Name Billing Class Employee No. Item Line Class Transaction Date Job No. Customer Service Item Notes Payroll Item Billable Employee Paid Day Rate Duration Days Remarks Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-06-29 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 2.5 0 Review proposals, create KPI comparison table, create score card, finish out cost estimate for DM, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-06-29 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 review project, reformat cost estimate, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-06-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Ops call, TSR Meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-06-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-06-29 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 SAK meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-06-29 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 2 0 Try to convert Creo to Solidworks Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-06-29 ORLAN-TSR :ORLAN-TSR TSR-01767-ORLP Bell Nipple Lifting Tool Regular Pay N 0.25 0 comments from Mio, review with Jorge, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-06-29 Rig 273L-TSR :Rig 273L-TSR TSR-01757-AADU Surface 21-1/4in. Annualar Lift Ring Modifications Regular Pay N 1.5 0 Drawing review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-06-30 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 6.5 0 Review proposals, create KPI comparison table, create score card, finish out cost estimate for DM, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-06-30 ORLAN-TSR :ORLAN-TSR TSR-01767-ORLP Bell Nipple Lifting Tool Regular Pay N 0.5 0 comments from Mio, review with Jorge, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-06-30 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 2 0 Review with Kyle and make corrections Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-01 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 7 0 Review proposals, create KPI comparison table, create score card, finish out cost estimate for DM, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-01 ORLAN-TSR :ORLAN-TSR TSR-01767-ORLP Bell Nipple Lifting Tool Regular Pay N 1.5 0 comments from Mio, review with Jorge, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-02 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 5 0 Review proposals, create KPI comparison table, create score card, finish out cost estimate for DM, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-02 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 review project, reformat cost estimate, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 Ops call, TSR Meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 4th of July Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 update cost estimate and formatting, review tech spec to ensure latest revision, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 Ops call, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-06 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 SAK meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-06 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 3.5 0 review drawings and model padeyes, lifting scenarios, FEA, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-06 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 1 0 discuss with Kyle, update closeout report, meeting with Kyle and John about SAFI Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-06 Rig 273L-TSR :Rig 273L-TSR TSR-01757-AADU Surface 21-1/4in. Annualar Lift Ring Modifications Regular Pay N 0.5 0 review drawings from Jorge Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-07 OH-010 :OH-010 Overhead All Activities Regular Pay N 1.5 0 Go up to work to retrieve monitors and docking station Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-07 ORLAN-TSR :ORLAN-TSR TSR-01767-ORLP Bell Nipple Lifting Tool Regular Pay N 5.5 0 create closeout report, small change to drawing, PDF and send to Mio, make changes to closeout and send to Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-07 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 1 0 discuss with Kyle, update closeout report, meeting with Kyle and John about SAFI Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-08 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.75 0 update cost estimate and formatting, review tech spec to ensure latest revision, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-08 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 SAK meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-08 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 5.5 0 review drawings and model padeyes, lifting scenarios, FEA, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-08 ORLAN-TSR :ORLAN-TSR TSR-01767-ORLP Bell Nipple Lifting Tool Regular Pay N 0.75 0 create closeout report, small change to drawing, PDF and send to Mio, make changes to closeout and send to Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-08 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 1 0 discuss with Kyle, update closeout report, meeting with Kyle and John about SAFI Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-09 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 3 0 logistics cost, conf call with Huisman, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-09 Berkut-TSR :Berkut-TSR TSR-01770-BERP Padeye for Choke Kill Hose Rigging on BOP Regular Pay N 1 0 Review TSR info, create model of clamp, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-09 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 update cost estimate and formatting, review tech spec to ensure latest revision, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 Ops call, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-09 ORLAN-TSR :ORLAN-TSR TSR-01767-ORLP Bell Nipple Lifting Tool Regular Pay N 1 0 create closeout report, small change to drawing, PDF and send to Mio, make changes to closeout and send to Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-10 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 logistics cost, conf call with Huisman, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-10 Berkut-TSR :Berkut-TSR TSR-01770-BERP Padeye for Choke Kill Hose Rigging on BOP Regular Pay N 5.25 0 Review TSR info, create model of clamp, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-13 Berkut-TSR :Berkut-TSR TSR-01770-BERP Padeye for Choke Kill Hose Rigging on BOP Regular Pay N 6.25 0 email Maxim, finish model, run analysis, modify model and discuss with Kyle Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-13 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.5 0 trucking logistics, detailed load lists, review tender docs, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Ops call, TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, PDR with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-13 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 SAK meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-14 Berkut-TSR :Berkut-TSR TSR-01770-BERP Padeye for Choke Kill Hose Rigging on BOP Regular Pay N 4 0 email Maxim, finish model, run analysis, modify model and discuss with Kyle Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-14 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 trucking logistics, detailed load lists, review tender docs, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, PDR with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-15 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 0.25 0 talk with Mat about project status, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-15 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 trucking logistics, detailed load lists, review tender docs, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, PDR with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-15 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 SAK meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-15 ORLAN-TSR :ORLAN-TSR TSR-01767-ORLP Bell Nipple Lifting Tool Regular Pay N 0.75 0 review Mio comments, Russian letters, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-15 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 0.5 0 download pics, review with Kyle, email Mio about installation issue, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-16 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 trucking logistics, detailed load lists, review tender docs, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ops call, TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 safety moment prep, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, PDR with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-16 ORLAN-TSR :ORLAN-TSR TSR-01767-ORLP Bell Nipple Lifting Tool Regular Pay N 1 0 review Mio comments, Russian letters, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-16 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 1.5 0 download pics, review with Kyle, email Mio about installation issue, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-17 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 trucking logistics, detailed load lists, review tender docs, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, PDR with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-17 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 0.75 0 send load info to Reck Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-20 Berkut-TSR :Berkut-TSR TSR-01770-BERP Padeye for Choke Kill Hose Rigging on BOP Regular Pay N 0.5 0 Review pictures from Alexey, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-20 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 8 0 Rig spec and discussions about logistics with Troy Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 Ops Call Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-20 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 SAK meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-20 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 0.75 0 review load scenarios with Reck, review safi model with Reck and Kyle Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-21 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 5 0 Review of docs, discussions with Kyle, Tyler, Dan, and Mat, create rig builder presentation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-21 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 Rig spec and discussions about logistics with Troy Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-21 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 0.75 0 review load scenarios with Reck, review safi model with Reck and Kyle Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-22 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 3 0 Review of docs, discussions with Kyle, Tyler, Dan, and Mat, create rig builder presentation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-22 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 Rig spec and discussions about logistics with Troy Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-22 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 SAK meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-22 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 0.75 0 review load scenarios with Reck, review safi model with Reck and Kyle Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-23 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 5 0 Review of docs, discussions with Kyle, Tyler, Dan, and Mat, create rig builder presentation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-23 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.5 0 Rig spec and discussions about logistics with Troy Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-23 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 0.75 0 review load scenarios with Reck, review safi model with Reck and Kyle Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-23 ORLAN-TSR :ORLAN-TSR TSR-01767-ORLP Bell Nipple Lifting Tool Regular Pay N 0.25 0 Answering questions from Kennedy Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-24 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 5.25 0 Review of docs, discussions with Kyle, Tyler, Dan, and Mat, create rig builder presentation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-24 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Rig spec and discussions about logistics with Troy Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-24 ORLAN-TSR :ORLAN-TSR TSR-01767-ORLP Bell Nipple Lifting Tool Regular Pay N 0.25 0 Answering questions from Kennedy Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-27 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 3 0 Willow tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 TOTAL tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ops call Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheets Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-27 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 SAK meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-27 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 0.75 0 Review SAFI model Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-28 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 5 0 Willow tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-28 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 TOTAL tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-28 ORLAN-TSR :ORLAN-TSR TSR-01767-ORLP Bell Nipple Lifting Tool Regular Pay N 0.5 0 discuss dwg comments with James Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-29 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 5 0 Willow tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-29 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 TOTAL tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-29 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 SAK meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-30 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 5 0 Willow tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-30 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 TOTAL tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-31 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 Willow tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-31 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 TOTAL tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-07-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheets Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-06-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (06/29/20) Update call with Tyler Update call with Lam. (06/30/20) Review and approved designer timesheets. Update weekly timesheet and submitted for approval. Update call with Jorge. Call with Lam to review ATC piping layouts. Organized 249 drawing folders. Sketchup call with Lam. (07/01/20) Update with Jorge. (07/02/20) Archived 249 files on Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-06-29 Rig 273L-TSR :Rig 273L-TSR TSR-01757-AADU Surface 21-1/4in. Annualar Lift Ring Modifications Regular Pay N 7.5 0 (06/29/20) Started checking lift ring. Call with Tyler to review redlines. Discussed redlines with Jorge. Revised existing lift ring to show obsolete stamp and added reference to new drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-06-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 4.25 0 (06/30/20) Updates to BOP skid 3D model (249L). (07/01/20) Researched safety topic and copied info. (07/02/20) Update 3D assembly drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-06-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.25 0 (06/29/20) Update call with Tyler Update call with Lam. (06/30/20) Review and approved designer timesheets. Update weekly timesheet and submitted for approval. Update call with Jorge. Call with Lam to review ATC piping layouts. Organized 249 drawing folders. Sketchup call with Lam. (07/01/20) Update with Jorge. (07/02/20) Archived 249 files on Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-06-30 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 1 0 (06/30/20) Call with Dan Colby to review progress/3D model. Updates 2d layouts (fixed clearance at locks. (07/01/20) Reviewed modification issues (clearance around hyd. valves). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 (06/30/20) Updates to BOP skid 3D model (249L). (07/01/20) Researched safety topic and copied info. (07/02/20) Update 3D assembly drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (06/29/20) Update call with Tyler Update call with Lam. (06/30/20) Review and approved designer timesheets. Update weekly timesheet and submitted for approval. Update call with Jorge. Call with Lam to review ATC piping layouts. Organized 249 drawing folders. Sketchup call with Lam. (07/01/20) Update with Jorge. (07/02/20) Archived 249 files on Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 (07/01/20) reviewed RUSA comments from Mio (lift tool) and discussed with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-01 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 3.5 0 (07/01/20) Revised chemical platform ramp per field comments. Transmitted drawing and archived files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-01 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 2.5 0 (06/30/20) Call with Dan Colby to review progress/3D model. Updates 2d layouts (fixed clearance at locks. (07/01/20) Reviewed modification issues (clearance around hyd. valves). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (07/02/20) Weekly TSR call (safety moment). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 5.25 0 (06/30/20) Updates to BOP skid 3D model (249L). (07/01/20) Researched safety topic and copied info. (07/02/20) Update 3D assembly drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (06/29/20) Update call with Tyler Update call with Lam. (06/30/20) Review and approved designer timesheets. Update weekly timesheet and submitted for approval. Update call with Jorge. Call with Lam to review ATC piping layouts. Organized 249 drawing folders. Sketchup call with Lam. (07/01/20) Update with Jorge. (07/02/20) Archived 249 files on Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (07/06/20) Updated weekly timesheet and submitted for approval. Update call with Kyle. Update call with Lam. (07/10/20) Update call with Lam. Update call with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5.5 0 (07/06/20) Reviewed S.O.W. for TSR-01770. Started checking ATC piping drawings. (07/10/20) Cont checking piping drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-06 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 (07/06/20) Pulled 257B steam info for Dan C. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-07 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-08 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-09 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (07/06/20) Updated weekly timesheet and submitted for approval. Update call with Kyle. Update call with Lam. (07/10/20) Update call with Lam. Update call with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6 0 (07/06/20) Reviewed S.O.W. for TSR-01770. Started checking ATC piping drawings. (07/10/20) Cont checking piping drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 (07/13/20) Update call with Kyle. Update call with Jorge. Reviewed and approved designer timsheets. Update call with Lam. (07/15/20) Update with Jorge. ATC call with Kyle. (07/16/20) Call with lam/Kyle-ATC review. Call to discuss RUSA redlines. Call with Ripal to review Genesis cable length. Looked at Mid-year review info and scheduled discussions with group. (07/17/20) Mid-year review with Kyle. Mid-year review with Jorge. Mid-year review with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-13 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 0.5 0 (07/13/20) Reviewed 270L ESP layout request with Jorge. (07/16/20) Reviewed drawings from Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6.25 0 (07/13/20) Reviewed ATC piping. (07/14/20) Finalized review and sent comments to lam. (07/16/20) Start review of ATC LP mud piping. (07/17/20) Cont to review LP mud drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-14 OH-011 :OH-011 Overhead All Activities Regular Pay N 4 0 (07/14/20) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 (07/13/20) Reviewed ATC piping. (07/14/20) Finalized review and sent comments to lam. (07/16/20) Start review of ATC LP mud piping. (07/17/20) Cont to review LP mud drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-14 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 (07/14/20) 212L redlines from Luis C. (07/15/20) Revised plot plan and hazardous area drawings. (07/16/20) Finalized drawing changes and transmitted files. (07/17/20) Searched for 165 drawworks info per request from Randy. discussed with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-14 Rig 273L-TSR :Rig 273L-TSR TSR-01757-AADU Surface 21-1/4in. Annualar Lift Ring Modifications Regular Pay N 0.5 0 (07/14/20) Reviewed drawing updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (07/13/20) Update call with Kyle. Update call with Jorge. Reviewed and approved designer timsheets. Update call with Lam. (07/15/20) Update with Jorge. ATC call with Kyle. (07/16/20) Call with lam/Kyle-ATC review. Call to discuss RUSA redlines. Call with Ripal to review Genesis cable length. Looked at Mid-year review info and scheduled discussions with group. (07/17/20) Mid-year review with Kyle. Mid-year review with Jorge. Mid-year review with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-15 OH-011 :OH-011 Overhead All Activities Regular Pay N 4 0 (07/14/20) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-15 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 2.75 0 (07/14/20) 212L redlines from Luis C. (07/15/20) Revised plot plan and hazardous area drawings. (07/16/20) Finalized drawing changes and transmitted files. (07/17/20) Searched for 165 drawworks info per request from Randy. discussed with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (07/16/20) Weekly TSR call. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 (07/13/20) Update call with Kyle. Update call with Jorge. Reviewed and approved designer timsheets. Update call with Lam. (07/15/20) Update with Jorge. ATC call with Kyle. (07/16/20) Call with lam/Kyle-ATC review. Call to discuss RUSA redlines. Call with Ripal to review Genesis cable length. Looked at Mid-year review info and scheduled discussions with group. (07/17/20) Mid-year review with Kyle. Mid-year review with Jorge. Mid-year review with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-16 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 0.5 0 (07/13/20) Reviewed 270L ESP layout request with Jorge. (07/16/20) Reviewed drawings from Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 (07/13/20) Reviewed ATC piping. (07/14/20) Finalized review and sent comments to lam. (07/16/20) Start review of ATC LP mud piping. (07/17/20) Cont to review LP mud drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-16 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 2.5 0 (07/14/20) 212L redlines from Luis C. (07/15/20) Revised plot plan and hazardous area drawings. (07/16/20) Finalized drawing changes and transmitted files. (07/17/20) Searched for 165 drawworks info per request from Randy. discussed with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 (07/13/20) Update call with Kyle. Update call with Jorge. Reviewed and approved designer timsheets. Update call with Lam. (07/15/20) Update with Jorge. ATC call with Kyle. (07/16/20) Call with lam/Kyle-ATC review. Call to discuss RUSA redlines. Call with Ripal to review Genesis cable length. Looked at Mid-year review info and scheduled discussions with group. (07/17/20) Mid-year review with Kyle. Mid-year review with Jorge. Mid-year review with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 (07/13/20) Reviewed ATC piping. (07/14/20) Finalized review and sent comments to lam. (07/16/20) Start review of ATC LP mud piping. (07/17/20) Cont to review LP mud drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-17 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1.5 0 (07/14/20) 212L redlines from Luis C. (07/15/20) Revised plot plan and hazardous area drawings. (07/16/20) Finalized drawing changes and transmitted files. (07/17/20) Searched for 165 drawworks info per request from Randy. discussed with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (07/20/20) Updated weekly timesheet and submitted for approval. Update call with Lam. (07/21/20) Updated PDR form and routed to Kyle. Sent PDR request to designer. Update call with Kyle. Update call with Jorge. (07/22/20) Update with Kyle (07/23/20) Reviewed drawing list. Update call with Tyler. Update call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3.5 0 (07/20/20) Researched lanyard options for Jorge (jetting tool). ATC piping review. (07/21/20) Finalized ATC piping mod check. Sent to Lam. (07/23/20) Checked new bell nipple lifting hook drawing (RUSA). (07/24/20) Reviewed redline info with Tyler. printed bell nipple comments and checked package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-20 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 3.5 0 (07/20/20) Reviewed email request from Robbie B (Aksai yard layout). Searched for reference info. (07/21/20) Started yard layout based on initial email request. Searched for additional info. (07/22/20) Call with Robbie to discuss scope of drawing request. reviewed new information from the field. Created new folder on the Q and saved ref info. Started new layout based on site photos. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.25 0 (07/20/20) Updated weekly timesheet and submitted for approval. Update call with Lam. (07/21/20) Updated PDR form and routed to Kyle. Sent PDR request to designer. Update call with Kyle. Update call with Jorge. (07/22/20) Update with Kyle (07/23/20) Reviewed drawing list. Update call with Tyler. Update call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3.5 0 (07/20/20) Researched lanyard options for Jorge (jetting tool). ATC piping review. (07/21/20) Finalized ATC piping mod check. Sent to Lam. (07/23/20) Checked new bell nipple lifting hook drawing (RUSA). (07/24/20) Reviewed redline info with Tyler. printed bell nipple comments and checked package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-21 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 2.75 0 (07/20/20) Reviewed email request from Robbie B (Aksai yard layout). Searched for reference info. (07/21/20) Started yard layout based on initial email request. Searched for additional info. (07/22/20) Call with Robbie to discuss scope of drawing request. reviewed new information from the field. Created new folder on the Q and saved ref info. Started new layout based on site photos. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (07/20/20) Updated weekly timesheet and submitted for approval. Update call with Lam. (07/21/20) Updated PDR form and routed to Kyle. Sent PDR request to designer. Update call with Kyle. Update call with Jorge. (07/22/20) Update with Kyle (07/23/20) Reviewed drawing list. Update call with Tyler. Update call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-22 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 8 0 (07/20/20) Reviewed email request from Robbie B (Aksai yard layout). Searched for reference info. (07/21/20) Started yard layout based on initial email request. Searched for additional info. (07/22/20) Call with Robbie to discuss scope of drawing request. reviewed new information from the field. Created new folder on the Q and saved ref info. Started new layout based on site photos. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (07/20/20) Updated weekly timesheet and submitted for approval. Update call with Lam. (07/21/20) Updated PDR form and routed to Kyle. Sent PDR request to designer. Update call with Kyle. Update call with Jorge. (07/22/20) Update with Kyle (07/23/20) Reviewed drawing list. Update call with Tyler. Update call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-23 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2.5 0 (07/23/20) Reviewed ESP redlines/updates from Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3.5 0 (07/20/20) Researched lanyard options for Jorge (jetting tool). ATC piping review. (07/21/20) Finalized ATC piping mod check. Sent to Lam. (07/23/20) Checked new bell nipple lifting hook drawing (RUSA). (07/24/20) Reviewed redline info with Tyler. printed bell nipple comments and checked package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-24 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6.5 0 (07/20/20) Researched lanyard options for Jorge (jetting tool). ATC piping review. (07/21/20) Finalized ATC piping mod check. Sent to Lam. (07/23/20) Checked new bell nipple lifting hook drawing (RUSA). (07/24/20) Reviewed redline info with Tyler. printed bell nipple comments and checked package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.25 0 (07/27/20) Updated weekly timesheet and submitted for approval. Update call with Lam. Review and approved designers timesheets. Update call with Kyle. Update call with Jorge. Update call with Tyler. (07/28/20) Call with Tyler- RUSA updates. Update with Kyle. (07/30/20) Update call with Kyle. Printing issue/fix. (07/31/20) Update call with Lam. Update call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-27 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 5.25 0 (07/27/20 - 07/31/20) Cont'd layout of yard background. Scaled site based on new redlines from the field. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (07/27/20) Updated weekly timesheet and submitted for approval. Update call with Lam. Review and approved designers timesheets. Update call with Kyle. Update call with Jorge. Update call with Tyler. (07/28/20) Call with Tyler- RUSA updates. Update with Kyle. (07/30/20) Update call with Kyle. Printing issue/fix. (07/31/20) Update call with Lam. Update call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3.5 0 (07/28/20) Reviewed lift tool dwg package. Reviewed RUSA pdf print issues & sent fix email to designers. Researched RUSD tblock info.and discussed with Lam. Sent lift tool package as Rev.b. (07/31/20) Started checking ATC cladding drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-28 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 3.5 0 (07/27/20 - 07/31/20) Cont'd layout of yard background. Scaled site based on new redlines from the field. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-29 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.25 0 (07/29/20) Cleaned up drawing folder and revised GA drawings (updated fuel tank info). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-29 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 7.25 0 (07/27/20 - 07/31/20) Cont'd layout of yard background. Scaled site based on new redlines from the field. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-30 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 (07/28/20) Call with Tyler to review rig and matting layout options. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 (07/27/20) Updated weekly timesheet and submitted for approval. Update call with Lam. Review and approved designers timesheets. Update call with Kyle. Update call with Jorge. Update call with Tyler. (07/28/20) Call with Tyler- RUSA updates. Update with Kyle. (07/30/20) Update call with Kyle. Printing issue/fix. (07/31/20) Update call with Lam. Update call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-30 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 6.75 0 (07/27/20 - 07/31/20) Cont'd layout of yard background. Scaled site based on new redlines from the field. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 (07/27/20) Updated weekly timesheet and submitted for approval. Update call with Lam. Review and approved designers timesheets. Update call with Kyle. Update call with Jorge. Update call with Tyler. (07/28/20) Call with Tyler- RUSA updates. Update with Kyle. (07/30/20) Update call with Kyle. Printing issue/fix. (07/31/20) Update call with Lam. Update call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-07-31 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5.25 0 (07/28/20) Reviewed lift tool dwg package. Reviewed RUSA pdf print issues & sent fix email to designers. Researched RUSD tblock info.and discussed with Lam. Sent lift tool package as Rev.b. (07/31/20) Started checking ATC cladding drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-01 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1.25 0 (08/01/20) Searched for OIME drawworks information. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-06-29 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 4 0 Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the interfacing the 53B top drive system on rig 212. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-06-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-06-30 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 4 0 Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the interfacing the 53B top drive system on rig 212. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-06-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-01 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 4 0 Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the interfacing the 53B top drive system on rig 212. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-02 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 4 0 Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the interfacing the 53B top drive system on rig 212. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-03 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 4 0 Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the interfacing the 53B top drive system on rig 212. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-06 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 4 0 Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the interfacing the 53B top drive system on rig 212. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-07 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 4 0 Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the interfacing the 53B top drive system on rig 212. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-08 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 4 0 Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the interfacing the 53B top drive system on rig 212. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-09 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 4 0 Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the interfacing the 53B top drive system on rig 212. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-10 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 4 0 Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Research the interfacing the 53B top drive system on rig 212. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-13 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 4 0 Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-14 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 4 0 Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-15 Holly Platform :Holly Platform TSR-01665-HOLP-15 Survey and Technical Support Regular Pay N 2 0 Providing information and support for equipment details to PKD operations Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-15 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 2 0 Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-16 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 1.5 0 Reviewing Cable List that Ripal provided Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-16 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 2.5 0 Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-17 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 4 0 Provide support as required. Conference calls and reviewing the Parker Drilling Rig 212. Attending weekly update conference calls with Jaguar and Patterson. