Name	Billing Class	Employee No.	Item Line Class	Transaction Date	Job No.	Customer	Service Item	Notes	Payroll Item	Billable	Duration	Remarks
Calpouzos, Reesa		28228	Calpouzos, Reesa	2013-09-05	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	0.5	Tracking and reporting on TSR documentation.
Calpouzos, Reesa		28228	Calpouzos, Reesa	2013-09-06	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	1	Tracking and reporting on TSR documentation.
Calpouzos, Reesa		28228	Calpouzos, Reesa	2013-09-09	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	0.5	Document transmittals and filing;
Calpouzos, Reesa		28228	Calpouzos, Reesa	2013-09-18	Rig 055B - TSR	:Rig 055B - TSR	TSR-01026-55B	Drawing list assessment	Regular Pay	N	0.25	Issuing Closeout
Calpouzos, Reesa		28228	Calpouzos, Reesa	2013-09-18	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	1	Project meeting
Calpouzos, Reesa		28228	Calpouzos, Reesa	2013-09-23	Rig 055B - TSR	:Rig 055B - TSR	TSR-01034-55B	Structural Design of the Port Crane Foundation	Regular Pay	N	0.25	Issuing CTR.
Calpouzos, Reesa		28228	Calpouzos, Reesa	2013-09-25	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	1	Weekly meeting
Calpouzos, Reesa		28228	Calpouzos, Reesa	2013-09-27	Rig 055B - TSR	:Rig 055B - TSR	TSR-01033-55B	Mast Headache Rack	Regular Pay	N	0.25	Filing and transmittal.
Enroth, Chris		31135	Enroth, Chris	2013-09-03	Rig 055B - TSR	:Rig 055B - TSR	TSR-01031-55B	Project Engineer Support	Regular Pay	N	1	9/3: Update on project status 9/4: Weekly update meeting for 55B 9/6: Work on CTR for the Project Engineer.
Enroth, Chris		31135	Enroth, Chris	2013-09-04	Rig 055B - TSR	:Rig 055B - TSR	TSR-01031-55B	Project Engineer Support	Regular Pay	N	1	9/3: Update on project status 9/4: Weekly update meeting for 55B 9/6: Work on CTR for the Project Engineer.
Enroth, Chris		31135	Enroth, Chris	2013-09-06	Rig 055B - TSR	:Rig 055B - TSR	TSR-01031-55B	Project Engineer Support	Regular Pay	N	0.5	9/3: Update on project status 9/4: Weekly update meeting for 55B 9/6: Work on CTR for the Project Engineer.
Enroth, Chris		31135	Enroth, Chris	2013-09-09	Rig 055B - TSR	:Rig 055B - TSR	TSR-01028-55B	Electrical Load Analysis	Regular Pay	N	1	9/9: Created TSR Closeout and CTR for the Electrical Load analysis.  
Enroth, Chris		31135	Enroth, Chris	2013-09-09	Rig 055B - TSR	:Rig 055B - TSR	TSR-01031-55B	Project Engineer Support	Regular Pay	N	1	9/9: Created a CTR for Project Engineer Support. Work on Project Engineer Tasks.  9/10: Developed TSR for the Installation of the Port Crane. Also, transmitted correspondence and discussed other TSRs with Daniel and Kenneth. 
Enroth, Chris		31135	Enroth, Chris	2013-09-10	Rig 055B - TSR	:Rig 055B - TSR	TSR-01031-55B	Project Engineer Support	Regular Pay	N	1	9/9: Created a CTR for Project Engineer Support. Work on Project Engineer Tasks.  9/10: Developed TSR for the Installation of the Port Crane. Also, transmitted correspondence and discussed other TSRs with Daniel and Kenneth. 
Enroth, Chris		31135	Enroth, Chris	2013-09-18	Rig 055B - TSR	:Rig 055B - TSR	TSR-01031-55B	Project Engineer Support	Regular Pay	N	2	9/18 Weekly meeting. Also discussed TSRs and CTRs with the Engineering Managers. Spoke with Daniel and Kyle about needed information and expectations for other TSRs. 9/19: Discussion with Kyle and Daniel. This covered the expectations for TSR-1035 to understand expectations. Also discussed the fuel tank and the requirements for it to be either single walled or double wall protection.  
