Name Billing Class Employee No. Item Line Class Transaction Date Job No. Customer Service Item Notes Payroll Item Billable Employee Paid Day Rate Duration Days Remarks Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 5 0 Working on rewriting the PM procedure for the drawworks. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Researched PM manuals for the drawworks. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 5 0 Working on rewriting the PM procedure for the drawworks. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Researched PM manuals for the drawworks. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Working on rewriting the PM procedure for the drawworks. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Researched PM manuals for the drawworks. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 1. Nor survey Document 2 Review SoW document Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 5 0 1 Review Mh Wirth Docuemnts , SoW and proposal Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 1. Nor survey Document 2 Review SoW document Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1 Review Mh Wirth Docuemnts , SoW and proposal Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-02 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 (01.02) Review Survey report,(01.04-01.05),Technical comparison of the MHWirthh TD to the TDX-1000. Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-02 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 (01.02-03) SoW document split for Life Extension and TD Upgrade, MHWirth survey follow up(01.05) Research and verification of TDS6S specs for MHWirth comparison, Organize clarifications for MHWirth Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 (01.02-03) SoW document split for Life Extension and TD Upgrade, MHWirth survey follow up(01.05) Research and verification of TDS6S specs for MHWirth comparison, Organize clarifications for MHWirth Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1.5 0 (01.02) Review Survey report,(01.04-01.05),Technical comparison of the MHWirthh TD to the TDX-1000. Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 (01.02-03) SoW document split for Life Extension and TD Upgrade, MHWirth survey follow up(01.05) Research and verification of TDS6S specs for MHWirth comparison, Organize clarifications for MHWirth Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 (01.02) Review Survey report,(01.04-01.05),Technical comparison of the MHWirthh TD to the TDX-1000. Lambert, Joshua Asst PM JOSHLAMBERT Lambert, Joshua:Asst PM 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 (01.02-03) SoW document split for Life Extension and TD Upgrade, MHWirth survey follow up(01.05) Research and verification of TDS6S specs for MHWirth comparison, Organize clarifications for MHWirth Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 On 1/5, review draft PKD survey report (NOV trip) and MH Wirth comp drive comparison Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 On 1/5, issue PM refresh weekly meetings. Review status with tteam. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1.5 0 Review SAP mass loading template for asset data. Updating asset data is not within the project scope, though the data is severely lacking. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Review maintenance data from C101-17-10-A & C101-17-10-J for assets 10399857 & 10399937 for completeness. Wilson, Gary Sr. Electrical Engineer GARYWILSON Wilson, Gary:Sr. Electrical Engineer 2018-01-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Tuesday 1/2: Adjust procedure and templates for J-17101 Drillers Control Console 10474751 A,B,C, J-17146 Purge Control Panel 10474802, J-1709 Control Panel No 1 10474776, J-17167 Control Panel No 3 10474901. Wednesday 1/3: Adjust template and procedures for J-17108 Drawworks PLC Checks 1/4W 10441929, N-75008 DC Drives Control Console 4W 10457614, Thursday 1/4: J-17101 Drilling Control Console (E) 48W, Drillers Ctrl Console 12W, N-75008 Drilling SCR Emergency Shutdown 10457614 Wilson, Gary Sr. Electrical Engineer GARYWILSON Wilson, Gary:Sr. Electrical Engineer 2018-01-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Tuesday 1/2: Review operator/maintenance materials for driller and purge control panels in order to verify and/or adjust the maintenance procedures. Wednesday 1/3: Review documentation of Drawworks Purge Air Control A/B/C, J-17108 Drawworks PLC Checks - 10441929, N-75008 DC Drives Control Console - 10457614. Thursday 1/4: Search and Review manuals for drawworks control consoles. Wilson, Gary Sr. Electrical Engineer GARYWILSON Wilson, Gary:Sr. Electrical Engineer 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Tuesday 1/2: Adjust procedure and templates for J-17101 Drillers Control Console 10474751 A,B,C, J-17146 Purge Control Panel 10474802, J-1709 Control Panel No 1 10474776, J-17167 Control Panel No 3 10474901. Wednesday 1/3: Adjust template and procedures for J-17108 Drawworks PLC Checks 1/4W 10441929, N-75008 DC Drives Control Console 4W 10457614, Thursday 1/4: J-17101 Drilling Control Console (E) 48W, Drillers Ctrl Console 12W, N-75008 Drilling SCR Emergency Shutdown 10457614 Wilson, Gary Sr. Electrical Engineer GARYWILSON Wilson, Gary:Sr. Electrical Engineer 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Tuesday 1/2: Review operator/maintenance materials for driller and purge control panels in order to verify and/or adjust the maintenance procedures. Wednesday 1/3: Review documentation of Drawworks Purge Air Control A/B/C, J-17108 Drawworks PLC Checks - 10441929, N-75008 DC Drives Control Console - 10457614. Thursday 1/4: Search and Review manuals for drawworks control consoles. Wilson, Gary Sr. Electrical Engineer GARYWILSON Wilson, Gary:Sr. Electrical Engineer 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 6 0 Tuesday 1/2: Adjust procedure and templates for J-17101 Drillers Control Console 10474751 A,B,C, J-17146 Purge Control Panel 10474802, J-1709 Control Panel No 1 10474776, J-17167 Control Panel No 3 10474901. Wednesday 1/3: Adjust template and procedures for J-17108 Drawworks PLC Checks 1/4W 10441929, N-75008 DC Drives Control Console 4W 10457614, Thursday 1/4: J-17101 Drilling Control Console (E) 48W, Drillers Ctrl Console 12W, N-75008 Drilling SCR Emergency Shutdown 10457614 Wilson, Gary Sr. Electrical Engineer GARYWILSON Wilson, Gary:Sr. Electrical Engineer 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Tuesday 1/2: Review operator/maintenance materials for driller and purge control panels in order to verify and/or adjust the maintenance procedures. Wednesday 1/3: Review documentation of Drawworks Purge Air Control A/B/C, J-17108 Drawworks PLC Checks - 10441929, N-75008 DC Drives Control Console - 10457614. Thursday 1/4: Search and Review manuals for drawworks control consoles.