Name Billing Class Employee No. Item Line Class Transaction Date Job No. Customer Service Item Notes Payroll Item Billable Duration Remarks Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-05 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 0.5 Tracking and reporting on TSR documentation. Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-06 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 1 Tracking and reporting on TSR documentation. Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-09 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 0.5 Document transmittals and filing; Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 0.25 Issuing Closeout Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 1 Project meeting Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-23 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 0.25 Issuing CTR. Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-25 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 1 Weekly meeting Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-27 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.25 Filing and transmittal. Enroth, Chris 31135 Enroth, Chris 2013-09-03 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 9/3: Update on project status 9/4: Weekly update meeting for 55B 9/6: Work on CTR for the Project Engineer. Enroth, Chris 31135 Enroth, Chris 2013-09-04 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 9/3: Update on project status 9/4: Weekly update meeting for 55B 9/6: Work on CTR for the Project Engineer. Enroth, Chris 31135 Enroth, Chris 2013-09-06 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 0.5 9/3: Update on project status 9/4: Weekly update meeting for 55B 9/6: Work on CTR for the Project Engineer. Enroth, Chris 31135 Enroth, Chris 2013-09-09 Rig 055B - TSR :Rig 055B - TSR TSR-01028-55B Electrical Load Analysis Regular Pay N 1 9/9: Created TSR Closeout and CTR for the Electrical Load analysis. Enroth, Chris 31135 Enroth, Chris 2013-09-09 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 9/9: Created a CTR for Project Engineer Support. Work on Project Engineer Tasks. 9/10: Developed TSR for the Installation of the Port Crane. Also, transmitted correspondence and discussed other TSRs with Daniel and Kenneth. Enroth, Chris 31135 Enroth, Chris 2013-09-10 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 9/9: Created a CTR for Project Engineer Support. Work on Project Engineer Tasks. 9/10: Developed TSR for the Installation of the Port Crane. Also, transmitted correspondence and discussed other TSRs with Daniel and Kenneth. Enroth, Chris 31135 Enroth, Chris 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2 9/18 Weekly meeting. Also discussed TSRs and CTRs with the Engineering Managers. Spoke with Daniel and Kyle about needed information and expectations for other TSRs. 9/19: Discussion with Kyle and Daniel. This covered the expectations for TSR-1035 to understand expectations. Also discussed the fuel tank and the requirements for it to be either single walled or double wall protection. Enroth, Chris 31135 Enroth, Chris 2013-09-19 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2 9/18 Weekly meeting. Also discussed TSRs and CTRs with the Engineering Managers. Spoke with Daniel and Kyle about needed information and expectations for other TSRs. 9/19: Discussion with Kyle and Daniel. This covered the expectations for TSR-1035 to understand expectations. Also discussed the fuel tank and the requirements for it to be either single walled or double wall protection. Enroth, Chris 31135 Enroth, Chris 2013-09-26 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2 9/26: Speaking with structural understand where they are in the CTR process. Spekaing with PM to determine if any support is needed. 9/27: (2 hr) Updating management on where we are with the project. Answering outstanding items that were of concern. (4.5 hrs) finding autocad drawings to adequately review the current mud pump foundation with the 77B foundation. Will be giving Daniel Lopez factual information about the two structures allowing him to make appropriate decisions. A TSR is currently not approved for any analysis therefore I am only giving a side by side comaprison not an analysis. Enroth, Chris 31135 Enroth, Chris 2013-09-27 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 6.5 9/26: Speaking with structural understand where they are in the CTR process. Spekaing with PM to determine if any support is needed. 