Enroth, Chris		31135	Enroth, Chris	2013-09-19	Rig 055B - TSR	:Rig 055B - TSR	TSR-01031-55B	Project Engineer Support	Regular Pay	N	2	9/18 Weekly meeting. Also discussed TSRs and CTRs with the Engineering Managers. Spoke with Daniel and Kyle about needed information and expectations for other TSRs. 9/19: Discussion with Kyle and Daniel. This covered the expectations for TSR-1035 to understand expectations. Also discussed the fuel tank and the requirements for it to be either single walled or double wall protection.  
Enroth, Chris		31135	Enroth, Chris	2013-09-26	Rig 055B - TSR	:Rig 055B - TSR	TSR-01031-55B	Project Engineer Support	Regular Pay	N	2	9/26: Speaking with structural understand where they are in the CTR process. Spekaing with PM to determine if any support is needed. 9/27: (2 hr) Updating management on where we are with the project. Answering outstanding items that were of concern. (4.5 hrs) finding autocad drawings to adequately review the current mud pump foundation with the 77B foundation. Will be giving Daniel Lopez factual information about the two structures allowing him to make appropriate decisions. A TSR is currently not approved for any analysis therefore I am only giving a side by side comaprison not an analysis. 
Enroth, Chris		31135	Enroth, Chris	2013-09-27	Rig 055B - TSR	:Rig 055B - TSR	TSR-01031-55B	Project Engineer Support	Regular Pay	N	6.5	9/26: Speaking with structural understand where they are in the CTR process. Spekaing with PM to determine if any support is needed. 9/27: (2 hr) Updating management on where we are with the project. Answering outstanding items that were of concern. (4.5 hrs) finding autocad drawings to adequately review the current mud pump foundation with the 77B foundation. Will be giving Daniel Lopez factual information about the two structures allowing him to make appropriate decisions. A TSR is currently not approved for any analysis therefore I am only giving a side by side comaprison not an analysis. 
Garzon, Jose		31999	Garzon, Jose	2013-09-27	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	2	Review Weekly Cost Report & Conference w/ Andre
Gasper, James		23139	Gasper, James	2013-09-09	Rig 055B - TSR	:Rig 055B - TSR	TSR-01033-55B	Mast Headache Rack	Regular Pay	N	1.5	(9/9) Pulled reference drawings for 55B headache rack drawing. Discussed HR with Kyle and created CTR. Made TSR folder on the Q. 
Gasper, James		23139	Gasper, James	2013-09-17	Rig 055B - TSR	:Rig 055B - TSR	TSR-01033-55B	Mast Headache Rack	Regular Pay	N	1	(9/17) Talked to Daniel and Kyle about CTR hours.  (9/20) Discussed design with Lam and Kyle.
Gasper, James		23139	Gasper, James	2013-09-20	Rig 055B - TSR	:Rig 055B - TSR	TSR-01033-55B	Mast Headache Rack	Regular Pay	N	0.5	(9/17) Talked to Daniel and Kyle about CTR hours.  (9/20) Discussed design with Lam and Kyle.
Gasper, James		23139	Gasper, James	2013-09-26	Rig 055B - TSR	:Rig 055B - TSR	TSR-01033-55B	Mast Headache Rack	Regular Pay	N	1.5	(9/26) First check of headache rac kdrawing. Discusse design with Kyle/Lam.
Hebert, Andre'		31147	Hebert, Andre'	2013-08-30	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	4	Working on and Completing Weekly Cost Report Sheet.
