Name Billing Class Employee No. Item Line Class Transaction Date Job No. Customer Service Item Notes Payroll Item Billable Employee Paid Day Rate Duration Days Remarks Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-03 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 4 0 Willow tender work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4.25 0 TOTAL tender work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 Ops call, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-03 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 SAK call Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-04 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 4.5 0 Willow tender work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-04 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 TOTAL tender work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-04 ORLAN-TSR :ORLAN-TSR TSR-01767-ORLP Bell Nipple Lifting Tool Regular Pay N 0.5 0 discussion on material with Kennedy Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-05 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 5 0 Willow tender work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-05 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 TOTAL tender work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-05 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 SAK call Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-05 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 0.5 0 discussion with Reck Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-06 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 4 0 Willow tender work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.75 0 TOTAL tender work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 Ops call, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-06 ORLAN-TSR :ORLAN-TSR TSR-01767-ORLP Bell Nipple Lifting Tool Regular Pay N 0.25 0 discussion on material with Kennedy Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-07 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 2 0 Willow tender work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-07 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 TOTAL tender work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-10 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 2 0 Willow tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-10 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 Uganda tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ops call, TS Update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-10 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 SAK call Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-10 ORLAN-TSR :ORLAN-TSR TSR-01767-ORLP Bell Nipple Lifting Tool Regular Pay N 0.5 0 address material concern with Kennedy Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-11 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 4.5 0 Willow tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-11 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 Uganda tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-11 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 0.5 0 discuss analysis Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-12 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 2 0 Willow tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-12 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7 0 Uganda tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-12 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 SAK call Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-13 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 Willow tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-13 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7 0 Uganda tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 Ops call, TS Update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-13 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 0.5 0 discuss analysis Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO - Dallas Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-17 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 Willow tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-17 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6 0 TOTAL Uganda tender work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ops call, TS update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 SVP call, timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-17 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 SAK call Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-18 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 Willow tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-18 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 8.5 0 TOTAL Uganda tender work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 SVP call, timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-19 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 11 0 TOTAL Uganda tender work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-20 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 Willow tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-20 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 8 0 TOTAL Uganda tender work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Ops call, TS update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-21 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6 0 TOTAL Uganda tender work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-24 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 Willow tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-24 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7 0 peer review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ops call, TS call, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-25 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9.5 0 peer review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9 0 peer review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-26 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 1 0 Review of load combos Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 8 0 peer review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ops call, TS call, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-28 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 3 0 Willow tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2020-08-28 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 peer review, Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 (08/03/20) Updated weekly timesheet and submitted for approval. Update call with Kyle. Call with Randy C to discuss drawworks information. Update call with Lam. (08/05/20) Reviewed designers timesheets. Update call with Jorge. (08/06/20) Update call with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6 0 (08/03/20) Finalized check - ATC cladding. (08/06/20) Signed ATC drawing package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-04 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 7.5 0 (08/04/20) Started Willow matting layout. Discussed with Tyler. (08/05/20) Continued matting layout. (08/06/20) Drawing review call with Tyler. Dwg update. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-04 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 (08/04/20) Searched for RUSA docs. and reviewed tolerance stamp information with Kyle. (08/06/20) Pulled AADU ref drawings for Tyler. (08/07/20) Pulled ref drawings for Tyler (pipe tub/pipe racks). Discussed with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-05 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 5.5 0 (08/04/20) Started Willow matting layout. Discussed with Tyler. (08/05/20) Continued matting layout. (08/06/20) Drawing review call with Tyler. Dwg update. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 (08/03/20) Updated weekly timesheet and submitted for approval. Update call with Kyle. Call with Randy C to discuss drawworks information. Update call with Lam. (08/05/20) Reviewed designers timesheets. Update call with Jorge. (08/06/20) Update call with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-05 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1.5 0 (08/05/20) Researched 249 camp info per request from Robbie. (08/06/20) Searched for original camp drawings/info (249). (08/07/20) Info for Robbie-249 tender drawings. Email to Dan for missing info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-05 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.75 0 (08/05/20) Researched HP piping material info per email request. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-06 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 3.25 0 (08/04/20) Started Willow matting layout. Discussed with Tyler. (08/05/20) Continued matting layout. (08/06/20) Drawing review call with Tyler. Dwg update. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 (08/06/20) Call with Tyler/Kyle to review Uganda drawings. Created new drawing locations and copied drawing files. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (08/06/20) Weekly TSR call. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.25 0 (08/04/20) Searched for RUSA docs. and reviewed tolerance stamp information with Kyle. (08/06/20) Pulled AADU ref drawings for Tyler. (08/07/20) Pulled ref drawings for Tyler (pipe tub/pipe racks). Discussed with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (08/03/20) Updated weekly timesheet and submitted for approval. Update call with Kyle. Call with Randy C to discuss drawworks information. Update call with Lam. (08/05/20) Reviewed designers timesheets. Update call with Jorge. (08/06/20) Update call with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.25 0 (08/03/20) Finalized check - ATC cladding. (08/06/20) Signed ATC drawing package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-06 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 2 0 (08/05/20) Researched 249 camp info per request from Robbie. (08/06/20) Searched for original camp drawings/info (249). (08/07/20) Info for Robbie-249 tender drawings. Email to Dan for missing info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-07 Berkut-TSR :Berkut-TSR TSR-01770-BERP Padeye for Choke Kill Hose Rigging on BOP Regular Pay N 2 0 (08/07/20) Started drawing check. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 (08/04/20) Searched for RUSA docs. and reviewed tolerance stamp information with Kyle. (08/06/20) Pulled AADU ref drawings for Tyler. (08/07/20) Pulled ref drawings for Tyler (pipe tub/pipe racks). Discussed with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-07 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 2.5 0 (08/05/20) Researched 249 camp info per request from Robbie. (08/06/20) Searched for original camp drawings/info (249). (08/07/20) Info for Robbie-249 tender drawings. Email to Dan for missing info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 (08/10/20) Sent pipe tub info to Tyler for reference. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (08/10/20) Update call with Lam. Review/approved designer timesheets. (08/11/20) Update call with Lam. (08/12/20) Update call with Kyle. Update with Lam. (08/13/20) Update call with John. (08/14/20) Update with Kyle Update with Lam. Update with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3.5 0 (08/10/20) Cont check Berkut padeye/clamp drawing. (08/11/20) Finalized check and sent comments. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-10 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 3.5 0 (08/10/20) Reviewed 249 camp layout. Cont yard layout. (08/11/20) Yard layout. (08/12/20) Yard layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-11 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 (08/11/20) Updated GA drawing. Call to discuss drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (08/10/20) Update call with Lam. Review/approved designer timesheets. (08/11/20) Update call with Lam. (08/12/20) Update call with Kyle. Update with Lam. (08/13/20) Update call with John. (08/14/20) Update with Kyle Update with Lam. Update with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3.5 0 (08/10/20) Cont check Berkut padeye/clamp drawing. (08/11/20) Finalized check and sent comments. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-11 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 3.75 0 (08/10/20) Reviewed 249 camp layout. Cont yard layout. (08/11/20) Yard layout. (08/12/20) Yard layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (08/10/20) Update call with Lam. Review/approved designer timesheets. (08/11/20) Update call with Lam. (08/12/20) Update call with Kyle. Update with Lam. (08/13/20) Update call with John. (08/14/20) Update with Kyle Update with Lam. Update with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-12 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 7 0 (08/12/20) Oxy Llanos site layouts. (08/13/20) Update call with Kyle. Site redlines and updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-12 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 (08/10/20) Reviewed 249 camp layout. Cont yard layout. (08/11/20) Yard layout. (08/12/20) Yard layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-13 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.5 0 (08/13/20) Started drawing package redlines. (08/14/20) Cont drawing updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (08/13/20) Weekly TSR call. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (08/10/20) Update call with Lam. Review/approved designer timesheets. (08/11/20) Update call with Lam. (08/12/20) Update call with Kyle. Update with Lam. (08/13/20) Update call with John. (08/14/20) Update with Kyle Update with Lam. Update with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-13 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 5 0 (08/12/20) Oxy Llanos site layouts. (08/13/20) Update call with Kyle. Site redlines and updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-14 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4.75 0 (08/13/20) Started drawing package redlines. (08/14/20) Cont drawing updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (08/10/20) Update call with Lam. Review/approved designer timesheets. (08/11/20) Update call with Lam. (08/12/20) Update call with Kyle. Update with Lam. (08/13/20) Update call with John. (08/14/20) Update with Kyle Update with Lam. Update with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-17 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.25 0 (08/17/20) Worked on drawing package. (08/18/20) Cont drawing revisions. (08/19/20) Worked on (matting, Site, & BOP dwgs). (08/20/20) Finalized BOP and new diverter drawing. (08/21/20) Call with Tyler to review drawing package and changes. Start LP mud. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (08/17/20) Update call with Brian/Sandy. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 (08/17/20) Update with Kyle. Updated weekly timesheet and submitted for approval. (08/18/20) Update call with Lam Update call with Jorge. Update call with Kyle. Update call with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 (08/17/20) Reviewed casing jetting tool comments. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-17 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 (08/17/20) Searched for reference drill line spooler. (08/20/20) Searched for hyd. drill line spooler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-18 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7 0 (08/17/20) Worked on drawing package. (08/18/20) Cont drawing revisions. (08/19/20) Worked on (matting, Site, & BOP dwgs). (08/20/20) Finalized BOP and new diverter drawing. (08/21/20) Call with Tyler to review drawing package and changes. Start LP mud. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (08/17/20) Update with Kyle. Updated weekly timesheet and submitted for approval. (08/18/20) Update call with Lam Update call with Jorge. Update call with Kyle. Update call with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-19 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 8.5 0 (08/17/20) Worked on drawing package. (08/18/20) Cont drawing revisions. (08/19/20) Worked on (matting, Site, & BOP dwgs). (08/20/20) Finalized BOP and new diverter drawing. (08/21/20) Call with Tyler to review drawing package and changes. Start LP mud. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-20 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 8 0 (08/17/20) Worked on drawing package. (08/18/20) Cont drawing revisions. (08/19/20) Worked on (matting, Site, & BOP dwgs). (08/20/20) Finalized BOP and new diverter drawing. (08/21/20) Call with Tyler to review drawing package and changes. Start LP mud. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-20 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 (08/17/20) Searched for reference drill line spooler. (08/20/20) Searched for hyd. drill line spooler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-21 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 (08/17/20) Worked on drawing package. (08/18/20) Cont drawing revisions. (08/19/20) Worked on (matting, Site, & BOP dwgs). (08/20/20) Finalized BOP and new diverter drawing. (08/21/20) Call with Tyler to review drawing package and changes. Start LP mud. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-21 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 4 0 (08/21/20) Aksai yard layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-24 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 (08/24/20) Floating Holiday. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-25 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5.25 0 (08/25/20 - 08/28/20) Continued with drawing package updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 (08/25/20) Updated weekly timesheet and submitted for approval. Update call with Tyler. Update call with Lam. (08/27/20) Update call with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 (08/25/20) Pulled 262 redlines and reviewed comments with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 8.5 0 (08/25/20 - 08/28/20) Continued with drawing package updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6.25 0 (08/25/20 - 08/28/20) Continued with drawing package updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (08/27/20) Weekly TSR call. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (08/25/20) Updated weekly timesheet and submitted for approval. Update call with Tyler. Update call with Lam. (08/27/20) Update call with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-27 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 (08/27/20) Searched for 249 muffler information per request from Dan Colby. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-08-28 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6.5 0 (08/25/20 - 08/28/20) Continued with drawing package updates. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-03 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 2 0 Reviewing Tender Documentation and equipment requirements. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-03 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 4 0 Continue to review single line drawings. Mark up the same and return to Ripal for review. Conference call with team to discuss Caterpillar engine requirements Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-03 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 2 0 According to Luis the rig is still getting the wrong information from the PLC's this time in using the software that the team has received. Was ask to set up a conference call with Siemens and or NOV with Efrain to discuss issues and requirements? I requested Luis and Efrain to provide further clarification as to what type of information they want to capture so that I can pass this information on to both NOV as well as Siemens. Haven't had a reply from Mexico to date. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Gary Wilson for rig 265 potential power and mud pump upgrade. Performing load analysis and editing as required for review with both Gary and Ripal Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-04 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 2 0 Reviewing Tender Documentation and equipment requirements. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-04 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 2 0 Continue to review single line drawings. Mark up the same and return to Ripal for review. Conference call with team to discuss Caterpillar engine requirements Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Gary Wilson for rig 265 potential power and mud pump upgrade. Performing load analysis and editing as required for review with both Gary and Ripal Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-05 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 Working with Tyler and Kyle on the TOTAL PO1356 proposal. Reviewing single line and design proposal to TOTAL Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Gary Wilson for rig 265 potential power and mud pump upgrade. Performing load analysis and editing as required for review with both Gary and Ripal Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-06 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 Reviewing Tender Documentation and equipment requirements. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 Working with Tyler and Kyle on the TOTAL PO1356 proposal. Reviewing single line and design proposal to TOTAL Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-06 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 2.5 0 According to Luis the rig is still getting the wrong information from the PLC's this time in using the software that the team has received. Was ask to set up a conference call with Siemens and or NOV with Efrain to discuss issues and requirements? I requested Luis and Efrain to provide further clarification as to what type of information they want to capture so that I can pass this information on to both NOV as well as Siemens. Haven't had a reply from Mexico to date. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Gary Wilson for rig 265 potential power and mud pump upgrade. Performing load analysis and editing as required for review with both Gary and Ripal Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-07 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 Working with Tyler and Kyle on the TOTAL PO1356 proposal. Reviewing single line and design proposal to TOTAL Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Gary Wilson for rig 265 potential power and mud pump upgrade. Performing load analysis and editing as required for review with both Gary and Ripal Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-10 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 1 0 Was ask by Luis to set up a conference call with Siemens and or NOV with Efrain to discuss issues and requirements. I requested Luis and Efrain to provide further clarification as to what type of information they want to capture so that I can pass this information on to both NOV as well as Siemens. Haven't had a reply from Mexico to date. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Gary Wilson for rig 265 potential power and mud pump upgrade. Performing load analysis and editing as required for review with both Gary and Ripal Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-11 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 2 0 Continue to review single line drawings. Mark up the same and return to Ripal for review. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-11 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Working with Tyler and Kyle on the TOTAL PO1356 proposal. Reviewing single line and design proposal to TOTAL Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-11 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 1 0 Was ask by Luis to set up a conference call with Siemens and or NOV with Efrain to discuss issues and requirements. I requested Luis and Efrain to provide further clarification as to what type of information they want to capture so that I can pass this information on to both NOV as well as Siemens. Haven't had a reply from Mexico to date. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Gary Wilson for rig 265 potential power and mud pump upgrade. Performing load analysis and editing as required for review with both Gary and Ripal Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-12 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 Reviewing Tender Documentation and equipment requirements. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-12 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Working with Tyler and Kyle on the TOTAL PO1356 proposal. Reviewing single line and design proposal to TOTAL Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-12 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 2 0 Was ask by Luis to set up a conference call with Siemens and or NOV with Efrain to discuss issues and requirements. I requested Luis and Efrain to provide further clarification as to what type of information they want to capture so that I can pass this information on to both NOV as well as Siemens. Haven't had a reply from Mexico to date. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Gary Wilson for rig 265 potential power and mud pump upgrade. Performing load analysis and editing as required for review with both Gary and Ripal Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-13 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 Reviewing Tender Documentation and equipment requirements. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-13 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 2 0 Continue to review single line drawings. Mark up the same and return to Ripal for review. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-13 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Working with Tyler and Kyle on the TOTAL PO1356 proposal. Reviewing single line and design proposal to TOTAL Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-13 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 2 0 Was ask by Luis to set up a conference call with Siemens and or NOV with Efrain to discuss issues and requirements. I requested Luis and Efrain to provide further clarification as to what type of information they want to capture so that I can pass this information on to both NOV as well as Siemens. Haven't had a reply from Mexico to date. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Gary Wilson for rig 265 potential power and mud pump upgrade. Performing load analysis and editing as required for review with both Gary and Ripal Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-14 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 Reviewing Tender Documentation and equipment requirements. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-14 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 1 0 Continue to review single line drawings. Mark up the same and return to Ripal for review. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-14 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 2 0 Was ask by Luis to set up a conference call with Siemens and or NOV with Efrain to discuss issues and requirements. I requested Luis and Efrain to provide further clarification as to what type of information they want to capture so that I can pass this information on to both NOV as well as Siemens. Haven't had a reply from Mexico to date. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Gary Wilson for rig 265 potential power and mud pump upgrade. Performing load analysis and editing as required for review with both Gary and Ripal Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-17 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 1 0 I requested Luis and Efrain to provide further clarification as to what type of information they want to capture so that I can pass this information on to both NOV as well as Siemens. Haven't had a reply from Mexico to date. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Conference call with Brian Collins and Team. Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Gary Wilson for rig 265 potential power and transformer upgrades. Getting quotes for above. Modified 480 volt MCC drawing to reflect split buss with an additional 1250 kVA tranformer. Sent back to Gary for review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-18 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 2 0 Investigating clarifications for utility power harmonic distortion filtration with NOV. NOV does not provide harmonic filtration to be able to provide cost summary. Visited with two other companies, rough order of magnitude is somewhere around $550K to $650K. Should have a budgetary quote by COB 8/21/20. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-18 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Working with Tyler and Kyle on the TOTAL PO1356 proposal. Reviewing single line and answering emails regarding clarification and potential for utility power Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-18 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 1 0 I requested Luis and Efrain to provide further clarification as to what type of information they want to capture so that I can pass this information on to both NOV as well as Siemens. Haven't had a reply from Mexico to date. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-18 Latin America Region-TSR :Latin America Region-TSR TSR-01765-LABU Jaguar 2nd Rig - Mexico Regular Pay N 2 0 Conference call to discuss the second rig for Jaguar in Mexico. reviewing second rig documentation and requirements. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Conference call with Brian Collins and Team. Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Gary Wilson for rig 265 potential power and transformer upgrades. Getting quotes for above. Modified 480 volt MCC drawing to reflect split buss with an additional 1250 kVA tranformer. Sent back to Gary for review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-19 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 Investigating clarifications for utility power harmonic distortion filtration with NOV. NOV does not provide harmonic filtration to be able to provide cost summary. Visited with two other companies, rough order of magnitude is somewhere around $550K to $650K. Should have a budgetary quote by COB 8/21/20. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-19 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 1 0 Continue to review single line drawings. Mark up the same and return to Ripal for review. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-19 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Working with Tyler and Kyle on the TOTAL PO1356 proposal. Reviewing single line and answering emails regarding clarification and potential for utility power Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-19 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 1 0 I requested Luis and Efrain to provide further clarification as to what type of information they want to capture so that I can pass this information on to both NOV as well as Siemens. Haven't had a reply from Mexico to date. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-19 Latin America Region-TSR :Latin America Region-TSR TSR-01765-LABU Jaguar 2nd Rig - Mexico Regular Pay N 2 0 Conference call to discuss the second rig for Jaguar in Mexico. reviewing second rig documentation and requirements. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Conference call with Brian Collins and Team. Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Gary Wilson for rig 265 potential power and transformer upgrades. Getting quotes for above. Modified 480 volt MCC drawing to reflect split buss with an additional 1250 kVA tranformer. Sent back to Gary for review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-20 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 Investigating clarifications for utility power harmonic distortion filtration with NOV. NOV does not provide harmonic filtration to be able to provide cost summary. Visited with two other companies, rough order of magnitude is somewhere around $550K to $650K. Should have a budgetary quote by COB 8/21/20. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-20 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 1 0 I requested Luis and Efrain to provide further clarification as to what type of information they want to capture so that I can pass this information on to both NOV as well as Siemens. Haven't had a reply from Mexico to date. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-20 Latin America Region-TSR :Latin America Region-TSR TSR-01765-LABU Jaguar 2nd Rig - Mexico Regular Pay N 1 0 Conference call to discuss the second rig for Jaguar in Mexico. reviewing second rig documentation and requirements. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Conference call with Brian Collins and Team. Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Gary Wilson for rig 265 potential power and transformer upgrades. Getting quotes for above. Modified 480 volt MCC drawing to reflect split buss with an additional 1250 kVA tranformer. Sent back to Gary for review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-21 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 5 0 Investigating clarifications for utility power harmonic distortion filtration with NOV. NOV does not provide harmonic filtration to be able to provide cost summary. Visited with two other companies, rough order of magnitude is somewhere around $550K to $650K. Should have a budgetary quote by COB 8/21/20. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-21 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 1 0 I requested Luis and Efrain to provide further clarification as to what type of information they want to capture so that I can pass this information on to both NOV as well as Siemens. Haven't had a reply from Mexico to date. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Conference call with Brian Collins and Team. Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Gary Wilson for rig 265 potential power and transformer upgrades. Getting quotes for above. Modified 480 volt MCC drawing to reflect split buss with an additional 1250 kVA tranformer. Sent back to Gary for review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Conference call with Brian Collins and Team. Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Gary Wilson for rig 265 potential power and transformer upgrades. Getting quotes for above. Modified 480 volt MCC drawing to reflect split buss with an additional 1250 kVA tranformer. Sent back to Gary for review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-24 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 2 0 Investigating clarifications for utility power harmonic distortion filtration. Sent the budgetary quote from Industrial Oilfield and Marine Components for the HGA Filtration Skid Package to Tyler Byers, mark Quinlan, and Kyle McMullen. estimated cost is $660K Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-24 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 1 0 Reading email from report and supporting as required. I requested Luis and Efrain to provide further clarification as to what type of information they want to capture so that I can pass this information on to both NOV as well as Siemens. Haven't had a reply from Mexico to date. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Gary Wilson for rig 265 potential power and transformer upgrades. Getting quotes for above. Modified 480 volt MCC drawing to reflect split buss with an additional 1250 kVA transformer. Sent back to Gary for review. Recommended AC tie breakers as well as main feeder breakers for split MCC for Gary to review. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-25 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 2 0 Investigating clarifications for utility power harmonic distortion filtration. Sent the budgetary quote from Industrial Oilfield and Marine Components for the HGA Filtration Skid Package to Tyler Byers, mark Quinlan, and Kyle McMullen. estimated cost is $660K Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-25 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Working with Tyler and Kyle on the TOTAL PO1356 proposal. Reviewing single line and answering emails regarding clarification and potential for utility power. Developed a Endurance/Integrated Testing Plan and sent to Tyler and Kyle for review. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-25 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 1 0 Reading email from report and supporting as required. I requested Luis and Efrain to provide further clarification as to what type of information they want to capture so that I can pass this information on to both NOV as well as Siemens. Haven't had a reply from Mexico to date. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-25 Latin America Region-TSR :Latin America Region-TSR TSR-01765-LABU Jaguar 2nd Rig - Mexico Regular Pay N 2 0 Reviewing second rig documentation and requirements comparison from Randy Vrowson. Editing Randy's documents and sent back for review and comments..Developing cost spread sheet for rig 122 to comply with rig tender specification Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Gary Wilson for rig 265 potential power and transformer upgrades. Getting quotes for above. Modified 480 volt MCC drawing to reflect split buss with an additional 1250 kVA transformer. Sent back to Gary for review. Recommended AC tie breakers as well as main feeder breakers for split MCC for Gary to review. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-26 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 2 0 Investigating clarifications for utility power harmonic distortion filtration. Sent the budgetary quote from Industrial Oilfield and Marine Components for the HGA Filtration Skid Package to Tyler Byers, mark Quinlan, and Kyle McMullen. estimated cost is $660K Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 Working with Tyler and Kyle on the TOTAL PO1356 proposal. Reviewing single line and answering emails regarding clarification and potential for utility power. Developed a Endurance/Integrated Testing Plan and sent to Tyler and Kyle for review. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-26 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 1 0 Reading email from report and supporting as required. I requested Luis and Efrain to provide further clarification as to what type of information they want to capture so that I can pass this information on to both NOV as well as Siemens. Haven't had a reply from Mexico to date. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-26 Latin America Region-TSR :Latin America Region-TSR TSR-01765-LABU Jaguar 2nd Rig - Mexico Regular Pay N 2 0 Reviewing second rig documentation and requirements comparison from Randy Vrowson. Editing Randy's documents and sent back for review and comments..Developing cost spread sheet for rig 122 to comply with rig tender specification Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Gary Wilson for rig 265 potential power and transformer upgrades. Getting quotes for above. Modified 480 volt MCC drawing to reflect split buss with an additional 1250 kVA transformer. Sent back to Gary for review. Recommended AC tie breakers as well as main feeder breakers for split MCC for Gary to review. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-27 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 1 0 Reading email from report and supporting as required. I requested Luis and Efrain to provide further clarification as to what type of information they want to capture so that I can pass this information on to both NOV as well as Siemens. Haven't had a reply from Mexico to date. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-27 Latin America Region-TSR :Latin America Region-TSR TSR-01765-LABU Jaguar 2nd Rig - Mexico Regular Pay N 2 0 Reviewing second rig documentation and requirements comparison from Randy Vrowson. Editing Randy's documents and sent back for review and comments..Developing cost spread sheet for rig 122 to comply with rig tender specification Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Gary Wilson for rig 265 potential power and transformer upgrades. Getting quotes for above. Modified 480 volt MCC drawing to reflect split buss with an additional 1250 kVA transformer. Sent back to Gary for review. Recommended AC tie breakers as well as main feeder breakers for split MCC for Gary to review. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-28 Latin America Region-TSR :Latin America Region-TSR TSR-01753-LABU Jaguar Exploration - Mexico Regular Pay N 1 0 Reading email from report and supporting as required. I requested Luis and Efrain to provide further clarification as to what type of information they want to capture so that I can pass this information on to both NOV as well as Siemens. Haven't had a reply from Mexico to date. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-28 Latin America Region-TSR :Latin America Region-TSR TSR-01765-LABU Jaguar 2nd Rig - Mexico Regular Pay N 4 0 Reviewing second rig documentation and requirements comparison from Randy Vrowson. Editing Randy's documents and sent back for review and comments..Developing cost spread sheet for rig 122 to comply with rig tender specification Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Answering company emails and taking phone calls providing support for miscellaneous projects as required. Working with Gary Wilson for rig 265 potential power and transformer upgrades. Getting quotes for above. Modified 480 volt MCC drawing to reflect split buss with an additional 1250 kVA transformer. Sent back to Gary for review. Recommended AC tie breakers as well as main feeder breakers for split MCC for Gary to review. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-08-29 Latin America Region-TSR :Latin America Region-TSR TSR-01765-LABU Jaguar 2nd Rig - Mexico Regular Pay N 2 0 Reviewing second rig documentation and requirements comparison from Randy Vrowson. Editing Randy's documents and sent back for review and comments..Developing cost spread sheet for rig 122 to comply with rig tender specification Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call; Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-03 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 7.5 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-04 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 9 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-05 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 8.5 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call; Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-06 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 7.5 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-07 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 7 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call; Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-10 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 8 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-11 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 9 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-12 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 8 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call; Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-13 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 7 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-14 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 7 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-17 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 7.5 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-19 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 8 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-20 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 8.5 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-21 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 6 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call; Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-24 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 8 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-25 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 9 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-26 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 9 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call; Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-27 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 5.5 0 NCOC Workover Rig Tender Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2020-08-28 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 7 0 NCOC Workover Rig Tender Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-03 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 4 0 Work order, Quotes and Purchase Orders, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-03 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Weekly report, technical clarifications for interface meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Internal meetings Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-04 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 4.5 0 Work order, Quotes and Purchase Orders, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-04 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4.5 0 Weekly report, technical clarifications for interface meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-05 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 4.5 0 Work order, Quotes and Purchase Orders, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-05 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4.5 0 Weekly report, technical clarifications for interface meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-06 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 4 0 Work order, Quotes and Purchase Orders, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-06 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Weekly report, technical clarifications for interface meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Internal meetings Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-07 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 3 0 Work order, Quotes and Purchase Orders, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-07 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2.5 0 Weekly report, technical clarifications for interface meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-10 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 8 0 Quotes, baselune project, execute work order and submit first invoice, Bardex request Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-11 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 9 0 Quotes, baselune project, execute work order and submit first invoice, Bardex request Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-12 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 9 0 Quotes, baselune project, execute work order and submit first invoice, Bardex request Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-13 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 8 0 Quotes, baselune project, execute work order and submit first invoice, Bardex request Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-14 Holly Platform :Holly Platform TSR-01665-HOLP-20 Rig Upgrades Regular Pay N 4 0 Closeout report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-17 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Video discussions, travel to New Iberia Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-17 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 6 0 Procurement, project baseline, kick off meet with Loadmaster Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly meetings Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-18 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 7 0 Procurement, project baseline, kick off meet with Loadmaster Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-18 Holly Platform :Holly Platform TSR-01665-HOLP-20 Rig Upgrades Regular Pay N 2 0 Closeout report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-19 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Video discussions, travel to New Iberia Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-19 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 5 0 Procurement, project baseline, kick off meet with Loadmaster Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-20 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Procurement, project baseline, kick off meet with Loadmaster Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-21 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Video discussions, travel to New Iberia Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-21 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 4 0 Procurement, project baseline, kick off meet with Loadmaster Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-25 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 sawyer performance bond Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-25 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 7 0 Manrider Change Notice, Procurement, Project baseline, Interface Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-26 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 5 0 Manrider Change Notice, Procurement, Project baseline, Interface Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-26 Holly Platform :Holly Platform TSR-01665-HOLP-20 Rig Upgrades Regular Pay N 4 0 Project Closeout Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-27 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 8 0 Manrider Change Notice, Procurement, Project baseline, Interface Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-28 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 5 0 Manrider Change Notice, Procurement, Project baseline, Interface Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-03 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1.5 0 Commercial conference call Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-03 HTSG-TSR :HTSG-TSR HTSG-2020 SMART-Developmental Goals Regular Pay N 2 0 file room review @ office Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly operations CC HTSG weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 discussions regarding video of Genesis during SIT Timesheet / approvals Calls with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-03 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 0.75 0 ENL workover conf. call with Sakhalin Operations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-03 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 0.75 0 Conference call with COMC Clarification meeting with MK Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-03 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly conference call on Monday and Wednesday Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-03 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1.5 0 165L drawworks support Mast and HP piping welding email to Luis C. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-04 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.5 0 Clarification(s) Interface register discussion with RP and JR Review overturning BOD Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-04 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.5 0 Tender support - electrical discussion with CG, RP, specifications, CC(s) with TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 discussions regarding video of Genesis during SIT Timesheet / approvals Calls with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-04 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 Conference call with COMC Clarification meeting with MK Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 209L ATC Unit Closeout, material discussion for Orlan bell nipple lifting tool, Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-04 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 165L drawworks support Mast and HP piping welding email to Luis C. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-05 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 Clarification(s) Interface register discussion with RP and JR Review overturning BOD Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-05 HTSG-TSR :HTSG-TSR HTSG-2020 SMART-Developmental Goals Regular Pay N 5.5 0 file room review @ office Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-05 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 0.75 0 ENL workover conf. call with Sakhalin Operations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-05 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2 0 Conference call with COMC Clarification meeting with MK Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-05 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 weekly conference call on Monday and Wednesday Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Tender support - electrical discussion with CG, RP, specifications, CC(s) with TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly operations CC HTSG weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 discussions regarding video of Genesis during SIT Timesheet / approvals Calls with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-06 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 0.75 0 ENL workover conf. call with Sakhalin Operations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 updating TSR tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-06 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1.5 0 265L electrical load analysis - CC with RP and CG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-06 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 165L drawworks support Mast and HP piping welding email to Luis C. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-07 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 Tender support - electrical discussion with CG, RP, specifications, CC(s) with TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-07 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 only half day but applying 8 hours Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 discussions regarding video of Genesis during SIT Timesheet / approvals Calls with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-07 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 265L electrical load analysis - CC with RP and CG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-10 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 discussions with TE and other team members; reviewing optional items; Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-10 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.5 0 interface CC with chevron facilities Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-10 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 reading tender documents; reviewing requirements with TE; clarificaiton review; reviewing old tender submission Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-10 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 Driving home from lease Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations CC Weekly HTSG CC Mtg RE: marketing material for CVX project IDR Cordinator CC with Sundas / Marilyn Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-10 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 weekly meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-11 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 discussions with TE and other team members; reviewing optional items; Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-11 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 reading tender documents; reviewing requirements with TE; clarificaiton review; reviewing old tender submission Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Weekly Operations CC Weekly HTSG CC Mtg RE: marketing material for CVX project IDR Cordinator CC with Sundas / Marilyn Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Technical Services forecast Reviewing and discarding all of RS's old files Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-11 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 1 0 Oxy rig layouts with JG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.75 0 Status email to team; outstanding items; 209L ATC unit BOM review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-12 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 discussions with TE and other team members; reviewing optional items; Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-12 HTSG-TSR :HTSG-TSR HTSG-2020 SMART-Developmental Goals Regular Pay N 4 0 7th floor file room review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Technical Services forecast Reviewing and discarding all of RS's old files Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-12 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 1 0 Oxy rig layouts with JG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-12 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 weekly meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-12 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 1 0 Analysis review Closeout started Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-12 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 1 0 Analysis review Closeout started Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-13 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 reading tender documents; reviewing requirements with TE; clarificaiton review; reviewing old tender submission Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations CC Weekly HTSG CC Mtg RE: marketing material for CVX project IDR Cordinator CC with Sundas / Marilyn Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Technical Services forecast Reviewing and discarding all of RS's old files Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-13 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1.5 0 NCOC Workover Rig proposal review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-13 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 1 0 Oxy rig layouts with JG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.25 0 Status email to team; outstanding items; 209L ATC unit BOM review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-13 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 0.5 0 Analysis review Closeout started Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-14 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 discussions with TE and other team members; reviewing optional items; Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-14 Berkut-TSR :Berkut-TSR TSR-01772-BERP Access Platform for Drill Line Stabilizer Regular Pay N 1 0 Interface with Loadmaster CTR development Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-14 Berkut-TSR :Berkut-TSR TSR-01773-BERP CRI Mud Gun Modifications Regular Pay N 1 0 TSR review / discuss with LTN Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-14 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 reading tender documents; reviewing requirements with TE; clarificaiton review; reviewing old tender submission Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Technical Services forecast Reviewing and discarding all of RS's old files Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.75 0 Status email to team; outstanding items; 209L ATC unit BOM review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-14 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 0.5 0 Analysis review Closeout started Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-14 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 0.5 0 Analysis review Closeout started Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-17 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 Drill line spooler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-17 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Bulliten review; discussions with Tyler; clarificaiton support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-17 HTSG-TSR :HTSG-TSR HTSG-2020 SMART-Developmental Goals Regular Pay N 1 0 File room documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 weekly ops CC SVP postion update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 HTSG update to Steve C. Timesheet and reviews Discussions with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-17 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1.5 0 review NOV proposal for NCOC Workover rig Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 ATC Unit MTO review; update email Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-17 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 269L flare line questions from Andy Young Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-18 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1.5 0 Providing information to Tyler Byers; discussing electrical with CG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-18 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 Drill line spooler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-18 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Bulliten review; discussions with Tyler; clarificaiton support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-18 HTSG-TSR :HTSG-TSR HTSG-2020 SMART-Developmental Goals Regular Pay N 1 0 File room documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 HTSG update to Steve C. Timesheet and reviews Discussions with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 ATC Unit MTO review; update email Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-18 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 269L flare line questions from Andy Young Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-19 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 2.5 0 Fabrication kick-off meeting @ Loadmaster Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-19 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 Bulliten review; discussions with Tyler; clarificaiton support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 HTSG update to Steve C. Timesheet and reviews Discussions with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-19 OH-010 :OH-010 Overhead All Activities Regular Pay N 4.5 0 HOU to LA to HOU Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-20 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 0.5 0 Providing information to Tyler Byers; discussing electrical with CG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-20 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3.5 0 Drill line spooler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-20 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Bulliten review; discussions with Tyler; clarificaiton support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 HTSG update to Steve C. Timesheet and reviews Discussions with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-20 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 Drawworks research for Randy C. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 HTSG update to Steve C. Timesheet and reviews Discussions with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-21 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 HOU to LA to HOU Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-21 ORLAN-TSR :ORLAN-TSR TSR-01759-ORLP Casing Jetting Tool (9.625 in.) Regular Pay N 1 0 Closeout (revision 1) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-24 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 Internal peer review Technical submission review HSE support (Andy Young) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-24 HTSG-TSR :HTSG-TSR HTSG-2020 SMART-Developmental Goals Regular Pay N 1.5 0 7th floor file room Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ops Weekly conference call HTSG weekly CC Timesheet and timesheet review(s) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Steve C. update report Managment/support of direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-24 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2 0 Execution plan review Proposal review ZMS proposal review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-24 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 Weekly update meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-24 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 Mexico HP piping upgrade 122L drawworks Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-24 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 1 0 Final closeout review and addition of analysis report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-25 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Internal peer review Technical submission review HSE support (Andy Young) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-25 HTSG-TSR :HTSG-TSR HTSG-2020 SMART-Developmental Goals Regular Pay N 3 0 7th floor file room Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Steve C. update report Managment/support of direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-25 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 Execution plan review Proposal review ZMS proposal review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Casing jetting tool closeout (revision 1) Status update sent to team Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-25 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 1 0 Final closeout review and addition of analysis report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-26 Berkut-TSR :Berkut-TSR TSR-01772-BERP Access Platform for Drill Line Stabilizer Regular Pay N 1 0 LM Proposal review CTR transmittal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-26 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 personnel management conference calls review of documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Internal peer review Technical submission review HSE support (Andy Young) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Steve C. update report Managment/support of direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-26 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 Execution plan review Proposal review ZMS proposal review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 update TSR tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Casing jetting tool closeout (revision 1) Status update sent to team Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-26 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 249 genset exhaust system Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-27 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 personnel management conference calls review of documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Internal peer review Technical submission review HSE support (Andy Young) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ops Weekly conference call HTSG weekly CC Timesheet and timesheet review(s) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-27 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 Execution plan review Proposal review ZMS proposal review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-27 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 Layouts and CC's regarding CDPU on Equinor SPAR; email to JL regarding SPAR crane lifts Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 update TSR tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Casing jetting tool closeout (revision 1) Status update sent to team Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-27 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 249 genset exhaust system Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-27 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 1 0 Final closeout review and addition of analysis report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-28 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Internal peer review Technical submission review HSE support (Andy Young) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-28 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1.5 0 review closeout report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Steve C. update report Managment/support of direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-28 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2 0 Layouts and CC's regarding CDPU on Equinor SPAR; email to JL regarding SPAR crane lifts Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-28 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 Mexico HP piping upgrade 122L drawworks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 08/03: generate SAK actuals for Emanuel; convert Willow PDF files 08/04-05: RUSA/RUSD CAD standardization. 08/05: generate SAK accruals for Emanuel 08/06: move Orlan SWF files and file player to H: 08/07: RUSA/RUSD CAD standardization. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-03 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 08/03: teleconference call with Sakhalin regarding TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5 0 08/03: picked up red lines for all drawing sets of ATC support structure addition. 08/05-08/07: convert Sketchup model of compiled ATC data to STP file Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 08/03: generate SAK actuals for Emanuel; convert Willow PDF files 08/04-05: RUSA/RUSD CAD standardization. 08/05: generate SAK accruals for Emanuel 08/06: move Orlan SWF files and file player to H: 08/07: RUSA/RUSD CAD standardization. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 08/03: generate SAK actuals for Emanuel; convert Willow PDF files 08/04-05: RUSA/RUSD CAD standardization. 08/05: generate SAK accruals for Emanuel 08/06: move Orlan SWF files and file player to H: 08/07: RUSA/RUSD CAD standardization. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 08/03: picked up red lines for all drawing sets of ATC support structure addition. 08/05-08/07: convert Sketchup model of compiled ATC data to STP file Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 08/06: teleconference to discuss TSR updates and ongoing tasks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.75 0 08/06: transmit TSR-01725-DOC to CVX Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5.25 0 08/03: picked up red lines for all drawing sets of ATC support structure addition. 08/05-08/07: convert Sketchup model of compiled ATC data to STP file Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 08/03: generate SAK actuals for Emanuel; convert Willow PDF files 08/04-05: RUSA/RUSD CAD standardization. 08/05: generate SAK accruals for Emanuel 08/06: move Orlan SWF files and file player to H: 08/07: RUSA/RUSD CAD standardization. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 08/03: picked up red lines for all drawing sets of ATC support structure addition. 08/05-08/07: convert Sketchup model of compiled ATC data to STP file Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.25 0 08/10: timesheets to ProjXsense and payroll 08/10-08/12: AutoCAD standardization for RUSA/RUSD 08/12: convert PDF to CAD for OXY Columbia proposal Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-10 OH-013 :OH-013 Overhead All Activities Regular Pay N 2.75 0 08/10: verify LM transmittals with their transmittal document; transmit TSR-01737-209L drawing sets; 08/11: process incoming TSR-01773 and upload to SharePoint; transmit TSR-01737-209L-CO 08/13: process incoming TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-10 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 08/10: teleconference call with Sakhalin regarding TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.25 0 08/10: timesheets to ProjXsense and payroll 08/10-08/12: AutoCAD standardization for RUSA/RUSD 08/12: convert PDF to CAD for OXY Columbia proposal Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-11 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.75 0 08/10: verify LM transmittals with their transmittal document; transmit TSR-01737-209L drawing sets; 08/11: process incoming TSR-01773 and upload to SharePoint; transmit TSR-01737-209L-CO 08/13: process incoming TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 08/10: timesheets to ProjXsense and payroll 08/10-08/12: AutoCAD standardization for RUSA/RUSD 08/12: convert PDF to CAD for OXY Columbia proposal Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-12 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 08/12: meeting with Tyler and Dan regarding concept for COPA Willow. 08/13-08/14: concept model for COPA Willow (additional shaker and centrifuge) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 08/12-13: generate MTO from BOM on drawing sets. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 08/13: teleconference to discuss TSR updates and ongoing tasks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-13 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2.25 0 08/12: meeting with Tyler and Dan regarding concept for COPA Willow. 08/13-08/14: concept model for COPA Willow (additional shaker and centrifuge) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-13 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 08/10: verify LM transmittals with their transmittal document; transmit TSR-01737-209L drawing sets; 08/11: process incoming TSR-01773 and upload to SharePoint; transmit TSR-01737-209L-CO 08/13: process incoming TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 08/12-13: generate MTO from BOM on drawing sets. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-14 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 4 0 08/14: create drawing for CVX regarding grasshopper and SPAR connection interface Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-14 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 4 0 08/12: meeting with Tyler and Dan regarding concept for COPA Willow. 08/13-08/14: concept model for COPA Willow (additional shaker and centrifuge) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-17 Berkut-TSR :Berkut-TSR TSR-01773-BERP CRI Mud Gun Modifications Regular Pay N 3 0 08/17: review TSR/reference data and email Mio questions Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 08/17: SVP OPS Update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.75 0 08/17-18: RUSA/RUSD title block print settings; pull down menu Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 08/17: timesheets to ProjXsense 08/17-18: troubleshoot CAD license bottleneck; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-17 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 08/17: teleconference call with Sakhalin regarding TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 08/17-18: corrections and spot check MTO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 08/17-18: RUSA/RUSD title block print settings; pull down menu Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 08/17: timesheets to ProjXsense 08/17-18: troubleshoot CAD license bottleneck; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-18 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 08/18: transmit TSR-01759-DWG & CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 08/17-18: corrections and spot check MTO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-19 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 8 0 08/19: meeting with John & Ripal to discuss changes in SPAR interface drawing; updated drawing requests; 08/19-21: begin generating model for Genesis Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-20 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 8 0 08/19: meeting with John & Ripal to discuss changes in SPAR interface drawing; updated drawing requests; 08/19-21: begin generating model for Genesis Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-21 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 8 0 08/19: meeting with John & Ripal to discuss changes in SPAR interface drawing; updated drawing requests; 08/19-21: begin generating model for Genesis Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-24 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 2.5 0 08/24-08/28: model topsides of Genesis SPAR (drill deck level only) 08/25: utility interface drawing updates, and meetings 08/27: superstructure model review for windwalls with Reck 08/26: HPU model review with Sawyer Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 08/24: timesheets to Payroll and ProjXsense; troubleshoot CAD licensing errors and have users check out correct licenses. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-24 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 08/24: transmit TSR-01759-CO 08/25: transmit TSR-01772-CTR 08/27: process incoming transmittal from SAK Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-24 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 08/24: teleconference call with Sakhalin regarding TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-25 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 7 0 08/24-08/28: model topsides of Genesis SPAR (drill deck level only) 08/25: utility interface drawing updates, and meetings 08/27: superstructure model review for windwalls with Reck 08/26: HPU model review with Sawyer Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 08/24: transmit TSR-01759-CO 08/25: transmit TSR-01772-CTR 08/27: process incoming transmittal from SAK Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-26 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 4 0 08/24-08/28: model topsides of Genesis SPAR (drill deck level only) 08/25: utility interface drawing updates, and meetings 08/27: superstructure model review for windwalls with Reck 08/26: HPU model review with Sawyer Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-26 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 4 0 08/26: model Equinor ATP Titan from image and overlay Genesis SPAR's pony sub and superstructure. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-27 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 6 0 08/24-08/28: model topsides of Genesis SPAR (drill deck level only) 08/25: utility interface drawing updates, and meetings 08/27: superstructure model review for windwalls with Reck 08/26: HPU model review with Sawyer Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 08/27: teleconference to discuss TSR updates and ongoing tasks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 08/24: transmit TSR-01759-CO 08/25: transmit TSR-01772-CTR 08/27: process incoming transmittal from SAK Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-28 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 8 0 08/24-08/28: model topsides of Genesis SPAR (drill deck level only) 08/25: utility interface drawing updates, and meetings 08/27: superstructure model review for windwalls with Reck 08/26: HPU model review with Sawyer Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-03 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 2 0 On 8/3-8/5, support rig builder financing request. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 On 8/3, weekly Ops mtg Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-03 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 3 0 On 8/3-8/5, support Sakhalin workover rig quotes and clarifications. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-03 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 On 8/3-8/5, support NCOC workover rig quote process and PPD concept. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-03 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 3 0 On 8/3-8/5, support Oxy Colombia opportunity 1500HP and 1000HP rigs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-04 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 2 0 On 8/3-8/5, support rig builder financing request. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-04 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 3 0 On 8/3-8/5, support Sakhalin workover rig quotes and clarifications. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-04 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 On 8/3-8/5, support NCOC workover rig quote process and PPD concept. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-04 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 3 0 On 8/3-8/5, support Oxy Colombia opportunity 1500HP and 1000HP rigs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-05 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 2 0 On 8/3-8/5, support rig builder financing request. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-05 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 On 8/5, support ms project schedule prep. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-05 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 3 0 On 8/3-8/5, support Sakhalin workover rig quotes and clarifications. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-05 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 On 8/3-8/5, support NCOC workover rig quote process and PPD concept. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-05 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 2 0 On 8/3-8/5, support Oxy Colombia opportunity 1500HP and 1000HP rigs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 8/6 and 8/7, PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-07 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 8/6 and 8/7, PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 8/10, weekly ops mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-10 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 4 0 Support NCOC Workover quotes and capex light options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-10 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 5 0 On 8/10, sipport Oxy Colombia rig search Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-11 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4 0 On 8/11, support 1000HP Jaguar oportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-11 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 3 0 On 8/10, sipport Oxy Colombia rig search Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-11 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2 0 Support CVX Genesis planning for video. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-12 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 2 0 Support rig builder financing requests. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-12 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 7 0 On 8/10, sipport Oxy Colombia rig search Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-13 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 On 8/13, 8/14, support MS project schedule update Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-13 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 Support Sakhalin workover rig proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-13 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 Support NCOC Workover quotes and capex light options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-13 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 6 0 On 8/10, sipport Oxy Colombia rig search Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-14 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 On 8/13, 8/14, support MS project schedule update Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-14 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 8 0 On 8/10, sipport Oxy Colombia rig search Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-17 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 Support Total Uganda MS project schedule and cash flow summary. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Weekly ops call and SVP conf call Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-17 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4 0 Support technical review of Jaguar 2nd rig, 2000HP, options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-17 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 Support WIPA video. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Support Pluspetrol Tender for 1600HP Rig. Coordinate with HH for Brazil rig option. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-18 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 Support NCOC workover tender proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-18 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4 0 Support technical review of Jaguar 2nd rig, 2000HP, options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-19 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 Support Total Uganda MS project schedule and cash flow summary. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-19 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 3 0 Support Oxy Llanos 1500HP & 300k Oxy Teca,/ LCI Rigs opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-19 OH-011 :OH-011 Overhead All Activities Regular Pay N 2 0 Dentist appointment Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-20 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2 0 Support NCOC workover tender proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-20 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 7 0 Support Oxy Llanos 1500HP & 300k Oxy Teca,/ LCI Rigs opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-21 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 Schedule NOV finance option meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-21 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Support Total Uganda MS project schedule and cash flow summary. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Support Pluspetrol Tender for 1600HP Rig. Coordinate with HH for Brazil rig option. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-21 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 2 0 Support Oxy Llanos 1500HP & 300k Oxy Teca,/ LCI Rigs opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-21 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 Support WIPA video. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-24 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 3 0 Support COPA Willow project financing Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Ops conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Support Pluspetrol heli-rig market survey. Conf calls with HH. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-25 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 1 0 Support COPA Willow project financing Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 Support Pluspetrol heli-rig market survey. Conf calls with HH. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-25 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 3 0 Support Jaguar 2nd rig option; Rig 122 upgrades and Rig 326 dry-lease. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-25 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 3 0 Support Oxy Colombia 1500HP and 750HP rig proposals. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Support Pluspetrol heli-rig market survey. Conf calls with HH. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-26 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3 0 Support Kazakhstahn workover rig proposal Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-26 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 3 0 Support Jaguar 2nd rig option; Rig 122 upgrades and Rig 326 dry-lease. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-26 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 2 0 Support Oxy Colombia 1500HP and 750HP rig proposals. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-27 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4 0 Support Jaguar 2nd rig option; Rig 122 upgrades and Rig 326 dry-lease. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-27 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 5 0 Support Oxy Colombia 1500HP and 750HP rig proposals. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Support Pluspetrol heli-rig market survey. Conf calls with HH. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2020-08-28 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 7 0 Support Jaguar 2nd rig option; Rig 122 upgrades and Rig 326 dry-lease. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-03 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 Oneline updated with CVX comments Electrical Load List Updated and sent to CVX. Filter Cart Load added to Electrical Load Genesis Weekly Meeting Final ACS Quote provided to Joshua. Updated Oneline sent to CVX . Final Gaitronics PA/GA system Quote provided to Joshua. Electrical Interface register created Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-03 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 SAK Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-03 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Discuss Load List with Chuck Venturetech Operator Cab Cable list updated. Email sent to Charlie Sawyer. Cable added to EMI quote for Skidding Sub Motor and Operator Cab. 3D model review with LM. Final Review with Bruce from Gaitronics. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-04 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Oneline updated with CVX comments Electrical Load List Updated and sent to CVX. Filter Cart Load added to Electrical Load Genesis Weekly Meeting Final ACS Quote provided to Joshua. Updated Oneline sent to CVX . Final Gaitronics PA/GA system Quote provided to Joshua. Electrical Interface register created Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-04 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Discuss Load List with Chuck Venturetech Operator Cab Cable list updated. Email sent to Charlie Sawyer. Cable added to EMI quote for Skidding Sub Motor and Operator Cab. 3D model review with LM. Final Review with Bruce from Gaitronics. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-05 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Oneline updated with CVX comments Electrical Load List Updated and sent to CVX. Filter Cart Load added to Electrical Load Genesis Weekly Meeting Final ACS Quote provided to Joshua. Updated Oneline sent to CVX . Final Gaitronics PA/GA system Quote provided to Joshua. Electrical Interface register created Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-05 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 6 0 Discuss Load List with Chuck Venturetech Operator Cab Cable list updated. Email sent to Charlie Sawyer. Cable added to EMI quote for Skidding Sub Motor and Operator Cab. 3D model review with LM. Final Review with Bruce from Gaitronics. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-06 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Oneline updated with CVX comments Electrical Load List Updated and sent to CVX. Filter Cart Load added to Electrical Load Genesis Weekly Meeting Final ACS Quote provided to Joshua. Updated Oneline sent to CVX . Final Gaitronics PA/GA system Quote provided to Joshua. Electrical Interface register created Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-06 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 4 0 Rig 265 . Centrifuge Motor and Pump added to 480V load List Load Analysis Done with this load, 3 Load Analysis Scenario created for Rig 265 as per Gary. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-06 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Discuss Load List with Chuck Venturetech Operator Cab Cable list updated. Email sent to Charlie Sawyer. Cable added to EMI quote for Skidding Sub Motor and Operator Cab. 3D model review with LM. Final Review with Bruce from Gaitronics. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-07 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Oneline updated with CVX comments Electrical Load List Updated and sent to CVX. Filter Cart Load added to Electrical Load Genesis Weekly Meeting Final ACS Quote provided to Joshua. Updated Oneline sent to CVX . Final Gaitronics PA/GA system Quote provided to Joshua. Electrical Interface register created Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-07 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 4 0 Rig 265 . Centrifuge Motor and Pump added to 480V load List Load Analysis Done with this load, 3 Load Analysis Scenario created for Rig 265 as per Gary. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-10 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Electrical Interface register created. RFI sent to CVX. Updated Oneline as per CVX 400A feed. Revised Oneline sent to EMI with updated cable list. Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-10 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 SAK Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-10 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 Internal PKD meeting with Chuck to go over Genesis Spar Interface. Revsied ACS quote for 400A CB CVX action item sent to Joshua Conference call with CCS about Gaitronics Plug and Receptacle Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-11 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 Electrical Interface register created. RFI sent to CVX. Updated Oneline as per CVX 400A feed. Revised Oneline sent to EMI with updated cable list. Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-11 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 5 0 Internal PKD meeting with Chuck to go over Genesis Spar Interface. Revsied ACS quote for 400A CB CVX action item sent to Joshua Conference call with CCS about Gaitronics Plug and Receptacle Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-12 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Electrical Interface register created. RFI sent to CVX. Updated Oneline as per CVX 400A feed. Revised Oneline sent to EMI with updated cable list. Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-12 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2 0 Review 1250KVA XFMR Space and Quote Review MCC and Circuit Breaker requirement. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-12 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Internal PKD meeting with Chuck to go over Genesis Spar Interface. Revsied ACS quote for 400A CB CVX action item sent to Joshua Conference call with CCS about Gaitronics Plug and Receptacle Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-13 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Electrical Interface register created. RFI sent to CVX. Updated Oneline as per CVX 400A feed. Revised Oneline sent to EMI with updated cable list. Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-13 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2 0 Review 1250KVA XFMR Space and Quote Review MCC and Circuit Breaker requirement. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-13 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 Internal PKD meeting with Chuck to go over Genesis Spar Interface. Revsied ACS quote for 400A CB CVX action item sent to Joshua Conference call with CCS about Gaitronics Plug and Receptacle Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-14 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Electrical Interface register created. RFI sent to CVX. Updated Oneline as per CVX 400A feed. Revised Oneline sent to EMI with updated cable list. Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-14 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2 0 Review 1250KVA XFMR Space and Quote Review MCC and Circuit Breaker requirement. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-14 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Internal PKD meeting with Chuck to go over Genesis Spar Interface. Revsied ACS quote for 400A CB CVX action item sent to Joshua Conference call with CCS about Gaitronics Plug and Receptacle Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-17 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 Pont Sub Walkway Light report review. Oneline Updated and send to Joshua Electrical Interface register Done Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-17 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 SAK Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-17 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 1250KVA Transformer Quote Request from Square D. Discuss Breaker Trip setting and MCC layout for Rig 265. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-17 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 Nitro PDF Software installed Pony Sub Walkway Light 3D Model and Cable measurement meeting with Lam 3rd Party Interface meeting review with John Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-18 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Pont Sub Walkway Light report review. Oneline Updated and send to Joshua Electrical Interface register Done Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-18 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2 0 1250KVA Transformer Quote Request from Square D. Discuss Breaker Trip setting and MCC layout for Rig 265. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-18 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Nitro PDF Software installed Pony Sub Walkway Light 3D Model and Cable measurement meeting with Lam 3rd Party Interface meeting review with John Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-19 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Pont Sub Walkway Light report review. Oneline Updated and send to Joshua Electrical Interface register Done Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-19 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 4 0 1250KVA Transformer Quote Request from Square D. Discuss Breaker Trip setting and MCC layout for Rig 265. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-19 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Nitro PDF Software installed Pony Sub Walkway Light 3D Model and Cable measurement meeting with Lam 3rd Party Interface meeting review with John Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-20 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Pont Sub Walkway Light report review. Oneline Updated and send to Joshua Electrical Interface register Done Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-20 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 1250KVA Transformer Quote Request from Square D. Discuss Breaker Trip setting and MCC layout for Rig 265. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-20 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 5 0 Nitro PDF Software installed Pony Sub Walkway Light 3D Model and Cable measurement meeting with Lam 3rd Party Interface meeting review with John Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-21 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 Pont Sub Walkway Light report review. Oneline Updated and send to Joshua Electrical Interface register Done Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-21 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2 0 1250KVA Transformer Quote Request from Square D. Discuss Breaker Trip setting and MCC layout for Rig 265. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-21 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 Nitro PDF Software installed Pony Sub Walkway Light 3D Model and Cable measurement meeting with Lam 3rd Party Interface meeting review with John Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-24 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Spar Interface drawing finalized Spar Weekly Meeting CVX Genesis Tech service status meeting. Master Interface register revised. Electrical MTO created . Meeting with 3rd party and vendor Meeting with Subcontractor EMI Quote finalized Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-24 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 SAK weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-24 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 1250KVA XFMR compare for Chad. Call Garry to comfort XFMR spec. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-24 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Review Venturetech Quote sent by Joshua 3D Model meeting with Lam for Pony Sub Walkway light. Meeting with EMI Meeting with John to finish Interface register. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-25 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 Spar Interface drawing finalized Spar Weekly Meeting CVX Genesis Tech service status meeting. Master Interface register revised. Electrical MTO created . Meeting with 3rd party and vendor Meeting with Subcontractor EMI Quote finalized Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-25 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 1250KVA XFMR compare for Chad. Call Garry to comfort XFMR spec. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-25 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Review Venturetech Quote sent by Joshua 3D Model meeting with Lam for Pony Sub Walkway light. Meeting with EMI Meeting with John to finish Interface register. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-26 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Spar Interface drawing finalized Spar Weekly Meeting CVX Genesis Tech service status meeting. Master Interface register revised. Electrical MTO created . Meeting with 3rd party and vendor Meeting with Subcontractor EMI Quote finalized Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-26 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 1250KVA XFMR compare for Chad. Call Garry to comfort XFMR spec. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-26 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 Review Venturetech Quote sent by Joshua 3D Model meeting with Lam for Pony Sub Walkway light. Meeting with EMI Meeting with John to finish Interface register. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-27 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Spar Interface drawing finalized Spar Weekly Meeting CVX Genesis Tech service status meeting. Master Interface register revised. Electrical MTO created . Meeting with 3rd party and vendor Meeting with Subcontractor EMI Quote finalized Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-27 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 1250KVA XFMR compare for Chad. Call Garry to comfort XFMR spec. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-27 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 5 0 Review Venturetech Quote sent by Joshua 3D Model meeting with Lam for Pony Sub Walkway light. Meeting with EMI Meeting with John to finish Interface register. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-28 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Spar Interface drawing finalized Spar Weekly Meeting CVX Genesis Tech service status meeting. Master Interface register revised. Electrical MTO created . Meeting with 3rd party and vendor Meeting with Subcontractor EMI Quote finalized Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-28 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 5 0 Review Venturetech Quote sent by Joshua 3D Model meeting with Lam for Pony Sub Walkway light. Meeting with EMI Meeting with John to finish Interface register. Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 Emails Timesheet FUZE meeting w/ T.E. (8/3/20) Call J.G. (Status Update) (8/5/20) Review Tasks w/ J.G. (8/7/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6 0 C.& K. Pad Eye Clamp (8/3-7/20) Drawing Number Request for Berkut Rig (TSR-01770) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-04 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet FUZE meeting w/ T.E. (8/3/20) Call J.G. (Status Update) (8/5/20) Review Tasks w/ J.G. (8/7/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7 0 C.& K. Pad Eye Clamp (8/3-7/20) Drawing Number Request for Berkut Rig (TSR-01770) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Emails Timesheet FUZE meeting w/ T.E. (8/3/20) Call J.G. (Status Update) (8/5/20) Review Tasks w/ J.G. (8/7/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6.5 0 C.& K. Pad Eye Clamp (8/3-7/20) Drawing Number Request for Berkut Rig (TSR-01770) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Technical Services weekly meeting (8/6/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet FUZE meeting w/ T.E. (8/3/20) Call J.G. (Status Update) (8/5/20) Review Tasks w/ J.G. (8/7/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6.5 0 C.& K. Pad Eye Clamp (8/3-7/20) Drawing Number Request for Berkut Rig (TSR-01770) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-07 HTSG-TSR :HTSG-TSR HTSG-2020 SMART-Developmental Goals Regular Pay N 1 0 Review Goals w/ L.N. (8/7/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Emails Timesheet FUZE meeting w/ T.E. (8/3/20) Call J.G. (Status Update) (8/5/20) Review Tasks w/ J.G. (8/7/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3.5 0 C.& K. Pad Eye Clamp (8/3-7/20) Drawing Number Request for Berkut Rig (TSR-01770) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-10 HTSG-TSR :HTSG-TSR HTSG-2020 SMART-Developmental Goals Regular Pay N 4.5 0 Drafting Handbook (coordinate w/ L.N. & review) Call L.N. (8/10,13/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Emails Timesheet Call J.G. Update/task (8/13/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 TSR-01770. C.& K. Pad Eye Clamp (8/11,12,14/20) TSR-01759 RUSA-PKE-DT-LD-53200. (Update per comments and PDF) (8/13-14/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-11 HTSG-TSR :HTSG-TSR HTSG-2020 SMART-Developmental Goals Regular Pay N 7.5 0 Drafting Handbook (coordinate w/ L.N. & review) Call L.N. (8/10,13/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Call J.G. Update/task (8/13/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Call J.G. Update/task (8/13/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 8 0 TSR-01770. C.& K. Pad Eye Clamp (8/11,12,14/20) TSR-01759 RUSA-PKE-DT-LD-53200. (Update per comments and PDF) (8/13-14/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Technical Services Weekly meeting (8/13/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Emails Timesheet Call J.G. Update/task (8/13/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6 0 TSR-01770. C.& K. Pad Eye Clamp (8/11,12,14/20) TSR-01759 RUSA-PKE-DT-LD-53200. (Update per comments and PDF) (8/13-14/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Call J.G. Update/task (8/13/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 TSR-01770. C.& K. Pad Eye Clamp (8/11,12,14/20) TSR-01759 RUSA-PKE-DT-LD-53200. (Update per comments and PDF) (8/13-14/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 SVP Ops Update meeting (8/18/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Emails Timesheet Call J.G. Update (8/18/20) CAD license renewal/comment w/ L.N. (8/21/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5 0 ORLAN-TSR-01759 Comment update Review w/ J.R. (8/17-18/20) BERKUT-TSR-01770 Drawing #RUSD-PKE-T2-ND-27400.1018.001-.003 (8/20/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-18 HTSG-TSR :HTSG-TSR HTSG-2020 SMART-Developmental Goals Regular Pay N 5 0 Drafting Handbook (8/18-21/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Emails Timesheet Call J.G. Update (8/18/20) CAD license renewal/comment w/ L.N. (8/21/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 ORLAN-TSR-01759 Comment update Review w/ J.R. (8/17-18/20) BERKUT-TSR-01770 Drawing #RUSD-PKE-T2-ND-27400.1018.001-.003 (8/20/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-19 HTSG-TSR :HTSG-TSR HTSG-2020 SMART-Developmental Goals Regular Pay N 7.5 0 Drafting Handbook (8/18-21/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Call J.G. Update (8/18/20) CAD license renewal/comment w/ L.N. (8/21/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-20 HTSG-TSR :HTSG-TSR HTSG-2020 SMART-Developmental Goals Regular Pay N 4.5 0 Drafting Handbook (8/18-21/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Emails Timesheet Call J.G. Update (8/18/20) CAD license renewal/comment w/ L.N. (8/21/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 ORLAN-TSR-01759 Comment update Review w/ J.R. (8/17-18/20) BERKUT-TSR-01770 Drawing #RUSD-PKE-T2-ND-27400.1018.001-.003 (8/20/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-21 HTSG-TSR :HTSG-TSR HTSG-2020 SMART-Developmental Goals Regular Pay N 5 0 Drafting Handbook (8/18-21/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Emails Timesheet Call J.G. Update (8/18/20) CAD license renewal/comment w/ L.N. (8/21/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-24 HTSG-TSR :HTSG-TSR HTSG-2020 SMART-Developmental Goals Regular Pay N 5 0 Drafting Hnadbook (8/24,25/20) Contact L.N. Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 3.5 0 Emails Timesheet CAD license issues (8/24/20) contact L.N. Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-25 HTSG-TSR :HTSG-TSR HTSG-2020 SMART-Developmental Goals Regular Pay N 2 0 Drafting Hnadbook (8/24,25/20) Contact L.N. Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet CAD license issues (8/24/20) contact L.N. Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5.5 0 262L-01-05-002-RN review comments, update, review w/ J.G. (8/25,-28/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-26 HTSG-TSR :HTSG-TSR HTSG-2020 SMART-Developmental Goals Regular Pay N 2 0 Drafting Hnadbook (8/24,25/20) Contact L.N. Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet CAD license issues (8/24/20) contact L.N. Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5.5 0 262L-01-05-002-RN review comments, update, review w/ J.G. (8/25,-28/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-27 HTSG-TSR :HTSG-TSR HTSG-2020 SMART-Developmental Goals Regular Pay N 4 0 Drafting Hnadbook (8/24,25/20) Contact L.N. Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Technical Services weekly meeting. (8/28/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet CAD license issues (8/24/20) contact L.N. Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 262L-01-05-002-RN review comments, update, review w/ J.G. (8/25,-28/20) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet CAD license issues (8/24/20) contact L.N. Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2020-08-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5 0 262L-01-05-002-RN review comments, update, review w/ J.G. (8/25,-28/20) Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-03 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 6.5 0 Master Interface Register creation and work, prep for CVX interface meeting, status update meetings, c32 engine exhaust info, grasshopper end terminations, high pressure pipe reducer research, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-03 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-03 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 1 0 SAFI review meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-04 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 7 0 Master Interface Register creation and work, prep for CVX interface meeting, status update meetings, c32 engine exhaust info, grasshopper end terminations, high pressure pipe reducer research, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 209 ATC Unit drawing review, Orlan casing jetting tool quote review, documentation requirements meeting with HPPS Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-05 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 7.5 0 Master Interface Register creation and work, prep for CVX interface meeting, status update meetings, c32 engine exhaust info, grasshopper end terminations, high pressure pipe reducer research, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 209 ATC Unit drawing review, Orlan casing jetting tool quote review, documentation requirements meeting with HPPS Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-06 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 6.5 0 Master Interface Register creation and work, prep for CVX interface meeting, status update meetings, c32 engine exhaust info, grasshopper end terminations, high pressure pipe reducer research, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 209 ATC Unit drawing review, Orlan casing jetting tool quote review, documentation requirements meeting with HPPS Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-07 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 5 0 Master Interface Register creation and work, prep for CVX interface meeting, status update meetings, c32 engine exhaust info, grasshopper end terminations, high pressure pipe reducer research, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 209 ATC Unit drawing review, Orlan casing jetting tool quote review, documentation requirements meeting with HPPS Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-10 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 5.5 0 master interface registry, facilities interface meeting and prep, spar interface drawing creation and review, manrider and winch clarifications, manrider placement review, hawkjaw placement, EMI grasshopper/dragchain clarifications and correspondence, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-10 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-10 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 2 0 safi model review and revision, additional load cases completed, began analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-11 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 5.5 0 master interface registry, facilities interface meeting and prep, spar interface drawing creation and review, manrider and winch clarifications, manrider placement review, hawkjaw placement, EMI grasshopper/dragchain clarifications and correspondence, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 casing jetting tool drawing review and closeout, casing jetting tool quote revision, 209 ATC unit drawing and MTO review Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-11 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 1 0 safi model review and revision, additional load cases completed, began analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-11 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 1 0 safi model review Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-12 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 5.5 0 master interface registry, facilities interface meeting and prep, spar interface drawing creation and review, manrider and winch clarifications, manrider placement review, hawkjaw placement, EMI grasshopper/dragchain clarifications and correspondence, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 casing jetting tool drawing review and closeout, casing jetting tool quote revision, 209 ATC unit drawing and MTO review Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-12 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 1.5 0 safi model review and revision, additional load cases completed, began analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-13 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 master interface registry, facilities interface meeting and prep, spar interface drawing creation and review, manrider and winch clarifications, manrider placement review, hawkjaw placement, EMI grasshopper/dragchain clarifications and correspondence, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 casing jetting tool drawing review and closeout, casing jetting tool quote revision, 209 ATC unit drawing and MTO review Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-13 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 1.5 0 safi model review and revision, additional load cases completed, began analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-14 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2.5 0 master interface registry, facilities interface meeting and prep, spar interface drawing creation and review, manrider and winch clarifications, manrider placement review, hawkjaw placement, EMI grasshopper/dragchain clarifications and correspondence, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Feedforward meeting and research Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 casing jetting tool drawing review and closeout, casing jetting tool quote revision, 209 ATC unit drawing and MTO review Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-17 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 SPAR interface drawing meeting and revision, genesis master interface work and meeting, misc vendor clarifications on connection details, action item meeting, BOD comments and review, winch clarifications, HPU house size review, air line location, adapter from 2 1/2" to 2" hyd, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 SVP ops update meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-17 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 Orlan casing jetting tool closeout, orlan casing jetting tool padeye review Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-17 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 0.5 0 revised and completed safi model, started and completed analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-18 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 6 0 SPAR interface drawing meeting and revision, genesis master interface work and meeting, misc vendor clarifications on connection details, action item meeting, BOD comments and review, winch clarifications, HPU house size review, air line location, adapter from 2 1/2" to 2" hyd, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-18 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 2.5 0 revised and completed safi model, started and completed analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-19 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 SPAR interface drawing meeting and revision, genesis master interface work and meeting, misc vendor clarifications on connection details, action item meeting, BOD comments and review, winch clarifications, HPU house size review, air line location, adapter from 2 1/2" to 2" hyd, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Orlan casing jetting tool closeout, orlan casing jetting tool padeye review Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-19 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 4 0 revised and completed safi model, started and completed analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-20 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4.5 0 SPAR interface drawing meeting and revision, genesis master interface work and meeting, misc vendor clarifications on connection details, action item meeting, BOD comments and review, winch clarifications, HPU house size review, air line location, adapter from 2 1/2" to 2" hyd, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 Orlan casing jetting tool padeye analysis review Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-20 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 3 0 revised and completed safi model, started and completed analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-20 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 0.5 0 Began analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-21 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 SPAR interface drawing meeting and revision, genesis master interface work and meeting, misc vendor clarifications on connection details, action item meeting, BOD comments and review, winch clarifications, HPU house size review, air line location, adapter from 2 1/2" to 2" hyd, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Orlan casing jetting tool padeye analysis review Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Orlan casing jetting tool closeout, orlan casing jetting tool padeye review Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-21 ORLAN-TSR :ORLAN-TSR TSR-01630-ORLP Lifting Appliance For Drawworks Regular Pay N 2 0 revised and completed safi model, started and completed analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-21 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 0.5 0 Began analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-24 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 6.5 0 status update meetings, grasshopper/dragchain TPP, updated master interface register, HPU cantelever discussion and concept, spar interface drawing revision, drill floor windwall discussion, windwal and jumper hose MTO, substructure winch location and wire rope routing, drill line spool clarifications, hawkjaw connection details, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-24 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-24 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 1 0 SAFI model revision, began analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-25 Berkut-TSR :Berkut-TSR TSR-01772-BERP Access Platform for Drill Line Stabilizer Regular Pay N 1 0 CTR review Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-25 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 6 0 status update meetings, grasshopper/dragchain TPP, updated master interface register, HPU cantelever discussion and concept, spar interface drawing revision, drill floor windwall discussion, windwal and jumper hose MTO, substructure winch location and wire rope routing, drill line spool clarifications, hawkjaw connection details, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-25 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 1.5 0 SAFI model revision, began analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-26 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 6 0 status update meetings, grasshopper/dragchain TPP, updated master interface register, HPU cantelever discussion and concept, spar interface drawing revision, drill floor windwall discussion, windwal and jumper hose MTO, substructure winch location and wire rope routing, drill line spool clarifications, hawkjaw connection details, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-26 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 2.5 0 SAFI model revision, began analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-27 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 status update meetings, grasshopper/dragchain TPP, updated master interface register, HPU cantelever discussion and concept, spar interface drawing revision, drill floor windwall discussion, windwal and jumper hose MTO, substructure winch location and wire rope routing, drill line spool clarifications, hawkjaw connection details, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-27 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 1.5 0 led and recorded meeting minutes for master interface register Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-27 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 3 0 SAFI model revision, began analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-28 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 status update meetings, grasshopper/dragchain TPP, updated master interface register, HPU cantelever discussion and concept, spar interface drawing revision, drill floor windwall discussion, windwal and jumper hose MTO, substructure winch location and wire rope routing, drill line spool clarifications, hawkjaw connection details, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-28 ORLAN-TSR :ORLAN-TSR TSR-01768-ORLP Repair of Mud Pump #1 & #2 Regular Pay N 2 0 SAFI model revision, began analysis report