Name	Billing Class	Employee No.	Item Line Class	Transaction Date	Job No.	Customer	Service Item	Notes	Payroll Item	Billable	Employee Paid Day Rate	Duration	Days	Remarks
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-01	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		0.75	0	Discussion with Tyler Byers, talk with mark, schedule update meeting,  project review and update, contact each rig builder, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-01	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		0.75	0	Ops call,  tsr meeting
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-01	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.25	0	timesheet
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-01	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		0.25	0	SAK meeting
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-01	ORLAN-TSR	:ORLAN-TSR	TSR-01767-ORLP	Bell Nipple Lifting Tool	Regular Pay	N		1	0	Discuss with Jorge drawing details and review model changes, review current drawing, update BOM for Jorge, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-01	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		3.5	0	model, analysis, discussion with Kyle
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-01	Rig 273L-TSR	:Rig 273L-TSR	TSR-01757-AADU	Surface 21-1/4in. Annualar Lift Ring Modifications	Regular Pay	N		2	0	modify design, rerun analysis, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-02	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		1	0	Discussion with Tyler Byers, talk with mark, schedule update meeting,  project review and update, contact each rig builder, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-02	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.25	0	timesheet
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-02	ORLAN-TSR	:ORLAN-TSR	TSR-01767-ORLP	Bell Nipple Lifting Tool	Regular Pay	N		0.25	0	Discuss with Jorge drawing details and review model changes, review current drawing, update BOM for Jorge, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-02	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		5.75	0	model, analysis, discussion with Kyle
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-02	Rig 273L-TSR	:Rig 273L-TSR	TSR-01757-AADU	Surface 21-1/4in. Annualar Lift Ring Modifications	Regular Pay	N		1.5	0	modify design, rerun analysis, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-03	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		1	0	Discussion with Tyler Byers, talk with mark, schedule update meeting,  project review and update, contact each rig builder, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-03	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.25	0	timesheet
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-03	ORLAN-TSR	:ORLAN-TSR	TSR-01767-ORLP	Bell Nipple Lifting Tool	Regular Pay	N		0.5	0	Discuss with Jorge drawing details and review model changes, review current drawing, update BOM for Jorge, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-03	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		6.5	0	model, analysis, discussion with Kyle
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-03	Rig 273L-TSR	:Rig 273L-TSR	TSR-01757-AADU	Surface 21-1/4in. Annualar Lift Ring Modifications	Regular Pay	N		0.25	0	modify design, rerun analysis, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-04	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		1	0	Discussion with Tyler Byers, talk with mark, schedule update meeting,  project review and update, contact each rig builder, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-04	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Ops call,  tsr meeting
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-04	ORLAN-TSR	:ORLAN-TSR	TSR-01767-ORLP	Bell Nipple Lifting Tool	Regular Pay	N		1	0	Discuss with Jorge drawing details and review model changes, review current drawing, update BOM for Jorge, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-04	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		6	0	model, analysis, discussion with Kyle
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-05	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.25	0	timesheet
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-05	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		6.25	0	model, analysis, discussion with Kyle
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-08	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		4	0	review and discuss clarifications, call CAT reps, review info from CRG, conf call, additional discussions, tripping calc, update cost estimate, conf call
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-08	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		0.75	0	Ops call
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-08	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	timesheet
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-08	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		0.5	0	SAK meeting
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-08	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		3	0	Review, adjust, and finalize analysis report, pick up Kyle's comments and discuss results, talk with Reck, work with IT to get MathCAD, run calc for flange, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-09	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		6.5	0	review and discuss clarifications, call CAT reps, review info from CRG, conf call, additional discussions, tripping calc, update cost estimate, conf call
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-09	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.25	0	timesheet
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-09	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		2	0	Review, adjust, and finalize analysis report, pick up Kyle's comments and discuss results, talk with Reck, work with IT to get MathCAD, run calc for flange, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-10	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		7	0	review and discuss clarifications, call CAT reps, review info from CRG, conf call, additional discussions, tripping calc, update cost estimate, conf call
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-10	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.25	0	timesheet
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-10	ORLAN-TSR	:ORLAN-TSR	TSR-01767-ORLP	Bell Nipple Lifting Tool	Regular Pay	N		1	0	review drawing with Jorge and collect weights, send out for quote, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-11	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		6	0	review and discuss clarifications, call CAT reps, review info from CRG, conf call, additional discussions, tripping calc, update cost estimate, conf call
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-11	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		0.75	0	Ops call
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-11	ORLAN-TSR	:ORLAN-TSR	TSR-01767-ORLP	Bell Nipple Lifting Tool	Regular Pay	N		1	0	review drawing with Jorge and collect weights, send out for quote, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-11	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		1	0	Review, adjust, and finalize analysis report, pick up Kyle's comments and discuss results, talk with Reck, work with IT to get MathCAD, run calc for flange, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-12	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		3	0	review and discuss clarifications, call CAT reps, review info from CRG, conf call, additional discussions, tripping calc, update cost estimate, conf call
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-12	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	timesheet
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-12	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		2.5	0	Review, adjust, and finalize analysis report, pick up Kyle's comments and discuss results, talk with Reck, work with IT to get MathCAD, run calc for flange, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-15	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		2	0	discuss clarifications with Kyle and Mat, review cost estimate items with Julie, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-15	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		0.75	0	Ops call, TSR meeting, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-15	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1.5	0	MPD meeting, goals, download docs to Sharepoint for 270L, telecommute survey, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-15	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	timesheet
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-15	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		0.25	0	SAK meeting
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-15	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		3.75	0	finished temporary analysis, started closeout, researched load test standard, discuss with Mio, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-16	HTSG-TSR	:HTSG-TSR	TSR-01738-HTSG	Review Doc Groups	Regular Pay	N		6	0	reviewed old notes, discussed notes with Ivan and Julie,
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-16	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	timesheet
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-16	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		1.5	0	finished temporary analysis, started closeout, researched load test standard, discuss with Mio, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-17	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		2.5	0	discuss clarifications with Kyle and Mat, review cost estimate items with Julie, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-17	Holly Platform	:Holly Platform	TSR-01665-HOLP-21	Reimbursable Rig Repairs 	Regular Pay	N		1	0	Drawing review and sign
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-17	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		3	0	MPD meeting, goals, download docs to Sharepoint for 270L, telecommute survey, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-17	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	timesheet
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-17	Rig 273L-TSR	:Rig 273L-TSR	TSR-01757-AADU	Surface 21-1/4in. Annualar Lift Ring Modifications	Regular Pay	N		1.5	0	Review design with Kyle and Byers
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-18	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		0.5	0	discuss clarifications with Kyle and Mat, review cost estimate items with Julie, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-18	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Ops call, TSR meeting, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-18	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1	0	MPD meeting, goals, download docs to Sharepoint for 270L, telecommute survey, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-18	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	timesheet
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-18	ORLAN-TSR	:ORLAN-TSR	TSR-01630-ORLP	Lifting Appliance For Drawworks	Regular Pay	N		2.5	0	Review info and create CTR
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-18	ORLAN-TSR	:ORLAN-TSR	TSR-01767-ORLP	Bell Nipple Lifting Tool	Regular Pay	N		1.5	0	Drawing review, quote review
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-18	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		1.5	0	finished temporary analysis, started closeout, researched load test standard, discuss with Mio, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-19	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		5	0	discuss clarifications with Kyle and Mat, review cost estimate items with Julie, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-19	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		0.75	0	MPD meeting, goals, download docs to Sharepoint for 270L, telecommute survey, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-19	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	timesheet
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-19	Rig 273L-TSR	:Rig 273L-TSR	TSR-01757-AADU	Surface 21-1/4in. Annualar Lift Ring Modifications	Regular Pay	N		0.5	0	Review design with Kyle and Byers
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-22	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		3.75	0	talked with Mark about Canyon Oak, tech evaluation, review NOV quote, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-22	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		0.75	0	Ops call, TSR meeting,
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-22	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		3.5	0	Help Kyle with HP piping calcs and help Julie with material issue, BOPX demo
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-22	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	timesheet, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-22	ORLAN-TSR	:ORLAN-TSR	TSR-01767-ORLP	Bell Nipple Lifting Tool	Regular Pay	N		0.25	0	discuss HP quote issue with Julie, drawing discussion, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-23	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		5.75	0	talked with Mark about Canyon Oak, tech evaluation, review NOV quote, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-23	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		0.5	0	Help Kyle with HP piping calcs and help Julie with material issue, BOPX demo
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-23	ORLAN-TSR	:ORLAN-TSR	TSR-01630-ORLP	Lifting Appliance For Drawworks	Regular Pay	N		0.5	0	review with Kyle and Mio
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-23	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		2	0	review seismic with Reck/Kyle
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-24	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		3.25	0	talked with Mark about Canyon Oak, tech evaluation, review NOV quote, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-24	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		4.5	0	Help Kyle with HP piping calcs and help Julie with material issue, BOPX demo
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-24	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	timesheet, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-25	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		2.75	0	talked with Mark about Canyon Oak, tech evaluation, review NOV quote, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-25	Berkut-TSR	:Berkut-TSR	TSR-01770-BERP	Padeye for Choke Kill Hose Rigging on BOP	Regular Pay	N		1	0	review TSR info and create CTR
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-25	EHBU-TSRs	:EHBU-TSRs	TSR-01521-EHBU	Total Uganda Support	Regular Pay	N		2.5	0	pull old cost estimate, call IOM and HH, review project details, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-25	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		0.5	0	Ops call, TSR meeting,
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-25	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	timesheet, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-25	ORLAN-TSR	:ORLAN-TSR	TSR-01767-ORLP	Bell Nipple Lifting Tool	Regular Pay	N		0.5	0	discuss HP quote issue with Julie, drawing discussion, 
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-25	Rig 273L-TSR	:Rig 273L-TSR	TSR-01757-AADU	Surface 21-1/4in. Annualar Lift Ring Modifications	Regular Pay	N		0.5	0	drawing review
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2020-06-26	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		6	0	talked with Mark about Canyon Oak, tech evaluation, review NOV quote, 
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-01	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2.5	0	(06/01/20) Update with Kyle. Update with Tyler. Update with Jorge. Update weekly timesheet and submitted for approval. (06/02/20) Update with Lam. Update with Kyle. Update with Tyler. (06/03/20) Update fuze meeting with Tyler  - review Orlan lift tool designs. Update with Jorge. (06/04/20) Update with Kyle.  (06/05/20) Update with Kyle.  Approved designers timesheets. 
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-01	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		1	0	(06/01/20) Started reviewing Genesis drawings for layout purposes. (06/02/20) Cont review structural/GA drawing info.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-01	Rig 270L-TSR	:Rig 270L-TSR	TSR-01743-270L-04	Operations on Rails Detailed Design - OH	Regular Pay	N		5	0	(06/01/20) Final 270 diverter sketch updates. Pulled dwg number for sketches and sent drawing for review. (06/02/20) Picked up comments and cleaned up drawing package. Drawings transmitted.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-02	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1.5	0	(06/01/20) Update with Kyle. Update with Tyler. Update with Jorge. Update weekly timesheet and submitted for approval. (06/02/20) Update with Lam. Update with Kyle. Update with Tyler. (06/03/20) Update fuze meeting with Tyler  - review Orlan lift tool designs. Update with Jorge. (06/04/20) Update with Kyle.  (06/05/20) Update with Kyle.  Approved designers timesheets. 
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-02	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		2	0	(06/01/20) Started reviewing Genesis drawings for layout purposes. (06/02/20) Cont review structural/GA drawing info.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-02	Rig 270L-TSR	:Rig 270L-TSR	TSR-01743-270L-04	Operations on Rails Detailed Design - OH	Regular Pay	N		5	0	(06/01/20) Final 270 diverter sketch updates. Pulled dwg number for sketches and sent drawing for review. (06/02/20) Picked up comments and cleaned up drawing package. Drawings transmitted.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-03	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		7	0	(06/03/20) Started drilling deck general arrangement drawing. (06/04/20) Continued with GA. 
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-03	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1.5	0	(06/01/20) Update with Kyle. Update with Tyler. Update with Jorge. Update weekly timesheet and submitted for approval. (06/02/20) Update with Lam. Update with Kyle. Update with Tyler. (06/03/20) Update fuze meeting with Tyler  - review Orlan lift tool designs. Update with Jorge. (06/04/20) Update with Kyle.  (06/05/20) Update with Kyle.  Approved designers timesheets. 
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-04	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		4.25	0	(06/03/20) Started drilling deck general arrangement drawing. (06/04/20) Continued with GA. 
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-04	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	(06/04/20) Weekly TSR call. 
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-04	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.25	0	(06/01/20) Update with Kyle. Update with Tyler. Update with Jorge. Update weekly timesheet and submitted for approval. (06/02/20) Update with Lam. Update with Kyle. Update with Tyler. (06/03/20) Update fuze meeting with Tyler  - review Orlan lift tool designs. Update with Jorge. (06/04/20) Update with Kyle.  (06/05/20) Update with Kyle.  Approved designers timesheets. 
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-04	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		2	0	(06/04/20) Checked updated casing jetting tool drawing. 
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-04	Rig 249L-TSR	:Rig 249L-TSR	TSR-01769-249L	BOP Transport Frame	Regular Pay	N		1	0	(06/04/20) Call to review BOP frame modifications with field.  (06/05/20) Pulled ref drawings and started creating 3 views of BOP stack for layout purposes. Discussed with Kyle. 