Hebert, Andre'		31147	Hebert, Andre'	2013-09-03	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	5	Daily updating of Weekly Cost Report; Weekly 55B Status Meeting
Hebert, Andre'		31147	Hebert, Andre'	2013-09-04	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	5	Daily updating of Weekly Cost Report; Weekly 55B Status Meeting
Hebert, Andre'		31147	Hebert, Andre'	2013-09-05	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	8	Daily updating of Weekly Cost Report; Weekly 55B Status Meeting
Hebert, Andre'		31147	Hebert, Andre'	2013-09-06	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	4	Daily updating of Weekly Cost Report; Weekly 55B Status Meeting
Hebert, Andre'		31147	Hebert, Andre'	2013-09-09	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	3	Daily Updating of Weekly Cost Report; Weekly 55B Status Meeting.
Hebert, Andre'		31147	Hebert, Andre'	2013-09-10	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	6	Daily Updating of Weekly Cost Report; Weekly 55B Status Meeting.
Hebert, Andre'		31147	Hebert, Andre'	2013-09-11	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	5	Daily Updating of Weekly Cost Report; Weekly 55B Status Meeting.
Hebert, Andre'		31147	Hebert, Andre'	2013-09-12	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	5	Daily Updating of Weekly Cost Report; Weekly 55B Status Meeting.
Hebert, Andre'		31147	Hebert, Andre'	2013-09-13	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	3	Daily Updating of Weekly Cost Report; Weekly 55B Status Meeting.
Hebert, Andre'		31147	Hebert, Andre'	2013-09-16	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	3	Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting; 55B Schedule Teleconference.
Hebert, Andre'		31147	Hebert, Andre'	2013-09-17	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	7	Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting; 55B Schedule Teleconference.
Hebert, Andre'		31147	Hebert, Andre'	2013-09-18	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	5	Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting; 55B Schedule Teleconference.
Hebert, Andre'		31147	Hebert, Andre'	2013-09-19	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	4	Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting; 55B Schedule Teleconference.
Hebert, Andre'		31147	Hebert, Andre'	2013-09-20	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	6	Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting; 55B Schedule Teleconference.
Hebert, Andre'		31147	Hebert, Andre'	2013-09-23	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	4	ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting
Hebert, Andre'		31147	Hebert, Andre'	2013-09-24	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	8	ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting
Hebert, Andre'		31147	Hebert, Andre'	2013-09-25	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	8	ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting
Hebert, Andre'		31147	Hebert, Andre'	2013-09-26	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	8	ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting
Hebert, Andre'		31147	Hebert, Andre'	2013-09-27	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	8	ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting
Hebert, Andre'		31147	Hebert, Andre'	2013-09-30	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	3	ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting
Hebert, Andre'		31147	Hebert, Andre'	2013-10-01	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	3	ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting
Hebert, Andre'		31147	Hebert, Andre'	2013-10-02	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	3	ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting
Hebert, Andre'		31147	Hebert, Andre'	2013-10-03	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	3	ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting
Hebert, Andre'		31147	Hebert, Andre'	2013-10-04	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	3	ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting
Hebert, Kenneth		30783	Hebert, Kenneth	2013-08-30	Rig 055B - TSR	:Rig 055B - TSR	TSR-01027-55B	Project Manager - Site Management	Regular Pay	N	8	Continue deck plate weld out. Contiune posted deck columns and diagonals. Continue Manway and ladder installation. Install mud pump and generator support on posted deck. Install hull vents. 5 Hours Travel to NI 8/26 5 Hours travel to Houston 8/31
Hebert, Kenneth		30783	Hebert, Kenneth	2013-08-31	Rig 055B - TSR	:Rig 055B - TSR	TSR-01027-55B	Project Manager - Site Management	Regular Pay	N	5	Continue deck plate weld out. Contiune posted deck columns and diagonals. Continue Manway and ladder installation. Install mud pump and generator support on posted deck. Install hull vents. 5 Hours Travel to NI 8/26 5 Hours travel to Houston 8/31
Hebert, Kenneth		30783	Hebert, Kenneth	2013-09-03	Rig 055B - TSR	:Rig 055B - TSR	TSR-01027-55B	Project Manager - Site Management	Regular Pay	N	6	5 hrs travel to NI 9/3. Continue weldout out of deck plate. Installation of remaining manways. Installation of mud pump posted deck support. Installation of sewage treatment containment. Quarters walk around. Heli-deck netting.
