Name Billing Class Employee No. Item Line Class Transaction Date Job No. Customer Service Item Notes Payroll Item Billable Employee Paid Day Rate Duration Days Remarks Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-09-01 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 (09/01/20) Weekly update call. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-09-08 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 (09/08/20) Weekly status call. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-09-15 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 (09/15/20) Weekly status call. (09/16/20) New drawing discussion with John/Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-09-16 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.75 0 (09/15/20) Weekly status call. (09/16/20) New drawing discussion with John/Lam. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-09-02 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 1 0 Conference call with Ripal to discuss design on the loading of systems as well as discussing cable conductor sizes required. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-09-03 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 1 0 Conference call with Ripal to discuss design on the loading of systems as well as discussing cable conductor sizes required. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-09-04 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 1 0 Conference call with Ripal to discuss design on the loading of systems as well as discussing cable conductor sizes required. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-09-09 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 2 0 Providing addional quotes for material required for electrical installation to Ripal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-09-16 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 4 0 Reviewing quotes for material as well as reviewing the one lines with Ripal Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-09-17 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 4 0 Reviewing quotes for material as well as reviewing the one lines with Ripal Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2020-09-23 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 2 0 Reviewing quotes for material as well as reviewing the one lines and cable management system with Ripal and discussions with Joshua. Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-08-31 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 8 0 Procurement, Manage scope, cost and schedule Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-09-01 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Procurement, Manage scope, cost and schedule Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-09-02 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Procurement, Manage scope, cost and schedule Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-09-03 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Procurement, Manage scope, cost and schedule Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-09-04 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 6 0 Procurement, Manage scope, cost and schedule Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-09-08 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Scheduling workshop, procurement, change management Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-09-09 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Scheduling workshop, procurement, change management Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-09-10 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Scheduling workshop, procurement, change management Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-09-11 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 5 0 Scheduling workshop, procurement, change management Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-09-13 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 1 0 Procurement, Hydraulic DW alternatives, weekly report, monitor scope, schedule and cost Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-09-14 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 11 0 Procurement, Hydraulic DW alternatives, weekly report, monitor scope, schedule and cost Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-09-15 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 10 0 Procurement, Hydraulic DW alternatives, weekly report, monitor scope, schedule and cost Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-09-16 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Procurement, Hydraulic DW alternatives, weekly report, monitor scope, schedule and cost Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-09-17 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Procurement, Hydraulic DW alternatives, weekly report, monitor scope, schedule and cost Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-09-18 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 7 0 Procurement, Hydraulic DW alternatives, weekly report, monitor scope, schedule and cost Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-09-20 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 2 0 Procurement, monitor and control scope, schedule and cost, weekly reporting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-09-21 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Procurement, monitor and control scope, schedule and cost, weekly reporting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-09-22 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Procurement, monitor and control scope, schedule and cost, weekly reporting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-09-23 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Procurement, monitor and control scope, schedule and cost, weekly reporting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-09-24 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 8 0 Procurement, monitor and control scope, schedule and cost, weekly reporting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-09-25 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 4 0 Procurement, monitor and control scope, schedule and cost, weekly reporting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-08-31 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 review meeting action items researching New Iberia yard specifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-09-02 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 review meeting action items researching New Iberia yard specifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-09-03 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 review meeting action items researching New Iberia yard specifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-09-04 