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-05	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	(06/01/20) Update with Kyle. Update with Tyler. Update with Jorge. Update weekly timesheet and submitted for approval. (06/02/20) Update with Lam. Update with Kyle. Update with Tyler. (06/03/20) Update fuze meeting with Tyler  - review Orlan lift tool designs. Update with Jorge. (06/04/20) Update with Kyle.  (06/05/20) Update with Kyle.  Approved designers timesheets. 
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-05	Rig 249L-TSR	:Rig 249L-TSR	TSR-01769-249L	BOP Transport Frame	Regular Pay	N		5	0	(06/04/20) Call to review BOP frame modifications with field.  (06/05/20) Pulled ref drawings and started creating 3 views of BOP stack for layout purposes. Discussed with Kyle. 
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-08	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		2	0	(06/08/20) Call to review Parker GA. Call to review Loadmaster GAs. (06/09/20) Worked on 2nd plan view GA. Call with John to review drawings. (06/10/20) Cont. updates -GA drawings. (06/11/20) Picked up additional comments from John.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-08	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2.75	0	(06/08/20) Updated weekly timesheet and submitted for approval. Update with Kyle. Update wit Lam. Update with Jorge. (06/09/20) Update with Kyle. (06/10/20) update with Kyle-discussed Genesis drawings. (06/11/20) Review/approved designers timesheets. Update with Kyle (review genesis dwgs). Update with Tyler. (06/12/20) update with Kyle. Pulled metric drawing scales and sent to design group for reference.  Discussed metric drawings with Lam.  Update with Jorge.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-08	Rig 249L-TSR	:Rig 249L-TSR	TSR-01769-249L	BOP Transport Frame	Regular Pay	N		3.75	0	(06/08/20) Worked on skid modifications. Call with Aksai to review. (06/09/20)Cont sketch. (06/10/20) Added correct C/K valves. Sent email to Dan to clarify valve orientation.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-09	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		5.5	0	(06/08/20) Call to review Parker GA. Call to review Loadmaster GAs. (06/09/20) Worked on 2nd plan view GA. Call with John to review drawings. (06/10/20) Cont. updates -GA drawings. (06/11/20) Picked up additional comments from John.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-09	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1.5	0	(06/09/20) Update with Kyle. call with matt to discuss office/working from home. (06/11/20) Weekly TSR call.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-09	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	(06/08/20) Updated weekly timesheet and submitted for approval. Update with Kyle. Update wit Lam. Update with Jorge. (06/09/20) Update with Kyle. (06/10/20) update with Kyle-discussed Genesis drawings. (06/11/20) Review/approved designers timesheets. Update with Kyle (review genesis dwgs). Update with Tyler. (06/12/20) update with Kyle. Pulled metric drawing scales and sent to design group for reference.  Discussed metric drawings with Lam.  Update with Jorge.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-09	Rig 249L-TSR	:Rig 249L-TSR	TSR-01769-249L	BOP Transport Frame	Regular Pay	N		1	0	(06/08/20) Worked on skid modifications. Call with Aksai to review. (06/09/20)Cont sketch. (06/10/20) Added correct C/K valves. Sent email to Dan to clarify valve orientation.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-10	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		5	0	(06/08/20) Call to review Parker GA. Call to review Loadmaster GAs. (06/09/20) Worked on 2nd plan view GA. Call with John to review drawings. (06/10/20) Cont. updates -GA drawings. (06/11/20) Picked up additional comments from John.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-10	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1.5	0	(06/08/20) Updated weekly timesheet and submitted for approval. Update with Kyle. Update wit Lam. Update with Jorge. (06/09/20) Update with Kyle. (06/10/20) update with Kyle-discussed Genesis drawings. (06/11/20) Review/approved designers timesheets. Update with Kyle (review genesis dwgs). Update with Tyler. (06/12/20) update with Kyle. Pulled metric drawing scales and sent to design group for reference.  Discussed metric drawings with Lam.  Update with Jorge.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-10	Rig 249L-TSR	:Rig 249L-TSR	TSR-01769-249L	BOP Transport Frame	Regular Pay	N		2	0	(06/08/20) Worked on skid modifications. Call with Aksai to review. (06/09/20)Cont sketch. (06/10/20) Added correct C/K valves. Sent email to Dan to clarify valve orientation.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-11	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		1.5	0	(06/08/20) Call to review Parker GA. Call to review Loadmaster GAs. (06/09/20) Worked on 2nd plan view GA. Call with John to review drawings. (06/10/20) Cont. updates -GA drawings. (06/11/20) Picked up additional comments from John.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-11	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	(06/09/20) Update with Kyle. call with matt to discuss office/working from home. (06/11/20) Weekly TSR call.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-11	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2	0	(06/08/20) Updated weekly timesheet and submitted for approval. Update with Kyle. Update wit Lam. Update with Jorge. (06/09/20) Update with Kyle. (06/10/20) update with Kyle-discussed Genesis drawings. (06/11/20) Review/approved designers timesheets. Update with Kyle (review genesis dwgs). Update with Tyler. (06/12/20) update with Kyle. Pulled metric drawing scales and sent to design group for reference.  Discussed metric drawings with Lam.  Update with Jorge.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-11	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		4	0	(06/11/20)Checked existing bell nipple drawings (Orlan). Rechecked Orlan casing jetting tool drawing. (06/12/20) Checked new bell nipple lift device -Orlan.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-12	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2.25	0	(06/08/20) Updated weekly timesheet and submitted for approval. Update with Kyle. Update wit Lam. Update with Jorge. (06/09/20) Update with Kyle. (06/10/20) update with Kyle-discussed Genesis drawings. (06/11/20) Review/approved designers timesheets. Update with Kyle (review genesis dwgs). Update with Tyler. (06/12/20) update with Kyle. Pulled metric drawing scales and sent to design group for reference.  Discussed metric drawings with Lam.  Update with Jorge.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-12	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		3.75	0	(06/11/20)Checked existing bell nipple drawings (Orlan). Rechecked Orlan casing jetting tool drawing. (06/12/20) Checked new bell nipple lift device -Orlan.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-15	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2.25	0	(06/15/20) Updated weekly timesheet and submitted. Update with Jorge. Update with Lam. Review/approve designers timesheets. (06/16/20) Computer issues/down time. Call with Kyle (249 bop skid). Call with lam/KPM (genesis elec drawings). (06/17/20) Office survey. Update with Kyle. Update with Tyler. Update with Jorge. (06/18/20) Update with Kyle. Update with Jorge. (06/19/20) Update with Tyler. Update with Lam.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-15	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1	0	(06/15/20) Finished checking Orlan bell nipple lifting tool drawing. (06/18/20) Rechecked ATC structure drawing (removable brace addition).
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-15	Rig 249L-TSR	:Rig 249L-TSR	TSR-01769-249L	BOP Transport Frame	Regular Pay	N		5.25	0	(06/15/20)Continued layout drawing of modifications. (06/16/20) Updated stack views and cont layout. (06/18/20) Call wit Dan Colby to review progress/layout.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-16	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		0.25	0	(06/16/20) Update GAs to reflect latest grasshopper location. (06/17/20) Call to review GA drawings.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-16	Holly Platform	:Holly Platform	TSR-01665-HOLP-21	Reimbursable Rig Repairs 	Regular Pay	N		1.5	0	(06/16/20) Checked egress platform drawing. (06/17/20) Circulated drawing for signature/approval. Issued drawing for construction.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-16	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1.5	0	(06/16/20) Searched for topdrive information for Mike A. (06/17/20) 3D sketchup model of 249 BOP skid (dev.goals). (06/18/20) Researched RUSA drawing question from John. Continued 249 3D model-BOP skid.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-16	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1.75	0	(06/15/20) Updated weekly timesheet and submitted. Update with Jorge. Update with Lam. Review/approve designers timesheets. (06/16/20) Computer issues/down time. Call with Kyle (249 bop skid). Call with lam/KPM (genesis elec drawings). (06/17/20) Office survey. Update with Kyle. Update with Tyler. Update with Jorge. (06/18/20) Update with Kyle. Update with Jorge. (06/19/20) Update with Tyler. Update with Lam.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-16	Rig 249L-TSR	:Rig 249L-TSR	TSR-01769-249L	BOP Transport Frame	Regular Pay	N		3.5	0	(06/15/20)Continued layout drawing of modifications. (06/16/20) Updated stack views and cont layout. (06/18/20) Call wit Dan Colby to review progress/layout.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-17	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		1	0	(06/16/20) Update GAs to reflect latest grasshopper location. (06/17/20) Call to review GA drawings.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-17	Holly Platform	:Holly Platform	TSR-01665-HOLP-21	Reimbursable Rig Repairs 	Regular Pay	N		0.5	0	(06/16/20) Checked egress platform drawing. (06/17/20) Circulated drawing for signature/approval. Issued drawing for construction.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-17	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		5.25	0	(06/16/20) Searched for topdrive information for Mike A. (06/17/20) 3D sketchup model of 249 BOP skid (dev.goals). (06/18/20) Researched RUSA drawing question from John. Continued 249 3D model-BOP skid.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-17	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1.75	0	(06/15/20) Updated weekly timesheet and submitted. Update with Jorge. Update with Lam. Review/approve designers timesheets. (06/16/20) Computer issues/down time. Call with Kyle (249 bop skid). Call with lam/KPM (genesis elec drawings). (06/17/20) Office survey. Update with Kyle. Update with Tyler. Update with Jorge. (06/18/20) Update with Kyle. Update with Jorge. (06/19/20) Update with Tyler. Update with Lam.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-18	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		0.75	0	(06/18/20) Weekly TSR call.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-18	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		2.75	0	(06/16/20) Searched for topdrive information for Mike A. (06/17/20) 3D sketchup model of 249 BOP skid (dev.goals). (06/18/20) Researched RUSA drawing question from John. Continued 249 3D model-BOP skid.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-18	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	(06/15/20) Updated weekly timesheet and submitted. Update with Jorge. Update with Lam. Review/approve designers timesheets. (06/16/20) Computer issues/down time. Call with Kyle (249 bop skid). Call with lam/KPM (genesis elec drawings). (06/17/20) Office survey. Update with Kyle. Update with Tyler. Update with Jorge. (06/18/20) Update with Kyle. Update with Jorge. (06/19/20) Update with Tyler. Update with Lam.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-18	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		4	0	(06/15/20) Finished checking Orlan bell nipple lifting tool drawing. (06/18/20) Rechecked ATC structure drawing (removable brace addition).
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-18	Rig 249L-TSR	:Rig 249L-TSR	TSR-01769-249L	BOP Transport Frame	Regular Pay	N		0.5	0	(06/15/20)Continued layout drawing of modifications. (06/16/20) Updated stack views and cont layout. (06/18/20) Call wit Dan Colby to review progress/layout.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-19	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	(06/15/20) Updated weekly timesheet and submitted. Update with Jorge. Update with Lam. Review/approve designers timesheets. (06/16/20) Computer issues/down time. Call with Kyle (249 bop skid). Call with lam/KPM (genesis elec drawings). (06/17/20) Office survey. Update with Kyle. Update with Tyler. Update with Jorge. (06/18/20) Update with Kyle. Update with Jorge. (06/19/20) Update with Tyler. Update with Lam.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-19	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		5	0	(06/19/20) Started CAD drawing of New Iberia storage yard per request from Odon.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-22	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2	0	(06/22/20) Updated weekly timesheet and submitted for approval. Update call with Lam. Computer connection issues. (06/23/20) Update call with Tyler. Update call with Jorge. Update call with Kyle. Computer issues (restarted/replaced mouse). (06/24/20) Cleaned up Genesis drawing files/created PDFs. (06/25/20) Update call with Tyler.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-22	OH-009	:OH-009	OH-009-014	Sakhalin	Regular Pay	N		1.5	0	(06/22/20) Workover rig BOP stack drawing. 
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-22	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		2	0	(06/22/20) Continued New Iberia yard layout drawing.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-22	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		3	0	(06/22/20) Checked casing jetting tool drawing (RUSA version). (06/25/20) Reviewed Orlan bell nipple lifting tool dwg and sent for review. Reviewed Orlan casing jetting tool and sent for review. 
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-23	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		2	0	(06/23/20) Continued 3D Sketchup model for 249L BOP transport skid modifications. (06/24/20) Searched for drawworks information per request from Bronco (Craig). Cont 249 3D model. (06/25/20) 3D model (06/26/20) Finished model of BOP support frame. Started assembly with Skid/Frame/BOP.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-23	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2.5	0	(06/22/20) Updated weekly timesheet and submitted for approval. Update call with Lam. Computer connection issues. (06/23/20) Update call with Tyler. Update call with Jorge. Update call with Kyle. Computer issues (restarted/replaced mouse). (06/24/20) Cleaned up Genesis drawing files/created PDFs. (06/25/20) Update call with Tyler.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-23	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		4	0	(06/22/20) Continued New Iberia yard layout drawing.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-24	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		4.75	0	(06/23/20) Continued 3D Sketchup model for 249L BOP transport skid modifications. (06/24/20) Searched for drawworks information per request from Bronco (Craig). Cont 249 3D model. (06/25/20) 3D model (06/26/20) Finished model of BOP support frame. Started assembly with Skid/Frame/BOP.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-24	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	(06/22/20) Updated weekly timesheet and submitted for approval. Update call with Lam. Computer connection issues. (06/23/20) Update call with Tyler. Update call with Jorge. Update call with Kyle. Computer issues (restarted/replaced mouse). (06/24/20) Cleaned up Genesis drawing files/created PDFs. (06/25/20) Update call with Tyler.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-24	OH-034	:OH-034	OH-034-006	Iraq	Regular Pay	N		1.75	0	(06/24/20) Pulled various 269/265 camp drawings per request from customer/field (Joe L).
