Name Billing Class Employee No. Item Line Class Transaction Date Job No. Customer Service Item Notes Payroll Item Billable Duration Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-08-06 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 0.25 Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-08-07 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 0.25 Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-08-07 Rig 055B - TSR :Rig 055B - TSR TSR-01028-55B Electrical Load Analysis Regular Pay N 0.25 Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-08-12 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 0.25 Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-08-15 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 0.5 Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-08-16 Rig 055B - TSR :Rig 055B - TSR TSR-01028-55B Electrical Load Analysis Regular Pay N 0.25 Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-08-16 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 0.25 Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-08-16 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 0.25 Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-08-20 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 0.25 Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-05 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 0.5 Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-06 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 1 Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-09 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 0.5 Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 0.25 Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 1 Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-23 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 0.25 Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-25 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 1 Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-27 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.25 Christman, Ralph 32324 Christman, Ralph 2013-11-06 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 4 Christman, Ralph 32324 Christman, Ralph 2013-11-07 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 4 Christman, Ralph 32324 Christman, Ralph 2013-11-07 Rig 055B - TSR :Rig 055B - TSR TSR-01035-55B Solids Control Support and Structure Regular Pay N 1 Christman, Ralph 32324 Christman, Ralph 2013-11-07 Rig 055B - TSR :Rig 055B - TSR TSR-01036-55B Snake Pit Access Regular Pay N 1 Christman, Ralph 32324 Christman, Ralph 2013-11-11 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 3 Christman, Ralph 32324 Christman, Ralph 2013-11-12 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 3 Christman, Ralph 32324 Christman, Ralph 2013-11-13 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 3 Christman, Ralph 32324 Christman, Ralph 2013-11-14 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 3 Christman, Ralph 32324 Christman, Ralph 2013-11-15 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 3 Christman, Ralph 32324 Christman, Ralph 2013-11-18 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 8 Christman, Ralph 32324 Christman, Ralph 2013-11-19 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 8 Christman, Ralph 32324 Christman, Ralph 2013-12-05 Rig 055B - TSR :Rig 055B - TSR TSR-01088-55B Shaker Cantilever Deck Regular Pay N 8 Christman, Ralph 32324 Christman, Ralph 2013-12-06 Rig 055B - TSR :Rig 055B - TSR TSR-01088-55B Shaker Cantilever Deck Regular Pay N 5 Christman, Ralph 32324 Christman, Ralph 2014-01-09 Rig 055B - TSR :Rig 055B - TSR TSR-01103-55B Rig Survey Regular Pay N 7 Christman, Ralph 32324 Christman, Ralph 2014-01-10 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 8 CULTON, DETRA DCULTON CULTON, DETRA 2013-10-08 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.25 CULTON, DETRA DCULTON CULTON, DETRA 2013-11-13 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 0.25 CULTON, DETRA DCULTON CULTON, DETRA 2013-11-19 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 0.25 CULTON, DETRA DCULTON CULTON, DETRA 2013-11-22 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 0.25 CULTON, DETRA DCULTON CULTON, DETRA 2013-12-19 Rig 055B - TSR :Rig 055B - TSR TSR-01088-55B Shaker Cantilever Deck Regular Pay N 0.25 Enroth, Chris 31135 Enroth, Chris 2013-08-06 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 5 Enroth, Chris 31135 Enroth, Chris 2013-08-07 Rig 055B - TSR :Rig 055B - TSR TSR-01028-55B Electrical Load Analysis Regular Pay N 2 Enroth, Chris 31135 Enroth, Chris 2013-08-08 Rig 055B - TSR :Rig 055B - TSR TSR-01028-55B Electrical Load Analysis Regular Pay N 4 Enroth, Chris 31135 Enroth, Chris 2013-08-08 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2 Enroth, Chris 31135 Enroth, Chris 2013-08-09 Rig 055B - TSR :Rig 055B - TSR TSR-01028-55B Electrical Load Analysis Regular Pay N 6 Enroth, Chris 31135 Enroth, Chris 2013-08-12 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 3 Enroth, Chris 31135 Enroth, Chris 2013-08-13 Rig 055B - TSR :Rig 055B - TSR TSR-01028-55B Electrical Load Analysis Regular Pay N 6 Enroth, Chris 31135 Enroth, Chris 2013-08-14 Rig 055B - TSR :Rig 055B - TSR TSR-01028-55B Electrical Load Analysis Regular Pay N 2 Enroth, Chris 31135 Enroth, Chris 2013-08-14 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2 Enroth, Chris 31135 Enroth, Chris 2013-08-16 Rig 055B - TSR :Rig 055B - TSR TSR-01028-55B Electrical Load Analysis Regular Pay N 1 Enroth, Chris 31135 Enroth, Chris 2013-09-03 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Enroth, Chris 31135 Enroth, Chris 2013-09-04 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Enroth, Chris 31135 Enroth, Chris 2013-09-06 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 0.5 Enroth, Chris 31135 Enroth, Chris 2013-09-09 Rig 055B - TSR :Rig 055B - TSR TSR-01028-55B Electrical Load Analysis Regular Pay N 1 Enroth, Chris 31135 Enroth, Chris 2013-09-09 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Enroth, Chris 31135 Enroth, Chris 2013-09-10 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Enroth, Chris 31135 Enroth, Chris 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2 Enroth, Chris 31135 Enroth, Chris 2013-09-19 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2 Enroth, Chris 31135 Enroth, Chris 2013-09-26 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2 Enroth, Chris 31135 Enroth, Chris 2013-09-27 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 6.5 Enroth, Chris 31135 Enroth, Chris 2013-09-30 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 3.5 Enroth, Chris 31135 Enroth, Chris 2013-10-03 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1.5 Enroth, Chris 31135 Enroth, Chris 2013-10-07 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2 Enroth, Chris 31135 Enroth, Chris 2013-10-10 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Enroth, Chris 31135 Enroth, Chris 2013-10-11 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Enroth, Chris 31135 Enroth, Chris 2013-10-15 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2.5 Enroth, Chris 31135 Enroth, Chris 2013-10-16 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2.5 Enroth, Chris 31135 Enroth, Chris 2013-10-17 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2.5 Enroth, Chris 31135 Enroth, Chris 2013-10-23 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Enroth, Chris 31135 Enroth, Chris 2013-10-24 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Enroth, Chris 31135 Enroth, Chris 2013-10-30 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2 Enroth, Chris 31135 Enroth, Chris 2013-10-31 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Enroth, Chris 31135 Enroth, Chris 2013-11-05 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Enroth, Chris 31135 Enroth, Chris 2013-11-06 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2 Enroth, Chris 31135 Enroth, Chris 2013-11-07 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Enroth, Chris 31135 Enroth, Chris 2013-11-12 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Enroth, Chris 31135 Enroth, Chris 2013-11-15 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2 Enroth, Chris 31135 Enroth, Chris 2013-11-21 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2.5 Enroth, Chris 31135 Enroth, Chris 2013-11-24 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 6 Enroth, Chris 31135 Enroth, Chris 2013-11-25 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 10 Enroth, Chris 31135 Enroth, Chris 2013-11-26 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2 Enroth, Chris 31135 Enroth, Chris 2013-12-09 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Enroth, Chris 31135 Enroth, Chris 2013-12-10 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 9 Enroth, Chris 31135 Enroth, Chris 2013-12-12 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 3 Enroth, Chris 31135 Enroth, Chris 2013-12-16 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 4 Enroth, Chris 31135 Enroth, Chris 2013-12-17 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 8 Enroth, Chris 31135 Enroth, Chris 2013-12-18 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2 Enroth, Chris 31135 Enroth, Chris 2013-12-19 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Enroth, Chris 31135 Enroth, Chris 2013-12-20 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Enroth, Chris 31135 Enroth, Chris 2013-12-30 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2 Enroth, Chris 31135 Enroth, Chris 2013-12-31 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 3 Enroth, Chris 31135 Enroth, Chris 2014-01-02 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2 Enroth, Chris 31135 Enroth, Chris 2014-01-06 