Name Billing Class Employee No. Item Line Class Transaction Date Job No. Customer Service Item Notes Payroll Item Billable Employee Paid Day Rate Duration Days Remarks Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-09-18 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 C101-17-10B, dwks work order review Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-09-19 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 3 0 C101-17-10B, dwks work order review Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-09-20 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 C101-17-10B, dwks work order review Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-09-21 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 C101-17-10B, dwks work order review Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-09-25 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 completed data collection of C101-17-10-A, Started data collection of C101-10-17-F Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-09-26 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 completed data collection of C101-17-10-A, Started data collection of C101-10-17-F Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-09-27 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 completed data collection of C101-17-10-A, Started data collection of C101-10-17-F Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-09-28 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 completed data collection of C101-17-10-A, Started data collection of C101-10-17-F Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 6 0 finished data collection for C101-17-10-F Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 finished data collection for C101-17-10-F Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 finished data collection for C101-17-10-F Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 finished data collection for C101-17-10-F Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Carried out the conversion of C101-17-10 - C,D,E from word docs & converted to excel for review Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-10 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Carried out the conversion of C101-17-10 - C,D,E from word docs & converted to excel for review Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-11 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Carried out the conversion of C101-17-10 - C,D,E from word docs & converted to excel for review Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-12 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Carried out the conversion of C101-17-10 - C,D,E from word docs & converted to excel for review Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-16 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Carried out the conversion of C101-17-10- G,H,K. Carried out the conversion of C101-09-10,20,30, and prepare for upload into SharePoint. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-17 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 6 0 Carried out the conversion of C101-17-10- G,H,K. Carried out the conversion of C101-09-10,20,30, and prepare for upload into SharePoint. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-18 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 3 0 Carried out the conversion of C101-17-10- G,H,K. Carried out the conversion of C101-09-10,20,30, and prepare for upload into SharePoint. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-19 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Carried out the conversion of C101-17-10- G,H,K. Carried out the conversion of C101-09-10,20,30, and prepare for upload into SharePoint. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-20 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Carried out the conversion of C101-17-10- G,H,K. Carried out the conversion of C101-09-10,20,30, and prepare for upload into SharePoint. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-23 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 6 0 Loaded remainder of C101-17-10 into SharePoint. catalogued and loaded C101-16, as part of phase one into SharePoint. SAP access was not available on Thursday, Friday, Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-24 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 6 0 Loaded remainder of C101-17-10 into SharePoint. catalogued and loaded C101-16, as part of phase one into SharePoint. SAP access was not available on Thursday, Friday, Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-25 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Loaded remainder of C101-17-10 into SharePoint. catalogued and loaded C101-16, as part of phase one into SharePoint. SAP access was not available on Thursday, Friday, Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-10-30 Hibernia Platform :Hibernia Platform Overhead All Activities Regular Pay N 2 0 Completed the remained of Phase one maintenance plans, distributed maintenance plans on SharePoint, Limited access on Tuesday and Wednesday due to Citrix issues. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-11-02 Hibernia Platform :Hibernia Platform Overhead All Activities Regular Pay N 2 0 Completed the remained of Phase one maintenance plans, distributed maintenance plans on SharePoint, Limited access on Tuesday and Wednesday due to Citrix issues. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-11-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Travel to St. johns, on Sunday, Meet with Ron Taffee and Steve Sharpe on Monday to discuss project overview, Prepared slides and information on Tuesday. Meet with HMDC on Wednesday and Thursday, debrief on Thursday with PDC, travel back to Houston on Friday Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-11-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Travel to St. johns, on Sunday, Meet with Ron Taffee and Steve Sharpe on Monday to discuss project overview, Prepared slides and information on Tuesday. Meet with HMDC on Wednesday and Thursday, debrief on Thursday with PDC, travel back to Houston on Friday Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-11-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Travel to St. johns, on Sunday, Meet with Ron Taffee and Steve Sharpe on Monday to discuss project overview, Prepared slides and information on Tuesday. Meet with HMDC on Wednesday and Thursday, debrief on Thursday with PDC, travel back to Houston on Friday Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-11-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Travel to St. johns, on Sunday, Meet with Ron Taffee and Steve Sharpe on Monday to discuss project overview, Prepared slides and information on Tuesday. Meet with HMDC on Wednesday and Thursday, debrief on Thursday with PDC, travel back to Houston on Friday Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-11-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Travel to St. johns, on Sunday, Meet with Ron Taffee and Steve Sharpe on Monday to discuss project overview, Prepared slides and information on Tuesday. Meet with HMDC on Wednesday and Thursday, debrief on Thursday with PDC, travel back to Houston on Friday Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-11-10 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Travel to St. johns, on Sunday, Meet with Ron Taffee and Steve Sharpe on Monday to discuss project overview, Prepared slides and information on Tuesday. Meet with HMDC on Wednesday and Thursday, debrief on Thursday with PDC, travel back to Houston on Friday Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-11-13 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Began pulling manuals and reviewing top drive information. Reviewed the AC motor and control maintenance tasks, made recommendations. Reviewed top drive heat exchanger maintenance tasks, researched heat exchanger supplemental docs for review. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-11-14 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Began pulling manuals and reviewing top drive information. Reviewed the AC motor and control maintenance tasks, made recommendations. Reviewed top drive heat exchanger maintenance tasks, researched heat exchanger supplemental docs for review. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-11-15 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Began pulling manuals and reviewing top drive information. Reviewed the AC motor and control maintenance tasks, made recommendations. Reviewed top drive heat exchanger maintenance tasks, researched heat exchanger supplemental docs for review. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-11-17 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 3 0 Began pulling manuals and reviewing top drive information. Reviewed the AC motor and control maintenance tasks, made recommendations. Reviewed top drive heat exchanger maintenance tasks, researched heat exchanger supplemental docs for review. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-11-27 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2.5 0 Monday, review top drive heat exchanger requirements, research CSA B51 regulations and API 660. Begin re-draft for heat exchanger requirements. Tuesday, work on the Ps-16/21 maintenance activities, revised the tracking sheet, Wednesday, meet with HMDC teleconference, continue research into the CSA-regulations, continue development of the PS-21 maintenance activities. Thursday, met with PDC maintenance group to discuss revision process. Finish PS-21 maintenance activity revisions. No review work carried out on Friday. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-11-27 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1.5 0 Monday research CSA-B51, Tuesday, research the PS-16/21 maintenance materials. Wednesday meet with HMDC, continue with CSA regulation research. Thursday, meet with PDC maintenance personnel to discuss review process. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-11-28 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Monday, review top drive heat exchanger requirements, research CSA B51 regulations and API 660. Begin re-draft for heat exchanger requirements. Tuesday, work on the Ps-16/21 maintenance activities, revised the tracking sheet, Wednesday, meet with HMDC teleconference, continue research into the CSA-regulations, continue development of the PS-21 maintenance activities. Thursday, met with PDC maintenance group to discuss revision process. Finish PS-21 maintenance activity revisions. No review work carried out on Friday. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-11-28 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Monday research CSA-B51, Tuesday, research the PS-16/21 maintenance materials. Wednesday meet with HMDC, continue with CSA regulation research. Thursday, meet with PDC maintenance personnel to discuss review process. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-11-29 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Monday, review top drive heat exchanger requirements, research CSA B51 regulations and API 660. Begin re-draft for heat exchanger requirements. Tuesday, work on the Ps-16/21 maintenance activities, revised the tracking sheet, Wednesday, meet with HMDC teleconference, continue research into the CSA-regulations, continue development of the PS-21 maintenance activities. Thursday, met with PDC maintenance group to discuss revision process. Finish PS-21 maintenance activity revisions. No review work carried out on Friday. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-11-29 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Monday research CSA-B51, Tuesday, research the PS-16/21 maintenance materials. Wednesday meet with HMDC, continue with CSA regulation research. Thursday, meet with PDC maintenance personnel to discuss review process. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-11-30 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Monday, review top drive heat exchanger requirements, research CSA B51 regulations and API 660. Begin re-draft for heat exchanger requirements. Tuesday, work on the Ps-16/21 maintenance activities, revised the tracking sheet, Wednesday, meet with HMDC teleconference, continue research into the CSA-regulations, continue development of the PS-21 maintenance activities. Thursday, met with PDC maintenance group to discuss revision process. Finish PS-21 maintenance activity revisions. No review work carried out on Friday. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-11-30 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Monday research CSA-B51, Tuesday, research the PS-16/21 maintenance materials. Wednesday meet with HMDC, continue with CSA regulation research. Thursday, meet with PDC maintenance personnel to discuss review process. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-12-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Worked on various aspects of the top drive maintenance plan, as well as help the other in the revision and draft of new procedures. Completed both heat exchangers, the top drive lube pump, the PS-21 and the PS-16 Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-12-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Worked on various aspects of the top drive maintenance plan, as well as help the other in the revision and draft of new procedures. Completed both heat exchangers, the top drive lube pump, the PS-21 and the PS-16 Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-12-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Worked on various aspects of the top drive maintenance plan, as well as help the other in the revision and draft of new procedures. Completed both heat exchangers, the top drive lube pump, the PS-21 and the PS-16 Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-12-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Worked on various aspects of the top drive maintenance plan, as well as help the other in the revision and draft of new procedures. Completed both heat exchangers, the top drive lube pump, the PS-21 and the PS-16 Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-12-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Worked on various aspects of the top drive maintenance plan, as well as help the other in the revision and draft of new procedures. Completed both heat exchangers, the top drive lube pump, the PS-21 and the PS-16 Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-12-11 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Various meetings, and vendor communications to secure adequate TDS6 top drive service information. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-12-12 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Various meetings, and vendor communications to secure adequate TDS6 top drive service information. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-12-13 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Various meetings, and vendor communications to secure adequate TDS6 top drive service information. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2017-12-14 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Various meetings, and vendor communications to secure adequate TDS6 top drive service information. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-01-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 reviewing C101-17-10B reference documents, chasing manuals, and follow up on the TDS6 manual excerpts from NOV. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 reviewing C101-17-10B reference documents, chasing manuals, and follow up on the TDS6 manual excerpts from NOV. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-01-11 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 reviewing C101-17-10B reference documents, chasing manuals, and follow up on the TDS6 manual excerpts from NOV. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-01-18 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Coordination with the OEM to secure TDS6 top drive details. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-01-31 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Revised and reviewed heat exchanger PM Plan for c101-17-10B, Draw works components. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-02-01 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 3 0 Revised and reviewed heat exchanger PM Plan for c101-17-10B, Draw works components. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-02-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 complete long text updates on the upload template. test the upload and revise the data as required to facilitate proper loading. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-02-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 complete long text updates on the upload template. test the upload and revise the data as required to facilitate proper loading. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-02-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 complete long text updates on the upload template. test the upload and revise the data as required to facilitate proper loading. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-02-12 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Weekly meeting, revise docs for easier management. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-02-13 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Weekly meeting, revise docs for easier management. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-02-14 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Went through C101-17-10A and began cleaning up procedures and populating the Task List Long Text Upload templates, in preparation for loading into SAP Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-02-15 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Went through C101-17-10A and began cleaning up procedures and populating the Task List Long Text Upload templates, in preparation for loading into SAP Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-02-16 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Went through C101-17-10A and began cleaning up procedures and populating the Task List Long Text Upload templates, in preparation for loading into SAP Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-02-27 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Weekly update meeting, spent some time attempting to log into SAP, ongoing issue with the log in being expired, Awaiting additional details from Bill Drover, Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-02-28 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Weekly update meeting, spent some time attempting to log into SAP, ongoing issue with the log in being expired, Awaiting additional details from Bill Drover, Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-03-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Finished reviewing and loading long test updates for C101-17-10-A, ready for submittal, attended two project meeting, Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-03-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 0.5 0 Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-03-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Finished reviewing and loading long test updates for C101-17-10-A, ready for submittal, attended two project meeting, Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-03-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-03-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Finished reviewing and loading long test updates for C101-17-10-A, ready for submittal, attended two project meeting, Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-03-20 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 0.5 0 catalogued missing C101-17-10-A data and compiling Long text task list updates for missing data. Awaiting confirmation for missing docs. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-03-21 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 catalogued missing C101-17-10-A data and compiling Long text task list updates for missing data. Awaiting confirmation for missing docs. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-04-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 0.5 0 Review tracker, verified some minor details with equipment make model and manufacturer. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-04-12 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 0.5 0 Review tracker, verified some minor details with equipment make model and manufacturer. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-04-25 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 0.5 0 Sorting out log on issues in SAP, one hour conference call to address issues and questions with Mark and Adam on Thursday Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-04-26 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Sorting out log on issues in SAP, one hour conference call to address issues and questions with Mark and Adam on Thursday Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-05-01 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 0.25 0 Minor discussion with Adam, and multiple attempts to log in. Forwarded mtls to Adam for upload. Anatra, Mike Site Manager MIKEANATRA Anatra, Mike:Site Manager 2018-05-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 0.25 0 Minor discussion with Adam, and multiple attempts to log in. Forwarded mtls to Adam for upload. Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2017-09-26 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Setting up hierarchy on my system and going through Top Drive maintenance procedures. Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2017-09-28 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Setting up hierarchy on my system and going through Top Drive maintenance procedures. Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2017-11-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 11/7- Travel to St. Johns 11/8 - 11/ 9 workshop 11/10 - Travel Home Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2017-11-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 11/7- Travel to St. Johns 11/8 - 11/ 9 workshop 11/10 - Travel Home Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2017-11-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 11/7- Travel to St. Johns 11/8 - 11/ 9 workshop 11/10 - Travel Home Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2017-11-10 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 11/7- Travel to St. Johns 11/8 - 11/ 9 workshop 11/10 - Travel Home Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2017-12-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Meetings PM review Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2017-12-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Meetings PM review Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2017-12-10 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 0.5 0 Meetings on PM review Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2017-12-13 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Meetings on PM review Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-01-29 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Review and update PM task, reducing PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-01-30 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 3 0 Review and update PM task, reducing PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-01-31 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 5 0 Review and update PM task, reducing PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-01 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Review and update PM task, reducing PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Review and update PM task, reducing PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 3 0 Review and update PM task, reducing PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 3 0 Review and update PM task and reduce PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Review and update PM task and reduce PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 3 0 Review and update PM task and reduce PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Review and update PM task and reduce PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Review and update PM task and reduce PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-12 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-13 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-14 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 3 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-15 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item Carmichael, Steve Manager/Staff Consultant Carmichael, Steve:Manager/Staff Consultant 2018-02-16 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-03 EHBU-TSRs :EHBU-TSRs TSR-01530-EHBU 1st Quarter 2017 General Query- Aksai Regular Pay N 1 0 Working on developing spreadsheet for KPO accumulator sizing requirement and pipe ram shear calculations with Cameron Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Kan ban meetingss, tsr mtngs, Tech Services mtng with Gary Rich Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Spillover hours from ehbu gen query for researching KPO accumulator sizing requirement and pipe ram shear calculations Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 catching up on emails from holiday, discussions regarding organizational announcement, timesheet Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-03 Rig 209L-TSR :Rig 209L-TSR TSR-01525-209L BOP Tie Backs Regular Pay N 3 0 Compiling results from analysis and developing email for odoptu guys; developing CTR Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-04 EHBU-TSRs :EHBU-TSRs TSR-01530-EHBU 1st Quarter 2017 General Query- Aksai Regular Pay N 2 0 Working on developing spreadsheet for KPO accumulator sizing requirement and pipe ram shear calculations with Cameron Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kan ban meetingss, tsr mtngs, Tech Services mtng with Gary Rich Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-04 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Spillover hours from ehbu gen query for researching KPO accumulator sizing requirement and pipe ram shear calculations Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-04 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 4 0 drawing review, lifting analysis of platform Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-05 EHBU-TSRs :EHBU-TSRs TSR-01530-EHBU 1st Quarter 2017 General Query- Aksai Regular Pay N 2 0 Working on developing spreadsheet for KPO accumulator sizing requirement and pipe ram shear calculations with Cameron Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kan ban meetingss, tsr mtngs, Tech Services mtng with Gary Rich Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Spillover hours from ehbu gen query for researching KPO accumulator sizing requirement and pipe ram shear calculations Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 catching up on emails from holiday, discussions regarding organizational announcement, timesheet Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-05 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 2 0 drawing review, lifting analysis of platform Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-05 Rig 209L-TSR :Rig 209L-TSR TSR-01525-209L BOP Tie Backs Regular Pay N 1 0 Compiling results from analysis and developing email for odoptu guys; developing CTR Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-06 EHBU-TSRs :EHBU-TSRs TSR-01530-EHBU 1st Quarter 2017 General Query- Aksai Regular Pay N 2 0 Working on developing spreadsheet for KPO accumulator sizing requirement and pipe ram shear calculations with Cameron Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Kan ban meetingss, tsr mtngs, Tech Services mtng with Gary Rich Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 Spillover hours from ehbu gen query for researching KPO accumulator sizing requirement and pipe ram shear calculations Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 catching up on emails from holiday, discussions regarding organizational announcement, timesheet Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 kan-ban mtngs, tsr mtng and mtng with Jason G regarding rig inventory, general discussions with manager Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 -SWL for fuel tank platform spreader beam for Jeff - helping lam revise ctr for dsm platform - preparing beam sketch for the 270 TD tieback spreader Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-09 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-09 Rig 209L-TSR :Rig 209L-TSR TSR-01516-209L Bucking Machine HPU Enclosure Regular Pay N 3 0 finishing up drawings and closeout Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-09 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 1.5 0 working with lam on install drawings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 kan-ban mtngs, tsr mtng and mtng with Jason G regarding rig inventory, general discussions with manager Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 -SWL for fuel tank platform spreader beam for Jeff - helping lam revise ctr for dsm platform - preparing beam sketch for the 270 TD tieback spreader Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-10 Rig 209L-TSR :Rig 209L-TSR TSR-01516-209L Bucking Machine HPU Enclosure Regular Pay N 2 0 finishing up drawings and closeout Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-10 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 2 0 working with lam on install drawings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 kan-ban mtngs, tsr mtng and mtng with Jason G regarding rig inventory, general discussions with manager Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 -SWL for fuel tank platform spreader beam for Jeff - helping lam revise ctr for dsm platform - preparing beam sketch for the 270 TD tieback spreader Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 (1) timesheet (9) performance evaluation Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-11 Rig 209L-TSR :Rig 209L-TSR TSR-01510-209L DSM-PB HPU Cantilever Regular Pay N 2 0 updating analysis report for additional load combos Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 kan-ban mtngs, tsr mtng and mtng with Jason G regarding rig inventory, general discussions with manager Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 (1) timesheet (9) performance evaluation Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 kan-ban mtngs, tsr mtng and mtng with Jason G regarding rig inventory, general discussions with manager Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 -SWL for fuel tank platform spreader beam for Jeff - helping lam revise ctr for dsm platform - preparing beam sketch for the 270 TD tieback spreader Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-13 Rig 209L-TSR :Rig 209L-TSR TSR-01510-209L DSM-PB HPU Cantilever Regular Pay N 1 0 updating analysis report for additional load combos Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-13 Rig 209L-TSR :Rig 209L-TSR TSR-01525-209L BOP Tie Backs Regular Pay N 5 0 closeout for bop tiebacks Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 building plate loading spreadhseet; PE registry template for Kyle; Department Lessons Learned; correspondence with Cameron finding minimum temperature requirements for BOP Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-16 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-16 Rig 209L-TSR :Rig 209L-TSR TSR-01510-209L DSM-PB HPU Cantilever Regular Pay N 2 0 updating load combinations to safi model and analysis report Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-16 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 3 0 Analysis report and tie down calculations for spooler; mtng to discuss mast window; correspondence for break strength of control lines Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR meeting and preparing safety and IMS moment; kan ban meeting and general discussions with KPM on ground bearing Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 building plate loading spreadhseet; PE registry template for Kyle; Department Lessons Learned; correspondence with Cameron finding minimum temperature requirements for BOP Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-17 Rig 209L-TSR :Rig 209L-TSR TSR-01510-209L DSM-PB HPU Cantilever Regular Pay N 0.5 0 updating load combinations to safi model and analysis report Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-17 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 5 0 Analysis report and tie down calculations for spooler; mtng to discuss mast window; correspondence for break strength of control lines Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting and preparing safety and IMS moment; kan ban meeting and general discussions with KPM on ground bearing Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 building plate loading spreadhseet; PE registry template for Kyle; Department Lessons Learned; correspondence with Cameron finding minimum temperature requirements for BOP Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-18 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 3 0 Analysis report and tie down calculations for spooler; mtng to discuss mast window; correspondence for break strength of control lines Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-19 EHBU-TSRs :EHBU-TSRs TSR-01536-EHBU 1st Quarter 2017 General Query - Iraq Regular Pay N 4 0 Ground Bearing spreadsheet for 247L/265L for mast raising scenario; searching for applicable drawings and rig weights Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 TSR meeting and preparing safety and IMS moment; kan ban meeting and general discussions with KPM on ground bearing Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 building plate loading spreadhseet; PE registry template for Kyle; Department Lessons Learned; correspondence with Cameron finding minimum temperature requirements for BOP Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-20 EHBU-TSRs :EHBU-TSRs TSR-01536-EHBU 1st Quarter 2017 General Query - Iraq Regular Pay N 1 0 Ground Bearing spreadsheet for 247L/265L for mast raising scenario; searching for applicable drawings and rig weights Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 building plate loading spreadhseet; PE registry template for Kyle; Department Lessons Learned; correspondence with Cameron finding minimum temperature requirements for BOP Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-20 OH-011 :OH-011 Overhead All Activities Regular Pay N 4 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-20 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 1 0 Analysis report and tie down calculations for spooler; mtng to discuss mast window; correspondence for break strength of control lines Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-23 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint and TSR Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 Updating SAFI, updating CV, SWOT Analysis for matt for business development, PE template for Kyle, overflow meeting hours for mast windwall meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-24 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Lunch and Learn Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-24 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 3 0 Analysis Report Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint and TSR Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 3.5 0 Updating SAFI, updating CV, SWOT Analysis for matt for business development, PE template for Kyle, overflow meeting hours for mast windwall meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-25 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 3 0 Analysis Report Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Sprint and TSR Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Updating SAFI, updating CV, SWOT Analysis for matt for business development, PE template for Kyle, overflow meeting hours for mast windwall meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-26 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 3 0 Analysis Report Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint and TSR Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 7.5 0 Updating SAFI, updating CV, SWOT Analysis for matt for business development, PE template for Kyle, overflow meeting hours for mast windwall meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint team meetings and tsr meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 revising CTR for HPU cantilevers, researching cam follower and unf nut callouts, overflow bearing pressure hours for bomco rigs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 CV update, timesheet, preparing memo for sakhalin Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 helping matt with case study brochures, reviewing, and help laying out Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-30 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 sakhalin mtng Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint team meetings and tsr meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 CV update, timesheet, preparing memo for sakhalin Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-01-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 helping matt with case study brochures, reviewing, and help laying out Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-01 EHBU-TSRs :EHBU-TSRs TSR-01536-EHBU 1st Quarter 2017 General Query - Iraq Regular Pay N 1 0 Revisiting BOMCO bearing pressure for new matting board layout Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint team meetings and tsr meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 revising CTR for HPU cantilevers, researching cam follower and unf nut callouts, overflow bearing pressure hours for bomco rigs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 CV update, timesheet, preparing memo for sakhalin Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-01 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 1 0 closeout and MTO Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 sprint team meetings and tsr meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 revising CTR for HPU cantilevers, researching cam follower and unf nut callouts, overflow bearing pressure hours for bomco rigs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 CV update, timesheet, preparing memo for sakhalin Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-02 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 4 0 closeout and MTO Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-03 EHBU-TSRs :EHBU-TSRs TSR-01536-EHBU 1st Quarter 2017 General Query - Iraq Regular Pay N 2 0 Revisiting BOMCO bearing pressure for new matting board layout Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint team meetings and tsr meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 revising CTR for HPU cantilevers, researching cam follower and unf nut callouts, overflow bearing pressure hours for bomco rigs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-03 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 4 0 closeout and MTO Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint meetings and tsr meetings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 4.5 0 MTO for mast door; researching bearing pressure modelling; reviewing door drawings for mast; discussing 2m Tek work with Joshua and reviewing ARB and Top Tek tool Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 at copy.com setting up case study prints and going back to pick up finished prints Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint meetings and tsr meetings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 5.5 0 MTO for mast door; researching bearing pressure modelling; reviewing door drawings for mast; discussing 2m Tek work with Joshua and reviewing ARB and Top Tek tool Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet; Performance evaluation on sharepoint; Packing and moving from 7th floor to 5th Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 at copy.com setting up case study prints and going back to pick up finished prints Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-08 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 2 0 Creating TSR and CTR and developing questions for AJ Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint meetings and tsr meetings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 4.5 0 MTO for mast door; researching bearing pressure modelling; reviewing door drawings for mast; discussing 2m Tek work with Joshua and reviewing ARB and Top Tek tool Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet; Performance evaluation on sharepoint; Packing and moving from 7th floor to 5th Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Sprint meetings and tsr meetings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Timesheet; Performance evaluation on sharepoint; Packing and moving from 7th floor to 5th Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-09 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 1 0 Review of drawings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-10 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 1 0 Creating TSR and CTR and developing questions for AJ Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint meetings and tsr meetings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 3.5 0 MTO for mast door; researching bearing pressure modelling; reviewing door drawings for mast; discussing 2m Tek work with Joshua and reviewing ARB and Top Tek tool Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Timesheet; Performance evaluation on sharepoint; Packing and moving from 7th floor to 5th Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-13 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 7 0 At 2M-tek facility working on ARB design support, Solidworks modelling, preparation of drawings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet and discussions with managers Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-14 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 8 0 At 2M-tek facility working on ARB design support, Solidworks modelling, preparation of drawings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-15 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 8 0 At 2M-tek facility working on ARB design support, Solidworks modelling, preparation of drawings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-16 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 5.5 0 At 2M-tek facility working on ARB design support, Solidworks modelling, preparation of drawings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 TSR meeting and 4th quarter earnings meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-17 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 6.5 0 At 2M-tek facility working on ARB design support, Solidworks modelling, preparation of drawings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 timesheet and discussions with managers Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-20 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-21 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 7.5 0 Creating drawings for ARB Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 speaking with Greg and TSR meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-22 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 7 0 Creating drawings for ARB Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-22 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Review of 269L TSR's Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-23 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 6 0 Creating drawings for ARB Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-23 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 1 0 general use padeye analysis and comments Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 speaking with Greg and TSR meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-24 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 6 0 Creating drawings for ARB Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-24 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 0.5 0 general use padeye analysis and comments Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-24 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1.5 0 Review of 269L TSR's Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-27 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 1.5 0 Analysis and Closeout report, Operational Manual, addressing AJ's drawing comments and re-PDF'ing drawing set Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint team meetings , TSR meeting, Loadmaster discussion for 269L, talking with Matt about Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 timesheet and inputting Lessons Learned, reviewing passport renewal process with Sande, general discussions with managers Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-27 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 -Updating rig floor PE drawing for 209L -270L Torque Tube Tieback inquiries Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-28 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 3.5 0 Analysis and Closeout report, Operational Manual, addressing AJ's drawing comments and re-PDF'ing drawing set Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Sprint team meetings , TSR meeting, Loadmaster discussion for 269L, talking with Matt about Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet and inputting Lessons Learned, reviewing passport renewal process with Sande, general discussions with managers Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-02-28 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1.5 0 researching existing drawings for 269 mast and belly boards Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-01 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 4 0 Analysis and Closeout report, Operational Manual, addressing AJ's drawing comments and re-PDF'ing drawing set Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint team meetings , TSR meeting, Loadmaster discussion for 269L, talking with Matt about Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 timesheet and inputting Lessons Learned, reviewing passport renewal process with Sande, general discussions with managers Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-01 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 2 0 Reviewing Loadmaster analysis report trying to find BOP analysis Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-02 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 3 0 Analysis and Closeout report, Operational Manual, addressing AJ's drawing comments and re-PDF'ing drawing set Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Sprint team meetings , TSR meeting, Loadmaster discussion for 269L, talking with Matt about Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet and inputting Lessons Learned, reviewing passport renewal process with Sande, general discussions with managers Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-02 Rig 253L-TSR :Rig 253L-TSR TSR-01554-253L Skidding Beam Repair Regular Pay N 1.5 0 Reviewing inspection report and preparing c/o Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-02 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 Reviewing Loadmaster analysis report trying to find BOP analysis Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-02 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 0.5 0 researching existing drawings for 269 mast and belly boards Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-03 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 1.5 0 Analysis and Closeout report, Operational Manual, addressing AJ's drawing comments and re-PDF'ing drawing set Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint team meetings , TSR meeting, Loadmaster discussion for 269L, talking with Matt about Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-03 OH-011 :OH-011 Overhead All Activities Regular Pay N 4 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 -Updating rig floor PE drawing for 209L -270L Torque Tube Tieback inquiries Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint meetings and TSR meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet, lessons learned upload, general office items, completing passport renewal with Sande; general discussions with manager Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-06 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Sakhalin meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5 0 (6)270L Crib analysis report for 270L (7) Working with Lam on DSM HPU Cantilever drawing set (2) Cellar floor panel analysis Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint meetings and TSR meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, lessons learned upload, general office items, completing passport renewal with Sande; general discussions with manager Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 (6)270L Crib analysis report for 270L (7) Working with Lam on DSM HPU Cantilever drawing set (2) Cellar floor panel analysis Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-07 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 2.5 0 reviewing information for belly board i.e. Solidworks file for 269L Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint meetings and TSR meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (6)270L Crib analysis report for 270L (7) Working with Lam on DSM HPU Cantilever drawing set (2) Cellar floor panel analysis Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-08 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 2 0 Working on CTR and getting PO issued Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-08 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1.5 0 reviewing information for belly board i.e. Solidworks file for 269L Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-08 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 3 0 Creating IFC 270L Torque Tube Tieback Beam drawing Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Sprint meetings and TSR meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, lessons learned upload, general office items, completing passport renewal with Sande; general discussions with manager Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (6)270L Crib analysis report for 270L (7) Working with Lam on DSM HPU Cantilever drawing set (2) Cellar floor panel analysis Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-09 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 5 0 Creating IFC 270L Torque Tube Tieback Beam drawing Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint meetings and TSR meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet, lessons learned upload, general office items, completing passport renewal with Sande; general discussions with manager Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 (6)270L Crib analysis report for 270L (7) Working with Lam on DSM HPU Cantilever drawing set (2) Cellar floor panel analysis Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-10 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1.5 0 reviewing information for belly board i.e. Solidworks file for 269L Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Team meetings and TSR meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and general items including conversations with manager Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-13 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 (8) Cellar Framing Analysis for panels around well center (11) Analysis of existing DSM structure to support the new HPU cantilever platform and review and commenting on drawings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-14 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 Researching and development of spreadsheet for Chinese material grades and structural shapes, pipes, and plates for unit rate sheet for HH Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Team meetings and TSR meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 timesheet and general items including conversations with manager Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 (8) Cellar Framing Analysis for panels around well center (11) Analysis of existing DSM structure to support the new HPU cantilever platform and review and commenting on drawings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-15 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 Researching and development of spreadsheet for Chinese material grades and structural shapes, pipes, and plates for unit rate sheet for HH Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and general items including conversations with manager Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-15 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 (8) Cellar Framing Analysis for panels around well center (11) Analysis of existing DSM structure to support the new HPU cantilever platform and review and commenting on drawings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-16 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Researching and development of spreadsheet for Chinese material grades and structural shapes, pipes, and plates for unit rate sheet for HH Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Team meetings and TSR meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet and general items including conversations with manager Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 (8) Cellar Framing Analysis for panels around well center (11) Analysis of existing DSM structure to support the new HPU cantilever platform and review and commenting on drawings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-16 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 Speaking with Loadmaster regarding analysis methodology and results Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Team meetings and TSR meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 timesheet and general items including conversations with manager Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6 0 (8) Cellar Framing Analysis for panels around well center (11) Analysis of existing DSM structure to support the new HPU cantilever platform and review and commenting on drawings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 updating compensation table spreadsheet Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Sprint meetings, conversation with Tecky, TSR mtng Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, general office items and discussions with manager Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 (21) analysis and report for the DSM hpu cantilevered platform; finding original UC's for existing structure and verifying strength as well as new design of pinned connections and modelling new platform with all environmental loads (1) Cellar framing - compiling information and sending email to Jeff (2.5) looking at design of claw and failure analysis with Reck Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-20 ORLAN-TSR :ORLAN-TSR TSR-01543-ORLP PB Mezz Deck - Additional Storage Regular Pay N 1 0 Review of TSR and creating RFI Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-20 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 0.5 0 meeting with rachel and mike from Loadmaster and George Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint meetings, conversation with Tecky, TSR mtng Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, general office items and discussions with manager Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6.5 0 (21) analysis and report for the DSM hpu cantilevered platform; finding original UC's for existing structure and verifying strength as well as new design of pinned connections and modelling new platform with all environmental loads (1) Cellar framing - compiling information and sending email to Jeff (2.5) looking at design of claw and failure analysis with Reck Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint meetings, conversation with Tecky, TSR mtng Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, general office items and discussions with manager Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 (21) analysis and report for the DSM hpu cantilevered platform; finding original UC's for existing structure and verifying strength as well as new design of pinned connections and modelling new platform with all environmental loads (1) Cellar framing - compiling information and sending email to Jeff (2.5) looking at design of claw and failure analysis with Reck Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-22 ORLAN-TSR :ORLAN-TSR TSR-01543-ORLP PB Mezz Deck - Additional Storage Regular Pay N 3 0 Review of TSR and creating RFI Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-23 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 updating compensation table spreadsheet Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Sprint meetings, conversation with Tecky, TSR mtng Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, general office items and discussions with manager Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4.5 0 (21) analysis and report for the DSM hpu cantilevered platform; finding original UC's for existing structure and verifying strength as well as new design of pinned connections and modelling new platform with all environmental loads (1) Cellar framing - compiling information and sending email to Jeff (2.5) looking at design of claw and failure analysis with Reck Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-23 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1 0 meeting with rachel and mike from Loadmaster and George Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint meetings, conversation with Tecky, TSR mtng Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, general office items and discussions with manager Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-24 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6.5 0 (21) analysis and report for the DSM hpu cantilevered platform; finding original UC's for existing structure and verifying strength as well as new design of pinned connections and modelling new platform with all environmental loads (1) Cellar framing - compiling information and sending email to Jeff (2.5) looking at design of claw and failure analysis with Reck Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meeting and tsr meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 General office items, emails, discussions with manager Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-27 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 finishing up analysis report for the DSM cantilever platform Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-27 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 2 0 review of report and call with Brian to discuss Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meeting and tsr meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 General office items, emails, discussions with manager Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 finishing up analysis report for the DSM cantilever platform Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-28 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 5 0 15B trolley beam global structure analysis and sketch of trolley beam to Leroy Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-28 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 review of report and call with Brian to discuss Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meeting and tsr meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 General office items, emails, discussions with manager Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-29 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 15B trolley beam global structure analysis and sketch of trolley beam to Leroy Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-29 ORLAN-TSR :ORLAN-TSR TSR-01543-ORLP PB Mezz Deck - Additional Storage Regular Pay N 1 0 Review of RFI, technical specification, and preparation of analysis documents Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-29 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 3 0 solidworks analysis of DSM claw (existing case) Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 sprint meeting and tsr meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 General office items, emails, discussions with manager Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-30 ORLAN-TSR :ORLAN-TSR TSR-01543-ORLP PB Mezz Deck - Additional Storage Regular Pay N 2 0 Review of RFI, technical specification, and preparation of analysis documents Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-30 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 4 0 solidworks analysis of DSM claw (existing case) Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meeting and tsr meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 General office items, emails, discussions with manager Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-03-31 ORLAN-TSR :ORLAN-TSR TSR-01543-ORLP PB Mezz Deck - Additional Storage Regular Pay N 6 0 Review of RFI, technical specification, and preparation of analysis documents Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meetings and tsr meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-03 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 cellar floor discussion with Jake, updating memo, and fuel tank spreader frame discussion with jake and kyle Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-03 ORLAN-TSR :ORLAN-TSR TSR-01543-ORLP PB Mezz Deck - Additional Storage Regular Pay N 4 0 remaining calcs, drawing comments, and closeout documentation Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-03 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 solildworks modelling of the existing claws for DSM, PB, and DM Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meetings and tsr meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 timesheet, performance evaluation, review of performance evaluation Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-04 ORLAN-TSR :ORLAN-TSR TSR-01543-ORLP PB Mezz Deck - Additional Storage Regular Pay N 1 0 remaining calcs, drawing comments, and closeout documentation Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-04 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 2.5 0 solildworks modelling of the existing claws for DSM, PB, and DM Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meetings and tsr meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 SAFI research for smart goal Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, performance evaluation, review of performance evaluation Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-05 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 3.5 0 solildworks modelling of the existing claws for DSM, PB, and DM Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 sprint meetings and tsr meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 cellar floor discussion with Jake, updating memo, and fuel tank spreader frame discussion with jake and kyle Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-06 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 6 0 solildworks modelling of the existing claws for DSM, PB, and DM Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meetings and tsr meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 cellar floor discussion with Jake, updating memo, and fuel tank spreader frame discussion with jake and kyle Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-07 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 6.5 0 solildworks modelling of the existing claws for DSM, PB, and DM Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint meetings and TSR meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Reviewing Kyle's PE application for Canada; Timesheet; general office items Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-10 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-10 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 6 0 Analysis of failed claw and existing claws Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint meetings and TSR meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Reviewing Kyle's PE application for Canada; Timesheet; general office items Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-11 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 6 0 Analysis of failed claw and existing claws Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-12 OH-014 :OH-014 Overhead All Activities Regular Pay N 7 0 IADC Maintenance Committee meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-12 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1 0 creating CTR Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Sprint meetings and TSR meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Reviewing Kyle's PE application for Canada; Timesheet; general office items Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-13 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 4 0 Analysis of failed claw and existing claws Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-13 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 2 0 discussing fit-up and requirements for new BOP Hoists with Bishop Lifting and JDN Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-14 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Morning board meetin' Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 general emails and items, timesheet, PTO schedule updating, developing OTC schedule Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-17 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 weekly call Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-17 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 3 0 Developing analysis spreadsheets for the claws. New versus existing and populating for all modules; some solidworks modelling Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-17 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 3 0 Start up support for belly board design by Loadmaster Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Morning board meetin' Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 general emails and items, timesheet, PTO schedule updating, developing OTC schedule Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-18 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 4.5 0 Developing analysis spreadsheets for the claws. New versus existing and populating for all modules; some solidworks modelling Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-18 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 2 0 Start up support for belly board design by Loadmaster Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Morning board meetin' Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 general emails and items, timesheet, PTO schedule updating, developing OTC schedule Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-19 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 6.5 0 Developing analysis spreadsheets for the claws. New versus existing and populating for all modules; some solidworks modelling Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Morning board meetin' Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 general emails and items, timesheet, PTO schedule updating, developing OTC schedule Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-20 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 4.5 0 Developing analysis spreadsheets for the claws. New versus existing and populating for all modules; some solidworks modelling Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Morning board meetin' Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 general emails and items, timesheet, PTO schedule updating, developing OTC schedule Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-21 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 6.5 0 Analyzing preliminary member sizes for BOP lifting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meetings, Keppel arctic jacket presentation, tsr meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Bishop Lifting representative came by office, timesheet, preparing safety moment, discussions with kyle Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-24 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-24 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 3 0 BOP Lifting arrangement drawings with blocks, developing cost estimate for block lifting of bop, secondary retention cost estimate, CofG calcs for stack Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-24 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 2 0 Reviewing of Loadmaster GA drawings, correspondence with loadmaster, preliminary handrail calcs for personnel fall arrest, responding to Loadmaster RFI Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meetings, Keppel arctic jacket presentation, tsr meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Bishop Lifting representative came by office, timesheet, preparing safety moment, discussions with kyle Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-25 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 3.5 0 BOP Lifting arrangement drawings with blocks, developing cost estimate for block lifting of bop, secondary retention cost estimate, CofG calcs for stack Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-25 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 3 0 Reviewing of Loadmaster GA drawings, correspondence with loadmaster, preliminary handrail calcs for personnel fall arrest, responding to Loadmaster RFI Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 sprint meetings, Keppel arctic jacket presentation, tsr meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Bishop Lifting representative came by office, timesheet, preparing safety moment, discussions with kyle Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-26 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 2 0 calculations DM and PB claws Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-26 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 2 0 BOP Lifting arrangement drawings with blocks, developing cost estimate for block lifting of bop, secondary retention cost estimate, CofG calcs for stack Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-26 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 0.5 0 Reviewing of Loadmaster GA drawings, correspondence with loadmaster, preliminary handrail calcs for personnel fall arrest, responding to Loadmaster RFI Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 sprint meetings, Keppel arctic jacket presentation, tsr meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Bishop Lifting representative came by office, timesheet, preparing safety moment, discussions with kyle Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Reviewing TSR-01510 closeout Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-27 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 2 0 calculations DM and PB claws Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-27 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 2 0 BOP Lifting arrangement drawings with blocks, developing cost estimate for block lifting of bop, secondary retention cost estimate, CofG calcs for stack Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-04-28 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint and TSR mtngs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, discussions with manager, discussions with HR, helping anatra with excel chart Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-01 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 OTC Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 revisiting PB stanchion tsr and determining scope and path forward to re-open; general conversations with field personnel Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-01 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 Providing site guys preliminary analysis report for all the claws Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-01 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 secondary retention study, drawing layouts and interference checks, locating documentation on 257's lift frame Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint and TSR mtngs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, discussions with manager, discussions with HR, helping anatra with excel chart Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 revisiting PB stanchion tsr and determining scope and path forward to re-open; general conversations with field personnel Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-02 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 Providing site guys preliminary analysis report for all the claws Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-02 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 4 0 secondary retention study, drawing layouts and interference checks, locating documentation on 257's lift frame Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-02 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1 0 general coordination with Loadmaster Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint and TSR mtngs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet, discussions with manager, discussions with HR, helping anatra with excel chart Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 revisiting PB stanchion tsr and determining scope and path forward to re-open; general conversations with field personnel Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-03 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 secondary retention study, drawing layouts and interference checks, locating documentation on 257's lift frame Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-03 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 0.5 0 general coordination with Loadmaster Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Sprint and TSR mtngs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, discussions with manager, discussions with HR, helping anatra with excel chart Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-04 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 OTC Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-04 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 Providing site guys preliminary analysis report for all the claws Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-04 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1 0 general coordination with Loadmaster Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint and TSR mtngs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Timesheet, discussions with manager, discussions with HR, helping anatra with excel chart Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 revisiting PB stanchion tsr and determining scope and path forward to re-open; general conversations with field personnel Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-05 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 secondary retention study, drawing layouts and interference checks, locating documentation on 257's lift frame Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-05 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1 0 general coordination with Loadmaster Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint and TSR meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 General office items, conversations with manager, and timesheet Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-08 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 Verifying with SAFI model that diagonal brace on DSM Spooler Platform can be moved higher up column; Providing reinforcement sketch for this as well Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-08 Rig 209L-TSR :Rig 209L-TSR TSR-01497-209L Increase-PB-Tubular-Storage Regular Pay N 1 0 Revising CTR for Pipe Stanchion modifications and performing analysis and sketches Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-08 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 Adding weld call-outs on the Sawyer drawings for the existing claws Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint and TSR meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 General office items, conversations with manager, and timesheet Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-09 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 4 0 Adding weld call-outs on the Sawyer drawings for the existing claws Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-09 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 2 0 Revised CTR, email to Bishop/JDneuhaus for trolley beam dimensions Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-09 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1 0 Approving/reviewing drawings, preparing Loadmaster tracking spreadsheet, conversation with Loadmaster engineering Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint and TSR meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 General office items, conversations with manager, and timesheet Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-10 Rig 209L-TSR :Rig 209L-TSR TSR-01497-209L Increase-PB-Tubular-Storage Regular Pay N 2 0 Revising CTR for Pipe Stanchion modifications and performing analysis and sketches Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-10 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 2 0 Revised CTR, email to Bishop/JDneuhaus for trolley beam dimensions Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-10 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 2 0 Approving/reviewing drawings, preparing Loadmaster tracking spreadsheet, conversation with Loadmaster engineering Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Sprint and TSR meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 General office items, conversations with manager, and timesheet Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-11 Rig 209L-TSR :Rig 209L-TSR TSR-01497-209L Increase-PB-Tubular-Storage Regular Pay N 4 0 Revising CTR for Pipe Stanchion modifications and performing analysis and sketches Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-11 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 2 0 Approving/reviewing drawings, preparing Loadmaster tracking spreadsheet, conversation with Loadmaster engineering Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-12 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meetings and tsr meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 general emails, discussions with manager and hr Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-15 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-15 Rig 209L-TSR :Rig 209L-TSR TSR-01497-209L Increase-PB-Tubular-Storage Regular Pay N 3 0 drawings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-15 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 correspondence and bop drawing review Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-15 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1 0 correspondence; status updates, reviewing belly board ifc package Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meetings and tsr meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 general emails, discussions with manager and hr Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-16 Rig 209L-TSR :Rig 209L-TSR TSR-01497-209L Increase-PB-Tubular-Storage Regular Pay N 2 0 drawings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-16 Rig 209L-TSR :Rig 209L-TSR TSR-01573-209L Wellhead Spreader Beam Regular Pay N 1 0 Spreader beam drawings and layout on cart checking for interferences Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-16 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 correspondence and bop drawing review Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-16 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 2 0 correspondence; status updates, reviewing belly board ifc package Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meetings and tsr meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 