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-24	Rig 249L-TSR	:Rig 249L-TSR	TSR-01769-249L	BOP Transport Frame	Regular Pay	N		1	0	(06/24/20) Reviewed 249L drawing progress/concept with Kyle. (06/25/20) Updated drawing views to show compact annular per info from filed.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-25	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		1	0	(06/25/20) Started elevation view GA.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-25	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		0.5	0	(06/25/20) Weekly TSR call.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-25	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		2.5	0	(06/23/20) Continued 3D Sketchup model for 249L BOP transport skid modifications. (06/24/20) Searched for drawworks information per request from Bronco (Craig). Cont 249 3D model. (06/25/20) 3D model (06/26/20) Finished model of BOP support frame. Started assembly with Skid/Frame/BOP.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-25	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	(06/22/20) Updated weekly timesheet and submitted for approval. Update call with Lam. Computer connection issues. (06/23/20) Update call with Tyler. Update call with Jorge. Update call with Kyle. Computer issues (restarted/replaced mouse). (06/24/20) Cleaned up Genesis drawing files/created PDFs. (06/25/20) Update call with Tyler.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-25	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		2.5	0	(06/22/20) Checked casing jetting tool drawing (RUSA version). (06/25/20) Reviewed Orlan bell nipple lifting tool dwg and sent for review. Reviewed Orlan casing jetting tool and sent for review. 
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-25	Rig 249L-TSR	:Rig 249L-TSR	TSR-01769-249L	BOP Transport Frame	Regular Pay	N		1.5	0	(06/24/20) Reviewed 249L drawing progress/concept with Kyle. (06/25/20) Updated drawing views to show compact annular per info from filed.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2020-06-26	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		6	0	(06/23/20) Continued 3D Sketchup model for 249L BOP transport skid modifications. (06/24/20) Searched for drawworks information per request from Bronco (Craig). Cont 249 3D model. (06/25/20) 3D model (06/26/20) Finished model of BOP support frame. Started assembly with Skid/Frame/BOP.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-01	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		3	0	Provide support as required. Contact NOV for drawings required for rig. Conference calls and reviewing the Parker Drilling Rig 212 Action Items List. Attending weekly update conference calls with Jaguar and Patterson.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-01	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3	0	Answering company emails and taking phone calls providing support for miscellaneous projects for S. Carmichael and B. Collins. Research and supply preservation literature and documentation to Ripal for the Caterpillar Engine Sets, Generator Sets, and Large AC/DC Electrical Motors.information
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-02	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		3	0	Research the existing platform as well as determining the best solution for the proposal of the PA/GA/Gai-Tronics System. Researched and proposed to Joshua Lambert. Answer questions and make recommendations regarding the Gai-Tronics cable that should be proposed.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-02	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		3	0	Provide support as required. Contact NOV for drawings required for rig. Conference calls and reviewing the Parker Drilling Rig 212 Action Items List. Attending weekly update conference calls with Jaguar and Patterson.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-02	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3	0	Answering company emails and taking phone calls providing support for miscellaneous projects for S. Carmichael and B. Collins. Research and supply preservation literature and documentation to Ripal for the Caterpillar Engine Sets, Generator Sets, and Large AC/DC Electrical Motors.information
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-03	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		2	0	Research the existing platform as well as determining the best solution for the proposal of the PA/GA/Gai-Tronics System. Researched and proposed to Joshua Lambert. Answer questions and make recommendations regarding the Gai-Tronics cable that should be proposed.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-03	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		3	0	Provide support as required. Contact NOV for drawings required for rig. Conference calls and reviewing the Parker Drilling Rig 212 Action Items List. Attending weekly update conference calls with Jaguar and Patterson.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-03	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3	0	Answering company emails and taking phone calls providing support for miscellaneous projects for S. Carmichael and B. Collins. Research and supply preservation literature and documentation to Ripal for the Caterpillar Engine Sets, Generator Sets, and Large AC/DC Electrical Motors.information
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-04	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		3	0	Provide support as required. Contact NOV for drawings required for rig. Conference calls and reviewing the Parker Drilling Rig 212 Action Items List. Attending weekly update conference calls with Jaguar and Patterson.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-04	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3	0	Answering company emails and taking phone calls providing support for miscellaneous projects for S. Carmichael and B. Collins. Research and supply preservation literature and documentation to Ripal for the Caterpillar Engine Sets, Generator Sets, and Large AC/DC Electrical Motors.information
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-05	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		2	0	Research the existing platform as well as determining the best solution for the proposal of the PA/GA/Gai-Tronics System. Researched and proposed to Joshua Lambert. Answer questions and make recommendations regarding the Gai-Tronics cable that should be proposed.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-05	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		3	0	Provide support as required. Contact NOV for drawings required for rig. Conference calls and reviewing the Parker Drilling Rig 212 Action Items List. Attending weekly update conference calls with Jaguar and Patterson.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-05	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3	0	Answering company emails and taking phone calls providing support for miscellaneous projects for S. Carmichael and B. Collins. Research and supply preservation literature and documentation to Ripal for the Caterpillar Engine Sets, Generator Sets, and Large AC/DC Electrical Motors.information
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-06	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3	0	Answering company emails and taking phone calls providing support for miscellaneous projects for S. Carmichael and B. Collins. Research and supply preservation literature and documentation to Ripal for the Caterpillar Engine Sets, Generator Sets, and Large AC/DC Electrical Motors.information
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-07	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		1	0	Provide support as required. Contact NOV for drawings required for rig. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the possibility of utilizing SCR system/Engine packages/mud pump from 53B for independently driven 3rd mud pump. Also looking at interfacing the 53B topdrive system on rig 212.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-08	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		1	0	Further research the Gai-Tronics cable that should be proposed for the CVX genesis Project
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-08	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		4	0	Provide support as required. Contact NOV for drawings required for rig. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the possibility of utilizing SCR system/Engine packages/mud pump from 53B for independently driven 3rd mud pump. Also looking at interfacing the 53B topdrive system on rig 212.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-08	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3	0	Answering company emails and taking phone calls providing support for miscellaneous projects.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-09	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		4	0	Provide support as required. Contact NOV for drawings required for rig. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the possibility of utilizing SCR system/Engine packages/mud pump from 53B for independently driven 3rd mud pump. Also looking at interfacing the 53B topdrive system on rig 212.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-09	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3	0	Answering company emails and taking phone calls providing support for miscellaneous projects.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-10	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		4	0	Provide support as required. Contact NOV for drawings required for rig. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the possibility of utilizing SCR system/Engine packages/mud pump from 53B for independently driven 3rd mud pump. Also looking at interfacing the 53B topdrive system on rig 212.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-10	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3	0	Answering company emails and taking phone calls providing support for miscellaneous projects.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-11	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		4	0	Provide support as required. Contact NOV for drawings required for rig. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the possibility of utilizing SCR system/Engine packages/mud pump from 53B for independently driven 3rd mud pump. Also looking at interfacing the 53B topdrive system on rig 212.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-11	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3	0	Answering company emails and taking phone calls providing support for miscellaneous projects.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-12	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		4	0	Provide support as required. Contact NOV for drawings required for rig. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the possibility of utilizing SCR system/Engine packages/mud pump from 53B for independently driven 3rd mud pump. Also looking at interfacing the 53B topdrive system on rig 212.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-12	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3	0	Answering company emails and taking phone calls providing support for miscellaneous projects.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-13	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		2	0	Provide support as required. Contact NOV for drawings required for rig. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the possibility of utilizing SCR system/Engine packages/mud pump from 53B for independently driven 3rd mud pump. Also looking at interfacing the 53B topdrive system on rig 212.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-13	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	Answering company emails and taking phone calls providing support for miscellaneous projects.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-15	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		4	0	Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the interfacing the 53B top drive system on rig 212.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-15	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		4	0	Answering company emails and taking phone calls providing support for miscellaneous projects as required.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-16	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		4	0	Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the interfacing the 53B top drive system on rig 212.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-16	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		4	0	Answering company emails and taking phone calls providing support for miscellaneous projects as required.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-17	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		4	0	Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the interfacing the 53B top drive system on rig 212.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-17	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		4	0	Answering company emails and taking phone calls providing support for miscellaneous projects as required.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-18	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		4	0	Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the interfacing the 53B top drive system on rig 212.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-18	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		4	0	Answering company emails and taking phone calls providing support for miscellaneous projects as required.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-19	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		4	0	Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the interfacing the 53B top drive system on rig 212.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-19	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		4	0	Answering company emails and taking phone calls providing support for miscellaneous projects as required.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-22	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		4	0	Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the interfacing the 53B top drive system on rig 212.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-22	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		4	0	Answering company emails and taking phone calls providing support for miscellaneous projects as required.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-23	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		4	0	Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the interfacing the 53B top drive system on rig 212.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-23	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		4	0	Answering company emails and taking phone calls providing support for miscellaneous projects as required.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-24	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		4	0	Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the interfacing the 53B top drive system on rig 212.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-24	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		4	0	Answering company emails and taking phone calls providing support for miscellaneous projects as required.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-25	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		4	0	Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the interfacing the 53B top drive system on rig 212.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-25	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		4	0	Answering company emails and taking phone calls providing support for miscellaneous projects as required.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-26	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		4	0	Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the interfacing the 53B top drive system on rig 212.
Gorrell, Chuck	Sr Site Mgr	10154	Gorrell, Chuck:Sr Site Mgr	2020-06-26	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		4	0	Answering company emails and taking phone calls providing support for miscellaneous projects as required.
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-01	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Weekly Operations Conference Call; Technical Services Weekly Meeting
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-01	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	MK Timesheet
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-01	OH-009	:OH-009	OH-009-007	General Business Development Support	Regular Pay	N		2	0	Continue editing D30 whitepaper; Update Competitor Financial Analysis; Office Lease Project
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-01	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		5	0	NCOC Workover Rig Tender
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-02	OH-009	:OH-009	OH-009-007	General Business Development Support	Regular Pay	N		3	0	Continue editing D30 whitepaper; Update Competitor Financial Analysis; Office Lease Project
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-02	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		6	0	NCOC Workover Rig Tender
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-03	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		8	0	NCOC Workover Rig Tender
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-04	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Weekly Operations Conference Call; Technical Services Weekly Meeting
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-04	OH-009	:OH-009	OH-009-007	General Business Development Support	Regular Pay	N		2	0	Continue editing D30 whitepaper; Update Competitor Financial Analysis; Office Lease Project
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-04	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		5.5	0	NCOC Workover Rig Tender
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-05	OH-009	:OH-009	OH-009-007	General Business Development Support	Regular Pay	N		3	0	Continue editing D30 whitepaper; Update Competitor Financial Analysis; Office Lease Project
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-05	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		5	0	NCOC Workover Rig Tender
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-08	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Weekly Operations Conference Call; Technical Services Weekly Meeting
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-08	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	MK Timesheet
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-08	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		8	0	NCOC Workover Rig Tender
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-09	OH-009	:OH-009	OH-009-007	General Business Development Support	Regular Pay	N		4	0	Office Lease Project; 
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-09	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		5	0	NCOC Workover Rig Tender
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-10	OH-009	:OH-009	OH-009-007	General Business Development Support	Regular Pay	N		4.5	0	Office Lease Project; 
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-10	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		4	0	NCOC Workover Rig Tender
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-11	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Weekly Operations Conference Call; Technical Services Weekly Meeting
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-11	OH-009	:OH-009	OH-009-007	General Business Development Support	Regular Pay	N		3	0	Office Lease Project; 
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-11	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		5	0	NCOC Workover Rig Tender
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-12	OH-009	:OH-009	OH-009-007	General Business Development Support	Regular Pay	N		2	0	Office Lease Project; 
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-12	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		6	0	NCOC Workover Rig Tender
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-15	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Weekly Operations Conference Call; Technical Services Weekly Meeting
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-15	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	MK Timesheet
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-15	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		7.5	0	NCOC Workover Rig Tender activities
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-16	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		8.5	0	NCOC Workover Rig Tender activities
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-17	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		8	0	NCOC Workover Rig Tender activities
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-18	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Weekly Operations Conference Call; Technical Services Weekly Meeting
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-18	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		7.5	0	NCOC Workover Rig Tender activities
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-19	OH-009	:OH-009	OH-009-007	General Business Development Support	Regular Pay	N		3	0	Office Lease Meetings
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-19	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		5	0	NCOC Workover Rig Tender activities
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-22	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Weekly Operations Conference Call; Tech Services Weekly Meeting
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-22	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	MK Timesheet
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-22	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		7	0	NCOC Workover Rig Tender
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-23	OH-009	:OH-009	OH-009-007	General Business Development Support	Regular Pay	N		3	0	Office Lease Project - Meetings with ELT; O&M Brochure Support; Technical Services Presentation
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-23	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		6	0	NCOC Workover Rig Tender
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-24	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		8.5	0	NCOC Workover Rig Tender
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-25	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Weekly Operations Conference Call; Tech Services Weekly Meeting
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-25	OH-009	:OH-009	OH-009-007	General Business Development Support	Regular Pay	N		3	0	Office Lease Project - Meetings with ELT; O&M Brochure Support; Technical Services Presentation
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-25	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		6	0	NCOC Workover Rig Tender
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-26	OH-009	:OH-009	OH-009-007	General Business Development Support	Regular Pay	N		3	0	Office Lease Project - Meetings with ELT; O&M Brochure Support; Technical Services Presentation
Kuehn, Matt	Project Manager	22143	Kuehn, Matt:Project Manager	2020-06-26	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		5	0	NCOC Workover Rig Tender
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-01	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		8	0	Work order, weekly meeting, gaitronics, verify 3D models, grasshopper and dragchain
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-01	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	Weekly ops call, weekly TS meeting
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-02	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		2	0	Technical clarifications and reviews
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-02	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		7	0	Work order, weekly meeting, gaitronics, verify 3D models, grasshopper and dragchain
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-03	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		2	0	Technical clarifications and reviews
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-03	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		7	0	Work order, weekly meeting, gaitronics, verify 3D models, grasshopper and dragchain
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-04	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		2	0	Technical clarifications and reviews
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-04	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		1	0	Work order, weekly meeting, gaitronics, verify 3D models, grasshopper and dragchain
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-04	Holly Platform	:Holly Platform	TSR-01665-HOLP-20	Rig Upgrades	Regular Pay	N		1	0	Monitor and control costs
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-04	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	Weekly ops call, weekly TS meeting
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-04	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		4	0	Month end close data. document control