9/27: (2 hr) Updating management on where we are with the project. Answering outstanding items that were of concern. (4.5 hrs) finding autocad drawings to adequately review the current mud pump foundation with the 77B foundation. Will be giving Daniel Lopez factual information about the two structures allowing him to make appropriate decisions. A TSR is currently not approved for any analysis therefore I am only giving a side by side comaprison not an analysis. Garzon, Jose 31999 Garzon, Jose 2013-09-27 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Review Weekly Cost Report & Conference w/ Andre Gasper, James 23139 Gasper, James 2013-09-09 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 1.5 (9/9) Pulled reference drawings for 55B headache rack drawing. Discussed HR with Kyle and created CTR. Made TSR folder on the Q. Gasper, James 23139 Gasper, James 2013-09-17 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 1 (9/17) Talked to Daniel and Kyle about CTR hours. (9/20) Discussed design with Lam and Kyle. Gasper, James 23139 Gasper, James 2013-09-20 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.5 (9/17) Talked to Daniel and Kyle about CTR hours. (9/20) Discussed design with Lam and Kyle. Gasper, James 23139 Gasper, James 2013-09-26 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 1.5 (9/26) First check of headache rac kdrawing. Discusse design with Kyle/Lam. Hebert, Andre' 31147 Hebert, Andre' 2013-08-30 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Working on and Completing Weekly Cost Report Sheet. Hebert, Andre' 31147 Hebert, Andre' 2013-09-03 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 5 Daily updating of Weekly Cost Report; Weekly 55B Status Meeting Hebert, Andre' 31147 Hebert, Andre' 2013-09-04 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 5 Daily updating of Weekly Cost Report; Weekly 55B Status Meeting Hebert, Andre' 31147 Hebert, Andre' 2013-09-05 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 8 Daily updating of Weekly Cost Report; Weekly 55B Status Meeting Hebert, Andre' 31147 Hebert, Andre' 2013-09-06 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Daily updating of Weekly Cost Report; Weekly 55B Status Meeting Hebert, Andre' 31147 Hebert, Andre' 2013-09-09 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Daily Updating of Weekly Cost Report; Weekly 55B Status Meeting. Hebert, Andre' 31147 Hebert, Andre' 2013-09-10 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 6 Daily Updating of Weekly Cost Report; Weekly 55B Status Meeting. Hebert, Andre' 31147 Hebert, Andre' 2013-09-11 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 5 Daily Updating of Weekly Cost Report; Weekly 55B Status Meeting. Hebert, Andre' 31147 Hebert, Andre' 2013-09-12 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 5 Daily Updating of Weekly Cost Report; Weekly 55B Status Meeting. Hebert, Andre' 31147 Hebert, Andre' 2013-09-13 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Daily Updating of Weekly Cost Report; Weekly 55B Status Meeting. Hebert, Andre' 31147 Hebert, Andre' 2013-09-16 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting; 55B Schedule Teleconference. Hebert, Andre' 31147 Hebert, Andre' 2013-09-17 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 7 Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting; 55B Schedule Teleconference. Hebert, Andre' 31147 Hebert, Andre' 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 5 Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting; 55B Schedule Teleconference. Hebert, Andre' 31147 Hebert, Andre' 2013-09-19 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting; 55B Schedule Teleconference. Hebert, Andre' 31147 Hebert, Andre' 2013-09-20 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 6 Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting; 55B Schedule Teleconference. Hebert, Andre' 31147 Hebert, Andre' 2013-09-23 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting Hebert, Andre' 31147 Hebert, Andre' 2013-09-24 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 8 ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting Hebert, Andre' 31147 Hebert, Andre' 2013-09-25 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 8 ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting Hebert, Andre' 31147 Hebert, Andre' 2013-09-26 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 8 ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting Hebert, Andre' 31147 Hebert, Andre' 2013-09-27 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 8 ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting Hebert, Andre' 31147 Hebert, Andre' 2013-09-30 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting Hebert, Andre' 31147 Hebert, Andre' 2013-10-01 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting Hebert, Andre' 31147 Hebert, Andre' 2013-10-02 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting Hebert, Andre' 31147 Hebert, Andre' 2013-10-03 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting Hebert, Andre' 31147 Hebert, Andre' 2013-10-04 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting Hebert, Kenneth 30783 Hebert, Kenneth 2013-08-30 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Continue deck plate weld out. Contiune posted deck columns and diagonals. Continue Manway and ladder installation. Install mud pump and generator support on posted deck. Install hull vents. 