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 review meeting action items researching New Iberia yard specifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-09-08 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 General meetings and discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-09-09 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 3.5 0 Scheduling workshop (NEw Iberia) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-09-14 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.5 0 Versabar Visit Hydraulic Subcontractor path forward Overturn analysis report review / CC with Loadmaster Oil States conference call Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-09-15 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2.5 0 Versabar Visit Hydraulic Subcontractor path forward Overturn analysis report review / CC with Loadmaster Oil States conference call Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-09-16 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Versabar Visit Hydraulic Subcontractor path forward Overturn analysis report review / CC with Loadmaster Oil States conference call Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-09-17 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Versabar Visit Hydraulic Subcontractor path forward Overturn analysis report review / CC with Loadmaster Oil States conference call Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-09-18 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Versabar Visit Hydraulic Subcontractor path forward Overturn analysis report review / CC with Loadmaster Oil States conference call Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-08-31 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 6.5 0 09/31-09/04: update 3D model of topside structure and incorporate new concepts Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-09-01 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 5 0 09/31-09/04: update 3D model of topside structure and incorporate new concepts Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-09-01 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 09/01: Genesis update meeting with HTSG 09/03: CVX meeting to go over pad eyes for manrider; meeting with John and Joshua to look at pad eye locations; meeting with Ripal for cable lengths 09/04: webmeeting with Royal Camera to go over camera placement and cable lenghts Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-09-02 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 6.5 0 09/31-09/04: update 3D model of topside structure and incorporate new concepts Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-09-03 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 6.5 0 09/31-09/04: update 3D model of topside structure and incorporate new concepts Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-09-03 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.5 0 09/01: Genesis update meeting with HTSG 09/03: CVX meeting to go over pad eyes for manrider; meeting with John and Joshua to look at pad eye locations; meeting with Ripal for cable lengths 09/04: webmeeting with Royal Camera to go over camera placement and cable lenghts Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-09-04 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 7 0 09/31-09/04: update 3D model of topside structure and incorporate new concepts Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-09-04 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 09/01: Genesis update meeting with HTSG 09/03: CVX meeting to go over pad eyes for manrider; meeting with John and Joshua to look at pad eye locations; meeting with Ripal for cable lengths 09/04: webmeeting with Royal Camera to go over camera placement and cable lenghts Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-09-08 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 2.75 0 09/07-09/11: revise drilling deck layout model from CVX CAD data Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-09-08 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 09/08: meeting regarding project updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-09-08 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 3 0 09/07: update electrical load list diagram drawing Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-09-09 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 8 0 09/07-09/11: revise drilling deck layout model from CVX CAD data Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-09-10 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4.5 0 09/07-09/11: revise drilling deck layout model from CVX CAD data Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-09-11 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 8 0 09/07-09/11: revise drilling deck layout model from CVX CAD data Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-09-14 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 6 0 09-14: compile updated data from 3rd party vendors (EMI & Sawyer); run through model with Ripal and Reck for cable lengths 09/15: updated grasshopper interface drawing; CVX update meeting 09//16: review drawing task with Reck for new grasshopper drawing Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-09-15 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 8 0 09-14: compile updated data from 3rd party vendors (EMI & Sawyer); run through model with Ripal and Reck for cable lengths 09/15: updated grasshopper interface drawing; CVX update meeting 09//16: review drawing task with Reck for new grasshopper drawing Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-09-16 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4 0 09-14: compile updated data from 3rd party vendors (EMI & Sawyer); run through model with Ripal and Reck for cable lengths 09/15: updated grasshopper interface drawing; CVX update meeting 09//16: review drawing task with Reck for new grasshopper drawing Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-09-16 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 4 0 09/16-09/18: updated crane boom rests; added tank transfer platform 09/16: clarification meeting with LM regarding cable routing, lengths, and trays. 09/17: meeting with Sawyer regarding jbox locations and cable lengths; meeting with Oil States. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-09-17 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 7 0 09/16-09/18: updated crane boom rests; added tank transfer platform 09/16: clarification meeting with LM regarding cable routing, lengths, and trays. 09/17: meeting with Sawyer regarding jbox locations and cable lengths; meeting with Oil States. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-09-18 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 8 0 09/16-09/18: updated crane boom rests; added tank transfer platform 09/16: clarification meeting with LM regarding cable routing, lengths, and trays. 