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-05	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		2	0	Technical clarifications and reviews
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-05	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		4	0	Work order, weekly meeting, gaitronics, verify 3D models, grasshopper and dragchain
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-08	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		2	0	Technical clarifications, document review,weekly meeting andminutes
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-08	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		4	0	Grasshopper technical evaluation and clash check, exhaust routing check, superstructure lighting analysis review
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-08	Holly Platform	:Holly Platform	TSR-01665-HOLP-20	Rig Upgrades	Regular Pay	N		2	0	Milestone closeout requests, change request for south side egress
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-08	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	Ops call, weekly TS meeting
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-09	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		2	0	Technical clarifications, document review,weekly meeting andminutes
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-09	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		7	0	Grasshopper technical evaluation and clash check, exhaust routing check, superstructure lighting analysis review
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-10	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		2	0	Technical clarifications, document review,weekly meeting andminutes
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-10	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		7	0	Grasshopper technical evaluation and clash check, exhaust routing check, superstructure lighting analysis review
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-11	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		2	0	Technical clarifications, document review,weekly meeting andminutes
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-11	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		6	0	Grasshopper technical evaluation and clash check, exhaust routing check, superstructure lighting analysis review
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-11	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	Ops call, weekly TS meeting
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-12	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		2	0	Technical clarifications, document review,weekly meeting andminutes
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-12	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		4	0	Grasshopper technical evaluation and clash check, exhaust routing check, superstructure lighting analysis review
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-15	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		6	0	Drawing review
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-15	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		6	0	Gaitronics, layouts, verify lead times, schedule updates, grasshopper quote finalization, CAT contract
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-16	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		4	0	Drawing review
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-16	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		4	0	Gaitronics, layouts, verify lead times, schedule updates, grasshopper quote finalization, CAT contract
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-16	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2	0	Computer replacement
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-17	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		5	0	Drawing review
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-17	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		5	0	Gaitronics, layouts, verify lead times, schedule updates, grasshopper quote finalization, CAT contract
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-18	OH-001	:OH-001	Overhead	All Activities	Regular Pay	N		8	0	PTO
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-19	OH-001	:OH-001	Overhead	All Activities	Regular Pay	N		4	0	PTO
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-22	OH-001	:OH-001	Overhead	All Activities	Regular Pay	N		8	0	PTO
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-23	OH-001	:OH-001	Overhead	All Activities	Regular Pay	N		8	0	PTO
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-24	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		5	0	Piping drawings, utilities interface, weekly meeting, coordinate technical scope
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-24	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		5	0	Verify technical details for procurement scope,
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-25	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		4.5	0	Piping drawings, utilities interface, weekly meeting, coordinate technical scope
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-25	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		4.5	0	Verify technical details for procurement scope,
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-26	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		4	0	Piping drawings, utilities interface, weekly meeting, coordinate technical scope
Lambert, Joshua	Project Manager	JOSHLAMBERT	Lambert, Joshua:Project Manager	2020-06-26	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		4	0	Work order revision
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-01	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1.25	0	Weekly Ops Conference Call Weekly TS meeting
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-01	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2	0	Emails to Steve C. TS status to SC Office access and SAFI install Updating forecast; forecast review with Mark T. Timekeeping system administration
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-01	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		1	0	Weekly meeting and preparation
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-01	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		2.5	0	Orlan Casing Jetting Tool - Drawing review CC with Tecky regarding 209L ATC unit
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-01	ORLAN-TSR	:ORLAN-TSR	TSR-01767-ORLP	Bell Nipple Lifting Tool	Regular Pay	N		1	0	Drawing review; discuss with TE
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-01	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		2	0	Hand Calculations; review with Tyler
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-02	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		0.75	0	status update
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-02	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2.5	0	Emails to Steve C. TS status to SC Office access and SAFI install Updating forecast; forecast review with Mark T. Timekeeping system administration
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-02	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		1.5	0	NCOC Workover Tender Support
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-02	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1	0	Orlan Casing Jetting Tool - Drawing review CC with Tecky regarding 209L ATC unit
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-02	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		0.5	0	Confirming payment for MRS DOROTHY 
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-02	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		1.5	0	Hand Calculations; review with Tyler
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-02	Rig 249L-TSR	:Rig 249L-TSR	TSR-01769-249L	BOP Transport Frame	Regular Pay	N		1	0	CC with Operations Reviewing historical drawings and analysis 
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-03	Holly Platform	:Holly Platform	TSR-01665-HOLP-99	Project Management (OH)	Regular Pay	N		1	0	 Holly CC with operations and Joshua L.; developing revised CTR
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-03	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2	0	Emails to Steve C. TS status to SC Office access and SAFI install Updating forecast; forecast review with Mark T. Timekeeping system administration
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-03	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		0.5	0	NCOC Workover Tender Support
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-03	OH-013	:OH-013	Overhead	All Activities	Regular Pay	N		1	0	Update TSR tracking spreadsheet
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-03	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1.5	0	Orlan Casing Jetting Tool - Drawing review CC with Tecky regarding 209L ATC unit
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-03	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		1	0	Hand Calculations; review with Tyler
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-03	Rig 249L-TSR	:Rig 249L-TSR	TSR-01769-249L	BOP Transport Frame	Regular Pay	N		1	0	CC with Operations Reviewing historical drawings and analysis 
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-03	Rig 273L-TSR	:Rig 273L-TSR	TSR-01757-AADU	Surface 21-1/4in. Annualar Lift Ring Modifications	Regular Pay	N		0.5	0	CC with Tyler E.
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-04	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		1	0	layout drawing review CC with Joshua and James G. 
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-04	Holly Platform	:Holly Platform	TSR-01665-HOLP-99	Project Management (OH)	Regular Pay	N		0.5	0	 Holly CC with operations and Joshua L.; developing revised CTR
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-04	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Weekly Ops Conference Call Weekly TS meeting
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-04	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2.5	0	Emails to Steve C. TS status to SC Office access and SAFI install Updating forecast; forecast review with Mark T. Timekeeping system administration
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-04	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		1	0	NCOC Workover Tender Support
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-04	OH-013	:OH-013	Overhead	All Activities	Regular Pay	N		0.75	0	Update TSR tracking spreadsheet
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-04	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		0.75	0	Orlan Casing Jetting Tool - Drawing review CC with Tecky regarding 209L ATC unit
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-04	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		1	0	Hand Calculations; review with Tyler
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-04	Rig 249L-TSR	:Rig 249L-TSR	TSR-01769-249L	BOP Transport Frame	Regular Pay	N		1	0	CC with Operations Reviewing historical drawings and analysis 
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-05	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		1	0	layout drawing review CC with Joshua and James G. 
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-05	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2.5	0	Emails to Steve C. TS status to SC Office access and SAFI install Updating forecast; forecast review with Mark T. Timekeeping system administration
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-05	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1	0	Orlan Casing Jetting Tool - Drawing review CC with Tecky regarding 209L ATC unit
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-05	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		1	0	Hand Calculations; review with Tyler
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-05	Rig 249L-TSR	:Rig 249L-TSR	TSR-01769-249L	BOP Transport Frame	Regular Pay	N		0.5	0	CC with Operations Reviewing historical drawings and analysis 
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-08	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		2.5	0	Pedestal layouts and conf calls LM Analysis report review Genesis GA review (FUZE mtg)
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-08	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Weekly Ops CC Weekly HTSG Meeting
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-08	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2.5	0	Finalizing forecast - reclassing travel charges Updates from direct reports Timesheet/timesheet approvals & admin
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-08	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		0.75	0	Weekly meeting Conf call with Bohan
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-08	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		0.5	0	Rig Move administration - CTR development, CC with Genesis, CC with SAK OPS Review ORLP casing jetting tool drawings Converting HTSG drawings to RUSA title block SAK workover rig opportunity 
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-08	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		1.5	0	EPIRB renewal for MR Robert Parker OH - Genesis project
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-08	Rig 249L-TSR	:Rig 249L-TSR	TSR-01769-249L	BOP Transport Frame	Regular Pay	N		1	0	Conference Call with Operations Review layouts with JJG
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-09	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		1.5	0	Clarification from COPA Conf Call(s) with TE 
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-09	Holly Platform	:Holly Platform	TSR-01665-HOLP-21	Reimbursable Rig Repairs 	Regular Pay	N		2.25	0	South side egress drawings and analysis - APPROVED
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-09	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2	0	Finalizing forecast - reclassing travel charges Updates from direct reports Timesheet/timesheet approvals & admin
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-09	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1	0	Rig Move administration - CTR development, CC with Genesis, CC with SAK OPS Review ORLP casing jetting tool drawings Converting HTSG drawings to RUSA title block SAK workover rig opportunity 
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-09	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		1.25	0	Review structural report Discuss path fwd
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-10	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		1	0	Clarification from COPA Conf Call(s) with TE 
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-10	Holly Platform	:Holly Platform	TSR-01665-HOLP-21	Reimbursable Rig Repairs 	Regular Pay	N		1	0	South side egress drawings and analysis - APPROVED
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-10	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2	0	Finalizing forecast - reclassing travel charges Updates from direct reports Timesheet/timesheet approvals & admin
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-10	OH-013	:OH-013	Overhead	All Activities	Regular Pay	N		1	0	Update TSR tracker
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-10	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1	0	Rig Move administration - CTR development, CC with Genesis, CC with SAK OPS Review ORLP casing jetting tool drawings Converting HTSG drawings to RUSA title block SAK workover rig opportunity 
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-10	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		2	0	EPIRB renewal for MR Robert Parker OH - Genesis project
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-10	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		0.75	0	Review structural report Discuss path fwd
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-10	Rig 249L-TSR	:Rig 249L-TSR	TSR-01769-249L	BOP Transport Frame	Regular Pay	N		0.5	0	Conference Call with Operations Review layouts with JJG
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-11	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		0.5	0	Clarification from COPA Conf Call(s) with TE 
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-11	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		1	0	Pedestal layouts and conf calls LM Analysis report review Genesis GA review (FUZE mtg)
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-11	Holly Platform	:Holly Platform	TSR-01665-HOLP-21	Reimbursable Rig Repairs 	Regular Pay	N		2	0	South side egress drawings and analysis - APPROVED
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-11	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Weekly Ops CC Weekly HTSG Meeting
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-11	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1.5	0	Finalizing forecast - reclassing travel charges Updates from direct reports Timesheet/timesheet approvals & admin
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-11	OH-013	:OH-013	Overhead	All Activities	Regular Pay	N		0.5	0	Update TSR tracker
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-11	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		0.75	0	Weekly meeting Conf call with Bohan
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-11	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1.25	0	Rig Move administration - CTR development, CC with Genesis, CC with SAK OPS Review ORLP casing jetting tool drawings Converting HTSG drawings to RUSA title block SAK workover rig opportunity 
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-11	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		1	0	Review structural report Discuss path fwd
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-12	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		0.5	0	Clarification from COPA Conf Call(s) with TE 
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-12	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		0.5	0	Pedestal layouts and conf calls LM Analysis report review Genesis GA review (FUZE mtg)
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-12	Holly Platform	:Holly Platform	TSR-01665-HOLP-21	Reimbursable Rig Repairs 	Regular Pay	N		2	0	South side egress drawings and analysis - APPROVED
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-12	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1.5	0	Finalizing forecast - reclassing travel charges Updates from direct reports Timesheet/timesheet approvals & admin
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-12	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		0.5	0	Rig Move administration - CTR development, CC with Genesis, CC with SAK OPS Review ORLP casing jetting tool drawings Converting HTSG drawings to RUSA title block SAK workover rig opportunity 
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-12	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		0.5	0	EPIRB renewal for MR Robert Parker OH - Genesis project
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-12	Rig 249L-TSR	:Rig 249L-TSR	TSR-01769-249L	BOP Transport Frame	Regular Pay	N		0.5	0	Conference Call with Operations Review layouts with JJG
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-15	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		1	0	Document review / provide comments and path forward
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-15	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		1	0	Coating Specification review Finish reviewing LM analysis report Weekly meeting 
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-15	Holly Platform	:Holly Platform	TSR-01665-HOLP-21	Reimbursable Rig Repairs 	Regular Pay	N		3	0	South side egress
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-15	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Iron Mountain Discussion w/ Kathy M. Weekly Ops CC Weekly HTSG CC
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-15	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1.25	0	IHS Administration - coding sent to Adriana
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-15	OH-009	:OH-009	OH-009-007	General Business Development Support	Regular Pay	N		1	0	MPD Conference Call BD conf call with Odon and GO; CC with Matt Kuehn
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-15	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		0.75	0	Weekly meeting and preparation
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-15	OH-034	:OH-034	OH-034-002	Alaska	Regular Pay	N		0.75	0	TH Hill Document research
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-16	Holly Platform	:Holly Platform	TSR-01665-HOLP-21	Reimbursable Rig Repairs 	Regular Pay	N		2	0	South side egress
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-16	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2.5	0	IHS Administration - coding sent to Adriana
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-16	OH-009	:OH-009	OH-009-007	General Business Development Support	Regular Pay	N		1.25	0	MPD Conference Call BD conf call with Odon and GO; CC with Matt Kuehn
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-16	OH-009	:OH-009	OH-009-014	Sakhalin	Regular Pay	N		1.75	0	Workover rig meeting / documentation review
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-16	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1	0	Rig move CTR - CC with Genesis Eng. / CC with SAK Ops TSR status update with TS 
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-16	Rig 249L-TSR	:Rig 249L-TSR	TSR-01769-249L	BOP Transport Frame	Regular Pay	N		1	0	Drawing review; CC with KAZ Ops
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-17	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		2.25	0	Coating Specification review Finish reviewing LM analysis report Weekly meeting 
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-17	Holly Platform	:Holly Platform	TSR-01665-HOLP-21	Reimbursable Rig Repairs 	Regular Pay	N		1	0	South side egress
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-17	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2	0	IHS Administration - coding sent to Adriana
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-17	OH-009	:OH-009	OH-009-007	General Business Development Support	Regular Pay	N		0.5	0	MPD Conference Call BD conf call with Odon and GO; CC with Matt Kuehn
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-17	OH-013	:OH-013	Overhead	All Activities	Regular Pay	N		0.75	0	Updating TSR tracking document
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-17	OH-034	:OH-034	OH-034-005	Kazakhstan	Regular Pay	N		1.25	0	249 hawk jaw MOC  249 / 258 research for Robbie Bennett
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-17	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		0.75	0	Chevron Genesis Overhead (Administrative support)
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-18	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1.5	0	Iron Mountain Discussion w/ Kathy M. Weekly Ops CC Weekly HTSG CC
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-18	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2.5	0	IHS Administration - coding sent to Adriana
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-18	OH-013	:OH-013	Overhead	All Activities	Regular Pay	N		0.5	0	Updating TSR tracking document
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-18	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1.5	0	Rig move CTR - CC with Genesis Eng. / CC with SAK Ops TSR status update with TS 
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-18	OH-034	:OH-034	OH-034-005	Kazakhstan	Regular Pay	N		1	0	249 hawk jaw MOC  249 / 258 research for Robbie Bennett
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-18	OH-034	:OH-034	OH-034-008	Mexico	Regular Pay	N		1	0	HP piping documentation review
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-18	Rig 249L-TSR	:Rig 249L-TSR	TSR-01769-249L	BOP Transport Frame	Regular Pay	N		0.75	0	Drawing review; CC with KAZ Ops
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-19	OH-001	:OH-001	Overhead	All Activities	Regular Pay	N		8	0	
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-22	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		2	0	Stair Tower Concept Meeting Hydraulic Piping Meeting Project Administration (JL on PTO)
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-22	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Weekly Ops Conference Call
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-22	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1.25	0	Personnel administration Timesheets / Approvals iHS clarification for iTS
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-22	OH-009	:OH-009	OH-009-014	Sakhalin	Regular Pay	N		1	0	ENL W/O Rig Proposal Review functional specification CC with GO
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-22	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		0.75	0	Weekly Conference Call CC with Mio (Tuesday)
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-22	OH-034	:OH-034	OH-034-005	Kazakhstan	Regular Pay	N		0.5	0	Research and email to Robbie B. related to 249 / 258 temperature rating and H2S compliance
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-22	OH-034	:OH-034	OH-034-008	Mexico	Regular Pay	N		3.5	0	165 / 256 HP Piping Support -Mtg with DPR -Calculations
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-22	ORLAN-TSR	:ORLAN-TSR	TSR-01630-ORLP	Lifting Appliance For Drawworks	Regular Pay	N		0.5	0	Review SoW with Tyler E.