Hebert, Kenneth		30783	Hebert, Kenneth	2013-09-04	Rig 055B - TSR	:Rig 055B - TSR	TSR-01027-55B	Project Manager - Site Management	Regular Pay	N	8	5 hrs travel to NI 9/3. Continue weldout out of deck plate. Installation of remaining manways. Installation of mud pump posted deck support. Installation of sewage treatment containment. Quarters walk around. Heli-deck netting.
Hebert, Kenneth		30783	Hebert, Kenneth	2013-09-05	Rig 055B - TSR	:Rig 055B - TSR	TSR-01027-55B	Project Manager - Site Management	Regular Pay	N	8	5 hrs travel to NI 9/3. Continue weldout out of deck plate. Installation of remaining manways. Installation of mud pump posted deck support. Installation of sewage treatment containment. Quarters walk around. Heli-deck netting.
Hebert, Kenneth		30783	Hebert, Kenneth	2013-09-06	Rig 055B - TSR	:Rig 055B - TSR	TSR-01027-55B	Project Manager - Site Management	Regular Pay	N	8	5 hrs travel to NI 9/3. Continue weldout out of deck plate. Installation of remaining manways. Installation of mud pump posted deck support. Installation of sewage treatment containment. Quarters walk around. Heli-deck netting.
Hebert, Kenneth		30783	Hebert, Kenneth	2013-09-09	Rig 055B - TSR	:Rig 055B - TSR	TSR-01027-55B	Project Manager - Site Management	Regular Pay	N	8	Solids control mtg. Tire bumpers. Quarters walk around. Helideck netting. Posted deck columns and diagonals.  5 hrs travel to Houston. 
Leonard, Richard		31084	Leonard, Richard	2013-09-03	Rig 055B - TSR	:Rig 055B - TSR	TSR-01030-55B	Planning and Scheduling	Regular Pay	N	7	Rig-55B schedule development (35%).
Leonard, Richard		31084	Leonard, Richard	2013-09-05	Rig 055B - TSR	:Rig 055B - TSR	TSR-01030-55B	Planning and Scheduling	Regular Pay	N	8	Rig-55B schedule development (35%).
Leonard, Richard		31084	Leonard, Richard	2013-09-06	Rig 055B - TSR	:Rig 055B - TSR	TSR-01030-55B	Planning and Scheduling	Regular Pay	N	7	Rig-55B schedule development (35%).
Leonard, Richard		31084	Leonard, Richard	2013-09-16	Rig 055B - TSR	:Rig 055B - TSR	TSR-01030-55B	Planning and Scheduling	Regular Pay	N	5	Added acts & codes from Act list.  Worked on resource loading & durations. Worked in New Iberia w/Daniel, Ken & Andre. 
Leonard, Richard		31084	Leonard, Richard	2013-09-17	Rig 055B - TSR	:Rig 055B - TSR	TSR-01030-55B	Planning and Scheduling	Regular Pay	N	7	Added acts & codes from Act list.  Worked on resource loading & durations. Worked in New Iberia w/Daniel, Ken & Andre. 
Leonard, Richard		31084	Leonard, Richard	2013-09-18	Rig 055B - TSR	:Rig 055B - TSR	TSR-01030-55B	Planning and Scheduling	Regular Pay	N	8	Added acts & codes from Act list.  Worked on resource loading & durations. Worked in New Iberia w/Daniel, Ken & Andre. 
Leonard, Richard		31084	Leonard, Richard	2013-09-19	Rig 055B - TSR	:Rig 055B - TSR	TSR-01030-55B	Planning and Scheduling	Regular Pay	N	7	Added acts & codes from Act list.  Worked on resource loading & durations. Worked in New Iberia w/Daniel, Ken & Andre. 
Leonard, Richard		31084	Leonard, Richard	2013-09-20	Rig 055B - TSR	:Rig 055B - TSR	TSR-01030-55B	Planning and Scheduling	Regular Pay	N	6	Added acts & codes from Act list.  Worked on resource loading & durations. Worked in New Iberia w/Daniel, Ken & Andre. 
