Name Billing Class Employee No. Item Line Class Transaction Date Job No. Customer Service Item Notes Payroll Item Billable Employee Paid Day Rate Duration Days Remarks Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2019-03-11 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 0.5 0 (03/11/19) Revised bell nipple drawing to show API flange - updated scale. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2019-03-11 Holly Platform :Holly Platform TSR-01665-HOLP-18 Rig Repairs Regular Pay N 0.5 0 (03/11/19) Checked mud trough drawing. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2019-03-10 Holly Platform :Holly Platform TSR-01665-HOLP-18 Rig Repairs Regular Pay N 5 0 Working with California Team to progress rig repairs, tracking equipment and materials, Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2019-03-11 Holly Platform :Holly Platform TSR-01665-HOLP-18 Rig Repairs Regular Pay N 5 0 Working with California Team to progress rig repairs, tracking equipment and materials, Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2019-03-12 Holly Platform :Holly Platform TSR-01665-HOLP-97 Travel (OH) Regular Pay N 8 0 Travel to Santa Barbara Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2019-03-13 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 12 0 Working with California Team to progress rig repairs, tracking equipment and materials. Reviewing drawings, equipment quotes, specifications, MTO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2019-03-14 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 12 0 Working with California Team to progress rig repairs, tracking equipment and materials. Reviewing drawings, equipment quotes, specifications, MTO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2019-03-15 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 12 0 Working with California Team to progress rig repairs, tracking equipment and materials. Reviewing drawings, equipment quotes, specifications, MTO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2019-03-16 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 12 0 Working with California Team to progress rig repairs, tracking equipment and materials. Reviewing drawings, equipment quotes, specifications, MTO's, & MR's for procurement. Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2019-03-11 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 3 0 Change management, Weekly Report, Procurement, Weekly Cost tracking, Weekly Thomas and Beers meetings, Weekly Supplier status meetings, Weekly STM meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2019-03-11 Holly Platform :Holly Platform TSR-01665-HOLP-15 Survey and Technical Support Regular Pay N 4 0 T&B clarifications on design, Create PPT for accumulator location and report out to the State of CA, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2019-03-11 Holly Platform :Holly Platform TSR-01665-HOLP-18 Rig Repairs Regular Pay N 4 0 Monitor and coordinate engineering, procurement, Monitor and expedite delivery, Mud gas separator RFI Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2019-03-12 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 11 0 Change management, Weekly Report, Procurement, Weekly Cost tracking, Weekly Thomas and Beers meetings, Weekly Supplier status meetings, Weekly STM meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2019-03-12 Holly Platform :Holly Platform TSR-01665-HOLP-18 Rig Repairs Regular Pay N 1 0 Monitor and coordinate engineering, procurement, Monitor and expedite delivery, Mud gas separator RFI Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2019-03-13 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 6 0 Change management, Weekly Report, Procurement, Weekly Cost tracking, Weekly Thomas and Beers meetings, Weekly Supplier status meetings, Weekly STM meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2019-03-13 Holly Platform :Holly Platform TSR-01665-HOLP-15 Survey and Technical Support Regular Pay N 2 0 T&B clarifications on design, Create PPT for accumulator location and report out to the State of CA, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2019-03-13 Holly Platform :Holly Platform TSR-01665-HOLP-18 Rig Repairs Regular Pay N 2 0 Monitor and coordinate engineering, procurement, Monitor and expedite delivery, Mud gas separator RFI Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2019-03-14 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 7.5 0 Change management, Weekly Report, Procurement, Weekly Cost tracking, Weekly Thomas and Beers meetings, Weekly Supplier status meetings, Weekly STM meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2019-03-14 Holly Platform :Holly Platform TSR-01665-HOLP-15 Survey and Technical Support Regular Pay N 2 0 T&B clarifications on design, Create PPT for accumulator location and report out to the State of CA, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2019-03-15 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 4 0 Change management, Weekly Report, Procurement, Weekly Cost tracking, Weekly Thomas and Beers meetings, Weekly Supplier status meetings, Weekly STM meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2019-03-15 Holly Platform :Holly Platform TSR-01665-HOLP-18 Rig Repairs Regular Pay N 2 0 Monitor and coordinate engineering, procurement, Monitor and expedite delivery, Mud gas separator RFI Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2019-03-11 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 1 0 accumulator support frame - mtg with field personnel; reviewing concepts Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2019-03-11 Holly Platform :Holly Platform TSR-01665-HOLP-98 Rentals (OH) Regular Pay N 1.25 0 CIP house lifting eyes Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2019-03-15 