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1.5 Enroth, Chris 31135 Enroth, Chris 2014-01-07 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Enroth, Chris 31135 Enroth, Chris 2014-01-08 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Enroth, Chris 31135 Enroth, Chris 2014-01-09 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 4.5 Garg, Ravi 33008 Garg, Ravi 2014-01-02 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 2 Garg, Ravi 33008 Garg, Ravi 2014-01-03 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 1.5 Garg, Ravi 33008 Garg, Ravi 2014-01-06 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 6 Garg, Ravi 33008 Garg, Ravi 2014-01-07 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 6 Garg, Ravi 33008 Garg, Ravi 2014-01-08 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 1.5 Garg, Ravi 33008 Garg, Ravi 2014-01-09 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 5.5 Garg, Ravi 33008 Garg, Ravi 2014-01-10 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 1.75 Garg, Ravi 33008 Garg, Ravi 2014-01-10 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 6 Garzon, Jose 31999 Garzon, Jose 2013-09-27 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Garzon, Jose 31999 Garzon, Jose 2013-11-13 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 0.25 Garzon, Jose 31999 Garzon, Jose 2013-11-13 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 0.25 Garzon, Jose 31999 Garzon, Jose 2013-11-27 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 0.25 Garzon, Jose 31999 Garzon, Jose 2013-12-26 Rig 055B - TSR :Rig 055B - TSR TSR-01096-55B Mud Pumps Lift Plans Regular Pay N 0.25 Gasper, James 23139 Gasper, James 2013-08-29 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 1 Gasper, James 23139 Gasper, James 2013-09-09 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 1.5 Gasper, James 23139 Gasper, James 2013-09-17 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 1 Gasper, James 23139 Gasper, James 2013-09-20 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.5 Gasper, James 23139 Gasper, James 2013-09-26 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 1.5 Gasper, James 23139 Gasper, James 2013-09-30 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 1 Gasper, James 23139 Gasper, James 2013-10-02 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 1 Gasper, James 23139 Gasper, James 2013-10-03 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.25 Gasper, James 23139 Gasper, James 2013-10-07 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.25 Gasper, James 23139 Gasper, James 2013-10-08 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 1 Gasper, James 23139 Gasper, James 2013-10-28 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 1 Gasper, James 23139 Gasper, James 2013-10-29 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 1 Gasper, James 23139 Gasper, James 2013-11-07 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 1 Gasper, James 23139 Gasper, James 2013-11-12 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 1 Gasper, James 23139 Gasper, James 2013-11-15 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 0.5 Gasper, James 23139 Gasper, James 2013-11-18 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 1 Gasper, James 23139 Gasper, James 2013-11-21 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 0.5 Gasper, James 23139 Gasper, James 2013-11-25 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 1 Gasper, James 23139 Gasper, James 2013-11-27 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 0.5 Gasper, James 23139 Gasper, James 2013-12-03 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 0.5 Gasper, James 23139 Gasper, James 2013-12-06 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 2 Gasper, James 23139 Gasper, James 2013-12-09 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 1 Gasper, James 23139 Gasper, James 2013-12-10 Rig 055B - TSR :Rig 055B - TSR TSR-01088-55B Shaker Cantilever Deck Regular Pay N 1 Gasper, James 23139 Gasper, James 2013-12-11 Rig 055B - TSR :Rig 055B - TSR TSR-01088-55B Shaker Cantilever Deck Regular Pay N 1 Gasper, James 23139 Gasper, James 2013-12-12 Rig 055B - TSR :Rig 055B - TSR TSR-01088-55B Shaker Cantilever Deck Regular Pay N 0.25 Gasper, James 23139 Gasper, James 2013-12-12 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 2.5 Gasper, James 23139 Gasper, James 2013-12-13 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 1 Gasper, James 23139 Gasper, James 2013-12-13 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 1 Gasper, James 23139 Gasper, James 2013-12-13 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 0.5 Gasper, James 23139 Gasper, James 2013-12-16 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 1.5 Gasper, James 23139 Gasper, James 2013-12-17 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 0.5 Gasper, James 23139 Gasper, James 2013-12-18 Rig 055B - TSR :Rig 055B - TSR TSR-01088-55B Shaker Cantilever Deck Regular Pay N 0.5 Gasper, James 23139 Gasper, James 2013-12-19 Rig 055B - TSR :Rig 055B - TSR TSR-01088-55B Shaker Cantilever Deck Regular Pay N 1 Gasper, James 23139 Gasper, James 2013-12-19 Rig 055B - TSR :Rig 055B - TSR TSR-01096-55B Mud Pumps Lift Plans Regular Pay N 0.75 Gasper, James 23139 Gasper, James 2013-12-20 Rig 055B - TSR :Rig 055B - TSR TSR-01096-55B Mud Pumps Lift Plans Regular Pay N 1 Gasper, James 23139 Gasper, James 2013-12-26 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 1 Gasper, James 23139 Gasper, James 2013-12-30 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 0.25 Gasper, James 23139 Gasper, James 2013-12-30 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 0.5 Gasper, James 23139 Gasper, James 2013-12-31 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 0.25 Gasper, James 23139 Gasper, James 2013-12-31 Rig 055B - TSR :Rig 055B - TSR TSR-01096-55B Mud Pumps Lift Plans Regular Pay N 0.25 Gasper, James 23139 Gasper, James 2014-01-02 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 2 Gasper, James 23139 Gasper, James 2014-01-02 Rig 055B - TSR :Rig 055B - TSR TSR-01098-55B BOP Cart Regular Pay N 0.5 Gasper, James 23139 Gasper, James 2014-01-03 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 2 Gasper, James 23139 Gasper, James 2014-01-03 Rig 055B - TSR :Rig 055B - TSR TSR-01098-55B BOP Cart Regular Pay N 1.5 Gasper, James 23139 Gasper, James 2014-01-06 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 0.25 Gasper, James 23139 Gasper, James 2014-01-06 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 0.25 Gasper, James 23139 Gasper, James 2014-01-06 Rig 055B - TSR :Rig 055B - TSR TSR-01098-55B BOP Cart Regular Pay N 0.25 Gasper, James 23139 Gasper, James 2014-01-06 Rig 055B - TSR :Rig 055B - TSR TSR-01099-55B Piperack Porch Regular Pay N 0.25 Gasper, James 23139 Gasper, James 2014-01-08 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 0.5 Gasper, James 23139 Gasper, James 2014-01-09 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 1 Hardie, Danielle 28034 Hardie, Danielle 2013-08-23 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Hebert, Andre' 31147 Hebert, Andre' 2013-08-06 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 7 Hebert, Andre' 31147 Hebert, Andre' 2013-08-07 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 9 Hebert, Andre' 31147 Hebert, Andre' 2013-08-08 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 6 Hebert, Andre' 31147 Hebert, Andre' 2013-08-09 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 7 Hebert, Andre' 31147 Hebert, Andre' 2013-08-12 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 6 Hebert, Andre' 31147 Hebert, Andre' 2013-08-13 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 1 Hebert, Andre' 31147 Hebert, Andre' 2013-08-14 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 8 Hebert, Andre' 31147 Hebert, Andre' 2013-08-15 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 8 Hebert, Andre' 31147 Hebert, Andre' 2013-08-16 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 8 Hebert, Andre' 31147 Hebert, Andre' 2013-08-19 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 1 Hebert, Andre' 31147 Hebert, Andre' 2013-08-21 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Hebert, Andre' 31147 Hebert, Andre' 2013-08-22 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 5 Hebert, Andre' 31147 Hebert, Andre' 2013-08-23 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 6 Hebert, Andre' 31147 Hebert, Andre' 2013-08-26 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 6 Hebert, Andre' 31147 Hebert, Andre' 2013-08-27 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 8 Hebert, Andre' 31147 Hebert, Andre' 2013-08-28 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Hebert, Andre' 31147 Hebert, Andre' 2013-08-29 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 5 Hebert, Andre' 31147 Hebert, Andre' 2013-08-30 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Hebert, Andre' 31147 Hebert, Andre' 2013-09-03 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 5 Hebert, Andre' 31147 Hebert, Andre' 2013-09-04 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 5 Hebert, Andre' 31147 Hebert, Andre' 2013-09-05 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 8 Hebert, Andre' 31147 Hebert, Andre' 2013-09-06 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Hebert, Andre' 31147 Hebert, Andre' 2013-09-09 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-09-10 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 6 Hebert, Andre' 31147 Hebert, Andre' 2013-09-11 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 5 Hebert, Andre' 31147 Hebert, Andre' 2013-09-12 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 5 Hebert, Andre' 31147 Hebert, Andre' 2013-09-13 