general emails, discussions with manager and hr Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-17 Rig 209L-TSR :Rig 209L-TSR TSR-01573-209L Wellhead Spreader Beam Regular Pay N 6 0 Spreader beam drawings and layout on cart checking for interferences Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 sprint meetings and tsr meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 general emails, discussions with manager and hr Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-18 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 2 0 271L tender support Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-18 Rig 209L-TSR :Rig 209L-TSR TSR-01497-209L Increase-PB-Tubular-Storage Regular Pay N 2 0 drawings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-18 Rig 209L-TSR :Rig 209L-TSR TSR-01573-209L Wellhead Spreader Beam Regular Pay N 1 0 Spreader beam drawings and layout on cart checking for interferences Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-18 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1 0 correspondence; status updates, reviewing belly board ifc package Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meetings and tsr meeting Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 general emails, discussions with manager and hr Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-19 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 4 0 271L tender support Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-19 Rig 209L-TSR :Rig 209L-TSR TSR-01573-209L Wellhead Spreader Beam Regular Pay N 1.5 0 Spreader beam drawings and layout on cart checking for interferences Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-19 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1 0 correspondence; status updates, reviewing belly board ifc package Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 general emails, received offer letter and reviewing/discussing with HR and manager, timesheet, cleaning up 7th floor documents Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-22 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-22 Rig 209L-TSR :Rig 209L-TSR TSR-01573-209L Wellhead Spreader Beam Regular Pay N 1.5 0 Drawing updates Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-22 Rig 209L-TSR :Rig 209L-TSR TSR-01574-209L Casing Push Tool Regular Pay N 2 0 Reviewing TSR; solidworks modeling; drawings with Lam; meetings with ops Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-22 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 3 0 Review analysis report and general fabrication correspondence Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 general emails, received offer letter and reviewing/discussing with HR and manager, timesheet, cleaning up 7th floor documents Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-23 Rig 209L-TSR :Rig 209L-TSR TSR-01574-209L Casing Push Tool Regular Pay N 4 0 Reviewing TSR; solidworks modeling; drawings with Lam; meetings with ops Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-23 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1 0 Review analysis report and general fabrication correspondence Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 general emails, received offer letter and reviewing/discussing with HR and manager, timesheet, cleaning up 7th floor documents Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-24 Rig 209L-TSR :Rig 209L-TSR TSR-01574-209L Casing Push Tool Regular Pay N 4 0 Reviewing TSR; solidworks modeling; drawings with Lam; meetings with ops Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-24 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 2 0 Reviewing reinforcement drawings and emails to ops Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-24 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 0.5 0 Review analysis report and general fabrication correspondence Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Sprint Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 general emails, received offer letter and reviewing/discussing with HR and manager, timesheet, cleaning up 7th floor documents Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-25 Rig 209L-TSR :Rig 209L-TSR TSR-01574-209L Casing Push Tool Regular Pay N 2 0 Reviewing TSR; solidworks modeling; drawings with Lam; meetings with ops Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-25 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 Reviewing reinforcement drawings and emails to ops Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 general emails, received offer letter and reviewing/discussing with HR and manager, timesheet, cleaning up 7th floor documents Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-26 Rig 209L-TSR :Rig 209L-TSR TSR-01574-209L Casing Push Tool Regular Pay N 4 0 Reviewing TSR; solidworks modeling; drawings with Lam; meetings with ops Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-26 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 0.5 0 Review analysis report and general fabrication correspondence Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-29 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meetings and TSR Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 General emails, discussions with HR, going to get full physical for new position, gathering documentation for LOI and VISA Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-30 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1 0 meetings, discussions with George, completing equipment list, organizing project folder, correspondence with Entro Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-30 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 2 0 Review of lam's design and discussions with lam Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-30 Rig 209L-TSR :Rig 209L-TSR TSR-01573-209L Wellhead Spreader Beam Regular Pay N 1 0 CTR Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meetings and TSR Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 General emails, discussions with HR, going to get full physical for new position, gathering documentation for LOI and VISA Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-05-31 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5.5 0 meetings, discussions with George, completing equipment list, organizing project folder, correspondence with Entro Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 sprint meetings and TSR Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 General emails, discussions with HR, going to get full physical for new position, gathering documentation for LOI and VISA Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-01 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5.5 0 meetings, discussions with George, completing equipment list, organizing project folder, correspondence with Entro Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-01 Rig 209L-TSR :Rig 209L-TSR TSR-01497-209L Increase-PB-Tubular-Storage Regular Pay N 1 0 handover material to Dan Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-01 Rig 209L-TSR :Rig 209L-TSR TSR-01574-209L Casing Push Tool Regular Pay N 1 0 put together summary report for Jeff Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meetings and TSR Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 General emails, discussions with HR, going to get full physical for new position, gathering documentation for LOI and VISA Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-02 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5 0 meetings, discussions with George, completing equipment list, organizing project folder, correspondence with Entro Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-07 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-08 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-09 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint meetings, town hall mtng, tsr mtng Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 catching up on emails, reviewing handover notes from kyle, timesheet, background screening for new position Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-12 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-12 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 4 0 review of secondary retention drawings and sending out for quote, creating mto for george Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Sprint meetings, town hall mtng, tsr mtng Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 catching up on emails, reviewing handover notes from kyle, timesheet, background screening for new position Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-13 Rig 209L-TSR :Rig 209L-TSR TSR-01497-209L Increase-PB-Tubular-Storage Regular Pay N 2 0 redline of drawings to send out for review, reviewing material per aws and mihovil's emails Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-13 Rig 209L-TSR :Rig 209L-TSR TSR-01571-209L BOP Mechanical Seal Platform Regular Pay N 2 0 review of tsr and getting dan started on rendering Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-13 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1.5 0 coordinating deliverable with supply chain and loadmaster Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-14 Hibernia Platform :Hibernia Platform TSR-01576-HIBP Top Drive Maintenance Platform Regular Pay N 1.5 0 Review of TSR and discussions with Sara and Lam Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-14 Hibernia Platform :Hibernia Platform TSR-01577-HIBP Monkey Board Handrail Assembly Regular Pay N 1.5 0 Review of TSR and discussions with Sara and Lam Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint meetings, town hall mtng, tsr mtng Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 catching up on emails, reviewing handover notes from kyle, timesheet, background screening for new position Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-14 Rig 209L-TSR :Rig 209L-TSR TSR-01497-209L Increase-PB-Tubular-Storage Regular Pay N 1 0 redline of drawings to send out for review, reviewing material per aws and mihovil's emails Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-14 Rig 209L-TSR :Rig 209L-TSR TSR-01571-209L BOP Mechanical Seal Platform Regular Pay N 1 0 review of tsr and getting dan started on rendering Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-14 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 2 0 coordinating deliverable with supply chain and loadmaster Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Sprint meetings, town hall mtng, tsr mtng Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 catching up on emails, reviewing handover notes from kyle, timesheet, background screening for new position Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-15 Rig 209L-TSR :Rig 209L-TSR TSR-01497-209L Increase-PB-Tubular-Storage Regular Pay N 1 0 redline of drawings to send out for review, reviewing material per aws and mihovil's emails Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-15 Rig 209L-TSR :Rig 209L-TSR TSR-01573-209L Wellhead Spreader Beam Regular Pay N 5 0 analysis report and c/o Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Sprint meetings, town hall mtng, tsr mtng Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-16 Rig 209L-TSR :Rig 209L-TSR TSR-01573-209L Wellhead Spreader Beam Regular Pay N 4.5 0 analysis report and c/o Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meetings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 general emails, discussions with manager, timesheet Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-19 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1.5 0 meetings regarding sub base for Cysda, modeling of sub base and cost estimate Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-19 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-19 Rig 209L-TSR :Rig 209L-TSR TSR-01573-209L Wellhead Spreader Beam Regular Pay N 1 0 closeout Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-19 Rig 209L-TSR :Rig 209L-TSR TSR-01579-209L Wireline Deflector Sheave Installation Regular Pay N 2.5 0 analysis and closeout Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-19 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 2 0 Providing and explaining paint spec to Loadmaster, general coordination with Loadmaster Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meetings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 general emails, discussions with manager, timesheet Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-20 Rig 209L-TSR :Rig 209L-TSR TSR-01579-209L Wireline Deflector Sheave Installation Regular Pay N 6.5 0 analysis and closeout Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-20 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1 0 Providing and explaining paint spec to Loadmaster, general coordination with Loadmaster Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meetings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 general emails, discussions with manager, timesheet Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-21 Rig 209L-TSR :Rig 209L-TSR TSR-01571-209L BOP Mechanical Seal Platform Regular Pay N 3 0 modeling in SAFI Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-21 Rig 209L-TSR :Rig 209L-TSR TSR-01579-209L Wireline Deflector Sheave Installation Regular Pay N 4 0 analysis and closeout Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-21 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1 0 Providing and explaining paint spec to Loadmaster, general coordination with Loadmaster Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 sprint meetings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 general emails, discussions with manager, timesheet Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-22 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 5 0 meetings regarding sub base for Cysda, modeling of sub base and cost estimate Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-22 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-22 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 Final review of secondary retention drawings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meetings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 general emails, discussions with manager, timesheet Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-23 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 2 0 meetings regarding sub base for Cysda, modeling of sub base and cost estimate Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meetings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 general emails and also getting new laptop Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-26 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 Shalapa cost estimate for HTSG Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-26 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-26 Rig 209L-TSR :Rig 209L-TSR TSR-01502-209L BOP Platform Modifications Regular Pay N 3 0 modeling in SAFI Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-26 Rig 209L-TSR :Rig 209L-TSR TSR-01574-209L Casing Push Tool Regular Pay N 1 0 drawing review Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-26 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 developing c/o Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meetings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 general emails and also getting new laptop Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-27 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1.5 0 Shalapa cost estimate for HTSG Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-27 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 4 0 coordination with fabrication, trip to Galena Park to view belly board, organizing documents Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meetings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 general emails and also getting new laptop Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-28 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 2 0 Shalapa cost estimate for HTSG Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-28 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 3 0 developing c/o Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-28 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1.5 0 coordination with fabrication, trip to Galena Park to view belly board, organizing documents Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meetings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 general emails and also getting new laptop Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-29 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 3 0 discussing control line spooler options with Jeff Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-29 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 developing c/o Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-29 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 0.5 0 coordination with fabrication, trip to Galena Park to view belly board, organizing documents Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-06-30 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-07-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-07-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-07-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meetings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-07-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 preparing items for VISA app Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-07-06 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 preparing safi training items Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-07-06 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1 0 accessing smartsheet and going through documentation Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-07-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 sprint meetings Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-07-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 preparing items for VISA app Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2017-07-07 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 preparing safi training items Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-03-13 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-03-14 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-03-15 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-03-16 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-03-17 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-03-20 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-03-21 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-03-22 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-03-23 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-03-24 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-03-27 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-03-28 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-03-29 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-03-30 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-03-31 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-04-03 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-04-04 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-04-05 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-04-06 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-04-07 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-04-10 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-04-11 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-04-12 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-04-13 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-04-14 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-04-17 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-04-18 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-04-19 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-04-20 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-04-21 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-04-24 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-04-25 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-04-26 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-04-27 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-04-28 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-05-01 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-05-02 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-05-03 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-05-04 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-05-05 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-05-15 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-05-16 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-05-17 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-05-18 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-05-19 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-05-22 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-05-23 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-05-24 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-05-25 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-05-26 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-05-29 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-05-30 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-05-31 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-06-01 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-06-02 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-06-26 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-06-27 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-06-28 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-06-29 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-06-30 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-07-03 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-07-04 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-07-05 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-07-06 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Connolly, Jason Operations Supervisor Connolly, Jason:Operations Supervisor 2017-07-07 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-02-13 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-02-14 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-02-15 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-02-16 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-02-17 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-02-20 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-02-21 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-02-22 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-02-23 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-02-24 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-02-27 2M-TEK :2M-TEK -OH-003 PTO Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-02-28 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-03-01 2M-TEK :2M-TEK -OH-003 PTO Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-03-02 2M-TEK :2M-TEK -OH-003 PTO Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-03-03 2M-TEK :2M-TEK -OH-003 PTO Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-03-06 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-03-07 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-03-08 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-03-09 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-03-10 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-03-13 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-03-14 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-03-15 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-03-16 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-03-17 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-03-20 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-03-21 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-03-22 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-03-23 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-03-24 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-03-27 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-03-28 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-03-29 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-03-30 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-03-31 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-04-03 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-04-04 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-04-05 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-04-06 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-04-07 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-04-10 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-04-11 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-04-12 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-04-13 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-04-17 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-04-18 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-04-19 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-04-20 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-04-21 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-04-24 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-04-25 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-04-26 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-04-27 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-04-28 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-05-01 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-05-02 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-05-03 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-05-04 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-05-10 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-05-11 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-05-12 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-05-15 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-05-16 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-05-17 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-05-18 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-05-19 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-05-22 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-05-23 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-05-24 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-05-25 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-05-26 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-05-30 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-05-31 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-06-01 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-06-02 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-06-05 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-06-06 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-06-07 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-06-08 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-06-09 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-06-12 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-06-13 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-06-14 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-06-15 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 CONNOLLY, Lisa Operations Support Specialist LISAC CONNOLLY, Lisa:Operations Support Specialist 2017-06-16 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-02-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-02-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-02-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-02-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-02-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-02-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-02-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-02-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-02-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-02-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-02-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-02-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-05 OH-010 :OH-010 Overhead All Activities Regular Pay N 19 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-17 OH-010 :OH-010 Overhead All Activities Regular Pay N 14 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-18 OH-010 :OH-010 Overhead All Activities Regular Pay N 11 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-29 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-03-31 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-04-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-04-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-04-05 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-04-06 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-04-07 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-04-10 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-04-11 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-04-12 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-04-13 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-04-14 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-04-17 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-04-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-04-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-04-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-04-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-04-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-04-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-04-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-04-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-04-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-05-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-05-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-05-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-05-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-05-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-05-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-05-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-05-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-05-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-05-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-05-21 OH-010 :OH-010 Overhead All Activities Regular Pay N 12 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-05-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-05-22 OH-010 :OH-010 Overhead All Activities Regular Pay N 9 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-05-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 10 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-05-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-05-24 OH-010 :OH-010 Overhead All Activities Regular Pay N 12 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-05-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-05-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-05-29 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-05-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-05-31 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-06-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-06-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-06-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-06-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-06-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-06-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-06-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-06-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-06-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-06-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-06-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-06-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-06-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-06-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-06-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-06-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-06-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-06-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-06-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-06-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-06-29 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-06-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-08-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-08-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-08-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-08-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-08-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-08-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-08-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-08-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-08-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-08-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-08-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-08-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-08-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-08-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-08-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-08-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-08-29 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-08-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-08-31 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-09-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-09-04 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-09-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-09-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-09-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-09-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-09-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-09-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-09-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-09-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-09-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-09-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-09-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-09-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-09-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-09-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-09-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-09-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-09-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-09-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-09-29 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-10-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-10-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-10-04 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-10-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-10-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-10-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-10-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-10-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-10-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-10-26 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-10-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-10-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-10-31 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-11-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-11-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-11-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-11-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-11-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-11-08 OH-002 :OH-002 Overhead All Activities Regular Pay N 8 0 Father in law funeral Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-11-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-11-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-11-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-11-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-11-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-11-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-11-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-11-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-11-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-11-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-11-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-11-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-11-26 OH-010 :OH-010 Overhead All Activities Regular Pay N 22 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-11-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-11-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-11-29 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-11-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-12-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-12-01 OH-010 :OH-010 Overhead All Activities Regular Pay N 10 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-12-02 OH-010 :OH-010 Overhead All Activities Regular Pay N 14 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-12-04 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-12-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-12-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-12-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-12-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-12-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-12-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-12-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-12-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2017-12-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 4 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-14 OH-010 :OH-010 Overhead All Activities Regular Pay N 20 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-21 OH-010 :OH-010 Overhead All Activities Regular Pay N 6 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-22 OH-010 :OH-010 Overhead All Activities Regular Pay N 16 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-01-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-02-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-02-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-02-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-02-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-02-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-02-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-02-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-03-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-03-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-03-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-03-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-03-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 Corse, Ian Sr. Electrical Engineer Corse, Ian:Sr. Electrical Engineer 2018-03-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-02-13 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 4.5 0 2/13 worked on email responses for thru-tubing and open hole apps. 2/13 worked on jar request per Ranju's email request. 2/13 start to review jar drawing request for 6-3/4 Jar project. 2/14 Email inquiries regarding casing exit projects thru tubing. 2/14 time spent reviewing details for 6-3/4" jar design. 2/15 Email regarding APAC proj. work. 2/15 Email regarding Packer whip project work. 2/15 work applied to NCR mills in Dubai 2/15 working on references for 6-1/2 jars with 2-3/4" bores. 2/16 NCR mills (IF conns)-working on project tasks. 2/16 Working on 6-1/2" Drill jars per emails from Ranju. 2/16 Conf. call with Arturo and co. to discuss objectives to resolve NCR for mills (w/ IF conns). 2/17 Cont'd support on 6-1/2 " Drill Jars. 2/17 Conference call with Ranju regarding 6-1/2" Drill jars. 2/17 Emails with Arturo on Casing exit projects. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-02-13 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 3.5 0 2/13 Met with Arturo on Casing exit projects and thru tubing email requests. 2/13 unboxed contents in new office space. 2/13 worked with setting up new time sheet entries. 2/16 office admin 2/17 office admin Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-02-14 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 4 0 2/13 worked on email responses for thru-tubing and open hole apps. 2/13 worked on jar request per Ranju's email request. 2/13 start to review jar drawing request for 6-3/4 Jar project. 2/14 Email inquiries regarding casing exit projects thru tubing. 2/14 time spent reviewing details for 6-3/4" jar design. 2/15 Email regarding APAC proj. work. 2/15 Email regarding Packer whip project work. 2/15 work applied to NCR mills in Dubai 2/15 working on references for 6-1/2 jars with 2-3/4" bores. 2/16 NCR mills (IF conns)-working on project tasks. 2/16 Working on 6-1/2" Drill jars per emails from Ranju. 2/16 Conf. call with Arturo and co. to discuss objectives to resolve NCR for mills (w/ IF conns). 2/17 Cont'd support on 6-1/2 " Drill Jars. 2/17 Conference call with Ranju regarding 6-1/2" Drill jars. 2/17 Emails with Arturo on Casing exit projects. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-02-14 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 4 0 PTO - 4 hrs Tuesday afternoon. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-02-15 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 8.5 0 2/13 worked on email responses for thru-tubing and open hole apps. 2/13 worked on jar request per Ranju's email request. 2/13 start to review jar drawing request for 6-3/4 Jar project. 2/14 Email inquiries regarding casing exit projects thru tubing. 2/14 time spent reviewing details for 6-3/4" jar design. 2/15 Email regarding APAC proj. work. 2/15 Email regarding Packer whip project work. 2/15 work applied to NCR mills in Dubai 2/15 working on references for 6-1/2 jars with 2-3/4" bores. 2/16 NCR mills (IF conns)-working on project tasks. 2/16 Working on 6-1/2" Drill jars per emails from Ranju. 2/16 Conf. call with Arturo and co. to discuss objectives to resolve NCR for mills (w/ IF conns). 2/17 Cont'd support on 6-1/2 " Drill Jars. 2/17 Conference call with Ranju regarding 6-1/2" Drill jars. 2/17 Emails with Arturo on Casing exit projects. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-02-16 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7.5 0 2/13 worked on email responses for thru-tubing and open hole apps. 2/13 worked on jar request per Ranju's email request. 2/13 start to review jar drawing request for 6-3/4 Jar project. 2/14 Email inquiries regarding casing exit projects thru tubing. 2/14 time spent reviewing details for 6-3/4" jar design. 2/15 Email regarding APAC proj. work. 2/15 Email regarding Packer whip project work. 2/15 work applied to NCR mills in Dubai 2/15 working on references for 6-1/2 jars with 2-3/4" bores. 2/16 NCR mills (IF conns)-working on project tasks. 2/16 Working on 6-1/2" Drill jars per emails from Ranju. 2/16 Conf. call with Arturo and co. to discuss objectives to resolve NCR for mills (w/ IF conns). 2/17 Cont'd support on 6-1/2 " Drill Jars. 2/17 Conference call with Ranju regarding 6-1/2" Drill jars. 2/17 Emails with Arturo on Casing exit projects. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-02-16 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 2/13 Met with Arturo on Casing exit projects and thru tubing email requests. 2/13 unboxed contents in new office space. 2/13 worked with setting up new time sheet entries. 2/16 office admin 2/17 office admin Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-02-17 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6 0 2/13 worked on email responses for thru-tubing and open hole apps. 2/13 worked on jar request per Ranju's email request. 2/13 start to review jar drawing request for 6-3/4 Jar project. 2/14 Email inquiries regarding casing exit projects thru tubing. 2/14 time spent reviewing details for 6-3/4" jar design. 2/15 Email regarding APAC proj. work. 2/15 Email regarding Packer whip project work. 2/15 work applied to NCR mills in Dubai 2/15 working on references for 6-1/2 jars with 2-3/4" bores. 2/16 NCR mills (IF conns)-working on project tasks. 2/16 Working on 6-1/2" Drill jars per emails from Ranju. 2/16 Conf. call with Arturo and co. to discuss objectives to resolve NCR for mills (w/ IF conns). 2/17 Cont'd support on 6-1/2 " Drill Jars. 2/17 Conference call with Ranju regarding 6-1/2" Drill jars. 2/17 Emails with Arturo on Casing exit projects. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-02-17 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 2/13 Met with Arturo on Casing exit projects and thru tubing email requests. 2/13 unboxed contents in new office space. 2/13 worked with setting up new time sheet entries. 2/16 office admin 2/17 office admin Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-02-20 ITS -NON TSR :ITS -NON TSR -OH-004 Holiday Regular Pay N 8 0 2/19 President's Day Holiday Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-02-21 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 8 0 2/20 PTO Tuesday 2/21 PTO Wednesday Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-02-22 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 8 0 2/20 PTO Tuesday 2/21 PTO Wednesday Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-02-23 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 2/23 Spent time (4 hrs.) with casing exit support - MVS redress kit. 2/23 Spent time (3 hrs.) with Drilling jars. 2/24 Spent time (3.5 hrs.) supporting casing exit issues with Arturo. 2/24 Spent time (3.5 hrs) reviewing seals for 6-3/4" Jar - inner components and submitting additional details to Ranju via email. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-02-23 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 2/23 Office admin 2/24 Office admin Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-02-24 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 2/23 Spent time (4 hrs.) with casing exit support - MVS redress kit. 2/23 Spent time (3 hrs.) with Drilling jars. 2/24 Spent time (3.5 hrs.) supporting casing exit issues with Arturo. 2/24 Spent time (3.5 hrs) reviewing seals for 6-3/4" Jar - inner components and submitting additional details to Ranju via email. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-02-24 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 2/23 Office admin 2/24 Office admin Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-02-27 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 2/27 conf call with Ranju - 6-3/4" jar. 2/27 weld details 1018 to 1018 2/27 start checking drawings : 055-A-011 (f/5-1/2" casing). 2/28 Met with Irvin to review the modified features/ O-rings required for internal components for 6-3/4 Jar. 3/02 checked print for 4-1/4" dia. concave 055-A-011. 3/02 Began review on check prints for 133-A-A03 and A05. 3/03 Provided check prints for 13-3/8" casing to Dan S. ; some adjustments made to anchor assembly as well. 3/03 Start to review the 6-1/2 jar incident NCR 001/2017. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-02-27 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 2/26 Proj meeting and office admin. 2/28 address the TSR request for Joshua. 3/01 Addressed the commercial invoice for tools going to Abu Dhabi with Joshua and Rob. 3/02 verified the docs for 13-3/8" for the Far East. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-02-28 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 2/27 conf call with Ranju - 6-3/4" jar. 2/27 weld details 1018 to 1018 2/27 start checking drawings : 055-A-011 (f/5-1/2" casing). 2/28 Met with Irvin to review the modified features/ O-rings required for internal components for 6-3/4 Jar. 3/02 checked print for 4-1/4" dia. concave 055-A-011. 3/02 Began review on check prints for 133-A-A03 and A05. 3/03 Provided check prints for 13-3/8" casing to Dan S. ; some adjustments made to anchor assembly as well. 3/03 Start to review the 6-1/2 jar incident NCR 001/2017. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-02-28 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 2/26 Proj meeting and office admin. 2/28 address the TSR request for Joshua. 3/01 Addressed the commercial invoice for tools going to Abu Dhabi with Joshua and Rob. 3/02 verified the docs for 13-3/8" for the Far East. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-01 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 2/27 conf call with Ranju - 6-3/4" jar. 2/27 weld details 1018 to 1018 2/27 start checking drawings : 055-A-011 (f/5-1/2" casing). 2/28 Met with Irvin to review the modified features/ O-rings required for internal components for 6-3/4 Jar. 3/02 checked print for 4-1/4" dia. concave 055-A-011. 3/02 Began review on check prints for 133-A-A03 and A05. 3/03 Provided check prints for 13-3/8" casing to Dan S. ; some adjustments made to anchor assembly as well. 3/03 Start to review the 6-1/2 jar incident NCR 001/2017. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-01 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 2/26 Proj meeting and office admin. 2/28 address the TSR request for Joshua. 3/01 Addressed the commercial invoice for tools going to Abu Dhabi with Joshua and Rob. 3/02 verified the docs for 13-3/8" for the Far East. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-02 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 5.5 0 2/27 conf call with Ranju - 6-3/4" jar. 2/27 weld details 1018 to 1018 2/27 start checking drawings : 055-A-011 (f/5-1/2" casing). 2/28 Met with Irvin to review the modified features/ O-rings required for internal components for 6-3/4 Jar. 3/02 checked print for 4-1/4" dia. concave 055-A-011. 3/02 Began review on check prints for 133-A-A03 and A05. 3/03 Provided check prints for 13-3/8" casing to Dan S. ; some adjustments made to anchor assembly as well. 3/03 Start to review the 6-1/2 jar incident NCR 001/2017. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-02 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 2 0 2/26 Proj meeting and office admin. 2/28 address the TSR request for Joshua. 3/01 Addressed the commercial invoice for tools going to Abu Dhabi with Joshua and Rob. 3/02 verified the docs for 13-3/8" for the Far East. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-03 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7.5 0 2/27 conf call with Ranju - 6-3/4" jar. 2/27 weld details 1018 to 1018 2/27 start checking drawings : 055-A-011 (f/5-1/2" casing). 2/28 Met with Irvin to review the modified features/ O-rings required for internal components for 6-3/4 Jar. 3/02 checked print for 4-1/4" dia. concave 055-A-011. 3/02 Began review on check prints for 133-A-A03 and A05. 3/03 Provided check prints for 13-3/8" casing to Dan S. ; some adjustments made to anchor assembly as well. 3/03 Start to review the 6-1/2 jar incident NCR 001/2017. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-03 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 2/26 Proj meeting and office admin. 2/28 address the TSR request for Joshua. 3/01 Addressed the commercial invoice for tools going to Abu Dhabi with Joshua and Rob. 3/02 verified the docs for 13-3/8" for the Far East. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-06 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6 0 3/06 6-1/2 Jar time delay issues under review - (Ranju - request) 3/06 working on Casing Exit Mill repair. 3/07 6-3/4 Jar component dwg. under review 3/07 Completed Casing Exit Mill repair and submitted out to team for NCR closure. 3/08 completed jar component details provided by Irvin. 3/08 Reviewed some welding details per Joshua. 3/09 Jar support - 6 3/4, providing mod details worked on by Irvin to Ranju. 3/09 Dan and I discussed ECN issues regarding anchor parts for the 13 3/8" casing size. 3/10 Drilling jar support to 6-3/4 Jar Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-06 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 2 0 3/06 Eng. weekly meeting 3/07 Meeting on Jar time delay issue 3/08 Meeting with HR - James Yaw. 3/09 admin details - James Yaw (HR) 3/10 admin Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-07 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6 0 3/06 6-1/2 Jar time delay issues under review - (Ranju - request) 3/06 working on Casing Exit Mill repair. 3/07 6-3/4 Jar component dwg. under review 3/07 Completed Casing Exit Mill repair and submitted out to team for NCR closure. 3/08 completed jar component details provided by Irvin. 3/08 Reviewed some welding details per Joshua. 3/09 Jar support - 6 3/4, providing mod details worked on by Irvin to Ranju. 3/09 Dan and I discussed ECN issues regarding anchor parts for the 13 3/8" casing size. 3/10 Drilling jar support to 6-3/4 Jar Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-07 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 2 0 3/06 Eng. weekly meeting 3/07 Meeting on Jar time delay issue 3/08 Meeting with HR - James Yaw. 3/09 admin details - James Yaw (HR) 3/10 admin Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-08 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 3/06 6-1/2 Jar time delay issues under review - (Ranju - request) 3/06 working on Casing Exit Mill repair. 3/07 6-3/4 Jar component dwg. under review 3/07 Completed Casing Exit Mill repair and submitted out to team for NCR closure. 3/08 completed jar component details provided by Irvin. 3/08 Reviewed some welding details per Joshua. 3/09 Jar support - 6 3/4, providing mod details worked on by Irvin to Ranju. 3/09 Dan and I discussed ECN issues regarding anchor parts for the 13 3/8" casing size. 3/10 Drilling jar support to 6-3/4 Jar Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-08 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 3/06 Eng. weekly meeting 3/07 Meeting on Jar time delay issue 3/08 Meeting with HR - James Yaw. 3/09 admin details - James Yaw (HR) 3/10 admin Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-09 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 3/06 6-1/2 Jar time delay issues under review - (Ranju - request) 3/06 working on Casing Exit Mill repair. 3/07 6-3/4 Jar component dwg. under review 3/07 Completed Casing Exit Mill repair and submitted out to team for NCR closure. 3/08 completed jar component details provided by Irvin. 3/08 Reviewed some welding details per Joshua. 3/09 Jar support - 6 3/4, providing mod details worked on by Irvin to Ranju. 3/09 Dan and I discussed ECN issues regarding anchor parts for the 13 3/8" casing size. 3/10 Drilling jar support to 6-3/4 Jar Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-09 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 3/06 Eng. weekly meeting 3/07 Meeting on Jar time delay issue 3/08 Meeting with HR - James Yaw. 3/09 admin details - James Yaw (HR) 3/10 admin Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-10 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 3/06 6-1/2 Jar time delay issues under review - (Ranju - request) 3/06 working on Casing Exit Mill repair. 3/07 6-3/4 Jar component dwg. under review 3/07 Completed Casing Exit Mill repair and submitted out to team for NCR closure. 3/08 completed jar component details provided by Irvin. 3/08 Reviewed some welding details per Joshua. 3/09 Jar support - 6 3/4, providing mod details worked on by Irvin to Ranju. 3/09 Dan and I discussed ECN issues regarding anchor parts for the 13 3/8" casing size. 3/10 Drilling jar support to 6-3/4 Jar Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-10 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 3/06 Eng. weekly meeting 3/07 Meeting on Jar time delay issue 3/08 Meeting with HR - James Yaw. 3/09 admin details - James Yaw (HR) 3/10 admin Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-13 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6 0 3/13Jar/Energizer support 3/13(Ranju), Meeting held to discuss drawing package for 6-3/4 Jar Mods. 3/13Meeting to discuss Engineering tasks. 3/14Email support to Ranju - Energizer details for 6-1/2 and 9-1/2 Energizers. 3/14Email support to Ranju - 9-1/2 Jar Inspection. 3/14Casing Exit support to Adrian Nicolescu. 3/14Casing Exit support - Flex joint (Mfg. @ 2M-TEK) 3/13hipstock discussion - 7-5/8" casing and misc Whipstock assembly types. 3/15 resolved flex joint issue with MFG. 3/15 meeting to discuss 7-5/8 project timeline. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-13 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 2 0 3/13 Admin - PTO acct resolved. 3/13 Admin 3/15 Admin Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-14 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 3/13Jar/Energizer support 3/13(Ranju), Meeting held to discuss drawing package for 6-3/4 Jar Mods. 3/13Meeting to discuss Engineering tasks. 3/14Email support to Ranju - Energizer details for 6-1/2 and 9-1/2 Energizers. 3/14Email support to Ranju - 9-1/2 Jar Inspection. 3/14Casing Exit support to Adrian Nicolescu. 3/14Casing Exit support - Flex joint (Mfg. @ 2M-TEK) 3/13hipstock discussion - 7-5/8" casing and misc Whipstock assembly types. 3/15 resolved flex joint issue with MFG. 3/15 meeting to discuss 7-5/8 project timeline. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-15 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 3 0 3/13Jar/Energizer support 3/13(Ranju), Meeting held to discuss drawing package for 6-3/4 Jar Mods. 3/13Meeting to discuss Engineering tasks. 3/14Email support to Ranju - Energizer details for 6-1/2 and 9-1/2 Energizers. 3/14Email support to Ranju - 9-1/2 Jar Inspection. 3/14Casing Exit support to Adrian Nicolescu. 3/14Casing Exit support - Flex joint (Mfg. @ 2M-TEK) 3/13hipstock discussion - 7-5/8" casing and misc Whipstock assembly types. 3/15 resolved flex joint issue with MFG. 3/15 meeting to discuss 7-5/8 project timeline. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-15 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 3/13 Admin - PTO acct resolved. 3/13 Admin 3/15 Admin Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-15 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 4 0 Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-16 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 8 0 Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-17 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 8 0 Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-20 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 3/20 Meeting with Ranju and India Team to discuss 6-3/4 Drilling Jar design package. 3/20 Engineering met with Joshua to discuss timetable for 7-5/8" MET design. 3/20 Irvin and I met with Andrew to discuss new MGT. structure and general projects. 3/20 Eng. team met with Joshua to discuss weekly objectives. 3/21 start work Eng. project scope (6 mons). 3/21Jar support to Ranju 3/21 Irvin and I discussed supplier master list with Joshua. 3/22 Naming convention meeting with Eng. team and Joshua. 3/22 cont. work with Eng. project scope (6 mons.) 3/24 Jar inspection details Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-20 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 3/20 Admin 3/20 Close out TRS 1476 3/21 Admin - HR request 3/22 Admin 3/24 Admin Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-21 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 3/20 Meeting with Ranju and India Team to discuss 6-3/4 Drilling Jar design package. 3/20 Engineering met with Joshua to discuss timetable for 7-5/8" MET design. 3/20 Irvin and I met with Andrew to discuss new MGT. structure and general projects. 3/20 Eng. team met with Joshua to discuss weekly objectives. 3/21 start work Eng. project scope (6 mons). 3/21Jar support to Ranju 3/21 Irvin and I discussed supplier master list with Joshua. 3/22 Naming convention meeting with Eng. team and Joshua. 3/22 cont. work with Eng. project scope (6 mons.) 3/24 Jar inspection details Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-21 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 3/20 Admin 3/20 Close out TRS 1476 3/21 Admin - HR request 3/22 Admin 3/24 Admin Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-22 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 3/20 Meeting with Ranju and India Team to discuss 6-3/4 Drilling Jar design package. 3/20 Engineering met with Joshua to discuss timetable for 7-5/8" MET design. 3/20 Irvin and I met with Andrew to discuss new MGT. structure and general projects. 3/20 Eng. team met with Joshua to discuss weekly objectives. 3/21 start work Eng. project scope (6 mons). 3/21Jar support to Ranju 3/21 Irvin and I discussed supplier master list with Joshua. 3/22 Naming convention meeting with Eng. team and Joshua. 3/22 cont. work with Eng. project scope (6 mons.) 3/24 Jar inspection details Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-22 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 3/20 Admin 3/20 Close out TRS 1476 3/21 Admin - HR request 3/22 Admin 3/24 Admin Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-23 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 8 0 3/23 1 DAY PTO 3/24 1/2 DAY PTO Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-24 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 2.5 0 3/20 Meeting with Ranju and India Team to discuss 6-3/4 Drilling Jar design package. 3/20 Engineering met with Joshua to discuss timetable for 7-5/8" MET design. 3/20 Irvin and I met with Andrew to discuss new MGT. structure and general projects. 3/20 Eng. team met with Joshua to discuss weekly objectives. 3/21 start work Eng. project scope (6 mons). 3/21Jar support to Ranju 3/21 Irvin and I discussed supplier master list with Joshua. 3/22 Naming convention meeting with Eng. team and Joshua. 3/22 cont. work with Eng. project scope (6 mons.) 3/24 Jar inspection details Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-24 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 3/20 Admin 3/20 Close out TRS 1476 3/21 Admin - HR request 3/22 Admin 3/24 Admin Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-24 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 4 0 3/23 1 DAY PTO 3/24 1/2 DAY PTO Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-27 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 3/27 Meeting with Ranju and India Team to discuss 6-3/4 Drilling Jar design package with global team. 3/27 Engineering met with Andrew to discuss timetable for Proj work and Oracle/QC project work for RnS drawings. 3/28 Energizer Project work 3/30 Met with Tech serv. for handoff details. 3/31 Start 4-3/4 Jar review and round up for Ranju. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-27 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 3/27 Admin 3/29 Admin 3/30 Admin 3/31 Admin Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-28 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 3/27 Meeting with Ranju and India Team to discuss 6-3/4 Drilling Jar design package with global team. 3/27 Engineering met with Andrew to discuss timetable for Proj work and Oracle/QC project work for RnS drawings. 3/28 Energizer Project work 3/30 Met with Tech serv. for handoff details. 3/31 Start 4-3/4 Jar review and round up for Ranju. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-29 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 3/27 Meeting with Ranju and India Team to discuss 6-3/4 Drilling Jar design package with global team. 3/27 Engineering met with Andrew to discuss timetable for Proj work and Oracle/QC project work for RnS drawings. 3/28 Energizer Project work 3/30 Met with Tech serv. for handoff details. 3/31 Start 4-3/4 Jar review and round up for Ranju. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-29 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 3/27 Admin 3/29 Admin 3/30 Admin 3/31 Admin Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-30 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 3/27 Meeting with Ranju and India Team to discuss 6-3/4 Drilling Jar design package with global team. 3/27 Engineering met with Andrew to discuss timetable for Proj work and Oracle/QC project work for RnS drawings. 3/28 Energizer Project work 3/30 Met with Tech serv. for handoff details. 3/31 Start 4-3/4 Jar review and round up for Ranju. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-30 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 3/27 Admin 3/29 Admin 3/30 Admin 3/31 Admin Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-31 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 3/27 Meeting with Ranju and India Team to discuss 6-3/4 Drilling Jar design package with global team. 3/27 Engineering met with Andrew to discuss timetable for Proj work and Oracle/QC project work for RnS drawings. 3/28 Energizer Project work 3/30 Met with Tech serv. for handoff details. 3/31 Start 4-3/4 Jar review and round up for Ranju. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-03-31 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 3/27 Admin 3/29 Admin 3/30 Admin 3/31 Admin Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-03 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 4/03 QC support - Deepak (Dubai) 4/03 BOM Master 4/04 provided support to QC Dubai - Deepak 4/05 Jar support to Ranju - conference call 4/06 Casing Exit field support - 7" x 26.0# Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-03 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 4/03 Admin 4/04 Admin 4/05 Admin 4/06 Admin Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-04 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 4/03 QC support - Deepak (Dubai) 4/03 BOM Master 4/04 provided support to QC Dubai - Deepak 4/05 Jar support to Ranju - conference call 4/06 Casing Exit field support - 7" x 26.0# Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-04 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 4/03 Admin 4/04 Admin 4/05 Admin 4/06 Admin Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-05 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 4/03 QC support - Deepak (Dubai) 4/03 BOM Master 4/04 provided support to QC Dubai - Deepak 4/05 Jar support to Ranju - conference call 4/06 Casing Exit field support - 7" x 26.0# Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-05 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 4/03 Admin 4/04 Admin 4/05 Admin 4/06 Admin Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-06 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 4/03 QC support - Deepak (Dubai) 4/03 BOM Master 4/04 provided support to QC Dubai - Deepak 4/05 Jar support to Ranju - conference call 4/06 Casing Exit field support - 7" x 26.0# Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-06 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 4/03 Admin 4/04 Admin 4/05 Admin 4/06 Admin Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-07 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 8 0 4/07 PTO Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-10 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 4/10 provide Eng. support to QC Dubai (Deepak) 4/10 Eng. support - Conf. call for 6-3/4" Jars 4/11 Eng. support to ITS- India (Packer Whipstock app inside 9-5/8" x 40.0 lb. casing) 4/12 Provided Eng. support to Sam Yang (Best Win Energy) - Future Hyd. Whipstock app inside 9-5/8" x 40.0 lb. casing. 4/13 Support to Lisa (2M-TEK) 4/13 Support to Sam Yang (Best Win Energy) - Shim details for fulcrum pad (9-5/8" casing app.) Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-10 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 4/10 Admin. 4/11 Admin. 4/13 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-11 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 4/10 provide Eng. support to QC Dubai (Deepak) 4/10 Eng. support - Conf. call for 6-3/4" Jars 4/11 Eng. support to ITS- India (Packer Whipstock app inside 9-5/8" x 40.0 lb. casing) 4/12 Provided Eng. support to Sam Yang (Best Win Energy) - Future Hyd. Whipstock app inside 9-5/8" x 40.0 lb. casing. 4/13 Support to Lisa (2M-TEK) 4/13 Support to Sam Yang (Best Win Energy) - Shim details for fulcrum pad (9-5/8" casing app.) Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-11 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 4/10 Admin. 4/11 Admin. 4/13 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-12 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6 0 4/10 provide Eng. support to QC Dubai (Deepak) 4/10 Eng. support - Conf. call for 6-3/4" Jars 4/11 Eng. support to ITS- India (Packer Whipstock app inside 9-5/8" x 40.0 lb. casing) 4/12 Provided Eng. support to Sam Yang (Best Win Energy) - Future Hyd. Whipstock app inside 9-5/8" x 40.0 lb. casing. 4/13 Support to Lisa (2M-TEK) 4/13 Support to Sam Yang (Best Win Energy) - Shim details for fulcrum pad (9-5/8" casing app.) Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-12 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 2 0 4/10 Admin. 4/11 Admin. 4/13 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-13 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 4/10 provide Eng. support to QC Dubai (Deepak) 4/10 Eng. support - Conf. call for 6-3/4" Jars 4/11 Eng. support to ITS- India (Packer Whipstock app inside 9-5/8" x 40.0 lb. casing) 4/12 Provided Eng. support to Sam Yang (Best Win Energy) - Future Hyd. Whipstock app inside 9-5/8" x 40.0 lb. casing. 4/13 Support to Lisa (2M-TEK) 4/13 Support to Sam Yang (Best Win Energy) - Shim details for fulcrum pad (9-5/8" casing app.) Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-13 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 4/10 Admin. 4/11 Admin. 4/13 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-14 ITS -NON TSR :ITS -NON TSR -OH-004 Holiday Regular Pay N 8 0 4/14 Good Friday - Holiday Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-17 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 8 0 4/17 PTO 4/18 PTO Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-18 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 8 0 4/17 PTO 4/18 PTO Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-19 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 4/19 Tech support to BestWin (Sam Yang) - 9-5/8" csg 4/19 Ref: BestWin apps, support to Renato. 4/20 Provided ring gauge support to Jason C. for 12.25 mills. 4/20 Seal review for 6-3/4 Jar from MaxSpare Limited. 4/21 Provided details for Trip pin/ anchor mods for 13-3/8" csg. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-19 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 4/19 Admin 4/20 Admin. 4/21 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-20 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 4/19 Tech support to BestWin (Sam Yang) - 9-5/8" csg 4/19 Ref: BestWin apps, support to Renato. 4/20 Provided ring gauge support to Jason C. for 12.25 mills. 4/20 Seal review for 6-3/4 Jar from MaxSpare Limited. 4/21 Provided details for Trip pin/ anchor mods for 13-3/8" csg. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-20 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 4/19 Admin 4/20 Admin. 4/21 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-21 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 4/19 Tech support to BestWin (Sam Yang) - 9-5/8" csg 4/19 Ref: BestWin apps, support to Renato. 4/20 Provided ring gauge support to Jason C. for 12.25 mills. 4/20 Seal review for 6-3/4 Jar from MaxSpare Limited. 4/21 Provided details for Trip pin/ anchor mods for 13-3/8" csg. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-21 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 4/19 Admin 4/20 Admin. 4/21 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-24 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 4/24 Engineering in Conf. call regarding Seals for 6-3/4 in Jars. 4/24 Engineering in Conf call with Andrew (2M-TEK) over Oracle/BOM/Item master 4/25 13-3/8 csg. - Concave detail support to 2M-TEK. 4/25 Seal detail prep work to vendor for 6-3/4 in Jars. 4/26 Prep work on details for Mill/Whip features for 9-5/8 csg 4/27 Spoke with Andrew from 2M-TEK. 4/27 Met with Arturo Perez 4/27 Submitted email to seal vendor /Amit for responses regarding list of questions. 4/28 worked with request for Best Win regarding app inside 9-5/8" casing Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-24 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 4/24 Admin. 4/25 Admin. 4/26 Admin. 4/28 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-25 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 4/24 Engineering in Conf. call regarding Seals for 6-3/4 in Jars. 4/24 Engineering in Conf call with Andrew (2M-TEK) over Oracle/BOM/Item master 4/25 13-3/8 csg. - Concave detail support to 2M-TEK. 4/25 Seal detail prep work to vendor for 6-3/4 in Jars. 4/26 Prep work on details for Mill/Whip features for 9-5/8 csg 4/27 Spoke with Andrew from 2M-TEK. 4/27 Met with Arturo Perez 4/27 Submitted email to seal vendor /Amit for responses regarding list of questions. 4/28 worked with request for Best Win regarding app inside 9-5/8" casing Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-25 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 4/24 Admin. 4/25 Admin. 4/26 Admin. 4/28 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-26 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 4/24 Engineering in Conf. call regarding Seals for 6-3/4 in Jars. 4/24 Engineering in Conf call with Andrew (2M-TEK) over Oracle/BOM/Item master 4/25 13-3/8 csg. - Concave detail support to 2M-TEK. 4/25 Seal detail prep work to vendor for 6-3/4 in Jars. 4/26 Prep work on details for Mill/Whip features for 9-5/8 csg 4/27 Spoke with Andrew from 2M-TEK. 4/27 Met with Arturo Perez 4/27 Submitted email to seal vendor /Amit for responses regarding list of questions. 4/28 worked with request for Best Win regarding app inside 9-5/8" casing Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-26 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 4/24 Admin. 4/25 Admin. 4/26 Admin. 4/28 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-27 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 4/24 Engineering in Conf. call regarding Seals for 6-3/4 in Jars. 4/24 Engineering in Conf call with Andrew (2M-TEK) over Oracle/BOM/Item master 4/25 13-3/8 csg. - Concave detail support to 2M-TEK. 4/25 Seal detail prep work to vendor for 6-3/4 in Jars. 4/26 Prep work on details for Mill/Whip features for 9-5/8 csg 4/27 Spoke with Andrew from 2M-TEK. 4/27 Met with Arturo Perez 4/27 Submitted email to seal vendor /Amit for responses regarding list of questions. 4/28 worked with request for Best Win regarding app inside 9-5/8" casing Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-28 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 4/24 Engineering in Conf. call regarding Seals for 6-3/4 in Jars. 4/24 Engineering in Conf call with Andrew (2M-TEK) over Oracle/BOM/Item master 4/25 13-3/8 csg. - Concave detail support to 2M-TEK. 4/25 Seal detail prep work to vendor for 6-3/4 in Jars. 4/26 Prep work on details for Mill/Whip features for 9-5/8 csg 4/27 Spoke with Andrew from 2M-TEK. 4/27 Met with Arturo Perez 4/27 Submitted email to seal vendor /Amit for responses regarding list of questions. 4/28 worked with request for Best Win regarding app inside 9-5/8" casing Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-04-28 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 4/24 Admin. 4/25 Admin. 4/26 Admin. 4/28 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-01 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 5/1 supported 6-1/2' Drilling jar project. 5/1 cont'd work on 9-5/8" app for Best Win. 5/2 Supported Sam Yang (Best Win) with 9-5/8" app. 5/4 Jar support Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-01 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 5/1 Admin. 5/2 Admin. 5/3 OTC2017 at NRG Reliant 5/4 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-02 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 5/1 supported 6-1/2' Drilling jar project. 5/1 cont'd work on 9-5/8" app for Best Win. 5/2 Supported Sam Yang (Best Win) with 9-5/8" app. 5/4 Jar support Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-02 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 5/1 Admin. 5/2 Admin. 5/3 OTC2017 at NRG Reliant 5/4 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-03 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 4 0 5/1 supported 6-1/2' Drilling jar project. 5/1 cont'd work on 9-5/8" app for Best Win. 5/2 Supported Sam Yang (Best Win) with 9-5/8" app. 5/4 Jar support Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-03 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 4 0 5/1 Admin. 5/2 Admin. 5/3 OTC2017 at NRG Reliant 5/4 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-04 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 5/1 supported 6-1/2' Drilling jar project. 5/1 cont'd work on 9-5/8" app for Best Win. 5/2 Supported Sam Yang (Best Win) with 9-5/8" app. 5/4 Jar support Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-04 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 5/1 Admin. 5/2 Admin. 5/3 OTC2017 at NRG Reliant 5/4 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-05 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 4 0 5/1 supported 6-1/2' Drilling jar project. 5/1 cont'd work on 9-5/8" app for Best Win. 5/2 Supported Sam Yang (Best Win) with 9-5/8" app. 5/4 Jar support Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-05 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 4 0 5/05 PTO Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-08 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 5/08 CONF CALL - 6-3/4 Drilling Jar 5/08 Jar Support 5/09 CONF CALL - Time delay for 6-1/2" Drilling Jar (positive results) 5/09 MENA - TIW packer details. 5/10 Jar support 5/11 Jar support Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-08 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 5/08 Admin. 5/10 Admin. 5/11 Admin. 5/12 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-09 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 5/08 CONF CALL - 6-3/4 Drilling Jar 5/08 Jar Support 5/09 CONF CALL - Time delay for 6-1/2" Drilling Jar (positive results) 5/09 MENA - TIW packer details. 5/10 Jar support 5/11 Jar support Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-10 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 5/08 CONF CALL - 6-3/4 Drilling Jar 5/08 Jar Support 5/09 CONF CALL - Time delay for 6-1/2" Drilling Jar (positive results) 5/09 MENA - TIW packer details. 5/10 Jar support 5/11 Jar support Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-10 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 5/08 Admin. 5/10 Admin. 5/11 Admin. 5/12 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-11 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 5/08 CONF CALL - 6-3/4 Drilling Jar 5/08 Jar Support 5/09 CONF CALL - Time delay for 6-1/2" Drilling Jar (positive results) 5/09 MENA - TIW packer details. 5/10 Jar support 5/11 Jar support Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-11 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 5/08 Admin. 5/10 Admin. 5/11 Admin. 5/12 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-12 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 3 0 5/08 CONF CALL - 6-3/4 Drilling Jar 5/08 Jar Support 5/09 CONF CALL - Time delay for 6-1/2" Drilling Jar (positive results) 5/09 MENA - TIW packer details. 5/10 Jar support 5/11 Jar support Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-12 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 5/08 Admin. 5/10 Admin. 5/11 Admin. 5/12 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-12 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 4 0 5/12 PTO Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-15 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 5/15 Drilling Jar support 5/16 Drilling Jar support 5/16 Drilling Jar registry support. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-15 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 5/15 Admin. 5/16 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-16 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 5/15 Drilling Jar support 5/16 Drilling Jar support 5/16 Drilling Jar registry support. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-16 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 5/15 Admin. 