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 Meeting with Lam to get status; discuss open items Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2019-03-16 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 0.75 0 accumulator support frame - mtg with field personnel; reviewing concepts Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2019-03-16 Holly Platform :Holly Platform TSR-01665-HOLP-98 Rentals (OH) Regular Pay N 0.75 0 CIP house lifting eyes Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2019-03-10 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 4 0 03/10: safety meeting; stand pipe manifold support 03/11: revisit stand pipe hose; 03/15:CIP house pad eye addition drawing; 03/16: office closed for installing standpipe/cement (Loadmaster) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2019-03-10 Holly Platform :Holly Platform TSR-01665-HOLP-18 Rig Repairs Regular Pay N 8 0 03/10: drawworks guard covers for Leroy; 03/11: el mago brake drawing; pick up flow line trough redlines; 03/12: model brake water cooling skid concept; update and finalize flow line trough; double check hp hose lengths 03/13: generate views for degasser placement; coordinate with CDL for weld of mud dock placement and f-1000 mud pump 03/15: updated flow line trough drawing; cuttings bin drawing (for bid) 03/16: updated reserve piping isometrics Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2019-03-11 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 2.5 0 03/10: safety meeting; stand pipe manifold support 03/11: revisit stand pipe hose; 03/15:CIP house pad eye addition drawing; 03/16: office closed for installing standpipe/cement (Loadmaster) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2019-03-11 Holly Platform :Holly Platform TSR-01665-HOLP-15 Survey and Technical Support Regular Pay N 6 0 03/11: model koomey cantilever concept; model t&b knuckle boom crane platform; 03/13: investigate KBC platform concept and egress issue 03/14: begin accumulator cantilever concept model; modeled placement of brake cooling skid 03/15: continue updating accumulator cantilever concept; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2019-03-11 Holly Platform :Holly Platform TSR-01665-HOLP-18 Rig Repairs Regular Pay N 3.5 0 03/10: drawworks guard covers for Leroy; 03/11: el mago brake drawing; pick up flow line trough redlines; 03/12: model brake water cooling skid concept; update and finalize flow line trough; double check hp hose lengths 03/13: generate views for degasser placement; coordinate with CDL for weld of mud dock placement and f-1000 mud pump 03/15: updated flow line trough drawing; cuttings bin drawing (for bid) 03/16: updated reserve piping isometrics Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2019-03-12 Holly Platform :Holly Platform TSR-01665-HOLP-18 Rig Repairs Regular Pay N 12 0 03/10: drawworks guard covers for Leroy; 03/11: el mago brake drawing; pick up flow line trough redlines; 03/12: model brake water cooling skid concept; update and finalize flow line trough; double check hp hose lengths 03/13: generate views for degasser placement; coordinate with CDL for weld of mud dock placement and f-1000 mud pump 03/15: updated flow line trough drawing; cuttings bin drawing (for bid) 03/16: updated reserve piping isometrics Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2019-03-13 Holly Platform :Holly Platform TSR-01665-HOLP-15 Survey and Technical Support Regular Pay N 5 0 03/11: model koomey cantilever concept; model t&b knuckle boom crane platform; 03/13: investigate KBC platform concept and egress issue 03/14: begin accumulator cantilever concept model; modeled placement of brake cooling skid 03/15: continue updating accumulator cantilever concept; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2019-03-13 Holly Platform :Holly Platform TSR-01665-HOLP-18 Rig Repairs Regular Pay N 7 0 03/10: drawworks guard covers for Leroy; 03/11: el mago brake drawing; pick up flow line trough redlines; 03/12: model brake water cooling skid concept; update and finalize flow line trough; double check hp hose lengths 03/13: generate views for degasser placement; coordinate with CDL for weld of mud dock placement and f-1000 mud pump 03/15: updated flow line trough drawing; cuttings bin drawing (for bid) 03/16: updated reserve piping isometrics Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2019-03-14 Holly Platform :Holly Platform TSR-01665-HOLP-15 Survey and Technical Support Regular Pay N 12 0 03/11: model koomey cantilever concept; model t&b knuckle boom crane platform; 03/13: investigate KBC platform concept and egress issue 03/14: begin accumulator cantilever concept model; modeled placement of brake cooling skid 03/15: continue updating accumulator cantilever concept; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2019-03-15 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 5 0 03/10: safety meeting; stand pipe manifold support 03/11: revisit stand pipe hose; 03/15:CIP house pad eye addition drawing; 03/16: office closed for installing standpipe/cement (Loadmaster) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2019-03-15 Holly Platform :Holly Platform TSR-01665-HOLP-15 Survey and Technical Support Regular Pay N 4 0 03/11: model koomey cantilever concept; model t&b knuckle boom crane platform; 03/13: investigate KBC platform concept and egress issue 03/14: begin accumulator cantilever concept model; modeled placement of brake cooling skid 03/15: continue updating accumulator cantilever concept; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2019-03-15 Holly Platform :Holly Platform TSR-01665-HOLP-18 Rig Repairs Regular Pay N 3 0 03/10: drawworks guard covers for Leroy; 03/11: el mago brake