Lopez, Daniel		13879	Lopez, Daniel	2013-08-30	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	1	Misc reviews of schedule progress, cost tracking, daily reports, RFP's, etc
Lopez, Daniel		13879	Lopez, Daniel	2013-09-03	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	2	mtg with Allen, Leroy, Ken; mtg with Ken, Chet; mtg with Ken, Jody; MR/PO process, misc
Lopez, Daniel		13879	Lopez, Daniel	2013-09-04	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	3	mtg with Allen, Leroy, Ken; mtg with Ken, Chet; mtg with Ken, Jody; MR/PO process, misc
Lopez, Daniel		13879	Lopez, Daniel	2013-09-05	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	1	mtg with Allen, Leroy, Ken; mtg with Ken, Chet; mtg with Ken, Jody; MR/PO process, misc
Lopez, Daniel		13879	Lopez, Daniel	2013-09-06	Rig 055B - TSR	:Rig 055B - TSR	TSR-01029-55B	Project Support and Cost	Regular Pay	N	1	mtg with Allen, Leroy, Ken; mtg with Ken, Chet; mtg with Ken, Jody; MR/PO process, misc
Lopez, Daniel		13879	Lopez, Daniel	2013-09-09	Rig 055B - TSR	:Rig 055B - TSR	TSR-01027-55B	Project Manager - Site Management	Regular Pay	N	8	Qtrs Walkaround; Helideck Netting; Sub Repairs; Mud Pump Foundation; Generator Skids; Mud Tank Sumps
Lopez, Daniel		13879	Lopez, Daniel	2013-09-10	Rig 055B - TSR	:Rig 055B - TSR	TSR-01027-55B	Project Manager - Site Management	Regular Pay	N	8	Qtrs Walkaround; Helideck Netting; Sub Repairs; Mud Pump Foundation; Generator Skids; Mud Tank Sumps
Lopez, Daniel		13879	Lopez, Daniel	2013-09-11	Rig 055B - TSR	:Rig 055B - TSR	TSR-01027-55B	Project Manager - Site Management	Regular Pay	N	8	Qtrs Walkaround; Helideck Netting; Sub Repairs; Mud Pump Foundation; Generator Skids; Mud Tank Sumps
Lopez, Daniel		13879	Lopez, Daniel	2013-09-12	Rig 055B - TSR	:Rig 055B - TSR	TSR-01027-55B	Project Manager - Site Management	Regular Pay	N	8	Qtrs Walkaround; Helideck Netting; Sub Repairs; Mud Pump Foundation; Generator Skids; Mud Tank Sumps
Lopez, Daniel		13879	Lopez, Daniel	2013-09-13	Rig 055B - TSR	:Rig 055B - TSR	TSR-01027-55B	Project Manager - Site Management	Regular Pay	N	8	Qtrs Walkaround; Helideck Netting; Sub Repairs; Mud Pump Foundation; Generator Skids; Mud Tank Sumps
Lopez, Daniel		13879	Lopez, Daniel	2013-09-16	Rig 055B - TSR	:Rig 055B - TSR	TSR-01027-55B	Project Manager - Site Management	Regular Pay	N	8	PO's for most bid jobs are issued; completed installation of Living Qtrs Walkaround; installing Helideck Safety Net panels; completed Mud Pump foundations; Genset foundations at blast yard; completed installation of Mud Tank Sumps; 
Lopez, Daniel		13879	Lopez, Daniel	2013-09-17	Rig 055B - TSR	:Rig 055B - TSR	TSR-01027-55B	Project Manager - Site Management	Regular Pay	N	8	PO's for most bid jobs are issued; completed installation of Living Qtrs Walkaround; installing Helideck Safety Net panels; completed Mud Pump foundations; Genset foundations at blast yard; completed installation of Mud Tank Sumps; 