5 Hours Travel to NI 8/26 5 Hours travel to Houston 8/31 Hebert, Kenneth 30783 Hebert, Kenneth 2013-08-31 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 5 Continue deck plate weld out. Contiune posted deck columns and diagonals. Continue Manway and ladder installation. Install mud pump and generator support on posted deck. Install hull vents. 5 Hours Travel to NI 8/26 5 Hours travel to Houston 8/31 Hebert, Kenneth 30783 Hebert, Kenneth 2013-09-03 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 6 5 hrs travel to NI 9/3. Continue weldout out of deck plate. Installation of remaining manways. Installation of mud pump posted deck support. Installation of sewage treatment containment. Quarters walk around. Heli-deck netting. Hebert, Kenneth 30783 Hebert, Kenneth 2013-09-04 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 5 hrs travel to NI 9/3. Continue weldout out of deck plate. Installation of remaining manways. Installation of mud pump posted deck support. Installation of sewage treatment containment. Quarters walk around. Heli-deck netting. Hebert, Kenneth 30783 Hebert, Kenneth 2013-09-05 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 5 hrs travel to NI 9/3. Continue weldout out of deck plate. Installation of remaining manways. Installation of mud pump posted deck support. Installation of sewage treatment containment. Quarters walk around. Heli-deck netting. Hebert, Kenneth 30783 Hebert, Kenneth 2013-09-06 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 5 hrs travel to NI 9/3. Continue weldout out of deck plate. Installation of remaining manways. Installation of mud pump posted deck support. Installation of sewage treatment containment. Quarters walk around. Heli-deck netting. Hebert, Kenneth 30783 Hebert, Kenneth 2013-09-09 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Solids control mtg. Tire bumpers. Quarters walk around. Helideck netting. Posted deck columns and diagonals. 5 hrs travel to Houston. Leonard, Richard 31084 Leonard, Richard 2013-09-03 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 7 Rig-55B schedule development (35%). Leonard, Richard 31084 Leonard, Richard 2013-09-05 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 8 Rig-55B schedule development (35%). Leonard, Richard 31084 Leonard, Richard 2013-09-06 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 7 Rig-55B schedule development (35%). Leonard, Richard 31084 Leonard, Richard 2013-09-16 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 5 Added acts & codes from Act list. Worked on resource loading & durations. Worked in New Iberia w/Daniel, Ken & Andre. Leonard, Richard 31084 Leonard, Richard 2013-09-17 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 7 Added acts & codes from Act list. Worked on resource loading & durations. Worked in New Iberia w/Daniel, Ken & Andre. Leonard, Richard 31084 Leonard, Richard 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 8 Added acts & codes from Act list. Worked on resource loading & durations. Worked in New Iberia w/Daniel, Ken & Andre. Leonard, Richard 31084 Leonard, Richard 2013-09-19 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 7 Added acts & codes from Act list. Worked on resource loading & durations. Worked in New Iberia w/Daniel, Ken & Andre. Leonard, Richard 31084 Leonard, Richard 2013-09-20 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 6 Added acts & codes from Act list. Worked on resource loading & durations. Worked in New Iberia w/Daniel, Ken & Andre. Lopez, Daniel 13879 Lopez, Daniel 2013-08-30 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 1 Misc reviews of schedule progress, cost tracking, daily reports, RFP's, etc Lopez, Daniel 13879 Lopez, Daniel 2013-09-03 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 mtg with Allen, Leroy, Ken; mtg with Ken, Chet; mtg with Ken, Jody; MR/PO process, misc Lopez, Daniel 13879 Lopez, Daniel 2013-09-04 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 mtg with Allen, Leroy, Ken; mtg with Ken, Chet; mtg with Ken, Jody; MR/PO process, misc Lopez, Daniel 13879 Lopez, Daniel 2013-09-05 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 1 mtg with Allen, Leroy, Ken; mtg with Ken, Chet; mtg with Ken, Jody; MR/PO process, misc Lopez, Daniel 13879 Lopez, Daniel 