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-09-16 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-09-17 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 7 Hebert, Andre' 31147 Hebert, Andre' 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 5 Hebert, Andre' 31147 Hebert, Andre' 2013-09-19 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Hebert, Andre' 31147 Hebert, Andre' 2013-09-20 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 6 Hebert, Andre' 31147 Hebert, Andre' 2013-09-23 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Hebert, Andre' 31147 Hebert, Andre' 2013-09-24 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 8 Hebert, Andre' 31147 Hebert, Andre' 2013-09-25 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 8 Hebert, Andre' 31147 Hebert, Andre' 2013-09-26 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 8 Hebert, Andre' 31147 Hebert, Andre' 2013-09-27 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 8 Hebert, Andre' 31147 Hebert, Andre' 2013-09-30 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-10-01 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-10-02 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-10-03 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-10-04 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-10-14 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-10-15 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-10-16 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-10-17 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 7 Hebert, Andre' 31147 Hebert, Andre' 2013-10-18 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 6 Hebert, Andre' 31147 Hebert, Andre' 2013-10-21 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-10-22 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-10-23 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-10-24 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 6 Hebert, Andre' 31147 Hebert, Andre' 2013-10-25 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-10-28 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-10-29 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-10-30 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Hebert, Andre' 31147 Hebert, Andre' 2013-10-31 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-11-01 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 5 Hebert, Andre' 31147 Hebert, Andre' 2013-11-04 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 7 Hebert, Andre' 31147 Hebert, Andre' 2013-11-05 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 5 Hebert, Andre' 31147 Hebert, Andre' 2013-11-05 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 0.5 Hebert, Andre' 31147 Hebert, Andre' 2013-11-06 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Hebert, Andre' 31147 Hebert, Andre' 2013-11-06 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 0.5 Hebert, Andre' 31147 Hebert, Andre' 2013-11-07 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 5 Hebert, Andre' 31147 Hebert, Andre' 2013-11-08 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 5 Hebert, Andre' 31147 Hebert, Andre' 2013-11-08 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 2 Hebert, Andre' 31147 Hebert, Andre' 2013-11-11 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 7 Hebert, Andre' 31147 Hebert, Andre' 2013-11-12 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-11-13 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Hebert, Andre' 31147 Hebert, Andre' 2013-11-14 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-11-15 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Hebert, Andre' 31147 Hebert, Andre' 2013-11-18 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-11-19 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-11-20 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Hebert, Andre' 31147 Hebert, Andre' 2013-11-21 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 6 Hebert, Andre' 31147 Hebert, Andre' 2013-11-22 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Hebert, Andre' 31147 Hebert, Andre' 2013-11-25 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2.5 Hebert, Andre' 31147 Hebert, Andre' 2013-11-26 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Hebert, Andre' 31147 Hebert, Andre' 2013-11-27 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Andre' 31147 Hebert, Andre' 2013-12-02 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Hebert, Andre' 31147 Hebert, Andre' 2013-12-03 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Hebert, Andre' 31147 Hebert, Andre' 2013-12-04 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Hebert, Andre' 31147 Hebert, Andre' 2013-12-05 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Hebert, Andre' 31147 Hebert, Andre' 2013-12-06 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-12-09 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Hebert, Andre' 31147 Hebert, Andre' 2013-12-10 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 8 Hebert, Andre' 31147 Hebert, Andre' 2013-12-11 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-12-12 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Hebert, Andre' 31147 Hebert, Andre' 2013-12-13 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 1 Hebert, Andre' 31147 Hebert, Andre' 2013-12-16 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 1 Hebert, Andre' 31147 Hebert, Andre' 2013-12-17 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 8 Hebert, Andre' 31147 Hebert, Andre' 2013-12-18 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 6 Hebert, Andre' 31147 Hebert, Andre' 2013-12-19 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 6 Hebert, Andre' 31147 Hebert, Andre' 2013-12-20 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Hebert, Andre' 31147 Hebert, Andre' 2013-12-23 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Hebert, Andre' 31147 Hebert, Andre' 2013-12-26 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Hebert, Andre' 31147 Hebert, Andre' 2013-12-27 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 5 Hebert, Andre' 31147 Hebert, Andre' 2013-12-30 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Hebert, Andre' 31147 Hebert, Andre' 2013-12-31 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 5 Hebert, Andre' 31147 Hebert, Andre' 2014-01-02 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 6 Hebert, Andre' 31147 Hebert, Andre' 2014-01-03 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 5 Hebert, Andre' 31147 Hebert, Andre' 2014-01-06 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 5 Hebert, Andre' 31147 Hebert, Andre' 2014-01-07 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Hebert, Andre' 31147 Hebert, Andre' 2014-01-08 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 7 Hebert, Andre' 31147 Hebert, Andre' 2014-01-09 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 5 Hebert, Andre' 31147 Hebert, Andre' 2014-01-10 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 5 Hebert, Kenneth 30783 Hebert, Kenneth 2013-08-01 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-08-02 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-08-06 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 4 Hebert, Kenneth 30783 Hebert, Kenneth 2013-08-07 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-08-08 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-08-09 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-08-12 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 3 Hebert, Kenneth 30783 Hebert, Kenneth 2013-08-13 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-08-14 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-08-15 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-08-16 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-08-19 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-08-20 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-08-21 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-08-22 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-08-23 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-08-26 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-08-27 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-08-28 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-08-29 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-08-30 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-08-31 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 5 Hebert, Kenneth 30783 Hebert, Kenneth 2013-09-03 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 6 Hebert, Kenneth 30783 Hebert, Kenneth 2013-09-04 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-09-05 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-09-06 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-09-09 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-10-29 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Hebert, Kenneth 30783 Hebert, Kenneth 2013-11-06 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 4 Hebert, Kenneth 30783 Hebert, Kenneth 2013-11-06 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Hebert, Kenneth 30783 Hebert, Kenneth 2013-11-07 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-11-08 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-11-12 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-11-13 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 4 Hebert, Kenneth 30783 Hebert, Kenneth 2013-11-14 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 4 Hebert, Kenneth 30783 Hebert, Kenneth 2013-11-15 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-11-18 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-11-19 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 7 Hebert, Kenneth 30783 Hebert, Kenneth 2013-11-20 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-11-21 