Name Billing Class Employee No. Item Line Class Transaction Date Job No. Customer Service Item Notes Payroll Item Billable Employee Paid Day Rate Duration Days Remarks Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-01-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 reviewing C101-17-10B reference documents, chasing manuals, and follow up on the TDS6 manual excerpts from NOV. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 reviewing C101-17-10B reference documents, chasing manuals, and follow up on the TDS6 manual excerpts from NOV. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-01-11 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 reviewing C101-17-10B reference documents, chasing manuals, and follow up on the TDS6 manual excerpts from NOV. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-01-18 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Coordination with the OEM to secure TDS6 top drive details. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-01-31 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Revised and reviewed heat exchanger PM Plan for c101-17-10B, Draw works components. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-02-01 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 3 0 Revised and reviewed heat exchanger PM Plan for c101-17-10B, Draw works components. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-02-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 complete long text updates on the upload template. test the upload and revise the data as required to facilitate proper loading. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-02-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 complete long text updates on the upload template. test the upload and revise the data as required to facilitate proper loading. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-02-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 complete long text updates on the upload template. test the upload and revise the data as required to facilitate proper loading. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-02-12 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Weekly meeting, revise docs for easier management. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-02-13 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Weekly meeting, revise docs for easier management. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-02-14 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Went through C101-17-10A and began cleaning up procedures and populating the Task List Long Text Upload templates, in preparation for loading into SAP Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-02-15 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Went through C101-17-10A and began cleaning up procedures and populating the Task List Long Text Upload templates, in preparation for loading into SAP Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-02-16 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Went through C101-17-10A and began cleaning up procedures and populating the Task List Long Text Upload templates, in preparation for loading into SAP Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-02-27 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Weekly update meeting, spent some time attempting to log into SAP, ongoing issue with the log in being expired, Awaiting additional details from Bill Drover, Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-02-28 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Weekly update meeting, spent some time attempting to log into SAP, ongoing issue with the log in being expired, Awaiting additional details from Bill Drover, Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-03-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Finished reviewing and loading long test updates for C101-17-10-A, ready for submittal, attended two project meeting, Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-03-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 0.5 0 Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-03-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Finished reviewing and loading long test updates for C101-17-10-A, ready for submittal, attended two project meeting, Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-03-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-03-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Finished reviewing and loading long test updates for C101-17-10-A, ready for submittal, attended two project meeting, Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-03-20 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 0.5 0 catalogued missing C101-17-10-A data and compiling Long text task list updates for missing data. Awaiting confirmation for missing docs. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-03-21 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 catalogued missing C101-17-10-A data and compiling Long text task list updates for missing data. Awaiting confirmation for missing docs. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-04-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 0.5 0 Review tracker, verified some minor details with equipment make model and manufacturer. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-04-12 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 0.5 0 Review tracker, verified some minor details with equipment make model and manufacturer. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-04-25 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 0.5 0 Sorting out log on issues in SAP, one hour conference call to address issues and questions with Mark and Adam on Thursday Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-04-26 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Sorting out log on issues in SAP, one hour conference call to address issues and questions with Mark and Adam on Thursday Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-05-01 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 0.25 0 Minor discussion with Adam, and multiple attempts to log in. Forwarded mtls to Adam for upload. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-05-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 0.25 0 Minor discussion with Adam, and multiple attempts to log in. Forwarded mtls to Adam for upload. Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-01-29 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Review and update PM task, reducing PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-01-30 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 3 0 Review and update PM task, reducing PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-01-31 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 5 0 Review and update PM task, reducing PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-01 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Review and update PM task, reducing PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Review and update PM task, reducing PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 3 0 Review and update PM task, reducing PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 3 0 Review and update PM task and reduce PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Review and update PM task and reduce PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 3 0 Review and update PM task and reduce PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Review and update PM task and reduce PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Review and update PM task and reduce PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-12 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-13 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-14 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 3 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-15 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-16 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 4 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-14 OH-010 :OH-010 Overhead All Activities Regular Pay N 20 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-21 OH-010 :OH-010 Overhead All Activities Regular Pay N 6 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-22 OH-010 :OH-010 Overhead All Activities Regular Pay N 16 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-02-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-02-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-02-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-02-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-02-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-02-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-02-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-03-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-03-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-03-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-03-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-03-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-03-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Years Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-02 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.75 0 TOTAL tender support and clarifications Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-02 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 7 0 Pluspetrol Argentina tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 TOTAL tender support and clarifications Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-03 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 6 0 Pluspetrol Argentina tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-04 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 TOTAL tender support and clarifications Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-04 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 5.5 0 Pluspetrol Argentina tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-05 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 TOTAL tender support and clarifications Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-05 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4 0 Pluspetrol Argentina tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-05 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3 0 SEMS package calculations Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Prep for trip to Angola, discussed with Gary and George, collect BOSIET info for Gary, talk about inspections with Greg, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-08 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1.25 0 Start pressure calcs, get Oracle info from Anatra, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-08 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 3 0 Review schedule from George, discuss with George, create schedule, call Randy Crowson, modify schedule, submit to George, Randy, and Steve, called Randy again, talked with George again, updated schedule again, updated schedule again after talking with Randy, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-08 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2 0 meeting with Mark and Genesis, review scope and method of payment, review and modify strength and stability spreadsheet for DM, finish weight sheet and discuss with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Prep for trip to Angola, discussed with Gary and George, collect BOSIET info for Gary, talk about inspections with Greg, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-09 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 3 0 Pluspetrol Argentina, submitted a price to PP, reviewed rig info with Lizzy, reviewed and discussed clarification, respond to Omar with priorities and updated gap analysis, talk with Billy, Jack, and Omar about path forward, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-09 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1.75 0 Start pressure calcs, get Oracle info from Anatra, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-09 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1.5 0 Review schedule from George, discuss with George, create schedule, call Randy Crowson, modify schedule, submit to George, Randy, and Steve, called Randy again, talked with George again, updated schedule again, updated schedule again after talking with Randy, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-09 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 0.5 0 meeting with Mark and Genesis, review scope and method of payment, review and modify strength and stability spreadsheet for DM, finish weight sheet and discuss with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Prep for trip to Angola, discussed with Gary and George, collect BOSIET info for Gary, talk about inspections with Greg, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-10 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4.5 0 Pluspetrol Argentina, submitted a price to PP, reviewed rig info with Lizzy, reviewed and discussed clarification, respond to Omar with priorities and updated gap analysis, talk with Billy, Jack, and Omar about path forward, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-10 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2 0 Review schedule from George, discuss with George, create schedule, call Randy Crowson, modify schedule, submit to George, Randy, and Steve, called Randy again, talked with George again, updated schedule again, updated schedule again after talking with Randy, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-10 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 0.5 0 meeting with Mark and Genesis, review scope and method of payment, review and modify strength and stability spreadsheet for DM, finish weight sheet and discuss with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-11 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.75 0 PO problem with sound study supplier, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 TSR meeting, saferunion presentation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-11 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4.5 0 Pluspetrol Argentina, submitted a price to PP, reviewed rig info with Lizzy, reviewed and discussed clarification, respond to Omar with priorities and updated gap analysis, talk with Billy, Jack, and Omar about path forward, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-11 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2 0 Review schedule from George, discuss with George, create schedule, call Randy Crowson, modify schedule, submit to George, Randy, and Steve, called Randy again, talked with George again, updated schedule again, updated schedule again after talking with Randy, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 TSR meeting, saferunion presentation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Prep for trip to Angola, discussed with Gary and George, collect BOSIET info for Gary, talk about inspections with Greg, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-12 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1.5 0 Pluspetrol Argentina, submitted a price to PP, reviewed rig info with Lizzy, reviewed and discussed clarification, respond to Omar with priorities and updated gap analysis, talk with Billy, Jack, and Omar about path forward, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-12 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2.5 0 meeting with Mark and Genesis, review scope and method of payment, review and modify strength and stability spreadsheet for DM, finish weight sheet and discuss with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Setting up meeting and presentation for SaferUnion, collecting info on PMP and PE cost, catch up after office closure, discuss goals with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-15 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 6.5 0 Pressure Calcs, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Office closure due to icy weather Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Office closure due to icy weather Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Setting up meeting and presentation for SaferUnion, collecting info on PMP and PE cost, catch up after office closure, discuss goals with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 Angola VISA stuff, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-18 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 3 0 Pluspetrol support and HH rig visit, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-18 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1 0 Pressure Calcs, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-18 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2 0 Kick off meeting with Genesis Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Setting up meeting and presentation for SaferUnion, collecting info on PMP and PE cost, catch up after office closure, discuss goals with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Angola VISA stuff, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-19 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 6 0 Pluspetrol support and HH rig visit, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-19 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 0.5 0 Pressure Calcs, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 Board Meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 filled out application and submitted all documents for Angola VISA Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-22 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1.5 0 pluspetrol Argentina Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-22 OH-014 :OH-014 Overhead All Activities Regular Pay N 5.5 0 Visit MH Wirth facility in Katy; Good to Great Review; Safer Union; Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-22 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 0.5 0 discussed drawings with James, pressure calculations, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-23 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 pluspetrol Argentina Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-23 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1.5 0 discussed drawings with James, pressure calculations, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-23 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 5.5 0 meeting with Genesis, send information to Genesis, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 AutoCAD install Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-24 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3 0 DNO technical specs Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-24 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Visit MH Wirth facility in Katy; Good to Great Review; Safer Union; Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-24 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2 0 meeting with Genesis, send information to Genesis, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-25 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 Test Frame meeting, research, and discussion Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board Meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-25 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 3 0 pluspetrol Argentina Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-25 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 Visit MH Wirth facility in Katy; Good to Great Review; Safer Union; Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-25 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1 0 discussed drawings with James, pressure calculations, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-25 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2 0 meeting with Genesis, send information to Genesis, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-26 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 8 0 pluspetrol Argentina Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-26 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 0.5 0 discussed drawings with James, pressure calculations, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-29 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.75 0 discuss design with Dan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 board meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 Received dummy itinerary and forwarded to Jen, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-29 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 6 0 Pluspetrol Argentina tech spec comparison, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-29 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 0.5 0 Forwarded drill floor weight info to Genesis, prep and status meeting, send out minutes, review questions, call Mark and Dan for slope information, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-30 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4.75 0 Pluspetrol Argentina tech spec comparison, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-30 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 2 0 pressure calcs complete, start flow calcs, discussion with James, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-30 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2.25 0 Forwarded drill floor weight info to Genesis, prep and status meeting, send out minutes, review questions, call Mark and Dan for slope information, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-31 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 discuss design with Dan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-31 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 5 0 Pluspetrol Argentina tech spec comparison, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-31 OH-014 :OH-014 Overhead All Activities Regular Pay N 0.75 0 Good to Great with Rob Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-31 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 0.25 0 pressure calcs complete, start flow calcs, discussion with James, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-31 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2 0 Forwarded drill floor weight info to Genesis, prep and status meeting, send out minutes, review questions, call Mark and Dan for slope information, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-01 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 discuss design with Dan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 board meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Performance Review, create reading schedule for PMBOK 2018 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-01 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4 0 Pluspetrol Argentina tech spec comparison, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-01 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 0.75 0 pressure calcs complete, start flow calcs, discussion with James, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-01 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 1.5 0 Forwarded drill floor weight info to Genesis, prep and status meeting, send out minutes, review questions, call Mark and Dan for slope information, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-02 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.75 0 discuss design with Dan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Performance Review, create reading schedule for PMBOK 2018 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-02 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 0.75 0 pressure calcs complete, start flow calcs, discussion with James, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-02 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 1 0 Forwarded drill floor weight info to Genesis, prep and status meeting, send out minutes, review questions, call Mark and Dan for slope information, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-05 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 discuss with Kyle, email Tyler and AJ, project schedule, create high level design comparison, review with AJ Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 board meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-05 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 2 0 flow calculations Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-05 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 1.5 0 Review drawing plan with Dan, create a slope table for the different well locations, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-05 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 1.5 0 Review submitted docs, status meeting and review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-06 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 4 0 discuss with Kyle, email Tyler and AJ, project schedule, create high level design comparison, review with AJ Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-06 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4 0 flow calculations Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-06 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2 0 Review submitted docs, status meeting and review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.75 0 Angola consulate visit, discuss path forward with Kizomba rig inspection Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-07 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4 0 flow calculations Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-07 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 2.5 0 Review drawing plan with Dan, create a slope table for the different well locations, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-08 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 discuss with Kyle, email Tyler and AJ, project schedule, create high level design comparison, review with AJ Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Angola consulate visit, discuss path forward with Kizomba rig inspection Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-08 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 7.5 0 flow calculations Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-09 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 discuss with Kyle, email Tyler and AJ, project schedule, create high level design comparison, review with AJ Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-09 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 6.75 0 flow calculations Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-12 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 review plan, adjust work load, create meeting for Friday, review design with Dan, book hotel for Monday, make travel plans, communicate with 2mtek, review travel with Dan and review final design pictures and make list of questions for 2mtek, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 board meeting, TSR meeting, 4th quarter earnings meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Problem with Outlook, helpdesk ticket with IT, 13 updates had to be installed, closed, reviewed BOP test issue from Hibernia with Mike Kyle and Rob, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-12 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1.5 0 Add API information to a table for Crescent tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-12 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 2 0 review drawings with Dan, create closeout, submit to Kyle Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-12 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2 0 final review of Genesis report, mark up report and discuss with Tecky Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 Angola travel info, schedule clinic visit for offshore medical Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-13 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 4.5 0 review drawings with Dan, create closeout, submit to Kyle Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-13 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 3 0 final review of Genesis report, mark up report and discuss with Tecky Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-14 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 review plan, adjust work load, create meeting for Friday, review design with Dan, book hotel for Monday, make travel plans, communicate with 2mtek, review travel with Dan and review final design pictures and make list of questions for 2mtek, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-14 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4 0 flow calcs Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-14 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 1 0 review drawings with Dan, create closeout, submit to Kyle Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-14 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2 0 final review of Genesis report, mark up report and discuss with Tecky Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-15 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2.5 0 review plan, adjust work load, create meeting for Friday, review design with Dan, book hotel for Monday, make travel plans, communicate with 2mtek, review travel with Dan and review final design pictures and make list of questions for 2mtek, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 board meeting, TSR meeting, 4th quarter earnings meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Problem with Outlook, helpdesk ticket with IT, 13 updates had to be installed, closed, reviewed BOP test issue from Hibernia with Mike Kyle and Rob, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.25 0 Angola travel info, schedule clinic visit for offshore medical Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-15 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4.25 0 flow calcs Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-16 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1.5 0 review plan, adjust work load, create meeting for Friday, review design with Dan, book hotel for Monday, make travel plans, communicate with 2mtek, review travel with Dan and review final design pictures and make list of questions for 2mtek, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Problem with Outlook, helpdesk ticket with IT, 13 updates had to be installed, closed, reviewed BOP test issue from Hibernia with Mike Kyle and Rob, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-16 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3 0 flow calcs Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 6 0 President's day Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-19 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 travel to Lafayette, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-20 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5 0 travel to Lafayette and review tension and torque test machines at 2MTek; travel to Stress Engineering and witness tension test for torque subs, review frame design, size cylinders, expense report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-20 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 travel to Lafayette, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-21 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5 0 travel to Lafayette and review tension and torque test machines at 2MTek; travel to Stress Engineering and witness tension test for torque subs, review frame design, size cylinders, expense report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 Angola discussions with Gary, malaria training, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-21 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 0.25 0 discussion with James, mud gun flow calcs, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-21 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2 0 finished changes to report, finalized, submitted, started closeout, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-22 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1.5 0 travel to Lafayette and review tension and torque test machines at 2MTek; travel to Stress Engineering and witness tension test for torque subs, review frame design, size cylinders, expense report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 TSR meeting, review well control operations with Hibernia, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Angola discussions with Gary, malaria training, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-22 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1.75 0 DNO equipment spec comparison Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-22 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3 0 discussion with James, mud gun flow calcs, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-22 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 3 0 finished changes to report, finalized, submitted, started closeout, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting, review well control operations with Hibernia, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-23 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 5 0 discussion with James, mud gun flow calcs, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-26 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.75 0 Review model and discuss path forward, create meeting for Thursday, review the model with Dan and prep for meeting, update schedule, have meeting, discuss analysis structure, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 TSR board meeting, TSR weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-26 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6 0 DNO tender, Discussion about Baku Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-26 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1.5 0 trip tank calcs, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-27 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6.25 0 DNO tender, Discussion about Baku Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-27 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1.25 0 Argentina Support Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-28 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Review model and discuss path forward, create meeting for Thursday, review the model with Dan and prep for meeting, update schedule, have meeting, discuss analysis structure, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board meeting, TSR weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-28 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1.5 0 DNO tender, Discussion about Baku Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-28 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 6.5 0 Argentina Support Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-01 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 Review model and discuss path forward, create meeting for Thursday, review the model with Dan and prep for meeting, update schedule, have meeting, discuss analysis structure, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-01 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 Discussion with George, Joe, and Rodney about clarification and re-quote, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR board meeting, TSR weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-01 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 2 0 DNO tender, Discussion about Baku Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-01 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1.25 0 Argentina Support Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-02 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 Review model and discuss path forward, create meeting for Thursday, review the model with Dan and prep for meeting, update schedule, have meeting, discuss analysis structure, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-02 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6 0 Discussion with George, Joe, and Rodney about clarification and re-quote, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-05 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Review analysis, troubleshoot analysis, discuss material selection, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-05 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.25 0 send out all tech specs for requote, review cost estimate, review rig mat and noise control quotes, discuss drill string scope with Rodney, answer TOTAL clarification, update cost estimate, send info to Rodney, setup meeting for cost estimate review, have meeting with Rodney, review needed changes, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-05 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 0.75 0 Reviewed flight options to Baku, reviewed Socar AQS presentation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-05 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4.5 0 set up meeting with NOV, have meeting with NOV, review and discuss findings from quote, get clarification from Rod and Billy, send info to Omar, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-06 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 Review analysis, troubleshoot analysis, discuss material selection, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7.75 0 send out all tech specs for requote, review cost estimate, review rig mat and noise control quotes, discuss drill string scope with Rodney, answer TOTAL clarification, update cost estimate, send info to Rodney, setup meeting for cost estimate review, have meeting with Rodney, review needed changes, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-06 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 3.5 0 set up meeting with NOV, have meeting with NOV, review and discuss findings from quote, get clarification from Rod and Billy, send info to Omar, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-07 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 6 0 Review analysis, troubleshoot analysis, discuss material selection, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-07 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 send out all tech specs for requote, review cost estimate, review rig mat and noise control quotes, discuss drill string scope with Rodney, answer TOTAL clarification, update cost estimate, send info to Rodney, setup meeting for cost estimate review, have meeting with Rodney, review needed changes, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, department discussions, meeting with Rob Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-08 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 6 0 Review analysis, troubleshoot analysis, discuss material selection, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-08 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 send out all tech specs for requote, review cost estimate, review rig mat and noise control quotes, discuss drill string scope with Rodney, answer TOTAL clarification, update cost estimate, send info to Rodney, setup meeting for cost estimate review, have meeting with Rodney, review needed changes, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, department discussions, meeting with Rob Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-09 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 4 0 Review analysis, troubleshoot analysis, discuss material selection, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-09 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 send out all tech specs for requote, review cost estimate, review rig mat and noise control quotes, discuss drill string scope with Rodney, answer TOTAL clarification, update cost estimate, send info to Rodney, setup meeting for cost estimate review, have meeting with Rodney, review needed changes, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 board meeting, department discussions, meeting with Rob Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-12 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 4 0 analysis, tracking hours, hand calcs, solidworks problems, analysis, met with AMC about material selection, set up meeting for Joshua Dan and me, identify materials in all components, have meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-12 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 reviewing quotes for TOTAL, radio cabin, Red Sea scope increase, calculated loads for pad to pad moves for Bemuga, answered questions from WOM, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-12 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2.5 0 KPO JV schedule creation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-13 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.5 0 analysis, tracking hours, hand calcs, solidworks problems, analysis, met with AMC about material selection, set up meeting for Joshua Dan and me, identify materials in all components, have meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-13 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 reviewing quotes for TOTAL, radio cabin, Red Sea scope increase, calculated loads for pad to pad moves for Bemuga, answered questions from WOM, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-13 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1.5 0 KPO JV schedule creation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-14 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 9 0 analysis, tracking hours, hand calcs, solidworks problems, analysis, met with AMC about material selection, set up meeting for Joshua Dan and me, identify materials in all components, have meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-14 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 reviewing quotes for TOTAL, radio cabin, Red Sea scope increase, calculated loads for pad to pad moves for Bemuga, answered questions from WOM, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-15 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 9.5 0 analysis, tracking hours, hand calcs, solidworks problems, analysis, met with AMC about material selection, set up meeting for Joshua Dan and me, identify materials in all components, have meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-15 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 reviewing quotes for TOTAL, radio cabin, Red Sea scope increase, calculated loads for pad to pad moves for Bemuga, answered questions from WOM, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 board meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-15 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 0.5 0 Baku prep Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-16 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5 0 analysis, tracking hours, hand calcs, solidworks problems, analysis, met with AMC about material selection, set up meeting for Joshua Dan and me, identify materials in all components, have meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-16 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 reviewing quotes for TOTAL, radio cabin, Red Sea scope increase, calculated loads for pad to pad moves for Bemuga, answered questions from WOM, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-16 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1 0 Review drawings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-19 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 3.5 0 Review current model with Dan, discuss project with AJ, review problems with assumptions, send detailed email with status and questions to AJ, update cost tracker, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-19 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 review cost estimate with Rodney and joe, review HH quote, review outstanding quotes with Jack, update cost estimate, answer Dinesh questions, review DP quote, fishing quote, and well control quote, NOV quote and meeting with Jack, update cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-19 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 2.75 0 VISA process for Azerbaijan, cancel flights and discuss plan forward with Gary, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-20 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.75 0 Review current model with Dan, discuss project with AJ, review problems with assumptions, send detailed email with status and questions to AJ, update cost tracker, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-20 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6.5 0 review cost estimate with Rodney and joe, review HH quote, review outstanding quotes with Jack, update cost estimate, answer Dinesh questions, review DP quote, fishing quote, and well control quote, NOV quote and meeting with Jack, update cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, expense report for Angola, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-20 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1.25 0 VISA process for Azerbaijan, cancel flights and discuss plan forward with Gary, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-21 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.75 0 Review current model with Dan, discuss project with AJ, review problems with assumptions, send detailed email with status and questions to AJ, update cost tracker, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-21 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7 0 review cost estimate with Rodney and joe, review HH quote, review outstanding quotes with Jack, update cost estimate, answer Dinesh questions, review DP quote, fishing quote, and well control quote, NOV quote and meeting with Jack, update cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, expense report for Angola, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-22 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 review cost estimate with Rodney and joe, review HH quote, review outstanding quotes with Jack, update cost estimate, answer Dinesh questions, review DP quote, fishing quote, and well control quote, NOV quote and meeting with Jack, update cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-23 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 Review current model with Dan, discuss project with AJ, review problems with assumptions, send detailed email with status and questions to AJ, update cost tracker, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-23 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6.75 0 review cost estimate with Rodney and joe, review HH quote, review outstanding quotes with Jack, update cost estimate, answer Dinesh questions, review DP quote, fishing quote, and well control quote, NOV quote and meeting with Jack, update cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-26 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1.5 0 Run FEA with new material on test anchor, review allowable stresses, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 10.5 0 TOTAL re-quote and cost estimate, review estimate with George and Joe, update bid model, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, prep for safety moment, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-27 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Run FEA with new material on test anchor, review allowable stresses, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6.5 0 TOTAL re-quote and cost estimate, review estimate with George and Joe, update bid model, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-28 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7.25 0 TOTAL re-quote and cost estimate, review estimate with George and Joe, update bid model, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, prep for safety moment, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-29 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Run FEA with new material on test anchor, review allowable stresses, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-29 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7.25 0 TOTAL re-quote and cost estimate, review estimate with George and Joe, update bid model, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, prep for safety moment, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-30 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Good Friday Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-02 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7 0 simulations issues, discussion with AJ, discussion with Joshua, more simulations, review of Charlie's quote, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-02 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Answer a few questions, discussion, work with Karma on tripping times Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Dan's computer situation, emails, discussions, download Mathcad, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-02 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3.5 0 257 Reactivation schedule for George, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-03 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5.75 0 simulations issues, discussion with AJ, discussion with Joshua, more simulations, review of Charlie's quote, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Dan's computer situation, emails, discussions, download Mathcad, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-03 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3 0 257 Reactivation schedule for George, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-04 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 6.5 0 simulations issues, discussion with AJ, discussion with Joshua, more simulations, review of Charlie's quote, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-04 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 Answer a few questions, discussion, work with Karma on tripping times Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-04 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Dan's computer situation, emails, discussions, download Mathcad, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-05 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 9 0 simulations issues, discussion with AJ, discussion with Joshua, more simulations, review of Charlie's quote, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 board meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-06 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7 0 simulations issues, discussion with AJ, discussion with Joshua, more simulations, review of Charlie's quote, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-06 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 Analyze options for laying down the mast for demob, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-09 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 4.75 0 review meeting, analysis report, preliminary drawing review, hydraulic review, cost estimate and schedule update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-09 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 3 0 Reducing billable hours Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-10 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 4.5 0 review meeting, analysis report, preliminary drawing review, hydraulic review, cost estimate and schedule update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-10 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 4 0 Reducing billable hours Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-11 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 3.25 0 review meeting, analysis report, preliminary drawing review, hydraulic review, cost estimate and schedule update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-11 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 4 0 Reducing billable hours Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-11 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Meeting with Mike Murray from MD Totco on sensor package Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.75 0 emails, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-12 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5.25 0 review meeting, analysis report, preliminary drawing review, hydraulic review, cost estimate and schedule update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-12 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 4.5 0 Reducing billable hours Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.75 0 TS weekly meeting Good to Great Review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-13 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 3 0 review meeting, analysis report, preliminary drawing review, hydraulic review, cost estimate and schedule update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-13 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 3 0 Reducing billable hours Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-16 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 3.5 0 Review dwgs and handover to James, send out analysis report and preliminary drawings, make efficiency and handling modifications to the model, pick up changes to analysis report, refine model and start drawings with Dan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-16 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 4 0 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 TSR board meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, discussions, look ahead at future work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, getting Dan a new computer, discussions with IT, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-16 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.25 0 AAR prep and meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-17 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 3 0 Review dwgs and handover to James, send out analysis report and preliminary drawings, make efficiency and handling modifications to the model, pick up changes to analysis report, refine model and start drawings with Dan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-17 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 3 0 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, discussions, look ahead at future work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, getting Dan a new computer, discussions with IT, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-17 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 AAR prep and meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-18 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 4 0 Review dwgs and handover to James, send out analysis report and preliminary drawings, make efficiency and handling modifications to the model, pick up changes to analysis report, refine model and start drawings with Dan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-18 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 3 0 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, discussions, look ahead at future work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 timesheet, getting Dan a new computer, discussions with IT, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-19 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1.5 0 Review dwgs and handover to James, send out analysis report and preliminary drawings, make efficiency and handling modifications to the model, pick up changes to analysis report, refine model and start drawings with Dan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-19 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 Clarification #20 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, discussions, look ahead at future work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-20 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Review dwgs and handover to James, send out analysis report and preliminary drawings, make efficiency and handling modifications to the model, pick up changes to analysis report, refine model and start drawings with Dan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-20 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 Clarification #20 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails, discussions, look ahead at future work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, getting Dan a new computer, discussions with IT, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-23 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 4 0 create field inspection report, create TPP for hydraulic SOW, analysis review with Joshua, cost estimate update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-23 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 5 0 update hours tracker, email ian about controls preferences, email fabricators, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-24 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 create field inspection report, create TPP for hydraulic SOW, analysis review with Joshua, cost estimate update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-24 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1.5 0 update hours tracker, email ian about controls preferences, email fabricators, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-24 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.5 0 TOTAL clarification Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 board meeting, TSR weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-24 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3.5 0 meeting with George, Randy, and Robby on Rig 216 start up, create new schedule for 216 start up, talk with Randy Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-25 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 3 0 create field inspection report, create TPP for hydraulic SOW, analysis review with Joshua, cost estimate update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-25 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2.5 0 update hours tracker, email ian about controls preferences, email fabricators, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-25 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.5 0 TOTAL clarification Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-26 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 create field inspection report, create TPP for hydraulic SOW, analysis review with Joshua, cost estimate update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-26 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 update hours tracker, email ian about controls preferences, email fabricators, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.5 0 TOTAL clarification Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, TSR weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-26 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2.5 0 meeting with George, Randy, and Robby on Rig 216 start up, create new schedule for 216 start up, talk with Randy Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-27 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 create field inspection report, create TPP for hydraulic SOW, analysis review with Joshua, cost estimate update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-27 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 update hours tracker, email ian about controls preferences, email fabricators, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 TOTAL clarification Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-30 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 review transportation quotes and update cost estimate, finish hyd TPP and create fab TPP, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-30 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2 0 cost estimate, sent out analysis report, worked on modifying CTR, discuss outstanding items with Joshua, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-30 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6 0 Clarification 21 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-01 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 4 0 cost estimate, sent out analysis report, worked on modifying CTR, discuss outstanding items with Joshua, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-01 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4.5 0 Clarification 21 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 quarterly earnings meeting, board meeting, TSR weekly meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-02 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2 0 cost estimate, sent out analysis report, worked on modifying CTR, discuss outstanding items with Joshua, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-02 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5.5 0 Clarification 21 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 quarterly earnings meeting, board meeting, TSR weekly meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-03 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 review transportation quotes and update cost estimate, finish hyd TPP and create fab TPP, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-03 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 cost estimate, sent out analysis report, worked on modifying CTR, discuss outstanding items with Joshua, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Clarification 21 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 quarterly earnings meeting, board meeting, TSR weekly meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-03 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2.5 0 NCOC tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-04 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 review transportation quotes and update cost estimate, finish hyd TPP and create fab TPP, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-04 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Clarification 21 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-04 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3 0 NCOC tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-04 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 2 0 TTOpco schedules for 247 and 269 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-07 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Hydraulic TPP, Fabrication TPP, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-07 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 catch up with Schniddy and ask about hydraulic standards, pick up comments on fabrication TPP Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-07 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 Review payment schedule with George and Bruce and Wayne, set up histogram meeting with Rodney, meeting with Rodney, discussion with George about Wednesday meeting and SOW document Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 Drill pipe discussion with Joshua, creation of my SER for my PE license, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-07 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 7.75 0 reviewed all drawings and added process information, created pipe and valve standard specification deliverable, created equipment specification deliverable, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-08 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 Hydraulic TPP, Fabrication TPP, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-08 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1.5 0 catch up with Schniddy and ask about hydraulic standards, pick up comments on fabrication TPP Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-08 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 6 0 reviewed all drawings and added process information, created pipe and valve standard specification deliverable, created equipment specification deliverable, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-09 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 Hydraulic TPP, Fabrication TPP, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-09 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 4.5 0 catch up with Schniddy and ask about hydraulic standards, pick up comments on fabrication TPP Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-09 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 Review payment schedule with George and Bruce and Wayne, set up histogram meeting with Rodney, meeting with Rodney, discussion with George about Wednesday meeting and SOW document Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-09 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1.5 0 reviewed all drawings and added process information, created pipe and valve standard specification deliverable, created equipment specification deliverable, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-10 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 Hydraulic TPP, Fabrication TPP, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-10 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2 0 catch up with Schniddy and ask about hydraulic standards, pick up comments on fabrication TPP Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-10 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Review payment schedule with George and Bruce and Wayne, set up histogram meeting with Rodney, meeting with Rodney, discussion with George about Wednesday meeting and SOW document Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Drill pipe discussion with Joshua, creation of my SER for my PE license, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-11 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.5 0 Review payment schedule with George and Bruce and Wayne, set up histogram meeting with Rodney, meeting with Rodney, discussion with George about Wednesday meeting and SOW document Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 Drill pipe discussion with Joshua, creation of my SER for my PE license, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-14 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 TPP review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-14 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9 0 Clarification 22, Clarification 23, Scope of Work doc, discussions, internal meetings, TOTAL meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 board meeting, weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-14 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 2 0 drawing review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-15 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Finalize TPPs Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-15 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 TPP review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-15 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 8 0 Clarification 22, Clarification 23, Scope of Work doc, discussions, internal meetings, TOTAL meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-16 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Finalize TPPs Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-16 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6.5 0 Clarification 22, Clarification 23, Scope of Work doc, discussions, internal meetings, TOTAL meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-16 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 HSE and Security Training Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-17 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 TPP review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-17 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7 0 Clarification 22, Clarification 23, Scope of Work doc, discussions, internal meetings, TOTAL meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-18 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1.5 0 TPP review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-18 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.5 0 Clarification 22, Clarification 23, Scope of Work doc, discussions, internal meetings, TOTAL meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-21 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 3 0 finished TPP/SOW for fabrication and hydraulics, reviewed drawing status with Dan and James, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-21 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.5 0 talked with Sachin about ATEX, talked with Craig about ATEX and their equipment, talked with Kyle about direction for this issue, review tech specs, add drilling contract items to tech spec, review scope of work doc, determine path forward for Coriolis meter, meeting with Greg and Kyle, review and update SOW, create high level equipment list for David Tucker, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 SER for PE, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, get new driver for Solidworks, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-21 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1.5 0 Reviewed final two drawings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-22 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7.25 0 talked with Sachin about ATEX, talked with Craig about ATEX and their equipment, talked with Kyle about direction for this issue, review tech specs, add drilling contract items to tech spec, review scope of work doc, determine path forward for Coriolis meter, meeting with Greg and Kyle, review and update SOW, create high level equipment list for David Tucker, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 SER for PE, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, get new driver for Solidworks, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-23 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 0.5 0 finished TPP/SOW for fabrication and hydraulics, reviewed drawing status with Dan and James, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-23 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 8 0 talked with Sachin about ATEX, talked with Craig about ATEX and their equipment, talked with Kyle about direction for this issue, review tech specs, add drilling contract items to tech spec, review scope of work doc, determine path forward for Coriolis meter, meeting with Greg and Kyle, review and update SOW, create high level equipment list for David Tucker, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 timesheet, get new driver for Solidworks, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-24 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9 0 talked with Sachin about ATEX, talked with Craig about ATEX and their equipment, talked with Kyle about direction for this issue, review tech specs, add drilling contract items to tech spec, review scope of work doc, determine path forward for Coriolis meter, meeting with Greg and Kyle, review and update SOW, create high level equipment list for David Tucker, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.75 0 SER for PE, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, get new driver for Solidworks, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-25 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 talked with Sachin about ATEX, talked with Craig about ATEX and their equipment, talked with Kyle about direction for this issue, review tech specs, add drilling contract items to tech spec, review scope of work doc, determine path forward for Coriolis meter, meeting with Greg and Kyle, review and update SOW, create high level equipment list for David Tucker, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 SER for PE, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, get new driver for Solidworks, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-28 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Memorial Day Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-29 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 3.5 0 split clamp simulation and calculations, drawing review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-29 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4.5 0 SOW, tech spec, standards, meeting in 1007, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-29 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2 0 Rig 216 start up schedule mods Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-30 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2.5 0 split clamp simulation and calculations, drawing review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-30 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7 0 SOW, tech spec, standards, meeting in 1007, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-31 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 3.5 0 split clamp simulation and calculations, drawing review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-31 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4.5 0 SOW, tech spec, standards, meeting in 1007, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-31 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 discussions Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-01 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 SOW, tech spec, standards, meeting in 1007, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 discussions Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-04 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 11 0 tech spec, kanban meeting, discussion with Wayne, discussion with Jenny and Kyle on visas, get update from Duane on stack drawing, cost estimate modification, histogram modification, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 discussions Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-05 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5.5 0 tech spec, kanban meeting, discussion with Wayne, discussion with Jenny and Kyle on visas, get update from Duane on stack drawing, cost estimate modification, histogram modification, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-06 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 discuss transfer of project with AJ and set up plan to transfer all info to 2mtek, transfer Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 11 0 tech spec, kanban meeting, discussion with Wayne, discussion with Jenny and Kyle on visas, get update from Duane on stack drawing, cost estimate modification, histogram modification, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-07 OH-002 :OH-002 Overhead All Activities Regular Pay N 8 0 Caroline's Granddad Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-08 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2 0 discuss transfer of project with AJ and set up plan to transfer all info to 2mtek, transfer Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-08 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7 0 tech spec, kanban meeting, discussion with Wayne, discussion with Jenny and Kyle on visas, get update from Duane on stack drawing, cost estimate modification, histogram modification, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 discussions Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-11 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 12 0 TOTAL tech spec and project initiation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-12 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9 0 TOTAL tech spec and project initiation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-13 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 10 0 TOTAL tech spec and project initiation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-14 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9.5 0 TOTAL tech spec and project initiation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Beach Retreat Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 JH Beach Retreat Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 JH Beach Retreat Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 JH Beach Retreat Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-21 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 JH Beach Retreat Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 JH Beach Retreat Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-25 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9 0 Review tech spec with Kyle, review TOTAL updates with Joshua, update Action and Decision tracker, kanban meeting, update tech spec, research flare line specs, list questions for HH, pre for meeting with HH, meeting with HH, update action tracker, review sharepoint site status, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9 0 Review tech spec with Kyle, review TOTAL updates with Joshua, update Action and Decision tracker, kanban meeting, update tech spec, research flare line specs, list questions for HH, pre for meeting with HH, meeting with HH, update action tracker, review sharepoint site status, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9 0 Review tech spec with Kyle, review TOTAL updates with Joshua, update Action and Decision tracker, kanban meeting, update tech spec, research flare line specs, list questions for HH, pre for meeting with HH, meeting with HH, update action tracker, review sharepoint site status, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-28 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9 0 Review tech spec with Kyle, review TOTAL updates with Joshua, update Action and Decision tracker, kanban meeting, update tech spec, research flare line specs, list questions for HH, pre for meeting with HH, meeting with HH, update action tracker, review sharepoint site status, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-29 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6 0 Review tech spec with Kyle, review TOTAL updates with Joshua, update Action and Decision tracker, kanban meeting, update tech spec, research flare line specs, list questions for HH, pre for meeting with HH, meeting with HH, update action tracker, review sharepoint site status, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-02 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 8.5 0 Updated meeting minutes from Thursday and distributed, updated deliverables list and distributed, visited Canrig, added items to Opportunities list, discussed changing HH and IDS scope, meeting with Chuck and Sachin, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-02 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 0.5 0 Adjusted 216L StartUp Schedule with Randy Crowson Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9 0 Updated meeting minutes from Thursday and distributed, updated deliverables list and distributed, visited Canrig, added items to Opportunities list, discussed changing HH and IDS scope, meeting with Chuck and Sachin, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 PE Application prep and completion, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 July 4th Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-05 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7 0 Updated meeting minutes from Thursday and distributed, updated deliverables list and distributed, visited Canrig, added items to Opportunities list, discussed changing HH and IDS scope, meeting with Chuck and Sachin, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 PE Application prep and completion, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6 0 Updated meeting minutes from Thursday and distributed, updated deliverables list and distributed, visited Canrig, added items to Opportunities list, discussed changing HH and IDS scope, meeting with Chuck and Sachin, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-09 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6.5 0 update project schedule, reply to Chuck's concerns, TOTAL kanban, ATEX info, WOM visit, BOP quote mod, project schedule, meeting with patent attorney, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 TSR board meeting, RT Casey Submarine Cable presentation, TSR weekly meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-10 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 12 0 update project schedule, reply to Chuck's concerns, TOTAL kanban, ATEX info, WOM visit, BOP quote mod, project schedule, meeting with patent attorney, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-10 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 0.5 0 247 tender for George Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-11 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 update project schedule, reply to Chuck's concerns, TOTAL kanban, ATEX info, WOM visit, BOP quote mod, project schedule, meeting with patent attorney, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-11 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6 0 247 tender for George Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-12 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 8 0 update project schedule, reply to Chuck's concerns, TOTAL kanban, ATEX info, WOM visit, BOP quote mod, project schedule, meeting with patent attorney, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 TSR board meeting, RT Casey Submarine Cable presentation, TSR weekly meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-13 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7 0 update project schedule, reply to Chuck's concerns, TOTAL kanban, ATEX info, WOM visit, BOP quote mod, project schedule, meeting with patent attorney, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-16 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 11 0 financing schedule review, milestone schedule creation, kanban, finance methodology structure, patent meeting, camp specs, wireline arrangement for Canrig, kanban meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, mid year review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-17 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 financing schedule review, milestone schedule creation, kanban, finance methodology structure, patent meeting, camp specs, wireline arrangement for Canrig, kanban meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-17 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8 0 Gulf Keystone tender support, HKN Energy tender support, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, mid year review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-18 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 9.5 0 Gulf Keystone tender support, HKN Energy tender support, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-19 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2.25 0 Review drawing mark ups with Tyler Cook and Lam, establish path forward, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-19 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6 0 financing schedule review, milestone schedule creation, kanban, finance methodology structure, patent meeting, camp specs, wireline arrangement for Canrig, kanban meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-20 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 financing schedule review, milestone schedule creation, kanban, finance methodology structure, patent meeting, camp specs, wireline arrangement for Canrig, kanban meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-20 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3 0 Gulf Keystone tender support, HKN Energy tender support, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-23 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.75 0 kanban meeting, opportunities meeting, modify tech spec, research IDE and IEC, conf call with Master Rig, update tech spec, review and have conf call with IDS, create closure email on scope split idea, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 TSR board meeting, TSR weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-23 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 7.5 0 HKN tender support, Gulf Keystone tender support, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-24 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.25 0 kanban meeting, opportunities meeting, modify tech spec, research IDE and IEC, conf call with Master Rig, update tech spec, review and have conf call with IDS, create closure email on scope split idea, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-24 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5 0 HKN tender support, Gulf Keystone tender support, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-25 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6 0 kanban meeting, opportunities meeting, modify tech spec, research IDE and IEC, conf call with Master Rig, update tech spec, review and have conf call with IDS, create closure email on scope split idea, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-25 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1 0 HKN tender support, Gulf Keystone tender support, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-25 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 NOV WellData, Drillwell, Synopsis lunch and learn Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-26 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 Review redlines with Lam Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 kanban meeting, opportunities meeting, modify tech spec, research IDE and IEC, conf call with Master Rig, update tech spec, review and have conf call with IDS, create closure email on scope split idea, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR board meeting, TSR weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-26 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 2 0 HKN tender support, Gulf Keystone tender support, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-27 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 6 0 SEMS Package Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-30 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.25 0 IDS confusion, review of WOM BOP quote, IDS/HH email, IDS visit, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-30 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5 0 265 and 269 tender support Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-31 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 IDS confusion, review of WOM BOP quote, IDS/HH email, IDS visit, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-31 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 6 0 SEMS Package Design docs, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-01 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Review Lam's first 5 drawings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-01 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4.25 0 IDS confusion, review of WOM BOP quote, IDS/HH email, IDS visit, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-01 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3.75 0 SEMS Package Design docs, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 TSR weekly meeting and quarterly earnings meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-02 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 2 0 Review XTO opportunity, review plan for Lewis rigs inspection, create travel plan, go home and pack Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-02 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 Houston to Freer, Freer to Encinal, Encinal back to Houston Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-02 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3 0 SEMS Package Design docs, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-03 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 5.5 0 Review XTO opportunity, review plan for Lewis rigs inspection, create travel plan, go home and pack Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-03 OH-010 :OH-010 Overhead All Activities Regular Pay N 6 0 Houston to Freer, Freer to Encinal, Encinal back to Houston Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-06 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Review drawings from Lam, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 review quote from WOM, request high level drawing from IDS, high level block diagram, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 TSR board meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-06 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 4 0 dump pictures, fill out digital copy of inspection report, review cost estimate, cost estimate meeting, modify cost estimate, create cost estimate for high spec rig option, modify high spec cost estimate, get info from GD and AB for mud pump cost, review HH300 rig, upload Drillmec pictures, review rig walking concerns, create cost estimate for walking 157ft, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-06 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1 0 creating alarms document, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-07 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 review quote from WOM, request high level drawing from IDS, high level block diagram, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-07 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 5.5 0 dump pictures, fill out digital copy of inspection report, review cost estimate, cost estimate meeting, modify cost estimate, create cost estimate for high spec rig option, modify high spec cost estimate, get info from GD and AB for mud pump cost, review HH300 rig, upload Drillmec pictures, review rig walking concerns, create cost estimate for walking 157ft, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-08 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.5 0 review quote from WOM, request high level drawing from IDS, high level block diagram, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-08 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 5.75 0 dump pictures, fill out digital copy of inspection report, review cost estimate, cost estimate meeting, modify cost estimate, create cost estimate for high spec rig option, modify high spec cost estimate, get info from GD and AB for mud pump cost, review HH300 rig, upload Drillmec pictures, review rig walking concerns, create cost estimate for walking 157ft, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-09 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 review quote from WOM, request high level drawing from IDS, high level block diagram, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-09 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 8.75 0 dump pictures, fill out digital copy of inspection report, review cost estimate, cost estimate meeting, modify cost estimate, create cost estimate for high spec rig option, modify high spec cost estimate, get info from GD and AB for mud pump cost, review HH300 rig, upload Drillmec pictures, review rig walking concerns, create cost estimate for walking 157ft, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-10 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 6 0 dump pictures, fill out digital copy of inspection report, review cost estimate, cost estimate meeting, modify cost estimate, create cost estimate for high spec rig option, modify high spec cost estimate, get info from GD and AB for mud pump cost, review HH300 rig, upload Drillmec pictures, review rig walking concerns, create cost estimate for walking 157ft, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-13 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 6.25 0 add info to cost estimate, search for suppliers in Argentina, meeting with Karma and Patricia, rig mat layout, various equipment checks, dims and weights, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-14 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 7.25 0 add info to cost estimate, search for suppliers in Argentina, meeting with Karma and Patricia, rig mat layout, various equipment checks, dims and weights, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-14 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Loadmaster Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-15 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 6 0 add info to cost estimate, search for suppliers in Argentina, meeting with Karma and Patricia, rig mat layout, various equipment checks, dims and weights, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-15 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3.5 0 Fire Detection System Description Document, PSV and Pressure Vessel Research and Registry, finish up SEMS formatting and consolidation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-16 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1.5 0 hours summary, invoices, review and mark up drawings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-16 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1.5 0 add info to cost estimate, search for suppliers in Argentina, meeting with Karma and Patricia, rig mat layout, various equipment checks, dims and weights, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-16 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4.75 0 Fire Detection System Description Document, PSV and Pressure Vessel Research and Registry, finish up SEMS formatting and consolidation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-17 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 hours summary, invoices, review and mark up drawings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-17 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4.5 0 Fire Detection System Description Document, PSV and Pressure Vessel Research and Registry, finish up SEMS formatting and consolidation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-20 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1.5 0 Review Lam's drawings, change and modify accordingly, review again, create invoice for August Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board meeting, TSR weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-20 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4.5 0 Pick up rev B comments, update accordingly, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-21 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 9 0 Review Lam's drawings, change and modify accordingly, review again, create invoice for August Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 emails, discussions with operations, 2018 Goals Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-22 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8.25 0 Review Lam's drawings, change and modify accordingly, review again, create invoice for August Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails, discussions with operations, 2018 Goals Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-23 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 3 0 Review Lam's drawings, change and modify accordingly, review again, create invoice for August Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR board meeting, TSR weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails, discussions with operations, 2018 Goals Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-23 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 Bid sheet and tender process training Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 5.5 0 emails, discussions with operations, 2018 Goals Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-27 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 9 0 status meetings, cost estimates, tech specs, schedules, all for YPF proposal, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-28 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 11 0 status meetings, cost estimates, tech specs, schedules, all for YPF proposal, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-29 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 11.5 0 status meetings, cost estimates, tech specs, schedules, all for YPF proposal, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 2017 goals Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-30 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 8.5 0 status meetings, cost estimates, tech specs, schedules, all for YPF proposal, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-31 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 2017 goals Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-31 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1 0 status meetings, cost estimates, tech specs, schedules, all for YPF proposal, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-08-31 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Meeting with Entro, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Holiday Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-04 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Rig Completeness list, Five Dysfunctions of a Team Poster, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-04 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 6.5 0 Option 6 with expedited schedule Option 5 cost estimate Submitted both Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-05 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 6 0 Creating solidworks model and running FEA, create CTR, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-05 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1.5 0 Option 6 with expedited schedule Option 5 cost estimate Submitted both Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-05 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1.5 0 consolidate and submit SEMS closeout report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-06 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 3 0 Creating solidworks model and running FEA, create CTR, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Rig Completeness list, Five Dysfunctions of a Team Poster, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 BP RFI support, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-06 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 2.5 0 Option 6 with expedited schedule Option 5 cost estimate Submitted both Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-07 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 0.5 0 Creating solidworks model and running FEA, create CTR, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 Rig Completeness list, Five Dysfunctions of a Team Poster, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 BP RFI support, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-07 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1.5 0 Option 6 with expedited schedule Option 5 cost estimate Submitted both Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-10 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 0.5 0 Review with Kyle Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-10 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.5 0 Send emails for updated quotes, start new cost estimate, review options with George Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-10 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 5 0 create TPPs and MRs Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 BP North Sea RFI review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-11 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 1.5 0 draw out receiver fittings and list all items, call Aleksey and review with Ralph Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-11 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4.5 0 Send emails for updated quotes, start new cost estimate, review options with George Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-11 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 3 0 create TPPs and MRs Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-11 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 0.5 0 review pressure vessel and PSV registers Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-12 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 0.5 0 draw out receiver fittings and list all items, call Aleksey and review with Ralph Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-12 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6 0 Send emails for updated quotes, start new cost estimate, review options with George Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-12 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 2.5 0 create TPPs and MRs Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-13 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 0.5 0 draw out receiver fittings and list all items, call Aleksey and review with Ralph Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-13 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 Send emails for updated quotes, start new cost estimate, review options with George Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-13 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 0.5 0 create TPPs and MRs Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-13 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Compliance, PE prep course, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-14 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 Compliance, PE prep course, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-17 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 2 0 Review and adjust closeout information, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-17 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Review quotes and update cost tracking spreadsheet, review TSC connection, verify patent timing, request quote, review new WOM quote and adjust tracking spreadsheet, review Shelter quote Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-17 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 5 0 Review drawing and BOM with Kyle, prep for pressure test, witness pressure test at AMC facility, create scope of work for lifting padeyes, request quote, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-18 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.5 0 Review quotes and update cost tracking spreadsheet, review TSC connection, verify patent timing, request quote, review new WOM quote and adjust tracking spreadsheet, review Shelter quote Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-18 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 1 0 Verification of compressor information Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-18 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1.5 0 Verify PSV and Vessel information, mark up drawings, PDF and rev up design package Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-18 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 2.5 0 Review drawing and BOM with Kyle, prep for pressure test, witness pressure test at AMC facility, create scope of work for lifting padeyes, request quote, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-18 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 1.5 0 Meeting with Genesis, create and send formal RFI to Sakhalin, Review RFI response and forward to Genesis Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-19 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 3.5 0 adjust force and rerun FEA, make changes to model and rerun FEA, create structural analysis report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-19 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Review quotes and update cost tracking spreadsheet, review TSC connection, verify patent timing, request quote, review new WOM quote and adjust tracking spreadsheet, review Shelter quote Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-19 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3 0 Verify PSV and Vessel information, mark up drawings, PDF and rev up design package Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-19 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 Review drawing and BOM with Kyle, prep for pressure test, witness pressure test at AMC facility, create scope of work for lifting padeyes, request quote, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-19 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 1 0 Meeting with Genesis, create and send formal RFI to Sakhalin, Review RFI response and forward to Genesis Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-20 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 2.5 0 adjust force and rerun FEA, make changes to model and rerun FEA, create structural analysis report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-20 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Review quotes and update cost tracking spreadsheet, review TSC connection, verify patent timing, request quote, review new WOM quote and adjust tracking spreadsheet, review Shelter quote Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-20 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 2.5 0 Verify PSV and Vessel information, mark up drawings, PDF and rev up design package Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-21 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 6 0 adjust force and rerun FEA, make changes to model and rerun FEA, create structural analysis report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-21 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 Review quotes and update cost tracking spreadsheet, review TSC connection, verify patent timing, request quote, review new WOM quote and adjust tracking spreadsheet, review Shelter quote Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-24 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 7 0 structural analysis report, adjust model, contact Sakhalin about changes, review and establish path forward, finish analysis report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-24 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 review B&A quote, update tracking spreadsheet, looking into other sound attenuation companies, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-25 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 5.5 0 structural analysis report, adjust model, contact Sakhalin about changes, review and establish path forward, finish analysis report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-25 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 review B&A quote, update tracking spreadsheet, looking into other sound attenuation companies, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-25 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Validate IHS account and research API 20E and 20F for Mark Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-25 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 detail the path forward for AMC to finish the padeyes, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-26 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 3 0 structural analysis report, adjust model, contact Sakhalin about changes, review and establish path forward, finish analysis report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.5 0 review B&A quote, update tracking spreadsheet, looking into other sound attenuation companies, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-26 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1.5 0 Validate IHS account and research API 20E and 20F for Mark Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-26 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 0.5 0 Status updates, review and forward info from RFIs, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-27 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 3 0 structural analysis report, adjust model, contact Sakhalin about changes, review and establish path forward, finish analysis report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4.5 0 review B&A quote, update tracking spreadsheet, looking into other sound attenuation companies, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-27 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 detail the path forward for AMC to finish the padeyes, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-27 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 0.5 0 Status updates, review and forward info from RFIs, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-09-28 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 PE prep course Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-01 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 8.25 0 finished analysis, finished closeout, picked up Kyle's redlines, finish closeout, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-02 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 1.5 0 finished analysis, finished closeout, picked up Kyle's redlines, finish closeout, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Tender Checklist and Rig Completeness Survey (2018 Goals), TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 4.5 0 Tender Checklist and Rig Completeness Survey (2018 Goals), TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-03 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 3 0 Review TSR for substructure design, create list of questions, create SOW Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-03 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1 0 Modify air system drawings, update MDR, update design package, and update closeout Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-04 OH-005 :OH-005 Overhead All Activities Regular Pay N 3.25 0 Tender Checklist and Rig Completeness Survey (2018 Goals), TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-04 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 2.5 0 Review TSR for substructure design, create list of questions, create SOW Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Prep for baby Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-08 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 My baby girl - Everly ! Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-09 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 My baby girl - Everly ! Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-10 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 My baby girl - Everly ! Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-11 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 My baby girl - Everly ! Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-12 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 My baby girl - Everly ! Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-15 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 1 0 Review Ante's comments and respond, modify closeout and resubmit Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails and discussions Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-15 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1.5 0 exhaust stack issue discussion with James, review different designs, talk with CRG, discuss options with Mark, create 3D model and send to Mark Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-15 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 4.5 0 Review current status, get dimensions from sketchup model, send clarification to Genesis, model beam clamp design, modify gusset design, send to Tecky, try to find offtheshelf clamp solution Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 emails and discussions Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-16 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 2 0 Review current status, get dimensions from sketchup model, send clarification to Genesis, model beam clamp design, modify gusset design, send to Tecky, try to find offtheshelf clamp solution Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-17 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 2 0 Create MTO Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-17 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 2 0 Review Ante's comments and respond, modify closeout and resubmit Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 emails and discussions Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-17 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 exhaust stack issue discussion with James, review different designs, talk with CRG, discuss options with Mark, create 3D model and send to Mark Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-17 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 1 0 Review current status, get dimensions from sketchup model, send clarification to Genesis, model beam clamp design, modify gusset design, send to Tecky, try to find offtheshelf clamp solution Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-18 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 6 0 Create MTO Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-18 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 3 0 exhaust stack issue discussion with James, review different designs, talk with CRG, discuss options with Mark, create 3D model and send to Mark Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-10-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 5 0 Working on rewriting the PM procedure for the drawworks. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Researched PM manuals for the drawworks. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 5 0 Working on rewriting the PM procedure for the drawworks. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Researched PM manuals for the drawworks. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Working on rewriting the PM procedure for the drawworks. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Researched PM manuals for the drawworks. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-08-26 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 Supervising the removal of equipment from the rig that will be disposed of or sent from refurbishment. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-08-27 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 Supervising the removal of equipment from the rig that will be disposed of or sent from refurbishment. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-08-28 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 Supervising the removal of equipment from the rig that will be disposed of or sent from refurbishment. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-08-29 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 Supervising the removal of equipment from the rig that will be disposed of or sent from refurbishment. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-08-30 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 Supervising the removal of equipment from the rig that will be disposed of or sent from refurbishment. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-08-31 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 Supervising the removal of equipment from the rig that will be disposed of or sent from refurbishment. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-09-01 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 Supervising the removal of equipment from the rig that will be disposed of or sent from refurbishment. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-09-02 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-09-03 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-09-04 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-09-05 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-09-06 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-09-07 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-09-08 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-09-16 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-09-17 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-09-18 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-09-19 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-09-20 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-09-21 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-09-22 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-09-23 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-09-24 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-09-25 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-09-26 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-09-27 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-09-28 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-09-29 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-09-30 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Working on drawings with engineering. Flew home Friday Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-10-01 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Working on drawings with engineering. Flew home Friday Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-10-02 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Working on drawings with engineering. Flew home Friday Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-10-03 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Working on drawings with engineering. Flew home Friday Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-10-04 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Working on drawings with engineering. Flew home Friday Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-10-05 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 12 0 Working on Holly project removing equipment and cleaning platform. Working on drawings with engineering. Flew home Friday Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-10-09 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 8 0 Drawing for Holly Platform HP Discharge, LP Mud Mixing and Charging systems. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-10-10 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 8 0 Drawing for Holly Platform HP Discharge, LP Mud Mixing and Charging systems. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-10-11 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 8 0 Drawing for Holly Platform HP Discharge, LP Mud Mixing and Charging systems. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-10-13 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 8 0 Drawing for Holly Platform HP Discharge, LP Mud Mixing and Charging systems. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-10-14 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4 0 Drawing on Suction and discharge piping, meetings and planning. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-10-15 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 6 0 Drawing on Suction and discharge piping, meetings and planning. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-10-16 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 6 0 Drawing on Suction and discharge piping, meetings and planning. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-10-17 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 6 0 Drawing on Suction and discharge piping, meetings and planning. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-10-18 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 6 0 Drawing on Suction and discharge piping, meetings and planning. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-10-19 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 6 0 Drawing on Suction and discharge piping, meetings and planning. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-10-20 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 6 0 Drawing on Suction and discharge piping, meetings and planning. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-10-21 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 5 0 Drawing on Suction and discharge piping, meetings and planning. flew to California for meetings on Tuesday back home Thursday. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-10-22 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 6 0 Drawing on Suction and discharge piping, meetings and planning. flew to California for meetings on Tuesday back home Thursday. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-10-23 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 12 0 Drawing on Suction and discharge piping, meetings and planning. flew to California for meetings on Tuesday back home Thursday. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-10-24 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 12 0 Drawing on Suction and discharge piping, meetings and planning. flew to California for meetings on Tuesday back home Thursday. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-10-25 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 12 0 Drawing on Suction and discharge piping, meetings and planning. flew to California for meetings on Tuesday back home Thursday. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (01/02/18) Team meeting. (01/04/18) Weekly TSR meeting (01/05/18) Team meeting. AutoCAD pricing discussion. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-02 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 8.75 0 (01/02/18) Continued work on 77B safety plans. Created drawing progress sheet. (01/04/18) Continued with safety plan revisions. (01/05/18) General progress discussion with Tyler. Worked on GA revisions. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (01/03/18) Scheduled meeting to discuss AutoCAD pricing for 2018'. Updated weekly timesheet and submitted. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-03 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 6.75 0 (01/03/18) Discussed 257B stack drawings with George. Searched for reference info. Revised drawings and sent PDFs (01/05/18) Revised 257B drawings for BP proposal. Discussed with Marina. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (01/03/18) Checked 209L cantilevered walkway drawing. (01/04/18) Completed drawing check - discussed redlines. (01/05/18) Back-check 209L hanging platform. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (01/02/18) Team meeting. (01/04/18) Weekly TSR meeting (01/05/18) Team meeting. AutoCAD pricing discussion. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (01/03/18) Checked 209L cantilevered walkway drawing. (01/04/18) Completed drawing check - discussed redlines. (01/05/18) Back-check 209L hanging platform. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-04 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 7.25 0 (01/02/18) Continued work on 77B safety plans. Created drawing progress sheet. (01/04/18) Continued with safety plan revisions. (01/05/18) General progress discussion with Tyler. Worked on GA revisions. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (01/02/18) Team meeting. (01/04/18) Weekly TSR meeting (01/05/18) Team meeting. AutoCAD pricing discussion. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-05 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2 0 (01/03/18) Discussed 257B stack drawings with George. Searched for reference info. Revised drawings and sent PDFs (01/05/18) Revised 257B drawings for BP proposal. Discussed with Marina. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (01/03/18) Checked 209L cantilevered walkway drawing. (01/04/18) Completed drawing check - discussed redlines. (01/05/18) Back-check 209L hanging platform. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-05 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3 0 (01/02/18) Continued work on 77B safety plans. Created drawing progress sheet. (01/04/18) Continued with safety plan revisions. (01/05/18) General progress discussion with Tyler. Worked on GA revisions. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (01/08/18) Team meeting. (01/10/18) Team meeting. (01/11/18) Weekly TSR meeting. (01/12/18) Met to discuss CAD standards/improvements for 2018'. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-08 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 (01/08/18) Revised 258L HP schematic. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-08 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 7.75 0 (01/08/18) Revised 77B Drill floor/helideck GAs. Updated progress sheet. (01/09/18) 77B Quarters arrangements. (01/10/18) Revised 77B Engine cooling P&ID. (01/11/18) Started 77B Drill water P&ID (01/12/18) Cont'd Drill water. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 (01/09/18) Back checked 209L lift device. (01/10/18) Transmitted/Archived 209L lift device drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (01/09/18) Updated timesheet and submitted for approval. Scheduled meeting for titleblock review. (01/10/18) Discussed performance review/general status with Kyle. Sent out folder structure guide to group. (01/11/18) Worked on design groups performance reviews. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-09 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 2 0 (01/09/18) 258L BOP/Diverter drawing revisions for BP tender. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-09 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4.75 0 (01/08/18) Revised 77B Drill floor/helideck GAs. Updated progress sheet. (01/09/18) 77B Quarters arrangements. (01/10/18) Revised 77B Engine cooling P&ID. (01/11/18) Started 77B Drill water P&ID (01/12/18) Cont'd Drill water. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (01/08/18) Team meeting. (01/10/18) Team meeting. (01/11/18) Weekly TSR meeting. (01/12/18) Met to discuss CAD standards/improvements for 2018'. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 (01/09/18) Back checked 209L lift device. (01/10/18) Transmitted/Archived 209L lift device drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (01/09/18) Updated timesheet and submitted for approval. Scheduled meeting for titleblock review. (01/10/18) Discussed performance review/general status with Kyle. Sent out folder structure guide to group. (01/11/18) Worked on design groups performance reviews. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-10 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 7.25 0 (01/08/18) Revised 77B Drill floor/helideck GAs. Updated progress sheet. (01/09/18) 77B Quarters arrangements. (01/10/18) Revised 77B Engine cooling P&ID. (01/11/18) Started 77B Drill water P&ID (01/12/18) Cont'd Drill water. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (01/08/18) Team meeting. (01/10/18) Team meeting. (01/11/18) Weekly TSR meeting. (01/12/18) Met to discuss CAD standards/improvements for 2018'. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 (01/09/18) Updated timesheet and submitted for approval. Scheduled meeting for titleblock review. (01/10/18) Discussed performance review/general status with Kyle. Sent out folder structure guide to group. (01/11/18) Worked on design groups performance reviews. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-11 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 2.25 0 (01/08/18) Revised 77B Drill floor/helideck GAs. Updated progress sheet. (01/09/18) 77B Quarters arrangements. (01/10/18) Revised 77B Engine cooling P&ID. (01/11/18) Started 77B Drill water P&ID (01/12/18) Cont'd Drill water. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (01/08/18) Team meeting. (01/10/18) Team meeting. (01/11/18) Weekly TSR meeting. (01/12/18) Met to discuss CAD standards/improvements for 2018'. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-12 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3.75 0 (01/08/18) Revised 77B Drill floor/helideck GAs. Updated progress sheet. (01/09/18) 77B Quarters arrangements. (01/10/18) Revised 77B Engine cooling P&ID. (01/11/18) Started 77B Drill water P&ID (01/12/18) Cont'd Drill water. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-12 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1.25 0 (01/12/18) Final drawing check. Issued drawings and archived files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (01/15/18) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (01/15/18) Archived 209L platform drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-15 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 8.5 0 (01/15/18) Updated progress sheet. Started fire water P&ID. Assigned Dan to rig air. (01/18/18) 77B Potable water P&ID. (01/19/18) Cont'd pot water. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Office closure. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Office closure. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 (01/18/18) Reviewed drawing request from the field. Searched for ref info. Discussed 272/273 TSRs with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-18 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1.5 0 (01/18/18) 265L Hawkjaw padeye research. Created drawing and sent to Mat for info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-18 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 6.5 0 (01/15/18) Updated progress sheet. Started fire water P&ID. Assigned Dan to rig air. (01/18/18) 77B Potable water P&ID. (01/19/18) Cont'd pot water. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-19 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 6 0 (01/15/18) Updated progress sheet. Started fire water P&ID. Assigned Dan to rig air. (01/18/18) 77B Potable water P&ID. (01/19/18) Cont'd pot water. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (01/22/18) Team meeting. Meeting with Kyle to discuss performance reviews. (01/24/18) Team meeting. (01/25/18) Weekly TSR meeting. Safer union product meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (01/22/18) Updated weekly timesheets and submitted for approval. (01/23/18) Updated designer performance reviews. Loaded new AutoCAD menus for 2018 install. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-22 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 7 0 (01/22/18) Finalized potable water P&ID. Started bulk mud system P&ID. (01/23/18) Started 77B LP mud P&ID. (01/24/18) Finalized LP mud and started HP mud. (01/25/18) Started 77B drain schematic. (01/26/18) Cleaned up drain format. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (01/22/18) Updated weekly timesheets and submitted for approval. (01/23/18) Updated designer performance reviews. Loaded new AutoCAD menus for 2018 install. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-23 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 7 0 (01/22/18) Finalized potable water P&ID. Started bulk mud system P&ID. (01/23/18) Started 77B LP mud P&ID. (01/24/18) Finalized LP mud and started HP mud. (01/25/18) Started 77B drain schematic. (01/26/18) Cleaned up drain format. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (01/22/18) Team meeting. Meeting with Kyle to discuss performance reviews. (01/24/18) Team meeting. (01/25/18) Weekly TSR meeting. Safer union product meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-24 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (01/24/18) Checked DM-DSM platform redlines. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-24 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 7.75 0 (01/22/18) Finalized potable water P&ID. Started bulk mud system P&ID. (01/23/18) Started 77B LP mud P&ID. (01/24/18) Finalized LP mud and started HP mud. (01/25/18) Started 77B drain schematic. (01/26/18) Cleaned up drain format. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 (01/22/18) Team meeting. Meeting with Kyle to discuss performance reviews. (01/24/18) Team meeting. (01/25/18) Weekly TSR meeting. Safer union product meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-25 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 7 0 (01/22/18) Finalized potable water P&ID. Started bulk mud system P&ID. (01/23/18) Started 77B LP mud P&ID. (01/24/18) Finalized LP mud and started HP mud. (01/25/18) Started 77B drain schematic. (01/26/18) Cleaned up drain format. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-26 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3 0 (01/22/18) Finalized potable water P&ID. Started bulk mud system P&ID. (01/23/18) Started 77B LP mud P&ID. (01/24/18) Finalized LP mud and started HP mud. (01/25/18) Started 77B drain schematic. (01/26/18) Cleaned up drain format. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-26 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 3 0 (01/26/18) First check on west stair/platform drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (01/29/18) Team meeting. group discussion about platform concepts. (01/31/18) Team meeting. (02/01/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (01/29/18) Updated weekly timesheet and submitted. (01/30/18) Discussed reviews with Kyle. scheduled reviews with design group. Discussed CAD invoice with Lam. (01/31/18) Performance review meetings with design group. My performance review with Kyle. (02/01/18) Updated weekly timesheet and submitted. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-29 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 (01/29/18) Researched 265 mast info and sent to Mat. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-29 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 5 0 (01/29/18) Started BOP control schematic and Well control sch. (01/29/18) Cont well control updates. (02/01/18) Started hazardous are drawings. Discussed with Sachin/Tyler. (02/02/18) Started 77B ballast P&ID. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-29 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 1 0 (01/29/18) Finalized dwg check and discussed with Lam. (01/31/18) Checked ext walkway drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (01/29/18) Team meeting. group discussion about platform concepts. (01/31/18) Team meeting. (02/01/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (01/29/18) Updated weekly timesheet and submitted. (01/30/18) Discussed reviews with Kyle. scheduled reviews with design group. Discussed CAD invoice with Lam. (01/31/18) Performance review meetings with design group. My performance review with Kyle. (02/01/18) Updated weekly timesheet and submitted. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-30 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 7 0 (01/29/18) Started BOP control schematic and Well control sch. (01/29/18) Cont well control updates. (02/01/18) Started hazardous are drawings. Discussed with Sachin/Tyler. (02/02/18) Started 77B ballast P&ID. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (01/29/18) Team meeting. group discussion about platform concepts. (01/31/18) Team meeting. (02/01/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 (01/29/18) Updated weekly timesheet and submitted. (01/30/18) Discussed reviews with Kyle. scheduled reviews with design group. Discussed CAD invoice with Lam. (01/31/18) Performance review meetings with design group. My performance review with Kyle. (02/01/18) Updated weekly timesheet and submitted. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-31 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4.5 0 (01/29/18) Started BOP control schematic and Well control sch. (01/29/18) Cont well control updates. (02/01/18) Started hazardous are drawings. Discussed with Sachin/Tyler. (02/02/18) Started 77B ballast P&ID. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-31 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 1 0 (01/29/18) Finalized dwg check and discussed with Lam. (01/31/18) Checked ext walkway drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (01/29/18) Team meeting. group discussion about platform concepts. (01/31/18) Team meeting. (02/01/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-01 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 8.25 0 (01/29/18) Started BOP control schematic and Well control sch. (01/29/18) Cont well control updates. (02/01/18) Started hazardous are drawings. Discussed with Sachin/Tyler. (02/02/18) Started 77B ballast P&ID. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (01/29/18) Updated weekly timesheet and submitted. (01/30/18) Discussed reviews with Kyle. scheduled reviews with design group. Discussed CAD invoice with Lam. (01/31/18) Performance review meetings with design group. My performance review with Kyle. (02/01/18) Updated weekly timesheet and submitted. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-02 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 5 0 (01/29/18) Started BOP control schematic and Well control sch. (01/29/18) Cont well control updates. (02/01/18) Started hazardous are drawings. Discussed with Sachin/Tyler. (02/02/18) Started 77B ballast P&ID. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-07 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-08 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-09 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (02/12/18) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-12 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 8 0 (02/12/18) Reviewed comments from BP. Started drawing updates - 257B BOP stacks. (02/16/18) Created new BOP drawings with customer wellhead info - 257B Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-13 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-16 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 7.5 0 (02/12/18) Reviewed comments from BP. Started drawing updates - 257B BOP stacks. (02/16/18) Created new BOP drawings with customer wellhead info - 257B Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-20 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 9 0 (02/20/18) Created new BOP stack layouts for 257B - BP request. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (02/21/18) Updated weekly timesheets. (02/23/18) Updated timesheet and approved designers time. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-21 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 8 0 (02/21/18) Worked on 77B Fuel PFD, Ballast PFD, and Eng cooling. (02/22/18) Worked on Compressed air PFD, Bulk mud, and BOP control PFD. (02/23/18) Worked on 77B BOP stack drawing, and STBD side elevation GA. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (02/22/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-22 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 8 0 (02/21/18) Worked on 77B Fuel PFD, Ballast PFD, and Eng cooling. (02/22/18) Worked on Compressed air PFD, Bulk mud, and BOP control PFD. (02/23/18) Worked on 77B BOP stack drawing, and STBD side elevation GA. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (02/21/18) Updated weekly timesheets. (02/23/18) Updated timesheet and approved designers time. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 (02/23/18) Archived misc CAD files received from Sakhalin. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-23 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4.5 0 (02/21/18) Worked on 77B Fuel PFD, Ballast PFD, and Eng cooling. (02/22/18) Worked on Compressed air PFD, Bulk mud, and BOP control PFD. (02/23/18) Worked on 77B BOP stack drawing, and STBD side elevation GA. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-23 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 0.5 0 (02/23/18) Archived stair/platform drawings on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (02/26/18) team meeting. (02/28/18) team meeting. (03/01/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-26 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8.75 0 (02/26/18) DNO Drawing package (247/269). (02/27/18) Continued bid drawings. (02/28/18) Created safety plans. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (02/27/18) Archived CAD files from Sakhalin. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-27 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5 0 (02/26/18) DNO Drawing package (247/269). (02/27/18) Continued bid drawings. (02/28/18) Created safety plans. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-27 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3.75 0 (02/27/18) SEMS drawing check/ updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (02/26/18) team meeting. (02/28/18) team meeting. (03/01/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-28 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3 0 (02/26/18) DNO Drawing package (247/269). (02/27/18) Continued bid drawings. (02/28/18) Created safety plans. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-28 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 5.5 0 (02/28/18) Started platform drawing. (03/01/18) Cont platform drawing. (03/02/18) Cont platform drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (02/26/18) team meeting. (02/28/18) team meeting. (03/01/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-01 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 8.5 0 (02/28/18) Started platform drawing. (03/01/18) Cont platform drawing. (03/02/18) Cont platform drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-02 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 6 0 (02/28/18) Started platform drawing. (03/01/18) Cont platform drawing. (03/02/18) Cont platform drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-05 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 6.5 0 (03/05/18) Plot plan drawings for various well spacing. Dummy wellhouse sketch with dims. Drawing for Conoco meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-05 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 2.5 0 (03/05/18) Drawing check. (03/06/18) Updates and plots. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-05 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 (03/05/18) Checked new PBM door drawing. (03/07/18) Worked on platform. (03/08/18) Cont platform. (03/09/18) Cont platform. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-06 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 9 0 (03/05/18) Drawing check. (03/06/18) Updates and plots. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/06/18) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (03/05/18) Updated weekly timesheet and submitted for approval. (03/07/18) Researched safety topic. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-07 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 7.75 0 (03/05/18) Checked new PBM door drawing. (03/07/18) Worked on platform. (03/08/18) Cont platform. (03/09/18) Cont platform. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-08 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 (03/08/18) Checked pipe support drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-08 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 8 0 (03/05/18) Checked new PBM door drawing. (03/07/18) Worked on platform. (03/08/18) Cont platform. (03/09/18) Cont platform. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-09 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 5.75 0 (03/05/18) Checked new PBM door drawing. (03/07/18) Worked on platform. (03/08/18) Cont platform. (03/09/18) Cont platform. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/12/18) Team meeting. (03/15/18) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-12 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 (03/12/18) Searched for info per field request - 55B Mast (03/13/18) Cont search for mast info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-12 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 5.75 0 (03/14/18) Started drawing changes. (03/16/18) Cont changes Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (03/13/18) Archived CAD files for 209L/Orlan. Updated weekly timesheet and submitted. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-13 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3 0 (03/13/18) Searched for drawings per field request from Dan Colby. (03/14/18) Discussed drawings with Dan - searched for additional piping information. Sent info to Dan . Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-13 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 (03/12/18) Searched for info per field request - 55B Mast (03/13/18) Cont search for mast info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-13 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 3 0 (03/13/18) Started ISO drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-14 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3 0 (03/13/18) Searched for drawings per field request from Dan Colby. (03/14/18) Discussed drawings with Dan - searched for additional piping information. Sent info to Dan . Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-14 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 2 0 (03/14/18) Created new drawings for DNO per request from Nancy. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-14 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 4 0 (03/14/18) Started drawing changes. (03/16/18) Cont changes Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/12/18) Team meeting. (03/15/18) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-15 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 8.75 0 (03/14/18) Started drawing changes. (03/16/18) Cont changes Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-16 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 6 0 (03/14/18) Started drawing changes. (03/16/18) Cont changes Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/19/18) Team meeting. (03/22/18) Weekly TSR meeting. (03/23/18) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (03/19/18) Updated weekly timesheets and submitted. Reviewed designers timesheets. (03/20/18) Discussed titleblock format/updates with Lam. (03/22/18) Researched safety topic and IMS moment. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-19 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 (03/19/18) researched electrical information for George- 257B. Sent drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-19 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 (03/19/18) Searched for reference mast info for Bob W. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-19 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 (03/19/18) Searched for ref. choke/kill information for George. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-19 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 (03/19/18) Cont'd on ISO drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-19 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 3.5 0 (03/19/18) Finalized platform drawing. (03/20/18) Checked 209L stair mod drawing. (03/21/18) Archived platform drawing on the Q. Back checked stair mod drawing. (03/23/18) Archived stair mod drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-20 HTSG-TSR :HTSG-TSR 2018-SMART-Goals Development Goals Regular Pay N 1 0 (03/20/18) Started Solidworks tutorial - (Parts/Drawings) (03/21/18) Cont tutorial. (03/22/18) Cont tutorial. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (03/19/18) Updated weekly timesheets and submitted. Reviewed designers timesheets. (03/20/18) Discussed titleblock format/updates with Lam. (03/22/18) Researched safety topic and IMS moment. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-20 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 5.5 0 (03/20/18) Reviewed MOC request from 249L. Started sketch. (03/21/18) Researched design options. (03/22/18) Sketched different options. (03/23/18) Cont with options. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-20 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 (03/20/18) Checked padeye drawing. (03/21/18) Archived padeye drawing on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-20 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 (03/19/18) Finalized platform drawing. (03/20/18) Checked 209L stair mod drawing. (03/21/18) Archived platform drawing on the Q. Back checked stair mod drawing. (03/23/18) Archived stair mod drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-21 HTSG-TSR :HTSG-TSR 2018-SMART-Goals Development Goals Regular Pay N 4 0 (03/20/18) Started Solidworks tutorial - (Parts/Drawings) (03/21/18) Cont tutorial. (03/22/18) Cont tutorial. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-21 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 3.25 0 (03/20/18) Reviewed MOC request from 249L. Started sketch. (03/21/18) Researched design options. (03/22/18) Sketched different options. (03/23/18) Cont with options. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-21 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 0.25 0 (03/20/18) Checked padeye drawing. (03/21/18) Archived padeye drawing on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-21 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1.5 0 (03/19/18) Finalized platform drawing. (03/20/18) Checked 209L stair mod drawing. (03/21/18) Archived platform drawing on the Q. Back checked stair mod drawing. (03/23/18) Archived stair mod drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-22 HTSG-TSR :HTSG-TSR 2018-SMART-Goals Development Goals Regular Pay N 4 0 (03/20/18) Started Solidworks tutorial - (Parts/Drawings) (03/21/18) Cont tutorial. (03/22/18) Cont tutorial. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (03/19/18) Team meeting. (03/22/18) Weekly TSR meeting. (03/23/18) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (03/19/18) Updated weekly timesheets and submitted. Reviewed designers timesheets. (03/20/18) Discussed titleblock format/updates with Lam. (03/22/18) Researched safety topic and IMS moment. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-22 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 3 0 (03/20/18) Reviewed MOC request from 249L. Started sketch. (03/21/18) Researched design options. (03/22/18) Sketched different options. (03/23/18) Cont with options. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/19/18) Team meeting. (03/22/18) Weekly TSR meeting. (03/23/18) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-23 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 5.5 0 (03/20/18) Reviewed MOC request from 249L. Started sketch. (03/21/18) Researched design options. (03/22/18) Sketched different options. (03/23/18) Cont with options. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-23 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 0.25 0 (03/19/18) Finalized platform drawing. (03/20/18) Checked 209L stair mod drawing. (03/21/18) Archived platform drawing on the Q. Back checked stair mod drawing. (03/23/18) Archived stair mod drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/26/18) Team meeting. (03/28/18) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (03/27/18) Saved downloaded vendor drawings to the template folder. Updated weekly timesheet. General drawing status discussion. (03/28/18) Status update with designers. Updated work pack progress list. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-26 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 5.75 0 (03/26/18) Continued layout/options. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-26 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 (03/26/18) Checked first group of drawings completed. (03/27/18) Stated work pack drawings. Searched for ref drawings and discussed scope with John. (03/28/18) Continued work packs. Checked updated drawings for Lam. Archived work bench dwg. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-26 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 (03/27/18) Checked updated GA/Safety plan drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (03/27/18) Saved downloaded vendor drawings to the template folder. Updated weekly timesheet. General drawing status discussion. (03/28/18) Status update with designers. Updated work pack progress list. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-27 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 7 0 (03/26/18) Checked first group of drawings completed. (03/27/18) Stated work pack drawings. Searched for ref drawings and discussed scope with John. (03/28/18) Continued work packs. Checked updated drawings for Lam. Archived work bench dwg. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/26/18) Team meeting. (03/28/18) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (03/27/18) Saved downloaded vendor drawings to the template folder. Updated weekly timesheet. General drawing status discussion. (03/28/18) Status update with designers. Updated work pack progress list. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-28 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1 0 (03/28/18) Pulled reference drawings and sent to Benny. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-28 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 (03/28/18) First check - choke manifold support skid. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-28 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 5.25 0 (03/26/18) Checked first group of drawings completed. (03/27/18) Stated work pack drawings. Searched for ref drawings and discussed scope with John. (03/28/18) Continued work packs. Checked updated drawings for Lam. Archived work bench dwg. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 (03/29/18) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-30 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (04/02/18) Team meeting. (04/05/18) Weekly TSR meeting - Minkit presentation. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 (04/02/18) Discussed 2M-TEK TSR with Tyler. Discussed drawing list/options. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-02 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 5.75 0 (04/02/18) Researched chain/connection components for no-go bar design. (04/03/18) Updated chain configuration. Emailed concept to field for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-02 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 (04/02/18) Back checked ckoke skid drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-02 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 (04/02/18) Discussed workpack drawings with John-revised drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-03 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 9 0 (04/02/18) Researched chain/connection components for no-go bar design. (04/03/18) Updated chain configuration. Emailed concept to field for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (04/04/18) Updated weekly timesheet and submitted. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-04 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 1 0 (04/04/18) Pulled geothermal BOP stack info for Gary B. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-04 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 7 0 (04/04/18) Reviewed scope and pulled reference data for background layout. (04/05/18) Continued drawing. (04/06/18) Discussed drawing with John - made changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (04/02/18) Team meeting. (04/05/18) Weekly TSR meeting - Minkit presentation. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-05 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 2 0 (04/05/18) Searched for pony sub drawings for 122, 221, and 256 - Al M. (04/06/18) Pony sub/BOP stack layouts for Al. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-05 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 6 0 (04/04/18) Reviewed scope and pulled reference data for background layout. (04/05/18) Continued drawing. (04/06/18) Discussed drawing with John - made changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-06 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 3.5 0 (04/05/18) Searched for pony sub drawings for 122, 221, and 256 - Al M. (04/06/18) Pony sub/BOP stack layouts for Al. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-06 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 2.5 0 (04/04/18) Reviewed scope and pulled reference data for background layout. (04/05/18) Continued drawing. (04/06/18) Discussed drawing with John - made changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (04/09/18) Team meeting. (04/12/18) Weekly TSR meeting. Met to discuss 2M-TEK TSR/drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-09 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 8.5 0 (04/09/18) Detailed drawing layout. (04/10/18) Continued details. (04/11/18) Final drawing changes. Issued drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-10 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1.25 0 (04/09/18) 211 plot plan layouts for Al. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-10 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 0.75 0 (04/10/18) First check - hatch/ladder. (04/11/18) Continued checking. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-10 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 7 0 (04/09/18) Detailed drawing layout. (04/10/18) Continued details. (04/11/18) Final drawing changes. Issued drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-11 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 5.25 0 (04/11/18) Started detailed drawing for No-go bar design per field request. (04/12/18) Continued bar details. (04/13/18) Reviewed design with John/Updated file. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-11 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 0.75 0 (04/10/18) First check - hatch/ladder. (04/11/18) Continued checking. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-11 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 3 0 (04/09/18) Detailed drawing layout. (04/10/18) Continued details. (04/11/18) Final drawing changes. Issued drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 (04/09/18) Team meeting. (04/12/18) Weekly TSR meeting. Met to discuss 2M-TEK TSR/drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (04/12/18) Updated weekly timesheet and submitted. Archived misc. TSR drawings. (04/13/18) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-12 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 5.5 0 (04/11/18) Started detailed drawing for No-go bar design per field request. (04/12/18) Continued bar details. (04/13/18) Reviewed design with John/Updated file. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-13 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2.5 0 (04/13/18) Drawing review. discussed format with Tyler/Dan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (04/12/18) Updated weekly timesheet and submitted. Archived misc. TSR drawings. (04/13/18) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-13 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 2 0 (04/11/18) Started detailed drawing for No-go bar design per field request. (04/12/18) Continued bar details. (04/13/18) Reviewed design with John/Updated file. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-16 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 (04/16/18) Continued checking drawings. (04/20/18) Started final drawing check. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (04/16/18) Team meeting. (04/18/18) Sakh doc control discussion with Lam/Kyle. (04/19/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (04/16/18) Updated weekly timesheet and submitted for approval. (04/19/18) Restructured 209L workpack folders and moved files. (04/20/18) Discussed Solidworks prints/options with Dan & Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (04/16/18) Archived drawing files from Sakhalin (Berkut/209L). Researched 209L drawing revision issues. (04/18/18) Archived Berkut drawing files from Sakh. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-16 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 5.25 0 (04/16/18) Revised wp drawings. (04/17/18) Started drawing revisions ( correcting OPDL changes on 209L files). (04/18/18) Cont with drawing updates. (04/19/18) Updated Workpack tracking sheet. Searched for reference info and printed workpack info. Sent drawing request for supporting info. (04/20/18) Discussed workpack drawings with John and printed ref. info Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-17 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 4.5 0 (04/17/18) Discussed no-go bar redlines with Kyle. Researched options and revised drawing. transmitted drawing and archived file on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-17 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2.5 0 (04/17/18) Discussed 76B drawings with Leroy. Revised choke spool drawing and sent for info. (04/18/18) Revised spool and sent to Leroy. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-17 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2 0 (04/16/18) Revised wp drawings. (04/17/18) Started drawing revisions ( correcting OPDL changes on 209L files). (04/18/18) Cont with drawing updates. (04/19/18) Updated Workpack tracking sheet. Searched for reference info and printed workpack info. Sent drawing request for supporting info. (04/20/18) Discussed workpack drawings with John and printed ref. info Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (04/16/18) Team meeting. (04/18/18) Sakh doc control discussion with Lam/Kyle. (04/19/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-18 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 (04/17/18) Discussed 76B drawings with Leroy. Revised choke spool drawing and sent for info. (04/18/18) Revised spool and sent to Leroy. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-18 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 5 0 (04/16/18) Revised wp drawings. (04/17/18) Started drawing revisions ( correcting OPDL changes on 209L files). (04/18/18) Cont with drawing updates. (04/19/18) Updated Workpack tracking sheet. Searched for reference info and printed workpack info. Sent drawing request for supporting info. (04/20/18) Discussed workpack drawings with John and printed ref. info Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-18 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 (04/18/18) Checked updated design drawing. (04/19/18) Back checked drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (04/16/18) Team meeting. (04/18/18) Sakh doc control discussion with Lam/Kyle. (04/19/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (04/16/18) Updated weekly timesheet and submitted for approval. (04/19/18) Restructured 209L workpack folders and moved files. (04/20/18) Discussed Solidworks prints/options with Dan & Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 (04/16/18) Archived drawing files from Sakhalin (Berkut/209L). Researched 209L drawing revision issues. (04/18/18) Archived Berkut drawing files from Sakh. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-19 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 6.25 0 (04/16/18) Revised wp drawings. (04/17/18) Started drawing revisions ( correcting OPDL changes on 209L files). (04/18/18) Cont with drawing updates. (04/19/18) Updated Workpack tracking sheet. Searched for reference info and printed workpack info. Sent drawing request for supporting info. (04/20/18) Discussed workpack drawings with John and printed ref. info Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-19 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 0.5 0 (04/18/18) Checked updated design drawing. (04/19/18) Back checked drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-20 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 4 0 (04/16/18) Continued checking drawings. (04/20/18) Started final drawing check. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (04/16/18) Updated weekly timesheet and submitted for approval. (04/19/18) Restructured 209L workpack folders and moved files. (04/20/18) Discussed Solidworks prints/options with Dan & Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-20 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 (04/16/18) Revised wp drawings. (04/17/18) Started drawing revisions ( correcting OPDL changes on 209L files). (04/18/18) Cont with drawing updates. (04/19/18) Updated Workpack tracking sheet. Searched for reference info and printed workpack info. Sent drawing request for supporting info. (04/20/18) Discussed workpack drawings with John and printed ref. info Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-23 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 6.75 0 (04/23/18) Discussed drawing number standards with Tyler/Kyle. Added new tabs to drawing register. Checked drawings for Dan. (04/24/18) Checked drawings and info in drawing register. (04/26/18) Discussed machining tolerances with Tyler. (04/27/18) Checked drawings and updated progress sheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (04/23/18) Updated weekly timesheet and submitted. Approved designers timesheets. Discussed office hours with Kyle and sent email to Designers. Created new proposal folder on the Q and assigned "P" number Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.25 0 (04/23/18) Archived 209L drawings files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-24 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 7 0 (04/23/18) Discussed drawing number standards with Tyler/Kyle. Added new tabs to drawing register. Checked drawings for Dan. (04/24/18) Checked drawings and info in drawing register. (04/26/18) Discussed machining tolerances with Tyler. (04/27/18) Checked drawings and updated progress sheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-24 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 (04/24/18) Searched for 257B Koomey/Nitrogen system information per email request from Robbie B. Searched Greenway 3 files. Searched for 258 racking board layouts. Discussed with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-25 ARBU-TSRs :ARBU-TSRs TSR-01648-ARBU Anchorage Office Plan Regular Pay N 9 0 (04/25/18) Discussed request with Mark. Started sketch of existing office space. (04/26/18) Received existing office dimensions and scaled plan. Started new layout in CH2MH space. (04/27/18) Cleaned up layout and sent PDFs to Mark. reviewed layout with Mark. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-26 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 (04/23/18) Discussed drawing number standards with Tyler/Kyle. Added new tabs to drawing register. Checked drawings for Dan. (04/24/18) Checked drawings and info in drawing register. (04/26/18) Discussed machining tolerances with Tyler. (04/27/18) Checked drawings and updated progress sheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-26 ARBU-TSRs :ARBU-TSRs TSR-01648-ARBU Anchorage Office Plan Regular Pay N 6.25 0 (04/25/18) Discussed request with Mark. Started sketch of existing office space. (04/26/18) Received existing office dimensions and scaled plan. Started new layout in CH2MH space. (04/27/18) Cleaned up layout and sent PDFs to Mark. reviewed layout with Mark. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (04/26/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-26 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 (04/26/18) First check spool drawing. Discussed options with Lam. (04/27/18) Final drawing check. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-27 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1.5 0 (04/23/18) Discussed drawing number standards with Tyler/Kyle. Added new tabs to drawing register. Checked drawings for Dan. (04/24/18) Checked drawings and info in drawing register. (04/26/18) Discussed machining tolerances with Tyler. (04/27/18) Checked drawings and updated progress sheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-27 ARBU-TSRs :ARBU-TSRs TSR-01648-ARBU Anchorage Office Plan Regular Pay N 3.5 0 (04/25/18) Discussed request with Mark. Started sketch of existing office space. (04/26/18) Received existing office dimensions and scaled plan. Started new layout in CH2MH space. (04/27/18) Cleaned up layout and sent PDFs to Mark. reviewed layout with Mark. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-27 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 (04/26/18) First check spool drawing. Discussed options with Lam. (04/27/18) Final drawing check. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-30 ARBU-TSRs :ARBU-TSRs TSR-01648-ARBU Anchorage Office Plan Regular Pay N 0.5 0 (04/30/18) Created CTR and submitted for review/approval. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 (04/30/18) Team meeting. NOV presentation (NOVOS) (05/02/18) 1st quarter earnings review. (05/03/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (04/30/18) Updated weekly timesheet and submitted for approval. Discussed drawing package and transmittal with Lam. (05/01/18) Cleaned up 209L archive folder (created new folders/moved files etc). (05/02/18) Reviewed Solidworks standards. (05/03/18) Discussed Liberty drawings with Kyle. (05/04/18) Created PDFs for Liberty files and uploaded. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-30 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 5.25 0 (04/30/18) Cont'd work pack drawings (diesel /base oil schematics). Updated corresponding ODPL files to show obsolete stamp. (05/01/18) Worked on drawings for WP-0048. Archived diesel/bas oil files on the Q. Searched for ref drawings - requested additional file. Updated tracking sheet. (05/02/18) Cont WP-0048 - reviewed with John. (05/03/18) Finalized WP-0048 drawings and issued. (05/04/18) WP-0154 drawing updates. Updated tracking sheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-30 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 (04/30/18) Final dwg check. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-01 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 3 0 (05/01/18) Cont'd checking drawings. (05/02/18) Reviewed CTR hours with Tyler. Cont'd checking. (05/03/18) Cont'd checking drawings and dwg register. Discussed redlines with Dan. (05/04/18) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (04/30/18) Updated weekly timesheet and submitted for approval. Discussed drawing package and transmittal with Lam. (05/01/18) Cleaned up 209L archive folder (created new folders/moved files etc). (05/02/18) Reviewed Solidworks standards. (05/03/18) Discussed Liberty drawings with Kyle. (05/04/18) Created PDFs for Liberty files and uploaded. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-01 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 5.5 0 (04/30/18) Cont'd work pack drawings (diesel /base oil schematics). Updated corresponding ODPL files to show obsolete stamp. (05/01/18) Worked on drawings for WP-0048. Archived diesel/bas oil files on the Q. Searched for ref drawings - requested additional file. Updated tracking sheet. (05/02/18) Cont WP-0048 - reviewed with John. (05/03/18) Finalized WP-0048 drawings and issued. (05/04/18) WP-0154 drawing updates. Updated tracking sheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-02 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2.5 0 (05/01/18) Cont'd checking drawings. (05/02/18) Reviewed CTR hours with Tyler. Cont'd checking. (05/03/18) Cont'd checking drawings and dwg register. Discussed redlines with Dan. (05/04/18) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 (04/30/18) Team meeting. NOV presentation (NOVOS) (05/02/18) 1st quarter earnings review. (05/03/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (04/30/18) Updated weekly timesheet and submitted for approval. Discussed drawing package and transmittal with Lam. (05/01/18) Cleaned up 209L archive folder (created new folders/moved files etc). (05/02/18) Reviewed Solidworks standards. (05/03/18) Discussed Liberty drawings with Kyle. (05/04/18) Created PDFs for Liberty files and uploaded. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-02 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 4 0 (04/30/18) Cont'd work pack drawings (diesel /base oil schematics). Updated corresponding ODPL files to show obsolete stamp. (05/01/18) Worked on drawings for WP-0048. Archived diesel/bas oil files on the Q. Searched for ref drawings - requested additional file. Updated tracking sheet. (05/02/18) Cont WP-0048 - reviewed with John. (05/03/18) Finalized WP-0048 drawings and issued. (05/04/18) WP-0154 drawing updates. Updated tracking sheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-03 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 3.5 0 (05/01/18) Cont'd checking drawings. (05/02/18) Reviewed CTR hours with Tyler. Cont'd checking. (05/03/18) Cont'd checking drawings and dwg register. Discussed redlines with Dan. (05/04/18) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (04/30/18) Team meeting. NOV presentation (NOVOS) (05/02/18) 1st quarter earnings review. (05/03/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (04/30/18) Updated weekly timesheet and submitted for approval. Discussed drawing package and transmittal with Lam. (05/01/18) Cleaned up 209L archive folder (created new folders/moved files etc). (05/02/18) Reviewed Solidworks standards. (05/03/18) Discussed Liberty drawings with Kyle. (05/04/18) Created PDFs for Liberty files and uploaded. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-03 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 3.25 0 (04/30/18) Cont'd work pack drawings (diesel /base oil schematics). Updated corresponding ODPL files to show obsolete stamp. (05/01/18) Worked on drawings for WP-0048. Archived diesel/bas oil files on the Q. Searched for ref drawings - requested additional file. Updated tracking sheet. (05/02/18) Cont WP-0048 - reviewed with John. (05/03/18) Finalized WP-0048 drawings and issued. (05/04/18) WP-0154 drawing updates. Updated tracking sheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (04/30/18) Updated weekly timesheet and submitted for approval. Discussed drawing package and transmittal with Lam. (05/01/18) Cleaned up 209L archive folder (created new folders/moved files etc). (05/02/18) Reviewed Solidworks standards. (05/03/18) Discussed Liberty drawings with Kyle. (05/04/18) Created PDFs for Liberty files and uploaded. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-04 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1 0 (05/03/18) Drawing package for TTOPCO (247/269). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-04 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 (05/03/18) Searched for BOP rail info - sent to Robbie. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-04 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2.5 0 (04/30/18) Cont'd work pack drawings (diesel /base oil schematics). Updated corresponding ODPL files to show obsolete stamp. (05/01/18) Worked on drawings for WP-0048. Archived diesel/bas oil files on the Q. Searched for ref drawings - requested additional file. Updated tracking sheet. (05/02/18) Cont WP-0048 - reviewed with John. (05/03/18) Finalized WP-0048 drawings and issued. (05/04/18) WP-0154 drawing updates. Updated tracking sheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-04 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 (05/03/18) Checked drawing. Discussed with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (05/07/18) Updated weekly timesheet and submitted for approval. Reviewed/approved designer's time. (05/08/18) Researched CAD printing issues and submitted IT ticket to resolve. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-07 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 (05/07/18) Researched material information for Dan C. Discussed with Kyle. (05/08/18) Researched 249/258 racking board info. (05/09/18) Discussed racking board chains with Dan Colby. Created padeye/chain sketch and send for info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-07 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4 0 (05/07/18) Started final redline drawing package from Tyler. (05/08/18) Worked on redlines. (05/10/18) Worked on redlines. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-07 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2 0 (05/07/18) Archived completed WP drawings and clean up working folders. Printed next electrical wp and discussed with John. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-08 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2.5 0 (05/08/18) Continued checking drawing package. (05/09/18) Continued checking drawing package. (05/10/18) Checking (05/11/18) Checking Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (05/08/18) Team meeting. (05/10/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (05/07/18) Updated weekly timesheet and submitted for approval. Reviewed/approved designer's time. (05/08/18) Researched CAD printing issues and submitted IT ticket to resolve. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-08 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 (05/07/18) Researched material information for Dan C. Discussed with Kyle. (05/08/18) Researched 249/258 racking board info. (05/09/18) Discussed racking board chains with Dan Colby. Created padeye/chain sketch and send for info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-08 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3 0 (05/07/18) Started final redline drawing package from Tyler. (05/08/18) Worked on redlines. (05/10/18) Worked on redlines. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-09 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 3 0 (05/08/18) Continued checking drawing package. (05/09/18) Continued checking drawing package. (05/10/18) Checking (05/11/18) Checking Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-09 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 5.5 0 (05/07/18) Researched material information for Dan C. Discussed with Kyle. (05/08/18) Researched 249/258 racking board info. (05/09/18) Discussed racking board chains with Dan Colby. Created padeye/chain sketch and send for info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-09 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 (05/08/18) Checked new spool drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-10 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2.5 0 (05/08/18) Continued checking drawing package. (05/09/18) Continued checking drawing package. (05/10/18) Checking (05/11/18) Checking Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (05/08/18) Team meeting. (05/10/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-10 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 (05/10/18) Discussed HP mud spool with Chad T. (05/11/18) HP spool sketch. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-10 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 5 0 (05/07/18) Started final redline drawing package from Tyler. (05/08/18) Worked on redlines. (05/10/18) Worked on redlines. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-11 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 3 0 (05/08/18) Continued checking drawing package. (05/09/18) Continued checking drawing package. (05/10/18) Checking (05/11/18) Checking Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-11 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2 0 (05/10/18) Discussed HP mud spool with Chad T. (05/11/18) HP spool sketch. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-14 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 4.5 0 (05/14/18) Checking drawing package. (05/15/18) Checking. (05/17/18) Checking. (05/18/18) Checking. Discussed final package with Tyler and Dan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (05/14/18) Team meeting. (05/17/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-14 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 4 0 (05/14/18) Searched for bilge pump information per request from Robbie B. (257) (05/16/18) Worked on 257B safety plan and new life boat layout drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-15 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2.5 0 (05/14/18) Checking drawing package. (05/15/18) Checking. (05/17/18) Checking. (05/18/18) Checking. Discussed final package with Tyler and Dan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (05/15/18) Updated weekly timesheet and submitted for approval. Discussed TSR progress with Kyle. Approved designers timsheets. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-15 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.5 0 (05/15/18) Discussed steel grade/welding info with Kyle. 249 request from Dan C. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-15 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3.5 0 (05/15/18) Continued with redline drawings. Updated drawing register to reflect new drawings. Sent clarification email to Leroy. (05/16/18) Continued work on redlines. (05/17/18) Continued work on safety plans for 257B. Sent to Robbie for review. (05/18/18) New redlines for safety plans-257. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-15 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.25 0 (05/15/18) Sent clarification email for electrical redlines. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-15 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 (05/15/18) Archived piping drawing files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-15 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.25 0 (05/15/18) Archived drawing files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-16 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 (05/16/18) Office safety course. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 (05/16/18) Back checked Orlan choke support revisions. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-16 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 6 0 (05/14/18) Searched for bilge pump information per request from Robbie B. (257) (05/16/18) Worked on 257B safety plan and new life boat layout drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-16 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1.5 0 (05/15/18) Continued with redline drawings. Updated drawing register to reflect new drawings. Sent clarification email to Leroy. (05/16/18) Continued work on redlines. (05/17/18) Continued work on safety plans for 257B. Sent to Robbie for review. (05/18/18) New redlines for safety plans-257. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-17 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1.5 0 (05/14/18) Checking drawing package. (05/15/18) Checking. (05/17/18) Checking. (05/18/18) Checking. Discussed final package with Tyler and Dan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (05/14/18) Team meeting. (05/17/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-17 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 6.75 0 (05/14/18) Searched for bilge pump information per request from Robbie B. (257) (05/16/18) Worked on 257B safety plan and new life boat layout drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-18 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2 0 (05/14/18) Checking drawing package. (05/15/18) Checking. (05/17/18) Checking. (05/18/18) Checking. Discussed final package with Tyler and Dan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-18 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1 0 (05/18/18) Checked HP spool drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-18 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3 0 (05/14/18) Searched for bilge pump information per request from Robbie B. (257) (05/16/18) Worked on 257B safety plan and new life boat layout drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (05/21/18) Updated weekly timesheet and submitted for approval. (05/23/18) Discussed open design position with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-21 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 (05/21/18) Updated lifeboat sketch. (05/22/18) Additional update to show rollers. Researched vendors Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-21 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 7 0 (05/21/18) Continued package clean up. Updated progress tracking sheet. (05/22/18) discussed drawings with Tyler and continued clean up. (05/24/18) Started printing final drawings for review. (05/25/18) Finished printing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (05/22/18) Team meeting. (05/24/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-22 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 (05/21/18) Updated lifeboat sketch. (05/22/18) Additional update to show rollers. Researched vendors Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-22 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 6.5 0 (05/21/18) Continued package clean up. Updated progress tracking sheet. (05/22/18) discussed drawings with Tyler and continued clean up. (05/24/18) Started printing final drawings for review. (05/25/18) Finished printing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-23 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 8.5 0 (05/23/18) Continued checking final drawings. Reviewed redlines with Dan. (05/24/18) Cont checking. (05/25/18) Checking - main assembly drawing/last sub assembly. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (05/21/18) Updated weekly timesheet and submitted for approval. (05/23/18) Discussed open design position with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-24 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 5.5 0 (05/23/18) Continued checking final drawings. Reviewed redlines with Dan. (05/24/18) Cont checking. (05/25/18) Checking - main assembly drawing/last sub assembly. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (05/22/18) Team meeting. (05/24/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-24 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 0.5 0 (05/21/18) Continued package clean up. Updated progress tracking sheet. (05/22/18) discussed drawings with Tyler and continued clean up. (05/24/18) Started printing final drawings for review. (05/25/18) Finished printing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-24 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2.5 0 (05/24/18) Checked LP schematic and piping arrangements. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-25 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 5.5 0 (05/23/18) Continued checking final drawings. Reviewed redlines with Dan. (05/24/18) Cont checking. (05/25/18) Checking - main assembly drawing/last sub assembly. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-25 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 0.5 0 (05/21/18) Continued package clean up. Updated progress tracking sheet. (05/22/18) discussed drawings with Tyler and continued clean up. (05/24/18) Started printing final drawings for review. (05/25/18) Finished printing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-28 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (05/29/18) Team meeting. Call with Dan Colby to discuss open MOC request. (05/31/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (05/29/18) Discussed TSR status with Kyle. (05/30/18) Updated weekly timesheet and submitted for approval. (05/31/18) Discussed Dan's offboarding with Kyle. (06/01/18) Approved Dan's timesheet. Approved offboarding request. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-29 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 7.5 0 (05/29/18) Started cellar cover layout. Discussed with Benny. (05/30/18) Continued with drawing. (05/31/18) Cont drawing. (06/01/18) Added hinged hatch and removed handrails. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (05/29/18) Discussed TSR status with Kyle. (05/30/18) Updated weekly timesheet and submitted for approval. (05/31/18) Discussed Dan's offboarding with Kyle. (06/01/18) Approved Dan's timesheet. Approved offboarding request. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-30 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 8 0 (05/29/18) Started cellar cover layout. Discussed with Benny. (05/30/18) Continued with drawing. (05/31/18) Cont drawing. (06/01/18) Added hinged hatch and removed handrails. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (05/29/18) Team meeting. Call with Dan Colby to discuss open MOC request. (05/31/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (05/29/18) Discussed TSR status with Kyle. (05/30/18) Updated weekly timesheet and submitted for approval. (05/31/18) Discussed Dan's offboarding with Kyle. (06/01/18) Approved Dan's timesheet. Approved offboarding request. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-31 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 7.25 0 (05/29/18) Started cellar cover layout. Discussed with Benny. (05/30/18) Continued with drawing. (05/31/18) Cont drawing. (06/01/18) Added hinged hatch and removed handrails. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (05/29/18) Discussed TSR status with Kyle. (05/30/18) Updated weekly timesheet and submitted for approval. (05/31/18) Discussed Dan's offboarding with Kyle. (06/01/18) Approved Dan's timesheet. Approved offboarding request. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-01 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 5.5 0 (05/29/18) Started cellar cover layout. Discussed with Benny. (05/30/18) Continued with drawing. (05/31/18) Cont drawing. (06/01/18) Added hinged hatch and removed handrails. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-04 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 (06/04/18) Started new 258L layouts for BP proposal. (06/05/18) Cont layouts. Sent drawings to George. (06/06/18) Discussed drawings with George. Created new matting drawing and sent updates to GW. (06/08/18) Researched new 18 3/4" BOP information for drawing layout. Started drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-04 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 9 0 (06/04/18) continued on cover drawing. (06/05/18) Call with Benny to review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (06/05/18) Team meeting. (06/07/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (06/05/18) Updated weekly timesheet and submitted for approval. (06/06/18) Discussed software package/install info with Lam. (06/07/18) Researched safety/IMS topic for weekly meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-05 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 7 0 (06/04/18) Started new 258L layouts for BP proposal. (06/05/18) Cont layouts. Sent drawings to George. (06/06/18) Discussed drawings with George. Created new matting drawing and sent updates to GW. (06/08/18) Researched new 18 3/4" BOP information for drawing layout. Started drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-05 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 0.5 0 (06/04/18) continued on cover drawing. (06/05/18) Call with Benny to review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-06 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.25 0 (06/06/18) Archived drawing files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 (06/05/18) Updated weekly timesheet and submitted for approval. (06/06/18) Discussed software package/install info with Lam. (06/07/18) Researched safety/IMS topic for weekly meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-06 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 (06/04/18) Started new 258L layouts for BP proposal. (06/05/18) Cont layouts. Sent drawings to George. (06/06/18) Discussed drawings with George. Created new matting drawing and sent updates to GW. (06/08/18) Researched new 18 3/4" BOP information for drawing layout. Started drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-06 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 5.25 0 (06/07/18) Started on final redline comments. (06/08/18) Cont redlines. (06/09/18) Cont redlines. Created binder. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-06 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.25 0 (06/06/18) Archived drawing files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (06/05/18) Team meeting. (06/07/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (06/05/18) Updated weekly timesheet and submitted for approval. (06/06/18) Discussed software package/install info with Lam. (06/07/18) Researched safety/IMS topic for weekly meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-07 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 2 0 (06/07/18) Started on final redline comments. (06/08/18) Cont redlines. (06/09/18) Cont redlines. Created binder. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-07 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1 0 (06/07/18) Checked revised drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-07 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 4 0 (06/07/18) Worked on electrical redlines and discussed with Sachin. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-08 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3.5 0 (06/04/18) Started new 258L layouts for BP proposal. (06/05/18) Cont layouts. Sent drawings to George. (06/06/18) Discussed drawings with George. Created new matting drawing and sent updates to GW. (06/08/18) Researched new 18 3/4" BOP information for drawing layout. Started drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-08 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3 0 (06/07/18) Started on final redline comments. (06/08/18) Cont redlines. (06/09/18) Cont redlines. Created binder. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-11 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 0.25 0 (06/11/18) Checked drawing revision. (06/12/18) Archived drawings on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (06/11/18) Team meeting. (06/14/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (06/11/18)Updated weekly timesheet and submitted for approval. researched payroll issue for Dan. (06/13/18) Reviewed Engineering drawing number standards for IMS. (06/14/18) Pulled ref drawings for Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-11 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 6.75 0 (06/11/18) Revised 18-3/4" BOP and sent to George. Searched for additional RCD information. Discussed BOP weights with Kyle. Created CTR. (06/12/18) Layouts/heights for BOP - George. (06/13/18) Searched for historical cost info (256 skidding) for reference. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-11 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 0.25 0 (06/11/18) Archived drawings on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-12 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 0.25 0 (06/11/18) Checked drawing revision. (06/12/18) Archived drawings on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-12 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 4 0 (06/11/18) Revised 18-3/4" BOP and sent to George. Searched for additional RCD information. Discussed BOP weights with Kyle. Created CTR. (06/12/18) Layouts/heights for BOP - George. (06/13/18) Searched for historical cost info (256 skidding) for reference. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-12 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 2.75 0 (06/12/18) Worked on redlines. (06/13/18) Worked on redlines. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-12 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 2 0 (06/12/18) Finalized CTR and submitted. Discussed drawing with John. (06/13/18) Calc weights for John (06/14/18) Worked on final drawing details. (06/15/18) Finished bom and details. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (06/11/18)Updated weekly timesheet and submitted for approval. researched payroll issue for Dan. (06/13/18) Reviewed Engineering drawing number standards for IMS. (06/14/18) Pulled ref drawings for Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-13 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 8 0 (06/12/18) Worked on redlines. (06/13/18) Worked on redlines. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-13 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 0.5 0 (06/12/18) Finalized CTR and submitted. Discussed drawing with John. (06/13/18) Calc weights for John (06/14/18) Worked on final drawing details. (06/15/18) Finished bom and details. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (06/11/18) Team meeting. (06/14/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (06/11/18)Updated weekly timesheet and submitted for approval. researched payroll issue for Dan. (06/13/18) Reviewed Engineering drawing number standards for IMS. (06/14/18) Pulled ref drawings for Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-14 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 7.25 0 (06/12/18) Finalized CTR and submitted. Discussed drawing with John. (06/13/18) Calc weights for John (06/14/18) Worked on final drawing details. (06/15/18) Finished bom and details. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-15 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 5 0 (06/12/18) Finalized CTR and submitted. Discussed drawing with John. (06/13/18) Calc weights for John (06/14/18) Worked on final drawing details. (06/15/18) Finished bom and details. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 (06/18/18) Updated weekly timesheet and submitted for approval. Discussed bid/proposal process with Lam as part of 2018 SMART goals. Started cleanup of 273L work-in-progress folders in preparation for archiving. (06/19/18) Printed 18' goals and reviewed for discussion. Cont 273L archiving. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-18 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1.5 0 (06/19/18) Researched 272L HP piping information and discussed with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-18 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 5 0 (06/18/18) Discussed 269 substructure/wellhead clearance with Bernie. Created a sketch and sent it for information. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (06/19/18) Mid year review discussion. (06/20/18) Mid year review with Lam. (06/21/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 (06/18/18) Updated weekly timesheet and submitted for approval. Discussed bid/proposal process with Lam as part of 2018 SMART goals. Started cleanup of 273L work-in-progress folders in preparation for archiving. (06/19/18) Printed 18' goals and reviewed for discussion. Cont 273L archiving. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-19 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2 0 (06/19/18) Checking - condensate drawings. (06/22/18) Checked new drawing set for condensate changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-19 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 2 0 (06/19/18) Discussed drawing changes with Kyle - searched for lift point drawing. (06/20/18) Added new lift points and updated sheets. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (06/19/18) Mid year review discussion. (06/20/18) Mid year review with Lam. (06/21/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-20 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 2 0 (06/20/18) MOC discussion with Kyle. Pulled reference info. (06/21/18) Discussed 216 substructure info with Kyle. Searched for info. (06/22/18) Started 249L crown post drawing. Call with Dan C. to discuss open MOC/TSRs. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-20 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 6 0 (06/19/18) Discussed drawing changes with Kyle - searched for lift point drawing. (06/20/18) Added new lift points and updated sheets. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (06/19/18) Mid year review discussion. (06/20/18) Mid year review with Lam. (06/21/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-21 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1.5 0 (06/20/18) MOC discussion with Kyle. Pulled reference info. (06/21/18) Discussed 216 substructure info with Kyle. Searched for info. (06/22/18) Started 249L crown post drawing. Call with Dan C. to discuss open MOC/TSRs. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-21 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 6.5 0 (06/21/18) Scanned 30B drawing binder. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-22 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 4.5 0 (06/20/18) MOC discussion with Kyle. Pulled reference info. (06/21/18) Discussed 216 substructure info with Kyle. Searched for info. (06/22/18) Started 249L crown post drawing. Call with Dan C. to discuss open MOC/TSRs. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-22 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1.5 0 (06/19/18) Checking - condensate drawings. (06/22/18) Checked new drawing set for condensate changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (06/25/18) Updated weekly timesheet. retyped timesheet info due to projxsense issues. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-25 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1.25 0 (06/25/18) Cleaned up scans. Archived drawings on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-25 Rig 216L-TSR :Rig 216L-TSR TSR-01659-216L Spreader Bar Regular Pay N 6.25 0 (06/25/18) Reviewed scope for TSR and pulled ref info. Started drawing. (06/26/18) Cont drawing. (06/27/18) Cont drawing. (06/28/18) Finalized drawing and created CTR. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-26 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.5 0 (06/26/18) Searched for 216L lift plans. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-26 Rig 216L-TSR :Rig 216L-TSR TSR-01659-216L Spreader Bar Regular Pay N 8.5 0 (06/25/18) Reviewed scope for TSR and pulled ref info. Started drawing. (06/26/18) Cont drawing. (06/27/18) Cont drawing. (06/28/18) Finalized drawing and created CTR. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-27 Rig 216L-TSR :Rig 216L-TSR TSR-01659-216L Spreader Bar Regular Pay N 9 0 (06/25/18) Reviewed scope for TSR and pulled ref info. Started drawing. (06/26/18) Cont drawing. (06/27/18) Cont drawing. (06/28/18) Finalized drawing and created CTR. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-28 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-28 Rig 216L-TSR :Rig 216L-TSR TSR-01659-216L Spreader Bar Regular Pay N 5 0 (06/25/18) Reviewed scope for TSR and pulled ref info. Started drawing. (06/26/18) Cont drawing. (06/27/18) Cont drawing. (06/28/18) Finalized drawing and created CTR. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (07/02/18) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 7.5 0 (07/02/18) Updated weekly timesheet and submitted. Continued clean up effort/archiving for 273 work-in-progress folders (drawings). (07/03/18) Cont'd 273 archiving. (07/05/18) Archived Canrig TD files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-02 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1 0 (07/02/18) Updated PDF files and discussed package with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 8.5 0 (07/02/18) Updated weekly timesheet and submitted. Continued clean up effort/archiving for 273 work-in-progress folders (drawings). (07/03/18) Cont'd 273 archiving. (07/05/18) Archived Canrig TD files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-03 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 (07/03/18) Revised CG drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (07/02/18) Updated weekly timesheet and submitted. Continued clean up effort/archiving for 273 work-in-progress folders (drawings). (07/03/18) Cont'd 273 archiving. (07/05/18) Archived Canrig TD files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-05 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6.75 0 (07/05/18) 269l site layout for Mat Ellis. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-05 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2 0 (07/05/18) Searched for 269L fuel tank info per field request. discussed 269L temp choke manifold replacement with George. (07/06/18) Started choke manifold replacement layout. Discussed with George. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-06 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 5.5 0 (07/05/18) Searched for 269L fuel tank info per field request. discussed 269L temp choke manifold replacement with George. (07/06/18) Started choke manifold replacement layout. Discussed with George. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (07/09/18) Team meeting. (07/12/18) TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-09 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 (07/09/18) Submarine cable presentation. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-09 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 7 0 (07/09/18) Started layout for 249L crown padeye installation. (07/10/18) Cont'd layout. (07/12/18) Updated layout and sent to Dan C. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (07/10/18) Updated weekly timesheet and submitted for approval. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-10 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 6 0 (07/10/18) 258L BOP stack drawings for George. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-10 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 (07/09/18) Started layout for 249L crown padeye installation. (07/10/18) Cont'd layout. (07/12/18) Updated layout and sent to Dan C. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-10 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 (07/10/18) Search for 77/15B bell nipple pan information for Leroy. (07/11/18) Bell nipple pan layout for 15B. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-11 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 6 0 (07/10/18) 258L BOP stack drawings for George. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-11 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 (07/10/18) Search for 77/15B bell nipple pan information for Leroy. (07/11/18) Bell nipple pan layout for 15B. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.75 0 (07/09/18) Team meeting. (07/12/18) TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-12 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 4.25 0 (07/09/18) Started layout for 249L crown padeye installation. (07/10/18) Cont'd layout. (07/12/18) Updated layout and sent to Dan C. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-12 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1 0 (07/12/18) Archived final drawing package on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-13 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-17 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-23 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-25 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (07/26/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (07/26/18) Archived drawing files from Sakhalin. Updated AutoCAD setup due to version updates/ installation. (07/27/18) Archived updated 77B drawings. Archived 216L spreader beam drawing. Archived Berkut spool drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-26 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6.5 0 (07/26/18) 247l Gulf keystone bid drawings, (07/27/18) Saved changes to drawings Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (07/26/18) Archived drawing files from Sakhalin. Updated AutoCAD setup due to version updates/ installation. (07/27/18) Archived updated 77B drawings. Archived 216L spreader beam drawing. Archived Berkut spool drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-27 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3.5 0 (07/26/18) 247l Gulf keystone bid drawings, (07/27/18) Saved changes to drawings Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-27 Rig 249L-TSR :Rig 249L-TSR TSR-01664-249L Mast - Top Drive Layout Regular Pay N 3 0 (07/27/18) Pulled ref drawings and checked drawing. Discussed with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (07/30/18) Team meeting. (07/31/18) Team meeting. Brandon's presentation. (08/02/18) Weekly TSR meeting. Quarterly earnings meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (07/30/18) Updated weekly timesheet and submitted for approval. discussed open TSrs with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-30 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 4.5 0 (07/30/18) Researched 216L doghouse window information. discussed with Kyle. (07/31/18) Sent clarification email to Dan C. Cancelled drawing request for crown post per follow-up email. (08/01/18) New drawing for hoist sheave padeyes. (08/02/18) Revised 216l plot plans, Haz area, and safety plans drawings per comments from the field. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-30 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 2 0 (07/30/18) Received closeout confirmation email from Mat. Clean up TSR folder and added closing comments. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (07/30/18) Team meeting. (07/31/18) Team meeting. Brandon's presentation. (08/02/18) Weekly TSR meeting. Quarterly earnings meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-31 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 7 0 (07/31/18) Discussed rig brochure updates with Lam. Sent clarification email to Dan Colby. Checked current plot plans against redlines received for rig brochure updates.(216, 249, and 258). Con't on crown padeye drawing for 249L. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-31 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 (07/30/18) Researched 216L doghouse window information. discussed with Kyle. (07/31/18) Sent clarification email to Dan C. Cancelled drawing request for crown post per follow-up email. (08/01/18) New drawing for hoist sheave padeyes. (08/02/18) Revised 216l plot plans, Haz area, and safety plans drawings per comments from the field. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-01 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 8 0 (07/30/18) Researched 216L doghouse window information. discussed with Kyle. (07/31/18) Sent clarification email to Dan C. Cancelled drawing request for crown post per follow-up email. (08/01/18) New drawing for hoist sheave padeyes. (08/02/18) Revised 216l plot plans, Haz area, and safety plans drawings per comments from the field. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-01 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1 0 (08/01/18) Pulled tag numbers for Tyler. (08/02/18) Revised 77B air schematic per Tylers comments. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 (07/30/18) Team meeting. (07/31/18) Team meeting. Brandon's presentation. (08/02/18) Weekly TSR meeting. Quarterly earnings meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-02 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3 0 (08/02/18) 247L HKN drawings for George. (08/03/18) Cleaned up draiwngs. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 (08/02/18) Filed misc. drawing files from Sakh. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-02 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 2 0 (07/30/18) Researched 216L doghouse window information. discussed with Kyle. (07/31/18) Sent clarification email to Dan C. Cancelled drawing request for crown post per follow-up email. (08/01/18) New drawing for hoist sheave padeyes. (08/02/18) Revised 216l plot plans, Haz area, and safety plans drawings per comments from the field. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-02 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1 0 (08/01/18) Pulled tag numbers for Tyler. (08/02/18) Revised 77B air schematic per Tylers comments. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-03 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 2 0 (08/02/18) 247L HKN drawings for George. (08/03/18) Cleaned up draiwngs. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-03 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 3 0 (08/03/18) researched boiler/heater/genset exhaust cap options for Mark. Pulled examples and sent pdfs. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-03 ORLAN-TSR :ORLAN-TSR TSR-01662-ORLP SLB Rig Floor Padeyes Regular Pay N 1 0 (08/03/18) Checked padeye drawing. Discussed comments with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-06 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 0.5 0 (08/06/18) Reviewed redlines with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (08/06/18) Team meeting. (08/07/18) Meeting with Quality group to review MOC process. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (08/06/18) Updated weekly timesheet and submitted for approval. Discussed charge codes in projxsense with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-06 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 4.5 0 (08/06/18) 265L catwalk layout for Mat. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.25 0 (08/06/18) Archived heat trace drawings for 209L. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-06 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.5 0 (08/06/18) Search for 216L mast information. (08/08/18) Created new mast brace handling padeye drawing. (08/10/18) Archived 249L padeye drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-06 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 (08/06/18) Pulled ref drawings for 5K hoist stand and sent to Leroy. (08/08/18) researched additional size hoist stands information. (08/09/18) Started Holly choke manifold proposal drawing. (08/10/18) Reviewed drawing with Leroy and made changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-06 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1 0 (08/06/18) Revised air PFD and archived files. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (08/06/18) Team meeting. (08/07/18) Meeting with Quality group to review MOC process. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-07 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 8.5 0 (08/07/18) 265/269L BOP stack layouts for George- 10k annular options Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-08 OH-014 :OH-014 Overhead All Activities Regular Pay N 3.5 0 (08/08/18) Started new Solidworks tutorial. (08/10/18) Finalized first tutorial, started second. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-08 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 4.5 0 (08/06/18) Search for 216L mast information. (08/08/18) Created new mast brace handling padeye drawing. (08/10/18) Archived 249L padeye drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-08 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 (08/06/18) Pulled ref drawings for 5K hoist stand and sent to Leroy. (08/08/18) researched additional size hoist stands information. (08/09/18) Started Holly choke manifold proposal drawing. (08/10/18) Reviewed drawing with Leroy and made changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-09 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 9 0 (08/06/18) Pulled ref drawings for 5K hoist stand and sent to Leroy. (08/08/18) researched additional size hoist stands information. (08/09/18) Started Holly choke manifold proposal drawing. (08/10/18) Reviewed drawing with Leroy and made changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-10 OH-014 :OH-014 Overhead All Activities Regular Pay N 3.25 0 (08/08/18) Started new Solidworks tutorial. (08/10/18) Finalized first tutorial, started second. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-10 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.25 0 (08/06/18) Search for 216L mast information. (08/08/18) Created new mast brace handling padeye drawing. (08/10/18) Archived 249L padeye drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-10 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2.5 0 (08/06/18) Pulled ref drawings for 5K hoist stand and sent to Leroy. (08/08/18) researched additional size hoist stands information. (08/09/18) Started Holly choke manifold proposal drawing. (08/10/18) Reviewed drawing with Leroy and made changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (08/13/18) Updated weekly timesheet and submitted for approval. Created new drawing register for Holly. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-13 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1 0 (08/13/18) researched general choke manifold info for Tyler. (08/15/18) Researched festoon information and discussed with Tyler/Josh. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-13 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 6 0 (08/13/18) Reviewed drawing revision levels to reduce duplicate files under work-in-progress folder. Moved drawings to archive. (08/14/18) Continued drawing file reconciliation of W.I.P. folders. (08/15/18) Continued drawing file reconciliation of W.I.P. folders. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 (08/14/18) Team meeting. Loadmaster presentation. (08/16/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 (08/14/18) researched general air receiver info for reference. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-14 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2 0 (08/13/18) Reviewed drawing revision levels to reduce duplicate files under work-in-progress folder. Moved drawings to archive. (08/14/18) Continued drawing file reconciliation of W.I.P. folders. (08/15/18) Continued drawing file reconciliation of W.I.P. folders. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-14 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 2 0 (08/14/18) Revised padeye drawing. (08/15/18) Additional changes to drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-14 OH-034 :OH-034 OH-034-009 Colombia Regular Pay N 1 0 (08/14/18) Cleaned folders and moved obsolete rig drawings to archive. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-14 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 1 0 (08/14/18) Checked drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-15 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1.5 0 (08/13/18) researched general choke manifold info for Tyler. (08/15/18) Researched festoon information and discussed with Tyler/Josh. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-15 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 6.5 0 (08/13/18) Reviewed drawing revision levels to reduce duplicate files under work-in-progress folder. Moved drawings to archive. (08/14/18) Continued drawing file reconciliation of W.I.P. folders. (08/15/18) Continued drawing file reconciliation of W.I.P. folders. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-15 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 (08/14/18) Revised padeye drawing. (08/15/18) Additional changes to drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (08/14/18) Team meeting. Loadmaster presentation. (08/16/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-16 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 8 0 (08/16/18) Researched cantilever deck info for 55B. Started cement unit layouts. (08/17/18) Continued with layouts - optional smaller cement unit layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-17 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 6 0 (08/16/18) Researched cantilever deck info for 55B. Started cement unit layouts. (08/17/18) Continued with layouts - optional smaller cement unit layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (08/20/18) Team meeting. (08/21/18) Call with Dan Colby to discuss open items/status. (08/23/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (08/20/18) Updated weekly timesheet and submitted for approval. reviewed SketchUp templates with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-20 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 0.5 0 (08/20/18) Discussed 55B drawings with Leroy. (08/21/18) Elevation views of 55B cantilever platform for cement unit install. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-20 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 6.75 0 (08/20/18) Continued to reconcile 272 drawing under work-in-progress folders. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (08/20/18) Team meeting. (08/21/18) Call with Dan Colby to discuss open items/status. (08/23/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-21 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 5.5 0 (08/20/18) Discussed 55B drawings with Leroy. (08/21/18) Elevation views of 55B cantilever platform for cement unit install. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-21 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 (08/21/18) ACS site visit - sketch CIP house for lifting modifications. (08/22/18) Created folder and uploaded pics from site visit. Started CIP house drawing. (08/23/18) Continued CIP house drawing. (08/24/18) Discussed lifting modifications with Kyle. Call with Canrig. Sketched possible option. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-22 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 9 0 (08/21/18) ACS site visit - sketch CIP house for lifting modifications. (08/22/18) Created folder and uploaded pics from site visit. Started CIP house drawing. (08/23/18) Continued CIP house drawing. (08/24/18) Discussed lifting modifications with Kyle. Call with Canrig. Sketched possible option. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (08/20/18) Team meeting. (08/21/18) Call with Dan Colby to discuss open items/status. (08/23/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-23 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 (08/23/18) Started sketchUp training. (used CIP house for reference) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-23 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 6 0 (08/21/18) ACS site visit - sketch CIP house for lifting modifications. (08/22/18) Created folder and uploaded pics from site visit. Started CIP house drawing. (08/23/18) Continued CIP house drawing. (08/24/18) Discussed lifting modifications with Kyle. Call with Canrig. Sketched possible option. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-24 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1.5 0 (08/24/18) Discussed 249 tong hangoff padeye with Kyle. Converted existing expertCAD file to AutoCAD. Discussed with John. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-24 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4.5 0 (08/21/18) ACS site visit - sketch CIP house for lifting modifications. (08/22/18) Created folder and uploaded pics from site visit. Started CIP house drawing. (08/23/18) Continued CIP house drawing. (08/24/18) Discussed lifting modifications with Kyle. Call with Canrig. Sketched possible option. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (08/27/18) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (08/27/18) Sent ticket to resolve AutoCAD issue. Discussed AutoCAD settings with Lam. (08/28/18) Assigned drawing number for Sakh. Updated weekly timesheet and submitted for approval. (08/30/18) Discussed trip and made travel arrangements for trip to CA. Copied ref info for trip. (08/31/18) Updated timesheet. Pulled more ref drawings for trip. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-27 OH-014 :OH-014 Overhead All Activities Regular Pay N 7.75 0 (08/27/18) Continued on CIP house model in SketchUp. (08/28/18) Discussed Sketchup options with Lam. Cont on 3D model. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (08/27/18) Sent ticket to resolve AutoCAD issue. Discussed AutoCAD settings with Lam. (08/28/18) Assigned drawing number for Sakh. Updated weekly timesheet and submitted for approval. (08/30/18) Discussed trip and made travel arrangements for trip to CA. Copied ref info for trip. (08/31/18) Updated timesheet. Pulled more ref drawings for trip. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-28 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1.5 0 (08/28/18) Discussed 121 backyard with Tyler. Searched for mud pit weights/shipping info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-28 OH-014 :OH-014 Overhead All Activities Regular Pay N 6.25 0 (08/27/18) Continued on CIP house model in SketchUp. (08/28/18) Discussed Sketchup options with Lam. Cont on 3D model. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-29 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 0.75 0 (08/29/18) Meeting to discuss rig visit and scope of work. (08/30/18) Reviewed updated scope items with John. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-29 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 8.25 0 (08/29/18) Continued to reconcile 272 drawing revisions and archiving. (08/30/18) Continued clean up. (08/31/18) Continued clean up Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-30 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 1 0 (08/29/18) Meeting to discuss rig visit and scope of work. (08/30/18) Reviewed updated scope items with John. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 (08/27/18) Sent ticket to resolve AutoCAD issue. Discussed AutoCAD settings with Lam. (08/28/18) Assigned drawing number for Sakh. Updated weekly timesheet and submitted for approval. (08/30/18) Discussed trip and made travel arrangements for trip to CA. Copied ref info for trip. (08/31/18) Updated timesheet. Pulled more ref drawings for trip. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-30 OH-016 :OH-016 Overhead All Activities Regular Pay N 2 0 (08/30/18) Discussed drawing request with Kyle. Sketched light mounting base and sent for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-30 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2 0 (08/29/18) Continued to reconcile 272 drawing revisions and archiving. (08/30/18) Continued clean up. (08/31/18) Continued clean up Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 (08/27/18) Sent ticket to resolve AutoCAD issue. Discussed AutoCAD settings with Lam. (08/28/18) Assigned drawing number for Sakh. Updated weekly timesheet and submitted for approval. (08/30/18) Discussed trip and made travel arrangements for trip to CA. Copied ref info for trip. (08/31/18) Updated timesheet. Pulled more ref drawings for trip. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-08-31 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2 0 (08/29/18) Continued to reconcile 272 drawing revisions and archiving. (08/30/18) Continued clean up. (08/31/18) Continued clean up Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-04 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 9 0 (09/04/18) Travel to California. (09/05/18) H2S training/FIT test at Ellwood facility. Created layout of existing CIP house roof structure. Created a modification layout for house lifting (includes tubing columns, plating, and padeye locations). (09/06/18) Rig safety orientation. Reviewed scope of work for BOP handling. Took pictures of existing BOP cart/area. Checked dimensions on existing cart drawing. (09/07/18) Created folders for each CO task and saved field information. Surveyed area for possible CIP house platform. Sketched existing deck structure and took pics. (09/08/18) Created AutoCAD drawing of existing structure in order to create a concept for the CIP house installation. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-05 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 (09/04/18) Travel to California. (09/05/18) H2S training/FIT test at Ellwood facility. Created layout of existing CIP house roof structure. Created a modification layout for house lifting (includes tubing columns, plating, and padeye locations). (09/06/18) Rig safety orientation. Reviewed scope of work for BOP handling. Took pictures of existing BOP cart/area. Checked dimensions on existing cart drawing. (09/07/18) Created folders for each CO task and saved field information. Surveyed area for possible CIP house platform. Sketched existing deck structure and took pics. (09/08/18) Created AutoCAD drawing of existing structure in order to create a concept for the CIP house installation. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-06 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 13 0 (09/04/18) Travel to California. (09/05/18) H2S training/FIT test at Ellwood facility. Created layout of existing CIP house roof structure. Created a modification layout for house lifting (includes tubing columns, plating, and padeye locations). (09/06/18) Rig safety orientation. Reviewed scope of work for BOP handling. Took pictures of existing BOP cart/area. Checked dimensions on existing cart drawing. (09/07/18) Created folders for each CO task and saved field information. Surveyed area for possible CIP house platform. Sketched existing deck structure and took pics. (09/08/18) Created AutoCAD drawing of existing structure in order to create a concept for the CIP house installation. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-07 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 (09/04/18) Travel to California. (09/05/18) H2S training/FIT test at Ellwood facility. Created layout of existing CIP house roof structure. Created a modification layout for house lifting (includes tubing columns, plating, and padeye locations). (09/06/18) Rig safety orientation. Reviewed scope of work for BOP handling. Took pictures of existing BOP cart/area. Checked dimensions on existing cart drawing. (09/07/18) Created folders for each CO task and saved field information. Surveyed area for possible CIP house platform. Sketched existing deck structure and took pics. (09/08/18) Created AutoCAD drawing of existing structure in order to create a concept for the CIP house installation. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-08 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 (09/04/18) Travel to California. (09/05/18) H2S training/FIT test at Ellwood facility. Created layout of existing CIP house roof structure. Created a modification layout for house lifting (includes tubing columns, plating, and padeye locations). (09/06/18) Rig safety orientation. Reviewed scope of work for BOP handling. Took pictures of existing BOP cart/area. Checked dimensions on existing cart drawing. (09/07/18) Created folders for each CO task and saved field information. Surveyed area for possible CIP house platform. Sketched existing deck structure and took pics. (09/08/18) Created AutoCAD drawing of existing structure in order to create a concept for the CIP house installation. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-09 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 10 0 (09/09/18)Surveyed structure under mud pump area. Revised crown drawing for Loadmaster. Sketched existing MP blower ducting (pvc piping). Exxon weekly safety meeting. (09/10/18) Updated weekly timesheet and submitted for approval. Surveyed existing AFT drag chain area. Surveyed area for new drag chain (D.S. substructure). Converted existing cable tray drawing to AutoCAD for reference. Converted koomey unit drawing to AutoCAD. (09/11/18) Finalized drawing for replacement drag chain (AFT side). Continued survey of new drag chain area. (09/12/18) Made final puch list for rig survey. Surveyed rig floor for hoist location. & sketched area. Checked alternate option for CIP house location and sent info to Houston for review. Discussed options with Chuck and researched festoon option for D.S. substructure area. Sketched festoon option. (09/13/19) Sketched flow line and created AutoCAD layout for call with Exxon. Call to discuss mud system options. Discussed drag chain info with vendor and gathered additional info for new drag chain option. (09/14/18) Travel from California to Houston. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-10 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 (09/09/18)Surveyed structure under mud pump area. Revised crown drawing for Loadmaster. Sketched existing MP blower ducting (pvc piping). Exxon weekly safety meeting. (09/10/18) Updated weekly timesheet and submitted for approval. Surveyed existing AFT drag chain area. Surveyed area for new drag chain (D.S. substructure). Converted existing cable tray drawing to AutoCAD for reference. Converted koomey unit drawing to AutoCAD. (09/11/18) Finalized drawing for replacement drag chain (AFT side). Continued survey of new drag chain area. (09/12/18) Made final puch list for rig survey. Surveyed rig floor for hoist location. & sketched area. Checked alternate option for CIP house location and sent info to Houston for review. Discussed options with Chuck and researched festoon option for D.S. substructure area. Sketched festoon option. (09/13/19) Sketched flow line and created AutoCAD layout for call with Exxon. Call to discuss mud system options. Discussed drag chain info with vendor and gathered additional info for new drag chain option. (09/14/18) Travel from California to Houston. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-11 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 (09/09/18)Surveyed structure under mud pump area. Revised crown drawing for Loadmaster. Sketched existing MP blower ducting (pvc piping). Exxon weekly safety meeting. (09/10/18) Updated weekly timesheet and submitted for approval. Surveyed existing AFT drag chain area. Surveyed area for new drag chain (D.S. substructure). Converted existing cable tray drawing to AutoCAD for reference. Converted koomey unit drawing to AutoCAD. (09/11/18) Finalized drawing for replacement drag chain (AFT side). Continued survey of new drag chain area. (09/12/18) Made final puch list for rig survey. Surveyed rig floor for hoist location. & sketched area. Checked alternate option for CIP house location and sent info to Houston for review. Discussed options with Chuck and researched festoon option for D.S. substructure area. Sketched festoon option. (09/13/19) Sketched flow line and created AutoCAD layout for call with Exxon. Call to discuss mud system options. Discussed drag chain info with vendor and gathered additional info for new drag chain option. (09/14/18) Travel from California to Houston. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-12 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 (09/09/18)Surveyed structure under mud pump area. Revised crown drawing for Loadmaster. Sketched existing MP blower ducting (pvc piping). Exxon weekly safety meeting. (09/10/18) Updated weekly timesheet and submitted for approval. Surveyed existing AFT drag chain area. Surveyed area for new drag chain (D.S. substructure). Converted existing cable tray drawing to AutoCAD for reference. Converted koomey unit drawing to AutoCAD. (09/11/18) Finalized drawing for replacement drag chain (AFT side). Continued survey of new drag chain area. (09/12/18) Made final puch list for rig survey. Surveyed rig floor for hoist location. & sketched area. Checked alternate option for CIP house location and sent info to Houston for review. Discussed options with Chuck and researched festoon option for D.S. substructure area. Sketched festoon option. (09/13/19) Sketched flow line and created AutoCAD layout for call with Exxon. Call to discuss mud system options. Discussed drag chain info with vendor and gathered additional info for new drag chain option. (09/14/18) Travel from California to Houston. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-13 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 (09/09/18)Surveyed structure under mud pump area. Revised crown drawing for Loadmaster. Sketched existing MP blower ducting (pvc piping). Exxon weekly safety meeting. (09/10/18) Updated weekly timesheet and submitted for approval. Surveyed existing AFT drag chain area. Surveyed area for new drag chain (D.S. substructure). Converted existing cable tray drawing to AutoCAD for reference. Converted koomey unit drawing to AutoCAD. (09/11/18) Finalized drawing for replacement drag chain (AFT side). Continued survey of new drag chain area. (09/12/18) Made final puch list for rig survey. Surveyed rig floor for hoist location. & sketched area. Checked alternate option for CIP house location and sent info to Houston for review. Discussed options with Chuck and researched festoon option for D.S. substructure area. Sketched festoon option. (09/13/19) Sketched flow line and created AutoCAD layout for call with Exxon. Call to discuss mud system options. Discussed drag chain info with vendor and gathered additional info for new drag chain option. (09/14/18) Travel from California to Houston. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-14 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 9 0 (09/09/18)Surveyed structure under mud pump area. Revised crown drawing for Loadmaster. Sketched existing MP blower ducting (pvc piping). Exxon weekly safety meeting. (09/10/18) Updated weekly timesheet and submitted for approval. Surveyed existing AFT drag chain area. Surveyed area for new drag chain (D.S. substructure). Converted existing cable tray drawing to AutoCAD for reference. Converted koomey unit drawing to AutoCAD. (09/11/18) Finalized drawing for replacement drag chain (AFT side). Continued survey of new drag chain area. (09/12/18) Made final puch list for rig survey. Surveyed rig floor for hoist location. & sketched area. Checked alternate option for CIP house location and sent info to Houston for review. Discussed options with Chuck and researched festoon option for D.S. substructure area. Sketched festoon option. (09/13/19) Sketched flow line and created AutoCAD layout for call with Exxon. Call to discuss mud system options. Discussed drag chain info with vendor and gathered additional info for new drag chain option. (09/14/18) Travel from California to Houston. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-17 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-18 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 (09/18/18) Started mud pump area sketch for Thomas/Beers. (09/20/18) Reviewed new drawing chain design from EMI. Discussed festoon option with Chuck and updated drawing. Call with EMI to discuss festoon - sent email request. Meeting with Chuck/Kyle to discuss mud dock modifications. Call with Thomas/Beers to discuss mud dock proposal. (09/21/18) revised mud pump layout and sent drawing to Thomas/Beers for information. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (09/18/18) Discussed trip details with Kyle. Downloaded pics. (09/21/18) Expense report for trip. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-19 Holly Platform :Holly Platform TSR-01665-HOLP-98 Rentals (OH) Regular Pay N 8 0 (09/19/18) Discussed choke manifold changes wit Leroy. Started drawing changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-19 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 (09/19/18) Cyber security training. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-20 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 (09/18/18) Started mud pump area sketch for Thomas/Beers. (09/20/18) Reviewed new drawing chain design from EMI. Discussed festoon option with Chuck and updated drawing. Call with EMI to discuss festoon - sent email request. Meeting with Chuck/Kyle to discuss mud dock modifications. Call with Thomas/Beers to discuss mud dock proposal. (09/21/18) revised mud pump layout and sent drawing to Thomas/Beers for information. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (09/20/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-21 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 5 0 (09/18/18) Started mud pump area sketch for Thomas/Beers. (09/20/18) Reviewed new drawing chain design from EMI. Discussed festoon option with Chuck and updated drawing. Call with EMI to discuss festoon - sent email request. Meeting with Chuck/Kyle to discuss mud dock modifications. Call with Thomas/Beers to discuss mud dock proposal. (09/21/18) revised mud pump layout and sent drawing to Thomas/Beers for information. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (09/18/18) Discussed trip details with Kyle. Downloaded pics. (09/21/18) Expense report for trip. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-24 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 9 0 (09/24/18) Discussed survey reports with Kyle. Worked on sketch of BOP handling option. Discussed changes to mud pump area drawing - made changes. Call with field to review remaining scope/info needed for survey reports. Sent revised MP layout for quote. (09/25/18) Reviewed report progress with Kyle. Started drag chain/festoon survey report. Discussed festoon concept with Chuck and sent updated request to EMI for drawing purposes. Started survey report for CIP house installation. (09/26/18) Cont report for CIP house. Finalized epense report for survey trip. Researched hoist options for BOP handling options - sent to RAM for discussion. Discussed options with Kyle/Rob.(09/27/18) Layout of new option for BOP handling - discussed concept with Kyle/Chuck. (09/28/18) Coded expense report and submitted for approval. Created BOP stack drawing for Holly. Converted vendor jib crane info to AutoCAD for handling layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-25 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 9 0 (09/24/18) Discussed survey reports with Kyle. Worked on sketch of BOP handling option. Discussed changes to mud pump area drawing - made changes. Call with field to review remaining scope/info needed for survey reports. Sent revised MP layout for quote. (09/25/18) Reviewed report progress with Kyle. Started drag chain/festoon survey report. Discussed festoon concept with Chuck and sent updated request to EMI for drawing purposes. Started survey report for CIP house installation. (09/26/18) Cont report for CIP house. Finalized epense report for survey trip. Researched hoist options for BOP handling options - sent to RAM for discussion. Discussed options with Kyle/Rob.(09/27/18) Layout of new option for BOP handling - discussed concept with Kyle/Chuck. (09/28/18) Coded expense report and submitted for approval. Created BOP stack drawing for Holly. Converted vendor jib crane info to AutoCAD for handling layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-26 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 9.5 0 (09/24/18) Discussed survey reports with Kyle. Worked on sketch of BOP handling option. Discussed changes to mud pump area drawing - made changes. Call with field to review remaining scope/info needed for survey reports. Sent revised MP layout for quote. (09/25/18) Reviewed report progress with Kyle. Started drag chain/festoon survey report. Discussed festoon concept with Chuck and sent updated request to EMI for drawing purposes. Started survey report for CIP house installation. (09/26/18) Cont report for CIP house. Finalized epense report for survey trip. Researched hoist options for BOP handling options - sent to RAM for discussion. Discussed options with Kyle/Rob.(09/27/18) Layout of new option for BOP handling - discussed concept with Kyle/Chuck. (09/28/18) Coded expense report and submitted for approval. Created BOP stack drawing for Holly. Converted vendor jib crane info to AutoCAD for handling layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-27 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 7.5 0 (09/24/18) Discussed survey reports with Kyle. Worked on sketch of BOP handling option. Discussed changes to mud pump area drawing - made changes. Call with field to review remaining scope/info needed for survey reports. Sent revised MP layout for quote. (09/25/18) Reviewed report progress with Kyle. Started drag chain/festoon survey report. Discussed festoon concept with Chuck and sent updated request to EMI for drawing purposes. Started survey report for CIP house installation. (09/26/18) Cont report for CIP house. Finalized epense report for survey trip. Researched hoist options for BOP handling options - sent to RAM for discussion. Discussed options with Kyle/Rob.(09/27/18) Layout of new option for BOP handling - discussed concept with Kyle/Chuck. (09/28/18) Coded expense report and submitted for approval. Created BOP stack drawing for Holly. Converted vendor jib crane info to AutoCAD for handling layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-27 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1.5 0 (09/27/18) Pulled 77B drawings for meeting with customer (request by Leroy). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-28 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 3.5 0 (09/24/18) Discussed survey reports with Kyle. Worked on sketch of BOP handling option. Discussed changes to mud pump area drawing - made changes. Call with field to review remaining scope/info needed for survey reports. Sent revised MP layout for quote. (09/25/18) Reviewed report progress with Kyle. Started drag chain/festoon survey report. Discussed festoon concept with Chuck and sent updated request to EMI for drawing purposes. Started survey report for CIP house installation. (09/26/18) Cont report for CIP house. Finalized epense report for survey trip. Researched hoist options for BOP handling options - sent to RAM for discussion. Discussed options with Kyle/Rob.(09/27/18) Layout of new option for BOP handling - discussed concept with Kyle/Chuck. (09/28/18) Coded expense report and submitted for approval. Created BOP stack drawing for Holly. Converted vendor jib crane info to AutoCAD for handling layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (09/28/18) Created new drawing folders for Holly and organized files. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (09/28/18) Archived misc drawing files received from Sakhalin. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-09-28 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 (09/28/18) Revised drawing. Transmitted files and archived on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-01 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 7 0 (10/01/18) Discussed survey report status with Chuck. CIP house install drawing for report. Call with Benny/Lam to discuss remaining survey items. Updated BOP/handling layout and sent to field for review. (10/02/18) Printed drawings for meeting (Chuck). Completed CIP drawing. Started final drag chain drawings. (10/03/18) Finished existing & new drag chain drawings. Finished festoon sketch. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (10/01/18) Updated weekly timesheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (10/01/18) Searched for 262L drawworks info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-02 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 9 0 (10/01/18) Discussed survey report status with Chuck. CIP house install drawing for report. Call with Benny/Lam to discuss remaining survey items. Updated BOP/handling layout and sent to field for review. (10/02/18) Printed drawings for meeting (Chuck). Completed CIP drawing. Started final drag chain drawings. (10/03/18) Finished existing & new drag chain drawings. Finished festoon sketch. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-03 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 (10/01/18) Discussed survey report status with Chuck. CIP house install drawing for report. Call with Benny/Lam to discuss remaining survey items. Updated BOP/handling layout and sent to field for review. (10/02/18) Printed drawings for meeting (Chuck). Completed CIP drawing. Started final drag chain drawings. (10/03/18) Finished existing & new drag chain drawings. Finished festoon sketch. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-03 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 (10/03/18) Pulled Haz area and ventilation drawings for Sachin - discussed drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-04 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 8.5 0 (10/04/18) Started on driller's console drawing. (10/05/18) Discussed console with Chuck - continued drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (10/04/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-05 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 6 0 (10/04/18) Started on driller's console drawing. (10/05/18) Discussed console with Chuck - continued drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-08 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 3 0 (10/08/18) Finalized driller's console and sent to Chuck for quote. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-08 Holly Platform :Holly Platform TSR-01665-HOLP-98 Rentals (OH) Regular Pay N 2 0 (10/08/18) Revised choke manifold for Leroy. Sent updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (10/08/18) Team meeting. (10/10/18) Team meeting. (10/11/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (10/08/18) Updated weekly timesheet and submitted for approval. general status update with Kyle. (10/09/18) Created new AutoCAD block for a Weatherford rotating control device and saved block on Q for future use. (10/10/18) discussed BP drawing package with Kyle. (10/12/18) Status discussion with Kyle/Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-08 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 2 0 (10/08/18) Searched for reference info for large BOP stack for BP tender. Started layouts. (10/09/18) Racking board layout for BP clarification request. Call with George to discuss Eng scope for clarifications. Created new 21-1/4" and 18-3/4" BOP stack drawings (with rotating heads). (10/10/18) Pulled ref info and updated 258L plot plan for BP. Cleaned up drawing folders and finalized stack drawings. (10/11/18) follow up call with George to discuss outstanding clarifications and deliverables. Pulled 15K choke info for drawing. Updated HP mud schematic and sent to George. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-08 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 (10/08/18) Call with Mark/Dan to discuss exhaust cap issues. Pulled ref info and sent for discussion. (10/10/18) Updated 272L HP mud sch per request from Mark. Discussed PID drawings with Dan B. (10/11/18) Researched HP piping info for Mark. (10/12/18) Pulled additional info for Mark. Discussed drawing redlines with Dan. Made changes and sent LP mud back to Alaska for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (10/08/18) Updated weekly timesheet and submitted for approval. general status update with Kyle. (10/09/18) Created new AutoCAD block for a Weatherford rotating control device and saved block on Q for future use. (10/10/18) discussed BP drawing package with Kyle. (10/12/18) Status discussion with Kyle/Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-09 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 7 0 (10/08/18) Searched for reference info for large BOP stack for BP tender. Started layouts. (10/09/18) Racking board layout for BP clarification request. Call with George to discuss Eng scope for clarifications. Created new 21-1/4" and 18-3/4" BOP stack drawings (with rotating heads). (10/10/18) Pulled ref info and updated 258L plot plan for BP. Cleaned up drawing folders and finalized stack drawings. (10/11/18) follow up call with George to discuss outstanding clarifications and deliverables. Pulled 15K choke info for drawing. Updated HP mud schematic and sent to George. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-09 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 (10/09/18) Searched for deadline anchor info for rig 247L ( info from 272L old deadline). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (10/08/18) Team meeting. (10/10/18) Team meeting. (10/11/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (10/08/18) Updated weekly timesheet and submitted for approval. general status update with Kyle. (10/09/18) Created new AutoCAD block for a Weatherford rotating control device and saved block on Q for future use. (10/10/18) discussed BP drawing package with Kyle. (10/12/18) Status discussion with Kyle/Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-10 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 5.75 0 (10/08/18) Searched for reference info for large BOP stack for BP tender. Started layouts. (10/09/18) Racking board layout for BP clarification request. Call with George to discuss Eng scope for clarifications. Created new 21-1/4" and 18-3/4" BOP stack drawings (with rotating heads). (10/10/18) Pulled ref info and updated 258L plot plan for BP. Cleaned up drawing folders and finalized stack drawings. (10/11/18) follow up call with George to discuss outstanding clarifications and deliverables. Pulled 15K choke info for drawing. Updated HP mud schematic and sent to George. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-10 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2.5 0 (10/08/18) Call with Mark/Dan to discuss exhaust cap issues. Pulled ref info and sent for discussion. (10/10/18) Updated 272L HP mud sch per request from Mark. Discussed PID drawings with Dan B. (10/11/18) Researched HP piping info for Mark. (10/12/18) Pulled additional info for Mark. Discussed drawing redlines with Dan. Made changes and sent LP mud back to Alaska for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (10/08/18) Team meeting. (10/10/18) Team meeting. (10/11/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-11 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 7 0 (10/08/18) Searched for reference info for large BOP stack for BP tender. Started layouts. (10/09/18) Racking board layout for BP clarification request. Call with George to discuss Eng scope for clarifications. Created new 21-1/4" and 18-3/4" BOP stack drawings (with rotating heads). (10/10/18) Pulled ref info and updated 258L plot plan for BP. Cleaned up drawing folders and finalized stack drawings. (10/11/18) follow up call with George to discuss outstanding clarifications and deliverables. Pulled 15K choke info for drawing. Updated HP mud schematic and sent to George. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-11 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 (10/08/18) Call with Mark/Dan to discuss exhaust cap issues. Pulled ref info and sent for discussion. (10/10/18) Updated 272L HP mud sch per request from Mark. Discussed PID drawings with Dan B. (10/11/18) Researched HP piping info for Mark. (10/12/18) Pulled additional info for Mark. Discussed drawing redlines with Dan. Made changes and sent LP mud back to Alaska for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (10/08/18) Updated weekly timesheet and submitted for approval. general status update with Kyle. (10/09/18) Created new AutoCAD block for a Weatherford rotating control device and saved block on Q for future use. (10/10/18) discussed BP drawing package with Kyle. (10/12/18) Status discussion with Kyle/Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-12 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 5.5 0 (10/08/18) Call with Mark/Dan to discuss exhaust cap issues. Pulled ref info and sent for discussion. (10/10/18) Updated 272L HP mud sch per request from Mark. Discussed PID drawings with Dan B. (10/11/18) Researched HP piping info for Mark. (10/12/18) Pulled additional info for Mark. Discussed drawing redlines with Dan. Made changes and sent LP mud back to Alaska for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (10/15/18) Updated weekly timesheet and submitted for approval. (10/16/18) General status update with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-15 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2.5 0 (10/15/18) Searched for Liberty module weight info for Alaska. Sent drawings. Discussed heater/genset exhaust issues with Mark. Discussed with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-15 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2.5 0 (10/15/18) Searched for 247L mast sheave info (searched archives/fileroom). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-15 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 3 0 (10/15/18) Started standpipe gusset drawing. (10/16/18) Updated gusset design and continued drawing. (10/17/18) Updated drawing for quotation. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-16 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 1 0 (10/16/18) Meeting to discuss drawing requirements for the remainder of reburb. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-16 Holly Platform :Holly Platform TSR-01665-HOLP-98 Rentals (OH) Regular Pay N 2 0 (10/16/18) Choke manifold drawing revision for Leroy. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (10/15/18) Updated weekly timesheet and submitted for approval. (10/16/18) General status update with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-16 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 5.5 0 (10/15/18) Started standpipe gusset drawing. (10/16/18) Updated gusset design and continued drawing. (10/17/18) Updated drawing for quotation. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-17 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 9 0 (10/15/18) Started standpipe gusset drawing. (10/16/18) Updated gusset design and continued drawing. (10/17/18) Updated drawing for quotation. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-22 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 3 0 (10/22/18) Updated driller's console drawing and issued for construction. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (10/22/18) NCOC meeting. (10/24/18) Meeting wit hHR to discuss designer travel/OT (10/25/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (10/22/18) Updated weekly timesheet and submitted for approval. Status update with Kyle. General drawing status review with Kyle. (10/23/18) Created drawing progress tracker for Holly project. Started notes for performance review - self appr. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-22 OH-014 :OH-014 Overhead All Activities Regular Pay N 2.5 0 (10/22/18) Started 3D SketchUp model of driller's console. (2018' goals) (10/23/18) Cont model. (10/24/18) Cont model. (10/25/18) Cont model. (10/26/18) Final changes - saved to project folder. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 (10/22/18) Archived AutoCAD files from Sakh. (10/23/18) Archived additional drawing files. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (10/22/18) Updated weekly timesheet and submitted for approval. Status update with Kyle. General drawing status review with Kyle. (10/23/18) Created drawing progress tracker for Holly project. Started notes for performance review - self appr. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-23 OH-014 :OH-014 Overhead All Activities Regular Pay N 5.5 0 (10/22/18) Started 3D SketchUp model of driller's console. (2018' goals) (10/23/18) Cont model. (10/24/18) Cont model. (10/25/18) Cont model. (10/26/18) Final changes - saved to project folder. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 (10/22/18) Archived AutoCAD files from Sakh. (10/23/18) Archived additional drawing files. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-23 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 (10/23/18) Added dims to GA and sent info to Luis. (10/25/18) Call with Alaska to discuss exhaust modifications. Started new sketch. (10/25/18) Continued with exhaust sketch. Call with Mark to review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (10/22/18) NCOC meeting. (10/24/18) Meeting wit hHR to discuss designer travel/OT (10/25/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-24 OH-014 :OH-014 Overhead All Activities Regular Pay N 7 0 (10/22/18) Started 3D SketchUp model of driller's console. (2018' goals) (10/23/18) Cont model. (10/24/18) Cont model. (10/25/18) Cont model. (10/26/18) Final changes - saved to project folder. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-24 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1.5 0 (10/24/18) Researched 216 Safe house info for Dan Colby. Sent info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (10/22/18) NCOC meeting. (10/24/18) Meeting wit hHR to discuss designer travel/OT (10/25/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-25 OH-014 :OH-014 Overhead All Activities Regular Pay N 2.5 0 (10/22/18) Started 3D SketchUp model of driller's console. (2018' goals) (10/23/18) Cont model. (10/24/18) Cont model. (10/25/18) Cont model. (10/26/18) Final changes - saved to project folder. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-25 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2.5 0 (10/23/18) Added dims to GA and sent info to Luis. (10/25/18) Call with Alaska to discuss exhaust modifications. Started new sketch. (10/25/18) Continued with exhaust sketch. Call with Mark to review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-25 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 3 0 (10/25/18) 253L top drive hang-off padeye drawing. Issued drawing and archived file. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-26 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 (10/22/18) Started 3D SketchUp model of driller's console. (2018' goals) (10/23/18) Cont model. (10/24/18) Cont model. (10/25/18) Cont model. (10/26/18) Final changes - saved to project folder. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-10-26 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 5 0 (10/23/18) Added dims to GA and sent info to Luis. (10/25/18) Call with Alaska to discuss exhaust modifications. Started new sketch. (10/25/18) Continued with exhaust sketch. Call with Mark to review. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-02 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Time Off ( Hibernia Visit) Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1.kanban Board meeting 2. TSR Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-03 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 4 0 1. Kvaerner Platform Power Comparison 2. Reviewing project Document Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-03 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 2 0 1 Creating load list . Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-03 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 1. Internal Controls training 2. Compliance Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 1. Nor survey Document 2 Review SoW document Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 5 0 1 Review Mh Wirth Docuemnts , SoW and proposal Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1.kanban Board meeting 2. TSR Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-04 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Worksheet Update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-04 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 1. Internal Controls training 2. Compliance Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 1. Nor survey Document 2 Review SoW document Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1 Review Mh Wirth Docuemnts , SoW and proposal Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-05 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 1. Kvaerner Platform Power Comparison 2. Reviewing project Document Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-05 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 1. Internal Controls training 2. Compliance Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-08 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 6 0 Review MH wirth documents. Review of SoW documents : 1 TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW 2TSR-01583-SP-MU-00007-RevA-PLC Life Extension 3.TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW 4. TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 1 TSR meeting 2. Kanban meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-08 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Sakhalin Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 NOV survey report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 6 0 Review MH wirth documents. Review of SoW documents : 1 TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW 2TSR-01583-SP-MU-00007-RevA-PLC Life Extension 3.TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW 4. TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-09 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 1. Vendor meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-10 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 6 0 Review MH wirth documents. Review of SoW documents : 1 TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW 2TSR-01583-SP-MU-00007-RevA-PLC Life Extension 3.TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW 4. TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-10 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 1 TSR worksheet update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-10 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 1. Vendor meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 6 0 Review MH wirth documents. Review of SoW documents : 1 TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW 2TSR-01583-SP-MU-00007-RevA-PLC Life Extension 3.TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW 4. TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1 TSR meeting 2. Kanban meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-11 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 2 0 Update and TSR Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 5 0 Review MH wirth documents. Review of SoW documents : 1 TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW 2TSR-01583-SP-MU-00007-RevA-PLC Life Extension 3.TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW 4. TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. MH Wirth meeting 2. Review of MH Wirth proposal 3. Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR board meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-15 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-15 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 4 0 Project Status and closeout report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Snow storm and black icing Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 1. MH Wirth meeting 2. Review of MH Wirth proposal 3. Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Snow storm and black icing Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 5 0 1. MH Wirth meeting 2. Review of MH Wirth proposal 3. Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 Support on old TSR queries Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-18 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 1 0 Project Status and closeout report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. MH Wirth meeting 2. Review of MH Wirth proposal 3. Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-19 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4 0 HH rig visit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-22 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 1. Research on Hibernia documentation for DC field and area class issue. 2. Meeting action item resolution. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Kanban meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-22 OH-014 :OH-014 Overhead All Activities Regular Pay N 5 0 MH wirth visit Toastmasters Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-22 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Sakhlin queries over phone and email Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-23 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. Research on Hibernia documentation for DC field and area class issue. 2. Meeting action item resolution. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-23 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 Rig visit document Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-23 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Gas generator research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-23 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 3 0 Report: NOVOS System Weekly conference calls Gathering information and statistics Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-24 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 1. Review on HM wirth document for new DC top drive Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-24 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. Research on Hibernia documentation for DC field and area class issue. 2. Meeting action item resolution. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-24 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Update weekely worksheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-24 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 MH wirth visit Toastmasters Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-24 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 3 0 Report: NOVOS System Weekly conference calls Gathering information and statistics Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 1. Review on HM wirth document for new DC top drive Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 1. Research on Hibernia documentation for DC field and area class issue. 2. Meeting action item resolution. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 TSR meeting Kanban meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-25 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 4 0 Report: NOVOS System Weekly conference calls Gathering information and statistics Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. Research on Hibernia documentation for DC field and area class issue. 2. Meeting action item resolution. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-26 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Gas generator research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-26 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 3 0 Report: NOVOS System Weekly conference calls Gathering information and statistics Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-29 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Floating holiday Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-30 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 1. Top drive certification and DC field amp research 2. Area class native file research 3. Review of MH Wirth DC top drive documents Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Weekly TSR meeting 2. Kanban board meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-30 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 4 0 Report: NOVOS System Weekly conference calls Gathering information and statistics Presentation for TS team Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-31 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. Top drive certification and DC field amp research 2. Area class native file research 3. Review of MH Wirth DC top drive documents Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-31 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 1. gas generator research 2. Submarine cable research 3. Cost comparison for submarine cable option Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-31 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 1. ACS vendor visit 2. Waukesha facility visit 3.Mandatory compliance training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-31 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 4 0 Report: NOVOS System Weekly conference calls Gathering information and statistics Presentation for TS team Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Weekly TSR meeting 2. Kanban board meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-01 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 1. gas generator research 2. Submarine cable research 3. Cost comparison for submarine cable option Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Update worksheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-01 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 1. ACS vendor visit 2. Waukesha facility visit 3.Mandatory compliance training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Weekly TSR meeting 2. Kanban board meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-02 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 1. gas generator research 2. Submarine cable research 3. Cost comparison for submarine cable option Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-02 OH-014 :OH-014 Overhead All Activities Regular Pay N 3 0 1. ACS vendor visit 2. Waukesha facility visit 3.Mandatory compliance training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban Board meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-05 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-05 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 6 0 NOVOS weekly call, Report update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-06 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 1. Review MH Wirth quote 2. Top Drive Comparison Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-06 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 1. Submarine cable support Minkit platform proposal study Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-07 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. Review MH Wirth quote 2. Top Drive Comparison Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Rig equipment worksheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-07 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 1. Submarine cable support Minkit platform proposal study Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 SCR notching issue research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-08 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. Review MH Wirth quote 2. Top Drive Comparison Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Rig equipment worksheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-08 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 1. Submarine cable support Minkit platform proposal study Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-08 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 Fire and gas shutdown research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban Board meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Rig equipment worksheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-09 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 1. Submarine cable support Minkit platform proposal study Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Hibernia TD comparison Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kan ban meetin TSR meeting Earnings call Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Initial IT set up GE PO and MR Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Hibernia TD comparison Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-13 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 BoD document Genesis kickoff meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-13 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Initial IT set up GE PO and MR Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-14 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Hibernia TD comparison Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kan ban meetin TSR meeting Earnings call Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-14 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 worksheet update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Initial IT set up GE PO and MR Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Hibernia TD comparison Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Kan ban meetin TSR meeting Earnings call Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-15 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 BoD document Genesis kickoff meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-16 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Hibernia TD comparison Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-16 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 BoD document Genesis kickoff meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 TD comparison ppt and internal meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 8 0 Gathering information on Berkut ,orlan and comparing with Minkit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 1. TD BoD document preparation. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Gathering information on Berkut ,orlan and comparing with Minkit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 1. TD BoD document preparation. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kanban meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-26 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-26 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Meetings, Timesheet updates, biweekly report, BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 TD comparison document and comments Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Meetings, Timesheet updates, biweekly report, BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-28 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 TD comparison document and comments Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Meetings, Timesheet updates, biweekly report, BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 TD comparison document and comments Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 3 0 BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Meetings, Timesheet updates, biweekly report, BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-02 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 TD comparison Document Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-02 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 3 0 BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Meetings, Timesheet updates, biweekly report, BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kan Ban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 7 0 1.Electrical Power System Studies 2. BoD modification 3. Action Tracker 4. Timesheet and Weekly report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 1. Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-07 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Business Development training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-07 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 7 0 1.Electrical Power System Studies 2. BoD modification 3. Action Tracker 4. Timesheet and Weekly report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 9 0 1.Electrical Power System Studies 2. BoD modification 3. Action Tracker 4. Timesheet and Weekly report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-09 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 1.Electrical Power System Studies 2. BoD modification 3. Action Tracker 4. Timesheet and Weekly report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-12 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Oracle Module training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-12 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly conference call Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Revised Power System PPT 2. Revised BoD to add option 6 3. Risk register and action tracker 4. Weekly report and timesheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 1, Weekly meetings 2. Document review Weight , CG. 3 Document review Scope split 4 Requisition update 5 GE invoice receiving Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-13 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Oracle Module training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Revised Power System PPT 2. Revised BoD to add option 6 3. Risk register and action tracker 4. Weekly report and timesheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 1, Weekly meetings 2. Document review Weight , CG. 3 Document review Scope split 4 Requisition update 5 GE invoice receiving Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-14 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Oracle Module training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Revised Power System PPT 2. Revised BoD to add option 6 3. Risk register and action tracker 4. Weekly report and timesheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 1, Weekly meetings 2. Document review Weight , CG. 3 Document review Scope split 4 Requisition update 5 GE invoice receiving Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-15 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 4 0 TSR review Electrical part search Schematic Drawing Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-15 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Revised Power System PPT 2. Revised BoD to add option 6 3. Risk register and action tracker 4. Weekly report and timesheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-15 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 1, Weekly meetings 2. Document review Weight , CG. 3 Document review Scope split 4 Requisition update 5 GE invoice receiving Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-16 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 4 0 TSR review Electrical part search Schematic Drawing Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-16 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 1. Revised Power System PPT 2. Revised BoD to add option 6 3. Risk register and action tracker 4. Weekly report and timesheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-16 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 1, Weekly meetings 2. Document review Weight , CG. 3 Document review Scope split 4 Requisition update 5 GE invoice receiving Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban meeting 2 Weekly status meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-19 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-19 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 4 0 1 Schematic Drawing sketch 2. Panel layout 3. MTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly report and timesheet 2. Review of Screening and RAC matrix 3. Scope split ppt Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-20 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 4 0 1 Schematic Drawing sketch 2. Panel layout 3. MTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-20 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 2 0 Novos system conference call System update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly report and timesheet 2. Review of Screening and RAC matrix 3. Scope split ppt Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban meeting 2 Weekly status meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-21 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 vendor interaction Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly report and timesheet 2. Review of Screening and RAC matrix 3. Scope split ppt Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 1. Weekly meetings 2. RIsk matrix 3. Topsides Philosophies 4. Electrical Capex 5. Metocean PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban meeting 2 Weekly status meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-22 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 1 Schematic Drawing sketch 2. Panel layout 3. MTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly report and timesheet 2. Review of Screening and RAC matrix 3. Scope split ppt Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 1. Weekly meetings 2. RIsk matrix 3. Topsides Philosophies 4. Electrical Capex 5. Metocean PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-23 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 1 Schematic Drawing sketch 2. Panel layout 3. MTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 6 0 1. Weekly meetings 2. RIsk matrix 3. Topsides Philosophies 4. Electrical Capex 5. Metocean PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Weekly Kanban Meeting 2 TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-26 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 3 0 1. Weekly report and timesheet 2. RIsk matrix 3. Topsides Philosophies Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 1. Weekly meetings 2. RIsk matrix meeting 3. Topsides Philosophies review 4 Project meetings 5. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 3 0 1. Weekly report and timesheet 2. RIsk matrix 3. Topsides Philosophies Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 1. Weekly meetings 2. RIsk matrix meeting 3. Topsides Philosophies review 4 Project meetings 5. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Weekly Kanban Meeting 2 TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly report and timesheet 2. RIsk matrix 3. Topsides Philosophies Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 1. Weekly meetings 2. RIsk matrix meeting 3. Topsides Philosophies review 4 Project meetings 5. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Weekly Kanban Meeting 2 TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-29 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Worksheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 3 0 1. Weekly report and timesheet 2. RIsk matrix 3. Topsides Philosophies Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 1. Weekly meetings 2. RIsk matrix meeting 3. Topsides Philosophies review 4 Project meetings 5. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-30 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly Report and Timesheet 2. RIsk Register 3 Screening Document 4. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 6 0 1. Weekly meetings 2. RIsk Register 3 Screening Document 4. Action register changes Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-03 ORLAN-TSR :ORLAN-TSR TSR-01631-ORLP Flow Meter on Base Oil Supply Line Regular Pay N 1 0 TSR review , generate CTR Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly Report and Timesheet 2. RIsk Register 3 Screening Document 4. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 6 0 1. Weekly meetings 2. RIsk Register 3 Screening Document 4. Action register changes Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly Report and Timesheet 2. RIsk Register 3 Screening Document 4. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 6 0 1. Weekly meetings 2. RIsk Register 3 Screening Document 4. Action register changes Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-05 ORLAN-TSR :ORLAN-TSR TSR-01637-ORLP Centrifugal Pumps Soft Start Regular Pay N 1 0 TSR review , generate CTR Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly Report and Timesheet 2. RIsk Register 3 Screening Document 4. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 1. Weekly meetings 2. RIsk Register 3 Screening Document 4. Action register changes Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly Report and Timesheet 2. RIsk Register 3 Screening Document 4. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 1. Weekly meetings 2. RIsk Register 3 Screening Document 4. Action register changes Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-09 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-09 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 6 0 1. Create Invoice KV 2. Receive Invoice GE Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-10 ORLAN-TSR :ORLAN-TSR TSR-01631-ORLP Flow Meter on Base Oil Supply Line Regular Pay N 8 0 1. TSR review 2. MTO review 3. TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-11 ORLAN-TSR :ORLAN-TSR TSR-01631-ORLP Flow Meter on Base Oil Supply Line Regular Pay N 6 0 1. TSR review 2. MTO review 3. TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-11 ORLAN-TSR :ORLAN-TSR TSR-01637-ORLP Centrifugal Pumps Soft Start Regular Pay N 2 0 1. TSR review 2. MTO Review 3. TSR Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-12 ORLAN-TSR :ORLAN-TSR TSR-01637-ORLP Centrifugal Pumps Soft Start Regular Pay N 8 0 1. TSR review 2. MTO Review 3. TSR Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-13 ORLAN-TSR :ORLAN-TSR TSR-01637-ORLP Centrifugal Pumps Soft Start Regular Pay N 6 0 1. TSR review 2. MTO Review 3. TSR Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-17 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 KanBan Meeting , TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-23 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 4 0 Research for load list, Invoice receiving , Document research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-23 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-23 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 1 0 Coordination , conference call , review of statistics documents Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 KanBan Meeting , TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-24 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 3 0 Research for load list, Invoice receiving , Document research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-24 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3 0 Research for IEC 60079 and API 505 maintenance Procedure Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-24 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 2 0 Coordination , conference call , review of statistics documents Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 KanBan Meeting , TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-25 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 4 0 Research for load list, Invoice receiving , Document research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-25 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 Research for IEC 60079 and API 505 maintenance Procedure Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-25 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 2 0 Coordination , conference call , review of statistics documents Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 KanBan Meeting , TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-26 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 Research for load list, Invoice receiving , Document research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-26 OH-014 :OH-014 Overhead All Activities Regular Pay N 3 0 Requisition Process , Receiving Process Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-26 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 Research for IEC 60079 and API 505 maintenance Procedure Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-26 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 2 0 Coordination , conference call , review of statistics documents Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 1. TSR -Closeout document research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-27 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 Research for load list, Invoice receiving , Document research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-27 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 Research for IEC 60079 and API 505 maintenance Procedure Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-27 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 2 0 TSR review and CTR Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 KanBan Meeting TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-30 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-30 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3 0 IEC vs API comparison Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-30 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 4 0 TSR meeting Closeout document preparation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 5 0 TSR Closeout New TSR documents review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 KanBan Meeting TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-01 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 Crane investigation Standards and codes investigation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-02 OH-014 :OH-014 Overhead All Activities Regular Pay N 9 0 OTC Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-03 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 5 0 TSR Closeout New TSR documents review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 KanBan Meeting TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-03 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 Crane investigation Standards and codes investigation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-04 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 Crane investigation Standards and codes investigation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-04 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 2 0 TSR review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-04 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 2 0 TSR meeting Closeout document preparation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-07 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Meeting Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-07 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 Research on breaker parts for Supply chain department.( Non TSR) research for grounding solution Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-07 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 2 0 TSR review , Discussion with Sakhalin team. suggestion of alternate design Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Meeting Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-08 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 Crane research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-08 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-08 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 2 0 TSR review , Discussion with Sakhalin team. suggestion of alternate design Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-08 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 1 0 Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-09 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 Crane research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-09 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Vendor meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 Research on breaker parts for Supply chain department.( Non TSR) research for grounding solution Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-09 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 1 0 TSR review , Discussion with Sakhalin team. suggestion of alternate design Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Meeting Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-10 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Vendor meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-10 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 5 0 TSR review , Discussion with Sakhalin team. suggestion of alternate design Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-10 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 1 0 Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 Research on breaker parts for Supply chain department.( Non TSR) research for grounding solution Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-11 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 1 0 TSR review , Discussion with Sakhalin team. suggestion of alternate design Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-11 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 2 0 Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Sick day Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. Hibernia PLC scope review . 2. Hibernia TD rail scope review. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Meeting with vendor Chris from BREUER-MOTOREN GMBH & CO. KG 2.Toastmasters Meeting 3. Weekly kanban meeting 4. TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-15 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 3 0 1. Minkit Load List Update 2. Minkit crane power consumption study Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-15 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 IMS training schedule Security Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-16 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. Hibernia PLC scope review . 2. Hibernia TD rail scope review. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Meeting with vendor Chris from BREUER-MOTOREN GMBH & CO. KG 2.Toastmasters Meeting 3. Weekly kanban meeting 4. TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Breaker trip issue MAC heater 2. Research for grounding issue Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-16 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 4 0 1. TSR review and discussion 2. TSR closeout 3. TSR scope change and CTR update. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Meeting with vendor Chris from BREUER-MOTOREN GMBH & CO. KG 2.Toastmasters Meeting 3. Weekly kanban meeting 4. TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-17 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 1. Minkit Load List Update 2. Minkit crane power consumption study Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Breaker trip issue MAC heater 2. Research for grounding issue Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-17 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 4 0 1. TSR review and discussion 2. TSR closeout 3. TSR scope change and CTR update. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 1. Meeting with vendor Chris from BREUER-MOTOREN GMBH & CO. KG 2.Toastmasters Meeting 3. Weekly kanban meeting 4. TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Breaker trip issue MAC heater 2. Research for grounding issue Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-18 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 1. CTR for TSR-1635 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-21 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 1. Monthly Timesheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1,TSR board meeting 2. Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-21 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 4 0 1. Closeout report NOVOS Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1,TSR board meeting 2. Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Breaker Trip Issue document review. 2. Grounding issue drawing research. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-22 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 1. Research for standard 1458 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-22 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 3 0 1. Closeout report NOVOS Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1,TSR board meeting 2. Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Breaker Trip Issue document review. 2. Grounding issue drawing research. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-23 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 1. Research for standard 1458 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-23 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 3 0 1. Closeout report NOVOS Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1,TSR board meeting 2. Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-24 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 4 0 1.CTR Update 2.TSR review 3.Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-24 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 3 0 1. Closeout report NOVOS Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-25 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 4 0 1.CTR Update 2.TSR review 3.Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-25 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 TSR review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-25 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 2 0 1. Closeout report NOVOS Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-28 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Holiday Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-29 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Sakhalin Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-29 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Neutral Grounding Issue Research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-29 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 4 0 1. Drawing Mark Up 2. MTO 3.Part datasheet 4. Design of Test circuit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-29 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 3 0 1.TSR closeout 2. NOVOS system Report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1.Kanban Meeting 2. TSR Meeting 3. Vendor ACS meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-30 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Neutral Grounding Issue Research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-30 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 4 0 1. Drawing Mark Up 2. MTO 3.Part datasheet 4. Design of Test circuit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1.Kanban Meeting 2. TSR Meeting 3. Vendor ACS meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-31 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Neutral Grounding Issue Research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-31 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 5 0 1. Drawing Mark Up 2. MTO 3.Part datasheet 4. Design of Test circuit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-31 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 TSR review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1.Timesheet approval 2. Follow up on NOV quote Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 1.Kanban Meeting 2. TSR Meeting 3. Vendor ACS meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-01 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 3 0 1.TSR closeout 2. NOVOS system Report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-04 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 1 Weekly meeting 2. Call with Sakhalin engineer Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-04 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 8 0 TSR closeout and MTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Weekly TSR meeting 2. Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-05 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 1 Weekly meeting 2. Call with Sakhalin engineer Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Research for grounding solution options. 2. Research on SCR notching issues, Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-05 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 2 0 TSR closeout and MTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-05 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 TSR review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Weekly TSR meeting 2. Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-06 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 1. Call with Submarine cable vendor and crane vendor Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR Worksheet update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-06 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 1 Weekly meeting 2. Call with Sakhalin engineer Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Research for grounding solution options. 2. Research on SCR notching issues, Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-06 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 TSR review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Weekly TSR meeting 2. Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-07 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 1. Call with Submarine cable vendor and crane vendor Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-07 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 CAT DGB training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Research for grounding solution options. 2. Research on SCR notching issues, Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-07 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 3 0 TSR review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Research for grounding solution options. 2. Research on SCR notching issues, Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-08 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 4 0 TSR review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. TSR board meeting 2. Kanban meeting 3. HDI vendor visit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-11 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 DGB research communication with cable vendor Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-11 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 1. Generator Part number research 2. Research for Kretchet MCC Schematic 3. Review of new star and stop switch design 4. Red line MCC schematic 5. Check code requirements Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-11 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 2 0 Revised MTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-11 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 CTR revision Call with Mark Mcconn Research on power issue solution Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. TSR board meeting 2. Kanban meeting 3. HDI vendor visit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-12 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 DGB research communication with cable vendor Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Generator Part number research 2. Research for Kretchet MCC Schematic 3. Review of new star and stop switch design 4. Red line MCC schematic 5. Check code requirements Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-12 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 2 0 Revised MTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-12 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 CTR revision Call with Mark Mcconn Research on power issue solution Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 1. TSR board meeting 2. Kanban meeting 3. HDI vendor visit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 NOVOS System presentation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-13 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Supply chain IMS training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 1. Generator Part number research 2. Research for Kretchet MCC Schematic 3. Review of new star and stop switch design 4. Red line MCC schematic 5. Check code requirements Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-14 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. NOV quote review 2. Meeting path forward for SOW Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 1. TSR board meeting 2. Kanban meeting 3. HDI vendor visit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 NOVOS System presentation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-14 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Worksheet Update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 1. Generator Part number research 2. Research for Kretchet MCC Schematic 3. Review of new star and stop switch design 4. Red line MCC schematic 5. Check code requirements Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. NOV quote review 2. Meeting path forward for SOW Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 NOVOS System presentation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-15 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 DGB research communication with cable vendor Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-15 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Generator Part number research 2. Research for Kretchet MCC Schematic 3. Review of new star and stop switch design 4. Red line MCC schematic 5. Check code requirements Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Scope of work draft, communication with NOV to clarify scope. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 Scope of work draft, communication with NOV to clarify scope. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Kanban Meeting Safety Moment Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Procurement support for supply chain department Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-19 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 TSR review Coordination with NOV Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Scope of work draft, communication with NOV to clarify scope. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 Scope of work draft, communication with NOV to clarify scope. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Kanban Meeting Safety Moment Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-20 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 Setting up meeting with Submarine cable vendor for Minkit. Vendor meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-20 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 TSR review Coordination with NOV Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-21 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Scope of work draft, communication with NOV to clarify scope. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-21 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Scope of work draft, communication with NOV to clarify scope. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Kanban Meeting Safety Moment Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-21 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Update worksheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-21 OH-014 :OH-014 Overhead All Activities Regular Pay N 3 0 NOV Well Data training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-21 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 TSR review Coordination with NOV Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-22 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Scope of work draft, communication with NOV to clarify scope. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-22 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Scope of work draft, communication with NOV to clarify scope. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Kanban Meeting Safety Moment Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Procurement support for supply chain department Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-22 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 TSR review Coordination with NOV Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 1.Scope of work for gear ratio upgrade 2. Scope of work for PLS system upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1.Scope of work for gear ratio upgrade 2. Scope of work for PLS system upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Uganda Proposal support 2. Revised MTO camp generator Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-25 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 2 0 Vendor coordination with CAT Requesting quote for DGB kit DGB kit understanding Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 1.Scope of work for gear ratio upgrade 2. Scope of work for PLS system upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1.Scope of work for gear ratio upgrade 2. Scope of work for PLS system upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Uganda Proposal support 2. Revised MTO camp generator Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-26 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 1 Coordination with NOV 2. Discussion with Mark McConn Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-26 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 Vendor coordination with CAT Requesting quote for DGB kit DGB kit understanding Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 1.Scope of work for gear ratio upgrade 2. Scope of work for PLS system upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 1.Scope of work for gear ratio upgrade 2. Scope of work for PLS system upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Uganda Proposal support 2. Revised MTO camp generator Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-27 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 1 Coordination with NOV 2. Discussion with Mark McConn Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-27 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 Vendor coordination with CAT Requesting quote for DGB kit DGB kit understanding Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-28 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 1.Scope of work for gear ratio upgrade 2. Scope of work for PLS system upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-28 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 1.Scope of work for gear ratio upgrade 2. Scope of work for PLS system upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 1. Worksheet Update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Uganda Proposal support 2. Revised MTO camp generator Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-28 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 2 0 Vendor coordination with CAT Requesting quote for DGB kit DGB kit understanding Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-29 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1.Scope of work for gear ratio upgrade 2. Scope of work for PLS system upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-29 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Uganda Proposal support 2. Revised MTO camp generator Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-29 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 1 Coordination with NOV 2. Discussion with Mark McConn Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-29 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 2 0 Vendor coordination with CAT Requesting quote for DGB kit DGB kit understanding Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-02 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-03 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Holiday Independence day Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-05 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 1. IDS system review 2. Project review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 Dual Fuel Study research and communication Power issue communication with NOV Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 Dual Fuel Study research and communication Power issue communication with NOV Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-06 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 NOV communication and conference call for scope discussion Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-09 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Document review Project specs review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Scope of work development Proposal request from NOV proposal request from Setpoint Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting , Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-09 OH-014 :OH-014 Overhead All Activities Regular Pay N 3 0 WOM visit Submarine cable presentation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-09 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 2 0 1. TSR review 2. Receive quote from CAT 3 Sent RFI requesting gas data Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-10 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Document review Project specs review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-10 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Scope of work development Proposal request from NOV proposal request from Setpoint Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-10 OH-014 :OH-014 Overhead All Activities Regular Pay N 6 0 WOM visit Submarine cable presentation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-11 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Document review Project specs review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Scope of work development Proposal request from NOV proposal request from Setpoint Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Scope of work for gear ration adding setpoint Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting , Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-11 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 Follow up quote from NOV Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-11 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 2 0 1. TSR review 2. Receive quote from CAT 3 Sent RFI requesting gas data Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-12 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Document review Project specs review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Scope of work development Proposal request from NOV proposal request from Setpoint Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Scope of work for gear ration adding setpoint Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting , Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-12 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 1. TSR review 2. Receive quote from CAT 3 Sent RFI requesting gas data Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Scope of work development Proposal request from NOV proposal request from Setpoint Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Scope of work for gear ration adding setpoint Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-13 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 3 0 1. TSR review 2. Receive quote from CAT 3 Sent RFI requesting gas data Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-16 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 IDS technical analysis Flow meter analysis Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-16 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Scope of work , Follow up on quotation Consulting with Lloyds Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1.TSR meeting 2 Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Question related to Kretchet and Auto Drill link system Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-16 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 Rig 265 Load analysis Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-16 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 Generate RFI Follow up on additional information Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-17 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 IDS technical analysis Flow meter analysis Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Scope of work , Follow up on quotation Consulting with Lloyds Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1.TSR meeting 2 Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Question related to Kretchet and Auto Drill link system Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-17 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 Rig 265 Load analysis Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-17 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 Follow up on Quotation Generate RFI Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-17 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 Generate RFI Follow up on additional information Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-18 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 IDS technical analysis Flow meter analysis Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Scope of work for setpoint Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Scope of work , Follow up on quotation Consulting with Lloyds Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1.TSR meeting 2 Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-18 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 Rig 265 Load analysis Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-18 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 Follow up on Quotation Generate RFI Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-18 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 2 0 Generate RFI Follow up on additional information Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-19 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 IDS technical analysis Flow meter analysis Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Scope of work , Follow up on quotation Consulting with Lloyds Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 1.TSR meeting 2 Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Question related to Kretchet and Auto Drill link system Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-19 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 Rig 265 Load analysis Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-19 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 Generate RFI Follow up on additional information Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-20 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 IDS technical analysis Flow meter analysis Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Scope of work for setpoint Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Scope of work , Follow up on quotation Consulting with Lloyds Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Question related to Kretchet and Auto Drill link system Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-20 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 Generate RFI Follow up on additional information Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-23 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Support for proposal IDS system Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-23 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Scope of work and vendor coordination Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting , Kanban meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-23 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-23 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 TSR review , drawing update RFI Vendor coordination Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-23 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 TSR review RFI coordination with vendor and operations Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-24 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Support for proposal IDS system Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-24 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Scope of work and vendor coordination Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-24 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 TSR review , drawing update RFI Vendor coordination Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-24 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 TSR review RFI coordination with vendor and operations Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-24 Rig 209L-TSR :Rig 209L-TSR TSR-01658-209L Fuel Station Regular Pay N 1 0 CTR creation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-25 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Support for proposal IDS system Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Scope of work and vendor coordination Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting , Kanban meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Worksheet update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-25 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 TSR review , drawing update RFI Vendor coordination Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-25 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 TSR review RFI coordination with vendor and operations Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Support for proposal IDS system Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Scope of work and vendor coordination Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting , Kanban meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-26 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 TSR review , drawing update RFI Vendor coordination Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-26 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 TSR review RFI coordination with vendor and operations Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Support for proposal IDS system Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting , Kanban meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-27 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 TSR review , drawing update RFI Vendor coordination Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-27 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 TSR review RFI coordination with vendor and operations Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-30 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-31 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-31 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 Vendor and operations communication Document review RFI response Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-31 Rig 209L-TSR :Rig 209L-TSR TSR-01636-209L Electric Backfeed Regular Pay N 4 0 TSR review Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-31 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 Vendor and operations communication Document review RFI response Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-01 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 IDS meeting Internal meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Worksheet update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-01 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 Vendor and operations communication Document review RFI response Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-01 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 Vendor and operations communication Document review RFI response Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-02 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Vendor coordination Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 TSR meeting Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-02 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 Vendor and operations communication Document review RFI response Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-02 Rig 209L-TSR :Rig 209L-TSR TSR-01636-209L Electric Backfeed Regular Pay N 3 0 TSR review Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-02 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 2 0 Vendor and operations communication Document review RFI response Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 IDS meeting Internal meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-03 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 Vendor and operations communication Document review RFI response Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-03 Rig 209L-TSR :Rig 209L-TSR TSR-01636-209L Electric Backfeed Regular Pay N 1 0 TSR review Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-03 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 2 0 Vendor and operations communication Document review RFI response Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-03 Rig 209L-TSR :Rig 209L-TSR TSR-01658-209L Fuel Station Regular Pay N 1 0 CTR creation TSR review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 IDS system review Dual fuel Gen review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-06 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 1 0 Vendor communication Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-06 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1 0 Drill mec visit Proposal support Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-06 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-06 Rig 209L-TSR :Rig 209L-TSR TSR-01636-209L Electric Backfeed Regular Pay N 4 0 TSR review Drawings redline TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-06 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 RFI response CAT follow up Vendor research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-07 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 IDS system review Dual fuel Gen review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kanban meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-07 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1 0 Drill mec visit Proposal support Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-07 Rig 209L-TSR :Rig 209L-TSR TSR-01636-209L Electric Backfeed Regular Pay N 4 0 TSR review Drawings redline TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-07 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 RFI response CAT follow up Vendor research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-07 Rig 209L-TSR :Rig 209L-TSR TSR-01658-209L Fuel Station Regular Pay N 1 0 TSR review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-08 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 IDS system review Dual fuel Gen review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kanban meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-08 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1 0 Drill mec visit Proposal support Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-08 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Worksheet update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-08 Rig 209L-TSR :Rig 209L-TSR TSR-01636-209L Electric Backfeed Regular Pay N 4 0 TSR review Drawings redline TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-08 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 RFI response CAT follow up Vendor research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-09 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 8 0 Drill mec visit Proposal support Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-09 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 RFI response CAT follow up Vendor research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-10 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 IDS system review Dual fuel Gen review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-10 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Scope of work Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-10 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1 0 Drill mec visit Proposal support Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-10 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 NOV follow-up Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Meeting Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-13 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1 0 Proposal help Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-13 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-13 Rig 209L-TSR :Rig 209L-TSR TSR-01636-209L Electric Backfeed Regular Pay N 1 0 TSR Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-13 Rig 209L-TSR :Rig 209L-TSR TSR-01656-209L Heat Trace Panels Regular Pay N 4 0 TSR review Drawing redline MTO Redline Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-13 Rig 209L-TSR :Rig 209L-TSR TSR-01658-209L Fuel Station Regular Pay N 1 0 TSR review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Meeting Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-14 Rig 209L-TSR :Rig 209L-TSR TSR-01636-209L Electric Backfeed Regular Pay N 1 0 TSR Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-14 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 2 0 Data gathering and quote request for filter unit. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-14 Rig 209L-TSR :Rig 209L-TSR TSR-01656-209L Heat Trace Panels Regular Pay N 5 0 TSR review Drawing redline MTO Redline Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Meeting Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-15 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 2 0 Data gathering and quote request for filter unit. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-15 Rig 209L-TSR :Rig 209L-TSR TSR-01656-209L Heat Trace Panels Regular Pay N 6 0 TSR review Drawing redline MTO Redline Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-16 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Scope of work approval and vendor coordination Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Meeting Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Worksheet update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-16 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 Data gathering and quote request for filter unit. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-16 Rig 209L-TSR :Rig 209L-TSR TSR-01656-209L Heat Trace Panels Regular Pay N 3 0 TSR review Drawing redline MTO Redline Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-17 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Technical review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-17 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 1 0 Vendor coordination and quote for processing unit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-17 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 NOV follow up on quote Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-17 Rig 209L-TSR :Rig 209L-TSR TSR-01656-209L Heat Trace Panels Regular Pay N 2 0 TSR review Drawing redline MTO Redline Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-20 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 1 0 Vendor research for filter unit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kanban Meeting TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-20 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-20 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 Quote follow up , Drawings update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-20 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 Vendor research and coordination Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-20 Rig 209L-TSR :Rig 209L-TSR TSR-01656-209L Heat Trace Panels Regular Pay N 2 0 TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-20 Rig 209L-TSR :Rig 209L-TSR TSR-01657-209L Steam Heater Electrical Power Modifications Regular Pay N 3 0 TSR design review , drawings research and redlines . Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-21 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-22 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Top Drive gear ratio upgrade quote and scope of work Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kanban Meeting TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-22 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1 0 Proposal help Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-22 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 Quote follow up , Drawings update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-22 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 Vendor research and coordination Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-22 Rig 209L-TSR :Rig 209L-TSR TSR-01656-209L Heat Trace Panels Regular Pay N 1 0 TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-22 Rig 209L-TSR :Rig 209L-TSR TSR-01657-209L Steam Heater Electrical Power Modifications Regular Pay N 2 0 TSR design review , drawings research and redlines . Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-23 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Top Drive gear ratio upgrade quote and scope of work Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kanban Meeting TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Worksheet update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-23 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 Quote follow up , Drawings update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-23 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 Vendor research and coordination Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-23 Rig 209L-TSR :Rig 209L-TSR TSR-01657-209L Steam Heater Electrical Power Modifications Regular Pay N 3 0 TSR design review , drawings research and redlines . Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-24 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Top Drive gear ratio upgrade quote and scope of work Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-24 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 Vendor research and coordination Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-24 Rig 209L-TSR :Rig 209L-TSR TSR-01657-209L Steam Heater Electrical Power Modifications Regular Pay N 3 0 TSR design review , drawings research and redlines . Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-24 Rig 209L-TSR :Rig 209L-TSR TSR-01658-209L Fuel Station Regular Pay N 1 0 TSR review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. Monthly Timesheet 2. Scope of Work approval 3. NOV quotation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-27 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Phone calls Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-27 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 2 0 TSR scope update RFI Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-27 Rig 209L-TSR :Rig 209L-TSR TSR-01657-209L Steam Heater Electrical Power Modifications Regular Pay N 3 0 TSR review Drawing and MTO redline TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-28 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. Monthly Timesheet 2. Scope of Work approval 3. NOV quotation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-28 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 TSR scope update RFI Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-28 Rig 209L-TSR :Rig 209L-TSR TSR-01657-209L Steam Heater Electrical Power Modifications Regular Pay N 4 0 TSR review Drawing and MTO redline TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-29 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. Monthly Timesheet 2. Scope of Work approval 3. NOV quotation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-29 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 TSR scope update RFI Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-29 Rig 209L-TSR :Rig 209L-TSR TSR-01657-209L Steam Heater Electrical Power Modifications Regular Pay N 5 0 TSR review Drawing and MTO redline TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-30 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. Monthly Timesheet 2. Scope of Work approval 3. NOV quotation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-30 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Worksheet update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-30 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 2 0 TSR scope update RFI Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-30 Rig 209L-TSR :Rig 209L-TSR TSR-01657-209L Steam Heater Electrical Power Modifications Regular Pay N 3 0 TSR review Drawing and MTO redline TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-30 Rig 209L-TSR :Rig 209L-TSR TSR-01658-209L Fuel Station Regular Pay N 1 0 TSR review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-31 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Phone calls Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-31 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 TSR scope update RFI Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-08-31 Rig 209L-TSR :Rig 209L-TSR TSR-01657-209L Steam Heater Electrical Power Modifications Regular Pay N 3 0 TSR review Drawing and MTO redline TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Holiday Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 KanBan Meeting TSR Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-04 Rig 209L-TSR :Rig 209L-TSR TSR-01657-209L Steam Heater Electrical Power Modifications Regular Pay N 2 0 TSR Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-04 Rig 209L-TSR :Rig 209L-TSR TSR-01658-209L Fuel Station Regular Pay N 6 0 TSR review Drawing redlines TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-05 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Worksheet Update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-05 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 RFI response and updates Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-05 Rig 209L-TSR :Rig 209L-TSR TSR-01658-209L Fuel Station Regular Pay N 6 0 TSR review Drawing redlines TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 KanBan Meeting TSR Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-06 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 RFI response and updates Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-06 Rig 209L-TSR :Rig 209L-TSR TSR-01658-209L Fuel Station Regular Pay N 6 0 TSR review Drawing redlines TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-07 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 PO and project schedule Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-07 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Phone call with Sakhalin Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-07 Rig 209L-TSR :Rig 209L-TSR TSR-01658-209L Fuel Station Regular Pay N 5 0 TSR review Drawing redlines TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-10 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Meeting Kanban board meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-10 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-10 Rig 209L-TSR :Rig 209L-TSR TSR-01658-209L Fuel Station Regular Pay N 6 0 TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Meeting Kanban board meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-11 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Compliance and cyber security training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-11 Rig 209L-TSR :Rig 209L-TSR TSR-01658-209L Fuel Station Regular Pay N 4 0 TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-11 Rig 253L-TSR :Rig 253L-TSR TSR-01663-253L Power and Mud Pump Upgrade - REVIEW Regular Pay N 1 0 TSR review Kerui proposal review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Worksheet update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-12 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Compliance and cyber security training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-12 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 Data gathering on alternate power options Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-12 Rig 253L-TSR :Rig 253L-TSR TSR-01663-253L Power and Mud Pump Upgrade - REVIEW Regular Pay N 6 0 TSR review Kerui proposal review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Meeting Kanban board meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-13 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Compliance and cyber security training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-13 Rig 253L-TSR :Rig 253L-TSR TSR-01663-253L Power and Mud Pump Upgrade - REVIEW Regular Pay N 6 0 TSR review Kerui proposal review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-14 Rig 253L-TSR :Rig 253L-TSR TSR-01663-253L Power and Mud Pump Upgrade - REVIEW Regular Pay N 6 0 TSR review Kerui proposal review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TSR meeting kanban meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-17 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-17 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 Gas train evaluation for Sakhalin Call with GTUIT Call with Sakhalin operations team Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-17 Rig 253L-TSR :Rig 253L-TSR TSR-01663-253L Power and Mud Pump Upgrade - REVIEW Regular Pay N 5 0 Load List review Kerui proposal review TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-18 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 1 0 Load list evaluation and comments. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-18 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Compliance training Cyber security Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-18 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 2 0 Gas train evaluation for Sakhalin Call with GTUIT Call with Sakhalin operations team Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-18 Rig 253L-TSR :Rig 253L-TSR TSR-01663-253L Power and Mud Pump Upgrade - REVIEW Regular Pay N 4 0 Load List review Kerui proposal review TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 PO for TD gear ratio Conference call Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-19 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 2 0 Load list evaluation and comments. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-19 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 2 0 Engine conversion from 399 to 3512 evaluation Communication with CAT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TSR meeting kanban meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-19 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Worksheet update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-19 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 2 0 Gas train evaluation for Sakhalin Call with GTUIT Call with Sakhalin operations team Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 PO for TD gear ratio Conference call Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-20 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 3 0 Load list evaluation and comments. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-20 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 1 0 Engine conversion from 399 to 3512 evaluation Communication with CAT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TSR meeting kanban meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-20 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 2 0 Gas train evaluation for Sakhalin Call with GTUIT Call with Sakhalin operations team Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-21 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 4 0 Engine conversion from 399 to 3512 evaluation Communication with CAT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-21 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 2 0 Gas train evaluation for Sakhalin Call with GTUIT Call with Sakhalin operations team Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-24 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Monthly time sheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-24 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 4 0 Vendor communication Solution design Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-25 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 4 0 Vendor communication Solution design Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-25 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 compliance training online Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-25 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 3 0 Generator conversion from 399 to 3512 . Dual fuel kit feasibility study. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-27 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 4 0 Vendor communication Solution design Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR worksheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-27 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 3 0 Generator conversion from 399 to 3512 . Dual fuel kit feasibility study. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-28 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 4 0 Vendor communication Solution design Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-09-28 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 4 0 Generator conversion from 399 to 3512 . Dual fuel kit feasibility study. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-01 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 2 0 Dual Fuel option assessment Conversion from 399 to 3512 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TSR meeting Kanban board meeting Vendor visit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-01 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 Vendor coordination Solution search Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-01 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 3 0 Vendor meeting Solution search Information gathering Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-02 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 2 0 Dual Fuel option assessment Conversion from 399 to 3512 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TSR meeting Kanban board meeting Vendor visit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-02 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 Vendor coordination Solution search Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-02 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 3 0 Vendor meeting Solution search Information gathering Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-03 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Weekly Status conference call Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-03 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 2 0 Dual Fuel option assessment Conversion from 399 to 3512 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TSR meeting Kanban board meeting Vendor visit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-03 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR worksheet update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-03 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 Vendor coordination Solution search Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-03 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 2 0 Vendor meeting Solution search Information gathering Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-04 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Weekly Status conference call Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-04 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 2 0 Dual Fuel option assessment Conversion from 399 to 3512 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TSR meeting Kanban board meeting Vendor visit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-04 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 Vendor coordination Solution search Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-04 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 2 0 Vendor meeting Solution search Information gathering Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-05 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 2 0 Dual Fuel option assessment Conversion from 399 to 3512 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TSR meeting Kanban board meeting Vendor visit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-05 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 Vendor coordination Solution search Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-05 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 2 0 Vendor meeting Solution search Information gathering Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 KanBan Meeting TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-08 OH-019 :OH-019 Overhead All Activities Regular Pay N 3 0 Weekly Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-08 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 Vendor Meeting Solution Search Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-08 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 3 0 Vendor Meeting Quote follow up Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-09 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 2 0 Vendor Communication Engine quote for 3512 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-09 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 Vendor Meeting Solution Search Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-09 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 4 0 Vendor Meeting Quote follow up Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-10 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Weekly Meeting TSR schedule follow up Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-10 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 2 0 Vendor Communication Engine quote for 3512 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 KanBan Meeting TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-10 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR worksheet Update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-10 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 Vendor Meeting Solution Search Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-10 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 Vendor Meeting Quote follow up Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Weekly Meeting TSR schedule follow up Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-11 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 2 0 Vendor Communication Engine quote for 3512 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 KanBan Meeting TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-11 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 4 0 Load List evaluation for Rig 269 with Rig 247 pits Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Weekly Meeting TSR schedule follow up Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-12 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 2 0 Vendor Communication Engine quote for 3512 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-12 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 4 0 Load List evaluation for Rig 269 with Rig 247 pits Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-12 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 Vendor Meeting Solution Search Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Part order progress Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-15 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 4 0 Quote from CAT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-15 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-15 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 Solution evaluation NOV quote Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-16 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 4 0 Quote from CAT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-16 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 Solution evaluation NOV quote Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-16 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 2 0 PPT format SM quote Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Part order progress Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Worksheet Update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-17 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 Solution evaluation NOV quote Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-17 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 4 0 PPT format SM quote Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-18 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 Solution evaluation NOV quote Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-18 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 6 0 PPT format SM quote Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-19 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 Solution evaluation NOV quote Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-19 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 4 0 PPT format SM quote Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-22 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 1 0 Conference call with Mustang CAT Specify D399 to 3512 conversion RFQ Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR board meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-22 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-22 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 6 0 Vendor Visit Receive Quote and information from ACS Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-23 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4 0 MTO for Rig Mast Light MR for Rig Mast light Received Quote from ACS and Rexel Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-23 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 2 0 Conference call with Mustang CAT Specify D399 to 3512 conversion RFQ Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-23 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 3 0 Received quote from Sakhalin machinery Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 TD Gear ration upgrade project schedule and follow up Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-25 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4 0 MTO for Rig Mast Light MR for Rig Mast light Received Quote from ACS and Rexel Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-25 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 2 0 Conference call with Mustang CAT Specify D399 to 3512 conversion RFQ Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR board meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR worksheet Update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-10-26 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 5 0 Received quote from Sakhalin machinery Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Years Day. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 8 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 6 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW * TSR-01583-SP-MU-00007-RevA-PLC Life Extension * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-10 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW * TSR-01583-SP-MU-00007-RevA-PLC Life Extension * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-10 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW * TSR-01583-SP-MU-00007-RevA-PLC Life Extension * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-11 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Reviewing the Island Rig Major Maintenance Technical Proposal Rev A as well as the 12260 SOW for ITT MM Island Rigs documentation for Rodney Sumner. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW * TSR-01583-SP-MU-00007-RevA-PLC Life Extension * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-12 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Reviewing the Island Rig Major Maintenance Technical Proposal Rev A as well as the 12260 SOW for ITT MM Island Rigs documentation for Rodney Sumner. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SOW * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-15 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Monday thru Thursday - Reviewing the Island Rig Major Maintenance Technical Proposal Rev A as well as the 12260 SOW for ITT MM Island Rigs documentation for Rodney Sumner. Look at the 5 year recommended maintenance for the Traveling Blocks/Crown Blocks. Looked at SOW for each and time duration to complete. Friday - Reviewing the information regarding the Holley Platform to be surveyed in February. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-16 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SOW * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-16 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Monday thru Thursday - Reviewing the Island Rig Major Maintenance Technical Proposal Rev A as well as the 12260 SOW for ITT MM Island Rigs documentation for Rodney Sumner. Look at the 5 year recommended maintenance for the Traveling Blocks/Crown Blocks. Looked at SOW for each and time duration to complete. Friday - Reviewing the information regarding the Holley Platform to be surveyed in February. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2.5 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SOW * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-17 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Monday thru Thursday - Reviewing the Island Rig Major Maintenance Technical Proposal Rev A as well as the 12260 SOW for ITT MM Island Rigs documentation for Rodney Sumner. Look at the 5 year recommended maintenance for the Traveling Blocks/Crown Blocks. Looked at SOW for each and time duration to complete. Friday - Reviewing the information regarding the Holley Platform to be surveyed in February. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SOW * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-18 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Monday thru Thursday - Reviewing the Island Rig Major Maintenance Technical Proposal Rev A as well as the 12260 SOW for ITT MM Island Rigs documentation for Rodney Sumner. Look at the 5 year recommended maintenance for the Traveling Blocks/Crown Blocks. Looked at SOW for each and time duration to complete. Friday - Reviewing the information regarding the Holley Platform to be surveyed in February. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SOW * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-19 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2.5 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Monday thru Thursday - Reviewing the Island Rig Major Maintenance Technical Proposal Rev A as well as the 12260 SOW for ITT MM Island Rigs documentation for Rodney Sumner. Look at the 5 year recommended maintenance for the Traveling Blocks/Crown Blocks. Looked at SOW for each and time duration to complete. Friday - Reviewing the information regarding the Holley Platform to be surveyed in February. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-22 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Monday/Tuesday - Reviewing the information regarding the Holley Platform to be surveyed in February. Found out on the 24 the trip to the Holly Platform to be postponed until further notice. Tues/Wen/Thurs - Reviewing and researching NG Engine application for Drilling. Supply research documentation to GO. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-23 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Monday/Tuesday - Reviewing the information regarding the Holley Platform to be surveyed in February. Found out on the 24 the trip to the Holly Platform to be postponed until further notice. Tues/Wen/Thurs - Reviewing and researching NG Engine application for Drilling. Supply research documentation to GO. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-24 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Monday/Tuesday - Reviewing the information regarding the Holley Platform to be surveyed in February. Found out on the 24 the trip to the Holly Platform to be postponed until further notice. Tues/Wen/Thurs - Reviewing and researching NG Engine application for Drilling. Supply research documentation to GO. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Review NOV Field Service Report regarding torque control for TD and reply back via email to JL Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-25 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Monday/Tuesday - Reviewing the information regarding the Holley Platform to be surveyed in February. Found out on the 24 the trip to the Holly Platform to be postponed until further notice. Tues/Wen/Thurs - Reviewing and researching NG Engine application for Drilling. Supply research documentation to GO. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-25 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 5 0 Research and provide documentation to rig 269 regarding procedural process for alignment of generator to engine package. Exchanged email and phone conversations with Cristian Marcu the Chief Mechanic for rig 269. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-26 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Monday/Tuesday - Reviewing the information regarding the Holley Platform to be surveyed in February. Found out on the 24 the trip to the Holly Platform to be postponed until further notice. Tues/Wen/Thurs - Reviewing and researching NG Engine application for Drilling. Supply research documentation to GO. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-26 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 5 0 Research and provide documentation to rig 269 regarding procedural process for alignment of generator to engine package. Exchanged email and phone conversations with Cristian Marcu the Chief Mechanic for rig 269. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-28 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 Research and provide documentation to rig 269 regarding procedural process for alignment of generator to engine package. Exchanged email and phone conversations with Cristian Marcu the Chief Mechanic for rig 269. Generator #% complete starting on generators 1 & 4. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-29 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-29 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3 0 Research and provide documentation to rig 269 regarding procedural process for alignment of generator to engine package. Exchanged email and phone conversations with Cristian Marcu the Chief Mechanic for rig 269. Generator #% complete starting on generators 1 & 4. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-30 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 Reviewing MH Wirth TD & Traveling Block information & Drawings. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-30 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-30 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3 0 Research and provide documentation to rig 269 regarding procedural process for alignment of generator to engine package. Exchanged email and phone conversations with Cristian Marcu the Chief Mechanic for rig 269. Generator #% complete starting on generators 1 & 4. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-31 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing MH Wirth TD & Traveling Block information & Drawings. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-31 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-31 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 Research and provide documentation to rig 269 regarding procedural process for alignment of generator to engine package. Exchanged email and phone conversations with Cristian Marcu the Chief Mechanic for rig 269. Generator #% complete starting on generators 1 & 4. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-01 OH-010 :OH-010 Overhead All Activities Regular Pay N 9 0 Thursday - Travel to Houston for mandatory required training. Saturday - Travel to OKC 908 miles round-trip Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-02 OH-014 :OH-014 Overhead All Activities Regular Pay N 3 0 Mandatory Corporate Training Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-03 OH-010 :OH-010 Overhead All Activities Regular Pay N 9 0 Thursday - Travel to Houston for mandatory required training. Saturday - Travel to OKC 908 miles round-trip Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing MH Wirth TD & Traveling Block information & Drawings. Reviewing the information that Billy Arnold with NOV sent. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Visiting with RR regarding 7838 Brake Maintenance Procedures. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-05 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Reviewing documentation regarding fuel consumption verses submarine cable option Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-05 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Reviewing documentation from the Holly Platform and visiting with Allen Henley on the phone regarding same. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-06 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing MH Wirth TD & Traveling Block information & Drawings. Reviewing the information that Billy Arnold with NOV sent. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Visiting with RR regarding 7838 Brake Maintenance Procedures. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-06 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Reviewing documentation regarding fuel consumption verses submarine cable option Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-06 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Reviewing documentation from the Holly Platform and visiting with Allen Henley on the phone regarding same. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-07 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing MH Wirth TD & Traveling Block information & Drawings. Reviewing the information that Billy Arnold with NOV sent. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Visiting with RR regarding 7838 Brake Maintenance Procedures. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-07 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Reviewing documentation regarding fuel consumption verses submarine cable option Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-07 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 Reviewing documentation from the Holly Platform and visiting with Allen Henley on the phone regarding same. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-08 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing MH Wirth TD & Traveling Block information & Drawings. Reviewing the information that Billy Arnold with NOV sent. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Visiting with RR regarding 7838 Brake Maintenance Procedures. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-08 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 Reviewing documentation from the Holly Platform and visiting with Allen Henley on the phone regarding same. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Visiting with RR regarding 7838 Brake Maintenance Procedures. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-09 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Reviewing documentation from the Holly Platform and visiting with Allen Henley on the phone regarding same. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-12 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Attending conference call meetings. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-12 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Reviewing documentation from the Holly Platform and visiting with Allen Henley on the phone regarding same. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing MH Wirth TD & Traveling Block information & Drawings. Reviewing the information that Billy Arnold with NOV sent. Attending NOV - Survey Report Review conference meeting call. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-13 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Attending conference call meetings. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-13 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Reviewing documentation from the Holly Platform and visiting with Allen Henley on the phone regarding same. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-14 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing MH Wirth TD & Traveling Block information & Drawings. Reviewing the information that Billy Arnold with NOV sent. Attending NOV - Survey Report Review conference meeting call. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-14 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Attending conference call meetings. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-14 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Reviewing documentation from the Holly Platform and visiting with Allen Henley on the phone regarding same. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 Reviewing MH Wirth TD & Traveling Block information & Drawings. Reviewing the information that Billy Arnold with NOV sent. Attending NOV - Survey Report Review conference meeting call. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-15 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Attending conference call meetings. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-15 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 Reviewing documentation regarding fuel consumption verses submarine cable option. Reviewing documentation of the BOD located on Q;Drive, attending conference calls Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-15 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Reviewing documentation from the Holly Platform and visiting with Allen Henley on the phone regarding same. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-16 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Attending conference call meetings. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-16 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Reviewing documentation regarding fuel consumption verses submarine cable option. Reviewing documentation of the BOD located on Q;Drive, attending conference calls Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-16 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Reviewing documentation from the Holly Platform and visiting with Allen Henley on the phone regarding same. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 . Reviewing the information that was sent by NOV. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-19 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Continue to review and update SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-19 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Audit Holly Platform and meet with audit team to discuss. Generate report on findings on Friday Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-20 OH-010 :OH-010 Overhead All Activities Regular Pay N 6 0 Travel to/from Santa Barbara Californis to audit the Holly Platform Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-20 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Audit Holly Platform and meet with audit team to discuss. Generate report on findings on Friday Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-21 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 12 0 Audit Holly Platform and meet with audit team to discuss. Generate report on findings on Friday Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-22 OH-010 :OH-010 Overhead All Activities Regular Pay N 6 0 Travel to/from Santa Barbara Californis to audit the Holly Platform Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-22 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Audit Holly Platform and meet with audit team to discuss. Generate report on findings on Friday Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-23 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Reviewed “TSR-01629-PT-MU-00001-RevA BoD Presentation for accuracy. Responded via email. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-23 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 8 0 Audit Holly Platform and meet with audit team to discuss. Generate report on findings on Friday Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-26 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Continue to review and update SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing and discussions BF on documentation Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-26 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 8 0 Working on schedule/SOW document/cost sheet analysis. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-26 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Concept Study Min Kit Opportunities review, TSR-01583 Deliverables Review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-27 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Continue to review and update SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing and discussions BF on documentation Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-27 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 8 0 Working on schedule/SOW document/cost sheet analysis. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-28 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Continue to review and update SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing and discussions BF on documentation Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-28 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 9 0 Working on schedule/SOW document/cost sheet analysis. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-28 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Concept Study Min Kit Opportunities review, TSR-01583 Deliverables Review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-01 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Continue to review and update SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing and discussions BF on documentation Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-01 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 9 0 Working on schedule/SOW document/cost sheet analysis. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Continue to review and update SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing and discussions BF on documentation Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-02 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 7 0 Working on schedule/SOW document/cost sheet analysis. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-05 OH-010 :OH-010 Overhead All Activities Regular Pay N 8 0 Travel from OKC to Houston - Monday Travel from Houston to OKC - Friday Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-06 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 8 0 Worked on SOW Document and Lump Sum Cost Analysis for the Holly Platform Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-07 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 8 0 Worked on SOW Document and Lump Sum Cost Analysis for the Holly Platform Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-07 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Review of TSR-01629-PT-MU-00003-RevA-Electrical System Sizing and Comparison, Concept 3 Concrete MODU 3D Block Model and GA 03.09.2018– PDF (3D Manipulate), -Concept 3 Concrete MODU 3D Block Model and GA 03.09.2018- PPT Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-08 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 8 0 Worked on SOW Document and Lump Sum Cost Analysis for the Holly Platform Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Review of TSR-01629-PT-MU-00003-RevA-Electrical System Sizing and Comparison, Concept 3 Concrete MODU 3D Block Model and GA 03.09.2018– PDF (3D Manipulate), -Concept 3 Concrete MODU 3D Block Model and GA 03.09.2018- PPT Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-09 OH-010 :OH-010 Overhead All Activities Regular Pay N 8 0 Travel from OKC to Houston - Monday Travel from Houston to OKC - Friday Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-12 OH-010 :OH-010 Overhead All Activities Regular Pay N 8 0 Travel from OKC to Houston Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-13 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 9.5 0 Working on Holly Platform SOW Document, Schedule, Material/Equipment Cost Estimate, reviewing the schedule attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-14 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 10.5 0 Working on Holly Platform SOW Document, Schedule, Material/Equipment Cost Estimate, reviewing the schedule attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-15 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 10.5 0 Working on Holly Platform SOW Document, Schedule, Material/Equipment Cost Estimate, reviewing the schedule attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-16 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 11 0 Working on Holly Platform SOW Document, Schedule, Material/Equipment Cost Estimate, reviewing the schedule attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-17 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 7 0 Working on Holly Platform SOW Document, Schedule, Material/Equipment Cost Estimate, reviewing the schedule attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-18 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 7 0 Working on Holly Platform SOW Document, Schedule, Material/Equipment Cost Estimate, reviewing the schedule attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-19 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 10 0 Working on Holly Platform SOW Document, Schedule, Material/Equipment Cost Estimate, reviewing the schedule attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-20 OH-010 :OH-010 Overhead All Activities Regular Pay N 8 0 Travel from Houston to OKC on Tuesday and Travel to Houston on Friday Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-21 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 4 0 Working on Holly Platform SOW Document, Schedule, Material/Equipment Cost Estimate, reviewing the schedule attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-22 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 4 0 Working on Holly Platform SOW Document, Schedule, Material/Equipment Cost Estimate, reviewing the schedule attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-23 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 6 0 Working on Holly Platform SOW Document, Schedule, Material/Equipment Cost Estimate, reviewing the schedule attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-24 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 4 0 Working on Holly Platform SOW Document, Schedule, Material/Equipment Cost Estimate, reviewing the schedule attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-24 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 Travel from Houston to OKC on Tuesday and Travel to Houston on Friday Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-02 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 9 0 Provide support to develop the Tender to XOM for the Holly Platform.Reviewing the Holly Platform SOW Document, Material/Equipment Cost Estimate,the schedule, and attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-03 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 9 0 Provide support to develop the Tender to XOM for the Holly Platform.Reviewing the Holly Platform SOW Document, Material/Equipment Cost Estimate,the schedule, and attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-04 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 9 0 Provide support to develop the Tender to XOM for the Holly Platform.Reviewing the Holly Platform SOW Document, Material/Equipment Cost Estimate,the schedule, and attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 8 0 Continue to review and update SAP Functional Equipment Maintenance Procedures. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 8 0 Continue to review and update SAP Functional Equipment Maintenance Procedures. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-09 OH-003 :OH-003 Overhead All Activities Regular Pay N 8 0 Jury Duty Oklahoma County Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-10 OH-003 :OH-003 Overhead All Activities Regular Pay N 8 0 Jury Duty Oklahoma County Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-11 OH-003 :OH-003 Overhead All Activities Regular Pay N 8 0 Jury Duty Oklahoma County Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-12 OH-003 :OH-003 Overhead All Activities Regular Pay N 8 0 Jury Duty Oklahoma County Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-13 OH-003 :OH-003 Overhead All Activities Regular Pay N 8 0 Jury Duty Oklahoma County Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-16 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 2 0 Reviewing the Holly Platform SOW Document, Material/Equipment Cost Estimate,the schedule. Reviewing IPS drawings for installation of DC Top Drive or an AC Top Drive. Need to determine what are the potential issues with either. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Reviewing & editing PM procedures in Oracle for all generators, AC/DC motors, SCR systems, transformers, VFD's, Eddi-Current Elmagco Brakes, and electrical systems in general to ensure procedures are accurate and per OEM & National Standards & Codes. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-17 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 2 0 Reviewing the Holly Platform SOW Document, Material/Equipment Cost Estimate,the schedule. Reviewing IPS drawings for installation of DC Top Drive or an AC Top Drive. Need to determine what are the potential issues with either. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Reviewing & editing PM procedures in Oracle for all generators, AC/DC motors, SCR systems, transformers, VFD's, Eddi-Current Elmagco Brakes, and electrical systems in general to ensure procedures are accurate and per OEM & National Standards & Codes. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-18 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 2 0 Reviewing the Holly Platform SOW Document, Material/Equipment Cost Estimate,the schedule. Reviewing IPS drawings for installation of DC Top Drive or an AC Top Drive. Need to determine what are the potential issues with either. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Reviewing & editing PM procedures in Oracle for all generators, AC/DC motors, SCR systems, transformers, VFD's, Eddi-Current Elmagco Brakes, and electrical systems in general to ensure procedures are accurate and per OEM & National Standards & Codes. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-19 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 2 0 Reviewing the Holly Platform SOW Document, Material/Equipment Cost Estimate,the schedule. Reviewing IPS drawings for installation of DC Top Drive or an AC Top Drive. Need to determine what are the potential issues with either. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Reviewing & editing PM procedures in Oracle for all generators, AC/DC motors, SCR systems, transformers, VFD's, Eddi-Current Elmagco Brakes, and electrical systems in general to ensure procedures are accurate and per OEM & National Standards & Codes. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-20 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 2 0 Reviewing the Holly Platform SOW Document, Material/Equipment Cost Estimate,the schedule. Reviewing IPS drawings for installation of DC Top Drive or an AC Top Drive. Need to determine what are the potential issues with either. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Reviewing & editing PM procedures in Oracle for all generators, AC/DC motors, SCR systems, transformers, VFD's, Eddi-Current Elmagco Brakes, and electrical systems in general to ensure procedures are accurate and per OEM & National Standards & Codes. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-23 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 4 0 Reviewing IPS drawings for installation of DC Top Drive or an AC Top Drive.Talked with Gerardo Gamboa on 4/24/18, 4/25/18 & 4/28/18 to clarify the SOS Document included in the tender for Material/Equipment for the technical sections of the proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-24 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 5 0 Reviewing IPS drawings for installation of DC Top Drive or an AC Top Drive.Talked with Gerardo Gamboa on 4/24/18, 4/25/18 & 4/28/18 to clarify the SOS Document included in the tender for Material/Equipment for the technical sections of the proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-25 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 5 0 Reviewing IPS drawings for installation of DC Top Drive or an AC Top Drive.Talked with Gerardo Gamboa on 4/24/18, 4/25/18 & 4/28/18 to clarify the SOS Document included in the tender for Material/Equipment for the technical sections of the proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-26 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 4 0 Reviewing IPS drawings for installation of DC Top Drive or an AC Top Drive.Talked with Gerardo Gamboa on 4/24/18, 4/25/18 & 4/28/18 to clarify the SOS Document included in the tender for Material/Equipment for the technical sections of the proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-27 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 5 0 Reviewing IPS drawings for installation of DC Top Drive or an AC Top Drive.Talked with Gerardo Gamboa on 4/24/18, 4/25/18 & 4/28/18 to clarify the SOS Document included in the tender for Material/Equipment for the technical sections of the proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-30 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 5 0 Reviewed IPS drawings for potential installation of DC/AC Top Drive.Talked and answering emails with Allen Henley & Gerardo Gamboa on 04/30/18, 05/01/18, 05/02/18 & 5/05/18 to clarify the SOS/SOW Document included in the tender for Material/Equipment for the technical sections of the proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-01 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 5 0 Reviewed IPS drawings for potential installation of DC/AC Top Drive.Talked and answering emails with Allen Henley & Gerardo Gamboa on 04/30/18, 05/01/18, 05/02/18 & 5/05/18 to clarify the SOS/SOW Document included in the tender for Material/Equipment for the technical sections of the proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-02 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 5 0 Reviewed IPS drawings for potential installation of DC/AC Top Drive.Talked and answering emails with Allen Henley & Gerardo Gamboa on 04/30/18, 05/01/18, 05/02/18 & 5/05/18 to clarify the SOS/SOW Document included in the tender for Material/Equipment for the technical sections of the proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-03 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 5 0 Reviewed IPS drawings for potential installation of DC/AC Top Drive.Talked and answering emails with Allen Henley & Gerardo Gamboa on 04/30/18, 05/01/18, 05/02/18 & 5/05/18 to clarify the SOS/SOW Document included in the tender for Material/Equipment for the technical sections of the proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-04 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 7 0 Reviewed IPS drawings for potential installation of DC/AC Top Drive.Talked and answering emails with Allen Henley & Gerardo Gamboa on 04/30/18, 05/01/18, 05/02/18 & 5/05/18 to clarify the SOS/SOW Document included in the tender for Material/Equipment for the technical sections of the proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-15 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 4 0 Preparing for and attended meeting with XOM at their Houston office regarding the Holly Project. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-16 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 4 0 Preparing for and attended meeting with XOM at their Houston office regarding the Holly Project. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-17 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 2 0 Preparing for and attended meeting with XOM at their Houston office regarding the Holly Project. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-17 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 Travel to and from Houston Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-18 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 5 0 Preparing for and attended meeting with XOM at their Houston office regarding the Holly Project. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-18 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 Travel to and from Houston Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-21 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-23 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-25 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-28 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Memorial Day Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-30 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-31 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-06-01 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-08-20 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 8 0 Working on meeting notes, SOW documents, attending conference calls with XOM/PKD in Houston and in Santa Barbara. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-08-21 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 8 0 Working on meeting notes, SOW documents, attending conference calls with XOM/PKD in Houston and in Santa Barbara. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-08-22 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 8 0 Working on meeting notes, SOW documents, attending conference calls with XOM/PKD in Houston and in Santa Barbara. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-08-23 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 8 0 Working on meeting notes, SOW documents, attending conference calls with XOM/PKD in Houston and in Santa Barbara. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-08-24 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 8 0 Working on meeting notes, SOW documents, attending conference calls with XOM/PKD in Houston and in Santa Barbara. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-08-26 Holly Platform :Holly Platform TSR-01665-HOLP-97 Travel (OH) Regular Pay N 8 0 Travel from Oklahoma City to Houston Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-08-27 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4 0 Reviewing equipment quotes and specifications and creating TPP's, MTO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-08-27 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 4 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-08-28 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4 0 Reviewing equipment quotes and specifications and creating TPP's, MTO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-08-28 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 4 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-08-29 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4 0 Reviewing equipment quotes and specifications and creating TPP's, MTO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-08-29 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 4 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-08-30 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4 0 Reviewing equipment quotes and specifications and creating TPP's, MTO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-08-30 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 4 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-08-31 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4 0 Reviewing equipment quotes and specifications and creating TPP's, MTO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-08-31 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 4 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-01 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4 0 Reviewing equipment quotes and specifications and creating TPP's, MTO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-01 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 4 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-02 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-03 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-04 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-05 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-06 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-07 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-08 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-09 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-10 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-11 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-12 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-13 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-14 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-15 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-16 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-17 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-18 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-19 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-20 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-21 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-22 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-23 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-24 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-25 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-26 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-27 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-28 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-29 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-09-30 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-01 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-02 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-03 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-04 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-05 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-06 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 Working on meeting notes, Weekly Reports, POB documentation, attending conference calls/meetings at XOM Campus with XOM/PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-07 Holly Platform :Holly Platform TSR-01665-HOLP-02 Change Order 2 (Delayed Reactivation Day Rate) Regular Pay N 8 0 Weekly Reports, POB documentation, attending conference calls/meetings at XOM Meetings with PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-08 Holly Platform :Holly Platform TSR-01665-HOLP-02 Change Order 2 (Delayed Reactivation Day Rate) Regular Pay N 8 0 Weekly Reports, POB documentation, attending conference calls/meetings at XOM Meetings with PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-09 Holly Platform :Holly Platform TSR-01665-HOLP-02 Change Order 2 (Delayed Reactivation Day Rate) Regular Pay N 8 0 Weekly Reports, POB documentation, attending conference calls/meetings at XOM Meetings with PKD in Houston and calls with rig in Santa Barbara. Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-10 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 8 0 Working on meeting notes, documentation, Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-11 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 8 0 Working on meeting notes, documentation, Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-12 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 8 0 Working on meeting notes, documentation, Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-13 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 8 0 Working on meeting notes, documentation, Reviewing equipment quotes and specifications and creating TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-14 Holly Platform :Holly Platform TSR-01665-HOLP-02 Change Order 2 (Delayed Reactivation Day Rate) Regular Pay N 8 0 Weekly Reports, POB documentation, attending conference calls/meetings at XOM Meetings with PKD in Houston and calls with rig in Santa Barbara. Developing pipe handling plans and spill containment plans for accomplishing zero spill on the drilling rig decks. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-15 Holly Platform :Holly Platform TSR-01665-HOLP-02 Change Order 2 (Delayed Reactivation Day Rate) Regular Pay N 8 0 Weekly Reports, POB documentation, attending conference calls/meetings at XOM Meetings with PKD in Houston and calls with rig in Santa Barbara. Developing pipe handling plans and spill containment plans for accomplishing zero spill on the drilling rig decks. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-16 Holly Platform :Holly Platform TSR-01665-HOLP-02 Change Order 2 (Delayed Reactivation Day Rate) Regular Pay N 8 0 Weekly Reports, POB documentation, attending conference calls/meetings at XOM Meetings with PKD in Houston and calls with rig in Santa Barbara. Developing pipe handling plans and spill containment plans for accomplishing zero spill on the drilling rig decks. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-17 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 8 0 Working on meeting notes, documentation, Reviewing drawings, equipment quotes, specifications, TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-18 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 8 0 Working on meeting notes, documentation, Reviewing drawings, equipment quotes, specifications, TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-19 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 8 0 Working on meeting notes, documentation, Reviewing drawings, equipment quotes, specifications, TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-20 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4 0 Working on meeting notes, documentation, Reviewing drawings, equipment quotes, specifications, TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-21 Holly Platform :Holly Platform TSR-01665-HOLP-02 Change Order 2 (Delayed Reactivation Day Rate) Regular Pay N 8 0 Weekly Reports, POB documentation, attending conference calls/meetings at XOM Meetings with PKD in Houston and calls with rig in Santa Barbara. Developing pipe handling plans with Knuckle Boom Crane and spill containment plans for accomplishing zero spill on the drilling rig decks. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-22 Holly Platform :Holly Platform TSR-01665-HOLP-02 Change Order 2 (Delayed Reactivation Day Rate) Regular Pay N 8 0 Weekly Reports, POB documentation, attending conference calls/meetings at XOM Meetings with PKD in Houston and calls with rig in Santa Barbara. Developing pipe handling plans with Knuckle Boom Crane and spill containment plans for accomplishing zero spill on the drilling rig decks. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-23 Holly Platform :Holly Platform TSR-01665-HOLP-02 Change Order 2 (Delayed Reactivation Day Rate) Regular Pay N 8 0 Weekly Reports, POB documentation, attending conference calls/meetings at XOM Meetings with PKD in Houston and calls with rig in Santa Barbara. Developing pipe handling plans with Knuckle Boom Crane and spill containment plans for accomplishing zero spill on the drilling rig decks. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-24 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 8 0 Working on meeting notes, documentation, Reviewing drawings, equipment quotes, specifications, TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-25 Holly Platform :Holly Platform TSR-01665-HOLP-97 Travel (OH) Regular Pay N 8 0 Travel to Oklahoma City Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-26 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4 0 Working on meeting notes, documentation, Reviewing drawings, equipment quotes, specifications, TPP's, MTO's,CO's, & MR's for procurement. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-10-27 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 8 0 Working on meeting notes, documentation, Reviewing drawings, equipment quotes, specifications, TPP's, MTO's,CO's, & MR's for procurement. Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Years Day Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Due Diligence - Review Report Data and Presentations; Revise Argentina DD Spider Graph Equations; ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Due Diligence - Review Report Data and Presentations; Revise Argentina DD Spider Graph Equations; ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina Due Diligence - Review Report Data and Presentations; Revise Argentina DD Spider Graph Equations; ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Argentina Due Diligence - Review Report Data and Presentations; Revise Argentina DD Spider Graph Equations; ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina Due Diligence Closeout Meeting; Business Development Workshop Day 1; Business Development Workshop Day 2; Business Development Team Building Event Develop Technical Services goals related to Business Development; ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call; Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Argentina Due Diligence Closeout Meeting; Business Development Workshop Day 1; Business Development Workshop Day 2; Business Development Team Building Event Develop Technical Services goals related to Business Development; ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 12 0 Argentina Due Diligence Closeout Meeting; Business Development Workshop Day 1; Business Development Workshop Day 2; Business Development Team Building Event Develop Technical Services goals related to Business Development; ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Argentina Due Diligence Closeout Meeting; Business Development Workshop Day 1; Business Development Workshop Day 2; Business Development Team Building Event Develop Technical Services goals related to Business Development; ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call; Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina Due Diligence Closeout Meeting; Business Development Workshop Day 1; Business Development Workshop Day 2; Business Development Team Building Event Develop Technical Services goals related to Business Development; ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Argentina Due Diligence Closeout Meeting; Business Development Workshop Day 1; Business Development Workshop Day 2; Business Development Team Building Event Develop Technical Services goals related to Business Development; ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 01/15/2018 - Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet; Update 2018 Goals based on Feedback from GO Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Business Develop Support for Argentina; Review Angola trip with Wayne Fox ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Business Develop Support for Argentina; Review Angola trip with Wayne Fox ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 4 0 The Great Ice Blizzard of 2018 Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Business Develop Support for Argentina; Review Angola trip with Wayne Fox ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 6 0 The Great Ice Blizzard of 2018 Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 MK Timesheet; Update 2018 Goals based on Feedback from GO Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Business Develop Support for Argentina; Review Angola trip with Wayne Fox ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 01/22/2018 - Weekly Operations Conference Call; 01/25/2018 - Technical Services Weekly Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Argentina Due Diligence Closeout Form; Argentina Entity Planning; Angola Due Diligence Trip Debrief Meeting; Due Diligence Weekly Update Call; Create Rig List for SLB Master Service Agreement; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 12 0 Argentina Due Diligence Closeout Form; Argentina Entity Planning; Angola Due Diligence Trip Debrief Meeting; Due Diligence Weekly Update Call; Create Rig List for SLB Master Service Agreement; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Argentina Due Diligence Closeout Form; Argentina Entity Planning; Angola Due Diligence Trip Debrief Meeting; Due Diligence Weekly Update Call; Create Rig List for SLB Master Service Agreement; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 01/22/2018 - Weekly Operations Conference Call; 01/25/2018 - Technical Services Weekly Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Due Diligence Closeout Form; Argentina Entity Planning; Angola Due Diligence Trip Debrief Meeting; Due Diligence Weekly Update Call; Create Rig List for SLB Master Service Agreement; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Due Diligence Closeout Form; Argentina Entity Planning; Angola Due Diligence Trip Debrief Meeting; Due Diligence Weekly Update Call; Create Rig List for SLB Master Service Agreement; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 01/29/2018 - Weekly Operations Conference Call; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 01/29/2018 - MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 SLB MSA Meeting - Rig Specs and KPI's; SOCAR AQS Due Diligence Meeting for Azerbaijan; Start assembling Angola Due Diligence report; Collect notes and contacts from Angola trip; Continue development of DD Tiers; Argentina Due Diligence Closeout form; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 SLB MSA Meeting - Rig Specs and KPI's; SOCAR AQS Due Diligence Meeting for Azerbaijan; Start assembling Angola Due Diligence report; Collect notes and contacts from Angola trip; Continue development of DD Tiers; Argentina Due Diligence Closeout form; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 SLB MSA Meeting - Rig Specs and KPI's; SOCAR AQS Due Diligence Meeting for Azerbaijan; Start assembling Angola Due Diligence report; Collect notes and contacts from Angola trip; Continue development of DD Tiers; Argentina Due Diligence Closeout form; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 SLB MSA Meeting - Rig Specs and KPI's; SOCAR AQS Due Diligence Meeting for Azerbaijan; Start assembling Angola Due Diligence report; Collect notes and contacts from Angola trip; Continue development of DD Tiers; Argentina Due Diligence Closeout form; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 SLB MSA Meeting - Rig Specs and KPI's; SOCAR AQS Due Diligence Meeting for Azerbaijan; Start assembling Angola Due Diligence report; Collect notes and contacts from Angola trip; Continue development of DD Tiers; Argentina Due Diligence Closeout form; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet; MK PDR Review Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Start Angola Due Diligence Closeout Report; Conduct Angola DD Meeting with Wayne, Ed, Nathan, and Carlos; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 MK Timesheet; MK PDR Review Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Start Angola Due Diligence Closeout Report; Conduct Angola DD Meeting with Wayne, Ed, Nathan, and Carlos; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Start Angola Due Diligence Closeout Report; Conduct Angola DD Meeting with Wayne, Ed, Nathan, and Carlos; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Start Angola Due Diligence Closeout Report; Conduct Angola DD Meeting with Wayne, Ed, Nathan, and Carlos; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Start Angola Due Diligence Closeout Report; Conduct Angola DD Meeting with Wayne, Ed, Nathan, and Carlos; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 02/12/2018 - Weekly Operations Conference Call; 02/15/2018 - Tech Services Weekly Meeting; PKD 4th QTR Earnings Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Angola Due Diligence Report; Angola Due Diligence Opportunity Assessment Meeting; Angola Risk Spider Graph; Trip notes from Angola DD ; Argentina Due Diligence Entity Update Meeting; Argentina Due Diligence Closeout Report (Chase Signatures); Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Angola Due Diligence Report; Angola Due Diligence Opportunity Assessment Meeting; Angola Risk Spider Graph; Trip notes from Angola DD ; Argentina Due Diligence Entity Update Meeting; Argentina Due Diligence Closeout Report (Chase Signatures); Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Angola Due Diligence Report; Angola Due Diligence Opportunity Assessment Meeting; Angola Risk Spider Graph; Trip notes from Angola DD ; Argentina Due Diligence Entity Update Meeting; Argentina Due Diligence Closeout Report (Chase Signatures); Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 02/12/2018 - Weekly Operations Conference Call; 02/15/2018 - Tech Services Weekly Meeting; PKD 4th QTR Earnings Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Angola Due Diligence Report; Angola Due Diligence Opportunity Assessment Meeting; Angola Risk Spider Graph; Trip notes from Angola DD ; Argentina Due Diligence Entity Update Meeting; Argentina Due Diligence Closeout Report (Chase Signatures); Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Angola Due Diligence Report; Angola Due Diligence Opportunity Assessment Meeting; Angola Risk Spider Graph; Trip notes from Angola DD ; Argentina Due Diligence Entity Update Meeting; Argentina Due Diligence Closeout Report (Chase Signatures); Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Presidents Day Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 12 0 Due Diligence Weekly Meeting; Angola Due Diligence Tender Meeting; Angola Due Diligence Closeout Report; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10.5 0 Due Diligence Weekly Meeting; Angola Due Diligence Tender Meeting; Angola Due Diligence Closeout Report; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Due Diligence Weekly Meeting; Angola Due Diligence Tender Meeting; Angola Due Diligence Closeout Report; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Due Diligence Weekly Meeting; Angola Due Diligence Tender Meeting; Angola Due Diligence Closeout Report; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 02/26/2018 - Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10.5 0 Argentina Due Diligence and Entity Set-Up Angola Due Diligence Report; Internal Corporate Project Activities; Presentation to ELT Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Argentina Due Diligence and Entity Set-Up Angola Due Diligence Report; Internal Corporate Project Activities; Presentation to ELT Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Argentina Due Diligence and Entity Set-Up Angola Due Diligence Report; Internal Corporate Project Activities; Presentation to ELT Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 12 0 Argentina Due Diligence and Entity Set-Up Angola Due Diligence Report; Internal Corporate Project Activities; Presentation to ELT Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Due Diligence and Entity Set-Up Angola Due Diligence Report; Internal Corporate Project Activities; Presentation to ELT Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 03/05/2018 - Weekly Operations Conference Call; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Argentina Due Diligence Update Meeting for HR Leadership Team; Continue on Angola Due Diligence Closeout Report; Due Diligence Weekly Meeting Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 12 0 Argentina Due Diligence Update Meeting for HR Leadership Team; Continue on Angola Due Diligence Closeout Report; Due Diligence Weekly Meeting Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 12 0 Argentina Due Diligence Update Meeting for HR Leadership Team; Continue on Angola Due Diligence Closeout Report; Due Diligence Weekly Meeting Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11.5 0 Argentina Due Diligence Update Meeting for HR Leadership Team; Continue on Angola Due Diligence Closeout Report; Due Diligence Weekly Meeting Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Due Diligence Update Meeting for HR Leadership Team; Continue on Angola Due Diligence Closeout Report; Due Diligence Weekly Meeting Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 03/12/2018 - Weekly Operations Conference Call; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina New Market Entry Action Items - New Entity Start-Up; Angola Due Diligence Report; Angola DD Partner Research; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Argentina New Market Entry Action Items - New Entity Start-Up; Angola Due Diligence Report; Angola DD Partner Research; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina New Market Entry Action Items - New Entity Start-Up; Angola Due Diligence Report; Angola DD Partner Research; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Argentina New Market Entry Action Items - New Entity Start-Up; Angola Due Diligence Report; Angola DD Partner Research; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina New Market Entry Action Items - New Entity Start-Up; Angola Due Diligence Report; Angola DD Partner Research; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 03/19/2019 - Weekly Operations Conference Call; 03/22/2018 - Weekly Tech Services Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Argentina Entity Planning; Total Uganda Presentation Preparation; Due Diligence Weekly Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Argentina Entity Planning; Total Uganda Presentation Preparation; Due Diligence Weekly Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Argentina Entity Planning; Total Uganda Presentation Preparation; Due Diligence Weekly Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 03/19/2019 - Weekly Operations Conference Call; 03/22/2018 - Weekly Tech Services Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Entity Planning; Total Uganda Presentation Preparation; Due Diligence Weekly Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina Entity Planning; Total Uganda Presentation Preparation; Due Diligence Weekly Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 03/26/2018 - Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 03/26/2018 - MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Total Presentation - Review meetings and updating presentation; Argentina Entity Start-Up Activities; Internal Corporate Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Total Presentation - Review meetings and updating presentation; Argentina Entity Start-Up Activities; Internal Corporate Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Total Presentation - Review meetings and updating presentation; Argentina Entity Start-Up Activities; Internal Corporate Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Total Presentation - Review meetings and updating presentation; Argentina Entity Start-Up Activities; Internal Corporate Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-30 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Holiday - Good Friday Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 04/02/2018 - Weekly Operations Conference Call; 04/05/2018 - Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10.5 0 Argentina Entity Start-Up and Further Due Diligence; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Argentina Entity Start-Up and Further Due Diligence; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Argentina Entity Start-Up and Further Due Diligence; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 04/02/2018 - Weekly Operations Conference Call; 04/05/2018 - Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Entity Start-Up and Further Due Diligence; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Argentina Entity Start-Up and Further Due Diligence; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Argentina Entity Start-Up Oversight; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Entity Start-Up Oversight; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-11 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-12 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-13 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 04/16/2018 - Weekly Operations Conference Call; 04/19/2018 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Develop Argentina New Country Start-Up Project Schedule; Conduct Biweekly Argentina Start-Up Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11.5 0 Develop Argentina New Country Start-Up Project Schedule; Conduct Biweekly Argentina Start-Up Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 12 0 Develop Argentina New Country Start-Up Project Schedule; Conduct Biweekly Argentina Start-Up Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 04/16/2018 - Weekly Operations Conference Call; 04/19/2018 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Develop Argentina New Country Start-Up Project Schedule; Conduct Biweekly Argentina Start-Up Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Develop Argentina New Country Start-Up Project Schedule; Conduct Biweekly Argentina Start-Up Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 04/23/2018 - Weekly Operations Conference Call; 04/26/2018 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Argentina Entity Start-Up Planning with Functional Groups; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Argentina Entity Start-Up Planning with Functional Groups; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Argentina Entity Start-Up Planning with Functional Groups; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 04/23/2018 - Weekly Operations Conference Call; 04/26/2018 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Entity Start-Up Planning with Functional Groups; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Argentina Entity Start-Up Planning with Functional Groups; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 04/30/2018 - Weekly Operations Conference Call; 05/02/2018 - 1st Qtr Earning Call and Update Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Argentina Start-up Biweekly Meeting; Ethiopia Due Diligence Documents; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-30 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 OTC Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Argentina Start-up Biweekly Meeting; Ethiopia Due Diligence Documents; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 04/30/2018 - Weekly Operations Conference Call; 05/02/2018 - 1st Qtr Earning Call and Update Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Argentina Start-up Biweekly Meeting; Ethiopia Due Diligence Documents; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Argentina Start-up Biweekly Meeting; Ethiopia Due Diligence Documents; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Argentina Start-up Biweekly Meeting; Ethiopia Due Diligence Documents; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/07/2018 - Weekly Operations Conference Call; 05/10/2018 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Ethiopia Due Diligence Kick-Off Meeting; Update Argentina New Entity Start-Up schedule; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Ethiopia Due Diligence Kick-Off Meeting; Update Argentina New Entity Start-Up schedule; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Ethiopia Due Diligence Kick-Off Meeting; Update Argentina New Entity Start-Up schedule; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-09 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Intellectual Property Presentation by Andrews Kurth Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/07/2018 - Weekly Operations Conference Call; 05/10/2018 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Ethiopia Due Diligence Kick-Off Meeting; Update Argentina New Entity Start-Up schedule; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Ethiopia Due Diligence Kick-Off Meeting; Update Argentina New Entity Start-Up schedule; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/14/2018 - Weekly Operations Update Meeting; 05/17/2018 - Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Argentina Entity Start-Up Biweekly meeting; Argentina Start-Up schedule update; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Argentina Entity Start-Up Biweekly meeting; Argentina Start-Up schedule update; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Argentina Entity Start-Up Biweekly meeting; Argentina Start-Up schedule update; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-16 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 IMS Training - HSE for Office & Security Program Overview Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/14/2018 - Weekly Operations Update Meeting; 05/17/2018 - Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina Entity Start-Up Biweekly meeting; Argentina Start-Up schedule update; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Argentina Entity Start-Up Biweekly meeting; Argentina Start-Up schedule update; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/21/2018 - Weekly Operations Conference Call; 05/24/2018 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Argentina Entity Updates; Create Technical Services Content for BD; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Entity Updates; Create Technical Services Content for BD; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Entity Updates; Create Technical Services Content for BD; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/21/2018 - Weekly Operations Conference Call; 05/24/2018 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina Entity Updates; Create Technical Services Content for BD; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Argentina Entity Updates; Create Technical Services Content for BD; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-28 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Memorial Day Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Entity Start-Up Meetings and Schedule; Internal Corporate Project Activities; Weekly Update Meeting with Jon-Al Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Argentina Entity Start-Up Meetings and Schedule; Internal Corporate Project Activities; Weekly Update Meeting with Jon-Al Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Argentina Entity Start-Up Meetings and Schedule; Internal Corporate Project Activities; Weekly Update Meeting with Jon-Al Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6.5 0 Argentina Entity Start-Up Meetings and Schedule; Internal Corporate Project Activities; Weekly Update Meeting with Jon-Al Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 06/04/2018 - Weekly Operations Conference Call; 06/07/2018 - Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Argentina Entity Start-Up Project; Internal Corporate Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Entity Start-Up Project; Internal Corporate Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Entity Start-Up Project; Internal Corporate Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 06/04/2018 - Weekly Operations Conference Call; 06/07/2018 - Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Entity Start-Up Project; Internal Corporate Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Argentina Entity Start-Up Project; Internal Corporate Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 06/11/2018 - Weekly Operations Conference Call; 06/14/2018 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Argentina Entity Start-Up Planning, Schedule, and Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Entity Start-Up Planning, Schedule, and Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Entity Start-Up Planning, Schedule, and Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 06/11/2018 - Weekly Operations Conference Call; 06/14/2018 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina Entity Start-Up Planning, Schedule, and Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina Entity Start-Up Planning, Schedule, and Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-18 OH-010 :OH-010 Overhead All Activities Regular Pay N 12 0 Travel to Copenhagen; Travel to Houston Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-19 OH-014 :OH-014 Overhead All Activities Regular Pay N 9 0 IADC World Drilling Conference Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-20 OH-014 :OH-014 Overhead All Activities Regular Pay N 9 0 IADC World Drilling Conference Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-21 OH-010 :OH-010 Overhead All Activities Regular Pay N 12 0 Travel to Copenhagen; Travel to Houston Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet; MK Mid-Year PDR Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Argentina New Entity Start-Up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina New Entity Start-Up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet; MK Mid-Year PDR Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Argentina New Entity Start-Up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina New Entity Start-Up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Argentina New Entity Start-Up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina Start-Up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina Start-Up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 4th of July Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-09 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Argentina Start-Up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Argentina Start-Up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Argentina Start-Up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Argentina Start-Up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 07/16/2018 - Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Argentina Start-up Activities; Update Argentina Start-up Risk Assessment; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Start-up Activities; Update Argentina Start-up Risk Assessment; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Start-up Activities; Update Argentina Start-up Risk Assessment; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Start-up Activities; Update Argentina Start-up Risk Assessment; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Argentina Start-up Activities; Update Argentina Start-up Risk Assessment; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 07/23/2018 - Weekly Operations Conference Call; 07/26/2018 - Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet; Safety Moment Prep Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Argentina Start-Up Meeting and Notes; HH300 Uruguay/Drillmec meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Start-Up Meeting and Notes; HH300 Uruguay/Drillmec meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Start-Up Meeting and Notes; HH300 Uruguay/Drillmec meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 07/23/2018 - Weekly Operations Conference Call; 07/26/2018 - Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet; Safety Moment Prep Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6.5 0 Argentina Start-Up Meeting and Notes; HH300 Uruguay/Drillmec meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Argentina Start-Up Meeting and Notes; HH300 Uruguay/Drillmec meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 07/30/2018 - Weekly Operations Conference Call; 08/02/2018 - Technical Services Weekly Meeting; 2Q Earnings Update Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet; MK CV Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Internal Corporate Project Activities; Argentina Start-Up activities; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Internal Corporate Project Activities; Argentina Start-Up activities; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet; MK CV Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10.5 0 Internal Corporate Project Activities; Argentina Start-Up activities; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 07/30/2018 - Weekly Operations Conference Call; 08/02/2018 - Technical Services Weekly Meeting; 2Q Earnings Update Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Internal Corporate Project Activities; Argentina Start-Up activities; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Internal Corporate Project Activities; Argentina Start-Up activities; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 08/06/2018 - Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5.5 0 Argentina Start-Up Planning Activities; BD Rig Business Model Selection Process; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Start-Up Planning Activities; BD Rig Business Model Selection Process; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Start-Up Planning Activities; BD Rig Business Model Selection Process; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Start-Up Planning Activities; BD Rig Business Model Selection Process; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-10 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 08/13/2018 - Weekly Operations Conference Call; 08/16/2018 - Weekly Tech Services Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Business Model selection process for various contract types; Bridging Document between Opportunity Assessment and Bid Sheet Argentina Entity Start-Up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Business Model selection process for various contract types; Bridging Document between Opportunity Assessment and Bid Sheet Argentina Entity Start-Up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Business Model selection process for various contract types; Bridging Document between Opportunity Assessment and Bid Sheet Argentina Entity Start-Up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 08/13/2018 - Weekly Operations Conference Call; 08/16/2018 - Weekly Tech Services Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Business Model selection process for various contract types; Bridging Document between Opportunity Assessment and Bid Sheet Argentina Entity Start-Up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Business Model selection process for various contract types; Bridging Document between Opportunity Assessment and Bid Sheet Argentina Entity Start-Up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call; Tech Service Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Pre-DD Review for Ukraine; Argentina Start-Up Activities and Schedule Maintenance; New Rig Opportunity Assessment Spreadsheet Development; Barge Rig Spec sheet Development and swap over; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Pre-DD Review for Ukraine; Argentina Start-Up Activities and Schedule Maintenance; New Rig Opportunity Assessment Spreadsheet Development; Barge Rig Spec sheet Development and swap over; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Pre-DD Review for Ukraine; Argentina Start-Up Activities and Schedule Maintenance; New Rig Opportunity Assessment Spreadsheet Development; Barge Rig Spec sheet Development and swap over; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call; Tech Service Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Pre-DD Review for Ukraine; Argentina Start-Up Activities and Schedule Maintenance; New Rig Opportunity Assessment Spreadsheet Development; Barge Rig Spec sheet Development and swap over; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-23 OH-014 :OH-014 Overhead All Activities Regular Pay N 3 0 Bid Sheet Training - Commercial Model Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Pre-DD Review for Ukraine; Argentina Start-Up Activities and Schedule Maintenance; New Rig Opportunity Assessment Spreadsheet Development; Barge Rig Spec sheet Development and swap over; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Revise New Market Entry - Business Development Procedure (BD.PRO.005); Continue on New Rig Opportunity Process and Checklist Spreadsheet; Prepare for Ukraine DD Steering Committee Meeting; Organize Azerbaijan DD Start-Up Meeting; Argentina Entity Start-up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Revise New Market Entry - Business Development Procedure (BD.PRO.005); Continue on New Rig Opportunity Process and Checklist Spreadsheet; Prepare for Ukraine DD Steering Committee Meeting; Organize Azerbaijan DD Start-Up Meeting; Argentina Entity Start-up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-28 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 Leading the Way - Leadership Training Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Revise New Market Entry - Business Development Procedure (BD.PRO.005); Continue on New Rig Opportunity Process and Checklist Spreadsheet; Prepare for Ukraine DD Steering Committee Meeting; Organize Azerbaijan DD Start-Up Meeting; Argentina Entity Start-up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-29 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 Leading the Way - Leadership Training Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-30 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 Leading the Way - Leadership Training Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-08-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Revise New Market Entry - Business Development Procedure (BD.PRO.005); Continue on New Rig Opportunity Process and Checklist Spreadsheet; Prepare for Ukraine DD Steering Committee Meeting; Organize Azerbaijan DD Start-Up Meeting; Argentina Entity Start-up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Labor Day Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Ukraine Due Diligence - Presentation to Steering Committee; Azerbaijan Due Diligence Preparation and Update Meeting; Argentina Start-Up Meeting and Schedule; Revise Due Diligence Process Flow Diagram; Internal Corporate Project Activities; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Ukraine Due Diligence - Presentation to Steering Committee; Azerbaijan Due Diligence Preparation and Update Meeting; Argentina Start-Up Meeting and Schedule; Revise Due Diligence Process Flow Diagram; Internal Corporate Project Activities; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Ukraine Due Diligence - Presentation to Steering Committee; Azerbaijan Due Diligence Preparation and Update Meeting; Argentina Start-Up Meeting and Schedule; Revise Due Diligence Process Flow Diagram; Internal Corporate Project Activities; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Ukraine Due Diligence - Presentation to Steering Committee; Azerbaijan Due Diligence Preparation and Update Meeting; Argentina Start-Up Meeting and Schedule; Revise Due Diligence Process Flow Diagram; Internal Corporate Project Activities; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call; Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Opportunity Management Procedure Revision Meeting; Tender Management Procedure Revision Meeting; Due Diligence Procedure Revision Meeting; Argentina New Entity Start-Up Schedule and Activities; Create Due Diligence Templates; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Opportunity Management Procedure Revision Meeting; Tender Management Procedure Revision Meeting; Due Diligence Procedure Revision Meeting; Argentina New Entity Start-Up Schedule and Activities; Create Due Diligence Templates; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-11 OH-014 :OH-014 Overhead All Activities Regular Pay N 3 0 Demonstration of the New Compliance Portal; Annual Compliance Training; Cyber Security Training Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Opportunity Management Procedure Revision Meeting; Tender Management Procedure Revision Meeting; Due Diligence Procedure Revision Meeting; Argentina New Entity Start-Up Schedule and Activities; Create Due Diligence Templates; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-12 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Demonstration of the New Compliance Portal; Annual Compliance Training; Cyber Security Training Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call; Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Opportunity Management Procedure Revision Meeting; Tender Management Procedure Revision Meeting; Due Diligence Procedure Revision Meeting; Argentina New Entity Start-Up Schedule and Activities; Create Due Diligence Templates; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Opportunity Management Procedure Revision Meeting; Tender Management Procedure Revision Meeting; Due Diligence Procedure Revision Meeting; Argentina New Entity Start-Up Schedule and Activities; Create Due Diligence Templates; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Revise New Market Entry Business Development Procedure and Process Flow Diagram; Create DD Templates for IMS; Argentina New Entity Start-Up Activities; Create Due Diligence Presentation for Leadership Meetings; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Revise New Market Entry Business Development Procedure and Process Flow Diagram; Create DD Templates for IMS; Argentina New Entity Start-Up Activities; Create Due Diligence Presentation for Leadership Meetings; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Revise New Market Entry Business Development Procedure and Process Flow Diagram; Create DD Templates for IMS; Argentina New Entity Start-Up Activities; Create Due Diligence Presentation for Leadership Meetings; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Revise New Market Entry Business Development Procedure and Process Flow Diagram; Create DD Templates for IMS; Argentina New Entity Start-Up Activities; Create Due Diligence Presentation for Leadership Meetings; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Revise New Market Entry Business Development Procedure and Process Flow Diagram; Create DD Templates for IMS; Argentina New Entity Start-Up Activities; Create Due Diligence Presentation for Leadership Meetings; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Argentina Start-Up Meeting and Planning Activities; Azerbaijan Due Diligence Review; Revise New Market Entry Due Diligence Procedure; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Argentina Start-Up Meeting and Planning Activities; Azerbaijan Due Diligence Review; Revise New Market Entry Due Diligence Procedure; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Argentina Start-Up Meeting and Planning Activities; Azerbaijan Due Diligence Review; Revise New Market Entry Due Diligence Procedure; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Start-Up Meeting and Planning Activities; Azerbaijan Due Diligence Review; Revise New Market Entry Due Diligence Procedure; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-09-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Argentina Start-Up Meeting and Planning Activities; Azerbaijan Due Diligence Review; Revise New Market Entry Due Diligence Procedure; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call; Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Azerbaijan Due Diligence Activities; Argentina Market Start-up Activities; Revise Due Diligence supporting templates and forms for IMS; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Azerbaijan Due Diligence Activities; Argentina Market Start-up Activities; Revise Due Diligence supporting templates and forms for IMS; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Azerbaijan Due Diligence Activities; Argentina Market Start-up Activities; Revise Due Diligence supporting templates and forms for IMS; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call; Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Azerbaijan Due Diligence Activities; Argentina Market Start-up Activities; Revise Due Diligence supporting templates and forms for IMS; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Azerbaijan Due Diligence Activities; Argentina Market Start-up Activities; Revise Due Diligence supporting templates and forms for IMS; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Meetings on Revisions to Business Development Procedures; Azerbaijan Due Diligence Follow-Up Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Meetings on Revisions to Business Development Procedures; Azerbaijan Due Diligence Follow-Up Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-09 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3 0 NCOC CTR Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Meetings on Revisions to Business Development Procedures; Azerbaijan Due Diligence Follow-Up Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-10 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 4 0 NCOC CTR Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-11 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-12 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-17 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call; Tech Services weekly meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Revisions to Due Diligence Procedure and Templates; Ukraine Due Diligence Update; Azerbaijan Due Diligence Update; Peer Review of Talos CTR; Create spreadsheet tracker for SOCAR AQS; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-22 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2 0 NCOC Workover Rig Opportunity Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Revisions to Due Diligence Procedure and Templates; Ukraine Due Diligence Update; Azerbaijan Due Diligence Update; Peer Review of Talos CTR; Create spreadsheet tracker for SOCAR AQS; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Revisions to Due Diligence Procedure and Templates; Ukraine Due Diligence Update; Azerbaijan Due Diligence Update; Peer Review of Talos CTR; Create spreadsheet tracker for SOCAR AQS; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call; Tech Services weekly meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Revisions to Due Diligence Procedure and Templates; Ukraine Due Diligence Update; Azerbaijan Due Diligence Update; Peer Review of Talos CTR; Create spreadsheet tracker for SOCAR AQS; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-10-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5.5 0 Revisions to Due Diligence Procedure and Templates; Ukraine Due Diligence Update; Azerbaijan Due Diligence Update; Peer Review of Talos CTR; Create spreadsheet tracker for SOCAR AQS; Internal Corporate Project Activities Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Years Day Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-02 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 (01.02) Review Survey report,(01.04-01.05),Technical comparison of the MHWirthh TD to the TDX-1000. Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-02 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 (01.02-03) SoW document split for Life Extension and TD Upgrade, MHWirth survey follow up(01.05) Research and verification of TDS6S specs for MHWirth comparison, Organize clarifications for MHWirth Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 (01.02)Timesheet, Sakhalin research, (01.03) Sakhalin research (01.04) Review of IDR documents, Weekly TS meeting, Daily update with Manager, (01.05) Timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 (01.02-03) SoW document split for Life Extension and TD Upgrade, MHWirth survey follow up(01.05) Research and verification of TDS6S specs for MHWirth comparison, Organize clarifications for MHWirth Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 (01.02)Timesheet, Sakhalin research, (01.03) Sakhalin research (01.04) Review of IDR documents, Weekly TS meeting, Daily update with Manager, (01.05) Timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-03 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 (01.03) Kvaerner scope of work review, Brainstorming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-04 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1.5 0 (01.04) Close-out repprt Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1.5 0 (01.02) Review Survey report,(01.04-01.05),Technical comparison of the MHWirthh TD to the TDX-1000. Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 (01.02-03) SoW document split for Life Extension and TD Upgrade, MHWirth survey follow up(01.05) Research and verification of TDS6S specs for MHWirth comparison, Organize clarifications for MHWirth Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 (01.02)Timesheet, Sakhalin research, (01.03) Sakhalin research (01.04) Review of IDR documents, Weekly TS meeting, Daily update with Manager, (01.05) Timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 (01.02) Review Survey report,(01.04-01.05),Technical comparison of the MHWirthh TD to the TDX-1000. Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 (01.02-03) SoW document split for Life Extension and TD Upgrade, MHWirth survey follow up(01.05) Research and verification of TDS6S specs for MHWirth comparison, Organize clarifications for MHWirth Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (01.02)Timesheet, Sakhalin research, (01.03) Sakhalin research (01.04) Review of IDR documents, Weekly TS meeting, Daily update with Manager, (01.05) Timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-05 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 (01.05) Man-hour billable and non-billable tracking Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-08 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 7 0 NOV Survey report review, Scope of Work document split, TD Rails, AC TD, PLC, Research Hibernia material specifications, Expense reports Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet approvals, 2M-Tek torque sub scope meeting, TS weekly meeting, MHWirth lunch meeting, PKD W-4 update, Training research, Lamar holding BD opportunity discussion, Document control review, Husky research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-08 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Deliverable man-hour estimate draft Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 NOV Survey report review, Scope of Work document split, TD Rails, AC TD, PLC, Research Hibernia material specifications, Expense reports Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Timesheet approvals, 2M-Tek torque sub scope meeting, TS weekly meeting, MHWirth lunch meeting, PKD W-4 update, Training research, Lamar holding BD opportunity discussion, Document control review, Husky research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-09 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 Deliverable man-hour estimate draft Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-10 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 NOV Survey report review, Scope of Work document split, TD Rails, AC TD, PLC, Research Hibernia material specifications, Expense reports Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet approvals, 2M-Tek torque sub scope meeting, TS weekly meeting, MHWirth lunch meeting, PKD W-4 update, Training research, Lamar holding BD opportunity discussion, Document control review, Husky research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-10 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 Deliverable man-hour estimate draft Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 (1.11) MHWirth Scope clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 NOV Survey report review, Scope of Work document split, TD Rails, AC TD, PLC, Research Hibernia material specifications, Expense reports Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Timesheet approvals, 2M-Tek torque sub scope meeting, TS weekly meeting, MHWirth lunch meeting, PKD W-4 update, Training research, Lamar holding BD opportunity discussion, Document control review, Husky research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet approvals, 2M-Tek torque sub scope meeting, TS weekly meeting, MHWirth lunch meeting, PKD W-4 update, Training research, Lamar holding BD opportunity discussion, Document control review, Husky research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-12 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 Deliverable man-hour estimate draft Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2.5 0 MHWirth TD Clarifications, Lead MHWirth technical review meeting and update action tracker, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 UDoc access, Training and certification costs, W-4 update, Skype Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-15 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 MDR and SharePoint folder setup, KV deliverable list Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-16 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 2 0 TSR and CTR for test machine Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-16 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 St John updates and alignment, TD Rail replacement SoW, AC TD SoW, Update NDA with MHWirth, PLC Life Extension SoW, MHWirth clarification references Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-16 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 MDR and SharePoint folder setup, KV deliverable list Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 MHWirth TD Clarifications, Lead MHWirth technical review meeting and update action tracker, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 St John updates and alignment, TD Rail replacement SoW, AC TD SoW, Update NDA with MHWirth, PLC Life Extension SoW, MHWirth clarification references Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-17 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 MDR and SharePoint folder setup, KV deliverable list Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-18 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 TSR and CTR for test machine Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 St John updates and alignment, TD Rail replacement SoW, AC TD SoW, Update NDA with MHWirth, PLC Life Extension SoW, MHWirth clarification references Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-18 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 MDR and SharePoint folder setup, KV deliverable list Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-18 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Non-billable update Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-19 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Review and brainstorm the design scope for the test machine, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 St John updates and alignment, TD Rail replacement SoW, AC TD SoW, Update NDA with MHWirth, PLC Life Extension SoW, MHWirth clarification references Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 UDoc access, Training and certification costs, W-4 update, Skype Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-19 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4 0 HH 1500 HP rig visit, documenting pictures of the rig Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-19 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 0.5 0 MDR and SharePoint folder setup, KV deliverable list Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-22 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 MHWirth technical clarifications, update technical comparison, Provide feedback for 2012 test machine, Update MHWirth action tracker and clarification list Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-22 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Update NDA with MHWirth, TDS6S technical comparison, Review Bardex survey report, review NOV survey report, Discuss torque testing scope with David, Update email to David Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 Timesheet, TQSI lunch, MHWirth equipment tour, travel to and from, Hr payroll documents, AutoCAD install, Vallourec buyout notification, Coordinate WPI shop visit, keyboard replacement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-22 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 0.5 0 Organize pictures from HH Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-23 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Update NDA with MHWirth, TDS6S technical comparison, Review Bardex survey report, review NOV survey report, Discuss torque testing scope with David, Update email to David Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-23 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Biweekly Meeting and action items, Mass PM plan upload template meetings, travel to XOM campus Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Timesheet, TQSI lunch, MHWirth equipment tour, travel to and from, Hr payroll documents, AutoCAD install, Vallourec buyout notification, Coordinate WPI shop visit, keyboard replacement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-23 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 Deliverable list and MDR review, NG Genset research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-23 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Monthly timesheet submittal Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-24 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 0.5 0 Research existing machines Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-24 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 MHWirth technical clarifications, update technical comparison, Provide feedback for 2012 test machine, Update MHWirth action tracker and clarification list Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-24 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Update NDA with MHWirth, TDS6S technical comparison, Review Bardex survey report, review NOV survey report, Discuss torque testing scope with David, Update email to David Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-24 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Biweekly Meeting and action items, Mass PM plan upload template meetings, travel to XOM campus Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet, TQSI lunch, MHWirth equipment tour, travel to and from, Hr payroll documents, AutoCAD install, Vallourec buyout notification, Coordinate WPI shop visit, keyboard replacement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-24 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 Deliverable list and MDR review, NG Genset research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-24 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 Monthly timesheet submittal Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-25 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Action tracker and design brainstorm Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.5 0 MHWirth technical clarifications, update technical comparison, Provide feedback for 2012 test machine, Update MHWirth action tracker and clarification list Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1.5 0 Update NDA with MHWirth, TDS6S technical comparison, Review Bardex survey report, review NOV survey report, Discuss torque testing scope with David, Update email to David Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-25 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4.5 0 Biweekly Meeting and action items, Mass PM plan upload template meetings, travel to XOM campus Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, TQSI lunch, MHWirth equipment tour, travel to and from, Hr payroll documents, AutoCAD install, Vallourec buyout notification, Coordinate WPI shop visit, keyboard replacement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-25 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Deliverable list and MDR review, NG Genset research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 MHWirth technical clarifications, update technical comparison, Provide feedback for 2012 test machine, Update MHWirth action tracker and clarification list Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 Update NDA with MHWirth, TDS6S technical comparison, Review Bardex survey report, review NOV survey report, Discuss torque testing scope with David, Update email to David Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, TQSI lunch, MHWirth equipment tour, travel to and from, Hr payroll documents, AutoCAD install, Vallourec buyout notification, Coordinate WPI shop visit, keyboard replacement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-26 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Deliverable list and MDR review, NG Genset research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-29 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Create template for technical and commercial evaluation, Torque limitation electrical clarification, TD comparison PPT, MH Wirth Clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-29 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 0.5 0 Distribute FIMS documents, Review tracker update to align with percent complete Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-29 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1.5 0 Clarification to how project percent complete is calculated, Update action tracker, Template meeting follow ups Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 WPI Facility visit, Bardex MSA, clarification for legal on Hibernia, research training for mud pumps, weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-29 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 NG Genset reasearch, GE meeting to review man-hours, Basis of Design Review and PPT generation, Document control PPT, Review TCs Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-30 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Disucssions on integration of MHWirth TD into Derrick, Survey report reviews Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 WPI Facility visit, Bardex MSA, clarification for legal on Hibernia, research training for mud pumps, weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-30 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 NG Genset reasearch, GE meeting to review man-hours, Basis of Design Review and PPT generation, Document control PPT, Review TCs Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-30 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 TSR for torque testing on M72 Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-31 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.5 0 Create template for technical and commercial evaluation, Torque limitation electrical clarification, TD comparison PPT, MH Wirth Clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-31 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Disucssions on integration of MHWirth TD into Derrick, Survey report reviews Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-31 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 0.5 0 Clarification to how project percent complete is calculated, Update action tracker, Template meeting follow ups Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 WPI Facility visit, Bardex MSA, clarification for legal on Hibernia, research training for mud pumps, weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-31 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4.5 0 NG Genset reasearch, GE meeting to review man-hours, Basis of Design Review and PPT generation, Document control PPT, Review TCs Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 WPI Facility visit, Bardex MSA, clarification for legal on Hibernia, research training for mud pumps, weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-01 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 6 0 NG Genset reasearch, GE meeting to review man-hours, Basis of Design Review and PPT generation, Document control PPT, Review TCs Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-02 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Design review with Dan Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Distribute FIMS documents, Review tracker update to align with percent complete Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Clarification to how project percent complete is calculated, Update action tracker, Template meeting follow ups Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-02 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 5.5 0 NG Genset reasearch, GE meeting to review man-hours, Basis of Design Review and PPT generation, Document control PPT, Review TCs Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-05 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1.5 0 Draft CTR, XOM MTG Debrief, Genesis services procurement, Deliverables revision, JU research with KA, SharePoint setup for file sharing with GE Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-05 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 TH hill training Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-06 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 TH hill training Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 WebEx bi-weekly meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-07 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 TH hill training Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-08 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Design brainstorming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-08 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Technical and commercial evaluation for MHWirth TD, DC TD clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-08 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Planning survey review meetin Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Expense report, PDR meeting, Vendor lunch with Control flow Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-08 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 Draft CTR, XOM MTG Debrief, Genesis services procurement, Deliverables revision, JU research with KA, SharePoint setup for file sharing with GE Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-08 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 TSR and CTR for torque and electrical test Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.5 0 Technical and commercial evaluation for MHWirth TD, DC TD clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Expense report, PDR meeting, Vendor lunch with Control flow Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-09 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 5.5 0 Draft CTR, XOM MTG Debrief, Genesis services procurement, Deliverables revision, JU research with KA, SharePoint setup for file sharing with GE Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-12 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Design review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 MHWirth technical clarifications and analysis, NOV survey review meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Discussion with david, NOV, survey review meeting, discussion with MHWirth Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-12 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Coordinate with team to align on weekly priorities, BoD presentation, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 CTR for KV, Project setup in Oracle, PO issuance to GE, Weekly meeting with KV, SP setup, Genesis access for PKD office, Deliverable list and CTR development with Genesis, Email approval for Genesis subcontractor, Lead Genesis kick-off meeting, Project setup Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.5 0 MHWirth technical clarifications and analysis, NOV survey review meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-13 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 9 0 CTR for KV, Project setup in Oracle, PO issuance to GE, Weekly meeting with KV, SP setup, Genesis access for PKD office, Deliverable list and CTR development with Genesis, Email approval for Genesis subcontractor, Lead Genesis kick-off meeting, Project setup Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-14 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1.5 0 MHWirth technical clarifications and analysis, NOV survey review meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-14 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Discussion with david, NOV, survey review meeting, discussion with MHWirth Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-14 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 Coordinate with team to align on weekly priorities, BoD presentation, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5.5 0 CTR for KV, Project setup in Oracle, PO issuance to GE, Weekly meeting with KV, SP setup, Genesis access for PKD office, Deliverable list and CTR development with Genesis, Email approval for Genesis subcontractor, Lead Genesis kick-off meeting, Project setup Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 Discussion with david, NOV, survey review meeting, discussion with MHWirth Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly TS meeting, Timesheet, SCM entro address update Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-15 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 8.5 0 CTR for KV, Project setup in Oracle, PO issuance to GE, Weekly meeting with KV, SP setup, Genesis access for PKD office, Deliverable list and CTR development with Genesis, Email approval for Genesis subcontractor, Lead Genesis kick-off meeting, Project setup Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-16 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 0.5 0 Update percent complete in template Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Weekly TS meeting, Timesheet, SCM entro address update Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-16 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 CTR for KV, Project setup in Oracle, PO issuance to GE, Weekly meeting with KV, SP setup, Genesis access for PKD office, Deliverable list and CTR development with Genesis, Email approval for Genesis subcontractor, Lead Genesis kick-off meeting, Project setup Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Holiday Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 TD comparison review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 8 0 Setup cost report template, support Genesis access to PKD systems and facility, researching files for reference, weekly meeting with Kvaerner and ENL, invoicing procedure, setup project risk template, discussions on concept, Email approval for steel CVN testing, Combining powerpoints for BoD Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-21 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Weekly meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-21 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 Timesheets and tracker updates Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-21 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 Basis of Design Presentation, Weekly Report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Setup cost report template, support Genesis access to PKD systems and facility, researching files for reference, weekly meeting with Kvaerner and ENL, invoicing procedure, setup project risk template, discussions on concept, Email approval for steel CVN testing, Combining powerpoints for BoD Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 7 0 Basis of Design Presentation, Weekly Report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Setup cost report template, support Genesis access to PKD systems and facility, researching files for reference, weekly meeting with Kvaerner and ENL, invoicing procedure, setup project risk template, discussions on concept, Email approval for steel CVN testing, Combining powerpoints for BoD Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 Basis of Design Presentation, Weekly Report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Setup cost report template, support Genesis access to PKD systems and facility, researching files for reference, weekly meeting with Kvaerner and ENL, invoicing procedure, setup project risk template, discussions on concept, Email approval for steel CVN testing, Combining powerpoints for BoD Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Weekly TS meeting, Timesheet, PTO forms, Compliance questionnaire, Provide schedule go-by to M Hoffman Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-26 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 7 0 Basis of Design Presentation initial submittal and revision, review of 3D block layouts, Clarifications to Kvaerner Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Weekly XOM meeting, KV alignment meeting, training Sachin on timesheets and weekly report, Research into go-bys, Internal coordination meeting, Invoicing procedure, Invoicing procedure, steering commitee, Revised CTR, Genesis timesheet approval Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Weekly TS meeting, Timesheet, PTO forms, Compliance questionnaire, Provide schedule go-by to M Hoffman Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 Basis of Design Presentation initial submittal and revision, review of 3D block layouts, Clarifications to Kvaerner Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Weekly XOM meeting, KV alignment meeting, training Sachin on timesheets and weekly report, Research into go-bys, Internal coordination meeting, Invoicing procedure, Invoicing procedure, steering commitee, Revised CTR, Genesis timesheet approval Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-28 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.5 0 Review and issue TD comparison PPT, Bid evaluation and TD technical comparison Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Weekly TS meeting, Timesheet, PTO forms, Compliance questionnaire, Provide schedule go-by to M Hoffman Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 Basis of Design Presentation initial submittal and revision, review of 3D block layouts, Clarifications to Kvaerner Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Weekly XOM meeting, KV alignment meeting, training Sachin on timesheets and weekly report, Research into go-bys, Internal coordination meeting, Invoicing procedure, Invoicing procedure, steering commitee, Revised CTR, Genesis timesheet approval Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-01 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Design review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Review and issue TD comparison PPT, Bid evaluation and TD technical comparison Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly TS meeting, Timesheet, PTO forms, Compliance questionnaire, Provide schedule go-by to M Hoffman Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 3 0 Basis of Design Presentation initial submittal and revision, review of 3D block layouts, Clarifications to Kvaerner Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Weekly XOM meeting, KV alignment meeting, training Sachin on timesheets and weekly report, Research into go-bys, Internal coordination meeting, Invoicing procedure, Invoicing procedure, steering commitee, Revised CTR, Genesis timesheet approval Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly TS meeting, Timesheet, PTO forms, Compliance questionnaire, Provide schedule go-by to M Hoffman Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Weekly XOM meeting, KV alignment meeting, training Sachin on timesheets and weekly report, Research into go-bys, Internal coordination meeting, Invoicing procedure, Invoicing procedure, steering commitee, Revised CTR, Genesis timesheet approval Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-05 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 Design review, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 TD recommendation ppt review, Award recommendation ppt slide Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet, New role Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 9.5 0 03.05 Concept study block layout option 1 and 2 review, coordination meeting to guide the team, Revise BOD per initial comments, clarifications to Kvaerner, RFI--002 seismic assessment 03.06-Review weekly report, technical BOD review with XOM, update action and decision register, update BOD, Review responsibility matrix 03.07- Equipment weight research, 3d model reviews, clarifications on seismic and weights 03.08-Power sizing review, winterization discussion and review, 3d model review, RFI-002 seismic, concept 6 incorporation to BoD, review execution and level 1 schedule 03.09-3D model review, seismic technical discussion, issue execution and level 1 schedule, update histogram cost tracker Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 Internal meetings, research into go-bys, weekly status meeting with XOM, travel to and from XOM, clarification for XOM SME on seismic, invoicing alignment Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-06 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.5 0 TD recommendation ppt review, Award recommendation ppt slide Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-06 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 TD recommendation ppt review - IT Issues, Team update on TD project Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 10.5 0 03.05 Concept study block layout option 1 and 2 review, coordination meeting to guide the team, Revise BOD per initial comments, clarifications to Kvaerner, RFI--002 seismic assessment 03.06-Review weekly report, technical BOD review with XOM, update action and decision register, update BOD, Review responsibility matrix 03.07- Equipment weight research, 3d model reviews, clarifications on seismic and weights 03.08-Power sizing review, winterization discussion and review, 3d model review, RFI-002 seismic, concept 6 incorporation to BoD, review execution and level 1 schedule 03.09-3D model review, seismic technical discussion, issue execution and level 1 schedule, update histogram cost tracker Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 Internal meetings, research into go-bys, weekly status meeting with XOM, travel to and from XOM, clarification for XOM SME on seismic, invoicing alignment Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-07 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 TD recommendation ppt review - IT Issues, Team update on TD project Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 0.5 0 Weekly meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-07 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 6 0 03.05 Concept study block layout option 1 and 2 review, coordination meeting to guide the team, Revise BOD per initial comments, clarifications to Kvaerner, RFI--002 seismic assessment 03.06-Review weekly report, technical BOD review with XOM, update action and decision register, update BOD, Review responsibility matrix 03.07- Equipment weight research, 3d model reviews, clarifications on seismic and weights 03.08-Power sizing review, winterization discussion and review, 3d model review, RFI-002 seismic, concept 6 incorporation to BoD, review execution and level 1 schedule 03.09-3D model review, seismic technical discussion, issue execution and level 1 schedule, update histogram cost tracker Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-07 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 Internal meetings, research into go-bys, weekly status meeting with XOM, travel to and from XOM, clarification for XOM SME on seismic, invoicing alignment Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-08 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Design review, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 03.05 Concept study block layout option 1 and 2 review, coordination meeting to guide the team, Revise BOD per initial comments, clarifications to Kvaerner, RFI--002 seismic assessment 03.06-Review weekly report, technical BOD review with XOM, update action and decision register, update BOD, Review responsibility matrix 03.07- Equipment weight research, 3d model reviews, clarifications on seismic and weights 03.08-Power sizing review, winterization discussion and review, 3d model review, RFI-002 seismic, concept 6 incorporation to BoD, review execution and level 1 schedule 03.09-3D model review, seismic technical discussion, issue execution and level 1 schedule, update histogram cost tracker Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Internal meetings, research into go-bys, weekly status meeting with XOM, travel to and from XOM, clarification for XOM SME on seismic, invoicing alignment Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, New role Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-09 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 6 0 03.05 Concept study block layout option 1 and 2 review, coordination meeting to guide the team, Revise BOD per initial comments, clarifications to Kvaerner, RFI--002 seismic assessment 03.06-Review weekly report, technical BOD review with XOM, update action and decision register, update BOD, Review responsibility matrix 03.07- Equipment weight research, 3d model reviews, clarifications on seismic and weights 03.08-Power sizing review, winterization discussion and review, 3d model review, RFI-002 seismic, concept 6 incorporation to BoD, review execution and level 1 schedule 03.09-3D model review, seismic technical discussion, issue execution and level 1 schedule, update histogram cost tracker Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-09 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Internal meetings, research into go-bys, weekly status meeting with XOM, travel to and from XOM, clarification for XOM SME on seismic, invoicing alignment Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 Internal discussions, XOM discussion for remaining upgrade work, clarifications to Suppliers Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Guide team on technical writing, provide go-bys to Hazel Fraser Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 Guide, coordinate and expedite the team. 03.12 - Winterization BoD, Weight Clarification, Coordinate deliverable responsibility for team, issues informal weekly report, Costing template for GustoMSC, review concept 6 3D model 03.13 - Review and issue weekly report, coordinate with team to start risk register, weight clarification, J/U weight estimate and unit costs for GustoMSC, Research J/U mast test temps, concept screening and scoring 03.14 Screening matrix review, Review lifting feasibility and updated concept 1 3D model, coordinate team reviews for topsides philosophy, review weight report and CG 03.15 - Lifting feasibility review, review and issue electrical sizing, review concept 6 3D model, review weight and CGs, issue clarification to KBR, electrical clarifications 03.16-LQ weight clarification, request estimated pricing differences for low-temp steel, request budgetary pricing for platform cranes, issue weight and cg report, KBR scope split, BoD concept 6 update, issue updated 3D models, coordinate review for KBR topsides, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Internal meetings and discussions, man-hour forecast, research offshore crane options, NDA with KBR Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2.5 0 Internal discussions, XOM discussion for remaining upgrade work, clarifications to Suppliers Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Guide team on technical writing, provide go-bys to Hazel Fraser Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 7 0 Guide, coordinate and expedite the team. 03.12 - Winterization BoD, Weight Clarification, Coordinate deliverable responsibility for team, issues informal weekly report, Costing template for GustoMSC, review concept 6 3D model 03.13 - Review and issue weekly report, coordinate with team to start risk register, weight clarification, J/U weight estimate and unit costs for GustoMSC, Research J/U mast test temps, concept screening and scoring 03.14 Screening matrix review, Review lifting feasibility and updated concept 1 3D model, coordinate team reviews for topsides philosophy, review weight report and CG 03.15 - Lifting feasibility review, review and issue electrical sizing, review concept 6 3D model, review weight and CGs, issue clarification to KBR, electrical clarifications 03.16-LQ weight clarification, request estimated pricing differences for low-temp steel, request budgetary pricing for platform cranes, issue weight and cg report, KBR scope split, BoD concept 6 update, issue updated 3D models, coordinate review for KBR topsides, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 Guide, coordinate and expedite the team. 03.12 - Winterization BoD, Weight Clarification, Coordinate deliverable responsibility for team, issues informal weekly report, Costing template for GustoMSC, review concept 6 3D model 03.13 - Review and issue weekly report, coordinate with team to start risk register, weight clarification, J/U weight estimate and unit costs for GustoMSC, Research J/U mast test temps, concept screening and scoring 03.14 Screening matrix review, Review lifting feasibility and updated concept 1 3D model, coordinate team reviews for topsides philosophy, review weight report and CG 03.15 - Lifting feasibility review, review and issue electrical sizing, review concept 6 3D model, review weight and CGs, issue clarification to KBR, electrical clarifications 03.16-LQ weight clarification, request estimated pricing differences for low-temp steel, request budgetary pricing for platform cranes, issue weight and cg report, KBR scope split, BoD concept 6 update, issue updated 3D models, coordinate review for KBR topsides, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Internal meetings and discussions, man-hour forecast, research offshore crane options, NDA with KBR Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-15 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 9.5 0 Guide, coordinate and expedite the team. 03.12 - Winterization BoD, Weight Clarification, Coordinate deliverable responsibility for team, issues informal weekly report, Costing template for GustoMSC, review concept 6 3D model 03.13 - Review and issue weekly report, coordinate with team to start risk register, weight clarification, J/U weight estimate and unit costs for GustoMSC, Research J/U mast test temps, concept screening and scoring 03.14 Screening matrix review, Review lifting feasibility and updated concept 1 3D model, coordinate team reviews for topsides philosophy, review weight report and CG 03.15 - Lifting feasibility review, review and issue electrical sizing, review concept 6 3D model, review weight and CGs, issue clarification to KBR, electrical clarifications 03.16-LQ weight clarification, request estimated pricing differences for low-temp steel, request budgetary pricing for platform cranes, issue weight and cg report, KBR scope split, BoD concept 6 update, issue updated 3D models, coordinate review for KBR topsides, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-15 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Internal meetings and discussions, man-hour forecast, research offshore crane options, NDA with KBR Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-16 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2 0 Review FEA in Solidworks, advise on FEA modeling Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet, Guide team on technical writing, provide go-bys to Hazel Fraser Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-16 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5.5 0 Guide, coordinate and expedite the team. 03.12 - Winterization BoD, Weight Clarification, Coordinate deliverable responsibility for team, issues informal weekly report, Costing template for GustoMSC, review concept 6 3D model 03.13 - Review and issue weekly report, coordinate with team to start risk register, weight clarification, J/U weight estimate and unit costs for GustoMSC, Research J/U mast test temps, concept screening and scoring 03.14 Screening matrix review, Review lifting feasibility and updated concept 1 3D model, coordinate team reviews for topsides philosophy, review weight report and CG 03.15 - Lifting feasibility review, review and issue electrical sizing, review concept 6 3D model, review weight and CGs, issue clarification to KBR, electrical clarifications 03.16-LQ weight clarification, request estimated pricing differences for low-temp steel, request budgetary pricing for platform cranes, issue weight and cg report, KBR scope split, BoD concept 6 update, issue updated 3D models, coordinate review for KBR topsides, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1.5 0 Request for quote on DC TD. coordinate team for close-out and new TSR, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, compliance questionnaire, IT followup Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.19 Liehberr RFQ, KBR Scope split PPT, Revise BoD for Concept 6 and winterization, concept ranking system 03.20 Screening matrix review and ranking, scope split PPT 03.21 Review and revise weight and CG PPT, scope split review and document update 03.22 Review KBR sketches for topsides, revised weight and CG for concept 6, review topsides philosophy by KBR, send capex template, CAPEX deliverable Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Concept screening and scoring, weekly status meeting with Kvaerner and XOM, research industry offshore lifts, internal discussions, NDA with KBR, research on Berkut weather conditions, update weight and CG based on internal comments, NDA coordination Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 10.5 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.19 Liehberr RFQ, KBR Scope split PPT, Revise BoD for Concept 6 and winterization, concept ranking system 03.20 Screening matrix review and ranking, scope split PPT 03.21 Review and revise weight and CG PPT, scope split review and document update 03.22 Review KBR sketches for topsides, revised weight and CG for concept 6, review topsides philosophy by KBR, send capex template, CAPEX deliverable Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Concept screening and scoring, weekly status meeting with Kvaerner and XOM, research industry offshore lifts, internal discussions, NDA with KBR, research on Berkut weather conditions, update weight and CG based on internal comments, NDA coordination Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.19 Liehberr RFQ, KBR Scope split PPT, Revise BoD for Concept 6 and winterization, concept ranking system 03.20 Screening matrix review and ranking, scope split PPT 03.21 Review and revise weight and CG PPT, scope split review and document update 03.22 Review KBR sketches for topsides, revised weight and CG for concept 6, review topsides philosophy by KBR, send capex template, CAPEX deliverable Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Concept screening and scoring, weekly status meeting with Kvaerner and XOM, research industry offshore lifts, internal discussions, NDA with KBR, research on Berkut weather conditions, update weight and CG based on internal comments, NDA coordination Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-22 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 0.5 0 Guidance on FEA Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 7 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.19 Liehberr RFQ, KBR Scope split PPT, Revise BoD for Concept 6 and winterization, concept ranking system 03.20 Screening matrix review and ranking, scope split PPT 03.21 Review and revise weight and CG PPT, scope split review and document update 03.22 Review KBR sketches for topsides, revised weight and CG for concept 6, review topsides philosophy by KBR, send capex template, CAPEX deliverable Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Concept screening and scoring, weekly status meeting with Kvaerner and XOM, research industry offshore lifts, internal discussions, NDA with KBR, research on Berkut weather conditions, update weight and CG based on internal comments, NDA coordination Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, compliance questionnaire, IT followup Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-23 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 6.5 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.19 Liehberr RFQ, KBR Scope split PPT, Revise BoD for Concept 6 and winterization, concept ranking system 03.20 Screening matrix review and ranking, scope split PPT 03.21 Review and revise weight and CG PPT, scope split review and document update 03.22 Review KBR sketches for topsides, revised weight and CG for concept 6, review topsides philosophy by KBR, send capex template, CAPEX deliverable Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Concept screening and scoring, weekly status meeting with Kvaerner and XOM, research industry offshore lifts, internal discussions, NDA with KBR, research on Berkut weather conditions, update weight and CG based on internal comments, NDA coordination Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Weekly meeting timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.26-Review screening summary, draft of CAPEX estimates, clarifications on CAPEX, review schedule, draft of screening comparison 03.27-Dimensional clarifications, update concept 6 3D model, clarification for concept 4 float-over, seismic benchmark, topsides philosophy review 03.28-Technical meeting with KBR and Kvaerner, research alternative Jack-Ups, RFQ for Pioneering Spirit, CAPEX summary, CAPEX Concept 4 03.29-CAPEX estimate, clarification for float-over, risk and HSE register and PPT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Internal discussions and meetings, float-over feasibility, pioneering spirit RFQ, electric versus diesel crane, time tracker update, timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 follow up on quotes for DC TD Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-27 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 Timesheets Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 7 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.26-Review screening summary, draft of CAPEX estimates, clarifications on CAPEX, review schedule, draft of screening comparison 03.27-Dimensional clarifications, update concept 6 3D model, clarification for concept 4 float-over, seismic benchmark, topsides philosophy review 03.28-Technical meeting with KBR and Kvaerner, research alternative Jack-Ups, RFQ for Pioneering Spirit, CAPEX summary, CAPEX Concept 4 03.29-CAPEX estimate, clarification for float-over, risk and HSE register and PPT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Internal discussions and meetings, float-over feasibility, pioneering spirit RFQ, electric versus diesel crane, time tracker update, timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.26-Review screening summary, draft of CAPEX estimates, clarifications on CAPEX, review schedule, draft of screening comparison 03.27-Dimensional clarifications, update concept 6 3D model, clarification for concept 4 float-over, seismic benchmark, topsides philosophy review 03.28-Technical meeting with KBR and Kvaerner, research alternative Jack-Ups, RFQ for Pioneering Spirit, CAPEX summary, CAPEX Concept 4 03.29-CAPEX estimate, clarification for float-over, risk and HSE register and PPT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Internal discussions and meetings, float-over feasibility, pioneering spirit RFQ, electric versus diesel crane, time tracker update, timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly meeting timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 7 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.26-Review screening summary, draft of CAPEX estimates, clarifications on CAPEX, review schedule, draft of screening comparison 03.27-Dimensional clarifications, update concept 6 3D model, clarification for concept 4 float-over, seismic benchmark, topsides philosophy review 03.28-Technical meeting with KBR and Kvaerner, research alternative Jack-Ups, RFQ for Pioneering Spirit, CAPEX summary, CAPEX Concept 4 03.29-CAPEX estimate, clarification for float-over, risk and HSE register and PPT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Internal discussions and meetings, float-over feasibility, pioneering spirit RFQ, electric versus diesel crane, time tracker update, timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-30 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Holiday Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, weekly meeting, Jeff discussion on Krechet procurement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report, CAPEX, Risk and HSE Register, report out presentation, estimate, weight and CG revision, risk register revision, concept screening review, screening report review, revised BoD, draft close-out letter Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Internal meeting and disucssions, time tracking Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 9 0 Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report, CAPEX, Risk and HSE Register, report out presentation, estimate, weight and CG revision, risk register revision, concept screening review, screening report review, revised BoD, draft close-out letter Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Internal meeting and disucssions, time tracking Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 9 0 Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report, CAPEX, Risk and HSE Register, report out presentation, estimate, weight and CG revision, risk register revision, concept screening review, screening report review, revised BoD, draft close-out letter Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2.5 0 Internal meeting and disucssions, time tracking Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, weekly meeting, Jeff discussion on Krechet procurement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report, CAPEX, Risk and HSE Register, report out presentation, estimate, weight and CG revision, risk register revision, concept screening review, screening report review, revised BoD, draft close-out letter Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3.5 0 Internal meeting and disucssions, time tracking Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, weekly meeting, Jeff discussion on Krechet procurement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 6 0 Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report, CAPEX, Risk and HSE Register, report out presentation, estimate, weight and CG revision, risk register revision, concept screening review, screening report review, revised BoD, draft close-out letter Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Internal meeting and disucssions, time tracking Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 IT, Weekly timesheet, internal discussion on finance, market research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-09 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 8 0 Report out meeting at XOM campus, Client clarifications, final weekly report, final timesheets. client invoice, acceptance letter, internal discussions, report closeout, issue screening report, revise report out presentation, schedule after action review, discussion with Client Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 IT, Weekly timesheet, internal discussion on finance, market research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-10 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 8 0 Report out meeting at XOM campus, Client clarifications, final weekly report, final timesheets. client invoice, acceptance letter, internal discussions, report closeout, issue screening report, revise report out presentation, schedule after action review, discussion with Client Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-11 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 9.5 0 Report out meeting at XOM campus, Client clarifications, final weekly report, final timesheets. client invoice, acceptance letter, internal discussions, report closeout, issue screening report, revise report out presentation, schedule after action review, discussion with Client Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 Follow up on gearbox modification, delivery for TD rails Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 IT, Weekly timesheet, internal discussion on finance, market research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-12 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 research arctic land rigs, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Report out meeting at XOM campus, Client clarifications, final weekly report, final timesheets. client invoice, acceptance letter, internal discussions, report closeout, issue screening report, revise report out presentation, schedule after action review, discussion with Client Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 IT, Weekly timesheet, internal discussion on finance, market research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-13 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 research arctic land rigs, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-13 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Report out meeting at XOM campus, Client clarifications, final weekly report, final timesheets. client invoice, acceptance letter, internal discussions, report closeout, issue screening report, revise report out presentation, schedule after action review, discussion with Client Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly TS meeting, IMS training planning, OTC registration, Research conferences, benefits Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-16 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 5 0 Market survey for modularized arctic rigs, internet research, powerpoint, NOV Kostroma clarifications, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-16 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 CTR and TSR for TD Rail replacement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-16 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Close-out report, Acceptance letter, invoice, Timesheet, Review clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly TS meeting, IMS training planning, OTC registration, Research conferences, benefits Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-17 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 7 0 Market survey for modularized arctic rigs, internet research, powerpoint, NOV Kostroma clarifications, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-17 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Close-out report, Acceptance letter, invoice, Timesheet, Review clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-18 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Review and discuss FEA report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-18 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 6 0 Market survey for modularized arctic rigs, internet research, powerpoint, NOV Kostroma clarifications, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Russian CUTR support for new choke manifold Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet, Weekly TS meeting, IMS training planning, OTC registration, Research conferences, benefits Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-19 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 5 0 Market survey for modularized arctic rigs, internet research, powerpoint, NOV Kostroma clarifications, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly TS meeting, IMS training planning, OTC registration, Research conferences, benefits Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-20 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 4.5 0 CTR and TSR for TD Rail replacement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 Close-out report, Acceptance letter, invoice, Timesheet, Review clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-23 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 Review FEA report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Internal FEA disucssion Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-23 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 Cost estimate for mini minkit, waterfall for deep dive Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 XOM clarifications and steerig committee meeting, Invoice clarification, weight basis, revise screening report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-24 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Review FEA report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Internal FEA disucssion Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-24 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 3 0 Cost estimate for mini minkit, waterfall for deep dive Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-24 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 XOM clarifications and steerig committee meeting, Invoice clarification, weight basis, revise screening report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Internal FEA disucssion Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-25 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 4.5 0 Cost estimate for mini minkit, waterfall for deep dive Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-25 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Timesheets Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-25 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 XOM clarifications and steerig committee meeting, Invoice clarification, weight basis, revise screening report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IMS training, IMS document review, Weekly TS meeting, Timesheet, Q1 earnings, invoice clarification, OTC reserach Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-30 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 7 0 Minkit reduced rig cost estimate, Krechet as-built specs, Low temp steel spec research, Client calls, deliverable list for deep dive Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-01 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 Internal discussion on cost estimate Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 OTC Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-01 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 Minkit reduced rig cost estimate, Krechet as-built specs, Low temp steel spec research, Client calls, deliverable list for deep dive Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 IMS training, IMS document review, Weekly TS meeting, Timesheet, Q1 earnings, invoice clarification, OTC reserach Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4.5 0 TSR closeout and closeout report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-02 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Follow up on gearbox upgrade Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 IMS training, IMS document review, Weekly TS meeting, Timesheet, Q1 earnings, invoice clarification, OTC reserach Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-03 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 6 0 Minkit reduced rig cost estimate, Krechet as-built specs, Low temp steel spec research, Client calls, deliverable list for deep dive Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 TSR closeout and closeout report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.5 0 IMS training, IMS document review, Weekly TS meeting, Timesheet, Q1 earnings, invoice clarification, OTC reserach Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-04 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 0.5 0 Minkit reduced rig cost estimate, Krechet as-built specs, Low temp steel spec research, Client calls, deliverable list for deep dive Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 weekly TS meeting, timesheet, Contract management procedure, IP presentation, invoice follow up, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-07 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 6 0 Liehberr meeting on platform cranes, TSR closeout report for minkit Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-07 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 TSR and CTR for TD rail replacement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-08 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 review scope of work documents Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-08 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 review scope of work documents Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-08 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 Gearbox follow up Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 weekly TS meeting, timesheet, Contract management procedure, IP presentation, invoice follow up, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-08 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 Liehberr meeting on platform cranes, TSR closeout report for minkit Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-08 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 TSR and CTR for TD rail replacement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 weekly TS meeting, timesheet, Contract management procedure, IP presentation, invoice follow up, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-09 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 Liehberr meeting on platform cranes, TSR closeout report for minkit Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 weekly TS meeting, timesheet, Contract management procedure, IP presentation, invoice follow up, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-10 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 6 0 Liehberr meeting on platform cranes, TSR closeout report for minkit Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 weekly TS meeting, timesheet, Contract management procedure, IP presentation, invoice follow up, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-11 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 3 0 Liehberr meeting on platform cranes, TSR closeout report for minkit Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-14 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Review scope of work documents Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-14 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 Review scope of work documents Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Research Sakhalin rig thesis, timesheet, Weekly TS meeting, IMS Cost management procedure, Equipment training research, Expense report, George excel help, Handover Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-15 Hibernia Platform :Hibernia Platform TSR-01646-HIBP Top Drive Rail Replacement Regular Pay N 6 0 Create Material Requisition Specification for TD Rails and TD rail Replacement Scope of Work Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Research Sakhalin rig thesis, timesheet, Weekly TS meeting, IMS Cost management procedure, Equipment training research, Expense report, George excel help, Handover Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-16 Hibernia Platform :Hibernia Platform TSR-01646-HIBP Top Drive Rail Replacement Regular Pay N 6 0 Create Material Requisition Specification for TD Rails and TD rail Replacement Scope of Work Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Research Sakhalin rig thesis, timesheet, Weekly TS meeting, IMS Cost management procedure, Equipment training research, Expense report, George excel help, Handover Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-17 Hibernia Platform :Hibernia Platform TSR-01646-HIBP Top Drive Rail Replacement Regular Pay N 0.5 0 Create Material Requisition Specification for TD Rails and TD rail Replacement Scope of Work Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 Research Sakhalin rig thesis, timesheet, Weekly TS meeting, IMS Cost management procedure, Equipment training research, Expense report, George excel help, Handover Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Follow-up on gearbox replacement and scope alignment meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-18 Hibernia Platform :Hibernia Platform TSR-01646-HIBP Top Drive Rail Replacement Regular Pay N 0.5 0 Create Material Requisition Specification for TD Rails and TD rail Replacement Scope of Work Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Research Sakhalin rig thesis, timesheet, Weekly TS meeting, IMS Cost management procedure, Equipment training research, Expense report, George excel help, Handover Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-21 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-23 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-25 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-28 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Memorial Day Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-30 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-31 Hibernia Platform :Hibernia Platform TSR-01646-HIBP Top Drive Rail Replacement Regular Pay N 2 0 Material Requisition and Scope of Work Internal update and issue for approval Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Weekly TS meeting, PDC benefits paperwork, Status discussion Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Total-Uganda technical spec review, Brainstorming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly TS meeting, PDC benefits paperwork, Status discussion Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Total-Uganda technical spec review, Brainstorming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-04 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Research TDS-6S upgrades, Follow up on TDS-6S Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly TS meeting, Site manager lunch. DGB presentation, IMS training Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Total Uganda Cashflow, Scope review, Rig builder interface for milestone dates, Execution brainstorming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Total Uganda Cashflow, Scope review, Rig builder interface for milestone dates, Execution brainstorming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-06 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 Research TDS-6S upgrades, Follow up on TDS-6S Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet, Weekly TS meeting, Site manager lunch. DGB presentation, IMS training Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Total Uganda Cashflow, Scope review, Rig builder interface for milestone dates, Execution brainstorming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Timesheet, Weekly TS meeting, Site manager lunch. DGB presentation, IMS training Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Total Uganda Cashflow, Scope review, Rig builder interface for milestone dates, Execution brainstorming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Total Uganda Cashflow, Scope review, Rig builder interface for milestone dates, Execution brainstorming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 TS weekly, timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 total Uganda technical spec review, cost estimate, cashflow, procurement plan by PO, execution brainstroming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 total Uganda technical spec review, cost estimate, cashflow, procurement plan by PO, execution brainstroming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 total Uganda technical spec review, cost estimate, cashflow, procurement plan by PO, execution brainstroming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-14 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 Review technical scope and align on path forward Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 TS weekly, timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 total Uganda technical spec review, cost estimate, cashflow, procurement plan by PO, execution brainstroming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6.5 0 total Uganda technical spec review, cost estimate, cashflow, procurement plan by PO, execution brainstroming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-18 Hibernia Platform :Hibernia Platform TSR-01646-HIBP Top Drive Rail Replacement Regular Pay N 0.5 0 Route scope documents for review, Follow-up Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IMS cost templates, Weekly TS meeting, timesheet, IT tickets, Mid-year review, Drillwell discussion with NOV Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Total-Uganda planning. Cashflow, Histogram Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Internal discussions on scope for pipe handling and gear ratio upgrade Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 IMS cost templates, Weekly TS meeting, timesheet, IT tickets, Mid-year review, Drillwell discussion with NOV Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Total-Uganda planning. Cashflow, Histogram Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Internal discussions on scope for pipe handling and gear ratio upgrade Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Total-Uganda planning. Cashflow, Histogram Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-21 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Clarifications on scope with NOV, Review scope of work for top drive gear ratio upgrade Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 IMS cost templates, Weekly TS meeting, timesheet, IT tickets, Mid-year review, Drillwell discussion with NOV Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Total-Uganda planning. Cashflow, Histogram Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4.5 0 Total-Uganda planning. Cashflow, Histogram Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Coordinate facility visits, Project Engineer Lunch meet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Update Cashflow, Technical clarifications, HH financing, File formats for XOM minkit model Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Timesheet, Coordinate facility visits, Project Engineer Lunch meet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Update Cashflow, Technical clarifications, HH financing, File formats for XOM minkit model Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Coordinate facility visits, Project Engineer Lunch meet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Update Cashflow, Technical clarifications, HH financing, File formats for XOM minkit model Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Coordinate facility visits, Project Engineer Lunch meet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Update Cashflow, Technical clarifications, HH financing, File formats for XOM minkit model Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Update Cashflow, Technical clarifications, HH financing, File formats for XOM minkit model Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Canrig facility visit, IDS facility visit Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 HH meeting on Sinosure, Financing, Cashflow update, Internal discussion on Sinsosure, Technical discussion on IP Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 Timesheet, Canrig facility visit, IDS facility visit Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4.5 0 HH meeting on Sinosure, Financing, Cashflow update, Internal discussion on Sinsosure, Technical discussion on IP Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 HH meeting on Sinosure, Financing, Cashflow update, Internal discussion on Sinsosure, Technical discussion on IP Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Timesheet, Canrig facility visit, IDS facility visit Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5.5 0 HH meeting on Sinosure, Financing, Cashflow update, Internal discussion on Sinsosure, Technical discussion on IP Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 HH meeting on Sinosure, Financing, Cashflow update, Internal discussion on Sinsosure, Technical discussion on IP Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 WOM visit, Weekly TS Meeting, Submarine cable Lunch, Timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Total Uganda: HH Financing, Financing Schedule, Reconcile cashflow to bid sheet, Internal discussion's, Spares philosophy and procurements, Financing schedule, Sinosure meeting minutes, IDS patent discussions Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.5 0 WOM visit, Weekly TS Meeting, Submarine cable Lunch, Timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Total Uganda: HH Financing, Financing Schedule, Reconcile cashflow to bid sheet, Internal discussion's, Spares philosophy and procurements, Financing schedule, Sinosure meeting minutes, IDS patent discussions Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Total Uganda: HH Financing, Financing Schedule, Reconcile cashflow to bid sheet, Internal discussion's, Spares philosophy and procurements, Financing schedule, Sinosure meeting minutes, IDS patent discussions Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 WOM visit, Weekly TS Meeting, Submarine cable Lunch, Timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Total Uganda: HH Financing, Financing Schedule, Reconcile cashflow to bid sheet, Internal discussion's, Spares philosophy and procurements, Financing schedule, Sinosure meeting minutes, IDS patent discussions Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-13 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Jacquis farewell lunch Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 total Uganda Entity, Financing, Technical discussions, Update cashflow Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 total Uganda Entity, Financing, Technical discussions, Update cashflow Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 total Uganda Entity, Financing, Technical discussions, Update cashflow Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Jacquis farewell lunch Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 total Uganda Entity, Financing, Technical discussions, Update cashflow Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 total Uganda Entity, Financing, Technical discussions, Update cashflow Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Welldata and drillwell lunch and learn, timesheet, drillmech facility visit, safety moment prep for Monday ops call Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Cashflow for bank financing, entity stetup, technical scope clarification with IDS Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Welldata and drillwell lunch and learn, timesheet, drillmech facility visit, safety moment prep for Monday ops call Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Cashflow for bank financing, entity stetup, technical scope clarification with IDS Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Welldata and drillwell lunch and learn, timesheet, drillmech facility visit, safety moment prep for Monday ops call Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Cashflow for bank financing, entity stetup, technical scope clarification with IDS Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Welldata and drillwell lunch and learn, timesheet, drillmech facility visit, safety moment prep for Monday ops call Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Cashflow for bank financing, entity stetup, technical scope clarification with IDS Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-30 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 5.5 0 Early start-up change order, cost tracking excel sheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Weekly operations call and safety moment, Timesheet, Weekly TS meeting, Q2 earningss meeting, meeting with Kiewit project engineer Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Uganda financing cashflow meeting, Ugabda legal representation meeting, IDS scope clarification, XTO tender support, Lewis energy travel and rig inspection Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-31 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 8 0 Early start-up change order, cost tracking excel sheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Uganda financing cashflow meeting, Ugabda legal representation meeting, IDS scope clarification, XTO tender support, Lewis energy travel and rig inspection Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-01 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 6 0 Early start-up change order, cost tracking excel sheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Weekly operations call and safety moment, Timesheet, Weekly TS meeting, Q2 earningss meeting, meeting with Kiewit project engineer Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Uganda financing cashflow meeting, Ugabda legal representation meeting, IDS scope clarification, XTO tender support, Lewis energy travel and rig inspection Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-02 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 4 0 Early start-up change order, cost tracking excel sheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Weekly operations call and safety moment, Timesheet, Weekly TS meeting, Q2 earningss meeting, meeting with Kiewit project engineer Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Uganda financing cashflow meeting, Ugabda legal representation meeting, IDS scope clarification, XTO tender support, Lewis energy travel and rig inspection Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 12 0 Uganda financing cashflow meeting, Ugabda legal representation meeting, IDS scope clarification, XTO tender support, Lewis energy travel and rig inspection Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly TS Meeting, Vendor lunch and learn Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-06 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 8 0 Drillmec visit, XTO tender support, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-07 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 9 0 Drillmec visit, XTO tender support, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-08 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 9 0 Drillmec visit, XTO tender support, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-09 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 9 0 Drillmec visit, XTO tender support, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-10 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 4 0 Drillmec visit, XTO tender support, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-13 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 9 0 Argentina tender technical support, Identify Suppliers Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Timesheet, Loadmaster Lunch&Learn, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-14 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 7.5 0 Argentina tender technical support, Identify Suppliers Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-15 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 Cost report template review and handover, change order discussion Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet, Loadmaster Lunch&Learn, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-15 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 7.5 0 Argentina tender technical support, Identify Suppliers Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-16 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 Cost report template review and handover, change order discussion Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-16 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 8 0 Argentina tender technical support, Identify Suppliers Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-17 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 PTO 08.17 Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-20 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 9.5 0 Change Order 001, Weekly report templates, POB Tracker, Scope of Work review, Contract Review, Cost Management and Acceptance Plan, Cost Report Development, AFE review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Bidsheet training, Weekly TS meeting, IT computer replacement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-21 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 5.5 0 Change Order 001, Weekly report templates, POB Tracker, Scope of Work review, Contract Review, Cost Management and Acceptance Plan, Cost Report Development, AFE review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Timesheet, Bidsheet training, Weekly TS meeting, IT computer replacement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-22 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 11 0 Change Order 001, Weekly report templates, POB Tracker, Scope of Work review, Contract Review, Cost Management and Acceptance Plan, Cost Report Development, AFE review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-23 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 10.5 0 Change Order 001, Weekly report templates, POB Tracker, Scope of Work review, Contract Review, Cost Management and Acceptance Plan, Cost Report Development, AFE review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Bidsheet training, Weekly TS meeting, IT computer replacement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-24 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 5 0 Change Order 001, Weekly report templates, POB Tracker, Scope of Work review, Contract Review, Cost Management and Acceptance Plan, Cost Report Development, AFE review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-25 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 Change Order 001, Weekly report templates, POB Tracker, Scope of Work review, Contract Review, Cost Management and Acceptance Plan, Cost Report Development, AFE review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-27 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 10 0 Setup ProjXSense, Guidance on ProjXSense, Change Order log, AFE, Timesheet guidance Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-28 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 1 0 Update weekly report for CO001, Action list for priority procurement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-28 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 2 0 Setup ProjXSense, Guidance on ProjXSense, Change Order log, AFE, Timesheet guidance Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-28 OH-014 :OH-014 Overhead All Activities Regular Pay N 7 0 Leading the Way: A Leader's Organizational Impact Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-29 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 1 0 Update weekly report for CO001, Action list for priority procurement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-29 Holly Platform :Holly Platform TSR-01665-HOLP-98 Rentals (OH) Regular Pay N 0.5 0 Track down documentation for TD Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-29 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 2.5 0 Setup ProjXSense, Guidance on ProjXSense, Change Order log, AFE, Timesheet guidance Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-29 OH-014 :OH-014 Overhead All Activities Regular Pay N 7 0 Leading the Way: A Leader's Organizational Impact Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-30 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-08-31 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Holiday Labor day Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-04 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 1.5 0 MR and procurement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-04 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 9.5 0 Update schedule, cost tracker, contract kickoff, review technical procurement packages, ProjXSense guidance, Weekly report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-05 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 10 0 Update schedule, cost tracker, contract kickoff, review technical procurement packages, ProjXSense guidance, Weekly report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-06 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 11.5 0 Update schedule, cost tracker, contract kickoff, review technical procurement packages, ProjXSense guidance, Weekly report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-07 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 9.5 0 Update schedule, cost tracker, contract kickoff, review technical procurement packages, ProjXSense guidance, Weekly report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-08 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 4 0 Update schedule, cost tracker, contract kickoff, review technical procurement packages, ProjXSense guidance, Weekly report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-17 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4.5 0 Procurement planning, MRs and TPPs, Project discussions, Change order drafts, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-17 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 2 0 Weekly Report, Cost tracking, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 IT, Timesheet, Reference estimates Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-17 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Train Svetlana on cost trackers Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-18 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 9 0 Procurement planning, MRs and TPPs, Project discussions, Change order drafts, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 IT, Timesheet, Reference estimates Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-19 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 9 0 Procurement planning, MRs and TPPs, Project discussions, Change order drafts, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-20 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 9 0 Procurement planning, MRs and TPPs, Project discussions, Change order drafts, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 IT, Timesheet, Reference estimates Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-21 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 7 0 Procurement planning, MRs and TPPs, Project discussions, Change order drafts, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-24 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 8 0 MRs and Change Order Orders, Weekly report, Holly crown removal discussions and powerpoint, Project startup checklist, Logistics plan Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 IMS document review for MR and Cost report, Timesheet, PE renewal, Pentagon visit Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-25 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 8 0 MRs and Change Order Orders, Weekly report, Holly crown removal discussions and powerpoint, Project startup checklist, Logistics plan Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-25 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 Train Svetlana on weekly cost report and tracking, training on Oracle reports with lerma Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-26 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 9.5 0 MRs and Change Order Orders, Weekly report, Holly crown removal discussions and powerpoint, Project startup checklist, Logistics plan Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-27 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 9.5 0 MRs and Change Order Orders, Weekly report, Holly crown removal discussions and powerpoint, Project startup checklist, Logistics plan Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-28 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 5 0 MRs and Change Order Orders, Weekly report, Holly crown removal discussions and powerpoint, Project startup checklist, Logistics plan Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-09-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 IMS document review for MR and Cost report, Timesheet, PE renewal, Pentagon visit Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-01 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 8.5 0 XOM Meeting, Schedule update, Procurement, Weekly report, Change Order drafts, Drawworks MTO, Organization chart Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly TS Meeting, MR form revision Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-02 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 9.5 0 XOM Meeting, Schedule update, Procurement, Weekly report, Change Order drafts, Drawworks MTO, Organization chart Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly TS Meeting, MR form revision Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-03 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 5.5 0 XOM Meeting, Schedule update, Procurement, Weekly report, Change Order drafts, Drawworks MTO, Organization chart Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-03 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 training with C. Lerma for pulling oracle reports, Training Svetlana on weekly cost tracking Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-04 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 9 0 XOM Meeting, Schedule update, Procurement, Weekly report, Change Order drafts, Drawworks MTO, Organization chart Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-05 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 5.5 0 XOM Meeting, Schedule update, Procurement, Weekly report, Change Order drafts, Drawworks MTO, Organization chart Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-06 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 2 0 XOM Meeting, Schedule update, Procurement, Weekly report, Change Order drafts, Drawworks MTO, Organization chart Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-08 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 2 0 Change order drafting and tracking, update schedule, MRs and procurement, Update logistics plan, project charter, American Block facility visit for deadline anchor, tax discussions, XOM meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-08 Holly Platform :Holly Platform TSR-01665-HOLP-02 Change Order 2 (Delayed Reactivation Day Rate) Regular Pay N 7 0 Weekly update, Weekly XOM, meeting and minutes, change order drafting and tracking, update schedule Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-09 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 10.5 0 Change order drafting and tracking, update schedule, MRs and procurement, Update logistics plan, project charter, American Block facility visit for deadline anchor, tax discussions, XOM meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-10 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 8.5 0 Change order drafting and tracking, update schedule, MRs and procurement, Update logistics plan, project charter, American Block facility visit for deadline anchor, tax discussions, XOM meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-10 Holly Platform :Holly Platform TSR-01665-HOLP-02 Change Order 2 (Delayed Reactivation Day Rate) Regular Pay N 2 0 Weekly update, Weekly XOM, meeting and minutes, change order drafting and tracking, update schedule Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-11 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 10 0 Change order drafting and tracking, update schedule, MRs and procurement, Update logistics plan, project charter, American Block facility visit for deadline anchor, tax discussions, XOM meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-12 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 6 0 Change order drafting and tracking, update schedule, MRs and procurement, Update logistics plan, project charter, American Block facility visit for deadline anchor, tax discussions, XOM meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-15 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 1 0 Procurement, Draft Change Orders, Weekly Report, Labor variance forecasting, Tax memorandums, Timesheet review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-15 Holly Platform :Holly Platform TSR-01665-HOLP-02 Change Order 2 (Delayed Reactivation Day Rate) Regular Pay N 4 0 Weekly report, draft change orders, review weekly cost utilization, review spill containment specs Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-15 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 4 0 Pulling unit, Request for pricing, cost estimate template, Pulling unit meeting with LM, Talos modular rig concept meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-16 Holly Platform :Holly Platform TSR-01665-HOLP-02 Change Order 2 (Delayed Reactivation Day Rate) Regular Pay N 9 0 Weekly report, draft change orders, review weekly cost utilization, review spill containment specs Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-17 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4.5 0 Procurement, Draft Change Orders, Weekly Report, Labor variance forecasting, Tax memorandums, Timesheet review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-17 Holly Platform :Holly Platform TSR-01665-HOLP-02 Change Order 2 (Delayed Reactivation Day Rate) Regular Pay N 5 0 Weekly report, draft change orders, review weekly cost utilization, review spill containment specs Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-18 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 8.5 0 Procurement, Draft Change Orders, Weekly Report, Labor variance forecasting, Tax memorandums, Timesheet review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-18 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 Pulling unit, Request for pricing, cost estimate template, Pulling unit meeting with LM, Talos modular rig concept meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-19 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4 0 Procurement, Draft Change Orders, Weekly Report, Labor variance forecasting, Tax memorandums, Timesheet review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-19 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2 0 Pulling unit, Request for pricing, cost estimate template, Pulling unit meeting with LM, Talos modular rig concept meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-22 Holly Platform :Holly Platform TSR-01665-HOLP-02 Change Order 2 (Delayed Reactivation Day Rate) Regular Pay N 8 0 Procurement tracking, change order tracking, weekly report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 NCOC query review meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-23 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 1.5 0 Procurement, Draft Change Orders, Weekly Report, Labor variance forecasting, Timesheet review, MTO review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-23 Holly Platform :Holly Platform TSR-01665-HOLP-02 Change Order 2 (Delayed Reactivation Day Rate) Regular Pay N 9 0 Procurement tracking, change order tracking, weekly report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly technical services meeting, expense report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-24 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 7.5 0 Procurement, Draft Change Orders, Weekly Report, Labor variance forecasting, Timesheet review, MTO review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-24 Holly Platform :Holly Platform TSR-01665-HOLP-02 Change Order 2 (Delayed Reactivation Day Rate) Regular Pay N 1 0 Procurement tracking, change order tracking, weekly report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-24 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 Talos CTR review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-25 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 10.5 0 Procurement, Draft Change Orders, Weekly Report, Labor variance forecasting, Timesheet review, MTO review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly technical services meeting, expense report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-10-26 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 6 0 Procurement, Draft Change Orders, Weekly Report, Labor variance forecasting, Timesheet review, MTO review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR Board Meetings (daily) AutoCAD renewal meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Reviewing PKD 10-K filing incl. rig details Discussing training with Chris Lerma AutoCAD renewal discussion IHS subscription for Canada Performance Appraisals Computer Issues (IT support) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-02 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 SOW review general discussions with GO and JL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 discuss 209L rig move with Genesis general sakhalinTSR support / status updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-02 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 USCG check issue Renewing COI's for ROBERT PARKER and CISSY 2017 COD renewal (2nd check sent out) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-02 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1 0 schedule review with tyler update cost estimate Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Board Meetings (daily) AutoCAD renewal meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Reviewing PKD 10-K filing incl. rig details Discussing training with Chris Lerma AutoCAD renewal discussion IHS subscription for Canada Performance Appraisals Computer Issues (IT support) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-03 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 SOW review general discussions with GO and JL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 discuss 209L rig move with Genesis general sakhalinTSR support / status updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-03 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 USCG check issue Renewing COI's for ROBERT PARKER and CISSY 2017 COD renewal (2nd check sent out) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Board Meetings (daily) AutoCAD renewal meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Reviewing PKD 10-K filing incl. rig details Discussing training with Chris Lerma AutoCAD renewal discussion IHS subscription for Canada Performance Appraisals Computer Issues (IT support) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-04 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 SOW review general discussions with GO and JL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 discuss 209L rig move with Genesis general sakhalinTSR support / status updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-04 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 USCG check issue Renewing COI's for ROBERT PARKER and CISSY 2017 COD renewal (2nd check sent out) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-04 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1 0 schedule review with tyler update cost estimate Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR Board Meetings (daily) AutoCAD renewal meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Reviewing PKD 10-K filing incl. rig details Discussing training with Chris Lerma AutoCAD renewal discussion IHS subscription for Canada Performance Appraisals Computer Issues (IT support) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-05 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 0.5 0 SOW review general discussions with GO and JL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 discuss 209L rig move with Genesis general sakhalinTSR support / status updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-05 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 USCG check issue Renewing COI's for ROBERT PARKER and CISSY 2017 COD renewal (2nd check sent out) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-05 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1.5 0 schedule review with tyler update cost estimate Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-08 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 3.25 0 Weekly Operations Phone Conf. Call Weekly TS Mgmt. Meeting 2M Tek Meeting with Dan, Joshua and AJ Client owned asset drawings - meeting Parker Technology Title Block meeting IHS subscription meeting with Quality Dept. Rolling forecast meeting with JS, RS and GO Weekly TSR meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 A&E Insurance Renewal Performance Evaluations IHS subscription for Canada - starting process timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-08 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 Check Issue; sending out new check Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-08 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 RFI review ;/ Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-08 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 0.5 0 Review of FEA with JR Drawing review and issuance Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-08 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 1 0 Meeting with MQ and Genesis regarding the SOW producing CTR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 reviewing various scopes of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Phone Conf. Call Weekly TS Mgmt. Meeting 2M Tek Meeting with Dan, Joshua and AJ Client owned asset drawings - meeting Parker Technology Title Block meeting IHS subscription meeting with Quality Dept. Rolling forecast meeting with JS, RS and GO Weekly TSR meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 A&E Insurance Renewal Performance Evaluations IHS subscription for Canada - starting process timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Pluspetrol Argentina (meeting with Omar, review of budgetary cost) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-09 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Bridal line issue (MQ) meeting with JR to discuss ventilation issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-09 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Check Issue; sending out new check Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-09 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1 0 Drawing review and approval existing platform analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-09 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 0.5 0 Review of FEA with JR Drawing review and issuance Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-09 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 0.5 0 Cost estimate meetings reviewing documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-10 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 reviewing various scopes of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Weekly Operations Phone Conf. Call Weekly TS Mgmt. Meeting 2M Tek Meeting with Dan, Joshua and AJ Client owned asset drawings - meeting Parker Technology Title Block meeting IHS subscription meeting with Quality Dept. Rolling forecast meeting with JS, RS and GO Weekly TSR meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 A&E Insurance Renewal Performance Evaluations IHS subscription for Canada - starting process timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Pluspetrol Argentina (meeting with Omar, review of budgetary cost) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 general support - discussing Orlan derrick inspection Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-10 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Bridal line issue (MQ) meeting with JR to discuss ventilation issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-10 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Check Issue; sending out new check Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-10 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 0.5 0 Drawing review and approval existing platform analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-10 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 0.5 0 Cost estimate meetings reviewing documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-10 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 0.5 0 Meeting with MQ and Genesis regarding the SOW producing CTR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 reviewing various scopes of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 3.5 0 Weekly Operations Phone Conf. Call Weekly TS Mgmt. Meeting 2M Tek Meeting with Dan, Joshua and AJ Client owned asset drawings - meeting Parker Technology Title Block meeting IHS subscription meeting with Quality Dept. Rolling forecast meeting with JS, RS and GO Weekly TSR meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 A&E Insurance Renewal Performance Evaluations IHS subscription for Canada - starting process timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 Pluspetrol Argentina (meeting with Omar, review of budgetary cost) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-11 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 0.5 0 Drawing review and approval existing platform analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-11 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 0.5 0 Cost estimate meetings reviewing documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-11 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 0.5 0 Meeting with MQ and Genesis regarding the SOW producing CTR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 reviewing various scopes of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Weekly Operations Phone Conf. Call Weekly TS Mgmt. Meeting 2M Tek Meeting with Dan, Joshua and AJ Client owned asset drawings - meeting Parker Technology Title Block meeting IHS subscription meeting with Quality Dept. Rolling forecast meeting with JS, RS and GO Weekly TSR meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 A&E Insurance Renewal Performance Evaluations IHS subscription for Canada - starting process timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-12 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 0.5 0 Drawing review and approval existing platform analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-12 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 0.5 0 Cost estimate meetings reviewing documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 A&E Insurance Renewal Performance Evaluations IHS subscription for Canada - starting process timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 (Sunday) Performance Appraisals; 18-Month Rolling Forecast Spreadsheet; Technical Services Hours Summary for 2017 Update IMS TSR and CTR forms and complete MOC Issuing PO to Genesis for Alaska work Meet with RS to discuss Performance Evaluations (x4) 269L belly board documentation sent to DCDM IHS subscription for Canada and Russia Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Weekly Ops Phone Call Weekly TS Mgmt Mtg TSR board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 (Sunday) Performance Appraisals; 18-Month Rolling Forecast Spreadsheet; Technical Services Hours Summary for 2017 Update IMS TSR and CTR forms and complete MOC Issuing PO to Genesis for Alaska work Meet with RS to discuss Performance Evaluations (x4) 269L belly board documentation sent to DCDM IHS subscription for Canada and Russia Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 Pluspetrol Argentina - visit HH to inspect 1500 HP rig Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-15 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 1 0 Discussing issues with Genesis and Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (Sunday) Performance Appraisals; 18-Month Rolling Forecast Spreadsheet; Technical Services Hours Summary for 2017 Update IMS TSR and CTR forms and complete MOC Issuing PO to Genesis for Alaska work Meet with RS to discuss Performance Evaluations (x4) 269L belly board documentation sent to DCDM IHS subscription for Canada and Russia Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 7 0 Ice Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (Sunday) Performance Appraisals; 18-Month Rolling Forecast Spreadsheet; Technical Services Hours Summary for 2017 Update IMS TSR and CTR forms and complete MOC Issuing PO to Genesis for Alaska work Meet with RS to discuss Performance Evaluations (x4) 269L belly board documentation sent to DCDM IHS subscription for Canada and Russia Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 6.5 0 Ice Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-17 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.5 0 Regulatory changes to four (4) rigs site plans Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.75 0 Reviewing PLC scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 (Sunday) Performance Appraisals; 18-Month Rolling Forecast Spreadsheet; Technical Services Hours Summary for 2017 Update IMS TSR and CTR forms and complete MOC Issuing PO to Genesis for Alaska work Meet with RS to discuss Performance Evaluations (x4) 269L belly board documentation sent to DCDM IHS subscription for Canada and Russia Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 Pluspetrol Argentina - visit HH to inspect 1500 HP rig Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-18 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.5 0 Regulatory changes to four (4) rigs site plans Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-18 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 COD Status Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-18 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2 0 Discussing issues with Genesis and Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (Sunday) Performance Appraisals; 18-Month Rolling Forecast Spreadsheet; Technical Services Hours Summary for 2017 Update IMS TSR and CTR forms and complete MOC Issuing PO to Genesis for Alaska work Meet with RS to discuss Performance Evaluations (x4) 269L belly board documentation sent to DCDM IHS subscription for Canada and Russia Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2.5 0 Pluspetrol Argentina - visit HH to inspect 1500 HP rig Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-19 OH-010 :OH-010 Overhead All Activities Regular Pay N 0.75 0 Travel to HH America Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-19 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.25 0 Regulatory changes to four (4) rigs site plans Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-21 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Email response to Joe L. regarding additional clarifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-22 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 TSR and CTR approval Meeting with JL, TE, and DS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Weekly Operations Phone Conference Weekly TS Mgmt. Meeting TSR Board Mtgs. SparkCognition Meeting with RS 18 Month Rolling Forecast Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IHS Subscription set-up for Canada and Russia Revising performance appraisals Connie Simms (GoM Assets / insurance) Support AutoCAD 2018 Install IMS Audit review of TSR procedure Hyperion Installation / IT ticket Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 Pluspetrol Argentina - meeting with client; general submittal support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-22 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 0.5 0 MDR review and meeting with JL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-22 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 review of open TSR's and discussion with JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-22 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.75 0 Randy Crowsen drawing revision request - fuel tanks and camp Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-22 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1.25 0 Closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Weekly Operations Phone Conference Weekly TS Mgmt. Meeting TSR Board Mtgs. SparkCognition Meeting with RS 18 Month Rolling Forecast Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IHS Subscription set-up for Canada and Russia Revising performance appraisals Connie Simms (GoM Assets / insurance) Support AutoCAD 2018 Install IMS Audit review of TSR procedure Hyperion Installation / IT ticket Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 General supoport (Jeff A.) - material questions, fabrications questions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-23 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Timesheet approval Review GO's Husky presentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-23 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2.5 0 Check and payment issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-23 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 1.5 0 Genesis Meeting @ PKD Offices Weight verification GA review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Weekly Operations Phone Conference Weekly TS Mgmt. Meeting TSR Board Mtgs. SparkCognition Meeting with RS 18 Month Rolling Forecast Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IHS Subscription set-up for Canada and Russia Revising performance appraisals Connie Simms (GoM Assets / insurance) Support AutoCAD 2018 Install IMS Audit review of TSR procedure Hyperion Installation / IT ticket Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-24 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1.25 0 MDR review and meeting with JL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-24 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 review tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-24 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 General supoport (Jeff A.) - material questions, fabrications questions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-24 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Check and payment issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-24 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1.25 0 Hand Calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-24 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 0.5 0 Genesis Meeting @ PKD Offices Weight verification GA review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-25 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 0.75 0 TSR and CTR approval Meeting with JL, TE, and DS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Weekly Operations Phone Conference Weekly TS Mgmt. Meeting TSR Board Mtgs. SparkCognition Meeting with RS 18 Month Rolling Forecast Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IHS Subscription set-up for Canada and Russia Revising performance appraisals Connie Simms (GoM Assets / insurance) Support AutoCAD 2018 Install IMS Audit review of TSR procedure Hyperion Installation / IT ticket Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-25 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.25 0 SaferUnion presentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 General supoport (Jeff A.) - material questions, fabrications questions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-25 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Timesheet approval Review GO's Husky presentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-25 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 Check and payment issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-25 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 1.25 0 Hand Calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-25 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 0.5 0 Genesis Meeting @ PKD Offices Weight verification GA review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IHS Subscription set-up for Canada and Russia Revising performance appraisals Connie Simms (GoM Assets / insurance) Support AutoCAD 2018 Install IMS Audit review of TSR procedure Hyperion Installation / IT ticket Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.75 0 Pluspetrol Argentina - meeting with client; general submittal support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 General supoport (Jeff A.) - material questions, fabrications questions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-26 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Check and payment issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-26 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 1 0 Genesis Meeting @ PKD Offices Weight verification GA review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-29 OH-003 :OH-003 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 TSR weekly meeting TSR board meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-30 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 5 0 Meetings with team Meetings with Genesis Meeting with Exxon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-30 OH-010 :OH-010 Overhead All Activities Regular Pay N 1.75 0 Greenway to Exxon (round trip) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-30 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1.5 0 Crew boats and rig COD's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-30 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 1.5 0 Kick-Off Meeting Preparation Seismic and Material research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.5 0 IHS Subscription for Canada and Russia ECAD Invoice WED - John Reck and James Gasper performance evaluation THURS - Sachin and Tyler performance evaluation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-31 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1.5 0 Meetings with team Meetings with Genesis Meeting with Exxon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-31 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1 0 closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-31 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 1 0 closeout review and approva Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-31 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 1 0 Kick-Off Meeting Preparation Seismic and Material research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-01 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 reviewing current design Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR weekly meeting TSR board meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IHS Subscription for Canada and Russia ECAD Invoice WED - John Reck and James Gasper performance evaluation THURS - Sachin and Tyler performance evaluation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 TSR tracker update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-01 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 Torque and electrical testing TSR and CTR review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-01 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 CTR rev 1 review and approval w/ revisions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-01 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 0.25 0 CTR review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-01 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 3.5 0 Kick-Off Meeting Preparation Seismic and Material research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-02 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-02 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 Torque and electrical testing TSR and CTR review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-02 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 1 0 Kick-Off Meeting Preparation Seismic and Material research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Weekly TS Mgmt. Meeting Weekly TSR review meeting TSR Board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Performance Evaluation closeout Personnel meeting with RS SAFI license update Intern paperwork Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-05 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Subsea power cable slide review BOD slide review Internal meetings Seismic research - LM and Genesis discussions PO Process; meeting with Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR Administration and support Conference call with island to discuss rig move to SWS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-05 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 ESD Philosophy to Dan Colby; interface with EMD and CG Review of GHW email regarding 258 stack-up drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-05 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Compliance Documentation Payment for COI User Fee - MR PERRY, PB DB 3 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-05 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 3 0 Preparation for Meeting WED - meeting with Kvaerner THURS - meeting at Exxon; debrief with Kvaerner Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly TS Mgmt. Meeting Weekly TSR review meeting TSR Board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Performance Evaluation closeout Personnel meeting with RS SAFI license update Intern paperwork Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-06 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Subsea power cable slide review BOD slide review Internal meetings Seismic research - LM and Genesis discussions PO Process; meeting with Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 TSR Administration and support Conference call with island to discuss rig move to SWS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-06 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.5 0 ESD Philosophy to Dan Colby; interface with EMD and CG Review of GHW email regarding 258 stack-up drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-06 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2 0 Meeting with Genesis and TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-06 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 2 0 Preparation for Meeting WED - meeting with Kvaerner THURS - meeting at Exxon; debrief with Kvaerner Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly TS Mgmt. Meeting Weekly TSR review meeting TSR Board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Creating spreadsheet for Bryan C. (based on info provided by RS) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-07 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Subsea power cable slide review BOD slide review Internal meetings Seismic research - LM and Genesis discussions PO Process; meeting with Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR Administration and support Conference call with island to discuss rig move to SWS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-07 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 ESD Philosophy to Dan Colby; interface with EMD and CG Review of GHW email regarding 258 stack-up drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-07 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Compliance Documentation Payment for COI User Fee - MR PERRY, PB DB 3 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-07 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 2 0 report review and meeting with SG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-07 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 4 0 Preparation for Meeting WED - meeting with Kvaerner THURS - meeting at Exxon; debrief with Kvaerner Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-08 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 Review of various designs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-08 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Subsea power cable slide review BOD slide review Internal meetings Seismic research - LM and Genesis discussions PO Process; meeting with Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-08 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 Round trip to Exxon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-08 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Compliance Documentation Payment for COI User Fee - MR PERRY, PB DB 3 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-08 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 8 0 Preparation for Meeting WED - meeting with Kvaerner THURS - meeting at Exxon; debrief with Kvaerner Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-09 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 Review of various designs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Performance Evaluation closeout Personnel meeting with RS SAFI license update Intern paperwork Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-09 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2.5 0 Subsea power cable slide review BOD slide review Internal meetings Seismic research - LM and Genesis discussions PO Process; meeting with Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-09 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.75 0 ESD Philosophy to Dan Colby; interface with EMD and CG Review of GHW email regarding 258 stack-up drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-09 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1.25 0 Compliance Documentation Payment for COI User Fee - MR PERRY, PB DB 3 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Weekly Operations Phone Conference Weekly TS Mgmt. Meeting Daily TSR board meeting Weekly TSR meeting (earning conf call) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals IHS invoice ECAD Performance Appraisal Meeting with Rob Earnings Update Luncheon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-12 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 update compliance tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-12 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 0.5 0 CO review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-12 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 1 0 reviewing report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-12 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 1.5 0 Review Genesis report / meeting with MDQ Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Board meetings Setting up timekeeping system Genesis on boarding Weekly Exxon Meeting Genesis PO SharePoint Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-13 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 Design review Meetings with Tyler and Dan Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Operations Phone Conference Weekly TS Mgmt. Meeting Daily TSR board meeting Weekly TSR meeting (earning conf call) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 timesheet and timesheet approvals IHS invoice ECAD Performance Appraisal Meeting with Rob Earnings Update Luncheon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-13 ORLAN-TSR :ORLAN-TSR TSR-01623-ORLP Orlan Service Beam CRI HP Pump Regular Pay N 1 0 Drawing review and hand calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-13 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 1 0 CO review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-13 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 1 0 Review Genesis report / meeting with MDQ Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-13 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2.5 0 Board meetings Setting up timekeeping system Genesis on boarding Weekly Exxon Meeting Genesis PO SharePoint Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-14 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 Design review Meetings with Tyler and Dan Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Operations Phone Conference Weekly TS Mgmt. Meeting Daily TSR board meeting Weekly TSR meeting (earning conf call) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals IHS invoice ECAD Performance Appraisal Meeting with Rob Earnings Update Luncheon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-14 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 257B BOP stack-up drawings Quote for Rig Saver for EMD gensets (257) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-14 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 1.5 0 comparison sketch between 264L and 1500 HP rig (Starr Energy) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-14 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 1 0 CO review / approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-14 ORLAN-TSR :ORLAN-TSR TSR-01623-ORLP Orlan Service Beam CRI HP Pump Regular Pay N 0.5 0 Drawing review and hand calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-14 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 0.5 0 CTR review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-14 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 1 0 CO review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-14 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 0.5 0 reviewing report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 Board meetings Setting up timekeeping system Genesis on boarding Weekly Exxon Meeting Genesis PO SharePoint Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-15 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 Design review Meetings with Tyler and Dan Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Weekly Operations Phone Conference Weekly TS Mgmt. Meeting Daily TSR board meeting Weekly TSR meeting (earning conf call) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 timesheet and timesheet approvals IHS invoice ECAD Performance Appraisal Meeting with Rob Earnings Update Luncheon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-15 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1.5 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-15 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 257B BOP stack-up drawings Quote for Rig Saver for EMD gensets (257) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-15 ORLAN-TSR :ORLAN-TSR TSR-01623-ORLP Orlan Service Beam CRI HP Pump Regular Pay N 0.5 0 Drawing review and hand calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-15 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Board meetings Setting up timekeeping system Genesis on boarding Weekly Exxon Meeting Genesis PO SharePoint Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals IHS invoice ECAD Performance Appraisal Meeting with Rob Earnings Update Luncheon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-16 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 257B BOP stack-up drawings Quote for Rig Saver for EMD gensets (257) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-16 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 Basis of Design Kick-Off Meeting Review of BOD / provide comments Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-16 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Board meetings Setting up timekeeping system Genesis on boarding Weekly Exxon Meeting Genesis PO SharePoint Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 Top Drive Technical and Commercial Evaluation Mtg. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Meeting with Brian Waligura (informal interview) TSR weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet and timesheet approvals Parking and Office access for Tecky S. Processing of ECAD refund check Discussing 2-12 forecast Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Review of open TSR's and prioritization Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-20 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.75 0 257B BOP Stack-Ups EMD Rig Saver quote sent to Dan Colby Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-20 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 Proposed Mexico TSR for Tender Submission Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-20 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 0.5 0 Final review and issue Genesis report Review and issue closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.25 0 Document reviews incl. BOD KanBan Board Meeting Emails regarding storage on platform Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Timesheet and timesheet approvals Parking and Office access for Tecky S. Processing of ECAD refund check Discussing 2-12 forecast Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-21 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 0.75 0 DNO tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-21 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Hyperion Training Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Review of open TSR's and prioritization Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-21 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.75 0 Hibernia timesheet review and approval Well control testing procedure review / meeting on Friday with Operations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-21 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 DROP's email from Dan Colby - discuss with Rob Johnson Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-21 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 1 0 Final review and issue Genesis report Review and issue closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Document reviews incl. BOD KanBan Board Meeting Emails regarding storage on platform Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Meeting with Brian Waligura (informal interview) TSR weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet and timesheet approvals Parking and Office access for Tecky S. Processing of ECAD refund check Discussing 2-12 forecast Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-22 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2 0 Well control 3rd party inspection document; review and discuss with MDQ Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-22 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Hibernia timesheet review and approval Well control testing procedure review / meeting on Friday with Operations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-22 ORLAN-TSR :ORLAN-TSR TSR-01623-ORLP Orlan Service Beam CRI HP Pump Regular Pay N 2 0 Review, analysis and closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-22 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 1 0 Final review and issue Genesis report Review and issue closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 BOD Presentation review and comment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Document reviews incl. BOD KanBan Board Meeting Emails regarding storage on platform Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet and timesheet approvals Parking and Office access for Tecky S. Processing of ECAD refund check Discussing 2-12 forecast Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-23 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Well control 3rd party inspection document; review and discuss with MDQ Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-23 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Hibernia timesheet review and approval Well control testing procedure review / meeting on Friday with Operations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-23 ORLAN-TSR :ORLAN-TSR TSR-01623-ORLP Orlan Service Beam CRI HP Pump Regular Pay N 0.5 0 Review, analysis and closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.5 0 BOD Presentation review and comment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Document reviews incl. BOD KanBan Board Meeting Emails regarding storage on platform Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Weekly Ops Phone Conf. Weekly TS Mgmt. Meeting TSR Board Meetings TSR / TS Weekly Meeting Meeting to discuss 257B scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 GSM Contract Issue Timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Pluspetrol Argentina - discussions with TE and meeting with Omar Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-26 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Hibernia BOP transport frame discussed with Steve Sharpe and Bishop Lifting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-26 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 GoM Compliance Documents Interoffice mail - PD DB-3 COD sent to EJ Holly Support (Chuck Gorrell) 30B drawing for Perry Landry Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Model Review(s) BOD Reviews Exxon Meeting Internal Meetings KV Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Ops Phone Conf. Weekly TS Mgmt. Meeting TSR Board Meetings TSR / TS Weekly Meeting Meeting to discuss 257B scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 GSM Contract Issue Timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-27 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 0.5 0 DNO Tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Meeting with Genesis regarding 209L move to SWS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-27 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 GoM Compliance Documents Interoffice mail - PD DB-3 COD sent to EJ Holly Support (Chuck Gorrell) 30B drawing for Perry Landry Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-27 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 0.5 0 Demolition drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 Option "1" Model Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2.5 0 Model Review(s) BOD Reviews Exxon Meeting Internal Meetings KV Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-28 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 phone conf with GHW and JL regarding clarification and cost re-work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-28 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 Review and revise TD comparison documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Ops Phone Conf. Weekly TS Mgmt. Meeting TSR Board Meetings TSR / TS Weekly Meeting Meeting to discuss 257B scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 Update TSR tracker and review hours for all open TSR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Meeting with Genesis regarding 209L move to SWS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-28 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1.25 0 Hibernia BOP transport frame discussed with Steve Sharpe and Bishop Lifting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-28 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1.5 0 GoM Compliance Documents Interoffice mail - PD DB-3 COD sent to EJ Holly Support (Chuck Gorrell) 30B drawing for Perry Landry Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-28 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 email to Jonathon Marsh (Exxon) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2.5 0 Model Review(s) BOD Reviews Exxon Meeting Internal Meetings KV Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-01 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Design review meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-01 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 phone conf with GHW and JL regarding clarification and cost re-work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1.25 0 Review and revise TD comparison documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.25 0 Weekly Ops Phone Conf. Weekly TS Mgmt. Meeting TSR Board Meetings TSR / TS Weekly Meeting Meeting to discuss 257B scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 GSM Contract Issue Timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Pluspetrol Argentina - discussions with TE and meeting with Omar Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Model Review(s) BOD Reviews Exxon Meeting Internal Meetings KV Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-02 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-05 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 0.5 0 Reviewing and revising SOW document - multiple revisions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 18 Month Rolling Forecast Meeting TS Mgmt Meeting Weekly TS TSR Meeting TSR Board Review Meetings Meeting with Tyler and John Reck regarding personnel issues/opportunities Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 Rig Fleet data sheet for RS and BC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Personnel Discussions with Sachin and Joshua and R.S. TS Standards into IMS x 2 Revenue recognition Meetings with JS Administrative actions sent to Jazqui Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Pluspetrol Argentina - Meeting with NOV Gap Analysis discussion with TE Bauer Neo-Rig Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 Minkit 3D model review Minkit Seismic meeting with KV Weekly Meeting with Exxon/KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Model Reviews, general meetings, BOD review. general documentation review. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 clarification review cost estimate review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-06 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 0.5 0 Reviewing and revising SOW document - multiple revisions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 18 Month Rolling Forecast Meeting TS Mgmt Meeting Weekly TS TSR Meeting TSR Board Review Meetings Meeting with Tyler and John Reck regarding personnel issues/opportunities Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Rig Fleet data sheet for RS and BC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Personnel Discussions with Sachin and Joshua and R.S. TS Standards into IMS x 2 Revenue recognition Meetings with JS Administrative actions sent to Jazqui Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Pluspetrol Argentina - Meeting with NOV Gap Analysis discussion with TE Bauer Neo-Rig Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 Minkit 3D model review Minkit Seismic meeting with KV Weekly Meeting with Exxon/KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Model Reviews, general meetings, BOD review. general documentation review. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-07 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 2 0 Reviewing and revising SOW document - multiple revisions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 18 Month Rolling Forecast Meeting TS Mgmt Meeting Weekly TS TSR Meeting TSR Board Review Meetings Meeting with Tyler and John Reck regarding personnel issues/opportunities Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Personnel Discussions with Sachin and Joshua and R.S. TS Standards into IMS x 2 Revenue recognition Meetings with JS Administrative actions sent to Jazqui Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 Pluspetrol Argentina - Meeting with NOV Gap Analysis discussion with TE Bauer Neo-Rig Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Meeting preparation Prioritization of TSR's / Updates Non-TSR work actions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-07 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Model Reviews, general meetings, BOD review. general documentation review. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-08 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 clarification review cost estimate review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-08 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 1 0 Reviewing and revising SOW document - multiple revisions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 18 Month Rolling Forecast Meeting TS Mgmt Meeting Weekly TS TSR Meeting TSR Board Review Meetings Meeting with Tyler and John Reck regarding personnel issues/opportunities Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Rig Fleet data sheet for RS and BC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Personnel Discussions with Sachin and Joshua and R.S. TS Standards into IMS x 2 Revenue recognition Meetings with JS Administrative actions sent to Jazqui Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 Pluspetrol Argentina - Meeting with NOV Gap Analysis discussion with TE Bauer Neo-Rig Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Meeting preparation Prioritization of TSR's / Updates Non-TSR work actions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 Model Reviews, general meetings, BOD review. general documentation review. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 18 Month Rolling Forecast Meeting TS Mgmt Meeting Weekly TS TSR Meeting TSR Board Review Meetings Meeting with Tyler and John Reck regarding personnel issues/opportunities Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Rig Fleet data sheet for RS and BC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Personnel Discussions with Sachin and Joshua and R.S. TS Standards into IMS x 2 Revenue recognition Meetings with JS Administrative actions sent to Jazqui Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Meeting preparation Prioritization of TSR's / Updates Non-TSR work actions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-09 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Minkit 3D model review Minkit Seismic meeting with KV Weekly Meeting with Exxon/KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Weekly Ops Phone Call Weekly TS Mgmt. Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 NEO Rig Lunch and Meeting for Argentina (LABU) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Status of BOP inspection in Singapore Preparation for Weekly Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-12 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 257B Discussions KPO Contract Discussion (KMGDS) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Documentation Review (BoD slides, Electrical Slides, 3D models) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Review Weight and CG Documents 3D Modeling Revisions 3D file conversions Various documentation review meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-13 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 FEA review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-13 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 Meeting with Sawyer regarding hydraulic design 2M Test frame review meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 IMS Documents / MoC Process (Paint and NDT) Personnel discussion with Rob S. meeting with RS and JR regarding BU report IHS invoice review / produce breakdown Safety moment schedule Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-13 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 257B Discussions KPO Contract Discussion (KMGDS) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-13 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Documentation sent to Danielle and Jenn Frias regarding payments to USCG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Review Weight and CG Documents 3D Modeling Revisions 3D file conversions Various documentation review meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-14 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 0.75 0 Schedule review SOW review with CG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IMS Documents / MoC Process (Paint and NDT) Personnel discussion with Rob S. meeting with RS and JR regarding BU report IHS invoice review / produce breakdown Safety moment schedule Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Status of BOP inspection in Singapore Preparation for Weekly Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-14 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 Meeting with Bishop Lifting and Canadian Operations regarding BOP Lift Frames Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-14 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 257B Discussions KPO Contract Discussion (KMGDS) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-14 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1.5 0 Documentation sent to Danielle and Jenn Frias regarding payments to USCG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-14 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 review KA weight reports and send to project team Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Review Weight and CG Documents 3D Modeling Revisions 3D file conversions Various documentation review meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-15 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 Meeting with Sawyer regarding hydraulic design 2M Test frame review meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IMS Documents / MoC Process (Paint and NDT) Personnel discussion with Rob S. meeting with RS and JR regarding BU report IHS invoice review / produce breakdown Safety moment schedule Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-15 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 Meeting with Bishop Lifting and Canadian Operations regarding BOP Lift Frames Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-15 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 257B Discussions KPO Contract Discussion (KMGDS) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-15 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 Documentation sent to Danielle and Jenn Frias regarding payments to USCG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-15 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 Documentation Review (BoD slides, Electrical Slides, 3D models) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-15 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Review Weight and CG Documents 3D Modeling Revisions 3D file conversions Various documentation review meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-16 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 0.75 0 Schedule review SOW review with CG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IMS Documents / MoC Process (Paint and NDT) Personnel discussion with Rob S. meeting with RS and JR regarding BU report IHS invoice review / produce breakdown Safety moment schedule Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-16 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.75 0 Documentation sent to Danielle and Jenn Frias regarding payments to USCG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-16 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Documentation Review (BoD slides, Electrical Slides, 3D models) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-16 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Review Weight and CG Documents 3D Modeling Revisions 3D file conversions Various documentation review meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-19 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 1.5 0 drawings for Bob W., review SOW, rates to Bryan L. personnel discussion Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 weekly ops phone conf weekly TS mgmt meeting TSR board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 timesheet and timesheet approvals; TS personnel discussion IHS invoice Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-19 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-19 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3 0 choke manifold quote for KMGDS 257B Tender Support (mtg with Alexander-Ryan, conf calls with Ops, review documentation) 257B drawing review and organization Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-19 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 0.5 0 drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1.5 0 review and revise latest revision of BoD; review pipe barn proposal for Concept 6 weight/CG PowerPoint slide review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Berkut/Orlan reference documentation; scope split meeting meeting to discuss scoring of concepts weekly meetings with Exxon and KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-20 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 updating cost estimate; conf call(s) with Rodney and TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 timesheet and timesheet approvals; TS personnel discussion IHS invoice Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-20 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 choke manifold quote for KMGDS 257B Tender Support (mtg with Alexander-Ryan, conf calls with Ops, review documentation) 257B drawing review and organization Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-20 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 revised CTR; reviewing additional scope Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 review and revise latest revision of BoD; review pipe barn proposal for Concept 6 weight/CG PowerPoint slide review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Berkut/Orlan reference documentation; scope split meeting meeting to discuss scoring of concepts weekly meetings with Exxon and KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals; TS personnel discussion IHS invoice Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-21 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 updating tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Discussing upcoming TSR's with Jeff; TSR prioritization Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-21 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.75 0 review 3000HP KOC specification and discuss with Carlos C. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-21 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 51B crane pedestal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-21 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 revised CTR; reviewing additional scope Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-21 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 0.5 0 drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.5 0 review and revise latest revision of BoD; review pipe barn proposal for Concept 6 weight/CG PowerPoint slide review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2.75 0 Berkut/Orlan reference documentation; scope split meeting meeting to discuss scoring of concepts weekly meetings with Exxon and KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-22 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 0.5 0 drawings for Bob W., review SOW, rates to Bryan L. personnel discussion Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 weekly ops phone conf weekly TS mgmt meeting TSR board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet and timesheet approvals; TS personnel discussion IHS invoice Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Discussing upcoming TSR's with Jeff; TSR prioritization Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-22 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 BOP lift frame administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-22 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2.5 0 choke manifold quote for KMGDS 257B Tender Support (mtg with Alexander-Ryan, conf calls with Ops, review documentation) 257B drawing review and organization Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-22 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 51B crane pedestal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-22 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 calculations; drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.5 0 review and revise latest revision of BoD; review pipe barn proposal for Concept 6 weight/CG PowerPoint slide review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-23 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.75 0 updating cost estimate; conf call(s) with Rodney and TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 timesheet and timesheet approvals; TS personnel discussion IHS invoice Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-23 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 choke manifold quote for KMGDS 257B Tender Support (mtg with Alexander-Ryan, conf calls with Ops, review documentation) 257B drawing review and organization Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-23 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 revised CTR; reviewing additional scope Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-23 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 calculations; drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 Berkut/Orlan reference documentation; scope split meeting meeting to discuss scoring of concepts weekly meetings with Exxon and KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 JR recommendation letter timesheet and timesheet approvals RAL number revision to paint specification; IMS document submittal sent JS updated forecast information Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.5 0 HH cost increase; reviewing documentation with TE; bid sheet review and updates Conference call with BU Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 weekly ops phone conf call weekly TS mgmt meeting TSR board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 JR recommendation letter timesheet and timesheet approvals RAL number revision to paint specification; IMS document submittal sent JS updated forecast information Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-26 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-26 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 257B drawing clean-up; helideck cost support for Rodney; lifeboat support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-26 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 1 0 Preliminary calculations; wheel loading from NOV document Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Screening matrix review Seismic conf call with Genesis weekly conf call with Exxon weekly conf call with KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-27 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 CTR issues; CTR transmitted to 2M-Tek Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 HH cost increase; reviewing documentation with TE; bid sheet review and updates Conference call with BU Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 JR recommendation letter timesheet and timesheet approvals RAL number revision to paint specification; IMS document submittal sent JS updated forecast information Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-27 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 drawing review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Risk register review / workshop topside philosophy document review and comments Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2.25 0 Screening matrix review Seismic conf call with Genesis weekly conf call with Exxon weekly conf call with KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-28 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.25 0 HH cost increase; reviewing documentation with TE; bid sheet review and updates Conference call with BU Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 weekly ops phone conf call weekly TS mgmt meeting TSR board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 JR recommendation letter timesheet and timesheet approvals RAL number revision to paint specification; IMS document submittal sent JS updated forecast information Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 updating tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-28 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.75 0 257B drawing clean-up; helideck cost support for Rodney; lifeboat support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-28 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 updating compliance tracker; paying COI annual user fees Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Risk register review / workshop topside philosophy document review and comments Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Screening matrix review Seismic conf call with Genesis weekly conf call with Exxon weekly conf call with KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-29 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 HH cost increase; reviewing documentation with TE; bid sheet review and updates Conference call with BU Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 weekly ops phone conf call weekly TS mgmt meeting TSR board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-29 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.5 0 257B drawing clean-up; helideck cost support for Rodney; lifeboat support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-29 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 0.5 0 Preliminary calculations; wheel loading from NOV document Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.5 0 Risk register review / workshop topside philosophy document review and comments Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Screening matrix review Seismic conf call with Genesis weekly conf call with Exxon weekly conf call with KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-30 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-02 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 0.5 0 Hours Summary review of design / status of project / setting up design review meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 weekly operations phone call\\ weekly TS mgmt meeting TSR board meetings weekly TSR meeting (MINKIT mtg replaced this week) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals personnel package and meeting invite 2018 talent review spreadsheet MOC approvals for new IMS documents monthly PDR review meeting with Rob S. 10Q reporting - rig count Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-02 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 weekly meeting and preparation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.75 0 TSR status review with John Reck reviewing and prioritizing new electrical TSR's with Sachin **unbillable** rig move to SWS (209L) general support inquiries from Jeff A. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-02 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2.5 0 257B Tender Support / Review spreadsheet and compile engineering hours / schedule Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-02 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 reviewing ALE report; meeting with ALE and ENL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 final review of screening report and other deliverables Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 concept 3 - cost and execution meeting review of final deliverables and preparation for closeout mtg at Exxon weekly meeting(s) mtg to review report out slides Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly operations phone call\\ weekly TS mgmt meeting TSR board meetings weekly TSR meeting (MINKIT mtg replaced this week) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 timesheet and timesheet approvals personnel package and meeting invite 2018 talent review spreadsheet MOC approvals for new IMS documents monthly PDR review meeting with Rob S. 10Q reporting - rig count Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.75 0 TSR status review with John Reck reviewing and prioritizing new electrical TSR's with Sachin **unbillable** rig move to SWS (209L) general support inquiries from Jeff A. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-03 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3 0 257B Tender Support / Review spreadsheet and compile engineering hours / schedule Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 final review of screening report and other deliverables Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 concept 3 - cost and execution meeting review of final deliverables and preparation for closeout mtg at Exxon weekly meeting(s) mtg to review report out slides Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 timesheet and timesheet approvals personnel package and meeting invite 2018 talent review spreadsheet MOC approvals for new IMS documents monthly PDR review meeting with Rob S. 10Q reporting - rig count Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-04 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 updating spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR status review with John Reck reviewing and prioritizing new electrical TSR's with Sachin **unbillable** rig move to SWS (209L) general support inquiries from Jeff A. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-04 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 257B Tender Support / Review spreadsheet and compile engineering hours / schedule Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-04 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 reviewing ALE report; meeting with ALE and ENL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 final review of screening report and other deliverables Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 concept 3 - cost and execution meeting review of final deliverables and preparation for closeout mtg at Exxon weekly meeting(s) mtg to review report out slides Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly operations phone call\\ weekly TS mgmt meeting TSR board meetings weekly TSR meeting (MINKIT mtg replaced this week) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 timesheet and timesheet approvals personnel package and meeting invite 2018 talent review spreadsheet MOC approvals for new IMS documents monthly PDR review meeting with Rob S. 10Q reporting - rig count Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 TSR status review with John Reck reviewing and prioritizing new electrical TSR's with Sachin **unbillable** rig move to SWS (209L) general support inquiries from Jeff A. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-05 ORLAN-TSR :ORLAN-TSR TSR-01631-ORLP Flow Meter on Base Oil Supply Line Regular Pay N 1 0 review TSR scope of work and approve CTR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-05 ORLAN-TSR :ORLAN-TSR TSR-01637-ORLP Centrifugal Pumps Soft Start Regular Pay N 1 0 review TSR scope of work and approve CTR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-05 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1.5 0 closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1.5 0 final review of screening report and other deliverables Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-06 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 0.5 0 Hours Summary review of design / status of project / setting up design review meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly operations phone call\\ weekly TS mgmt meeting TSR board meetings weekly TSR meeting (MINKIT mtg replaced this week) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet and timesheet approvals personnel package and meeting invite 2018 talent review spreadsheet MOC approvals for new IMS documents monthly PDR review meeting with Rob S. 10Q reporting - rig count Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 TSR status review with John Reck reviewing and prioritizing new electrical TSR's with Sachin **unbillable** rig move to SWS (209L) general support inquiries from Jeff A. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-06 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 257B Tender Support / Review spreadsheet and compile engineering hours / schedule Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 final review of screening report and other deliverables Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 concept 3 - cost and execution meeting review of final deliverables and preparation for closeout mtg at Exxon weekly meeting(s) mtg to review report out slides Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 TSR status review with John Reck reviewing and prioritizing new electrical TSR's with Sachin **unbillable** rig move to SWS (209L) general support inquiries from Jeff A. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 weekly meetings (Monday) TSR meeting (daily) TSR weekly mtg Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 called bronco regarding oime draw works CVN material cost sent to JL Sakhalin document control meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals IMS documentation uploaded to SharePoint personnel discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-09 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 min kit platform / continuing support after action review alternative rigs for platform Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-09 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 review status of all TSR's with JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Orlan choke manifold issues customs union certificate review standpipe TSR (draft) and send comments back to field weekly meeting regarding rig move / waiting for approved CTR NDA sent to Oliver at ALE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-09 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 0.5 0 documentation review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-10 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2 0 review analysis report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 called bronco regarding oime draw works CVN material cost sent to JL Sakhalin document control meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet and timesheet approvals IMS documentation uploaded to SharePoint personnel discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-10 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 3.25 0 min kit platform / continuing support after action review alternative rigs for platform Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.25 0 Orlan choke manifold issues customs union certificate review standpipe TSR (draft) and send comments back to field weekly meeting regarding rig move / waiting for approved CTR NDA sent to Oliver at ALE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-10 ORLAN-TSR :ORLAN-TSR TSR-01637-ORLP Centrifugal Pumps Soft Start Regular Pay N 1.25 0 review closeout and approve Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly meetings (Monday) TSR meeting (daily) TSR weekly mtg Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet and timesheet approvals IMS documentation uploaded to SharePoint personnel discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-11 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 update tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Orlan choke manifold issues customs union certificate review standpipe TSR (draft) and send comments back to field weekly meeting regarding rig move / waiting for approved CTR NDA sent to Oliver at ALE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-11 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Discussion with Mark Quinlan regarding upcoming TSR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-11 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2.75 0 no-go bar review / approval 257B tender support 258L Tender Support logistics cost request Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-11 Rig 216L-TSR :Rig 216L-TSR TSR-01645-216L HP Piping Repair Regular Pay N 1.5 0 reviewing TSR and sending email with weld procedure and typical weld details Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-12 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 0.5 0 review analysis report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-12 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 clarification no. 20 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 weekly meetings (Monday) TSR meeting (daily) TSR weekly mtg Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals IMS documentation uploaded to SharePoint personnel discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 update tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Orlan choke manifold issues customs union certificate review standpipe TSR (draft) and send comments back to field weekly meeting regarding rig move / waiting for approved CTR NDA sent to Oliver at ALE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-12 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3 0 no-go bar review / approval 257B tender support 258L Tender Support logistics cost request Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-13 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 clarification no. 20 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly meetings (Monday) TSR meeting (daily) TSR weekly mtg Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 timesheet and timesheet approvals IMS documentation uploaded to SharePoint personnel discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.75 0 Orlan choke manifold issues customs union certificate review standpipe TSR (draft) and send comments back to field weekly meeting regarding rig move / waiting for approved CTR NDA sent to Oliver at ALE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-13 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1.25 0 review tsr and ctr for top drive rail replacement Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-13 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 no-go bar review / approval 257B tender support 258L Tender Support logistics cost request Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-16 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 review hand calculations review meetings with Tyler and Rob Shank Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approval talent identification document HR meeting with Rob S. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-16 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 0.75 0 review of ttopco documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-16 OH-010 :OH-010 Overhead All Activities Regular Pay N 2.25 0 travel to and from Exxon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-16 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 updating hours in spreadsheet; meeting with GO; spreadsheet to Rodney; review meeting on Tuesday Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-16 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5.5 0 meeting at Exxon; internal debrief meeting; support for closeout; discuss 270 on platform Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-17 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2.5 0 review hand calculations review meetings with Tyler and Rob Shank Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approval talent identification document HR meeting with Rob S. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 updating tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Rig move CTR revision start Genesis PO process for rig move TSR reference documents to Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-17 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2.5 0 updating hours in spreadsheet; meeting with GO; spreadsheet to Rodney; review meeting on Tuesday Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-17 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 document research for EJ in New Iberia updating compliance tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.25 0 timesheet and timesheet approval talent identification document HR meeting with Rob S. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-18 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 updating tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Rig move CTR revision start Genesis PO process for rig move TSR reference documents to Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-18 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2.5 0 updating hours in spreadsheet; meeting with GO; spreadsheet to Rodney; review meeting on Tuesday Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-18 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 document research for EJ in New Iberia updating compliance tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-18 ORLAN-TSR :ORLAN-TSR TSR-01637-ORLP Centrifugal Pumps Soft Start Regular Pay N 0.5 0 Discuss TSR with Sachin; review sow Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-18 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 meeting with Genesis Discuss sow with Odoptu Staff Eng. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-18 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 1 0 drawing review and provide comments Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-18 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 meeting at Exxon; internal debrief meeting; support for closeout; discuss 270 on platform Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-19 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 review hand calculations review meetings with Tyler and Rob Shank Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 timesheet and timesheet approval talent identification document HR meeting with Rob S. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Rig move CTR revision start Genesis PO process for rig move TSR reference documents to Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-19 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 updating hours in spreadsheet; meeting with GO; spreadsheet to Rodney; review meeting on Tuesday Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-19 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 document research for EJ in New Iberia updating compliance tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-19 ORLAN-TSR :ORLAN-TSR TSR-01631-ORLP Flow Meter on Base Oil Supply Line Regular Pay N 1.5 0 review and approve CO Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-19 ORLAN-TSR :ORLAN-TSR TSR-01637-ORLP Centrifugal Pumps Soft Start Regular Pay N 0.5 0 Discuss TSR with Sachin; review sow Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-19 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 meeting with Genesis Discuss sow with Odoptu Staff Eng. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-19 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 meeting at Exxon; internal debrief meeting; support for closeout; discuss 270 on platform Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Weekly Operation Conf. Call Weekly TS Mgmt. Meeting TSR Board Meeting TSR Weekly Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Intern discussions with Jim Tolsma and Neil Slater Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-23 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 0.5 0 Min Kit Activities Meeting at Exxon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-23 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Monday meeting preparation Meeting with Lam and JR to discuss status and priority Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Minkit Meeting at Exxon Conf. Call with Ralph C. Discussion of Rig Move PO, Issue PO to Genesis, set-up kick-off mtg. Conf. Call with Bohan regarding JA Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-23 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 NOVOS Conf. Call Reviewing NOVOS documentaiton Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-23 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 216 Schedule 258 Tender Support 257 Tender Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-23 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 Review of TSR, development of design, sent out 3D concept Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-24 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2.5 0 Min Kit Activities Meeting at Exxon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-24 OH-010 :OH-010 Overhead All Activities Regular Pay N 2.5 0 Travel to Exxon and return Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-24 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 Minkit Meeting at Exxon Conf. Call with Ralph C. Discussion of Rig Move PO, Issue PO to Genesis, set-up kick-off mtg. Conf. Call with Bohan regarding JA Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-24 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 216 Schedule 258 Tender Support 257 Tender Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-24 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 Closeout review and Approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-25 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Meeting with GHW Clarification No. 21 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Intern discussions with Jim Tolsma and Neil Slater Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Updating tracing sheet; updating timesheet with new TSR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Minkit Meeting at Exxon Conf. Call with Ralph C. Discussion of Rig Move PO, Issue PO to Genesis, set-up kick-off mtg. Conf. Call with Bohan regarding JA Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-25 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1.5 0 NOVOS Conf. Call Reviewing NOVOS documentaiton Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-25 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 Review of TSR, development of design, sent out 3D concept Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Meeting with GHW Clarification No. 21 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operation Conf. Call Weekly TS Mgmt. Meeting TSR Board Meeting TSR Weekly Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Intern discussions with Jim Tolsma and Neil Slater Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 Updating tracing sheet; updating timesheet with new TSR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Minkit Meeting at Exxon Conf. Call with Ralph C. Discussion of Rig Move PO, Issue PO to Genesis, set-up kick-off mtg. Conf. Call with Bohan regarding JA Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-26 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.25 0 216 Schedule 258 Tender Support 257 Tender Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-26 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.75 0 BOP stacks sent to Benny Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-26 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 Review of TSR, development of design, sent out 3D concept Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-26 Rig 216L-TSR :Rig 216L-TSR TSR-01645-216L HP Piping Repair Regular Pay N 0.5 0 Reviewing documents Email to Robbie Bennett Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-27 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 2 0 TSR review, preliminary calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Meeting with GHW Clarification No. 21 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Intern discussions with Jim Tolsma and Neil Slater Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Minkit Meeting at Exxon Conf. Call with Ralph C. Discussion of Rig Move PO, Issue PO to Genesis, set-up kick-off mtg. Conf. Call with Bohan regarding JA Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-27 Rig 216L-TSR :Rig 216L-TSR TSR-01645-216L HP Piping Repair Regular Pay N 1 0 Reviewing documents Email to Robbie Bennett Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 weekly operations phone call TSR board meetings Weekly TSR meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 looking over 4-8 forecast data timesheet and timesheet approval internship planning 270L TSR / change order (working with Lana) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-30 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 review of Sakhalin TSR's and setting priority Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-30 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.5 0 BP Tender support (onshore and offshore); review NCOC tender package; meetings with GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-30 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Ms Risa / Ms Dorothy EPIRB renewal Mr. Shelby COI User Fee renewal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-30 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 Set-up SharePoint site; bi-weekly meeting; DM trailer layouts sent to team Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-30 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 drawing review and comment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-30 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 2 0 TSR review and preliminary calcs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-01 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 0.5 0 CTR revision review and meetings with Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-01 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 0.5 0 discussion with Sakhalin operations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-01 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 reviewing histogram IADC DDR research and meetings with Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly operations phone call TSR board meetings Weekly TSR meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 looking over 4-8 forecast data timesheet and timesheet approval internship planning 270L TSR / change order (working with Lana) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 update TSR tracker and upl.oad new TSR's into timekeeping system Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Rig move administrations General TSR support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-01 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Correspondence and uploading Liberty drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-01 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 BP Tender support (onshore and offshore); review NCOC tender package; meetings with GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-01 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 Set-up SharePoint site; bi-weekly meeting; DM trailer layouts sent to team Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-02 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 reviewing histogram IADC DDR research and meetings with Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 looking over 4-8 forecast data timesheet and timesheet approval internship planning 270L TSR / change order (working with Lana) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-02 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 0.5 0 GO meeting to review Krechet specifications; deliverables review for deep dive Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 update TSR tracker and upl.oad new TSR's into timekeeping system Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-02 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.25 0 AISC Webinar - "Tariffs and trade Issues" Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Rig move administrations General TSR support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-02 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Correspondence and uploading Liberty drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-02 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 Ms Risa / Ms Dorothy EPIRB renewal Mr. Shelby COI User Fee renewal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-02 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1.5 0 Set-up SharePoint site; bi-weekly meeting; DM trailer layouts sent to team Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-02 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 concept and drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-03 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 0.5 0 CTR revision review and meetings with Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-03 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 review and approve CTR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 reviewing histogram IADC DDR research and meetings with Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly operations phone call TSR board meetings Weekly TSR meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 looking over 4-8 forecast data timesheet and timesheet approval internship planning 270L TSR / change order (working with Lana) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-03 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 0.75 0 GO meeting to review Krechet specifications; deliverables review for deep dive Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Rig move administrations General TSR support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-03 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 BP Tender support (onshore and offshore); review NCOC tender package; meetings with GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-03 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 Ms Risa / Ms Dorothy EPIRB renewal Mr. Shelby COI User Fee renewal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-03 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 reviewing closeout report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 looking over 4-8 forecast data timesheet and timesheet approval internship planning 270L TSR / change order (working with Lana) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-04 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 0.5 0 TTopCo Tender - Drawing package Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Rig move administrations General TSR support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-04 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Correspondence and uploading Liberty drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-04 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.5 0 BP Tender support (onshore and offshore); review NCOC tender package; meetings with GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-04 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 concept and drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-04 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 reviewing closeout report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-07 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 Fabrication TPP Hydraulics TPP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-07 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 histogram meeting(s) with GHW and Tyler conference call with Rodney Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 TSR board meetings Weekly TSR meeting (Thursday) 4-8 forecast review meeting meeting with AMASE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 4-8 forecast data timesheet and timesheet approval internship planning renewed PTI engineering firm registration technical services hours summary Job descriptions sent to Bo and held conf call to discuss setting up support CTR with Genesis IHS subscription for Quail Tools Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-07 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 review of Sakhalin TSR's and priority Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-07 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Liberty files Reviewing historical documents conference call with team and Gary (Liberty) HP gate valve procurement support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-07 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 BP Tender Support (258 and 257) 216L Support for KPO tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-07 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 EPIRB renewal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-07 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 baseline assumptions; review of trailer layout from ALE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-08 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 0.5 0 Fabrication TPP Hydraulics TPP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-08 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 histogram meeting(s) with GHW and Tyler conference call with Rodney Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 3.5 0 TSR board meetings Weekly TSR meeting (Thursday) 4-8 forecast review meeting meeting with AMASE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 4-8 forecast data timesheet and timesheet approval internship planning renewed PTI engineering firm registration technical services hours summary Job descriptions sent to Bo and held conf call to discuss setting up support CTR with Genesis IHS subscription for Quail Tools Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-08 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1 0 TTopCO clarification\\ Electrical spreadsheet review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-08 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Liberty files Reviewing historical documents conference call with team and Gary (Liberty) HP gate valve procurement support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-08 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.25 0 BP Tender Support (258 and 257) 216L Support for KPO tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-08 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 EPIRB renewal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-09 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 TSR and CTR review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-09 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 histogram meeting(s) with GHW and Tyler conference call with Rodney Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board meetings Weekly TSR meeting (Thursday) 4-8 forecast review meeting meeting with AMASE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 4-8 forecast data timesheet and timesheet approval internship planning renewed PTI engineering firm registration technical services hours summary Job descriptions sent to Bo and held conf call to discuss setting up support CTR with Genesis IHS subscription for Quail Tools Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-09 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1 0 TTopCO clarification\\ Electrical spreadsheet review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-09 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 update TSR tracker and upload new TSR's into timekeeping system Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-09 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.25 0 Hunton Andrews and Kurth Lunch and Learn (IP) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Rig move (unbillable) TSR support (unbillable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-09 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 BP Tender Support (258 and 257) 216L Support for KPO tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-10 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 histogram meeting(s) with GHW and Tyler conference call with Rodney Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 TSR board meetings Weekly TSR meeting (Thursday) 4-8 forecast review meeting meeting with AMASE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 4-8 forecast data timesheet and timesheet approval internship planning renewed PTI engineering firm registration technical services hours summary Job descriptions sent to Bo and held conf call to discuss setting up support CTR with Genesis IHS subscription for Quail Tools Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-10 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 update TSR tracker and upload new TSR's into timekeeping system Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-10 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Liberty files Reviewing historical documents conference call with team and Gary (Liberty) HP gate valve procurement support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-10 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 BP Tender Support (258 and 257) 216L Support for KPO tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-10 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 baseline assumptions; review of trailer layout from ALE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-10 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 drawing review and approval (as-built) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-11 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 Fabrication TPP Hydraulics TPP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-11 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 histogram meeting(s) with GHW and Tyler conference call with Rodney Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board meetings Weekly TSR meeting (Thursday) 4-8 forecast review meeting meeting with AMASE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 4-8 forecast data timesheet and timesheet approval internship planning renewed PTI engineering firm registration technical services hours summary Job descriptions sent to Bo and held conf call to discuss setting up support CTR with Genesis IHS subscription for Quail Tools Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-11 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1.5 0 GO meeting to review Krechet/Berkut specifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-11 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2.5 0 Liberty files Reviewing historical documents conference call with team and Gary (Liberty) HP gate valve procurement support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-14 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.5 0 Total Uganda Scope of Work review creating slides GHW meeting (wed) email/discussion to supply chain regarding Uganda bids clarification review Mtg with Total on Thursday morning Starting Tech Spec for contract Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 weekly ops conf call weekly TS mgmt. meeting weekly TSR review meeting TSR daily board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals Review Genesis blanket CTR intern discussion Contract Mgmt. IMS document review intern scope of work personnel discussions with RS and GO Quail IHS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-14 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 preparation and meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-14 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2 0 Liberty - reviewing emails, documents General conf call with Alaska ops. (Conoco, Alpine, Doyon, etc..) valve specification Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-14 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 257B tender support (technical) 249 tender support (bp) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-14 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 review 30B incident report compliance Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-14 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 conf call with Tecky (x3) email to ALE review of Genesis preliminary results Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-14 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 final drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-15 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 Total Uganda Scope of Work review creating slides GHW meeting (wed) email/discussion to supply chain regarding Uganda bids clarification review Mtg with Total on Thursday morning Starting Tech Spec for contract Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly ops conf call weekly TS mgmt. meeting weekly TSR review meeting TSR daily board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 timesheet and timesheet approvals Review Genesis blanket CTR intern discussion Contract Mgmt. IMS document review intern scope of work personnel discussions with RS and GO Quail IHS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-15 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Liberty - reviewing emails, documents General conf call with Alaska ops. (Conoco, Alpine, Doyon, etc..) valve specification Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-15 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 257B tender support (technical) 249 tender support (bp) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-15 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 0.5 0 final approval of closeout discussion about weld procedure with JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-16 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.5 0 Total Uganda Scope of Work review creating slides GHW meeting (wed) email/discussion to supply chain regarding Uganda bids clarification review Mtg with Total on Thursday morning Starting Tech Spec for contract Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-16 Hibernia Platform :Hibernia Platform TSR-01646-HIBP Top Drive Rail Replacement Regular Pay N 1 0 scope of work and MTO review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 timesheet and timesheet approvals Review Genesis blanket CTR intern discussion Contract Mgmt. IMS document review intern scope of work personnel discussions with RS and GO Quail IHS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 updating tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-16 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 IMS security training Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-16 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2 0 Liberty - reviewing emails, documents General conf call with Alaska ops. (Conoco, Alpine, Doyon, etc..) valve specification Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-16 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 257B tender support (technical) 249 tender support (bp) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-16 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 1 0 discuss with Jon Richardson and Sachin; review closeout and make revisions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-17 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 Total Uganda Scope of Work review creating slides GHW meeting (wed) email/discussion to supply chain regarding Uganda bids clarification review Mtg with Total on Thursday morning Starting Tech Spec for contract Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly ops conf call weekly TS mgmt. meeting weekly TSR review meeting TSR daily board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 updating tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 boiler condensate line issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-17 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Liberty - reviewing emails, documents General conf call with Alaska ops. (Conoco, Alpine, Doyon, etc..) valve specification Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-17 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 257B tender support (technical) 249 tender support (bp) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-17 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 review 30B incident report compliance Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-17 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 conf call with Tecky (x3) email to ALE review of Genesis preliminary results Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-17 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 closeout review and approval; Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-18 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Total Uganda Scope of Work review creating slides GHW meeting (wed) email/discussion to supply chain regarding Uganda bids clarification review Mtg with Total on Thursday morning Starting Tech Spec for contract Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly ops conf call weekly TS mgmt. meeting weekly TSR review meeting TSR daily board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals Review Genesis blanket CTR intern discussion Contract Mgmt. IMS document review intern scope of work personnel discussions with RS and GO Quail IHS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-18 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 257B tender support (technical) 249 tender support (bp) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-18 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 conf call with Tecky (x3) email to ALE review of Genesis preliminary results Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-18 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 0.5 0 final approval of closeout discussion about weld procedure with JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-21 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 scope of work review; discussions with GHW and RS technical requirements review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Lunch with Logan Industries (Chad Trumps, Rob Shank) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Sachin's MBA recommendation Brendon white PE recommendation timesheet and timesheet approvals Personnel admin IADC rig inspection training research Intern SOW and discussions with Ops Quail ITS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-21 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 meeting preparation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-21 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.75 0 timesheet review and approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-21 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.75 0 257B / 258L tender support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-21 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Ms. Cissy compliance 77B draft calcs for Leroy Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-21 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 conf call(s) with Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-22 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 scope of work review; discussions with GHW and RS technical requirements review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Lunch with Logan Industries (Chad Trumps, Rob Shank) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Sachin's MBA recommendation Brendon white PE recommendation timesheet and timesheet approvals Personnel admin IADC rig inspection training research Intern SOW and discussions with Ops Quail ITS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-22 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 Ms. Cissy compliance 77B draft calcs for Leroy Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-22 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 0.5 0 Drawing package review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-22 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 conf call(s) with Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-22 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 0.5 0 TSR review and CTR approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-22 Rig 216L-TSR :Rig 216L-TSR TSR-01645-216L HP Piping Repair Regular Pay N 2 0 closeout preparation and review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-23 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 scope of work review; discussions with GHW and RS technical requirements review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Lunch with Logan Industries (Chad Trumps, Rob Shank) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Sachin's MBA recommendation Brendon white PE recommendation timesheet and timesheet approvals Personnel admin IADC rig inspection training research Intern SOW and discussions with Ops Quail ITS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-23 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 1 0 Meeting with Alisa and Tolsma regarding YPF and XTO Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Updating TSR tracker; safety moment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 status updates with JR; unbillable hours for open TSR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-23 Rig 216L-TSR :Rig 216L-TSR TSR-01645-216L HP Piping Repair Regular Pay N 0.5 0 closeout preparation and review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-24 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 1 0 discussion with JR; review of solid works model. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-24 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 scope of work review; discussions with GHW and RS technical requirements review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Sachin's MBA recommendation Brendon white PE recommendation timesheet and timesheet approvals Personnel admin IADC rig inspection training research Intern SOW and discussions with Ops Quail ITS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-24 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Updating TSR tracker; safety moment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-24 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 status updates with JR; unbillable hours for open TSR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-24 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Ms. Cissy compliance 77B draft calcs for Leroy Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-24 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 review of status; review of red lines; discussion with James and Lam Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-24 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 conf call(s) with Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-25 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 scope of work review; discussions with GHW and RS technical requirements review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.75 0 Sachin's MBA recommendation Brendon white PE recommendation timesheet and timesheet approvals Personnel admin IADC rig inspection training research Intern SOW and discussions with Ops Quail ITS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 status updates with JR; unbillable hours for open TSR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-25 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1.5 0 Drawing package review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-25 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 conf call(s) with Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-28 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-29 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 Drawing package review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-29 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 0.5 0 review of model / discussion with JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-29 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Scope of Work review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Intern Planning incl. SOW, schedule and travel planning Quail PE reference form Timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-29 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 review of open TSR's and ensuring schedule is being met Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-29 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 review all MOC's sent in by Robbie and/or Dan C. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-29 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 257B Tender support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-29 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 265L cellar cover Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-29 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 Crew boat documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-29 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1 0 drawing package review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-29 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1.5 0 Bi-weekly meeting; conf call with Tecky Hours summary Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-29 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 1 0 closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-30 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1.5 0 Drawing package review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-30 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 0.5 0 review of model / discussion with JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-30 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Scope of Work review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Intern Planning incl. SOW, schedule and travel planning Quail PE reference form Timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-30 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 TSR tracker update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-30 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.75 0 crown sheave cluster information sent to Luis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-30 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.5 0 review all MOC's sent in by Robbie and/or Dan C. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-30 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1.5 0 265L cellar cover Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-30 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 Crew boat documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-30 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 0.5 0 drawing package review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-31 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 0.5 0 Drawing package review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-31 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 review of spool drawing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-31 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 2 0 TSR review and analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-31 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.5 0 Scope of Work review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly TSR meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Intern Planning incl. SOW, schedule and travel planning Quail PE reference form Timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-31 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 TSR tracker update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-31 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.5 0 review all MOC's sent in by Robbie and/or Dan C. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-01 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-04 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Scope of Work Procurement Plan Kan Ban Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 operations weekly conf call daily TSR board meetings Weekly TSR meeting CAT DGB Meeting Lunch with intern and RS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 intern guidance / administration vendor add - Logan Industries Dan Slack off boarding technical services hours summary IMS document review and red lines Forecast review meeting preparation phone call with Ravi Garg (Saturday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-04 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Sakhalin personnel discussions DSM cantilever walkway review (non-billable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-04 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.5 0 Supporting supply chain for 216 start-up 258 BOP hoists - info sent to GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-04 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 KPO and BP tender support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-04 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 Ms Dorothy Mr Robert Parker Compliance sheet update 30B tugger line site visit - set-up Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-04 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.75 0 drill module report review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-04 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 0.5 0 reviewing proposed design Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-05 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 1 0 additional analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-05 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 Scope of Work Procurement Plan Kan Ban Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 operations weekly conf call daily TSR board meetings Weekly TSR meeting CAT DGB Meeting Lunch with intern and RS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 intern guidance / administration vendor add - Logan Industries Dan Slack off boarding technical services hours summary IMS document review and red lines Forecast review meeting preparation phone call with Ravi Garg (Saturday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Sakhalin personnel discussions DSM cantilever walkway review (non-billable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-05 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1.5 0 Supporting supply chain for 216 start-up 258 BOP hoists - info sent to GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-05 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 KPO and BP tender support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-05 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.25 0 Ms Dorothy Mr Robert Parker Compliance sheet update 30B tugger line site visit - set-up Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-05 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.75 0 drill module report review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Scope of Work Procurement Plan Kan Ban Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 operations weekly conf call daily TSR board meetings Weekly TSR meeting CAT DGB Meeting Lunch with intern and RS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 intern guidance / administration vendor add - Logan Industries Dan Slack off boarding technical services hours summary IMS document review and red lines Forecast review meeting preparation phone call with Ravi Garg (Saturday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 updating TSR tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Sakhalin personnel discussions DSM cantilever walkway review (non-billable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-06 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Crown sheave removal Discussion with Lam regarding cellar area drawings and models Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-06 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 Supporting supply chain for 216 start-up 258 BOP hoists - info sent to GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-06 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 KPO and BP tender support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-06 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 1 0 closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-06 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 1 0 reviewing proposed design Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-07 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Scope of Work Procurement Plan Kan Ban Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.75 0 operations weekly conf call daily TSR board meetings Weekly TSR meeting CAT DGB Meeting Lunch with intern and RS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 intern guidance / administration vendor add - Logan Industries Dan Slack off boarding technical services hours summary IMS document review and red lines Forecast review meeting preparation phone call with Ravi Garg (Saturday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-07 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 updating TSR tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Sakhalin personnel discussions DSM cantilever walkway review (non-billable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-07 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.5 0 Supporting supply chain for 216 start-up 258 BOP hoists - info sent to GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-07 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 Ms Dorothy Mr Robert Parker Compliance sheet update 30B tugger line site visit - set-up Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-07 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 0.5 0 reviewing new design Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-07 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.25 0 drill module report review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-07 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 1 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-08 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Scope of Work Procurement Plan Kan Ban Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 operations weekly conf call daily TSR board meetings Weekly TSR meeting CAT DGB Meeting Lunch with intern and RS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 intern guidance / administration vendor add - Logan Industries Dan Slack off boarding technical services hours summary IMS document review and red lines Forecast review meeting preparation phone call with Ravi Garg (Saturday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Sakhalin personnel discussions DSM cantilever walkway review (non-billable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-08 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.25 0 Crown sheave removal Discussion with Lam regarding cellar area drawings and models Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-08 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.5 0 Supporting supply chain for 216 start-up 258 BOP hoists - info sent to GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-08 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.75 0 Ms Dorothy Mr Robert Parker Compliance sheet update 30B tugger line site visit - set-up Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-08 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 0.5 0 reviewing new design Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 intern guidance / administration vendor add - Logan Industries Dan Slack off boarding technical services hours summary IMS document review and red lines Forecast review meeting preparation phone call with Ravi Garg (Saturday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-11 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 1.5 0 weld calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-11 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 reviewing Tech Spec reviewing Total specifications and contract Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-11 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 0.5 0 drawing review (revision) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Ops weekly conf call Weekly TS mgmt. meeting TSR board meetings TSR weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 timesheet and timesheet approvals intern admin (timesheet, trip, workload) discussion with NH and GO SAFI invoice Quail IHS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-11 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR administration - setting priorities phone calls with island Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-11 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 18-3/4" 15M weight sent to GHW BP Tender support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-11 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 0.5 0 CTR revision - review/approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-11 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 reviewing drill module and PBM reports; conf calls with Tecky Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-12 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 0.5 0 reviewing solidworks model reviewing hand calcs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-12 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 reviewing Tech Spec reviewing Total specifications and contract Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals intern admin (timesheet, trip, workload) discussion with NH and GO SAFI invoice Quail IHS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 updating TSR tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-12 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1.5 0 Accumulator issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-12 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 18-3/4" 15M weight sent to GHW BP Tender support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-12 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 265 cellar cover Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-12 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 30B Trip Planning Compliance renewals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-12 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 reviewing drill module and PBM reports; conf calls with Tecky Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-13 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 0.5 0 reviewing solidworks model reviewing hand calcs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-13 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 reviewing Tech Spec reviewing Total specifications and contract Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet and timesheet approvals intern admin (timesheet, trip, workload) discussion with NH and GO SAFI invoice Quail IHS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-13 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 18-3/4" 15M weight sent to GHW BP Tender support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-13 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 265 cellar cover Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-14 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 reviewing Tech Spec reviewing Total specifications and contract Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ops weekly conf call Weekly TS mgmt. meeting TSR board meetings TSR weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 timesheet and timesheet approvals intern admin (timesheet, trip, workload) discussion with NH and GO SAFI invoice Quail IHS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-14 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 updating TSR tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR administration - setting priorities phone calls with island Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-14 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Accumulator issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-14 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 30B Trip Planning Compliance renewals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-14 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 reviewing drill module and PBM reports; conf calls with Tecky Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-15 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 1 0 reviewing solidworks model reviewing hand calcs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-15 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 reviewing Tech Spec reviewing Total specifications and contract Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Ops weekly conf call Weekly TS mgmt. meeting TSR board meetings TSR weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals intern admin (timesheet, trip, workload) discussion with NH and GO SAFI invoice Quail IHS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-15 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 265 cellar cover Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-15 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 reviewing drill module and PBM reports; conf calls with Tecky Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-18 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 0.5 0 drawing and analysis review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-18 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 0.5 0 drawing and analysis review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-18 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 cash flow meeting with GO and JL tech spec review and board meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 weekly ops phone call weekly TS mgmt meeting (Thursday) TSR board meetings weekly TS meeting (Thursday) meeting with NOV (Mike Murray) meeting with Ford Steel Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 personnel meeting with GO and RS; timesheet and timesheet approvals J. Gasper mid-year review J. Reck mid-year review meeting with HR regarding ATH Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-18 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 prepare for mtg with JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR updates; TSR reviews; planning Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-18 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.75 0 Contract question from Mark Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-18 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 269L rig down over wellhead Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-19 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 1 0 drawing and analysis review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-19 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 1 0 drawing and analysis review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-19 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 cash flow meeting with GO and JL tech spec review and board meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-19 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 2 0 inputting all serial numbers; discussion path forward with Sachin; creating spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly ops phone call weekly TS mgmt meeting (Thursday) TSR board meetings weekly TS meeting (Thursday) meeting with NOV (Mike Murray) meeting with Ford Steel Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 personnel meeting with GO and RS; timesheet and timesheet approvals J. Gasper mid-year review J. Reck mid-year review meeting with HR regarding ATH Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-19 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 2 0 Genesis report review starting Co reviewing LTN's sketches / redlines Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-20 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 cash flow meeting with GO and JL tech spec review and board meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-20 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 1 0 inputting all serial numbers; discussion path forward with Sachin; creating spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly ops phone call weekly TS mgmt meeting (Thursday) TSR board meetings weekly TS meeting (Thursday) meeting with NOV (Mike Murray) meeting with Ford Steel Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 personnel meeting with GO and RS; timesheet and timesheet approvals J. Gasper mid-year review J. Reck mid-year review meeting with HR regarding ATH Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-20 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 TSR updates; TSR reviews; planning Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-20 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 Genesis report review starting Co reviewing LTN's sketches / redlines Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-20 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 1 0 drawing review and discussion with James Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-21 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 0.5 0 drawing and analysis review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 weekly ops phone call weekly TS mgmt meeting (Thursday) TSR board meetings weekly TS meeting (Thursday) meeting with NOV (Mike Murray) meeting with Ford Steel Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.25 0 personnel meeting with GO and RS; timesheet and timesheet approvals J. Gasper mid-year review J. Reck mid-year review meeting with HR regarding ATH Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-21 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-21 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 216L ground bearing pressure Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-21 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 cydsa platform; discussion with RS; review of previously submitted work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-21 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 Genesis report review starting Co reviewing LTN's sketches / redlines Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-21 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 0.5 0 drawing review and discussion with James Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-22 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 1 0 drawing and analysis review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-22 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 cash flow meeting with GO and JL tech spec review and board meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-22 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 1 0 inputting all serial numbers; discussion path forward with Sachin; creating spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly ops phone call weekly TS mgmt meeting (Thursday) TSR board meetings weekly TS meeting (Thursday) meeting with NOV (Mike Murray) meeting with Ford Steel Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 personnel meeting with GO and RS; timesheet and timesheet approvals J. Gasper mid-year review J. Reck mid-year review meeting with HR regarding ATH Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-22 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.5 0 cydsa platform; discussion with RS; review of previously submitted work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-22 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1 0 CO revision review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-25 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 tech spec review meetings with TE Meeting with HH Cash flow review HH meeting agenda review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Ops Conference Call TSR Board Meetings meeting with Derrick Equipment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 mid-year review with RS intern administration technical services hours summary Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-25 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 Rig Move - non-billable general support Rig Move - Phase II scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-25 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 3 0 Closeout Conference Calls Bi-weekly meeting with ENL, ALE meeting notes Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 tech spec review meetings with TE Meeting with HH Cash flow review HH meeting agenda review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-26 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 1 0 conf call with CAT Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ops Conference Call TSR Board Meetings meeting with Derrick Equipment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 mid-year review with RS intern administration technical services hours summary Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Rig Move - non-billable general support Rig Move - Phase II scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-26 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 time sheets Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-26 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 Conf call with GHW, Randy Crowsen, and Andy Young - KPO lifting requirements Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-26 Rig 216L-TSR :Rig 216L-TSR TSR-01659-216L Spreader Bar Regular Pay N 1 0 review analysis and drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Ops Conference Call TSR Board Meetings meeting with Derrick Equipment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 mid-year review with RS intern administration technical services hours summary Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 updating tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Rig Move - non-billable general support Rig Move - Phase II scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-27 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1.25 0 review closeout / approve / transmit Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-27 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 2 0 Closeout Conference Calls Bi-weekly meeting with ENL, ALE meeting notes Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-27 Rig 216L-TSR :Rig 216L-TSR TSR-01659-216L Spreader Bar Regular Pay N 0.75 0 review analysis and drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-28 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 tech spec review meetings with TE Meeting with HH Cash flow review HH meeting agenda review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ops Conference Call TSR Board Meetings meeting with Derrick Equipment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 mid-year review with RS intern administration technical services hours summary Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 updating tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Rig Move - non-billable general support Rig Move - Phase II scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-28 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 269L additional fuel tank Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-28 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 Closeout Conference Calls Bi-weekly meeting with ENL, ALE meeting notes Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-28 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 0.75 0 review closeout revision Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-29 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 1 0 review closoeut Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.75 0 mid-year review with RS intern administration technical services hours summary Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-29 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Rig Move - non-billable general support Rig Move - Phase II scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-29 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 crown removal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-29 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 Closeout Conference Calls Bi-weekly meeting with ENL, ALE meeting notes Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 meeting with GO regarding personnel meeting with Jacqui regarding forecast Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 mid-year reviews forecast update personnel update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-02 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 preparation for weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR status updates rig move Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-02 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 requirements for CAT IV inspection Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-02 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 conference calls finalizing documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-02 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1.5 0 reviewing scope of work reviewing engine specifications discussing with CAT to determine compatibility Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 HH / IDS interface discussion regarding IP law Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 mid-year reviews forecast update personnel update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 TSR status updates rig move Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-03 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 requirements for CAT IV inspection Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-03 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 conference calls finalizing documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-03 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1.5 0 reviewing scope of work reviewing engine specifications discussing with CAT to determine compatibility Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 mid-year reviews forecast update personnel update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-05 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 MOC support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-05 OH-011 :OH-011 Overhead All Activities Regular Pay N 4 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-05 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 2 0 conference calls finalizing documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-09 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-10 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-11 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-12 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-13 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-16 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.75 0 meeting with Lam and JR; Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-16 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 project financing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 drilling operations support meeting; weekly ops conf call; TSR board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 software renewals; timesheet and timesheet approval; mid-year reviews for SG and TE; IDR group interface; DiSC profile; TSR meeting safety moment schedule; TS hours summary Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-16 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1.25 0 bp Tender clarification document 107/247 tender documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 TSR support; conf call with Sakhalin team Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-16 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 load analysis (supporting Sachin) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-16 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1.5 0 Compliance Holly meeting and discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-16 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 conf call with Benny; email to Lief (ENL) regarding PBM options and timing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-16 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 0.5 0 scope and CTR review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 software renewals; timesheet and timesheet approval; mid-year reviews for SG and TE; IDR group interface; DiSC profile; TSR meeting safety moment schedule; TS hours summary Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-17 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2.5 0 bp Tender clarification document 107/247 tender documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-17 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 Compliance Holly meeting and discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-17 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 2 0 conf call with Benny; email to Lief (ENL) regarding PBM options and timing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-17 Rig 216L-TSR :Rig 216L-TSR TSR-01659-216L Spreader Bar Regular Pay N 2 0 closeout review; analysis review; drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-18 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 project financing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 drilling operations support meeting; weekly ops conf call; TSR board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 software renewals; timesheet and timesheet approval; mid-year reviews for SG and TE; IDR group interface; DiSC profile; TSR meeting safety moment schedule; TS hours summary Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-18 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 update tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR support; conf call with Sakhalin team Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-18 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 conf call with Benny; email to Lief (ENL) regarding PBM options and timing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 drilling operations support meeting; weekly ops conf call; TSR board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 software renewals; timesheet and timesheet approval; mid-year reviews for SG and TE; IDR group interface; DiSC profile; TSR meeting safety moment schedule; TS hours summary Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR support; conf call with Sakhalin team Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-19 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 Compliance Holly meeting and discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-19 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1.5 0 scope and CTR review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-23 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 1.25 0 closeout and analysis revision Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 weekly ops conf call weekly TSR meeting weekly mgmt meeting with RS mike barnes / Rachel koen conf. call Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 AutoCAD server issues timesheet and timesheet approval intern administration network cleanup Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-23 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 preparation / notes for weekly mtg Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 started draft of phase II CTR for rig move Unbillable - rig move admin document control issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-23 Rig 209L-TSR :Rig 209L-TSR TSR-01656-209L Heat Trace Panels Regular Pay N 1.25 0 TSR review / CTR approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-23 Rig 249L-TSR :Rig 249L-TSR TSR-01664-249L Mast - Top Drive Layout Regular Pay N 1 0 reviewing layout with Lam discussion with GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-23 Rig 253L-TSR :Rig 253L-TSR TSR-01663-253L Power and Mud Pump Upgrade - REVIEW Regular Pay N 0.5 0 reviewing Sachin's comments / reviewing scope reviewing proposal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-24 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 risk/opportunity register meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-24 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 1 0 meeting with SG and RS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly ops conf call weekly TSR meeting weekly mgmt meeting with RS mike barnes / Rachel koen conf. call Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 AutoCAD server issues timesheet and timesheet approval intern administration network cleanup Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-24 OH-014 :OH-014 Overhead All Activities Regular Pay N 0.75 0 Whip stocks Webinar NOV DrillWell Lunch and Learn Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-24 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Holly Top Drive drawings sent to Leroy for BOP cart Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-24 Rig 209L-TSR :Rig 209L-TSR TSR-01658-209L Fuel Station Regular Pay N 1 0 TSR scope review / approve CTR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-24 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1.5 0 Prepare TSR and CTR - sent for review bi-weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-24 Rig 253L-TSR :Rig 253L-TSR TSR-01663-253L Power and Mud Pump Upgrade - REVIEW Regular Pay N 0.5 0 reviewing Sachin's comments / reviewing scope reviewing proposal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-25 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 3.25 0 closeout and analysis revision Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 weekly ops conf call weekly TSR meeting weekly mgmt meeting with RS mike barnes / Rachel koen conf. call Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 AutoCAD server issues timesheet and timesheet approval intern administration network cleanup Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-25 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 Whip stocks Webinar NOV DrillWell Lunch and Learn Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-25 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 Prepare TSR and CTR - sent for review bi-weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-26 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 1.5 0 closeout and analysis revision Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 weekly ops conf call weekly TSR meeting weekly mgmt meeting with RS mike barnes / Rachel koen conf. call Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 updating TSR tracking sheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 started draft of phase II CTR for rig move Unbillable - rig move admin document control issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-26 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.75 0 Holly Top Drive drawings sent to Leroy for BOP cart Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-26 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 Casing procurement discussion Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-26 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 Prepare TSR and CTR - sent for review bi-weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-26 Rig 249L-TSR :Rig 249L-TSR TSR-01664-249L Mast - Top Drive Layout Regular Pay N 0.5 0 reviewing layout with Lam discussion with GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-26 Rig 253L-TSR :Rig 253L-TSR TSR-01663-253L Power and Mud Pump Upgrade - REVIEW Regular Pay N 1 0 reviewing Sachin's comments / reviewing scope reviewing proposal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-27 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 1 0 closeout and analysis revision Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 AutoCAD server issues timesheet and timesheet approval intern administration network cleanup Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 started draft of phase II CTR for rig move Unbillable - rig move admin document control issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-27 ORLAN-TSR :ORLAN-TSR TSR-01662-ORLP SLB Rig Floor Padeyes Regular Pay N 2.5 0 analysis and CO Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Weekly Ops Conference Call Weekly Drilling Ops Support Meeting TSR Daily Meetings Intern Closeout Presentation TS Weekly Meeting Quarterly Corporate Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet and Timesheet approval Forecasting / invoicing research and self training MOC Process discussions Reviewing GT240 / GT270 reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Setting up meeting with Loadmaster / Canyon Oak Meeting at Loadmaster with Canyon Oak Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-30 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 meeting prep Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-30 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 SharePoint access for Phase II study ALE drawings to Genesis Reviewing SOW for Rig Move TSR internally and with Genesis Rig move CTR development / meetings Personnel discussion with Bohan Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-30 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 216L doghouse info Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-30 Rig 249L-TSR :Rig 249L-TSR TSR-01664-249L Mast - Top Drive Layout Regular Pay N 1 0 Email to operations Weight development Drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Weekly Ops Conference Call Weekly Drilling Ops Support Meeting TSR Daily Meetings Intern Closeout Presentation TS Weekly Meeting Quarterly Corporate Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet and Timesheet approval Forecasting / invoicing research and self training MOC Process discussions Reviewing GT240 / GT270 reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-31 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 3 0 XTO Meeting with Rob and Greg Completing Appendix A1-1 XTO Technical Specification Lewis Rig Discussion Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-31 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Hyperion Training Forecasting / Invoicing training Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-31 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 SharePoint access for Phase II study ALE drawings to Genesis Reviewing SOW for Rig Move TSR internally and with Genesis Rig move CTR development / meetings Personnel discussion with Bohan Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-07-31 Rig 249L-TSR :Rig 249L-TSR TSR-01664-249L Mast - Top Drive Layout Regular Pay N 0.5 0 Email to operations Weight development Drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Weekly Ops Conference Call Weekly Drilling Ops Support Meeting TSR Daily Meetings Intern Closeout Presentation TS Weekly Meeting Quarterly Corporate Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet and Timesheet approval Forecasting / invoicing research and self training MOC Process discussions Reviewing GT240 / GT270 reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2.75 0 Setting up meeting with Loadmaster / Canyon Oak Meeting at Loadmaster with Canyon Oak Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-01 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 2.5 0 XTO Meeting with Rob and Greg Completing Appendix A1-1 XTO Technical Specification Lewis Rig Discussion Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-01 OH-010 :OH-010 Overhead All Activities Regular Pay N 1.25 0 round trip to Loadmaster Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 SharePoint access for Phase II study ALE drawings to Genesis Reviewing SOW for Rig Move TSR internally and with Genesis Rig move CTR development / meetings Personnel discussion with Bohan Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Weekly Ops Conference Call Weekly Drilling Ops Support Meeting TSR Daily Meetings Intern Closeout Presentation TS Weekly Meeting Quarterly Corporate Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet and Timesheet approval Forecasting / invoicing research and self training MOC Process discussions Reviewing GT240 / GT270 reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-02 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1 0 XTO Meeting with Rob and Greg Completing Appendix A1-1 XTO Technical Specification Lewis Rig Discussion Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Updating TSR tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-02 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Mr. Robert Parker EPIRB Issues - Contact NOAA Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-02 ORLAN-TSR :ORLAN-TSR TSR-01662-ORLP SLB Rig Floor Padeyes Regular Pay N 1.5 0 reviewing analysis redlining drawing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-02 Rig 249L-TSR :Rig 249L-TSR TSR-01664-249L Mast - Top Drive Layout Regular Pay N 1 0 Email to operations Weight development Drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-03 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 2 0 XTO Meeting with Rob and Greg Completing Appendix A1-1 XTO Technical Specification Lewis Rig Discussion Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-03 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Hyperion Training Forecasting / Invoicing training Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 SharePoint access for Phase II study ALE drawings to Genesis Reviewing SOW for Rig Move TSR internally and with Genesis Rig move CTR development / meetings Personnel discussion with Bohan Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-03 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 Mr. Robert Parker EPIRB Issues - Contact NOAA Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-03 ORLAN-TSR :ORLAN-TSR TSR-01662-ORLP SLB Rig Floor Padeyes Regular Pay N 1 0 reviewing analysis redlining drawing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 MoC Meeting with Quality group Forecasting meeting with RS and GO weekly ops conf call Weekly Drilling Ops Support Meeting TSR Daily Meetings Meeting with Liza in Accounting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Invoicing support Forecasting in Hyperion Intern closeout; turn in equipment Access to Jacqui's files OH budget worksheet for forecasting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-06 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting preparation and attend meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Rig Move Administration for Phase II work Documents uploaded to SharePoint for ALE access Sakhalin MOC review/processing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-06 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Mr. Robert Parker EPIRB issues Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-06 ORLAN-TSR :ORLAN-TSR TSR-01662-ORLP SLB Rig Floor Padeyes Regular Pay N 1 0 Review calculations (FEA) Prepare calculations (MathCAD) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-06 Rig 209L-TSR :Rig 209L-TSR TSR-01636-209L Electric Backfeed Regular Pay N 1 0 review and approve CO Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-06 Rig 249L-TSR :Rig 249L-TSR TSR-01664-249L Mast - Top Drive Layout Regular Pay N 0.75 0 weight information sent to GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-07 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 review new scope of work for TD gear upgrade Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 MoC Meeting with Quality group Forecasting meeting with RS and GO weekly ops conf call Weekly Drilling Ops Support Meeting TSR Daily Meetings Meeting with Liza in Accounting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Invoicing support Forecasting in Hyperion Intern closeout; turn in equipment Access to Jacqui's files OH budget worksheet for forecasting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Rig Move Administration for Phase II work Documents uploaded to SharePoint for ALE access Sakhalin MOC review/processing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-07 ORLAN-TSR :ORLAN-TSR TSR-01662-ORLP SLB Rig Floor Padeyes Regular Pay N 1.5 0 Review calculations (FEA) Prepare calculations (MathCAD) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-07 Rig 209L-TSR :Rig 209L-TSR TSR-01636-209L Electric Backfeed Regular Pay N 0.5 0 review and approve CO Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-07 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 2 0 Hand calcs and discussion with John R. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 MoC Meeting with Quality group Forecasting meeting with RS and GO weekly ops conf call Weekly Drilling Ops Support Meeting TSR Daily Meetings Meeting with Liza in Accounting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Invoicing support Forecasting in Hyperion Intern closeout; turn in equipment Access to Jacqui's files OH budget worksheet for forecasting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-08 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1 0 Conference call with Drillmec Integration of 121/165 backyards with Drillmec rigs Lewis rigs upgrade cost estimate and scheduling Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-08 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 Update spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Rig Move Administration for Phase II work Documents uploaded to SharePoint for ALE access Sakhalin MOC review/processing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-08 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 document sent to Dan C and team regarding the MoC process Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-08 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 bi-weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 MoC Meeting with Quality group Forecasting meeting with RS and GO weekly ops conf call Weekly Drilling Ops Support Meeting TSR Daily Meetings Meeting with Liza in Accounting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Invoicing support Forecasting in Hyperion Intern closeout; turn in equipment Access to Jacqui's files OH budget worksheet for forecasting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-09 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 2 0 Conference call with Drillmec Integration of 121/165 backyards with Drillmec rigs Lewis rigs upgrade cost estimate and scheduling Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Rig Move Administration for Phase II work Documents uploaded to SharePoint for ALE access Sakhalin MOC review/processing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-09 ORLAN-TSR :ORLAN-TSR TSR-01662-ORLP SLB Rig Floor Padeyes Regular Pay N 0.25 0 Review calculations (FEA) Prepare calculations (MathCAD) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-09 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 0.75 0 TSR review; meeting with JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-09 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 0.75 0 Hand calcs and discussion with John R. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Invoicing support Forecasting in Hyperion Intern closeout; turn in equipment Access to Jacqui's files OH budget worksheet for forecasting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-10 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 3 0 Conference call with Drillmec Integration of 121/165 backyards with Drillmec rigs Lewis rigs upgrade cost estimate and scheduling Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Rig Move Administration for Phase II work Documents uploaded to SharePoint for ALE access Sakhalin MOC review/processing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-10 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 0.25 0 Hand calcs and discussion with John R. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-13 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 deer lease Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-14 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 2 0 Reviewing TSR Locating existing design that will comply with requirements Interfacing with Sakhalin Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly meeting with RS, GO, SB, SC, CL TS weekly meeting daily TSR board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Conference call with Mark Quinlan Conference call with Ralph Christman Technical Services Personnel Histogram IHS ivoice issues / working with AP Setting up projects in Oracle (TSR's) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-14 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 Loadmaster Industries Lunch / Learn Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-14 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 GoM Compliance Tracker Mr. Robert Parker EPIRB Holly weekly report review Cement unit on cantilever deck - 55B Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-14 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 1 0 Drawing red-lines Closeout review Hand calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly meeting with RS, GO, SB, SC, CL TS weekly meeting daily TSR board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Conference call with Mark Quinlan Conference call with Ralph Christman Technical Services Personnel Histogram IHS ivoice issues / working with AP Setting up projects in Oracle (TSR's) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-15 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 update TSR tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-15 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 PO process for Genesis / Rig Move Phase II Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-15 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 GoM Compliance Tracker Mr. Robert Parker EPIRB Holly weekly report review Cement unit on cantilever deck - 55B Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-15 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 1 0 verifying scope and creating CTR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-15 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 meeting with SG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-16 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 1 0 Reviewing TSR Locating existing design that will comply with requirements Interfacing with Sakhalin Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly meeting with RS, GO, SB, SC, CL TS weekly meeting daily TSR board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Conference call with Mark Quinlan Conference call with Ralph Christman Technical Services Personnel Histogram IHS ivoice issues / working with AP Setting up projects in Oracle (TSR's) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.25 0 update TSR tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-16 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 GoM Compliance Tracker Mr. Robert Parker EPIRB Holly weekly report review Cement unit on cantilever deck - 55B Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-16 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 2.25 0 Drawing red-lines Closeout review Hand calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-16 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 0.5 0 meeting with SG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Conference call with Mark Quinlan Conference call with Ralph Christman Technical Services Personnel Histogram IHS ivoice issues / working with AP Setting up projects in Oracle (TSR's) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-17 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1.5 0 GoM Compliance Tracker Mr. Robert Parker EPIRB Holly weekly report review Cement unit on cantilever deck - 55B Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-17 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1.5 0 reviewing SEMS design documentaiton Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-20 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 1 0 research air receive for Berkut / send info. to supply chain review / approve CTR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 weekly operations conference call TSR board meetings weekly TS meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 setting up TSR's in Oracle - meeting with Chris L. review AMEX travel charges and submit historical timesheet approvals continuing education spreadsheet update PO / MR routing issues revenue recognition / Genesis invoicing / meeting with Chris L. 2019 budget form / formatting and reviewing preparing safety moment 2M Tek Invoicing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-20 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2.5 0 Holly mast report review / conference call with Loadmaster Industries review Holly early start scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-20 OH-019 :OH-019 Overhead All Activities Regular Pay N 1.5 0 spreadsheet for meeting update weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-20 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 meeting with Dan B. Liberty drawings / documents for Mark Q. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-20 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1.5 0 77B/55B Cement Unit placement Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-20 Rig 209L-TSR :Rig 209L-TSR TSR-01656-209L Heat Trace Panels Regular Pay N 1.5 0 review and approve closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-21 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 0.25 0 review and approve closeout document - TSR cancelled Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-21 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 1.5 0 review / approve closeout - REVISION 1 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly operations conference call TSR board meetings weekly TS meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 setting up TSR's in Oracle - meeting with Chris L. review AMEX travel charges and submit historical timesheet approvals continuing education spreadsheet update PO / MR routing issues revenue recognition / Genesis invoicing / meeting with Chris L. 2019 budget form / formatting and reviewing preparing safety moment 2M Tek Invoicing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-21 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 Holly mast report review / conference call with Loadmaster Industries review Holly early start scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-21 OH-014 :OH-014 Overhead All Activities Regular Pay N 0.75 0 continuing education - AISC webinar Bid Sheet Training Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 262L skid rail modifications for future gas wells Genesis PO for rig move status of rig move RFI Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-21 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 77B/55B Cement Unit placement Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-21 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 0.75 0 review and approve TSR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-22 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 0.75 0 review and approve closeout document - TSR cancelled Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly operations conference call TSR board meetings weekly TS meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 setting up TSR's in Oracle - meeting with Chris L. review AMEX travel charges and submit historical timesheet approvals continuing education spreadsheet update PO / MR routing issues revenue recognition / Genesis invoicing / meeting with Chris L. 2019 budget form / formatting and reviewing preparing safety moment 2M Tek Invoicing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-22 OH-014 :OH-014 Overhead All Activities Regular Pay N 0.25 0 continuing education - AISC webinar Bid Sheet Training Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-22 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2 0 meeting with Dan B. Liberty drawings / documents for Mark Q. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-22 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 meeting with Karl Cao with ALE - bi-weekly meeting / issuing PO to Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-23 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 1 0 research air receive for Berkut / send info. to supply chain review / approve CTR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 weekly operations conference call TSR board meetings weekly TS meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 setting up TSR's in Oracle - meeting with Chris L. review AMEX travel charges and submit historical timesheet approvals continuing education spreadsheet update PO / MR routing issues revenue recognition / Genesis invoicing / meeting with Chris L. 2019 budget form / formatting and reviewing preparing safety moment 2M Tek Invoicing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-23 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 0.5 0 Holly mast report review / conference call with Loadmaster Industries review Holly early start scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 tracking spreadsheet update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-23 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 continuing education - AISC webinar Bid Sheet Training Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 262L skid rail modifications for future gas wells Genesis PO for rig move status of rig move RFI Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-23 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1.25 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-23 Rig 209L-TSR :Rig 209L-TSR TSR-01657-209L Steam Heater Electrical Power Modifications Regular Pay N 0.75 0 review TSR review / approve CTR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-24 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 0.5 0 gathering files for ARB interface design (TDS-11S top drive) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly operations conference call TSR board meetings weekly TS meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-24 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 262L skid rail modifications for future gas wells Genesis PO for rig move status of rig move RFI Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-24 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 77B/55B Cement Unit placement Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-24 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 0.5 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-24 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 1 0 review support options Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 weekly ops conference call TSR board meeting Meeting with Entro Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 timekeeping system issues AutoCAD server issues timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-27 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 1 0 YPF Argentina support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 262L Skid Rails - email and phone call with Dean at Exxon 209L rig move admin TSR support Path forward discussion with JR and SG for 209L Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-27 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1 0 closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-27 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 0.5 0 conf call with ALE Genesis support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-28 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 reviewing drawings; providing support for CO No. 1 scope of work meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-28 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 Leading the Way training - Stacy Senn Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 262L Skid Rails - email and phone call with Dean at Exxon 209L rig move admin TSR support Path forward discussion with JR and SG for 209L Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-29 Holly Platform :Holly Platform TSR-01665-HOLP-98 Rentals (OH) Regular Pay N 0.5 0 reviewing CIP house for top drive Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-29 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 0.5 0 reviewing drawings; providing support for CO No. 1 scope of work meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-29 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 Leading the Way training - Stacy Senn Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-29 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 262L Skid Rails - email and phone call with Dean at Exxon 209L rig move admin TSR support Path forward discussion with JR and SG for 209L Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-29 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 0.5 0 conf call with ALE Genesis support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-30 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 0.5 0 reviewing drawings; providing support for CO No. 1 scope of work meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timekeeping system issues AutoCAD server issues timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-30 OH-014 :OH-014 Overhead All Activities Regular Pay N 7.5 0 Leading the Way training - Stacy Senn Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-30 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 262L Skid Rails - email and phone call with Dean at Exxon 209L rig move admin TSR support Path forward discussion with JR and SG for 209L Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-31 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 1 0 CTR and closeout approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-31 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 1 0 TSR review / approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 weekly ops conference call TSR board meeting Meeting with Entro Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-31 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 0.5 0 YPF Argentina support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-31 OH-016 :OH-016 Overhead All Activities Regular Pay N 0.5 0 navigation light install Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-31 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 262L Skid Rails - email and phone call with Dean at Exxon 209L rig move admin TSR support Path forward discussion with JR and SG for 209L Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-08-31 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 conf call with ALE Genesis support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-04 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 Alignment meeting with John R. and Joshua Lambert Contract Meeting CTR-001 Development (Manrider) Email/phone call(s) to Thomas/Beers Engineering Firm Drawing Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Performance Review Mtg with RS Drilling Operations Support Meeting TS Weekly Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Technical Services Hours Summary Timekeeping System Invoice iHS Subscription for ITS Spreadsheet for finance team Reviewing forecast for remainder of year Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-04 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 Meeting with Ivan regarding Cydsa substructure and other opportunities Researching past projects in Mexico Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-04 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Cyber Security Training Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-04 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Update due to missed Monday meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-04 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 Koomey Piping Substructure Pins Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-04 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 0.5 0 Genesis / ALE Meeting Bi-weekly meeting Correspondence with ENL Outrigger information to Sakhalin Updating Action Tracker SharePoint request(s) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-05 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 1 0 reviewing scope and FEA with Tyler E. CTR development Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-05 Holly Platform :Holly Platform TSR-01665-HOLP-98 Rentals (OH) Regular Pay N 1 0 Top Drive / CIP House / Mud Pump Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-05 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 2 0 Alignment meeting with John R. and Joshua Lambert Contract Meeting CTR-001 Development (Manrider) Email/phone call(s) to Thomas/Beers Engineering Firm Drawing Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Technical Services Hours Summary Timekeeping System Invoice iHS Subscription for ITS Spreadsheet for finance team Reviewing forecast for remainder of year Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-05 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 2 0 Meeting with Ivan regarding Cydsa substructure and other opportunities Researching past projects in Mexico Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-05 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 55/77 Support for Leroy B. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-05 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 1 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-05 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 2 0 Genesis / ALE Meeting Bi-weekly meeting Correspondence with ENL Outrigger information to Sakhalin Updating Action Tracker SharePoint request(s) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-06 Holly Platform :Holly Platform TSR-01665-HOLP-98 Rentals (OH) Regular Pay N 1 0 Top Drive / CIP House / Mud Pump Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-06 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 Alignment meeting with John R. and Joshua Lambert Contract Meeting CTR-001 Development (Manrider) Email/phone call(s) to Thomas/Beers Engineering Firm Drawing Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Performance Review Mtg with RS Drilling Operations Support Meeting TS Weekly Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Technical Services Hours Summary Timekeeping System Invoice iHS Subscription for ITS Spreadsheet for finance team Reviewing forecast for remainder of year Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 Tracker Update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-06 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 Koomey Piping Substructure Pins Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-06 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 Genesis / ALE Meeting Bi-weekly meeting Correspondence with ENL Outrigger information to Sakhalin Updating Action Tracker SharePoint request(s) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-07 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 1 0 reviewing scope and FEA with Tyler E. CTR development Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-07 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 1.5 0 Holly Crown weights Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-07 Holly Platform :Holly Platform TSR-01665-HOLP-98 Rentals (OH) Regular Pay N 1 0 Top Drive / CIP House / Mud Pump Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-07 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 0.5 0 Alignment meeting with John R. and Joshua Lambert Contract Meeting CTR-001 Development (Manrider) Email/phone call(s) to Thomas/Beers Engineering Firm Drawing Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Technical Services Hours Summary Timekeeping System Invoice iHS Subscription for ITS Spreadsheet for finance team Reviewing forecast for remainder of year Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-07 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 0.5 0 Genesis / ALE Meeting Bi-weekly meeting Correspondence with ENL Outrigger information to Sakhalin Updating Action Tracker SharePoint request(s) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-10 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 1 0 MTO revision / review closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-10 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 1.5 0 Hand calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-10 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 1.25 0 General support Mud tank refurbishment crown removal/loadmaster quote CIP house placement drag chain placement BOP cart / BOP lifting arrangement air dryer Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-10 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 General support Thomas / Beers set-up MSA review Invoicing procedure and coding Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-10 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 compliance training Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-10 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 weekly meeting Berkut air receiver (unbillable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 PO issuance to Genesis for standpipe vibration Fuel tank leak test information to Jon Richardson BOP lift cylinders on Orlan (Mike Anatra inquiry) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-10 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 77B choke line documentation Compliance documentation for crew boats Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-10 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1.25 0 closeout review / comments back to tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-10 Rig 209L-TSR :Rig 209L-TSR TSR-01658-209L Fuel Station Regular Pay N 1.25 0 closeout review / approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-11 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 Total Uganda requote Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-11 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 1.5 0 General support Mud tank refurbishment crown removal/loadmaster quote CIP house placement drag chain placement BOP cart / BOP lifting arrangement air dryer Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-11 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 2 0 General support Thomas / Beers set-up MSA review Invoicing procedure and coding Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet/timesheet approval Forecast Log of forecast changes Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 harsh environment work over rig North sea regulatory requirements Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 PO issuance to Genesis for standpipe vibration Fuel tank leak test information to Jon Richardson BOP lift cylinders on Orlan (Mike Anatra inquiry) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-11 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Meeting Load list to Supply Chain Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-11 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 Bi-weekly meeting Review of ALE report interface with Genesis SharePoint administration drafting standards to Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-12 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 1 0 MTO revision / review closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-12 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 1.25 0 General support Mud tank refurbishment crown removal/loadmaster quote CIP house placement drag chain placement BOP cart / BOP lifting arrangement air dryer Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-12 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 General support Thomas / Beers set-up MSA review Invoicing procedure and coding Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 drilling operations support meeting TSR weekly meeing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet/timesheet approval Forecast Log of forecast changes Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 harsh environment work over rig North sea regulatory requirements Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR tracker update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-12 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 weekly meeting Berkut air receiver (unbillable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.75 0 PO issuance to Genesis for standpipe vibration Fuel tank leak test information to Jon Richardson BOP lift cylinders on Orlan (Mike Anatra inquiry) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-12 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 Bi-weekly meeting Review of ALE report interface with Genesis SharePoint administration drafting standards to Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-13 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 1.5 0 General support Mud tank refurbishment crown removal/loadmaster quote CIP house placement drag chain placement BOP cart / BOP lifting arrangement air dryer Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-13 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 General support Thomas / Beers set-up MSA review Invoicing procedure and coding Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 drilling operations support meeting TSR weekly meeing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet/timesheet approval Forecast Log of forecast changes Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-13 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 weekly meeting Berkut air receiver (unbillable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-13 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Meeting Load list to Supply Chain Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-13 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 substructure pin drawing to Dan Colby and supply chain Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-13 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 77B choke line documentation Compliance documentation for crew boats Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-13 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 reviewing weld procedure setting up site visit Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-13 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 Bi-weekly meeting Review of ALE report interface with Genesis SharePoint administration drafting standards to Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-14 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 1.5 0 General support Mud tank refurbishment crown removal/loadmaster quote CIP house placement drag chain placement BOP cart / BOP lifting arrangement air dryer Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-14 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 General support Thomas / Beers set-up MSA review Invoicing procedure and coding Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 timesheet/timesheet approval Forecast Log of forecast changes Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 PO issuance to Genesis for standpipe vibration Fuel tank leak test information to Jon Richardson BOP lift cylinders on Orlan (Mike Anatra inquiry) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-14 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 reviewing weld procedure setting up site visit Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-14 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 Bi-weekly meeting Review of ALE report interface with Genesis SharePoint administration drafting standards to Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-17 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 1.25 0 closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-17 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 1 0 bronco brake band issue equipment MR's / PO's Change Order CTR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-17 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 2.5 0 Change Order No. 1 technical items - mud pump install, BOP handling, tank repair, meeting with T&B Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly operations phone call Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet and timesheet approvals Sakhalin personnel administration research Raptor drilling MOC discussion with Matt H. and Dan Colby Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-17 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 meeting prep and meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR status review / discussion with Mio 262L Reactivation Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-17 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 review of submitted 216 MOC's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-17 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 email to Ivan summarizing cost for the various upgrades; reviewing power upgrade spreadsheets (271L) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-17 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.75 0 reviewing test procedure with TE additional scope of work - pad eye certification Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-17 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 1 0 Kick-off meeting with Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-18 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 0.5 0 review and discussion with TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-18 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 1 0 bronco brake band issue equipment MR's / PO's Change Order CTR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-18 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 3 0 Change Order No. 1 technical items - mud pump install, BOP handling, tank repair, meeting with T&B Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-18 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 0.75 0 Thomas and Beers MSA / Quote Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals Sakhalin personnel administration research Raptor drilling MOC discussion with Matt H. and Dan Colby Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-18 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.75 0 reviewing test procedure with TE additional scope of work - pad eye certification Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-18 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 conference call with ENL discussions and path forward with Sachin Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-18 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 Bi-weekly meeting; updating action tracer; reviewing reports SharePoint administration weekly meeting with Genesis timesheet approvals; status update sent to ENL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-19 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 0.5 0 review and discussion with TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-19 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 1 0 bronco brake band issue equipment MR's / PO's Change Order CTR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-19 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 2 0 Change Order No. 1 technical items - mud pump install, BOP handling, tank repair, meeting with T&B Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-19 Holly Platform :Holly Platform TSR-01665-HOLP-98 Rentals (OH) Regular Pay N 1 0 CIP house lifting plan Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals Sakhalin personnel administration research Raptor drilling MOC discussion with Matt H. and Dan Colby Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-19 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR tracker update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-19 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 2 0 Bi-weekly meeting; updating action tracer; reviewing reports SharePoint administration weekly meeting with Genesis timesheet approvals; status update sent to ENL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-20 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 0.5 0 review and discussion with TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-20 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 1.5 0 bronco brake band issue equipment MR's / PO's Change Order CTR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-20 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 3 0 Change Order No. 1 technical items - mud pump install, BOP handling, tank repair, meeting with T&B Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-20 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 Thomas and Beers MSA / Quote Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet and timesheet approvals Sakhalin personnel administration research Raptor drilling MOC discussion with Matt H. and Dan Colby Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR status review / discussion with Mio 262L Reactivation Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-20 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 0.5 0 conference call with ENL discussions and path forward with Sachin Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-20 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 Bi-weekly meeting; updating action tracer; reviewing reports SharePoint administration weekly meeting with Genesis timesheet approvals; status update sent to ENL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-21 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 1 0 bronco brake band issue equipment MR's / PO's Change Order CTR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-21 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 2 0 Change Order No. 1 technical items - mud pump install, BOP handling, tank repair, meeting with T&B Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-21 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 0.5 0 Thomas and Beers MSA / Quote Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet and timesheet approvals Sakhalin personnel administration research Raptor drilling MOC discussion with Matt H. and Dan Colby Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 TSR status review / discussion with Mio 262L Reactivation Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-24 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.75 0 discussion with Supply Chain and HPPS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-24 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 1.5 0 Hand calcs; discussion with Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-24 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 1 0 equipment data sent to field; BOp handling meetings; BOP weight spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-24 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 4 0 Survey reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Ops Phone Conf. Meeting with RS regarding personnel Global operations support meeting Meeting with HR regarding RC transfer Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 timesheet and timesheet approvals; IHS administration; personnel administration Sakhalin/Hibernia invoicing data to Emanuel Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-24 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 0.5 0 Power upgrade information sent to Ivan Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-24 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-24 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 0.75 0 NOV quote Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-25 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 1 0 Hand calcs; discussion with Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-25 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 1.5 0 equipment data sent to field; BOp handling meetings; BOP weight spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-25 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 3 0 Survey reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 timesheet and timesheet approvals; IHS administration; personnel administration Sakhalin/Hibernia invoicing data to Emanuel Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-25 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 HR On-boarding training with Casey Repa Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-25 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 0.5 0 Genesis status Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-25 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 Conference call with Genesis (Tuesday) Conference call with ALE and Genesis (Wednesday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-26 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 1 0 equipment data sent to field; BOp handling meetings; BOP weight spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-26 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 3 0 Survey reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-26 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 Survey report administration; meetings with CG/JL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.75 0 Weekly Ops Phone Conf. Meeting with RS regarding personnel Global operations support meeting Meeting with HR regarding RC transfer Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 TSR tracker update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-26 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1.25 0 API 20E/20F info to Mark; conference call to discuss contract requirements Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-26 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 249L top drive swap; email/phone conf with Tom Yost Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-26 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 4 0 Conference call with Genesis (Tuesday) Conference call with ALE and Genesis (Wednesday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-27 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.75 0 discussion with Supply Chain and HPPS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-27 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 0.5 0 discussing requested changes with JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-27 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 0.5 0 equipment data sent to field; BOp handling meetings; BOP weight spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-27 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 3 0 Survey reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-27 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 Survey report administration; meetings with CG/JL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 TSR tracker update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-27 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 API 20E/20F info to Mark; conference call to discuss contract requirements Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-27 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 265L incident research for RS and MA Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-27 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 HP and choke documentation for Leroy B. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-27 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 0.25 0 path forward mtg with SG; reviewing documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-27 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 0.5 0 Conference call with Genesis (Tuesday) Conference call with ALE and Genesis (Wednesday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-28 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 discussion with Supply Chain and HPPS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-28 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 1 0 equipment data sent to field; BOp handling meetings; BOP weight spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-28 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 1 0 Survey reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 Weekly Ops Phone Conf. Meeting with RS regarding personnel Global operations support meeting Meeting with HR regarding RC transfer Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 status meeting with JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-28 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 HP and choke documentation for Leroy B. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-28 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 reviewing all info with JR; drawing update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-09-28 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 0.75 0 path forward mtg with SG; reviewing documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-01 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 2 0 Final review and transmittal of closeout Additional hand calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-01 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 3.5 0 Survey reports x 7 BOP weight estimate Reviewing all drawings Obtaining quotes Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-01 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 0.5 0 Morning meetings with CG Conference calls with Benny/Lam Schedule review and comment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conf Call Meeting with NOV Monthly performance meeting with RS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Technical Services Invoices - info sent to Emanuel Personnel planning Discussion with legal and Nick regarding Sakhalin contract IT support for designers TS Hours summary Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-01 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 weekly meeting and preparation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 262L reactivation support (Jon Richardson) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-01 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1.5 0 cement unit install on 77B Data books (77B) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-01 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 weight estimate for PBM strongbacks conf call with Genesis x 2 agenda for bi-weekly meeting bi-weekly meeting and preparation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-02 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 1 0 Final review and transmittal of closeout Additional hand calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-02 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 3.5 0 Survey reports x 7 BOP weight estimate Reviewing all drawings Obtaining quotes Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-02 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 0.5 0 Morning meetings with CG Conference calls with Benny/Lam Schedule review and comment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Technical Services Invoices - info sent to Emanuel Personnel planning Discussion with legal and Nick regarding Sakhalin contract IT support for designers TS Hours summary Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-02 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 cement unit install on 77B Data books (77B) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-02 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 weight estimate for PBM strongbacks conf call with Genesis x 2 agenda for bi-weekly meeting bi-weekly meeting and preparation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-03 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 3.5 0 Survey reports x 7 BOP weight estimate Reviewing all drawings Obtaining quotes Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-03 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 0.5 0 Morning meetings with CG Conference calls with Benny/Lam Schedule review and comment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Technical Services Invoices - info sent to Emanuel Personnel planning Discussion with legal and Nick regarding Sakhalin contract IT support for designers TS Hours summary Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-03 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 0.5 0 Cydsa platform RFI Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-03 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 Updating tracking sheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-03 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1.5 0 BP contract support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-03 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 mouse hole refurbishment support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-03 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1.75 0 RFI-002 review and revision Meeting agenda preparation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-03 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 2 0 weight estimate for PBM strongbacks conf call with Genesis x 2 agenda for bi-weekly meeting bi-weekly meeting and preparation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-04 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 2.5 0 Survey reports x 7 BOP weight estimate Reviewing all drawings Obtaining quotes Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-04 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1.5 0 Morning meetings with CG Conference calls with Benny/Lam Schedule review and comment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conf Call Meeting with NOV Monthly performance meeting with RS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Technical Services Invoices - info sent to Emanuel Personnel planning Discussion with legal and Nick regarding Sakhalin contract IT support for designers TS Hours summary Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 262L reactivation support (Jon Richardson) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-04 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1.5 0 cement unit install on 77B Data books (77B) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-04 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1 0 reviewing/approving closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-05 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 Morning meetings with CG Conference calls with Benny/Lam Schedule review and comment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Operations Conf Call Meeting with NOV Monthly performance meeting with RS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Technical Services Invoices - info sent to Emanuel Personnel planning Discussion with legal and Nick regarding Sakhalin contract IT support for designers TS Hours summary Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Chevron Genesis Discussion / Research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-05 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 BP contract support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-05 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1.5 0 RFI-002 review and revision Meeting agenda preparation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-08 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 3 0 Holly mud pump skid; final approval of Holly survey reports Mud Pit Repair MTO - discuss and review with JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Chevron Genesis - GoM - Superior Derrick Mast - Dynamic Analysis admin Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-08 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 weekly meeting and prep Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 sent Lief email regarding Sakhalin matting board install and grade issues when rigging up at NWS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-08 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1.5 0 P&ID updates; supporting MQ for new BP contract Exhaust issues HAZOP Comments Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-08 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2.5 0 Conference call with GHW Putting together additional costs for BP clarification Reviewing requested drawings Technical clarifications Dan Colby's MOC's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-08 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.75 0 77B Documentation (choke manifold, HP piping) Cement Unit Install Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-08 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 1.5 0 report review; sketch for gusset Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-08 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1.25 0 meeting with ENL; reviewing status; starting presentation slides Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-09 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 1 0 Holly mud pump skid; final approval of Holly survey reports Mud Pit Repair MTO - discuss and review with JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Operations support mtg (bi-weekly) Weekly TSR meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals Forecast and and budget Updates in Hyperion Meeting with RS and GO regarding 2019 forecast IHS issues at Quail Tools Bronco contract Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Chevron Genesis - GoM - Superior Derrick Mast - Dynamic Analysis admin Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-09 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.5 0 Conference call with GHW Putting together additional costs for BP clarification Reviewing requested drawings Technical clarifications Dan Colby's MOC's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-09 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 RFI sent to Ivan for Cydsa Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-09 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1.5 0 Meeting with Genesis Drill Module review PBM clarifications Emails to ALE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-10 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 1.5 0 Holly MTO reviews Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 timesheet and timesheet approvals Forecast and and budget Updates in Hyperion Meeting with RS and GO regarding 2019 forecast IHS issues at Quail Tools Bronco contract Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Chevron Genesis - GoM - Superior Derrick Mast - Dynamic Analysis admin Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-10 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 Conference call with GHW Putting together additional costs for BP clarification Reviewing requested drawings Technical clarifications Dan Colby's MOC's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-10 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 Meeting with Genesis Drill Module review PBM clarifications Emails to ALE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-11 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 0.75 0 Holly mud pump skid; final approval of Holly survey reports Mud Pit Repair MTO - discuss and review with JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-11 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 Planning LTN's trip to New Iberia Meetings with CG, BF, and JG Drawworks control console Knuckle boom crane planning Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Operations support mtg (bi-weekly) Weekly TSR meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet and timesheet approvals Forecast and and budget Updates in Hyperion Meeting with RS and GO regarding 2019 forecast IHS issues at Quail Tools Bronco contract Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-11 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 TSR Tracker Update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-11 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 P&ID updates; supporting MQ for new BP contract Exhaust issues HAZOP Comments Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-11 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2.5 0 Conference call with GHW Putting together additional costs for BP clarification Reviewing requested drawings Technical clarifications Dan Colby's MOC's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-11 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 1.5 0 Supporting Starr Energy Tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-12 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1.5 0 Planning LTN's trip to New Iberia Meetings with CG, BF, and JG Drawworks control console Knuckle boom crane planning Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 timesheet and timesheet approvals Forecast and and budget Updates in Hyperion Meeting with RS and GO regarding 2019 forecast IHS issues at Quail Tools Bronco contract Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-12 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1.5 0 P&ID updates; supporting MQ for new BP contract Exhaust issues HAZOP Comments Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-12 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 Conference call with GHW Putting together additional costs for BP clarification Reviewing requested drawings Technical clarifications Dan Colby's MOC's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-12 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 1 0 Supporting Starr Energy Tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-16 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 0.5 0 Review and revise CTR Review updated MTO Meetings with Tyler and JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Q3 Margin Analysis Forecasting Timesheet and timesheet approval Bronco contract - path forward PE reference review and approval MLC CAD invoice / administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-16 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 AADU Exhaust Issue - conf calls with MQ, modeling support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-16 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 top drive support (257 to 249) - phone call with tom yost Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-16 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 247L Support - raising sheave 269L tie-back beam Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-16 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 0.5 0 reviewing options, reviewing drawings, interface with Sakhalin Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-16 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 Reviewing SG's slides Updates on progress Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-16 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1.5 0 ALE Conference Call Bi-Weekly Meeting with ENL / ALE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-17 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 0.75 0 Review and revise CTR Review updated MTO Meetings with Tyler and JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-17 Holly Platform :Holly Platform TSR-01665-HOLP-98 Rentals (OH) Regular Pay N 1 0 review mud pump skid drawing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-17 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1.25 0 Status meetings Scope of Work Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Q3 Margin Analysis Forecasting Timesheet and timesheet approval Bronco contract - path forward PE reference review and approval MLC CAD invoice / administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-17 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1.5 0 Chevron Genesis Support Loadmaster conference call Meeting with Bruce and Alan Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-17 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 conference call with Mihovil Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-17 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 AADU Exhaust Issue - conf calls with MQ, modeling support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-17 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 top drive support (257 to 249) - phone call with tom yost Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-17 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 247L Support - raising sheave 269L tie-back beam Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-17 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 0.75 0 reviewing options, reviewing drawings, interface with Sakhalin Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-17 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 2.5 0 ALE Conference Call Bi-Weekly Meeting with ENL / ALE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-18 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 1 0 Closeout revision 1 - review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR Board Update Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-18 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2 0 NCOC Tender Support - #D Model and documentation review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-18 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 Chevron Genesis Support Loadmaster conference call Meeting with Bruce and Alan Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-18 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 Updating TSR tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 General support for all open TSR's TSR Administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-18 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 AADU Exhaust Issue - conf calls with MQ, modeling support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-18 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 2 0 ALE Conference Call Bi-Weekly Meeting with ENL / ALE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-19 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 2 0 MTO and MR review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-19 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2 0 NCOC Tender Support - #D Model and documentation review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 General support for all open TSR's TSR Administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-19 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 0.75 0 reviewing options, reviewing drawings, interface with Sakhalin Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-19 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 Reviewing SG's slides Updates on progress Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals; updating timekeeping system update personnel discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-22 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1.5 0 NCOC 3D renderings and information for GHW RFI questions for NCOC RFI response for Robbie Bennett Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-22 OH-019 :OH-019 Overhead All Activities Regular Pay N 1.5 0 weekly meeting phone conf with Mihovil Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-22 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1.5 0 Mast leveling / alignment Top Drive rail alignment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-22 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 1.5 0 253L Top Drive Hang-Off pad eye; analysis and research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-22 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 1 0 meeting with Genesis; review of multipe options; conf call(s) with SAK Ops Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-22 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 1 0 reviewing slides Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-22 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 2.5 0 conf call(s) with Genesis and ALE sending information to Genesis SharePoint administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-23 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 1 0 review of closeout revision Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-23 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1.25 0 NCOC 3D renderings and information for GHW RFI questions for NCOC RFI response for Robbie Bennett Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-23 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2.5 0 Mast leveling / alignment Top Drive rail alignment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-23 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.25 0 safe house information sent to Dan C. BP Tender clarifications; conf call with BP pipe handling info sent to GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-23 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 1.25 0 253L Top Drive Hang-Off pad eye; analysis and research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-23 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 2 0 meeting with Genesis; review of multipe options; conf call(s) with SAK Ops Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Ops Support Meeting HR Meeting with JM and JJG Operation Support meeting TSR weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet and timesheet approvals; updating timekeeping system update personnel discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-24 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1.5 0 Talos discussion with Greg Review of CTR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-24 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2.25 0 Mast leveling / alignment Top Drive rail alignment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-24 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.75 0 safe house information sent to Dan C. BP Tender clarifications; conf call with BP pipe handling info sent to GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-24 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-24 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1.25 0 conf call(s) with Genesis and ALE sending information to Genesis SharePoint administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ops Support Meeting HR Meeting with JM and JJG Operation Support meeting TSR weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 timesheet and timesheet approvals; updating timekeeping system update personnel discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-25 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 Talos discussion with Greg Review of CTR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 TSR tracker update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-25 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.5 0 safe house information sent to Dan C. BP Tender clarifications; conf call with BP pipe handling info sent to GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-25 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1.5 0 conf call(s) with Genesis and ALE sending information to Genesis SharePoint administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-25 Rig 272L-TSR :Rig 272L-TSR TSR-01674-272L Exhaust Stack Modifications (Air Permit) Regular Pay N 1.5 0 reviewing options and discussing path forward Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet and timesheet approvals; updating timekeeping system update personnel discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR Status Discussion Reference Information sent to SAK OPS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-26 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 0.5 0 253L Top Drive Hang-Off pad eye; analysis and research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-26 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1.5 0 Ivan's email - provided response, researched Mexico rigs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-26 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 0.75 0 reviewing slides Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-26 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1.5 0 conf call(s) with Genesis and ALE sending information to Genesis SharePoint administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-10-26 Rig 272L-TSR :Rig 272L-TSR TSR-01674-272L Exhaust Stack Modifications (Air Permit) Regular Pay N 0.25 0 reviewing options and discussing path forward Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Year's Holiday Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board meeting update (30 mins) 01/05: ECAD Price Discussion Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 01/02: Time sheets to payroll and ProjectSense; update status on TSR documentation 01/03: Plot Orlan and Berkut drawings on large format; 01/05: resolve issues with users and ProjectSense. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-02 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 6 0 DM external stairs Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board meeting update (30 mins) 01/05: ECAD Price Discussion Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 01/02: Time sheets to payroll and ProjectSense; update status on TSR documentation 01/03: Plot Orlan and Berkut drawings on large format; 01/05: resolve issues with users and ProjectSense. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-03 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 6 0 DM external stairs Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-04 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 8 0 DM external stairs Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board meeting update (30 mins) 01/05: ECAD Price Discussion Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 01/02: Time sheets to payroll and ProjectSense; update status on TSR documentation 01/03: Plot Orlan and Berkut drawings on large format; 01/05: resolve issues with users and ProjectSense. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-05 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 6.5 0 DM external stairs Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board meeting update (30 mins) 01/11: weekly TSR meeting update 01/12: meeting to finalize title block changes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 01/08: ECAD Autodesk quotes and work with IT to update software; big plots on large plotter. 01/10: troubleshoot Sarah's CAD license issues. 01/11: IT helpdesk ticket submittal and explanation. 01/12: implementing changes from title block meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-08 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin meeting regarding TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-08 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 4.75 0 switching from east bridge walkway to west stairwell with adjustable platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-09 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 01/09: transmit TSR-01605-CTR; TSR-01492-CTR; TSR-01599-CTR; TSR-01618-DWG 01/10: transmit TSR-01559-CO 01/11: transmit TSR-01608-CTR; TSR-01572-RFI; TSR-01617-RFI 01/12: transmit TSR-01593-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-09 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 5 0 switching from east bridge walkway to west stairwell with adjustable platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-10 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board meeting update (30 mins) 01/11: weekly TSR meeting update 01/12: meeting to finalize title block changes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 01/08: ECAD Autodesk quotes and work with IT to update software; big plots on large plotter. 01/10: troubleshoot Sarah's CAD license issues. 01/11: IT helpdesk ticket submittal and explanation. 01/12: implementing changes from title block meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-10 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 01/09: transmit TSR-01605-CTR; TSR-01492-CTR; TSR-01599-CTR; TSR-01618-DWG 01/10: transmit TSR-01559-CO 01/11: transmit TSR-01608-CTR; TSR-01572-RFI; TSR-01617-RFI 01/12: transmit TSR-01593-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-10 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 1.75 0 switching from east bridge walkway to west stairwell with adjustable platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (30 mins) 01/11: weekly TSR meeting update 01/12: meeting to finalize title block changes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 01/08: ECAD Autodesk quotes and work with IT to update software; big plots on large plotter. 01/10: troubleshoot Sarah's CAD license issues. 01/11: IT helpdesk ticket submittal and explanation. 01/12: implementing changes from title block meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-11 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 01/09: transmit TSR-01605-CTR; TSR-01492-CTR; TSR-01599-CTR; TSR-01618-DWG 01/10: transmit TSR-01559-CO 01/11: transmit TSR-01608-CTR; TSR-01572-RFI; TSR-01617-RFI 01/12: transmit TSR-01593-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-11 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 5.5 0 switching from east bridge walkway to west stairwell with adjustable platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 daily: TSR board meeting update (30 mins) 01/11: weekly TSR meeting update 01/12: meeting to finalize title block changes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 01/08: ECAD Autodesk quotes and work with IT to update software; big plots on large plotter. 01/10: troubleshoot Sarah's CAD license issues. 01/11: IT helpdesk ticket submittal and explanation. 01/12: implementing changes from title block meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 01/09: transmit TSR-01605-CTR; TSR-01492-CTR; TSR-01599-CTR; TSR-01618-DWG 01/10: transmit TSR-01559-CO 01/11: transmit TSR-01608-CTR; TSR-01572-RFI; TSR-01617-RFI 01/12: transmit TSR-01593-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-12 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 1.75 0 switching from east bridge walkway to west stairwell with adjustable platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (30 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 1/15: CAD to PDF conversions; AutoCAD standard changes. 1/18: IT support help 1/19: timesheets; testing ProjectSense with Manjula (java update) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-15 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin meeting regarding TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-15 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 5.25 0 finalization of west stairwell with adjustable platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 winter storm office closure Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 winter storm office closure Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.5 0 NOV top drive CAD clean up Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 1/15: CAD to PDF conversions; AutoCAD standard changes. 