2013-09-06 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 1 mtg with Allen, Leroy, Ken; mtg with Ken, Chet; mtg with Ken, Jody; MR/PO process, misc Lopez, Daniel 13879 Lopez, Daniel 2013-09-09 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Qtrs Walkaround; Helideck Netting; Sub Repairs; Mud Pump Foundation; Generator Skids; Mud Tank Sumps Lopez, Daniel 13879 Lopez, Daniel 2013-09-10 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Qtrs Walkaround; Helideck Netting; Sub Repairs; Mud Pump Foundation; Generator Skids; Mud Tank Sumps Lopez, Daniel 13879 Lopez, Daniel 2013-09-11 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Qtrs Walkaround; Helideck Netting; Sub Repairs; Mud Pump Foundation; Generator Skids; Mud Tank Sumps Lopez, Daniel 13879 Lopez, Daniel 2013-09-12 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Qtrs Walkaround; Helideck Netting; Sub Repairs; Mud Pump Foundation; Generator Skids; Mud Tank Sumps Lopez, Daniel 13879 Lopez, Daniel 2013-09-13 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Qtrs Walkaround; Helideck Netting; Sub Repairs; Mud Pump Foundation; Generator Skids; Mud Tank Sumps Lopez, Daniel 13879 Lopez, Daniel 2013-09-16 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 PO's for most bid jobs are issued; completed installation of Living Qtrs Walkaround; installing Helideck Safety Net panels; completed Mud Pump foundations; Genset foundations at blast yard; completed installation of Mud Tank Sumps; Lopez, Daniel 13879 Lopez, Daniel 2013-09-17 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 PO's for most bid jobs are issued; completed installation of Living Qtrs Walkaround; installing Helideck Safety Net panels; completed Mud Pump foundations; Genset foundations at blast yard; completed installation of Mud Tank Sumps; Lopez, Daniel 13879 Lopez, Daniel 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 PO's for most bid jobs are issued; completed installation of Living Qtrs Walkaround; installing Helideck Safety Net panels; completed Mud Pump foundations; Genset foundations at blast yard; completed installation of Mud Tank Sumps; Lopez, Daniel 13879 Lopez, Daniel 2013-09-19 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 PO's for most bid jobs are issued; completed installation of Living Qtrs Walkaround; installing Helideck Safety Net panels; completed Mud Pump foundations; Genset foundations at blast yard; completed installation of Mud Tank Sumps; Lopez, Daniel 13879 Lopez, Daniel 2013-09-20 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 PO's for most bid jobs are issued; completed installation of Living Qtrs Walkaround; installing Helideck Safety Net panels; completed Mud Pump foundations; Genset foundations at blast yard; completed installation of Mud Tank Sumps; Lopez, Daniel 13879 Lopez, Daniel 2013-09-23 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 weeks activities: helideck Safety Net; Stairs - Barge Deck to P-tank room; stairs - barge deck to change room; piperack handrails; rig floor wings; spot p-tank and install piping; stbd side crane pedestal; Lopez, Daniel 13879 Lopez, Daniel 2013-09-24 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 weeks activities: helideck Safety Net; Stairs - Barge Deck to P-tank room; stairs - barge deck to change room; piperack handrails; rig floor wings; spot p-tank and install piping; stbd side crane pedestal; Lopez, Daniel 13879 Lopez, Daniel 2013-09-25 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 weeks activities: helideck Safety Net; Stairs - Barge Deck to P-tank room; stairs - barge deck to change room; piperack handrails; rig floor wings; spot p-tank and install piping; stbd side crane pedestal; Lopez, Daniel 13879 Lopez, Daniel 2013-09-26 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 weeks activities: helideck Safety Net; Stairs - Barge Deck to P-tank room; stairs - barge deck to change room; piperack handrails; rig floor wings; spot p-tank and install piping; stbd side crane pedestal; Lopez, Daniel 13879 Lopez, Daniel 2013-09-27 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 weeks activities: helideck Safety Net; Stairs - Barge Deck to P-tank room; stairs - barge deck to change room; piperack handrails; rig floor wings; spot p-tank and install piping; stbd side crane pedestal; Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-10 Rig 055B - TSR :Rig 055B - TSR TSR-01035-55B Solids Control Support and Structure Regular Pay N 0.