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-11-22 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-11-25 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-11-26 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-12-02 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-12-03 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-12-04 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-12-05 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-12-06 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-12-09 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-12-10 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-12-11 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-12-12 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-12-13 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-12-16 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-12-17 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-12-18 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-12-19 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-12-20 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-12-23 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-12-26 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2013-12-27 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2014-01-06 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2014-01-07 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2014-01-08 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2014-01-09 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Hebert, Kenneth 30783 Hebert, Kenneth 2014-01-10 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 JONES, BRUCE BRUCEJ JONES, BRUCE 2013-12-05 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 0.5 JONES, BRUCE BRUCEJ JONES, BRUCE 2013-12-06 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 1 JONES, BRUCE BRUCEJ JONES, BRUCE 2013-12-11 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 1 JONES, BRUCE BRUCEJ JONES, BRUCE 2013-12-12 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 1 Kuehn, Matt 22143 Kuehn, Matt 2013-12-05 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 2 Kuehn, Matt 22143 Kuehn, Matt 2013-12-10 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 1 Kuehn, Matt 22143 Kuehn, Matt 2013-12-11 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 1 Kuehn, Matt 22143 Kuehn, Matt 2013-12-12 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 1 Kuehn, Matt 22143 Kuehn, Matt 2013-12-16 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 6 Kuehn, Matt 22143 Kuehn, Matt 2013-12-17 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 5 Kuehn, Matt 22143 Kuehn, Matt 2013-12-18 Rig 055B - TSR :Rig 055B - TSR TSR-01096-55B Mud Pumps Lift Plans Regular Pay N 1 Kuehn, Matt 22143 Kuehn, Matt 2014-01-02 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 1 Kuehn, Matt 22143 Kuehn, Matt 2014-01-03 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 2 Kuehn, Matt 22143 Kuehn, Matt 2014-01-06 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 1 Kuehn, Matt 22143 Kuehn, Matt 2014-01-10 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 1 Leonard, Richard 31084 Leonard, Richard 2013-08-05 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 7 Leonard, Richard 31084 Leonard, Richard 2013-08-06 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 6 Leonard, Richard 31084 Leonard, Richard 2013-08-08 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 6 Leonard, Richard 31084 Leonard, Richard 2013-08-09 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 8 Leonard, Richard 31084 Leonard, Richard 2013-08-12 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 1 Leonard, Richard 31084 Leonard, Richard 2013-08-13 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 2 Leonard, Richard 31084 Leonard, Richard 2013-08-22 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 2 Leonard, Richard 31084 Leonard, Richard 2013-09-03 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 7 Leonard, Richard 31084 Leonard, Richard 2013-09-05 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 8 Leonard, Richard 31084 Leonard, Richard 2013-09-06 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 7 Leonard, Richard 31084 Leonard, Richard 2013-09-16 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 5 Leonard, Richard 31084 Leonard, Richard 2013-09-17 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 7 Leonard, Richard 31084 Leonard, Richard 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 8 Leonard, Richard 31084 Leonard, Richard 2013-09-19 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 7 Leonard, Richard 31084 Leonard, Richard 2013-09-20 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 6 Leonard, Richard 31084 Leonard, Richard 2013-10-06 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 5 Leonard, Richard 31084 Leonard, Richard 2013-10-07 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 2 Leonard, Richard 31084 Leonard, Richard 2013-10-14 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 7 Leonard, Richard 31084 Leonard, Richard 2013-10-15 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 6 Leonard, Richard 31084 Leonard, Richard 2013-10-16 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 8 Leonard, Richard 31084 Leonard, Richard 2013-10-17 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 8 Leonard, Richard 31084 Leonard, Richard 2013-10-21 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 7 Leonard, Richard 31084 Leonard, Richard 2013-10-22 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 8 Leonard, Richard 31084 Leonard, Richard 2013-10-23 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 8 Leonard, Richard 31084 Leonard, Richard 2013-10-24 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 8 Leonard, Richard 31084 Leonard, Richard 2013-10-25 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 8 Leonard, Richard 31084 Leonard, Richard 2013-10-28 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 7 Leonard, Richard 31084 Leonard, Richard 2013-10-29 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 8 Leonard, Richard 31084 Leonard, Richard 2013-10-30 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 8 Leonard, Richard 31084 Leonard, Richard 2013-10-31 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 8 Leonard, Richard 31084 Leonard, Richard 2013-11-01 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 1 Li, Ally 30863 Li, Ally 2013-12-20 Rig 055B - TSR :Rig 055B - TSR TSR-01096-55B Mud Pumps Lift Plans Regular Pay N 0.5 Li, Ally 30863 Li, Ally 2013-12-26 Rig 055B - TSR :Rig 055B - TSR TSR-01098-55B BOP Cart Regular Pay N 8 Li, Ally 30863 Li, Ally 2013-12-31 Rig 055B - TSR :Rig 055B - TSR TSR-01098-55B BOP Cart Regular Pay N 8 Li, Ally 30863 Li, Ally 2014-01-03 Rig 055B - TSR :Rig 055B - TSR TSR-01098-55B BOP Cart Regular Pay N 4 Li, Ally 30863 Li, Ally 2014-01-06 Rig 055B - TSR :Rig 055B - TSR TSR-01098-55B BOP Cart Regular Pay N 4 Lopez, Daniel 13879 Lopez, Daniel 2013-08-05 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2013-08-06 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2013-08-07 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2013-08-08 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 7 Lopez, Daniel 13879 Lopez, Daniel 2013-08-09 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 5 Lopez, Daniel 13879 Lopez, Daniel 2013-08-12 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 1 Lopez, Daniel 13879 Lopez, Daniel 2013-08-13 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-08-14 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-08-15 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-08-16 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-08-19 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-08-20 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-08-21 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-08-22 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-08-23 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-08-26 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 1 Lopez, Daniel 13879 Lopez, Daniel 2013-08-27 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 1 Lopez, Daniel 13879 Lopez, Daniel 2013-08-28 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-08-29 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-08-30 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 1 Lopez, Daniel 13879 Lopez, Daniel 2013-09-03 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-09-04 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2013-09-05 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 1 Lopez, Daniel 13879 Lopez, Daniel 2013-09-06 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 1 Lopez, Daniel 13879 Lopez, Daniel 2013-09-09 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-09-10 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-09-11 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-09-12 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-09-13 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-09-16 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-09-17 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-09-19 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-09-20 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-09-23 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-09-24 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-09-25 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-09-26 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-09-27 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-09-30 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-10-01 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-10-02 