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-23	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		2	0	Stair Tower Concept Meeting Hydraulic Piping Meeting Project Administration (JL on PTO)
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-23	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	Personnel administration Timesheets / Approvals iHS clarification for iTS
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-23	OH-009	:OH-009	OH-009-014	Sakhalin	Regular Pay	N		1	0	ENL W/O Rig Proposal Review functional specification CC with GO
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-23	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		1	0	Review slides for Oxy presentation Review Matt's presentation
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-23	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		1	0	Weekly Conference Call CC with Mio (Tuesday)
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-23	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1	0	Review SAFI model for Orlan Trolley beam
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-23	OH-034	:OH-034	OH-034-005	Kazakhstan	Regular Pay	N		0.5	0	Research and email to Robbie B. related to 249 / 258 temperature rating and H2S compliance
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-23	OH-034	:OH-034	OH-034-008	Mexico	Regular Pay	N		1	0	165 / 256 HP Piping Support -Mtg with DPR -Calculations
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-23	ORLAN-TSR	:ORLAN-TSR	TSR-01630-ORLP	Lifting Appliance For Drawworks	Regular Pay	N		0.5	0	Review SoW with Tyler E.
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-24	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		2	0	Stair Tower Concept Meeting Hydraulic Piping Meeting Project Administration (JL on PTO)
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-24	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3	0	Personnel administration Timesheets / Approvals iHS clarification for iTS
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-24	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		1	0	Review slides for Oxy presentation Review Matt's presentation
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-24	OH-013	:OH-013	Overhead	All Activities	Regular Pay	N		1	0	Update TSR tracker
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-24	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1	0	Review SAFI model for Orlan Trolley beam
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-24	OH-034	:OH-034	OH-034-006	Iraq	Regular Pay	N		1	0	Research and emails to David Villarreal and Justin W. - 265L
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-24	OH-034	:OH-034	OH-034-008	Mexico	Regular Pay	N		0.5	0	165 / 256 HP Piping Support -Mtg with DPR -Calculations
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-25	OH-001	:OH-001	Overhead	All Activities	Regular Pay	N		8	0	
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2020-06-26	OH-001	:OH-001	Overhead	All Activities	Regular Pay	N		4	0	
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-08	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	06/08: timesheets to ProjXsense 06/12: RUSA title block template
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-08	OH-013	:OH-013	Overhead	All Activities	Regular Pay	N		3	0	06/08: process incoming TSR and CTR trasnmittals; transmit TSR-01725-LM-DWG 06/10: transmit TSR-01725-DOC; transmit (3) CTRs for Sakhalin 06/11: transmit TSR-01725-DOC
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-08	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		1	0	06/08: teleconference call with Sakhalin regarding 270L updates and Sakhalin TSRs
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-08	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		3	0	06/08-06/10: finalize details for ATC removable diagonal brace; continue details of piping modfication for ATC egress/access.
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-09	Holly Platform	:Holly Platform	TSR-01665-HOLP-21	Reimbursable Rig Repairs 	Regular Pay	N		2.5	0	06/09: model update for south egress from KBC 06/11: clarification corresponse with Rig Manager regarding tank member sizes. 06/11-06/12: begin export and drafting details of south egress walkway
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-09	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		5.5	0	06/08-06/10: finalize details for ATC removable diagonal brace; continue details of piping modfication for ATC egress/access.
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-10	OH-001	:OH-001	Overhead	All Activities	Regular Pay	N		4	0	
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-10	OH-013	:OH-013	Overhead	All Activities	Regular Pay	N		2.5	0	06/08: process incoming TSR and CTR trasnmittals; transmit TSR-01725-LM-DWG 06/10: transmit TSR-01725-DOC; transmit (3) CTRs for Sakhalin 06/11: transmit TSR-01725-DOC
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-10	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1.5	0	06/08-06/10: finalize details for ATC removable diagonal brace; continue details of piping modfication for ATC egress/access.
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-11	Holly Platform	:Holly Platform	TSR-01665-HOLP-21	Reimbursable Rig Repairs 	Regular Pay	N		6	0	06/09: model update for south egress from KBC 06/11: clarification corresponse with Rig Manager regarding tank member sizes. 06/11-06/12: begin export and drafting details of south egress walkway
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-11	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	06/11: teleconference to discuss TSR updates and ongoing tasks
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-11	OH-013	:OH-013	Overhead	All Activities	Regular Pay	N		1	0	06/08: process incoming TSR and CTR trasnmittals; transmit TSR-01725-LM-DWG 06/10: transmit TSR-01725-DOC; transmit (3) CTRs for Sakhalin 06/11: transmit TSR-01725-DOC
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-12	Holly Platform	:Holly Platform	TSR-01665-HOLP-21	Reimbursable Rig Repairs 	Regular Pay	N		7.5	0	06/09: model update for south egress from KBC 06/11: clarification corresponse with Rig Manager regarding tank member sizes. 06/11-06/12: begin export and drafting details of south egress walkway
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-12	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	06/08: timesheets to ProjXsense 06/12: RUSA title block template
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-15	Holly Platform	:Holly Platform	TSR-01665-HOLP-21	Reimbursable Rig Repairs 	Regular Pay	N		6	0	06/15: complete drawings set for south egress walkway.  06/16: picked up red lines from James' comments.
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-15	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	06/15: timesheets to ProjXsense and to payroll 06/16: telework survey
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-15	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		1	0	06/15: teleconference call with Sakhalin regarding 270L updates and Sakhalin TSRs
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-16	Holly Platform	:Holly Platform	TSR-01665-HOLP-21	Reimbursable Rig Repairs 	Regular Pay	N		4	0	06/15: complete drawings set for south egress walkway.  06/16: picked up red lines from James' comments.
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-16	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.75	0	06/15: timesheets to ProjXsense and to payroll 06/16: telework survey
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-16	OH-013	:OH-013	Overhead	All Activities	Regular Pay	N		1	0	06/16: process TSR requests 06/17: process incoming CTR and CO transmittals
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-16	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		2.25	0	06/16-06/17: picked up red lines for removable brace drawing set. 06/18-06/19: continue drawings for piping modifications for ATC install.
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-17	OH-013	:OH-013	Overhead	All Activities	Regular Pay	N		2.5	0	06/16: process TSR requests 06/17: process incoming CTR and CO transmittals
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-17	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		5.5	0	06/16-06/17: picked up red lines for removable brace drawing set. 06/18-06/19: continue drawings for piping modifications for ATC install.
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-18	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	06/18: teleconference to discuss TSR updates and ongoing tasks
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-18	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		7	0	06/16-06/17: picked up red lines for removable brace drawing set. 06/18-06/19: continue drawings for piping modifications for ATC install.
