Name Billing Class Employee No. Item Line Class Transaction Date Job No. Customer Service Item Notes Payroll Item Billable Employee Paid Day Rate Duration Days Remarks Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-01-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 reviewing C101-17-10B reference documents, chasing manuals, and follow up on the TDS6 manual excerpts from NOV. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 reviewing C101-17-10B reference documents, chasing manuals, and follow up on the TDS6 manual excerpts from NOV. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-01-11 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 reviewing C101-17-10B reference documents, chasing manuals, and follow up on the TDS6 manual excerpts from NOV. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-01-18 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Coordination with the OEM to secure TDS6 top drive details. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2017-12-27 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 1. Worked on rewriting the Dead line anchor PM procedure and sent in for review. . 2. Completed rewriting the PM procedure for the traveling blocks and sent in for review. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2017-12-27 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 1. Researched the PM manuals for the dead line anchor. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2017-12-28 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 1. Worked on rewriting the Dead line anchor PM procedure and sent in for review. . 2. Completed rewriting the PM procedure for the traveling blocks and sent in for review. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2017-12-28 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 1. Researched the PM manuals for the dead line anchor. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2017-12-29 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 1. Worked on rewriting the Dead line anchor PM procedure and sent in for review. . 2. Completed rewriting the PM procedure for the traveling blocks and sent in for review. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 5 0 Working on rewriting the PM procedure for the drawworks. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Researched PM manuals for the drawworks. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 5 0 Working on rewriting the PM procedure for the drawworks. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Researched PM manuals for the drawworks. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Working on rewriting the PM procedure for the drawworks. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Researched PM manuals for the drawworks. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 10 0 1. NOV survey activities 2 NOV survey report 3.Travel 4.Standby for chopper due to weather on platform Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 10 0 1. NOV survey activities 2 NOV survey report 3.Travel 4.Standby for chopper due to weather on platform Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 10 0 1. NOV survey activities 2 NOV survey report 3.Travel 4.Standby for chopper due to weather on platform Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. NOV survey activities 2 NOV survey report 3.Travel 4.Standby for chopper due to weather on platform Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-21 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. NOV survey activities 2 NOV survey report 3.Travel 4.Standby for chopper due to weather on platform Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-22 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 1. NOV survey activities 2 NOV survey report 3.Travel 4.Standby for chopper due to weather on platform Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 9 0 1. Survey Expense report 2. Arranging survey pictures 3. Survey report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 1. Hibernia NOV survey report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 1. Survey Expense report 2. Arranging survey pictures 3. Survey report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 1. Nor survey Document 2 Review SoW document Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 5 0 1 Review Mh Wirth Docuemnts , SoW and proposal Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 1. Nor survey Document 2 Review SoW document Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1 Review Mh Wirth Docuemnts , SoW and proposal Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-08 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 6 0 Review MH wirth documents. Review of SoW documents : 1 TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW 2TSR-01583-SP-MU-00007-RevA-PLC Life Extension 3.TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW 4. TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 NOV survey report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 6 0 Review MH wirth documents. Review of SoW documents : 1 TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW 2TSR-01583-SP-MU-00007-RevA-PLC Life Extension 3.TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW 4. TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-10 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 6 0 Review MH wirth documents. Review of SoW documents : 1 TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW 2TSR-01583-SP-MU-00007-RevA-PLC Life Extension 3.TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW 4. TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 6 0 Review MH wirth documents. Review of SoW documents : 1 TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW 2TSR-01583-SP-MU-00007-RevA-PLC Life Extension 3.TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW 4. TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 5 0 Review MH wirth documents. Review of SoW documents : 1 TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW 2TSR-01583-SP-MU-00007-RevA-PLC Life Extension 3.TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW 4. TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. MH Wirth meeting 2. Review of MH Wirth proposal 3. Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 1. MH Wirth meeting 2. Review of MH Wirth proposal 3. Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 5 0 1. MH Wirth meeting 2. Review of MH Wirth proposal 3. Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. MH Wirth meeting 2. Review of MH Wirth proposal 3. Drawing review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Research documentation regarding required temperature ratings of equipment in the CEC. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-18 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Research documentation regarding required temperature ratings of equipment in the CEC. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-19 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 8 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 6 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW * TSR-01583-SP-MU-00007-RevA-PLC Life Extension * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-10 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW * TSR-01583-SP-MU-00007-RevA-PLC Life Extension * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-10 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW * TSR-01583-SP-MU-00007-RevA-PLC Life Extension * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-11 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW * TSR-01583-SP-MU-00007-RevA-PLC Life Extension * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-12 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SOW * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-15 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-16 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SOW * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-16 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2.5 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SOW * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-17 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SOW * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-18 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SOW * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-19 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2.5 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2017-12-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Split out scope of work documents for PLC Life Extension, HPU Life Extension, and TD Upgrade, Coordinate travel changes for the NOV survey, NOV proposal clarifications, Engaged MHwirth Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2017-12-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Split out scope of work documents for PLC Life Extension, HPU Life Extension, and TD Upgrade, Coordinate travel changes for the NOV survey, NOV proposal clarifications, Engaged MHwirth Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2017-12-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 Split out scope of work documents for PLC Life Extension, HPU Life Extension, and TD Upgrade, Coordinate travel changes for the NOV survey, NOV proposal clarifications, Engaged MHwirth Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-02 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 (01.02) Review Survey report,(01.04-01.05),Technical comparison of the MHWirthh TD to the TDX-1000. Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-02 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 (01.02-03) SoW document split for Life Extension and TD Upgrade, MHWirth survey follow up(01.05) Research and verification of TDS6S specs for MHWirth comparison, Organize clarifications for MHWirth Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 (01.02-03) SoW document split for Life Extension and TD Upgrade, MHWirth survey follow up(01.05) Research and verification of TDS6S specs for MHWirth comparison, Organize clarifications for MHWirth Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1.5 0 (01.02) Review Survey report,(01.04-01.05),Technical comparison of the MHWirthh TD to the TDX-1000. Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 (01.02-03) SoW document split for Life Extension and TD Upgrade, MHWirth survey follow up(01.05) Research and verification of TDS6S specs for MHWirth comparison, Organize clarifications for MHWirth Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 (01.02) Review Survey report,(01.04-01.05),Technical comparison of the MHWirthh TD to the TDX-1000. Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 (01.02-03) SoW document split for Life Extension and TD Upgrade, MHWirth survey follow up(01.05) Research and verification of TDS6S specs for MHWirth comparison, Organize clarifications for MHWirth Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-08 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 7 0 NOV Survey report review, Scope of Work document split, TD Rails, AC TD, PLC, Research Hibernia material specifications, Expense reports Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 NOV Survey report review, Scope of Work document split, TD Rails, AC TD, PLC, Research Hibernia material specifications, Expense reports Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-10 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 NOV Survey report review, Scope of Work document split, TD Rails, AC TD, PLC, Research Hibernia material specifications, Expense reports Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 (1.11) MHWirth Scope clarifications Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 NOV Survey report review, Scope of Work document split, TD Rails, AC TD, PLC, Research Hibernia material specifications, Expense reports Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2.5 0 MHWirth TD Clarifications, Lead MHWirth technical review meeting and update action tracker, Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-16 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 St John updates and alignment, TD Rail replacement SoW, AC TD SoW, Update NDA with MHWirth, PLC Life Extension SoW, MHWirth clarification references Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 MHWirth TD Clarifications, Lead MHWirth technical review meeting and update action tracker, Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 St John updates and alignment, TD Rail replacement SoW, AC TD SoW, Update NDA with MHWirth, PLC Life Extension SoW, MHWirth clarification references Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 St John updates and alignment, TD