Lopez, Daniel		13879	Lopez, Daniel	2013-09-18	Rig 055B - TSR	:Rig 055B - TSR	TSR-01027-55B	Project Manager - Site Management	Regular Pay	N	8	PO's for most bid jobs are issued; completed installation of Living Qtrs Walkaround; installing Helideck Safety Net panels; completed Mud Pump foundations; Genset foundations at blast yard; completed installation of Mud Tank Sumps; 
Lopez, Daniel		13879	Lopez, Daniel	2013-09-19	Rig 055B - TSR	:Rig 055B - TSR	TSR-01027-55B	Project Manager - Site Management	Regular Pay	N	8	PO's for most bid jobs are issued; completed installation of Living Qtrs Walkaround; installing Helideck Safety Net panels; completed Mud Pump foundations; Genset foundations at blast yard; completed installation of Mud Tank Sumps; 
Lopez, Daniel		13879	Lopez, Daniel	2013-09-20	Rig 055B - TSR	:Rig 055B - TSR	TSR-01027-55B	Project Manager - Site Management	Regular Pay	N	8	PO's for most bid jobs are issued; completed installation of Living Qtrs Walkaround; installing Helideck Safety Net panels; completed Mud Pump foundations; Genset foundations at blast yard; completed installation of Mud Tank Sumps; 
Lopez, Daniel		13879	Lopez, Daniel	2013-09-23	Rig 055B - TSR	:Rig 055B - TSR	TSR-01027-55B	Project Manager - Site Management	Regular Pay	N	8	weeks activities: helideck Safety Net; Stairs - Barge Deck to P-tank room; stairs - barge deck to change room; piperack handrails; rig floor wings; spot p-tank and install piping; stbd side crane pedestal; 
Lopez, Daniel		13879	Lopez, Daniel	2013-09-24	Rig 055B - TSR	:Rig 055B - TSR	TSR-01027-55B	Project Manager - Site Management	Regular Pay	N	8	weeks activities: helideck Safety Net; Stairs - Barge Deck to P-tank room; stairs - barge deck to change room; piperack handrails; rig floor wings; spot p-tank and install piping; stbd side crane pedestal; 
Lopez, Daniel		13879	Lopez, Daniel	2013-09-25	Rig 055B - TSR	:Rig 055B - TSR	TSR-01027-55B	Project Manager - Site Management	Regular Pay	N	8	weeks activities: helideck Safety Net; Stairs - Barge Deck to P-tank room; stairs - barge deck to change room; piperack handrails; rig floor wings; spot p-tank and install piping; stbd side crane pedestal; 
Lopez, Daniel		13879	Lopez, Daniel	2013-09-26	Rig 055B - TSR	:Rig 055B - TSR	TSR-01027-55B	Project Manager - Site Management	Regular Pay	N	8	weeks activities: helideck Safety Net; Stairs - Barge Deck to P-tank room; stairs - barge deck to change room; piperack handrails; rig floor wings; spot p-tank and install piping; stbd side crane pedestal; 
Lopez, Daniel		13879	Lopez, Daniel	2013-09-27	Rig 055B - TSR	:Rig 055B - TSR	TSR-01027-55B	Project Manager - Site Management	Regular Pay	N	8	weeks activities: helideck Safety Net; Stairs - Barge Deck to P-tank room; stairs - barge deck to change room; piperack handrails; rig floor wings; spot p-tank and install piping; stbd side crane pedestal; 
Mcmullen, Kyle		20461	Mcmullen, Kyle	2013-09-10	Rig 055B - TSR	:Rig 055B - TSR	TSR-01035-55B	Solids Control Support and Structure	Regular Pay	N	0.75	
Mcmullen, Kyle		20461	Mcmullen, Kyle	2013-09-16	Rig 055B - TSR	:Rig 055B - TSR	TSR-01033-55B	Mast Headache Rack	Regular Pay	N	0.75	