1/18: IT support help 1/19: timesheets; testing ProjectSense with Manjula (java update) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-18 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 6.5 0 finalization of west stairwell with adjustable platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 1/15: CAD to PDF conversions; AutoCAD standard changes. 1/18: IT support help 1/19: timesheets; testing ProjectSense with Manjula (java update) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-19 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 6.25 0 finalization of west stairwell with adjustable platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (30 mins) 01/25: SaferUnion product presentation. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 01/22: setup new tasks in ProjectSense; assist IT with AutoCAD installations. 1/25: search for 273 pad eyes assembly for Genesis. 01/24: CAD issues; Hightail uploads; Globalmeet meeting setup for John Reck. 01/26: ProjectSense timesheets and timesheets to Payroll; create a CAD standards deployment (for off-site users) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-22 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 01/22: transmit TSR-01613-CO; 01/24: transmit TSR-01621-TSR; 01/25; resend transmittals to Hibernia for a signed reciept. 01/26: locate and email commissioning report for rotary table; transmit TSR-01593-DWG; send files to Genesis. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-22 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin meeting regarding TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-22 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 4.5 0 finalization of east and west stairwell with adjustable platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-23 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (30 mins) 01/25: SaferUnion product presentation. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 01/22: setup new tasks in ProjectSense; assist IT with AutoCAD installations. 1/25: search for 273 pad eyes assembly for Genesis. 01/24: CAD issues; Hightail uploads; Globalmeet meeting setup for John Reck. 01/26: ProjectSense timesheets and timesheets to Payroll; create a CAD standards deployment (for off-site users) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-24 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 01/22: transmit TSR-01613-CO; 01/24: transmit TSR-01621-TSR; 01/25; resend transmittals to Hibernia for a signed reciept. 01/26: locate and email commissioning report for rotary table; transmit TSR-01593-DWG; send files to Genesis. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-24 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 5.75 0 finalization of east and west stairwell with adjustable platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (30 mins) 01/25: SaferUnion product presentation. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 01/22: setup new tasks in ProjectSense; assist IT with AutoCAD installations. 1/25: search for 273 pad eyes assembly for Genesis. 01/24: CAD issues; Hightail uploads; Globalmeet meeting setup for John Reck. 01/26: ProjectSense timesheets and timesheets to Payroll; create a CAD standards deployment (for off-site users) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 01/22: transmit TSR-01613-CO; 01/24: transmit TSR-01621-TSR; 01/25; resend transmittals to Hibernia for a signed reciept. 01/26: locate and email commissioning report for rotary table; transmit TSR-01593-DWG; send files to Genesis. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-25 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 5.75 0 finalization of east and west stairwell with adjustable platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.75 0 Top Drive drawing updates for MHWirth Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 01/22: setup new tasks in ProjectSense; assist IT with AutoCAD installations. 1/25: search for 273 pad eyes assembly for Genesis. 01/24: CAD issues; Hightail uploads; Globalmeet meeting setup for John Reck. 01/26: ProjectSense timesheets and timesheets to Payroll; create a CAD standards deployment (for off-site users) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 4.25 0 01/22: transmit TSR-01613-CO; 01/24: transmit TSR-01621-TSR; 01/25; resend transmittals to Hibernia for a signed reciept. 01/26: locate and email commissioning report for rotary table; transmit TSR-01593-DWG; send files to Genesis. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-29 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 update CAD drawings for traveling block and top drive arrangement Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (30 mins) 01/31: performance meeting 02/01: weekly TSR meeting update. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 01/29: timesheets online and to payroll daily:AutoCAD standards preparation for deployment; working with EJ to assist with CAD installs; ECAD payment issues; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-29 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1.75 0 01/29: update model for AADU to reflect signage on mast. 01/31: find and send AADU equipment drawings/models Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-29 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 01/29: TSR number reservations 01/30: retransmit TSR's to Hibernia 01/31: transmit TSR-01593-CO; 02/01: transmit TSR-01620-CTR; TSR-01619-CTR; 02/02: updated MDR for Orlan Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-29 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting with Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-30 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.25 0 update CAD drawings for traveling block and top drive arrangement Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (30 mins) 01/31: performance meeting 02/01: weekly TSR meeting update. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 01/29: timesheets online and to payroll daily:AutoCAD standards preparation for deployment; working with EJ to assist with CAD installs; ECAD payment issues; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-30 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 01/29: TSR number reservations 01/30: retransmit TSR's to Hibernia 01/31: transmit TSR-01593-CO; 02/01: transmit TSR-01620-CTR; TSR-01619-CTR; 02/02: updated MDR for Orlan Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-30 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 3.25 0 edit drawings per TSR package Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-30 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 1.5 0 red lines for drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-31 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.25 0 update CAD drawings for traveling block and top drive arrangement Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (30 mins) 01/31: performance meeting 02/01: weekly TSR meeting update. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 01/29: timesheets online and to payroll daily:AutoCAD standards preparation for deployment; working with EJ to assist with CAD installs; ECAD payment issues; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-31 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1.5 0 01/29: update model for AADU to reflect signage on mast. 01/31: find and send AADU equipment drawings/models Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-31 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 01/29: TSR number reservations 01/30: retransmit TSR's to Hibernia 01/31: transmit TSR-01593-CO; 02/01: transmit TSR-01620-CTR; TSR-01619-CTR; 02/02: updated MDR for Orlan Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-31 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1.75 0 edit drawings per TSR package Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-31 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 0.5 0 red lines for drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (30 mins) 01/31: performance meeting 02/01: weekly TSR meeting update. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 01/29: timesheets online and to payroll daily:AutoCAD standards preparation for deployment; working with EJ to assist with CAD installs; ECAD payment issues; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 01/29: TSR number reservations 01/30: retransmit TSR's to Hibernia 01/31: transmit TSR-01593-CO; 02/01: transmit TSR-01620-CTR; TSR-01619-CTR; 02/02: updated MDR for Orlan Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-01 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 1 0 red lines for drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-02 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1.5 0 model platform concept Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 01/29: TSR number reservations 01/30: retransmit TSR's to Hibernia 01/31: transmit TSR-01593-CO; 02/01: transmit TSR-01620-CTR; TSR-01619-CTR; 02/02: updated MDR for Orlan Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-02 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 6 0 edit drawings per TSR package Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board meeting update (30 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 02/05: PDF conversions from CAD files; 02/05-02/07: CAD standards for deployment 02/06: send converted 3D model file of 209 DM skidding claw/cylinder Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-05 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 MinKit Platform 3D concept and conversion to 3D PDF Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-05 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 02/05: transmit TSR-01622-CTR; TSR-01610-CTR 02/06: transmit TSR-01572-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-05 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting with Sakhalin. 02/06-02/09: meeting with Jeff regarding incoming TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board meeting update (30 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 02/05: PDF conversions from CAD files; 02/05-02/07: CAD standards for deployment 02/06: send converted 3D model file of 209 DM skidding claw/cylinder Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-06 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4.5 0 MinKit Platform 3D concept and conversion to 3D PDF Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 02/05: transmit TSR-01622-CTR; TSR-01610-CTR 02/06: transmit TSR-01572-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-06 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.25 0 weekly meeting with Sakhalin. 02/06-02/09: meeting with Jeff regarding incoming TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 02/05: PDF conversions from CAD files; 02/05-02/07: CAD standards for deployment 02/06: send converted 3D model file of 209 DM skidding claw/cylinder Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-07 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 weekly meeting with Sakhalin. 02/06-02/09: meeting with Jeff regarding incoming TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-07 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 3.5 0 completion of SWP-0120, SWP-0103, & SWP-097 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 02/05: PDF conversions from CAD files; 02/05-02/07: CAD standards for deployment 02/06: send converted 3D model file of 209 DM skidding claw/cylinder Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-08 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 weekly meeting with Sakhalin. 02/06-02/09: meeting with Jeff regarding incoming TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-08 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2.5 0 completion of SWP-0120, SWP-0103, & SWP-097 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-08 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 model concept for site review of door relocation in PB and access stair and platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-09 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 weekly meeting with Sakhalin. 02/06-02/09: meeting with Jeff regarding incoming TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-09 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1.5 0 completion of SWP-0120, SWP-0103, & SWP-097 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-09 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 6 0 model concept for site review of door relocation in PB and access stair and platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1.5 0 compiled CAD drawings from NOV and MHWirth to check for pipe handling clearance. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 daily: TSR board meeting update (30 mins) 02/12: online time sheets and time sheets to payroll 02/15: weekly TSR meeting/quarterly earning update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 02/12: update Projectsense to include Genesis for time keeping 02/14: install/update AutoCAD standard for all users in HTSG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 02/12: transmit TSR-01615-DWG 02/13: transmit TSR-01615-CO; TSR-01619-CO 02/14: transmit TSR-01626-CTR; TSR-01622-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-12 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting with Sakhalin regarding ongoing TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-12 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1.5 0 model concept for site review of door relocation in PB and access stair and platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-13 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 02/12: transmit TSR-01615-DWG 02/13: transmit TSR-01615-CO; TSR-01619-CO 02/14: transmit TSR-01626-CTR; TSR-01622-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-13 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 7 0 model concept for site review of door relocation in PB and access stair and platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board meeting update (30 mins) 02/12: online time sheets and time sheets to payroll 02/15: weekly TSR meeting/quarterly earning update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 02/12: update Projectsense to include Genesis for time keeping 02/14: install/update AutoCAD standard for all users in HTSG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-14 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 model concept for site review of door relocation in PB and access stair and platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-14 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1.5 0 updated Option 1: Krechet on GBS build Maersk CJ70 model and integrate with GBS and created 3D PDF file Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 daily: TSR board meeting update (30 mins) 02/12: online time sheets and time sheets to payroll 02/15: weekly TSR meeting/quarterly earning update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-15 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2 0 convert PDF files to CAD drawing for BOP clearance on 257 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-16 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 3 0 model concept for site review of door relocation in PB and access stair and platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-16 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 updated Option 1: Krechet on GBS build Maersk CJ70 model and integrate with GBS and created 3D PDF file Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 President's Day Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 02/21: send tutorial email for users to access and input time into ProjectSense. 02/22: update ProjectSense to allow for two approvals. 02/23: online time sheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-21 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 02/21: transmit TSR-01608-RPT; TSR-01623-CTR 02/23: transmit TSR-01623-CO; TSR-01608-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-21 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 export and dimension center line drawings for WOM to build c/k manifold spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-21 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 0.5 0 begin construction drawings from concept model sent. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-21 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 02/21: verify BoD dimensions and tank capacities 02/22: KanBan alignment meeting; build model Concept D: CJ50 on GBS and created 3D PDF file. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 02/21: send tutorial email for users to access and input time into ProjectSense. 02/22: update ProjectSense to allow for two approvals. 02/23: online time sheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-22 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 begin construction drawings from concept model sent. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4.5 0 02/21: verify BoD dimensions and tank capacities 02/22: KanBan alignment meeting; build model Concept D: CJ50 on GBS and created 3D PDF file. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 02/21: send tutorial email for users to access and input time into ProjectSense. 02/22: update ProjectSense to allow for two approvals. 02/23: online time sheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 02/21: transmit TSR-01608-RPT; TSR-01623-CTR 02/23: transmit TSR-01623-CO; TSR-01608-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-23 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 6 0 begin construction drawings from concept model sent. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board review update meeting 03/01: weekly HTSG TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 02/26: timesheets online and to payroll 03/02: ProjectSense updates; timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-26 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin TSR update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-26 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 3.5 0 demo drawing and door frame installation drawing to be sent to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-26 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2.5 0 02/26-03/01: model updates of option 1 and support for BOD updates. 03/01-03/02: model update for option 2 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 02/27: incoming TSR's to be filed; assigning TSR numbers 02/28: transmit TSR-01626-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-27 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 3 0 demo drawing and door frame installation drawing to be sent to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2.5 0 02/26-03/01: model updates of option 1 and support for BOD updates. 03/01-03/02: model update for option 2 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 02/27: meeting for Brainstorm Plan for Bocks Layouts and 3D models 02/28: meeting for 3D model Layouts 03/01: Kan-Ban board meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board review update meeting 03/01: weekly HTSG TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 02/27: incoming TSR's to be filed; assigning TSR numbers 02/28: transmit TSR-01626-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-28 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 demo drawing and door frame installation drawing to be sent to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 3.25 0 02/26-03/01: model updates of option 1 and support for BOD updates. 03/01-03/02: model update for option 2 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 02/27: meeting for Brainstorm Plan for Bocks Layouts and 3D models 02/28: meeting for 3D model Layouts 03/01: Kan-Ban board meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board review update meeting 03/01: weekly HTSG TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 02/26: timesheets online and to payroll 03/02: ProjectSense updates; timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-01 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2.25 0 demo drawing and door frame installation drawing to be sent to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5.5 0 02/26-03/01: model updates of option 1 and support for BOD updates. 03/01-03/02: model update for option 2 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 02/27: meeting for Brainstorm Plan for Bocks Layouts and 3D models 02/28: meeting for 3D model Layouts 03/01: Kan-Ban board meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 02/26: timesheets online and to payroll 03/02: ProjectSense updates; timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-02 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 3 0 demo drawing and door frame installation drawing to be sent to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-02 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 02/26-03/01: model updates of option 1 and support for BOD updates. 03/01-03/02: model update for option 2 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 03/05: TSR board update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-05 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 03/05: transmit TSR-01626-DWG-R1 03/06: assign TSRs, file incoming documents, assign drawing numbers. 03/08: transmit TSR-01572-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-05 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly call with Sakhalin for TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5.75 0 03/05: update models; export PPT slides; create 3D PDF files. 03/06: updated model concepts options 2 & 4 (3D PDF & PPT slides) 03/07: create concept model option 3 (3D PDF & PPT slides) 03/08: create option 6A&B for review and discussion 03/09: update option 6B to include living quarters and helideck Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 03/05: meeting to review 3D concept models Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 03/05: transmit TSR-01626-DWG-R1 03/06: assign TSRs, file incoming documents, assign drawing numbers. 03/08: transmit TSR-01572-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-06 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 5 0 create CAD files for choke manifold valve stands and updated 3D model. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4.5 0 03/05: update models; export PPT slides; create 3D PDF files. 03/06: updated model concepts options 2 & 4 (3D PDF & PPT slides) 03/07: create concept model option 3 (3D PDF & PPT slides) 03/08: create option 6A&B for review and discussion 03/09: update option 6B to include living quarters and helideck Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 03/05: TSR board update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-07 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 create CAD files for choke manifold valve stands and updated 3D model. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-07 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 6 0 03/05: update models; export PPT slides; create 3D PDF files. 03/06: updated model concepts options 2 & 4 (3D PDF & PPT slides) 03/07: create concept model option 3 (3D PDF & PPT slides) 03/08: create option 6A&B for review and discussion 03/09: update option 6B to include living quarters and helideck Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-08 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 03/05: transmit TSR-01626-DWG-R1 03/06: assign TSRs, file incoming documents, assign drawing numbers. 03/08: transmit TSR-01572-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-08 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 create drawing 209L-01-03-207 access relocation Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 03/05: update models; export PPT slides; create 3D PDF files. 03/06: updated model concepts options 2 & 4 (3D PDF & PPT slides) 03/07: create concept model option 3 (3D PDF & PPT slides) 03/08: create option 6A&B for review and discussion 03/09: update option 6B to include living quarters and helideck Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 03/05: meeting to review 3D concept models Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-09 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 4 0 create drawing 209L-01-03-207 access relocation Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-09 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 03/05: update models; export PPT slides; create 3D PDF files. 03/06: updated model concepts options 2 & 4 (3D PDF & PPT slides) 03/07: create concept model option 3 (3D PDF & PPT slides) 03/08: create option 6A&B for review and discussion 03/09: update option 6B to include living quarters and helideck Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 03/12: ProjeXSense time sheets and time sheets to payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 03/12: assign new TSR numbers; transmit TSR-01602-DWGs. 30/15: transmit TSR-01576-DWG; TSR-01625-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-12 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly TSR status update meeting with Sakhalin Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-12 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1.5 0 red lines/mark ups for 1st batch of Work PACS. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-12 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2.25 0 03/12-13: finalize PB rig access stair extension drawing/red lines. 03/16: electrical sketch for lighting sensors in PBM Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.75 0 complete 3D model of options 6B (symmetrical two-shaft GBS). 03/16: added max skidding slides for options 3 & 4. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 Minkit Kanban update meeting; support for Minkit Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.75 0 creating template for 3D fittings Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-13 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2 0 red lines/mark ups for 1st batch of Work PACS. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-13 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 03/12-13: finalize PB rig access stair extension drawing/red lines. 03/16: electrical sketch for lighting sensors in PBM Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1.25 0 complete 3D model of options 6B (symmetrical two-shaft GBS). 03/16: added max skidding slides for options 3 & 4. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Minkit Kanban update meeting; support for Minkit Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 creating template for 3D fittings Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-14 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 3 0 begin 3D model concept for hatch access below cellar floor area. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 complete 3D model of options 6B (symmetrical two-shaft GBS). 03/16: added max skidding slides for options 3 & 4. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Minkit Kanban update meeting; support for Minkit Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-15 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 03/12: assign new TSR numbers; transmit TSR-01602-DWGs. 30/15: transmit TSR-01576-DWG; TSR-01625-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-15 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 2 0 begin 3D model concept for hatch access below cellar floor area. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-15 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5.5 0 complete 3D model of options 6B (symmetrical two-shaft GBS). 03/16: added max skidding slides for options 3 & 4. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-16 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1.25 0 red lines/mark ups for 1st batch of Work PACS. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-16 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 2.25 0 begin 3D model concept for hatch access below cellar floor area. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-16 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 03/12-13: finalize PB rig access stair extension drawing/red lines. 03/16: electrical sketch for lighting sensors in PBM Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-16 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2.5 0 complete 3D model of options 6B (symmetrical two-shaft GBS). 03/16: added max skidding slides for options 3 & 4. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheets on ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-19 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly TSR update meeting with Sakhalin Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-19 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 03/19: Started on SWP-0106 work table in mud pump room. 03/21: updated SWP-0044; SWP-0096; SWP-0097; SWP-0103 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-19 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 4.5 0 03/19: modeled cellar deck area and created 3D PDF for site approval. 03/20: created CAD file of pad eyes. 03/23: created 3D concept model of access hatch and removable stairs for site review Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.25 0 verifications between current model and updated Kvaerner GBS specs 03/22: updated concept 6 with 21m capping beam spacing/Kyle's PBM dimensions. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.25 0 Minkit Kanban update meeting; support for Minkit Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-20 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.75 0 03/20: transmit TSR-01626-DWG; TSR-01625-DWG; TSR-01572-DWG; 03/21: transmit TSR-01572-CTR; 03/23: transmit TSR-01626-DWG; assign new TSR numbers. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-20 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1.5 0 03/19: Started on SWP-0106 work table in mud pump room. 03/21: updated SWP-0044; SWP-0096; SWP-0097; SWP-0103 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-20 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 3.5 0 03/19: modeled cellar deck area and created 3D PDF for site approval. 03/20: created CAD file of pad eyes. 03/23: created 3D concept model of access hatch and removable stairs for site review Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-20 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 03/20: modified stair extension drawings from flippable to fixed. 03/23: updated Keppel Amfel's GA's. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.25 0 Minkit Kanban update meeting; support for Minkit Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-21 EHBU-TSRs :EHBU-TSRs TSR-01356-EHBU Aksai General Query-4th Qtr Regular Pay N 0.75 0 03/21: updated man camp drawings and rev'd up to revision E. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-21 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 03/20: transmit TSR-01626-DWG; TSR-01625-DWG; TSR-01572-DWG; 03/21: transmit TSR-01572-CTR; 03/23: transmit TSR-01626-DWG; assign new TSR numbers. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-21 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2 0 03/19: Started on SWP-0106 work table in mud pump room. 03/21: updated SWP-0044; SWP-0096; SWP-0097; SWP-0103 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-21 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 3.75 0 03/19: modeled cellar deck area and created 3D PDF for site approval. 03/20: created CAD file of pad eyes. 03/23: created 3D concept model of access hatch and removable stairs for site review Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.5 0 verifications between current model and updated Kvaerner GBS specs 03/22: updated concept 6 with 21m capping beam spacing/Kyle's PBM dimensions. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 03/20: transmit TSR-01626-DWG; TSR-01625-DWG; TSR-01572-DWG; 03/21: transmit TSR-01572-CTR; 03/23: transmit TSR-01626-DWG; assign new TSR numbers. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-23 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 3.5 0 03/19: modeled cellar deck area and created 3D PDF for site approval. 03/20: created CAD file of pad eyes. 03/23: created 3D concept model of access hatch and removable stairs for site review Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-23 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1.5 0 03/20: modified stair extension drawings from flippable to fixed. 03/23: updated Keppel Amfel's GA's. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-23 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 verifications between current model and updated Kvaerner GBS specs 03/22: updated concept 6 with 21m capping beam spacing/Kyle's PBM dimensions. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 03/29: weekly TSR update meeting daily: TSR board update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 time sheets on ProjXsense and to payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 03/26: sign/file incoming transmittals and assign TSR numbers, 03/27: transmit TSR-01621-CTR 03/28: transmit TSR-01602-DWG 03/29: transmit TSR-01602-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-26 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly TSR update meeting with Sakhalin Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-26 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 3.75 0 03/26: SWP-0106 Mud Pump Room work table. 03/26-03/27: update DM and PB GA's/safety egress/hazardous area classification to reflect changes in TSR-01593, TSR-01615, & TSR-01626 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.25 0 Minkit Kanban update meeting; support for Minkit Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 03/26: sign/file incoming transmittals and assign TSR numbers, 03/27: transmit TSR-01621-CTR 03/28: transmit TSR-01602-DWG 03/29: transmit TSR-01602-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-27 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 3.5 0 03/26: SWP-0106 Mud Pump Room work table. 03/26-03/27: update DM and PB GA's/safety egress/hazardous area classification to reflect changes in TSR-01593, TSR-01615, & TSR-01626 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-27 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1.75 0 general concept model to check for interferences and potential clashes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.5 0 concept 3 verification of Kvaerner's GBS with topside arrangement. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 03/29: weekly TSR update meeting daily: TSR board update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 03/26: sign/file incoming transmittals and assign TSR numbers, 03/27: transmit TSR-01621-CTR 03/28: transmit TSR-01602-DWG 03/29: transmit TSR-01602-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-28 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.75 0 03/26: SWP-0106 Mud Pump Room work table. 03/26-03/27: update DM and PB GA's/safety egress/hazardous area classification to reflect changes in TSR-01593, TSR-01615, & TSR-01626 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-28 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 5.25 0 general concept model to check for interferences and potential clashes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.25 0 Minkit Kanban update meeting; support for Minkit Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 03/29: weekly TSR update meeting daily: TSR board update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-29 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 03/26: sign/file incoming transmittals and assign TSR numbers, 03/27: transmit TSR-01621-CTR 03/28: transmit TSR-01602-DWG 03/29: transmit TSR-01602-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-29 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.75 0 general concept model to check for interferences and potential clashes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-29 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 6 0 03/29: 3D concept approved; begin drafting phase of cellar access hatch. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-30 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board updated meeting 04/05: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 timesheets in ProjXsense. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 04/02: assign TSR numbers; sent CAD and MDR to Sakhalin; transmit TSR-01602-DWG WorkPAC drawing. 04/03: transmit TSR-01572-DWG; TSR-01636-CTR 04-05: transmit TSR-01631-CTR; assign TSR numbers Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-02 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin open TSR meeting update Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-02 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 4.25 0 04/02: drafting hatch and ladder access in cellar. 04/05: resuming drafting for hatch & access ladder Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.25 0 Minkit Kanban update meeting; support for Minkit Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board updated meeting 04/05: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-03 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 04/02: assign TSR numbers; sent CAD and MDR to Sakhalin; transmit TSR-01602-DWG WorkPAC drawing. 04/03: transmit TSR-01572-DWG; TSR-01636-CTR 04-05: transmit TSR-01631-CTR; assign TSR numbers Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-03 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 6.25 0 04/03: continue modeling 3D concept for premix piping: 04/04-04/06: begin modeling concept for equalizer piping Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-04 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 8 0 04/03: continue modeling 3D concept for premix piping: 04/04-04/06: begin modeling concept for equalizer piping Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board updated meeting 04/05: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-05 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 04/02: assign TSR numbers; sent CAD and MDR to Sakhalin; transmit TSR-01602-DWG WorkPAC drawing. 04/03: transmit TSR-01572-DWG; TSR-01636-CTR 04-05: transmit TSR-01631-CTR; assign TSR numbers Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-05 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 4.25 0 04/03: continue modeling 3D concept for premix piping: 04/04-04/06: begin modeling concept for equalizer piping Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-05 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 04/02: drafting hatch and ladder access in cellar. 04/05: resuming drafting for hatch & access ladder Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.75 0 update presentation material for concepts 2-6 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheets in ProjXsense. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-06 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1.5 0 04/03: continue modeling 3D concept for premix piping: 04/04-04/06: begin modeling concept for equalizer piping Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-06 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 3 0 04/02: drafting hatch and ladder access in cellar. 04/05: resuming drafting for hatch & access ladder Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 3 0 update presentation material for concepts 2-6 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board updated meeting 04/05: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 04/09: scale site drawing for Benny Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 04/09: timesheets to payroll and timesheets on ProjXsense 04/11: ProjXsense administrative tasks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-09 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 04/09: assign drawing number; transmit TSR-01626-CO 04/10: transmit TSR-01617-CTR; 04/11: process incoming transmittal; transmit TSR-01638-DWG; 04/12: transmit TSR-01631-CO; 04/13: assign TSR and drawing numbers Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-09 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin open TSR meeting update Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-09 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 3 0 redlines received from Jeff (condensate piping and mud trough modifications) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-09 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 begin drafting of east equalizer line spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board updated meeting 04/05: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-10 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 04/09: assign drawing number; transmit TSR-01626-CO 04/10: transmit TSR-01617-CTR; 04/11: process incoming transmittal; transmit TSR-01638-DWG; 04/12: transmit TSR-01631-CO; 04/13: assign TSR and drawing numbers Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-10 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 4 0 begin drafting of east equalizer line spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-10 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 2.75 0 finalization of access hatch details and ladder. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 04/09: timesheets to payroll and timesheets on ProjXsense 04/11: ProjXsense administrative tasks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-11 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 04/09: assign drawing number; transmit TSR-01626-CO 04/10: transmit TSR-01617-CTR; 04/11: process incoming transmittal; transmit TSR-01638-DWG; 04/12: transmit TSR-01631-CO; 04/13: assign TSR and drawing numbers Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-11 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2 0 begin drafting of east equalizer line spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-11 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 4 0 finalization of access hatch details and ladder. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board updated meeting 04/05: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 04/09: assign drawing number; transmit TSR-01626-CO 04/10: transmit TSR-01617-CTR; 04/11: process incoming transmittal; transmit TSR-01638-DWG; 04/12: transmit TSR-01631-CO; 04/13: assign TSR and drawing numbers Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-12 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 5.5 0 finalization of access hatch details and ladder. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-13 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 04/09: assign drawing number; transmit TSR-01626-CO 04/10: transmit TSR-01617-CTR; 04/11: process incoming transmittal; transmit TSR-01638-DWG; 04/12: transmit TSR-01631-CO; 04/13: assign TSR and drawing numbers Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-13 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 5 0 redlines received from Jeff (condensate piping and mud trough modifications) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-13 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2.25 0 begin drafting of east equalizer line spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board updated meeting 04/18: meeting regarding ODPL drawings 04/19: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 04/16: assign TSR numbers and file transmittals. 04/17: transmit TSR-01637-CO; 249L-01-03-190 No Go Bar. 04/19: transmit: TSR-01645-CTR 04/20: transmit: TSR-01625-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-16 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 04/16: weekly Sakhalin open TSR meeting update 04/18: export and conversion of Berkut Navisworks model to OBJ format for Sakhalin. 04/19: discussion with Jeff regarding ODPL drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-16 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 5.25 0 removal of ladder; revision to set of hatch access drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 04/16: assign TSR numbers and file transmittals. 04/17: transmit TSR-01637-CO; 249L-01-03-190 No Go Bar. 04/19: transmit: TSR-01645-CTR 04/20: transmit: TSR-01625-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-17 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 6.5 0 removal of ladder; revision to set of hatch access drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board updated meeting 04/18: meeting regarding ODPL drawings 04/19: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-18 OH-019 :OH-019 Overhead All Activities Regular Pay N 1.5 0 04/16: weekly Sakhalin open TSR meeting update 04/18: export and conversion of Berkut Navisworks model to OBJ format for Sakhalin. 04/19: discussion with Jeff regarding ODPL drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-18 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1.5 0 finalization of equalizer lines in active tank and tank penetrations. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-18 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 4 0 removal of ladder; revision to set of hatch access drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board updated meeting 04/18: meeting regarding ODPL drawings 04/19: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-19 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 04/16: assign TSR numbers and file transmittals. 04/17: transmit TSR-01637-CO; 249L-01-03-190 No Go Bar. 04/19: transmit: TSR-01645-CTR 04/20: transmit: TSR-01625-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-19 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 04/16: weekly Sakhalin open TSR meeting update 04/18: export and conversion of Berkut Navisworks model to OBJ format for Sakhalin. 04/19: discussion with Jeff regarding ODPL drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-19 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 5.75 0 04/19: meeting to discuss ga's and plans for TSR; export of GA blocks for ALE. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 04/20: assist with Solidworks title block standardization. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 04/20: timesheets to payroll and timesheets on ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-20 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 04/16: assign TSR numbers and file transmittals. 04/17: transmit TSR-01637-CO; 249L-01-03-190 No Go Bar. 04/19: transmit: TSR-01645-CTR 04/20: transmit: TSR-01625-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-20 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 3 0 04/19: meeting to discuss ga's and plans for TSR; export of GA blocks for ALE. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 SolidWorks AutoCAD title block layering and lineweight standard Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 04/23: timesheets to payroll and online ProjXsense 04/26: resolving FEED MDR file size issues on SharePoint Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 04/23: file incoming TSR files. 04/25: transmit TSR-01625-CO; TSR-01634-CTR 04/27: transmit TSR-01640-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-23 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly TSR update meeting for Sakhalin TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-23 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2 0 04/23: tank penetration drawings for equalizer addition. 04/25: finalizing details of active tank equalizer line and pipe penetrations; 04/27: pick up red lines and begin as-builts for east side piping spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 04/23: file incoming TSR files. 04/25: transmit TSR-01625-CO; TSR-01634-CTR 04/27: transmit TSR-01640-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-25 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 4 0 04/23: tank penetration drawings for equalizer addition. 04/25: finalizing details of active tank equalizer line and pipe penetrations; 04/27: pick up red lines and begin as-builts for east side piping spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-25 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 3.25 0 create model concept of casing jetting tool from hand sketches Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 04/23: timesheets to payroll and online ProjXsense 04/26: resolving FEED MDR file size issues on SharePoint Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 04/23: file incoming TSR files. 04/25: transmit TSR-01625-CO; TSR-01634-CTR 04/27: transmit TSR-01640-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-26 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 5.75 0 create model concept of casing jetting tool from hand sketches Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-27 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 6.5 0 04/23: tank penetration drawings for equalizer addition. 04/25: finalizing details of active tank equalizer line and pipe penetrations; 04/27: pick up red lines and begin as-builts for east side piping spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-27 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1.5 0 create model concept of casing jetting tool from hand sketches Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 04/30: NOVOS presentation from NOV 05/01: TSR board update meeting 05/02: Parker Earnings Update Meeting 05/03: TSR update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-30 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.75 0 04/30: transmit TSR-01620-DWG; TSR-01643-CTR; 05/01-05/02: transmit ODPL P&ID's. preparation for transmittal of obsolete ODPL drawing package 05/04: transmit TSR-01602-DWG; TSR-01639-CTR; process and file transmittals from Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-30 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly TSR update meeting for Sakhalin TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-30 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 4.25 0 created CAD blocks of PBM and DM for ALE Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 04/30: NOVOS presentation from NOV 05/01: TSR board update meeting 05/02: Parker Earnings Update Meeting 05/03: TSR update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 3.5 0 04/30: transmit TSR-01620-DWG; TSR-01643-CTR; 05/01-05/02: transmit ODPL P&ID's. preparation for transmittal of obsolete ODPL drawing package 05/04: transmit TSR-01602-DWG; TSR-01639-CTR; process and file transmittals from Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-01 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 4 0 05/04: pickup red lines on drawings for bid purposes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 04/30: NOVOS presentation from NOV 05/01: TSR board update meeting 05/02: Parker Earnings Update Meeting 05/03: TSR update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 04/30: transmit TSR-01620-DWG; TSR-01643-CTR; 05/01-05/02: transmit ODPL P&ID's. preparation for transmittal of obsolete ODPL drawing package 05/04: transmit TSR-01602-DWG; TSR-01639-CTR; process and file transmittals from Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-02 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 5 0 05/04: pickup red lines on drawings for bid purposes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 04/30: NOVOS presentation from NOV 05/01: TSR board update meeting 05/02: Parker Earnings Update Meeting 05/03: TSR update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-03 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 7 0 05/04: pickup red lines on drawings for bid purposes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 ProjXSense timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-04 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 04/30: transmit TSR-01620-DWG; TSR-01643-CTR; 05/01-05/02: transmit ODPL P&ID's. preparation for transmittal of obsolete ODPL drawing package 05/04: transmit TSR-01602-DWG; TSR-01639-CTR; process and file transmittals from Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-04 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2.75 0 05/04: continue as-builts of active tank premix piping in DSM. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-04 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 3 0 05/04: pickup red lines on drawings for bid purposes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 05/07: ProjXSense timesheets and timesheets to payroll. 05/10: Hightail support: sending files to H: drive. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-07 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 05/07: TSR-01629-CO 05/08: TSR-01646-TSR&CTR 05/09: TSR-01633-CTR 05/11: TSR-01647-CTR; TSR-01620-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-07 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly TSR update meeting for Sakhalin TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-07 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2.25 0 daily: drafting changes; red lines from drafting review to piping spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-07 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 3 0 05/07-05/08: red lines and additional comments Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 05/10: TSR board update meeting 05/08: TSR update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-08 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 05/07: TSR-01629-CO 05/08: TSR-01646-TSR&CTR 05/09: TSR-01633-CTR 05/11: TSR-01647-CTR; TSR-01620-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-08 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 3.5 0 daily: drafting changes; red lines from drafting review to piping spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-08 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 3 0 05/07-05/08: red lines and additional comments Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-09 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 05/07: TSR-01629-CO 05/08: TSR-01646-TSR&CTR 05/09: TSR-01633-CTR 05/11: TSR-01647-CTR; TSR-01620-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-09 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 5.5 0 Red Lines for condensation vent lines Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-09 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2 0 daily: drafting changes; red lines from drafting review to piping spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/10: TSR board update meeting 05/08: TSR update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 05/07: ProjXSense timesheets and timesheets to payroll. 05/10: Hightail support: sending files to H: drive. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-10 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 4.75 0 Red Lines for condensation vent lines Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-10 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1.25 0 daily: drafting changes; red lines from drafting review to piping spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-11 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 05/07: TSR-01629-CO 05/08: TSR-01646-TSR&CTR 05/09: TSR-01633-CTR 05/11: TSR-01647-CTR; TSR-01620-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-11 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 5.25 0 Red Lines for condensation vent lines Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-11 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1.25 0 05/07-05/08: red lines and additional comments Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-14 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1.5 0 05/14: begin drafting of choke and kill line spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 PTO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 05/14: TSR board update meeting (30 mins) 05/16: QHSSE IMS safety training 05/17: TSR update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-14 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 05/14 & 05/17: process incoming TSR emails and signed documents 05/15: troubleshoot Sakhalin hightail issues with IT. 05/16: transmit TSR-01640-DWG; TSR-01638-CO; TSR-01572-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-14 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 05/14: continue red lines of condensate vent lines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-14 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.75 0 05/14: red lines and mark-ups of casing jetting tool Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-15 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 6.5 0 05/14: begin drafting of choke and kill line spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 05/14: TSR board update meeting (30 mins) 05/16: QHSSE IMS safety training 05/17: TSR update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-15 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 05/14 & 05/17: process incoming TSR emails and signed documents 05/15: troubleshoot Sakhalin hightail issues with IT. 05/16: transmit TSR-01640-DWG; TSR-01638-CO; TSR-01572-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-16 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 4.25 0 05/14: begin drafting of choke and kill line spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 05/14: TSR board update meeting (30 mins) 05/16: QHSSE IMS safety training 05/17: TSR update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 05/16: troubleshoot SolidWorks licensing issue for Dan 05/17: timesheets to payroll and online timesheets on ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.75 0 05/14 & 05/17: process incoming TSR emails and signed documents 05/15: troubleshoot Sakhalin hightail issues with IT. 05/16: transmit TSR-01640-DWG; TSR-01638-CO; TSR-01572-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-17 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 3.5 0 05/14: begin drafting of choke and kill line spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/14: TSR board update meeting (30 mins) 05/16: QHSSE IMS safety training 05/17: TSR update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 05/16: troubleshoot SolidWorks licensing issue for Dan 05/17: timesheets to payroll and online timesheets on ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 05/14 & 05/17: process incoming TSR emails and signed documents 05/15: troubleshoot Sakhalin hightail issues with IT. 05/16: transmit TSR-01640-DWG; TSR-01638-CO; TSR-01572-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-17 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2.5 0 updating Keppel AmFels' P&IDs, piping arrangement drawings, and tank penetrations Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-21 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 PTO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 05/22: TSR board meeting 05/24: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-22 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 05/22: transmit TSR-01645-CO 05/23: transmit TSR-01634-CTR and TSR-01635-CTR. 05/25: fowarded emails (MOC) from 216L and 249L Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 05/22: search and find spool & fitting information for 209L LP mud from DSM transfer pump to DM trip tank. 05/24: find weights of external stairs for DM Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-22 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1.5 0 05/22: updating KA drawing for tank penetration as-built, picked up red-lines for P&ID and piping arrangements Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 05/22: transmit TSR-01645-CO 05/23: transmit TSR-01634-CTR and TSR-01635-CTR. 05/25: fowarded emails (MOC) from 216L and 249L Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-23 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1.5 0 begin condensate redlines Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-23 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 5.5 0 05/22: updating KA drawing for tank penetration as-built, picked up red-lines for P&ID and piping arrangements Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-24 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 1.75 0 begin model concept and integration study with Berkut model Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/22: TSR board meeting 05/24: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-24 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 05/22: search and find spool & fitting information for 209L LP mud from DSM transfer pump to DM trip tank. 05/24: find weights of external stairs for DM Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-24 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 3.75 0 begin condensate redlines Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-25 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 4 0 begin model concept and integration study with Berkut model Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 05/25: online timesheet for ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 05/22: transmit TSR-01645-CO 05/23: transmit TSR-01634-CTR and TSR-01635-CTR. 05/25: fowarded emails (MOC) from 216L and 249L Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-25 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2.5 0 begin condensate redlines Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-28 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 05/28: Memorial Day Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-29 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 3 0 05/29-05/31: revised choke line drawing BERP-01-05-004 to rev.C Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 05/29: TSR board update meeeting 05/31: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-29 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 05/29: transmit TSR-01591-CO; TSR-01639-DWG; process incoming TSR's and transmittals 06/01: transmit TSR-01639-DWG-R1 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-29 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly call in with Sakhalin regarding TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-29 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2 0 update condensate as-builts for KA piping arrangement drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-30 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 3 0 05/29-05/31: revised choke line drawing BERP-01-05-004 to rev.C Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.25 0 finding loadmaster information for sheave cluster platform for Luis (AADU) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 05/30: print out of AADU drawings 06/01: timesheets for ProjXsense and payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-30 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 2.5 0 05/30: update model concept to show frame using W6x20 and W8x40 05/31: sent preliminary pad eyes to Jeff Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-30 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 0.5 0 electrical schematic sketch of the ground fault Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-30 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.25 0 updated drawing and BOM details Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-31 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 05/29-05/31: revised choke line drawing BERP-01-05-004 to rev.C Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-31 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 1.5 0 model concept for the NW corner of the Berkut cellar floor. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/29: TSR board update meeeting 05/31: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-31 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1.5 0 05/30: update model concept to show frame using W6x20 and W8x40 05/31: sent preliminary pad eyes to Jeff Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-31 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 update condensate as-builts for KA piping arrangement drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-31 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 3 0 electrical schematic sketch of the ground fault Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-01 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 0.5 0 model concept for the NW corner of the Berkut cellar floor. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 05/30: print out of AADU drawings 06/01: timesheets for ProjXsense and payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 05/29: transmit TSR-01591-CO; TSR-01639-DWG; process incoming TSR's and transmittals 06/01: transmit TSR-01639-DWG-R1 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-01 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 5 0 updated piping line/valve registers and updated drawings accordlingly. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-01 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 1 0 electrical schematic sketch of the ground fault Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-04 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 1.25 0 update 2 of 3 posts (west) and update compiled model. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 06/04: online timesheet on JProjXsense and to payroll. 06/06: download setup files for AutoCAD 2019 AEC collection 06/07: timesheets and explaination of timesheet to Brandon Swearinger Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-04 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 06/05: transmit TSR-01620-CO; TSR-01634-CO; 06/07: transmit TSR-01647-CO; 06/08: transmit TSR-01592-DWG; TSR-01621-DWG&DOCS Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-04 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin meeting for TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-04 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1.25 0 finalize dust collector frame for installation and welding onto M-3130. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-04 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2.5 0 red lines for Keppel AmFels' drawing packages Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-04 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 0.25 0 red lines for ground fault electrical schematic. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board review 06/07: TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-05 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 7.5 0 finalize dust collector frame for installation and welding onto M-3130. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 06/04: online timesheet on JProjXsense and to payroll. 06/06: download setup files for AutoCAD 2019 AEC collection 06/07: timesheets and explaination of timesheet to Brandon Swearinger Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-06 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 4.5 0 finalize dust collector frame for installation and welding onto M-3130. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-07 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 3 0 update 2 of 3 posts (west) and update compiled model. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR board review 06/07: TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 06/04: online timesheet on JProjXsense and to payroll. 06/06: download setup files for AutoCAD 2019 AEC collection 06/07: timesheets and explaination of timesheet to Brandon Swearinger Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-07 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 06/05: transmit TSR-01620-CO; TSR-01634-CO; 06/07: transmit TSR-01647-CO; 06/08: transmit TSR-01592-DWG; TSR-01621-DWG&DOCS Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-07 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 2.75 0 finalize dust collector frame for installation and welding onto M-3130. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-08 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 4.75 0 update 2 of 3 posts (west) and update compiled model. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.25 0 search and send cellar/BOP area drawings for 272L to Luis (upcoming TSR) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-08 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 06/05: transmit TSR-01620-CO; TSR-01634-CO; 06/07: transmit TSR-01647-CO; 06/08: transmit TSR-01592-DWG; TSR-01621-DWG&DOCS Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-11 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 1.5 0 updated PDF/concept model package to send to Sakhalin for drafting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-11 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 0.75 0 updated winch drawing to reflect comments from site. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Autodesk AEC Suite installation; CAD administrative tasks; customization of new 2019 software. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-11 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 06/08: transmit TSR-01649-CTR; TSR-01584-DWG; 06/15: transmit TSR-01592-CTR; TSR-01643-CTR; TSR-01635-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-11 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly teleconference with Sakhalin regarding TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 modeled condensate lines for DM and built the haunch for PBM on 209L Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Autodesk AEC Suite installation; CAD administrative tasks; customization of new 2019 software. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-13 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Autodesk AEC Suite installation; CAD administrative tasks; customization of new 2019 software. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-15 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 06/08: transmit TSR-01649-CTR; TSR-01584-DWG; 06/15: transmit TSR-01592-CTR; TSR-01643-CTR; TSR-01635-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-15 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1.5 0 condensate red lines: updating Keppel AmFels' drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 06/18: timesheets to payroll 06/21: troubleshoot 2019 Autodesk AEC license issues Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-18 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.25 0 file incoming TSR's and reserve/assign TSR numbers 06/22: transmit TSR-01592-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-18 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly conference calls to Sakhalin regarding TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-18 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 6.5 0 condensate red lines for Keppel AmFels Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-19 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.25 0 file incoming TSR's and reserve/assign TSR numbers 06/22: transmit TSR-01592-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-19 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 3.75 0 condensate red lines for Keppel AmFels Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-19 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 4 0 created drawing package for DM and PBM showing origin datum and CG's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 06/20: meeting regarding mid-year goals and development. 06/21: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-20 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 4.5 0 condensate red lines for Keppel AmFels Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-20 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 2.5 0 created drawing package for DM and PBM showing origin datum and CG's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 06/20: meeting regarding mid-year goals and development. 06/21: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 06/21: convert Minkit model to OBJ file (client request); find old 209L CAD files. 06/22: model concept of production line protection shed for 209L Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 06/18: timesheets to payroll 06/21: troubleshoot 2019 Autodesk AEC license issues Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-21 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2 0 condensate red lines for Keppel AmFels Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 06/21: convert Minkit model to OBJ file (client request); find old 209L CAD files. 06/22: model concept of production line protection shed for 209L Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 06/18: timesheets to payroll 06/21: troubleshoot 2019 Autodesk AEC license issues Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-22 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 file incoming TSR's and reserve/assign TSR numbers 06/22: transmit TSR-01592-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-22 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.25 0 condensate red lines for Keppel AmFels Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.25 0 troubleshoot license issues and continue drafting standards and templates. 06/29: online timesheets for ProjXsense and timesheets to Payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 06/25: process incoming TSR for 216L spreader beam 06/27: transmit TSR-01602-CO; assign TSR numbers 06/28: transmit TSR-01634-CO; TSR-01617-CO; assign 262L dwg numbers. 06/29: transmit TSR-01643-CO; process incoming TSR. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-25 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin conference call for TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-25 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 4 0 06/25&26: create CG drawings from Genesis' reports. 06/26: create CG drawing for PBM option 2 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 troubleshoot license issues and continue drafting standards and templates. 06/29: online timesheets for ProjXsense and timesheets to Payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-26 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2 0 create and edit closeout documentation for TSR-01602. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-26 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 4 0 06/25&26: create CG drawings from Genesis' reports. 06/26: create CG drawing for PBM option 2 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 06/25: process incoming TSR for 216L spreader beam 06/27: transmit TSR-01602-CO; assign TSR numbers 06/28: transmit TSR-01634-CO; TSR-01617-CO; assign 262L dwg numbers. 06/29: transmit TSR-01643-CO; process incoming TSR. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-27 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2 0 create and edit closeout documentation for TSR-01602. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-27 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 4.5 0 06/25&26: create CG drawings from Genesis' reports. 06/26: create CG drawing for PBM option 2 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 troubleshoot license issues and continue drafting standards and templates. 06/29: online timesheets for ProjXsense and timesheets to Payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 06/25: process incoming TSR for 216L spreader beam 06/27: transmit TSR-01602-CO; assign TSR numbers 06/28: transmit TSR-01634-CO; TSR-01617-CO; assign 262L dwg numbers. 06/29: transmit TSR-01643-CO; process incoming TSR. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 troubleshoot license issues and continue drafting standards and templates. 06/29: online timesheets for ProjXsense and timesheets to Payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-29 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 06/25: process incoming TSR for 216L spreader beam 06/27: transmit TSR-01602-CO; assign TSR numbers 06/28: transmit TSR-01634-CO; TSR-01617-CO; assign 262L dwg numbers. 06/29: transmit TSR-01643-CO; process incoming TSR. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 07/02: TSR board update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.25 0 AutoCAD piping standards and templates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 2.25 0 07/02: transmit 77B SEMS drawing package. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-02 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Sakhalin weekly update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-03 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Independence Day Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 AutoCAD piping standards and templates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-06 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 4 0 Rig 269 on KM10 plot plan hand sketch Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 07/09: TSR board meeting update 07/12: Tech Services TSR update meeting (extended with Greg's Technology moment) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 07/09: update TSR board. AutoCAD updates 07/11: AutoCAD drafting handbook updates and timesheets for ProjXsense and to Payroll 07/12-07/13: install AutoCAD and update Solidworks on James' computer Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-09 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 07/09: Lunch and Learn with RTC submarine cable and Tetra Tech. 07/10: site visit to WOM's 3 facilities Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-09 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 07/09: weekly Sakhalin conference call TSR update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-10 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 2 0 updated drawings for rig 269 on KM10 plot plan per Mat Ellis and Paul Sercy Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-10 OH-014 :OH-014 Overhead All Activities Regular Pay N 6 0 07/09: Lunch and Learn with RTC submarine cable and Tetra Tech. 07/10: site visit to WOM's 3 facilities Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 07/09: update TSR board. AutoCAD updates 07/11: AutoCAD drafting handbook updates and timesheets for ProjXsense and to Payroll 07/12-07/13: install AutoCAD and update Solidworks on James' computer Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-11 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 4 0 updated drawings for rig 269 on KM10 plot plan per Mat Ellis and Paul Sercy Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 07/09: TSR board meeting update 07/12: Tech Services TSR update meeting (extended with Greg's Technology moment) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 07/09: update TSR board. AutoCAD updates 07/11: AutoCAD drafting handbook updates and timesheets for ProjXsense and to Payroll 07/12-07/13: install AutoCAD and update Solidworks on James' computer Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-12 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 4 0 update bell nipple pan for LeRoy Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.25 0 07/09: update TSR board. AutoCAD updates 07/11: AutoCAD drafting handbook updates and timesheets for ProjXsense and to Payroll 07/12-07/13: install AutoCAD and update Solidworks on James' computer Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-13 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 07/13: transmit TSR-01651-RFI Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-13 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 update Keppel AmFEL's drawings to rev 3 and picked up red lines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 07/16: TSR board update meeting. 07/19: meeting with Tyler Cook regarding 2M-TEK red lines; farewell lunch with HTSG for Jackie's farewell. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-16 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3.25 0 07/16-07/17: P01383-107L/247L drawings scrubbed and sent to Rana & Mat. plot and site plans for 258L for George Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 07/16: process incoming TSR-01656-209L heating trace panels, and transmittals from Sakhalin. 07/17: transmit TSR-01659-DWG 07/18: transmit TSR-01649-CO 07/19: transmit TSR-01662-CTR; TSR-01651-CTR; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-16 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly TSR update teleconference meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-16 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 4 0 update choke manifold drawings with red lines from site. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-17 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 4 0 07/16-07/17: P01383-107L/247L drawings scrubbed and sent to Rana & Mat. plot and site plans for 258L for George Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-17 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2 0 update 15B drawing of bell nipple skirt/pan for LeRoy. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 07/16: process incoming TSR-01656-209L heating trace panels, and transmittals from Sakhalin. 07/17: transmit TSR-01659-DWG 07/18: transmit TSR-01649-CO 07/19: transmit TSR-01662-CTR; TSR-01651-CTR; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-17 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 4 0 update choke manifold drawings with red lines from site. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 4.5 0 07/18: assist with installation of Simlab Composer (3D PDF software) 07/18-07/20: Solidworks CAD Standardization in preparation for 2m-Tek red lines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-18 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 4 0 07/16-07/17: P01383-107L/247L drawings scrubbed and sent to Rana & Mat. plot and site plans for 258L for George Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-18 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 07/16: process incoming TSR-01656-209L heating trace panels, and transmittals from Sakhalin. 07/17: transmit TSR-01659-DWG 07/18: transmit TSR-01649-CO 07/19: transmit TSR-01662-CTR; TSR-01651-CTR; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 07/16: TSR board update meeting. 07/19: meeting with Tyler Cook regarding 2M-TEK red lines; farewell lunch with HTSG for Jackie's farewell. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 07/18: assist with installation of Simlab Composer (3D PDF software) 07/18-07/20: Solidworks CAD Standardization in preparation for 2m-Tek red lines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-19 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 07/16: process incoming TSR-01656-209L heating trace panels, and transmittals from Sakhalin. 07/17: transmit TSR-01659-DWG 07/18: transmit TSR-01649-CO 07/19: transmit TSR-01662-CTR; TSR-01651-CTR; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 4.25 0 07/18: assist with installation of Simlab Composer (3D PDF software) 07/18-07/20: Solidworks CAD Standardization in preparation for 2m-Tek red lines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2.5 0 Plot plan updates and gathering information for brochure updates for Nancy Ngo Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-20 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 2 0 updated 77B's safety plan per Mike Defelice. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-23 2M-TEK :2M-TEK -OH-001 Gen. Dept. Engineering Regular Pay N 4 0 Standardizing Parker title blocks and annotations on Solidworks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 07/23: TSR board update meeting. 07/25: lunch & learn with NOV RT Welldata; 249L meeting 07/26: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 Final red lines for rig brochures Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 07/23: process new TSR for 249 top drive study.; transmit TSR-01656-CTR 07/26: transmit TSR-0658-CTR; TSR-01639--DWGS 07/27: transmit TSR-01649-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-23 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 07/23: weekly TSR updated teleconference meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-24 2M-TEK :2M-TEK -OH-001 Gen. Dept. Engineering Regular Pay N 4 0 Standardizing Parker title blocks and annotations on Solidworks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2.5 0 Final red lines for rig brochures Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-24 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 4 0 07/23: gather rig drawing for tender proposal P-01384 07/26: creating and laying out 249L's mast and studying 257L's Cargo 4S top drive. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-25 2M-TEK :2M-TEK -OH-001 Gen. Dept. Engineering Regular Pay N 4 0 Standardizing Parker title blocks and annotations on Solidworks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 07/23: TSR board update meeting. 07/25: lunch & learn with NOV RT Welldata; 249L meeting 07/26: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-25 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3 0 07/23: gather rig drawing for tender proposal P-01384 07/26: creating and laying out 249L's mast and studying 257L's Cargo 4S top drive. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-26 2M-TEK :2M-TEK -OH-001 Gen. Dept. Engineering Regular Pay N 1.75 0 Standardizing Parker title blocks and annotations on Solidworks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 07/23: TSR board update meeting. 07/25: lunch & learn with NOV RT Welldata; 249L meeting 07/26: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-26 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 6 0 07/23: gather rig drawing for tender proposal P-01384 07/26: creating and laying out 249L's mast and studying 257L's Cargo 4S top drive. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.75 0 07/23: process new TSR for 249 top drive study.; transmit TSR-01656-CTR 07/26: transmit TSR-0658-CTR; TSR-01639--DWGS 07/27: transmit TSR-01649-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 07/27: timesheets online and to payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 07/23: process new TSR for 249 top drive study.; transmit TSR-01656-CTR 07/26: transmit TSR-0658-CTR; TSR-01639--DWGS 07/27: transmit TSR-01649-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-27 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 6 0 Update piping isometric for choke manifold Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-30 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.75 0 updating drawing sheets per red lines from Tyler Cook. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 07/30: TSR board update meeting. 07/31: Summer Intern Close-Out Presentation. 08/02: weekly TSR meeting update; Q2 '18 Quarterly update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.75 0 search for window seal detail from PKD rig fleet. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 07/30: send Genesis files; create/send PDF to Exxon for DSM/PB heights. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-30 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 07/30: transmit TSR-01636-CTR 08/01: transmit TSR-01572-DWG 08/02: transmit TSR-01660-TSR; TSR-01572-DWG; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-30 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 07/30: weekly TSR update teleconference meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-30 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 6 0 07/30: update isometric drawings 08/02: added project table onto drawings per ENL/Mihovil's request. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-31 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 4 0 updating drawing sheets per red lines from Tyler Cook. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-31 2M-TEK :2M-TEK -OH-001 Gen. Dept. Engineering Regular Pay N 4.5 0 setting standard templates for BOM, blocks, annotations, etc. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 07/30: TSR board update meeting. 07/31: Summer Intern Close-Out Presentation. 08/02: weekly TSR meeting update; Q2 '18 Quarterly update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-01 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5.5 0 updating drawing sheets per red lines from Tyler Cook. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-01 2M-TEK :2M-TEK -OH-001 Gen. Dept. Engineering Regular Pay N 1.5 0 setting standard templates for BOM, blocks, annotations, etc. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-01 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1.5 0 find/calculate total weight of existing top drive rails on 249L Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 07/30: transmit TSR-01636-CTR 08/01: transmit TSR-01572-DWG 08/02: transmit TSR-01660-TSR; TSR-01572-DWG; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-02 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 3 0 updating drawing sheets per red lines from Tyler Cook. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 07/30: TSR board update meeting. 07/31: Summer Intern Close-Out Presentation. 08/02: weekly TSR meeting update; Q2 '18 Quarterly update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 07/30: transmit TSR-01636-CTR 08/01: transmit TSR-01572-DWG 08/02: transmit TSR-01660-TSR; TSR-01572-DWG; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-02 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 07/30: update isometric drawings 08/02: added project table onto drawings per ENL/Mihovil's request. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-03 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-06 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.25 0 standardizing complete set of test frame drawings; picking up red-lines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board meeting. 08/07: meeting regarding MOC process. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 08/06: added BD for Argentina on ProjXsense 08/07: ProjXsense admin tasks 08/10: timesheets for ProjXsense and to pay roll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 08/08: transmit TSR-01635-DWG; TSR-01662:CO; MOC drawing 08/06: transmit TSR-01660-CTR 08/10: transmit TSR-01636-CO; process incoming TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-06 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly teleconference call meeting for TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-07 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.75 0 standardizing complete set of test frame drawings; picking up red-lines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting. 08/07: meeting regarding MOC process. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 08/06: added BD for Argentina on ProjXsense 08/07: ProjXsense admin tasks 08/10: timesheets for ProjXsense and to pay roll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-08 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 6.75 0 standardizing complete set of test frame drawings; picking up red-lines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board meeting. 08/07: meeting regarding MOC process. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-08 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 08/08: transmit TSR-01635-DWG; TSR-01662:CO; MOC drawing 08/06: transmit TSR-01660-CTR 08/10: transmit TSR-01636-CO; process incoming TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-08 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1.25 0 update drawing with red-lines and RFI from site. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-09 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 standardizing complete set of test frame drawings; picking up red-lines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-09 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 lunch and learn with HDI Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-10 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 4.75 0 standardizing complete set of test frame drawings; picking up red-lines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 08/06: added BD for Argentina on ProjXsense 08/07: ProjXsense admin tasks 08/10: timesheets for ProjXsense and to pay roll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-10 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.75 0 08/08: transmit TSR-01635-DWG; TSR-01662:CO; MOC drawing 08/06: transmit TSR-01660-CTR 08/10: transmit TSR-01636-CO; process incoming TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-13 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.5 0 finalize red-lines from 2M-Tek Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 08/13: TSR update board meeting. 08/16: TSR weekly update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheets to payroll and ProjxSense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-13 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-14 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 6.5 0 finalize red-lines from 2M-Tek Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-14 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1 0 converted PDF file; lay-otut matting board plans Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-14 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 lunch & learn with Loadmaster Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-15 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 4.25 0 finalize red-lines from 2M-Tek Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-15 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 08/15: compile hours charged on ProjXSense for 2M-Tek hours. 08/16: transmit: TSR-01644-CO 08/17: add Holly to ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-15 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 3 0 create CG drawings for 209's DSM module additions. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-16 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 6 0 finalize red-lines from 2M-Tek Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 08/13: TSR update board meeting. 08/16: TSR weekly update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-16 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1.5 0 converted PDF file; lay-otut matting board plans Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 08/15: compile hours charged on ProjXSense for 2M-Tek hours. 08/16: transmit: TSR-01644-CO 08/17: add Holly to ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-17 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 3.25 0 finalize red-lines from 2M-Tek Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-17 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 08/15: compile hours charged on ProjXSense for 2M-Tek hours. 08/16: transmit: TSR-01644-CO 08/17: add Holly to ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-20 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 6 0 2M-Tek TSCM red lines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 08/20: general TSR board meeting 08/21: TSR weekly meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 08/20: troubleshoot AutoCAD license server (down) 08/23: timesheets for 2M-Tek hours; Solidworks standardization; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-20 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 08/20: transmit TSR-01656-CO 08/21: transmit TSR-01643-CO 08/22: transmit TSR-01633-CO 08/23: transmit TSR-01621-DWG; TSR-01653-TSR; TSR-01657-CTR 08/24: transmit TSR-01655-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-20 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly teleconference call with Sakhalin for TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-21 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 2M-Tek TSCM red lines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-21 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 08/20: transmit TSR-01656-CO 08/21: transmit TSR-01643-CO 08/22: transmit TSR-01633-CO 08/23: transmit TSR-01621-DWG; TSR-01653-TSR; TSR-01657-CTR 08/24: transmit TSR-01655-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-22 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 2M-Tek TSCM red lines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-22 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 08/20: transmit TSR-01656-CO 08/21: transmit TSR-01643-CO 08/22: transmit TSR-01633-CO 08/23: transmit TSR-01621-DWG; TSR-01653-TSR; TSR-01657-CTR 08/24: transmit TSR-01655-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-23 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1.5 0 2M-Tek TSCM red lines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 08/20: general TSR board meeting 08/21: TSR weekly meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 08/20: troubleshoot AutoCAD license server (down) 08/23: timesheets for 2M-Tek hours; Solidworks standardization; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 08/20: transmit TSR-01656-CO 08/21: transmit TSR-01643-CO 08/22: transmit TSR-01633-CO 08/23: transmit TSR-01621-DWG; TSR-01653-TSR; TSR-01657-CTR 08/24: transmit TSR-01655-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 08/24: compiling TDS-11 CAD drawings and data. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 08/20: troubleshoot AutoCAD license server (down) 08/23: timesheets for 2M-Tek hours; Solidworks standardization; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-24 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 08/20: transmit TSR-01656-CO 08/21: transmit TSR-01643-CO 08/22: transmit TSR-01633-CO 08/23: transmit TSR-01621-DWG; TSR-01653-TSR; TSR-01657-CTR 08/24: transmit TSR-01655-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.75 0 daily: CAD administration and SMART goals. 08/27: timesheets to payroll and ProjXsense; 08/31: Hightail items to Genesis Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.75 0 08/27: transfer 2M-TEK test frame drawings to their network drive; Projxsense updates for Holly 08/28: process incoming TSR-01666 08/29: transmit TSR-01657-CO 08/30: TSR dwg register updates; project hour dump for Emanuel. 08/31: transmit TSR-01596-CTR&CO; TSR-01603-D&A; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-27 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly teleconference call with Sakhalin Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 daily: CAD administration and SMART goals. 08/27: timesheets to payroll and ProjXsense; 08/31: Hightail items to Genesis Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 08/27: transfer 2M-TEK test frame drawings to their network drive; Projxsense updates for Holly 08/28: process incoming TSR-01666 08/29: transmit TSR-01657-CO 08/30: TSR dwg register updates; project hour dump for Emanuel. 08/31: transmit TSR-01596-CTR&CO; TSR-01603-D&A; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-29 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 08/29: look for personnel tie-off pad eye for Ralph. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.25 0 daily: CAD administration and SMART goals. 08/27: timesheets to payroll and ProjXsense; 08/31: Hightail items to Genesis Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-29 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 08/27: transfer 2M-TEK test frame drawings to their network drive; Projxsense updates for Holly 08/28: process incoming TSR-01666 08/29: transmit TSR-01657-CO 08/30: TSR dwg register updates; project hour dump for Emanuel. 08/31: transmit TSR-01596-CTR&CO; TSR-01603-D&A; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.5 0 daily: CAD administration and SMART goals. 08/27: timesheets to payroll and ProjXsense; 08/31: Hightail items to Genesis Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-30 OH-013 :OH-013 Overhead All Activities Regular Pay N 2.5 0 08/27: transfer 2M-TEK test frame drawings to their network drive; Projxsense updates for Holly 08/28: process incoming TSR-01666 08/29: transmit TSR-01657-CO 08/30: TSR dwg register updates; project hour dump for Emanuel. 08/31: transmit TSR-01596-CTR&CO; TSR-01603-D&A; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-30 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 CyberSecurity training from IT Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 daily: CAD administration and SMART goals. 08/27: timesheets to payroll and ProjXsense; 08/31: Hightail items to Genesis Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-08-31 OH-013 :OH-013 Overhead All Activities Regular Pay N 2.25 0 08/27: transfer 2M-TEK test frame drawings to their network drive; Projxsense updates for Holly 08/28: process incoming TSR-01666 08/29: transmit TSR-01657-CO 08/30: TSR dwg register updates; project hour dump for Emanuel. 08/31: transmit TSR-01596-CTR&CO; TSR-01603-D&A; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 09/03: TSR board updates 09/06: TSR weekly meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 daily: CAD admin tasks and SMART goals 09/07: timesheets to payroll and online ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-03 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 09/03&04: change timekeeping system for Holly 09/05: transmit TSR-01642-CTR 09/07: transmit TSR-01666-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-03 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly teleconference call with Sakhalin Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 daily: CAD admin tasks and SMART goals 09/07: timesheets to payroll and online ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-04 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 09/03&04: change timekeeping system for Holly 09/05: transmit TSR-01642-CTR 09/07: transmit TSR-01666-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 09/04: 09/05: update/scrub CIP house drawing; identify DM outrigger drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.25 0 daily: CAD admin tasks and SMART goals 09/07: timesheets to payroll and online ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-05 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 09/03&04: change timekeeping system for Holly 09/05: transmit TSR-01642-CTR 09/07: transmit TSR-01666-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 09/03: TSR board updates 09/06: TSR weekly meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 daily: CAD admin tasks and SMART goals 09/07: timesheets to payroll and online ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.25 0 daily: CAD admin tasks and SMART goals 09/07: timesheets to payroll and online ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-07 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 09/03&04: change timekeeping system for Holly 09/05: transmit TSR-01642-CTR 09/07: transmit TSR-01666-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 daily: CAD standardization for Autodesk products and Solidworks. 09/11: PKD drawings standards to Genesis. Search for TDS-11, bx-elevators, and bails for AJ 09/14: timesheets on ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-10 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 09/10: transmit TSR-01658-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-10 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin teleconference call-in meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 daily: CAD standardization for Autodesk products and Solidworks. 09/11: PKD drawings standards to Genesis. Search for TDS-11, bx-elevators, and bails for AJ 09/14: timesheets on ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-11 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 09/11: Annual Compliance Training. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 daily: CAD standardization for Autodesk products and Solidworks. 09/11: PKD drawings standards to Genesis. Search for TDS-11, bx-elevators, and bails for AJ 09/14: timesheets on ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-12 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 2 0 back porch mast raising sheave pin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-12 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 4 0 choke manifold drawing update request from George for rig 264L/265L. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 09/13: Technical Services TSR weekly meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 daily: CAD standardization for Autodesk products and Solidworks. 09/11: PKD drawings standards to Genesis. Search for TDS-11, bx-elevators, and bails for AJ 09/14: timesheets on ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-13 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 1 0 back porch mast raising sheave pin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-14 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 2.25 0 model substructure of Holly Platform from Dreco PDF manual. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 convert base oil offloading skid drawing to STEP model file, as requested per Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 daily: CAD standardization for Autodesk products and Solidworks. 09/11: PKD drawings standards to Genesis. Search for TDS-11, bx-elevators, and bails for AJ 09/14: timesheets on ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-14 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 0.5 0 back porch mast raising sheave pin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 4.25 0 09/17: look up information regarding rig 249 Lantec 750 Winches; conversion of CAD to 3D solidworks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-17 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1.25 0 09/17: review and check rig up plan and list potential issues and concerns. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 09/17: transmit TSR-01655-CO 09/18: transmit TSR-01642-RFI Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-17 OH-014 :OH-014 Overhead All Activities Regular Pay N 2.5 0 09/17: traveled to and from Katy to take a respiratory test. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 09/18: teleconference call to discuss tasks and priorities on Holly Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 09/18: troubleshooting and configuring D-size plotter to print job for Bryan Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-18 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 2.25 0 09/17: review and check rig up plan and list potential issues and concerns. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-18 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 09/17: transmit TSR-01655-CO 09/18: transmit TSR-01642-RFI Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-19 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 09/19: travel to Holly Platform 09/20: H2S training and orientation 09/21: begin 3D layout of drilling package on platform 09/22: capturing details of active mud tank first level (north side of drilling package) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-20 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 09/19: travel to Holly Platform 09/20: H2S training and orientation 09/21: begin 3D layout of drilling package on platform 09/22: capturing details of active mud tank first level (north side of drilling package) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-21 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 09/19: travel to Holly Platform 09/20: H2S training and orientation 09/21: begin 3D layout of drilling package on platform 09/22: capturing details of active mud tank first level (north side of drilling package) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-22 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 09/19: travel to Holly Platform 09/20: H2S training and orientation 09/21: begin 3D layout of drilling package on platform 09/22: capturing details of active mud tank first level (north side of drilling package) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-23 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 09/25: flowline trough and integration 09/27: HP mud pump area 09/28: SCR roof Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-24 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 09/25: flowline trough and integration 09/27: HP mud pump area 09/28: SCR roof Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-25 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 09/25: flowline trough and integration 09/27: HP mud pump area 09/28: SCR roof Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-26 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 12 0 09/26: Drawworks disassembly and rigging sketch 09/29: substructure as-built/ mast integration Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-27 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 09/25: flowline trough and integration 09/27: HP mud pump area 09/28: SCR roof Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-28 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 09/25: flowline trough and integration 09/27: HP mud pump area 09/28: SCR roof Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-29 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 12 0 09/26: Drawworks disassembly and rigging sketch 09/29: substructure as-built/ mast integration Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-09-30 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 09/30: mast integration with substructure survey 10/01: HP mud pump area arrangement, piping concept. 10/02: cellar deck area survey, BOP handling concept 10/03: general model update, travel back to Houston. 10/04: general clean-up of data within model 10/05: drawworks console model and MSG vent piping exports to DPR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-01 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 09/30: mast integration with substructure survey 10/01: HP mud pump area arrangement, piping concept. 10/02: cellar deck area survey, BOP handling concept 10/03: general model update, travel back to Houston. 10/04: general clean-up of data within model 10/05: drawworks console model and MSG vent piping exports to DPR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-02 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 09/30: mast integration with substructure survey 10/01: HP mud pump area arrangement, piping concept. 10/02: cellar deck area survey, BOP handling concept 10/03: general model update, travel back to Houston. 10/04: general clean-up of data within model 10/05: drawworks console model and MSG vent piping exports to DPR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-03 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 12 0 09/30: mast integration with substructure survey 10/01: HP mud pump area arrangement, piping concept. 10/02: cellar deck area survey, BOP handling concept 10/03: general model update, travel back to Houston. 10/04: general clean-up of data within model 10/05: drawworks console model and MSG vent piping exports to DPR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-04 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 2.75 0 09/30: mast integration with substructure survey 10/01: HP mud pump area arrangement, piping concept. 10/02: cellar deck area survey, BOP handling concept 10/03: general model update, travel back to Houston. 10/04: general clean-up of data within model 10/05: drawworks console model and MSG vent piping exports to DPR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 10/04: Holly Expense report to AP; help Dave Pascaloff with his expense report 10/05: timesheets and online timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-04 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.75 0 10/04: transmit TSR-01651-RFI; TSR-01603-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-05 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 6.75 0 10/05: drawworks console model and MSG vent piping exports to DPR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 10/04: Holly Expense report to AP; help Dave Pascaloff with his expense report 10/05: timesheets and online timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-08 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 5.25 0 10/08: modeled cantilevered trip tank skid for Holly. 10/09: pulling as-built dimensions from skid (2 hrs); compiling data into model (4 hrs) 10/12: modeled DPR's sketch for HP piping. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 10/08: working with IT to identify the issues with account getting constantly locked out; travel arrangements to New Iberia. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-08 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly teleconference call with Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-09 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 6 0 10/08: modeled cantilevered trip tank skid for Holly. 10/09: pulling as-built dimensions from skid (2 hrs); compiling data into model (4 hrs) 10/12: modeled DPR's sketch for HP piping. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-09 Holly Platform :Holly Platform TSR-01665-HOLP-97 Travel (OH) Regular Pay N 5 0 10/09: travel from Houston to New Iberia 10/11: travel from New Iberia to Houston. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-09 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 10/09: transmit P01364-RFI; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-10 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 7.5 0 10/10: pulling as-built dimensions for pipe rack "center" cantilever deck; HP mud piping from choke manifold to hose. 10/11: photos of 12B's mast (disassembled). Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-10 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 4.5 0 10/10: site visit to 30B to field verify desired winch location, wireline displacement sheave/rollers. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-11 Holly Platform :Holly Platform TSR-01665-HOLP-97 Travel (OH) Regular Pay N 5 0 10/09: travel from Houston to New Iberia 10/11: travel from New Iberia to Houston. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-11 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 3 0 10/10: pulling as-built dimensions for pipe rack "center" cantilever deck; HP mud piping from choke manifold to hose. 10/11: photos of 12B's mast (disassembled). Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-12 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 5.5 0 10/08: modeled cantilevered trip tank skid for Holly. 10/09: pulling as-built dimensions from skid (2 hrs); compiling data into model (4 hrs) 10/12: modeled DPR's sketch for HP piping. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.75 0 10/12: discussion about trip to New Iberia; dumping of data/certificates from 77B Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-12 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 3.75 0 10/15: model of standpipe vibration gussets from Genesis' data. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-15 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4.75 0 10/15: LP mud discharge piping 10/16: standpipe manifold piping; convert PDF to CAD; backstop exports; HP mud piping; LP mud BOM; 10/17: LP mud BOM; mud pump skid as-built/rebuild; CAD to PDF conversions; 10/18: modeled drill line spooler; PDF to CAD conversions; 10/19: modeled standpipe manifold; pedestal crane; HP piping from df to mud dock; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-15 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly teleconference call with Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-15 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 4.25 0 10/15-10/16: standpipe manifold vibration gusset clamp Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-16 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 3.5 0 10/15: LP mud discharge piping 10/16: standpipe manifold piping; convert PDF to CAD; backstop exports; HP mud piping; LP mud BOM; 10/17: LP mud BOM; mud pump skid as-built/rebuild; CAD to PDF conversions; 10/18: modeled drill line spooler; PDF to CAD conversions; 10/19: modeled standpipe manifold; pedestal crane; HP piping from df to mud dock; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 meeting with Chuck, Joshua to discuss deliverables for Holly, involvement with Thomas & Beers Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 daily: process TSR # requests/reservations 10/16: process incoming TSR-01667-BERP choke recertification; 10/17: transmit TSR-01660-CTR; TSR-01655-CTR; 10/18: transmit TSR-01666-CO-R1 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-16 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 4.5 0 10/15-10/16: standpipe manifold vibration gusset clamp Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-17 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 5.75 0 10/15: LP mud discharge piping 10/16: standpipe manifold piping; convert PDF to CAD; backstop exports; HP mud piping; LP mud BOM; 10/17: LP mud BOM; mud pump skid as-built/rebuild; CAD to PDF conversions; 10/18: modeled drill line spooler; PDF to CAD conversions; 10/19: modeled standpipe manifold; pedestal crane; HP piping from df to mud dock; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-17 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1.5 0 10/17-10/18: NCOC model concepts with AADU DM revisions Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.75 0 daily: process TSR # requests/reservations 10/16: process incoming TSR-01667-BERP choke recertification; 10/17: transmit TSR-01660-CTR; TSR-01655-CTR; 10/18: transmit TSR-01666-CO-R1 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-18 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 0.5 0 10/15: LP mud discharge piping 10/16: standpipe manifold piping; convert PDF to CAD; backstop exports; HP mud piping; LP mud BOM; 10/17: LP mud BOM; mud pump skid as-built/rebuild; CAD to PDF conversions; 10/18: modeled drill line spooler; PDF to CAD conversions; 10/19: modeled standpipe manifold; pedestal crane; HP piping from df to mud dock; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-18 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2.5 0 10/17-10/18: NCOC model concepts with AADU DM revisions Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-18 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 daily: process TSR # requests/reservations 10/16: process incoming TSR-01667-BERP choke recertification; 10/17: transmit TSR-01660-CTR; TSR-01655-CTR; 10/18: transmit TSR-01666-CO-R1 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-18 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 4.75 0 10/15-10/16: standpipe manifold vibration gusset clamp Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-19 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 6 0 10/15: LP mud discharge piping 10/16: standpipe manifold piping; convert PDF to CAD; backstop exports; HP mud piping; LP mud BOM; 10/17: LP mud BOM; mud pump skid as-built/rebuild; CAD to PDF conversions; 10/18: modeled drill line spooler; PDF to CAD conversions; 10/19: modeled standpipe manifold; pedestal crane; HP piping from df to mud dock; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-19 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 0.75 0 update model of exhaust piping for Mark. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-19 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1.25 0 10/19: update CG's and weights for rig move. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-22 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 7 0 10/22: update views of HP and LP piping and export views for Chuck's report; created updated 3D pdf for HSE in New Iberia; begin knuckle boom crane model; 10/23: updated LP active suction lines to model; knuckle boom crane modeling from PDF 10/24: model knuckle boom crane F600. 10/25: conference call with Benny regarding cable trays and mud piping; model F600RA with L414 extension arm (knuckle boom crane). 10/26: grating area dimensions; model snaps of knuckle boom crane concept; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 10/22: time sheets online and to payroll. 10/25: weld symbols troubleshooting on James' computer. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-22 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly teleconference call with Sakhalin regarding TSRs Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-22 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 2 0 updated model with new data from Genesis. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-23 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 2 0 10/22: update views of HP and LP piping and export views for Chuck's report; created updated 3D pdf for HSE in New Iberia; begin knuckle boom crane model; 10/23: updated LP active suction lines to model; knuckle boom crane modeling from PDF 10/24: model knuckle boom crane F600. 10/25: conference call with Benny regarding cable trays and mud piping; model F600RA with L414 extension arm (knuckle boom crane). 10/26: grating area dimensions; model snaps of knuckle boom crane concept; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-23 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 3 0 10/23: mast/a-frame shimming and alignment study. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 10/23: transmit TSR-01655-CO-R1 10/25: transmit DWG's for 253L (TD hang-off padeyes). Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-23 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 3.75 0 updated model with new data from Genesis. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-24 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 6 0 10/22: update views of HP and LP piping and export views for Chuck's report; created updated 3D pdf for HSE in New Iberia; begin knuckle boom crane model; 10/23: updated LP active suction lines to model; knuckle boom crane modeling from PDF 10/24: model knuckle boom crane F600. 10/25: conference call with Benny regarding cable trays and mud piping; model F600RA with L414 extension arm (knuckle boom crane). 10/26: grating area dimensions; model snaps of knuckle boom crane concept; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-24 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 3 0 10/23: mast/a-frame shimming and alignment study. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-25 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 6.5 0 10/22: update views of HP and LP piping and export views for Chuck's report; created updated 3D pdf for HSE in New Iberia; begin knuckle boom crane model; 10/23: updated LP active suction lines to model; knuckle boom crane modeling from PDF 10/24: model knuckle boom crane F600. 10/25: conference call with Benny regarding cable trays and mud piping; model F600RA with L414 extension arm (knuckle boom crane). 10/26: grating area dimensions; model snaps of knuckle boom crane concept; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR weekly meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 10/22: time sheets online and to payroll. 10/25: weld symbols troubleshooting on James' computer. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 10/23: transmit TSR-01655-CO-R1 10/25: transmit DWG's for 253L (TD hang-off padeyes). Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-25 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 1 0 modeled mast of 30B from PDF data; exported concept views of where new air winch could go to Perry Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-26 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 3 0 10/22: update views of HP and LP piping and export views for Chuck's report; created updated 3D pdf for HSE in New Iberia; begin knuckle boom crane model; 10/23: updated LP active suction lines to model; knuckle boom crane modeling from PDF 10/24: model knuckle boom crane F600. 10/25: conference call with Benny regarding cable trays and mud piping; model F600RA with L414 extension arm (knuckle boom crane). 10/26: grating area dimensions; model snaps of knuckle boom crane concept; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-10-26 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 5 0 modeled mast of 30B from PDF data; exported concept views of where new air winch could go to Perry Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 On 1/1, New Years Holiday. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-02 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 9 0 On 1/2-1/5, Arctic platform research. Review and provide comments to Kvaerner proposal scope of work. Review draft execution plans with GE and team. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 1/3, review and comment on new draft project equipment procurement standards. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-03 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 5 0 On 1/2-1/5, Arctic platform research. Review and provide comments to Kvaerner proposal scope of work. Review draft execution plans with GE and team. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 1/3, review and comment on new draft project equipment procurement standards. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-04 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 7 0 On 1/2-1/5, Arctic platform research. Review and provide comments to Kvaerner proposal scope of work. Review draft execution plans with GE and team. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 On 1/5, review draft PKD survey report (NOV trip) and MH Wirth comp drive comparison Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 On 1/5, issue PM refresh weekly meetings. Review status with tteam. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-05 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 On 1/2-1/5, Arctic platform research. Review and provide comments to Kvaerner proposal scope of work. Review draft execution plans with GE and team. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 On 1/8, issue 2018 PM refresh mtg invites. On 1/9, PM refresh weekly mtg. Review MH Wirth surveys. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 1/8, weekly TS planning mtg. Review potential rig build advisor for possible TX rig build. On 1/9, review timesheets. On 1/10, review and edit Lambert and Kuehn PDRs. On1/11, TS weekly mtg. Mtg and plan Client owned asset tech docs site and std. TS Forecast mtg. On 1/12, review j. Lambert PDR. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 1/8, weekly Ops call. O&M assessments mtg. On 1/9, support Pluspetrol non-binding offer. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-08 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 On 1/8, consolidate Orlan reference as-builts on Q WIP drive. assemble OFI slides for Client owned asset sharepoint site. On 1/10, plan Delierables list and MDR with J. Lambert. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 On 1/9, review TD rail SOW,AC Top drive SOW, HPU SOW. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 On 1/8, issue 2018 PM refresh mtg invites. On 1/9, PM refresh weekly mtg. Review MH Wirth surveys. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 1/8, weekly TS planning mtg. Review potential rig build advisor for possible TX rig build. On 1/9, review timesheets. On 1/10, review and edit Lambert and Kuehn PDRs. On1/11, TS weekly mtg. Mtg and plan Client owned asset tech docs site and std. TS Forecast mtg. On 1/12, review j. Lambert PDR. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 1/8, weekly Ops call. O&M assessments mtg. On 1/9, support Pluspetrol non-binding offer. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-09 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 On 1/8, consolidate Orlan reference as-builts on Q WIP drive. assemble OFI slides for Client owned asset sharepoint site. On 1/10, plan Delierables list and MDR with J. Lambert. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 On 1/8, weekly TS planning mtg. Review potential rig build advisor for possible TX rig build. On 1/9, review timesheets. On 1/10, review and edit Lambert and Kuehn PDRs. On1/11, TS weekly mtg. Mtg and plan Client owned asset tech docs site and std. TS Forecast mtg. On 1/12, review j. Lambert PDR. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-10 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 On 1/8, consolidate Orlan reference as-builts on Q WIP drive. assemble OFI slides for Client owned asset sharepoint site. On 1/10, plan Delierables list and MDR with J. Lambert. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 On 1/8, weekly TS planning mtg. Review potential rig build advisor for possible TX rig build. On 1/9, review timesheets. On 1/10, review and edit Lambert and Kuehn PDRs. On1/11, TS weekly mtg. Mtg and plan Client owned asset tech docs site and std. TS Forecast mtg. On 1/12, review j. Lambert PDR. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-11 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 On 1/8, consolidate Orlan reference as-builts on Q WIP drive. assemble OFI slides for Client owned asset sharepoint site. On 1/10, plan Delierables list and MDR with J. Lambert. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 1/8, weekly TS planning mtg. Review potential rig build advisor for possible TX rig build. On 1/9, review timesheets. On 1/10, review and edit Lambert and Kuehn PDRs. On1/11, TS weekly mtg. Mtg and plan Client owned asset tech docs site and std. TS Forecast mtg. On 1/12, review j. Lambert PDR. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-12 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 4 0 On 1/12, prep for Husky WRE mtg in St. John's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 1/15, TS Planning mtg, timesheets. On 1/18, PDR revisions. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 1/19, review Orlan nat gas study options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-15 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 On 1/15, Concept study planning w/ J. Lambert. On 1/17, review MDR & Deliverables Lists and review MHWirth conf call actions. On 1/19, Minkit prep slides for Exxon mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-16 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 On 1/16, review Hibernia scopes of work. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 6 0 On 1/16 & 1/17, office closure due to iced roads. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-17 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 On 1/15, Concept study planning w/ J. Lambert. On 1/17, review MDR & Deliverables Lists and review MHWirth conf call actions. On 1/19, Minkit prep slides for Exxon mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 6 0 On 1/16 & 1/17, office closure due to iced roads. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-18 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 On 1/18, PM refresh weekly mtg. On 1/19, PM Refresh bi-weekly report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 1/15, TS Planning mtg, timesheets. On 1/18, PDR revisions. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-19 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 6 0 On 1/18, PM refresh weekly mtg. On 1/19, PM Refresh bi-weekly report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 1/19, review Orlan nat gas study options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-22 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 On 1/22, review Top Drive quotes and provide comments. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-22 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 On 1/22, prep for PM refresh mtgs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 1/22, approve timesheets and update cost report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-22 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 2 0 On 1/24, 1/25 prepare slides for WRE pre-Tender presentation to Husky. On 1/26, prepare slides with team and present to Husky in St. John's for pre-Tender phase. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-22 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 On 1/22 and 1/24, coordinate with Engineers to research nat gas gensets in the industry. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-23 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 0.5 0 On 1/22 and 1/24, coordinate with Engineers to research nat gas gensets in the industry. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-23 OH-010 :OH-010 Overhead All Activities Regular Pay N 8 0 On 1/22 and 1/26, round trip travel Houston to St. John's for Husky Pre-Tender presentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-24 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 8 0 On 1/24, 1/25 prepare slides for WRE pre-Tender presentation to Husky. On 1/26, prepare slides with team and present to Husky in St. John's for pre-Tender phase. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-24 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 On 1/22 and 1/24, coordinate with Engineers to research nat gas gensets in the industry. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-25 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 8 0 On 1/24, 1/25 prepare slides for WRE pre-Tender presentation to Husky. On 1/26, prepare slides with team and present to Husky in St. John's for pre-Tender phase. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-26 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 8 0 On 1/24, 1/25 prepare slides for WRE pre-Tender presentation to Husky. On 1/26, prepare slides with team and present to Husky in St. John's for pre-Tender phase. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-26 OH-010 :OH-010 Overhead All Activities Regular Pay N 7.5 0 On 1/22 and 1/26, round trip travel Houston to St. John's for Husky Pre-Tender presentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 1/29, weekly ops mtg. On 1/30, review PDRs. On 1/31, review asset numbering process with Ops and QHSE. On 2/1, projects summary histogram. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-29 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 3 0 On 1/29, Huksy presentation debrief. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-29 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 On 1/29, MInkit mtg prep. On 1/30, meeting at XOM office for Minkit. On 1/31, Minkit BOD. On 2/1, Minkit Basis of Design review. On 2/2, additional Minkit prep. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 1/29, weekly ops mtg. On 1/30, review PDRs. On 1/31, review asset numbering process with Ops and QHSE. On 2/1, projects summary histogram. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-30 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 On 1/29, MInkit mtg prep. On 1/30, meeting at XOM office for Minkit. On 1/31, Minkit BOD. On 2/1, Minkit Basis of Design review. On 2/2, additional Minkit prep. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 1/29, weekly ops mtg. On 1/30, review PDRs. On 1/31, review asset numbering process with Ops and QHSE. On 2/1, projects summary histogram. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-31 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 6 0 On 1/29, MInkit mtg prep. On 1/30, meeting at XOM office for Minkit. On 1/31, Minkit BOD. On 2/1, Minkit Basis of Design review. On 2/2, additional Minkit prep. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 1/29, weekly ops mtg. On 1/30, review PDRs. On 1/31, review asset numbering process with Ops and QHSE. On 2/1, projects summary histogram. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-01 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 On 1/29, MInkit mtg prep. On 1/30, meeting at XOM office for Minkit. On 1/31, Minkit BOD. On 2/1, Minkit Basis of Design review. On 2/2, additional Minkit prep. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-01 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 6 0 On 2/1 and 2/2, prepare Kickoff BOD slides subsea cable and rig comparison. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-02 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 On 1/29, MInkit mtg prep. On 1/30, meeting at XOM office for Minkit. On 1/31, Minkit BOD. On 2/1, Minkit Basis of Design review. On 2/2, additional Minkit prep. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-02 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 4 0 On 2/1 and 2/2, prepare Kickoff BOD slides subsea cable and rig comparison. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 2/5, timesheets. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-05 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 On 2/5-2/9, prep for and attend Minkit meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-05 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 4 0 On 2/5, 2/6, prepare BOD presentation slides. On 2/7, meet with Kvaerner to prepare consolidated kickoff slides. On 2/8, attend Kickoff workshop and present BOD slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-06 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 On 2/5-2/9, prep for and attend Minkit meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-06 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 4 0 On 2/5, 2/6, prepare BOD presentation slides. On 2/7, meet with Kvaerner to prepare consolidated kickoff slides. On 2/8, attend Kickoff workshop and present BOD slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-07 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 6 0 On 2/5-2/9, prep for and attend Minkit meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-07 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 2 0 On 2/5, 2/6, prepare BOD presentation slides. On 2/7, meet with Kvaerner to prepare consolidated kickoff slides. On 2/8, attend Kickoff workshop and present BOD slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-08 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 6 0 On 2/5-2/9, prep for and attend Minkit meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-08 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 4 0 On 2/5, 2/6, prepare BOD presentation slides. On 2/7, meet with Kvaerner to prepare consolidated kickoff slides. On 2/8, attend Kickoff workshop and present BOD slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-09 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 8 0 On 2/5-2/9, prep for and attend Minkit meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 2/12, timesheets, weekly mtg and ops conf call. On 2/15, weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-12 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/12-2/16, continue BOD template and entries into BOD. Guide Minkit team formation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 On 2/12-2/16, continue BOD template and entries into BOD. On 2/13, XOM conf call update. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-13 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/12-2/16, continue BOD template and entries into BOD. Guide Minkit team formation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-13 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 2/12-2/16, continue BOD template and entries into BOD. On 2/13, XOM conf call update. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-14 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 On 2/14-2/16, PM review mtg, bi-weekly report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-14 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/12-2/16, continue BOD template and entries into BOD. Guide Minkit team formation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 2/12-2/16, continue BOD template and entries into BOD. On 2/13, XOM conf call update. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-15 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 On 2/14-2/16, PM review mtg, bi-weekly report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 2/12, timesheets, weekly mtg and ops conf call. On 2/15, weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-15 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/12-2/16, continue BOD template and entries into BOD. Guide Minkit team formation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-15 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 2/12-2/16, continue BOD template and entries into BOD. On 2/13, XOM conf call update. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-16 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 On 2/14-2/16, PM review mtg, bi-weekly report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-16 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/12-2/16, continue BOD template and entries into BOD. Guide Minkit team formation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-16 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 On 2/12-2/16, continue BOD template and entries into BOD. On 2/13, XOM conf call update. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 On 2/19, president's Day Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-20 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 On 2/02, 2/21, weekly PM refresh meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 2/20, timesheets Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-20 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/20-2/23, support and review BOD Deliverable. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 2/20-2/23, support and review BOD Deliverable. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-21 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 On 2/02, 2/21, weekly PM refresh meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-21 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/20-2/23, support and review BOD Deliverable. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 2/20-2/23, support and review BOD Deliverable. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/20-2/23, support and review BOD Deliverable. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 8 0 On 2/20-2/23, support and review BOD Deliverable. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/20-2/23, support and review BOD Deliverable. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 On 2/20-2/23, support and review BOD Deliverable. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 2/26, timesheet approvals, weekly TS planning mtg. On 3/1, provide final TS forecast comments for personnel. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 2/26, weekly Ops mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 6 0 On 2/26-3/2, present at Project Sponsor mtg. Attend KV weekly mtg. Review and comment BODs and 3D GAs. Review and edit KV Simple Engineering t's and c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-27 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 On 2/27, attend weekly PM refresh mtg. on 3/2, issue bi-weekly PM refresh report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/26-3/2, review and edit 3d GA's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 2/26-3/2, present at Project Sponsor mtg. Attend KV weekly mtg. Review and comment BODs and 3D GAs. Review and edit KV Simple Engineering t's and c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/26-3/2, review and edit 3d GA's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 8 0 On 2/26-3/2, present at Project Sponsor mtg. Attend KV weekly mtg. Review and comment BODs and 3D GAs. Review and edit KV Simple Engineering t's and c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 On 3/1, review TD recommendation slides and provide comments/edits. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 2/26, timesheet approvals, weekly TS planning mtg. On 3/1, provide final TS forecast comments for personnel. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/26-3/2, review and edit 3d GA's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 2/26-3/2, present at Project Sponsor mtg. Attend KV weekly mtg. Review and comment BODs and 3D GAs. Review and edit KV Simple Engineering t's and c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 On 2/27, attend weekly PM refresh mtg. on 3/2, issue bi-weekly PM refresh report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-02 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/26-3/2, review and edit 3d GA's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 On 2/26-3/2, present at Project Sponsor mtg. Attend KV weekly mtg. Review and comment BODs and 3D GAs. Review and edit KV Simple Engineering t's and c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 On 3/5, weekly Ops mtg and weekly TS planning mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 3/5, timesheets and forecast mtg. On 3/9, HR mtg for J. Lambert promotion. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-05 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 On 3/5, 3/6, 3/7, review Holly Scope of Work document and provide comments. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/5-3/9, review 3d block GAs, Electrical philosophy slides and include KV comments into Execution slides, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 On 3/5-3/9, support KV t's and c's alignment, comment on BOD, review Electrical philosophy slides, include KV comments into Execution slides, assemble Kfels bulk $/ton rates for CAPEX Deliverable. Attend concept study conference calls. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 On 3/6, 3/7, PM review weekly mtgs (PKD and HMDC). Review Maintenance plan quality collection content with asset mgt. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 3/5, timesheets and forecast mtg. On 3/9, HR mtg for J. Lambert promotion. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-06 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2 0 On 3/5, 3/6, 3/7, review Holly Scope of Work document and provide comments. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/5-3/9, review 3d block GAs, Electrical philosophy slides and include KV comments into Execution slides, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 On 3/5-3/9, support KV t's and c's alignment, comment on BOD, review Electrical philosophy slides, include KV comments into Execution slides, assemble Kfels bulk $/ton rates for CAPEX Deliverable. Attend concept study conference calls. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 On 3/6, 3/7, PM review weekly mtgs (PKD and HMDC). Review Maintenance plan quality collection content with asset mgt. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-07 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2 0 On 3/5, 3/6, 3/7, review Holly Scope of Work document and provide comments. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-07 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/5-3/9, review 3d block GAs, Electrical philosophy slides and include KV comments into Execution slides, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-07 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 On 3/5-3/9, support KV t's and c's alignment, comment on BOD, review Electrical philosophy slides, include KV comments into Execution slides, assemble Kfels bulk $/ton rates for CAPEX Deliverable. Attend concept study conference calls. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/5-3/9, review 3d block GAs, Electrical philosophy slides and include KV comments into Execution slides, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 3/5-3/9, support KV t's and c's alignment, comment on BOD, review Electrical philosophy slides, include KV comments into Execution slides, assemble Kfels bulk $/ton rates for CAPEX Deliverable. Attend concept study conference calls. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 3/5, timesheets and forecast mtg. On 3/9, HR mtg for J. Lambert promotion. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-09 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/5-3/9, review 3d block GAs, Electrical philosophy slides and include KV comments into Execution slides, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-09 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 On 3/5-3/9, support KV t's and c's alignment, comment on BOD, review Electrical philosophy slides, include KV comments into Execution slides, assemble Kfels bulk $/ton rates for CAPEX Deliverable. Attend concept study conference calls. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On weekly Ops conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/12 and 3/13, support Concept Study CAPEX estimate Deliverable. On 3/14, support Concept development. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 6 0 On 3/12 and 3/13, support Concept Study CAPEX estimate Deliverable. On 3/14, attend Kvaerner weekly mtg and provide recommended actions. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/12 and 3/13, support Concept Study CAPEX estimate Deliverable. On 3/14, support Concept development. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 3/12 and 3/13, support Concept Study CAPEX estimate Deliverable. On 3/14, attend Kvaerner weekly mtg and provide recommended actions. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 On 3/14-3/16, Spring break PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/12 and 3/13, support Concept Study CAPEX estimate Deliverable. On 3/14, support Concept development. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 On 3/12 and 3/13, support Concept Study CAPEX estimate Deliverable. On 3/14, attend Kvaerner weekly mtg and provide recommended actions. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 3/14-3/16, Spring break PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 3/14-3/16, Spring break PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-19 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 On 3/19, 3/20, bi-weekly report and issue hold on PM refresh project. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 3/19, timesheets. On 3/22, TS weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 3/19, weekly ops mtg. On 3/20, Conf call for KOC SLB opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 On 3/19-3/23, Minkit CAPEX estimates, OPEX estimate, XOM conf calls, KV conf calls, KV PO t's & c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-20 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 On 3/19, 3/20, bi-weekly report and issue hold on PM refresh project. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 3/19, weekly ops mtg. On 3/20, Conf call for KOC SLB opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 On 3/19-3/23, Minkit CAPEX estimates, OPEX estimate, XOM conf calls, KV conf calls, KV PO t's & c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 3/19-3/23, Minkit CAPEX estimates, OPEX estimate, XOM conf calls, KV conf calls, KV PO t's & c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 3/19, timesheets. On 3/22, TS weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 6 0 On 3/19-3/23, Minkit CAPEX estimates, OPEX estimate, XOM conf calls, KV conf calls, KV PO t's & c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-23 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 3/19-3/23, Minkit CAPEX estimates, OPEX estimate, XOM conf calls, KV conf calls, KV PO t's & c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 3/26, timesheets and weekly TS mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 3/26, weekly Ops mtg . On 3/29, Total presentation review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/26-3/30, assemble Drillex cost, review CAPEX summary, review Risks. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/26-3/30, assemble Drillex cost, review CAPEX summary, review Risks. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/26-3/30, assemble Drillex cost, review CAPEX summary, review Risks. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 3/26, weekly Ops mtg . On 3/29, Total presentation review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/26-3/30, assemble Drillex cost, review CAPEX summary, review Risks. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-30 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/26-3/30, assemble Drillex cost, review CAPEX summary, review Risks. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-30 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 4/2, Weekly Ops mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 On 4/2-4/6, prepare Drillex estimate and Screening Report slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 On 4/4, weekly KV conf call and prepare report out slides. On 4/6, prepare and present Minkit report out slides Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 4/3, 4/4, complete talent mgt file. On 4/5, weekly TS mtg. On 4/5, review IMS contract templates with L. Wilson. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 On 4/2-4/6, prepare Drillex estimate and Screening Report slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 On 4/4, weekly KV conf call and prepare report out slides. On 4/6, prepare and present Minkit report out slides Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 On 4/4, PM refresh turnover conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 4/3, 4/4, complete talent mgt file. On 4/5, weekly TS mtg. On 4/5, review IMS contract templates with L. Wilson. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 On 4/2-4/6, prepare Drillex estimate and Screening Report slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 On 4/4, weekly KV conf call and prepare report out slides. On 4/6, prepare and present Minkit report out slides Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 4/3, 4/4, complete talent mgt file. On 4/5, weekly TS mtg. On 4/5, review IMS contract templates with L. Wilson. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 On 4/2-4/6, prepare Drillex estimate and Screening Report slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 On 4/4, weekly KV conf call and prepare report out slides. On 4/6, prepare and present Minkit report out slides Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 On 4/2-4/6, prepare Drillex estimate and Screening Report slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 On 4/4, weekly KV conf call and prepare report out slides. On 4/6, prepare and present Minkit report out slides Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 4/9, timesheets and 4/12 TS weekly mtg. On 4/10-4/13, support Minkit screening study closeout. On 4/11, review timesheet status with S. Wilson. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-09 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 4/9, present Minkit screening study at Exxon. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 9 0 On 4/9, timesheets and 4/12 TS weekly mtg. On 4/10-4/13, support Minkit screening study closeout. On 4/11, review timesheet status with S. Wilson. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 On 4/9, timesheets and 4/12 TS weekly mtg. On 4/10-4/13, support Minkit screening study closeout. On 4/11, review timesheet status with S. Wilson. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 4/11, review 257 engineering estimated hours with K. McMullen. Lunch meeting with Keppel Amfels (M. Holcomb, TO Cheung). Lunch meeting with Wood (A. Maitland). On 4/13, review HH, Bentec, NOV arctic rig solutions in prep for Deep Dive. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 On 4/9, timesheets and 4/12 TS weekly mtg. On 4/10-4/13, support Minkit screening study closeout. On 4/11, review timesheet status with S. Wilson. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 On 4/11, review 257 engineering estimated hours with K. McMullen. Lunch meeting with Keppel Amfels (M. Holcomb, TO Cheung). Lunch meeting with Wood (A. Maitland). On 4/13, review HH, Bentec, NOV arctic rig solutions in prep for Deep Dive. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 4/9, timesheets and 4/12 TS weekly mtg. On 4/10-4/13, support Minkit screening study closeout. On 4/11, review timesheet status with S. Wilson. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 On 4/11, review 257 engineering estimated hours with K. McMullen. Lunch meeting with Keppel Amfels (M. Holcomb, TO Cheung). Lunch meeting with Wood (A. Maitland). On 4/13, review HH, Bentec, NOV arctic rig solutions in prep for Deep Dive. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 4/16, weekly Ops conf call, TS weekly mtg. On 4/17, support ppt slides for MInkit non-arctic rig options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 4/17, minkit AAR mtg. On 4/19, TS weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 On 4/16, weekly Ops conf call, TS weekly mtg. On 4/17, support ppt slides for MInkit non-arctic rig options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-17 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 On 4/17, IMS IDR training. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 4/16, weekly Ops conf call, TS weekly mtg. On 4/17, support ppt slides for MInkit non-arctic rig options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 4/17, minkit AAR mtg. On 4/19, TS weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 4/16, weekly Ops conf call, TS weekly mtg. On 4/17, support ppt slides for MInkit non-arctic rig options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-20 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 On 4/20, vacation day. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 4/23, timesheet and approvals. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 On 4/23, weekly Ops mtg. On 4/23-4/27, support planning for Minkit Deep Dive; scope of work, value added engineering, assemble Krechet spec list. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 4/23, weekly Ops mtg. On 4/23-4/27, support planning for Minkit Deep Dive; scope of work, value added engineering, assemble Krechet spec list. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 4/23, weekly Ops mtg. On 4/23-4/27, support planning for Minkit Deep Dive; scope of work, value added engineering, assemble Krechet spec list. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 4/23, weekly Ops mtg. On 4/23-4/27, support planning for Minkit Deep Dive; scope of work, value added engineering, assemble Krechet spec list. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 4/23, weekly Ops mtg. On 4/23-4/27, support planning for Minkit Deep Dive; scope of work, value added engineering, assemble Krechet spec list. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 7 0 On 4/30, assemble Krechet spec list summary in preparation for MInkit Deep Dive. On 5/2, review Krechet spec list summary with KM, SG, JL, JR. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 4/30 weekly ops mtg. On 5/1, attend OTC technical papers Shell Malikai project and Hebron project, attend Kfels reception. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 On 4/30 weekly ops mtg. On 5/1, attend OTC technical papers Shell Malikai project and Hebron project, attend Kfels reception. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 7 0 On 4/30, assemble Krechet spec list summary in preparation for MInkit Deep Dive. On 5/2, review Krechet spec list summary with KM, SG, JL, JR. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-02 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 On 5/2, HSE Overview training. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 5/3, TS weekly mtg (J. Lambert reviewed DS-1 training, G. Osten reviewed Shell Malikai paper). On 5/4, monthly PDR review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 On 4/30 weekly ops mtg. On 5/1, attend OTC technical papers Shell Malikai project and Hebron project, attend Kfels reception. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 5/3, TS weekly mtg (J. Lambert reviewed DS-1 training, G. Osten reviewed Shell Malikai paper). On 5/4, monthly PDR review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 On 4/30 weekly ops mtg. On 5/1, attend OTC technical papers Shell Malikai project and Hebron project, attend Kfels reception. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 On 5/7, developed TS projects schedule and planned resources. On 5/9, review IMS contract procedures. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 5/8, review L. Wilson revised Contract procedure and associated new contract templates. On 5/10, attended TS forecast and TS engineering resource planning mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 5/7, weekly Ops mtg. On 5/8, assembled Holly project files on Q drive. On 5/9-5/11, discussions with K. McMullen regarding Total Uganda scope of work and planning. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 On 5/8, review L. Wilson revised Contract procedure and associated new contract templates. On 5/10, attended TS forecast and TS engineering resource planning mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 5/7, weekly Ops mtg. On 5/8, assembled Holly project files on Q drive. On 5/9-5/11, discussions with K. McMullen regarding Total Uganda scope of work and planning. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 On 5/7, developed TS projects schedule and planned resources. On 5/9, review IMS contract procedures. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 5/7, weekly Ops mtg. On 5/8, assembled Holly project files on Q drive. On 5/9-5/11, discussions with K. McMullen regarding Total Uganda scope of work and planning. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-09 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 On 5/9, 5/10 and 5/11, support Krechet vs. Berkut spec comparison in preparation for Concept deep dive. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-09 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 On 5/9, IP training session. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-10 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 On 5/10 and 5/11, create and review PM review turnover ppt slides with M. Anatra. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 5/8, review L. Wilson revised Contract procedure and associated new contract templates. On 5/10, attended TS forecast and TS engineering resource planning mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 5/7, weekly Ops mtg. On 5/8, assembled Holly project files on Q drive. On 5/9-5/11, discussions with K. McMullen regarding Total Uganda scope of work and planning. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-10 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 On 5/9, 5/10 and 5/11, support Krechet vs. Berkut spec comparison in preparation for Concept deep dive. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-11 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 On 5/10 and 5/11, create and review PM review turnover ppt slides with M. Anatra. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 5/7, weekly Ops mtg. On 5/8, assembled Holly project files on Q drive. On 5/9-5/11, discussions with K. McMullen regarding Total Uganda scope of work and planning. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-11 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 On 5/9, 5/10 and 5/11, support Krechet vs. Berkut spec comparison in preparation for Concept deep dive. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-14 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 On 5/14, review draft Pm review turnover ppt slides with St. John's office and Asset mgt. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 5/14, timesheets. On 5/15, review IMS contract procedures after comments were included into final version. On 5/17, IMS cost estimate and wbs template. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 On 5/14, weekly Ops call and weekly TS planning mtg. Minkit concept study response to Exxon. On 5/15, 5/16, Total Uganda mtg, provide input for Uganda schedule, project scope of work and provide draft project document list. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 5/14, timesheets. On 5/15, review IMS contract procedures after comments were included into final version. On 5/17, IMS cost estimate and wbs template. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 5/14, weekly Ops call and weekly TS planning mtg. Minkit concept study response to Exxon. On 5/15, 5/16, Total Uganda mtg, provide input for Uganda schedule, project scope of work and provide draft project document list. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 5/14, weekly Ops call and weekly TS planning mtg. Minkit concept study response to Exxon. On 5/15, 5/16, Total Uganda mtg, provide input for Uganda schedule, project scope of work and provide draft project document list. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 On 5/14, timesheets. On 5/15, review IMS contract procedures after comments were included into final version. On 5/17, IMS cost estimate and wbs template. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 5/18, PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 5/21, attend weekly ops meeting. On 5/21-5/25, review Total Uganda Appendix 9 tech spec and identify gaps and risks. Support T. Elenburg create Project Scope of Work for Total Uganda rig builds. Create project document list with estimated hours. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 5/21, attend weekly ops meeting. On 5/21-5/25, review Total Uganda Appendix 9 tech spec and identify gaps and risks. Support T. Elenburg create Project Scope of Work for Total Uganda rig builds. Create project document list with estimated hours. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 5/21, attend weekly ops meeting. On 5/21-5/25, review Total Uganda Appendix 9 tech spec and identify gaps and risks. Support T. Elenburg create Project Scope of Work for Total Uganda rig builds. Create project document list with estimated hours. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 On 5/24, TS weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 5/24 and 5/25, plan next Skills VX Lunch and Learn review session for department. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 On 5/21, attend weekly ops meeting. On 5/21-5/25, review Total Uganda Appendix 9 tech spec and identify gaps and risks. Support T. Elenburg create Project Scope of Work for Total Uganda rig builds. Create project document list with estimated hours. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 5/24 and 5/25, plan next Skills VX Lunch and Learn review session for department. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 On 5/21, attend weekly ops meeting. On 5/21-5/25, review Total Uganda Appendix 9 tech spec and identify gaps and risks. Support T. Elenburg create Project Scope of Work for Total Uganda rig builds. Create project document list with estimated hours. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 5/28, timesheets. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 5/28, attend weekly Ops mtg. On 5/28-6/1, support Uganda Appendix 9 gap analysis & review. Pull Uganda govt. regs for team. Review App. 9 technical gaps/risks with team. Continue storing project templates on Q drive for Uganda (rig build RFP). Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 5/28, attend weekly Ops mtg. On 5/28-6/1, support Uganda Appendix 9 gap analysis & review. Pull Uganda govt. regs for team. Review App. 9 technical gaps/risks with team. Continue storing project templates on Q drive for Uganda (rig build RFP). Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 5/28, attend weekly Ops mtg. On 5/28-6/1, support Uganda Appendix 9 gap analysis & review. Pull Uganda govt. regs for team. Review App. 9 technical gaps/risks with team. Continue storing project templates on Q drive for Uganda (rig build RFP). Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 5/28, attend weekly Ops mtg. On 5/28-6/1, support Uganda Appendix 9 gap analysis & review. Pull Uganda govt. regs for team. Review App. 9 technical gaps/risks with team. Continue storing project templates on Q drive for Uganda (rig build RFP). Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 5/28, attend weekly Ops mtg. On 5/28-6/1, support Uganda Appendix 9 gap analysis & review. Pull Uganda govt. regs for team. Review App. 9 technical gaps/risks with team. Continue storing project templates on Q drive for Uganda (rig build RFP). Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 6/4-6/8, support assembly/review of Total Uganda Rig build RFP. Continue gap analysis of Appendix 9 and HH quote and compile findings in project action item list. On 6/4, weekly Ops mtg. On 6/7, CAT meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 6/4-6/8, support assembly/review of Total Uganda Rig build RFP. Continue gap analysis of Appendix 9 and HH quote and compile findings in project action item list. On 6/4, weekly Ops mtg. On 6/7, CAT meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 6/4-6/8, support assembly/review of Total Uganda Rig build RFP. Continue gap analysis of Appendix 9 and HH quote and compile findings in project action item list. On 6/4, weekly Ops mtg. On 6/7, CAT meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 6/4-6/8, support assembly/review of Total Uganda Rig build RFP. Continue gap analysis of Appendix 9 and HH quote and compile findings in project action item list. On 6/4, weekly Ops mtg. On 6/7, CAT meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 6/4-6/8, support assembly/review of Total Uganda Rig build RFP. Continue gap analysis of Appendix 9 and HH quote and compile findings in project action item list. On 6/4, weekly Ops mtg. On 6/7, CAT meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 6/11-6/15, support assembly/review of Total Uganda Rig build RFP. On 6/11, weekly Ops mtg. On 6/7, CAT meetings. On 6/14 and 6/15, attend PanAmerican presentations, potential ITT. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 6/11-6/15, support assembly/review of Total Uganda Rig build RFP. On 6/11, weekly Ops mtg. On 6/7, CAT meetings. On 6/14 and 6/15, attend PanAmerican presentations, potential ITT. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 6/11-6/15, support assembly/review of Total Uganda Rig build RFP. On 6/11, weekly Ops mtg. On 6/7, CAT meetings. On 6/14 and 6/15, attend PanAmerican presentations, potential ITT. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 6/11-6/15, support assembly/review of Total Uganda Rig build RFP. On 6/11, weekly Ops mtg. On 6/7, CAT meetings. On 6/14 and 6/15, attend PanAmerican presentations, potential ITT. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 On 6/11-6/15, support assembly/review of Total Uganda Rig build RFP. On 6/11, weekly Ops mtg. On 6/7, CAT meetings. On 6/14 and 6/15, attend PanAmerican presentations, potential ITT. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 On 6/18-6/21, assign asset numbers to Orlan ops manuals on DCDM. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 On 6/18-6/21, support Uganda opportunity, planning documents, cash flow forecast. Monday morning weekly Ops mtg. On 6/21, NOV welldata, Drillwell presentation, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 On 6/18-6/21, assign asset numbers to Orlan ops manuals on DCDM. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 6/19, J. Lambert 2018 mid year review. On 6/21, weekly TS mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 On 6/18-6/21, support Uganda opportunity, planning documents, cash flow forecast. Monday morning weekly Ops mtg. On 6/21, NOV welldata, Drillwell presentation, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 On 6/18-6/21, assign asset numbers to Orlan ops manuals on DCDM. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 On 6/18-6/21, support Uganda opportunity, planning documents, cash flow forecast. Monday morning weekly Ops mtg. On 6/21, NOV welldata, Drillwell presentation, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 On 6/18-6/21, assign asset numbers to Orlan ops manuals on DCDM. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 6/19, J. Lambert 2018 mid year review. On 6/21, weekly TS mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 On 6/18-6/21, support Uganda opportunity, planning documents, cash flow forecast. Monday morning weekly Ops mtg. On 6/21, NOV welldata, Drillwell presentation, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 6/22, PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-25 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 4 0 On 6/25-6/28, attend calls with Husky Whote Rose Ext Area Supt M. Wohl to support Husky WRE O&M tender Corpus Christi rate buildup. Review Husky O&M tender and meet with Eugene. On 6/29, meet with E. Ona for Corpus Christ rig crew and TS rate buildup. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Support J. Lambert Uganda opportunity HH project financing options and review cash flow forecasts. Attend weekly ops call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-26 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 4 0 On 6/25-6/28, attend calls with Husky Whote Rose Ext Area Supt M. Wohl to support Husky WRE O&M tender Corpus Christi rate buildup. Review Husky O&M tender and meet with Eugene. On 6/29, meet with E. Ona for Corpus Christ rig crew and TS rate buildup. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Support J. Lambert Uganda opportunity HH project financing options and review cash flow forecasts. Attend weekly ops call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 6/27, meet with M. Kuehn to complete mid-year review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-27 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 4 0 On 6/25-6/28, attend calls with Husky Whote Rose Ext Area Supt M. Wohl to support Husky WRE O&M tender Corpus Christi rate buildup. Review Husky O&M tender and meet with Eugene. On 6/29, meet with E. Ona for Corpus Christ rig crew and TS rate buildup. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Support J. Lambert Uganda opportunity HH project financing options and review cash flow forecasts. Attend weekly ops call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-28 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 4 0 On 6/25-6/28, attend calls with Husky Whote Rose Ext Area Supt M. Wohl to support Husky WRE O&M tender Corpus Christi rate buildup. Review Husky O&M tender and meet with Eugene. On 6/29, meet with E. Ona for Corpus Christ rig crew and TS rate buildup. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Support J. Lambert Uganda opportunity HH project financing options and review cash flow forecasts. Attend weekly ops call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-29 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 4 0 On 6/25-6/28, attend calls with Husky Whote Rose Ext Area Supt M. Wohl to support Husky WRE O&M tender Corpus Christi rate buildup. Review Husky O&M tender and meet with Eugene. On 6/29, meet with E. Ona for Corpus Christ rig crew and TS rate buildup. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Support J. Lambert Uganda opportunity HH project financing options and review cash flow forecasts. Attend weekly ops call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 7/2 and 7/3, support Oxy BD mtg for Permian. Support Karma tech eval of rigs for XTO Permian. Support J. Lambert Uganda opportunity HH project financing options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 7/2 and 7/3, support Oxy BD mtg for Permian. Support Karma tech eval of rigs for XTO Permian. Support J. Lambert Uganda opportunity HH project financing options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 On 7/4, July 4th holiday. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 7/5, 7/6, PTO. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 7/5, 7/6, PTO. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 7/9, timesheets. On 7/11, PDR review. On 7/12, weekly TS mtg and technology moment. On 7/12 and 7/13, review draft sharepoint project template site. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 7/9, weekly ops conf call. On 7/12 and 7/13, coordinate Wood BD lunch. Start contacting projects and ops persons for personnel required to support potential Ingalls and China rig build. On 7/12 & 7/13, review and comment on Total Project financing schedule. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 7/9, weekly ops conf call. On 7/12 and 7/13, coordinate Wood BD lunch. Start contacting projects and ops persons for personnel required to support potential Ingalls and China rig build. On 7/12 & 7/13, review and comment on Total Project financing schedule. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 7/9, timesheets. On 7/11, PDR review. On 7/12, weekly TS mtg and technology moment. On 7/12 and 7/13, review draft sharepoint project template site. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 7/9, weekly ops conf call. On 7/12 and 7/13, coordinate Wood BD lunch. Start contacting projects and ops persons for personnel required to support potential Ingalls and China rig build. On 7/12 & 7/13, review and comment on Total Project financing schedule. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 7/9, timesheets. On 7/11, PDR review. On 7/12, weekly TS mtg and technology moment. On 7/12 and 7/13, review draft sharepoint project template site. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 On 7/9, weekly ops conf call. On 7/12 and 7/13, coordinate Wood BD lunch. Start contacting projects and ops persons for personnel required to support potential Ingalls and China rig build. On 7/12 & 7/13, review and comment on Total Project financing schedule. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 7/9, timesheets. On 7/11, PDR review. On 7/12, weekly TS mtg and technology moment. On 7/12 and 7/13, review draft sharepoint project template site. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 On 7/9, weekly ops conf call. On 7/12 and 7/13, coordinate Wood BD lunch. Start contacting projects and ops persons for personnel required to support potential Ingalls and China rig build. On 7/12 & 7/13, review and comment on Total Project financing schedule. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 7/16, timesheets. On 7./19, meet with IDR for project site template and equipment data storage procedure. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 7/16-7/20, support Total Uganda project financing requests, reach out to Kiewit & Wood, support Argentina rig O&M tech evals. Meet with (2) O&M commissioning support candidates for Husky WRE opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 7/16-7/20, support Total Uganda project financing requests, reach out to Kiewit & Wood, support Argentina rig O&M tech evals. Meet with (2) O&M commissioning support candidates for Husky WRE opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 7/16-7/20, support Total Uganda project financing requests, reach out to Kiewit & Wood, support Argentina rig O&M tech evals. Meet with (2) O&M commissioning support candidates for Husky WRE opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 7/16, timesheets. On 7./19, meet with IDR for project site template and equipment data storage procedure. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 On 7/16-7/20, support Total Uganda project financing requests, reach out to Kiewit & Wood, support Argentina rig O&M tech evals. Meet with (2) O&M commissioning support candidates for Husky WRE opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 On 7/16-7/20, support Total Uganda project financing requests, reach out to Kiewit & Wood, support Argentina rig O&M tech evals. Meet with (2) O&M commissioning support candidates for Husky WRE opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 7/23, timesheets and on 7/26, weekly TS dept mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 7/23-7/26, support Total Uganda opportunity (cash flow summary for project finance), support review of Rig new build suppliers. On 7/24, lunch with Wood. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 7/23-7/26, support Total Uganda opportunity (cash flow summary for project finance), support review of Rig new build suppliers. On 7/24, lunch with Wood. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 7/23, timesheets and on 7/26, weekly TS dept mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 On 7/23-7/26, support Total Uganda opportunity (cash flow summary for project finance), support review of Rig new build suppliers. On 7/24, lunch with Wood. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-25 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 On 7/25, training with M/D Totco Welldata and Drillwell. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 7/23, timesheets and on 7/26, weekly TS dept mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 7/23-7/26, support Total Uganda opportunity (cash flow summary for project finance), support review of Rig new build suppliers. On 7/24, lunch with Wood. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 7/27, PTO. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 7/30, timesheets. On 8/1, bi-weekly Drill Ops mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 7/30, attend weekly Ops conf call. On 8/1, Canyon Oak & Loadmaster mtg for new rig design. On 7/31 & 8/1, support Holly Early start change order. On 8/2 & 8/3, support XTO Argentina estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 On 7/30, attend weekly Ops conf call. On 8/1, Canyon Oak & Loadmaster mtg for new rig design. On 7/31 & 8/1, support Holly Early start change order. On 8/2 & 8/3, support XTO Argentina estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-31 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 On 7/31, Hyperion forecast training. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 7/30, timesheets. On 8/1, bi-weekly Drill Ops mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 7/30, attend weekly Ops conf call. On 8/1, Canyon Oak & Loadmaster mtg for new rig design. On 7/31 & 8/1, support Holly Early start change order. On 8/2 & 8/3, support XTO Argentina estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 7/30, attend weekly Ops conf call. On 8/1, Canyon Oak & Loadmaster mtg for new rig design. On 7/31 & 8/1, support Holly Early start change order. On 8/2 & 8/3, support XTO Argentina estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 On 7/30, attend weekly Ops conf call. On 8/1, Canyon Oak & Loadmaster mtg for new rig design. On 7/31 & 8/1, support Holly Early start change order. On 8/2 & 8/3, support XTO Argentina estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 8/6, timesheets Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 8/6, weekly OPs mtg Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-06 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 7 0 On 8/6-8/10, support XTO proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-07 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 9 0 On 8/6-8/10, support XTO proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-08 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 9 0 On 8/6-8/10, support XTO proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-09 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 9 0 On 8/6-8/10, support XTO proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-10 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 6 0 On 8/6-8/10, support XTO proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 8/13, timesheets and weekly Ops mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-13 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 7 0 On 8/13-8/17, support XTO Argentina proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-14 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 7 0 On 8/13-8/17, support XTO Argentina proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-14 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 On 8/14, attend LM lunch and learn. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-15 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 9 0 On 8/13-8/17, support XTO Argentina proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-16 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 9 0 On 8/13-8/17, support XTO Argentina proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-17 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 6 0 On 8/13-8/17, support XTO Argentina proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 8/20, weekly Ops mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-20 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 8 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-21 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 9 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-22 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 9 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 8/23, weekly TS mtg and tech moment on workover rigs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-23 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 8 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-24 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 6 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 On 8/27-8/31, review Holly, Hibernia and Sakhalin daily reports and monitor progress. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 8/27, weekly ops mtg. On 8/28, BP IT security mtg for new MSA. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-27 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 7 0 On 8/29, visit NOV Victoria mobile rig site and review tech specs with NOV and team. On 8/30, discuss workover rig specs with PAE completions manager and team. On 8/31, complete YPF estimates and conf call with NOV for workover rig request for estimate and delivery. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 On 8/27-8/31, review Holly, Hibernia and Sakhalin daily reports and monitor progress. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 8/27, weekly ops mtg. On 8/28, BP IT security mtg for new MSA. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-28 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 7 0 On 8/29, visit NOV Victoria mobile rig site and review tech specs with NOV and team. On 8/30, discuss workover rig specs with PAE completions manager and team. On 8/31, complete YPF estimates and conf call with NOV for workover rig request for estimate and delivery. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 On 8/27-8/31, review Holly, Hibernia and Sakhalin daily reports and monitor progress. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-29 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 8 0 On 8/29, visit NOV Victoria mobile rig site and review tech specs with NOV and team. On 8/30, discuss workover rig specs with PAE completions manager and team. On 8/31, complete YPF estimates and conf call with NOV for workover rig request for estimate and delivery. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 On 8/27-8/31, review Holly, Hibernia and Sakhalin daily reports and monitor progress. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-30 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 8 0 On 8/29, visit NOV Victoria mobile rig site and review tech specs with NOV and team. On 8/30, discuss workover rig specs with PAE completions manager and team. On 8/31, complete YPF estimates and conf call with NOV for workover rig request for estimate and delivery. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 On 8/27-8/31, review Holly, Hibernia and Sakhalin daily reports and monitor progress. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-08-31 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 6 0 On 8/29, visit NOV Victoria mobile rig site and review tech specs with NOV and team. On 8/30, discuss workover rig specs with PAE completions manager and team. On 8/31, complete YPF estimates and conf call with NOV for workover rig request for estimate and delivery. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 On 9/3, labor day holiday. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-04 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 9 0 On 9/4-9/7, Argentina YPF proposal and PAE Workover rig proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-05 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 9 0 On 9/4-9/7, Argentina YPF proposal and PAE Workover rig proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 9/6, monthly PDR review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-06 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 6 0 On 9/4-9/7, Argentina YPF proposal and PAE Workover rig proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-06 OH-009 :OH-009 OH-009-026 BP North Sea Regular Pay N 2 0 On 9/6, BP RFI for Andrews Platfrom. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-07 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1 0 On 9/4-9/7, Argentina YPF proposal and PAE Workover rig proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-07 OH-009 :OH-009 OH-009-026 BP North Sea Regular Pay N 5 0 On 9/6, BP RFI for Andrews Platfrom. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 9/10 & 9/14, timesheets. On 9/12, bi-weekly Drilling Support mtg. On 9/13, weekly TS mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 9/11-9/13, generate class 4 BP liberty sealift Demob estimate and level 1 schedule. On 9/10, weekly OPs mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-10 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1 0 On 9/10-9/14, continue PAE workover rig cost estimate. On 9/12, Pampa Energy mud pump cost. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-10 OH-009 :OH-009 OH-009-026 BP North Sea Regular Pay N 4 0 On 9/10-9/14, BP Andrews RFI. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-10 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 On 9/10, cyber-security training. On 9/13, annual compliance training. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 9/11-9/13, generate class 4 BP liberty sealift Demob estimate and level 1 schedule. On 9/10, weekly OPs mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-11 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1 0 On 9/10-9/14, continue PAE workover rig cost estimate. On 9/12, Pampa Energy mud pump cost. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-11 OH-009 :OH-009 OH-009-026 BP North Sea Regular Pay N 4 0 On 9/10-9/14, BP Andrews RFI. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 9/10 & 9/14, timesheets. On 9/12, bi-weekly Drilling Support mtg. On 9/13, weekly TS mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 9/11-9/13, generate class 4 BP liberty sealift Demob estimate and level 1 schedule. On 9/10, weekly OPs mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-12 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1 0 On 9/10-9/14, continue PAE workover rig cost estimate. On 9/12, Pampa Energy mud pump cost. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-12 OH-009 :OH-009 OH-009-026 BP North Sea Regular Pay N 3 0 On 9/10-9/14, BP Andrews RFI. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 9/10 & 9/14, timesheets. On 9/12, bi-weekly Drilling Support mtg. On 9/13, weekly TS mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 On 9/11-9/13, generate class 4 BP liberty sealift Demob estimate and level 1 schedule. On 9/10, weekly OPs mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-13 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1 0 On 9/10-9/14, continue PAE workover rig cost estimate. On 9/12, Pampa Energy mud pump cost. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-13 OH-009 :OH-009 OH-009-026 BP North Sea Regular Pay N 2 0 On 9/10-9/14, BP Andrews RFI. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-13 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 On 9/10, cyber-security training. On 9/13, annual compliance training. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 9/10 & 9/14, timesheets. On 9/12, bi-weekly Drilling Support mtg. On 9/13, weekly TS mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-14 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1 0 On 9/10-9/14, continue PAE workover rig cost estimate. On 9/12, Pampa Energy mud pump cost. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-14 OH-009 :OH-009 OH-009-026 BP North Sea Regular Pay N 3 0 On 9/10-9/14, BP Andrews RFI. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 9/17, timesheets. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 On 9/17, Gusto arctic jackup review. On 9/20 & 9/21, translate Pluspetrol Workover & Pulling Unit specifications, assemble RFQ packages. Research Loadcraft for workover rigs and contact Loadcraft. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-17 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 5 0 On 9/17 & 9/18, coordinate with NOV for clarifications for PAE workover rig specs and estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 On 9/18, PTO in afternoon. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-18 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 4 0 On 9/17 & 9/18, coordinate with NOV for clarifications for PAE workover rig specs and estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-18 OH-009 :OH-009 OH-009-026 BP North Sea Regular Pay N 2 0 On 9/18 & 9/20, conf call with HH to to resolve clarifications and finish BP Andrews equipment list. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 On 9/17, Gusto arctic jackup review. On 9/20 & 9/21, translate Pluspetrol Workover & Pulling Unit specifications, assemble RFQ packages. Research Loadcraft for workover rigs and contact Loadcraft. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-19 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 3 0 On 9/17 & 9/18, coordinate with NOV for clarifications for PAE workover rig specs and estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-19 OH-009 :OH-009 OH-009-026 BP North Sea Regular Pay N 3 0 On 9/18 & 9/20, conf call with HH to to resolve clarifications and finish BP Andrews equipment list. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 On 9/17, Gusto arctic jackup review. On 9/20 & 9/21, translate Pluspetrol Workover & Pulling Unit specifications, assemble RFQ packages. Research Loadcraft for workover rigs and contact Loadcraft. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-20 OH-009 :OH-009 OH-009-026 BP North Sea Regular Pay N 4 0 On 9/18 & 9/20, conf call with HH to to resolve clarifications and finish BP Andrews equipment list. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 On 9/17, Gusto arctic jackup review. On 9/20 & 9/21, translate Pluspetrol Workover & Pulling Unit specifications, assemble RFQ packages. Research Loadcraft for workover rigs and contact Loadcraft. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 9/24, timesheets Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 9/25, XTO W. Texas opportunity. On 9/24, weekly BD, Ops support mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-24 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 7 0 On 9/24, Pluspetrol workover tender. On 9/25, Pluspetrol workover rigs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 9/25, XTO W. Texas opportunity. On 9/24, weekly BD, Ops support mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-25 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 4 0 On 9/24, Pluspetrol workover tender. On 9/25, Pluspetrol workover rigs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-25 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 On 9/25,onboarding training. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-26 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 9 0 On 9/26, visit Kennedy LM 3,000HP platform rigs. On 9/27, work with Loadmster for Talos 3,000HP rig specs. On 9/28, visit Talos office for Zama platform opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-27 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 9 0 On 9/26, visit Kennedy LM 3,000HP platform rigs. On 9/27, work with Loadmster for Talos 3,000HP rig specs. On 9/28, visit Talos office for Zama platform opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-09-28 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 8 0 On 9/26, visit Kennedy LM 3,000HP platform rigs. On 9/27, work with Loadmster for Talos 3,000HP rig specs. On 9/28, visit Talos office for Zama platform opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 10/1, timesheets. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 10/1, weekly ops meeting. On 10/4, assemble XTO pwerpoint slides for Permian rigs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-01 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 6 0 On 10/1, 10/2, 10/3, prepare Talos modular rig options ppt slides. On 10/5, Attend Chevron conf call and assemble equipment list for Chevron Genesis SPAR pulling unit opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-01 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1 0 On 10/1, Pluspetrol workover rig t's & c's mtg. On 10/3, PP conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-02 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 9 0 On 10/1, 10/2, 10/3, prepare Talos modular rig options ppt slides. On 10/5, Attend Chevron conf call and assemble equipment list for Chevron Genesis SPAR pulling unit opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-03 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 8 0 On 10/1, 10/2, 10/3, prepare Talos modular rig options ppt slides. On 10/5, Attend Chevron conf call and assemble equipment list for Chevron Genesis SPAR pulling unit opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-03 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 1 0 On 10/1, Pluspetrol workover rig t's & c's mtg. On 10/3, PP conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 10/1, weekly ops meeting. On 10/4, assemble XTO pwerpoint slides for Permian rigs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-05 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 7 0 On 10/1, 10/2, 10/3, prepare Talos modular rig options ppt slides. On 10/5, Attend Chevron conf call and assemble equipment list for Chevron Genesis SPAR pulling unit opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-15 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 9 0 On 10/15, continue seeking Superior Derrick proposal for Mast analysis for Chevron Genesis opportunity. On 10/15 and10/16, prepare for Talos and Loadmaster meeting. On 10/17, Organize and attend Concept meeting at Loadmaster office with Talos. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-16 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 9 0 On 10/15, continue seeking Superior Derrick proposal for Mast analysis for Chevron Genesis opportunity. On 10/15 and10/16, prepare for Talos and Loadmaster meeting. On 10/17, Organize and attend Concept meeting at Loadmaster office with Talos. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-17 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 9 0 On 10/15, continue seeking Superior Derrick proposal for Mast analysis for Chevron Genesis opportunity. On 10/15 and10/16, prepare for Talos and Loadmaster meeting. On 10/17, Organize and attend Concept meeting at Loadmaster office with Talos. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 10/18 and 10/19, PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 10/18 and 10/19, PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 On 10/22, weekly Ops mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 10/22, weekly timesheets. On 10/24, bi-weekly Drill Ops Support mtg and HR leave training. On 10/25, 272 BP Contract Cybersecurity requirements conf call. On 10/25 TS weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-22 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 7 0 On 10/22, 10/23, review Genesis SPAR equipment list with Odon. On 10/22-10/26, develop Concept Study CTR for Talos and present CTR to Talos. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-23 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 9 0 On 10/22, 10/23, review Genesis SPAR equipment list with Odon. On 10/22-10/26, develop Concept Study CTR for Talos and present CTR to Talos. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 10/22, weekly timesheets. On 10/24, bi-weekly Drill Ops Support mtg and HR leave training. On 10/25, 272 BP Contract Cybersecurity requirements conf call. On 10/25 TS weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-24 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 6 0 On 10/22, 10/23, review Genesis SPAR equipment list with Odon. On 10/22-10/26, develop Concept Study CTR for Talos and present CTR to Talos. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 10/22, weekly timesheets. On 10/24, bi-weekly Drill Ops Support mtg and HR leave training. On 10/25, 272 BP Contract Cybersecurity requirements conf call. On 10/25 TS weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-25 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 6 0 On 10/22, 10/23, review Genesis SPAR equipment list with Odon. On 10/22-10/26, develop Concept Study CTR for Talos and present CTR to Talos. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-25 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 2 0 On 10/25 and 10/26, start NOV Rapid Rig newbuild cost estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-26 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 5 0 On 10/22, 10/23, review Genesis SPAR equipment list with Odon. On 10/22-10/26, develop Concept Study CTR for Talos and present CTR to Talos. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-10-26 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 2 0 On 10/25 and 10/26, start NOV Rapid Rig newbuild cost estimate. Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Years Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Berkut 3D elbow procurement clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-02 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 Spool quote clarifications, support MTO, support clarifications, testing schedule Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-02 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1.5 0 concept review, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-02 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 1 0 drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-02 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 3 0 new quote revisions, standpipe clarifications, rootary hose clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Help desk config check for failing hard drive Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-03 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 Spool quote clarifications, support MTO, support clarifications, testing schedule Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-03 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1 0 concept review, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-03 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1.5 0 meeting with Genesis, TSR review, RFI clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-03 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 3 0 new quote revisions, standpipe clarifications, rootary hose clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Help desk config check for failing hard drive Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-04 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 Spool quote clarifications, support MTO, support clarifications, testing schedule Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-04 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1 0 concept review, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-04 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 meeting with Genesis, TSR review, RFI clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-04 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 1 0 drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-04 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 TSR review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-04 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1.5 0 new quote revisions, standpipe clarifications, rootary hose clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 Berkut 3D elbow procurement clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-05 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 Spool quote clarifications, support MTO, support clarifications, testing schedule Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-05 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1 0 concept review, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-05 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1 0 new quote revisions, standpipe clarifications, rootary hose clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-08 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-08 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 2 0 Drawing review, analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-08 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 4.5 0 piping review, dampener review, field clarifications, write TSR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-09 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 status update, piping quote, structural material Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-09 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 2 0 Drawing review, analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-09 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1.5 0 Document research, RFI clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-09 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 1.5 0 Drawing review, CO, analysis review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-09 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 TSR review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-09 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2 0 piping review, dampener review, field clarifications, write TSR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-10 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 status update, piping quote, structural material Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-10 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 3 0 Drawing review, analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-10 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 TSR review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-10 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2 0 piping review, dampener review, field clarifications, write TSR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-11 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 2 0 Drawing review, analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-11 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 Document research, RFI clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-11 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 2 0 Drawing review, CO, analysis review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-11 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 3 0 piping review, dampener review, field clarifications, write TSR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-12 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1.5 0 Drawing review, analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-12 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 Document research, RFI clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-12 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 1.5 0 Drawing review, CO, analysis review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-12 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2 0 piping review, dampener review, field clarifications, write TSR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-15 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-15 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 2 0 Drawing revision, Analysis report, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-15 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 0.5 0 Analysis review, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-15 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 4.5 0 CO, final quotes, TSR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Office Closed from Ice Storm Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Office Closed from Ice Storm Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-18 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 FAT set up Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-18 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 1 0 TSR review, meeting set up Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-18 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 2 0 Drawing revision, Analysis report, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-18 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 1.5 0 Analysis review, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-18 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2.5 0 CO, final quotes, TSR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-19 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 1 0 TSR review, meeting set up Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-19 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 3.5 0 Drawing revision, Analysis report, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-19 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 1 0 Analysis review, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-22 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-22 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 FAT witness, clarifications, fat planning Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-22 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 1 0 gauge research and presentation, quote request, in shop visit Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-22 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1 0 Analysis report, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-22 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 meeting discussion, RFI questions, document review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-22 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 2 0 analysis, drawing review, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-23 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 4 0 Analysis report, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-23 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 meeting discussion, RFI questions, document review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-23 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 1 0 analysis, drawing review, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-23 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1.5 0 TSR review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-24 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 2 0 gauge research and presentation, quote request, in shop visit Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-24 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 2.5 0 Analysis report, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-24 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 3 0 analysis, drawing review, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-25 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 4 0 FAT witness, clarifications, fat planning Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-25 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 4 0 gauge research and presentation, quote request, in shop visit Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board/ Update meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-29 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-29 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 Access platform analysis and CO, Lift tool analysis and CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-29 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 FAT clarifications, Shipping updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-29 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 0.5 0 Quote request, gauge research and presentation, quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-29 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1 0 Drawing review, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-29 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 0.5 0 Drawing review, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board/ Update meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-30 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3.5 0 Access platform analysis and CO, Lift tool analysis and CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-30 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 FAT clarifications, Shipping updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-30 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 2 0 Quote request, gauge research and presentation, quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-30 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 0.5 0 Drawing review, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-30 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1.5 0 Concept review, piping material Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board/ Update meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Performance evaluation Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-31 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 FAT clarifications, Shipping updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-31 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 1 0 Quote request, gauge research and presentation, quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-31 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 ALE documents review, scope research, Geology document review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-31 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 2.5 0 Drawing review, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-31 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 Concept review, piping material Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-31 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1.5 0 scope clarification, fan research Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board/ Update meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Access platform analysis and CO, Lift tool analysis and CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-01 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 FAT clarifications, Shipping updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-01 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 1.5 0 Quote request, gauge research and presentation, quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-01 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 0.5 0 Drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-01 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 ALE documents review, scope research, Geology document review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-01 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 0.5 0 Drawing review, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-01 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1.5 0 Concept review, piping material Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board/ Update meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-02 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 FAT clarifications, Shipping updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-02 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 0.5 0 Quote request, gauge research and presentation, quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-02 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 1 0 Drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-02 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 2 0 ALE documents review, scope research, Geology document review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-05 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-05 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2.5 0 FAT report, pictures, shipping clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-05 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 1 0 Quote clarification, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-05 ORLAN-TSR :ORLAN-TSR TSR-01623-ORLP Orlan Service Beam CRI HP Pump Regular Pay N 0.5 0 TSR review, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-05 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-05 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 TSR review, preliminary piping layout, platform concept Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-05 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 Concept development, TSR review, piping changes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 API flange research, Class 600 flange research, gasket research Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-06 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 4 0 Diverter valve clarifications and review for 249 Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-06 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 FAT report, pictures, shipping clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-06 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 0.5 0 Quote clarification, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-07 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 Diverter valve clarifications and review for 249 Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-07 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 FAT report, pictures, shipping clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-07 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 1 0 Quote clarification, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-07 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 1 0 Closeout, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-07 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-07 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2 0 TSR review, preliminary piping layout, platform concept Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-07 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1.5 0 conference call, field request Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-08 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 FAT report, pictures, shipping clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-08 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 3 0 Quote clarification, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-08 ORLAN-TSR :ORLAN-TSR TSR-01623-ORLP Orlan Service Beam CRI HP Pump Regular Pay N 1 0 TSR review, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-08 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 0.5 0 Closeout, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-08 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 TSR review, preliminary piping layout, platform concept Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-08 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 Concept development, TSR review, piping changes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-08 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 0.5 0 conference call, field request Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-09 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 FAT report, pictures, shipping clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-09 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 1.5 0 Quote clarification, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-09 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 3 0 Concept development, TSR review, piping changes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Earnings call and earnings meeting, Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-12 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 pipe inspection pipe rotator fabrication questions, base oil fittings questions, drains under rotary review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-12 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 10" diverter valve and line clarifications, quote check, gaps Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-12 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 3 0 HPPS PO status, center line review, WOM shipments coordination, fittings clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-12 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 concept check, piping spec Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-12 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 concept development, 3D review, piping spec Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Earnings call and earnings meeting, Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-13 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 10" diverter valve and line clarifications, quote check, gaps Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-13 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2.5 0 HPPS PO status, center line review, WOM shipments coordination, fittings clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-13 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 0.5 0 quote recommendation Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-13 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1.5 0 concept check, piping spec Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-13 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 3 0 concept development, 3D review, piping spec Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Earnings call and earnings meeting, Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 pipe inspection pipe rotator fabrication questions, base oil fittings questions, drains under rotary review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-14 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 10" diverter valve and line clarifications, quote check, gaps Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-14 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 HPPS PO status, center line review, WOM shipments coordination, fittings clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-14 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 0.5 0 quote recommendation Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-14 ORLAN-TSR :ORLAN-TSR TSR-01623-ORLP Orlan Service Beam CRI HP Pump Regular Pay N 1.5 0 drawing review, calculations review, FEA analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-14 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 concept development, 3D review, piping spec Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Earnings call and earnings meeting, Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-15 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 pipe inspection pipe rotator fabrication questions, base oil fittings questions, drains under rotary review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-15 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 10" diverter valve and line clarifications, quote check, gaps Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-15 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 HPPS PO status, center line review, WOM shipments coordination, fittings clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-15 ORLAN-TSR :ORLAN-TSR TSR-01623-ORLP Orlan Service Beam CRI HP Pump Regular Pay N 1 0 drawing review, calculations review, FEA analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Earnings call and earnings meeting, Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-16 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 HPPS PO status, center line review, WOM shipments coordination, fittings clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-16 ORLAN-TSR :ORLAN-TSR TSR-01623-ORLP Orlan Service Beam CRI HP Pump Regular Pay N 4.5 0 drawing review, calculations review, FEA analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 presidents day Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS meeting, board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Safety moment/IMS prep, update TSR tracker, computer software installation Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Dorma door quote clarifications, door hardware specs, pipe inspection rollers vendors, MR to PO process Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-20 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3.5 0 10" ball valve clarifications, diverter drawing review, flare line drawing research, API flange spec Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-20 ORLAN-TSR :ORLAN-TSR TSR-01623-ORLP Orlan Service Beam CRI HP Pump Regular Pay N 3 0 Complete FEA, complete CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS meeting, board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-21 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 charpy testing clarifications, PO status, fitting clarifications, manifold shipping clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-21 ORLAN-TSR :ORLAN-TSR TSR-01623-ORLP Orlan Service Beam CRI HP Pump Regular Pay N 5.5 0 Complete FEA, complete CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-21 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 ALE drawing review, marsh email Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-21 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 information request, status Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS meeting, board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Safety moment/IMS prep, update TSR tracker, computer software installation Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Dorma door quote clarifications, door hardware specs, pipe inspection rollers vendors, MR to PO process Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-22 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 charpy testing clarifications, PO status, fitting clarifications, manifold shipping clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-22 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 3.5 0 concept review, door specs, drawing review, piping MTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS meeting, board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 Dorma door quote clarifications, door hardware specs, pipe inspection rollers vendors, MR to PO process Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-23 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 charpy testing clarifications, PO status, fitting clarifications, manifold shipping clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-23 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 ALE drawing review, marsh email Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-23 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 0.5 0 concept review, door specs, drawing review, piping MTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-26 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 Berkut winterization contract clarifications, 209 Door clarifications, MTO unit clarifications, Orlan tee cross clarifications, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-26 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 10" diverter ball valve cameron questions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-26 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 scope meeting, email requests Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-26 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 Drawing review, platform clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-27 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 0.5 0 DNO Iraq Tender Technical Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Berkut winterization contract clarifications, 209 Door clarifications, MTO unit clarifications, Orlan tee cross clarifications, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-27 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 10" diverter ball valve cameron questions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-27 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 2 0 scope meeting, email requests Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-27 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 Drawing review, platform clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-27 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1.5 0 Field request Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-28 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3.5 0 DNO Iraq Tender Technical Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-28 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 scope meeting, email requests Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-28 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 Drawing review, platform clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-28 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 Field request Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 TSR tracker update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-01 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6.5 0 DNO Iraq Tender Technical Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-02 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR status updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-05 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3.5 0 DNO tender 269 technical evaluation Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-05 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-05 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 Typical stand drawing concept and review, status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-05 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1.5 0 Genesis CTR review, PKD CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-05 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 Drawing review, platform concept development Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-05 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 0.5 0 picture request, picture review, conference call Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR status updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-06 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 7 0 DNO tender 269 technical evaluation Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Orlan cross clarifications, Orlan bull plug dimensions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR status updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Paint and NDT standard for IMS Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-07 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 Typical stand drawing concept and review, status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR status updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Paint and NDT standard for IMS Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-08 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 Typical stand drawing concept and review, status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-08 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 Drawing review, platform concept development Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-08 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 picture request, picture review, conference call Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR status updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Paint and NDT standard for IMS Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Orlan cross clarifications, Orlan bull plug dimensions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-09 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 Typical stand drawing concept and review, status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-09 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1.5 0 Genesis CTR review, PKD CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-09 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 Concept review and discussion with fiel Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-09 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 0.5 0 Drawing review, platform concept development Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR tracker meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-12 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 209 Boiler blowdown questions, 209 diesel transfer station popoff Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-12 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 status update, HPPS dates, piping iso details Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-12 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 Genesis CTR, field communication CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-12 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 0.5 0 CTR, Concept review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-12 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 Drawing review, structural analysis of platform Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 TSR tracker meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 209 Boiler blowdown questions, 209 diesel transfer station popoff Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-13 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 status update, HPPS dates, piping iso details Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-13 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 Genesis CTR, field communication CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-13 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 Drawing review, structural analysis of platform Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-13 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 Field info review, requested quote Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR tracker meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-14 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Hibernia BOP Lift frame meeting and info Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-14 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 status update, HPPS dates, piping iso details Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-14 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 CTR, Concept review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-14 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 4 0 Drawing review, structural analysis of platform Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-14 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 Field info review, requested quote Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-15 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 6 0 Scope of Work report, create schedule, meeting for personnel requirements Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR tracker meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-15 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 Drawing review, structural analysis of platform Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-16 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 3 0 Scope of Work report, create schedule, meeting for personnel requirements Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR tracker meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Paint Spec IMS research Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-19 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 1 0 Henly meeting, Manning list, schedule revision, mud pump selection, equipment quotes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Status meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IMS paint spec and NDT Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-19 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-19 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 skid drawing concept, status updates, Masterflo choke questions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-19 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 drawing reviews Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-19 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 structural analysis, padeye check, ladder location Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-19 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 drawing review, structural analysis, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-20 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 2 0 Henly meeting, Manning list, schedule revision, mud pump selection, equipment quotes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Status meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 IMS paint spec and NDT Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-20 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 genesis CTR, scope clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-20 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 2.5 0 structural analysis, padeye check, ladder location Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-20 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1.5 0 drawing review, structural analysis, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-21 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 3 0 Henly meeting, Manning list, schedule revision, mud pump selection, equipment quotes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Status meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-21 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 skid drawing concept, status updates, Masterflo choke questions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-21 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 2 0 structural analysis, padeye check, ladder location Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-21 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 2 0 conference call for concepts, status update, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-22 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 2 0 Henly meeting, Manning list, schedule revision, mud pump selection, equipment quotes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Status meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-22 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 skid drawing concept, status updates, Masterflo choke questions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-22 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1.5 0 drawing reviews Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-22 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 genesis CTR, scope clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-22 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 0.5 0 structural analysis, padeye check, ladder location Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-22 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 0.5 0 drawing review, structural analysis, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-22 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 0.5 0 conference call for concepts, status update, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-23 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 2.5 0 Henly meeting, Manning list, schedule revision, mud pump selection, equipment quotes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Status meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 IMS paint spec and NDT Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-23 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 skid drawing concept, status updates, Masterflo choke questions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-23 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 drawing reviews Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-23 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 0.5 0 drawing review, structural analysis, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-26 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 1 0 Manning list, schedule revision, equipment delivery dates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-26 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-26 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 skid drawing review, piping update, fittings clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-26 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-26 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 ENL meeting, genesis scope change Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-26 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 Drawing review, clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-26 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 1 0 concept development, plate selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-27 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 2 0 Manning list, schedule revision, equipment delivery dates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-27 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 skid drawing review, piping update, fittings clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-27 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-27 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 2 0 ENL meeting, genesis scope change Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-27 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 ladder/hatch concept Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-27 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 0.5 0 concept development, plate selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-28 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 4 0 Manning list, schedule revision, equipment delivery dates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-28 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 skid drawing review, piping update, fittings clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-28 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 2 0 concept development, plate selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-28 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-30 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Good Friday Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Minkit presentation, update meetings, board meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-02 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-02 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 Skid drawing review and transmittal, status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-02 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2 0 calculations review, concept development, piping sizing, valve selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-02 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2.5 0 Structural Analysis report, closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-02 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 0.5 0 Plate sizing, sketch review, structural analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Minkit presentation, update meetings, board meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 choke/accumulator questions and quotes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-03 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 Skid drawing review and transmittal, status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-03 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 calculations review, concept development, piping sizing, valve selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-03 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 Ladder/hatch review, iiclarification Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-03 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 4 0 Structural Analysis report, closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-03 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 0.5 0 Plate sizing, sketch review, structural analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Minkit presentation, update meetings, board meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-04 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 2 0 ENL/ALE meeting and review, action item list Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-04 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 calculations review, concept development, piping sizing, valve selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-04 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2.5 0 Structural Analysis report, closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-04 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 2 0 Plate sizing, sketch review, structural analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-04 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 0.5 0 quote review, vendor clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Minkit presentation, update meetings, board meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 choke/accumulator questions and quotes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-05 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 ENL/ALE meeting and review, action item list Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-05 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1.5 0 calculations review, concept development, piping sizing, valve selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-05 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1.5 0 Ladder/hatch review, iiclarification Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-05 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 2.5 0 Plate sizing, sketch review, structural analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-05 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 quote review, vendor clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Minkit presentation, update meetings, board meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 209 loadmaster questions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-06 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 Skid drawing review and transmittal, status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-06 ORLAN-TSR :ORLAN-TSR TSR-01631-ORLP Flow Meter on Base Oil Supply Line Regular Pay N 2.5 0 P&ID review, redline review, MTO review, flow meter size Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-06 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 calculations review, concept development, piping sizing, valve selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-06 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 0.5 0 Structural Analysis report, closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-06 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 0.5 0 Plate sizing, sketch review, structural analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-06 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 0.5 0 quote review, vendor clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meetings, status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-09 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 0.5 0 Schedule B 247 for TTOpCo Tender, Revised Schedule B 269 for TTOpCo Tender Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-09 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-09 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 status update, documentation clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-09 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 Completed Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-09 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 3 0 concept development, drawing review, structural analysis, field changes, material selection, gap clearance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-10 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1.5 0 Schedule B 247 for TTOpCo Tender, Revised Schedule B 269 for TTOpCo Tender Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-10 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2.5 0 Completed Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-10 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 4 0 concept development, drawing review, structural analysis, field changes, material selection, gap clearance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-11 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1 0 Schedule B 247 for TTOpCo Tender, Revised Schedule B 269 for TTOpCo Tender Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-11 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 Hatch drawing review, concept development, padeye clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-11 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 Completed Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-11 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 4 0 concept development, drawing review, structural analysis, field changes, material selection, gap clearance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-11 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 Quote review, clarification emails, meeting setup Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meetings, status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 249 no go bar drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-12 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3.5 0 Schedule B 247 for TTOpCo Tender, Revised Schedule B 269 for TTOpCo Tender Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-12 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 Hatch drawing review, concept development, padeye clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-12 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 2.5 0 concept development, drawing review, structural analysis, field changes, material selection, gap clearance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 249 no go bar drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-13 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3 0 Schedule B 247 for TTOpCo Tender, Revised Schedule B 269 for TTOpCo Tender Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-13 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 Hatch drawing review, concept development, padeye clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-13 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 Quote review, clarification emails, meeting setup Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meetings, status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 customs union research, importation research, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-16 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1.5 0 Schedule B 247 for TTOpCo Tender, Revised Schedule B 269 for TTOpCo Tender Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-16 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 ODPL drawing obsolete, 209 drawing number discussions, desilter sheave belt clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-16 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 coorespondance with WOM and SGS for CU Cert, review of spool pictures, elbow fitting clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-16 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2 0 concept review, drawing review, pipe sizing, fitting selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-16 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 0.5 0 Quote review, Conference Call Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-17 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 1 0 coorespondance with Legal about vendor data Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-17 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1.5 0 TSR review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-17 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1.5 0 TSR Review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 ODPL drawing obsolete, 209 drawing number discussions, desilter sheave belt clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-17 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 concept review, drawing review, pipe sizing, fitting selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-17 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1.5 0 Quote review, Conference Call Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 customs union research, importation research, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-18 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 4 0 coorespondance with WOM and SGS for CU Cert, review of spool pictures, elbow fitting clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-18 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 conference call, sketches for ALE Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-18 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 1 0 Extension of top plate, drawing comments Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meetings, status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 customs union research, importation research, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-19 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 coorespondance with WOM and SGS for CU Cert, review of spool pictures, elbow fitting clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-19 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 conference call, sketches for ALE Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-19 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 concept review, drawing review, pipe sizing, fitting selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-19 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 3 0 hatch design, drawing review, completed closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-20 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 coorespondance with WOM and SGS for CU Cert, review of spool pictures, elbow fitting clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-20 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 4.5 0 hatch design, drawing review, completed closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meetings, status meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-23 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-23 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 CU Cert Updates, Fitting procurement, status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-23 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2 0 Piping MTO, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-23 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 0.5 0 TSR Review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-23 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 GSM/Cundiff Proposal review, coorespondance with Operations, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-23 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 1 0 API 64 review, GE coorespondance, scope review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, status meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-24 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 CU Cert Updates, Fitting procurement, status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-24 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 Piping MTO, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-24 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 3 0 Concept development Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-24 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 3 0 API 64 review, GE coorespondance, scope review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, status meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-25 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 3 0 CU Cert Updates, Fitting procurement, status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-25 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 Weekly call, created MR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-25 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 2 0 GSM/Cundiff Proposal review, coorespondance with Operations, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-25 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 2 0 API 64 review, GE coorespondance, scope review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meetings, status meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-26 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 Weekly call, created MR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-26 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 Piping MTO, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-26 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1.5 0 GSM/Cundiff Proposal review, coorespondance with Operations, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-26 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 4 0 API 64 review, GE coorespondance, scope review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, status meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-27 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 Piping MTO, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-27 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1.5 0 Concept development Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-27 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 3 0 API 64 review, GE coorespondance, scope review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Status updates, TS meeting, Kretchet spec meeting, earnings report meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-30 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-30 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 CU coorespondance, fittings from UK, shipping changes, PO revision Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-30 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 genesis kickoff, sharepoint setup, biweekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-30 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2 0 Drawing review, MTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-30 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 2 0 Correspondence with GE, Diverter Valve research, sections from operations Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-01 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 0.5 0 TSR and CTR review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Status updates, TS meeting, Kretchet spec meeting, earnings report meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 Odoptu Transfer station obsolete drawings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-01 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 CU coorespondance, fittings from UK, shipping changes, PO revision Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-01 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-01 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 genesis kickoff, sharepoint setup, biweekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-01 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 Drawing review, MTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-01 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 drawing review, stress on plate calculations, request for quotes, casing clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-01 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 0.5 0 TSR review, created CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-01 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 2 0 fan research, fan selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-01 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 1 0 Correspondence with GE, Diverter Valve research, sections from operations Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-02 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1.5 0 TSR review, Sketch review, created CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Status updates, TS meeting, Kretchet spec meeting, earnings report meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 Odoptu Transfer station obsolete drawings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-02 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 CU coorespondance, fittings from UK, shipping changes, PO revision Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-02 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-02 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 genesis kickoff, sharepoint setup, biweekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-02 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 drawing review, stress on plate calculations, request for quotes, casing clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-02 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 0.5 0 TSR review, created CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-02 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 1 0 Correspondence with GE, Diverter Valve research, sections from operations Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-03 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1 0 TSR review, Sketch review, created CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Status updates, TS meeting, Kretchet spec meeting, earnings report meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-03 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 CU coorespondance, fittings from UK, shipping changes, PO revision Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-03 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 genesis kickoff, sharepoint setup, biweekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-03 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 2 0 fan research, fan selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-03 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 1 0 Correspondence with GE, Diverter Valve research, sections from operations Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-04 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 TSR review, Sketch review, created CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Status updates, TS meeting, Kretchet spec meeting, earnings report meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-04 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 CU coorespondance, fittings from UK, shipping changes, PO revision Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-04 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 3.5 0 drawing review, stress on plate calculations, request for quotes, casing clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-04 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 0.5 0 Correspondence with GE, Diverter Valve research, sections from operations Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-07 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 Document collection, Tech Spec Review, Created CTR, Began TPP Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, board meetings, TS meeting, berkut kretchet specs Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 timesheet Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-07 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-07 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 2 0 Drawing review, vendor clarifications, quote questions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-07 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 Fan selection and clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-07 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 2 0 coorespondance with GE about annular, compilation of operations input Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-08 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 2.5 0 Document collection, Tech Spec Review, Created CTR, Began TPP Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-08 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 MTO review Flange clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-08 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 0.5 0 TSR review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, board meetings, TS meeting, berkut kretchet specs Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 field questions on platforms Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-08 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 Visit HPPS for inspection, spool clarifications, Choke documentation Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-08 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 condensate drawing numbers, electrical clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-08 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 status update, genesis preliminary information Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-08 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 0.5 0 Fan selection and clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-08 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 0.5 0 coorespondance with GE about annular, compilation of operations input Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, board meetings, TS meeting, berkut kretchet specs Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-09 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 6 0 Visit HPPS for inspection, spool clarifications, Choke documentation Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-09 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 condensate drawing numbers, electrical clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-09 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 as built drawing review, P&ID redline Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-09 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 Drawing review, vendor clarifications, quote questions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-10 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1.5 0 Document collection, Tech Spec Review, Created CTR, Began TPP Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-10 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1 0 MTO review Flange clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, board meetings, TS meeting, berkut kretchet specs Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-10 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 Visit HPPS for inspection, spool clarifications, Choke documentation Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-10 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 condensate drawing numbers, electrical clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-10 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 status update, genesis preliminary information Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-10 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2 0 as built drawing review, P&ID redline Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-11 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 Document collection, Tech Spec Review, Created CTR, Began TPP Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-11 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 1 0 TSR review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, board meetings, TS meeting, berkut kretchet specs Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-11 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 as built drawing review, P&ID redline Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-11 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 Drawing review, vendor clarifications, quote questions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-11 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 1 0 coorespondance with GE about annular, compilation of operations input Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-14 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 Created TPP, Cameron vendor coordination Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meetings, status updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 Safety Moment, Timesheet Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-14 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-14 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 Status updates, PO revision, CU Cert Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-14 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1.5 0 Electrical redlines clarification, Condensate drawings review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-14 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 Drawing review, P&ID redlines Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-14 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1.5 0 Drawing review, Casing Procurement, vendor clarifications, quote review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-14 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 1 0 GE Response and call, valve research Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-15 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1.5 0 Drawing review, API 17D clarifications, flange dimensions, Spool OAL Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, status updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-15 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 Security Training Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-15 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 209 Condensate lines Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-15 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 Status updates, PO revision, CU Cert Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-15 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 Genesis review, biweekly conference call, action tracker update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-15 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1.5 0 Fan Selection, Closed out Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-15 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 2 0 GE Response and call, valve research Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, status updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-16 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1.5 0 Genesis review, biweekly conference call, action tracker update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-16 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 Drawing review, P&ID redlines Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-16 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 6 0 Fan Selection, Closed out Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-17 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 3.5 0 Created TPP, Cameron vendor coordination Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-17 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1 0 Drawing review, API 17D clarifications, flange dimensions, Spool OAL Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meetings, status updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 Safety Moment, Timesheet Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-17 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 Electrical redlines clarification, Condensate drawings review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-17 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 Drawing review, P&ID redlines Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-17 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 Drawing review, Casing Procurement, vendor clarifications, quote review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-18 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 3 0 Structural Analysis, Calc Check Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-18 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 Status updates, PO revision, CU Cert Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-18 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 Drawing review, Casing Procurement, vendor clarifications, quote review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-18 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 2 0 GE Response and call, valve research Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-21 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 TPP review, Cameron coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-21 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1.5 0 Drawing review, MTO review, material specifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, TS meeting, status meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-21 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 209 Condensate piping Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-21 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 valve numbers, line numbers, electrical clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-21 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 2.5 0 valve clarifications, worksheet update, conference call Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-22 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 TPP review, Cameron coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-22 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1.5 0 Drawing review, MTO review, material specifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TS meeting, status meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 209 Condensate piping Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-22 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-22 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 valve numbers, line numbers, electrical clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-22 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 P&ID review, revisions review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-22 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1.5 0 Drawing review, drawing revision, Quote review, welding procedure Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-22 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 1 0 valve clarifications, worksheet update, conference call Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-23 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 0.5 0 TPP review, Cameron coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-23 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 Drawing review, MTO review, material specifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-23 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 3 0 Post analysis, new concept, north side clashes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TS meeting, status meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-23 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-23 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 valve numbers, line numbers, electrical clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-23 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-23 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 P&ID review, revisions review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-23 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 Drawing review, drawing revision, Quote review, welding procedure Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-23 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 0.5 0 valve clarifications, worksheet update, conference call Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-24 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 Drawing review, MTO review, material specifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-24 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 4 0 Post analysis, new concept, north side clashes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, TS meeting, status meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-24 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-24 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 P&ID review, revisions review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-24 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 2 0 Drawing review, drawing revision, Quote review, welding procedure Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-25 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 TPP review, Cameron coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-25 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 Drawing review, MTO review, material specifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-25 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 2.5 0 Post analysis, new concept, north side clashes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TS meeting, status meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-25 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-25 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 1 0 valve clarifications, worksheet update, conference call Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-28 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Memorial Day Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-29 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 TPP to Cameron, status updates, email coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-29 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1 0 flange clarifications, drawing revision, quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status meetings, board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-29 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-29 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-29 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 0.5 0 Reopened TSR for design changes, new analysis, concept development, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-29 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 drawing review, redline clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-29 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1.5 0 ENL meeting, action tracker, email coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-29 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 drawing review, drawing redlines, began closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-29 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 1 0 conference call, status update, started CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-30 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 0.5 0 TPP to Cameron, status updates, email coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-30 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1 0 flange clarifications, drawing revision, quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-30 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 2 0 North/East new flange design review and analysis, new scope clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status meetings, board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-30 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 2 0 Reopened TSR for design changes, new analysis, concept development, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-30 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 ENL meeting, action tracker, email coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-30 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 drawing review, drawing redlines, began closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-30 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 quote revision, email clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-30 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 0.5 0 conference call, status update, started CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-31 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 TPP to Cameron, status updates, email coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-31 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 6 0 North/East new flange design review and analysis, new scope clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status meetings, board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-31 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 0.5 0 Reopened TSR for design changes, new analysis, concept development, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-31 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 drawing review, drawing redlines, began closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-01 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 flange clarifications, drawing revision, quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-01 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 3 0 North/East new flange design review and analysis, new scope clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status meetings, board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-01 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 ENL meeting, action tracker, email coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-01 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 drawing review, drawing redlines, began closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-01 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 quote revision, email clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-04 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-04 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 status updates, quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-04 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 help the intern Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-04 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-04 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 5 0 Completed CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-05 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 status updates, quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-05 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 0.5 0 structural analysis of stiffener design, revised CTR, concept and analysis of new post, clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 help the intern Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-05 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 2 0 Completed analysis, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-05 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-05 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 4 0 Completed CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-06 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-06 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 2.5 0 structural analysis of stiffener design, revised CTR, concept and analysis of new post, clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-06 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-06 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 2 0 DM report review, coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-06 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 quote review, status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-06 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 2 0 Completed CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-07 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 4.5 0 structural analysis of stiffener design, revised CTR, concept and analysis of new post, clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-07 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 Cat DGB presentation Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 PB platform lifting eyes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-07 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 DM report review, coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-07 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 quote review, status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-08 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-08 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 2 0 structural analysis of stiffener design, revised CTR, concept and analysis of new post, clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 PB platform lifting eyes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-08 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1 0 Completed analysis, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-11 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 status update, quote review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-11 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 4 0 New design analysis, stiffener thickness, revised CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-11 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-11 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 biweekly meeting, Genesis report review, clartifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-11 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 1 0 structural review, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-12 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 4 0 New design analysis, stiffener thickness, revised CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-12 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 3 0 review of local analysis, global analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-12 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 biweekly meeting, Genesis report review, clartifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-13 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 4 0 review of local analysis, global analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-13 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 1 0 trip information, ops coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-13 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 biweekly meeting, Genesis report review, clartifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-13 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 2 0 structural review, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-14 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 0.5 0 status update, quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-14 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 status update, quote review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-14 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 4.5 0 review of local analysis, global analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-14 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 1 0 trip information, ops coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-14 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 1 0 beam deflection assistance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-15 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 status update, quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-15 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 status update, quote review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-15 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 1.5 0 New design analysis, stiffener thickness, revised CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-15 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 1 0 review of local analysis, global analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-15 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 0.5 0 trip information, ops coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-15 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 biweekly meeting, Genesis report review, clartifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-15 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 0.5 0 structural review, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-18 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 2 0 global analysis, correspondence, solidworks review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status meeting, TS meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-18 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-18 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 PB report review, phase 2 scope of work Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-18 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 1 0 hand calc review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-18 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 2 0 drawing review, analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-19 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 3 0 Cameron exceptions, sanctions end user letter Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-19 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 2.5 0 drawing review, design analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-19 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 1 0 global analysis, correspondence, solidworks review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status meeting, TS meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-19 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 1 0 Visit set up, Rig visit and travel Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status meeting, TS meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-20 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 11 0 Visit set up, Rig visit and travel Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-21 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1 0 quote review, Woodco elbow exception Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-21 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 2 0 drawing review, design analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-21 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 2 0 global analysis, correspondence, solidworks review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status meeting, TS meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-21 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 2 0 PB report review, phase 2 scope of work Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-25 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-26 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 5 0 final analysis, closeout, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-26 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 1 0 field clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-26 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 condensate drawings review, clarifications, CO review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-26 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 weekly meeting, genesis report review, closeout review, phase 2 scope Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-26 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 0.5 0 drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-27 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 0.5 0 exception log, quote clarifications, documentation requirements Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-27 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 5.5 0 final analysis, closeout, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-27 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 condensate drawings review, clarifications, CO review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-27 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 2 0 weekly meeting, genesis report review, closeout review, phase 2 scope Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-28 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 0.5 0 exception log, quote clarifications, documentation requirements Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-28 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1 0 RFQ to new vendors Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-28 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 5.5 0 final analysis, closeout, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-28 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 condensate drawings review, clarifications, CO review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-28 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 weekly meeting, genesis report review, closeout review, phase 2 scope Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-29 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 exception log, quote clarifications, documentation requirements Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-29 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 3.5 0 final analysis, closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-02 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 cameron exception list, RUSD standard clarifications, quote review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-02 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 new vendor RFQ, vendor clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-02 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 3.5 0 analysis UC comparison, flange load clarifications, cloaseout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status meetings, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-02 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-02 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 ALE call for scope, Lief call for scope, phase 2 scope, clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-02 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 vendor clarifications, casing procurement Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-03 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 7 0 analysis UC comparison, flange load clarifications, cloaseout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status meetings, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-03 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 ALE call for scope, Lief call for scope, phase 2 scope, clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 4th of July Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-05 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 new vendor RFQ, vendor clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-05 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 6 0 analysis UC comparison, flange load clarifications, cloaseout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status meetings, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-05 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 ALE call for scope, Lief call for scope, phase 2 scope, clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-06 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1.5 0 cameron exception list, RUSD standard clarifications, quote review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-06 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 new vendor RFQ, vendor clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-06 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 2.5 0 analysis UC comparison, flange load clarifications, cloaseout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status meetings, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-06 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 ALE call for scope, Lief call for scope, phase 2 scope, clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-06 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 1 0 tsr review, hand calc clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-09 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 vendor clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-09 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 3.5 0 analysis, closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-09 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 submarine cable vendor meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-09 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-09 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 casing procurement Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-10 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 quote review, vendor requote Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-10 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 6.5 0 analysis, closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-10 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 biweekly meeting, coorespondance with ALE/ENL, DSM weights, sketch revision Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-11 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 2.5 0 analysis, closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-11 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 3 0 biweekly meeting, coorespondance with ALE/ENL, DSM weights, sketch revision Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-11 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 casing procurement Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-11 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 1.5 0 SAFI model, reviewed hand calculations, operations coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 status updates, board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-12 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Holly schedule revision, prep for meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-12 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 2 0 drawing research and review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-12 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 2.5 0 SAFI model, reviewed hand calculations, operations coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-13 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 0.5 0 vendor clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-13 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1 0 quote review, vendor requote Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-13 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 3.5 0 SAFI model, reviewed hand calculations, operations coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-13 Rig 209L-TSR :Rig 209L-TSR TSR-01651-209L Dual Fuel Study Regular Pay N 0.5 0 Piping RFI Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-16 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 status updates and vendor clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-16 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 vendor quote review, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-16 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 1 0 UC comparison, closeout RevA Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-16 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 3 0 Holly Platform meetings, trip to California, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-16 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-16 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 0.5 0 safi model discussion Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-17 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 vendor quote review, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-17 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 3 0 UC comparison, closeout RevA Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-17 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 4 0 Holly Platform meetings, trip to California, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-18 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 8 0 Holly Platform meetings, trip to California, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-19 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 8 0 Holly Platform meetings, trip to California, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-20 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 8 0 Holly Platform meetings, trip to California, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-21 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 8 0 Holly Platform meetings, trip to California, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-23 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 6.5 0 Holly trip debrief, 4 week plan, schedule revision, manning schedule, dayrate for initial startup Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-23 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-24 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 7 0 Holly trip debrief, 4 week plan, schedule revision, manning schedule, dayrate for initial startup Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-24 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 chayvo loadmaster CAT 4 inspection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-25 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 3.5 0 revised closeout with site comments Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-25 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2 0 Holly trip debrief, 4 week plan, schedule revision, manning schedule, dayrate for initial startup Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-25 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 drillwell training Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-25 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 biweekly meeting, action list, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-26 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 status updates, RUSD specs Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-26 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1 0 RUSD documentation, requote Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-26 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 0.5 0 revised closeout with site comments Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-26 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 0.5 0 Holly trip debrief, 4 week plan, schedule revision, manning schedule, dayrate for initial startup Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-26 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 iso fitting list, iso drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-26 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 1 0 TSR draft Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-26 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 biweekly meeting, action list, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-26 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 casing procurement, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-26 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 0.5 0 SAFI model Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-27 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 0.5 0 status updates, RUSD specs Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-27 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1 0 RUSD documentation, requote Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-27 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2 0 Holly trip debrief, 4 week plan, schedule revision, manning schedule, dayrate for initial startup Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-27 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 iso fitting list, iso drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-27 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 1 0 SAFI model Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-30 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 status updates, RUSD clarifications, requote Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-30 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1.5 0 quote revision, vendor clarifications, sent for MR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, TS meeting, board meeting, intern presentation, Parker earnings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-30 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1.5 0 holly schedule revision, meeting notes, scope review, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-30 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-30 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 1 0 Force research, load test value, finalized SAFI model, beam flange calculations Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-30 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1.5 0 scope clarification and meetings, CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, TS meeting, board meeting, intern presentation, Parker earnings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-31 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 0.5 0 holly schedule revision, meeting notes, scope review, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-31 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 6 0 Force research, load test value, finalized SAFI model, beam flange calculations Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-31 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 scope clarification and meetings, CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-01 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 quote revision, vendor clarifications, sent for MR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, TS meeting, board meeting, intern presentation, Parker earnings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-01 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 iso review and revisions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-01 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 7 0 Force research, load test value, finalized SAFI model, beam flange calculations Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 3.5 0 status updates, TS meeting, board meeting, intern presentation, Parker earnings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-02 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2.5 0 holly schedule revision, meeting notes, scope review, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-02 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 iso review and revisions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-02 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 2 0 Force research, load test value, finalized SAFI model, beam flange calculations Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-03 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 0.5 0 status updates, RUSD clarifications, requote Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-03 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 quote revision, vendor clarifications, sent for MR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, TS meeting, board meeting, intern presentation, Parker earnings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-03 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2.5 0 holly schedule revision, meeting notes, scope review, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-03 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 0.5 0 scope of work, meeting setup Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-03 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 casing procurement, casing MTR review, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-03 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 0.5 0 Force research, load test value, finalized SAFI model, beam flange calculations Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-06 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 0.5 0 Quote revision, vendor clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-06 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 6 0 Holly change order, final contracts, schedule revision, set up for meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-06 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-07 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 MR process Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-07 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 CU cert manufacturers letter and clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-07 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 Casing quote and MR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-07 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 5.5 0 Safi Model, analysis report, flange bending calc, CO, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-08 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 1 0 scope clarification meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-08 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 biweekly meeting, clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-08 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 Casing quote and MR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-08 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 5 0 Safi Model, analysis report, flange bending calc, CO, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-09 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 HDI L&L Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 262 restart question Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-09 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 5.5 0 Safi Model, analysis report, flange bending calc, CO, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-10 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1.5 0 Quote revision, vendor clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-10 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 MR process Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-10 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2 0 Holly change order, final contracts, schedule revision, set up for meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-10 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 biweekly meeting, clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-10 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 1 0 Safi Model, analysis report, flange bending calc, CO, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-13 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1.5 0 quote clarifications, MR process, coorespondence Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-13 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 loadmaster presentation Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-13 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-13 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 casing MR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-13 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 3 0 completed analysis report, completed closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-14 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 quote clarifications, MR process, coorespondence Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-14 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 change order, risk assessment, scope of work Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-14 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 6 0 completed analysis report, completed closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-15 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 quote clarifications, MR process, coorespondence Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-15 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1 0 MR process, vendor meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-15 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 6 0 completed analysis report, completed closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-16 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 2.5 0 change order, risk assessment, scope of work Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 safety moment, ims moment Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-16 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 cu certificate coorespondance, clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-16 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 3.5 0 post relocation alanysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-17 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 quote clarifications, MR process, coorespondence Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-17 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 MR process, vendor meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-17 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 0.5 0 tsr review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-17 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1.5 0 change order, risk assessment, scope of work Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-17 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 1 0 post relocation alanysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-17 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 0.5 0 tsr review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-17 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 0.5 0 DSM cg/weight change Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-20 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 TSR canceled, comiled all information, completed closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-20 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 5 0 Loadmaster Derrick Report, Cat 3 Call Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, TS meeting, Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-20 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-20 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 casing PO, casing dimensions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-21 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 4 0 TSR canceled, comiled all information, completed closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-21 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 3 0 TSR review, quote review, MTO review, started CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, TS meeting, Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-21 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 created MR for Genesis, weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-22 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 4 0 TSR canceled, comiled all information, completed closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-22 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-22 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 1.5 0 TSR review, quote review, MTO review, started CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, TS meeting, Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-22 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 1.5 0 post movement analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-22 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 0.5 0 created MR for Genesis, weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-23 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 0.5 0 TSR canceled, comiled all information, completed closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-23 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-23 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 3 0 TSR review, quote review, MTO review, started CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-23 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 Loadmaster Derrick Report, Cat 3 Call Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, TS meeting, Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-23 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 CU certificate clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-23 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 casing PO, casing dimensions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-23 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 1.5 0 TSR review, site coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-24 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 1.5 0 TSR review, quote review, MTO review, started CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, TS meeting, Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-24 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1.5 0 216 mast padeye drill through hols Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-24 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 1 0 post movement analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-24 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 casing PO, casing dimensions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-24 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 1 0 TSR review, site coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-27 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-27 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 1.5 0 tsr review, concept review, shackle data Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-27 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 2 0 change order creation, equipment quote organization Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, board update, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-27 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 TechnipFMC Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-27 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-27 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-27 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-28 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 3 0 finalized clarification, closed TSR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-28 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 2.5 0 MTO review, Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-28 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 change order creation, equipment quote organization Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, board update, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-28 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1.5 0 status meetings, DM deflection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-29 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 2.5 0 MTO review, Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-29 Berkut-TSR :Berkut-TSR TSR-01666-BERP Wireline Unit Anchor Points Regular Pay N 0.5 0 tsr review, concept review, shackle data Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-29 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 3 0 change order creation, equipment quote organization Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, board update, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-29 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 CU Cet meeting and action tracker, status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-29 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-29 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 status meetings, DM deflection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-30 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 2 0 MTO review, Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-30 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 2 0 Survey Trip scope of work, survey trip meeting, CD Lyon MR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, board update, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-30 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 CU Cet meeting and action tracker, status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-30 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 1 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-30 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 1.5 0 TSR research, Genesis coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-31 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 4.5 0 Survey Trip scope of work, survey trip meeting, CD Lyon MR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, board update, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-31 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 CU Cet meeting and action tracker, status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-08-31 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 0.5 0 TSR research, Genesis coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Labor Day Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-04 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4 0 Amerimex motor TPP and MR, NOV MudWatch TPP and MR, NOV deadline anchor TPP and MR, Manrider CTR, Schedule updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-04 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 1.5 0 CD Lyons PO work Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-04 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 Contract Meeting, Kanban Meeting, MR process meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS meeting, Board meeting, status meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-04 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-05 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 2.5 0 Amerimex motor TPP and MR, NOV MudWatch TPP and MR, NOV deadline anchor TPP and MR, Manrider CTR, Schedule updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-05 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 3 0 Contract Meeting, Kanban Meeting, MR process meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS meeting, Board meeting, status meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-05 OH-014 :OH-014 Overhead All Activities Regular Pay N 0.5 0 Holloway Houston Lifting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-05 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 0.5 0 genesis coorespondence Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-05 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-06 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4 0 Amerimex motor TPP and MR, NOV MudWatch TPP and MR, NOV deadline anchor TPP and MR, Manrider CTR, Schedule updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-06 Holly Platform :Holly Platform TSR-01665-HOLP-98 Rentals (OH) Regular Pay N 1 0 CIP House lifting analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-06 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 Contract Meeting, Kanban Meeting, MR process meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS meeting, Board meeting, status meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-06 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 welding procedure Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-07 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 3 0 Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-07 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 0.5 0 Amerimex motor TPP and MR, NOV MudWatch TPP and MR, NOV deadline anchor TPP and MR, Manrider CTR, Schedule updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-07 Holly Platform :Holly Platform TSR-01665-HOLP-98 Rentals (OH) Regular Pay N 3 0 CIP House lifting analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS meeting, Board meeting, status meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-07 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 action items for CU Cert Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-10 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-11 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-12 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-13 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-17 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-21 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-25 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-26 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1 0 documentation review, flange 2 hole Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-26 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 0.5 0 TPP and MR status, loadmaster meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-26 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 0.5 0 Bronco Survey Report, Drawworks weight, BOP lifting concept, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Misc emails, IHS, 209 TSR research for audit Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 209 Super ATC Lite Operation assisitance, BERP Simops Hatch research and clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-26 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 PBM reinforcement, action list Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-27 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1.5 0 documentation review, flange 2 hole Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-27 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 5 0 Bronco Survey Report, Drawworks weight, BOP lifting concept, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-27 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Cyber Security Training Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 209 Super ATC Lite Operation assisitance, BERP Simops Hatch research and clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-27 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 AMC clarification, BOM revision Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-27 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 0.5 0 PBM reinforcement, action list Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-28 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 1 0 TPP and MR status, loadmaster meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-28 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 1.5 0 Bronco Survey Report, Drawworks weight, BOP lifting concept, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 Misc emails, IHS, 209 TSR research for audit Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-28 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 CU Cert Update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-28 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 0.5 0 completed work review, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-09-28 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 AMC clarification, BOM revision Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-01 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 weld clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-01 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4 0 Alignment meeting, drawworks rebuild MTO and scope of work documents, casing cutting tool selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-01 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 1.5 0 BOP lifting concept review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 stautus updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-01 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-01 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 paint clarifications, fitting revision Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-02 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 6.5 0 Alignment meeting, drawworks rebuild MTO and scope of work documents, casing cutting tool selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 stautus updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-02 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 CU Cert conference call Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-02 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 0.5 0 PBM drawings and COG, biweekly meeting, Genesis call Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-03 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 6 0 Alignment meeting, drawworks rebuild MTO and scope of work documents, casing cutting tool selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 stautus updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-03 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 2 0 PBM drawings and COG, biweekly meeting, Genesis call Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-04 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 2 0 CO comments and conference call Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 stautus updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-04 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 5.5 0 column relocation, drawing Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-05 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 1.5 0 Alignment meeting, drawworks rebuild MTO and scope of work documents, casing cutting tool selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 stautus updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-05 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 4 0 column relocation, drawing Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-08 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 2 0 drawworks parts, Catheads MR, hose, tong, and drag chain information research Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-08 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 2 0 Reserve Pit MTO, Piping MTOs, Survey reports review, HP piping quote, steel material clarifications, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-08 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 1.5 0 3D concept, Info to Lam for trip Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-08 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 2 0 shipping update, began closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-09 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 1.5 0 drawworks parts, Catheads MR, hose, tong, and drag chain information research Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-09 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 4 0 Reserve Pit MTO, Piping MTOs, Survey reports review, HP piping quote, steel material clarifications, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-09 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 shipping update, began closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-09 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 PBM weights, PBM strongback discussions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-10 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 1.5 0 drawworks parts, Catheads MR, hose, tong, and drag chain information research Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-10 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 4 0 Reserve Pit MTO, Piping MTOs, Survey reports review, HP piping quote, steel material clarifications, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-10 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 1 0 Genesis report, concept development Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-10 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 PBM weights, PBM strongback discussions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-11 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 4 0 Reserve Pit MTO, Piping MTOs, Survey reports review, HP piping quote, steel material clarifications, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-11 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 216L Winch analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-11 Rig 209L-TSR :Rig 209L-TSR TSR-01642-209L Excessive Standpipe Vibration Regular Pay N 1 0 Genesis report, concept development Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-11 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 PBM weights, PBM strongback discussions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-12 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-15 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 8 0 HP Hoses MTO, Drag Chain drawing and MTO, Manual Tongs research and MTO, LP Active mud system MTO and piping, Power Tongs TPP Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-16 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 7 0 HP Hoses MTO, Drag Chain drawing and MTO, Manual Tongs research and MTO, LP Active mud system MTO and piping, Power Tongs TPP Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-16 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 CU Cert meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-17 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 7 0 HP Hoses MTO, Drag Chain drawing and MTO, Manual Tongs research and MTO, LP Active mud system MTO and piping, Power Tongs TPP Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-17 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 meeting with ENL, DM weights and blocks, email coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-18 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 7 0 HP Hoses MTO, Drag Chain drawing and MTO, Manual Tongs research and MTO, LP Active mud system MTO and piping, Power Tongs TPP Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-18 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 meeting with ENL, DM weights and blocks, email coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-19 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 2.5 0 Quote revision, fitting MTO review, concept development Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-19 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 2 0 Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-19 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 meeting with ENL, DM weights and blocks, email coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-22 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1.5 0 elbow customs clarifications, status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-22 Berkut-TSR :Berkut-TSR TSR-01655-BERP Vertical Air Receiver in Boiler Room Regular Pay N 1 0 fitting review, MTO and quote review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-22 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4.5 0 Holly LP mud concept and MTO, Drag chain clarifications, scope of work doc review, rig equipment agreement research, piping spec clarifications, mud pit grating spec, power tong TPP Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-22 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-23 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 7 0 Holly LP mud concept and MTO, Drag chain clarifications, scope of work doc review, rig equipment agreement research, piping spec clarifications, mud pit grating spec, power tong TPP Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-23 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 CU cert action list Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-24 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1 0 elbow customs clarifications, status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-24 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4.5 0 Holly LP mud concept and MTO, Drag chain clarifications, scope of work doc review, rig equipment agreement research, piping spec clarifications, mud pit grating spec, power tong TPP Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-24 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 2.5 0 ALE clarifications, genesis strong backs, weight clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-25 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 2.5 0 Holly LP mud concept and MTO, Drag chain clarifications, scope of work doc review, rig equipment agreement research, piping spec clarifications, mud pit grating spec, power tong TPP Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-25 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 1 0 3D concept development Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-25 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 4 0 completed closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-26 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4.5 0 Holly LP mud concept and MTO, Drag chain clarifications, scope of work doc review, rig equipment agreement research, piping spec clarifications, mud pit grating spec, power tong TPP Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-10-26 Rig 209L-TSR :Rig 209L-TSR TSR-01660-209L PHASE II - Rig move to SWS Regular Pay N 1 0 ALE clarifications, genesis strong backs, weight clarifications Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1.5 0 Review SAP mass loading template for asset data. Updating asset data is not within the project scope, though the data is severely lacking. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Review maintenance data from C101-17-10-A & C101-17-10-J for assets 10399857 & 10399937 for completeness. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Review status meeting with Greg and Mike. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-01-24 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 1/24 - Review SAP Data templates and user guide. 1/25 - Travel to Exxon office & participate in meeting for use of data templates for mass loading data. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-01-25 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 1/24 - Review SAP Data templates and user guide. 1/25 - Travel to Exxon office & participate in meeting for use of data templates for mass loading data. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-01 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Updating reviewed maintenance tasks to meet template requirements. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Compiling revised LTV Energy FC-1600 maintenance tasks. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Updating reviewed maintenance tasks to meet template requirements. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Two hours for project meetings. Create and submit templates for tong text updates. (No issues) Reviewing task list update template. Reviewing submitted maintenance updates. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Two hours for project meetings. Create and submit templates for tong text updates. (No issues) Reviewing task list update template. Reviewing submitted maintenance updates. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Updating Aux Brake proposed maintenance tasks. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Two hours for project meetings. Create and submit templates for tong text updates. (No issues) Reviewing task list update template. Reviewing submitted maintenance updates. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Two hours for project meetings. Create and submit templates for tong text updates. (No issues) Reviewing task list update template. Reviewing submitted maintenance updates. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-13 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Research O&M manuals for LTV Energy FC-1600 Mud Pumps Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-15 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Research O&M manuals for LTV Energy FC-1600 Mud Pumps Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-16 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 3 0 Revising maintenance plans 10080279, 10080294, & 10080309 on the FC-1600 Mud Pumps. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-21 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Reviewing and updating formatting of previously submitted maintenance operations. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-22 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Reviewing and updating formatting of previously submitted maintenance operations. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-23 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Reviewing and updating formatting of previously submitted maintenance operations. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-26 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Reviewing and updating formatting of previously submitted maintenance operations. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-28 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Reviewing and updating formatting of previously submitted maintenance operations. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-03-01 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Reviewing and updating formatting of previously submitted maintenance operations. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-03-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Reviewing and updating formatting of previously submitted maintenance operations. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-03-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Reviewing and updating formatting of previously submitted maintenance operations. Accessing test database and reviewing loaded test data for long text updates. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-03-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Reviewing and updating formatting of previously submitted maintenance operations. Accessing test database and reviewing loaded test data for long text updates. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-03-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Updating maintenance tasks for FC-1600 Mud Pumps Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-03-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Reviewing and updating formatting of previously submitted maintenance operations. Accessing test database and reviewing loaded test data for long text updates. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-03-28 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 5 0 Added maintenance plan 10099394 to the file TD PKG Equip 10379079 RTL MA 2-15-2018 on the TD PKG #10379079 and Task Listing Long Text Updates worksheet Building monthly maintenance plan for 1600 Mud Pumps. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-04-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Reviewing Project status, and preparing for turnover meeting. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-04-11 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Research data request for Mark and Adam for Oracle maintenance on heat exchangers. Provide CAT III & IV Mast Inspections. Provide example of rewrite of SAP maintenance plan for heat exchanger. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-04-12 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Research data request for Mark and Adam for Oracle maintenance on heat exchangers. Provide CAT III & IV Mast Inspections. Provide example of rewrite of SAP maintenance plan for heat exchanger. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-04-25 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Research and review heat exchanger maintenance plans with Mark & Adam. Still unable to launch SAP desktop. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-02 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-03 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-04 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 weekly ops call; TSR meetings; weekly TS meeting; HR catch-up; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Spent most of the time working on the Ops Discipline Playbook and Performance Development Assessments (self and others); year-end financial review & 18-mo lookahead Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 BD general meeting - client O&M; PlusPetrol 1500hp rig review; ENL/Kvaerner project Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly ops call; TSR meetings; weekly TS meeting; HR catch-up; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Spent most of the time working on the Ops Discipline Playbook and Performance Development Assessments (self and others); year-end financial review & 18-mo lookahead Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 BD general meeting - client O&M; PlusPetrol 1500hp rig review; ENL/Kvaerner project Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Spent most of the time working on the Ops Discipline Playbook and Performance Development Assessments (self and others); year-end financial review & 18-mo lookahead Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 BD general meeting - client O&M; PlusPetrol 1500hp rig review; ENL/Kvaerner project Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly ops call; TSR meetings; weekly TS meeting; HR catch-up; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Spent most of the time working on the Ops Discipline Playbook and Performance Development Assessments (self and others); year-end financial review & 18-mo lookahead Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly ops call; TSR meetings; weekly TS meeting; HR catch-up; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Spent most of the time working on the Ops Discipline Playbook and Performance Development Assessments (self and others); year-end financial review & 18-mo lookahead Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-15 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 7 0 Ice days Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 6 0 Ice days Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-18 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.5 0 PDR's Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-22 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1.5 0 meeting preparation Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 PDR's Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 pluspetrol Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 PDR's Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-24 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 meeting preparation Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 PDR's Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 PDR's Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 pluspetrol Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-26 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 meeting preparation Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-29 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 1 0 Husky Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-29 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Meeting prep; meeting & debrief; building scope of study; setup PTI as a vendor to Kvaerner Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-30 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 Meeting prep; meeting & debrief; building scope of study; setup PTI as a vendor to Kvaerner Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-30 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 driving to/from Exxon Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-31 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 1 0 Husky Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-31 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Meeting prep; meeting & debrief; building scope of study; setup PTI as a vendor to Kvaerner Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-01 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Meeting prep; meeting & debrief; building scope of study; setup PTI as a vendor to Kvaerner Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-02 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Meeting prep; meeting & debrief; building scope of study; setup PTI as a vendor to Kvaerner Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Performance Development Reviews Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-05 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Preparations for and participation in Kickoff meeting. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Performance Development Reviews Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-06 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 Preparations for and participation in Kickoff meeting. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Performance Development Reviews Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-07 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 6 0 Preparations for and participation in Kickoff meeting. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-08 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 9 0 Preparations for and participation in Kickoff meeting. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Performance Development Reviews Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-09 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Preparations for and participation in Kickoff meeting. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-12 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-13 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-14 OH-011 :OH-011 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-15 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-16 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-27 OH-014 :OH-014 Overhead All Activities Regular Pay N 7 0 Auditor training Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Contract T&C's; customer visits Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Contract T&C's; customer visits Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-01 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 driving to/from Exxon Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Contract T&C's; customer visits Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Contract T&C's; customer visits Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 at Exxon Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-06 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 driving to/from Exxon Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-07 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-07 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-08 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-08 OH-014 :OH-014 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 5 0 weekly ops call; discussions with NEORig / Bauer Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 weekly ops call; discussions with NEORig / Bauer Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 weekly ops call; discussions with NEORig / Bauer Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-14 OH-011 :OH-011 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-19 OH-014 :OH-014 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-20 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-21 OH-014 :OH-014 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-27 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-28 OH-011 :OH-011 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-30 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-04 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-09 OH-010 :OH-010 Overhead All Activities Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-09 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 rig 257; Shell GoM opportunity Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-10 OH-011 :OH-011 Overhead All Activities Regular Pay N 2 0 dentist appointment Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 rig 257; Shell GoM opportunity Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 rig 257; Shell GoM opportunity Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-17 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Meeting with Shaun Z - XOM Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-18 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 4/23 & 4/24: preparation for Shell meeting 4/25: introduction to Shell; PKD's O&M opportunities Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 4/23 & 4/24: preparation for Shell meeting 4/25: introduction to Shell; PKD's O&M opportunities Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-24 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 4/24: follow-up on Minkit Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-24 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 4/24: driving to/from Exxon; 4/25: travel to/from Shell - NOLA Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 4/23 & 4/24: preparation for Shell meeting 4/25: introduction to Shell; PKD's O&M opportunities Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-25 OH-010 :OH-010 Overhead All Activities Regular Pay N 6 0 4/24: driving to/from Exxon; 4/25: travel to/from Shell - NOLA Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-01 OH-011 :OH-011 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 at OTC Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-02 OH-010 :OH-010 Overhead All Activities Regular Pay N 1 0 travel to/from OTC Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-02 OH-014 :OH-014 Overhead All Activities Regular Pay N 7 0 Attending OTC Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-03 OH-010 :OH-010 Overhead All Activities Regular Pay N 1 0 travel to/from OTC Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-03 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 Attending OTC Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 weekly ops call; maintenance call; forecast meetings; discussing rig 30B incident; PDR reviews Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Holly and NuclearSafe Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 weekly ops call; maintenance call; forecast meetings; discussing rig 30B incident; PDR reviews Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 weekly ops call; maintenance call; forecast meetings; discussing rig 30B incident; PDR reviews Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Holly and NuclearSafe Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-09 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 IP and patent law training Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 weekly ops call; maintenance call; forecast meetings; discussing rig 30B incident; PDR reviews Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Holly and NuclearSafe Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Holly and NuclearSafe Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-11 OH-011 :OH-011 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Weekly ops call; various catch-up meetings; weekly TS meeting; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 emails; stuff for Bryan; review Contract Mgt IMS docs Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 NuclearSafe; Oxy; Holly; Uganda Discussions Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 emails; stuff for Bryan; review Contract Mgt IMS docs Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 NuclearSafe; Oxy; Holly; Uganda Discussions Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-15 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 HSE annual Training Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Weekly ops call; various catch-up meetings; weekly TS meeting; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 emails; stuff for Bryan; review Contract Mgt IMS docs Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 NuclearSafe; Oxy; Holly; Uganda Discussions Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly ops call; various catch-up meetings; weekly TS meeting; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 emails; stuff for Bryan; review Contract Mgt IMS docs Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 NuclearSafe; Oxy; Holly; Uganda Discussions Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 emails; stuff for Bryan; review Contract Mgt IMS docs Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 NuclearSafe; Oxy; Holly; Uganda Discussions Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Ops discipline Playbook; Penguin; finalize lease closure of Bourgeois Rd.; review TS-Contracts IMS docs Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Ops discipline Playbook; Penguin; finalize lease closure of Bourgeois Rd.; review TS-Contracts IMS docs Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Ops discipline Playbook; Penguin; finalize lease closure of Bourgeois Rd.; review TS-Contracts IMS docs Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Letter to Gary (Liberty de-mob); Argentina rig tender; Uganda tender (DrillMec); XOM Holly - rework hours estimate for repairs. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Ops discipline Playbook; Penguin; finalize lease closure of Bourgeois Rd.; review TS-Contracts IMS docs Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Letter to Gary (Liberty de-mob); Argentina rig tender; Uganda tender (DrillMec); XOM Holly - rework hours estimate for repairs. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Ops discipline Playbook; Penguin; finalize lease closure of Bourgeois Rd.; review TS-Contracts IMS docs Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Letter to Gary (Liberty de-mob); Argentina rig tender; Uganda tender (DrillMec); XOM Holly - rework hours estimate for repairs. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-28 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 mid-year review with Bryan; PDR discussion with GO; weekly TS meeting; BOP discussion and other maintenance issues Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 7.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 follow-up on Liberty rig/NuclearSAFE Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-30 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 1.5 0 review SOW document; discussions with George; bi-weekly status update meeting Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-30 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 coaching session Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 mid-year review with Bryan; PDR discussion with GO; weekly TS meeting; BOP discussion and other maintenance issues Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-31 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 0.5 0 review SOW document; discussions with George; bi-weekly status update meeting Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 mid-year review with Bryan; PDR discussion with GO; weekly TS meeting; BOP discussion and other maintenance issues Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-01 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 1 0 review SOW document; discussions with George; bi-weekly status update meeting Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-04 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 rig comparison for XTO Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 7.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 6/12: at XOM - Brad Barton 6/14: developing PAE presentation Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-12 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 6/12: driving to/from XOM; 6/13: driving to/from training Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-13 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 6/12: driving to/from XOM; 6/13: driving to/from training Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-13 OH-014 :OH-014 Overhead All Activities Regular Pay N 3 0 IADC Technology Forum Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 6/12: at XOM - Brad Barton 6/14: developing PAE presentation Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-18 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 supporting John R. - rig 30B Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-20 OH-010 :OH-010 Overhead All Activities Regular Pay N 6 0 driving to/from rig 30B Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-20 OH-013 :OH-013 Overhead All Activities Regular Pay N 5 0 supporting John R. - rig 30B Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-28 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-02 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-03 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 ODP rollout discussions with Bryan & Drilling Leadership; weekly ops call; Hibernia OFI meeting; ATH review & discussions; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 ODP rollout planning; headcount planning; email; weekly Ops call preparation & AAR Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 General BD; 7/13: meetings at XOM RE: Holly Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 5 0 ODP rollout discussions with Bryan & Drilling Leadership; weekly ops call; Hibernia OFI meeting; ATH review & discussions; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 ODP rollout planning; headcount planning; email; weekly Ops call preparation & AAR Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 ODP rollout discussions with Bryan & Drilling Leadership; weekly ops call; Hibernia OFI meeting; ATH review & discussions; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 ODP rollout planning; headcount planning; email; weekly Ops call preparation & AAR Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 ODP rollout discussions with Bryan & Drilling Leadership; weekly ops call; Hibernia OFI meeting; ATH review & discussions; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 ODP rollout planning; headcount planning; email; weekly Ops call preparation & AAR Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 ODP rollout planning; headcount planning; email; weekly Ops call preparation & AAR Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 General BD; 7/13: meetings at XOM RE: Holly Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-13 OH-010 :OH-010 Overhead All Activities Regular Pay N 1 0 Driving to/from XOM Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Monday Ops call; various catch-ups; Monthly Maint. telecon; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 OP.STD.001 - issued draft; ODP rollout planning & discussions Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Holly mtgs & draft letter; Salesforce update Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Monday Ops call; various catch-ups; Monthly Maint. telecon; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.5 0 OP.STD.001 - issued draft; ODP rollout planning & discussions Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 1 0 dentist Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Monday Ops call; various catch-ups; Monthly Maint. telecon; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 OP.STD.001 - issued draft; ODP rollout planning & discussions Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Holly mtgs & draft letter; Salesforce update Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Monday Ops call; various catch-ups; Monthly Maint. telecon; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 OP.STD.001 - issued draft; ODP rollout planning & discussions Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 Holly mtgs & draft letter; Salesforce update Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 HR discussion; Weekly Ops call; dual fuel study update; catch-up w/Justin W. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 general meetings; Holly manning discussions; ODP rollout planning; ES.STD.001 issuance & MOC; preparing for weekly Ops call & follow-up afterwards. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 at XOM campus; PAE; XTO opportunity discussions and work; XOM Holly; lunch with WOOD (Andy Maitland); discussions with Jonathan Marsh Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 general meetings; Holly manning discussions; ODP rollout planning; ES.STD.001 issuance & MOC; preparing for weekly Ops call & follow-up afterwards. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 at XOM campus; PAE; XTO opportunity discussions and work; XOM Holly; lunch with WOOD (Andy Maitland); discussions with Jonathan Marsh Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-24 OH-010 :OH-010 Overhead All Activities Regular Pay N 1 0 One-way drive to XOM. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 HR discussion; Weekly Ops call; dual fuel study update; catch-up w/Justin W. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 general meetings; Holly manning discussions; ODP rollout planning; ES.STD.001 issuance & MOC; preparing for weekly Ops call & follow-up afterwards. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 at XOM campus; PAE; XTO opportunity discussions and work; XOM Holly; lunch with WOOD (Andy Maitland); discussions with Jonathan Marsh Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 general meetings; Holly manning discussions; ODP rollout planning; ES.STD.001 issuance & MOC; preparing for weekly Ops call & follow-up afterwards. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 at XOM campus; PAE; XTO opportunity discussions and work; XOM Holly; lunch with WOOD (Andy Maitland); discussions with Jonathan Marsh Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-26 OH-011 :OH-011 Overhead All Activities Regular Pay N 3 0 Robotics / ASME presentation Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 general meetings; Holly manning discussions; ODP rollout planning; ES.STD.001 issuance & MOC; preparing for weekly Ops call & follow-up afterwards. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 at XOM campus; PAE; XTO opportunity discussions and work; XOM Holly; lunch with WOOD (Andy Maitland); discussions with Jonathan Marsh Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 08/01: at Loadmaster for Canyon Oak meeting Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 XTO - Argentina: Various Discussions with Karma and others Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 08/01: at Loadmaster for Canyon Oak meeting Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 XTO - Argentina: Various Discussions with Karma and others Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-31 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 Hyperion Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 08/01: at Loadmaster for Canyon Oak meeting Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 XTO - Argentina: Various Discussions with Karma and others Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-01 OH-010 :OH-010 Overhead All Activities Regular Pay N 1.5 0 driving to/from Loadmaster meeting Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 08/01: at Loadmaster for Canyon Oak meeting Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 XTO - Argentina: Various Discussions with Karma and others Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 XTO - Argentina: Various Discussions with Karma and others Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-06 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 2.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-07 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-08 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-09 OH-009 :OH-009 OH-009-025 Argentina Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-10 OH-010 :OH-010 Overhead All Activities Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Argentina; At exxon - Katie Thurman; looking for James Blaine, quick chat with Johnathan Marsh, Sean Crenshaw. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 Argentina; At exxon - Katie Thurman; looking for James Blaine, quick chat with Johnathan Marsh, Sean Crenshaw. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-16 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 Driving to/from Exxon Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Argentina; At exxon - Katie Thurman; looking for James Blaine, quick chat with Johnathan Marsh, Sean Crenshaw. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 9 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-24 OH-010 :OH-010 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-25 OH-010 :OH-010 Overhead All Activities Regular Pay N 20 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-26 OH-010 :OH-010 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Ops Discipline Rollout - Kazakhstan; General email & department work Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Ops Discipline Rollout - Kazakhstan; General email & department work Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Ops Discipline Rollout - Kazakhstan; General email & department work Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Ops Discipline Rollout - Kazakhstan; General email & department work Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-30 OH-010 :OH-010 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-08-31 OH-010 :OH-010 Overhead All Activities Regular Pay N 20 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Labor Day Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Meetings at Exxon; BP Andrew platform; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-05 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 driving to/from Exxon Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Meetings at Exxon; BP Andrew platform; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Meetings at Exxon; BP Andrew platform; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-10 OH-010 :OH-010 Overhead All Activities Regular Pay N 2.5 0 Drivng to/from Austin for IADC-ART conference Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 Talking with people at ART conference; Liberty demob estimate. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-11 OH-014 :OH-014 Overhead All Activities Regular Pay N 6 0 ART conference 9/11 & 9/12; Compliance Training 9/13 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Talking with people at ART conference; Liberty demob estimate. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-12 OH-010 :OH-010 Overhead All Activities Regular Pay N 2.5 0 Drivng to/from Austin for IADC-ART conference Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-12 OH-014 :OH-014 Overhead All Activities Regular Pay N 6 0 ART conference 9/11 & 9/12; Compliance Training 9/13 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Talking with people at ART conference; Liberty demob estimate. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-13 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 ART conference 9/11 & 9/12; Compliance Training 9/13 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Talking with people at ART conference; Liberty demob estimate. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 XTO - Permian Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 9/17: planning ODP rollout - GoM Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-17 OH-010 :OH-010 Overhead All Activities Regular Pay N 4.5 0 drive Hou to New Iberia & back Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 9/17: planning ODP rollout - GoM Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-18 OH-010 :OH-010 Overhead All Activities Regular Pay N 4.5 0 drive Hou to New Iberia & back Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 7.5 0 9/17: planning ODP rollout - GoM Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 9/17: planning ODP rollout - GoM Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 5 0 9/24: ops call & QBR's 9/27: IADC ART/DCS mtg 9/28: ODP rollout in NI & various discussion in NI. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 9/24: ops call & QBR's 9/27: IADC ART/DCS mtg 9/28: ODP rollout in NI & various discussion in NI. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 9/24: ops call & QBR's 9/27: IADC ART/DCS mtg 9/28: ODP rollout in NI & various discussion in NI. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 9/24: ops call & QBR's 9/27: IADC ART/DCS mtg 9/28: ODP rollout in NI & various discussion in NI. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-27 OH-010 :OH-010 Overhead All Activities Regular Pay N 6 0 9/27: 1.5 to/from IADC; 4.5 to New Iberia 9/28: from NI 9/29: to/from Sugarland airport - delivering laptops for AK people to use on barges Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 6 0 9/24: ops call & QBR's 9/27: IADC ART/DCS mtg 9/28: ODP rollout in NI & various discussion in NI. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-28 OH-010 :OH-010 Overhead All Activities Regular Pay N 4.5 0 9/27: 1.5 to/from IADC; 4.5 to New Iberia 9/28: from NI 9/29: to/from Sugarland airport - delivering laptops for AK people to use on barges Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-09-29 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 9/27: 1.5 to/from IADC; 4.5 to New Iberia 9/28: from NI 9/29: to/from Sugarland airport - delivering laptops for AK people to use on barges Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 10/08: xom - data gathering from Krechet 10/09-10/12: XOM supplier project Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-08 OH-010 :OH-010 Overhead All Activities Regular Pay N 1 0 10/08: drive to XOM 10/10: drive to/from Kennedy Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 4.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 10/08: xom - data gathering from Krechet 10/09-10/12: XOM supplier project Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 10/08: xom - data gathering from Krechet 10/09-10/12: XOM supplier project Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-10 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 4 0 Talos Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-10 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 10/08: drive to XOM 10/10: drive to/from Kennedy Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 10/08: xom - data gathering from Krechet 10/09-10/12: XOM supplier project Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 10/08: xom - data gathering from Krechet 10/09-10/12: XOM supplier project Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 10/19 & 10/20: operational Assessments on Krechet Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 10/19 & 10/20: operational Assessments on Krechet Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-16 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 10/16-10/18: flights to SAK Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-17 OH-010 :OH-010 Overhead All Activities Regular Pay N 12 0 10/16-10/18: flights to SAK Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-18 OH-010 :OH-010 Overhead All Activities Regular Pay N 10 0 10/16-10/18: flights to SAK Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 10 0 10/19 & 10/20: operational Assessments on Krechet Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 10 0 10/19 & 10/20: operational Assessments on Krechet Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 10 0 10/21: operational assessment on Yastreb 10/22-10/26: operational assessment in Yuzhno Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-21 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 10/21 & 10/22: travel south to Yuzhno on train 10/27: flights from SAK to IAH Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 10/21: operational assessment on Yastreb 10/22-10/26: operational assessment in Yuzhno Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-22 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 10/21 & 10/22: travel south to Yuzhno on train 10/27: flights from SAK to IAH Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 9 0 10/21: operational assessment on Yastreb 10/22-10/26: operational assessment in Yuzhno Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 9 0 10/21: operational assessment on Yastreb 10/22-10/26: operational assessment in Yuzhno Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 9 0 10/21: operational assessment on Yastreb 10/22-10/26: operational assessment in Yuzhno Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 10/21: operational assessment on Yastreb 10/22-10/26: operational assessment in Yuzhno Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 10/21: operational assessment on Yastreb 10/22-10/26: operational assessment in Yuzhno Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-10-27 OH-010 :OH-010 Overhead All Activities Regular Pay N 12 0 10/21 & 10/22: travel south to Yuzhno on train 10/27: flights from SAK to IAH Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Years Day Holiday Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily Team meeting, Thursday TSR Update meeting. Timesheets. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-02 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 7.5 0 209L-01-03-411-1 thru 7 Revise drawings issued for construction, revise per comments. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-03 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 8 0 209L-01-03-411-1 thru 7 Revise drawings issued for construction, revise per comments. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily Team meeting, Thursday TSR Update meeting. Timesheets. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 For Lifting Tool revisions TSR 01618 - Revised for arm modifications / design change. 209L-01-03-633-1 thru 3 - run analysis. (Static 4) Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-04 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 5 0 209L-01-03-411-1 thru 7 Revise drawings issued for construction, revise per comments. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team meeting, Thursday TSR Update meeting. Timesheets. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 For Lifting Tool revisions TSR 01618 - Revised for arm modifications / design change. 209L-01-03-633-1 thru 3 - run analysis. (Static 4) Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-05 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 3.75 0 209L-01-03-411-1 thru 7 Revise drawings issued for construction, revise per comments. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Sakhalin Meeting, Daily Team meeting. Thursday Weekly TSR Meeting. Thrusday 2M Tek meeting for Test Frame Assembly. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7.75 0 For TSR 1593 & 1618 - 209L-01-03-633-1 thru 3 SBOP Lifting Ring - 209L-01-03-411-1 thru 6 Cantilever Walkway - 209L-01-03-629-1 thru 7 DSM Suitcase Access Platform - drawings issued for construction, revise per comments. Plate size changes on cantilever walkway. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Sakhalin Meeting, Daily Team meeting. Thursday Weekly TSR Meeting. Thrusday 2M Tek meeting for Test Frame Assembly. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-09 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 7.75 0 209L-01-03-411-1 thru 6 Cantilever Walkway - 209L-01-03-629-1 thru 7 DSM Suitcase Access Platform - drawings issued for construction, revise per comments. Plate size changes on cantilever walkway. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 8 0 For TSR 1593 & 1618 - 209L-01-03-633-1 thru 3 SBOP Lifting Ring - 209L-01-03-411-1 thru 6 Cantilever Walkway - 209L-01-03-629-1 thru 7 DSM Suitcase Access Platform - drawings issued for construction, revise per comments. Plate size changes on cantilever walkway. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Sakhalin Meeting, Daily Team meeting. Thursday Weekly TSR Meeting. Thrusday 2M Tek meeting for Test Frame Assembly. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5.5 0 For TSR 1593 & 1618 - 209L-01-03-633-1 thru 3 SBOP Lifting Ring - 209L-01-03-411-1 thru 6 Cantilever Walkway - 209L-01-03-629-1 thru 7 DSM Suitcase Access Platform - drawings issued for construction, revise per comments. Plate size changes on cantilever walkway. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 8 0 For TSR 1593 & 1618 - 209L-01-03-633-1 thru 3 SBOP Lifting Ring - 209L-01-03-411-1 thru 6 Cantilever Walkway - 209L-01-03-629-1 thru 7 DSM Suitcase Access Platform - drawings issued for construction, revise per comments. Plate size changes on cantilever walkway. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-15 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1.5 0 Meeting to review Torque sub calibration frame & review TSR/CTR. Go over parts to be modified in model. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily Team meeting, timesheets Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-15 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Revised 209L-01-03-411-R0-dsm-dm-access-walkway, fix BOM & Material call outs. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-15 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4 0 Created 077B-01-04-008-1-RA-compressed-air-system-p&id drawing per field sketches. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Inclement Weather Days Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Inclement Weather Days Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-18 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2.5 0 Meeting to review Torque sub calibration frame & review TSR/CTR. Go over parts to be modified in model. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team meeting, timesheets Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.25 0 Revised 209L-01-03-411-R0-dsm-dm-access-walkway, fix BOM & Material call outs. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-18 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4 0 Created 077B-01-04-008-1-RA-compressed-air-system-p&id drawing per field sketches. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-19 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5 0 Meeting to review Torque sub calibration frame & review TSR/CTR. Go over parts to be modified in model. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-19 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3 0 Created 077B-01-04-008-1-RA-compressed-air-system-p&id drawing per field sketches. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-22 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 3 0 Meeting to review Torque Go over parts to be modified in model, review clamp / torque connections, move torque connections to adapter sub pieces. shorten model and run FEA on existing "Top Hat" part for new pull design requirement. Design a new adjustable torque connection for adapter pieces. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Monday Morning Meeting with Sakhalin, Daily Team Meeting. Thursday TSR Update Meeting. Thursday Safer union product Presentation. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Revised 209L-01-03-411-R0-dsm-dm-access-walkway, fix handrail bom and details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-22 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 2 0 Finalize and check 077B-01-04-008-1-RA-compressed-air-system-p&id drawing per field sketches. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-23 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5.75 0 Meeting to review Torque Go over parts to be modified in model, review clamp / torque connections, move torque connections to adapter sub pieces. shorten model and run FEA on existing "Top Hat" part for new pull design requirement. Design a new adjustable torque connection for adapter pieces. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Monday Morning Meeting with Sakhalin, Daily Team Meeting. Thursday TSR Update Meeting. Thursday Safer union product Presentation. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Revised 209L-01-03-411-R0-dsm-dm-access-walkway, fix handrail bom and details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-24 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.75 0 Meeting to review Torque Go over parts to be modified in model, review clamp / torque connections, move torque connections to adapter sub pieces. shorten model and run FEA on existing "Top Hat" part for new pull design requirement. Design a new adjustable torque connection for adapter pieces. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Monday Morning Meeting with Sakhalin, Daily Team Meeting. Thursday TSR Update Meeting. Thursday Safer union product Presentation. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-25 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 6 0 Meeting to review Torque Go over parts to be modified in model, review clamp / torque connections, move torque connections to adapter sub pieces. shorten model and run FEA on existing "Top Hat" part for new pull design requirement. Design a new adjustable torque connection for adapter pieces. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Monday Morning Meeting with Sakhalin, Daily Team Meeting. Thursday TSR Update Meeting. Thursday Safer union product Presentation. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-26 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Meeting to review Torque Go over parts to be modified in model, review clamp / torque connections, move torque connections to adapter sub pieces. shorten model and run FEA on existing "Top Hat" part for new pull design requirement. Design a new adjustable torque connection for adapter pieces. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-29 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 6.75 0 Finalize Torque Sub Calibration Machine Layout Design, meetings to go over layout Adjustable anchor location layout and cylinder positions. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 Thursday TSR Meeting. Monday Sakhalin meeting. Daily Team Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-30 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.75 0 Finalize Torque Sub Calibration Machine Layout Design, meetings to go over layout Adjustable anchor location layout and cylinder positions. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Thursday TSR Meeting. Monday Sakhalin meeting. Daily Team Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-31 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.75 0 Finalize Torque Sub Calibration Machine Layout Design, meetings to go over layout Adjustable anchor location layout and cylinder positions. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Thursday TSR Meeting. Monday Sakhalin meeting. Daily Team Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-01 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7 0 Finalize Torque Sub Calibration Machine Layout Design, meetings to go over layout Adjustable anchor location layout and cylinder positions. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Thursday TSR Meeting. Monday Sakhalin meeting. Daily Team Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-02 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Finalize Torque Sub Calibration Machine Layout Design, meetings to go over layout Adjustable anchor location layout and cylinder positions. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-05 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.75 0 Layout torque sub test machine for maximum / minimum torque sub lengths, layout connections for horizontal torque attachment and discuss with Andrew on Friday meeting, finalized design discussion. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily team meeting. No TSR meeting this week. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-06 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.75 0 Layout torque sub test machine for maximum / minimum torque sub lengths, layout connections for horizontal torque attachment and discuss with Andrew on Friday meeting, finalized design discussion. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily team meeting. No TSR meeting this week. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-07 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 8 0 Created 270L-01-SK-024-RA-Chayvo-water-well-plot-plan (4 sheets). 270L-01-SK-025-1-RA-Chayvo-water-well-walking-path-layout (14 sheets) 270L-01-SK-026-01-RA-Chayvo-water-well-plot-plan-north-south-well-rows (4 sheets) 270L-01-SK-027-01-RA-Chayvo-water-well-plot-plan-east-west-well-rows (4 sheets) All modified from existing 270 water well drawings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-08 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 Layout torque sub test machine for maximum / minimum torque sub lengths, layout connections for horizontal torque attachment and discuss with Andrew on Friday meeting, finalized design discussion. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-08 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 6 0 Created 270L-01-SK-024-RA-Chayvo-water-well-plot-plan (4 sheets). 270L-01-SK-025-1-RA-Chayvo-water-well-walking-path-layout (14 sheets) 270L-01-SK-026-01-RA-Chayvo-water-well-plot-plan-north-south-well-rows (4 sheets) 270L-01-SK-027-01-RA-Chayvo-water-well-plot-plan-east-west-well-rows (4 sheets) All modified from existing 270 water well drawings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-09 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 Layout torque sub test machine for maximum / minimum torque sub lengths, layout connections for horizontal torque attachment and discuss with Andrew on Friday meeting, finalized design discussion. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-09 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 6 0 Created 270L-01-SK-024-RA-Chayvo-water-well-plot-plan (4 sheets). 270L-01-SK-025-1-RA-Chayvo-water-well-walking-path-layout (14 sheets) 270L-01-SK-026-01-RA-Chayvo-water-well-plot-plan-north-south-well-rows (4 sheets) 270L-01-SK-027-01-RA-Chayvo-water-well-plot-plan-east-west-well-rows (4 sheets) All modified from existing 270 water well drawings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily meeting, TSR Update Meeting, Timesheets. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-12 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 7.75 0 Options for walking 1A, 1B & 2 with matting layouts. 270L-01-SK-026-RA-Chayvo-water-well-plot-plan-north-south-well-rows, 270L-01-SK-028-RA-Chayvo-water-well-walking-path-layout-north-south-well-rows, 270L-01-SK-029-RA-Chayvo-water-well-walking-path-layout-east-west-well-rows, 270L-01-SK-024-RA-Chayvo-water-well-plot-plan, 270L-01-SK-027-RA-Chayvo-water-well-plot-plan-east-west-well-rows. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-13 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 8 0 Options for walking 1A, 1B & 2 with matting layouts. 270L-01-SK-026-RA-Chayvo-water-well-plot-plan-north-south-well-rows, 270L-01-SK-028-RA-Chayvo-water-well-walking-path-layout-north-south-well-rows, 270L-01-SK-029-RA-Chayvo-water-well-walking-path-layout-east-west-well-rows, 270L-01-SK-024-RA-Chayvo-water-well-plot-plan, 270L-01-SK-027-RA-Chayvo-water-well-plot-plan-east-west-well-rows. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-14 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5.75 0 Discuss design layout options Advantages vs. Disadvantages, Options for designs 1-4, create 3 model display modes for long sub, short sub & torque position for design option 4 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily meeting, TSR Update Meeting, Timesheets. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-14 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 2 0 Options for walking 1A, 1B & 2 with matting layouts. 270L-01-SK-026-RA-Chayvo-water-well-plot-plan-north-south-well-rows, 270L-01-SK-028-RA-Chayvo-water-well-walking-path-layout-north-south-well-rows, 270L-01-SK-029-RA-Chayvo-water-well-walking-path-layout-east-west-well-rows, 270L-01-SK-024-RA-Chayvo-water-well-plot-plan, 270L-01-SK-027-RA-Chayvo-water-well-plot-plan-east-west-well-rows. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-15 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7 0 Discuss design layout options Advantages vs. Disadvantages, Options for designs 1-4, create 3 model display modes for long sub, short sub & torque position for design option 4 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily meeting, TSR Update Meeting, Timesheets. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-16 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Floating Holiday Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Presidents Day Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-20 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5 0 Go to Lafayette to inspect existing machine for Tension Testing / Calibration. Tues. go to Stress Eng. for Pull Test on parts. Thurs. Friday. Adjust model for new larger size cylinders for tension. and set up torq plates for stress analysis. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-20 OH-010 :OH-010 Overhead All Activities Regular Pay N 3 0 Travel from 2M-TEK in Lafayette. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-21 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Go to Lafayette to inspect existing machine for Tension Testing / Calibration. Tues. go to Stress Eng. for Pull Test on parts. Thurs. Friday. Adjust model for new larger size cylinders for tension. and set up torq plates for stress analysis. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-22 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7 0 Go to Lafayette to inspect existing machine for Tension Testing / Calibration. Tues. go to Stress Eng. for Pull Test on parts. Thurs. Friday. Adjust model for new larger size cylinders for tension. and set up torq plates for stress analysis. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-23 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Go to Lafayette to inspect existing machine for Tension Testing / Calibration. Tues. go to Stress Eng. for Pull Test on parts. Thurs. Friday. Adjust model for new larger size cylinders for tension. and set up torq plates for stress analysis. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-26 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7 0 Adjust width of test machine to fit torque arm at 12". Finalize model for design review on Thursday. Thursday Create Design Review renderings for Hyd. Review. Detail Design Review Friday Analysis Overview. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily Team Meeting. Update PTO with Payroll. (Mon.) Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-27 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Adjust width of test machine to fit torque arm at 12". Finalize model for design review on Thursday. Thursday Create Design Review renderings for Hyd. Review. Detail Design Review Friday Analysis Overview. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-28 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Adjust width of test machine to fit torque arm at 12". Finalize model for design review on Thursday. Thursday Create Design Review renderings for Hyd. Review. Detail Design Review Friday Analysis Overview. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-01 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Adjust width of test machine to fit torque arm at 12". Finalize model for design review on Thursday. Thursday Create Design Review renderings for Hyd. Review. Detail Design Review Friday Analysis Overview. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-02 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 4 0 Adjust width of test machine to fit torque arm at 12". Finalize model for design review on Thursday. Thursday Create Design Review renderings for Hyd. Review. Detail Design Review Friday Analysis Overview. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-02 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 PTO Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-05 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.5 0 TSCM - TOP Hat Assembly FEA, TSCM - Anchor Assembly-Nonlinear FEA. New Head End plate redesign, FEA. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-06 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5 0 TSCM - TOP Hat Assembly FEA, TSCM - Anchor Assembly-Nonlinear FEA. New Head End plate redesign, FEA. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-07 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 9 0 TSCM - TOP Hat Assembly FEA, TSCM - Anchor Assembly-Nonlinear FEA. New Head End plate redesign, FEA. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-08 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 9.5 0 TSCM - TOP Hat Assembly FEA, TSCM - Anchor Assembly-Nonlinear FEA. New Head End plate redesign, FEA. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-09 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8.5 0 TSCM - TOP Hat Assembly FEA, TSCM - Anchor Assembly-Nonlinear FEA. New Head End plate redesign, FEA. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-12 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.5 0 Created new model for single plate head assemblies, model for FEA end head assemblies. FEA meeting to discuss nonlinear analysis. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Whiteboard Meetings Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-13 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.5 0 Created new model for single plate head assemblies, model for FEA end head assemblies. FEA meeting to discuss nonlinear analysis. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Whiteboard Meetings Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-14 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Created new model for single plate head assemblies, model for FEA end head assemblies. FEA meeting to discuss nonlinear analysis. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-15 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.5 0 Created new model for single plate head assemblies, model for FEA end head assemblies. FEA meeting to discuss nonlinear analysis. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Whiteboard Meetings Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-16 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Created new model for single plate head assemblies, model for FEA end head assemblies. FEA meeting to discuss nonlinear analysis. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-19 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 6.5 0 Meet with Josh to discuss FEA Layout for End frame, Set up FEA for Middle frame assembly. Clean up folder structure, path for Final Assembly model. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily Team Meeting, Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-19 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 Revise existing Hyundai drawing for choke line DS3K-KK-1926-1, put changes in and revise title block. Revise ORLP-01-03-009 1 thru 3, Layout for new choke support positions, detail new support installation and locations. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-20 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 4 0 Meet with Josh to discuss FEA Layout for End frame, Set up FEA for Middle frame assembly. Clean up folder structure, path for Final Assembly model. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-20 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 4 0 Revise electrical one line sketch, create sketch drawing 209L-01-SK-001-RA-crane-warning-light-elec-schematic, Revise and add electrical box detail. Look up part sizes for box arrangement drawing. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-21 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 Meet with Josh to discuss FEA Layout for End frame, Set up FEA for Middle frame assembly. Clean up folder structure, path for Final Assembly model. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting, Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-21 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 6.75 0 Revise existing Hyundai drawing for choke line DS3K-KK-1926-1, put changes in and revise title block. Revise ORLP-01-03-009 1 thru 3, Layout for new choke support positions, detail new support installation and locations. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-22 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Meet with Josh to discuss FEA Layout for End frame, Set up FEA for Middle frame assembly. Clean up folder structure, path for Final Assembly model. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily Team Meeting, Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-22 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 Revise existing Hyundai drawing for choke line DS3K-KK-1926-1, put changes in and revise title block. Revise ORLP-01-03-009 1 thru 3, Layout for new choke support positions, detail new support installation and locations. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-22 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 3 0 Revise electrical one line sketch, create sketch drawing 209L-01-SK-001-RA-crane-warning-light-elec-schematic, Revise and add electrical box detail. Look up part sizes for box arrangement drawing. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-23 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5 0 Meet with Josh to discuss FEA Layout for End frame, Set up FEA for Middle frame assembly. Clean up folder structure, path for Final Assembly model. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-23 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 Revise existing Hyundai drawing for choke line DS3K-KK-1926-1, put changes in and revise title block. Revise ORLP-01-03-009 1 thru 3, Layout for new choke support positions, detail new support installation and locations. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily team meeting, Thursday TSR Update Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-26 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 8.75 0 Create ORLP-01-03-009 4, 5, & 6, detail new support installation and locations. Friday redlines for supports, detail baseplate attachments. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily team meeting, Thursday TSR Update Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-27 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 7.75 0 Create ORLP-01-03-009 4, 5, & 6, detail new support installation and locations. Friday redlines for supports, detail baseplate attachments. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-28 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 3 0 Wed. Modified materials on middle frame assembly, run FEA model. Thurs. Modified both end assemblies for new material and new style anchor pieces., run FEA model. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily team meeting, Thursday TSR Update Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-28 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 4.75 0 Create ORLP-01-03-009 4, 5, & 6, detail new support installation and locations. Friday redlines for supports, detail baseplate attachments. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-29 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 3 0 Wed. Modified materials on middle frame assembly, run FEA model. Thurs. Modified both end assemblies for new material and new style anchor pieces., run FEA model. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily team meeting, Thursday TSR Update Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-29 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 3.5 0 Create ORLP-01-03-009 4, 5, & 6, detail new support installation and locations. Friday redlines for supports, detail baseplate attachments. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-30 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Good Friday Holilday Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-02 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 4.75 0 FEA Analysis for Anchor end mounts, and snapshots for Anchor Ends, Mount Plates, Main Head, Middle frame Torsion & Tension FEA setup Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting, Thursday TSR Update Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-02 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 3 0 Revise ORLP-01-03-009 1-6, pick up redlines. Issue for Fab. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-03 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.75 0 FEA Analysis for Anchor end mounts, and snapshots for Anchor Ends, Mount Plates, Main Head, Middle frame Torsion & Tension FEA setup Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting, Thursday TSR Update Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-04 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.75 0 FEA Analysis for Anchor end mounts, and snapshots for Anchor Ends, Mount Plates, Main Head, Middle frame Torsion & Tension FEA setup Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting, Thursday TSR Update Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-05 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7 0 FEA Analysis for Anchor end mounts, and snapshots for Anchor Ends, Mount Plates, Main Head, Middle frame Torsion & Tension FEA setup Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily Team Meeting, Thursday TSR Update Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-06 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.75 0 FEA Analysis for Anchor end mounts, and snapshots for Anchor Ends, Mount Plates, Main Head, Middle frame Torsion & Tension FEA setup Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting, Thursday TSR Update Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-09 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7 0 Final FEA snapshots, Torque Clevis, Leg/Pin Assembly, Middle frame torsion FEA. Create Bid Drawings for Middle frame assembly, End assembly, Head Assembly, Roller Frame Assembly Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily Team Meeting, Weekly TSR Update Meeting. Monday Sakhalin update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-10 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Final FEA snapshots, Torque Clevis, Leg/Pin Assembly, Middle frame torsion FEA. Create Bid Drawings for Middle frame assembly, End assembly, Head Assembly, Roller Frame Assembly Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-11 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.75 0 Final FEA snapshots, Torque Clevis, Leg/Pin Assembly, Middle frame torsion FEA. Create Bid Drawings for Middle frame assembly, End assembly, Head Assembly, Roller Frame Assembly Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting, Weekly TSR Update Meeting. Monday Sakhalin update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-12 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7 0 Final FEA snapshots, Torque Clevis, Leg/Pin Assembly, Middle frame torsion FEA. Create Bid Drawings for Middle frame assembly, End assembly, Head Assembly, Roller Frame Assembly Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily Team Meeting, Weekly TSR Update Meeting. Monday Sakhalin update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-13 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Final FEA snapshots, Torque Clevis, Leg/Pin Assembly, Middle frame torsion FEA. Create Bid Drawings for Middle frame assembly, End assembly, Head Assembly, Roller Frame Assembly Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-16 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.75 0 Adjust end plates on main assembly into weldment assemblies., Revise skid assembly for 10X6X5/8 tube. Add Lift lugs on plate assemblies. Adjust rollers and make new roller gussets to align with new skid frame tube. Create drawings from models for end assembly.2MTEK-01-01-020 thur 028. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting, Weekly TSR Update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-17 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8.75 0 Adjust end plates on main assembly into weldment assemblies., Revise skid assembly for 10X6X5/8 tube. Add Lift lugs on plate assemblies. Adjust rollers and make new roller gussets to align with new skid frame tube. Create drawings from models for end assembly.2MTEK-01-01-020 thur 028. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting, Weekly TSR Update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-18 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8.75 0 Adjust end plates on main assembly into weldment assemblies., Revise skid assembly for 10X6X5/8 tube. Add Lift lugs on plate assemblies. Adjust rollers and make new roller gussets to align with new skid frame tube. Create drawings from models for end assembly.2MTEK-01-01-020 thur 028. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting, Weekly TSR Update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-19 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Adjust end plates on main assembly into weldment assemblies., Revise skid assembly for 10X6X5/8 tube. Add Lift lugs on plate assemblies. Adjust rollers and make new roller gussets to align with new skid frame tube. Create drawings from models for end assembly.2MTEK-01-01-020 thur 028. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily Team Meeting, Weekly TSR Update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-20 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5 0 Adjust end plates on main assembly into weldment assemblies., Revise skid assembly for 10X6X5/8 tube. Add Lift lugs on plate assemblies. Adjust rollers and make new roller gussets to align with new skid frame tube. Create drawings from models for end assembly.2MTEK-01-01-020 thur 028. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-23 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Revise End Assembly drawings 2MTEK-01-11-020 thru 028 and assembly model, iron out drawing numbers and update dwg register. Create Main Assembly Snapshot for report. Create Roller Skid Assembly Drawing 2M-TEK-01-10-000 1&2. Start Head Assembly drawing 2M-TEK-01-10-001 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-24 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Revise End Assembly drawings 2MTEK-01-11-020 thru 028 and assembly model, iron out drawing numbers and update dwg register. Create Main Assembly Snapshot for report. Create Roller Skid Assembly Drawing 2M-TEK-01-10-000 1&2. Start Head Assembly drawing 2M-TEK-01-10-001 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-25 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Revise End Assembly drawings 2MTEK-01-11-020 thru 028 and assembly model, iron out drawing numbers and update dwg register. Create Main Assembly Snapshot for report. Create Roller Skid Assembly Drawing 2M-TEK-01-10-000 1&2. Start Head Assembly drawing 2M-TEK-01-10-001 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-26 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7 0 Revise End Assembly drawings 2MTEK-01-11-020 thru 028 and assembly model, iron out drawing numbers and update dwg register. Create Main Assembly Snapshot for report. Create Roller Skid Assembly Drawing 2M-TEK-01-10-000 1&2. Start Head Assembly drawing 2M-TEK-01-10-001 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TSR Update Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-27 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Revise End Assembly drawings 2MTEK-01-11-020 thru 028 and assembly model, iron out drawing numbers and update dwg register. Create Main Assembly Snapshot for report. Create Roller Skid Assembly Drawing 2M-TEK-01-10-000 1&2. Start Head Assembly drawing 2M-TEK-01-10-001 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-30 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Sick Days Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-01 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Redlines for 2M-TEK-01-10-000-RA-Roller-Skid-Assembly, Created: 2MTEK-01-10-001-RA-Head-Assembly 2M-TEK-01-11-007-RA-Triangular-Plate-Inside 2M-TEK-01-11-008-RA-Triangular-Plate 2M-TEK-01-11-009-RA-Cylinder-Plate. 2M-TEK-01-11-010-RA-Roller-Gusset-Plate 2M-TEK-01-11-011-RA-Roller-Gusset-Plate-Inside 2MTEK-01-11-012-RA-Head-Plate-Inside 2M-TEK-01-11-013-RA-Roller-Head-Assembly 2M-TEK-01-11-014-RA-Roller-Pin-Head-Assembly 2MTEK-01-11-015-RA-End-Plate 2M-TEK-01-11-058-RA-Roller-Support-Plate Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-02 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 3 0 Redlines for 2M-TEK-01-10-000-RA-Roller-Skid-Assembly, Created: 2MTEK-01-10-001-RA-Head-Assembly 2M-TEK-01-11-007-RA-Triangular-Plate-Inside 2M-TEK-01-11-008-RA-Triangular-Plate 2M-TEK-01-11-009-RA-Cylinder-Plate. 2M-TEK-01-11-010-RA-Roller-Gusset-Plate 2M-TEK-01-11-011-RA-Roller-Gusset-Plate-Inside 2MTEK-01-11-012-RA-Head-Plate-Inside 2M-TEK-01-11-013-RA-Roller-Head-Assembly 2M-TEK-01-11-014-RA-Roller-Pin-Head-Assembly 2MTEK-01-11-015-RA-End-Plate 2M-TEK-01-11-058-RA-Roller-Support-Plate Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1st Quarter Results meeting Wed., Weekly TSR Update Meeting Thursday. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-02 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 OTC Event, information on rig equipment. PALFINGER cranes & Misc. rig equipment. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-03 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7 0 Redlines for 2M-TEK-01-10-000-RA-Roller-Skid-Assembly, Created: 2MTEK-01-10-001-RA-Head-Assembly 2M-TEK-01-11-007-RA-Triangular-Plate-Inside 2M-TEK-01-11-008-RA-Triangular-Plate 2M-TEK-01-11-009-RA-Cylinder-Plate. 2M-TEK-01-11-010-RA-Roller-Gusset-Plate 2M-TEK-01-11-011-RA-Roller-Gusset-Plate-Inside 2MTEK-01-11-012-RA-Head-Plate-Inside 2M-TEK-01-11-013-RA-Roller-Head-Assembly 2M-TEK-01-11-014-RA-Roller-Pin-Head-Assembly 2MTEK-01-11-015-RA-End-Plate 2M-TEK-01-11-058-RA-Roller-Support-Plate Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1st Quarter Results meeting Wed., Weekly TSR Update Meeting Thursday. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-04 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Sick Days Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-07 2M Tek :2M Tek Default Default Task Regular Pay N 8 0 Created drawings for assemblies: Back Checks for Head Assembly 2M-TEK-01-10-001, Drawings 2M-TEK-01-11-006 thru 014 Created drawings: Middle Frame Assembly 2M-TEK-01-10-002, Drawings 2M-TEK-01-11-022 thru 035 Part Drawings: 2M-TEK-01-11-037 thru 040, 044 thru 046, & 049 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-08 2M Tek :2M Tek Default Default Task Regular Pay N 7 0 Created drawings for assemblies: Back Checks for Head Assembly 2M-TEK-01-10-001, Drawings 2M-TEK-01-11-006 thru 014 Created drawings: Middle Frame Assembly 2M-TEK-01-10-002, Drawings 2M-TEK-01-11-022 thru 035 Part Drawings: 2M-TEK-01-11-037 thru 040, 044 thru 046, & 049 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Team meeting Tuesday, TSR Update meeting Thrusday. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-09 2M Tek :2M Tek Default Default Task Regular Pay N 8 0 Created drawings for assemblies: Back Checks for Head Assembly 2M-TEK-01-10-001, Drawings 2M-TEK-01-11-006 thru 014 Created drawings: Middle Frame Assembly 2M-TEK-01-10-002, Drawings 2M-TEK-01-11-022 thru 035 Part Drawings: 2M-TEK-01-11-037 thru 040, 044 thru 046, & 049 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-10 2M Tek :2M Tek Default Default Task Regular Pay N 4 0 Created drawings for assemblies: Back Checks for Head Assembly 2M-TEK-01-10-001, Drawings 2M-TEK-01-11-006 thru 014 Created drawings: Middle Frame Assembly 2M-TEK-01-10-002, Drawings 2M-TEK-01-11-022 thru 035 Part Drawings: 2M-TEK-01-11-037 thru 040, 044 thru 046, & 049 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Team meeting Tuesday, TSR Update meeting Thrusday. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-11 2M Tek :2M Tek Default Default Task Regular Pay N 9 0 Created drawings for assemblies: Back Checks for Head Assembly 2M-TEK-01-10-001, Drawings 2M-TEK-01-11-006 thru 014 Created drawings: Middle Frame Assembly 2M-TEK-01-10-002, Drawings 2M-TEK-01-11-022 thru 035 Part Drawings: 2M-TEK-01-11-037 thru 040, 044 thru 046, & 049 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-12 2M Tek :2M Tek Default Default Task Regular Pay N 2 0 Created drawings for assemblies: Back Checks for Head Assembly 2M-TEK-01-10-001, Drawings 2M-TEK-01-11-006 thru 014 Created drawings: Middle Frame Assembly 2M-TEK-01-10-002, Drawings 2M-TEK-01-11-022 thru 035 Part Drawings: 2M-TEK-01-11-037 thru 040, 044 thru 046, & 049 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Computer Harddrive Crash, time spent getting back up and running. (Temp computer to run Solidworks, and installing Solidworks on new machine.) Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-15 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 Created Middle Frame detail drawings, Crossover sub details, Anchor Drawings 2M-TEK-01-11-034 thru 040. And 2M-TEK-01-11-042 thru 57 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 Computer Harddrive Crash, time spent getting back up and running. (Temp computer to run Solidworks, and installing Solidworks on new machine.) Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-16 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 Created Middle Frame detail drawings, Crossover sub details, Anchor Drawings 2M-TEK-01-11-034 thru 040. And 2M-TEK-01-11-042 thru 57 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-16 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2 0 Modify existing assemblies, constraint problems and adjustments, Revise detail sheets for bolt clearances Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Computer Harddrive Crash, time spent getting back up and running. (Temp computer to run Solidworks, and installing Solidworks on new machine.) Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-17 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5 0 Created Middle Frame detail drawings, Crossover sub details, Anchor Drawings 2M-TEK-01-11-034 thru 040. And 2M-TEK-01-11-042 thru 57 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-17 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2 0 Modify existing assemblies, constraint problems and adjustments, Revise detail sheets for bolt clearances Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TSR Update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-18 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Created Middle Frame detail drawings, Crossover sub details, Anchor Drawings 2M-TEK-01-11-034 thru 040. And 2M-TEK-01-11-042 thru 57 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-21 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 8 0 Created drawings: 2M-TEK-01-10-005-RA-End Assembly Outside 2MTEK-01-10-004-RA-Split-Sub-Assembly Finished 2M-TEK-01-10-003-RA-Middle-Frame Started 2MTEK-01-09-000-RA-Main-Assembly Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-22 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 7.5 0 Created drawings: 2M-TEK-01-10-005-RA-End Assembly Outside 2MTEK-01-10-004-RA-Split-Sub-Assembly Finished 2M-TEK-01-10-003-RA-Middle-Frame Started 2MTEK-01-09-000-RA-Main-Assembly Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting, Weekly TSR Update Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-23 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 8 0 Created drawings: 2M-TEK-01-10-005-RA-End Assembly Outside 2MTEK-01-10-004-RA-Split-Sub-Assembly Finished 2M-TEK-01-10-003-RA-Middle-Frame Started 2MTEK-01-09-000-RA-Main-Assembly Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-24 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 7 0 Created drawings: 2M-TEK-01-10-005-RA-End Assembly Outside 2MTEK-01-10-004-RA-Split-Sub-Assembly Finished 2M-TEK-01-10-003-RA-Middle-Frame Started 2MTEK-01-09-000-RA-Main-Assembly Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board Meeting, Weekly TSR Update Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-25 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 8 0 Created drawings: 2M-TEK-01-10-005-RA-End Assembly Outside 2MTEK-01-10-004-RA-Split-Sub-Assembly Finished 2M-TEK-01-10-003-RA-Middle-Frame Started 2MTEK-01-09-000-RA-Main-Assembly Smith, Ricky Manager/Staff Consultant RICKYSMITH Smith, Ricky :Manager/Staff Consultant 2018-02-20 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item. Removing Preliminary Work Instructions from PM task Smith, Ricky Manager/Staff Consultant RICKYSMITH Smith, Ricky :Manager/Staff Consultant 2018-02-21 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item. Removing Preliminary Work Instructions from PM task Smith, Ricky Manager/Staff Consultant RICKYSMITH Smith, Ricky :Manager/Staff Consultant 2018-02-22 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item. Removing Preliminary Work Instructions from PM task Smith, Ricky Manager/Staff Consultant RICKYSMITH Smith, Ricky :Manager/Staff Consultant 2018-02-23 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item. Removing Preliminary Work Instructions from PM task Smith, Ricky Manager/Staff Consultant RICKYSMITH Smith, Ricky :Manager/Staff Consultant 2018-02-26 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item. Removing Preliminary Work Instructions from PM task Smith, Ricky Manager/Staff Consultant RICKYSMITH Smith, Ricky :Manager/Staff Consultant 2018-02-27 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item. Removing Preliminary Work Instructions from PM task Smith, Ricky Manager/Staff Consultant RICKYSMITH Smith, Ricky :Manager/Staff Consultant 2018-02-28 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item. Removing Preliminary Work Instructions from PM task Smith, Ricky Manager/Staff Consultant RICKYSMITH Smith, Ricky :Manager/Staff Consultant 2018-03-01 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item. Removing Preliminary Work Instructions from PM task Smith, Ricky Manager/Staff Consultant RICKYSMITH Smith, Ricky :Manager/Staff Consultant 2018-03-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item. Removing Preliminary Work Instructions from PM task Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-04 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 Employee orientation. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-05 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 Employee orientation. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-05 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 4 0 Research for Alaska trip. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-06 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 8 0 Hatch Solidworks design. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-07 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 6 0 Hatch Solidworks design. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Weekly meeting and CAT meeting. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-08 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 8 0 Hatch Solidworks design. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-11 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 6 0 Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-11 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2 0 Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-12 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-12 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 4 0 Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6 0 Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-13 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2 0 Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-14 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 6 0 Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-15 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 8 0 Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-17 OH-010 :OH-010 Overhead All Activities Overtime Rate N 8 0 Travel to Alaska. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-18 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 HR safety and rig access training. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-19 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 HR safety and rig access training. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-19 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 4 0 Visit rigs 272 and 273 with Mark. Studied Alaskan operation and rig design. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-20 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 8 0 Visit rigs 272 and 273 with Mark. Studied Alaskan operation and rig design. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-21 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 8 0 Visit rigs 272 and 273 with Mark. Studied Alaskan operation and rig design. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-22 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 8 0 Visit rigs 272 and 273 with Mark. Studied Alaskan operation and rig design. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-24 OH-010 :OH-010 Overhead All Activities Overtime Rate N 8 0 Travel back from Alaska. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Industry studying. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-25 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 4 0 Solidworks and analysis of Spreader beam for TSR-01659. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Industry studying. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-26 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 4 0 Solidworks and analysis of Spreader beam for TSR-01659. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-27 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 8 0 Solidworks and analysis of Spreader beam for TSR-01659. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-28 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 8 0 Solidworks and analysis of Spreader beam for TSR-01659. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-29 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 8 0 Solidworks and analysis of Spreader beam for TSR-01659. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-02 Rig 216L-TSR :Rig 216L-TSR TSR-01659-216L Spreader Bar Regular Pay N 8 0 Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Canrig facility visit, and IDS facility visit. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-03 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 4 0 Spreader beam analysis and close out. Also, analysis of the new air hoist installation. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Canrig facility visit, and IDS facility visit. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-05 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Reading of Oil Industry books. Created Alaska presentation. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-05 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 4 0 Spreader beam analysis and close out. Also, analysis of the new air hoist installation. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-06 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 Reading of Oil Industry books. Created Alaska presentation. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 5 0 Facility visit Reports for Canrig, IDS, and WOM. Work on Alaska trip presentation. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-09 OH-013 :OH-013 Overhead All Activities Regular Pay N 4 0 Air Hoist Pedestal. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 5 0 WOM facility visit. Weekly Technical Services meeting. Meeting with Bryan Collins. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Facility visit Reports for Canrig, IDS, and WOM. Work on Alaska trip presentation. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-10 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Rig equipment study. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 9 0 Facility visit Reports for Canrig, IDS, and WOM. Work on Alaska trip presentation. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 WOM facility visit. Weekly Technical Services meeting. Meeting with Bryan Collins. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Facility visit Reports for Canrig, IDS, and WOM. Work on Alaska trip presentation. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 WOM facility visit. Weekly Technical Services meeting. Meeting with Bryan Collins. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 Facility visit Reports for Canrig, IDS, and WOM. Work on Alaska trip presentation. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Intern presentation. Uganda tech proposal. Uganda hook load study. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 4 0 CTR for spreader beam. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Intern presentation. Uganda tech proposal. Uganda hook load study. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 4 0 CTR for spreader beam. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-18 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 Read books from Bryan. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Lunch at Kata Robata. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 Intern presentation. Uganda tech proposal. Uganda hook load study. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Intern presentation. Uganda tech proposal. Uganda hook load study. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-20 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 Read books from Bryan. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 Preparation for presentation. Rig 77B Simops. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 CTR for Rig Floor Pad Eyes TSR. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Preparation for presentation. Rig 77B Simops. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 NOV meeting and lunch. Technical services weekly meeting. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 7 0 Preparation for presentation. Rig 77B Simops. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 NOV meeting and lunch. Technical services weekly meeting. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 7 0 Preparation for presentation. Rig 77B Simops. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 7 0 Preparation for presentation. Rig 77B Simops. Wilson, Gary Sr. Electrical Engineer GARYWILSON Wilson, Gary:Sr. Electrical Engineer 2018-01-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Tuesday 1/2: Adjust procedure and templates for J-17101 Drillers Control Console 10474751 A,B,C, J-17146 Purge Control Panel 10474802, J-1709 Control Panel No 1 10474776, J-17167 Control Panel No 3 10474901. Wednesday 1/3: Adjust template and procedures for J-17108 Drawworks PLC Checks 1/4W 10441929, N-75008 DC Drives Control Console 4W 10457614, Thursday 1/4: J-17101 Drilling Control Console (E) 48W, Drillers Ctrl Console 12W, N-75008 Drilling SCR Emergency Shutdown 10457614 Wilson, Gary Sr. Electrical Engineer GARYWILSON Wilson, Gary:Sr. Electrical Engineer 2018-01-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Tuesday 1/2: Review operator/maintenance materials for driller and purge control panels in order to verify and/or adjust the maintenance procedures. Wednesday 1/3: Review documentation of Drawworks Purge Air Control A/B/C, J-17108 Drawworks PLC Checks - 10441929, N-75008 DC Drives Control Console - 10457614. Thursday 1/4: Search and Review manuals for drawworks control consoles. Wilson, Gary Sr. Electrical Engineer GARYWILSON Wilson, Gary:Sr. Electrical Engineer 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Tuesday 1/2: Adjust procedure and templates for J-17101 Drillers Control Console 10474751 A,B,C, J-17146 Purge Control Panel 10474802, J-1709 Control Panel No 1 10474776, J-17167 Control Panel No 3 10474901. Wednesday 1/3: Adjust template and procedures for J-17108 Drawworks PLC Checks 1/4W 10441929, N-75008 DC Drives Control Console 4W 10457614, Thursday 1/4: J-17101 Drilling Control Console (E) 48W, Drillers Ctrl Console 12W, N-75008 Drilling SCR Emergency Shutdown 10457614 Wilson, Gary Sr. Electrical Engineer GARYWILSON Wilson, Gary:Sr. Electrical Engineer 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Tuesday 1/2: Review operator/maintenance materials for driller and purge control panels in order to verify and/or adjust the maintenance procedures. Wednesday 1/3: Review documentation of Drawworks Purge Air Control A/B/C, J-17108 Drawworks PLC Checks - 10441929, N-75008 DC Drives Control Console - 10457614. Thursday 1/4: Search and Review manuals for drawworks control consoles. Wilson, Gary Sr. Electrical Engineer GARYWILSON Wilson, Gary:Sr. Electrical Engineer 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 6 0 Tuesday 1/2: Adjust procedure and templates for J-17101 Drillers Control Console 10474751 A,B,C, J-17146 Purge Control Panel 10474802, J-1709 Control Panel No 1 10474776, J-17167 Control Panel No 3 10474901. Wednesday 1/3: Adjust template and procedures for J-17108 Drawworks PLC Checks 1/4W 10441929, N-75008 DC Drives Control Console 4W 10457614, Thursday 1/4: J-17101 Drilling Control Console (E) 48W, Drillers Ctrl Console 12W, N-75008 Drilling SCR Emergency Shutdown 10457614 Wilson, Gary Sr. Electrical Engineer GARYWILSON Wilson, Gary:Sr. Electrical Engineer 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Tuesday 1/2: Review operator/maintenance materials for driller and purge control panels in order to verify and/or adjust the maintenance procedures. Wednesday 1/3: Review documentation of Drawworks Purge Air Control A/B/C, J-17108 Drawworks PLC Checks - 10441929, N-75008 DC Drives Control Console - 10457614. Thursday 1/4: Search and Review manuals for drawworks control consoles. WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-12 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 Project related activities: kanban, T&C redline. drafted letter to Genesis, check on Contract flow down compliance WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-13 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 Project related activities: kanban, T&C redline. drafted letter to Genesis, check on Contract flow down compliance WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-14 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 Project related activities: kanban, T&C redline. drafted letter to Genesis, check on Contract flow down compliance WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-15 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 Project related activities: kanban, T&C redline. drafted letter to Genesis, check on Contract flow down compliance WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-16 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 Project related activities: kanban, T&C redline. drafted letter to Genesis, check on Contract flow down compliance WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Genesis T&Cs legal compliance confirmation, Kvaerner T&Cs review, Invoicing procedure meeting, Kanban meeting, meeting with Legal, Finance, contract strategy discussion, changes tracker update, clean version of T&Cs WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Genesis T&Cs legal compliance confirmation, Kvaerner T&Cs review, Invoicing procedure meeting, Kanban meeting, meeting with Legal, Finance, contract strategy discussion, changes tracker update, clean version of T&Cs WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Genesis T&Cs legal compliance confirmation, Kvaerner T&Cs review, Invoicing procedure meeting, Kanban meeting, meeting with Legal, Finance, contract strategy discussion, changes tracker update, clean version of T&Cs WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Genesis T&Cs legal compliance confirmation, Kvaerner T&Cs review, Invoicing procedure meeting, Kanban meeting, meeting with Legal, Finance, contract strategy discussion, changes tracker update, clean version of T&Cs WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Meeting with legal. Kanban, meetings of Kvaerner T&Cs, meeting with KV, internal meeting on T&Cs, Special conditions review, noted from, T&Cs summary, consulting agreement template, contract development, T&Cs review WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Meeting with legal. Kanban, meetings of Kvaerner T&Cs, meeting with KV, internal meeting on T&Cs, Special conditions review, noted from, T&Cs summary, consulting agreement template, contract development, T&Cs review WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Meeting with legal. Kanban, meetings of Kvaerner T&Cs, meeting with KV, internal meeting on T&Cs, Special conditions review, noted from, T&Cs summary, consulting agreement template, contract development, T&Cs review WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Meeting with legal. Kanban, meetings of Kvaerner T&Cs, meeting with KV, internal meeting on T&Cs, Special conditions review, noted from, T&Cs summary, consulting agreement template, contract development, T&Cs review WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Meeting with legal. Kanban, meetings of Kvaerner T&Cs, meeting with KV, internal meeting on T&Cs, Special conditions review, noted from, T&Cs summary, consulting agreement template, contract development, T&Cs review WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 New proposed changes review (KV T&Cs), tracker update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 New proposed changes review (KV T&Cs), tracker update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-07 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-08 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-09 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 New proposed changes review (KV T&Cs), tracker update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Special contitions with Kvaerner review, tracker update, Special conditions comments, NDA, request for info exchange with KBR, meeting with KV, letter to KBR, NDA with KBR, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Special contitions with Kvaerner review, tracker update, Special conditions comments, NDA, request for info exchange with KBR, meeting with KV, letter to KBR, NDA with KBR, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Special contitions with Kvaerner review, tracker update, Special conditions comments, NDA, request for info exchange with KBR, meeting with KV, letter to KBR, NDA with KBR, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-15 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Special contitions with Kvaerner review, tracker update, Special conditions comments, NDA, request for info exchange with KBR, meeting with KV, letter to KBR, NDA with KBR, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-16 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Special contitions with Kvaerner review, tracker update, Special conditions comments, NDA, request for info exchange with KBR, meeting with KV, letter to KBR, NDA with KBR, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 meeting on Kvaerner T&Cs, FEED agreement drafting, tracker preparations, Kanban meeting, close out notice for Screening phase, NDA with Alseas NDA with GustoMSC WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 meeting on Kvaerner T&Cs, FEED agreement drafting, tracker preparations, Kanban meeting, close out notice for Screening phase, NDA with Alseas NDA with GustoMSC WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 meeting on Kvaerner T&Cs, FEED agreement drafting, tracker preparations, Kanban meeting, close out notice for Screening phase, NDA with Alseas NDA with GustoMSC WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 meeting on Kvaerner T&Cs, FEED agreement drafting, tracker preparations, Kanban meeting, close out notice for Screening phase, NDA with Alseas NDA with GustoMSC WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 meeting on Kvaerner T&Cs, FEED agreement drafting, tracker preparations, Kanban meeting, close out notice for Screening phase, NDA with Alseas NDA with GustoMSC WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Kvaerner final T&Cs verification clean up, NDA with Allseas, meeting with Tax.Legal< Kanban meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Kvaerner final T&Cs verification clean up, NDA with Allseas, meeting with Tax.Legal< Kanban meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Kvaerner final T&Cs verification clean up, NDA with Allseas, meeting with Tax.Legal< Kanban meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Kvaerner final T&Cs verification clean up, NDA with Allseas, meeting with Tax.Legal< Kanban meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Minkit presentation review/feedback WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Minkit presentation review/feedback WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Minkit presentation review/feedback WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Minkit presentation review/feedback WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Project Contract Procedure development WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure for Project Management procedure development (forms,), forms register update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure for Project Management procedure development (forms,), forms register update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure for Project Management procedure development (forms,), forms register update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure for Project Management procedure development (forms,), forms register update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure for Project Management procedure development (forms,), forms register update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Minkit after action review, development of contract folder on SP for Minkit concept study, SP issues resolutions, update in SalesForce, procedure development WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Minkit after action review, development of contract folder on SP for Minkit concept study, SP issues resolutions, update in SalesForce, procedure development WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Minkit after action review, development of contract folder on SP for Minkit concept study, SP issues resolutions, update in SalesForce, procedure development WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Minkit after action review, development of contract folder on SP for Minkit concept study, SP issues resolutions, update in SalesForce, procedure development WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Minkit after action review, development of contract folder on SP for Minkit concept study, SP issues resolutions, update in SalesForce, procedure development WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Developed TS.FOR.064 - NDA, TS.FOR.065 - T&Cs, TS>FOR.066 - Subcontract, TS.FOR.067 - Eng. Services, started flow chart for General Contract Management, revision of procedure WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Developed TS.FOR.064 - NDA, TS.FOR.065 - T&Cs, TS>FOR.066 - Subcontract, TS.FOR.067 - Eng. Services, started flow chart for General Contract Management, revision of procedure WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Developed TS.FOR.064 - NDA, TS.FOR.065 - T&Cs, TS>FOR.066 - Subcontract, TS.FOR.067 - Eng. Services, started flow chart for General Contract Management, revision of procedure WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Developed TS.FOR.064 - NDA, TS.FOR.065 - T&Cs, TS>FOR.066 - Subcontract, TS.FOR.067 - Eng. Services, started flow chart for General Contract Management, revision of procedure WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Developed TS.FOR.064 - NDA, TS.FOR.065 - T&Cs, TS>FOR.066 - Subcontract, TS.FOR.067 - Eng. Services, started flow chart for General Contract Management, revision of procedure WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Technical services CO rates verifications (rig 270), docs for Yastreb, meeting with NOVOS, procedure development and submittal, meeting on Invoicing for Minkit for next phase WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Technical services CO rates verifications (rig 270), docs for Yastreb, meeting with NOVOS, procedure development and submittal, meeting on Invoicing for Minkit for next phase WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Technical services CO rates verifications (rig 270), docs for Yastreb, meeting with NOVOS, procedure development and submittal, meeting on Invoicing for Minkit for next phase WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Technical services CO rates verifications (rig 270), docs for Yastreb, meeting with NOVOS, procedure development and submittal, meeting on Invoicing for Minkit for next phase WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure meetings, Contract negotiations tracker, other forms and procedure update/revision/reprint WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure meetings, Contract negotiations tracker, other forms and procedure update/revision/reprint WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure meetings, Contract negotiations tracker, other forms and procedure update/revision/reprint WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure meetings, Contract negotiations tracker, other forms and procedure update/revision/reprint WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure revision, MOC form, Uganda procurement process meeting, IMS Audit training, TS meeting, procedure update, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure revision, MOC form, Uganda procurement process meeting, IMS Audit training, TS meeting, procedure update, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure revision, MOC form, Uganda procurement process meeting, IMS Audit training, TS meeting, procedure update, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure revision, MOC form, Uganda procurement process meeting, IMS Audit training, TS meeting, procedure update, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure revision, MOC form, Uganda procurement process meeting, IMS Audit training, TS meeting, procedure update, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-28 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Memorial Day WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-30 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-31 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-01 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS department: Meetings on Uganda projects, procedure review, Chinese visa info, info on importation to Uganda, project SOW (Uganda), TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS department: Meetings on Uganda projects, procedure review, Chinese visa info, info on importation to Uganda, project SOW (Uganda), TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS department: Meetings on Uganda projects, procedure review, Chinese visa info, info on importation to Uganda, project SOW (Uganda), TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS department: Meetings on Uganda projects, procedure review, Chinese visa info, info on importation to Uganda, project SOW (Uganda), TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: meetings on Uganda projects, rig build contract redlining/discussions, contract and com/invoice, exhibits development, Contract management procedure revision WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: meetings on Uganda projects, rig build contract redlining/discussions, contract and com/invoice, exhibits development, Contract management procedure revision WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: meetings on Uganda projects, rig build contract redlining/discussions, contract and com/invoice, exhibits development, Contract management procedure revision WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: meetings on Uganda projects, rig build contract redlining/discussions, contract and com/invoice, exhibits development, Contract management procedure revision WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: meetings on Uganda projects, rig build contract redlining/discussions, contract and com/invoice, exhibits development, Contract management procedure revision WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: Uganda contract matrix, questions for a meeting with HH, Kanban meetings, contract revision, meeting with Legal, MOC from for CM Procedures, TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: Uganda contract matrix, questions for a meeting with HH, Kanban meetings, contract revision, meeting with Legal, MOC from for CM Procedures, TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: Uganda contract matrix, questions for a meeting with HH, Kanban meetings, contract revision, meeting with Legal, MOC from for CM Procedures, TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: Uganda contract matrix, questions for a meeting with HH, Kanban meetings, contract revision, meeting with Legal, MOC from for CM Procedures, TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: Uganda contract matrix, questions for a meeting with HH, Kanban meetings, contract revision, meeting with Legal, MOC from for CM Procedures, TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-07-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: Kanban meetings, NDA with IDS, HH principal document revision, Canrig facility visit, HH financial options meeting, IDS facility visit, meeting with Legal WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-07-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: Kanban meetings, NDA with IDS, HH principal document revision, Canrig facility visit, HH financial options meeting, IDS facility visit, meeting with Legal WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-07-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: Kanban meetings, NDA with IDS, HH principal document revision, Canrig facility visit, HH financial options meeting, IDS facility visit, meeting with Legal WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-07-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: Kanban meetings, NDA with IDS, HH principal document revision, Canrig facility visit, HH financial options meeting, IDS facility visit, meeting with Legal WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-07-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: Kanban meetings, NDA with IDS, HH principal document revision, Canrig facility visit, HH financial options meeting, IDS facility visit, meeting with Legal WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-08-20 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 6 0 meeting on invoicing for Holly, cost tracker development, labor variance tracker, invoice tracker, weekly report, meeting on Holl cost tracking, contract with CD Lyon, meeting on Oracle, development of docs for Holly Projects, CO-1 review, Mobilization notice development, Holly project set-up files development, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-08-21 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 6 0 meeting on invoicing for Holly, cost tracker development, labor variance tracker, invoice tracker, weekly report, meeting on Holl cost tracking, contract with CD Lyon, meeting on Oracle, development of docs for Holly Projects, CO-1 review, Mobilization notice development, Holly project set-up files development, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-08-22 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 6 0 meeting on invoicing for Holly, cost tracker development, labor variance tracker, invoice tracker, weekly report, meeting on Holl cost tracking, contract with CD Lyon, meeting on Oracle, development of docs for Holly Projects, CO-1 review, Mobilization notice development, Holly project set-up files development, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-08-23 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 5 0 meeting on invoicing for Holly, cost tracker development, labor variance tracker, invoice tracker, weekly report, meeting on Holl cost tracking, contract with CD Lyon, meeting on Oracle, development of docs for Holly Projects, CO-1 review, Mobilization notice development, Holly project set-up files development, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-08-24 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 6 0 meeting on invoicing for Holly, cost tracker development, labor variance tracker, invoice tracker, weekly report, meeting on Holl cost tracking, contract with CD Lyon, meeting on Oracle, development of docs for Holly Projects, CO-1 review, Mobilization notice development, Holly project set-up files development, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-08-27 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 2 0 WBC codes development, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-08-28 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 2 0 WBC codes development, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-08-29 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 AFE new version development, org chart, project charter, project set up checklist, MR process review and training, Oracle, MR for Bronco, MR for CD Lyon, MR for DPR, paper MR review and revision, follow up on contracts WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-08-30 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 AFE new version development, org chart, project charter, project set up checklist, MR process review and training, Oracle, MR for Bronco, MR for CD Lyon, MR for DPR, paper MR review and revision, follow up on contracts WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-08-31 Holly Platform :Holly Platform TSR-01665-HOLP-01 Change Order (Day Rate) Regular Pay N 8 0 AFE new version development, org chart, project charter, project set up checklist, MR process review and training, Oracle, MR for Bronco, MR for CD Lyon, MR for DPR, paper MR review and revision, follow up on contracts WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-09-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-09-04 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 5 0 Weekly report update, cost tracker, new POs, MRs, MR for CD Lyons (revision), contract with Bronco, codes for MRs, MR for Amerimex, PO for CD Lyon, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-09-04 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 This timesheet reflects time assigned for TS/PM Department only: Kanban meeting, training on labor cost tracking, discussion on MR form revision. MR training WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-09-05 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 3 0 Weekly report update, cost tracker, new POs, MRs, MR for CD Lyons (revision), contract with Bronco, codes for MRs, MR for Amerimex, PO for CD Lyon, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-09-05 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 1 0 This timesheet reflects time assigned for TS/PM Department only: Kanban meeting, training on labor cost tracking, discussion on MR form revision. MR training WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-09-07 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4 0 Weekly report update, cost tracker, new POs, MRs, MR for CD Lyons (revision), contract with Bronco, codes for MRs, MR for Amerimex, PO for CD Lyon, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-09-07 Holly Platform :Holly Platform TSR-01665-HOLP-99 Project Management (OH) Regular Pay N 3 0 This timesheet reflects time assigned for TS/PM Department only: Kanban meeting, training on labor cost tracking, discussion on MR form revision. MR training WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-09-10 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 6 0 This time sheet covers time/scope for TS only: Meeting on cost/labor tracking, expenditure description USG, labor tracker update, meeting with Supply Chain, updated quote for CD Lyons, MR for Deadline Anchor, presentation for MRs development, MR for MUD Watch System, MR for Agitator, Contracts list for Holly, Contract with West Coast Welder (signed), contract with Thomas and Beers (negotiation), WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-09-11 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 6 0 This time sheet covers time/scope for TS only: Meeting on cost/labor tracking, expenditure description USG, labor tracker update, meeting with Supply Chain, updated quote for CD Lyons, MR for Deadline Anchor, presentation for MRs development, MR for MUD Watch System, MR for Agitator, Contracts list for Holly, Contract with West Coast Welder (signed), contract with Thomas and Beers (negotiation), WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-09-12 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 6 0 This time sheet covers time/scope for TS only: Meeting on cost/labor tracking, expenditure description USG, labor tracker update, meeting with Supply Chain, updated quote for CD Lyons, MR for Deadline Anchor, presentation for MRs development, MR for MUD Watch System, MR for Agitator, Contracts list for Holly, Contract with West Coast Welder (signed), contract with Thomas and Beers (negotiation), WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-09-13 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 6 0 This time sheet covers time/scope for TS only: Meeting on cost/labor tracking, expenditure description USG, labor tracker update, meeting with Supply Chain, updated quote for CD Lyons, MR for Deadline Anchor, presentation for MRs development, MR for MUD Watch System, MR for Agitator, Contracts list for Holly, Contract with West Coast Welder (signed), contract with Thomas and Beers (negotiation), WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-09-14 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 6 0 This time sheet covers time/scope for TS only: Meeting on cost/labor tracking, expenditure description USG, labor tracker update, meeting with Supply Chain, updated quote for CD Lyons, MR for Deadline Anchor, presentation for MRs development, MR for MUD Watch System, MR for Agitator, Contracts list for Holly, Contract with West Coast Welder (signed), contract with Thomas and Beers (negotiation), WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-09-17 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 5 0 Thomas and Beers negotiation, contract revision, phone call, contract execution, MR update for CD Lyon MR update, Project Cost Tracking meeting, tracking for procurement, labor, forecast, CO-2 review and revision, Meeting on priorities for the week, procurement plan meeting, cost tracking update, MR for centrifugal pumps, CO-3 review and revision, cost report update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-09-18 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 5 0 Thomas and Beers negotiation, contract revision, phone call, contract execution, MR update for CD Lyon MR update, Project Cost Tracking meeting, tracking for procurement, labor, forecast, CO-2 review and revision, Meeting on priorities for the week, procurement plan meeting, cost tracking update, MR for centrifugal pumps, CO-3 review and revision, cost report update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-09-19 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 5 0 Thomas and Beers negotiation, contract revision, phone call, contract execution, MR update for CD Lyon MR update, Project Cost Tracking meeting, tracking for procurement, labor, forecast, CO-2 review and revision, Meeting on priorities for the week, procurement plan meeting, cost tracking update, MR for centrifugal pumps, CO-3 review and revision, cost report update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-09-20 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 5 0 Thomas and Beers negotiation, contract revision, phone call, contract execution, MR update for CD Lyon MR update, Project Cost Tracking meeting, tracking for procurement, labor, forecast, CO-2 review and revision, Meeting on priorities for the week, procurement plan meeting, cost tracking update, MR for centrifugal pumps, CO-3 review and revision, cost report update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-09-21 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 5 0 Thomas and Beers negotiation, contract revision, phone call, contract execution, MR update for CD Lyon MR update, Project Cost Tracking meeting, tracking for procurement, labor, forecast, CO-2 review and revision, Meeting on priorities for the week, procurement plan meeting, cost tracking update, MR for centrifugal pumps, CO-3 review and revision, cost report update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-09-24 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 3 0 Weekly report update, Kanban meeting. Oracle meeting, MR for Weight indicators, MR revision MOC, CO-4 for email approvals review and revision, procurement tracker update, labor variance update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-09-25 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 3 0 Weekly report update, Kanban meeting. Oracle meeting, MR for Weight indicators, MR revision MOC, CO-4 for email approvals review and revision, procurement tracker update, labor variance update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-09-26 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 2 0 Weekly report update, Kanban meeting. Oracle meeting, MR for Weight indicators, MR revision MOC, CO-4 for email approvals review and revision, procurement tracker update, labor variance update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-09-27 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 2 0 Weekly report update, Kanban meeting. Oracle meeting, MR for Weight indicators, MR revision MOC, CO-4 for email approvals review and revision, procurement tracker update, labor variance update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-09-28 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 2 0 Weekly report update, Kanban meeting. Oracle meeting, MR for Weight indicators, MR revision MOC, CO-4 for email approvals review and revision, procurement tracker update, labor variance update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-10-01 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 2 0 Procurement tracking cost sheet update (budget), meeting with Chris on Oracle, deadline anchor MR, Thomas and Beers MR, labor cost update for invoicing, weekly update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-10-02 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 3 0 Procurement tracking cost sheet update (budget), meeting with Chris on Oracle, deadline anchor MR, Thomas and Beers MR, labor cost update for invoicing, weekly update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-10-03 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4 0 Procurement tracking cost sheet update (budget), meeting with Chris on Oracle, deadline anchor MR, Thomas and Beers MR, labor cost update for invoicing, weekly update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-10-04 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 2 0 Procurement tracking cost sheet update (budget), meeting with Chris on Oracle, deadline anchor MR, Thomas and Beers MR, labor cost update for invoicing, weekly update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-10-05 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 2 0 Procurement tracking cost sheet update (budget), meeting with Chris on Oracle, deadline anchor MR, Thomas and Beers MR, labor cost update for invoicing, weekly update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-10-11 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 7 0 This timesheet reflect time allocated for Holly platform project only: Labor variance file update, cost report update, COs upload on SharePoint and Salesforce, MR for catheads, procurement plan update, commitment report in Oracle, cost report update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-10-12 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4 0 This timesheet reflect time allocated for Holly platform project only: Labor variance file update, cost report update, COs upload on SharePoint and Salesforce, MR for catheads, procurement plan update, commitment report in Oracle, cost report update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-10-15 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 2 0 This timesheet reflects hours for Holly platform project only: Weekly report review, cost report update, MR for drawworks WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-10-17 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4 0 This timesheet reflects hours for Holly platform project only: Weekly report review, cost report update, MR for drawworks WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-10-18 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 3 0 This timesheet reflects hours for Holly platform project only: Weekly report review, cost report update, MR for drawworks WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-10-22 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4 0 This timesheet is for Holly Projects responsibilities only; Cost report update, MR for drillers console, MR for drilling line, CO-15, Knuckle Boom Crane, MR for centrifugal pumps, reports update, CO-010 for structure, MR for Angel Rental, upload of docs, procurement tracking, MR for Mast Light, MR for Kelly Hose and Jump hose, MR for DPR piping and stand pipe WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-10-23 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 6 0 This timesheet is for Holly Projects responsibilities only; Cost report update, MR for drillers console, MR for drilling line, CO-15, Knuckle Boom Crane, MR for centrifugal pumps, reports update, CO-010 for structure, MR for Angel Rental, upload of docs, procurement tracking, MR for Mast Light, MR for Kelly Hose and Jump hose, MR for DPR piping and stand pipe WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-10-24 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 3 0 This timesheet is for Holly Projects responsibilities only; Cost report update, MR for drillers console, MR for drilling line, CO-15, Knuckle Boom Crane, MR for centrifugal pumps, reports update, CO-010 for structure, MR for Angel Rental, upload of docs, procurement tracking, MR for Mast Light, MR for Kelly Hose and Jump hose, MR for DPR piping and stand pipe WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-10-25 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 4 0 This timesheet is for Holly Projects responsibilities only; Cost report update, MR for drillers console, MR for drilling line, CO-15, Knuckle Boom Crane, MR for centrifugal pumps, reports update, CO-010 for structure, MR for Angel Rental, upload of docs, procurement tracking, MR for Mast Light, MR for Kelly Hose and Jump hose, MR for DPR piping and stand pipe WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-10-26 Holly Platform :Holly Platform TSR-01665-HOLP-00T1 Task 1: Lump Sum Refurbishment Regular Pay N 6 0 This timesheet is for Holly Projects responsibilities only; Cost report update, MR for drillers console, MR for drilling line, CO-15, Knuckle Boom Crane, MR for centrifugal pumps, reports update, CO-010 for structure, MR for Angel Rental, upload of docs, procurement tracking, MR for Mast Light, MR for Kelly Hose and Jump hose, MR for DPR piping and stand pipe