drawing; pick up flow line trough redlines; 03/12: model brake water cooling skid concept; update and finalize flow line trough; double check hp hose lengths 03/13: generate views for degasser placement; coordinate with CDL for weld of mud dock placement and f-1000 mud pump 03/15: updated flow line trough drawing; cuttings bin drawing (for bid) 03/16: updated reserve piping isometrics Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2019-03-16 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 6 0 03/10: safety meeting; stand pipe manifold support 03/11: revisit stand pipe hose; 03/15:CIP house pad eye addition drawing; 03/16: office closed for installing standpipe/cement (Loadmaster) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2019-03-16 Holly Platform :Holly Platform TSR-01665-HOLP-18 Rig Repairs Regular Pay N 6 0 03/10: drawworks guard covers for Leroy; 03/11: el mago brake drawing; pick up flow line trough redlines; 03/12: model brake water cooling skid concept; update and finalize flow line trough; double check hp hose lengths 03/13: generate views for degasser placement; coordinate with CDL for weld of mud dock placement and f-1000 mud pump 03/15: updated flow line trough drawing; cuttings bin drawing (for bid) 03/16: updated reserve piping isometrics Reck, John Engineer I 29656 Reck, John:Engineer I 2019-03-11 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 4.5 0 bell nipple quote, HP hose length, cement hose procurement, flow line trough review, flowline and U tube MTO, shaker knife gate valve spec, popoff spec, drawworks water manifold guidance, blower motor intake pipiung, MP hoist design, traveling block hangoff line dicussion Reck, John Engineer I 29656 Reck, John:Engineer I 2019-03-11 Holly Platform :Holly Platform TSR-01665-HOLP-18 Rig Repairs Regular Pay N 3 0 lp mud system drawing review, MGS installation guidance, MGS U tube dimensions Reck, John Engineer I 29656 Reck, John:Engineer I 2019-03-12 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 6.5 0 bell nipple quote, HP hose length, cement hose procurement, flow line trough review, flowline and U tube MTO, shaker knife gate valve spec, popoff spec, drawworks water manifold guidance, blower motor intake pipiung, MP hoist design, traveling block hangoff line dicussion Reck, John Engineer I 29656 Reck, John:Engineer I 2019-03-12 Holly Platform :Holly Platform TSR-01665-HOLP-18 Rig Repairs Regular Pay N 1 0 lp mud system drawing review, MGS installation guidance, MGS U tube dimensions Reck, John Engineer I 29656 Reck, John:Engineer I 2019-03-13 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 8.5 0 bell nipple quote, HP hose length, cement hose procurement, flow line trough review, flowline and U tube MTO, shaker knife gate valve spec, popoff spec, drawworks water manifold guidance, blower motor intake pipiung, MP hoist design, traveling block hangoff line dicussion Reck, John Engineer I 29656 Reck, John:Engineer I 2019-03-14 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 6.5 0 bell nipple quote, HP hose length, cement hose procurement, flow line trough review, flowline and U tube MTO, shaker knife gate valve spec, popoff spec, drawworks water manifold guidance, blower motor intake pipiung, MP hoist design, traveling block hangoff line dicussion Reck, John Engineer I 29656 Reck, John:Engineer I 2019-03-14 Holly Platform :Holly Platform TSR-01665-HOLP-18 Rig Repairs Regular Pay N 2 0 lp mud system drawing review, MGS installation guidance, MGS U tube dimensions Reck, John Engineer I 29656 Reck, John:Engineer I 2019-03-15 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 4 0 bell nipple quote, HP hose length, cement hose procurement, flow line trough review, flowline and U tube MTO, shaker knife gate valve spec, popoff spec, drawworks water manifold guidance, blower motor intake pipiung, MP hoist design, traveling block hangoff line dicussion Reck, John Engineer I 29656 Reck, John:Engineer I 2019-03-15 Holly Platform :Holly Platform TSR-01665-HOLP-18 Rig Repairs Regular Pay N 2 0 lp mud system drawing review, MGS installation guidance, MGS U tube dimensions WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2019-03-11 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 6 0 Weekly cost meeting, preparation of cost report data, PO list update, labor variance update, paper and Oracle MRs, US9 issue resolution, cost tracker update, data for weekly report, POB, timesheets WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2019-03-12 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 6 0 Weekly cost meeting, preparation of cost report data, PO list update, labor variance update, paper and Oracle MRs, US9 issue resolution, cost tracker update, data for weekly report, POB, timesheets WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2019-03-13 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 6 0 Weekly cost meeting, preparation of cost report data, PO list update, labor variance update, paper and Oracle MRs, US9 issue resolution, cost tracker update, data for weekly report, POB, timesheets WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2019-03-14 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 4 0 Weekly cost meeting, preparation of cost report data, PO list update, labor variance update, paper and Oracle MRs, US9 issue resolution, cost tracker update, data for weekly report, POB, timesheets WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2019-03-15 Holly Platform :Holly Platform TSR-01665-HOLP-00T2 Task 2: Lump Sum Refurbishment Regular Pay N 4 0 Weekly cost meeting, preparation of cost report data, PO list update, labor variance update, paper and Oracle MRs, US9 issue resolution, cost tracker update, data for weekly report, POB, timesheets