5/16 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-17 OH-002 :OH-002 Overhead All Activities Regular Pay N 8 0 3 day leave for Father's funeral Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-18 OH-002 :OH-002 Overhead All Activities Regular Pay N 8 0 3 day leave for Father's funeral Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-19 OH-002 :OH-002 Overhead All Activities Regular Pay N 8 0 3 day leave for Father's funeral Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-22 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 8 0 5/22 PTO 5/23 PTO Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-23 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 8 0 5/22 PTO 5/23 PTO Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-24 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 5/24 Document Ops support 5/25 Jar support 5/25 Document Ops support 5/26 Mfg. support to Jason Connolly. 5/26 Document Ops support Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-24 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 5/24 Admin. 5/25 Admin. 5/26 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-25 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 5/24 Document Ops support 5/25 Jar support 5/25 Document Ops support 5/26 Mfg. support to Jason Connolly. 5/26 Document Ops support Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-25 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 5/24 Admin. 5/25 Admin. 5/26 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-26 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 5/24 Document Ops support 5/25 Jar support 5/25 Document Ops support 5/26 Mfg. support to Jason Connolly. 5/26 Document Ops support Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-26 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 5/24 Admin. 5/25 Admin. 5/26 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-29 ITS -NON TSR :ITS -NON TSR -OH-004 Holiday Regular Pay N 8 0 5/29 Holiday Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-30 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 5/30 Reviewed Re-Entry job for Energy Fishing and Rental Services. 5/30 Started to review the NCR for 8 in. Jars. 5/31 Started to review the data from the seal vendor. 5/31 Jar review on seals and time delays. 6/01 Conference call - Jars/ new Seals 6/02 Jar test review - time delays for both the 6 1/2 and 8" sizes. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-30 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 5/30 Admin. 5/31 Admin. 6/01 Admin. 6/02 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-31 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 5/30 Reviewed Re-Entry job for Energy Fishing and Rental Services. 5/30 Started to review the NCR for 8 in. Jars. 5/31 Started to review the data from the seal vendor. 5/31 Jar review on seals and time delays. 6/01 Conference call - Jars/ new Seals 6/02 Jar test review - time delays for both the 6 1/2 and 8" sizes. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-05-31 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 5/30 Admin. 5/31 Admin. 6/01 Admin. 6/02 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-01 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 5/30 Reviewed Re-Entry job for Energy Fishing and Rental Services. 5/30 Started to review the NCR for 8 in. Jars. 5/31 Started to review the data from the seal vendor. 5/31 Jar review on seals and time delays. 6/01 Conference call - Jars/ new Seals 6/02 Jar test review - time delays for both the 6 1/2 and 8" sizes. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-01 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 5/30 Admin. 5/31 Admin. 6/01 Admin. 6/02 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-02 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 5/30 Reviewed Re-Entry job for Energy Fishing and Rental Services. 5/30 Started to review the NCR for 8 in. Jars. 5/31 Started to review the data from the seal vendor. 5/31 Jar review on seals and time delays. 6/01 Conference call - Jars/ new Seals 6/02 Jar test review - time delays for both the 6 1/2 and 8" sizes. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-02 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 5/30 Admin. 5/31 Admin. 6/01 Admin. 6/02 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-05 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 6/05 Conf. Call - 6-1/2 Jars test results review. 6/05 Conf. call - NCR 8" Jars 6/06 Field support - Casing Exits 6/06 8" Jar Time delay review. 6/07 Documentation support 6/08 Casing Exit Documentation support. 6/08 QC support for 6-1/2" Jar. 6/09 Reviewing recent time delay test from Taufeek. 6/09 Jar document support. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-05 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 6/05 Admin. 6/06 Admin. 6/08 Admin. 6/09 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-06 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 6/05 Conf. Call - 6-1/2 Jars test results review. 6/05 Conf. call - NCR 8" Jars 6/06 Field support - Casing Exits 6/06 8" Jar Time delay review. 6/07 Documentation support 6/08 Casing Exit Documentation support. 6/08 QC support for 6-1/2" Jar. 6/09 Reviewing recent time delay test from Taufeek. 6/09 Jar document support. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-06 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 6/05 Admin. 6/06 Admin. 6/08 Admin. 6/09 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-07 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 4 0 6/05 Conf. Call - 6-1/2 Jars test results review. 6/05 Conf. call - NCR 8" Jars 6/06 Field support - Casing Exits 6/06 8" Jar Time delay review. 6/07 Documentation support 6/08 Casing Exit Documentation support. 6/08 QC support for 6-1/2" Jar. 6/09 Reviewing recent time delay test from Taufeek. 6/09 Jar document support. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-07 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 4 0 6/07 PTO Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-08 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 6/05 Conf. Call - 6-1/2 Jars test results review. 6/05 Conf. call - NCR 8" Jars 6/06 Field support - Casing Exits 6/06 8" Jar Time delay review. 6/07 Documentation support 6/08 Casing Exit Documentation support. 6/08 QC support for 6-1/2" Jar. 6/09 Reviewing recent time delay test from Taufeek. 6/09 Jar document support. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-08 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 6/05 Admin. 6/06 Admin. 6/08 Admin. 6/09 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-09 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 6/05 Conf. Call - 6-1/2 Jars test results review. 6/05 Conf. call - NCR 8" Jars 6/06 Field support - Casing Exits 6/06 8" Jar Time delay review. 6/07 Documentation support 6/08 Casing Exit Documentation support. 6/08 QC support for 6-1/2" Jar. 6/09 Reviewing recent time delay test from Taufeek. 6/09 Jar document support. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-09 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 6/05 Admin. 6/06 Admin. 6/08 Admin. 6/09 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-12 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 6/12 Conf. call Jar Team - 6 1/2 jars test review time delays 6/12 Conf. call with team India discussing new seal status. 6/13 Addressing new jar issue regarding the up/down release load results. 6/13 Meeting with Andrew - covered topics Eng. Docs and future Oracle needs. 6/14 Reviewing spring design for 6 1/2 Jar. 6/15 Eng. support for Jars 6-1/2 and 8" size. 6/15 Eng. support for casing exit - Far East. 6/16 Eng. support for Jars 6-1/2 and 8" size. 6/16 Eng. support for casing exit - Far East. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-12 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 6/12 Admin. 6/14 Admin. 6/15 Admin. 6/16 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-13 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 6/12 Conf. call Jar Team - 6 1/2 jars test review time delays 6/12 Conf. call with team India discussing new seal status. 6/13 Addressing new jar issue regarding the up/down release load results. 6/13 Meeting with Andrew - covered topics Eng. Docs and future Oracle needs. 6/14 Reviewing spring design for 6 1/2 Jar. 6/15 Eng. support for Jars 6-1/2 and 8" size. 6/15 Eng. support for casing exit - Far East. 6/16 Eng. support for Jars 6-1/2 and 8" size. 6/16 Eng. support for casing exit - Far East. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-14 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 6/12 Conf. call Jar Team - 6 1/2 jars test review time delays 6/12 Conf. call with team India discussing new seal status. 6/13 Addressing new jar issue regarding the up/down release load results. 6/13 Meeting with Andrew - covered topics Eng. Docs and future Oracle needs. 6/14 Reviewing spring design for 6 1/2 Jar. 6/15 Eng. support for Jars 6-1/2 and 8" size. 6/15 Eng. support for casing exit - Far East. 6/16 Eng. support for Jars 6-1/2 and 8" size. 6/16 Eng. support for casing exit - Far East. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-14 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 6/12 Admin. 6/14 Admin. 6/15 Admin. 6/16 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-15 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 6/12 Conf. call Jar Team - 6 1/2 jars test review time delays 6/12 Conf. call with team India discussing new seal status. 6/13 Addressing new jar issue regarding the up/down release load results. 6/13 Meeting with Andrew - covered topics Eng. Docs and future Oracle needs. 6/14 Reviewing spring design for 6 1/2 Jar. 6/15 Eng. support for Jars 6-1/2 and 8" size. 6/15 Eng. support for casing exit - Far East. 6/16 Eng. support for Jars 6-1/2 and 8" size. 6/16 Eng. support for casing exit - Far East. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-15 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 6/12 Admin. 6/14 Admin. 6/15 Admin. 6/16 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-16 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 6/12 Conf. call Jar Team - 6 1/2 jars test review time delays 6/12 Conf. call with team India discussing new seal status. 6/13 Addressing new jar issue regarding the up/down release load results. 6/13 Meeting with Andrew - covered topics Eng. Docs and future Oracle needs. 6/14 Reviewing spring design for 6 1/2 Jar. 6/15 Eng. support for Jars 6-1/2 and 8" size. 6/15 Eng. support for casing exit - Far East. 6/16 Eng. support for Jars 6-1/2 and 8" size. 6/16 Eng. support for casing exit - Far East. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-16 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 6/12 Admin. 6/14 Admin. 6/15 Admin. 6/16 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-19 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 6/19 Conf. call - 6-1/2 Jars with 6-3/4 bore. 6/19 Eng. support Jars - fish dims. 6/20 Eng. support Casing Exit docs. 6/21 Eng. support Casing exit. 6/21 Eng. support - Jars. 6/22 Excel - Eng. support for Oracle project. 6/22 Eng. support for 6-1/2' Jar with 2-3/4" bore. 6/23 Eng. support to 2M TEK MFG./NCR for anchor bodies - 9 5/8" casing. 6/23 Eng. support documentation for hooks - 5 1/2" casing. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-19 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 6/19 Admin. 6/21 Admin. 6/23 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-20 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 6/19 Conf. call - 6-1/2 Jars with 6-3/4 bore. 6/19 Eng. support Jars - fish dims. 6/20 Eng. support Casing Exit docs. 6/21 Eng. support Casing exit. 6/21 Eng. support - Jars. 6/22 Excel - Eng. support for Oracle project. 6/22 Eng. support for 6-1/2' Jar with 2-3/4" bore. 6/23 Eng. support to 2M TEK MFG./NCR for anchor bodies - 9 5/8" casing. 6/23 Eng. support documentation for hooks - 5 1/2" casing. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-21 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 6/19 Conf. call - 6-1/2 Jars with 6-3/4 bore. 6/19 Eng. support Jars - fish dims. 6/20 Eng. support Casing Exit docs. 6/21 Eng. support Casing exit. 6/21 Eng. support - Jars. 6/22 Excel - Eng. support for Oracle project. 6/22 Eng. support for 6-1/2' Jar with 2-3/4" bore. 6/23 Eng. support to 2M TEK MFG./NCR for anchor bodies - 9 5/8" casing. 6/23 Eng. support documentation for hooks - 5 1/2" casing. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-21 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 6/19 Admin. 6/21 Admin. 6/23 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-22 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 6/19 Conf. call - 6-1/2 Jars with 6-3/4 bore. 6/19 Eng. support Jars - fish dims. 6/20 Eng. support Casing Exit docs. 6/21 Eng. support Casing exit. 6/21 Eng. support - Jars. 6/22 Excel - Eng. support for Oracle project. 6/22 Eng. support for 6-1/2' Jar with 2-3/4" bore. 6/23 Eng. support to 2M TEK MFG./NCR for anchor bodies - 9 5/8" casing. 6/23 Eng. support documentation for hooks - 5 1/2" casing. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-23 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 6/19 Conf. call - 6-1/2 Jars with 6-3/4 bore. 6/19 Eng. support Jars - fish dims. 6/20 Eng. support Casing Exit docs. 6/21 Eng. support Casing exit. 6/21 Eng. support - Jars. 6/22 Excel - Eng. support for Oracle project. 6/22 Eng. support for 6-1/2' Jar with 2-3/4" bore. 6/23 Eng. support to 2M TEK MFG./NCR for anchor bodies - 9 5/8" casing. 6/23 Eng. support documentation for hooks - 5 1/2" casing. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-23 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 6/19 Admin. 6/21 Admin. 6/23 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-26 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 6/26 Eng. support Jars. 6/26 Eng. met with Arturo Perez 6/26 OC support (Innocent) 6/27 Eng support doc Casing Exit 6/27 Eng support Jars 6/28 QC support Casing Exit 6/28 Eng. support Jars 6/29 Eng. support Jars 6/30 Eng. support Jars Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-26 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 6/26 Admin. 6/28 Admin. 6/29 Admin. 6/30 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-27 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 6/26 Eng. support Jars. 6/26 Eng. met with Arturo Perez 6/26 OC support (Innocent) 6/27 Eng support doc Casing Exit 6/27 Eng support Jars 6/28 QC support Casing Exit 6/28 Eng. support Jars 6/29 Eng. support Jars 6/30 Eng. support Jars Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-28 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 6/26 Eng. support Jars. 6/26 Eng. met with Arturo Perez 6/26 OC support (Innocent) 6/27 Eng support doc Casing Exit 6/27 Eng support Jars 6/28 QC support Casing Exit 6/28 Eng. support Jars 6/29 Eng. support Jars 6/30 Eng. support Jars Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-28 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 6/26 Admin. 6/28 Admin. 6/29 Admin. 6/30 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-29 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 6/26 Eng. support Jars. 6/26 Eng. met with Arturo Perez 6/26 OC support (Innocent) 6/27 Eng support doc Casing Exit 6/27 Eng support Jars 6/28 QC support Casing Exit 6/28 Eng. support Jars 6/29 Eng. support Jars 6/30 Eng. support Jars Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-29 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 6/26 Admin. 6/28 Admin. 6/29 Admin. 6/30 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-30 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 6/26 Eng. support Jars. 6/26 Eng. met with Arturo Perez 6/26 OC support (Innocent) 6/27 Eng support doc Casing Exit 6/27 Eng support Jars 6/28 QC support Casing Exit 6/28 Eng. support Jars 6/29 Eng. support Jars 6/30 Eng. support Jars Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-06-30 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 6/26 Admin. 6/28 Admin. 6/29 Admin. 6/30 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-02 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 1.5 0 7/02 Eng. support Jars 7/05 Eng. support Jars 7/06 Conf. call - Jet recom. for 8" jars. 7/06 Conf. call - 6 3/4 Jars 7/06 Eng. support Jars 7/07 Conf. call - Eng. weekly mtg. 7/07 Eng. support doc. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-03 ITS -NON TSR :ITS -NON TSR -OH-004 Holiday Regular Pay N 8 0 7/03 Holiday 7/04 Holiday Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-04 ITS -NON TSR :ITS -NON TSR -OH-004 Holiday Regular Pay N 8 0 7/03 Holiday 7/04 Holiday Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-05 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 7/02 Eng. support Jars 7/05 Eng. support Jars 7/06 Conf. call - Jet recom. for 8" jars. 7/06 Conf. call - 6 3/4 Jars 7/06 Eng. support Jars 7/07 Conf. call - Eng. weekly mtg. 7/07 Eng. support doc. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-05 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 7/05 Admin. 7/07 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-06 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 7/02 Eng. support Jars 7/05 Eng. support Jars 7/06 Conf. call - Jet recom. for 8" jars. 7/06 Conf. call - 6 3/4 Jars 7/06 Eng. support Jars 7/07 Conf. call - Eng. weekly mtg. 7/07 Eng. support doc. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-07 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 7/02 Eng. support Jars 7/05 Eng. support Jars 7/06 Conf. call - Jet recom. for 8" jars. 7/06 Conf. call - 6 3/4 Jars 7/06 Eng. support Jars 7/07 Conf. call - Eng. weekly mtg. 7/07 Eng. support doc. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-07 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 7/05 Admin. 7/07 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-10 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 7/10 Eng. support Jars docs. 7/11 Eng. support Jars 7/12 Eng. support for QC 7/12 Eng. support Jars 7/13 Casing Exit doc support 7/13 Eng. support - Jars doc 7/14 Eng. support - Jars doc 7/14 Casing Exit doc Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-10 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 7/10 Admin. 7/11 Admin. 7/13 Admin. 7/14 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-11 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 7/10 Eng. support Jars docs. 7/11 Eng. support Jars 7/12 Eng. support for QC 7/12 Eng. support Jars 7/13 Casing Exit doc support 7/13 Eng. support - Jars doc 7/14 Eng. support - Jars doc 7/14 Casing Exit doc Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-11 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 7/10 Admin. 7/11 Admin. 7/13 Admin. 7/14 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-12 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 7/10 Eng. support Jars docs. 7/11 Eng. support Jars 7/12 Eng. support for QC 7/12 Eng. support Jars 7/13 Casing Exit doc support 7/13 Eng. support - Jars doc 7/14 Eng. support - Jars doc 7/14 Casing Exit doc Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-13 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 7/10 Eng. support Jars docs. 7/11 Eng. support Jars 7/12 Eng. support for QC 7/12 Eng. support Jars 7/13 Casing Exit doc support 7/13 Eng. support - Jars doc 7/14 Eng. support - Jars doc 7/14 Casing Exit doc Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-13 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 7/10 Admin. 7/11 Admin. 7/13 Admin. 7/14 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-14 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 7/10 Eng. support Jars docs. 7/11 Eng. support Jars 7/12 Eng. support for QC 7/12 Eng. support Jars 7/13 Casing Exit doc support 7/13 Eng. support - Jars doc 7/14 Eng. support - Jars doc 7/14 Casing Exit doc Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-14 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 7/10 Admin. 7/11 Admin. 7/13 Admin. 7/14 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-17 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 7/17 Conf. call 6-3/4 Jars 7/17 Jar support 7/18 Jar tech support 7/18 Jar tech review - max tensile load. 7/20 Jar doc support 7/20 Casing Exit support - die collars. 7/21 Jar doc support 7/21 Casing Exit doc support Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-17 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 7/17 Admin. 7/20 Admin. 7/21 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-18 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 7/17 Conf. call 6-3/4 Jars 7/17 Jar support 7/18 Jar tech support 7/18 Jar tech review - max tensile load. 7/20 Jar doc support 7/20 Casing Exit support - die collars. 7/21 Jar doc support 7/21 Casing Exit doc support Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-19 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 8 0 7/19 PTO Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-20 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 7/17 Conf. call 6-3/4 Jars 7/17 Jar support 7/18 Jar tech support 7/18 Jar tech review - max tensile load. 7/20 Jar doc support 7/20 Casing Exit support - die collars. 7/21 Jar doc support 7/21 Casing Exit doc support Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-20 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 7/17 Admin. 7/20 Admin. 7/21 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-21 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 7/17 Conf. call 6-3/4 Jars 7/17 Jar support 7/18 Jar tech support 7/18 Jar tech review - max tensile load. 7/20 Jar doc support 7/20 Casing Exit support - die collars. 7/21 Jar doc support 7/21 Casing Exit doc support Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-21 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 7/17 Admin. 7/20 Admin. 7/21 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-24 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 7/24 Conf. call - 6-3/4 Drilling Jars 7/24 Casing Exit docs 7/24 QC training - Innocent 7/25 Casing Exit doc 7/25 Casing Exit support 7/25 4-3/4 Drilling Jar support 7/26 Casing Exit support - Flow Chart - Hydraulics. 7/27 Casing Exit doc 7/27 Jar support 7/28 Casing Exit data review 7/28 Casing Exit support 7/28 Drilling Jar support Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-24 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 7/24 Admin. 7/25 Admin. 7/27 Admin. 7/28 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-25 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 7/24 Conf. call - 6-3/4 Drilling Jars 7/24 Casing Exit docs 7/24 QC training - Innocent 7/25 Casing Exit doc 7/25 Casing Exit support 7/25 4-3/4 Drilling Jar support 7/26 Casing Exit support - Flow Chart - Hydraulics. 7/27 Casing Exit doc 7/27 Jar support 7/28 Casing Exit data review 7/28 Casing Exit support 7/28 Drilling Jar support Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-25 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 7/24 Admin. 7/25 Admin. 7/27 Admin. 7/28 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-26 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 7/24 Conf. call - 6-3/4 Drilling Jars 7/24 Casing Exit docs 7/24 QC training - Innocent 7/25 Casing Exit doc 7/25 Casing Exit support 7/25 4-3/4 Drilling Jar support 7/26 Casing Exit support - Flow Chart - Hydraulics. 7/27 Casing Exit doc 7/27 Jar support 7/28 Casing Exit data review 7/28 Casing Exit support 7/28 Drilling Jar support Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-27 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 7/24 Conf. call - 6-3/4 Drilling Jars 7/24 Casing Exit docs 7/24 QC training - Innocent 7/25 Casing Exit doc 7/25 Casing Exit support 7/25 4-3/4 Drilling Jar support 7/26 Casing Exit support - Flow Chart - Hydraulics. 7/27 Casing Exit doc 7/27 Jar support 7/28 Casing Exit data review 7/28 Casing Exit support 7/28 Drilling Jar support Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-27 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 7/24 Admin. 7/25 Admin. 7/27 Admin. 7/28 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-28 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 7/24 Conf. call - 6-3/4 Drilling Jars 7/24 Casing Exit docs 7/24 QC training - Innocent 7/25 Casing Exit doc 7/25 Casing Exit support 7/25 4-3/4 Drilling Jar support 7/26 Casing Exit support - Flow Chart - Hydraulics. 7/27 Casing Exit doc 7/27 Jar support 7/28 Casing Exit data review 7/28 Casing Exit support 7/28 Drilling Jar support Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-28 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 7/24 Admin. 7/25 Admin. 7/27 Admin. 7/28 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-31 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 7/31 Eng. Support for Casing Exit 8/01 Eng. Support for Casing Exit (Hyd. calc and data review) 8/02 Eng. support Hyd. calc and data review. 8/03 6-1/2" Drilling Jar support 8/03 8" Drilling Jar support 8/03 Eng. support - Casing Exit 8/04 Eng. support - Casing Exit Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-07-31 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 7/31 Admin. 8/02 Admin. 8/03 Admin. 8/04 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-08-01 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 7/31 Eng. Support for Casing Exit 8/01 Eng. Support for Casing Exit (Hyd. calc and data review) 8/02 Eng. support Hyd. calc and data review. 8/03 6-1/2" Drilling Jar support 8/03 8" Drilling Jar support 8/03 Eng. support - Casing Exit 8/04 Eng. support - Casing Exit Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-08-02 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6 0 7/31 Eng. Support for Casing Exit 8/01 Eng. Support for Casing Exit (Hyd. calc and data review) 8/02 Eng. support Hyd. calc and data review. 8/03 6-1/2" Drilling Jar support 8/03 8" Drilling Jar support 8/03 Eng. support - Casing Exit 8/04 Eng. support - Casing Exit Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-08-02 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 2 0 7/31 Admin. 8/02 Admin. 8/03 Admin. 8/04 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-08-03 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 7 0 7/31 Eng. Support for Casing Exit 8/01 Eng. Support for Casing Exit (Hyd. calc and data review) 8/02 Eng. support Hyd. calc and data review. 8/03 6-1/2" Drilling Jar support 8/03 8" Drilling Jar support 8/03 Eng. support - Casing Exit 8/04 Eng. support - Casing Exit Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-08-03 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 7/31 Admin. 8/02 Admin. 8/03 Admin. 8/04 Admin. Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-08-04 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 6.5 0 7/31 Eng. Support for Casing Exit 8/01 Eng. Support for Casing Exit (Hyd. calc and data review) 8/02 Eng. support Hyd. calc and data review. 8/03 6-1/2" Drilling Jar support 8/03 8" Drilling Jar support 8/03 Eng. support - Casing Exit 8/04 Eng. support - Casing Exit Delgado, Rene Supervising Engineering/Pkg Mg Delgado, Rene:Supervising Engineering/Pkg Mg 2017-08-04 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 7/31 Admin. 8/02 Admin. 8/03 Admin. 8/04 Admin. Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Years 2017 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 CTO meeting, kanban board Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-03 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 5.5 0 Expense Report, ask follow up questions to Schniddy and Justin, save updated drawings, discuss bleeding jack cylinders further with Justin, answer some shipping questions, finalize cylinder bleed solution, send filter information to SAK for purchasing, reviewed Sawyer SOW, reviewed quality improvements with Sergio, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-03 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 2 0 torque tube tie back status, 270 weekly meeting, update for 270 weekly report, review filter option and request quote from Rafa, create torque tube tie back packing list, review filter quote, double check filter type with Schniddy, send quote to Warehouseman for purchase, ask Daniel about tie back beam, finish IAT procedure, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 CTO meeting, kanban board Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-04 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-04 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 1.5 0 Expense Report, ask follow up questions to Schniddy and Justin, save updated drawings, discuss bleeding jack cylinders further with Justin, answer some shipping questions, finalize cylinder bleed solution, send filter information to SAK for purchasing, reviewed Sawyer SOW, reviewed quality improvements with Sergio, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-04 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 6 0 torque tube tie back status, 270 weekly meeting, update for 270 weekly report, review filter option and request quote from Rafa, create torque tube tie back packing list, review filter quote, double check filter type with Schniddy, send quote to Warehouseman for purchase, ask Daniel about tie back beam, finish IAT procedure, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 CTO meeting, kanban board Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-05 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-05 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 2 0 Expense Report, ask follow up questions to Schniddy and Justin, save updated drawings, discuss bleeding jack cylinders further with Justin, answer some shipping questions, finalize cylinder bleed solution, send filter information to SAK for purchasing, reviewed Sawyer SOW, reviewed quality improvements with Sergio, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-05 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 4 0 torque tube tie back status, 270 weekly meeting, update for 270 weekly report, review filter option and request quote from Rafa, create torque tube tie back packing list, review filter quote, double check filter type with Schniddy, send quote to Warehouseman for purchase, ask Daniel about tie back beam, finish IAT procedure, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 CTO meeting, kanban board Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Performance Eval Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-06 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 4 0 Expense Report, ask follow up questions to Schniddy and Justin, save updated drawings, discuss bleeding jack cylinders further with Justin, answer some shipping questions, finalize cylinder bleed solution, send filter information to SAK for purchasing, reviewed Sawyer SOW, reviewed quality improvements with Sergio, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-06 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 2 0 torque tube tie back status, 270 weekly meeting, update for 270 weekly report, review filter option and request quote from Rafa, create torque tube tie back packing list, review filter quote, double check filter type with Schniddy, send quote to Warehouseman for purchase, ask Daniel about tie back beam, finish IAT procedure, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails, timesheet, discussions, discuss BD opportunities with Matt Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-09 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 3.5 0 verified shipping information, punch list review and continuation, hydraulic filter comparison, steel temp spec discussion, EAM and fixed asset review close out for walking system, create meeting for doc review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-09 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 2 0 Finished IAT creation, review, and distribution, filter quotes, tie back fasteners, IAT procedure discussion, Arctic meeting, resend IAT procedure, review beam design and send out to Ops, get details on hydraulic temperature limitations, arctic meeting, updated schedule to incorporate modifications, verify crossover for filters, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-10 Latin America Region-TSR :Latin America Region-TSR TSR-01532-LABU 1st Quarter 2017 General Query- Mexico Regular Pay N 1 0 tender support for 165 walking system Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 kanban Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails, timesheet, discussions, discuss BD opportunities with Matt Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-10 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 4 0 verified shipping information, punch list review and continuation, hydraulic filter comparison, steel temp spec discussion, EAM and fixed asset review close out for walking system, create meeting for doc review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-10 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 3.5 0 Finished IAT creation, review, and distribution, filter quotes, tie back fasteners, IAT procedure discussion, Arctic meeting, resend IAT procedure, review beam design and send out to Ops, get details on hydraulic temperature limitations, arctic meeting, updated schedule to incorporate modifications, verify crossover for filters, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-11 Latin America Region-TSR :Latin America Region-TSR TSR-01532-LABU 1st Quarter 2017 General Query- Mexico Regular Pay N 2.5 0 tender support for 165 walking system Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 kanban Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails, timesheet, discussions, discuss BD opportunities with Matt Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-11 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 1.5 0 verified shipping information, punch list review and continuation, hydraulic filter comparison, steel temp spec discussion, EAM and fixed asset review close out for walking system, create meeting for doc review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-11 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 4 0 Finished IAT creation, review, and distribution, filter quotes, tie back fasteners, IAT procedure discussion, Arctic meeting, resend IAT procedure, review beam design and send out to Ops, get details on hydraulic temperature limitations, arctic meeting, updated schedule to incorporate modifications, verify crossover for filters, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 kanban Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails, timesheet, discussions, discuss BD opportunities with Matt Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Performance Review Form, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-12 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 1 0 AAR review, AAR prep and meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-12 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 1.5 0 verified shipping information, punch list review and continuation, hydraulic filter comparison, steel temp spec discussion, EAM and fixed asset review close out for walking system, create meeting for doc review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-12 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 3 0 Finished IAT creation, review, and distribution, filter quotes, tie back fasteners, IAT procedure discussion, Arctic meeting, resend IAT procedure, review beam design and send out to Ops, get details on hydraulic temperature limitations, arctic meeting, updated schedule to incorporate modifications, verify crossover for filters, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails, timesheet, discussions, discuss BD opportunities with Matt Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Performance Review Form, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-13 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 4 0 AAR review, AAR prep and meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-13 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 0.5 0 verified shipping information, punch list review and continuation, hydraulic filter comparison, steel temp spec discussion, EAM and fixed asset review close out for walking system, create meeting for doc review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-13 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 1.5 0 Finished IAT creation, review, and distribution, filter quotes, tie back fasteners, IAT procedure discussion, Arctic meeting, resend IAT procedure, review beam design and send out to Ops, get details on hydraulic temperature limitations, arctic meeting, updated schedule to incorporate modifications, verify crossover for filters, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails, discussions, timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-16 Rig 270L-TSR :Rig 270L-TSR TSR-01533-270L Temp Rating Regular Pay N 8 0 temperature rating information collection and report, meeting with Ops, report review and modification, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails, discussions, timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-17 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 2 0 Risk register analysis, IDR handover, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-17 Rig 270L-TSR :Rig 270L-TSR TSR-01533-270L Temp Rating Regular Pay N 7 0 temperature rating information collection and report, meeting with Ops, report review and modification, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Kanban, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, discussions, timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-18 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 0.5 0 Risk register analysis, IDR handover, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-18 Rig 270L-TSR :Rig 270L-TSR TSR-01533-270L Temp Rating Regular Pay N 7 0 temperature rating information collection and report, meeting with Ops, report review and modification, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Kanban, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, discussions, timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-19 Rig 270L-TSR :Rig 270L-TSR TSR-01533-270L Temp Rating Regular Pay N 8 0 temperature rating information collection and report, meeting with Ops, report review and modification, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Minnesota Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 Kanban meeting, NOV monthly meeting, SSAB lunch and learn, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Performance Review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Review SWOT definitions and BD Plan, attend BD meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-23 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 3 0 review punch list and create work packs, review Sawyer quote for e-stop, walking system update sent to Enroth, review of Sawyer Invoice, IAT work pack, hydraulic header bracket work pack, review of Sawyer invoice, discuss invoice changes with Schniddy, work pack for suitcases, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Kanban meeting, NOV monthly meeting, SSAB lunch and learn, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-24 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 3.25 0 review punch list and create work packs, review Sawyer quote for e-stop, walking system update sent to Enroth, review of Sawyer Invoice, IAT work pack, hydraulic header bracket work pack, review of Sawyer invoice, discuss invoice changes with Schniddy, work pack for suitcases, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-24 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 1 0 Arctic meeting to give walking system update, check on tie back shipment, regulatory documents and clarifications, antenna logistics, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 emails, discussion with Greg on steam systems, computer problems, computer swap and set up, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-25 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 2 0 ANGS doc review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-25 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 4 0 review punch list and create work packs, review Sawyer quote for e-stop, walking system update sent to Enroth, review of Sawyer Invoice, IAT work pack, hydraulic header bracket work pack, review of Sawyer invoice, discuss invoice changes with Schniddy, work pack for suitcases, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-26 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 HDI Lunch and Learn Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-26 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 2.5 0 Joshua leaving the project, PM handover, Oracle access, review AFE change, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-26 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 2 0 ANGS doc review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-26 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 1 0 review punch list and create work packs, review Sawyer quote for e-stop, walking system update sent to Enroth, review of Sawyer Invoice, IAT work pack, hydraulic header bracket work pack, review of Sawyer invoice, discuss invoice changes with Schniddy, work pack for suitcases, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-27 ARBU-TSRs :ARBU-TSRs TSR-01534-ARBU 1st Quarter 2017 General Query - Alaska Regular Pay N 1 0 Mark's question about area classification on 272 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Kanban meeting, NOV monthly meeting, SSAB lunch and learn, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-27 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 2 0 Joshua leaving the project, PM handover, Oracle access, review AFE change, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-27 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 0.5 0 review punch list and create work packs, review Sawyer quote for e-stop, walking system update sent to Enroth, review of Sawyer Invoice, IAT work pack, hydraulic header bracket work pack, review of Sawyer invoice, discuss invoice changes with Schniddy, work pack for suitcases, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-27 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 1.5 0 Arctic meeting to give walking system update, check on tie back shipment, regulatory documents and clarifications, antenna logistics, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-27 Rig 270L-TSR :Rig 270L-TSR TSR-01533-270L Temp Rating Regular Pay N 2 0 Rev 2 of Report and Close Out creation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-27 Rig 270L-TSR :Rig 270L-TSR TSR-01535-270L BOP-Diverter Stack-Up Drawings Regular Pay N 1 0 Technical Review of Stack Drawings Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Kanban, Greg's farewell, TSR meeting, Monday meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails, discussions, timesheet, Compliance Survey, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-30 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 2 0 Learning curve on cost report, Oracle access, Logistics Tracker for 270, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-30 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 0.75 0 ANGS document review, review Sawyer Invoice, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-30 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 2 0 Work Packs Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-30 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 2 0 Update cost tracker, transmit 1395 CO for regulatory, update cost report, review sign and transmit timesheets, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Kanban, Greg's farewell, TSR meeting, Monday meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-31 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 emails, discussions, timesheet, Compliance Survey, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-31 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 1.5 0 Learning curve on cost report, Oracle access, Logistics Tracker for 270, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-31 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 1 0 ANGS document review, review Sawyer Invoice, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-31 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 4 0 Work Packs Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-01-31 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 0.25 0 Review Sawyer quote for rig 270 commissioning support, create rough draft for Rig 270 walking between wells WSP, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Kanban, Greg's farewell, TSR meeting, Monday meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, discussions, timesheet, Compliance Survey, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-01 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 1.5 0 Learning curve on cost report, Oracle access, Logistics Tracker for 270, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-01 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 5 0 ANGS document review, review Sawyer Invoice, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-01 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 1 0 Update cost tracker, transmit 1395 CO for regulatory, update cost report, review sign and transmit timesheets, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kanban, Greg's farewell, TSR meeting, Monday meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, discussions, timesheet, Compliance Survey, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-02 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 6.5 0 Work Packs Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-02 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 1 0 Review Sawyer quote for rig 270 commissioning support, create rough draft for Rig 270 walking between wells WSP, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, discussions, timesheet, Compliance Survey, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-03 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 0.5 0 Learning curve on cost report, Oracle access, Logistics Tracker for 270, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-03 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 2 0 Work Packs Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-03 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 0.5 0 Update cost tracker, transmit 1395 CO for regulatory, update cost report, review sign and transmit timesheets, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-03 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 5 0 Review Sawyer quote for rig 270 commissioning support, create rough draft for Rig 270 walking between wells WSP, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 kanban, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, discussions, timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-06 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 SAK TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-06 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 3 0 Stair and Platform work pack, electrical work pack, BWC and lp piping work pack, work pack modifications, PDF everything, review from Matt, submit for transmittal Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-06 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 5 0 review info for Walking System WSPs, modify IAT and detail out Moving Between Wells WSPs, transmit, technical descriptions for torque tube tie back items and technical summary, update weekly 270 report for walking system, discuss update, attend weekly Odoptu/270 meeting, review torque tube tie back shipment issue in customs, punch list update and resend, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 kanban, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails, discussions, timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-07 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 4.5 0 review invoice tracker, cost tracker, labor variance, and logistics tracker, customer scorecard request email, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-07 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 1 0 review and sign Russian Acceptance Act document, review sign and send timesheets for approval, sent invoice tracker to Andrey, updated labor forecast, update logistics tracker, PDF labor variance report, update invoice tracker from Andrey, PDF invoice tracker and cost report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-07 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 2.25 0 review info for Walking System WSPs, modify IAT and detail out Moving Between Wells WSPs, transmit, technical descriptions for torque tube tie back items and technical summary, update weekly 270 report for walking system, discuss update, attend weekly Odoptu/270 meeting, review torque tube tie back shipment issue in customs, punch list update and resend, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 kanban, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails, discussions, timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-08 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 3 0 review invoice tracker, cost tracker, labor variance, and logistics tracker, customer scorecard request email, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-08 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 1 0 Sawyer invoice issue, ANGS documentation issue, MR and RFS change for Sawyer services, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-08 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 2 0 review and sign Russian Acceptance Act document, review sign and send timesheets for approval, sent invoice tracker to Andrey, updated labor forecast, update logistics tracker, PDF labor variance report, update invoice tracker from Andrey, PDF invoice tracker and cost report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-08 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 0.75 0 review info for Walking System WSPs, modify IAT and detail out Moving Between Wells WSPs, transmit, technical descriptions for torque tube tie back items and technical summary, update weekly 270 report for walking system, discuss update, attend weekly Odoptu/270 meeting, review torque tube tie back shipment issue in customs, punch list update and resend, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 kanban, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails, discussions, timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Packing and Moving and Unpacking, Performance Review input to Parker online system, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-09 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 1 0 review invoice tracker, cost tracker, labor variance, and logistics tracker, customer scorecard request email, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-09 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 1 0 Sawyer invoice issue, ANGS documentation issue, MR and RFS change for Sawyer services, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-09 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 3.5 0 Stair and Platform work pack, electrical work pack, BWC and lp piping work pack, work pack modifications, PDF everything, review from Matt, submit for transmittal Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails, discussions, timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.5 0 Packing and Moving and Unpacking, Performance Review input to Parker online system, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-10 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 0.5 0 review invoice tracker, cost tracker, labor variance, and logistics tracker, customer scorecard request email, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-10 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 2 0 review and sign Russian Acceptance Act document, review sign and send timesheets for approval, sent invoice tracker to Andrey, updated labor forecast, update logistics tracker, PDF labor variance report, update invoice tracker from Andrey, PDF invoice tracker and cost report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 kanban, Scotty's farewell, Arctic meeting, TSR meeting, Q4 Earnings meeting, company lunch, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 timesheet, emails, discussions, padeye inspection procedure changes, padeye MOC change, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Solidworks Installation, consolidated green crates, organized documents in printer room, Safety Meeting, empty green crates and organize, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-13 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 1.5 0 ANGS doc review for subbase, review Entro invoice, discuss invoice with Sawyer, subbase and suitcase mod doc review, Entro invoice review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 kanban, Scotty's farewell, Arctic meeting, TSR meeting, Q4 Earnings meeting, company lunch, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 timesheet, emails, discussions, padeye inspection procedure changes, padeye MOC change, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 Solidworks Installation, consolidated green crates, organized documents in printer room, Safety Meeting, empty green crates and organize, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 send MTRs and nesting drawing to Ops, project review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-14 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 2.25 0 ANGS doc review for subbase, review Entro invoice, discuss invoice with Sawyer, subbase and suitcase mod doc review, Entro invoice review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 timesheet, emails, discussions, padeye inspection procedure changes, padeye MOC change, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-15 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 3 0 ANGS doc review for subbase, review Entro invoice, discuss invoice with Sawyer, subbase and suitcase mod doc review, Entro invoice review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-15 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 3 0 discussing call out date with operations, discuss needed info with ops, discuss details with Entro, Modify MR/RFS, sent to SAK, sent to Brian King, request travel details to SAK, discuss project closure with Brian Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.75 0 kanban, Scotty's farewell, Arctic meeting, TSR meeting, Q4 Earnings meeting, company lunch, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 send MTRs and nesting drawing to Ops, project review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-16 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 1.5 0 ANGS doc review for subbase, review Entro invoice, discuss invoice with Sawyer, subbase and suitcase mod doc review, Entro invoice review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-16 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 2 0 discussing call out date with operations, discuss needed info with ops, discuss details with Entro, Modify MR/RFS, sent to SAK, sent to Brian King, request travel details to SAK, discuss project closure with Brian Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-16 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 0.5 0 timesheets, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-16 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 0.5 0 regulatory drawing modification, sequence drawing modification, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-17 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 2 0 meeting with Kyle and Greg, create CTR, and submit Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 timesheet, emails, discussions, padeye inspection procedure changes, padeye MOC change, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-17 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 1 0 discussing call out date with operations, discuss needed info with ops, discuss details with Entro, Modify MR/RFS, sent to SAK, sent to Brian King, request travel details to SAK, discuss project closure with Brian Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-17 Rig 270L-TSR :Rig 270L-TSR TSR-01401-270L Walking System - Logistics Regular Pay N 2 0 Close Out Report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-17 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 0.5 0 regulatory drawing modification, sequence drawing modification, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-20 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 7 0 Chayvo Start Up Study - Cost Estimate Option A - Schedule Option A - Schedule Option B - meetings with Greg Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 TSR Board Meeting, Quick meeting with Peter from Lister, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-20 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Sakhalin Meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-21 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 7 0 Chayvo Start Up Study - Cost Estimate Option A - Schedule Option A - Schedule Option B - meetings with Greg Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Odoptu/270 Meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-22 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 8 0 Chayvo Start Up Study - Cost Estimate Option A - Schedule Option A - Schedule Option B - meetings with Greg Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR Board Meeting, Quick meeting with Peter from Lister, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-23 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 5.5 0 Chayvo Start Up Study - Cost Estimate Option A - Schedule Option A - Schedule Option B - meetings with Greg Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Board Meeting, Quick meeting with Peter from Lister, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-23 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 2.5 0 timesheets, bi-weekly update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-24 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 6.5 0 Chayvo Start Up Study - Cost Estimate Option A - Schedule Option A - Schedule Option B - meetings with Greg Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-24 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 2 0 timesheets, bi-weekly update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-27 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 7 0 meeting with Nick, Jim, and Kyle. Finished Option B Schedule, discussed meeting with Dean, add notes to schedule items, small mod, PDF, print and organize, reviewed James's drawing of Krechet at Chayvo, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 TSR Board Meeting, TSR weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-27 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Sakhalin Monday meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 discussion about 270 mast/sub raising, discuss RFI with Kate, review emails from Sakhalin, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-28 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 1 0 meeting with Nick, Jim, and Kyle. Finished Option B Schedule, discussed meeting with Dean, add notes to schedule items, small mod, PDF, print and organize, reviewed James's drawing of Krechet at Chayvo, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-28 GOM-TSR :GOM-TSR TSR-01557 TSR-01557-Halliburton-Rig-MIRU-CANCELLED Regular Pay N 4 0 project kick off meeting, discussion on project documents, creation of charter, templates, weekly meeting, presentation slides, questions list, risk register, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 TSR Board Meeting, TSR weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 emails, timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 discussion about 270 mast/sub raising, discuss RFI with Kate, review emails from Sakhalin, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-02-28 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 1.5 0 Update cost tracker, modify MR/RFS for ANGS T&M costs, discuss MR/RFS OT costs with Sveta, establish scope with Schniddy and Kevin, JOA clarification, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-01 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 1.5 0 meeting with Nick, Jim, and Kyle. Finished Option B Schedule, discussed meeting with Dean, add notes to schedule items, small mod, PDF, print and organize, reviewed James's drawing of Krechet at Chayvo, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-01 GOM-TSR :GOM-TSR TSR-01557 TSR-01557-Halliburton-Rig-MIRU-CANCELLED Regular Pay N 6.5 0 project kick off meeting, discussion on project documents, creation of charter, templates, weekly meeting, presentation slides, questions list, risk register, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-01 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 0.5 0 Update cost tracker, modify MR/RFS for ANGS T&M costs, discuss MR/RFS OT costs with Sveta, establish scope with Schniddy and Kevin, JOA clarification, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-02 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 1.5 0 meeting with Nick, Jim, and Kyle. Finished Option B Schedule, discussed meeting with Dean, add notes to schedule items, small mod, PDF, print and organize, reviewed James's drawing of Krechet at Chayvo, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-02 GOM-TSR :GOM-TSR TSR-01557 TSR-01557-Halliburton-Rig-MIRU-CANCELLED Regular Pay N 5 0 project kick off meeting, discussion on project documents, creation of charter, templates, weekly meeting, presentation slides, questions list, risk register, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Board Meeting, TSR weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 emails, timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-02 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 0.5 0 Update cost tracker, modify MR/RFS for ANGS T&M costs, discuss MR/RFS OT costs with Sveta, establish scope with Schniddy and Kevin, JOA clarification, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-03 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 Drillmec and HH meeting, CTR creation, discussion of project structure, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR Board Meeting, TSR weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-03 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 1.5 0 Rig update and discussion on Sawyer and Entro callout, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-06 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5.5 0 CTR revision and RFP package, make mods to RFP package, Create Appendix A1 and Appendix G for 3000hp and start 1500hp, Quality standard, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, NOV aftermarket meeting, 270/Odoptu meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-06 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 1.5 0 Official Entro call out and update with Rig270, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-06 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 1 0 send work packs to Chuck and discuss electrical extensions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-07 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 CTR revision and RFP package, make mods to RFP package, Create Appendix A1 and Appendix G for 3000hp and start 1500hp, Quality standard, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Board meeting, NOV aftermarket meeting, 270/Odoptu meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-08 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 4 0 Make modifications to current estimate and create new estimate for preservation and start up and make small change to schedule. Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-08 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 CTR revision and RFP package, make mods to RFP package, Create Appendix A1 and Appendix G for 3000hp and start 1500hp, Quality standard, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, NOV aftermarket meeting, 270/Odoptu meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-09 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 6 0 Make modifications to current estimate and create new estimate for preservation and start up and make small change to schedule. Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, NOV aftermarket meeting, 270/Odoptu meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-09 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 3 0 biweekly report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-10 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 CTR revision and RFP package, make mods to RFP package, Create Appendix A1 and Appendix G for 3000hp and start 1500hp, Quality standard, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, NOV aftermarket meeting, 270/Odoptu meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-10 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 3 0 biweekly report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-13 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 Modify App A-1 and G, discuss tech specs with Jack and Travis, modify tech specs again, modify one more time, send to Jack and Tanya, quality plan creation and meeting with Sergio and Innocent, add cost column to A-1, Discuss quality plan further with Sergio, modify quality section, verify with Ellis on dual language Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-13 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 1 0 Review Justin's and Kevin's daily reports on the 270 situation, Regulatory questions, review Kevin's daily report, review work packs with Enroth, questions from regulatory, review Justin's and Kevin's daily reports, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-14 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 Modify App A-1 and G, discuss tech specs with Jack and Travis, modify tech specs again, modify one more time, send to Jack and Tanya, quality plan creation and meeting with Sergio and Innocent, add cost column to A-1, Discuss quality plan further with Sergio, modify quality section, verify with Ellis on dual language Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheets, Canadian PE prep, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-14 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 0.5 0 Review Justin's and Kevin's daily reports on the 270 situation, Regulatory questions, review Kevin's daily report, review work packs with Enroth, questions from regulatory, review Justin's and Kevin's daily reports, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-14 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 1 0 Review forecaster portion of cost tracker with Joshua, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-15 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Modify App A-1 and G, discuss tech specs with Jack and Travis, modify tech specs again, modify one more time, send to Jack and Tanya, quality plan creation and meeting with Sergio and Innocent, add cost column to A-1, Discuss quality plan further with Sergio, modify quality section, verify with Ellis on dual language Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheets, Canadian PE prep, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-15 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 3 0 Review Justin's and Kevin's daily reports on the 270 situation, Regulatory questions, review Kevin's daily report, review work packs with Enroth, questions from regulatory, review Justin's and Kevin's daily reports, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-16 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 Modify App A-1 and G, discuss tech specs with Jack and Travis, modify tech specs again, modify one more time, send to Jack and Tanya, quality plan creation and meeting with Sergio and Innocent, add cost column to A-1, Discuss quality plan further with Sergio, modify quality section, verify with Ellis on dual language Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board Meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheets, Canadian PE prep, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-16 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 1 0 Review Justin's and Kevin's daily reports on the 270 situation, Regulatory questions, review Kevin's daily report, review work packs with Enroth, questions from regulatory, review Justin's and Kevin's daily reports, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-16 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 2 0 Review suitcase padeye documentation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-17 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 1.5 0 Close Out Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-17 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 Modify App A-1 and G, discuss tech specs with Jack and Travis, modify tech specs again, modify one more time, send to Jack and Tanya, quality plan creation and meeting with Sergio and Innocent, add cost column to A-1, Discuss quality plan further with Sergio, modify quality section, verify with Ellis on dual language Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheets, Canadian PE prep, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 modify project schedule, discuss next items to accomplish with Greg, contract meeting, kanban board and meeting, input principle docs in schedule, modify tech specs, compensation meeting, discussions with Greg over timeline and scope, rig builder schedule, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting, Odoptu/270 meeting, TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 discussions and timesheets Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-20 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 2.5 0 Review of Entro and Sawyer field reports, discuss rig up schedule status with onsite PM, discuss swap out of Entro contractor with Shawn, discuss changes with Brian, official Entro callout, discuss Sawyer path forward with Coordinator and Project Engineer, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-21 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 2 0 Make updates per Dean's comments, re-compose final report, review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-21 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3.5 0 modify project schedule, discuss next items to accomplish with Greg, contract meeting, kanban board and meeting, input principle docs in schedule, modify tech specs, compensation meeting, discussions with Greg over timeline and scope, rig builder schedule, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 Board Meeting, Odoptu/270 meeting, TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 discussions and timesheets Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-21 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 1.25 0 Review of Entro and Sawyer field reports, discuss rig up schedule status with onsite PM, discuss swap out of Entro contractor with Shawn, discuss changes with Brian, official Entro callout, discuss Sawyer path forward with Coordinator and Project Engineer, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-22 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7.5 0 modify project schedule, discuss next items to accomplish with Greg, contract meeting, kanban board and meeting, input principle docs in schedule, modify tech specs, compensation meeting, discussions with Greg over timeline and scope, rig builder schedule, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting, Odoptu/270 meeting, TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 discussions and timesheets Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-23 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 modify project schedule, discuss next items to accomplish with Greg, contract meeting, kanban board and meeting, input principle docs in schedule, modify tech specs, compensation meeting, discussions with Greg over timeline and scope, rig builder schedule, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board Meeting, Odoptu/270 meeting, TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 discussions and timesheets Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-24 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 modify project schedule, discuss next items to accomplish with Greg, contract meeting, kanban board and meeting, input principle docs in schedule, modify tech specs, compensation meeting, discussions with Greg over timeline and scope, rig builder schedule, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Board Meeting, Odoptu/270 meeting, TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 discussions and timesheets Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-24 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 1 0 Review of Entro and Sawyer field reports, discuss rig up schedule status with onsite PM, discuss swap out of Entro contractor with Shawn, discuss changes with Brian, official Entro callout, discuss Sawyer path forward with Coordinator and Project Engineer, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-24 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 8.5 0 bi-weekly report, create CO rev 6 and submit for approval, create MR and RFS and submit for approval, sign and submit timesheets for approval Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-27 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 KOC sprint team meetings, finalize tech specs, RFP meeting, HH meeting, vendor TandC's meeting, print KOC contract, help Joshua with BOP spec, designate the TPPs on the kanban board, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings and TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-27 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 1.5 0 Finish up biweekly report, discuss Sawyer travel issues with Matt and Ops, review Andrey's PO comments, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-28 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 KOC sprint team meetings, finalize tech specs, RFP meeting, HH meeting, vendor TandC's meeting, print KOC contract, help Joshua with BOP spec, designate the TPPs on the kanban board, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings and TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-29 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 KOC sprint team meetings, finalize tech specs, RFP meeting, HH meeting, vendor TandC's meeting, print KOC contract, help Joshua with BOP spec, designate the TPPs on the kanban board, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings and TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Safety Moment prep, timesheet, discussion Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-29 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 1 0 Finish up biweekly report, discuss Sawyer travel issues with Matt and Ops, review Andrey's PO comments, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-30 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 KOC sprint team meetings, finalize tech specs, RFP meeting, HH meeting, vendor TandC's meeting, print KOC contract, help Joshua with BOP spec, designate the TPPs on the kanban board, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meetings and TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-31 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 KOC sprint team meetings, finalize tech specs, RFP meeting, HH meeting, vendor TandC's meeting, print KOC contract, help Joshua with BOP spec, designate the TPPs on the kanban board, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings and TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-03-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Safety Moment prep, timesheet, discussion Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-03 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 1 0 reply to Dean's question about mast heights, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-03 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4.5 0 gas detection and breathing equipment concerns, sprint team meetings, TPP creation and review, clarification review and creation of bulletin, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-04 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8.5 0 gas detection and breathing equipment concerns, sprint team meetings, TPP creation and review, clarification review and creation of bulletin, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board meetings Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-04 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 1 0 review 270 status with Rafe from Entro, discuss Russian acceptance act with Schniddy, last bi weekly update Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-05 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7.5 0 gas detection and breathing equipment concerns, sprint team meetings, TPP creation and review, clarification review and creation of bulletin, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board meetings Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-06 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 gas detection and breathing equipment concerns, sprint team meetings, TPP creation and review, clarification review and creation of bulletin, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board meetings Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-07 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6.5 0 gas detection and breathing equipment concerns, sprint team meetings, TPP creation and review, clarification review and creation of bulletin, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board meetings Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-07 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 1 0 review 270 status with Rafe from Entro, discuss Russian acceptance act with Schniddy, last bi weekly update Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-10 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 TPP creation, camp power package clarifications, camp supplier conference calls, sprint team meetings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meetings, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-11 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 11.5 0 TPP creation, camp power package clarifications, camp supplier conference calls, sprint team meetings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meetings, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-12 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7.5 0 TPP creation, camp power package clarifications, camp supplier conference calls, sprint team meetings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meetings, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-13 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 TPP creation, camp power package clarifications, camp supplier conference calls, sprint team meetings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meetings, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-14 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Good Friday. The most important three days in all of history. Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-17 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 TPP creation and Review, sprint team meetings, RFP completion, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board meetings Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-18 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 TPP creation and Review, sprint team meetings, RFP completion, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board meetings Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 10 0 TPP creation and Review, sprint team meetings, RFP completion, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Uganda trip prep, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 12 0 TPP creation and Review, sprint team meetings, RFP completion, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-21 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 TPP creation and Review, sprint team meetings, RFP completion, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board meetings Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Uganda trip prep, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-24 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6.5 0 Clarifications, Cameron conference call, TPP review, review info on HH water tanks, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Vaccinations, application, 2 copies, discuss scope with Gary, discuss travel plan and details, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-25 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3.5 0 Clarifications, Cameron conference call, TPP review, review info on HH water tanks, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Vaccinations, application, 2 copies, discuss scope with Gary, discuss travel plan and details, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-25 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 3 0 review invoices from Rafe, Will, Justin, Kevin, Schniddy, review docs from ANGS, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-26 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 Clarifications, Cameron conference call, TPP review, review info on HH water tanks, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.75 0 discuss line boring at ANGS with Mihovil, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Vaccinations, application, 2 copies, discuss scope with Gary, discuss travel plan and details, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-26 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 3 0 review invoices from Rafe, Will, Justin, Kevin, Schniddy, review docs from ANGS, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-27 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7.5 0 Clarifications, Cameron conference call, TPP review, review info on HH water tanks, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-28 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 Clarifications, Cameron conference call, TPP review, review info on HH water tanks, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-04-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-01 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 TPP creation, Sprint Team Meetings, clarifications, Oracle Access, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 First Quarter Earnings, TSR meeting, Board Meetings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-01 Rig 270L-TSR :Rig 270L-TSR TSR-01566-270L Acummulator Modifications Regular Pay N 0.5 0 Review issue with Sakhalin, review with Al Mingo, review with Joe, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-02 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6.5 0 TPP creation, Sprint Team Meetings, clarifications, Oracle Access, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 First Quarter Earnings, TSR meeting, Board Meetings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Discuss new direction for Angola, get up-to-date with Sande on VISA requirements Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-03 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 TPP creation, Sprint Team Meetings, clarifications, Oracle Access, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 First Quarter Earnings, TSR meeting, Board Meetings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-03 Rig 270L-TSR :Rig 270L-TSR TSR-01566-270L Acummulator Modifications Regular Pay N 0.5 0 Review issue with Sakhalin, review with Al Mingo, review with Joe, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-04 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 TPP creation, Sprint Team Meetings, clarifications, Oracle Access, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 First Quarter Earnings, TSR meeting, Board Meetings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Discuss new direction for Angola, get up-to-date with Sande on VISA requirements Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-04 Rig 270L-TSR :Rig 270L-TSR TSR-01566-270L Acummulator Modifications Regular Pay N 0.5 0 Review issue with Sakhalin, review with Al Mingo, review with Joe, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-05 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 10.5 0 TPP creation, Sprint Team Meetings, clarifications, Oracle Access, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 First Quarter Earnings, TSR meeting, Board Meetings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-08 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 finish technical eval, discuss eval with Greg and Joshua, Safety Equipment MTO, sprint team meeting, BOP eval, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR meeting, board meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-09 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 finish technical eval, discuss eval with Greg and Joshua, Safety Equipment MTO, sprint team meeting, BOP eval, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR meeting, board meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-09 Rig 270L-TSR :Rig 270L-TSR TSR-01566-270L Acummulator Modifications Regular Pay N 1 0 Search koomey details, search for CPC contact, call CPC, email request to CPC, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-10 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 finish technical eval, discuss eval with Greg and Joshua, Safety Equipment MTO, sprint team meeting, BOP eval, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 2017 Goals: SEMS drawings for 76B, PCS pop off valve presentation, discussions, emails, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-10 Rig 270L-TSR :Rig 270L-TSR TSR-01566-270L Acummulator Modifications Regular Pay N 2 0 Search koomey details, search for CPC contact, call CPC, email request to CPC, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-11 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 finish technical eval, discuss eval with Greg and Joshua, Safety Equipment MTO, sprint team meeting, BOP eval, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 TSR meeting, board meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 2017 Goals: SEMS drawings for 76B, PCS pop off valve presentation, discussions, emails, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-12 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 finish technical eval, discuss eval with Greg and Joshua, Safety Equipment MTO, sprint team meeting, BOP eval, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR meeting, board meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 2017 Goals: SEMS drawings for 76B, PCS pop off valve presentation, discussions, emails, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-15 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 BOP eval, create different rig eval format, modify eval presentation, meeting with Greg on rig builder eval, modify tech eval spreadsheet, modify clarification form, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 discussions, emails, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-15 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 2.5 0 closeout meeting prep, discussion with Nick, modifications to cost and labor sheets, meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-15 Rig 270L-TSR :Rig 270L-TSR TSR-01566-270L Acummulator Modifications Regular Pay N 1.5 0 review letter from CPC, discuss reimbursable TSRs, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-16 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 BOP eval, create different rig eval format, modify eval presentation, meeting with Greg on rig builder eval, modify tech eval spreadsheet, modify clarification form, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 discussions, emails, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-16 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 3 0 closeout meeting prep, discussion with Nick, modifications to cost and labor sheets, meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-16 Rig 270L-TSR :Rig 270L-TSR TSR-01566-270L Acummulator Modifications Regular Pay N 0.5 0 review letter from CPC, discuss reimbursable TSRs, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-17 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 BOP eval, create different rig eval format, modify eval presentation, meeting with Greg on rig builder eval, modify tech eval spreadsheet, modify clarification form, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 discussions, emails, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-18 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 BOP eval, create different rig eval format, modify eval presentation, meeting with Greg on rig builder eval, modify tech eval spreadsheet, modify clarification form, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 discussions, emails, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8.5 0 BOP eval, create different rig eval format, modify eval presentation, meeting with Greg on rig builder eval, modify tech eval spreadsheet, modify clarification form, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 discussions, emails, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-22 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5.5 0 modify clarification form, add column for KOC on eval spreadsheet, verify other API exceptions, send out quote to Ops, sprint team meeting, create deviation and clarification tracker for HH, review Joshua's technical clarification list for 1500 and 3000hp, review both presentations for Thursday's meeting, review electrical exceptions with Sachin, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Spring Cleaning Mandatory Meeting, board meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Spring Cleaning, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-23 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 modify clarification form, add column for KOC on eval spreadsheet, verify other API exceptions, send out quote to Ops, sprint team meeting, create deviation and clarification tracker for HH, review Joshua's technical clarification list for 1500 and 3000hp, review both presentations for Thursday's meeting, review electrical exceptions with Sachin, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Spring Cleaning Mandatory Meeting, board meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-23 Rig 270L-TSR :Rig 270L-TSR TSR-01566-270L Acummulator Modifications Regular Pay N 1 0 review material for closeout, follow up on MOC, review MOC, make corrections, send off to Hoffman, review MOC from Hoffman, discuss marking up the schematic, call CPC to get accurate databook, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-24 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 modify clarification form, add column for KOC on eval spreadsheet, verify other API exceptions, send out quote to Ops, sprint team meeting, create deviation and clarification tracker for HH, review Joshua's technical clarification list for 1500 and 3000hp, review both presentations for Thursday's meeting, review electrical exceptions with Sachin, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Spring Cleaning Mandatory Meeting, board meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-25 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 modify clarification form, add column for KOC on eval spreadsheet, verify other API exceptions, send out quote to Ops, sprint team meeting, create deviation and clarification tracker for HH, review Joshua's technical clarification list for 1500 and 3000hp, review both presentations for Thursday's meeting, review electrical exceptions with Sachin, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Spring Cleaning, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-25 Rig 270L-TSR :Rig 270L-TSR TSR-01566-270L Acummulator Modifications Regular Pay N 0.5 0 review material for closeout, follow up on MOC, review MOC, make corrections, send off to Hoffman, review MOC from Hoffman, discuss marking up the schematic, call CPC to get accurate databook, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-26 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 modify clarification form, add column for KOC on eval spreadsheet, verify other API exceptions, send out quote to Ops, sprint team meeting, create deviation and clarification tracker for HH, review Joshua's technical clarification list for 1500 and 3000hp, review both presentations for Thursday's meeting, review electrical exceptions with Sachin, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 timesheet, Spring Cleaning, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-26 Rig 270L-TSR :Rig 270L-TSR TSR-01566-270L Acummulator Modifications Regular Pay N 1.5 0 review material for closeout, follow up on MOC, review MOC, make corrections, send off to Hoffman, review MOC from Hoffman, discuss marking up the schematic, call CPC to get accurate databook, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-29 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 Sprint team meeting, review clarifications with Kyle, modify Camp Power TPP, create Camp bulletin, rig builder evaluation meeting, review c&k manifold TPPs, review BOP controls TPPs, review handover notes from Joshua, review HH meeting agenda, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR Board meeting, TSR weekly meeting, Kerui meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Spring Cleaning, timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-29 Rig 270L-TSR :Rig 270L-TSR TSR-01566-270L Acummulator Modifications Regular Pay N 0.5 0 Review comments from Mark, review databook from CPC, ask again for schematic, final closeout, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-30 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Sprint team meeting, review clarifications with Kyle, modify Camp Power TPP, create Camp bulletin, rig builder evaluation meeting, review c&k manifold TPPs, review BOP controls TPPs, review handover notes from Joshua, review HH meeting agenda, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR Board meeting, TSR weekly meeting, Kerui meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-30 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 5.5 0 Nitrogen Vent Line review, conference call, research, discussions and emails, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-30 Rig 270L-TSR :Rig 270L-TSR TSR-01566-270L Acummulator Modifications Regular Pay N 1 0 Review comments from Mark, review databook from CPC, ask again for schematic, final closeout, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-31 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Sprint team meeting, review clarifications with Kyle, modify Camp Power TPP, create Camp bulletin, rig builder evaluation meeting, review c&k manifold TPPs, review BOP controls TPPs, review handover notes from Joshua, review HH meeting agenda, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-05-31 OH-014 :OH-014 Overhead All Activities Regular Pay N 7 0 Business Acumen Training Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-01 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 Sprint team meeting, review clarifications with Kyle, modify Camp Power TPP, create Camp bulletin, rig builder evaluation meeting, review c&k manifold TPPs, review BOP controls TPPs, review handover notes from Joshua, review HH meeting agenda, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 TSR Board meeting, TSR weekly meeting, Kerui meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 department emails, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-01 Rig 270L-TSR :Rig 270L-TSR TSR-01566-270L Acummulator Modifications Regular Pay N 0.5 0 Review comments from Mark, review databook from CPC, ask again for schematic, final closeout, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-02 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5.5 0 Sprint team meeting, review clarifications with Kyle, modify Camp Power TPP, create Camp bulletin, rig builder evaluation meeting, review c&k manifold TPPs, review BOP controls TPPs, review handover notes from Joshua, review HH meeting agenda, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR Board meeting, TSR weekly meeting, Kerui meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 department emails, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Spring Cleaning, timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-02 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1 0 review scope of work for tender from Ralph, review meeting minutes from Ralph and Entro, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-05 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 Review tpp for C&K and BOP Controls, send out tpps for review, send out rfps to Hydril and Wier, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-05 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 4.5 0 gap analysis for S. Iraq tender, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-05 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 weekly Sakhalin meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-06 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 Review tpp for C&K and BOP Controls, send out tpps for review, send out rfps to Hydril and Wier, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meetings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-07 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 Review tpp for C&K and BOP Controls, send out tpps for review, send out rfps to Hydril and Wier, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meetings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meetings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-08 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 7 0 gap analysis for S. Iraq tender, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-09 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Work Crew Beach Retreat Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-12 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Work Crew Beach Retreat Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-13 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Work Crew Beach Retreat Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Work Crew Beach Retreat Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Work Crew Beach Retreat Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Work Crew Beach Retreat Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-19 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.5 0 discussions with George and Gary, meeting with Marina on tender support, send load list to Drillmec, gap analysis, Due Diligence Overview meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1.5 0 Turn over to Chris Enroth, review BOP quote with Joshua, Sprint team meeting, Camp bulletin with septic tank scope Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meetings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-19 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 4 0 Closeout Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-20 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 discussions with George and Gary, meeting with Marina on tender support, send load list to Drillmec, gap analysis, Due Diligence Overview meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1.5 0 Turn over to Chris Enroth, review BOP quote with Joshua, Sprint team meeting, Camp bulletin with septic tank scope Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meetings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-20 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Crown sheave review, ask NOV for koomey P&ID, review Buxton installation manual, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-20 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 4 0 Closeout Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-21 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 discussions with George and Gary, meeting with Marina on tender support, send load list to Drillmec, gap analysis, Due Diligence Overview meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-21 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Turn over to Chris Enroth, review BOP quote with Joshua, Sprint team meeting, Camp bulletin with septic tank scope Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-21 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 1 0 redo Kenya application, talk with Gary, prep for Uganda, call Patty for flight info, review scope with Gary, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-21 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1.5 0 Crown sheave review, ask NOV for koomey P&ID, review Buxton installation manual, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-21 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 4 0 Closeout Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-22 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 discussions with George and Gary, meeting with Marina on tender support, send load list to Drillmec, gap analysis, Due Diligence Overview meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meetings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-22 Rig 270L-TSR :Rig 270L-TSR TSR-01479-270L General Query Engineering Regular Pay N 4 0 Closeout Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-23 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 discussions with George and Gary, meeting with Marina on tender support, send load list to Drillmec, gap analysis, Due Diligence Overview meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meetings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-23 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 0.5 0 redo Kenya application, talk with Gary, prep for Uganda, call Patty for flight info, review scope with Gary, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7 0 Review technical spec, gap analysis, divide up scope, send out to Drillmec and ask for load list, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meetings Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-26 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 1.5 0 Prep for Uganda trip, Uganda Due Diligence Trip, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7 0 Review technical spec, gap analysis, divide up scope, send out to Drillmec and ask for load list, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meetings Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-27 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 1.5 0 Prep for Uganda trip, Uganda Due Diligence Trip, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-28 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 Review technical spec, gap analysis, divide up scope, send out to Drillmec and ask for load list, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-28 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 4 0 Prep for Uganda trip, Uganda Due Diligence Trip, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-29 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 12 0 Prep for Uganda trip, Uganda Due Diligence Trip, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-06-30 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 12 0 Prep for Uganda trip, Uganda Due Diligence Trip, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-01 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 12 0 Prep for Uganda trip, Uganda Due Diligence Trip, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-02 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 12 0 Uganda Due Diligence Trip Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-03 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 12 0 Uganda Due Diligence Trip Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-04 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 12 0 Uganda Due Diligence Trip Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-05 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 12 0 Uganda Due Diligence Trip Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-06 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 12 0 Uganda Due Diligence Trip Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-07 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 12 0 Uganda Due Diligence Trip Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-08 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 12 0 Uganda Due Diligence Trip Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-09 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 12 0 Uganda Due Diligence Trip, create map, compile DD info and send to George, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-10 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 12 0 Uganda Due Diligence Trip, create map, compile DD info and send to George, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-11 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 12 0 Uganda Due Diligence Trip, create map, compile DD info and send to George, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-12 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 create load list for Parker furnished equipment, tech spec review, gather quotes, meeting with TDI, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-12 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 4 0 Uganda Due Diligence Trip, create map, compile DD info and send to George, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-13 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 8 0 create load list for Parker furnished equipment, tech spec review, gather quotes, meeting with TDI, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-14 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 8 0 create load list for Parker furnished equipment, tech spec review, gather quotes, meeting with TDI, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-17 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 11 0 Tech spec review, help Reck with cost estimate, track down costs, Environmental one pager, review clarifications, cost estimate meeting, TDI meeting, discussions with George, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-18 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 12 0 Tech spec review, help Reck with cost estimate, track down costs, Environmental one pager, review clarifications, cost estimate meeting, TDI meeting, discussions with George, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-19 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 11 0 Tech spec review, help Reck with cost estimate, track down costs, Environmental one pager, review clarifications, cost estimate meeting, TDI meeting, discussions with George, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-20 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9 0 Tech spec review, help Reck with cost estimate, track down costs, Environmental one pager, review clarifications, cost estimate meeting, TDI meeting, discussions with George, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-21 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 11 0 Tech spec review, help Reck with cost estimate, track down costs, Environmental one pager, review clarifications, cost estimate meeting, TDI meeting, discussions with George, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-24 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 8 0 Review emails on Uganda, discuss final touches to proposal, review and revise tech spec, format and pick up comments on the environmental one pager, adjust cost estimate and verify with George, create map on Google Earth, Peer Review Meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheets, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-25 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 Review emails on Uganda, discuss final touches to proposal, review and revise tech spec, format and pick up comments on the environmental one pager, adjust cost estimate and verify with George, create map on Google Earth, Peer Review Meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Plus Petrol Tender, conference call, cost estimate, project schedule, emails, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-25 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.25 0 Negotiating Seminar, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 Review emails on Uganda, discuss final touches to proposal, review and revise tech spec, format and pick up comments on the environmental one pager, adjust cost estimate and verify with George, create map on Google Earth, Peer Review Meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Plus Petrol Tender, conference call, cost estimate, project schedule, emails, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9.5 0 Review emails on Uganda, discuss final touches to proposal, review and revise tech spec, format and pick up comments on the environmental one pager, adjust cost estimate and verify with George, create map on Google Earth, Peer Review Meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 Weekly TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-28 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Missed holiday from Uganda trip Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, weekly TSR meeting, 2nd quarter earnings meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-07-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Plus Petrol questionnaire, cost estimate, RFI, schedule, tech specs prep, supplier list, load list summary Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Plus Petrol questionnaire, cost estimate, RFI, schedule, tech specs prep, supplier list, load list summary Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Plus Petrol questionnaire, cost estimate, RFI, schedule, tech specs prep, supplier list, load list summary Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.25 0 board meeting, weekly TSR meeting, 2nd quarter earnings meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Plus Petrol questionnaire, cost estimate, RFI, schedule, tech specs prep, supplier list, load list summary Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-04 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Modify RFS, sign final timesheet, send to Brian for signature Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6.5 0 Plus Petrol questionnaire, cost estimate, RFI, schedule, tech specs prep, supplier list, load list summary Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-07 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 clarifications, tech spec modification, project review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Plus Petrol Tender support, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-08 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 clarifications, tech spec modification, project review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-08 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 tender kick off meeting, project review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Plus Petrol Tender support, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-09 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 clarifications, tech spec modification, project review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-09 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 tender kick off meeting, project review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-09 Hibernia Platform :Hibernia Platform TSR-01594-HIBP Knuckle Boom Crane Regular Pay N 1 0 TSR creation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4.5 0 Plus Petrol Tender support, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-10 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 clarifications, tech spec modification, project review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-10 Hibernia Platform :Hibernia Platform TSR-01594-HIBP Knuckle Boom Crane Regular Pay N 1.5 0 TSR creation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4.5 0 Plus Petrol Tender support, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-11 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Ruby's Birthday in Dallas Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-14 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Clarifications, review, submittal of clarifications Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Review DATI support with Gary, timesheet, safety moment prep, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6.25 0 Plus Petrol tender support, HKN gap analysis, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-15 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Clarifications, review, submittal of clarifications Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-15 Hibernia Platform :Hibernia Platform TSR-01594-HIBP Knuckle Boom Crane Regular Pay N 2 0 meeting and discussion Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Plus Petrol tender support, HKN gap analysis, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-16 Hibernia Platform :Hibernia Platform TSR-01594-HIBP Knuckle Boom Crane Regular Pay N 0.5 0 meeting and discussion Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 Review DATI support with Gary, timesheet, safety moment prep, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Plus Petrol tender support, HKN gap analysis, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Review DATI support with Gary, timesheet, safety moment prep, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6.5 0 Plus Petrol tender support, HKN gap analysis, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Plus Petrol tender support, HKN gap analysis, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-21 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 10 0 Clarifications, more clarifications, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board meeting, weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 timesheet, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-22 OH-014 :OH-014 Overhead All Activities Regular Pay N 9 0 IADC Asset Integrity and Reliability Conference Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-23 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5.75 0 Clarifications, more clarifications, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-23 OH-014 :OH-014 Overhead All Activities Regular Pay N 5 0 IADC Asset Integrity and Reliability Conference Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-24 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 8 0 Clarifications, more clarifications, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board meeting, weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-25 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Tanner's Bach Party Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-28 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Hurricane Harvey (Stuck in Odessa) Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-29 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 TOTAL Clarifications No. 1 & No. 3 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-29 OH-011 :OH-011 Overhead All Activities Regular Pay N 5 0 Hurricane Harvey (Stuck in Odessa) Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-30 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 TOTAL Clarifications No. 1 & No. 3 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-30 OH-011 :OH-011 Overhead All Activities Regular Pay N 5 0 Hurricane Harvey (Stuck in Odessa) Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-31 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 TOTAL Clarifications No. 1 & No. 3 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-08-31 OH-011 :OH-011 Overhead All Activities Regular Pay N 4 0 Hurricane Harvey (Stuck in Odessa) Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-01 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 TOTAL Clarifications No. 1 & No. 3 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-01 OH-011 :OH-011 Overhead All Activities Regular Pay N 3 0 Hurricane Harvey (Stuck in Odessa) Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Labor Day Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-05 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 11 0 Clarifications No. 1 & 3, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 Clarifications No. 1 & 3, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-06 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 1 0 Create Solidworks model Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 timesheet, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-07 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Colton's Wedding in Connecticut Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-08 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Colton's Wedding in Connecticut Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-11 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Clarification No. 4, Clarification No. 5, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 emails, discussions, smart goal discussion, smart goal TSR, smart goal CTR, called Leroy, drawing list on CTR (1hr), prepped for lunch and learn on IADC Conference; Created tank volume spreadsheet for 269 & 247 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-11 Rig 209L-TSR :Rig 209L-TSR TSR-01599-209L Cameron X-mas Tree Stump Modification Regular Pay N 3 0 Review and discuss, call Jeff, list all fabrication and quotation requirements in RFI, closeout report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-11 Rig 270L-TSR :Rig 270L-TSR TSR-01595-270L Skidding Pony Sub Regular Pay N 3 0 Review and discuss, call Mihovil, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-12 Berkut-TSR :Berkut-TSR TSR-01598-BERP Catwalk Skate Adaptor Tool Regular Pay N 1 0 TSR Closeout review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-12 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 Clarification No. 4, Clarification No. 5, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails, discussions, smart goal discussion, smart goal TSR, smart goal CTR, called Leroy, drawing list on CTR (1hr), prepped for lunch and learn on IADC Conference; Created tank volume spreadsheet for 269 & 247 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-12 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Security Awareness Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-12 Rig 209L-TSR :Rig 209L-TSR TSR-01599-209L Cameron X-mas Tree Stump Modification Regular Pay N 2 0 Review and discuss, call Jeff, list all fabrication and quotation requirements in RFI, closeout report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-13 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Clarification No. 4, Clarification No. 5, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 emails, discussions, smart goal discussion, smart goal TSR, smart goal CTR, called Leroy, drawing list on CTR (1hr), prepped for lunch and learn on IADC Conference; Created tank volume spreadsheet for 269 & 247 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-13 Rig 209L-TSR :Rig 209L-TSR TSR-01599-209L Cameron X-mas Tree Stump Modification Regular Pay N 3 0 Review and discuss, call Jeff, list all fabrication and quotation requirements in RFI, closeout report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 5.5 0 emails, discussions, smart goal discussion, smart goal TSR, smart goal CTR, called Leroy, drawing list on CTR (1hr), prepped for lunch and learn on IADC Conference; Created tank volume spreadsheet for 269 & 247 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 Halliburton in Oman Questionnaire Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 7 0 emails, discussions, smart goal discussion, smart goal TSR, smart goal CTR, called Leroy, drawing list on CTR (1hr), prepped for lunch and learn on IADC Conference; Created tank volume spreadsheet for 269 & 247 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-18 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 Review TOTAL submissions from ITS, resubmit to Marina, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Review Indonesia opportunity with Gary (trip and rig), SEMS discussion and organization, prep for IADC Conference lunch and learn, actual meeting and discussions, 249 valve issue handed off to purchasing, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 filled out the Additional Information tab for the Oman tender, review the Chevron Angola project overview with George, start creating cost estimate, create cost estimate, review and hand over to Jack, start CNOOC tender, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-18 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 Sakhalin meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2.5 0 Drill Pipe Technical Evaluation, CAD and CPC evaluation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 Review Indonesia opportunity with Gary (trip and rig), SEMS discussion and organization, prep for IADC Conference lunch and learn, actual meeting and discussions, 249 valve issue handed off to purchasing, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 filled out the Additional Information tab for the Oman tender, review the Chevron Angola project overview with George, start creating cost estimate, create cost estimate, review and hand over to Jack, start CNOOC tender, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-19 Rig 209L-TSR :Rig 209L-TSR TSR-01599-209L Cameron X-mas Tree Stump Modification Regular Pay N 1 0 review RFI, email Cameron with specific details of what to quote, write close out, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Drill Pipe Technical Evaluation, CAD and CPC evaluation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Review Indonesia opportunity with Gary (trip and rig), SEMS discussion and organization, prep for IADC Conference lunch and learn, actual meeting and discussions, 249 valve issue handed off to purchasing, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5.5 0 filled out the Additional Information tab for the Oman tender, review the Chevron Angola project overview with George, start creating cost estimate, create cost estimate, review and hand over to Jack, start CNOOC tender, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-21 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 Drill Pipe Technical Evaluation, CAD and CPC evaluation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-21 Rig 209L-TSR :Rig 209L-TSR TSR-01599-209L Cameron X-mas Tree Stump Modification Regular Pay N 4 0 review RFI, email Cameron with specific details of what to quote, write close out, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-22 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Drill Pipe Technical Evaluation, CAD and CPC evaluation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 filled out the Additional Information tab for the Oman tender, review the Chevron Angola project overview with George, start creating cost estimate, create cost estimate, review and hand over to Jack, start CNOOC tender, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-22 Rig 209L-TSR :Rig 209L-TSR TSR-01599-209L Cameron X-mas Tree Stump Modification Regular Pay N 1 0 review RFI, email Cameron with specific details of what to quote, write close out, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 CNOOC Tender Support Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-25 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3 0 Adjust CTR before meeting, meeting with Kyle, Rob, and James on path forward, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 CNOOC Tender Support Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 TOTAL Clarifications Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 CNOOC Tender Support Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-28 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9 0 TOTAL Clarifications Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-09-29 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6.5 0 TOTAL Clarifications Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-02 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7 0 TOTAL drawings for meeting, Parker selling tactics, drawings and project review, meeting with George, meeting with HH, discussion about meeting rig design and strategy, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Logistics Clarification, Rig Move Schedule, Clean up and finish appendix 7 tech spec, clean up and finish appendix 8, have Lam add 3 reserve pits to plot plan drawing, submit all documents, HKN clarifications, read Crescent tender documents, started on tech specs, Plus Petrol clarification on third party services, discussion on PP response, PP meeting, modification of PP schedule, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 TOTAL drawings for meeting, Parker selling tactics, drawings and project review, meeting with George, meeting with HH, discussion about meeting rig design and strategy, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Logistics Clarification, Rig Move Schedule, Clean up and finish appendix 7 tech spec, clean up and finish appendix 8, have Lam add 3 reserve pits to plot plan drawing, submit all documents, HKN clarifications, read Crescent tender documents, started on tech specs, Plus Petrol clarification on third party services, discussion on PP response, PP meeting, modification of PP schedule, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-04 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 TOTAL drawings for meeting, Parker selling tactics, drawings and project review, meeting with George, meeting with HH, discussion about meeting rig design and strategy, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Logistics Clarification, Rig Move Schedule, Clean up and finish appendix 7 tech spec, clean up and finish appendix 8, have Lam add 3 reserve pits to plot plan drawing, submit all documents, HKN clarifications, read Crescent tender documents, started on tech specs, Plus Petrol clarification on third party services, discussion on PP response, PP meeting, modification of PP schedule, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-04 Rig 209L-TSR :Rig 209L-TSR TSR-01599-209L Cameron X-mas Tree Stump Modification Regular Pay N 2 0 RFI-002, status update from Cameron, review Kathy's update and check with Ralph on complete project scope, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-05 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.5 0 TOTAL drawings for meeting, Parker selling tactics, drawings and project review, meeting with George, meeting with HH, discussion about meeting rig design and strategy, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4.25 0 Logistics Clarification, Rig Move Schedule, Clean up and finish appendix 7 tech spec, clean up and finish appendix 8, have Lam add 3 reserve pits to plot plan drawing, submit all documents, HKN clarifications, read Crescent tender documents, started on tech specs, Plus Petrol clarification on third party services, discussion on PP response, PP meeting, modification of PP schedule, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-05 Rig 209L-TSR :Rig 209L-TSR TSR-01599-209L Cameron X-mas Tree Stump Modification Regular Pay N 0.75 0 RFI-002, status update from Cameron, review Kathy's update and check with Ralph on complete project scope, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6.5 0 Logistics Clarification, Rig Move Schedule, Clean up and finish appendix 7 tech spec, clean up and finish appendix 8, have Lam add 3 reserve pits to plot plan drawing, submit all documents, HKN clarifications, read Crescent tender documents, started on tech specs, Plus Petrol clarification on third party services, discussion on PP response, PP meeting, modification of PP schedule, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6.5 0 Plus Petrol questions, Crescent Tech Spec, HKN clarification 2 and 3, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-09 Rig 209L-TSR :Rig 209L-TSR TSR-01599-209L Cameron X-mas Tree Stump Modification Regular Pay N 1.5 0 create CTR and email official scope to Kathy, padeye question with Kathy, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-10 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 TOTAL clarification 8 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board meeting, Safety moment prep, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Plus Petrol questions, Crescent Tech Spec, HKN clarification 2 and 3, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-10 Rig 270L-TSR :Rig 270L-TSR TSR-01595-270L Skidding Pony Sub Regular Pay N 1.5 0 Prep for Exxon meeting, meeting at Exxon's facility Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-11 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.5 0 TOTAL clarification 8 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-11 Rig 270L-TSR :Rig 270L-TSR TSR-01595-270L Skidding Pony Sub Regular Pay N 6.5 0 Prep for Exxon meeting, meeting at Exxon's facility Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR board meeting, Safety moment prep, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2.5 0 Plus Petrol questions, Crescent Tech Spec, HKN clarification 2 and 3, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-12 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1.5 0 Set up travel to new iberia Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-12 Rig 209L-TSR :Rig 209L-TSR TSR-01599-209L Cameron X-mas Tree Stump Modification Regular Pay N 1 0 create CTR and email official scope to Kathy, padeye question with Kathy, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-13 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Tanner's Wedding Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-16 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 10.5 0 TOTAL clarifications, meeting with Kyle, meeting with George, meeting with Rob, clean up clarifications and send to HH, fill out ReelRig form, talk with Chuck, talk with HH, meeting with IDS, discussion with Sachin, Kyle, and Rob, email scope to sound company, continue working on clarifications, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 CFO meeting, TSR board meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-17 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9 0 TOTAL clarifications, meeting with Kyle, meeting with George, meeting with Rob, clean up clarifications and send to HH, fill out ReelRig form, talk with Chuck, talk with HH, meeting with IDS, discussion with Sachin, Kyle, and Rob, email scope to sound company, continue working on clarifications, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 CFO meeting, TSR board meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-17 Rig 270L-TSR :Rig 270L-TSR TSR-01595-270L Skidding Pony Sub Regular Pay N 0.25 0 meeting with Nick, conference call with Dean, brainstorm meeting with Reck, modify TSR, review old TSR information, establish TSR scope, discuss with Kyle, TSR modification and CTR creation, sent off to Dean, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-18 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4.5 0 TOTAL clarifications, meeting with Kyle, meeting with George, meeting with Rob, clean up clarifications and send to HH, fill out ReelRig form, talk with Chuck, talk with HH, meeting with IDS, discussion with Sachin, Kyle, and Rob, email scope to sound company, continue working on clarifications, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.25 0 Plus Petrol questions Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-18 Rig 209L-TSR :Rig 209L-TSR TSR-01599-209L Cameron X-mas Tree Stump Modification Regular Pay N 0.25 0 Received and reviewed Cameron quote, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-18 Rig 270L-TSR :Rig 270L-TSR TSR-01595-270L Skidding Pony Sub Regular Pay N 3.5 0 meeting with Nick, conference call with Dean, brainstorm meeting with Reck, modify TSR, review old TSR information, establish TSR scope, discuss with Kyle, TSR modification and CTR creation, sent off to Dean, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-19 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7 0 TOTAL clarifications, meeting with Kyle, meeting with George, meeting with Rob, clean up clarifications and send to HH, fill out ReelRig form, talk with Chuck, talk with HH, meeting with IDS, discussion with Sachin, Kyle, and Rob, email scope to sound company, continue working on clarifications, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 CFO meeting, TSR board meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 Plus Petrol questions Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-19 Rig 209L-TSR :Rig 209L-TSR TSR-01599-209L Cameron X-mas Tree Stump Modification Regular Pay N 1 0 Received and reviewed Cameron quote, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-19 Rig 270L-TSR :Rig 270L-TSR TSR-01595-270L Skidding Pony Sub Regular Pay N 3 0 meeting with Nick, conference call with Dean, brainstorm meeting with Reck, modify TSR, review old TSR information, establish TSR scope, discuss with Kyle, TSR modification and CTR creation, sent off to Dean, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-20 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 TOTAL clarifications, meeting with Kyle, meeting with George, meeting with Rob, clean up clarifications and send to HH, fill out ReelRig form, talk with Chuck, talk with HH, meeting with IDS, discussion with Sachin, Kyle, and Rob, email scope to sound company, continue working on clarifications, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-20 Rig 270L-TSR :Rig 270L-TSR TSR-01595-270L Skidding Pony Sub Regular Pay N 2 0 meeting with Nick, conference call with Dean, brainstorm meeting with Reck, modify TSR, review old TSR information, establish TSR scope, discuss with Kyle, TSR modification and CTR creation, sent off to Dean, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-23 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7 0 TOTAL clarifications, cost estimate, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-23 Rig 209L-TSR :Rig 209L-TSR TSR-01599-209L Cameron X-mas Tree Stump Modification Regular Pay N 2 0 review Cameron quote, send back to Cameron with changes, send info to Woodco, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-23 Rig 270L-TSR :Rig 270L-TSR TSR-01595-270L Skidding Pony Sub Regular Pay N 1 0 Review LoadMaster quote, send revised CTR, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-24 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7 0 TOTAL clarifications, cost estimate, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR Board Meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-24 Rig 270L-TSR :Rig 270L-TSR TSR-01595-270L Skidding Pony Sub Regular Pay N 1.5 0 Review LoadMaster quote, send revised CTR, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-25 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9 0 TOTAL clarifications, cost estimate, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 10 0 TOTAL clarifications, cost estimate, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 10.5 0 TOTAL clarifications, cost estimate, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-30 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7.75 0 Finishing up TOTAL technical clarifications and submittal, cost estimate, Path Forward meeting, phone call with HH, review sound study info, research Teflon inserts and Coriolis system, review cost increases with Lizzy, submit cost increases to everyone, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 TSR board meeting, TSR meeting, Quarterly Earnings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-30 Rig 270L-TSR :Rig 270L-TSR TSR-01595-270L Skidding Pony Sub Regular Pay N 2 0 Meeting with Nick, brainstorm, layout of cost estimate, finish cost estimate, revised again, sent summary to Dean, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-31 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6.75 0 Finishing up TOTAL technical clarifications and submittal, cost estimate, Path Forward meeting, phone call with HH, review sound study info, research Teflon inserts and Coriolis system, review cost increases with Lizzy, submit cost increases to everyone, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-31 Rig 209L-TSR :Rig 209L-TSR TSR-01599-209L Cameron X-mas Tree Stump Modification Regular Pay N 0.75 0 Refining the Woodco quote, revise closeout and submit, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-10-31 Rig 270L-TSR :Rig 270L-TSR TSR-01595-270L Skidding Pony Sub Regular Pay N 1 0 Meeting with Nick, brainstorm, layout of cost estimate, finish cost estimate, revised again, sent summary to Dean, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-01 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7.5 0 Finishing up TOTAL technical clarifications and submittal, cost estimate, Path Forward meeting, phone call with HH, review sound study info, research Teflon inserts and Coriolis system, review cost increases with Lizzy, submit cost increases to everyone, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board meeting, TSR meeting, Quarterly Earnings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-01 Rig 209L-TSR :Rig 209L-TSR TSR-01599-209L Cameron X-mas Tree Stump Modification Regular Pay N 1.5 0 Refining the Woodco quote, revise closeout and submit, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-01 Rig 270L-TSR :Rig 270L-TSR TSR-01595-270L Skidding Pony Sub Regular Pay N 1 0 Meeting with Nick, brainstorm, layout of cost estimate, finish cost estimate, revised again, sent summary to Dean, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-02 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7 0 Finishing up TOTAL technical clarifications and submittal, cost estimate, Path Forward meeting, phone call with HH, review sound study info, research Teflon inserts and Coriolis system, review cost increases with Lizzy, submit cost increases to everyone, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.75 0 TSR board meeting, TSR meeting, Quarterly Earnings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-02 Rig 270L-TSR :Rig 270L-TSR TSR-01595-270L Skidding Pony Sub Regular Pay N 1 0 Meeting with Nick, brainstorm, layout of cost estimate, finish cost estimate, revised again, sent summary to Dean, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6.5 0 Finishing up TOTAL technical clarifications and submittal, cost estimate, Path Forward meeting, phone call with HH, review sound study info, research Teflon inserts and Coriolis system, review cost increases with Lizzy, submit cost increases to everyone, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-03 Rig 270L-TSR :Rig 270L-TSR TSR-01595-270L Skidding Pony Sub Regular Pay N 1.5 0 Meeting with Nick, brainstorm, layout of cost estimate, finish cost estimate, revised again, sent summary to Dean, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9.5 0 Histogram learning and revising, Peer review meeting, modify histogram again, update cost estimate, send info to HH, talk with Lizzy, peer review, cost estimate, review sound study, update action item list with HH comments, review cashflow schedule with Rob, email HH about questions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-07 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 8 0 Histogram learning and revising, Peer review meeting, modify histogram again, update cost estimate, send info to HH, talk with Lizzy, peer review, cost estimate, review sound study, update action item list with HH comments, review cashflow schedule with Rob, email HH about questions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-08 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7.5 0 Histogram learning and revising, Peer review meeting, modify histogram again, update cost estimate, send info to HH, talk with Lizzy, peer review, cost estimate, review sound study, update action item list with HH comments, review cashflow schedule with Rob, email HH about questions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-08 Rig 270L-TSR :Rig 270L-TSR TSR-01595-270L Skidding Pony Sub Regular Pay N 1 0 update assumptions, update formatting, submit detailed cost estimate to Dean Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-09 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7.5 0 Histogram learning and revising, Peer review meeting, modify histogram again, update cost estimate, send info to HH, talk with Lizzy, peer review, cost estimate, review sound study, update action item list with HH comments, review cashflow schedule with Rob, email HH about questions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-09 Rig 270L-TSR :Rig 270L-TSR TSR-01595-270L Skidding Pony Sub Regular Pay N 2 0 update assumptions, update formatting, submit detailed cost estimate to Dean Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-10 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Histogram learning and revising, Peer review meeting, modify histogram again, update cost estimate, send info to HH, talk with Lizzy, peer review, cost estimate, review sound study, update action item list with HH comments, review cashflow schedule with Rob, email HH about questions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-10 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4 0 copy over calculations, call Leroy and prep for trip, change hotels, review drawings Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-12 OH-010 :OH-010 Overhead All Activities Regular Pay N 5 0 SEMS Package trip to Louisiana for 77B Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-13 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 10 0 SEMS Package trip to Louisiana for 77B Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-14 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 10 0 SEMS Package trip to Louisiana for 77B Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-15 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 10 0 SEMS Package trip to Louisiana for 77B Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-16 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 8 0 SEMS Package trip to Louisiana for 77B Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-17 OH-010 :OH-010 Overhead All Activities Regular Pay N 5 0 SEMS Package trip to Louisiana for 77B Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR board meetings Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Catch up on emails, discussions on work load Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-20 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 6 0 258L Tender for BP Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board meetings Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-21 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 6 0 258L Tender for BP Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-21 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3 0 Expense Report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-22 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 6 0 258L Tender for BP Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-23 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Thanksgiving Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-24 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Thanksgiving Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting, Internal Controls Refresher Meeting, TSR weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Review and answer emails from the weekend, review rig layouts with James, prep for safety moment, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-27 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 6.5 0 Finished tech spec gap analysis for 258L tender, review stack drawings with James Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-28 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 Visit IDS facility Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-28 OH-009 :OH-009 OH-009-012 270L Walking System – Non-billable Regular Pay N 4 0 Walking System Closeouts Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board Meeting, Internal Controls Refresher Meeting, TSR weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-29 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Review and answer emails from the weekend, review rig layouts with James, prep for safety moment, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-29 OH-009 :OH-009 OH-009-012 270L Walking System – Non-billable Regular Pay N 6.5 0 Walking System Closeouts Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board Meeting, Internal Controls Refresher Meeting, TSR weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 Review and answer emails from the weekend, review rig layouts with James, prep for safety moment, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-11-30 OH-009 :OH-009 OH-009-012 270L Walking System – Non-billable Regular Pay N 7 0 Walking System Closeouts Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-01 OH-009 :OH-009 OH-009-012 270L Walking System – Non-billable Regular Pay N 7 0 Walking System Closeouts Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-04 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.5 0 updating the tech spec, updating cost estimate, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-04 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3 0 258L Tender documents, finalize Technical Questions Sheet, review drawings with James, submit all documents to George and Mat Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-04 OH-014 :OH-014 Overhead All Activities Regular Pay N 2.5 0 Finance for Non-finance majors, SAFI training, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-05 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 updating the tech spec, updating cost estimate, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 Safety Moment creation, discussion with Greg, review Safer Union with Rob, contact Tami about adding them to AVL, contact Rae about lunch and learn, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-05 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3 0 258L Tender documents, finalize Technical Questions Sheet, review drawings with James, submit all documents to George and Mat Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6 0 updating the tech spec, updating cost estimate, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Safety Moment creation, discussion with Greg, review Safer Union with Rob, contact Tami about adding them to AVL, contact Rae about lunch and learn, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-06 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 258L Tender documents, finalize Technical Questions Sheet, review drawings with James, submit all documents to George and Mat Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-07 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 updating the tech spec, updating cost estimate, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board Meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-07 OH-014 :OH-014 Overhead All Activities Regular Pay N 4.75 0 Finance for Non-finance majors, SAFI training, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-08 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 updating the tech spec, updating cost estimate, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Safety Moment creation, discussion with Greg, review Safer Union with Rob, contact Tami about adding them to AVL, contact Rae about lunch and learn, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 timesheet, clean up office area, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-08 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3 0 258L Tender documents, finalize Technical Questions Sheet, review drawings with James, submit all documents to George and Mat Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting, Christmas luncheon, TSR Meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Fill out Supplier Add form and send questionnaire to R&H Machine, talked with Rae Burrows from R&H Machine, downloaded MS Office 2016, Researched Business Development Basics, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-11 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 5.5 0 258L tech spec, talk with Ellis, review tech spec and add more detail from SharePoint and drawings, talked with Cornel on 258L technical comparison, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-11 OH-014 :OH-014 Overhead All Activities Regular Pay N 2.5 0 Compliance Training, Training James on Solidworks, SAFI Training, book review with Rob, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Board Meeting, Christmas luncheon, TSR Meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 Fill out Supplier Add form and send questionnaire to R&H Machine, talked with Rae Burrows from R&H Machine, downloaded MS Office 2016, Researched Business Development Basics, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-12 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 7 0 258L tech spec, talk with Ellis, review tech spec and add more detail from SharePoint and drawings, talked with Cornel on 258L technical comparison, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Fill out Supplier Add form and send questionnaire to R&H Machine, talked with Rae Burrows from R&H Machine, downloaded MS Office 2016, Researched Business Development Basics, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Performance Evaluation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-13 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1.5 0 258L tech spec, talk with Ellis, review tech spec and add more detail from SharePoint and drawings, talked with Cornel on 258L technical comparison, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 Board Meeting, Christmas luncheon, TSR Meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Performance Evaluation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-14 OH-014 :OH-014 Overhead All Activities Regular Pay N 4.25 0 Compliance Training, Training James on Solidworks, SAFI Training, book review with Rob, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-15 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 cost estimate update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.75 0 Fill out Supplier Add form and send questionnaire to R&H Machine, talked with Rae Burrows from R&H Machine, downloaded MS Office 2016, Researched Business Development Basics, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Performance Evaluation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-15 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 0.5 0 258L tech spec, talk with Ellis, review tech spec and add more detail from SharePoint and drawings, talked with Cornel on 258L technical comparison, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-18 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5.5 0 TOTAL cost estimate and new clarifications, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 prep for meeting, 2018 Goals Brainstorming, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Performance Eval Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-18 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 PlusPetrol Argentina, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-19 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5.25 0 TOTAL cost estimate and new clarifications, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 prep for meeting, 2018 Goals Brainstorming, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-19 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 PlusPetrol Argentina, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-20 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7.5 0 TOTAL cost estimate and new clarifications, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Performance Eval Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-21 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Christmas in Odesser Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Christmas in Odesser Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-25 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Christmas Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Driving back from Odesser Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.5 0 Updating TOTAL cost estimate, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 email catch up, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-27 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4 0 Pluspetrol Argentina Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-28 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6 0 Updating TOTAL cost estimate, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-28 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 2 0 Pluspetrol Argentina Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-29 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6.75 0 Updating TOTAL cost estimate, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2017-12-29 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 Pluspetrol Argentina Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Years Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-02 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.75 0 TOTAL tender support and clarifications Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-02 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 7 0 Pluspetrol Argentina tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 TOTAL tender support and clarifications Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-03 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 6 0 Pluspetrol Argentina tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-04 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 TOTAL tender support and clarifications Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-04 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 5.5 0 Pluspetrol Argentina tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-05 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 TOTAL tender support and clarifications Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-05 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4 0 Pluspetrol Argentina tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-05 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3 0 SEMS package calculations Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Prep for trip to Angola, discussed with Gary and George, collect BOSIET info for Gary, talk about inspections with Greg, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-08 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1.25 0 Start pressure calcs, get Oracle info from Anatra, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-08 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 3 0 Review schedule from George, discuss with George, create schedule, call Randy Crowson, modify schedule, submit to George, Randy, and Steve, called Randy again, talked with George again, updated schedule again, updated schedule again after talking with Randy, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-08 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2 0 meeting with Mark and Genesis, review scope and method of payment, review and modify strength and stability spreadsheet for DM, finish weight sheet and discuss with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Prep for trip to Angola, discussed with Gary and George, collect BOSIET info for Gary, talk about inspections with Greg, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-09 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 3 0 Pluspetrol Argentina, submitted a price to PP, reviewed rig info with Lizzy, reviewed and discussed clarification, respond to Omar with priorities and updated gap analysis, talk with Billy, Jack, and Omar about path forward, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-09 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1.75 0 Start pressure calcs, get Oracle info from Anatra, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-09 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1.5 0 Review schedule from George, discuss with George, create schedule, call Randy Crowson, modify schedule, submit to George, Randy, and Steve, called Randy again, talked with George again, updated schedule again, updated schedule again after talking with Randy, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-09 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 0.5 0 meeting with Mark and Genesis, review scope and method of payment, review and modify strength and stability spreadsheet for DM, finish weight sheet and discuss with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Prep for trip to Angola, discussed with Gary and George, collect BOSIET info for Gary, talk about inspections with Greg, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-10 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4.5 0 Pluspetrol Argentina, submitted a price to PP, reviewed rig info with Lizzy, reviewed and discussed clarification, respond to Omar with priorities and updated gap analysis, talk with Billy, Jack, and Omar about path forward, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-10 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2 0 Review schedule from George, discuss with George, create schedule, call Randy Crowson, modify schedule, submit to George, Randy, and Steve, called Randy again, talked with George again, updated schedule again, updated schedule again after talking with Randy, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-10 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 0.5 0 meeting with Mark and Genesis, review scope and method of payment, review and modify strength and stability spreadsheet for DM, finish weight sheet and discuss with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-11 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.75 0 PO problem with sound study supplier, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 TSR meeting, saferunion presentation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-11 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4.5 0 Pluspetrol Argentina, submitted a price to PP, reviewed rig info with Lizzy, reviewed and discussed clarification, respond to Omar with priorities and updated gap analysis, talk with Billy, Jack, and Omar about path forward, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-11 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2 0 Review schedule from George, discuss with George, create schedule, call Randy Crowson, modify schedule, submit to George, Randy, and Steve, called Randy again, talked with George again, updated schedule again, updated schedule again after talking with Randy, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 TSR meeting, saferunion presentation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Prep for trip to Angola, discussed with Gary and George, collect BOSIET info for Gary, talk about inspections with Greg, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-12 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1.5 0 Pluspetrol Argentina, submitted a price to PP, reviewed rig info with Lizzy, reviewed and discussed clarification, respond to Omar with priorities and updated gap analysis, talk with Billy, Jack, and Omar about path forward, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-12 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2.5 0 meeting with Mark and Genesis, review scope and method of payment, review and modify strength and stability spreadsheet for DM, finish weight sheet and discuss with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Setting up meeting and presentation for SaferUnion, collecting info on PMP and PE cost, catch up after office closure, discuss goals with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-15 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 6.5 0 Pressure Calcs, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Office closure due to icy weather Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Office closure due to icy weather Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Setting up meeting and presentation for SaferUnion, collecting info on PMP and PE cost, catch up after