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-10-03 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-10-04 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-10-07 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-10-08 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-10-09 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-10-10 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-10-11 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-10-14 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-10-15 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-10-16 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-10-17 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-10-18 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-10-21 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-10-22 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-10-23 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-10-24 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-10-25 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-10-28 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-10-29 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-10-30 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-10-31 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-11-01 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-11-04 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-11-05 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-11-06 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-11-07 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-11-08 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-11-11 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-11-13 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-11-14 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-11-15 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 7 Lopez, Daniel 13879 Lopez, Daniel 2013-11-18 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2013-11-18 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 5 Lopez, Daniel 13879 Lopez, Daniel 2013-11-19 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2013-11-19 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 5 Lopez, Daniel 13879 Lopez, Daniel 2013-11-20 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2013-11-20 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 5 Lopez, Daniel 13879 Lopez, Daniel 2013-11-21 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2013-11-21 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 5 Lopez, Daniel 13879 Lopez, Daniel 2013-11-22 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2013-11-22 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 5 Lopez, Daniel 13879 Lopez, Daniel 2013-12-02 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Lopez, Daniel 13879 Lopez, Daniel 2013-12-02 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2013-12-03 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2013-12-03 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2013-12-04 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2013-12-04 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2013-12-05 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2013-12-05 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2013-12-06 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Lopez, Daniel 13879 Lopez, Daniel 2013-12-06 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2013-12-09 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2013-12-09 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-12-10 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2013-12-10 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-12-11 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2013-12-11 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-12-12 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2013-12-12 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-12-13 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2013-12-13 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-12-16 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-12-16 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-12-17 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-12-17 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-12-17 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 9 Lopez, Daniel 13879 Lopez, Daniel 2013-12-18 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-12-18 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-12-18 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 4 Lopez, Daniel 13879 Lopez, Daniel 2013-12-19 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-12-19 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-12-20 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-12-20 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2013-12-30 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-12-31 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2014-01-02 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 4 Lopez, Daniel 13879 Lopez, Daniel 2014-01-06 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2014-01-06 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2014-01-06 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 1 Lopez, Daniel 13879 Lopez, Daniel 2014-01-07 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2014-01-07 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2014-01-07 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 4 Lopez, Daniel 13879 Lopez, Daniel 2014-01-08 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2014-01-08 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2014-01-08 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 1 Lopez, Daniel 13879 Lopez, Daniel 2014-01-09 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2014-01-09 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2014-01-09 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 1 Lopez, Daniel 13879 Lopez, Daniel 2014-01-10 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Lopez, Daniel 13879 Lopez, Daniel 2014-01-10 Rig 055B - TSR :Rig 055B - TSR TSR-01077-55B Schedule Maintenance Regular Pay N 2 Lopez, Daniel 13879 Lopez, Daniel 2014-01-10 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 3 Martinez, Andy 24887 Martinez, Andy 2013-12-06 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 3.5 Martinez, Andy 24887 Martinez, Andy 2013-12-19 Rig 055B - TSR :Rig 055B - TSR TSR-01096-55B Mud Pumps Lift Plans Regular Pay N 4 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-08-19 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 1.25 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-08-21 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 0.25 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-10 Rig 055B - TSR :Rig 055B - TSR TSR-01035-55B Solids Control Support and Structure Regular Pay N 0.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-16 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-19 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-23 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-24 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-01 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-01 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 0.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-03 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-04 Rig 055B - TSR :Rig 055B - TSR TSR-01035-55B Solids Control Support and Structure Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-07 Rig 055B - TSR :Rig 055B - TSR TSR-01035-55B Solids Control Support and Structure Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-08 Rig 055B - TSR :Rig 055B - TSR TSR-01035-55B Solids Control Support and Structure Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-09 Rig 055B - TSR :Rig 055B - TSR TSR-01035-55B Solids Control Support and Structure Regular Pay N 0.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-11 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.25 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-11 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-14 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-14 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-15 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-15 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 0.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-15 Rig 055B - TSR :Rig 055B - TSR TSR-01035-55B Solids Control Support and Structure Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-16 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-16 Rig 055B - TSR :Rig 055B - TSR TSR-01036-55B Snake Pit Access Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-17 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-21 Rig 055B - TSR :Rig 055B - TSR TSR-01036-55B Snake Pit Access Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-22 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-23 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-23 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-23 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-24 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-24 Rig 055B - TSR :Rig 055B - TSR TSR-01035-55B Solids Control Support and Structure Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-25 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-28 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-10-30 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 0.