Mcmullen, Kyle		20461	Mcmullen, Kyle	2013-09-18	Rig 055B - TSR	:Rig 055B - TSR	TSR-01033-55B	Mast Headache Rack	Regular Pay	N	0.5	
Mcmullen, Kyle		20461	Mcmullen, Kyle	2013-09-19	Rig 055B - TSR	:Rig 055B - TSR	TSR-01034-55B	Structural Design of the Port Crane Foundation	Regular Pay	N	0.5	Creating CTR
Mcmullen, Kyle		20461	Mcmullen, Kyle	2013-09-23	Rig 055B - TSR	:Rig 055B - TSR	TSR-01033-55B	Mast Headache Rack	Regular Pay	N	0.75	
Mcmullen, Kyle		20461	Mcmullen, Kyle	2013-09-24	Rig 055B - TSR	:Rig 055B - TSR	TSR-01033-55B	Mast Headache Rack	Regular Pay	N	0.75	
Nguyen, Lam		27172	Nguyen, Lam	2013-09-20	Rig 055B - TSR	:Rig 055B - TSR	TSR-01033-55B	Mast Headache Rack	Regular Pay	N	8	begin sketches for mast headache rack
Nguyen, Lam		27172	Nguyen, Lam	2013-09-24	Rig 055B - TSR	:Rig 055B - TSR	TSR-01033-55B	Mast Headache Rack	Regular Pay	N	8	finalization of drawings for 55B's headache rack
Nguyen, Lam		27172	Nguyen, Lam	2013-09-25	Rig 055B - TSR	:Rig 055B - TSR	TSR-01033-55B	Mast Headache Rack	Regular Pay	N	8	finalization of drawings for 55B's headache rack
Nguyen, Lam		27172	Nguyen, Lam	2013-09-26	Rig 055B - TSR	:Rig 055B - TSR	TSR-01033-55B	Mast Headache Rack	Regular Pay	N	8	finalization of drawings for 55B's headache rack
Nguyen, Lam		27172	Nguyen, Lam	2013-09-27	Rig 055B - TSR	:Rig 055B - TSR	TSR-01033-55B	Mast Headache Rack	Regular Pay	N	4	finalization of drawings for 55B's headache rack
Oiboh, Maria		28657	Oiboh, Maria	2013-09-05	Rig 055B - TSR	:Rig 055B - TSR	TSR-01026-55B	Drawing list assessment	Regular Pay	N	0.5	revise CTR
Oiboh, Maria		28657	Oiboh, Maria	2013-09-18	Rig 055B - TSR	:Rig 055B - TSR	TSR-01026-55B	Drawing list assessment	Regular Pay	N	0.5	Revise Closeout Package
Oiboh, Maria		28657	Oiboh, Maria	2013-09-18	Rig 055B - TSR	:Rig 055B - TSR	TSR-01033-55B	Mast Headache Rack	Regular Pay	N	3	Headache Rack Analysis
Oiboh, Maria		28657	Oiboh, Maria	2013-09-19	Rig 055B - TSR	:Rig 055B - TSR	TSR-01033-55B	Mast Headache Rack	Regular Pay	N	4	Headache Rack Analysis
Oiboh, Maria		28657	Oiboh, Maria	2013-09-20	Rig 055B - TSR	:Rig 055B - TSR	TSR-01033-55B	Mast Headache Rack	Regular Pay	N	5	Headache Rack Analysis
Oiboh, Maria		28657	Oiboh, Maria	2013-09-23	Rig 055B - TSR	:Rig 055B - TSR	TSR-01033-55B	Mast Headache Rack	Regular Pay	N	4	Headache rack analysis
Oiboh, Maria		28657	Oiboh, Maria	2013-09-24	Rig 055B - TSR	:Rig 055B - TSR	TSR-01033-55B	Mast Headache Rack	Regular Pay	N	5	Headache rack analysis
Oiboh, Maria		28657	Oiboh, Maria	2013-09-25	Rig 055B - TSR	:Rig 055B - TSR	TSR-01033-55B	Mast Headache Rack	Regular Pay	N	5	Headache rack analysis
Oiboh, Maria		28657	Oiboh, Maria	2013-09-26	Rig 055B - TSR	:Rig 055B - TSR	TSR-01033-55B	Mast Headache Rack	Regular Pay	N	2	Headache rack analysis
Oiboh, Maria		28657	Oiboh, Maria	2013-09-27	Rig 055B - TSR	:Rig 055B - TSR	TSR-01033-55B	Mast Headache Rack	Regular Pay	N	1	Headache rack analysis
Quinlan, Mark		15605	Quinlan, Mark	2013-09-04	Rig 055B - TSR	:Rig 055B - TSR	Default	Default Task	Regular Pay	N	0.5	TSR process planning. Discussion regarding TSR, CTR, signatures, approvals, etc.