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2020-06-19	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		8	0	06/16-06/17: picked up red lines for removable brace drawing set. 06/18-06/19: continue drawings for piping modifications for ATC install.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-01	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		4	0	On 6/1-6/5, support Jaguar Rig 212 closeout and client reporting.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-01	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		2	0	On 6/1, weekly ops meeting.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-01	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		3	0	On 6/1-6/5, support P&A market entry.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-02	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		2	0	On 6/1-6/5, support Jaguar Rig 212 closeout and client reporting.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-02	OH-009	:OH-009	OH-009-007	General Business Development Support	Regular Pay	N		2	0	On 6/2, support CVX Genesis execution planning and risk register.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-02	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		2	0	On 6/2-6/5, support NCOC workover rig tender.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-02	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		3	0	On 6/1-6/5, support P&A market entry.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-03	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		4	0	On 6/3-6/5, support COP Willow RFI.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-03	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		2	0	On 6/1-6/5, support Jaguar Rig 212 closeout and client reporting.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-03	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		1	0	On 6/2-6/5, support NCOC workover rig tender.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-03	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		2	0	On 6/1-6/5, support P&A market entry.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-04	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		3	0	On 6/2-6/5, support NCOC workover rig tender.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-04	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		6	0	On 6/1-6/5, support P&A market entry.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-05	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		6	0	On 6/1-6/5, support P&A market entry.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-08	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		2	0	On 6/8- 6/12, support COP Willow new build opportunity.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-08	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		3	0	On 6/8, weekly Ops mtg.  On 6/11, TS weekly mtg.  On 6/8, CVX Genesis design review.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-08	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		1	0	On 6/8-6/12, continue support of NCOC workover new build opportunity.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-08	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		3	0	On 6/8-6/11, support GOM P&A marker entry.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-09	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		2	0	On 6/8- 6/12, support COP Willow new build opportunity.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-09	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		7	0	On 6/8-6/11, support GOM P&A marker entry.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-10	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		2	0	On 6/8- 6/12, support COP Willow new build opportunity.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-10	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		1	0	On 6/10, PTEN lead mtg.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-10	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		6	0	On 6/8-6/11, support GOM P&A marker entry.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-11	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	On 6/8, weekly Ops mtg.  On 6/11, TS weekly mtg.  On 6/8, CVX Genesis design review.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-11	OH-009	:OH-009	OH-009-014	Sakhalin	Regular Pay	N		2	0	On 6/11 and 6/12, support ENL Sakhalin workover rig build opportuntity.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-11	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		6	0	On 6/8-6/11, support GOM P&A marker entry.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-12	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		3	0	On 6/8- 6/12, support COP Willow new build opportunity.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-12	OH-009	:OH-009	OH-009-007	General Business Development Support	Regular Pay	N		2	0	On 6/12, support MPD and P&A market entry.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-12	OH-009	:OH-009	OH-009-014	Sakhalin	Regular Pay	N		4	0	On 6/11 and 6/12, support ENL Sakhalin workover rig build opportuntity.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-15	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		2	0	On 6/15-6/19, support COP Willow RFQ's.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-15	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		2	0	On 6/15-6/16, support Jaguar updates.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-15	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	On 6/15, weekly Ops mtg.  On 6/18, weekly TS mtg.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-15	OH-009	:OH-009	OH-009-014	Sakhalin	Regular Pay	N		3	0	On 6/15-6/19, submit RFI's and create rig build RFQ package.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-15	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		1	0	On 6/15-6/19, - support NCOC Workover RFQ's.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-16	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		2	0	On 6/15-6/19, support COP Willow RFQ's.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-16	Latin America Region-TSR	:Latin America Region-TSR	TSR-01753-LABU	Jaguar Exploration - Mexico	Regular Pay	N		2	0	On 6/15-6/16, support Jaguar updates.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-16	OH-009	:OH-009	OH-009-014	Sakhalin	Regular Pay	N		4	0	On 6/15-6/19, submit RFI's and create rig build RFQ package.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-16	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		1	0	On 6/15-6/19, - support NCOC Workover RFQ's.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-17	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		2	0	On 6/15-6/19, support COP Willow RFQ's.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-17	OH-009	:OH-009	OH-009-014	Sakhalin	Regular Pay	N		3	0	On 6/15-6/19, submit RFI's and create rig build RFQ package.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-17	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		1	0	On 6/15-6/19, - support NCOC Workover RFQ's.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-17	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		3	0	On 6/17-6/19, support COP Willow RFQ's.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-18	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		2	0	On 6/15-6/19, support COP Willow RFQ's.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-18	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		2	0	On 6/15, weekly Ops mtg.  On 6/18, weekly TS mtg.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-18	OH-009	:OH-009	OH-009-014	Sakhalin	Regular Pay	N		2	0	On 6/15-6/19, submit RFI's and create rig build RFQ package.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-18	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		1	0	On 6/15-6/19, - support NCOC Workover RFQ's.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-18	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		2	0	On 6/17-6/19, support COP Willow RFQ's.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-19	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		2	0	On 6/15-6/19, support COP Willow RFQ's.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-19	OH-009	:OH-009	OH-009-014	Sakhalin	Regular Pay	N		4	0	On 6/15-6/19, submit RFI's and create rig build RFQ package.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-19	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		1	0	On 6/15-6/19, - support NCOC Workover RFQ's.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-19	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		1	0	On 6/17-6/19, support COP Willow RFQ's.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-22	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		2	0	On 6/22-6/26, support COP Willow RFQs and tech eval.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-22	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	On 6/22, weekly Ops mtg.  On 6/25, weekly TS mtg.  On 6/24, visit BOPX shop in Conroe, TX for BOP digital testing demo.  Attend IADC Digital webinar.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-22	OH-009	:OH-009	OH-009-014	Sakhalin	Regular Pay	N		6	0	On 6/22-6/26, support Sakhalin workover rig RFQs.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-23	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		2	0	On 6/22-6/26, support COP Willow RFQs and tech eval.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-23	OH-009	:OH-009	OH-009-014	Sakhalin	Regular Pay	N		5	0	On 6/22-6/26, support Sakhalin workover rig RFQs.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-23	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		2	0	On 6/22-6/26, support P&A services presentation.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-24	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		7	0	On 6/22, weekly Ops mtg.  On 6/25, weekly TS mtg.  On 6/24, visit BOPX shop in Conroe, TX for BOP digital testing demo.  Attend IADC Digital webinar.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-24	OH-009	:OH-009	OH-009-014	Sakhalin	Regular Pay	N		3	0	On 6/22-6/26, support Sakhalin workover rig RFQs.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-24	OH-009	:OH-009	OH-009-021	Mexico	Regular Pay	N		2	0	On 6/24, 6/25 support Talos BD brainstorming
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-25	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	On 6/22, weekly Ops mtg.  On 6/25, weekly TS mtg.  On 6/24, visit BOPX shop in Conroe, TX for BOP digital testing demo.  Attend IADC Digital webinar.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-25	OH-009	:OH-009	OH-009-014	Sakhalin	Regular Pay	N		3	0	On 6/22-6/26, support Sakhalin workover rig RFQs.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-25	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		2	0	On 6/25 and 6/26, support NCOC workover RFQs.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-25	OH-009	:OH-009	OH-009-021	Mexico	Regular Pay	N		2	0	On 6/24, 6/25 support Talos BD brainstorming
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-25	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		2	0	On 6/22-6/26, support P&A services presentation.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-26	ARBU-TSRs	:ARBU-TSRs	TSR-01766-P01419	COPA Willow Proposal	Regular Pay	N		1	0	On 6/22-6/26, support COP Willow RFQs and tech eval.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-26	OH-009	:OH-009	OH-009-014	Sakhalin	Regular Pay	N		3	0	On 6/22-6/26, support Sakhalin workover rig RFQs.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-26	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		1	0	On 6/25 and 6/26, support NCOC workover RFQs.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2020-06-26	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		1	0	On 6/22-6/26, support P&A services presentation.
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-01	HTSG-TSR	:HTSG-TSR	HTSG-2020	SMART-Developmental Goals	Regular Pay	N		2	0	Send response back to Clean Design regarding Hi-Line  Call with Kevin from Clean Design Power Data sent via Dropbox 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-01	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		1	0	SAK Weekly meeting
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-01	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		5	0	LED Lights Report comments  Fix Genensis Online AutoCad sheet Typo Looking for GA/PA System Gaitronics Cable spec  
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-02	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		4	0	Genesis SPAR weekly meeting 480V Power Cable confirmed thru grasshopper and Drag chain Review API 540 Standard for LED light basic foot candle requirements  
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-02	HTSG-TSR	:HTSG-TSR	HTSG-2020	SMART-Developmental Goals	Regular Pay	N		1	0	Send response back to Clean Design regarding Hi-Line  Call with Kevin from Clean Design Power Data sent via Dropbox 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-02	OH-034	:OH-034	OH-034-007	Indonesia	Regular Pay	N		3	0	Rig 253 Rig Stacking question form Joseph reply.  Looking for Rig 253 Rig Stacking Procedure from Vendor. Email sent,. Waiting for rely back.  Chuck sent Basic Procedure and reviewing now. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-03	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		1	0	Genesis SPAR weekly meeting 480V Power Cable confirmed thru grasshopper and Drag chain Review API 540 Standard for LED light basic foot candle requirements  
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-03	OH-034	:OH-034	OH-034-007	Indonesia	Regular Pay	N		7	0	Rig 253 Rig Stacking question form Joseph reply.  Looking for Rig 253 Rig Stacking Procedure from Vendor. Email sent,. Waiting for rely back.  Chuck sent Basic Procedure and reviewing now. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-04	HTSG-TSR	:HTSG-TSR	HTSG-2020	SMART-Developmental Goals	Regular Pay	N		2	0	Send response back to Clean Design regarding Hi-Line  Call with Kevin from Clean Design Power Data sent via Dropbox 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-04	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	TS Weekly meeting
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-04	OH-034	:OH-034	OH-034-007	Indonesia	Regular Pay	N		2	0	Rig 253 Rig Stacking question form Joseph reply.  Looking for Rig 253 Rig Stacking Procedure from Vendor. Email sent,. Waiting for rely back.  Chuck sent Basic Procedure and reviewing now. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-04	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		3	0	LED Lights Report comments  Fix Genensis Online AutoCad sheet Typo Looking for GA/PA System Gaitronics Cable spec  
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-05	HTSG-TSR	:HTSG-TSR	HTSG-2020	SMART-Developmental Goals	Regular Pay	N		1	0	Send response back to Clean Design regarding Hi-Line  Call with Kevin from Clean Design Power Data sent via Dropbox 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-05	OH-014	:OH-014	Overhead	All Activities	Regular Pay	N		4	0	RIMS Training Completed
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-05	OH-034	:OH-034	OH-034-007	Indonesia	Regular Pay	N		2	0	Rig 253 Rig Stacking question form Joseph reply.  Looking for Rig 253 Rig Stacking Procedure from Vendor. Email sent,. Waiting for rely back.  Chuck sent Basic Procedure and reviewing now. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-05	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		1	0	LED Lights Report comments  Fix Genensis Online AutoCad sheet Typo Looking for GA/PA System Gaitronics Cable spec  
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-08	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		2	0	Genesis Spar Weekly meeting Genesis Basic Design Rev2 review  Genesis Automatic Alarm and Fire system spec verified and send to Joshua.  Sent Fire /Gas system requirement to Jelec. Working on getting Quote.   
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-08	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		1	0	SAK Weekly meeting 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-08	OH-034	:OH-034	OH-034-007	Indonesia	Regular Pay	N		3	0	Rig 253 CAT Engine and Motor Internal PKD storage procedure send to Joseph Request KATO GEN storage procedure from Cat Mustang
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-08	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		2	0	API 540 Standard review and send copy to Joshua. Genesis Gaitronics Cable spec sheet review from Rexel looking for Automatic Alarm system for Genesis as per Joshua  Review Fire system power requirement with Venturetech  
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-09	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		2	0	Genesis Spar Weekly meeting Genesis Basic Design Rev2 review  Genesis Automatic Alarm and Fire system spec verified and send to Joshua.  Sent Fire /Gas system requirement to Jelec. Working on getting Quote.   
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-09	OH-034	:OH-034	OH-034-007	Indonesia	Regular Pay	N		4	0	Rig 253 CAT Engine and Motor Internal PKD storage procedure send to Joseph Request KATO GEN storage procedure from Cat Mustang
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-09	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		2	0	API 540 Standard review and send copy to Joshua. Genesis Gaitronics Cable spec sheet review from Rexel looking for Automatic Alarm system for Genesis as per Joshua  Review Fire system power requirement with Venturetech  
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-10	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		1	0	Genesis Spar Weekly meeting Genesis Basic Design Rev2 review  Genesis Automatic Alarm and Fire system spec verified and send to Joshua.  Sent Fire /Gas system requirement to Jelec. Working on getting Quote.   
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-10	OH-034	:OH-034	OH-034-007	Indonesia	Regular Pay	N		3	0	Rig 253 CAT Engine and Motor Internal PKD storage procedure send to Joseph Request KATO GEN storage procedure from Cat Mustang
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-10	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		4	0	API 540 Standard review and send copy to Joshua. Genesis Gaitronics Cable spec sheet review from Rexel looking for Automatic Alarm system for Genesis as per Joshua  Review Fire system power requirement with Venturetech  
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-11	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		2	0	Genesis Spar Weekly meeting Genesis Basic Design Rev2 review  Genesis Automatic Alarm and Fire system spec verified and send to Joshua.  Sent Fire /Gas system requirement to Jelec. Working on getting Quote.   
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-11	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	TS Weekly meeting
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-11	OH-034	:OH-034	OH-034-007	Indonesia	Regular Pay	N		1	0	Rig 253 CAT Engine and Motor Internal PKD storage procedure send to Joseph Request KATO GEN storage procedure from Cat Mustang
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-11	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		4	0	API 540 Standard review and send copy to Joshua. Genesis Gaitronics Cable spec sheet review from Rexel looking for Automatic Alarm system for Genesis as per Joshua  Review Fire system power requirement with Venturetech  
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-12	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		4	0	Genesis Spar Weekly meeting Genesis Basic Design Rev2 review  Genesis Automatic Alarm and Fire system spec verified and send to Joshua.  Sent Fire /Gas system requirement to Jelec. Working on getting Quote.   
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-12	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		4	0	API 540 Standard review and send copy to Joshua. Genesis Gaitronics Cable spec sheet review from Rexel looking for Automatic Alarm system for Genesis as per Joshua  Review Fire system power requirement with Venturetech  
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-15	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		2	0	Gaitronics PA/GA system Datasheet and Quote provided Spec out PA/GA parts  Rig QA Comments response  Review Final SIT procedure and attend conference  call   Jelec Fire and Gas system spec and quote provided 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-15	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		1	0	SAK Weekly meeting
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-15	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		5	0	Speaker requirement inside Genesis Driller's cabin research and two option provided New Part number and spec sheet  provided Upload Autocad file to electrical folder as per Kyle and Fix title block  Speaker Volume adjustment solution provided   Jelec Fire and Gas system parts spec reviewed  Genesis weekly meeting
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-16	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		3	0	Gaitronics PA/GA system Datasheet and Quote provided Spec out PA/GA parts  Rig QA Comments response  Review Final SIT procedure and attend conference  call   Jelec Fire and Gas system spec and quote provided 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-16	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		5	0	Speaker requirement inside Genesis Driller's cabin research and two option provided New Part number and spec sheet  provided Upload Autocad file to electrical folder as per Kyle and Fix title block  Speaker Volume adjustment solution provided   Jelec Fire and Gas system parts spec reviewed  Genesis weekly meeting
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-17	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		4	0	Gaitronics PA/GA system Datasheet and Quote provided Spec out PA/GA parts  Rig QA Comments response  Review Final SIT procedure and attend conference  call   Jelec Fire and Gas system spec and quote provided 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-17	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		4	0	Speaker requirement inside Genesis Driller's cabin research and two option provided New Part number and spec sheet  provided Upload Autocad file to electrical folder as per Kyle and Fix title block  Speaker Volume adjustment solution provided   Jelec Fire and Gas system parts spec reviewed  Genesis weekly meeting
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-18	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		2	0	Gaitronics PA/GA system Datasheet and Quote provided Spec out PA/GA parts  Rig QA Comments response  Review Final SIT procedure and attend conference  call   Jelec Fire and Gas system spec and quote provided 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-18	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	TS Weekly meeting 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-18	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		5	0	Speaker requirement inside Genesis Driller's cabin research and two option provided New Part number and spec sheet  provided Upload Autocad file to electrical folder as per Kyle and Fix title block  Speaker Volume adjustment solution provided   Jelec Fire and Gas system parts spec reviewed  Genesis weekly meeting
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-19	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		4	0	Gaitronics PA/GA system Datasheet and Quote provided Spec out PA/GA parts  Rig QA Comments response  Review Final SIT procedure and attend conference  call   Jelec Fire and Gas system spec and quote provided 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-19	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		4	0	Speaker requirement inside Genesis Driller's cabin research and two option provided New Part number and spec sheet  provided Upload Autocad file to electrical folder as per Kyle and Fix title block  Speaker Volume adjustment solution provided   Jelec Fire and Gas system parts spec reviewed  Genesis weekly meeting
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-22	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		4	0	Jelec Fire and Gas installation Quote request and send to Joshua. Gaitronics cable interface and length identify  to buy 500FT of cable  Gaitronics Speaker and Cable updated quote sent to Joshua Rig QA comments updated  Genesis weekly meeting
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-22	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		1	0	SAK weekly meeting 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-22	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		3	0	Conference call Sawyers to discuss Drawworks HPU House layout .   Conference call with EMI to discuss incoming cable requirements as per Oneline to reflect on Grasshopper layout  Gaitronics system connection layout sent to EMI.  