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-11-04 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-11-05 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-11-06 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 6 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-11-06 Rig 055B - TSR :Rig 055B - TSR TSR-01035-55B Solids Control Support and Structure Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-11-07 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 4 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-11-07 Rig 055B - TSR :Rig 055B - TSR TSR-01035-55B Solids Control Support and Structure Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-11-07 Rig 055B - TSR :Rig 055B - TSR TSR-01036-55B Snake Pit Access Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-11-08 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-11-12 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-11-12 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 1.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-11-13 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-11-15 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-11-18 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-11-18 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-11-18 Rig 055B - TSR :Rig 055B - TSR TSR-01036-55B Snake Pit Access Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-11-20 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-11-20 Rig 055B - TSR :Rig 055B - TSR TSR-01036-55B Snake Pit Access Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-11-21 Rig 055B - TSR :Rig 055B - TSR TSR-01082-55B Bearing Pressure Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-11-22 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-11-22 Rig 055B - TSR :Rig 055B - TSR TSR-01082-55B Bearing Pressure Regular Pay N 0.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-12-02 Rig 055B - TSR :Rig 055B - TSR TSR-01082-55B Bearing Pressure Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-12-04 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-12-05 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-12-05 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 0.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-12-06 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-12-09 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 1.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-12-12 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-12-12 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-12-13 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-12-13 Rig 055B - TSR :Rig 055B - TSR TSR-01088-55B Shaker Cantilever Deck Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-12-16 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 6 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-12-18 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-12-18 Rig 055B - TSR :Rig 055B - TSR TSR-01088-55B Shaker Cantilever Deck Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-12-18 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-12-18 Rig 055B - TSR :Rig 055B - TSR TSR-01096-55B Mud Pumps Lift Plans Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-12-19 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-12-19 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-12-19 Rig 055B - TSR :Rig 055B - TSR TSR-01096-55B Mud Pumps Lift Plans Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-12-20 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-12-20 Rig 055B - TSR :Rig 055B - TSR TSR-01096-55B Mud Pumps Lift Plans Regular Pay N 3 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-12-23 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 1.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-12-23 Rig 055B - TSR :Rig 055B - TSR TSR-01096-55B Mud Pumps Lift Plans Regular Pay N 3 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-12-27 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-12-27 Rig 055B - TSR :Rig 055B - TSR TSR-01096-55B Mud Pumps Lift Plans Regular Pay N 0.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2014-01-02 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2014-01-02 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2014-01-03 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2 Mcmullen, Kyle 20461 Mcmullen, Kyle 2014-01-03 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2014-01-06 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 2 Mcmullen, Kyle 20461 Mcmullen, Kyle 2014-01-06 Rig 055B - TSR :Rig 055B - TSR TSR-01099-55B Piperack Porch Regular Pay N 0.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2014-01-07 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2014-01-07 Rig 055B - TSR :Rig 055B - TSR TSR-01098-55B BOP Cart Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2014-01-07 Rig 055B - TSR :Rig 055B - TSR TSR-01103-55B Rig Survey Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2014-01-08 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2014-01-09 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2014-01-09 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 0.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2014-01-09 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2014-01-09 Rig 055B - TSR :Rig 055B - TSR TSR-01099-55B Piperack Porch Regular Pay N 0.25 Mcmullen, Kyle 20461 Mcmullen, Kyle 2014-01-09 Rig 055B - TSR :Rig 055B - TSR TSR-01103-55B Rig Survey Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2014-01-10 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1.75 Mitchell, LeRon 31472 Mitchell, LeRon 2013-10-01 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 0.25 Mitchell, LeRon 31472 Mitchell, LeRon 2013-10-16 Rig 055B - TSR :Rig 055B - TSR TSR-01036-55B Snake Pit Access Regular Pay N 0.25 Mitchell, LeRon 31472 Mitchell, LeRon 2013-10-31 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 0.25 Mitchell, LeRon 31472 Mitchell, LeRon 2013-10-31 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 0.25 Mitchell, LeRon 31472 Mitchell, LeRon 2013-10-31 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 0.25 Nguyen, Lam 27172 Nguyen, Lam 2013-07-31 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 4 Nguyen, Lam 27172 Nguyen, Lam 2013-08-01 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 12 Nguyen, Lam 27172 Nguyen, Lam 2013-08-02 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 4 Nguyen, Lam 27172 Nguyen, Lam 2013-09-20 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 8 Nguyen, Lam 27172 Nguyen, Lam 2013-09-24 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 8 Nguyen, Lam 27172 Nguyen, Lam 2013-09-25 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 8 Nguyen, Lam 27172 Nguyen, Lam 2013-09-26 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 8 Nguyen, Lam 27172 Nguyen, Lam 2013-09-27 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 4 Nguyen, Lam 27172 Nguyen, Lam 2013-09-30 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 8 Nguyen, Lam 27172 Nguyen, Lam 2013-10-01 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 2 Nguyen, Lam 27172 Nguyen, Lam 2013-10-11 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 4 Nguyen, Lam 27172 Nguyen, Lam 2013-10-14 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 4 Nguyen, Lam 27172 Nguyen, Lam 2013-10-15 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 2 Nguyen, Lam 27172 Nguyen, Lam 2013-10-16 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 8 Nguyen, Lam 27172 Nguyen, Lam 2013-10-17 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 4.5 Nguyen, Lam 27172 Nguyen, Lam 2013-10-18 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 4 Nguyen, Lam 27172 Nguyen, Lam 2013-10-21 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 8 Nguyen, Lam 27172 Nguyen, Lam 2013-10-22 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 8 Nguyen, Lam 27172 Nguyen, Lam 2013-10-23 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 8 Nguyen, Lam 27172 Nguyen, Lam 2013-10-24 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 3 Nguyen, Lam 27172 Nguyen, Lam 2013-10-30 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 2 Nguyen, Lam 27172 Nguyen, Lam 2013-10-31 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 4 Nguyen, Lam 27172 Nguyen, Lam 2013-11-01 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 5 Nguyen, Lam 27172 Nguyen, Lam 2013-11-07 Rig 055B - TSR :Rig 055B - TSR Default Default Task Regular Pay N 3 Nguyen, Lam 27172 Nguyen, Lam 2013-11-08 Rig 055B - TSR :Rig 055B - TSR Default Default Task Regular Pay N 8 Nguyen, Lam 27172 Nguyen, Lam 2013-12-03 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 2 Nguyen, Lam 27172 Nguyen, Lam 2013-12-04 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 7.5 Nguyen, Lam 27172 Nguyen, Lam 2013-12-05 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 8 Nguyen, Lam 27172 Nguyen, Lam 2013-12-06 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 8 Nguyen, Lam 27172 Nguyen, Lam 2013-12-09 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 8 Nguyen, Lam 27172 Nguyen, Lam 2013-12-10 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 6 Nguyen, Lam 27172 Nguyen, Lam 2013-12-12 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 6 Nguyen, Lam 27172 Nguyen, Lam 2013-12-13 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 12 Nguyen, Lam 27172 Nguyen, Lam 2013-12-14 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 12 Nguyen, Lam 27172 Nguyen, Lam 2013-12-15 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 12 Nguyen, Lam 27172 Nguyen, Lam 2013-12-16 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 12 Nguyen, Lam 27172 Nguyen, Lam 2013-12-17 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 6.5 Nguyen, Lam 27172 Nguyen, Lam 2013-12-17 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 0.5 Nguyen, Lam 27172 Nguyen, Lam 2013-12-19 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 3 Nguyen, Lam 27172 Nguyen, Lam 2013-12-20 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 