Quinlan, Mark		15605	Quinlan, Mark	2013-09-05	Rig 055B - TSR	:Rig 055B - TSR	Default	Default Task	Regular Pay	N	0.5	TSR process planning. Discussion regarding TSR, CTR, signatures, approvals, etc.
Quinlan, Mark		15605	Quinlan, Mark	2013-09-06	Rig 055B - TSR	:Rig 055B - TSR	Default	Default Task	Regular Pay	N	1.5	TSR process planning. Discussion regarding TSR, CTR, signatures, approvals, etc.
Quinlan, Mark		15605	Quinlan, Mark	2013-09-09	Rig 055B - TSR	:Rig 055B - TSR	TSR-01030-55B	Planning and Scheduling	Regular Pay	N	2	TSR processing and guidance. Short service - Jody Guidry. Design support discussions. Solids control support modifications. Discussions with Project Manaagement.
Quinlan, Mark		15605	Quinlan, Mark	2013-09-10	Rig 055B - TSR	:Rig 055B - TSR	TSR-01030-55B	Planning and Scheduling	Regular Pay	N	0.5	TSR processing and guidance. Short service - Jody Guidry. Design support discussions. Solids control support modifications. Discussions with Project Manaagement.
Quinlan, Mark		15605	Quinlan, Mark	2013-09-11	Rig 055B - TSR	:Rig 055B - TSR	TSR-01030-55B	Planning and Scheduling	Regular Pay	N	1	TSR processing and guidance. Short service - Jody Guidry. Design support discussions. Solids control support modifications. Discussions with Project Manaagement.
Quinlan, Mark		15605	Quinlan, Mark	2013-09-17	Rig 055B - TSR	:Rig 055B - TSR	TSR-01026-55B	Drawing list assessment	Regular Pay	N	0.5	Closeout review and comment. Closeout approval.
Quinlan, Mark		15605	Quinlan, Mark	2013-09-17	Rig 055B - TSR	:Rig 055B - TSR	TSR-01030-55B	Planning and Scheduling	Regular Pay	N	1	TSR processing and discussions. Scope discussions.
Quinlan, Mark		15605	Quinlan, Mark	2013-09-17	Rig 055B - TSR	:Rig 055B - TSR	TSR-01033-55B	Mast Headache Rack	Regular Pay	N	0.5	Discussion and guidance.
Quinlan, Mark		15605	Quinlan, Mark	2013-09-18	Rig 055B - TSR	:Rig 055B - TSR	TSR-01026-55B	Drawing list assessment	Regular Pay	N	1	Closeout review and comment. Closeout approval.
Quinlan, Mark		15605	Quinlan, Mark	2013-09-19	Rig 055B - TSR	:Rig 055B - TSR	TSR-01030-55B	Planning and Scheduling	Regular Pay	N	0.5	TSR processing and discussions. Scope discussions.
Quinlan, Mark		15605	Quinlan, Mark	2013-09-25	Rig 055B - TSR	:Rig 055B - TSR	TSR-01030-55B	Planning and Scheduling	Regular Pay	N	1.5	Weekly project conference call and update discussion with New Iberia. TSR discussions and processing. Clarifications.
Quinlan, Mark		15605	Quinlan, Mark	2013-09-26	Rig 055B - TSR	:Rig 055B - TSR	TSR-01030-55B	Planning and Scheduling	Regular Pay	N	2	Weekly project conference call and update discussion with New Iberia. TSR discussions and processing. Clarifications.
Quinlan, Mark		15605	Quinlan, Mark	2013-09-27	Rig 055B - TSR	:Rig 055B - TSR	TSR-01030-55B	Planning and Scheduling	Regular Pay	N	0.5	Weekly project conference call and update discussion with New Iberia. TSR discussions and processing. Clarifications.