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-16 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-19 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 0.5 Creating CTR Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-23 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-24 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.75 Nguyen, Lam 27172 Nguyen, Lam 2013-09-20 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 8 begin sketches for mast headache rack Nguyen, Lam 27172 Nguyen, Lam 2013-09-24 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 8 finalization of drawings for 55B's headache rack Nguyen, Lam 27172 Nguyen, Lam 2013-09-25 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 8 finalization of drawings for 55B's headache rack Nguyen, Lam 27172 Nguyen, Lam 2013-09-26 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 8 finalization of drawings for 55B's headache rack Nguyen, Lam 27172 Nguyen, Lam 2013-09-27 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 4 finalization of drawings for 55B's headache rack Oiboh, Maria 28657 Oiboh, Maria 2013-09-05 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 0.5 revise CTR Oiboh, Maria 28657 Oiboh, Maria 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 0.5 Revise Closeout Package Oiboh, Maria 28657 Oiboh, Maria 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 3 Headache Rack Analysis Oiboh, Maria 28657 Oiboh, Maria 2013-09-19 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 4 Headache Rack Analysis Oiboh, Maria 28657 Oiboh, Maria 2013-09-20 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 5 Headache Rack Analysis Oiboh, Maria 28657 Oiboh, Maria 2013-09-23 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 4 Headache rack analysis Oiboh, Maria 28657 Oiboh, Maria 2013-09-24 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 5 Headache rack analysis Oiboh, Maria 28657 Oiboh, Maria 2013-09-25 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 5 Headache rack analysis Oiboh, Maria 28657 Oiboh, Maria 2013-09-26 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 2 Headache rack analysis Oiboh, Maria 28657 Oiboh, Maria 2013-09-27 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 1 Headache rack analysis Quinlan, Mark 15605 Quinlan, Mark 2013-09-04 Rig 055B - TSR :Rig 055B - TSR Default Default Task Regular Pay N 0.5 TSR process planning. Discussion regarding TSR, CTR, signatures, approvals, etc. Quinlan, Mark 15605 Quinlan, Mark 2013-09-05 Rig 055B - TSR :Rig 055B - TSR Default Default Task Regular Pay N 0.5 TSR process planning. Discussion regarding TSR, CTR, signatures, approvals, etc. Quinlan, Mark 15605 Quinlan, Mark 2013-09-06 Rig 055B - TSR :Rig 055B - TSR Default Default Task Regular Pay N 1.5 TSR process planning. Discussion regarding TSR, CTR, signatures, approvals, etc. Quinlan, Mark 15605 Quinlan, Mark 2013-09-09 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 2 TSR processing and guidance. Short service - Jody Guidry. Design support discussions. Solids control support modifications. Discussions with Project Manaagement. Quinlan, Mark 15605 Quinlan, Mark 2013-09-10 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 0.5 TSR processing and guidance. Short service - Jody Guidry. Design support discussions. Solids control support modifications. Discussions with Project Manaagement. Quinlan, Mark 15605 Quinlan, Mark 2013-09-11 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 1 TSR processing and guidance. Short service - Jody Guidry. Design support discussions. Solids control support modifications. Discussions with Project Manaagement. Quinlan, Mark 15605 Quinlan, Mark 2013-09-17 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 0.5 Closeout review and comment. Closeout approval. Quinlan, Mark 15605 Quinlan, Mark 2013-09-17 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 1 TSR processing and discussions. Scope discussions. Quinlan, Mark 15605 Quinlan, Mark 2013-09-17 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.5 Discussion and guidance. Quinlan, Mark 15605 Quinlan, Mark 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 1 Closeout review and comment. Closeout approval. Quinlan, Mark 15605 Quinlan, Mark 2013-09-19 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 0.5 TSR processing and discussions. Scope discussions. Quinlan, Mark 15605 Quinlan, Mark 2013-09-25 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 1.5 Weekly project conference call and update discussion with New Iberia. TSR discussions and processing. Clarifications. Quinlan, Mark 15605 Quinlan, Mark 2013-09-26 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 2 Weekly project conference call and update discussion with New Iberia. TSR discussions and processing. Clarifications. Quinlan, Mark 15605 Quinlan, Mark 2013-09-27 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 0.5 Weekly project conference call and update discussion with New Iberia. TSR discussions and processing. Clarifications.