1 Nguyen, Lam 27172 Nguyen, Lam 2013-12-23 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 3 Nguyen, Lam 27172 Nguyen, Lam 2013-12-23 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 1.5 Nguyen, Lam 27172 Nguyen, Lam 2013-12-26 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 4 Nguyen, Lam 27172 Nguyen, Lam 2013-12-27 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 4 Nguyen, Lam 27172 Nguyen, Lam 2013-12-30 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 2 Nguyen, Lam 27172 Nguyen, Lam 2013-12-30 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 2 Nguyen, Lam 27172 Nguyen, Lam 2014-01-03 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 8 Nguyen, Lam 27172 Nguyen, Lam 2014-01-06 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 8 Nguyen, Lam 27172 Nguyen, Lam 2014-01-07 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 8 Nguyen, Lam 27172 Nguyen, Lam 2014-01-08 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 8 Nguyen, Lam 27172 Nguyen, Lam 2014-01-09 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 6 Oiboh, Maria 28657 Oiboh, Maria 2013-07-30 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 8 Oiboh, Maria 28657 Oiboh, Maria 2013-07-31 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 7 Oiboh, Maria 28657 Oiboh, Maria 2013-08-01 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 12 Oiboh, Maria 28657 Oiboh, Maria 2013-08-02 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 4 Oiboh, Maria 28657 Oiboh, Maria 2013-08-06 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 1 Oiboh, Maria 28657 Oiboh, Maria 2013-08-09 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 2 Oiboh, Maria 28657 Oiboh, Maria 2013-09-05 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 0.5 Oiboh, Maria 28657 Oiboh, Maria 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 0.5 Oiboh, Maria 28657 Oiboh, Maria 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 3 Oiboh, Maria 28657 Oiboh, Maria 2013-09-19 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 4 Oiboh, Maria 28657 Oiboh, Maria 2013-09-20 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 5 Oiboh, Maria 28657 Oiboh, Maria 2013-09-23 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 4 Oiboh, Maria 28657 Oiboh, Maria 2013-09-24 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 5 Oiboh, Maria 28657 Oiboh, Maria 2013-09-25 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 5 Oiboh, Maria 28657 Oiboh, Maria 2013-09-26 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 2 Oiboh, Maria 28657 Oiboh, Maria 2013-09-27 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 1 Oiboh, Maria 28657 Oiboh, Maria 2013-09-30 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 4 Oiboh, Maria 28657 Oiboh, Maria 2013-10-01 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 2 Oiboh, Maria 28657 Oiboh, Maria 2013-10-02 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 4 Oiboh, Maria 28657 Oiboh, Maria 2013-10-03 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 2 Oiboh, Maria 28657 Oiboh, Maria 2013-10-03 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 3.5 Oiboh, Maria 28657 Oiboh, Maria 2013-10-04 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 2 Oiboh, Maria 28657 Oiboh, Maria 2013-10-04 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 2 Oiboh, Maria 28657 Oiboh, Maria 2013-10-07 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 1 Oiboh, Maria 28657 Oiboh, Maria 2013-10-07 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 3 Oiboh, Maria 28657 Oiboh, Maria 2013-10-08 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 5 Oiboh, Maria 28657 Oiboh, Maria 2013-10-09 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 5 Oiboh, Maria 28657 Oiboh, Maria 2013-10-10 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 1 Oiboh, Maria 28657 Oiboh, Maria 2013-10-10 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 4 Oiboh, Maria 28657 Oiboh, Maria 2013-10-11 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 4 Oiboh, Maria 28657 Oiboh, Maria 2013-10-14 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 5 Oiboh, Maria 28657 Oiboh, Maria 2013-10-15 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 2 Oiboh, Maria 28657 Oiboh, Maria 2013-10-16 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 4 Oiboh, Maria 28657 Oiboh, Maria 2013-10-17 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 4 Oiboh, Maria 28657 Oiboh, Maria 2013-10-17 Rig 055B - TSR :Rig 055B - TSR TSR-01036-55B Snake Pit Access Regular Pay N 2 Oiboh, Maria 28657 Oiboh, Maria 2013-10-18 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 2 Oiboh, Maria 28657 Oiboh, Maria 2013-10-18 Rig 055B - TSR :Rig 055B - TSR TSR-01036-55B Snake Pit Access Regular Pay N 2 Oiboh, Maria 28657 Oiboh, Maria 2013-10-21 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 4 Oiboh, Maria 28657 Oiboh, Maria 2013-10-21 Rig 055B - TSR :Rig 055B - TSR TSR-01036-55B Snake Pit Access Regular Pay N 1 Oiboh, Maria 28657 Oiboh, Maria 2013-10-22 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 4 Oiboh, Maria 28657 Oiboh, Maria 2013-10-23 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 2 Oiboh, Maria 28657 Oiboh, Maria 2013-10-23 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 2 Oiboh, Maria 28657 Oiboh, Maria 2013-10-24 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 5 Oiboh, Maria 28657 Oiboh, Maria 2013-10-28 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 4 Oiboh, Maria 28657 Oiboh, Maria 2013-10-29 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 4 Oiboh, Maria 28657 Oiboh, Maria 2013-11-04 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 4 Oiboh, Maria 28657 Oiboh, Maria 2013-11-05 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 4 Oiboh, Maria 28657 Oiboh, Maria 2013-11-06 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 3 Oiboh, Maria 28657 Oiboh, Maria 2013-11-07 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 1 Oiboh, Maria 28657 Oiboh, Maria 2013-11-08 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 1 Oiboh, Maria 28657 Oiboh, Maria 2013-11-11 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 2 Oiboh, Maria 28657 Oiboh, Maria 2013-11-11 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 4 Oiboh, Maria 28657 Oiboh, Maria 2013-11-12 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 1 Oiboh, Maria 28657 Oiboh, Maria 2013-11-12 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 2 Oiboh, Maria 28657 Oiboh, Maria 2013-11-12 Rig 055B - TSR :Rig 055B - TSR TSR-01036-55B Snake Pit Access Regular Pay N 2 Oiboh, Maria 28657 Oiboh, Maria 2013-11-13 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 1 Oiboh, Maria 28657 Oiboh, Maria 2013-11-13 Rig 055B - TSR :Rig 055B - TSR TSR-01036-55B Snake Pit Access Regular Pay N 2 Oiboh, Maria 28657 Oiboh, Maria 2013-11-14 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 1 Oiboh, Maria 28657 Oiboh, Maria 2013-11-15 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 3 Oiboh, Maria 28657 Oiboh, Maria 2013-11-19 Rig 055B - TSR :Rig 055B - TSR TSR-01036-55B Snake Pit Access Regular Pay N 2 Oiboh, Maria 28657 Oiboh, Maria 2013-11-20 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 1 Oiboh, Maria 28657 Oiboh, Maria 2013-11-21 Rig 055B - TSR :Rig 055B - TSR TSR-01082-55B Bearing Pressure Regular Pay N 2 Oiboh, Maria 28657 Oiboh, Maria 2013-11-22 Rig 055B - TSR :Rig 055B - TSR TSR-01082-55B Bearing Pressure Regular Pay N 4 Oiboh, Maria 28657 Oiboh, Maria 2013-11-25 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 0.5 Oiboh, Maria 28657 Oiboh, Maria 2013-11-25 Rig 055B - TSR :Rig 055B - TSR TSR-01082-55B Bearing Pressure Regular Pay N 1 Oiboh, Maria 28657 Oiboh, Maria 2013-11-26 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 1 Oiboh, Maria 28657 Oiboh, Maria 2013-11-27 Rig 055B - TSR :Rig 055B - TSR TSR-01082-55B Bearing Pressure Regular Pay N 0.5 Oiboh, Maria 28657 Oiboh, Maria 2013-12-12 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 3 Oiboh, Maria 28657 Oiboh, Maria 2013-12-13 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 5.5 Oiboh, Maria 28657 Oiboh, Maria 2013-12-16 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 8 Oiboh, Maria 28657 Oiboh, Maria 2013-12-17 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 7 Oiboh, Maria 28657 Oiboh, Maria 2013-12-18 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 4 Oiboh, Maria 28657 Oiboh, Maria 2013-12-19 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 6 Oiboh, Maria 28657 Oiboh, Maria 2013-12-20 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 5 Oiboh, Maria 28657 Oiboh, Maria 2013-12-23 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 8 Oiboh, Maria 28657 Oiboh, Maria 2014-01-02 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 6 Oiboh, Maria 28657 Oiboh, Maria 2014-01-03 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 2 Oiboh, Maria 28657 Oiboh, Maria 2014-01-06 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 4 Oiboh, Maria 28657 Oiboh, Maria 2014-01-07 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 4 Oiboh, Maria 28657 Oiboh, Maria 2014-01-08 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 2 Oiboh, Maria 28657 Oiboh, Maria 2014-01-09 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 1 Oiboh, Maria 28657 Oiboh, Maria 2014-01-09 Rig 055B - TSR :Rig 055B - TSR TSR-01098-55B BOP Cart Regular Pay N 2 Oiboh, Maria 28657 Oiboh, Maria 2014-01-10 Rig 055B - TSR :Rig 055B - TSR TSR-01098-55B BOP Cart Regular Pay N 2 Presas, David 29609 Presas, David 2013-12-09 Rig 055B - TSR :Rig 055B - TSR TSR-01088-55B Shaker Cantilever Deck Regular Pay N 8 Presas, David 29609 Presas, David 2013-12-11 Rig 055B - TSR :Rig 055B - TSR TSR-01088-55B Shaker Cantilever Deck Regular Pay N 4 Presas, David 29609 