Name Billing Class Employee No. Item Line Class Transaction Date Job No. Customer Service Item Notes Payroll Item Billable Employee Paid Day Rate Duration Days Remarks Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Carried out the conversion of C101-17-10 - C,D,E from word docs & converted to excel for review Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-10 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Carried out the conversion of C101-17-10 - C,D,E from word docs & converted to excel for review Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-11 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Carried out the conversion of C101-17-10 - C,D,E from word docs & converted to excel for review Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-12 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Carried out the conversion of C101-17-10 - C,D,E from word docs & converted to excel for review Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-16 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Carried out the conversion of C101-17-10- G,H,K. Carried out the conversion of C101-09-10,20,30, and prepare for upload into SharePoint. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-17 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 6 0 Carried out the conversion of C101-17-10- G,H,K. Carried out the conversion of C101-09-10,20,30, and prepare for upload into SharePoint. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-18 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 3 0 Carried out the conversion of C101-17-10- G,H,K. Carried out the conversion of C101-09-10,20,30, and prepare for upload into SharePoint. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-19 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Carried out the conversion of C101-17-10- G,H,K. Carried out the conversion of C101-09-10,20,30, and prepare for upload into SharePoint. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-20 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Carried out the conversion of C101-17-10- G,H,K. Carried out the conversion of C101-09-10,20,30, and prepare for upload into SharePoint. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-23 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 6 0 Loaded remainder of C101-17-10 into SharePoint. catalogued and loaded C101-16, as part of phase one into SharePoint. SAP access was not available on Thursday, Friday, Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-24 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 6 0 Loaded remainder of C101-17-10 into SharePoint. catalogued and loaded C101-16, as part of phase one into SharePoint. SAP access was not available on Thursday, Friday, Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-25 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Loaded remainder of C101-17-10 into SharePoint. catalogued and loaded C101-16, as part of phase one into SharePoint. SAP access was not available on Thursday, Friday, Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-30 Hibernia Platform :Hibernia Platform Overhead All Activities Regular Pay N 2 0 Completed the remained of Phase one maintenance plans, distributed maintenance plans on SharePoint, Limited access on Tuesday and Wednesday due to Citrix issues. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-11-02 Hibernia Platform :Hibernia Platform Overhead All Activities Regular Pay N 2 0 Completed the remained of Phase one maintenance plans, distributed maintenance plans on SharePoint, Limited access on Tuesday and Wednesday due to Citrix issues. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 9 0 Visit to Hibernia platform for survey Option 1. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-10 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 9 0 Visit to Hibernia platform for survey Option 1. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 9 0 Visit to Hibernia platform for survey Option 1. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 9 0 Visit to Hibernia platform for survey Option 1. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 Visit to Hibernia platform for survey Option 1. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-16 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. Site Survey report 2. Drawing for VFD house 3. Rig safety Procedure Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. Site Survey report 2. Drawing for VFD house 3. Rig safety Procedure Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. Site Survey report 2. Drawing for VFD house 3. Rig safety Procedure Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. Site Survey report 2. Drawing for VFD house 3. Rig safety Procedure Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 1. Site Survey report 2. Drawing for VFD house 3. Rig safety Procedure Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-23 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 1. Update scope of work 2. Block diagram 3 VFD house classification resolution 4. Weekly meetings Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-24 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 1. Update scope of work 2. Block diagram 3 VFD house classification resolution 4. Weekly meetings Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. Update scope of work 2. Block diagram 3 VFD house classification resolution 4. Weekly meetings Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. Update scope of work 2. Block diagram 3 VFD house classification resolution 4. Weekly meetings Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 1. Update scope of work 2. Block diagram 3 VFD house classification resolution 4. Weekly meetings Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-30 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 7 0 1. Weekly meeting with NOV and Wood group 2. SoW document update 3. Biweekly report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-31 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 9 0 1. Weekly meeting with NOV and Wood group 2. SoW document update 3. Biweekly report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 1. Weekly meeting with NOV and Wood group 2. SoW document update 