Name Billing Class Employee No. Item Line Class Job No. Customer Service Item Notes Payroll Item Billable Employee Paid Day Rate Duration Days Remarks Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 11 0 1. Weekly report and timesheet 2. RIsk matrix 3. Topsides Philosophies Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 16 0 1. Weekly meetings 2. RIsk matrix meeting 3. Topsides Philosophies review 4 Project meetings 5. Action register Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 30 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.26-Review screening summary, draft of CAPEX estimates, clarifications on CAPEX, review schedule, draft of screening comparison 03.27-Dimensional clarifications, update concept 6 3D model, clarification for concept 4 float-over, seismic benchmark, topsides philosophy review 03.28-Technical meeting with KBR and Kvaerner, research alternative Jack-Ups, RFQ for Pioneering Spirit, CAPEX summary, CAPEX Concept 4 03.29-CAPEX estimate, clarification for float-over, risk and HSE register and PPT Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 9.5 0 Internal discussions and meetings, float-over feasibility, pioneering spirit RFQ, electric versus diesel crane, time tracker update, timesheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2.5 0 Risk register review / workshop topside philosophy document review and comments Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7.25 0 Screening matrix review Seismic conf call with Genesis weekly conf call with Exxon weekly conf call with KV Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.5 0 concept 3 verification of Kvaerner's GBS with topside arrangement. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 Minkit Kanban update meeting; support for Minkit Osten, Greg Project Manager 23110 Osten, Greg:Project Manager TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 On 3/26-3/30, assemble Drillex cost, review CAPEX summary, review Risks. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 30 0