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-23	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		4	0	Jelec Fire and Gas installation Quote request and send to Joshua. Gaitronics cable interface and length identify  to buy 500FT of cable  Gaitronics Speaker and Cable updated quote sent to Joshua Rig QA comments updated  Genesis weekly meeting
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-23	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		4	0	Conference call Sawyers to discuss Drawworks HPU House layout .   Conference call with EMI to discuss incoming cable requirements as per Oneline to reflect on Grasshopper layout  Gaitronics system connection layout sent to EMI.  
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-24	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		1	0	Jelec Fire and Gas installation Quote request and send to Joshua. Gaitronics cable interface and length identify  to buy 500FT of cable  Gaitronics Speaker and Cable updated quote sent to Joshua Rig QA comments updated  Genesis weekly meeting
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-24	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		7	0	Conference call Sawyers to discuss Drawworks HPU House layout .   Conference call with EMI to discuss incoming cable requirements as per Oneline to reflect on Grasshopper layout  Gaitronics system connection layout sent to EMI.  
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-25	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		4	0	Jelec Fire and Gas installation Quote request and send to Joshua. Gaitronics cable interface and length identify  to buy 500FT of cable  Gaitronics Speaker and Cable updated quote sent to Joshua Rig QA comments updated  Genesis weekly meeting
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-25	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	TS weekly meeting 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-25	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		3	0	Conference call Sawyers to discuss Drawworks HPU House layout .   Conference call with EMI to discuss incoming cable requirements as per Oneline to reflect on Grasshopper layout  Gaitronics system connection layout sent to EMI.  
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-26	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		2	0	Jelec Fire and Gas installation Quote request and send to Joshua. Gaitronics cable interface and length identify  to buy 500FT of cable  Gaitronics Speaker and Cable updated quote sent to Joshua Rig QA comments updated  Genesis weekly meeting
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2020-06-26	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		6	0	Conference call Sawyers to discuss Drawworks HPU House layout .   Conference call with EMI to discuss incoming cable requirements as per Oneline to reflect on Grasshopper layout  Gaitronics system connection layout sent to EMI.  
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-01	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1	0	Emails  Timesheet Group C form.  Review status w/ J.G (6/1,& 3/20) 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-01	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1.5	0	ORLP-01-03-011-(sht.1-4)  Review w J.R. ORLP-01-03-011-(sht.1-4) comments per K.P.M. (6/1&2/20) ORLP-01-03-011-(sht.1-4) comments per J.R/J.G.. (6/1-4/20)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-01	ORLAN-TSR	:ORLAN-TSR	TSR-01767-ORLP	Bell Nipple Lifting Tool	Regular Pay	N		6	0	Lifting Tool Assembly-sketch-mod- by T.E. 5/26/20  (6/1/20)  Lift tool update per mod by T.E. 6/1/20 (6/1/20) Fuze meeting w T.E. (6/1/20) RUSA-PKE-DT-ND-1-27900.1008
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-02	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		0.5	0	Emails  Timesheet Group C form.  Review status w/ J.G (6/1,& 3/20) 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-02	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		3	0	ORLP-01-03-011-(sht.1-4)  Review w J.R. ORLP-01-03-011-(sht.1-4) comments per K.P.M. (6/1&2/20) ORLP-01-03-011-(sht.1-4) comments per J.R/J.G.. (6/1-4/20)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-02	ORLAN-TSR	:ORLAN-TSR	TSR-01767-ORLP	Bell Nipple Lifting Tool	Regular Pay	N		6	0	Lifting Tool Assembly-sketch-mod- by T.E. 5/26/20  (6/1/20)  Lift tool update per mod by T.E. 6/1/20 (6/1/20) Fuze meeting w T.E. (6/1/20) RUSA-PKE-DT-ND-1-27900.1008
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-03	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		2	0	Emails  Timesheet Group C form.  Review status w/ J.G (6/1,& 3/20) 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-03	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1.5	0	ORLP-01-03-011-(sht.1-4)  Review w J.R. ORLP-01-03-011-(sht.1-4) comments per K.P.M. (6/1&2/20) ORLP-01-03-011-(sht.1-4) comments per J.R/J.G.. (6/1-4/20)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-03	ORLAN-TSR	:ORLAN-TSR	TSR-01767-ORLP	Bell Nipple Lifting Tool	Regular Pay	N		6	0	Lifting Tool Assembly-sketch-mod- by T.E. 5/26/20  (6/1/20)  Lift tool update per mod by T.E. 6/1/20 (6/1/20) Fuze meeting w T.E. (6/1/20) RUSA-PKE-DT-ND-1-27900.1008
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-04	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Weekly meeting (6/4/20) 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-04	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		0.5	0	Emails  Timesheet Group C form.  Review status w/ J.G (6/1,& 3/20) 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-04	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		2.5	0	ORLP-01-03-011-(sht.1-4)  Review w J.R. ORLP-01-03-011-(sht.1-4) comments per K.P.M. (6/1&2/20) ORLP-01-03-011-(sht.1-4) comments per J.R/J.G.. (6/1-4/20)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-04	ORLAN-TSR	:ORLAN-TSR	TSR-01767-ORLP	Bell Nipple Lifting Tool	Regular Pay	N		1	0	Lifting Tool Assembly-sketch-mod- by T.E. 5/26/20  (6/1/20)  Lift tool update per mod by T.E. 6/1/20 (6/1/20) Fuze meeting w T.E. (6/1/20) RUSA-PKE-DT-ND-1-27900.1008
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-05	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		2	0	Emails  Timesheet Group C form.  Review status w/ J.G (6/1,& 3/20) 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-05	ORLAN-TSR	:ORLAN-TSR	TSR-01767-ORLP	Bell Nipple Lifting Tool	Regular Pay	N		5.5	0	Lifting Tool Assembly-sketch-mod- by T.E. 5/26/20  (6/1/20)  Lift tool update per mod by T.E. 6/1/20 (6/1/20) Fuze meeting w T.E. (6/1/20) RUSA-PKE-DT-ND-1-27900.1008
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-08	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1.5	0	Emails  Timesheet Call J.G. Update/progress (6/8/20) Call J.G. Update/progress (6/12/20)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-08	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		5	0	ORLP-01-03-011-(1-4) (6/8,9/20) RUSA BLOCK (6/12/20) RUSA-PKE-DT-ND-(1&2) (6/8-11
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-08	ORLAN-TSR	:ORLAN-TSR	TSR-01767-ORLP	Bell Nipple Lifting Tool	Regular Pay	N		2	0	RUSA-PKE-DT-ND-(1&2) (6/8-11
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-09	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		0.5	0	Emails  Timesheet Call J.G. Update/progress (6/8/20) Call J.G. Update/progress (6/12/20)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-09	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		6	0	ORLP-01-03-011-(1-4) (6/8,9/20) RUSA BLOCK (6/12/20) RUSA-PKE-DT-ND-(1&2) (6/8-11
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-09	ORLAN-TSR	:ORLAN-TSR	TSR-01767-ORLP	Bell Nipple Lifting Tool	Regular Pay	N		2	0	RUSA-PKE-DT-ND-(1&2) (6/8-11
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-10	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		0.5	0	Emails  Timesheet Call J.G. Update/progress (6/8/20) Call J.G. Update/progress (6/12/20)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-10	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		4.25	0	ORLP-01-03-011-(1-4) (6/8,9/20) RUSA BLOCK (6/12/20) RUSA-PKE-DT-ND-(1&2) (6/8-11
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-10	ORLAN-TSR	:ORLAN-TSR	TSR-01767-ORLP	Bell Nipple Lifting Tool	Regular Pay	N		3	0	RUSA-PKE-DT-ND-(1&2) (6/8-11
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-10	Rig 273L-TSR	:Rig 273L-TSR	TSR-01757-AADU	Surface 21-1/4in. Annualar Lift Ring Modifications	Regular Pay	N		0.5	0	273L-01-03-xxx- (1-3) R0  (Review w/ T.E., stress are low; further analysis e K.P.M. 6/10/20)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-10	Rig 273L-TSR	:Rig 273L-TSR	TSR-01758-AADU	BOP Ram Installation & Removal Tool System	Regular Pay	N		0.25	0	BOP Ram inst. (review w/ T.E. 6/10/20) 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-11	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Weekly meeting (6/15/20)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-11	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		0.5	0	Emails  Timesheet Call J.G. Update/progress (6/8/20) Call J.G. Update/progress (6/12/20)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-11	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		4	0	ORLP-01-03-011-(1-4) (6/8,9/20) RUSA BLOCK (6/12/20) RUSA-PKE-DT-ND-(1&2) (6/8-11
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-11	ORLAN-TSR	:ORLAN-TSR	TSR-01767-ORLP	Bell Nipple Lifting Tool	Regular Pay	N		3	0	RUSA-PKE-DT-ND-(1&2) (6/8-11
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-12	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		0.75	0	Emails  Timesheet Call J.G. Update/progress (6/8/20) Call J.G. Update/progress (6/12/20)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-12	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		5.25	0	ORLP-01-03-011-(1-4) (6/8,9/20) RUSA BLOCK (6/12/20) RUSA-PKE-DT-ND-(1&2) (6/8-11
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-15	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1	0	Emails Timesheet Call J.G. Updates/Progress
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-15	OH-014	:OH-014	Overhead	All Activities	Regular Pay	N		2	0	RUSA Metric conversion.