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Tyler on the TOTAL PO1356 proposal as well as with Ripal on the Genesis Project and the Willow Project PO1419 Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-21 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 2 0 Conference call with Ripal to review single line drawings. Mark up the same and return to Ripal for review. Conference call with Norm Germain and Ripal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-21 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 4 0 Provide Support as required Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Tyler on the TOTAL PO1356 proposal as well as with Ripal on the Genesis Project and the Willow Project PO1419 Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-22 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 2 0 Conference call with Ripal to review single line drawings. Mark up the same and return to Ripal for review. Conference call with Norm Germain and Ripal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-22 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 2 0 Provide Support as required Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Tyler on the TOTAL PO1356 proposal as well as with Ripal on the Genesis Project and the Willow Project PO1419 Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-23 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 1 0 Conference call with Ripal to review single line drawings. Mark up the same and return to Ripal for review. Conference call with Norm Germain and Ripal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-23 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 1.5 0 Provide Support as required Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-23 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 8 0 Attending conference calls and reviewing Tender Documentation Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-24 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 1 0 Conference call with Ripal to review single line drawings. Mark up the same and return to Ripal for review. Conference call with Norm Germain and Ripal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Tyler on the TOTAL PO1356 proposal as well as with Ripal on the Genesis Project and the Willow Project PO1419 Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-24 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 5 0 Attending conference calls and reviewing Tender Documentation Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-25 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 0.5 0 Conference call with Ripal to review single line drawings. Mark up the same and return to Ripal for review. Conference call with Norm Germain and Ripal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Tyler on the TOTAL PO1356 proposal as well as with Ripal on the Genesis Project. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-27 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Reviewing Tender Documentation and equipment requirements. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-28 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 2 0 Continue to review single line drawings. Mark up the same and return to Ripal for review. Conference call with team to discuss caterpillar engine requirements Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-28 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 4 0 Provide Support as required Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Tyler on the TOTAL PO1356 proposal as well as with Ripal on the Genesis Project. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-29 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 1 0 Continue to review single line drawings. Mark up the same and return to Ripal for review. Conference call with team to discuss caterpillar engine requirements Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-29 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 4 0 Provide Support as required Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Tyler on the TOTAL PO1356 proposal as well as with Ripal on the Genesis Project. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-29 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Reviewing Tender Documentation and equipment requirements. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-30 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 2 0 Continue to review single line drawings. Mark up the same and return to Ripal for review. Conference call with team to discuss caterpillar engine requirements Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-30 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 2 0 Provide Support as required Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Tyler on the TOTAL PO1356 proposal as well as with Ripal on the Genesis Project. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-30 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Reviewing Tender Documentation and equipment requirements. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-31 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 3 0 Provide Support as required Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-07-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Tyler on the TOTAL PO1356 proposal as well as with Ripal on the Genesis Project. Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-06-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call; Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-06-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-06-29 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 7.5 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-06-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-06-30 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 6.5 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-01 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 8 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call; Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-02 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 6 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 4th of July Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-07 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-08 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-09 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-10 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call; Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet; Mid Year PDR Review Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-13 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 7.5 0 NCOC Workover Rig Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-14 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 6.5 0 NCOC Workover Rig Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 MK Timesheet; Mid Year PDR Review Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-15 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 8 0 NCOC Workover Rig Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call; Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-16 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 9 0 NCOC Workover Rig Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-17 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 8 0 NCOC Workover Rig Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-20 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 8 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-21 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 9 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-22 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 8.5 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-23 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 8.5 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-24 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 7 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-27 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 8.5 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-28 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 9 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-29 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 8.5 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-30 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 8.5 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-07-31 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 8 0 NCOC Workover Rig Tender Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-06-29 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 8 0 Sound attenuation scope, technical quotes, RfP package for nast and substructure, Warren CAT subcontract Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-06-29 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Technical clarifications, drill floor attenuation rework Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-06-30 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 5 0 Sound attenuation scope, technical quotes, RfP package for nast and substructure, Warren CAT subcontract Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-06-30 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Technical clarifications, drill floor attenuation rework Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-01 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 6 0 Sound attenuation scope, technical quotes, RfP package for nast and substructure, Warren CAT subcontract Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-01 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 6 0 Technical clarifications, drill floor attenuation rework Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-02 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 4 0 Sound attenuation scope, technical quotes, RfP package for nast and substructure, Warren CAT subcontract Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-02 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Technical clarifications, drill floor attenuation rework Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Holiday Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-06 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 1 0 Power swivel HPU Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-06 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 3 0 Work Order, RFP for rig buli, Warren CAT subcontract Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-06 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Technical clarifications, timesheet admin for internal billing, sound study rework die drill floor HPU, month end close Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-06 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 Timesheet, month end Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly ops call, weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-07 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 1 0 Power swivel HPU Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-07 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 3 0 Work Order, RFP for rig buli, Warren CAT subcontract Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-07 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 Technical clarifications, timesheet admin for internal billing, sound study rework die drill floor HPU, month end close Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-07 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 Timesheet, month end Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-08 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 1 0 Power swivel HPU Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-08 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 3 0 Work Order, RFP for rig buli, Warren CAT subcontract Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-08 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 5 0 Technical clarifications, timesheet admin for internal billing, sound study rework die drill floor HPU, month end close Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-09 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 3 0 Work Order, RFP for rig buli, Warren CAT subcontract Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-09 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 5 0 Technical clarifications, timesheet admin for internal billing, sound study rework die drill floor HPU, month end close Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-10 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 3 0 Work Order, RFP for rig buli, Warren CAT subcontract Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-10 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Technical clarifications, timesheet admin for internal billing, sound study rework die drill floor HPU, month end close Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly ops call, weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-13 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 5 0 Work Order, RFP for rig bulid, Warren CAT subcontract Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-13 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Weekly status, project planning, engineering deliverable close Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Ops call, weekly TS meet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-14 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 5 0 Work Order, RFP for rig bulid, Warren CAT subcontract Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-14 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Weekly status, project planning, engineering deliverable close Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-15 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 5 0 Work Order, RFP for rig bulid, Warren CAT subcontract Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-15 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Weekly status, project planning, engineering deliverable close Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-16 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 5 0 Work Order, RFP for rig bulid, Warren CAT subcontract Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-16 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 Weekly status, project planning, engineering deliverable close Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Ops call, weekly TS meet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-17 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 4 0 Work Order, RFP for rig bulid, Warren CAT subcontract Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-17 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Weekly status, project planning, engineering deliverable close Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-20 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 9 0 Weelky status meeting, quotes, workorder, technical clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Internal weekly calls Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-21 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 8 0 Weelky status meeting, quotes, workorder, technical clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-21 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Sound study rework Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-22 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 9 0 Weelky status meeting, quotes, workorder, technical clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-23 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 8 0 Weelky status meeting, quotes, workorder, technical clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-24 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 2 0 Deliverable review, change orders Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-24 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 6 0 Weelky status meeting, quotes, workorder, technical clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-25 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 2 0 Deliverable review, change orders Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-27 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 11 0 Weekly status meeting, quotes, workorder, technical clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-27 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Sound study rework Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Internal weekly calls Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-28 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 9 0 Weekly status meeting, quotes, workorder, technical clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-29 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 1 0 Overturn analysis, work order revision Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-29 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 9 0 Weekly status meeting, quotes, workorder, technical clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-30 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 1 0 Overturn analysis, work order revision Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-30 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 7 0 Weekly status meeting, quotes, workorder, technical clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Internal weekly calls Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-07-31 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 8 0 Weekly status meeting, quotes, workorder, technical clarifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-06-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Galveston Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-06-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 Time verification with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-06-29 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.25 0 Reviewing status of TSR's and outstanding items with TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-06-30 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Galveston Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-06-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 Time verification with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-06-30 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.25 0 Reviewing status of TSR's and outstanding items with TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-01 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Galveston Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-02 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Galveston Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-06 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2.5 0 TS Rate Reduction (CC's, new rate sheet) Documentation review Mtg with Ripal; metg with JR, Joshua Lambert Review RigQA comments