3. Biweekly report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-02 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 1. Weekly meeting with NOV and Wood group 2. SoW document update 3. Biweekly report Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Conference Calls/Emails Correspondence/DDAS - Controls Drawing Review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-10 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Conference Calls/Emails Correspondence/DDAS - Controls Drawing Review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Conference Calls/Emails Correspondence/DDAS - Controls Drawing Review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Conference Calls/Emails Correspondence/DDAS - Controls Drawing Review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Conference Calls/Emails Correspondence/DDAS - Controls Drawing Review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Conference Calls/Emails Correspondence/DADS-Controls Drawing Review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3.5 0 Conference Calls/Emails Correspondence/DADS-Controls Drawing Review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 Conference Calls/Emails Correspondence/DADS-Controls Drawing Review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-23 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Reviewing NOV proposed Top Drive single line power/control drawings presented by NOV. Reviewing DDAS Topology drawings for potential upgrade that will be required when entire systems upgrade take place. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-24 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing NOV proposed Top Drive single line power/control drawings presented by NOV. Reviewing DDAS Topology drawings for potential upgrade that will be required when entire systems upgrade take place. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing NOV proposed Top Drive single line power/control drawings presented by NOV. Reviewing DDAS Topology drawings for potential upgrade that will be required when entire systems upgrade take place. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing NOV proposed Top Drive single line power/control drawings presented by NOV. Reviewing DDAS Topology drawings for potential upgrade that will be required when entire systems upgrade take place. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Reviewing NOV proposed Top Drive single line power/control drawings presented by NOV. Reviewing DDAS Topology drawings for potential upgrade that will be required when entire systems upgrade take place. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-30 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Continue to attend Conference Calls Meetings. Reviewing NOV proposed Top Drive single line power/control drawings as well as VFD building drawins presented by NOV. Working with Set Point in developing SOW for their services. Continue ti review DDAS for potential upgrade that will be required when entire systems upgrade take place. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-31 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Continue to attend Conference Calls Meetings. Reviewing NOV proposed Top Drive single line power/control drawings as well as VFD building drawins presented by NOV. Working with Set Point in developing SOW for their services. Continue ti review DDAS for potential upgrade that will be required when entire systems upgrade take place. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 Continue to attend Conference Calls Meetings. Reviewing NOV proposed Top Drive single line power/control drawings as well as VFD building drawins presented by NOV. Working with Set Point in developing SOW for their services. Continue ti review DDAS for potential upgrade that will be required when entire systems upgrade take place. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-02 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 Continue to attend Conference Calls Meetings. Reviewing NOV proposed Top Drive single line power/control drawings as well as VFD building drawins presented by NOV. Working with Set Point in developing SOW for their services. Continue ti review DDAS for potential upgrade that will be required when entire systems upgrade take place. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-03 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Continue to attend Conference Calls Meetings. Reviewing NOV proposed Top Drive single line power/control drawings as well as VFD building drawins presented by NOV. Working with Set Point in developing SOW for their services. Continue ti review DDAS for potential upgrade that will be required when entire systems upgrade take place. Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2017-10-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 Supplier weekly meeting, Minutes and action items update, Develop Survey scope of work, Cost tracking, Technical scope development, biweekly report, Coordinate survey, Travel requests, Bardex callout Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2017-10-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 7 0 Supplier weekly meeting, Minutes and action items update, Develop Survey scope of work, Cost tracking, Technical scope development, biweekly report, Coordinate survey, Travel requests, Bardex callout Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2017-10-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4.5 0 Supplier weekly meeting, Minutes and action items update, Develop Survey scope of work, Cost tracking, Technical scope development, biweekly report, Coordinate survey, Travel requests, Bardex callout Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2017-10-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Supplier weekly meeting, Minutes and action items update, Develop Survey scope of work, Cost tracking, Technical scope development, biweekly report, Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2017-10-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5.5 0 Supplier weekly meeting, Minutes and action items update, Develop Survey scope of work, Cost tracking, Technical scope development, biweekly report, Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2017-10-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 Supplier weekly meeting, Minutes and action items update, Develop Survey scope of work, Cost tracking, Technical scope development, biweekly report, Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2017-10-23 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 Supplier weekly meeting, Minutes and action items updateCost tracking, Technical scope development, biweekly report, schedule Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2017-10-24 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 Supplier weekly meeting, Minutes and action items updateCost tracking, Technical scope development, biweekly report, schedule Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2017-10-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 Supplier weekly meeting, Minutes and action items updateCost tracking, Technical scope development, biweekly report, schedule Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2017-10-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 Supplier weekly meeting, Minutes and action items updateCost tracking, Technical scope development, biweekly report, schedule Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2017-10-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 Supplier weekly meeting, Minutes and action items updateCost tracking, Technical scope development, biweekly report, schedule Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2017-10-30 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 Schedule, Cost estimate, Weekly meeting, minutes of meeting, technical clarifications, biweekly report, cost tracking, DDAS SetPoint, FoxDrill engagement for competitive quote Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2017-10-31 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 9 0 Schedule, Cost estimate, Weekly meeting, minutes of meeting, technical clarifications, biweekly report, cost tracking, DDAS SetPoint, FoxDrill engagement for competitive quote Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2017-11-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 10.5 0 Schedule, Cost estimate, Weekly meeting, minutes of meeting, technical clarifications, biweekly report, cost tracking, DDAS SetPoint, FoxDrill engagement for competitive quote Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2017-11-02 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 10 0 Schedule, Cost estimate, Weekly meeting, minutes of meeting, technical clarifications, biweekly report, cost tracking, DDAS SetPoint, FoxDrill engagement for competitive quote Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2017-11-03 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Schedule, Cost estimate, Weekly meeting, minutes of meeting, technical clarifications, biweekly report, cost tracking, DDAS SetPoint, FoxDrill engagement for competitive quote Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-30 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Review NOV Structural Report Review cost estimate Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.5 0 Review NOV Structural Report Review cost estimate Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-03 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.75 0 Review NOV Structural Report Review cost estimate Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-26 Hibernia Platform :Hibernia Platform TSR-01577-HIBP Monkey Board Handrail Assembly Regular Pay N 2 0 Closeout Documentation Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 On 10/11, Wood Group survey scope of work findings. On 10/13, assembled Hibernia Top Drive cost estimate option 1. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-11 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 On 10/11, organize PM review by phase. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 On 10/11, Wood Group survey scope of work findings. On 10/13, assembled Hibernia Top Drive cost estimate option 1. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 On 10/17, Hibernia Top Drive Cost Estimate. On 10/18, review Accumulator Survey Scope of Work. Review Sachin Ghadge Survey report. On 10/19, EPCI estimate for Top Drive Upgrade. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-17 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 On 10/17, create progress tracker for PM review tasks. On 10/18, set up progress tracker. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 On 10/17, Hibernia Top Drive Cost Estimate. On 10/18, review Accumulator Survey Scope of Work. Review Sachin Ghadge Survey report. On 10/19, EPCI estimate for Top Drive Upgrade. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-18 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 On 10/17, create progress tracker for PM review tasks. On 10/18, set up progress tracker. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 On 10/17, Hibernia Top Drive Cost Estimate. On 10/18, review Accumulator Survey Scope of Work. Review Sachin Ghadge Survey report. On 10/19, EPCI estimate for Top Drive Upgrade. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-23 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 On 10/23, assemble workshop agenda and travel schedule. On 10/24, progress phase tracker. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-24 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 On 10/24, review VFD House rating and obtain benchmarks. On 10/25, Wood conf call for Top Drive scope of work. On 10/26, NOV conf call for NOV action items. On 10/27, cost estimate and schedule development. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-24 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 0.5 0 On 10/23, assemble workshop agenda and travel schedule. On 10/24, progress phase tracker. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 On 10/24, review VFD House rating and obtain benchmarks. On 10/25, Wood conf call for Top Drive scope of work. On 10/26, NOV conf call for NOV action items. On 10/27, cost estimate and schedule development. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 On 10/24, review VFD House rating and obtain benchmarks. On 10/25, Wood conf call for Top Drive scope of work. On 10/26, NOV conf call for NOV action items. On 10/27, cost estimate and schedule development. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 On 10/24, review VFD House rating and obtain benchmarks. On 10/25, Wood conf call for Top Drive scope of work. On 10/26, NOV conf call for NOV action items. On 10/27, cost estimate and schedule development. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-30 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 On 10/30, review TD scope of work, PLC upgrade list and add edits/comments. On 10/31, review TD upgrade full project schedule. Review objectives of DDAS integration scope of work document and alternate quote from Setpoint. On 11/1, Wood conf call for TD upgrade scope and budget development. On 11/2, Hibernia NOV weekly mtg to define Top drive upgrade scope and cost estimate. Review cost estimate with team for new scope changes in VFD house (A0). Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-31 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 On 10/30, review TD scope of work, PLC upgrade list and add edits/comments. On 10/31, review TD upgrade full project schedule. Review objectives of DDAS integration scope of work document and alternate quote from Setpoint. On 11/1, Wood conf call for TD upgrade scope and budget development. On 11/2, Hibernia NOV weekly mtg to define Top drive upgrade scope and cost estimate. Review cost estimate with team for new scope changes in VFD house (A0). Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 On 10/30, review TD scope of work, PLC upgrade list and add edits/comments. On 10/31, review TD upgrade full project schedule. Review objectives of DDAS integration scope of work document and alternate quote from Setpoint. On 11/1, Wood conf call for TD upgrade scope and budget development. On 11/2, Hibernia NOV weekly mtg to define Top drive upgrade scope and cost estimate. Review cost estimate with team for new scope changes in VFD house (A0). Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-01 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 On 11/1, PM review meeting to status tracker and plan workshop agenda. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-02 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 On 10/30, review TD scope of work, PLC upgrade list and add edits/comments. On 10/31, review TD upgrade full project schedule. Review objectives of DDAS integration scope of work document and alternate quote from Setpoint. On 11/1, Wood conf call for TD upgrade scope and budget development. On 11/2, Hibernia NOV weekly mtg to define Top drive upgrade scope and cost estimate. Review cost estimate with team for new scope changes in VFD house (A0). Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-10-10 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Completed Steps 1 & 2 on Maintenance Plans 10080280, 10080285, 10080287, 10080291, 10080295, 10080300, 10080302, 10080306, 10080315, 10080316, 10080321, 10080335, 10080340, 10080342, 10080346, 10080350, 10080355, 10080357, 10080361, 10080365, 10080370, 10080371 for C101-08-10 & 20. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-10-11 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Completed Steps 1 & 2 on Maintenance Plans 10080280, 10080285, 10080287, 10080291, 10080295, 10080300, 10080302, 10080306, 10080315, 10080316, 10080321, 10080335, 10080340, 10080342, 10080346, 10080350, 10080355, 10080357, 10080361, 10080365, 10080370, 10080371 for C101-08-10 & 20. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-10-12 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Completed Steps 1 & 2 on Maintenance Plans 10080280, 10080285, 10080287, 10080291, 10080295, 10080300, 10080302, 10080306, 10080315, 10080316, 10080321, 10080335, 10080340, 10080342, 10080346, 10080350, 10080355, 10080357, 10080361, 10080365, 10080370, 10080371 for C101-08-10 & 20. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-10-13 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Completed Steps 1 & 2 on Maintenance Plans 10080280, 10080285, 10080287, 10080291, 10080295, 10080300, 10080302, 10080306, 10080315, 10080316, 10080321, 10080335, 10080340, 10080342, 10080346, 10080350, 10080355, 10080357, 10080361, 10080365, 10080370, 10080371 for C101-08-10 & 20. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-10-18 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Completed step 2 on Maintenance Plans 10087453, 10087454, 10087455, 10087456, 10087457, & 10087458. Completed step 1 on maintenance plans 10080289, 10080293,10080304, 10080308,10080319, 10080323, 10080344, 10080348, 10080359, 10080363, & 10080374. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-10-24 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Completed step 2 on maintenance plans 10080289, 10080293,10080304, 10080308,10080319, 10080323, 10080344, 10080348, 10080359, 10080363, & 10080374. Completed step 1 & 2 on maintenance plans 10080289, 10080330 10080376, 10080378 10080384, 10080387 10080385, 10080332 10080386, 10080333. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-10-25 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Completed step 2 on maintenance plans 10080289, 10080293,10080304, 10080308,10080319, 10080323, 10080344, 10080348, 10080359, 10080363, & 10080374. Completed step 1 & 2 on maintenance plans 10080289, 10080330 10080376, 10080378 10080384, 10080387 10080385, 10080332 10080386, 10080333. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-11-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 3 0 Associate equipment numbers to all maintenance plans in C101-08-10 & 20. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-12 Hibernia Platform :Hibernia Platform TSR-01526-HIBP Mud Pump Jib/Overhead Crane/Hoist Regular Pay N 3 0 Convert ply scan file to 3d file for AutoCAD M33 West - Scan 5.obj for Hybernia overhead jib crane 1526 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-13 Hibernia Platform :Hibernia Platform TSR-01526-HIBP Mud Pump Jib/Overhead Crane/Hoist Regular Pay N 1 0 Convert ply scan file to 3d file for AutoCAD M33 West - Scan 5.obj for Hybernia overhead jib crane 1526