09/17: meeting with Sawyer regarding jbox locations and cable lengths; meeting with Oil States. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-08-31 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Genesis Interface meeting Facility Interface meeting Genesis Tech service Status meeting ACS 42CKT and XFMR Quote completed Royal Camera conference call to go over quote and revised. Genesis Weekly Call Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-09-01 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 Genesis Interface meeting Facility Interface meeting Genesis Tech service Status meeting ACS 42CKT and XFMR Quote completed Royal Camera conference call to go over quote and revised. Genesis Weekly Call Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-09-02 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 Genesis Interface meeting Facility Interface meeting Genesis Tech service Status meeting ACS 42CKT and XFMR Quote completed Royal Camera conference call to go over quote and revised. Genesis Weekly Call Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-09-02 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 1 0 Genesis TPP reviewed and completed Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-09-03 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 2 0 Genesis TPP reviewed and completed Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-09-04 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 Genesis Interface meeting Facility Interface meeting Genesis Tech service Status meeting ACS 42CKT and XFMR Quote completed Royal Camera conference call to go over quote and revised. Genesis Weekly Call Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-09-07 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Jelec Eletrical equipment Quote QA Genesis Spar 42CKT panel oneline completed Bang Board Utility meeting with Sawyer Genesis Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-09-08 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Jelec Eletrical equipment Quote QA Genesis Spar 42CKT panel oneline completed Bang Board Utility meeting with Sawyer Genesis Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-09-09 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 4 0 Rigup, SIT and Rigdown Scheduling Workshop meeting Genesis Spar Rig up and SIT yard requirement completed . Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-09-10 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Jelec Eletrical equipment Quote QA Genesis Spar 42CKT panel oneline completed Bang Board Utility meeting with Sawyer Genesis Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-09-10 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 2 0 Rigup, SIT and Rigdown Scheduling Workshop meeting Genesis Spar Rig up and SIT yard requirement completed . Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-09-11 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Jelec Eletrical equipment Quote QA Genesis Spar 42CKT panel oneline completed Bang Board Utility meeting with Sawyer Genesis Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-09-14 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Conference call with Sawyer to talk about Band Board Layout plan. Mater Interface meeting Sawyer Weekly status meeting Finalize J-Box location for DWS HPU Power & Control Genesis Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-09-15 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Conference call with Sawyer to talk about Band Board Layout plan. Mater Interface meeting Sawyer Weekly status meeting Finalize J-Box location for DWS HPU Power & Control Genesis Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-09-16 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 Conference call with Sawyer to talk about Band Board Layout plan. Mater Interface meeting Sawyer Weekly status meeting Finalize J-Box location for DWS HPU Power & Control Genesis Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-09-17 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 Conference call with Sawyer to talk about Band Board Layout plan. Mater Interface meeting Sawyer Weekly status meeting Finalize J-Box location for DWS HPU Power & Control Genesis Weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-31 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 construction biweekly call, status update meetings, manrider in pony structure placement and routing, new sala block padeye requirements, royal camera mounting, research for grasshopper landing platform, winch and manrider reviw, revised SPAR interface drawing, foundation drawings research, drill line spooler, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-08-31 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 2 0 lead and meeting minutes for master interface meeting, lead and meating minutes for manrider in pony structure, completed and reviewed cable management TPP, updated master interface register Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-01 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2.5 0 construction biweekly call, status update meetings, manrider in pony structure placement and routing, new sala block padeye requirements, royal camera mounting, research for grasshopper landing platform, winch and manrider reviw, revised SPAR interface drawing, foundation drawings research, drill line spooler, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-01 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 2.5 0 lead and meeting minutes for master interface meeting, lead and meating minutes for manrider in pony structure, completed and reviewed cable management TPP, updated master interface register Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-02 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3.5 0 construction biweekly call, status update meetings, manrider in pony structure placement and routing, new sala block padeye requirements, royal camera mounting, research for grasshopper landing platform, winch and manrider reviw, revised SPAR interface drawing, foundation drawings research, drill line spooler, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-02 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 1.5 0 lead and meeting minutes for master interface meeting, lead and meating minutes for manrider in pony structure, completed and reviewed cable management TPP, updated master interface register Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-03 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 construction biweekly call, status update meetings, manrider in pony structure placement and routing, new sala block padeye requirements, royal camera