to LM design report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly ops CC Weekly HTSG CC Design / drafting update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Rig count info. to Lynn Forecast Preparation CC with Mark T. and Wayne RE: HTSG issues Start to review mid-year review items TS Hours Summary (June) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-06 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 CC with GO RE: Sakhalin workover Material use for SAK workover Technical queries CC with HTSG and SAK Ops 270L reduced load list / drawing / discussion with JG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-06 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 RIDER Training (COVID) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-06 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Sakhalin weekly CC CC with Mio RE: open projects Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-06 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 0.5 0 review TSR and review preliminary analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-06 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 0.75 0 Review / approve closeout Review seismic model (JR, TE) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-07 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2.5 0 TS Rate Reduction (CC's, new rate sheet) Documentation review Mtg with Ripal; metg with JR, Joshua Lambert Review RigQA comments to LM design report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Rig count info. to Lynn Forecast Preparation CC with Mark T. and Wayne RE: HTSG issues Start to review mid-year review items TS Hours Summary (June) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-07 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1.75 0 CC with GO RE: Sakhalin workover Material use for SAK workover Technical queries CC with HTSG and SAK Ops 270L reduced load list / drawing / discussion with JG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Rig 209 Rig Move TSR and CTR development Sakhalin TSR Administration CC with Genesis Engineering Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-07 ORLAN-TSR :ORLAN-TSR TSR-01767-ORLP Bell Nipple Lifting Tool Regular Pay N 0.5 0 Analysis review; drawing review; drawings sent to SAK Ops Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-08 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 TS Rate Reduction (CC's, new rate sheet) Documentation review Mtg with Ripal; metg with JR, Joshua Lambert Review RigQA comments to LM design report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Rig count info. to Lynn Forecast Preparation CC with Mark T. and Wayne RE: HTSG issues Start to review mid-year review items TS Hours Summary (June) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-08 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 0.5 0 CC with GO RE: Sakhalin workover Material use for SAK workover Technical queries CC with HTSG and SAK Ops 270L reduced load list / drawing / discussion with JG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-08 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 TSR tracker update / status from direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-08 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Sakhalin weekly CC CC with Mio RE: open projects Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Rig 209 Rig Move TSR and CTR development Sakhalin TSR Administration CC with Genesis Engineering Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-08 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 Jaguar 1000 HP Rig Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-08 ORLAN-TSR :ORLAN-TSR TSR-01767-ORLP Bell Nipple Lifting Tool Regular Pay N 0.5 0 Analysis review; drawing review; drawings sent to SAK Ops Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-08 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 0.75 0 Review / approve closeout Review seismic model (JR, TE) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-09 Berkut-TSR :Berkut-TSR TSR-01770-BERP Padeye for Choke Kill Hose Rigging on BOP Regular Pay N 0.25 0 Review TSR and discuss with TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-09 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.5 0 TS Rate Reduction (CC's, new rate sheet) Documentation review Mtg with Ripal; metg with JR, Joshua Lambert Review RigQA comments to LM design report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly ops CC Weekly HTSG CC Design / drafting update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Rig count info. to Lynn Forecast Preparation CC with Mark T. and Wayne RE: HTSG issues Start to review mid-year review items TS Hours Summary (June) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-09 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 TSR tracker update / status from direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-09 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Sakhalin weekly CC CC with Mio RE: open projects Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Rig 209 Rig Move TSR and CTR development Sakhalin TSR Administration CC with Genesis Engineering Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-09 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.5 0 Jaguar 1000 HP Rig Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-09 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 0.5 0 review TSR and review preliminary analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-09 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 0.5 0 Review / approve closeout Review seismic model (JR, TE) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-10 Berkut-TSR :Berkut-TSR TSR-01770-BERP Padeye for Choke Kill Hose Rigging on BOP Regular Pay N 0.5 0 Review TSR and discuss with TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-10 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 TS Rate Reduction (CC's, new rate sheet) Documentation review Mtg with Ripal; metg with JR, Joshua Lambert Review RigQA comments to LM design report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly ops CC Weekly HTSG CC Design / drafting update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Rig count info. to Lynn Forecast Preparation CC with Mark T. and Wayne RE: HTSG issues Start to review mid-year review items TS Hours Summary (June) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-10 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 0.5 0 CC with GO RE: Sakhalin workover Material use for SAK workover Technical queries CC with HTSG and SAK Ops 270L reduced load list / drawing / discussion with JG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Rig 209 Rig Move TSR and CTR development Sakhalin TSR Administration CC with Genesis Engineering Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-13 Berkut-TSR :Berkut-TSR TSR-01770-BERP Padeye for Choke Kill Hose Rigging on BOP Regular Pay N 1 0 review design with TE (CC) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-13 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 Loadmaster justification (email, CC, mtg with JL) Discuss status with JR / path forward Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ops Weekly Conference Call HTSG Weekly CC Forecast / margin analysis (Mark T.) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.75 0 HTSG Update preparation / send to Steve C. personnel administration (set-up mid-year reviews); complete mid-year reviews 2020 Q2 Margin Analysis CC with David V. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-13 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly CC and preparation CC with Mio / TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 209L ATC Unit Drawing Review CC with TE RE: all open SAK TSR's Mtg with DES/ENG - RUSA/RUSD title blocks Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-13 ORLAN-TSR :ORLAN-TSR TSR-01767-ORLP Bell Nipple Lifting Tool Regular Pay N 0.5 0 Review SWL; discuss load testing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-14 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Loadmaster justification (email, CC, mtg with JL) Discuss status with JR / path forward Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ops Weekly Conference Call HTSG Weekly CC Forecast / margin analysis (Mark T.) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 HTSG Update preparation / send to Steve C. personnel administration (set-up mid-year reviews); complete mid-year reviews 2020 Q2 Margin Analysis CC with David V. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-14 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 TSR tracker update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 209L ATC Unit Drawing Review CC with TE RE: all open SAK TSR's Mtg with DES/ENG - RUSA/RUSD title blocks Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-15 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Loadmaster justification (email, CC, mtg with JL) Discuss status with JR / path forward Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-15 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Start to review new Tender documents; CC with TE and Jeff W. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 HTSG Update preparation / send to Steve C. personnel administration (set-up mid-year reviews); complete mid-year reviews 2020 Q2 Margin Analysis CC with David V. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-15 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 0.75 0 Water well cellar dimensions General support (270L sketch review) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-15 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly CC and preparation CC with Mio / TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-15 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 209L ATC Unit Drawing Review CC with TE RE: all open SAK TSR's Mtg with DES/ENG - RUSA/RUSD title blocks Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-15 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 0.75 0 review all photos; discuss reinforcement plan Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-16 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Loadmaster justification (email, CC, mtg with JL) Discuss status with JR / path forward Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-16 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Start to review new Tender documents; CC with TE and Jeff W. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ops Weekly Conference Call HTSG Weekly CC Forecast / margin analysis (Mark T.) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 HTSG Update preparation / send to Steve C. personnel administration (set-up mid-year reviews); complete mid-year reviews 2020 Q2 Margin Analysis CC with David V. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-16 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 0.75 0 CC with NOV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 TSR tracker update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 209L ATC Unit Drawing Review CC with TE RE: all open SAK TSR's Mtg with DES/ENG - RUSA/RUSD title blocks Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-16 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 256L Mast Extension 165L drawworks issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-17 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 Start to review new Tender documents; CC with TE and Jeff W. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 HTSG Update preparation / send to Steve C. personnel administration (set-up mid-year reviews); complete mid-year reviews 2020 Q2 Margin Analysis CC with David V. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-17 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 0.5 0 Water well cellar dimensions General support (270L sketch review) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 209L ATC Unit Drawing Review CC with TE RE: all open SAK TSR's Mtg with DES/ENG - RUSA/RUSD title blocks Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-17 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 2 0 256L Mast Extension 165L drawworks issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Conference calls to discuss resources (GO, SC) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Finalize mid-year reviews IDR coordinator clarifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-20 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Willow tender support Canyon Oak meetings Tender KO meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-20 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1.5 0 Mexico (Jaguar) 1000 HP rig support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-20 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 weekly meeting and preparation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-21 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 CC with Roger at RAM to discuss man rider CC's with JL / JR / RP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-21 HTSG-TSR :HTSG-TSR HTSG-2020 SMART-Developmental Goals Regular Pay N 0.75 0 Office visit - documentation review for all file rooms Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Finalize mid-year reviews IDR coordinator clarifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-21 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Willow tender support Canyon Oak meetings Tender KO meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-21 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 0.5 0 Mexico (Jaguar) 1000 HP rig support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 209L ATC Closeout Email to Oliver at ALE RE: 209L rig move Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-21 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 1 0 CC to discuss model Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-21 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 0.5 0 Discuss path forward with Mio and TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-22 HTSG-TSR :HTSG-TSR HTSG-2020 SMART-Developmental Goals Regular Pay N 4 0 Office visit - documentation review for all file rooms Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 Finalize mid-year reviews IDR coordinator clarifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-22 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1.5 0 Willow tender support Canyon Oak meetings Tender KO meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-22 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 0.5 0 Mexico (Jaguar) 1000 HP rig support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-22 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 Update TSR tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-22 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 RAPID software introduction Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-22 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 165L drawworks drawings for Randy Crowsen 256L mast extension / new top drive Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-23 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 CC with Roger at RAM to discuss man rider CC's with JL / JR / RP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-23 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 Review documents / CC's with TE and GO Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Finalize mid-year reviews IDR coordinator clarifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-23 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 0.5 0 ENL Workover support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-23 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2.5 0 Willow tender support Canyon Oak meetings Tender KO meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 209L ATC Closeout Email to Oliver at ALE RE: 209L rig move Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-23 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 165L drawworks drawings for Randy Crowsen 256L mast extension / new top drive Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-23 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 0.5 0 CC to discuss model Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-24 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 Review documents / CC's with TE and GO Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 Finalize mid-year reviews IDR coordinator clarifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-24 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 4 0 Willow tender support Canyon Oak meetings Tender KO meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-24 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 165L drawworks drawings for Randy Crowsen 256L mast extension / new top drive Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-27 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.75 0 Overturning meeting with JL and Loadmaster Winch meeting with JL CC with JR regarding remaining engineering Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Reviewing tender documents CC with TE / JW SLB Rigs discussion / document review CC with TE and CG regarding ATEX requirement Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 Weekly Operations Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet / Timesheet approvals Mid-year review closeout start to look at next months forecast CC's with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-27 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Conference calls, internal and external meetings, vendor clarifications, document review(s) creating options spreadsheet to be utilized with rig builders Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-27 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 Update slide(s) / CC with MK to discuss presentation for Oxy Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-27 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting and preparation CC with Mio and TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 ATC Unit Install (209L) OH for other open TSR's Review new TSR / Submit to LM for quote Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-28 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Reviewing tender documents CC with TE / JW SLB Rigs discussion / document review CC with TE and CG regarding ATEX requirement Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet / Timesheet approvals Mid-year review closeout start to look at next months forecast CC's with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-28 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2.5 0 Conference calls, internal and external meetings, vendor clarifications, document review(s) creating options spreadsheet to be utilized with rig builders Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-28 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 0.75 0 NCOC Workover - phone calls and drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.75 0 ATC Unit Install (209L) OH for other open TSR's Review new TSR / Submit to LM for quote Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-28 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 0.5 0 review bracing installation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-29 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 Overturning meeting with JL and Loadmaster Winch meeting with JL CC with JR regarding remaining engineering Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-29 HTSG-TSR :HTSG-TSR HTSG-2020 SMART-Developmental Goals Regular Pay N 5 0 Office file room clean-up with SC and KM Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet / Timesheet approvals Mid-year review closeout start to look at next months forecast CC's with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-29 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Conference calls, internal and external meetings, vendor clarifications, document review(s) creating options spreadsheet to be utilized with rig builders Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-29 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 0.5 0 NCOC Workover - phone calls and drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-29 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 weekly meeting and preparation CC with Mio and TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-29 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.75 0 ATC Unit Install (209L) OH for other open TSR's Review new TSR / Submit to LM for quote Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-29 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.5 0 165 Drawworks drawings / info. sent to Randy C. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-30 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.75 0 Overturning meeting with JL and Loadmaster Winch meeting with JL CC with JR regarding remaining engineering Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-30 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 Reviewing tender documents CC with TE / JW SLB Rigs discussion / document review CC with TE and CG regarding ATEX requirement Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet / Timesheet approvals Mid-year review closeout start to look at next months forecast CC's with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-30 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Conference calls, internal and external meetings, vendor clarifications, document review(s) creating options spreadsheet to be utilized with rig builders Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-30 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 Update TSR tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-30 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 ATC Unit Install (209L) OH for other open TSR's Review new TSR / Submit to LM for quote Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-30 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 265 power analysis for Genel tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-30 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 165 Drawworks drawings / info. sent to Randy C. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-31 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Reviewing tender documents CC with TE / JW SLB Rigs discussion / document review CC with TE and CG regarding ATEX requirement Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet / Timesheet approvals Mid-year review closeout start to look at next months forecast CC's with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-31 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Conference calls, internal and external meetings, vendor clarifications, document review(s) creating options spreadsheet to be utilized with rig builders Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-31 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 265 power analysis for Genel tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-07-31 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 165 Drawworks drawings / info. sent to Randy C. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-06-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 06/29: timesheets to ProjXsense and to payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-06-29 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 06/29: process incoming TSR-01770 and TSR-01630-CTR 07/01: transmit TSR-01725-DOC; process May accruals for Emanuel; transmit TSR-01725-DOC 07/02: transmit 249L drawings Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-06-29 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 06/29: teleconference call with Sakhalin regarding TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-06-29 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5 0 finalize piping modification drawing set 209L-01-05-210; pick up red lines for outfitting items drawing set 209L-01-03-424; finalize cladding drawing set 209L-01-03-423 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-06-30 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 8 0 finalize piping modification drawing set 209L-01-05-210; pick up red lines for outfitting items drawing set 209L-01-03-424; finalize cladding drawing set 209L-01-03-423 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 06/29: process incoming TSR-01770 and TSR-01630-CTR 07/01: transmit TSR-01725-DOC; process May accruals for Emanuel; transmit TSR-01725-DOC 07/02: transmit 249L drawings Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7.25 0 finalize piping modification drawing set 209L-01-05-210; pick up red lines for outfitting items drawing set 209L-01-03-424; finalize cladding drawing set 209L-01-03-423 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 07/02: teleconference to discuss TSR updates and ongoing tasks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 06/29: process incoming TSR-01770 and TSR-01630-CTR 07/01: transmit TSR-01725-DOC; process May accruals for Emanuel; transmit TSR-01725-DOC 07/02: transmit 249L drawings Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5.75 0 finalize piping modification drawing set 209L-01-05-210; pick up red lines for outfitting items drawing set 209L-01-03-424; finalize cladding drawing set 209L-01-03-423 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 07/06: transmit TSR-01768-CO 07/07: create SAK accrual report for June; transmit TSR-01770-CTR; TSR-01768-CTR 07/08: transmit TSR-01725-DOC (Genesis) 07/09: process incoming transmittals Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7 0 07/06-07/09: create drawing set for LP mud drain/suction for ATC unit. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 07/07: IT help desk with TSR regional coordinator inbox/outbox issue. 07/10: AutoCAD administrative tasks (RUSA title block); continue goals Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-07 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 07/06: transmit TSR-01768-CO 07/07: create SAK accrual report for June; transmit TSR-01770-CTR; TSR-01768-CTR 07/08: transmit TSR-01725-DOC (Genesis) 07/09: process incoming transmittals Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5 0 07/06-07/09: create drawing set for LP mud drain/suction for ATC unit. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-08 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 07/06: transmit TSR-01768-CO 07/07: create SAK accrual report for June; transmit TSR-01770-CTR; TSR-01768-CTR 07/08: transmit TSR-01725-DOC (Genesis) 07/09: process incoming transmittals Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7 0 07/06-07/09: create drawing set for LP mud drain/suction for ATC unit. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 07/09: teleconference to discuss TSR updates and ongoing tasks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-09 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 07/06: transmit TSR-01768-CO 07/07: create SAK accrual report for June; transmit TSR-01770-CTR; TSR-01768-CTR 07/08: transmit TSR-01725-DOC (Genesis) 07/09: process incoming transmittals Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6.25 0 07/06-07/09: create drawing set for LP mud drain/suction for ATC unit. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 07/07: IT help desk with TSR regional coordinator inbox/outbox issue. 07/10: AutoCAD administrative tasks (RUSA title block); continue goals Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 5 0 07/13-16: continue standardization for structural members library (sketchup). 07/16-07/17: RUSA title block standards Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 07/13: timesheet to ProjXsense and Payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-13 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 07/13: transmit TSR-01725-LM-DOC to CVX 07/14: transmit TSR-01725-DOC to CVX 07/16: transmit TSR-01747-CO; TSR-01753-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-13 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 07/13: teleconference call with Sakhalin regarding TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 07/13-16: continue standardization for structural members library (sketchup). 07/16-07/17: RUSA title block standards Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-14 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 07/13: transmit TSR-01725-LM-DOC to CVX 07/14: transmit TSR-01725-DOC to CVX 07/16: transmit TSR-01747-CO; TSR-01753-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 07/16: teleconference to discuss TSR updates and ongoing tasks; webmeeting to discuss redlines for RUSA/RUSD title block redlines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 3.25 0 07/13-16: continue standardization for structural members library (sketchup). 07/16-07/17: RUSA title block standards Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.75 0 07/13: transmit TSR-01725-LM-DOC to CVX 07/14: transmit TSR-01725-DOC to CVX 07/16: transmit TSR-01747-CO; TSR-01753-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 07/16: webmeeting to discuss red lines for 209L ATC drawing sets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-17 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 07/17: meeting with Ripal to discuss one-liner sketch. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 07/16: teleconference to discuss TSR updates and ongoing tasks; webmeeting to discuss redlines for RUSA/RUSD title block redlines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 6.5 0 07/13-16: continue standardization for structural members library (sketchup). 07/16-07/17: RUSA title block standards Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-20 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 07/20: sketch for Ripal's electrical one-line GA Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 07/20: timesheets to ProjXsense 07/21: update midyear review goals online 07/22-25: update CAD standards for RUSA title block and lisp routines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-20 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 07/20: transmit TSR-01725-LM-DOC Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-20 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 07/20: teleconference call with Sakhalin regarding TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 07/20-21: red lines comments picked up for all drawing sets. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 07/20: timesheets to ProjXsense 07/21: update midyear review goals online 07/22-25: update CAD standards for RUSA title block and lisp routines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7 0 07/20-21: red lines comments picked up for all drawing sets. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 07/20: timesheets to ProjXsense 07/21: update midyear review goals online 07/22-25: update CAD standards for RUSA title block and lisp routines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5 0 07/20-21: red lines comments picked up for all drawing sets. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 07/23: teleconference to discuss TSR updates and ongoing tasks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 07/20: timesheets to ProjXsense 07/21: update midyear review goals online 07/22-25: update CAD standards for RUSA title block and lisp routines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 07/20: timesheets to ProjXsense 07/21: update midyear review goals online 07/22-25: update CAD standards for RUSA title block and lisp routines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 07/27: timesheets to payroll and ProjXsense 07/30-07/31: RUSA/RUSD title block standardization and lisp routines Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 07/27: process incoming transmittalsl 07/29: transmit TSR-01767-DWG; TSR-01725-DOC 07/30: transmit TSR-01725-LM-DWG&DOC 07/31: tranmit TSR-01725-LM-DOC Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-27 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 07/27: teleconference call with Sakhalin regarding TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5 0 07/27-07/29: finalize ATC cladding details for structural addition, per Mio comments Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 8 0 07/27-07/29: finalize ATC cladding details for structural addition, per Mio comments Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-29 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 07/27: process incoming transmittalsl 07/29: transmit TSR-01767-DWG; TSR-01725-DOC 07/30: transmit TSR-01725-LM-DWG&DOC 07/31: tranmit TSR-01725-LM-DOC Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-29 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6 0 07/27-07/29: finalize ATC cladding details for structural addition, per Mio comments Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 07/27: timesheets to payroll and ProjXsense 07/30-07/31: RUSA/RUSD title block standardization and lisp routines Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-30 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 07/27: process incoming transmittalsl 07/29: transmit TSR-01767-DWG; TSR-01725-DOC 07/30: transmit TSR-01725-LM-DWG&DOC 07/31: tranmit TSR-01725-LM-DOC Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 07/27: timesheets to payroll and ProjXsense 07/30-07/31: RUSA/RUSD title block standardization and lisp routines Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-07-31 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 07/27: process incoming transmittalsl 07/29: transmit TSR-01767-DWG; TSR-01725-DOC 07/30: transmit TSR-01725-LM-DWG&DOC 07/31: tranmit TSR-01725-LM-DOC Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-06-29 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 On 6/29-7/2, support COP Willow RFQs Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-06-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 On 6/29, weekly Ops mtg. On 7/2, Ts weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-06-29 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 4 0 On 6/29-7/2, support Sakhalin workover rig RFQs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-06-29 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 Support NCOC workover tender RFQs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-06-29 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 On 6/30, support Jaguar updates. On 6/29-7/2, support Talos O&M opportunuty. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-06-29 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 On 6/29, support P&A services market entry. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-06-30 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 On 6/29-7/2, support COP Willow RFQs Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-06-30 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 7 0 On 6/29-7/2, support Sakhalin workover rig RFQs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-06-30 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 On 6/30, support Jaguar updates. On 6/29-7/2, support Talos O&M opportunuty. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-01 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 On 6/29-7/2, support COP Willow RFQs Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-01 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 6 0 On 6/29-7/2, support Sakhalin workover rig RFQs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-01 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 Support NCOC workover tender RFQs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-01 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 On 6/30, support Jaguar updates. On 6/29-7/2, support Talos O&M opportunuty. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-02 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 On 6/29-7/2, support COP Willow RFQs Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 On 6/29, weekly Ops mtg. On 7/2, Ts weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-02 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 6 0 On 6/29-7/2, support Sakhalin workover rig RFQs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-02 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 On 6/30, support Jaguar updates. On 6/29-7/2, support Talos O&M opportunuty. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 July 4th Holiday Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-06 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 On 7/6 and 7/7, review COP Willow status. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 On 7/6, weekly Ops mtg. On 7/9, weekly TS mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-06 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 5 0 On 7/6-7/9, Sak Workover clarifications with rig builders, conf calls. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-06 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2 0 On 7/8 and 7/9, SUPPORT P&A presentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-07 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 On 7/6 and 7/7, review COP Willow status. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-07 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 5 0 On 7/6-7/9, Sak Workover clarifications with rig builders, conf calls. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-07 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 3 0 On 7/8 and 7/9, SUPPORT P&A presentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-08 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 5 0 On 7/6-7/9, Sak Workover clarifications with rig builders, conf calls. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-08 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4 0 On 7/8 and 7/9 , support Jaguar 1000HP EOI technical review of McCowan Rig 833. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 On 7/6, weekly Ops mtg. On 7/9, weekly TS mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-09 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 On 7/6-7/9, Sak Workover clarifications with rig builders, conf calls. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-09 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4 0 On 7/8 and 7/9 , support Jaguar 1000HP EOI technical review of McCowan Rig 833. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-09 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2 0 On 7/8 and 7/9, SUPPORT P&A presentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-10 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 7/10, PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 On 7/13, weekly Ops mtg. On 7/15, mid year reviews. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-13 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 On 7/13-7/17, support Jaguar 1000HP rig opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-13 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 7 0 On 7/13-7/17, support P&A opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-14 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 On 7/13-7/17, support Jaguar 1000HP rig opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-14 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 8 0 On 7/14, support Oxy Colombia 1500HP opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 8 0 On 7/13, weekly Ops mtg. On 7/15, mid year reviews. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-15 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 On 7/13-7/17, support Jaguar 1000HP rig opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-16 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 6 0 On 7/16, support 270 workover mode and workover newbuild rig. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-16 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 On 7/13-7/17, support Jaguar 1000HP rig opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-16 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2 0 On 7/13-7/17, support P&A opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-17 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 On 7/16, support 270 workover mode and workover newbuild rig. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-17 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 On 7/13-7/17, support Jaguar 1000HP rig opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-17 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 4 0 On 7/13-7/17, support P&A opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 On 7/20, weekly ops call. On 7/21, Rapid mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-20 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 8 0 On 7/20-7/24, support Sakhalin workover rig proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 On 7/20, weekly ops call. On 7/21, Rapid mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-21 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 8 0 On 7/20-7/24, support Sakhalin workover rig proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-22 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 9 0 On 7/20-7/24, support COP Willow tender proposal. Meet with Canyon Oak. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-23 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 5 0 On 7/20-7/24, support Sakhalin workover rig proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-23 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 4 0 On 7/20-7/24, support COP Willow tender proposal. Meet with Canyon Oak. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-24 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 2 0 On 7/24, review Total Uganda HH risk. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-24 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 On 7/20-7/24, support Sakhalin workover rig proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-24 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 4 0 On 7/20-7/24, support COP Willow tender proposal. Meet with Canyon Oak. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 On 7/27, weekly Ops mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-27 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Support Tender proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-27 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2 0 Support Tender proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-27 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 2 0 Support Jaguar RFI proposal and Talos rig build and O&M opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-27 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 2 0 Support Oxy RFI proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-28 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 1 0 Support Tender proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-28 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 Support RFI proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-28 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 4 0 Support Tender proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-28 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2 0 Support Tender proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-29 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 9 0 Support Tender proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-30 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 3 0 Support Tender proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-30 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 3 0 Support Tender proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-30 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3 0 Support Tender proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-07-31 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 7/31, PTO Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-06-29 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 2 0 Load List updated to reflect Superstructure LED light. Load List sent to CVX for review. Gaitronics Cable spec sent Updated Cable list to include Sawyer load list Update Onelione cable based on new load list Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-06-29 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 SAK weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-06-29 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 NCOC workover rig electrical clarification Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-06-29 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 Drawworks Cabin Model integration reviewing EMI cable layout Communicating with Venturetech regarding control cable Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-06-30 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 4 0 Load List updated to reflect Superstructure LED light. Load List sent to CVX for review. Gaitronics Cable spec sent Updated Cable list to include Sawyer load list Update Onelione cable based on new load list Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-06-30 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Drawworks Cabin Model integration reviewing EMI cable layout Communicating with Venturetech regarding control cable Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-01 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 2 0 Load List updated to reflect Superstructure LED light. Load List sent to CVX for review. Gaitronics Cable spec sent Updated Cable list to include Sawyer load list Update Onelione cable based on new load list Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-01 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 2 0 Searching for Rig 253 large motor overhaul procedure Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-01 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Drawworks Cabin Model integration reviewing EMI cable layout Communicating with Venturetech regarding control cable Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-02 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 3 0 Load List updated to reflect Superstructure LED light. Load List sent to CVX for review. Gaitronics Cable spec sent Updated Cable list to include Sawyer load list Update Onelione cable based on new load list Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-02 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Drawworks Cabin Model integration reviewing EMI cable layout Communicating with Venturetech regarding control cable Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 4th of July Holiday Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-06 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Genesis weekly meeting EMI Grasshopper connection meeting for Power Swivel HPU. Cable List updated after LM meeting. Order Control cable from Venturetech. Meeting with Swayer and LM to go over 3D model. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-06 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 SAK Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-06 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 1 0 Looking for DC Motor Overhual procedure for Joseph Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-06 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Confirm HPU control cable from Venturetech . Spec and estimated cost Power Swivel HPU confirm distance between HPU and Grasshopper. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-07 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 Genesis weekly meeting EMI Grasshopper connection meeting for Power Swivel HPU. Cable List updated after LM meeting. Order Control cable from Venturetech. Meeting with Swayer and LM to go over 3D model. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-07 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 5 0 Confirm HPU control cable from Venturetech . Spec and estimated cost Power Swivel HPU confirm distance between HPU and Grasshopper. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-08 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Genesis weekly meeting EMI Grasshopper connection meeting for Power Swivel HPU. Cable List updated after LM meeting. Order Control cable from Venturetech. Meeting with Swayer and LM to go over 3D model. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-08 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Confirm HPU control cable from Venturetech . Spec and estimated cost Power Swivel HPU confirm distance between HPU and Grasshopper. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-09 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Genesis weekly meeting EMI Grasshopper connection meeting for Power Swivel HPU. Cable List updated after LM meeting. Order Control cable from Venturetech. Meeting with Swayer and LM to go over 3D model. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-09 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 Confirm HPU control cable from Venturetech . Spec and estimated cost Power Swivel HPU confirm distance between HPU and Grasshopper. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-10 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 Genesis weekly meeting EMI Grasshopper connection meeting for Power Swivel HPU. Cable List updated after LM meeting. Order Control cable from Venturetech. Meeting with Swayer and LM to go over 3D model. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-10 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 5 0 Confirm HPU control cable from Venturetech . Spec and estimated cost Power Swivel HPU confirm distance between HPU and Grasshopper. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-13 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Pony Sub LED Lights Quote updated and add Plug and Recp. Rexel USA Pigtail cable AWG confirmed Send Revised Load List to Chuck for Review. Conference call with LM to get distances from Interface to Dog House. Finish Pony Sub LED Lights GA Genesis Spar Oneline revised. Conference call with Charlie Sawyer fro DWS HPU Load. Genesis Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-13 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 SAK Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-13 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 Set up conference call with LM to go over Cable Try layout. ACS quote revised based on New Load List. Conference call with EMI for interface from Grasshopper to LM interface Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-14 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Pony Sub LED Lights Quote updated and add Plug and Recp. Rexel USA Pigtail cable AWG confirmed Send Revised Load List to Chuck for Review. Conference call with LM to get distances from Interface to Dog House. Finish Pony Sub LED Lights GA Genesis Spar Oneline revised. Conference call with Charlie Sawyer fro DWS HPU Load. Genesis Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-14 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Set up conference call with LM to go over Cable Try layout. ACS quote revised based on New Load List. Conference call with EMI for interface from Grasshopper to LM interface Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-15 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 Pony Sub LED Lights Quote updated and add Plug and Recp. Rexel USA Pigtail cable AWG confirmed Send Revised Load List to Chuck for Review. Conference call with LM to get distances from Interface to Dog House. Finish Pony Sub LED Lights GA Genesis Spar Oneline revised. Conference call with Charlie Sawyer fro DWS HPU Load. Genesis Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-15 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Set up conference call with LM to go over Cable Try layout. ACS quote revised based on New Load List. Conference call with EMI for interface from Grasshopper to LM interface Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-16 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Pony Sub LED Lights Quote updated and add Plug and Recp. Rexel USA Pigtail cable AWG confirmed Send Revised Load List to Chuck for Review. Conference call with LM to get distances from Interface to Dog House. Finish Pony Sub LED Lights GA Genesis Spar Oneline revised. Conference call with Charlie Sawyer fro DWS HPU Load. Genesis Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-16 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 Set up conference call with LM to go over Cable Try layout. ACS quote revised based on New Load List. Conference call with EMI for interface from Grasshopper to LM interface Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-17 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Pony Sub LED Lights Quote updated and add Plug and Recp. Rexel USA Pigtail cable AWG confirmed Send Revised Load List to Chuck for Review. Conference call with LM to get distances from Interface to Dog House. Finish Pony Sub LED Lights GA Genesis Spar Oneline revised. Conference call with Charlie Sawyer fro DWS HPU Load. Genesis Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-17 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Set up conference call with LM to go over Cable Try layout. ACS quote revised based on New Load List. Conference call with EMI for interface from Grasshopper to LM interface Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-20 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Pony Sub GA drawing created. Sawyer Cooler Fan Motor Load power confirmed. All power requirement done with Sawyer. IFR sent to CVX Genesis Spar Oneline revised Conference call with EMI to confirm cable size in Grasshopper from Spar Utility interface. Review SOP for Genesis Spar Spar Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-20 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 SAK Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-20 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 Jelec Fire System Quote validated for offshore use. ACS -Conference call to go over revised Electrical Load. Venturetech QA regarding incoming power to HPU. Conference call with Chuck to go over Spar drawing. Bug Blower Motor HP confirm from LM and added CB to lighting panel. LM - Gaitronics Speaker location CCTV Power requirement confirm from Royal Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-21 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 Pony Sub GA drawing created. Sawyer Cooler Fan Motor Load power confirmed. All power requirement done with Sawyer. IFR sent to CVX Genesis Spar Oneline revised Conference call with EMI to confirm cable size in Grasshopper from Spar Utility interface. Review SOP for Genesis Spar Spar Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-21 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 5 0 Jelec Fire System Quote validated for offshore use. ACS -Conference call to go over revised Electrical Load. Venturetech QA regarding incoming power to HPU. Conference call with Chuck to go over Spar drawing. Bug Blower Motor HP confirm from