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-15	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		5.5	0	RUSA-PKE-DT-ND-(1&2) (6/15-16/20) RUSA-HDE-DT-(1&2) ORLP-01-03-011-(1-4) (6/15-17/20)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-16	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		0.5	0	Emails Timesheet Call J.G. Updates/Progress
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-16	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		8	0	RUSA-PKE-DT-ND-(1&2) (6/15-16/20) RUSA-HDE-DT-(1&2) ORLP-01-03-011-(1-4) (6/15-17/20)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-17	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		0.5	0	Emails Timesheet Call J.G. Updates/Progress
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-17	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		8	0	RUSA-PKE-DT-ND-(1&2) (6/15-16/20) RUSA-HDE-DT-(1&2) ORLP-01-03-011-(1-4) (6/15-17/20)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-18	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Weekly meeting (6/18/20)  
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-18	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		0.5	0	Emails Timesheet Call J.G. Updates/Progress
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-18	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		7	0	RUSA-PKE-DT-ND-(1&2) (6/15-16/20) RUSA-HDE-DT-(1&2) ORLP-01-03-011-(1-4) (6/15-17/20)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-19	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		0.5	0	Emails Timesheet Call J.G. Updates/Progress
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-19	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		2.5	0	RUSA-PKE-DT-ND-(1&2) (6/15-16/20) RUSA-HDE-DT-(1&2) ORLP-01-03-011-(1-4) (6/15-17/20)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-19	Rig 273L-TSR	:Rig 273L-TSR	TSR-01757-AADU	Surface 21-1/4in. Annualar Lift Ring Modifications	Regular Pay	N		3	0	273L-01-03-xxx- (1-3) R0 (6/19/20)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-22	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1	0	Emails Timesheet Call J.G. (progress/update) 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-22	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1	0	TSR-01759  Dwgs. update & comments (6/22,23,20) TSR-01759  Dwgs. Rev. B (06/25,26/20) TSR-01767  RUSA-PKE-DT-ND-(1&2)-27900.1008 updates per comments/call w J.G. (6/23/20)  
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-22	Rig 273L-TSR	:Rig 273L-TSR	TSR-01757-AADU	Surface 21-1/4in. Annualar Lift Ring Modifications	Regular Pay	N		6	0	273L-01-03-xxx- (1-3) R0/ SOLIDWORKS Model - 2D CAD DWG (6/22,23,24,25,/20) Review w/T.E. 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-23	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1	0	Emails Timesheet Call J.G. (progress/update) 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-23	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		2.5	0	TSR-01759  Dwgs. update & comments (6/22,23,20) TSR-01759  Dwgs. Rev. B (06/25,26/20) TSR-01767  RUSA-PKE-DT-ND-(1&2)-27900.1008 updates per comments/call w J.G. (6/23/20)  
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-23	Rig 273L-TSR	:Rig 273L-TSR	TSR-01757-AADU	Surface 21-1/4in. Annualar Lift Ring Modifications	Regular Pay	N		5	0	273L-01-03-xxx- (1-3) R0/ SOLIDWORKS Model - 2D CAD DWG (6/22,23,24,25,/20) Review w/T.E. 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-24	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1	0	Emails Timesheet Call J.G. (progress/update) 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-24	Rig 273L-TSR	:Rig 273L-TSR	TSR-01757-AADU	Surface 21-1/4in. Annualar Lift Ring Modifications	Regular Pay	N		7.5	0	273L-01-03-xxx- (1-3) R0/ SOLIDWORKS Model - 2D CAD DWG (6/22,23,24,25,/20) Review w/T.E. 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-25	Berkut-TSR	:Berkut-TSR	TSR-01770-BERP	Padeye for Choke Kill Hose Rigging on BOP	Regular Pay	N		2.5	0	TSR-01770 Review (06/25/20) 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-25	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Weekly meeting (06/25/20)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-25	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		0.5	0	Emails Timesheet Call J.G. (progress/update) 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-25	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		2	0	TSR-01759  Dwgs. update & comments (6/22,23,20) TSR-01759  Dwgs. Rev. B (06/25,26/20) TSR-01767  RUSA-PKE-DT-ND-(1&2)-27900.1008 updates per comments/call w J.G. (6/23/20)  
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-25	Rig 273L-TSR	:Rig 273L-TSR	TSR-01757-AADU	Surface 21-1/4in. Annualar Lift Ring Modifications	Regular Pay	N		3	0	273L-01-03-xxx- (1-3) R0/ SOLIDWORKS Model - 2D CAD DWG (6/22,23,24,25,/20) Review w/T.E. 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-26	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		0.5	0	Emails Timesheet Call J.G. (progress/update) 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2020-06-26	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		5.5	0	TSR-01759  Dwgs. update & comments (6/22,23,20) TSR-01759  Dwgs. Rev. B (06/25,26/20) TSR-01767  RUSA-PKE-DT-ND-(1&2)-27900.1008 updates per comments/call w J.G. (6/23/20)  
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-01	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		1.5	0	Status update meetings, master equipment list revision, basis of design revision, drawworks maintenance access, structural interface clarifications, GA review, mousehole design review
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-01	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		3.5	0	Grasshopper/Dragchain clarifications and meetings, overall SPAR layout assistance and meetings, gaitronics cable clarifications, substructure manrider clarifications, HPU exhaust routing, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-01	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		1	0	Weekly meeting
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-01	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1.5	0	Berkut standpipe support torque values and quote review,  
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-01	ORLAN-TSR	:ORLAN-TSR	TSR-01759-ORLP	Casing Jetting Tool (9.625 in.)	Regular Pay	N		1	0	C-plate locking mechanism design, drawing review, vendor correspondence, documentation/tpp requirements
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-02	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		1	0	Status update meetings, master equipment list revision, basis of design revision, drawworks maintenance access, structural interface clarifications, GA review, mousehole design review
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-02	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		3	0	Grasshopper/Dragchain clarifications and meetings, overall SPAR layout assistance and meetings, gaitronics cable clarifications, substructure manrider clarifications, HPU exhaust routing, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-02	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		3	0	SAFI installation and research, recieved SAFI key from office
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-02	ORLAN-TSR	:ORLAN-TSR	TSR-01759-ORLP	Casing Jetting Tool (9.625 in.)	Regular Pay	N		1.5	0	C-plate locking mechanism design, drawing review, vendor correspondence, documentation/tpp requirements
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-03	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		1	0	Status update meetings, master equipment list revision, basis of design revision, drawworks maintenance access, structural interface clarifications, GA review, mousehole design review
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-03	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		4	0	Grasshopper/Dragchain clarifications and meetings, overall SPAR layout assistance and meetings, gaitronics cable clarifications, substructure manrider clarifications, HPU exhaust routing, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-03	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		0.5	0	SAFI installation and research, recieved SAFI key from office
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-03	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1	0	Berkut standpipe support torque values and quote review,  
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-03	ORLAN-TSR	:ORLAN-TSR	TSR-01759-ORLP	Casing Jetting Tool (9.625 in.)	Regular Pay	N		2	0	C-plate locking mechanism design, drawing review, vendor correspondence, documentation/tpp requirements
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-04	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		2.5	0	Status update meetings, master equipment list revision, basis of design revision, drawworks maintenance access, structural interface clarifications, GA review, mousehole design review
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-04	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		1	0	Grasshopper/Dragchain clarifications and meetings, overall SPAR layout assistance and meetings, gaitronics cable clarifications, substructure manrider clarifications, HPU exhaust routing, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-04	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	TS meeting
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-04	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		4	0	SAFI installation and research, recieved SAFI key from office
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-05	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		3	0	Status update meetings, master equipment list revision, basis of design revision, drawworks maintenance access, structural interface clarifications, GA review, mousehole design review
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-05	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		2	0	Grasshopper/Dragchain clarifications and meetings, overall SPAR layout assistance and meetings, gaitronics cable clarifications, substructure manrider clarifications, HPU exhaust routing, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-05	ORLAN-TSR	:ORLAN-TSR	TSR-01759-ORLP	Casing Jetting Tool (9.625 in.)	Regular Pay	N		1	0	C-plate locking mechanism design, drawing review, vendor correspondence, documentation/tpp requirements
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-08	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		4	0	GA drawing review, SIT procedure review, drawworks maintenance concept, pipe route review, basis of design info and revision, install procedure review and comments
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-08	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		3	0	Overall layout drawing review and meetings, status update meeting, grasshopper/drag chain placement and concept, gaitronics cable, power swivel torque torque test, hydraulic consumers info, additional misc cable info, HPU exhaust info, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-08	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		1	0	Weekly meeting
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-08	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		0.5	0	orlan casing jetting tool clarifications and RFQ, orlan casing jetting tool drawing review, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-09	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		2	0	GA drawing review, SIT procedure review, drawworks maintenance concept, pipe route review, basis of design info and revision, install procedure review and comments
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-09	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		4	0	Overall layout drawing review and meetings, status update meeting, grasshopper/drag chain placement and concept, gaitronics cable, power swivel torque torque test, hydraulic consumers info, additional misc cable info, HPU exhaust info, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-09	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		2	0	orlan casing jetting tool clarifications and RFQ, orlan casing jetting tool drawing review, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-09	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		0.5	0	TSR review, model review
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-10	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		4	0	GA drawing review, SIT procedure review, drawworks maintenance concept, pipe route review, basis of design info and revision, install procedure review and comments
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-10	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		3	0	Overall layout drawing review and meetings, status update meeting, grasshopper/drag chain placement and concept, gaitronics cable, power swivel torque torque test, hydraulic consumers info, additional misc cable info, HPU exhaust info, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-10	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		0.5	0	orlan casing jetting tool clarifications and RFQ, orlan casing jetting tool drawing review, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-10	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		1	0	TSR review, model review
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-11	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		2	0	GA drawing review, SIT procedure review, drawworks maintenance concept, pipe route review, basis of design info and revision, install procedure review and comments
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-11	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		3	0	Overall layout drawing review and meetings, status update meeting, grasshopper/drag chain placement and concept, gaitronics cable, power swivel torque torque test, hydraulic consumers info, additional misc cable info, HPU exhaust info, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-11	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	TS meeting
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-11	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		2	0	orlan casing jetting tool clarifications and RFQ, orlan casing jetting tool drawing review, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-11	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		0.5	0	TSR review, model review
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-12	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		2	0	GA drawing review, SIT procedure review, drawworks maintenance concept, pipe route review, basis of design info and revision, install procedure review and comments
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-12	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		3	0	Overall layout drawing review and meetings, status update meeting, grasshopper/drag chain placement and concept, gaitronics cable, power swivel torque torque test, hydraulic consumers info, additional misc cable info, HPU exhaust info, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-12	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		1	0	TSR review, model review
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-15	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		2.5	0	Chevron interface drawing review and meetings, hydraulic interface locations and clarifications, rig piping routing meetings and clarifications, maintenance rail concept, SIT procedure comments, BOD revision comments, RigQA comments, stair tower concept, status updates, sound study clarifications, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-15	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		3.5	0	grasshopper end connection clarifications and meetings, Power swivel links, Sawyer HPU connection clarifications
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-15	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		1	0	weekly meeting
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-15	ORLAN-TSR	:ORLAN-TSR	TSR-01759-ORLP	Casing Jetting Tool (9.625 in.)	Regular Pay	N		1.5	0	casing jetting tool quote and drawing review, coating clarifications, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-16	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		3	0	Chevron interface drawing review and meetings, hydraulic interface locations and clarifications, rig piping routing meetings and clarifications, maintenance rail concept, SIT procedure comments, BOD revision comments, RigQA comments, stair tower concept, status updates, sound study clarifications, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-16	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		4	0	grasshopper end connection clarifications and meetings, Power swivel links, Sawyer HPU connection clarifications
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-16	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1	0	SAFI program refresher, RUSA revision research
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-16	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		0.5	0	TSR review, model review, began SAFI model
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-17	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		3	0	Chevron interface drawing review and meetings, hydraulic interface locations and clarifications, rig piping routing meetings and clarifications, maintenance rail concept, SIT procedure comments, BOD revision comments, RigQA comments, stair tower concept, status updates, sound study clarifications, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-17	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		3	0	grasshopper end connection clarifications and meetings, Power swivel links, Sawyer HPU connection clarifications
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-17	ORLAN-TSR	:ORLAN-TSR	TSR-01759-ORLP	Casing Jetting Tool (9.625 in.)	Regular Pay	N		2	0	casing jetting tool quote and drawing review, coating clarifications, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-17	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		0.5	0	TSR review, model review, began SAFI model
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-18	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		4	0	Chevron interface drawing review and meetings, hydraulic interface locations and clarifications, rig piping routing meetings and clarifications, maintenance rail concept, SIT procedure comments, BOD revision comments, RigQA comments, stair tower concept, status updates, sound study clarifications, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-18	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		1.5	0	grasshopper end connection clarifications and meetings, Power swivel links, Sawyer HPU connection clarifications
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-18	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	TS meeting
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-18	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1	0	SAFI program refresher, RUSA revision research
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-18	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		1	0	TSR review, model review, began SAFI model
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-19	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		3	0	SAFI program refresher, RUSA revision research
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-19	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		3	0	TSR review, model review, began SAFI model
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-22	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		3	0	3D model review, customer status update meeting, stair tower concept, BOD comments, SIT comments, Scope of work comments/clarification, action list meeting, exhaust piping coorespondance, control line spooler details
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-22	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		4.5	0	HPU sound attenuation options and integration, grasshipper/dragchain piping route and end fittings, hydraulic piping clarifications and meetings, series 71 vertical load, cabin jumper hose concept, mini grasshopper for cabin research, hawkjaw hydraulic connection
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-22	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		1	0	Weekly meeting
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-23	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		1	0	3D model review, customer status update meeting, stair tower concept, BOD comments, SIT comments, Scope of work comments/clarification, action list meeting, exhaust piping coorespondance, control line spooler details
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-23	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		1.5	0	HPU sound attenuation options and integration, grasshipper/dragchain piping route and end fittings, hydraulic piping clarifications and meetings, series 71 vertical load, cabin jumper hose concept, mini grasshopper for cabin research, hawkjaw hydraulic connection
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-23	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		2	0	Orlan casing jetting tool drawing and quote review and clarifications, RUSA title block clarifications
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-23	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		4	0	review of SAFI model meeting, Orlan seismic condition load combinations review, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-24	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		2.5	0	3D model review, customer status update meeting, stair tower concept, BOD comments, SIT comments, Scope of work comments/clarification, action list meeting, exhaust piping coorespondance, control line spooler details
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-24	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		1.5	0	HPU sound attenuation options and integration, grasshipper/dragchain piping route and end fittings, hydraulic piping clarifications and meetings, series 71 vertical load, cabin jumper hose concept, mini grasshopper for cabin research, hawkjaw hydraulic connection
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-24	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		3.5	0	Orlan casing jetting tool drawing and quote review and clarifications, RUSA title block clarifications
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-24	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		1	0	review of SAFI model meeting, Orlan seismic condition load combinations review, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-25	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		3	0	3D model review, customer status update meeting, stair tower concept, BOD comments, SIT comments, Scope of work comments/clarification, action list meeting, exhaust piping coorespondance, control line spooler details
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-25	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		2	0	HPU sound attenuation options and integration, grasshipper/dragchain piping route and end fittings, hydraulic piping clarifications and meetings, series 71 vertical load, cabin jumper hose concept, mini grasshopper for cabin research, hawkjaw hydraulic connection
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-25	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		2	0	TS meeting and Safety moment prep
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-25	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1.5	0	Orlan casing jetting tool drawing and quote review and clarifications, RUSA title block clarifications
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-26	CVX Genesis	:CVX Genesis	TSR-1725-GENP-01	FEED Study/Detailed Design	Regular Pay	N		1.5	0	3D model review, customer status update meeting, stair tower concept, BOD comments, SIT comments, Scope of work comments/clarification, action list meeting, exhaust piping coorespondance, control line spooler details
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-26	CVX Genesis	:CVX Genesis	TSR-1725-GENP-02	Initiation and Procurement	Regular Pay	N		2.5	0	HPU sound attenuation options and integration, grasshipper/dragchain piping route and end fittings, hydraulic piping clarifications and meetings, series 71 vertical load, cabin jumper hose concept, mini grasshopper for cabin research, hawkjaw hydraulic connection
Reck, John	Engineer I	29656	Reck, John:Engineer I	2020-06-26	ORLAN-TSR	:ORLAN-TSR	TSR-01768-ORLP	Repair of Mud Pump #1 & #2	Regular Pay	N		2	0	review of SAFI model meeting, Orlan seismic condition load combinations review,