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-02 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/26-3/2, review and edit 3d GA's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 On 2/26-3/2, present at Project Sponsor mtg. Attend KV weekly mtg. Review and comment BODs and 3D GAs. Review and edit KV Simple Engineering t's and c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/5-3/9, review 3d block GAs, Electrical philosophy slides and include KV comments into Execution slides, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 On 3/5-3/9, support KV t's and c's alignment, comment on BOD, review Electrical philosophy slides, include KV comments into Execution slides, assemble Kfels bulk $/ton rates for CAPEX Deliverable. Attend concept study conference calls. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/5-3/9, review 3d block GAs, Electrical philosophy slides and include KV comments into Execution slides, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 On 3/5-3/9, support KV t's and c's alignment, comment on BOD, review Electrical philosophy slides, include KV comments into Execution slides, assemble Kfels bulk $/ton rates for CAPEX Deliverable. Attend concept study conference calls. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-07 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/5-3/9, review 3d block GAs, Electrical philosophy slides and include KV comments into Execution slides, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-07 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 On 3/5-3/9, support KV t's and c's alignment, comment on BOD, review Electrical philosophy slides, include KV comments into Execution slides, assemble Kfels bulk $/ton rates for CAPEX Deliverable. Attend concept study conference calls. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/5-3/9, review 3d block GAs, Electrical philosophy slides and include KV comments into Execution slides, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 3/5-3/9, support KV t's and c's alignment, comment on BOD, review Electrical philosophy slides, include KV comments into Execution slides, assemble Kfels bulk $/ton rates for CAPEX Deliverable. Attend concept study conference calls. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-09 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/5-3/9, review 3d block GAs, Electrical philosophy slides and include KV comments into Execution slides, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-09 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 On 3/5-3/9, support KV t's and c's alignment, comment on BOD, review Electrical philosophy slides, include KV comments into Execution slides, assemble Kfels bulk $/ton rates for CAPEX Deliverable. Attend concept study conference calls. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/12 and 3/13, support Concept Study CAPEX estimate Deliverable. On 3/14, support Concept development. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 6 0 On 3/12 and 3/13, support Concept Study CAPEX estimate Deliverable. On 3/14, attend Kvaerner weekly mtg and provide recommended actions. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/12 and 3/13, support Concept Study CAPEX estimate Deliverable. On 3/14, support Concept development. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 3/12 and 3/13, support Concept Study CAPEX estimate Deliverable. On 3/14, attend Kvaerner weekly mtg and provide recommended actions. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/12 and 3/13, support Concept Study CAPEX estimate Deliverable. On 3/14, support Concept development. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 On 3/12 and 3/13, support Concept Study CAPEX estimate Deliverable. On 3/14, attend Kvaerner weekly mtg and provide recommended actions. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 On 3/19-3/23, Minkit CAPEX estimates, OPEX estimate, XOM conf calls, KV conf calls, KV PO t's & c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 On 3/19-3/23, Minkit CAPEX estimates, OPEX estimate, XOM conf calls, KV conf calls, KV PO t's & c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 3/19-3/23, Minkit CAPEX estimates, OPEX estimate, XOM conf calls, KV conf calls, KV PO t's & c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 6 0 On 3/19-3/23, Minkit CAPEX estimates, OPEX estimate, XOM conf calls, KV conf calls, KV PO t's & c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-23 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 3/19-3/23, Minkit CAPEX estimates, OPEX estimate, XOM conf calls, KV conf calls, KV PO t's & c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/26-3/30, assemble Drillex cost, review CAPEX summary, review Risks. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/26-3/30, assemble Drillex cost, review CAPEX summary, review Risks. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/26-3/30, assemble Drillex cost, review CAPEX summary, review Risks. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/26-3/30, assemble Drillex cost, review CAPEX summary, review Risks. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-30 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/26-3/30, assemble Drillex cost, review CAPEX summary, review Risks. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-30 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 On 4/2-4/6, prepare Drillex estimate and Screening Report slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 On 4/4, weekly KV conf call and prepare report out slides. On 4/6, prepare and present Minkit report out slides Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 On 4/2-4/6, prepare Drillex estimate and Screening Report slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 On 4/4, weekly KV conf call and prepare report out slides. On 4/6, prepare and present Minkit report out slides Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 On 4/2-4/6, prepare Drillex estimate and Screening Report slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 On 4/4, weekly KV conf call and prepare report out slides. On 4/6, prepare and present Minkit report out slides Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 On 4/2-4/6, prepare Drillex estimate and Screening Report slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 On 4/4, weekly KV conf call and prepare report out slides. On 4/6, prepare and present Minkit report out slides Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 On 4/2-4/6, prepare Drillex estimate and Screening Report slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 On 4/4, weekly KV conf call and prepare report out slides. On 4/6, prepare and present Minkit report out slides Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Contract T&C's; customer visits Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Contract T&C's; customer visits Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Contract T&C's; customer visits Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Contract T&C's; customer visits