LM and added CB to lighting panel. LM - Gaitronics Speaker location CCTV Power requirement confirm from Royal Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-22 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 5 0 Pony Sub GA drawing created. Sawyer Cooler Fan Motor Load power confirmed. All power requirement done with Sawyer. IFR sent to CVX Genesis Spar Oneline revised Conference call with EMI to confirm cable size in Grasshopper from Spar Utility interface. Review SOP for Genesis Spar Spar Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-22 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 Jelec Fire System Quote validated for offshore use. ACS -Conference call to go over revised Electrical Load. Venturetech QA regarding incoming power to HPU. Conference call with Chuck to go over Spar drawing. Bug Blower Motor HP confirm from LM and added CB to lighting panel. LM - Gaitronics Speaker location CCTV Power requirement confirm from Royal Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-23 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 6 0 Pony Sub GA drawing created. Sawyer Cooler Fan Motor Load power confirmed. All power requirement done with Sawyer. IFR sent to CVX Genesis Spar Oneline revised Conference call with EMI to confirm cable size in Grasshopper from Spar Utility interface. Review SOP for Genesis Spar Spar Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-23 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Jelec Fire System Quote validated for offshore use. ACS -Conference call to go over revised Electrical Load. Venturetech QA regarding incoming power to HPU. Conference call with Chuck to go over Spar drawing. Bug Blower Motor HP confirm from LM and added CB to lighting panel. LM - Gaitronics Speaker location CCTV Power requirement confirm from Royal Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-24 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Pony Sub GA drawing created. Sawyer Cooler Fan Motor Load power confirmed. All power requirement done with Sawyer. IFR sent to CVX Genesis Spar Oneline revised Conference call with EMI to confirm cable size in Grasshopper from Spar Utility interface. Review SOP for Genesis Spar Spar Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-24 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 6 0 Jelec Fire System Quote validated for offshore use. ACS -Conference call to go over revised Electrical Load. Venturetech QA regarding incoming power to HPU. Conference call with Chuck to go over Spar drawing. Bug Blower Motor HP confirm from LM and added CB to lighting panel. LM - Gaitronics Speaker location CCTV Power requirement confirm from Royal Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-27 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 5 0 Revised Oneline to show Skidding Sub Motor Data. Finalized Electrical Load List Create Superstructure and Pony Sub Electrical Connection Drawing Genesis Weekly Call Review EMI Quote Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-27 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 SAK Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-27 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Revised ACS Quote for DEL-WYE Transformer Sent RFI to CVX LM Bug Blower Load confirmed DWS C32 Engine Conference call Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-28 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 Revised Oneline to show Skidding Sub Motor Data. Finalized Electrical Load List Create Superstructure and Pony Sub Electrical Connection Drawing Genesis Weekly Call Review EMI Quote Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-28 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 5 0 Revised ACS Quote for DEL-WYE Transformer Sent RFI to CVX LM Bug Blower Load confirmed DWS C32 Engine Conference call Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-29 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Revised Oneline to show Skidding Sub Motor Data. Finalized Electrical Load List Create Superstructure and Pony Sub Electrical Connection Drawing Genesis Weekly Call Review EMI Quote Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-29 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Revised ACS Quote for DEL-WYE Transformer Sent RFI to CVX LM Bug Blower Load confirmed DWS C32 Engine Conference call Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-30 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Revised Oneline to show Skidding Sub Motor Data. Finalized Electrical Load List Create Superstructure and Pony Sub Electrical Connection Drawing Genesis Weekly Call Review EMI Quote Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-30 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 4 0 Rig 265 . Power System Analysis Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-30 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Revised ACS Quote for DEL-WYE Transformer Sent RFI to CVX LM Bug Blower Load confirmed DWS C32 Engine Conference call Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-07-31 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 8 0 Rig 265 . Power System Analysis Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-06-29 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Emails Timesheet, signature error. Call J.G. Update/review TSR-01757 & TSR-01767 (6/30/20 & 7/1/20) FUZE Update (7/1/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-06-29 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5 0 RUSA-PKE-DT-LD-1-53200.0001 (REV-B) (6/29/20) &review w/ J.R. Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-06-29 ORLAN-TSR :ORLAN-TSR TSR-01767-ORLP Bell Nipple Lifting Tool Regular Pay N 0.5 0 RUSA-HDE-DT-1-MD50700.50702 (Review comments from Mio & Update) (6/29,30/20) RUSA-PKE-DT-ND-1-27900.1008 (7/1/20) FUZE meeting w/ T.E. review comments (7/1/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-06-29 Rig 273L-TSR :Rig 273L-TSR TSR-01757-AADU Surface 21-1/4in. Annualar Lift Ring Modifications Regular Pay N 1 0 Emails from T.E. & J.G. comments/model updates per T.E.(6/30/20, 7/1/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-06-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.75 0 Emails Timesheet, signature error. Call J.G. Update/review TSR-01757 & TSR-01767 (6/30/20 & 7/1/20) FUZE Update (7/1/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-06-30 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 RUSA-PKE-DT-LD-1-53200.0001 (REV-B) (6/29/20) &review w/ J.R. Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-06-30 ORLAN-TSR :ORLAN-TSR TSR-01767-ORLP Bell Nipple Lifting Tool Regular Pay N 3.75 0 RUSA-HDE-DT-1-MD50700.50702 (Review comments from Mio & Update) (6/29,30/20) RUSA-PKE-DT-ND-1-27900.1008 (7/1/20) FUZE meeting w/ T.E. review comments (7/1/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 Emails Timesheet, signature error. Call J.G. Update/review TSR-01757 & TSR-01767 (6/30/20 & 7/1/20) FUZE Update (7/1/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-01 ORLAN-TSR :ORLAN-TSR TSR-01767-ORLP Bell Nipple Lifting Tool Regular Pay N 4.5 0 RUSA-HDE-DT-1-MD50700.50702 (Review comments from Mio & Update) (6/29,30/20) RUSA-PKE-DT-ND-1-27900.1008 (7/1/20) FUZE meeting w/ T.E. review comments (7/1/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-01 Rig 273L-TSR :Rig 273L-TSR TSR-01757-AADU Surface 21-1/4in. Annualar Lift Ring Modifications Regular Pay N 1 0 Emails from T.E. & J.G. comments/model updates per T.E.(6/30/20, 7/1/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly meeting (7/2/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet, signature error. Call J.G. Update/review TSR-01757 & TSR-01767 (6/30/20 & 7/1/20) FUZE Update (7/1/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-02 Rig 273L-TSR :Rig 273L-TSR TSR-01757-AADU Surface 21-1/4in. Annualar Lift Ring Modifications Regular Pay N 6 0 Emails from T.E. & J.G. comments/model updates per T.E.(6/30/20, 7/1/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 4th of July Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Emails Timesheet Work update stats K.M. (7/9/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-06 Rig 273L-TSR :Rig 273L-TSR TSR-01757-AADU Surface 21-1/4in. Annualar Lift Ring Modifications Regular Pay N 7 0 273L-01-03-341-(1-4)-R0-annular-lift-ring (updates per T.E. model; 7/6/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Work update stats K.M. (7/9/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7 0 RUSA-PKE-DT-LD-(1-4)-53200.0001 (7/7,8/20) PDF (7/9/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-08 Berkut-TSR :Berkut-TSR TSR-01770-BERP Padeye for Choke Kill Hose Rigging on BOP Regular Pay N 2.5 0 TSR-review, reference documents, 3d model, Sketch, Review w T.E., RFI (7/8-10/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Work update stats K.M. (7/9/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 RUSA-PKE-DT-LD-(1-4)-53200.0001 (7/7,8/20) PDF (7/9/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-08 ORLAN-TSR :ORLAN-TSR TSR-01767-ORLP Bell Nipple Lifting Tool Regular Pay N 4 0 RUSA-HDE-DT-1-MD50700.50702 RUSA-PKE-DT-ND-1-27900.1008 comment updates/review w/ T.E. (7/8/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-09 Berkut-TSR :Berkut-TSR TSR-01770-BERP Padeye for Choke Kill Hose Rigging on BOP Regular Pay N 5.5 0 TSR-review, reference documents, 3d model, Sketch, Review w T.E., RFI (7/8-10/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Technical Services Weekly meeting (7/9/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Work update stats K.M. (7/9/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 RUSA-PKE-DT-LD-(1-4)-53200.0001 (7/7,8/20) PDF (7/9/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-10 Berkut-TSR :Berkut-TSR TSR-01770-BERP Padeye for Choke Kill Hose Rigging on BOP Regular Pay N 3 0 TSR-review, reference documents, 3d model, Sketch, Review w T.E., RFI (7/8-10/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Emails Timesheet Work update stats K.M. (7/9/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-10 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 270L-01-00-140(1-3) update dwg per rig move email. (7/10/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Timesheet Emails Update status - J.G. Phone calls Title block swap paper space trouble shoot. 7/15/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-13 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 4 0 270L-01-00-140(1-3) update dwg per rig move email. (7/13-17/20) Call J.G. & review Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 TSR-01767- Mio's comments, review w/ T.E., FUZE meeting (7/15/20) FUZE Eng. meeting - Review & update comments for TSR-01759 & -1767 from Mio. 0TSR-review, reference documents, 3d model, Sketch, Review w T.E., RFI (7/8-10/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Timesheet Emails Update status - J.G. Phone calls Title block swap paper space trouble shoot. 7/15/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-14 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 4 0 270L-01-00-140(1-3) update dwg per rig move email. (7/13-17/20) Call J.G. & review Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 TSR-01767- Mio's comments, review w/ T.E., FUZE meeting (7/15/20) FUZE Eng. meeting - Review & update comments for TSR-01759 & -1767 from Mio. 0TSR-review, reference documents, 3d model, Sketch, Review w T.E., RFI (7/8-10/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 Timesheet Emails Update status - J.G. Phone calls Title block swap paper space trouble shoot. 7/15/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-15 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 3 0 270L-01-00-140(1-3) update dwg per rig move email. (7/13-17/20) Call J.G. & review Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-15 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 TSR-01767- Mio's comments, review w/ T.E., FUZE meeting (7/15/20) FUZE Eng. meeting - Review & update comments for TSR-01759 & -1767 from Mio. 0TSR-review, reference documents, 3d model, Sketch, Review w T.E., RFI (7/8-10/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-15 Rig 273L-TSR :Rig 273L-TSR TSR-01757-AADU Surface 21-1/4in. Annualar Lift Ring Modifications Regular Pay N 0.5 0 273L-01-03-341 (sht. 1-3) PDF per T.E. (7/15/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Technical Services Weekly meeting (7/16/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails Update status - J.G. Phone calls Title block swap paper space trouble shoot. 7/15/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-16 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 270L-01-00-140(1-3) update dwg per rig move email. (7/13-17/20) Call J.G. & review Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5.5 0 TSR-01767- Mio's comments, review w/ T.E., FUZE meeting (7/15/20) FUZE Eng. meeting - Review & update comments for TSR-01759 & -1767 from Mio. 0TSR-review, reference documents, 3d model, Sketch, Review w T.E., RFI (7/8-10/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails Update status - J.G. Phone calls Title block swap paper space trouble shoot. 7/15/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-17 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 0.5 0 270L-01-00-140(1-3) update dwg per rig move email. (7/13-17/20) Call J.G. & review Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4.5 0 TSR-01767- Mio's comments, review w/ T.E., FUZE meeting (7/15/20) FUZE Eng. meeting - Review & update comments for TSR-01759 & -1767 from Mio. 0TSR-review, reference documents, 3d model, Sketch, Review w T.E., RFI (7/8-10/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 7/20/20 Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-21 HTSG-TSR :HTSG-TSR HTSG-2020 SMART-Developmental Goals Regular Pay N 1.5 0 Review w/ J.G. 7/21/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Timesheet Emails Call J.G. Review/Update status Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-21 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 270L-01-00-140 (1-3) update dwg per rig move email. Comments per Gregg. (7/21/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3.5 0 RUSA drawing for Bell Nipple Pad Eye Hook (7/21-23/20) Request RUSA dwg #. Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Timesheet Emails Call J.G. Review/Update status Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-22 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 270L-01-00-140 (1-3) update dwg per rig move email. Comments per Gregg. (7/21/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5 0 RUSA drawing for Bell Nipple Pad Eye Hook (7/21-23/20) Request RUSA dwg #. Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-23 Berkut-TSR :Berkut-TSR TSR-01770-BERP Padeye for Choke Kill Hose Rigging on BOP Regular Pay N 4.5 0 Background sketch, layout, solidworks model dwg for CAD (7/23,24/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Timesheet Emails Call J.G. Review/Update status Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 RUSA drawing for Bell Nipple Pad Eye Hook (7/21-23/20) Request RUSA dwg #. Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-24 Berkut-TSR :Berkut-TSR TSR-01770-BERP Padeye for Choke Kill Hose Rigging on BOP Regular Pay N 5 0 Background sketch, layout, solidworks model dwg for CAD (7/23,24/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails Call J.G. Review/Update status Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-27 Berkut-TSR :Berkut-TSR TSR-01770-BERP Padeye for Choke Kill Hose Rigging on BOP Regular Pay N 2.5 0 Pad eye C.& K. Rigging sketch (7/27-30/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 Emails Timesheet Call J.G. CAD crash (8/3/20) Research for RUSD title block. (7/28/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 Orlan-TSR-01767 Comments (Mio/Internal) update (7/27,28/20) Orlan-TSR-01759 Comments update (7/28/20) Pad eye C.& K. Rigging sketch (7/31/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-28 Berkut-TSR :Berkut-TSR TSR-01770-BERP Padeye for Choke Kill Hose Rigging on BOP Regular Pay N 1.5 0 Pad eye C.& K. Rigging sketch (7/27-30/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 Emails Timesheet Call J.G. CAD crash (8/3/20) Research for RUSD title block. (7/28/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4.5 0 Orlan-TSR-01767 Comments (Mio/Internal) update (7/27,28/20) Orlan-TSR-01759 Comments update (7/28/20) Pad eye C.& K. Rigging sketch (7/31/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-29 Berkut-TSR :Berkut-TSR TSR-01770-BERP Padeye for Choke Kill Hose Rigging on BOP Regular Pay N 5.5 0 Pad eye C.& K. Rigging sketch (7/27-30/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-29 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Call J.G. CAD crash (8/3/20) Research for RUSD title block. (7/28/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-29 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Solidworks (TSR-01770 model & dwg file.) 7/29,30/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-30 Berkut-TSR :Berkut-TSR TSR-01770-BERP Padeye for Choke Kill Hose Rigging on BOP Regular Pay N 5.5 0 Pad eye C.& K. Rigging sketch (7/27-30/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Call J.G. CAD crash (8/3/20) Research for RUSD title block. (7/28/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-30 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Solidworks (TSR-01770 model & dwg file.) 7/29,30/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-31 Berkut-TSR :Berkut-TSR TSR-01770-BERP Padeye for Choke Kill Hose Rigging on BOP Regular Pay N 2 0 Pad eye C.& K. Rigging sketch (7/27-30/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-31 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Call J.G. CAD crash (8/3/20) Research for RUSD title block. (7/28/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-07-31 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 Orlan-TSR-01767 Comments (Mio/Internal) update (7/27,28/20) Orlan-TSR-01759 Comments update (7/28/20) Pad eye C.