mounting, research for grasshopper landing platform, winch and manrider reviw, revised SPAR interface drawing, foundation drawings research, drill line spooler, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-03 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 4.5 0 lead and meeting minutes for master interface meeting, lead and meating minutes for manrider in pony structure, completed and reviewed cable management TPP, updated master interface register Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-04 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3.5 0 construction biweekly call, status update meetings, manrider in pony structure placement and routing, new sala block padeye requirements, royal camera mounting, research for grasshopper landing platform, winch and manrider reviw, revised SPAR interface drawing, foundation drawings research, drill line spooler, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-04 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 0.5 0 lead and meeting minutes for master interface meeting, lead and meating minutes for manrider in pony structure, completed and reviewed cable management TPP, updated master interface register Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-08 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 6 0 Rigup/SIT workshop, dual winch upgrade possibility, attended status update meeting, cabin connection research, hardbanding info, manrider routing info, drill line spooler, electrical cable clarifications, bang board utilities, winch drawing clarifications, interface panel drawing clarifications, jumper hose information Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-08 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 2 0 lead and meeting minutes for master interface meeting, completed and reviewed cable management TPP, updated master interface register Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-09 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 7.5 0 Rigup/SIT workshop, dual winch upgrade possibility, attended status update meeting, cabin connection research, hardbanding info, manrider routing info, drill line spooler, electrical cable clarifications, bang board utilities, winch drawing clarifications, interface panel drawing clarifications, jumper hose information Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-10 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4.5 0 Rigup/SIT workshop, dual winch upgrade possibility, attended status update meeting, cabin connection research, hardbanding info, manrider routing info, drill line spooler, electrical cable clarifications, bang board utilities, winch drawing clarifications, interface panel drawing clarifications, jumper hose information Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-10 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 4 0 lead and meeting minutes for master interface meeting, completed and reviewed cable management TPP, updated master interface register Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-11 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3.5 0 Rigup/SIT workshop, dual winch upgrade possibility, attended status update meeting, cabin connection research, hardbanding info, manrider routing info, drill line spooler, electrical cable clarifications, bang board utilities, winch drawing clarifications, interface panel drawing clarifications, jumper hose information Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-11 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 1.5 0 lead and meeting minutes for master interface meeting, completed and reviewed cable management TPP, updated master interface register Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-14 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 6.5 0 Trip to Versabar, Status update meetings, cabin bang board meeting and clarifications, cable lengths meeting and clarifications, grasshopper n/s view drawins, landing platform drawing, 3d model review, jbox and cathead control location, winch location and interface, Oilstate call and clarifications, CCTV mounting, winch wire rope, alternative drawworks package clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-14 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 1 0 interface meeting and revision Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-15 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 8 0 Trip to Versabar, Status update meetings, cabin bang board meeting and clarifications, cable lengths meeting and clarifications, grasshopper n/s view drawins, landing platform drawing, 3d model review, jbox and cathead control location, winch location and interface, Oilstate call and clarifications, CCTV mounting, winch wire rope, alternative drawworks package clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-15 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 0.5 0 interface meeting and revision Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-16 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 8 0 Trip to Versabar, Status update meetings, cabin bang board meeting and clarifications, cable lengths meeting and clarifications, grasshopper n/s view drawins, landing platform drawing, 3d model review, jbox and cathead control location, winch location and interface, Oilstate call and clarifications, CCTV mounting, winch wire rope, alternative drawworks package clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-16 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 0.5 0 interface meeting and revision Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-17 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3.5 0 Trip to Versabar, Status update meetings, cabin bang board meeting and clarifications, cable lengths meeting and clarifications, grasshopper n/s view drawins, landing platform drawing, 3d model review, jbox and cathead control location, winch location and interface, Oilstate call and clarifications, CCTV mounting, winch wire rope, alternative drawworks package clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-17 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 4 0 interface meeting and revision Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-18 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Trip to Versabar, Status update meetings, cabin bang board meeting and clarifications, cable lengths meeting and clarifications, grasshopper n/s view drawins, landing platform drawing, 3d model review, jbox and cathead control location, winch location and interface, Oilstate call and clarifications, CCTV mounting, winch wire rope, alternative drawworks package clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2020-09-18 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 2 0 interface meeting and revision