Presas, David 2013-12-12 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 6 Presas, David 29609 Presas, David 2013-12-13 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 12 Presas, David 29609 Presas, David 2013-12-14 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 12 Presas, David 29609 Presas, David 2013-12-15 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 12 Presas, David 29609 Presas, David 2013-12-16 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 12 Presas, David 29609 Presas, David 2014-01-02 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 4 Quinlan, Mark 15605 Quinlan, Mark 2013-09-04 Rig 055B - TSR :Rig 055B - TSR Default Default Task Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-09-05 Rig 055B - TSR :Rig 055B - TSR Default Default Task Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-09-06 Rig 055B - TSR :Rig 055B - TSR Default Default Task Regular Pay N 1.5 Quinlan, Mark 15605 Quinlan, Mark 2013-09-09 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 2 Quinlan, Mark 15605 Quinlan, Mark 2013-09-10 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-09-11 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 1 Quinlan, Mark 15605 Quinlan, Mark 2013-09-17 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-09-17 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 1 Quinlan, Mark 15605 Quinlan, Mark 2013-09-17 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 1 Quinlan, Mark 15605 Quinlan, Mark 2013-09-19 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-09-25 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 1.5 Quinlan, Mark 15605 Quinlan, Mark 2013-09-26 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 2 Quinlan, Mark 15605 Quinlan, Mark 2013-09-27 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-10-03 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 1 Quinlan, Mark 15605 Quinlan, Mark 2013-10-04 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-10-08 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-10-10 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 1 Quinlan, Mark 15605 Quinlan, Mark 2013-10-14 Rig 055B - TSR :Rig 055B - TSR TSR-01036-55B Snake Pit Access Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-10-17 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1.5 Quinlan, Mark 15605 Quinlan, Mark 2013-10-17 Rig 055B - TSR :Rig 055B - TSR TSR-01036-55B Snake Pit Access Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-10-22 Rig 055B - TSR :Rig 055B - TSR TSR-01035-55B Solids Control Support and Structure Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-10-23 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 1.5 Quinlan, Mark 15605 Quinlan, Mark 2013-10-24 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1.5 Quinlan, Mark 15605 Quinlan, Mark 2013-10-25 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-10-25 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-10-29 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-10-31 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-11-07 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 0.75 Quinlan, Mark 15605 Quinlan, Mark 2013-11-13 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 1 Quinlan, Mark 15605 Quinlan, Mark 2013-11-14 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-11-15 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-12-05 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Quinlan, Mark 15605 Quinlan, Mark 2013-12-05 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-12-06 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-12-06 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-12-09 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 1 Quinlan, Mark 15605 Quinlan, Mark 2013-12-11 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Quinlan, Mark 15605 Quinlan, Mark 2013-12-12 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 3 Quinlan, Mark 15605 Quinlan, Mark 2013-12-13 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 3 Quinlan, Mark 15605 Quinlan, Mark 2013-12-16 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 6.5 Quinlan, Mark 15605 Quinlan, Mark 2013-12-16 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 3 Quinlan, Mark 15605 Quinlan, Mark 2013-12-17 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2 Quinlan, Mark 15605 Quinlan, Mark 2013-12-17 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 1.5 Quinlan, Mark 15605 Quinlan, Mark 2013-12-18 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-12-19 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Quinlan, Mark 15605 Quinlan, Mark 2013-12-19 Rig 055B - TSR :Rig 055B - TSR TSR-01096-55B Mud Pumps Lift Plans Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-12-20 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1.5 Quinlan, Mark 15605 Quinlan, Mark 2013-12-20 Rig 055B - TSR :Rig 055B - TSR TSR-01096-55B Mud Pumps Lift Plans Regular Pay N 1 Quinlan, Mark 15605 Quinlan, Mark 2013-12-30 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-12-30 Rig 055B - TSR :Rig 055B - TSR TSR-01096-55B Mud Pumps Lift Plans Regular Pay N 0.5 Quinlan, Mark 15605 Quinlan, Mark 2013-12-31 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 0.75 Quinlan, Mark 15605 Quinlan, Mark 2014-01-02 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1 Quinlan, Mark 15605 Quinlan, Mark 2014-01-03 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2 Quinlan, Mark 15605 Quinlan, Mark 2014-01-06 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 0.75 Quinlan, Mark 15605 Quinlan, Mark 2014-01-09 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 1.5 Raughter, Keith 20966 Raughter, Keith 2013-12-04 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 4 Raughter, Keith 20966 Raughter, Keith 2013-12-05 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 1 Raughter, Keith 20966 Raughter, Keith 2013-12-12 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 2.5 Roth, Samantha SRoth Roth, Samantha 2013-11-25 Rig 055B - TSR :Rig 055B - TSR TSR-01036-55B Snake Pit Access Regular Pay N 0.25 Roth, Samantha SRoth Roth, Samantha 2013-11-25 Rig 055B - TSR :Rig 055B - TSR TSR-01082-55B Bearing Pressure Regular Pay N 0.25 Roth, Samantha SRoth Roth, Samantha 2013-12-04 Rig 055B - TSR :Rig 055B - TSR TSR-01088-55B Shaker Cantilever Deck Regular Pay N 0.5 Roth, Samantha SRoth Roth, Samantha 2013-12-05 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 0.25 Roth, Samantha SRoth Roth, Samantha 2013-12-10 Rig 055B - TSR :Rig 055B - TSR TSR-01082-55B Bearing Pressure Regular Pay N 0.25 Roth, Samantha SRoth Roth, Samantha 2013-12-13 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 0.25 Roth, Samantha SRoth Roth, Samantha 2013-12-17 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 0.25 Roth, Samantha SRoth Roth, Samantha 2013-12-18 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 0.25 Roth, Samantha SRoth Roth, Samantha 2013-12-19 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 0.25 Roth, Samantha SRoth Roth, Samantha 2013-12-19 Rig 055B - TSR :Rig 055B - TSR TSR-01098-55B BOP Cart Regular Pay N 0.25 Roth, Samantha SRoth Roth, Samantha 2013-12-27 Rig 055B - TSR :Rig 055B - TSR TSR-01088-55B Shaker Cantilever Deck Regular Pay N 0.25 Roth, Samantha SRoth Roth, Samantha 2013-12-31 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 0.25 Roth, Samantha SRoth Roth, Samantha 2013-12-31 Rig 055B - TSR :Rig 055B - TSR TSR-01096-55B Mud Pumps Lift Plans Regular Pay N 0.25 Roth, Samantha SRoth Roth, Samantha 2014-01-03 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 0.25 Roth, Samantha SRoth Roth, Samantha 2014-01-07 Rig 055B - TSR :Rig 055B - TSR TSR-01098-55B BOP Cart Regular Pay N 0.25 Roth, Samantha SRoth Roth, Samantha 2014-01-07 Rig 055B - TSR :Rig 055B - TSR TSR-01099-55B Piperack Porch Regular Pay N 0.5 Roth, Samantha SRoth Roth, Samantha 2014-01-09 Rig 055B - TSR :Rig 055B - TSR TSR-01089-55B Quarters Diagonal Bracing Regular Pay N 0.25 Roth, Samantha SRoth Roth, Samantha 2014-01-09 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 0.25 Silva, Juan 29514 Silva, Juan 2013-11-21 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 2 Silva, Juan 29514 Silva, Juan 2013-11-22 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 1 Silva, Juan 29514 Silva, Juan 2013-12-19 Rig 055B - TSR :Rig 055B - TSR TSR-01032-55B Installation of Mud Pumps Regular Pay N 1.5 Silva, Juan 29514 Silva, Juan 2014-01-09 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 9 Silva, Juan 29514 Silva, Juan 2014-01-10 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 4 Slack, Dan 30809 Slack, Dan 2013-12-23 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 4 Slack, Dan 30809 Slack, Dan 2013-12-27 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 2 Slack, Dan 30809 Slack, Dan 2013-12-30 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 2 Slack, Dan 30809 Slack, Dan 2013-12-31 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 2 Slack, Dan 30809 Slack, Dan 2014-01-02 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 6 Slack, Dan 30809 Slack, Dan 2014-01-03 Rig 055B - TSR :Rig 055B - TSR TSR-01091-55B High Pressure Mud Line Regular Pay N 2 Slack, Dan 30809 Slack, Dan 2014-01-06 Rig 055B - TSR :Rig 055B - TSR TSR-01081-55B SEMS Requirements Regular Pay N 6 Zaidi, Shadab 30807 Zaidi, Shadab 2014-01-06 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 1 Zaidi, Shadab 30807 Zaidi, Shadab 2014-01-07 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Zaidi, Shadab 30807 Zaidi, Shadab 2014-01-08 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Zaidi, Shadab 30807 Zaidi, Shadab 2014-01-10 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Zaidi, Shadab 30807 Zaidi, Shadab 2014-01-11 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4