& K. Rigging sketch (7/31/20) Reck, John Engineer I 29656 Reck, John:Engineer I 2020-06-29 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 3 0 cabin integration and hydraulic concept, grasshopper terminations and drawing review, cabin bang board consumers, hydraulic consumer P&ID redlines, HPU air flow clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2020-06-29 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.5 0 piping termination meetings and clarifications, status updates, action items list and meeting, revised BOD, scope of work clarifications, diesel connection research, series 71 vertical load clarifications, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-06-29 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2020-06-29 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 vendor review and clarifications, drawing review, berkut standpipe support tagging clarifications, workover rig wind load clarifications, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-06-29 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 1 0 SAFI model update and analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2020-06-30 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 1.5 0 cabin integration and hydraulic concept, grasshopper terminations and drawing review, cabin bang board consumers, hydraulic consumer P&ID redlines, HPU air flow clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2020-06-30 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 piping termination meetings and clarifications, status updates, action items list and meeting, revised BOD, scope of work clarifications, diesel connection research, series 71 vertical load clarifications, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-06-30 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3.5 0 vendor review and clarifications, drawing review, berkut standpipe support tagging clarifications, workover rig wind load clarifications, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-01 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 2.5 0 cabin integration and hydraulic concept, grasshopper terminations and drawing review, cabin bang board consumers, hydraulic consumer P&ID redlines, HPU air flow clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-01 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 piping termination meetings and clarifications, status updates, action items list and meeting, revised BOD, scope of work clarifications, diesel connection research, series 71 vertical load clarifications, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 vendor review and clarifications, drawing review, berkut standpipe support tagging clarifications, workover rig wind load clarifications, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-01 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 2.5 0 SAFI model update and analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-02 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 1 0 cabin integration and hydraulic concept, grasshopper terminations and drawing review, cabin bang board consumers, hydraulic consumer P&ID redlines, HPU air flow clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-02 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 piping termination meetings and clarifications, status updates, action items list and meeting, revised BOD, scope of work clarifications, diesel connection research, series 71 vertical load clarifications, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 TS meeting and spreadsheet prep Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 vendor review and clarifications, drawing review, berkut standpipe support tagging clarifications, workover rig wind load clarifications, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-02 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 2.5 0 SAFI model update and analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 4th of July Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-06 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 5.5 0 status update meetings, action item status updates, grasshopper tail design and meetings, cat6/comm cable concepts, cabin bang board utilities, hydraulic requirements, exhaust backpressure sizing, winch meetings and research, Drawworks air flow and sound attenuation, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-06 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Orlan casing jetting tool RUSA drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-06 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 1 0 Safi model load combinations and meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-07 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 6 0 status update meetings, action item status updates, grasshopper tail design and meetings, cat6/comm cable concepts, cabin bang board utilities, hydraulic requirements, exhaust backpressure sizing, winch meetings and research, Drawworks air flow and sound attenuation, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Orlan casing jetting tool RUSA drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-07 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 2 0 Safi model load combinations and meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-08 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 6 0 status update meetings, action item status updates, grasshopper tail design and meetings, cat6/comm cable concepts, cabin bang board utilities, hydraulic requirements, exhaust backpressure sizing, winch meetings and research, Drawworks air flow and sound attenuation, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Orlan casing jetting tool RUSA drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-08 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 2 0 Safi model load combinations and meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-09 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3.5 0 status update meetings, action item status updates, grasshopper tail design and meetings, cat6/comm cable concepts, cabin bang board utilities, hydraulic requirements, exhaust backpressure sizing, winch meetings and research, Drawworks air flow and sound attenuation, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Orlan casing jetting tool RUSA drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-09 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 2 0 TSR review, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-10 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4.5 0 status update meetings, action item status updates, grasshopper tail design and meetings, cat6/comm cable concepts, cabin bang board utilities, hydraulic requirements, exhaust backpressure sizing, winch meetings and research, Drawworks air flow and sound attenuation, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Orlan casing jetting tool RUSA drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-10 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 1 0 TSR review, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-13 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 6 0 Service loop height location calculations, exhaust routing review, hydraulic interconnect fittings, turn of nut research, diesel connection and fittings research, manrider requirements research and calls with numerous vendors, exhaust piping material and insulation specification, Power swivel connections and lengths, utility winch vs manrider, grasshopper drawing review and comments, link length and dimension check, drawworks power swivel electrical connection assistance, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-13 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-13 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 1.5 0 safi model comments and review Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-14 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 8.5 0 Service loop height location calculations, exhaust routing review, hydraulic interconnect fittings, turn of nut research, diesel connection and fittings research, manrider requirements research and calls with numerous vendors, exhaust piping material and insulation specification, Power swivel connections and lengths, utility winch vs manrider, grasshopper drawing review and comments, link length and dimension check, drawworks power swivel electrical connection assistance, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-15 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 6.5 0 Service loop height location calculations, exhaust routing review, hydraulic interconnect fittings, turn of nut research, diesel connection and fittings research, manrider requirements research and calls with numerous vendors, exhaust piping material and insulation specification, Power swivel connections and lengths, utility winch vs manrider, grasshopper drawing review and comments, link length and dimension check, drawworks power swivel electrical connection assistance, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-15 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 RUSA title block discussion and review, orlan casing jetting tool drawing review and lanyard research Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-15 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 1 0 TSR review, began SAFI model, load combination clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-16 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 Service loop height location calculations, exhaust routing review, hydraulic interconnect fittings, turn of nut research, diesel connection and fittings research, manrider requirements research and calls with numerous vendors, exhaust piping material and insulation specification, Power swivel connections and lengths, utility winch vs manrider, grasshopper drawing review and comments, link length and dimension check, drawworks power swivel electrical connection assistance, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Mid year performance review Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 RUSA title block discussion and review, orlan casing jetting tool drawing review and lanyard research Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-16 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 1 0 TSR review, began SAFI model, load combination clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-17 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Service loop height location calculations, exhaust routing review, hydraulic interconnect fittings, turn of nut research, diesel connection and fittings research, manrider requirements research and calls with numerous vendors, exhaust piping material and insulation specification, Power swivel connections and lengths, utility winch vs manrider, grasshopper drawing review and comments, link length and dimension check, drawworks power swivel electrical connection assistance, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 RUSA title block discussion and review, orlan casing jetting tool drawing review and lanyard research Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-17 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 4 0 TSR review, began SAFI model, load combination clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-20 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 6.5 0 dual rated winch meetings and clarifications, drillers cabin pressurization, service loop fittings and hoses, lift list revision, master utilities interface research and began spreadsheet, drawing review, pony structure interface, power swivel goosneck location, brake air line location, winch wire rope calculation Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-20 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-20 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 1 0 Safi review meeting, safi update for v-crimp wall addition Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-21 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 6.5 0 dual rated winch meetings and clarifications, drillers cabin pressurization, service loop fittings and hoses, lift list revision, master utilities interface research and began spreadsheet, drawing review, pony structure interface, power swivel goosneck location, brake air line location, winch wire rope calculation Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-21 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 2 0 Safi review meeting, safi update for v-crimp wall addition Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-22 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 6.5 0 dual rated winch meetings and clarifications, drillers cabin pressurization, service loop fittings and hoses, lift list revision, master utilities interface research and began spreadsheet, drawing review, pony structure interface, power swivel goosneck location, brake air line location, winch wire rope calculation Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 mid year performance revision and routing Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-22 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 0.5 0 Safi review meeting, safi update for v-crimp wall addition Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-22 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 0.5 0 Bracing addition Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-23 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3.5 0 dual rated winch meetings and clarifications, drillers cabin pressurization, service loop fittings and hoses, lift list revision, master utilities interface research and began spreadsheet, drawing review, pony structure interface, power swivel goosneck location, brake air line location, winch wire rope calculation Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Safi plate property research Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 orlan casing jetting tool requote Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-23 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 1 0 Safi review meeting, safi update for v-crimp wall addition Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-23 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 1 0 Bracing addition Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-24 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 dual rated winch meetings and clarifications, drillers cabin pressurization, service loop fittings and hoses, lift list revision, master utilities interface research and began spreadsheet, drawing review, pony structure interface, power swivel goosneck location, brake air line location, winch wire rope calculation Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Safi plate property research Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-24 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 orlan casing jetting tool requote Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-24 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 2 0 Safi review meeting, safi update for v-crimp wall addition Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-27 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 6.5 0 drawing comments meeting and closeout, status update meetings, sound mitigation meetings and clarifications, utility winch options meetings and review, piping drawing review, grasshopper/dragchain quote review, master interface register, exhaust insulation and bolting clarifications, load list lifting spreedsheet, code 62 flanges for high pressure Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-27 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-27 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 1 0 safi model meeting and screenshots Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-28 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 7 0 drawing comments meeting and closeout, status update meetings, sound mitigation meetings and clarifications, utility winch options meetings and review, piping drawing review, grasshopper/dragchain quote review, master interface register, exhaust insulation and bolting clarifications, load list lifting spreedsheet, code 62 flanges for high pressure Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-28 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 1.5 0 additional brace meeting and safi analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-29 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 6.5 0 drawing comments meeting and closeout, status update meetings, sound mitigation meetings and clarifications, utility winch options meetings and review, piping drawing review, grasshopper/dragchain quote review, master interface register, exhaust insulation and bolting clarifications, load list lifting spreedsheet, code 62 flanges for high pressure Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-29 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 DFO4 documentation requirements review, orlan casing jetting tool quote clarifications, 209L ATC unit piping drawing review, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-30 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 7 0 drawing comments meeting and closeout, status update meetings, sound mitigation meetings and clarifications, utility winch options meetings and review, piping drawing review, grasshopper/dragchain quote review, master interface register, exhaust insulation and bolting clarifications, load list lifting spreedsheet, code 62 flanges for high pressure Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-30 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 DFO4 documentation requirements review, orlan casing jetting tool quote clarifications, 209L ATC unit piping drawing review, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-31 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 drawing comments meeting and closeout, status update meetings, sound mitigation meetings and clarifications, utility winch options meetings and review, piping drawing review, grasshopper/dragchain quote review, master interface register, exhaust insulation and bolting clarifications, load list lifting spreedsheet, code 62 flanges for high pressure Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-31 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3.5 0 DFO4 documentation requirements review, orlan casing jetting tool quote clarifications, 209L ATC unit piping drawing review, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-07-31 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 1.5 0 additional brace meeting and safi analysis