Rail replacement SoW, AC TD SoW, Update NDA with MHWirth, PLC Life Extension SoW, MHWirth clarification references Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 St John updates and alignment, TD Rail replacement SoW, AC TD SoW, Update NDA with MHWirth, PLC Life Extension SoW, MHWirth clarification references Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 reviewing various scopes of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-10 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 reviewing various scopes of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 reviewing various scopes of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 reviewing various scopes of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.75 0 Reviewing PLC scope of work Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.5 0 NOV top drive CAD clean up Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-22 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 On 12/22, review NOV survey reports. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 On 1/5, review draft PKD survey report (NOV trip) and MH Wirth comp drive comparison Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 On 1/5, issue PM refresh weekly meetings. Review status with tteam. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 On 1/8, issue 2018 PM refresh mtg invites. On 1/9, PM refresh weekly mtg. Review MH Wirth surveys. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 On 1/9, review TD rail SOW,AC Top drive SOW, HPU SOW. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 On 1/8, issue 2018 PM refresh mtg invites. On 1/9, PM refresh weekly mtg. Review MH Wirth surveys. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-16 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 On 1/16, review Hibernia scopes of work. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-18 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 On 1/18, PM refresh weekly mtg. On 1/19, PM Refresh bi-weekly report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-19 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 6 0 On 1/18, PM refresh weekly mtg. On 1/19, PM Refresh bi-weekly report. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-12-20 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 0.5 0 Unable to log into SAP Report login failure Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-12-27 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 0.5 0 Unable to log into SAP Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1.5 0 Review SAP mass loading template for asset data. Updating asset data is not within the project scope, though the data is severely lacking. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Review maintenance data from C101-17-10-A & C101-17-10-J for assets 10399857 & 10399937 for completeness. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Review status meeting with Greg and Mike. Wilson, Gary Sr. Electrical Engineer GARYWILSON Wilson, Gary:Sr. Electrical Engineer 2018-01-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Tuesday 1/2: Adjust procedure and templates for J-17101 Drillers Control Console 10474751 A,B,C, J-17146 Purge Control Panel 10474802, J-1709 Control Panel No 1 10474776, J-17167 Control Panel No 3 10474901. Wednesday 1/3: Adjust template and procedures for J-17108 Drawworks PLC Checks 1/4W 10441929, N-75008 DC Drives Control Console 4W 10457614, Thursday 1/4: J-17101 Drilling Control Console (E) 48W, Drillers Ctrl Console 12W, N-75008 Drilling SCR Emergency Shutdown 10457614 Wilson, Gary Sr. Electrical Engineer GARYWILSON Wilson, Gary:Sr. Electrical Engineer 2018-01-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Tuesday 1/2: Review operator/maintenance materials for driller and purge control panels in order to verify and/or adjust the maintenance procedures. Wednesday 1/3: Review documentation of Drawworks Purge Air Control A/B/C, J-17108 Drawworks PLC Checks - 10441929, N-75008 DC Drives Control Console - 10457614. Thursday 1/4: Search and Review manuals for drawworks control consoles. Wilson, Gary Sr. Electrical Engineer GARYWILSON Wilson, Gary:Sr. Electrical Engineer 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Tuesday 1/2: Adjust procedure and templates for J-17101 Drillers Control Console 10474751 A,B,C, J-17146 Purge Control Panel 10474802, J-1709 Control Panel No 1 10474776, J-17167 Control Panel No 3 10474901. Wednesday 1/3: Adjust template and procedures for J-17108 Drawworks PLC Checks 1/4W 10441929, N-75008 DC Drives Control Console 4W 10457614, Thursday 1/4: J-17101 Drilling Control Console (E) 48W, Drillers Ctrl Console 12W, N-75008 Drilling SCR Emergency Shutdown 10457614 Wilson, Gary Sr. Electrical Engineer GARYWILSON Wilson, Gary:Sr. Electrical Engineer 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Tuesday 1/2: Review operator/maintenance materials for driller and purge control panels in order to verify and/or adjust the maintenance procedures. Wednesday 1/3: Review documentation of Drawworks Purge Air Control A/B/C, J-17108 Drawworks PLC Checks - 10441929, N-75008 DC Drives Control Console - 10457614. Thursday 1/4: Search and Review manuals for drawworks control consoles. Wilson, Gary Sr. Electrical Engineer GARYWILSON Wilson, Gary:Sr. Electrical Engineer 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 6 0 Tuesday 1/2: Adjust procedure and templates for J-17101 Drillers Control Console 10474751 A,B,C, J-17146 Purge Control Panel 10474802, J-1709 Control Panel No 1 10474776, J-17167 Control Panel No 3 10474901. Wednesday 1/3: Adjust template and procedures for J-17108 Drawworks PLC Checks 1/4W 10441929, N-75008 DC Drives Control Console 4W 10457614, Thursday 1/4: J-17101 Drilling Control Console (E) 48W, Drillers Ctrl Console 12W, N-75008 Drilling SCR Emergency Shutdown 10457614 Wilson, Gary Sr. Electrical Engineer GARYWILSON Wilson, Gary:Sr. Electrical Engineer 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Tuesday 1/2: Review operator/maintenance materials for driller and purge control panels in order to verify and/or adjust the maintenance procedures. Wednesday 1/3: Review documentation of Drawworks Purge Air Control A/B/C, J-17108 Drawworks PLC Checks - 10441929, N-75008 DC Drives Control Console - 10457614. Thursday 1/4: Search and Review manuals for drawworks control consoles.