Name Billing Class Employee No. Item Line Class Job No. Customer Service Item Notes Payroll Item Billable Employee Paid Day Rate Duration Days Remarks Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 28 0 1.Electrical Power System Studies 2. BoD modification 3. Action Tracker 4. Timesheet and Weekly report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 1. Meeting Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 Review of TSR-01629-PT-MU-00003-RevA-Electrical System Sizing and Comparison, Concept 3 Concrete MODU 3D Block Model and GA 03.09.2018– PDF (3D Manipulate), -Concept 3 Concrete MODU 3D Block Model and GA 03.09.2018- PPT Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 40 0 03.05 Concept study block layout option 1 and 2 review, coordination meeting to guide the team, Revise BOD per initial comments, clarifications to Kvaerner, RFI--002 seismic assessment 03.06-Review weekly report, technical BOD review with XOM, update action and decision register, update BOD, Review responsibility matrix 03.07- Equipment weight research, 3d model reviews, clarifications on seismic and weights 03.08-Power sizing review, winterization discussion and review, 3d model review, RFI-002 seismic, concept 6 incorporation to BoD, review execution and level 1 schedule 03.09-3D model review, seismic technical discussion, issue execution and level 1 schedule, update histogram cost tracker Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3.5 0 Internal meetings, research into go-bys, weekly status meeting with XOM, travel to and from XOM, clarification for XOM SME on seismic, invoicing alignment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 Minkit 3D model review Minkit Seismic meeting with KV Weekly Meeting with Exxon/KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 8 0 Model Reviews, general meetings, BOD review. general documentation review. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 24.25 0 03/05: update models; export PPT slides; create 3D PDF files. 03/06: updated model concepts options 2 & 4 (3D PDF & PPT slides) 03/07: create concept model option 3 (3D PDF & PPT slides) 03/08: create option 6A&B for review and discussion 03/09: update option 6B to include living quarters and helideck Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2.5 0 03/05: meeting to review 3D concept models Osten, Greg Project Manager 23110 Osten, Greg:Project Manager TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 On 3/5-3/9, review 3d block GAs, Electrical philosophy slides and include KV comments into Execution slides, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 21 0 On 3/5-3/9, support KV t's and c's alignment, comment on BOD, review Electrical philosophy slides, include KV comments into Execution slides, assemble Kfels bulk $/ton rates for CAPEX Deliverable. Attend concept study conference calls.