office closure, discuss goals with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 Angola VISA stuff, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-18 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 3 0 Pluspetrol support and HH rig visit, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-18 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1 0 Pressure Calcs, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-18 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2 0 Kick off meeting with Genesis Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Setting up meeting and presentation for SaferUnion, collecting info on PMP and PE cost, catch up after office closure, discuss goals with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Angola VISA stuff, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-19 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 6 0 Pluspetrol support and HH rig visit, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-19 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 0.5 0 Pressure Calcs, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 Board Meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 filled out application and submitted all documents for Angola VISA Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-22 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1.5 0 pluspetrol Argentina Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-22 OH-014 :OH-014 Overhead All Activities Regular Pay N 5.5 0 Visit MH Wirth facility in Katy; Good to Great Review; Safer Union; Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-22 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 0.5 0 discussed drawings with James, pressure calculations, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-23 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 pluspetrol Argentina Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-23 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1.5 0 discussed drawings with James, pressure calculations, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-23 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 5.5 0 meeting with Genesis, send information to Genesis, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 AutoCAD install Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-24 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3 0 DNO technical specs Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-24 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Visit MH Wirth facility in Katy; Good to Great Review; Safer Union; Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-24 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2 0 meeting with Genesis, send information to Genesis, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-25 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 Test Frame meeting, research, and discussion Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board Meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-25 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 3 0 pluspetrol Argentina Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-25 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 Visit MH Wirth facility in Katy; Good to Great Review; Safer Union; Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-25 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1 0 discussed drawings with James, pressure calculations, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-25 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2 0 meeting with Genesis, send information to Genesis, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-26 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 8 0 pluspetrol Argentina Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-26 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 0.5 0 discussed drawings with James, pressure calculations, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-29 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.75 0 discuss design with Dan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 board meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 Received dummy itinerary and forwarded to Jen, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-29 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 6 0 Pluspetrol Argentina tech spec comparison, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-29 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 0.5 0 Forwarded drill floor weight info to Genesis, prep and status meeting, send out minutes, review questions, call Mark and Dan for slope information, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-30 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4.75 0 Pluspetrol Argentina tech spec comparison, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-30 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 2 0 pressure calcs complete, start flow calcs, discussion with James, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-30 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2.25 0 Forwarded drill floor weight info to Genesis, prep and status meeting, send out minutes, review questions, call Mark and Dan for slope information, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-31 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 discuss design with Dan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-31 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 5 0 Pluspetrol Argentina tech spec comparison, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-31 OH-014 :OH-014 Overhead All Activities Regular Pay N 0.75 0 Good to Great with Rob Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-31 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 0.25 0 pressure calcs complete, start flow calcs, discussion with James, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-01-31 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2 0 Forwarded drill floor weight info to Genesis, prep and status meeting, send out minutes, review questions, call Mark and Dan for slope information, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-01 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 discuss design with Dan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 board meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Performance Review, create reading schedule for PMBOK 2018 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-01 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4 0 Pluspetrol Argentina tech spec comparison, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-01 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 0.75 0 pressure calcs complete, start flow calcs, discussion with James, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-01 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 1.5 0 Forwarded drill floor weight info to Genesis, prep and status meeting, send out minutes, review questions, call Mark and Dan for slope information, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-02 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.75 0 discuss design with Dan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Performance Review, create reading schedule for PMBOK 2018 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-02 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 0.75 0 pressure calcs complete, start flow calcs, discussion with James, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-02 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 1 0 Forwarded drill floor weight info to Genesis, prep and status meeting, send out minutes, review questions, call Mark and Dan for slope information, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-05 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 discuss with Kyle, email Tyler and AJ, project schedule, create high level design comparison, review with AJ Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 board meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-05 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 2 0 flow calculations Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-05 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 1.5 0 Review drawing plan with Dan, create a slope table for the different well locations, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-05 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 1.5 0 Review submitted docs, status meeting and review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-06 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 4 0 discuss with Kyle, email Tyler and AJ, project schedule, create high level design comparison, review with AJ Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-06 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4 0 flow calculations Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-06 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2 0 Review submitted docs, status meeting and review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.75 0 Angola consulate visit, discuss path forward with Kizomba rig inspection Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-07 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4 0 flow calculations Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-07 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 2.5 0 Review drawing plan with Dan, create a slope table for the different well locations, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-08 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 discuss with Kyle, email Tyler and AJ, project schedule, create high level design comparison, review with AJ Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Angola consulate visit, discuss path forward with Kizomba rig inspection Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-08 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 7.5 0 flow calculations Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-09 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 discuss with Kyle, email Tyler and AJ, project schedule, create high level design comparison, review with AJ Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-09 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 6.75 0 flow calculations Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-12 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 review plan, adjust work load, create meeting for Friday, review design with Dan, book hotel for Monday, make travel plans, communicate with 2mtek, review travel with Dan and review final design pictures and make list of questions for 2mtek, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 board meeting, TSR meeting, 4th quarter earnings meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Problem with Outlook, helpdesk ticket with IT, 13 updates had to be installed, closed, reviewed BOP test issue from Hibernia with Mike Kyle and Rob, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-12 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1.5 0 Add API information to a table for Crescent tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-12 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 2 0 review drawings with Dan, create closeout, submit to Kyle Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-12 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2 0 final review of Genesis report, mark up report and discuss with Tecky Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 Angola travel info, schedule clinic visit for offshore medical Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-13 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 4.5 0 review drawings with Dan, create closeout, submit to Kyle Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-13 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 3 0 final review of Genesis report, mark up report and discuss with Tecky Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-14 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 review plan, adjust work load, create meeting for Friday, review design with Dan, book hotel for Monday, make travel plans, communicate with 2mtek, review travel with Dan and review final design pictures and make list of questions for 2mtek, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-14 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4 0 flow calcs Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-14 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 1 0 review drawings with Dan, create closeout, submit to Kyle Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-14 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2 0 final review of Genesis report, mark up report and discuss with Tecky Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-15 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2.5 0 review plan, adjust work load, create meeting for Friday, review design with Dan, book hotel for Monday, make travel plans, communicate with 2mtek, review travel with Dan and review final design pictures and make list of questions for 2mtek, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 board meeting, TSR meeting, 4th quarter earnings meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Problem with Outlook, helpdesk ticket with IT, 13 updates had to be installed, closed, reviewed BOP test issue from Hibernia with Mike Kyle and Rob, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.25 0 Angola travel info, schedule clinic visit for offshore medical Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-15 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4.25 0 flow calcs Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-16 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1.5 0 review plan, adjust work load, create meeting for Friday, review design with Dan, book hotel for Monday, make travel plans, communicate with 2mtek, review travel with Dan and review final design pictures and make list of questions for 2mtek, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Problem with Outlook, helpdesk ticket with IT, 13 updates had to be installed, closed, reviewed BOP test issue from Hibernia with Mike Kyle and Rob, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-16 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3 0 flow calcs Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 6 0 President's day Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-19 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 travel to Lafayette, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-20 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5 0 travel to Lafayette and review tension and torque test machines at 2MTek; travel to Stress Engineering and witness tension test for torque subs, review frame design, size cylinders, expense report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-20 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 travel to Lafayette, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-21 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5 0 travel to Lafayette and review tension and torque test machines at 2MTek; travel to Stress Engineering and witness tension test for torque subs, review frame design, size cylinders, expense report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 Angola discussions with Gary, malaria training, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-21 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 0.25 0 discussion with James, mud gun flow calcs, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-21 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2 0 finished changes to report, finalized, submitted, started closeout, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-22 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1.5 0 travel to Lafayette and review tension and torque test machines at 2MTek; travel to Stress Engineering and witness tension test for torque subs, review frame design, size cylinders, expense report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 TSR meeting, review well control operations with Hibernia, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Angola discussions with Gary, malaria training, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-22 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1.75 0 DNO equipment spec comparison Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-22 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3 0 discussion with James, mud gun flow calcs, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-22 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 3 0 finished changes to report, finalized, submitted, started closeout, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting, review well control operations with Hibernia, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-23 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 5 0 discussion with James, mud gun flow calcs, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-26 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.75 0 Review model and discuss path forward, create meeting for Thursday, review the model with Dan and prep for meeting, update schedule, have meeting, discuss analysis structure, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 TSR board meeting, TSR weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-26 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6 0 DNO tender, Discussion about Baku Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-26 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1.5 0 trip tank calcs, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-27 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6.25 0 DNO tender, Discussion about Baku Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-27 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1.25 0 Argentina Support Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-28 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Review model and discuss path forward, create meeting for Thursday, review the model with Dan and prep for meeting, update schedule, have meeting, discuss analysis structure, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board meeting, TSR weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-28 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1.5 0 DNO tender, Discussion about Baku Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-02-28 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 6.5 0 Argentina Support Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-01 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 Review model and discuss path forward, create meeting for Thursday, review the model with Dan and prep for meeting, update schedule, have meeting, discuss analysis structure, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-01 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 Discussion with George, Joe, and Rodney about clarification and re-quote, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR board meeting, TSR weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-01 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 2 0 DNO tender, Discussion about Baku Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-01 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1.25 0 Argentina Support Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-02 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 Review model and discuss path forward, create meeting for Thursday, review the model with Dan and prep for meeting, update schedule, have meeting, discuss analysis structure, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-02 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6 0 Discussion with George, Joe, and Rodney about clarification and re-quote, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-05 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Review analysis, troubleshoot analysis, discuss material selection, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-05 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.25 0 send out all tech specs for requote, review cost estimate, review rig mat and noise control quotes, discuss drill string scope with Rodney, answer TOTAL clarification, update cost estimate, send info to Rodney, setup meeting for cost estimate review, have meeting with Rodney, review needed changes, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-05 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 0.75 0 Reviewed flight options to Baku, reviewed Socar AQS presentation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-05 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4.5 0 set up meeting with NOV, have meeting with NOV, review and discuss findings from quote, get clarification from Rod and Billy, send info to Omar, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-06 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 Review analysis, troubleshoot analysis, discuss material selection, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7.75 0 send out all tech specs for requote, review cost estimate, review rig mat and noise control quotes, discuss drill string scope with Rodney, answer TOTAL clarification, update cost estimate, send info to Rodney, setup meeting for cost estimate review, have meeting with Rodney, review needed changes, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-06 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 3.5 0 set up meeting with NOV, have meeting with NOV, review and discuss findings from quote, get clarification from Rod and Billy, send info to Omar, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-07 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 6 0 Review analysis, troubleshoot analysis, discuss material selection, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-07 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 send out all tech specs for requote, review cost estimate, review rig mat and noise control quotes, discuss drill string scope with Rodney, answer TOTAL clarification, update cost estimate, send info to Rodney, setup meeting for cost estimate review, have meeting with Rodney, review needed changes, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, department discussions, meeting with Rob Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-08 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 6 0 Review analysis, troubleshoot analysis, discuss material selection, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-08 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 send out all tech specs for requote, review cost estimate, review rig mat and noise control quotes, discuss drill string scope with Rodney, answer TOTAL clarification, update cost estimate, send info to Rodney, setup meeting for cost estimate review, have meeting with Rodney, review needed changes, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, department discussions, meeting with Rob Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-09 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 4 0 Review analysis, troubleshoot analysis, discuss material selection, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-09 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 send out all tech specs for requote, review cost estimate, review rig mat and noise control quotes, discuss drill string scope with Rodney, answer TOTAL clarification, update cost estimate, send info to Rodney, setup meeting for cost estimate review, have meeting with Rodney, review needed changes, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 board meeting, department discussions, meeting with Rob Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-12 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 4 0 analysis, tracking hours, hand calcs, solidworks problems, analysis, met with AMC about material selection, set up meeting for Joshua Dan and me, identify materials in all components, have meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-12 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 reviewing quotes for TOTAL, radio cabin, Red Sea scope increase, calculated loads for pad to pad moves for Bemuga, answered questions from WOM, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-12 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2.5 0 KPO JV schedule creation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-13 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.5 0 analysis, tracking hours, hand calcs, solidworks problems, analysis, met with AMC about material selection, set up meeting for Joshua Dan and me, identify materials in all components, have meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-13 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 reviewing quotes for TOTAL, radio cabin, Red Sea scope increase, calculated loads for pad to pad moves for Bemuga, answered questions from WOM, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-13 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1.5 0 KPO JV schedule creation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-14 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 9 0 analysis, tracking hours, hand calcs, solidworks problems, analysis, met with AMC about material selection, set up meeting for Joshua Dan and me, identify materials in all components, have meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-14 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 reviewing quotes for TOTAL, radio cabin, Red Sea scope increase, calculated loads for pad to pad moves for Bemuga, answered questions from WOM, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-15 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 9.5 0 analysis, tracking hours, hand calcs, solidworks problems, analysis, met with AMC about material selection, set up meeting for Joshua Dan and me, identify materials in all components, have meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-15 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 reviewing quotes for TOTAL, radio cabin, Red Sea scope increase, calculated loads for pad to pad moves for Bemuga, answered questions from WOM, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 board meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-15 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 0.5 0 Baku prep Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-16 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5 0 analysis, tracking hours, hand calcs, solidworks problems, analysis, met with AMC about material selection, set up meeting for Joshua Dan and me, identify materials in all components, have meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-16 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 reviewing quotes for TOTAL, radio cabin, Red Sea scope increase, calculated loads for pad to pad moves for Bemuga, answered questions from WOM, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-16 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1 0 Review drawings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-19 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 3.5 0 Review current model with Dan, discuss project with AJ, review problems with assumptions, send detailed email with status and questions to AJ, update cost tracker, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-19 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 review cost estimate with Rodney and joe, review HH quote, review outstanding quotes with Jack, update cost estimate, answer Dinesh questions, review DP quote, fishing quote, and well control quote, NOV quote and meeting with Jack, update cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-19 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 2.75 0 VISA process for Azerbaijan, cancel flights and discuss plan forward with Gary, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-20 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.75 0 Review current model with Dan, discuss project with AJ, review problems with assumptions, send detailed email with status and questions to AJ, update cost tracker, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-20 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6.5 0 review cost estimate with Rodney and joe, review HH quote, review outstanding quotes with Jack, update cost estimate, answer Dinesh questions, review DP quote, fishing quote, and well control quote, NOV quote and meeting with Jack, update cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, expense report for Angola, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-20 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1.25 0 VISA process for Azerbaijan, cancel flights and discuss plan forward with Gary, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-21 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.75 0 Review current model with Dan, discuss project with AJ, review problems with assumptions, send detailed email with status and questions to AJ, update cost tracker, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-21 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7 0 review cost estimate with Rodney and joe, review HH quote, review outstanding quotes with Jack, update cost estimate, answer Dinesh questions, review DP quote, fishing quote, and well control quote, NOV quote and meeting with Jack, update cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, expense report for Angola, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-22 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 review cost estimate with Rodney and joe, review HH quote, review outstanding quotes with Jack, update cost estimate, answer Dinesh questions, review DP quote, fishing quote, and well control quote, NOV quote and meeting with Jack, update cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-23 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 Review current model with Dan, discuss project with AJ, review problems with assumptions, send detailed email with status and questions to AJ, update cost tracker, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-23 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6.75 0 review cost estimate with Rodney and joe, review HH quote, review outstanding quotes with Jack, update cost estimate, answer Dinesh questions, review DP quote, fishing quote, and well control quote, NOV quote and meeting with Jack, update cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-26 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1.5 0 Run FEA with new material on test anchor, review allowable stresses, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 10.5 0 TOTAL re-quote and cost estimate, review estimate with George and Joe, update bid model, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, prep for safety moment, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-27 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Run FEA with new material on test anchor, review allowable stresses, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6.5 0 TOTAL re-quote and cost estimate, review estimate with George and Joe, update bid model, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-28 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7.25 0 TOTAL re-quote and cost estimate, review estimate with George and Joe, update bid model, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, prep for safety moment, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-29 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Run FEA with new material on test anchor, review allowable stresses, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-29 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7.25 0 TOTAL re-quote and cost estimate, review estimate with George and Joe, update bid model, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, prep for safety moment, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-03-30 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Good Friday Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-02 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7 0 simulations issues, discussion with AJ, discussion with Joshua, more simulations, review of Charlie's quote, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-02 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Answer a few questions, discussion, work with Karma on tripping times Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Dan's computer situation, emails, discussions, download Mathcad, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-02 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3.5 0 257 Reactivation schedule for George, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-03 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5.75 0 simulations issues, discussion with AJ, discussion with Joshua, more simulations, review of Charlie's quote, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Dan's computer situation, emails, discussions, download Mathcad, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-03 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3 0 257 Reactivation schedule for George, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-04 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 6.5 0 simulations issues, discussion with AJ, discussion with Joshua, more simulations, review of Charlie's quote, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-04 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 Answer a few questions, discussion, work with Karma on tripping times Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-04 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Dan's computer situation, emails, discussions, download Mathcad, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-05 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 9 0 simulations issues, discussion with AJ, discussion with Joshua, more simulations, review of Charlie's quote, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 board meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-06 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7 0 simulations issues, discussion with AJ, discussion with Joshua, more simulations, review of Charlie's quote, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-06 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 Analyze options for laying down the mast for demob, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-09 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 4.75 0 review meeting, analysis report, preliminary drawing review, hydraulic review, cost estimate and schedule update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-09 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 3 0 Reducing billable hours Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-10 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 4.5 0 review meeting, analysis report, preliminary drawing review, hydraulic review, cost estimate and schedule update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-10 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 4 0 Reducing billable hours Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-11 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 3.25 0 review meeting, analysis report, preliminary drawing review, hydraulic review, cost estimate and schedule update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-11 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 4 0 Reducing billable hours Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-11 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Meeting with Mike Murray from MD Totco on sensor package Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.75 0 emails, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-12 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5.25 0 review meeting, analysis report, preliminary drawing review, hydraulic review, cost estimate and schedule update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-12 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 4.5 0 Reducing billable hours Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.75 0 TS weekly meeting Good to Great Review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-13 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 3 0 review meeting, analysis report, preliminary drawing review, hydraulic review, cost estimate and schedule update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-13 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 3 0 Reducing billable hours Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-16 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 3.5 0 Review dwgs and handover to James, send out analysis report and preliminary drawings, make efficiency and handling modifications to the model, pick up changes to analysis report, refine model and start drawings with Dan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-16 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 4 0 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 TSR board meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, discussions, look ahead at future work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, getting Dan a new computer, discussions with IT, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-16 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.25 0 AAR prep and meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-17 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 3 0 Review dwgs and handover to James, send out analysis report and preliminary drawings, make efficiency and handling modifications to the model, pick up changes to analysis report, refine model and start drawings with Dan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-17 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 3 0 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, discussions, look ahead at future work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, getting Dan a new computer, discussions with IT, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-17 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 AAR prep and meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-18 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 4 0 Review dwgs and handover to James, send out analysis report and preliminary drawings, make efficiency and handling modifications to the model, pick up changes to analysis report, refine model and start drawings with Dan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-18 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 3 0 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, discussions, look ahead at future work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 timesheet, getting Dan a new computer, discussions with IT, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-19 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1.5 0 Review dwgs and handover to James, send out analysis report and preliminary drawings, make efficiency and handling modifications to the model, pick up changes to analysis report, refine model and start drawings with Dan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-19 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 Clarification #20 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, discussions, look ahead at future work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-20 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Review dwgs and handover to James, send out analysis report and preliminary drawings, make efficiency and handling modifications to the model, pick up changes to analysis report, refine model and start drawings with Dan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-20 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 Clarification #20 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails, discussions, look ahead at future work Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, getting Dan a new computer, discussions with IT, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-23 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 4 0 create field inspection report, create TPP for hydraulic SOW, analysis review with Joshua, cost estimate update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-23 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 5 0 update hours tracker, email ian about controls preferences, email fabricators, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-24 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 create field inspection report, create TPP for hydraulic SOW, analysis review with Joshua, cost estimate update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-24 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1.5 0 update hours tracker, email ian about controls preferences, email fabricators, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-24 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.5 0 TOTAL clarification Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 board meeting, TSR weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-24 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3.5 0 meeting with George, Randy, and Robby on Rig 216 start up, create new schedule for 216 start up, talk with Randy Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-25 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 3 0 create field inspection report, create TPP for hydraulic SOW, analysis review with Joshua, cost estimate update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-25 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2.5 0 update hours tracker, email ian about controls preferences, email fabricators, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-25 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.5 0 TOTAL clarification Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-26 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 create field inspection report, create TPP for hydraulic SOW, analysis review with Joshua, cost estimate update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-26 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 update hours tracker, email ian about controls preferences, email fabricators, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.5 0 TOTAL clarification Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, TSR weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-26 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2.5 0 meeting with George, Randy, and Robby on Rig 216 start up, create new schedule for 216 start up, talk with Randy Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-27 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 create field inspection report, create TPP for hydraulic SOW, analysis review with Joshua, cost estimate update, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-27 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 update hours tracker, email ian about controls preferences, email fabricators, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 TOTAL clarification Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-30 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 review transportation quotes and update cost estimate, finish hyd TPP and create fab TPP, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-30 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2 0 cost estimate, sent out analysis report, worked on modifying CTR, discuss outstanding items with Joshua, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-04-30 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6 0 Clarification 21 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-01 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 4 0 cost estimate, sent out analysis report, worked on modifying CTR, discuss outstanding items with Joshua, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-01 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4.5 0 Clarification 21 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 quarterly earnings meeting, board meeting, TSR weekly meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-02 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2 0 cost estimate, sent out analysis report, worked on modifying CTR, discuss outstanding items with Joshua, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-02 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5.5 0 Clarification 21 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 quarterly earnings meeting, board meeting, TSR weekly meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-03 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 review transportation quotes and update cost estimate, finish hyd TPP and create fab TPP, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-03 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 cost estimate, sent out analysis report, worked on modifying CTR, discuss outstanding items with Joshua, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Clarification 21 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 quarterly earnings meeting, board meeting, TSR weekly meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-03 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2.5 0 NCOC tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-04 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 review transportation quotes and update cost estimate, finish hyd TPP and create fab TPP, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-04 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Clarification 21 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-04 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3 0 NCOC tender Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-04 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 2 0 TTOpco schedules for 247 and 269 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-07 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Hydraulic TPP, Fabrication TPP, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-07 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 catch up with Schniddy and ask about hydraulic standards, pick up comments on fabrication TPP Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-07 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 Review payment schedule with George and Bruce and Wayne, set up histogram meeting with Rodney, meeting with Rodney, discussion with George about Wednesday meeting and SOW document Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 Drill pipe discussion with Joshua, creation of my SER for my PE license, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-07 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 7.75 0 reviewed all drawings and added process information, created pipe and valve standard specification deliverable, created equipment specification deliverable, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-08 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 Hydraulic TPP, Fabrication TPP, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-08 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1.5 0 catch up with Schniddy and ask about hydraulic standards, pick up comments on fabrication TPP Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-08 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 6 0 reviewed all drawings and added process information, created pipe and valve standard specification deliverable, created equipment specification deliverable, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-09 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 Hydraulic TPP, Fabrication TPP, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-09 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 4.5 0 catch up with Schniddy and ask about hydraulic standards, pick up comments on fabrication TPP Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-09 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 Review payment schedule with George and Bruce and Wayne, set up histogram meeting with Rodney, meeting with Rodney, discussion with George about Wednesday meeting and SOW document Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-09 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1.5 0 reviewed all drawings and added process information, created pipe and valve standard specification deliverable, created equipment specification deliverable, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-10 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 Hydraulic TPP, Fabrication TPP, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-10 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2 0 catch up with Schniddy and ask about hydraulic standards, pick up comments on fabrication TPP Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-10 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Review payment schedule with George and Bruce and Wayne, set up histogram meeting with Rodney, meeting with Rodney, discussion with George about Wednesday meeting and SOW document Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Drill pipe discussion with Joshua, creation of my SER for my PE license, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-11 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.5 0 Review payment schedule with George and Bruce and Wayne, set up histogram meeting with Rodney, meeting with Rodney, discussion with George about Wednesday meeting and SOW document Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 Drill pipe discussion with Joshua, creation of my SER for my PE license, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-14 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 TPP review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-14 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9 0 Clarification 22, Clarification 23, Scope of Work doc, discussions, internal meetings, TOTAL meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 board meeting, weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-14 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 2 0 drawing review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-15 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Finalize TPPs Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-15 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 TPP review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-15 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 8 0 Clarification 22, Clarification 23, Scope of Work doc, discussions, internal meetings, TOTAL meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-16 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Finalize TPPs Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-16 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6.5 0 Clarification 22, Clarification 23, Scope of Work doc, discussions, internal meetings, TOTAL meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-16 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 HSE and Security Training Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-17 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 TPP review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-17 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7 0 Clarification 22, Clarification 23, Scope of Work doc, discussions, internal meetings, TOTAL meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, weekly meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-18 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1.5 0 TPP review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-18 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.5 0 Clarification 22, Clarification 23, Scope of Work doc, discussions, internal meetings, TOTAL meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-21 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 3 0 finished TPP/SOW for fabrication and hydraulics, reviewed drawing status with Dan and James, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-21 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.5 0 talked with Sachin about ATEX, talked with Craig about ATEX and their equipment, talked with Kyle about direction for this issue, review tech specs, add drilling contract items to tech spec, review scope of work doc, determine path forward for Coriolis meter, meeting with Greg and Kyle, review and update SOW, create high level equipment list for David Tucker, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 SER for PE, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, get new driver for Solidworks, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-21 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1.5 0 Reviewed final two drawings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-22 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7.25 0 talked with Sachin about ATEX, talked with Craig about ATEX and their equipment, talked with Kyle about direction for this issue, review tech specs, add drilling contract items to tech spec, review scope of work doc, determine path forward for Coriolis meter, meeting with Greg and Kyle, review and update SOW, create high level equipment list for David Tucker, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 SER for PE, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, get new driver for Solidworks, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-23 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 0.5 0 finished TPP/SOW for fabrication and hydraulics, reviewed drawing status with Dan and James, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-23 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 8 0 talked with Sachin about ATEX, talked with Craig about ATEX and their equipment, talked with Kyle about direction for this issue, review tech specs, add drilling contract items to tech spec, review scope of work doc, determine path forward for Coriolis meter, meeting with Greg and Kyle, review and update SOW, create high level equipment list for David Tucker, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 timesheet, get new driver for Solidworks, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-24 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9 0 talked with Sachin about ATEX, talked with Craig about ATEX and their equipment, talked with Kyle about direction for this issue, review tech specs, add drilling contract items to tech spec, review scope of work doc, determine path forward for Coriolis meter, meeting with Greg and Kyle, review and update SOW, create high level equipment list for David Tucker, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.75 0 SER for PE, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, get new driver for Solidworks, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-25 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 talked with Sachin about ATEX, talked with Craig about ATEX and their equipment, talked with Kyle about direction for this issue, review tech specs, add drilling contract items to tech spec, review scope of work doc, determine path forward for Coriolis meter, meeting with Greg and Kyle, review and update SOW, create high level equipment list for David Tucker, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 SER for PE, discussions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, get new driver for Solidworks, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-28 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Memorial Day Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-29 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 3.5 0 split clamp simulation and calculations, drawing review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-29 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4.5 0 SOW, tech spec, standards, meeting in 1007, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-29 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2 0 Rig 216 start up schedule mods Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-30 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2.5 0 split clamp simulation and calculations, drawing review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-30 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7 0 SOW, tech spec, standards, meeting in 1007, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-31 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 3.5 0 split clamp simulation and calculations, drawing review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-31 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4.5 0 SOW, tech spec, standards, meeting in 1007, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-05-31 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 discussions Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-01 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 SOW, tech spec, standards, meeting in 1007, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 discussions Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-04 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 11 0 tech spec, kanban meeting, discussion with Wayne, discussion with Jenny and Kyle on visas, get update from Duane on stack drawing, cost estimate modification, histogram modification, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 discussions Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-05 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5.5 0 tech spec, kanban meeting, discussion with Wayne, discussion with Jenny and Kyle on visas, get update from Duane on stack drawing, cost estimate modification, histogram modification, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-06 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 discuss transfer of project with AJ and set up plan to transfer all info to 2mtek, transfer Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 11 0 tech spec, kanban meeting, discussion with Wayne, discussion with Jenny and Kyle on visas, get update from Duane on stack drawing, cost estimate modification, histogram modification, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-07 OH-002 :OH-002 Overhead All Activities Regular Pay N 8 0 Caroline's Granddad Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-08 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2 0 discuss transfer of project with AJ and set up plan to transfer all info to 2mtek, transfer Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-08 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7 0 tech spec, kanban meeting, discussion with Wayne, discussion with Jenny and Kyle on visas, get update from Duane on stack drawing, cost estimate modification, histogram modification, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 discussions Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-11 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 12 0 TOTAL tech spec and project initiation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-12 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9 0 TOTAL tech spec and project initiation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-13 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 10 0 TOTAL tech spec and project initiation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-14 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9.5 0 TOTAL tech spec and project initiation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Beach Retreat Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 JH Beach Retreat Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 JH Beach Retreat Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 JH Beach Retreat Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-21 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 JH Beach Retreat Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 JH Beach Retreat Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-25 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9 0 Review tech spec with Kyle, review TOTAL updates with Joshua, update Action and Decision tracker, kanban meeting, update tech spec, research flare line specs, list questions for HH, pre for meeting with HH, meeting with HH, update action tracker, review sharepoint site status, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9 0 Review tech spec with Kyle, review TOTAL updates with Joshua, update Action and Decision tracker, kanban meeting, update tech spec, research flare line specs, list questions for HH, pre for meeting with HH, meeting with HH, update action tracker, review sharepoint site status, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9 0 Review tech spec with Kyle, review TOTAL updates with Joshua, update Action and Decision tracker, kanban meeting, update tech spec, research flare line specs, list questions for HH, pre for meeting with HH, meeting with HH, update action tracker, review sharepoint site status, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-28 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9 0 Review tech spec with Kyle, review TOTAL updates with Joshua, update Action and Decision tracker, kanban meeting, update tech spec, research flare line specs, list questions for HH, pre for meeting with HH, meeting with HH, update action tracker, review sharepoint site status, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-06-29 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6 0 Review tech spec with Kyle, review TOTAL updates with Joshua, update Action and Decision tracker, kanban meeting, update tech spec, research flare line specs, list questions for HH, pre for meeting with HH, meeting with HH, update action tracker, review sharepoint site status, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-02 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 8.5 0 Updated meeting minutes from Thursday and distributed, updated deliverables list and distributed, visited Canrig, added items to Opportunities list, discussed changing HH and IDS scope, meeting with Chuck and Sachin, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-02 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 0.5 0 Adjusted 216L StartUp Schedule with Randy Crowson Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9 0 Updated meeting minutes from Thursday and distributed, updated deliverables list and distributed, visited Canrig, added items to Opportunities list, discussed changing HH and IDS scope, meeting with Chuck and Sachin, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 PE Application prep and completion, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 July 4th Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-05 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7 0 Updated meeting minutes from Thursday and distributed, updated deliverables list and distributed, visited Canrig, added items to Opportunities list, discussed changing HH and IDS scope, meeting with Chuck and Sachin, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 PE Application prep and completion, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2018-07-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6 0 Updated meeting minutes from Thursday and distributed, updated deliverables list and distributed, visited Canrig, added items to Opportunities list, discussed changing HH and IDS scope, meeting with Chuck and Sachin, Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-06-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 create bulletin for camp scope of work increase, review KOC/KDC tender information, review and begin work on execution plan. Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-06-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 general preparation. Supplies, computer setup, discussions for upcoming scope of work. Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-06-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7.5 0 create bulletin for camp scope of work increase, review KOC/KDC tender information, review and begin work on execution plan. Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-06-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 meeting with Drillmec to understand the new land rig they are offering (Striker 800) Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-06-21 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 create bulletin for camp scope of work increase, review KOC/KDC tender information, review and begin work on execution plan. Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-06-22 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 create bulletin for camp scope of work increase, review KOC/KDC tender information, review and begin work on execution plan. Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-06-23 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 create bulletin for camp scope of work increase, review KOC/KDC tender information, review and begin work on execution plan. Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-06-26 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 work on execution plan for KOC. Discussed with logistics about focus on mobilization section. Discussed with quality the status of the document control plan. Assisted in review of well control documents and F&G. Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-06-27 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 work on execution plan for KOC. Discussed with logistics about focus on mobilization section. Discussed with quality the status of the document control plan. Assisted in review of well control documents and F&G. Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-06-27 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 general discussions with Canada staff engineer and Sachin about status. Still waiting on TSR for scope of work Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-06-28 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 work on execution plan for KOC. Discussed with logistics about focus on mobilization section. Discussed with quality the status of the document control plan. Assisted in review of well control documents and F&G. Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-06-28 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 2 0 General review of Husky materials for upcoming meetings Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-06-29 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 work on execution plan for KOC. Discussed with logistics about focus on mobilization section. Discussed with quality the status of the document control plan. Assisted in review of well control documents and F&G. Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-06-29 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 2 0 General review of Husky materials for upcoming meetings Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-06-30 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 work on execution plan for KOC. Discussed with logistics about focus on mobilization section. Discussed with quality the status of the document control plan. Assisted in review of well control documents and F&G. Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-06-30 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 2 0 General review of Husky materials for upcoming meetings Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-06-30 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 general discussions with Canada staff engineer and Sachin about status. Still waiting on TSR for scope of work Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-07-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 4th of July Holiday Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 4th of July Holiday Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-07-05 OH-010 :OH-010 Overhead All Activities Regular Pay N 10 0 travel from Houston to St John's, NL, Canada. Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-07-06 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 8 0 Working on PowerPoint for presentation to Wood Group and/or Husky. Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-07-07 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 8 0 Working on PowerPoint for presentation to Wood Group and/or Husky. Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-07-10 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 9 0 development of presentation for Wood Group meeting to discuss Husky's West White Rose opportunity Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-07-11 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 9.5 0 development of presentation for Wood Group meeting to discuss Husky's West White Rose opportunity Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-07-12 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 7 0 development of presentation for Wood Group meeting to discuss Husky's West White Rose opportunity Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-07-12 OH-010 :OH-010 Overhead All Activities Regular Pay N 8 0 travel from St John's NL Canada to Houston. Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-07-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Hibernia Top Drive Meeting and Lee C Moore Meeting Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-07-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Expense report and general work Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-07-13 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 2 0 development of presentation for Wood Group meeting to discuss Husky's West White Rose opportunity Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-07-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Hibernia Top Drive Meeting and Lee C Moore Meeting Enroth, Chris Engineer II 31135 Enroth, Chris:Engineer II 2017-07-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Expense report and general work Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2017-12-27 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 1. Worked on rewriting the Dead line anchor PM procedure and sent in for review. . 2. Completed rewriting the PM procedure for the traveling blocks and sent in for review. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2017-12-27 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 1. Researched the PM manuals for the dead line anchor. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2017-12-28 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 1. Worked on rewriting the Dead line anchor PM procedure and sent in for review. . 2. Completed rewriting the PM procedure for the traveling blocks and sent in for review. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2017-12-28 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 1. Researched the PM manuals for the dead line anchor. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2017-12-29 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 1. Worked on rewriting the Dead line anchor PM procedure and sent in for review. . 2. Completed rewriting the PM procedure for the traveling blocks and sent in for review. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 5 0 Working on rewriting the PM procedure for the drawworks. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Researched PM manuals for the drawworks. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 5 0 Working on rewriting the PM procedure for the drawworks. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Researched PM manuals for the drawworks. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Working on rewriting the PM procedure for the drawworks. Flud, Benny Senior Site Manager 10145 Flud, Benny:Senior Site Manager 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Researched PM manuals for the drawworks. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-03 Rig 216L-TSR :Rig 216L-TSR TSR-01520-216L Safety Plans Regular Pay N 1.5 0 (01/03/17) New mud system instrumentation drawing. (01/05/17) Closeout package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.75 0 (01/03/17) Team meeting and board update. Discussed changes to Uganda proposal drawings. Discussed 270L cellar cover designs with Kyle. Logged out new drawing number for 249L grounding plan. Cleaned up grounding plans. (01/04/17) Searched for 15K BOP stack ref. info. Started new 13-5/8 BOP stack drawing for rig 165L - Halliburton tender (no approved general query to charge time). Discussed Uganda matting board drawings with Josh. Logged out new proposal number and saved work for 165L tender. Submitted IT ticket for printer paper. (01/05/17) Worked on additional BOP/Diverter stack drawings for rig 165L. File storage meeting with ITS. Archived 209L spool drawing. (01/06/17) Logged out new drawing numbers and cleaned up TSR folders for 216L/249L. Sent TSR closeouts to Kyle for review. Discussed 270L celllar drawing design with Lam. Checked 270L drawing. TS meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-04 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 5 0 (01/04/17) Final drawing review/discussion with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 (01/03/17) Team meeting and board update. Discussed changes to Uganda proposal drawings. Discussed 270L cellar cover designs with Kyle. Logged out new drawing number for 249L grounding plan. Cleaned up grounding plans. (01/04/17) Searched for 15K BOP stack ref. info. Started new 13-5/8 BOP stack drawing for rig 165L - Halliburton tender (no approved general query to charge time). Discussed Uganda matting board drawings with Josh. Logged out new proposal number and saved work for 165L tender. Submitted IT ticket for printer paper. (01/05/17) Worked on additional BOP/Diverter stack drawings for rig 165L. File storage meeting with ITS. Archived 209L spool drawing. (01/06/17) Logged out new drawing numbers and cleaned up TSR folders for 216L/249L. Sent TSR closeouts to Kyle for review. Discussed 270L celllar drawing design with Lam. Checked 270L drawing. TS meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-05 Rig 216L-TSR :Rig 216L-TSR TSR-01520-216L Safety Plans Regular Pay N 1.5 0 (01/03/17) New mud system instrumentation drawing. (01/05/17) Closeout package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 (01/06/17) Updated Drillmec proposal drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (01/05/17) Weekly meeting Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 (01/03/17) Team meeting and board update. Discussed changes to Uganda proposal drawings. Discussed 270L cellar cover designs with Kyle. Logged out new drawing number for 249L grounding plan. Cleaned up grounding plans. (01/04/17) Searched for 15K BOP stack ref. info. Started new 13-5/8 BOP stack drawing for rig 165L - Halliburton tender (no approved general query to charge time). Discussed Uganda matting board drawings with Josh. Logged out new proposal number and saved work for 165L tender. Submitted IT ticket for printer paper. (01/05/17) Worked on additional BOP/Diverter stack drawings for rig 165L. File storage meeting with ITS. Archived 209L spool drawing. (01/06/17) Logged out new drawing numbers and cleaned up TSR folders for 216L/249L. Sent TSR closeouts to Kyle for review. Discussed 270L celllar drawing design with Lam. Checked 270L drawing. TS meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-06 Rig 249L-TSR :Rig 249L-TSR TSR-01523-249L Safety & Grounding Plans Regular Pay N 1.5 0 (01/06/17) Closeout package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-09 Latin America Region-TSR :Latin America Region-TSR TSR-01532-LABU 1st Quarter 2017 General Query- Mexico Regular Pay N 1 0 (01/09/17) Worked on 165 BOP stack drawings. (01/11/17) Created addition BOP stack option drawings for Al. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 7.5 0 (01/09/17) Updated weekly timesheet and submitted for approval. Searched for rotating head information/CAD file. Meeting to discuss BOP drawing request for rig 165L. Team meeting and board update. Updated PTO forms and submitted. Discussed 270L suitcase handrails with Tyler. Discussed CAD network seats with Lam. (01/10/17) Archived drawing files received from Sakh. engineering. Started on performance appraisal. Team meeting and board update. Discussed 165L stack drawings with Julio. Discussed 209L drawings files with Kyle. Sent email response to Sakh. (electrical drawing file request). Discussed drawing review with Ralph. EMAR clarification email to Jeff-209L. Transmitted/archived revised cellar drawings for 270L. Discussed performance review with Lam. (01/11/17) Approved designer's timesheets. Worked on performance appraisal. Team meeting and board update. CAD license review with Lam and Kyle. Discussed 165L stack options with Al M. (01/12/17) Continued with self appraisal. Reviewed drawings received from Sakh. eng. Cost review with Kyle. Sent final self appraisal form. (01/13/17) Discussed goals with Dan S. Discussed drawing progress with lam. Team meeting and board update. Archived drawing files received from Sakh. 270 L walking system review meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-09 Rig 270L-TSR :Rig 270L-TSR TSR-01528-270L Odoptu Cellar Covers-closed Regular Pay N 0.5 0 (01/09/17) Transmitted drawings and archived file on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 7.25 0 (01/09/17) Updated weekly timesheet and submitted for approval. Searched for rotating head information/CAD file. Meeting to discuss BOP drawing request for rig 165L. Team meeting and board update. Updated PTO forms and submitted. Discussed 270L suitcase handrails with Tyler. Discussed CAD network seats with Lam. (01/10/17) Archived drawing files received from Sakh. engineering. Started on performance appraisal. Team meeting and board update. Discussed 165L stack drawings with Julio. Discussed 209L drawings files with Kyle. Sent email response to Sakh. (electrical drawing file request). Discussed drawing review with Ralph. EMAR clarification email to Jeff-209L. Transmitted/archived revised cellar drawings for 270L. Discussed performance review with Lam. (01/11/17) Approved designer's timesheets. Worked on performance appraisal. Team meeting and board update. CAD license review with Lam and Kyle. Discussed 165L stack options with Al M. (01/12/17) Continued with self appraisal. Reviewed drawings received from Sakh. eng. Cost review with Kyle. Sent final self appraisal form. (01/13/17) Discussed goals with Dan S. Discussed drawing progress with lam. Team meeting and board update. Archived drawing files received from Sakh. 270 L walking system review meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-10 Rig 209L-TSR :Rig 209L-TSR TSR-01515-209L Control Line Spooler Placement Regular Pay N 0.75 0 (01/10/17) Checked lift plan drawing. Transmitted file and archived on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-10 Rig 209L-TSR :Rig 209L-TSR TSR-01516-209L Bucking Machine HPU Enclosure Regular Pay N 1 0 (01/10/17) Checked P209L drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-11 Latin America Region-TSR :Latin America Region-TSR TSR-01532-LABU 1st Quarter 2017 General Query- Mexico Regular Pay N 2 0 (01/09/17) Worked on 165 BOP stack drawings. (01/11/17) Created addition BOP stack option drawings for Al. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 (01/09/17) Updated weekly timesheet and submitted for approval. Searched for rotating head information/CAD file. Meeting to discuss BOP drawing request for rig 165L. Team meeting and board update. Updated PTO forms and submitted. Discussed 270L suitcase handrails with Tyler. Discussed CAD network seats with Lam. (01/10/17) Archived drawing files received from Sakh. engineering. Started on performance appraisal. Team meeting and board update. Discussed 165L stack drawings with Julio. Discussed 209L drawings files with Kyle. Sent email response to Sakh. (electrical drawing file request). Discussed drawing review with Ralph. EMAR clarification email to Jeff-209L. Transmitted/archived revised cellar drawings for 270L. Discussed performance review with Lam. (01/11/17) Approved designer's timesheets. Worked on performance appraisal. Team meeting and board update. CAD license review with Lam and Kyle. Discussed 165L stack options with Al M. (01/12/17) Continued with self appraisal. Reviewed drawings received from Sakh. eng. Cost review with Kyle. Sent final self appraisal form. (01/13/17) Discussed goals with Dan S. Discussed drawing progress with lam. Team meeting and board update. Archived drawing files received from Sakh. 270 L walking system review meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (01/12/17) Weekly meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 (01/09/17) Updated weekly timesheet and submitted for approval. Searched for rotating head information/CAD file. Meeting to discuss BOP drawing request for rig 165L. Team meeting and board update. Updated PTO forms and submitted. Discussed 270L suitcase handrails with Tyler. Discussed CAD network seats with Lam. (01/10/17) Archived drawing files received from Sakh. engineering. Started on performance appraisal. Team meeting and board update. Discussed 165L stack drawings with Julio. Discussed 209L drawings files with Kyle. Sent email response to Sakh. (electrical drawing file request). Discussed drawing review with Ralph. EMAR clarification email to Jeff-209L. Transmitted/archived revised cellar drawings for 270L. Discussed performance review with Lam. (01/11/17) Approved designer's timesheets. Worked on performance appraisal. Team meeting and board update. CAD license review with Lam and Kyle. Discussed 165L stack options with Al M. (01/12/17) Continued with self appraisal. Reviewed drawings received from Sakh. eng. Cost review with Kyle. Sent final self appraisal form. (01/13/17) Discussed goals with Dan S. Discussed drawing progress with lam. Team meeting and board update. Archived drawing files received from Sakh. 270 L walking system review meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-13 HTSG-TSR :HTSG-TSR TSR-01494-HTSG Choke Manifold Register Regular Pay N 2 0 (01/12/17) Worked on 76B choke drawing changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 (01/09/17) Updated weekly timesheet and submitted for approval. Searched for rotating head information/CAD file. Meeting to discuss BOP drawing request for rig 165L. Team meeting and board update. Updated PTO forms and submitted. Discussed 270L suitcase handrails with Tyler. Discussed CAD network seats with Lam. (01/10/17) Archived drawing files received from Sakh. engineering. Started on performance appraisal. Team meeting and board update. Discussed 165L stack drawings with Julio. Discussed 209L drawings files with Kyle. Sent email response to Sakh. (electrical drawing file request). Discussed drawing review with Ralph. EMAR clarification email to Jeff-209L. Transmitted/archived revised cellar drawings for 270L. Discussed performance review with Lam. (01/11/17) Approved designer's timesheets. Worked on performance appraisal. Team meeting and board update. CAD license review with Lam and Kyle. Discussed 165L stack options with Al M. (01/12/17) Continued with self appraisal. Reviewed drawings received from Sakh. eng. Cost review with Kyle. Sent final self appraisal form. (01/13/17) Discussed goals with Dan S. Discussed drawing progress with lam. Team meeting and board update. Archived drawing files received from Sakh. 270 L walking system review meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-16 EHBU-TSRs :EHBU-TSRs TSR-01536-EHBU 1st Quarter 2017 General Query - Iraq Regular Pay N 2 0 (01/16/17) Started tender drawing package for Repsol. (01/17/17) Finalized package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 (01/16/17) Discussed 249L drawing redlines with Kyle. Discussed new tender package with Mat E. Team meeting and board update. Updated GOM general query TSR/CTR. AutoCAD cost review with Kyle and Lam. Discussed tender package with Marina. Worked on 249L redlines. (01/17/17) discussed tender drawings with Mat. Pulled mast information for Mat E. Approved designer's online timesheets. Updated timesheet and submitted for approval. Printed 270 BOP clarification email. Finished 249L redlines. Team meeting and board update. Snt RFi to Robbie B (249/258 suitcase layout). CAD standard discussion with Lam. (01/18/17) Printed information from Sakh eng (270 stacks). Discussed 209L closeout with Sachin. Filed drawings received from Sakh doc control. Created clarification sketch and sent to Robbie (249L plot plan). (01/19/17) Reviewed drawings received from Sakhalin. Discussed drawing number issue with Kyle. Created PDFs for all 270L walking system drawings for Tyler. Discussed mast window design with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-17 EHBU-TSRs :EHBU-TSRs TSR-01536-EHBU 1st Quarter 2017 General Query - Iraq Regular Pay N 0.5 0 (01/16/17) Started tender drawing package for Repsol. (01/17/17) Finalized package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-17 HTSG-TSR :HTSG-TSR TSR-01494-HTSG Choke Manifold Register Regular Pay N 1 0 (01/17/17) 76B manifold drawing updates. (01/18/17) Drawing finalized. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 (01/16/17) Discussed 249L drawing redlines with Kyle. Discussed new tender package with Mat E. Team meeting and board update. Updated GOM general query TSR/CTR. AutoCAD cost review with Kyle and Lam. Discussed tender package with Marina. Worked on 249L redlines. (01/17/17) discussed tender drawings with Mat. Pulled mast information for Mat E. Approved designer's online timesheets. Updated timesheet and submitted for approval. Printed 270 BOP clarification email. Finished 249L redlines. Team meeting and board update. Snt RFi to Robbie B (249/258 suitcase layout). CAD standard discussion with Lam. (01/18/17) Printed information from Sakh eng (270 stacks). Discussed 209L closeout with Sachin. Filed drawings received from Sakh doc control. Created clarification sketch and sent to Robbie (249L plot plan). (01/19/17) Reviewed drawings received from Sakhalin. Discussed drawing number issue with Kyle. Created PDFs for all 270L walking system drawings for Tyler. Discussed mast window design with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-17 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 (01/17/17) Annual compliance training. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-17 Rig 209L-TSR :Rig 209L-TSR TSR-01510-209L DSM-PB HPU Cantilever Regular Pay N 0.5 0 (01/17/17) High level drawing review with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-18 HTSG-TSR :HTSG-TSR TSR-01494-HTSG Choke Manifold Register Regular Pay N 1 0 (01/17/17) 76B manifold drawing updates. (01/18/17) Drawing finalized. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 (01/16/17) Discussed 249L drawing redlines with Kyle. Discussed new tender package with Mat E. Team meeting and board update. Updated GOM general query TSR/CTR. AutoCAD cost review with Kyle and Lam. Discussed tender package with Marina. Worked on 249L redlines. (01/17/17) discussed tender drawings with Mat. Pulled mast information for Mat E. Approved designer's online timesheets. Updated timesheet and submitted for approval. Printed 270 BOP clarification email. Finished 249L redlines. Team meeting and board update. Snt RFi to Robbie B (249/258 suitcase layout). CAD standard discussion with Lam. (01/18/17) Printed information from Sakh eng (270 stacks). Discussed 209L closeout with Sachin. Filed drawings received from Sakh doc control. Created clarification sketch and sent to Robbie (249L plot plan). (01/19/17) Reviewed drawings received from Sakhalin. Discussed drawing number issue with Kyle. Created PDFs for all 270L walking system drawings for Tyler. Discussed mast window design with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (01/19/17) Department meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 (01/16/17) Discussed 249L drawing redlines with Kyle. Discussed new tender package with Mat E. Team meeting and board update. Updated GOM general query TSR/CTR. AutoCAD cost review with Kyle and Lam. Discussed tender package with Marina. Worked on 249L redlines. (01/17/17) discussed tender drawings with Mat. Pulled mast information for Mat E. Approved designer's online timesheets. Updated timesheet and submitted for approval. Printed 270 BOP clarification email. Finished 249L redlines. Team meeting and board update. Snt RFi to Robbie B (249/258 suitcase layout). CAD standard discussion with Lam. (01/18/17) Printed information from Sakh eng (270 stacks). Discussed 209L closeout with Sachin. Filed drawings received from Sakh doc control. Created clarification sketch and sent to Robbie (249L plot plan). (01/19/17) Reviewed drawings received from Sakhalin. Discussed drawing number issue with Kyle. Created PDFs for all 270L walking system drawings for Tyler. Discussed mast window design with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-19 Rig 270L-TSR :Rig 270L-TSR TSR-01535-270L BOP-Diverter Stack-Up Drawings Regular Pay N 6 0 (01/19/17) Created CTR and sent for approval. Started stack drawings. (01/21/17) Cont on drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-20 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Floating Holiday Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-21 Rig 270L-TSR :Rig 270L-TSR TSR-01535-270L BOP-Diverter Stack-Up Drawings Regular Pay N 6 0 (01/19/17) Created CTR and sent for approval. Started stack drawings. (01/21/17) Cont on drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (01/23/17) Business development meeting with Matt K. (01/24/17) Lunch and Learn with Strenx. (01/26/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (01/23/17) Searched for requested 270L winterization drawings/info. Searched for 270l electrical drawings for Sakhalin. Team meeting and update. Transmitted 270L drawings and archived files on the Q. (01/24/17) Updated PTO forms and submitted. Sent drawing to Sakh (drawing number correction). General TSR status review with Kyle. Sent email to Odoptu Engineering (drawing numbering standards). Team meeting and board update. Discussed new team board format with Kyle. Updated weekly timesheet and submitted for approval. Discussed 270L stack drawings with Tyler. (01/25/17) Timesheet updates. Archived old 272L drawings Pulled hazardous area drawings and sent to Mark. Archived old 273 files on the Q. Team meeting. Discussed mast door design with Lam. Discussed general query folder structure with Klye. Sent clarification email with sketch to Kazakhstan group (suitcase layout). Made a new general query folder for rig 258L. Pulled reference info for revisions to 272L haz area drawings. (01/26/17) Started 272L haz area drawing revisions. Discussed classifications with Sachin. Discussed Alaska PE stamp issue with Mark Q. Issued revised 270 cellar drawings and archived files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-23 Rig 270L-TSR :Rig 270L-TSR TSR-01535-270L BOP-Diverter Stack-Up Drawings Regular Pay N 6 0 (01/23/17) Continued on stack drawings. (01/24/17) Diverter drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 (01/23/17) Business development meeting with Matt K. (01/24/17) Lunch and Learn with Strenx. (01/26/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 (01/23/17) Searched for requested 270L winterization drawings/info. Searched for 270l electrical drawings for Sakhalin. Team meeting and update. Transmitted 270L drawings and archived files on the Q. (01/24/17) Updated PTO forms and submitted. Sent drawing to Sakh (drawing number correction). General TSR status review with Kyle. Sent email to Odoptu Engineering (drawing numbering standards). Team meeting and board update. Discussed new team board format with Kyle. Updated weekly timesheet and submitted for approval. Discussed 270L stack drawings with Tyler. (01/25/17) Timesheet updates. Archived old 272L drawings Pulled hazardous area drawings and sent to Mark. Archived old 273 files on the Q. Team meeting. Discussed mast door design with Lam. Discussed general query folder structure with Klye. Sent clarification email with sketch to Kazakhstan group (suitcase layout). Made a new general query folder for rig 258L. Pulled reference info for revisions to 272L haz area drawings. (01/26/17) Started 272L haz area drawing revisions. Discussed classifications with Sachin. Discussed Alaska PE stamp issue with Mark Q. Issued revised 270 cellar drawings and archived files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-24 Rig 270L-TSR :Rig 270L-TSR TSR-01535-270L BOP-Diverter Stack-Up Drawings Regular Pay N 3 0 (01/23/17) Continued on stack drawings. (01/24/17) Diverter drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 (01/23/17) Searched for requested 270L winterization drawings/info. Searched for 270l electrical drawings for Sakhalin. Team meeting and update. Transmitted 270L drawings and archived files on the Q. (01/24/17) Updated PTO forms and submitted. Sent drawing to Sakh (drawing number correction). General TSR status review with Kyle. Sent email to Odoptu Engineering (drawing numbering standards). Team meeting and board update. Discussed new team board format with Kyle. Updated weekly timesheet and submitted for approval. Discussed 270L stack drawings with Tyler. (01/25/17) Timesheet updates. Archived old 272L drawings Pulled hazardous area drawings and sent to Mark. Archived old 273 files on the Q. Team meeting. Discussed mast door design with Lam. Discussed general query folder structure with Klye. Sent clarification email with sketch to Kazakhstan group (suitcase layout). Made a new general query folder for rig 258L. Pulled reference info for revisions to 272L haz area drawings. (01/26/17) Started 272L haz area drawing revisions. Discussed classifications with Sachin. Discussed Alaska PE stamp issue with Mark Q. Issued revised 270 cellar drawings and archived files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-25 Rig 249L-TSR :Rig 249L-TSR TSR-01523-249L Safety & Grounding Plans Regular Pay N 1 0 (01/25/17) Revised plot plan Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (01/23/17) Business development meeting with Matt K. (01/24/17) Lunch and Learn with Strenx. (01/26/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 7.5 0 (01/23/17) Searched for requested 270L winterization drawings/info. Searched for 270l electrical drawings for Sakhalin. Team meeting and update. Transmitted 270L drawings and archived files on the Q. (01/24/17) Updated PTO forms and submitted. Sent drawing to Sakh (drawing number correction). General TSR status review with Kyle. Sent email to Odoptu Engineering (drawing numbering standards). Team meeting and board update. Discussed new team board format with Kyle. Updated weekly timesheet and submitted for approval. Discussed 270L stack drawings with Tyler. (01/25/17) Timesheet updates. Archived old 272L drawings Pulled hazardous area drawings and sent to Mark. Archived old 273 files on the Q. Team meeting. Discussed mast door design with Lam. Discussed general query folder structure with Klye. Sent clarification email with sketch to Kazakhstan group (suitcase layout). Made a new general query folder for rig 258L. Pulled reference info for revisions to 272L haz area drawings. (01/26/17) Started 272L haz area drawing revisions. Discussed classifications with Sachin. Discussed Alaska PE stamp issue with Mark Q. Issued revised 270 cellar drawings and archived files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-26 Rig 270L-TSR :Rig 270L-TSR TSR-01528-270L Odoptu Cellar Covers-closed Regular Pay N 0.5 0 (01/26/17) Checked redline drawing corrections. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (01/30/17) Daily team meeting. (01/31/17) Daily team meeting. (02/01/17) Daily team meeting. Call with Mihovil to discuss 270 site plan changes. (02/02/17) Weekly TS meeting. (02/03/17) Daily team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 (01/30/17) Researched flange information (class 600 and 2M). (02/02/17) Reviewed 270L handrail modifications with Tyler. (02/03/17) Discussed design options with Lam (mast window). Discussed 270L site move and requirements with Tyler. Reviewed handrail mod with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.75 0 (01/30/17) Created new archive folders and saved drawings from Sakhalin (209L). Updated PTO form and submitted. Discussed 270L drawings with Al M. Searched for 272L nitrogen bottle drawings for Al. Discussed drawing number issue with Tanya. Engineering discussion with Kyle. (01/31/17) Updated weekly timesheet and submitted for approval. Reviewed/approved designer timesheet's. Completed 2016' compliance questionnaire. Cleaned up 249L TSR folder. Discussed Orlan and Berkut drawing files with Ralph. Transmitted 216l drawings and archived the files on the Q. Fixed 216l archive folder structure to match standard. 258L plot plan sketch - sent to field to verify layout(to Dan C.). Discussed 270 stair relocation with Tyler. (02/01/17) Discussed office move with Kyle. Reviewed 270L site plan drawing received from Sakh engineering. Discussed with Tyler. discussed PTO with Lam. Replied to doc control email from Tanya. Reapproved design timesheets. Discussed standard folder structure with Kyle. (02/02/17) Updates to standard folder structure sketch. Drawing status update with Lam. Discussed training with Dan. (02/03/17) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-30 Rig 270L-TSR :Rig 270L-TSR TSR-01535-270L BOP-Diverter Stack-Up Drawings Regular Pay N 4 0 (01/30/17) Revised stack drawings. Created RFI and sent to Sakh. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-31 EHBU-TSRs :EHBU-TSRs TSR-01530-EHBU 1st Quarter 2017 General Query- Aksai Regular Pay N 2 0 (01/31/17) Corrected 249 plot plan drawings based on suitcase info from the field. (02/01/17) Tranmitted 249L plot plan drawings to field. Archived files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (01/30/17) Daily team meeting. (01/31/17) Daily team meeting. (02/01/17) Daily team meeting. Call with Mihovil to discuss 270 site plan changes. (02/02/17) Weekly TS meeting. (02/03/17) Daily team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.75 0 (01/30/17) Created new archive folders and saved drawings from Sakhalin (209L). Updated PTO form and submitted. Discussed 270L drawings with Al M. Searched for 272L nitrogen bottle drawings for Al. Discussed drawing number issue with Tanya. Engineering discussion with Kyle. (01/31/17) Updated weekly timesheet and submitted for approval. Reviewed/approved designer timesheet's. Completed 2016' compliance questionnaire. Cleaned up 249L TSR folder. Discussed Orlan and Berkut drawing files with Ralph. Transmitted 216l drawings and archived the files on the Q. Fixed 216l archive folder structure to match standard. 258L plot plan sketch - sent to field to verify layout(to Dan C.). Discussed 270 stair relocation with Tyler. (02/01/17) Discussed office move with Kyle. Reviewed 270L site plan drawing received from Sakh engineering. Discussed with Tyler. discussed PTO with Lam. Replied to doc control email from Tanya. Reapproved design timesheets. Discussed standard folder structure with Kyle. (02/02/17) Updates to standard folder structure sketch. Drawing status update with Lam. Discussed training with Dan. (02/03/17) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-01-31 Rig 249L-TSR :Rig 249L-TSR TSR-01523-249L Safety & Grounding Plans Regular Pay N 1 0 (01/31/17) Revised closeout and submitted for approval. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-01 EHBU-TSRs :EHBU-TSRs TSR-01530-EHBU 1st Quarter 2017 General Query- Aksai Regular Pay N 0.5 0 (01/31/17) Corrected 249 plot plan drawings based on suitcase info from the field. (02/01/17) Tranmitted 249L plot plan drawings to field. Archived files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (01/30/17) Daily team meeting. (01/31/17) Daily team meeting. (02/01/17) Daily team meeting. Call with Mihovil to discuss 270 site plan changes. (02/02/17) Weekly TS meeting. (02/03/17) Daily team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 (01/30/17) Created new archive folders and saved drawings from Sakhalin (209L). Updated PTO form and submitted. Discussed 270L drawings with Al M. Searched for 272L nitrogen bottle drawings for Al. Discussed drawing number issue with Tanya. Engineering discussion with Kyle. (01/31/17) Updated weekly timesheet and submitted for approval. Reviewed/approved designer timesheet's. Completed 2016' compliance questionnaire. Cleaned up 249L TSR folder. Discussed Orlan and Berkut drawing files with Ralph. Transmitted 216l drawings and archived the files on the Q. Fixed 216l archive folder structure to match standard. 258L plot plan sketch - sent to field to verify layout(to Dan C.). Discussed 270 stair relocation with Tyler. (02/01/17) Discussed office move with Kyle. Reviewed 270L site plan drawing received from Sakh engineering. Discussed with Tyler. discussed PTO with Lam. Replied to doc control email from Tanya. Reapproved design timesheets. Discussed standard folder structure with Kyle. (02/02/17) Updates to standard folder structure sketch. Drawing status update with Lam. Discussed training with Dan. (02/03/17) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (01/30/17) Daily team meeting. (01/31/17) Daily team meeting. (02/01/17) Daily team meeting. Call with Mihovil to discuss 270 site plan changes. (02/02/17) Weekly TS meeting. (02/03/17) Daily team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 (01/30/17) Researched flange information (class 600 and 2M). (02/02/17) Reviewed 270L handrail modifications with Tyler. (02/03/17) Discussed design options with Lam (mast window). Discussed 270L site move and requirements with Tyler. Reviewed handrail mod with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 (01/30/17) Created new archive folders and saved drawings from Sakhalin (209L). Updated PTO form and submitted. Discussed 270L drawings with Al M. Searched for 272L nitrogen bottle drawings for Al. Discussed drawing number issue with Tanya. Engineering discussion with Kyle. (01/31/17) Updated weekly timesheet and submitted for approval. Reviewed/approved designer timesheet's. Completed 2016' compliance questionnaire. Cleaned up 249L TSR folder. Discussed Orlan and Berkut drawing files with Ralph. Transmitted 216l drawings and archived the files on the Q. Fixed 216l archive folder structure to match standard. 258L plot plan sketch - sent to field to verify layout(to Dan C.). Discussed 270 stair relocation with Tyler. (02/01/17) Discussed office move with Kyle. Reviewed 270L site plan drawing received from Sakh engineering. Discussed with Tyler. discussed PTO with Lam. Replied to doc control email from Tanya. Reapproved design timesheets. Discussed standard folder structure with Kyle. (02/02/17) Updates to standard folder structure sketch. Drawing status update with Lam. Discussed training with Dan. (02/03/17) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-02 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 1 0 (02/02/17) Started handrail mod sketch for 270L. (02/03/17) Cont. working on handrail drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (01/30/17) Daily team meeting. (01/31/17) Daily team meeting. (02/01/17) Daily team meeting. Call with Mihovil to discuss 270 site plan changes. (02/02/17) Weekly TS meeting. (02/03/17) Daily team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.25 0 (01/30/17) Researched flange information (class 600 and 2M). (02/02/17) Reviewed 270L handrail modifications with Tyler. (02/03/17) Discussed design options with Lam (mast window). Discussed 270L site move and requirements with Tyler. Reviewed handrail mod with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-03 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 2.5 0 (02/03/17) Checked mast window drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-03 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 4 0 (02/02/17) Started handrail mod sketch for 270L. (02/03/17) Cont. working on handrail drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (02/06/17) Daily team meeting. (02/07/17) Discussed choke manifold progress with Kyle. Daily team meeting. (02/08/17) team meeting. (02/09/17) TS meeting. (02/10/17) team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 5.75 0 (02/06/17) Reviewed handrail drawing with Tyler. Discussed 270L electrical drawings with Kyle. Sent electrical files to Mihovil (270). (02/07/17) Pulled 272L diverter information and sent to Mark. Discussed diverter layout with Mark. Reviewed 209L electrical sketch. (02/10/17) Discussed 209L diverter spool with John. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (02/06/17) Assigned drawing number for 270 handrail mod sketch. Drawing review with Lam. (02/07/17) Discussed 270L TSR status with Kyle. Archived 270L/209L drawing files from Sakh. engineering. discussed new drawing package with Lam (209L diverter). Transmitted 258 drawings and archived files on the Q. Discussed 270 site plan drawing with Kyle. Updated timesheet and submitted for approval. Approved designer timesheets. Transmitted 209L mast window mod drawing and archived file on the Q. (02/08/17) Finalized 270l site plan. Discussed 209L door mod drawing with Lam. reviewed choke manifold redlines and drawing progress. Searched for AADU accumulator bottle info for Luis C. Sent email response to Luis. (02/09/17) Discussed layout for Total site plan with Matt. Started packing office. (02/10/17) Pack/office move. Transmitted 209L spool drawing and archived file on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-06 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 1 0 (02/06/17) Final drawing check. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-06 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 1 0 (02/06/17) Finalized trip tank skid handrail mod sketch for Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-07 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 2 0 (02/07/17) Updated 270L site plan to include regulatory callouts from previous drawing revision. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-07 EHBU-TSRs :EHBU-TSRs TSR-01530-EHBU 1st Quarter 2017 General Query- Aksai Regular Pay N 1 0 (02/07/17) Updated 258L plot plan drawings to show updated suitcase layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (02/06/17) Daily team meeting. (02/07/17) Discussed choke manifold progress with Kyle. Daily team meeting. (02/08/17) team meeting. (02/09/17) TS meeting. (02/10/17) team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 (02/06/17) Reviewed handrail drawing with Tyler. Discussed 270L electrical drawings with Kyle. Sent electrical files to Mihovil (270). (02/07/17) Pulled 272L diverter information and sent to Mark. Discussed diverter layout with Mark. Reviewed 209L electrical sketch. (02/10/17) Discussed 209L diverter spool with John. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.25 0 (02/06/17) Assigned drawing number for 270 handrail mod sketch. Drawing review with Lam. (02/07/17) Discussed 270L TSR status with Kyle. Archived 270L/209L drawing files from Sakh. engineering. discussed new drawing package with Lam (209L diverter). Transmitted 258 drawings and archived files on the Q. Discussed 270 site plan drawing with Kyle. Updated timesheet and submitted for approval. Approved designer timesheets. Transmitted 209L mast window mod drawing and archived file on the Q. (02/08/17) Finalized 270l site plan. Discussed 209L door mod drawing with Lam. reviewed choke manifold redlines and drawing progress. Searched for AADU accumulator bottle info for Luis C. Sent email response to Luis. (02/09/17) Discussed layout for Total site plan with Matt. Started packing office. (02/10/17) Pack/office move. Transmitted 209L spool drawing and archived file on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (02/06/17) Daily team meeting. (02/07/17) Discussed choke manifold progress with Kyle. Daily team meeting. (02/08/17) team meeting. (02/09/17) TS meeting. (02/10/17) team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 8.25 0 (02/06/17) Reviewed handrail drawing with Tyler. Discussed 270L electrical drawings with Kyle. Sent electrical files to Mihovil (270). (02/07/17) Pulled 272L diverter information and sent to Mark. Discussed diverter layout with Mark. Reviewed 209L electrical sketch. (02/10/17) Discussed 209L diverter spool with John. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-09 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 (02/09/17) Site plan drawing for Matt. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (02/06/17) Daily team meeting. (02/07/17) Discussed choke manifold progress with Kyle. Daily team meeting. (02/08/17) team meeting. (02/09/17) TS meeting. (02/10/17) team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 (02/06/17) Assigned drawing number for 270 handrail mod sketch. Drawing review with Lam. (02/07/17) Discussed 270L TSR status with Kyle. Archived 270L/209L drawing files from Sakh. engineering. discussed new drawing package with Lam (209L diverter). Transmitted 258 drawings and archived files on the Q. Discussed 270 site plan drawing with Kyle. Updated timesheet and submitted for approval. Approved designer timesheets. Transmitted 209L mast window mod drawing and archived file on the Q. (02/08/17) Finalized 270l site plan. Discussed 209L door mod drawing with Lam. reviewed choke manifold redlines and drawing progress. Searched for AADU accumulator bottle info for Luis C. Sent email response to Luis. (02/09/17) Discussed layout for Total site plan with Matt. Started packing office. (02/10/17) Pack/office move. Transmitted 209L spool drawing and archived file on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-09 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 1.5 0 (02/09/17) Checked cellar door mod drawing. (02/10/17) Checked spool drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (02/06/17) Daily team meeting. (02/07/17) Discussed choke manifold progress with Kyle. Daily team meeting. (02/08/17) team meeting. (02/09/17) TS meeting. (02/10/17) team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 (02/06/17) Reviewed handrail drawing with Tyler. Discussed 270L electrical drawings with Kyle. Sent electrical files to Mihovil (270). (02/07/17) Pulled 272L diverter information and sent to Mark. Discussed diverter layout with Mark. Reviewed 209L electrical sketch. (02/10/17) Discussed 209L diverter spool with John. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 7.75 0 (02/06/17) Assigned drawing number for 270 handrail mod sketch. Drawing review with Lam. (02/07/17) Discussed 270L TSR status with Kyle. Archived 270L/209L drawing files from Sakh. engineering. discussed new drawing package with Lam (209L diverter). Transmitted 258 drawings and archived files on the Q. Discussed 270 site plan drawing with Kyle. Updated timesheet and submitted for approval. Approved designer timesheets. Transmitted 209L mast window mod drawing and archived file on the Q. (02/08/17) Finalized 270l site plan. Discussed 209L door mod drawing with Lam. reviewed choke manifold redlines and drawing progress. Searched for AADU accumulator bottle info for Luis C. Sent email response to Luis. (02/09/17) Discussed layout for Total site plan with Matt. Started packing office. (02/10/17) Pack/office move. Transmitted 209L spool drawing and archived file on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-10 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 0.5 0 (02/09/17) Checked cellar door mod drawing. (02/10/17) Checked spool drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 8.5 0 (02/13/17) Unpacked boxes and set up new office space. Discussed storage option with Jacob. Installed new printers (5th floor). Archived 209l diverter window drawing on the Q. (02/14/17) Updated weekly timesheet and submitted for approval. Discussed standard BOM callouts info with Lam. (02/15/17) Continued with choke manifold research. Discussed 270 site plan with Tyler. Transmitted site plan and archived file on the Q. Updated self review and submitted. Approved designers timesheets. (02/16/17) Discussed new billing structure with Kyle. Transmitted 270 regulatory drawing and archived file on the Q. Discussed LABU tenders and possible TSR work with Bryan L. (02/17/17) Discussed site plan changes with Kyle. Transmitted 15B safety plan and archived file on the Q. Discussed diverter stand drawing with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (02/14/17) Safety meeting. (02/16/17) Weekly TSR meeting. Quarterly earnings meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 8.25 0 (02/13/17) Unpacked boxes and set up new office space. Discussed storage option with Jacob. Installed new printers (5th floor). Archived 209l diverter window drawing on the Q. (02/14/17) Updated weekly timesheet and submitted for approval. Discussed standard BOM callouts info with Lam. (02/15/17) Continued with choke manifold research. Discussed 270 site plan with Tyler. Transmitted site plan and archived file on the Q. Updated self review and submitted. Approved designers timesheets. (02/16/17) Discussed new billing structure with Kyle. Transmitted 270 regulatory drawing and archived file on the Q. Discussed LABU tenders and possible TSR work with Bryan L. (02/17/17) Discussed site plan changes with Kyle. Transmitted 15B safety plan and archived file on the Q. Discussed diverter stand drawing with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 (02/13/17) Unpacked boxes and set up new office space. Discussed storage option with Jacob. Installed new printers (5th floor). Archived 209l diverter window drawing on the Q. (02/14/17) Updated weekly timesheet and submitted for approval. Discussed standard BOM callouts info with Lam. (02/15/17) Continued with choke manifold research. Discussed 270 site plan with Tyler. Transmitted site plan and archived file on the Q. Updated self review and submitted. Approved designers timesheets. (02/16/17) Discussed new billing structure with Kyle. Transmitted 270 regulatory drawing and archived file on the Q. Discussed LABU tenders and possible TSR work with Bryan L. (02/17/17) Discussed site plan changes with Kyle. Transmitted 15B safety plan and archived file on the Q. Discussed diverter stand drawing with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-15 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 5 0 (02/15/17) 15B safety plan drawing. (02/17/17) Revised safety plan for 15B. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 (02/14/17) Safety meeting. (02/16/17) Weekly TSR meeting. Quarterly earnings meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.5 0 (02/13/17) Unpacked boxes and set up new office space. Discussed storage option with Jacob. Installed new printers (5th floor). Archived 209l diverter window drawing on the Q. (02/14/17) Updated weekly timesheet and submitted for approval. Discussed standard BOM callouts info with Lam. (02/15/17) Continued with choke manifold research. Discussed 270 site plan with Tyler. Transmitted site plan and archived file on the Q. Updated self review and submitted. Approved designers timesheets. (02/16/17) Discussed new billing structure with Kyle. Transmitted 270 regulatory drawing and archived file on the Q. Discussed LABU tenders and possible TSR work with Bryan L. (02/17/17) Discussed site plan changes with Kyle. Transmitted 15B safety plan and archived file on the Q. Discussed diverter stand drawing with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (02/16/17) Revised 270 regulatory drawing. (02/17/17) Chayvo site plan with 262/209L. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 (02/13/17) Unpacked boxes and set up new office space. Discussed storage option with Jacob. Installed new printers (5th floor). Archived 209l diverter window drawing on the Q. (02/14/17) Updated weekly timesheet and submitted for approval. Discussed standard BOM callouts info with Lam. (02/15/17) Continued with choke manifold research. Discussed 270 site plan with Tyler. Transmitted site plan and archived file on the Q. Updated self review and submitted. Approved designers timesheets. (02/16/17) Discussed new billing structure with Kyle. Transmitted 270 regulatory drawing and archived file on the Q. Discussed LABU tenders and possible TSR work with Bryan L. (02/17/17) Discussed site plan changes with Kyle. Transmitted 15B safety plan and archived file on the Q. Discussed diverter stand drawing with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (02/16/17) Revised 270 regulatory drawing. (02/17/17) Chayvo site plan with 262/209L. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-17 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 (02/15/17) 15B safety plan drawing. (02/17/17) Revised safety plan for 15B. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-17 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 1.5 0 (02/17/17) Checked diverter support stand drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-20 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 (02/21/17) Searched for annular information for Steve C. Called GE for reference info. Converted ExpertCAD files for rig 253 reference. Saved converted files on the Q for future reference. (02/22/17) Reviewed new TSR for 269 BOP hoist upgrade. Discussed Hydril annular with Steve C. (02/23/17) Continued search for Hydril annular info. Sent info to Steve C. Worked on hydril GX annular CAD block. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (02/21/17) Discussed 209L 3D model drawing number with Lam and Tanya. Discussed drawing number request with Tanya. (02/22/17) Discussed new TSR with Tanya. Stamped 209L diverter support drawing. Transmitted 209L diverter support drawing and archived file on the Q. Assigned 272 haz area TSR to Sachin and discussed. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-21 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 0.5 0 (02/21/17) Discussed KPO drawing package with Eugene - sign review sheet Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-21 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 3.5 0 (02/21/17) Discussed 77B drawing request with Leroy. Worked on rock pad and BOP drawings for 77B. (02/22/17) Revised 77B rock pad drawing per comments from Leroy. (02/24/17) Started new rock pad drawing for rig 51B. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-21 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 1.5 0 (02/21/17) Pulled 253 skidrail info for Gary B. Searched greenway 3 fileroom for 253 ref info. (02/22/17) Searched greenway 3 files for additional 253L ref drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 (02/21/17) Searched for annular information for Steve C. Called GE for reference info. Converted ExpertCAD files for rig 253 reference. Saved converted files on the Q for future reference. (02/22/17) Reviewed new TSR for 269 BOP hoist upgrade. Discussed Hydril annular with Steve C. (02/23/17) Continued search for Hydril annular info. Sent info to Steve C. Worked on hydril GX annular CAD block. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 (02/21/17) Discussed 209L 3D model drawing number with Lam and Tanya. Discussed drawing number request with Tanya. (02/22/17) Discussed new TSR with Tanya. Stamped 209L diverter support drawing. Transmitted 209L diverter support drawing and archived file on the Q. Assigned 272 haz area TSR to Sachin and discussed. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-22 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2 0 (02/21/17) Discussed 77B drawing request with Leroy. Worked on rock pad and BOP drawings for 77B. (02/22/17) Revised 77B rock pad drawing per comments from Leroy. (02/24/17) Started new rock pad drawing for rig 51B. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-22 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 1 0 (02/21/17) Pulled 253 skidrail info for Gary B. Searched greenway 3 fileroom for 253 ref info. (02/22/17) Searched greenway 3 files for additional 253L ref drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-23 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 4 0 (02/23/17) 209L DS well head cover drawing changes. (02/24/17) Continued with cover drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (02/23/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 (02/21/17) Searched for annular information for Steve C. Called GE for reference info. Converted ExpertCAD files for rig 253 reference. Saved converted files on the Q for future reference. (02/22/17) Reviewed new TSR for 269 BOP hoist upgrade. Discussed Hydril annular with Steve C. (02/23/17) Continued search for Hydril annular info. Sent info to Steve C. Worked on hydril GX annular CAD block. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-24 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 3 0 (02/23/17) 209L DS well head cover drawing changes. (02/24/17) Continued with cover drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-24 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 5 0 (02/21/17) Discussed 77B drawing request with Leroy. Worked on rock pad and BOP drawings for 77B. (02/22/17) Revised 77B rock pad drawing per comments from Leroy. (02/24/17) Started new rock pad drawing for rig 51B. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-27 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 6 0 (02/27/17) Continued working on well head cover mod drawings for 209L. (02/28/17)Reviewed mast assist padeye drawing. Transmitted drawing and archived file on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (02/27/17) Monday update meeting. (02/28/17) Daily meeting. (03/01/17) Daily meeting. Meeting with LABU to discuss 2017 goals/tender drawings. (03/02/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (02/27/17) Updated weekly timesheet. Discussed TSRs with Kyle. Discussed CAD standards with Ralph and sent correct tblock. (02/28/17) Discussed Sakhalin transmittals with Kyle. Archived 209L drawing files received from Sakh. Doc control. Discussed Sakh drawing transmittals with Tanya. (03/01/17) Reviewed well head cover drawings with Kyle/Lam. (03/02/17) Made corrections to timesheet and submitted. Discussed drawing status with Lam. (03/03/17) Made new TSR folder on Q for 272. Archived drawing files from Sakh. Archived AADU 3D model on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-28 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 1.5 0 (02/27/17) Continued working on well head cover mod drawings for 209L. (02/28/17)Reviewed mast assist padeye drawing. Transmitted drawing and archived file on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (02/27/17) Monday update meeting. (02/28/17) Daily meeting. (03/01/17) Daily meeting. Meeting with LABU to discuss 2017 goals/tender drawings. (03/02/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (02/27/17) Updated weekly timesheet. Discussed TSRs with Kyle. Discussed CAD standards with Ralph and sent correct tblock. (02/28/17) Discussed Sakhalin transmittals with Kyle. Archived 209L drawing files received from Sakh. Doc control. Discussed Sakh drawing transmittals with Tanya. (03/01/17) Reviewed well head cover drawings with Kyle/Lam. (03/02/17) Made corrections to timesheet and submitted. Discussed drawing status with Lam. (03/03/17) Made new TSR folder on Q for 272. Archived drawing files from Sakh. Archived AADU 3D model on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-28 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 (02/28/17) Pulled reference info for Nancy N. (rig brochure). (03/01/17) Updated rig brochure for Nancy - rig 270. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-28 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 2.5 0 (02/28/17) Checked diverter line hood drawing. Discussed with Lam. transmitted drawing and archived file on the Q. (03/02/17) Issued site drawing and archived file on the Q. (03/03/17) Updated 270 drawing and organized brochure drawing files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-02-28 Rig 270L-TSR :Rig 270L-TSR TSR-01535-270L BOP-Diverter Stack-Up Drawings Regular Pay N 0.75 0 (02/28/17) Discussed RFI with Tyler. reviewed info (03/01/17) Checked diverter site plan. (03/02/17) Reviewed RFI info from Sakh. Discussed plan finalize drawings with Tyler. Started closeout Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (02/27/17) Monday update meeting. (02/28/17) Daily meeting. (03/01/17) Daily meeting. Meeting with LABU to discuss 2017 goals/tender drawings. (03/02/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (02/27/17) Updated weekly timesheet. Discussed TSRs with Kyle. Discussed CAD standards with Ralph and sent correct tblock. (02/28/17) Discussed Sakhalin transmittals with Kyle. Archived 209L drawing files received from Sakh. Doc control. Discussed Sakh drawing transmittals with Tanya. (03/01/17) Reviewed well head cover drawings with Kyle/Lam. (03/02/17) Made corrections to timesheet and submitted. Discussed drawing status with Lam. (03/03/17) Made new TSR folder on Q for 272. Archived drawing files from Sakh. Archived AADU 3D model on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-01 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 4 0 (02/28/17) Pulled reference info for Nancy N. (rig brochure). (03/01/17) Updated rig brochure for Nancy - rig 270. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-01 Rig 270L-TSR :Rig 270L-TSR TSR-01535-270L BOP-Diverter Stack-Up Drawings Regular Pay N 2 0 (02/28/17) Discussed RFI with Tyler. reviewed info (03/01/17) Checked diverter site plan. (03/02/17) Reviewed RFI info from Sakh. Discussed plan finalize drawings with Tyler. Started closeout Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-02 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 5 0 (03/02/17) Discussed Chayvo site plan sketch with Tyler. Worked on drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (02/27/17) Monday update meeting. (02/28/17) Daily meeting. (03/01/17) Daily meeting. Meeting with LABU to discuss 2017 goals/tender drawings. (03/02/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (02/27/17) Updated weekly timesheet. Discussed TSRs with Kyle. Discussed CAD standards with Ralph and sent correct tblock. (02/28/17) Discussed Sakhalin transmittals with Kyle. Archived 209L drawing files received from Sakh. Doc control. Discussed Sakh drawing transmittals with Tanya. (03/01/17) Reviewed well head cover drawings with Kyle/Lam. (03/02/17) Made corrections to timesheet and submitted. Discussed drawing status with Lam. (03/03/17) Made new TSR folder on Q for 272. Archived drawing files from Sakh. Archived AADU 3D model on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-02 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 1 0 (02/28/17) Checked diverter line hood drawing. Discussed with Lam. transmitted drawing and archived file on the Q. (03/02/17) Issued site drawing and archived file on the Q. (03/03/17) Updated 270 drawing and organized brochure drawing files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (02/27/17) Updated weekly timesheet. Discussed TSRs with Kyle. Discussed CAD standards with Ralph and sent correct tblock. (02/28/17) Discussed Sakhalin transmittals with Kyle. Archived 209L drawing files received from Sakh. Doc control. Discussed Sakh drawing transmittals with Tanya. (03/01/17) Reviewed well head cover drawings with Kyle/Lam. (03/02/17) Made corrections to timesheet and submitted. Discussed drawing status with Lam. (03/03/17) Made new TSR folder on Q for 272. Archived drawing files from Sakh. Archived AADU 3D model on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-03 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 2 0 (02/28/17) Checked diverter line hood drawing. Discussed with Lam. transmitted drawing and archived file on the Q. (03/02/17) Issued site drawing and archived file on the Q. (03/03/17) Updated 270 drawing and organized brochure drawing files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-03 Rig 270L-TSR :Rig 270L-TSR TSR-01535-270L BOP-Diverter Stack-Up Drawings Regular Pay N 4 0 (02/28/17) Discussed RFI with Tyler. reviewed info (03/01/17) Checked diverter site plan. (03/02/17) Reviewed RFI info from Sakh. Discussed plan finalize drawings with Tyler. Started closeout Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (03/06/17) Team meeting. (03/07/17) Team meeting. (03/08/17) Team meeting. (03/09/17) TSR meeting. (03/10/17) Team meeting Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 (03/06/17) Discussed mousehole designs with John - searched for ref drawings. (03/08/17) Discussed platform drawings with Kyle. (03/09/17) Discussed drawing format with Ralph. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (03/06/17) Routed closeout for review/approval. Reviewed platform drawings with Lam. (03/07/17) Sent drawing number request to Tanya/discussed. (03/08/17) Timesheets. (03/09/17) Logged out new drawing number for 270 and archived file on the Q. (03/10/17) Archived drawings from Sakh. eng. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 (03/06/17) Reviewed substructure drawings with Kyle (pin connection damage). Worked on substructure repair sketch. (03/07/17) Completed final changes to well head cover drawings. (03/10/17) Stamped well head drawings. Tranmitted drawings and archived files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-06 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1.5 0 (03/06/17) Reviewed 272 Hazardous area drawings with Sachin. (03/07/17) Conf call with Alaska - Haz area review. (03/08/17) Discussed drawing changes with Sachin. Worked on redlines. Sketched vent line elevation view for discussion. (03/10/17) Reviewed drawings and started diverter updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-06 Rig 270L-TSR :Rig 270L-TSR TSR-01535-270L BOP-Diverter Stack-Up Drawings Regular Pay N 1 0 (03/06/17) Added drawings and finalized closeout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-07 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 (03/07/17) Discussed drawing requirements with Tyler. (03/10/17) Reviewed plan for drawing progress with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/06/17) Team meeting. (03/07/17) Team meeting. (03/08/17) Team meeting. (03/09/17) TSR meeting. (03/10/17) Team meeting Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (03/06/17) Routed closeout for review/approval. Reviewed platform drawings with Lam. (03/07/17) Sent drawing number request to Tanya/discussed. (03/08/17) Timesheets. (03/09/17) Logged out new drawing number for 270 and archived file on the Q. (03/10/17) Archived drawings from Sakh. eng. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 (03/06/17) Reviewed substructure drawings with Kyle (pin connection damage). Worked on substructure repair sketch. (03/07/17) Completed final changes to well head cover drawings. (03/10/17) Stamped well head drawings. Tranmitted drawings and archived files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-07 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1.5 0 (03/06/17) Reviewed 272 Hazardous area drawings with Sachin. (03/07/17) Conf call with Alaska - Haz area review. (03/08/17) Discussed drawing changes with Sachin. Worked on redlines. Sketched vent line elevation view for discussion. (03/10/17) Reviewed drawings and started diverter updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-07 Rig 209L-TSR :Rig 209L-TSR TSR-01510-209L DSM-PB HPU Cantilever Regular Pay N 1.5 0 (03/07/17) Checked DSM north HPU platform drawing. (03/08/17) Cont. checking drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/06/17) Team meeting. (03/07/17) Team meeting. (03/08/17) Team meeting. (03/09/17) TSR meeting. (03/10/17) Team meeting Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 (03/06/17) Discussed mousehole designs with John - searched for ref drawings. (03/08/17) Discussed platform drawings with Kyle. (03/09/17) Discussed drawing format with Ralph. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (03/06/17) Routed closeout for review/approval. Reviewed platform drawings with Lam. (03/07/17) Sent drawing number request to Tanya/discussed. (03/08/17) Timesheets. (03/09/17) Logged out new drawing number for 270 and archived file on the Q. (03/10/17) Archived drawings from Sakh. eng. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-08 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 4.75 0 (03/06/17) Reviewed 272 Hazardous area drawings with Sachin. (03/07/17) Conf call with Alaska - Haz area review. (03/08/17) Discussed drawing changes with Sachin. Worked on redlines. Sketched vent line elevation view for discussion. (03/10/17) Reviewed drawings and started diverter updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-08 Rig 209L-TSR :Rig 209L-TSR TSR-01510-209L DSM-PB HPU Cantilever Regular Pay N 2 0 (03/07/17) Checked DSM north HPU platform drawing. (03/08/17) Cont. checking drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (03/06/17) Team meeting. (03/07/17) Team meeting. (03/08/17) Team meeting. (03/09/17) TSR meeting. (03/10/17) Team meeting Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 (03/06/17) Discussed mousehole designs with John - searched for ref drawings. (03/08/17) Discussed platform drawings with Kyle. (03/09/17) Discussed drawing format with Ralph. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (03/06/17) Routed closeout for review/approval. Reviewed platform drawings with Lam. (03/07/17) Sent drawing number request to Tanya/discussed. (03/08/17) Timesheets. (03/09/17) Logged out new drawing number for 270 and archived file on the Q. (03/10/17) Archived drawings from Sakh. eng. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-09 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 6 0 (03/09/17) Worked on tieback beam drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-10 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 (03/07/17) Discussed drawing requirements with Tyler. (03/10/17) Reviewed plan for drawing progress with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/06/17) Team meeting. (03/07/17) Team meeting. (03/08/17) Team meeting. (03/09/17) TSR meeting. (03/10/17) Team meeting Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (03/06/17) Routed closeout for review/approval. Reviewed platform drawings with Lam. (03/07/17) Sent drawing number request to Tanya/discussed. (03/08/17) Timesheets. (03/09/17) Logged out new drawing number for 270 and archived file on the Q. (03/10/17) Archived drawings from Sakh. eng. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 (03/06/17) Reviewed substructure drawings with Kyle (pin connection damage). Worked on substructure repair sketch. (03/07/17) Completed final changes to well head cover drawings. (03/10/17) Stamped well head drawings. Tranmitted drawings and archived files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-10 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 4.25 0 (03/06/17) Reviewed 272 Hazardous area drawings with Sachin. (03/07/17) Conf call with Alaska - Haz area review. (03/08/17) Discussed drawing changes with Sachin. Worked on redlines. Sketched vent line elevation view for discussion. (03/10/17) Reviewed drawings and started diverter updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/13/17) Team meeting. (03/14/17) Team meeting. (03/15/17) Team meeting. 2017' goal meeting with Kyle. (03/16/17) Weekly TSR meeting. (03/17/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (03/13/17) Discussed drawing number request with Tanya. (03/14/17) Call with Alaska to discuss additional changes to haz area drawings. Sent additional ref info to Luis. Pulled CAD blocks and sent to Daniel for reference. (03/15/17) General status discussion with Kyle. Reviewed 272 ventilation drawings. (03/16/17) Updated weekly timesheet and submitted for approval. Reviewed designers timesheets. Reviewed goals with Kyle. Call with Alaska. Transmit/archived North DSM HPU platform drawings. (03/17/17) Discussed reviews with Kyle. Worked on reviews. Email to IT (phone issue). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-13 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8 0 (03/13/17) Discussed tender drawing packages with Mat E. Update to 247/265 Sarquala site plan. Started Sarta-3 site plan options for rig 269L. (03/14/17) Discussed 247/265 sites and sent updated pdfs to Mat. Continued with 269L site options. Conference call with Mat/Bernie/Billy M. (03/15/17) Additional site layouts for Sarta-3. Reviewed with Mat E. (03/16/17) Created options 4-6 for Sarta-3 site. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/13/17) Team meeting. (03/14/17) Team meeting. (03/15/17) Team meeting. 2017' goal meeting with Kyle. (03/16/17) Weekly TSR meeting. (03/17/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 (03/13/17) Discussed drawing number request with Tanya. (03/14/17) Call with Alaska to discuss additional changes to haz area drawings. Sent additional ref info to Luis. Pulled CAD blocks and sent to Daniel for reference. (03/15/17) General status discussion with Kyle. Reviewed 272 ventilation drawings. (03/16/17) Updated weekly timesheet and submitted for approval. Reviewed designers timesheets. Reviewed goals with Kyle. Call with Alaska. Transmit/archived North DSM HPU platform drawings. (03/17/17) Discussed reviews with Kyle. Worked on reviews. Email to IT (phone issue). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-14 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 4.75 0 (03/13/17) Discussed tender drawing packages with Mat E. Update to 247/265 Sarquala site plan. Started Sarta-3 site plan options for rig 269L. (03/14/17) Discussed 247/265 sites and sent updated pdfs to Mat. Continued with 269L site options. Conference call with Mat/Bernie/Billy M. (03/15/17) Additional site layouts for Sarta-3. Reviewed with Mat E. (03/16/17) Created options 4-6 for Sarta-3 site. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-14 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 (03/14/17) Discussed rock pad drawing with Leroy. Sent 30B pad. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.75 0 (03/13/17) Team meeting. (03/14/17) Team meeting. (03/15/17) Team meeting. 2017' goal meeting with Kyle. (03/16/17) Weekly TSR meeting. (03/17/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (03/13/17) Discussed drawing number request with Tanya. (03/14/17) Call with Alaska to discuss additional changes to haz area drawings. Sent additional ref info to Luis. Pulled CAD blocks and sent to Daniel for reference. (03/15/17) General status discussion with Kyle. Reviewed 272 ventilation drawings. (03/16/17) Updated weekly timesheet and submitted for approval. Reviewed designers timesheets. Reviewed goals with Kyle. Call with Alaska. Transmit/archived North DSM HPU platform drawings. (03/17/17) Discussed reviews with Kyle. Worked on reviews. Email to IT (phone issue). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-15 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5.25 0 (03/13/17) Discussed tender drawing packages with Mat E. Update to 247/265 Sarquala site plan. Started Sarta-3 site plan options for rig 269L. (03/14/17) Discussed 247/265 sites and sent updated pdfs to Mat. Continued with 269L site options. Conference call with Mat/Bernie/Billy M. (03/15/17) Additional site layouts for Sarta-3. Reviewed with Mat E. (03/16/17) Created options 4-6 for Sarta-3 site. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (03/13/17) Team meeting. (03/14/17) Team meeting. (03/15/17) Team meeting. 2017' goal meeting with Kyle. (03/16/17) Weekly TSR meeting. (03/17/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 (03/13/17) Discussed drawing number request with Tanya. (03/14/17) Call with Alaska to discuss additional changes to haz area drawings. Sent additional ref info to Luis. Pulled CAD blocks and sent to Daniel for reference. (03/15/17) General status discussion with Kyle. Reviewed 272 ventilation drawings. (03/16/17) Updated weekly timesheet and submitted for approval. Reviewed designers timesheets. Reviewed goals with Kyle. Call with Alaska. Transmit/archived North DSM HPU platform drawings. (03/17/17) Discussed reviews with Kyle. Worked on reviews. Email to IT (phone issue). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-16 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3 0 (03/13/17) Discussed tender drawing packages with Mat E. Update to 247/265 Sarquala site plan. Started Sarta-3 site plan options for rig 269L. (03/14/17) Discussed 247/265 sites and sent updated pdfs to Mat. Continued with 269L site options. Conference call with Mat/Bernie/Billy M. (03/15/17) Additional site layouts for Sarta-3. Reviewed with Mat E. (03/16/17) Created options 4-6 for Sarta-3 site. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-16 Rig 272L-TSR :Rig 272L-TSR TSR-01551-272L Mud Pump Room Area Clarification Regular Pay N 2.25 0 (03/16/17) Added hours to CTR. Updated drawing and sent to Alaska for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/13/17) Team meeting. (03/14/17) Team meeting. (03/15/17) Team meeting. 2017' goal meeting with Kyle. (03/16/17) Weekly TSR meeting. (03/17/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 7.75 0 (03/13/17) Discussed drawing number request with Tanya. (03/14/17) Call with Alaska to discuss additional changes to haz area drawings. Sent additional ref info to Luis. Pulled CAD blocks and sent to Daniel for reference. (03/15/17) General status discussion with Kyle. Reviewed 272 ventilation drawings. (03/16/17) Updated weekly timesheet and submitted for approval. Reviewed designers timesheets. Reviewed goals with Kyle. Call with Alaska. Transmit/archived North DSM HPU platform drawings. (03/17/17) Discussed reviews with Kyle. Worked on reviews. Email to IT (phone issue). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/20/17) Daily team meeting. (03/21/17) Daily team meeting. (03/22/17) Daily team meeting. (03/23/17) Weekly TSR meeting. (03/24/17) Daily team meeting. Meeting to discuss ITS engineering support Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 (03/20/17) Continued updates to designer's performance reviews. Updated weekly timesheet and submitted for approval. Converted reference ExpertCAD drawings for Sachin. Researched reference CAD standards for future use. (03/21/17) Discussed performance reviews with Kyle. Cleaned up misc 269 drawing files under archive. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-20 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5.25 0 (03/20/17) Created new site layout for Sarta-3 site-Chevron (less reserve mud pits). (03/21/17) Discussed new site options with Mat. Started 2 new layout drawings. Researched 269 flow line info. Pulled LP/HP mid schematics for tender. Started initial piping layout for mud pit additions. (03/22/17) Reviewed piping for 247/269 mud pits. Revised 269 bop stack drawings to show new RCD. Researched BOP hoist info. (03/24/17) Created new CAD block for RCD - 269 Sarta tender support. Started flow line layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/20/17) Daily team meeting. (03/21/17) Daily team meeting. (03/22/17) Daily team meeting. (03/23/17) Weekly TSR meeting. (03/24/17) Daily team meeting. Meeting to discuss ITS engineering support Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (03/20/17) Continued updates to designer's performance reviews. Updated weekly timesheet and submitted for approval. Converted reference ExpertCAD drawings for Sachin. Researched reference CAD standards for future use. (03/21/17) Discussed performance reviews with Kyle. Cleaned up misc 269 drawing files under archive. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-21 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6.75 0 (03/20/17) Created new site layout for Sarta-3 site-Chevron (less reserve mud pits). (03/21/17) Discussed new site options with Mat. Started 2 new layout drawings. Researched 269 flow line info. Pulled LP/HP mid schematics for tender. Started initial piping layout for mud pit additions. (03/22/17) Reviewed piping for 247/269 mud pits. Revised 269 bop stack drawings to show new RCD. Researched BOP hoist info. (03/24/17) Created new CAD block for RCD - 269 Sarta tender support. Started flow line layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/20/17) Daily team meeting. (03/21/17) Daily team meeting. (03/22/17) Daily team meeting. (03/23/17) Weekly TSR meeting. (03/24/17) Daily team meeting. Meeting to discuss ITS engineering support Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-22 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8.25 0 (03/20/17) Created new site layout for Sarta-3 site-Chevron (less reserve mud pits). (03/21/17) Discussed new site options with Mat. Started 2 new layout drawings. Researched 269 flow line info. Pulled LP/HP mid schematics for tender. Started initial piping layout for mud pit additions. (03/22/17) Reviewed piping for 247/269 mud pits. Revised 269 bop stack drawings to show new RCD. Researched BOP hoist info. (03/24/17) Created new CAD block for RCD - 269 Sarta tender support. Started flow line layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (03/20/17) Daily team meeting. (03/21/17) Daily team meeting. (03/22/17) Daily team meeting. (03/23/17) Weekly TSR meeting. (03/24/17) Daily team meeting. Meeting to discuss ITS engineering support Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 (03/23/17) Checked 209L HPU platform stairs. (03/24/17) Discussed rig brochure drawings with Nancy. Call with Alaska to discuss 272 haz area. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6 0 (03/23/17) 270 racking board repair sketch. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (03/20/17) Daily team meeting. (03/21/17) Daily team meeting. (03/22/17) Daily team meeting. (03/23/17) Weekly TSR meeting. (03/24/17) Daily team meeting. Meeting to discuss ITS engineering support Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 (03/23/17) Checked 209L HPU platform stairs. (03/24/17) Discussed rig brochure drawings with Nancy. Call with Alaska to discuss 272 haz area. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-24 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6.75 0 (03/20/17) Created new site layout for Sarta-3 site-Chevron (less reserve mud pits). (03/21/17) Discussed new site options with Mat. Started 2 new layout drawings. Researched 269 flow line info. Pulled LP/HP mid schematics for tender. Started initial piping layout for mud pit additions. (03/22/17) Reviewed piping for 247/269 mud pits. Revised 269 bop stack drawings to show new RCD. Researched BOP hoist info. (03/24/17) Created new CAD block for RCD - 269 Sarta tender support. Started flow line layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/27/17) Team meeting. (03/28/17) Team meeting. (03/29/17) Team meeting. (03/31/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-27 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 7.25 0 (03/27/17) Finished RCD AutuoCAD block and added to stack up drawing. Created new 29-1/2" diverter stack drawing. (03/28/17) Started pulling info for 269 LP mud schematic. Discussed piping options with Mat. Discussed site options with Bernie (269 Chevron). Revised site to show as-built fence location. Started suction/discharge piping options for 269/247 pits. (03/29/17) Discussed 269 drawings with Mat/Kyle. Continued with site/piping options(added process pit and associated piping. Revised stack drawings per field comments. Assigned 269 camp drawings to Dan. (03/31/17) Revised 269l RCD flowline drawings per input from Mat. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/27/17) Team meeting. (03/28/17) Team meeting. (03/29/17) Team meeting. (03/31/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 (03/28/17) Sketch for 272 haz area closeout. (03/31/17) Researched 270 padeye info request for Mat E. Archived drawings files from Sakh. Eng. Researched drawing number issue for 209L and sent email to Sak doc control. Discussed with Tanya. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-28 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8.25 0 (03/27/17) Finished RCD AutuoCAD block and added to stack up drawing. Created new 29-1/2" diverter stack drawing. (03/28/17) Started pulling info for 269 LP mud schematic. Discussed piping options with Mat. Discussed site options with Bernie (269 Chevron). Revised site to show as-built fence location. Started suction/discharge piping options for 269/247 pits. (03/29/17) Discussed 269 drawings with Mat/Kyle. Continued with site/piping options(added process pit and associated piping. Revised stack drawings per field comments. Assigned 269 camp drawings to Dan. (03/31/17) Revised 269l RCD flowline drawings per input from Mat. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/27/17) Team meeting. (03/28/17) Team meeting. (03/29/17) Team meeting. (03/31/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (03/29/17) Updated weekly timesheet and submitted for approval. (03/31/17) Updated designer performance reviews. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-29 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 7.75 0 (03/27/17) Finished RCD AutuoCAD block and added to stack up drawing. Created new 29-1/2" diverter stack drawing. (03/28/17) Started pulling info for 269 LP mud schematic. Discussed piping options with Mat. Discussed site options with Bernie (269 Chevron). Revised site to show as-built fence location. Started suction/discharge piping options for 269/247 pits. (03/29/17) Discussed 269 drawings with Mat/Kyle. Continued with site/piping options(added process pit and associated piping. Revised stack drawings per field comments. Assigned 269 camp drawings to Dan. (03/31/17) Revised 269l RCD flowline drawings per input from Mat. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-30 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 (03/30/17) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/27/17) Team meeting. (03/28/17) Team meeting. (03/29/17) Team meeting. (03/31/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-31 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 (03/28/17) Sketch for 272 haz area closeout. (03/31/17) Researched 270 padeye info request for Mat E. Archived drawings files from Sakh. Eng. Researched drawing number issue for 209L and sent email to Sak doc control. Discussed with Tanya. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-03-31 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6.25 0 (03/27/17) Finished RCD AutuoCAD block and added to stack up drawing. Created new 29-1/2" diverter stack drawing. (03/28/17) Started pulling info for 269 LP mud schematic. Discussed piping options with Mat. Discussed site options with Bernie (269 Chevron). Revised site to show as-built fence location. Started suction/discharge piping options for 269/247 pits. (03/29/17) Discussed 269 drawings with Mat/Kyle. Continued with site/piping options(added process pit and associated piping. Revised stack drawings per field comments. Assigned 269 camp drawings to Dan. (03/31/17) Revised 269l RCD flowline drawings per input from Mat. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 (04/03/17) Team meeting. Meeting with Gary B - Geothermal wells - eng support (04/04/17) Team meeting. (04/05/17) Team meeting. (04/06/17) Weekly TSR meeting. (04/07/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.25 0 (04/03/17) Sent meeting invites for designers performance reviews. Archived CAD drawings received from Sakh. Eng. Discussed AutoCAD pulldown menus with Lam. Discussed TSR coord. roll with kyle. Discussed drawing number with Tanya. (04/04/17) Printed performance review forms. My performance review with Kyle. Performance review with Lam and Dan. Updated timesheet and submitted for review. Discussed 258 yard layout with Dan. (04/06/17) discussed TSR Coord. roll with lam/Kyle. (04/07/17) reviewed 258 yard layout and sent to Robbie B for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-03 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 (04/03/17) Discussed rig brochure drawing with Kyle and made updates. Sent PDF to Nancy. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-03 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 1.5 0 (04/03/17) Pulled substructure info for 216/258 per email request from the field. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-03 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 2 0 (04/03/17) Researched yard layout request from the field. Pulled go by drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (04/03/17) Team meeting. Meeting with Gary B - Geothermal wells - eng support (04/04/17) Team meeting. (04/05/17) Team meeting. (04/06/17) Weekly TSR meeting. (04/07/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 8.25 0 (04/03/17) Sent meeting invites for designers performance reviews. Archived CAD drawings received from Sakh. Eng. Discussed AutoCAD pulldown menus with Lam. Discussed TSR coord. roll with kyle. Discussed drawing number with Tanya. (04/04/17) Printed performance review forms. My performance review with Kyle. Performance review with Lam and Dan. Updated timesheet and submitted for review. Discussed 258 yard layout with Dan. (04/06/17) discussed TSR Coord. roll with lam/Kyle. (04/07/17) reviewed 258 yard layout and sent to Robbie B for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (04/03/17) Team meeting. Meeting with Gary B - Geothermal wells - eng support (04/04/17) Team meeting. (04/05/17) Team meeting. (04/06/17) Weekly TSR meeting. (04/07/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 (04/05/17) Researched stack drawings for geothermal wells. - Peru (04/06/17) Started new BOP/Diverter drawings for Gary. (04/07/17) Cont on stack drawings - reviewed with Gary. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-05 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6.25 0 (04/05/17) Discussed bop stack - lift arrangement with Mat. Created lift drawing for 20-3/4 stack. Pulled pit info for George. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-05 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 0.5 0 (04/05/17) Pulled 55B pad drawings for Toby. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (04/03/17) Team meeting. Meeting with Gary B - Geothermal wells - eng support (04/04/17) Team meeting. (04/05/17) Team meeting. (04/06/17) Weekly TSR meeting. (04/07/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (04/03/17) Sent meeting invites for designers performance reviews. Archived CAD drawings received from Sakh. Eng. Discussed AutoCAD pulldown menus with Lam. Discussed TSR coord. roll with kyle. Discussed drawing number with Tanya. (04/04/17) Printed performance review forms. My performance review with Kyle. Performance review with Lam and Dan. Updated timesheet and submitted for review. Discussed 258 yard layout with Dan. (04/06/17) discussed TSR Coord. roll with lam/Kyle. (04/07/17) reviewed 258 yard layout and sent to Robbie B for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 (04/05/17) Researched stack drawings for geothermal wells. - Peru (04/06/17) Started new BOP/Diverter drawings for Gary. (04/07/17) Cont on stack drawings - reviewed with Gary. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (04/03/17) Team meeting. Meeting with Gary B - Geothermal wells - eng support (04/04/17) Team meeting. (04/05/17) Team meeting. (04/06/17) Weekly TSR meeting. (04/07/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (04/03/17) Sent meeting invites for designers performance reviews. Archived CAD drawings received from Sakh. Eng. Discussed AutoCAD pulldown menus with Lam. Discussed TSR coord. roll with kyle. Discussed drawing number with Tanya. (04/04/17) Printed performance review forms. My performance review with Kyle. Performance review with Lam and Dan. Updated timesheet and submitted for review. Discussed 258 yard layout with Dan. (04/06/17) discussed TSR Coord. roll with lam/Kyle. (04/07/17) reviewed 258 yard layout and sent to Robbie B for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6.75 0 (04/05/17) Researched stack drawings for geothermal wells. - Peru (04/06/17) Started new BOP/Diverter drawings for Gary. (04/07/17) Cont on stack drawings - reviewed with Gary. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (04/10/17) Team meeting. (04/11/17) Team meeting (04/12/17) Team meeting Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 8.75 0 (04/10/17) Final drawing check - 209L DSM HPU platform drawings. Pulled 272 mud pit information for Luis C. - sent pdfs. Discussed drawing status with Lam and Dan. (04/11/17) Cleaned up 269 proposal drawing folder (P01350). (04/12/17) Updated weekly timesheet and submitted for approval. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (04/10/17) Team meeting. (04/11/17) Team meeting (04/12/17) Team meeting Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (04/10/17) Final drawing check - 209L DSM HPU platform drawings. Pulled 272 mud pit information for Luis C. - sent pdfs. Discussed drawing status with Lam and Dan. (04/11/17) Cleaned up 269 proposal drawing folder (P01350). (04/12/17) Updated weekly timesheet and submitted for approval. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-11 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8.5 0 (04/11/17) Cleaned up latest BOP stack drawings and sent PDFs to Mat. Started diverter vent line layout and discussed with George. Updated site plan drawing. (04/12/17) Cleaned up vent line option and sent to Mat. Started on camp site plan updates with new CAD file from chevron. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (04/10/17) Team meeting. (04/11/17) Team meeting (04/12/17) Team meeting Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (04/10/17) Final drawing check - 209L DSM HPU platform drawings. Pulled 272 mud pit information for Luis C. - sent pdfs. Discussed drawing status with Lam and Dan. (04/11/17) Cleaned up 269 proposal drawing folder (P01350). (04/12/17) Updated weekly timesheet and submitted for approval. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-12 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 7.75 0 (04/11/17) Cleaned up latest BOP stack drawings and sent PDFs to Mat. Started diverter vent line layout and discussed with George. Updated site plan drawing. (04/12/17) Cleaned up vent line option and sent to Mat. Started on camp site plan updates with new CAD file from chevron. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-13 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 (04/13/17) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-14 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 (04/14/17) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-17 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (04/18/17) Team meeting. (04/19/17) Team meeting. (04/21/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (04/18/17) Discussed open TSRs with Kyle. Reviewed 270 rotary hose connection sketch from Benny. (04/20/17) Discussed 269 tender drawings with Kyle. Archived 209L HPU platform and Haz area drawings for 209L. Archived 270 well control schematic from Sakh. Updated weekly timesheet. Discussed rig brochures with ark Q. (04/21/17) Discussed 272L vent line info with Kyle - searched for ref info. Searched for 258 racking capacity for Randy Discussed BOP lifting with George. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-18 Rig 270L-TSR :Rig 270L-TSR TSR-01568-270L Rotary Hose Connection Spool Regular Pay N 7.75 0 (04/18/17) Discussed design with John R. Researched pipe fittings (OD/ID etc). Created new drawing for review. Call with Benny to discuss. (04/21/17) Revised drawing - pdf for quote. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (04/18/17) Team meeting. (04/19/17) Team meeting. (04/21/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-19 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 8.75 0 (04/19/17) Discussed new lifting option with George/Kyle. Created new sketch. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 (04/18/17) Discussed open TSRs with Kyle. Reviewed 270 rotary hose connection sketch from Benny. (04/20/17) Discussed 269 tender drawings with Kyle. Archived 209L HPU platform and Haz area drawings for 209L. Archived 270 well control schematic from Sakh. Updated weekly timesheet. Discussed rig brochures with ark Q. (04/21/17) Discussed 272L vent line info with Kyle - searched for ref info. Searched for 258 racking capacity for Randy Discussed BOP lifting with George. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-20 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5 0 (04/21/17) Call with Mat to review drawings/status. Created drawing lists to track progress. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (04/18/17) Team meeting. (04/19/17) Team meeting. (04/21/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.75 0 (04/18/17) Discussed open TSRs with Kyle. Reviewed 270 rotary hose connection sketch from Benny. (04/20/17) Discussed 269 tender drawings with Kyle. Archived 209L HPU platform and Haz area drawings for 209L. Archived 270 well control schematic from Sakh. Updated weekly timesheet. Discussed rig brochures with ark Q. (04/21/17) Discussed 272L vent line info with Kyle - searched for ref info. Searched for 258 racking capacity for Randy Discussed BOP lifting with George. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-21 Rig 270L-TSR :Rig 270L-TSR TSR-01568-270L Rotary Hose Connection Spool Regular Pay N 3 0 (04/18/17) Discussed design with John R. Researched pipe fittings (OD/ID etc). Created new drawing for review. Call with Benny to discuss. (04/21/17) Revised drawing - pdf for quote. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (04/24/17) Team meeting. (04/25/17) Team meeting. (04/26/17) Team meeting. Arctic rig presentation - Keppel. (04/27/17) Weekly TSR meeting. (04/28/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-24 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8.75 0 (04/24/17) Discussed choke manifold changes with Mat- sent sketch to Mat. Started revision to main camp drawings. (04/25/17) Continued with camp drawing updates. (04/26/17) Mud gun layout for 269 pits. (04/27/17) reviewed mud gun info from Mat - made changes. (04/28/17) Cleaned up site plan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (04/24/17) Team meeting. (04/25/17) Team meeting. (04/26/17) Team meeting. Arctic rig presentation - Keppel. (04/27/17) Weekly TSR meeting. (04/28/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-25 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8.75 0 (04/24/17) Discussed choke manifold changes with Mat- sent sketch to Mat. Started revision to main camp drawings. (04/25/17) Continued with camp drawing updates. (04/26/17) Mud gun layout for 269 pits. (04/27/17) reviewed mud gun info from Mat - made changes. (04/28/17) Cleaned up site plan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 (04/24/17) Team meeting. (04/25/17) Team meeting. (04/26/17) Team meeting. Arctic rig presentation - Keppel. (04/27/17) Weekly TSR meeting. (04/28/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-26 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 7 0 (04/24/17) Discussed choke manifold changes with Mat- sent sketch to Mat. Started revision to main camp drawings. (04/25/17) Continued with camp drawing updates. (04/26/17) Mud gun layout for 269 pits. (04/27/17) reviewed mud gun info from Mat - made changes. (04/28/17) Cleaned up site plan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (04/24/17) Team meeting. (04/25/17) Team meeting. (04/26/17) Team meeting. Arctic rig presentation - Keppel. (04/27/17) Weekly TSR meeting. (04/28/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (04/27/17) Updated weekly timesheet and submitted for approval. Archived CAD files from Sakh. (04/28/17) Discussed 269 drawing package with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-27 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 7 0 (04/24/17) Discussed choke manifold changes with Mat- sent sketch to Mat. Started revision to main camp drawings. (04/25/17) Continued with camp drawing updates. (04/26/17) Mud gun layout for 269 pits. (04/27/17) reviewed mud gun info from Mat - made changes. (04/28/17) Cleaned up site plan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (04/24/17) Team meeting. (04/25/17) Team meeting. (04/26/17) Team meeting. Arctic rig presentation - Keppel. (04/27/17) Weekly TSR meeting. (04/28/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (04/27/17) Updated weekly timesheet and submitted for approval. Archived CAD files from Sakh. (04/28/17) Discussed 269 drawing package with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-28 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6.25 0 (04/24/17) Discussed choke manifold changes with Mat- sent sketch to Mat. Started revision to main camp drawings. (04/25/17) Continued with camp drawing updates. (04/26/17) Mud gun layout for 269 pits. (04/27/17) reviewed mud gun info from Mat - made changes. (04/28/17) Cleaned up site plan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-04-28 Rig 270L-TSR :Rig 270L-TSR TSR-01568-270L Rotary Hose Connection Spool Regular Pay N 1 0 (04/28/17) Revised drawing to show additional spool. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (05/01/17) Team meeting. (05/02/17) Team meeting. (05/03/17) Team meeting. Call with Mat E - review 269 scope. quarterly earnings meeting. (05/04/17) TSR meeting. (05/05/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (05/01/17) Discussed open TSRs with Kyle. (05/02/17) Transmitted 270 rotary hose spool and archived file on the Q. (05/03/17) Researched safety topic. (05/05/17) Updated weekly timesheet and submitted for approval. Issued/archived 270 bop stack drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-01 Rig 270L-TSR :Rig 270L-TSR TSR-01569-270L BOP/Diverter Stack-Up Drawings Regular Pay N 8.25 0 (05/01/17) Started BOP stack revisions. (05/02/17) Created CTR and submitted. Continued with stack drawings. (05/03/17) Worked on diverter drawing Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (05/01/17) Team meeting. (05/02/17) Team meeting. (05/03/17) Team meeting. Call with Mat E - review 269 scope. quarterly earnings meeting. (05/04/17) TSR meeting. (05/05/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 (05/02/17) Researched bop equipment info. (height verification etc). (05/03/17) Researched ring gasket information. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (05/01/17) Discussed open TSRs with Kyle. (05/02/17) Transmitted 270 rotary hose spool and archived file on the Q. (05/03/17) Researched safety topic. (05/05/17) Updated weekly timesheet and submitted for approval. Issued/archived 270 bop stack drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-02 Rig 270L-TSR :Rig 270L-TSR TSR-01569-270L BOP/Diverter Stack-Up Drawings Regular Pay N 6.75 0 (05/01/17) Started BOP stack revisions. (05/02/17) Created CTR and submitted. Continued with stack drawings. (05/03/17) Worked on diverter drawing Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 (05/01/17) Team meeting. (05/02/17) Team meeting. (05/03/17) Team meeting. Call with Mat E - review 269 scope. quarterly earnings meeting. (05/04/17) TSR meeting. (05/05/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 (05/02/17) Researched bop equipment info. (height verification etc). (05/03/17) Researched ring gasket information. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (05/01/17) Discussed open TSRs with Kyle. (05/02/17) Transmitted 270 rotary hose spool and archived file on the Q. (05/03/17) Researched safety topic. (05/05/17) Updated weekly timesheet and submitted for approval. Issued/archived 270 bop stack drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-03 Rig 270L-TSR :Rig 270L-TSR TSR-01569-270L BOP/Diverter Stack-Up Drawings Regular Pay N 3.5 0 (05/01/17) Started BOP stack revisions. (05/02/17) Created CTR and submitted. Continued with stack drawings. (05/03/17) Worked on diverter drawing Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (05/01/17) Team meeting. (05/02/17) Team meeting. (05/03/17) Team meeting. Call with Mat E - review 269 scope. quarterly earnings meeting. (05/04/17) TSR meeting. (05/05/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-04 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8.25 0 (05/04/17) Reviewed info from Mat. Revised 269 stack drawings and flow line dwgs. Discussed camp layout. (05/05/17) Cont flow line drawing and stack changes (new cross height etc). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (05/01/17) Team meeting. (05/02/17) Team meeting. (05/03/17) Team meeting. Call with Mat E - review 269 scope. quarterly earnings meeting. (05/04/17) TSR meeting. (05/05/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (05/01/17) Discussed open TSRs with Kyle. (05/02/17) Transmitted 270 rotary hose spool and archived file on the Q. (05/03/17) Researched safety topic. (05/05/17) Updated weekly timesheet and submitted for approval. Issued/archived 270 bop stack drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-05 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6.25 0 (05/04/17) Reviewed info from Mat. Revised 269 stack drawings and flow line dwgs. Discussed camp layout. (05/05/17) Cont flow line drawing and stack changes (new cross height etc). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (05/08/17) Team meeting. (05/09/17) Team meeting. (05/10/17) Team meeting. (05/11/17) TSR meeting. (05/12/17) Team meeting. Meeting with Bryan to discuss 271 tender drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-08 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8.75 0 (05/08/17) Discussed choke hose layout/length with Mat. Worked on rig camp redlines from Mat. Reviewed choke manifold connection for MPD system. (05/09/17) New choke manifold loction/hose layout. More camp updates. (05/10/17) Worked on choke manifold sketch. Updated site camp drawing. Created new CAD blocks for proposed RCDs. (05/11/17) Site camp revisions per chevron comments. Updated choke skid location on site plan. Continued with new CAD block fr rotating head (13-5/8"). (05/12/17) Worked on choke manifold asbuilts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (05/08/17) Team meeting. (05/09/17) Team meeting. (05/10/17) Team meeting. (05/11/17) TSR meeting. (05/12/17) Team meeting. Meeting with Bryan to discuss 271 tender drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-09 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8.75 0 (05/08/17) Discussed choke hose layout/length with Mat. Worked on rig camp redlines from Mat. Reviewed choke manifold connection for MPD system. (05/09/17) New choke manifold loction/hose layout. More camp updates. (05/10/17) Worked on choke manifold sketch. Updated site camp drawing. Created new CAD blocks for proposed RCDs. (05/11/17) Site camp revisions per chevron comments. Updated choke skid location on site plan. Continued with new CAD block fr rotating head (13-5/8"). (05/12/17) Worked on choke manifold asbuilts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (05/08/17) Team meeting. (05/09/17) Team meeting. (05/10/17) Team meeting. (05/11/17) TSR meeting. (05/12/17) Team meeting. Meeting with Bryan to discuss 271 tender drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-10 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8.75 0 (05/08/17) Discussed choke hose layout/length with Mat. Worked on rig camp redlines from Mat. Reviewed choke manifold connection for MPD system. (05/09/17) New choke manifold loction/hose layout. More camp updates. (05/10/17) Worked on choke manifold sketch. Updated site camp drawing. Created new CAD blocks for proposed RCDs. (05/11/17) Site camp revisions per chevron comments. Updated choke skid location on site plan. Continued with new CAD block fr rotating head (13-5/8"). (05/12/17) Worked on choke manifold asbuilts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (05/08/17) Team meeting. (05/09/17) Team meeting. (05/10/17) Team meeting. (05/11/17) TSR meeting. (05/12/17) Team meeting. Meeting with Bryan to discuss 271 tender drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-11 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8.25 0 (05/08/17) Discussed choke hose layout/length with Mat. Worked on rig camp redlines from Mat. Reviewed choke manifold connection for MPD system. (05/09/17) New choke manifold loction/hose layout. More camp updates. (05/10/17) Worked on choke manifold sketch. Updated site camp drawing. Created new CAD blocks for proposed RCDs. (05/11/17) Site camp revisions per chevron comments. Updated choke skid location on site plan. Continued with new CAD block fr rotating head (13-5/8"). (05/12/17) Worked on choke manifold asbuilts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (05/08/17) Team meeting. (05/09/17) Team meeting. (05/10/17) Team meeting. (05/11/17) TSR meeting. (05/12/17) Team meeting. Meeting with Bryan to discuss 271 tender drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (05/12/17) Timesheet update. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-12 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6 0 (05/08/17) Discussed choke hose layout/length with Mat. Worked on rig camp redlines from Mat. Reviewed choke manifold connection for MPD system. (05/09/17) New choke manifold loction/hose layout. More camp updates. (05/10/17) Worked on choke manifold sketch. Updated site camp drawing. Created new CAD blocks for proposed RCDs. (05/11/17) Site camp revisions per chevron comments. Updated choke skid location on site plan. Continued with new CAD block fr rotating head (13-5/8"). (05/12/17) Worked on choke manifold asbuilts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (05/15/17) Team meeting. (05/16/17) Team meeting. (05/17/17) Team meeting. (05/18/17) TSR meeting. (05/19/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 (05/15/17) Discussed drawing support with designers. (05/17/17) Archived choke manifold drawing for rig 271L. Status review with designers. Searched for bit breaker drawings for Gary B. (05/18/17) Weekly timesheet update, Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-15 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 5.25 0 (05/15/17) Discussed 271L tender drawings with Kyle. Created proposal folder and pulled reference drawings. Discussed drawings with Bryan. Started drawing package. (05/16/17) Discussed racking capacity with Byran. Created plot, and ground bearing drawings for tender. (05/17/17) Started HP schematic and rig camp drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (05/15/17) Team meeting. (05/16/17) Team meeting. (05/17/17) Team meeting. (05/18/17) TSR meeting. (05/19/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-16 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 7.75 0 (05/16/17) Continued with choke manifold mod layout. Updated BOP drawings. (05/18/17) Status call with Mat. Updated flow line and sent for review. Started LP mud schematic revision. (05/19/17) Continued LP mud schematic. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-16 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 1.5 0 (05/15/17) Discussed 271L tender drawings with Kyle. Created proposal folder and pulled reference drawings. Discussed drawings with Bryan. Started drawing package. (05/16/17) Discussed racking capacity with Byran. Created plot, and ground bearing drawings for tender. (05/17/17) Started HP schematic and rig camp drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (05/15/17) Team meeting. (05/16/17) Team meeting. (05/17/17) Team meeting. (05/18/17) TSR meeting. (05/19/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.25 0 (05/15/17) Discussed drawing support with designers. (05/17/17) Archived choke manifold drawing for rig 271L. Status review with designers. Searched for bit breaker drawings for Gary B. (05/18/17) Weekly timesheet update, Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-17 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 7.5 0 (05/15/17) Discussed 271L tender drawings with Kyle. Created proposal folder and pulled reference drawings. Discussed drawings with Bryan. Started drawing package. (05/16/17) Discussed racking capacity with Byran. Created plot, and ground bearing drawings for tender. (05/17/17) Started HP schematic and rig camp drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (05/15/17) Team meeting. (05/16/17) Team meeting. (05/17/17) Team meeting. (05/18/17) TSR meeting. (05/19/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 (05/15/17) Discussed drawing support with designers. (05/17/17) Archived choke manifold drawing for rig 271L. Status review with designers. Searched for bit breaker drawings for Gary B. (05/18/17) Weekly timesheet update, Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-18 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 7.5 0 (05/16/17) Continued with choke manifold mod layout. Updated BOP drawings. (05/18/17) Status call with Mat. Updated flow line and sent for review. Started LP mud schematic revision. (05/19/17) Continued LP mud schematic. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (05/15/17) Team meeting. (05/16/17) Team meeting. (05/17/17) Team meeting. (05/18/17) TSR meeting. (05/19/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-19 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8.25 0 (05/16/17) Continued with choke manifold mod layout. Updated BOP drawings. (05/18/17) Status call with Mat. Updated flow line and sent for review. Started LP mud schematic revision. (05/19/17) Continued LP mud schematic. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (05/22/17) Team meeting. (05/25/17) TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (05/22/17) Updated weekly timesheet and submitted. Discussed tender drawings status with Kyle. (05/26/17) Cleaned 7th floor cubicles. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-22 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 7.75 0 (05/22/17) Worked on suction/discharge spool drawings. Updated stacks/flow line drawings and sent for review. (05/25/17) Additional stack redlines. (05/26/17) Continued with spool drawings (support layout/handrail layout.) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-23 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (05/22/17) Team meeting. (05/25/17) TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-25 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5.25 0 (05/22/17) Worked on suction/discharge spool drawings. Updated stacks/flow line drawings and sent for review. (05/25/17) Additional stack redlines. (05/26/17) Continued with spool drawings (support layout/handrail layout.) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-25 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 1.5 0 (05/25/17) Revised 271L BOP/Diverter drawings (Shell-Bolivia). Sent PDFs to Bryan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-25 Rig 209L-TSR :Rig 209L-TSR TSR-01573-209L Wellhead Spreader Beam Regular Pay N 1 0 (05/25/17) Checked drawing. Transmitted file and archived on Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (05/22/17) Updated weekly timesheet and submitted. Discussed tender drawings status with Kyle. (05/26/17) Cleaned 7th floor cubicles. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-26 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6.5 0 (05/22/17) Worked on suction/discharge spool drawings. Updated stacks/flow line drawings and sent for review. (05/25/17) Additional stack redlines. (05/26/17) Continued with spool drawings (support layout/handrail layout.) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-29 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (05/30/17) Team meeting. (05/31/17) Team meeting. (06/01/17) TSR meeting. (06/02/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (05/30/17) TSR discussion with Kyle. (05/31/17) Updated weekly timesheet. Archived 209L drawings on the Q. Discussed 209L MDR issue with Lam. (06/02/17) Updated weekly timesheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-30 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8.25 0 (05/30/17) Worked on 269 BOP stack changes - discussed with Bernie. Pulled haz area info and assigned drawing to Lam. (05/31/17) Cont 269 chevron stack changes. Pulled new proposal number for SLB southern Iraq tender. Discussed with Lam. (06/01/17) Call with Bernie. Discussed spools with George. Updated stack drawings. Started new SLB tender drawings. (06/02/17) Sent 269 stack changes to Bernie. New SLB tender meeting. Started new drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (05/30/17) Team meeting. (05/31/17) Team meeting. (06/01/17) TSR meeting. (06/02/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (05/30/17) TSR discussion with Kyle. (05/31/17) Updated weekly timesheet. Archived 209L drawings on the Q. Discussed 209L MDR issue with Lam. (06/02/17) Updated weekly timesheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-31 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5.25 0 (05/30/17) Worked on 269 BOP stack changes - discussed with Bernie. Pulled haz area info and assigned drawing to Lam. (05/31/17) Cont 269 chevron stack changes. Pulled new proposal number for SLB southern Iraq tender. Discussed with Lam. (06/01/17) Call with Bernie. Discussed spools with George. Updated stack drawings. Started new SLB tender drawings. (06/02/17) Sent 269 stack changes to Bernie. New SLB tender meeting. Started new drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-05-31 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 1.5 0 (05/31/17) Created choke manifold drawings for 271L - Shell tender. (06/01/17) Revised choke manifold/PH schematic.. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (05/30/17) Team meeting. (05/31/17) Team meeting. (06/01/17) TSR meeting. (06/02/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-01 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6.5 0 (05/30/17) Worked on 269 BOP stack changes - discussed with Bernie. Pulled haz area info and assigned drawing to Lam. (05/31/17) Cont 269 chevron stack changes. Pulled new proposal number for SLB southern Iraq tender. Discussed with Lam. (06/01/17) Call with Bernie. Discussed spools with George. Updated stack drawings. Started new SLB tender drawings. (06/02/17) Sent 269 stack changes to Bernie. New SLB tender meeting. Started new drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-01 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 1.5 0 (05/31/17) Created choke manifold drawings for 271L - Shell tender. (06/01/17) Revised choke manifold/PH schematic.. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (05/30/17) Team meeting. (05/31/17) Team meeting. (06/01/17) TSR meeting. (06/02/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (05/30/17) TSR discussion with Kyle. (05/31/17) Updated weekly timesheet. Archived 209L drawings on the Q. Discussed 209L MDR issue with Lam. (06/02/17) Updated weekly timesheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-02 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 4.5 0 (05/30/17) Worked on 269 BOP stack changes - discussed with Bernie. Pulled haz area info and assigned drawing to Lam. (05/31/17) Cont 269 chevron stack changes. Pulled new proposal number for SLB southern Iraq tender. Discussed with Lam. (06/01/17) Call with Bernie. Discussed spools with George. Updated stack drawings. Started new SLB tender drawings. (06/02/17) Sent 269 stack changes to Bernie. New SLB tender meeting. Started new drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-05 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 9 0 (06/05/17) SLB tender drawings. (06/06/17) Continued SLB drawing package. Revised 269 20-3/4 BOP drawing for Chevron tender. Discussed with Mat. (06/07/17) Cleaned up final 269 choke drawing to Mat/Bernie (269 chevron tender). (06/08/17) 269 Chevron piping drawings (06/09/17) Continued 269 piping layouts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (06/06/17) Team meeting. (06/07/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-06 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8.75 0 (06/05/17) SLB tender drawings. (06/06/17) Continued SLB drawing package. Revised 269 20-3/4 BOP drawing for Chevron tender. Discussed with Mat. (06/07/17) Cleaned up final 269 choke drawing to Mat/Bernie (269 chevron tender). (06/08/17) 269 Chevron piping drawings (06/09/17) Continued 269 piping layouts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (06/06/17) Team meeting. (06/07/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (06/07/17) Status update with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-07 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8.25 0 (06/05/17) SLB tender drawings. (06/06/17) Continued SLB drawing package. Revised 269 20-3/4 BOP drawing for Chevron tender. Discussed with Mat. (06/07/17) Cleaned up final 269 choke drawing to Mat/Bernie (269 chevron tender). (06/08/17) 269 Chevron piping drawings (06/09/17) Continued 269 piping layouts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-08 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 9 0 (06/05/17) SLB tender drawings. (06/06/17) Continued SLB drawing package. Revised 269 20-3/4 BOP drawing for Chevron tender. Discussed with Mat. (06/07/17) Cleaned up final 269 choke drawing to Mat/Bernie (269 chevron tender). (06/08/17) 269 Chevron piping drawings (06/09/17) Continued 269 piping layouts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-09 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6.5 0 (06/05/17) SLB tender drawings. (06/06/17) Continued SLB drawing package. Revised 269 20-3/4 BOP drawing for Chevron tender. Discussed with Mat. (06/07/17) Cleaned up final 269 choke drawing to Mat/Bernie (269 chevron tender). (06/08/17) 269 Chevron piping drawings (06/09/17) Continued 269 piping layouts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (06/12/17) Team meeting. (06/13/17) Team meeting. (06/14/17) Team meeting. (06/15/17) TSR meeting. (06/16/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-12 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8.75 0 (06/12/17) Final 269 main camp drawing. (06/13/17) Final 269 site plan drawing. (06/14/17) Piping MTO for 269 modifications. Discussed layout with Benny. (06/15/17) PDF SLB tender drawings. Continued 269 Chevron piping drawings. (06/16/17) Continued 269 Chevron piping drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (06/12/17) Team meeting. (06/13/17) Team meeting. (06/14/17) Team meeting. (06/15/17) TSR meeting. (06/16/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-13 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8.75 0 (06/12/17) Final 269 main camp drawing. (06/13/17) Final 269 site plan drawing. (06/14/17) Piping MTO for 269 modifications. Discussed layout with Benny. (06/15/17) PDF SLB tender drawings. Continued 269 Chevron piping drawings. (06/16/17) Continued 269 Chevron piping drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (06/12/17) Team meeting. (06/13/17) Team meeting. (06/14/17) Team meeting. (06/15/17) TSR meeting. (06/16/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-14 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8.75 0 (06/12/17) Final 269 main camp drawing. (06/13/17) Final 269 site plan drawing. (06/14/17) Piping MTO for 269 modifications. Discussed layout with Benny. (06/15/17) PDF SLB tender drawings. Continued 269 Chevron piping drawings. (06/16/17) Continued 269 Chevron piping drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (06/12/17) Team meeting. (06/13/17) Team meeting. (06/14/17) Team meeting. (06/15/17) TSR meeting. (06/16/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (06/15/17) Updated weekly timesheet and submitted for approval. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-15 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 7.5 0 (06/12/17) Final 269 main camp drawing. (06/13/17) Final 269 site plan drawing. (06/14/17) Piping MTO for 269 modifications. Discussed layout with Benny. (06/15/17) PDF SLB tender drawings. Continued 269 Chevron piping drawings. (06/16/17) Continued 269 Chevron piping drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (06/12/17) Team meeting. (06/13/17) Team meeting. (06/14/17) Team meeting. (06/15/17) TSR meeting. (06/16/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-16 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5.75 0 (06/12/17) Final 269 main camp drawing. (06/13/17) Final 269 site plan drawing. (06/14/17) Piping MTO for 269 modifications. Discussed layout with Benny. (06/15/17) PDF SLB tender drawings. Continued 269 Chevron piping drawings. (06/16/17) Continued 269 Chevron piping drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (06/19/17) Team meeting. (06/20/17) Team meeting. Drilmec presentation. (06/23/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (06/19/17) Updated weekly timesheet and submitted for approval. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-19 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 7.75 0 (06/19/17) Finalized 269/247 suction piping changes for Chevron tender. (06/20/17) Updated 269L plot plan to match latest config. for Chevron tender.Discussed matting board layout with Mat. (06/21/17) Worked on handrail modification drawing for 269/Chevron. Revised 269 flowline for Benny. (06/22/17) Continued with handrail mod drawing. (06/23/17) Finalized handrail drawing/BOM Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 (06/19/17) Team meeting. (06/20/17) Team meeting. Drilmec presentation. (06/23/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-20 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6.5 0 (06/19/17) Finalized 269/247 suction piping changes for Chevron tender. (06/20/17) Updated 269L plot plan to match latest config. for Chevron tender.Discussed matting board layout with Mat. (06/21/17) Worked on handrail modification drawing for 269/Chevron. Revised 269 flowline for Benny. (06/22/17) Continued with handrail mod drawing. (06/23/17) Finalized handrail drawing/BOM Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-21 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 9 0 (06/19/17) Finalized 269/247 suction piping changes for Chevron tender. (06/20/17) Updated 269L plot plan to match latest config. for Chevron tender.Discussed matting board layout with Mat. (06/21/17) Worked on handrail modification drawing for 269/Chevron. Revised 269 flowline for Benny. (06/22/17) Continued with handrail mod drawing. (06/23/17) Finalized handrail drawing/BOM Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-22 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5 0 (06/19/17) Finalized 269/247 suction piping changes for Chevron tender. (06/20/17) Updated 269L plot plan to match latest config. for Chevron tender.Discussed matting board layout with Mat. (06/21/17) Worked on handrail modification drawing for 269/Chevron. Revised 269 flowline for Benny. (06/22/17) Continued with handrail mod drawing. (06/23/17) Finalized handrail drawing/BOM Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-22 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 4 0 (06/22/17) 30B BOP stack drawing for Leroy. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (06/19/17) Team meeting. (06/20/17) Team meeting. Drilmec presentation. (06/23/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-23 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5.75 0 (06/19/17) Finalized 269/247 suction piping changes for Chevron tender. (06/20/17) Updated 269L plot plan to match latest config. for Chevron tender.Discussed matting board layout with Mat. (06/21/17) Worked on handrail modification drawing for 269/Chevron. Revised 269 flowline for Benny. (06/22/17) Continued with handrail mod drawing. (06/23/17) Finalized handrail drawing/BOM Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (06/26/17) Team meeting. (06/27/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-26 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8.25 0 (06/26/17) Discussed matting board layout with Benny. Revised drawing (269/Chevron) (06/27/17) Walkway modification drawing for 269/Chevron. (06/28/17) Revised 269 LM mud schematic for Chevron tender. (06/29/17) Cont walkway mod drawing/BOM. (06/30/17) Finalized handrail/walkway drawings for 269. Sent to field for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (06/26/17) Team meeting. (06/27/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-27 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8.25 0 (06/26/17) Discussed matting board layout with Benny. Revised drawing (269/Chevron) (06/27/17) Walkway modification drawing for 269/Chevron. (06/28/17) Revised 269 LM mud schematic for Chevron tender. (06/29/17) Cont walkway mod drawing/BOM. (06/30/17) Finalized handrail/walkway drawings for 269. Sent to field for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-28 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 7 0 (06/26/17) Discussed matting board layout with Benny. Revised drawing (269/Chevron) (06/27/17) Walkway modification drawing for 269/Chevron. (06/28/17) Revised 269 LM mud schematic for Chevron tender. (06/29/17) Cont walkway mod drawing/BOM. (06/30/17) Finalized handrail/walkway drawings for 269. Sent to field for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-28 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1.5 0 (06/28/17) Researched 72B ABS for Toby. (06/29/17) Pulled additional 72B info for Toby. Scanned ABS certs and sent. (pulled from file room) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (06/29/17) Archived drawing files from Sakh (209L/270L) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-29 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3 0 (06/26/17) Discussed matting board layout with Benny. Revised drawing (269/Chevron) (06/27/17) Walkway modification drawing for 269/Chevron. (06/28/17) Revised 269 LM mud schematic for Chevron tender. (06/29/17) Cont walkway mod drawing/BOM. (06/30/17) Finalized handrail/walkway drawings for 269. Sent to field for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-29 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 3.5 0 (06/28/17) Researched 72B ABS for Toby. (06/29/17) Pulled additional 72B info for Toby. Scanned ABS certs and sent. (pulled from file room) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-06-30 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6 0 (06/26/17) Discussed matting board layout with Benny. Revised drawing (269/Chevron) (06/27/17) Walkway modification drawing for 269/Chevron. (06/28/17) Revised 269 LM mud schematic for Chevron tender. (06/29/17) Cont walkway mod drawing/BOM. (06/30/17) Finalized handrail/walkway drawings for 269. Sent to field for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (07/05/17) Team meeting. (07/06/17) TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 (07/05/17) General TSR status discussion with Kyle. Discussed 209L MDR. Drawing/MDR discussion with Lam. Updated weekly timesheet and submitted. (07/07/17) Archived 209L CAD files received from Sakhalin. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-05 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6.25 0 (07/05/17) Updated 269L Chevron tender drawing list. Cleaned up obsolete drawings. (07/06/17) 269L main camp update. PDF complete drawing package for Chevron - sent to Mat. (07/07/17) Update to came drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (07/05/17) Team meeting. (07/06/17) TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-06 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8.5 0 (07/05/17) Updated 269L Chevron tender drawing list. Cleaned up obsolete drawings. (07/06/17) 269L main camp update. PDF complete drawing package for Chevron - sent to Mat. (07/07/17) Update to came drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 (07/07/17) Checked 209L pipe rack extensions. Discussed with Dan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (07/05/17) General TSR status discussion with Kyle. Discussed 209L MDR. Drawing/MDR discussion with Lam. Updated weekly timesheet and submitted. (07/07/17) Archived 209L CAD files received from Sakhalin. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-07 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 2.5 0 (07/05/17) Updated 269L Chevron tender drawing list. Cleaned up obsolete drawings. (07/06/17) 269L main camp update. PDF complete drawing package for Chevron - sent to Mat. (07/07/17) Update to came drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (07/10/17) Team meeting. (07/11/17) Team meeting. (07/12/17) Team meeting.(07/13/17) TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 7.25 0 (07/10/17) Archived drawing files from Sakhalin. Updated proposal drawing register. Transmitted 209L casing tool drawing and archived files on the Q. Discussed 209L MDR issues with Lam/Kyle. Researched transmittal/drawing archive info (209L). (07/11/17) Discussed 209 transmittalswith Lam. Searched for related files. (07/12/17) Discussed Hibernia files with John. archived drawings from Hibernia and cleaned up archive folder (added drawing titles to file name for reference). (07/13/17) Discussed new TSrs with Kyle. Pulled supporting drawings. Updated weekly timesheets Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-10 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1.5 0 (07/10/17) Stared Mexico tender drawing research. ( 2017' SMART Goal). (07/11/17) Started drawing list for Mexico tender support. Searched for reference info/drawings. (07/12/17) Continued with drawing package research/development. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (07/10/17) Team meeting. (07/11/17) Team meeting. (07/12/17) Team meeting.(07/13/17) TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (07/10/17) Archived drawing files from Sakhalin. Updated proposal drawing register. Transmitted 209L casing tool drawing and archived files on the Q. Discussed 209L MDR issues with Lam/Kyle. Researched transmittal/drawing archive info (209L). (07/11/17) Discussed 209 transmittalswith Lam. Searched for related files. (07/12/17) Discussed Hibernia files with John. archived drawings from Hibernia and cleaned up archive folder (added drawing titles to file name for reference). (07/13/17) Discussed new TSrs with Kyle. Pulled supporting drawings. Updated weekly timesheets Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-11 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 7.75 0 (07/10/17) Stared Mexico tender drawing research. ( 2017' SMART Goal). (07/11/17) Started drawing list for Mexico tender support. Searched for reference info/drawings. (07/12/17) Continued with drawing package research/development. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (07/10/17) Team meeting. (07/11/17) Team meeting. (07/12/17) Team meeting.(07/13/17) TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 (07/10/17) Archived drawing files from Sakhalin. Updated proposal drawing register. Transmitted 209L casing tool drawing and archived files on the Q. Discussed 209L MDR issues with Lam/Kyle. Researched transmittal/drawing archive info (209L). (07/11/17) Discussed 209 transmittalswith Lam. Searched for related files. (07/12/17) Discussed Hibernia files with John. archived drawings from Hibernia and cleaned up archive folder (added drawing titles to file name for reference). (07/13/17) Discussed new TSrs with Kyle. Pulled supporting drawings. Updated weekly timesheets Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-12 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 5.75 0 (07/10/17) Stared Mexico tender drawing research. ( 2017' SMART Goal). (07/11/17) Started drawing list for Mexico tender support. Searched for reference info/drawings. (07/12/17) Continued with drawing package research/development. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (07/10/17) Team meeting. (07/11/17) Team meeting. (07/12/17) Team meeting.(07/13/17) TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 (07/10/17) Archived drawing files from Sakhalin. Updated proposal drawing register. Transmitted 209L casing tool drawing and archived files on the Q. Discussed 209L MDR issues with Lam/Kyle. Researched transmittal/drawing archive info (209L). (07/11/17) Discussed 209 transmittalswith Lam. Searched for related files. (07/12/17) Discussed Hibernia files with John. archived drawings from Hibernia and cleaned up archive folder (added drawing titles to file name for reference). (07/13/17) Discussed new TSrs with Kyle. Pulled supporting drawings. Updated weekly timesheets Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-13 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 4 0 (07/13/17) 269L Standpipe hose layout for Mat. Discussed layout with Lam Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-13 OH-011 :OH-011 Overhead All Activities Regular Pay N 1 0 (07/13/17) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-17 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-21 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-25 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-27 Hibernia Platform :Hibernia Platform TSR-01576-HIBP Top Drive Maintenance Platform Regular Pay N 2 0 (07/27/17) Checked handrail drawing. Discussed with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (07/27/17) TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.75 0 (07/27/17) TSR status discussion with Kyle. Archived drawing files on the Q. Created new drawing register for Hibernia and saved in on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-28 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (07/31/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-07-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 8.75 0 (07/31/17) Researched 249 valve info per field request (searched greenway 3 file room). LABU SMART goal review with Bryan L. Pulled reference info for new AADU TSR. (08/01/17) Reviewed 216 HP piping upgrade with Kyle. Discussed 249 valve replacement with Tyler. Searched file room for additional info. (08/02/17) Archived rig 209L drawings from Sakhalin. Drawing discussion with Lam. (08/03/17) discussed platform TSR with Luis C. Pulled bop stack info for 272. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 (07/31/17) Researched 249 valve info per field request (searched greenway 3 file room). LABU SMART goal review with Bryan L. Pulled reference info for new AADU TSR. (08/01/17) Reviewed 216 HP piping upgrade with Kyle. Discussed 249 valve replacement with Tyler. Searched file room for additional info. (08/02/17) Archived rig 209L drawings from Sakhalin. Drawing discussion with Lam. (08/03/17) discussed platform TSR with Luis C. Pulled bop stack info for 272. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-01 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 4 0 (08/01/17) Started platform design. (08/02/17) Continued with platform layout. (08/03/17) Continued wit drawing - discussed with John. (08/04/17) Continued with platform layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 (07/31/17) Researched 249 valve info per field request (searched greenway 3 file room). LABU SMART goal review with Bryan L. Pulled reference info for new AADU TSR. (08/01/17) Reviewed 216 HP piping upgrade with Kyle. Discussed 249 valve replacement with Tyler. Searched file room for additional info. (08/02/17) Archived rig 209L drawings from Sakhalin. Drawing discussion with Lam. (08/03/17) discussed platform TSR with Luis C. Pulled bop stack info for 272. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-02 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 6.5 0 (08/01/17) Started platform design. (08/02/17) Continued with platform layout. (08/03/17) Continued wit drawing - discussed with John. (08/04/17) Continued with platform layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (07/31/17) Researched 249 valve info per field request (searched greenway 3 file room). LABU SMART goal review with Bryan L. Pulled reference info for new AADU TSR. (08/01/17) Reviewed 216 HP piping upgrade with Kyle. Discussed 249 valve replacement with Tyler. Searched file room for additional info. (08/02/17) Archived rig 209L drawings from Sakhalin. Drawing discussion with Lam. (08/03/17) discussed platform TSR with Luis C. Pulled bop stack info for 272. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-03 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 7 0 (08/01/17) Started platform design. (08/02/17) Continued with platform layout. (08/03/17) Continued wit drawing - discussed with John. (08/04/17) Continued with platform layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-04 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 6 0 (08/01/17) Started platform design. (08/02/17) Continued with platform layout. (08/03/17) Continued wit drawing - discussed with John. (08/04/17) Continued with platform layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 (08/07/17) Updated weekly timesheet and submitted for approval. Archived new CAD files on the Q. (08/08/17) Searched for hoist information for 249, discussed info with John R. Researched information for legal department (21B). (08/09/17) Filed new CAD drawings on the Q. Assigned Lam to 30B sketch - discussed. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-07 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 5.5 0 (08/07/17) Continued platform design drawing. (08/08/17) Cont. platform. (08/09/17) Cont. platform. (08/10/17) Cont. platform. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 (08/07/17) Updated weekly timesheet and submitted for approval. Archived new CAD files on the Q. (08/08/17) Searched for hoist information for 249, discussed info with John R. Researched information for legal department (21B). (08/09/17) Filed new CAD drawings on the Q. Assigned Lam to 30B sketch - discussed. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-08 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 5.5 0 (08/07/17) Continued platform design drawing. (08/08/17) Cont. platform. (08/09/17) Cont. platform. (08/10/17) Cont. platform. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 (08/07/17) Updated weekly timesheet and submitted for approval. Archived new CAD files on the Q. (08/08/17) Searched for hoist information for 249, discussed info with John R. Researched information for legal department (21B). (08/09/17) Filed new CAD drawings on the Q. Assigned Lam to 30B sketch - discussed. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-09 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 6 0 (08/07/17) Continued platform design drawing. (08/08/17) Cont. platform. (08/09/17) Cont. platform. (08/10/17) Cont. platform. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (08/10/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-10 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 7.5 0 (08/07/17) Continued platform design drawing. (08/08/17) Cont. platform. (08/09/17) Cont. platform. (08/10/17) Cont. platform. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-11 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6 0 (08/11/17) Updated BOP stack drawings for 269 Chevron tender. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-14 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 9 0 (08/14/17) Updates to platform drawing (08/15/17) Finalized drawing Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 (08/15/17) Discussed 77B drawings/SEMS package. Looked at existing SEMS info. (08/17/17) Checked 272 crown sheave removal drawing and discussed with Dan. (08/18/17) Pulled reference choke manifold drawings and sent to Joe W. for information. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-15 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 8 0 (08/14/17) Updates to platform drawing (08/15/17) Finalized drawing Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 (08/16/17) team meeting. Mid-year review with Dan/Lam. (08/17/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-16 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 7 0 (08/16/17) Started new drawing package for HKN tender. (08/17/17) Pulled final drawings for tender. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (08/16/17) team meeting. Mid-year review with Dan/Lam. (08/17/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 (08/15/17) Discussed 77B drawings/SEMS package. Looked at existing SEMS info. (08/17/17) Checked 272 crown sheave removal drawing and discussed with Dan. (08/18/17) Pulled reference choke manifold drawings and sent to Joe W. for information. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (08/16/17) Archived drawing files on the Q. General status discussion with Kyle. Discussed new tender with Kyle and assigned proposal number. (08/17/17) Timesheet update. Checked control line spooler platform revisions. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-17 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3 0 (08/16/17) Started new drawing package for HKN tender. (08/17/17) Pulled final drawings for tender. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-17 Rig 270L-TSR :Rig 270L-TSR TSR-01575-270L Circulation Spool Drawings Regular Pay N 2 0 (08/17/17) Checked piping drawing. (08/18/17) Finished drawing check and discussed changes with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 (08/16/17) Archived drawing files on the Q. General status discussion with Kyle. Discussed new tender with Kyle and assigned proposal number. (08/17/17) Timesheet update. Checked control line spooler platform revisions. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-18 Rig 270L-TSR :Rig 270L-TSR TSR-01575-270L Circulation Spool Drawings Regular Pay N 2 0 (08/17/17) Checked piping drawing. (08/18/17) Finished drawing check and discussed changes with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (08/21/17) Discussed Shell tender with Kyle. (08/22/17) Archived 209L drawings on the Q. Email to Luis C (272 haz area question). (08/24/17) Updated weekly timesheet and submitted. Searched greenway 3 fileroom for 77B drawings/info per request from Leroy. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-21 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 10 0 (08/21/17) Started on tender equip. list. (08/22/17) Cont equip list and created drawing package. (08/25/17) HKN tender drawing updates Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (08/21/17) Discussed Shell tender with Kyle. (08/22/17) Archived 209L drawings on the Q. Email to Luis C (272 haz area question). (08/24/17) Updated weekly timesheet and submitted. Searched greenway 3 fileroom for 77B drawings/info per request from Leroy. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-22 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8 0 (08/21/17) Started on tender equip. list. (08/22/17) Cont equip list and created drawing package. (08/25/17) HKN tender drawing updates Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-23 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 9 0 (08/23/17) Revised hazardous area/general arrangement drawings. (08/24/17) Revised safety plans Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (08/24/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (08/21/17) Discussed Shell tender with Kyle. (08/22/17) Archived 209L drawings on the Q. Email to Luis C (272 haz area question). (08/24/17) Updated weekly timesheet and submitted. Searched greenway 3 fileroom for 77B drawings/info per request from Leroy. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-24 Rig 209L-TSR :Rig 209L-TSR TSR-01567-209L Shaker Trough Regular Pay N 1 0 (08/24/17) Checked LP schematic. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-24 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 4.75 0 (08/23/17) Revised hazardous area/general arrangement drawings. (08/24/17) Revised safety plans Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-25 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3 0 (08/21/17) Started on tender equip. list. (08/22/17) Cont equip list and created drawing package. (08/25/17) HKN tender drawing updates Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-28 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 (08/28/17 - 08/30/17) Office closed due to flooding. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-29 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 (08/28/17 - 08/30/17) Office closed due to flooding. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-30 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 (08/28/17 - 08/30/17) Office closed due to flooding. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (08/31/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 (08/31/17) Printed Berkut TSR info for scope review. Discussed tender documents with John. Searched for HP piping weld test info for 272. (09/01/17) Archived released drawing files on the Q. Changes to AADU platform, stamped for approval. Searched for reference drawings - camp info for Lam. Updated 270 spool drawings/LP schematic. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-08-31 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5 0 (08/31/17) Final drawing package update for HKN tender. Created PDF package and sent to Mat for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 (08/31/17) Printed Berkut TSR info for scope review. Discussed tender documents with John. Searched for HP piping weld test info for 272. (09/01/17) Archived released drawing files on the Q. Changes to AADU platform, stamped for approval. Searched for reference drawings - camp info for Lam. Updated 270 spool drawings/LP schematic. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (09/05/17) Updated weekly timesheet and submitted for approval. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-05 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3.5 0 (09/05/17) Discussed 269L choke manifold changes with Mat. Revised drawing to match. (09/06/17) Additional revisions to choke and BOP stack drawings (269 Chevron). (09/07/17) Finished BOP stack changes. (09/08/17) Discussed pit system schematics with Benny (269 chevron). Sent drawings. Reviewed excel drawing request from Mat. Imported stack and reviewed options with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 (09/05/17) Updated Berkut drawing register and archived drawing files on the Q. Discussed Insulation cover TSR with Kyle. (09/07/17) Pulled 269 well control drawing for field request. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-05 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 (09/05/17) Created new folders under archive for Hibernia. Archived drawings files. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-05 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1.5 0 (09/05/17) Met with Bryan L to discuss LABU tender package/details. Updated deliverable list. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-05 Rig 270L-TSR :Rig 270L-TSR TSR-01575-270L Circulation Spool Drawings Regular Pay N 0.5 0 (09/05/17) Transmitted drawings and archived files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-06 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5.5 0 (09/05/17) Discussed 269L choke manifold changes with Mat. Revised drawing to match. (09/06/17) Additional revisions to choke and BOP stack drawings (269 Chevron). (09/07/17) Finished BOP stack changes. (09/08/17) Discussed pit system schematics with Benny (269 chevron). Sent drawings. Reviewed excel drawing request from Mat. Imported stack and reviewed options with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-07 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 7.5 0 (09/05/17) Discussed 269L choke manifold changes with Mat. Revised drawing to match. (09/06/17) Additional revisions to choke and BOP stack drawings (269 Chevron). (09/07/17) Finished BOP stack changes. (09/08/17) Discussed pit system schematics with Benny (269 chevron). Sent drawings. Reviewed excel drawing request from Mat. Imported stack and reviewed options with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (09/05/17) Updated Berkut drawing register and archived drawing files on the Q. Discussed Insulation cover TSR with Kyle. (09/07/17) Pulled 269 well control drawing for field request. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-07 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 (09/07/17) Discussed TSR/closeout with John (272 cut. chute). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-08 Berkut-TSR :Berkut-TSR TSR-01549-BERP Insulation Covers Regular Pay N 3 0 (09/08/17) Started drawing review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-08 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1 0 (09/05/17) Discussed 269L choke manifold changes with Mat. Revised drawing to match. (09/06/17) Additional revisions to choke and BOP stack drawings (269 Chevron). (09/07/17) Finished BOP stack changes. (09/08/17) Discussed pit system schematics with Benny (269 chevron). Sent drawings. Reviewed excel drawing request from Mat. Imported stack and reviewed options with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4.5 0 (09/05/17) Updated Berkut drawing register and archived drawing files on the Q. Discussed Insulation cover TSR with Kyle. (09/07/17) Pulled 269 well control drawing for field request. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-11 Berkut-TSR :Berkut-TSR TSR-01549-BERP Insulation Covers Regular Pay N 7.75 0 (09/11/17) Continued drawing review/redlines. (09/12/17) Created CTR and sent for approval. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-11 Berkut-TSR :Berkut-TSR TSR-01598-BERP Catwalk Skate Adaptor Tool Regular Pay N 1 0 (09/11/17) Checked drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (09/11/17) Team meeting. (09/13/17) Team meeting. (09/14/17) Weekly TSR meeting Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-12 Berkut-TSR :Berkut-TSR TSR-01549-BERP Insulation Covers Regular Pay N 8 0 (09/11/17) Continued drawing review/redlines. (09/12/17) Created CTR and sent for approval. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-12 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 (09/12/17) IT training course. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-13 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 1 0 (09/13/17) Checked drawings and reviewed comments with Dan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (09/11/17) Team meeting. (09/13/17) Team meeting. (09/14/17) Weekly TSR meeting Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-13 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 4.5 0 (09/13/17) Discussed SEMS package/77B trip with Tyler. Meeting with Tyler/Kyle to discuss SOW. Started on drawing list. (09/14/17) Cleaned up archive folders for 77B. Continued drawing list. (09/15/17) Printed 77B GAs for reference. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 (09/13/17) Transmitted drawing for control line spooler platform and archived files on the Q. Archived drawings from Sakh 9pipe inspection door). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-13 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.75 0 (09/13/17) Transmitted arrangement drawings and archived files on the Q. (09/15/17) Call with Alaska to discuss mud mast installation TSR. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-13 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1 0 (09/13/17) Checked spreader padeye drawing and stamped for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-14 Hibernia Platform :Hibernia Platform TSR-01577-HIBP Monkey Board Handrail Assembly Regular Pay N 2 0 (09/14/17) Discussed drawings with John. Checked handrails. Discussed with Kyle/Lam Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (09/11/17) Team meeting. (09/13/17) Team meeting. (09/14/17) Weekly TSR meeting Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-14 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 6 0 (09/13/17) Discussed SEMS package/77B trip with Tyler. Meeting with Tyler/Kyle to discuss SOW. Started on drawing list. (09/14/17) Cleaned up archive folders for 77B. Continued drawing list. (09/15/17) Printed 77B GAs for reference. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (09/15/17) Updated weekly timesheet and submitted for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-15 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 2 0 (09/15/17) Discussed 269/247 pit volume request from Mat E. Worked with Tyler to get pit area/volume info in CAD. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-15 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2 0 (09/13/17) Discussed SEMS package/77B trip with Tyler. Meeting with Tyler/Kyle to discuss SOW. Started on drawing list. (09/14/17) Cleaned up archive folders for 77B. Continued drawing list. (09/15/17) Printed 77B GAs for reference. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-15 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 (09/13/17) Transmitted arrangement drawings and archived files on the Q. (09/15/17) Call with Alaska to discuss mud mast installation TSR. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (09/18/17) Checked 2017 PTO sheets to verify balance. Sent email to payroll. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-18 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 6 0 (09/18/17) Continued pulling reference info for SEMS package. (09/19/17) discussed drawings with Tyler. Cont drawing list/reference search. (09/20/17) Started new LP mud PID. (09/22/17) Cleaned up existing 77B drawing register. Logged new drawing numbers. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 (09/18/17) Archived drawing for spreader beam padeye. Archived additional drawing files from Sakh. (09/19/17) Discussed Orlan choke manifold changes with John/lam. reviewed model. (09/21/17) Discussed new platform concept with Lam. reviewed model/layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-19 Hibernia Platform :Hibernia Platform TSR-01577-HIBP Monkey Board Handrail Assembly Regular Pay N 1 0 (09/19/17) Rechecked drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (09/19/17) IADC presentation - Tyler. (09/19/17) Team meeting. (09/22/17) Call with Alaska to discuss flow meter install. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-19 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 4.5 0 (09/18/17) Continued pulling reference info for SEMS package. (09/19/17) discussed drawings with Tyler. Cont drawing list/reference search. (09/20/17) Started new LP mud PID. (09/22/17) Cleaned up existing 77B drawing register. Logged new drawing numbers. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (09/18/17) Archived drawing for spreader beam padeye. Archived additional drawing files from Sakh. (09/19/17) Discussed Orlan choke manifold changes with John/lam. reviewed model. (09/21/17) Discussed new platform concept with Lam. reviewed model/layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-19 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1.5 0 (09/19/17) Discussed flow meter scope with Kyle. Reviewed model/issues with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (09/19/17) IADC presentation - Tyler. (09/19/17) Team meeting. (09/22/17) Call with Alaska to discuss flow meter install. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-20 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 8.75 0 (09/18/17) Continued pulling reference info for SEMS package. (09/19/17) discussed drawings with Tyler. Cont drawing list/reference search. (09/20/17) Started new LP mud PID. (09/22/17) Cleaned up existing 77B drawing register. Logged new drawing numbers. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-21 Berkut-TSR :Berkut-TSR TSR-01549-BERP Insulation Covers Regular Pay N 8 0 (09/21/17) Finalized drawing check. Scanned redlines. Updated closeout and sent for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (09/18/17) Archived drawing for spreader beam padeye. Archived additional drawing files from Sakh. (09/19/17) Discussed Orlan choke manifold changes with John/lam. reviewed model. (09/21/17) Discussed new platform concept with Lam. reviewed model/layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (09/19/17) IADC presentation - Tyler. (09/19/17) Team meeting. (09/22/17) Call with Alaska to discuss flow meter install. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-22 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 2 0 (09/22/17) CNOOC tender drawings. Discussed with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-22 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2.5 0 (09/18/17) Continued pulling reference info for SEMS package. (09/19/17) discussed drawings with Tyler. Cont drawing list/reference search. (09/20/17) Started new LP mud PID. (09/22/17) Cleaned up existing 77B drawing register. Logged new drawing numbers. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (09/25/17) Team meeting. SEMS discussion for 77B. (09/28/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (09/25/17) Updated weekly timesheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-25 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 7.25 0 (09/25/17) Revised SEMS CTR for the drawing package. Reviewed SOW with Tyler. Worked on 77B fuel P&ID. (09/26/17) Worked on 77B air and Ballast piping P&IDs. (09/27/17) Worked on engine cooling P&ID for 77B. (09/28/17) 77B HP mud P&ID. (09/29/17) Cont HP mud. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-26 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 7.5 0 (09/25/17) Revised SEMS CTR for the drawing package. Reviewed SOW with Tyler. Worked on 77B fuel P&ID. (09/26/17) Worked on 77B air and Ballast piping P&IDs. (09/27/17) Worked on engine cooling P&ID for 77B. (09/28/17) 77B HP mud P&ID. (09/29/17) Cont HP mud. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-26 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1.5 0 (09/26/17) First review of support drawing. Discussed with Dan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-27 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 7.5 0 (09/25/17) Revised SEMS CTR for the drawing package. Reviewed SOW with Tyler. Worked on 77B fuel P&ID. (09/26/17) Worked on 77B air and Ballast piping P&IDs. (09/27/17) Worked on engine cooling P&ID for 77B. (09/28/17) 77B HP mud P&ID. (09/29/17) Cont HP mud. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-27 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1.5 0 (09/27/17) Searched for 216L steam piping information per field request. Sent drawings. Cleaned 216L archive drawing folder. (09/29/17) reviewed MOD from field. Pulled associated drawings for reference. Sent clarification email to Dan C. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-28 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 (09/28/17) Reviewed HP Mud system P&ID. Discussed with Kyle and updated. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (09/25/17) Team meeting. SEMS discussion for 77B. (09/28/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-28 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 6.5 0 (09/25/17) Revised SEMS CTR for the drawing package. Reviewed SOW with Tyler. Worked on 77B fuel P&ID. (09/26/17) Worked on 77B air and Ballast piping P&IDs. (09/27/17) Worked on engine cooling P&ID for 77B. (09/28/17) 77B HP mud P&ID. (09/29/17) Cont HP mud. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-29 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 3 0 (09/25/17) Revised SEMS CTR for the drawing package. Reviewed SOW with Tyler. Worked on 77B fuel P&ID. (09/26/17) Worked on 77B air and Ballast piping P&IDs. (09/27/17) Worked on engine cooling P&ID for 77B. (09/28/17) 77B HP mud P&ID. (09/29/17) Cont HP mud. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-09-29 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 3 0 (09/27/17) Searched for 216L steam piping information per field request. Sent drawings. Cleaned 216L archive drawing folder. (09/29/17) reviewed MOD from field. Pulled associated drawings for reference. Sent clarification email to Dan C. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-02 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 (10/02/17) Discussed drawings/Options with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (10/02/17) Team meeting. (10/03/17) MOC discussion with Kyle/Sergio. (10/05/17) Weekly TSR meeting. (10/06/17) Meeting to review design group performance (Rob/Kyle). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (10/02/17) Discussed design group performance with Kyle. (10/03/17) Updated weekly timesheet and submitted for review. (10/05/17) Reviewed designers timesheets. (10/06/17) TSR discussion with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-02 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 5.25 0 (10/02/17) Updated 77B HP P&ID to match drawings from DPR. Cont'd on 77B bulk P&ID. (10/04/17) discussed plan/trip with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-02 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1.5 0 (10/02/17) Reviewed email info from Dan C. Sent sketch response. (10/03/17) Reviewed new info from Dan C (249/258 mud line mods). Pulled ref information. (10/05/17) Reviewed email request from Dan C. Discussed with Kyle/Dan. printed reference drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (10/02/17) Team meeting. (10/03/17) MOC discussion with Kyle/Sergio. (10/05/17) Weekly TSR meeting. (10/06/17) Meeting to review design group performance (Rob/Kyle). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (10/02/17) Discussed design group performance with Kyle. (10/03/17) Updated weekly timesheet and submitted for review. (10/05/17) Reviewed designers timesheets. (10/06/17) TSR discussion with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-03 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 2.5 0 (10/02/17) Reviewed email info from Dan C. Sent sketch response. (10/03/17) Reviewed new info from Dan C (249/258 mud line mods). Pulled ref information. (10/05/17) Reviewed email request from Dan C. Discussed with Kyle/Dan. printed reference drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-03 Rig 249L-TSR :Rig 249L-TSR TSR-01607-249/258L LP Mud Lines Regular Pay N 4.5 0 (10/03/17) Created new TSR folder and save reference information. Started 249 drawing updates. (10/04/17) Continued 249L drawing revisions. (10/05/17) Continued drawings. Created TSR?CTR and sent for review. (10/06/17) Drawing review/updates - PDF drawing package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-04 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 0.5 0 (10/02/17) Updated 77B HP P&ID to match drawings from DPR. Cont'd on 77B bulk P&ID. (10/04/17) discussed plan/trip with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-04 Rig 249L-TSR :Rig 249L-TSR TSR-01607-249/258L LP Mud Lines Regular Pay N 8 0 (10/03/17) Created new TSR folder and save reference information. Started 249 drawing updates. (10/04/17) Continued 249L drawing revisions. (10/05/17) Continued drawings. Created TSR?CTR and sent for review. (10/06/17) Drawing review/updates - PDF drawing package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (10/02/17) Team meeting. (10/03/17) MOC discussion with Kyle/Sergio. (10/05/17) Weekly TSR meeting. (10/06/17) Meeting to review design group performance (Rob/Kyle). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (10/02/17) Discussed design group performance with Kyle. (10/03/17) Updated weekly timesheet and submitted for review. (10/05/17) Reviewed designers timesheets. (10/06/17) TSR discussion with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-05 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 (10/02/17) Reviewed email info from Dan C. Sent sketch response. (10/03/17) Reviewed new info from Dan C (249/258 mud line mods). Pulled ref information. (10/05/17) Reviewed email request from Dan C. Discussed with Kyle/Dan. printed reference drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-05 Rig 249L-TSR :Rig 249L-TSR TSR-01607-249/258L LP Mud Lines Regular Pay N 7 0 (10/03/17) Created new TSR folder and save reference information. Started 249 drawing updates. (10/04/17) Continued 249L drawing revisions. (10/05/17) Continued drawings. Created TSR?CTR and sent for review. (10/06/17) Drawing review/updates - PDF drawing package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (10/02/17) Team meeting. (10/03/17) MOC discussion with Kyle/Sergio. (10/05/17) Weekly TSR meeting. (10/06/17) Meeting to review design group performance (Rob/Kyle). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (10/02/17) Discussed design group performance with Kyle. (10/03/17) Updated weekly timesheet and submitted for review. (10/05/17) Reviewed designers timesheets. (10/06/17) TSR discussion with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-06 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 0.5 0 (10/06/17) Discussed final package with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-06 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1 0 (10/06/17) 2nd drawing review. Discussed with dan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-06 Rig 249L-TSR :Rig 249L-TSR TSR-01607-249/258L LP Mud Lines Regular Pay N 3 0 (10/03/17) Created new TSR folder and save reference information. Started 249 drawing updates. (10/04/17) Continued 249L drawing revisions. (10/05/17) Continued drawings. Created TSR?CTR and sent for review. (10/06/17) Drawing review/updates - PDF drawing package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 (10/09/17) Team meeting. meeting to discuss designer performance(Rob/Kyle/HR). Meeting with employee. (10/10/17) Team meeting. employee performance discussion. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (10/09/17) Updated weekly timesheet and submitted for approval. (10/10/17) Started employee performance email. (10/11/17) Sent employee performance notes. (10/12/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-09 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 3.5 0 (10/09/17) Called Leroy to discuss SEMS package/travel plans. Started 77B drill water P&ID (10/10/17) Cont'd with DW drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-09 Rig 249L-TSR :Rig 249L-TSR TSR-01607-249/258L LP Mud Lines Regular Pay N 3 0 (10/09/17) Started closeout package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (10/09/17) Team meeting. meeting to discuss designer performance(Rob/Kyle/HR). Meeting with employee. (10/10/17) Team meeting. employee performance discussion. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (10/09/17) Updated weekly timesheet and submitted for approval. (10/10/17) Started employee performance email. (10/11/17) Sent employee performance notes. (10/12/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-10 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 5.75 0 (10/09/17) Called Leroy to discuss SEMS package/travel plans. Started 77B drill water P&ID (10/10/17) Cont'd with DW drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-10 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1.5 0 (10/11/17) Reviewed new TSRs and discussed with Lam. Researched CAD info for TSR. Sent clarification email to Luis C. Created new TSR folders and started CTR. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (10/09/17) Team meeting. meeting to discuss designer performance(Rob/Kyle/HR). Meeting with employee. (10/10/17) Team meeting. employee performance discussion. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (10/09/17) Updated weekly timesheet and submitted for approval. (10/10/17) Started employee performance email. (10/11/17) Sent employee performance notes. (10/12/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-11 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1.25 0 (10/11/17) Reviewed 270 3D site plan with Lam. Discussed 3D backyard layout options. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-11 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 6 0 (10/11/17) Reviewed new TSRs and discussed with Lam. Researched CAD info for TSR. Sent clarification email to Luis C. Created new TSR folders and started CTR. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (10/09/17) Updated weekly timesheet and submitted for approval. (10/10/17) Started employee performance email. (10/11/17) Sent employee performance notes. (10/12/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-12 Rig 272L-TSR :Rig 272L-TSR TSR-01609-272L-273L Rig GA & BOP Stack Updates Regular Pay N 8.5 0 (10/12/17) Finalized CTR and sent for approval. Started BOP stack updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-13 OH-001 :OH-001 Overhead All Activities Regular Pay N 4.5 0 (10/13/17) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (10/16/17) Team meeting. (10/19/17) Weekly TSR meeting. General TSR discussion with Alaska. (10/20/17) Employee performance follow up discussion. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (10/16/17) Updated weekly timesheet and submitted for approval. review/Approve designer timesheets. (10/17/17) discussed 262L drawing register info with Lam. (10/18/17) general TSR discussion with Lam/Dan (status). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-16 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3.75 0 (10/16/17)Cresent tender support - TDS-11SA layout with dims. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-16 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 2.5 0 (10/16/17) Researched pin info for 258 trailer Discussed with Kyle. Created new pin sketch and sent to Dan C for information. (10/17/17) Follow up email to Dan C.(TSR/CTR) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-16 Rig 272L-TSR :Rig 272L-TSR TSR-01609-272L-273L Rig GA & BOP Stack Updates Regular Pay N 1 0 (10/16/17) Revised TCR and sent. (10/17/17) Continued with drawing revisions. (10/18/17) Closeout package and drawing PDFs. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-17 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 (10/17/17) Revised site drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (10/16/17) Updated weekly timesheet and submitted for approval. review/Approve designer timesheets. (10/17/17) discussed 262L drawing register info with Lam. (10/18/17) general TSR discussion with Lam/Dan (status). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-17 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.25 0 (10/16/17) Researched pin info for 258 trailer Discussed with Kyle. Created new pin sketch and sent to Dan C for information. (10/17/17) Follow up email to Dan C.(TSR/CTR) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-17 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 0.5 0 (10/17/17) Final drawing check. discussed with Dan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-17 Rig 272L-TSR :Rig 272L-TSR TSR-01609-272L-273L Rig GA & BOP Stack Updates Regular Pay N 6.75 0 (10/16/17) Revised TCR and sent. (10/17/17) Continued with drawing revisions. (10/18/17) Closeout package and drawing PDFs. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (10/16/17) Updated weekly timesheet and submitted for approval. review/Approve designer timesheets. (10/17/17) discussed 262L drawing register info with Lam. (10/18/17) general TSR discussion with Lam/Dan (status). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 (10/18/17) checked arrangement drawings. (Dust. collector updates). (10/20/17) Discussed 270 CTR hours with Tyler. Discussed scope. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-18 Rig 249L-TSR :Rig 249L-TSR TSR-01607-249/258L LP Mud Lines Regular Pay N 1.5 0 (10/18/17) Saved TSR/CTR on Q. Updated closeout and sent for approval. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-18 Rig 272L-TSR :Rig 272L-TSR TSR-01609-272L-273L Rig GA & BOP Stack Updates Regular Pay N 4 0 (10/16/17) Revised TCR and sent. (10/17/17) Continued with drawing revisions. (10/18/17) Closeout package and drawing PDFs. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (10/16/17) Team meeting. (10/19/17) Weekly TSR meeting. General TSR discussion with Alaska. (10/20/17) Employee performance follow up discussion. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-19 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 5 0 (10/19/17) started BOP control schematic for 77B. Researched Koomey info. (10/20/17) discussed new travel plans wit Tyler. Pulled additional ref info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-19 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 3 0 (10/19/17) Saved reference drawings under TSR. Started vent sketch to review proposed vent locations. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (10/16/17) Team meeting. (10/19/17) Weekly TSR meeting. General TSR discussion with Alaska. (10/20/17) Employee performance follow up discussion. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-20 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 3 0 (10/19/17) started BOP control schematic for 77B. Researched Koomey info. (10/20/17) discussed new travel plans wit Tyler. Pulled additional ref info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (10/18/17) checked arrangement drawings. (Dust. collector updates). (10/20/17) Discussed 270 CTR hours with Tyler. Discussed scope. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-20 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1 0 (10/20/17) Started new platform drawing review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (10/23/17) Updated weekly timesheet and submitted for approval. (10/25/17) Checked designer timesheets for Hibernia time. Approved all. Discussed new titleblock issues with Lam (future improvements) (10/26/17) Update discussion with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-23 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4 0 (10/23/17) Site plan for 122L - Renaissance Oil. (10/24/17) Created tender folder and saved info to the Q. Drawing updated. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-23 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1.75 0 (10/23/17) Continued 77B BOP control schematic. (10/25/17) Cont BOP schematic. Pulled ref info for drain schematic. (10/26/17) Drain schematic updates. (10/27/17) Contr drain schematic. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 (10/23/17) Checked revised platform drawing. Reviewed redlines with Lam. (10/24/17) Back checked platform drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-23 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.25 0 (10/23/17) AADU PDFs for presentation. (10/26/17) Sketch for 272l RFI. Sent for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-24 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6 0 (10/24/17) 265/269L drawing package for Crescent proposal. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-24 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 2 0 (10/23/17) Site plan for 122L - Renaissance Oil. (10/24/17) Created tender folder and saved info to the Q. Drawing updated. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-24 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (10/23/17) Checked revised platform drawing. Reviewed redlines with Lam. (10/24/17) Back checked platform drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (10/25/17) Employee performance follow up meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (10/23/17) Updated weekly timesheet and submitted for approval. (10/25/17) Checked designer timesheets for Hibernia time. Approved all. Discussed new titleblock issues with Lam (future improvements) (10/26/17) Update discussion with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-25 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 4 0 (10/23/17) Continued 77B BOP control schematic. (10/25/17) Cont BOP schematic. Pulled ref info for drain schematic. (10/26/17) Drain schematic updates. (10/27/17) Contr drain schematic. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-25 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 (10/25/17) IT Service desk training. (10/26/17) Managers training with legal. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-25 Rig 249L-TSR :Rig 249L-TSR TSR-01607-249/258L LP Mud Lines Regular Pay N 1 0 (10/25/17) PDF drawings - transmitted IFC. Saved files to the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 (10/26/17) Matting board drawing for site plan. (10/27/17) Discussed drawing with Tyler. Made changes to matting layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (10/23/17) Updated weekly timesheet and submitted for approval. (10/25/17) Checked designer timesheets for Hibernia time. Approved all. Discussed new titleblock issues with Lam (future improvements) (10/26/17) Update discussion with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-26 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 3 0 (10/23/17) Continued 77B BOP control schematic. (10/25/17) Cont BOP schematic. Pulled ref info for drain schematic. (10/26/17) Drain schematic updates. (10/27/17) Contr drain schematic. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-26 OH-014 :OH-014 Overhead All Activities Regular Pay N 2.5 0 (10/25/17) IT Service desk training. (10/26/17) Managers training with legal. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-26 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2 0 (10/23/17) AADU PDFs for presentation. (10/26/17) Sketch for 272l RFI. Sent for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 (10/26/17) Matting board drawing for site plan. (10/27/17) Discussed drawing with Tyler. Made changes to matting layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-27 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 3 0 (10/23/17) Continued 77B BOP control schematic. (10/25/17) Cont BOP schematic. Pulled ref info for drain schematic. (10/26/17) Drain schematic updates. (10/27/17) Contr drain schematic. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (10/30/17) Team meeting. (10/31/17) Team meeting. (11/02/17) Weekly TSR meeting. PKD earnings meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (10/30/17) Updated weekly timesheet and submitted for approval. Approved design group timesheets. (11/02/17) TSR updates with Sachin. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-30 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 1 0 (10/30/17) Discussed site plan/rig layout drawings with Gary B. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-30 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 4.5 0 (10/30/17) 77B Fire water schematic. (10/31/17) 77B Well control schematic. Started new drawing- -barge deck safety plan. (11/01/17) Started 77B fuel PFD. (11/02/17) 77B general schematic updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-30 Rig 272L-TSR :Rig 272L-TSR TSR-01609-272L-273L Rig GA & BOP Stack Updates Regular Pay N 2 0 (10/30/17) Created drawing list for c/o. Revised closeout and sent for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-31 Berkut-TSR :Berkut-TSR TSR-01605-BERP Snubbing Post Regular Pay N 0.5 0 (10/31/17) Drafting review of post drawings. (11/01/17) Cont checking. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (10/30/17) Team meeting. (10/31/17) Team meeting. (11/02/17) Weekly TSR meeting. PKD earnings meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-10-31 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 8.25 0 (10/30/17) 77B Fire water schematic. (10/31/17) 77B Well control schematic. Started new drawing- -barge deck safety plan. (11/01/17) Started 77B fuel PFD. (11/02/17) 77B general schematic updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-01 Berkut-TSR :Berkut-TSR TSR-01605-BERP Snubbing Post Regular Pay N 1 0 (10/31/17) Drafting review of post drawings. (11/01/17) Cont checking. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-01 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 7 0 (10/30/17) 77B Fire water schematic. (10/31/17) 77B Well control schematic. Started new drawing- -barge deck safety plan. (11/01/17) Started 77B fuel PFD. (11/02/17) 77B general schematic updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.75 0 (10/30/17) Team meeting. (10/31/17) Team meeting. (11/02/17) Weekly TSR meeting. PKD earnings meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (10/30/17) Updated weekly timesheet and submitted for approval. Approved design group timesheets. (11/02/17) TSR updates with Sachin. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-02 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 (11/02/17) 270 drawing hours/ctr. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-02 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 3.75 0 (10/30/17) 77B Fire water schematic. (10/31/17) 77B Well control schematic. Started new drawing- -barge deck safety plan. (11/01/17) Started 77B fuel PFD. (11/02/17) 77B general schematic updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 (11/02/17) Checked 209 platform redlines and discussed with Lam. Archived 209 HP piping drawings on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-03 OH-001 :OH-001 Overhead All Activities Regular Pay N 5 0 (11/03/17) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (11/06/17) Updated weekly timesheet and submitted for approval. (11/08/17) General TSR update with designers. (11/10/17) Updated timesheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-06 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 2 0 (11/06/17) Discussed 216 HP piping with Kyle. Pulled drawings and reviewed scope with Lam. (11/07/17) Reviewed drawings/sketch with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-06 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 6 0 (11/06/17) 77B ballast P&ID/PFD changes. (11/07/17) Cont drawing updates. (11/08/17) Started new PFD drawings. (11/10/17) Printed drawing package for 77B rig visit. discussed scope with Tyler/Kyle. Called Leroy to confirm travel plans. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (11/07/17) Team meeting. (11/09/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-07 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 1 0 (11/06/17) Discussed 216 HP piping with Kyle. Pulled drawings and reviewed scope with Lam. (11/07/17) Reviewed drawings/sketch with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-07 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 5.75 0 (11/06/17) 77B ballast P&ID/PFD changes. (11/07/17) Cont drawing updates. (11/08/17) Started new PFD drawings. (11/10/17) Printed drawing package for 77B rig visit. discussed scope with Tyler/Kyle. Called Leroy to confirm travel plans. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (11/07/17) discussed new Berkut TRS with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-07 Rig 272L-TSR :Rig 272L-TSR TSR-01609-272L-273L Rig GA & BOP Stack Updates Regular Pay N 1 0 (11/07/17) Sent drawings to lam for transmittal. Archived files on the Q. (11/10/17) revised closeout and sent for approval. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-08 Berkut-TSR :Berkut-TSR TSR-01614-BERP Cement Unit Jib Lifting Tool Regular Pay N 6.5 0 (11/08/17) Worked on new jib base sketch - discussed with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (11/06/17) Updated weekly timesheet and submitted for approval. (11/08/17) General TSR update with designers. (11/10/17) Updated timesheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-08 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2 0 (11/06/17) 77B ballast P&ID/PFD changes. (11/07/17) Cont drawing updates. (11/08/17) Started new PFD drawings. (11/10/17) Printed drawing package for 77B rig visit. discussed scope with Tyler/Kyle. Called Leroy to confirm travel plans. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (11/07/17) Team meeting. (11/09/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-09 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 6 0 (11/09/17) Pulled new proposal number for Star energy proposal. Scaled site plans and started rig layouts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-09 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 2.5 0 (11/09/17) Checked DSM platform drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (11/06/17) Updated weekly timesheet and submitted for approval. (11/08/17) General TSR update with designers. (11/10/17) Updated timesheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-10 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 4.5 0 (11/06/17) 77B ballast P&ID/PFD changes. (11/07/17) Cont drawing updates. (11/08/17) Started new PFD drawings. (11/10/17) Printed drawing package for 77B rig visit. discussed scope with Tyler/Kyle. Called Leroy to confirm travel plans. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-10 Rig 272L-TSR :Rig 272L-TSR TSR-01609-272L-273L Rig GA & BOP Stack Updates Regular Pay N 0.5 0 (11/07/17) Sent drawings to lam for transmittal. Archived files on the Q. (11/10/17) revised closeout and sent for approval. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-12 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 5 0 Travel to Amelia, LA - 77B Rig survey for SEMS package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-13 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 10 0 Travel to Amelia, LA - 77B Rig survey for SEMS package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-14 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 10 0 Travel to Amelia, LA - 77B Rig survey for SEMS package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-15 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 10 0 Travel to Amelia, LA - 77B Rig survey for SEMS package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-16 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 8 0 Travel to Amelia, LA - 77B Rig survey for SEMS package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-17 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 5 0 Travel to Amelia, LA - 77B Rig survey for SEMS package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (11/20/17) Team meeting. (11/21/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-20 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 8.5 0 (11/20/17) Created barge slip layout for New Iberia - (Leroy B.) (11/21/17) Reviewed trip to 77B with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (11/20/17) Team meeting. (11/21/17) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 (11/21/17) archived drawing files from Sakhalin. Discussed 258L piping with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (11/21/17) Updated weekly timesheet and submitted for approval. Approved designers timesheets. (11/22/17) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-21 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 6 0 (11/21/17) Revised Star Energy site plan to show rig 253L (11/22/17) Call with Joe Wink/Gary to discuss possible rig options for Star Energy tender. Created blocks for 231L site layouts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-21 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 (11/20/17) Created barge slip layout for New Iberia - (Leroy B.) (11/21/17) Reviewed trip to 77B with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (11/21/17) Updated weekly timesheet and submitted for approval. Approved designers timesheets. (11/22/17) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-22 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 4 0 (11/21/17) Revised Star Energy site plan to show rig 253L (11/22/17) Call with Joe Wink/Gary to discuss possible rig options for Star Energy tender. Created blocks for 231L site layouts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-22 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1 0 (11/22/17) Expense report for trip. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-23 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-24 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (11/27/17) Team meeting. Met to discuss CTR hours for 209L redlines. (11/30/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (11/27/17) Helped Tyler with CAD settings. (11/29/17) Updated weekly timesheet and submitted. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-27 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 7 0 (11/27/17) Searched for 107L racking board info for Randy. Created sketch of board. Pulled new proposal number for 258L and started layouts. (11/28/17) Cont'd BOP stack layouts. (12/01/17) Pulled safety plan drawing and sent files to Mat for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-27 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 (11/27/17) Revised New Iberia slip layout for Leroy. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-28 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 8.5 0 (11/27/17) Searched for 107L racking board info for Randy. Created sketch of board. Pulled new proposal number for 258L and started layouts. (11/28/17) Cont'd BOP stack layouts. (12/01/17) Pulled safety plan drawing and sent files to Mat for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 (11/28/17)Transmitted 209L platform drawing - archived files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (11/27/17) Helped Tyler with CAD settings. (11/29/17) Updated weekly timesheet and submitted. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-29 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 8 0 (11/29/17) Printed new site info for Star Energy. Worked on site layouts and rig options. (11/30/17) Cont site layouts. (12/01/17) Cont site layouts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (11/27/17) Team meeting. Met to discuss CTR hours for 209L redlines. (11/30/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-11-30 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 8 0 (11/29/17) Printed new site info for Star Energy. Worked on site layouts and rig options. (11/30/17) Cont site layouts. (12/01/17) Cont site layouts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-01 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 1 0 (11/27/17) Searched for 107L racking board info for Randy. Created sketch of board. Pulled new proposal number for 258L and started layouts. (11/28/17) Cont'd BOP stack layouts. (12/01/17) Pulled safety plan drawing and sent files to Mat for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-01 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 5 0 (11/29/17) Printed new site info for Star Energy. Worked on site layouts and rig options. (11/30/17) Cont site layouts. (12/01/17) Cont site layouts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (12/04/17) Team meeting. (12/07/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (12/04/17) Discussed goals/reviews with Kyle. (12/06/17) Updated weekly timesheet and submitted for approval. Reviewed designers timesheets. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-04 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 7.75 0 (12/04/17) Reviewed new drawing list from operations. Started new drawings. (12/06/17) Discussed drawing package with Kyle. (12/07/17) Created PDFs for drawing package. Searched for 249/258 fuel tank information per field request. (12/08/17) Checked drawing package - made changes. Reviewed info with Tyler and updated PDF package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-04 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 0.5 0 (12/04/17) Reviewed new pad drawings from field. (12/05/17) Continued site plan options. call with Ops. (12/06/17) Saved new drawings from the field. Worked on layout Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-05 Berkut-TSR :Berkut-TSR TSR-01614-BERP Cement Unit Jib Lifting Tool Regular Pay N 2 0 (12/05/17) Started IFC drawing per field request. (12/06/17) Finalized drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-05 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 7 0 (12/04/17) Reviewed new pad drawings from field. (12/05/17) Continued site plan options. call with Ops. (12/06/17) Saved new drawings from the field. Worked on layout Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-06 Berkut-TSR :Berkut-TSR TSR-01614-BERP Cement Unit Jib Lifting Tool Regular Pay N 8.5 0 (12/05/17) Started IFC drawing per field request. (12/06/17) Finalized drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-06 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 0.5 0 (12/04/17) Reviewed new drawing list from operations. Started new drawings. (12/06/17) Discussed drawing package with Kyle. (12/07/17) Created PDFs for drawing package. Searched for 249/258 fuel tank information per field request. (12/08/17) Checked drawing package - made changes. Reviewed info with Tyler and updated PDF package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (12/04/17) Team meeting. (12/07/17) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (12/04/17) Discussed goals/reviews with Kyle. (12/06/17) Updated weekly timesheet and submitted for approval. Reviewed designers timesheets. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-07 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 2.75 0 (12/04/17) Reviewed new pad drawings from field. (12/05/17) Continued site plan options. call with Ops. (12/06/17) Saved new drawings from the field. Worked on layout Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 (12/07/17) 269L top drive tieback drawing. Revised jib drawing and sent IFC. Archived file on the Q. (12/08/17) Archived drawing files on the Q (209L). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-08 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 5.5 0 (12/04/17) Reviewed new pad drawings from field. (12/05/17) Continued site plan options. call with Ops. (12/06/17) Saved new drawings from the field. Worked on layout Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 (12/07/17) 269L top drive tieback drawing. Revised jib drawing and sent IFC. Archived file on the Q. (12/08/17) Archived drawing files on the Q (209L). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (12/11/17) Team meeting. (12/12/17) Meeting with designers to review 3D scanning software and options. Xmas lunch party. (12/14/17) Weekly TSR meeting. Vendor presentation - Sigma Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.25 0 (12/11/17) Researched local 3D scanning companies. researched current scanners/software used. (12/12/17) Continued with research for 3D scanning-sent request for demo. (12/13/17) Updated weekly timesheet and submitted for approval. Approved designer's time. (12/14/17) Discussed doc control issue with Lam. Pulled reference info for PDR. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-11 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 0.5 0 (12/11/17) Discussed tender drawing packages with Marina. (12/13/17)Updated 258 drawing package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 (12/11/17) checked BOP platform modification drawing - redlines from Sakh. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 (12/11/17) Team meeting. (12/12/17) Meeting with designers to review 3D scanning software and options. Xmas lunch party. (12/14/17) Weekly TSR meeting. Vendor presentation - Sigma Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 (12/11/17) Researched local 3D scanning companies. researched current scanners/software used. (12/12/17) Continued with research for 3D scanning-sent request for demo. (12/13/17) Updated weekly timesheet and submitted for approval. Approved designer's time. (12/14/17) Discussed doc control issue with Lam. Pulled reference info for PDR. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-12 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 (12/12/17) Reviewed Handrail drawing redline updates. (12/13/17) Transmitted drawing and archived files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (12/11/17) Researched local 3D scanning companies. researched current scanners/software used. (12/12/17) Continued with research for 3D scanning-sent request for demo. (12/13/17) Updated weekly timesheet and submitted for approval. Approved designer's time. (12/14/17) Discussed doc control issue with Lam. Pulled reference info for PDR. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-13 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 4 0 (12/11/17) Discussed tender drawing packages with Marina. (12/13/17)Updated 258 drawing package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-13 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 (12/13/17) Compliance training. (12/14/17) Solidworks training with Tyler Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-13 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 (12/12/17) Reviewed Handrail drawing redline updates. (12/13/17) Transmitted drawing and archived files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 (12/11/17) Team meeting. (12/12/17) Meeting with designers to review 3D scanning software and options. Xmas lunch party. (12/14/17) Weekly TSR meeting. Vendor presentation - Sigma Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 (12/11/17) Researched local 3D scanning companies. researched current scanners/software used. (12/12/17) Continued with research for 3D scanning-sent request for demo. (12/13/17) Updated weekly timesheet and submitted for approval. Approved designer's time. (12/14/17) Discussed doc control issue with Lam. Pulled reference info for PDR. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-14 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 (12/13/17) Compliance training. (12/14/17) Solidworks training with Tyler Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 9 0 (12/19/17) 2018 SMART goal discussion. (12/20/17) Meeting with ECAD. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 (12/19/17) 2018 SMART goal discussion. (12/20/17) Meeting with ECAD. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 (12/18/17) Lost performance review info from prior week - started over. (12/19/17) Cont. performance review. Discussed 216 layouts with Lam/John. (12/21/17) Updated weekly timesheet and submitted. Discussed PTO with Lam. Cont review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (12/19/17) 2018 SMART goal discussion. (12/20/17) Meeting with ECAD. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-20 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 7.75 0 (12/20/17) Reviewed tender drawing list. Pulled drawings to support. (12/21/17) Discussed package with Marina. Created PDFs and sent for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 (12/18/17) Lost performance review info from prior week - started over. (12/19/17) Cont. performance review. Discussed 216 layouts with Lam/John. (12/21/17) Updated weekly timesheet and submitted. Discussed PTO with Lam. Cont review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-21 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3 0 (12/20/17) Reviewed tender drawing list. Pulled drawings to support. (12/21/17) Discussed package with Marina. Created PDFs and sent for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-25 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 (12/26/17) Finalized review and submitted. Reviewed drawing redlines with Dan. Scanned 77B redlines and saved on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-27 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 7.5 0 (12/27/17) Started on SEMS redlines. (12/28/17) Cont. on drawing package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-27 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 0.5 0 (12/27/17) discussed design with Dan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-28 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-28 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4 0 (12/27/17) Started on SEMS redlines. (12/28/17) Cont. on drawing package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2017-12-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (01/02/18) Team meeting. (01/04/18) Weekly TSR meeting (01/05/18) Team meeting. AutoCAD pricing discussion. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-02 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 8.75 0 (01/02/18) Continued work on 77B safety plans. Created drawing progress sheet. (01/04/18) Continued with safety plan revisions. (01/05/18) General progress discussion with Tyler. Worked on GA revisions. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (01/03/18) Scheduled meeting to discuss AutoCAD pricing for 2018'. Updated weekly timesheet and submitted. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-03 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 6.75 0 (01/03/18) Discussed 257B stack drawings with George. Searched for reference info. Revised drawings and sent PDFs (01/05/18) Revised 257B drawings for BP proposal. Discussed with Marina. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (01/03/18) Checked 209L cantilevered walkway drawing. (01/04/18) Completed drawing check - discussed redlines. (01/05/18) Back-check 209L hanging platform. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (01/02/18) Team meeting. (01/04/18) Weekly TSR meeting (01/05/18) Team meeting. AutoCAD pricing discussion. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (01/03/18) Checked 209L cantilevered walkway drawing. (01/04/18) Completed drawing check - discussed redlines. (01/05/18) Back-check 209L hanging platform. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-04 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 7.25 0 (01/02/18) Continued work on 77B safety plans. Created drawing progress sheet. (01/04/18) Continued with safety plan revisions. (01/05/18) General progress discussion with Tyler. Worked on GA revisions. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (01/02/18) Team meeting. (01/04/18) Weekly TSR meeting (01/05/18) Team meeting. AutoCAD pricing discussion. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-05 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2 0 (01/03/18) Discussed 257B stack drawings with George. Searched for reference info. Revised drawings and sent PDFs (01/05/18) Revised 257B drawings for BP proposal. Discussed with Marina. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (01/03/18) Checked 209L cantilevered walkway drawing. (01/04/18) Completed drawing check - discussed redlines. (01/05/18) Back-check 209L hanging platform. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-05 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3 0 (01/02/18) Continued work on 77B safety plans. Created drawing progress sheet. (01/04/18) Continued with safety plan revisions. (01/05/18) General progress discussion with Tyler. Worked on GA revisions. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (01/08/18) Team meeting. (01/10/18) Team meeting. (01/11/18) Weekly TSR meeting. (01/12/18) Met to discuss CAD standards/improvements for 2018'. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-08 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 (01/08/18) Revised 258L HP schematic. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-08 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 7.75 0 (01/08/18) Revised 77B Drill floor/helideck GAs. Updated progress sheet. (01/09/18) 77B Quarters arrangements. (01/10/18) Revised 77B Engine cooling P&ID. (01/11/18) Started 77B Drill water P&ID (01/12/18) Cont'd Drill water. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 (01/09/18) Back checked 209L lift device. (01/10/18) Transmitted/Archived 209L lift device drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (01/09/18) Updated timesheet and submitted for approval. Scheduled meeting for titleblock review. (01/10/18) Discussed performance review/general status with Kyle. Sent out folder structure guide to group. (01/11/18) Worked on design groups performance reviews. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-09 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 2 0 (01/09/18) 258L BOP/Diverter drawing revisions for BP tender. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-09 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4.75 0 (01/08/18) Revised 77B Drill floor/helideck GAs. Updated progress sheet. (01/09/18) 77B Quarters arrangements. (01/10/18) Revised 77B Engine cooling P&ID. (01/11/18) Started 77B Drill water P&ID (01/12/18) Cont'd Drill water. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (01/08/18) Team meeting. (01/10/18) Team meeting. (01/11/18) Weekly TSR meeting. (01/12/18) Met to discuss CAD standards/improvements for 2018'. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 (01/09/18) Back checked 209L lift device. (01/10/18) Transmitted/Archived 209L lift device drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (01/09/18) Updated timesheet and submitted for approval. Scheduled meeting for titleblock review. (01/10/18) Discussed performance review/general status with Kyle. Sent out folder structure guide to group. (01/11/18) Worked on design groups performance reviews. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-10 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 7.25 0 (01/08/18) Revised 77B Drill floor/helideck GAs. Updated progress sheet. (01/09/18) 77B Quarters arrangements. (01/10/18) Revised 77B Engine cooling P&ID. (01/11/18) Started 77B Drill water P&ID (01/12/18) Cont'd Drill water. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (01/08/18) Team meeting. (01/10/18) Team meeting. (01/11/18) Weekly TSR meeting. (01/12/18) Met to discuss CAD standards/improvements for 2018'. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 (01/09/18) Updated timesheet and submitted for approval. Scheduled meeting for titleblock review. (01/10/18) Discussed performance review/general status with Kyle. Sent out folder structure guide to group. (01/11/18) Worked on design groups performance reviews. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-11 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 2.25 0 (01/08/18) Revised 77B Drill floor/helideck GAs. Updated progress sheet. (01/09/18) 77B Quarters arrangements. (01/10/18) Revised 77B Engine cooling P&ID. (01/11/18) Started 77B Drill water P&ID (01/12/18) Cont'd Drill water. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (01/08/18) Team meeting. (01/10/18) Team meeting. (01/11/18) Weekly TSR meeting. (01/12/18) Met to discuss CAD standards/improvements for 2018'. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-12 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3.75 0 (01/08/18) Revised 77B Drill floor/helideck GAs. Updated progress sheet. (01/09/18) 77B Quarters arrangements. (01/10/18) Revised 77B Engine cooling P&ID. (01/11/18) Started 77B Drill water P&ID (01/12/18) Cont'd Drill water. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-12 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1.25 0 (01/12/18) Final drawing check. Issued drawings and archived files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (01/15/18) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (01/15/18) Archived 209L platform drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-15 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 8.5 0 (01/15/18) Updated progress sheet. Started fire water P&ID. Assigned Dan to rig air. (01/18/18) 77B Potable water P&ID. (01/19/18) Cont'd pot water. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Office closure. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Office closure. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 (01/18/18) Reviewed drawing request from the field. Searched for ref info. Discussed 272/273 TSRs with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-18 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1.5 0 (01/18/18) 265L Hawkjaw padeye research. Created drawing and sent to Mat for info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-18 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 6.5 0 (01/15/18) Updated progress sheet. Started fire water P&ID. Assigned Dan to rig air. (01/18/18) 77B Potable water P&ID. (01/19/18) Cont'd pot water. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-19 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 6 0 (01/15/18) Updated progress sheet. Started fire water P&ID. Assigned Dan to rig air. (01/18/18) 77B Potable water P&ID. (01/19/18) Cont'd pot water. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (01/22/18) Team meeting. Meeting with Kyle to discuss performance reviews. (01/24/18) Team meeting. (01/25/18) Weekly TSR meeting. Safer union product meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (01/22/18) Updated weekly timesheets and submitted for approval. (01/23/18) Updated designer performance reviews. Loaded new AutoCAD menus for 2018 install. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-22 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 7 0 (01/22/18) Finalized potable water P&ID. Started bulk mud system P&ID. (01/23/18) Started 77B LP mud P&ID. (01/24/18) Finalized LP mud and started HP mud. (01/25/18) Started 77B drain schematic. (01/26/18) Cleaned up drain format. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (01/22/18) Updated weekly timesheets and submitted for approval. (01/23/18) Updated designer performance reviews. Loaded new AutoCAD menus for 2018 install. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-23 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 7 0 (01/22/18) Finalized potable water P&ID. Started bulk mud system P&ID. (01/23/18) Started 77B LP mud P&ID. (01/24/18) Finalized LP mud and started HP mud. (01/25/18) Started 77B drain schematic. (01/26/18) Cleaned up drain format. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (01/22/18) Team meeting. Meeting with Kyle to discuss performance reviews. (01/24/18) Team meeting. (01/25/18) Weekly TSR meeting. Safer union product meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-24 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (01/24/18) Checked DM-DSM platform redlines. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-24 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 7.75 0 (01/22/18) Finalized potable water P&ID. Started bulk mud system P&ID. (01/23/18) Started 77B LP mud P&ID. (01/24/18) Finalized LP mud and started HP mud. (01/25/18) Started 77B drain schematic. (01/26/18) Cleaned up drain format. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 (01/22/18) Team meeting. Meeting with Kyle to discuss performance reviews. (01/24/18) Team meeting. (01/25/18) Weekly TSR meeting. Safer union product meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-25 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 7 0 (01/22/18) Finalized potable water P&ID. Started bulk mud system P&ID. (01/23/18) Started 77B LP mud P&ID. (01/24/18) Finalized LP mud and started HP mud. (01/25/18) Started 77B drain schematic. (01/26/18) Cleaned up drain format. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-26 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3 0 (01/22/18) Finalized potable water P&ID. Started bulk mud system P&ID. (01/23/18) Started 77B LP mud P&ID. (01/24/18) Finalized LP mud and started HP mud. (01/25/18) Started 77B drain schematic. (01/26/18) Cleaned up drain format. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-26 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 3 0 (01/26/18) First check on west stair/platform drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (01/29/18) Team meeting. group discussion about platform concepts. (01/31/18) Team meeting. (02/01/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (01/29/18) Updated weekly timesheet and submitted. (01/30/18) Discussed reviews with Kyle. scheduled reviews with design group. Discussed CAD invoice with Lam. (01/31/18) Performance review meetings with design group. My performance review with Kyle. (02/01/18) Updated weekly timesheet and submitted. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-29 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 (01/29/18) Researched 265 mast info and sent to Mat. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-29 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 5 0 (01/29/18) Started BOP control schematic and Well control sch. (01/29/18) Cont well control updates. (02/01/18) Started hazardous are drawings. Discussed with Sachin/Tyler. (02/02/18) Started 77B ballast P&ID. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-29 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 1 0 (01/29/18) Finalized dwg check and discussed with Lam. (01/31/18) Checked ext walkway drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (01/29/18) Team meeting. group discussion about platform concepts. (01/31/18) Team meeting. (02/01/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (01/29/18) Updated weekly timesheet and submitted. (01/30/18) Discussed reviews with Kyle. scheduled reviews with design group. Discussed CAD invoice with Lam. (01/31/18) Performance review meetings with design group. My performance review with Kyle. (02/01/18) Updated weekly timesheet and submitted. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-30 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 7 0 (01/29/18) Started BOP control schematic and Well control sch. (01/29/18) Cont well control updates. (02/01/18) Started hazardous are drawings. Discussed with Sachin/Tyler. (02/02/18) Started 77B ballast P&ID. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (01/29/18) Team meeting. group discussion about platform concepts. (01/31/18) Team meeting. (02/01/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 (01/29/18) Updated weekly timesheet and submitted. (01/30/18) Discussed reviews with Kyle. scheduled reviews with design group. Discussed CAD invoice with Lam. (01/31/18) Performance review meetings with design group. My performance review with Kyle. (02/01/18) Updated weekly timesheet and submitted. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-31 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4.5 0 (01/29/18) Started BOP control schematic and Well control sch. (01/29/18) Cont well control updates. (02/01/18) Started hazardous are drawings. Discussed with Sachin/Tyler. (02/02/18) Started 77B ballast P&ID. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-01-31 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 1 0 (01/29/18) Finalized dwg check and discussed with Lam. (01/31/18) Checked ext walkway drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (01/29/18) Team meeting. group discussion about platform concepts. (01/31/18) Team meeting. (02/01/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-01 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 8.25 0 (01/29/18) Started BOP control schematic and Well control sch. (01/29/18) Cont well control updates. (02/01/18) Started hazardous are drawings. Discussed with Sachin/Tyler. (02/02/18) Started 77B ballast P&ID. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (01/29/18) Updated weekly timesheet and submitted. (01/30/18) Discussed reviews with Kyle. scheduled reviews with design group. Discussed CAD invoice with Lam. (01/31/18) Performance review meetings with design group. My performance review with Kyle. (02/01/18) Updated weekly timesheet and submitted. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-02 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 5 0 (01/29/18) Started BOP control schematic and Well control sch. (01/29/18) Cont well control updates. (02/01/18) Started hazardous are drawings. Discussed with Sachin/Tyler. (02/02/18) Started 77B ballast P&ID. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-07 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-08 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-09 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (02/12/18) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-12 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 8 0 (02/12/18) Reviewed comments from BP. Started drawing updates - 257B BOP stacks. (02/16/18) Created new BOP drawings with customer wellhead info - 257B Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-13 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-16 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 7.5 0 (02/12/18) Reviewed comments from BP. Started drawing updates - 257B BOP stacks. (02/16/18) Created new BOP drawings with customer wellhead info - 257B Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-20 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 9 0 (02/20/18) Created new BOP stack layouts for 257B - BP request. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (02/21/18) Updated weekly timesheets. (02/23/18) Updated timesheet and approved designers time. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-21 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 8 0 (02/21/18) Worked on 77B Fuel PFD, Ballast PFD, and Eng cooling. (02/22/18) Worked on Compressed air PFD, Bulk mud, and BOP control PFD. (02/23/18) Worked on 77B BOP stack drawing, and STBD side elevation GA. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (02/22/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-22 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 8 0 (02/21/18) Worked on 77B Fuel PFD, Ballast PFD, and Eng cooling. (02/22/18) Worked on Compressed air PFD, Bulk mud, and BOP control PFD. (02/23/18) Worked on 77B BOP stack drawing, and STBD side elevation GA. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (02/21/18) Updated weekly timesheets. (02/23/18) Updated timesheet and approved designers time. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 (02/23/18) Archived misc CAD files received from Sakhalin. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-23 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4.5 0 (02/21/18) Worked on 77B Fuel PFD, Ballast PFD, and Eng cooling. (02/22/18) Worked on Compressed air PFD, Bulk mud, and BOP control PFD. (02/23/18) Worked on 77B BOP stack drawing, and STBD side elevation GA. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-23 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 0.5 0 (02/23/18) Archived stair/platform drawings on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (02/26/18) team meeting. (02/28/18) team meeting. (03/01/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-26 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8.75 0 (02/26/18) DNO Drawing package (247/269). (02/27/18) Continued bid drawings. (02/28/18) Created safety plans. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (02/27/18) Archived CAD files from Sakhalin. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-27 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5 0 (02/26/18) DNO Drawing package (247/269). (02/27/18) Continued bid drawings. (02/28/18) Created safety plans. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-27 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3.75 0 (02/27/18) SEMS drawing check/ updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (02/26/18) team meeting. (02/28/18) team meeting. (03/01/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-28 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3 0 (02/26/18) DNO Drawing package (247/269). (02/27/18) Continued bid drawings. (02/28/18) Created safety plans. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-02-28 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 5.5 0 (02/28/18) Started platform drawing. (03/01/18) Cont platform drawing. (03/02/18) Cont platform drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (02/26/18) team meeting. (02/28/18) team meeting. (03/01/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-01 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 8.5 0 (02/28/18) Started platform drawing. (03/01/18) Cont platform drawing. (03/02/18) Cont platform drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-02 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 6 0 (02/28/18) Started platform drawing. (03/01/18) Cont platform drawing. (03/02/18) Cont platform drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-05 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 6.5 0 (03/05/18) Plot plan drawings for various well spacing. Dummy wellhouse sketch with dims. Drawing for Conoco meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-05 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 2.5 0 (03/05/18) Drawing check. (03/06/18) Updates and plots. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-05 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 (03/05/18) Checked new PBM door drawing. (03/07/18) Worked on platform. (03/08/18) Cont platform. (03/09/18) Cont platform. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-06 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 9 0 (03/05/18) Drawing check. (03/06/18) Updates and plots. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/06/18) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (03/05/18) Updated weekly timesheet and submitted for approval. (03/07/18) Researched safety topic. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-07 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 7.75 0 (03/05/18) Checked new PBM door drawing. (03/07/18) Worked on platform. (03/08/18) Cont platform. (03/09/18) Cont platform. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-08 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 (03/08/18) Checked pipe support drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-08 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 8 0 (03/05/18) Checked new PBM door drawing. (03/07/18) Worked on platform. (03/08/18) Cont platform. (03/09/18) Cont platform. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-09 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 5.75 0 (03/05/18) Checked new PBM door drawing. (03/07/18) Worked on platform. (03/08/18) Cont platform. (03/09/18) Cont platform. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/12/18) Team meeting. (03/15/18) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-12 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 (03/12/18) Searched for info per field request - 55B Mast (03/13/18) Cont search for mast info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-12 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 5.75 0 (03/14/18) Started drawing changes. (03/16/18) Cont changes Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (03/13/18) Archived CAD files for 209L/Orlan. Updated weekly timesheet and submitted. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-13 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3 0 (03/13/18) Searched for drawings per field request from Dan Colby. (03/14/18) Discussed drawings with Dan - searched for additional piping information. Sent info to Dan . Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-13 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 (03/12/18) Searched for info per field request - 55B Mast (03/13/18) Cont search for mast info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-13 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 3 0 (03/13/18) Started ISO drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-14 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3 0 (03/13/18) Searched for drawings per field request from Dan Colby. (03/14/18) Discussed drawings with Dan - searched for additional piping information. Sent info to Dan . Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-14 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 2 0 (03/14/18) Created new drawings for DNO per request from Nancy. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-14 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 4 0 (03/14/18) Started drawing changes. (03/16/18) Cont changes Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/12/18) Team meeting. (03/15/18) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-15 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 8.75 0 (03/14/18) Started drawing changes. (03/16/18) Cont changes Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-16 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 6 0 (03/14/18) Started drawing changes. (03/16/18) Cont changes Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/19/18) Team meeting. (03/22/18) Weekly TSR meeting. (03/23/18) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (03/19/18) Updated weekly timesheets and submitted. Reviewed designers timesheets. (03/20/18) Discussed titleblock format/updates with Lam. (03/22/18) Researched safety topic and IMS moment. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-19 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 (03/19/18) researched electrical information for George- 257B. Sent drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-19 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 (03/19/18) Searched for reference mast info for Bob W. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-19 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 (03/19/18) Searched for ref. choke/kill information for George. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-19 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 (03/19/18) Cont'd on ISO drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-19 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 3.5 0 (03/19/18) Finalized platform drawing. (03/20/18) Checked 209L stair mod drawing. (03/21/18) Archived platform drawing on the Q. Back checked stair mod drawing. (03/23/18) Archived stair mod drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-20 HTSG-TSR :HTSG-TSR 2018-SMART-Goals Development Goals Regular Pay N 1 0 (03/20/18) Started Solidworks tutorial - (Parts/Drawings) (03/21/18) Cont tutorial. (03/22/18) Cont tutorial. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (03/19/18) Updated weekly timesheets and submitted. Reviewed designers timesheets. (03/20/18) Discussed titleblock format/updates with Lam. (03/22/18) Researched safety topic and IMS moment. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-20 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 5.5 0 (03/20/18) Reviewed MOC request from 249L. Started sketch. (03/21/18) Researched design options. (03/22/18) Sketched different options. (03/23/18) Cont with options. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-20 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 (03/20/18) Checked padeye drawing. (03/21/18) Archived padeye drawing on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-20 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 (03/19/18) Finalized platform drawing. (03/20/18) Checked 209L stair mod drawing. (03/21/18) Archived platform drawing on the Q. Back checked stair mod drawing. (03/23/18) Archived stair mod drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-21 HTSG-TSR :HTSG-TSR 2018-SMART-Goals Development Goals Regular Pay N 4 0 (03/20/18) Started Solidworks tutorial - (Parts/Drawings) (03/21/18) Cont tutorial. (03/22/18) Cont tutorial. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-21 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 3.25 0 (03/20/18) Reviewed MOC request from 249L. Started sketch. (03/21/18) Researched design options. (03/22/18) Sketched different options. (03/23/18) Cont with options. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-21 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 0.25 0 (03/20/18) Checked padeye drawing. (03/21/18) Archived padeye drawing on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-21 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1.5 0 (03/19/18) Finalized platform drawing. (03/20/18) Checked 209L stair mod drawing. (03/21/18) Archived platform drawing on the Q. Back checked stair mod drawing. (03/23/18) Archived stair mod drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-22 HTSG-TSR :HTSG-TSR 2018-SMART-Goals Development Goals Regular Pay N 4 0 (03/20/18) Started Solidworks tutorial - (Parts/Drawings) (03/21/18) Cont tutorial. (03/22/18) Cont tutorial. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (03/19/18) Team meeting. (03/22/18) Weekly TSR meeting. (03/23/18) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (03/19/18) Updated weekly timesheets and submitted. Reviewed designers timesheets. (03/20/18) Discussed titleblock format/updates with Lam. (03/22/18) Researched safety topic and IMS moment. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-22 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 3 0 (03/20/18) Reviewed MOC request from 249L. Started sketch. (03/21/18) Researched design options. (03/22/18) Sketched different options. (03/23/18) Cont with options. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/19/18) Team meeting. (03/22/18) Weekly TSR meeting. (03/23/18) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-23 OH-009 :OH-009 OH-009-017 Aksai Regular Pay N 5.5 0 (03/20/18) Reviewed MOC request from 249L. Started sketch. (03/21/18) Researched design options. (03/22/18) Sketched different options. (03/23/18) Cont with options. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-23 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 0.25 0 (03/19/18) Finalized platform drawing. (03/20/18) Checked 209L stair mod drawing. (03/21/18) Archived platform drawing on the Q. Back checked stair mod drawing. (03/23/18) Archived stair mod drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/26/18) Team meeting. (03/28/18) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (03/27/18) Saved downloaded vendor drawings to the template folder. Updated weekly timesheet. General drawing status discussion. (03/28/18) Status update with designers. Updated work pack progress list. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-26 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 5.75 0 (03/26/18) Continued layout/options. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-26 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 (03/26/18) Checked first group of drawings completed. (03/27/18) Stated work pack drawings. Searched for ref drawings and discussed scope with John. (03/28/18) Continued work packs. Checked updated drawings for Lam. Archived work bench dwg. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-26 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 (03/27/18) Checked updated GA/Safety plan drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (03/27/18) Saved downloaded vendor drawings to the template folder. Updated weekly timesheet. General drawing status discussion. (03/28/18) Status update with designers. Updated work pack progress list. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-27 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 7 0 (03/26/18) Checked first group of drawings completed. (03/27/18) Stated work pack drawings. Searched for ref drawings and discussed scope with John. (03/28/18) Continued work packs. Checked updated drawings for Lam. Archived work bench dwg. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (03/26/18) Team meeting. (03/28/18) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (03/27/18) Saved downloaded vendor drawings to the template folder. Updated weekly timesheet. General drawing status discussion. (03/28/18) Status update with designers. Updated work pack progress list. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-28 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1 0 (03/28/18) Pulled reference drawings and sent to Benny. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-28 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 (03/28/18) First check - choke manifold support skid. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-28 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 5.25 0 (03/26/18) Checked first group of drawings completed. (03/27/18) Stated work pack drawings. Searched for ref drawings and discussed scope with John. (03/28/18) Continued work packs. Checked updated drawings for Lam. Archived work bench dwg. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 (03/29/18) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-03-30 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (04/02/18) Team meeting. (04/05/18) Weekly TSR meeting - Minkit presentation. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 (04/02/18) Discussed 2M-TEK TSR with Tyler. Discussed drawing list/options. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-02 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 5.75 0 (04/02/18) Researched chain/connection components for no-go bar design. (04/03/18) Updated chain configuration. Emailed concept to field for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-02 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 (04/02/18) Back checked ckoke skid drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-02 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 (04/02/18) Discussed workpack drawings with John-revised drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-03 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 9 0 (04/02/18) Researched chain/connection components for no-go bar design. (04/03/18) Updated chain configuration. Emailed concept to field for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (04/04/18) Updated weekly timesheet and submitted. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-04 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 1 0 (04/04/18) Pulled geothermal BOP stack info for Gary B. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-04 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 7 0 (04/04/18) Reviewed scope and pulled reference data for background layout. (04/05/18) Continued drawing. (04/06/18) Discussed drawing with John - made changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (04/02/18) Team meeting. (04/05/18) Weekly TSR meeting - Minkit presentation. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-05 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 2 0 (04/05/18) Searched for pony sub drawings for 122, 221, and 256 - Al M. (04/06/18) Pony sub/BOP stack layouts for Al. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-05 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 6 0 (04/04/18) Reviewed scope and pulled reference data for background layout. (04/05/18) Continued drawing. (04/06/18) Discussed drawing with John - made changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-06 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 3.5 0 (04/05/18) Searched for pony sub drawings for 122, 221, and 256 - Al M. (04/06/18) Pony sub/BOP stack layouts for Al. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-06 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 2.5 0 (04/04/18) Reviewed scope and pulled reference data for background layout. (04/05/18) Continued drawing. (04/06/18) Discussed drawing with John - made changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (04/09/18) Team meeting. (04/12/18) Weekly TSR meeting. Met to discuss 2M-TEK TSR/drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-09 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 8.5 0 (04/09/18) Detailed drawing layout. (04/10/18) Continued details. (04/11/18) Final drawing changes. Issued drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-10 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1.25 0 (04/09/18) 211 plot plan layouts for Al. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-10 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 0.75 0 (04/10/18) First check - hatch/ladder. (04/11/18) Continued checking. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-10 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 7 0 (04/09/18) Detailed drawing layout. (04/10/18) Continued details. (04/11/18) Final drawing changes. Issued drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-11 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 5.25 0 (04/11/18) Started detailed drawing for No-go bar design per field request. (04/12/18) Continued bar details. (04/13/18) Reviewed design with John/Updated file. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-11 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 0.75 0 (04/10/18) First check - hatch/ladder. (04/11/18) Continued checking. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-11 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 3 0 (04/09/18) Detailed drawing layout. (04/10/18) Continued details. (04/11/18) Final drawing changes. Issued drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 (04/09/18) Team meeting. (04/12/18) Weekly TSR meeting. Met to discuss 2M-TEK TSR/drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (04/12/18) Updated weekly timesheet and submitted. Archived misc. TSR drawings. (04/13/18) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-12 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 5.5 0 (04/11/18) Started detailed drawing for No-go bar design per field request. (04/12/18) Continued bar details. (04/13/18) Reviewed design with John/Updated file. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-13 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2.5 0 (04/13/18) Drawing review. discussed format with Tyler/Dan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (04/12/18) Updated weekly timesheet and submitted. Archived misc. TSR drawings. (04/13/18) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-13 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 2 0 (04/11/18) Started detailed drawing for No-go bar design per field request. (04/12/18) Continued bar details. (04/13/18) Reviewed design with John/Updated file. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-16 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 (04/16/18) Continued checking drawings. (04/20/18) Started final drawing check. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (04/16/18) Team meeting. (04/18/18) Sakh doc control discussion with Lam/Kyle. (04/19/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (04/16/18) Updated weekly timesheet and submitted for approval. (04/19/18) Restructured 209L workpack folders and moved files. (04/20/18) Discussed Solidworks prints/options with Dan & Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (04/16/18) Archived drawing files from Sakhalin (Berkut/209L). Researched 209L drawing revision issues. (04/18/18) Archived Berkut drawing files from Sakh. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-16 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 5.25 0 (04/16/18) Revised wp drawings. (04/17/18) Started drawing revisions ( correcting OPDL changes on 209L files). (04/18/18) Cont with drawing updates. (04/19/18) Updated Workpack tracking sheet. Searched for reference info and printed workpack info. Sent drawing request for supporting info. (04/20/18) Discussed workpack drawings with John and printed ref. info Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-17 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 4.5 0 (04/17/18) Discussed no-go bar redlines with Kyle. Researched options and revised drawing. transmitted drawing and archived file on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-17 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2.5 0 (04/17/18) Discussed 76B drawings with Leroy. Revised choke spool drawing and sent for info. (04/18/18) Revised spool and sent to Leroy. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-17 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2 0 (04/16/18) Revised wp drawings. (04/17/18) Started drawing revisions ( correcting OPDL changes on 209L files). (04/18/18) Cont with drawing updates. (04/19/18) Updated Workpack tracking sheet. Searched for reference info and printed workpack info. Sent drawing request for supporting info. (04/20/18) Discussed workpack drawings with John and printed ref. info Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (04/16/18) Team meeting. (04/18/18) Sakh doc control discussion with Lam/Kyle. (04/19/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-18 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 (04/17/18) Discussed 76B drawings with Leroy. Revised choke spool drawing and sent for info. (04/18/18) Revised spool and sent to Leroy. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-18 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 5 0 (04/16/18) Revised wp drawings. (04/17/18) Started drawing revisions ( correcting OPDL changes on 209L files). (04/18/18) Cont with drawing updates. (04/19/18) Updated Workpack tracking sheet. Searched for reference info and printed workpack info. Sent drawing request for supporting info. (04/20/18) Discussed workpack drawings with John and printed ref. info Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-18 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 (04/18/18) Checked updated design drawing. (04/19/18) Back checked drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (04/16/18) Team meeting. (04/18/18) Sakh doc control discussion with Lam/Kyle. (04/19/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (04/16/18) Updated weekly timesheet and submitted for approval. (04/19/18) Restructured 209L workpack folders and moved files. (04/20/18) Discussed Solidworks prints/options with Dan & Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 (04/16/18) Archived drawing files from Sakhalin (Berkut/209L). Researched 209L drawing revision issues. (04/18/18) Archived Berkut drawing files from Sakh. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-19 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 6.25 0 (04/16/18) Revised wp drawings. (04/17/18) Started drawing revisions ( correcting OPDL changes on 209L files). (04/18/18) Cont with drawing updates. (04/19/18) Updated Workpack tracking sheet. Searched for reference info and printed workpack info. Sent drawing request for supporting info. (04/20/18) Discussed workpack drawings with John and printed ref. info Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-19 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 0.5 0 (04/18/18) Checked updated design drawing. (04/19/18) Back checked drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-20 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 4 0 (04/16/18) Continued checking drawings. (04/20/18) Started final drawing check. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (04/16/18) Updated weekly timesheet and submitted for approval. (04/19/18) Restructured 209L workpack folders and moved files. (04/20/18) Discussed Solidworks prints/options with Dan & Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-20 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 (04/16/18) Revised wp drawings. (04/17/18) Started drawing revisions ( correcting OPDL changes on 209L files). (04/18/18) Cont with drawing updates. (04/19/18) Updated Workpack tracking sheet. Searched for reference info and printed workpack info. Sent drawing request for supporting info. (04/20/18) Discussed workpack drawings with John and printed ref. info Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-23 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 6.75 0 (04/23/18) Discussed drawing number standards with Tyler/Kyle. Added new tabs to drawing register. Checked drawings for Dan. (04/24/18) Checked drawings and info in drawing register. (04/26/18) Discussed machining tolerances with Tyler. (04/27/18) Checked drawings and updated progress sheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (04/23/18) Updated weekly timesheet and submitted. Approved designers timesheets. Discussed office hours with Kyle and sent email to Designers. Created new proposal folder on the Q and assigned "P" number Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.25 0 (04/23/18) Archived 209L drawings files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-24 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 7 0 (04/23/18) Discussed drawing number standards with Tyler/Kyle. Added new tabs to drawing register. Checked drawings for Dan. (04/24/18) Checked drawings and info in drawing register. (04/26/18) Discussed machining tolerances with Tyler. (04/27/18) Checked drawings and updated progress sheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-24 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 (04/24/18) Searched for 257B Koomey/Nitrogen system information per email request from Robbie B. Searched Greenway 3 files. Searched for 258 racking board layouts. Discussed with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-25 ARBU-TSRs :ARBU-TSRs TSR-01648-ARBU Anchorage Office Plan Regular Pay N 9 0 (04/25/18) Discussed request with Mark. Started sketch of existing office space. (04/26/18) Received existing office dimensions and scaled plan. Started new layout in CH2MH space. (04/27/18) Cleaned up layout and sent PDFs to Mark. reviewed layout with Mark. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-26 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 (04/23/18) Discussed drawing number standards with Tyler/Kyle. Added new tabs to drawing register. Checked drawings for Dan. (04/24/18) Checked drawings and info in drawing register. (04/26/18) Discussed machining tolerances with Tyler. (04/27/18) Checked drawings and updated progress sheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-26 ARBU-TSRs :ARBU-TSRs TSR-01648-ARBU Anchorage Office Plan Regular Pay N 6.25 0 (04/25/18) Discussed request with Mark. Started sketch of existing office space. (04/26/18) Received existing office dimensions and scaled plan. Started new layout in CH2MH space. (04/27/18) Cleaned up layout and sent PDFs to Mark. reviewed layout with Mark. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (04/26/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-26 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 (04/26/18) First check spool drawing. Discussed options with Lam. (04/27/18) Final drawing check. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-27 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1.5 0 (04/23/18) Discussed drawing number standards with Tyler/Kyle. Added new tabs to drawing register. Checked drawings for Dan. (04/24/18) Checked drawings and info in drawing register. (04/26/18) Discussed machining tolerances with Tyler. (04/27/18) Checked drawings and updated progress sheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-27 ARBU-TSRs :ARBU-TSRs TSR-01648-ARBU Anchorage Office Plan Regular Pay N 3.5 0 (04/25/18) Discussed request with Mark. Started sketch of existing office space. (04/26/18) Received existing office dimensions and scaled plan. Started new layout in CH2MH space. (04/27/18) Cleaned up layout and sent PDFs to Mark. reviewed layout with Mark. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-27 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 (04/26/18) First check spool drawing. Discussed options with Lam. (04/27/18) Final drawing check. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-30 ARBU-TSRs :ARBU-TSRs TSR-01648-ARBU Anchorage Office Plan Regular Pay N 0.5 0 (04/30/18) Created CTR and submitted for review/approval. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 (04/30/18) Team meeting. NOV presentation (NOVOS) (05/02/18) 1st quarter earnings review. (05/03/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (04/30/18) Updated weekly timesheet and submitted for approval. Discussed drawing package and transmittal with Lam. (05/01/18) Cleaned up 209L archive folder (created new folders/moved files etc). (05/02/18) Reviewed Solidworks standards. (05/03/18) Discussed Liberty drawings with Kyle. (05/04/18) Created PDFs for Liberty files and uploaded. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-30 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 5.25 0 (04/30/18) Cont'd work pack drawings (diesel /base oil schematics). Updated corresponding ODPL files to show obsolete stamp. (05/01/18) Worked on drawings for WP-0048. Archived diesel/bas oil files on the Q. Searched for ref drawings - requested additional file. Updated tracking sheet. (05/02/18) Cont WP-0048 - reviewed with John. (05/03/18) Finalized WP-0048 drawings and issued. (05/04/18) WP-0154 drawing updates. Updated tracking sheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-04-30 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 (04/30/18) Final dwg check. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-01 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 3 0 (05/01/18) Cont'd checking drawings. (05/02/18) Reviewed CTR hours with Tyler. Cont'd checking. (05/03/18) Cont'd checking drawings and dwg register. Discussed redlines with Dan. (05/04/18) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (04/30/18) Updated weekly timesheet and submitted for approval. Discussed drawing package and transmittal with Lam. (05/01/18) Cleaned up 209L archive folder (created new folders/moved files etc). (05/02/18) Reviewed Solidworks standards. (05/03/18) Discussed Liberty drawings with Kyle. (05/04/18) Created PDFs for Liberty files and uploaded. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-01 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 5.5 0 (04/30/18) Cont'd work pack drawings (diesel /base oil schematics). Updated corresponding ODPL files to show obsolete stamp. (05/01/18) Worked on drawings for WP-0048. Archived diesel/bas oil files on the Q. Searched for ref drawings - requested additional file. Updated tracking sheet. (05/02/18) Cont WP-0048 - reviewed with John. (05/03/18) Finalized WP-0048 drawings and issued. (05/04/18) WP-0154 drawing updates. Updated tracking sheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-02 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2.5 0 (05/01/18) Cont'd checking drawings. (05/02/18) Reviewed CTR hours with Tyler. Cont'd checking. (05/03/18) Cont'd checking drawings and dwg register. Discussed redlines with Dan. (05/04/18) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 (04/30/18) Team meeting. NOV presentation (NOVOS) (05/02/18) 1st quarter earnings review. (05/03/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (04/30/18) Updated weekly timesheet and submitted for approval. Discussed drawing package and transmittal with Lam. (05/01/18) Cleaned up 209L archive folder (created new folders/moved files etc). (05/02/18) Reviewed Solidworks standards. (05/03/18) Discussed Liberty drawings with Kyle. (05/04/18) Created PDFs for Liberty files and uploaded. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-02 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 4 0 (04/30/18) Cont'd work pack drawings (diesel /base oil schematics). Updated corresponding ODPL files to show obsolete stamp. (05/01/18) Worked on drawings for WP-0048. Archived diesel/bas oil files on the Q. Searched for ref drawings - requested additional file. Updated tracking sheet. (05/02/18) Cont WP-0048 - reviewed with John. (05/03/18) Finalized WP-0048 drawings and issued. (05/04/18) WP-0154 drawing updates. Updated tracking sheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-03 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 3.5 0 (05/01/18) Cont'd checking drawings. (05/02/18) Reviewed CTR hours with Tyler. Cont'd checking. (05/03/18) Cont'd checking drawings and dwg register. Discussed redlines with Dan. (05/04/18) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (04/30/18) Team meeting. NOV presentation (NOVOS) (05/02/18) 1st quarter earnings review. (05/03/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (04/30/18) Updated weekly timesheet and submitted for approval. Discussed drawing package and transmittal with Lam. (05/01/18) Cleaned up 209L archive folder (created new folders/moved files etc). (05/02/18) Reviewed Solidworks standards. (05/03/18) Discussed Liberty drawings with Kyle. (05/04/18) Created PDFs for Liberty files and uploaded. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-03 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 3.25 0 (04/30/18) Cont'd work pack drawings (diesel /base oil schematics). Updated corresponding ODPL files to show obsolete stamp. (05/01/18) Worked on drawings for WP-0048. Archived diesel/bas oil files on the Q. Searched for ref drawings - requested additional file. Updated tracking sheet. (05/02/18) Cont WP-0048 - reviewed with John. (05/03/18) Finalized WP-0048 drawings and issued. (05/04/18) WP-0154 drawing updates. Updated tracking sheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (04/30/18) Updated weekly timesheet and submitted for approval. Discussed drawing package and transmittal with Lam. (05/01/18) Cleaned up 209L archive folder (created new folders/moved files etc). (05/02/18) Reviewed Solidworks standards. (05/03/18) Discussed Liberty drawings with Kyle. (05/04/18) Created PDFs for Liberty files and uploaded. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-04 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1 0 (05/03/18) Drawing package for TTOPCO (247/269). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-04 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 (05/03/18) Searched for BOP rail info - sent to Robbie. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-04 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2.5 0 (04/30/18) Cont'd work pack drawings (diesel /base oil schematics). Updated corresponding ODPL files to show obsolete stamp. (05/01/18) Worked on drawings for WP-0048. Archived diesel/bas oil files on the Q. Searched for ref drawings - requested additional file. Updated tracking sheet. (05/02/18) Cont WP-0048 - reviewed with John. (05/03/18) Finalized WP-0048 drawings and issued. (05/04/18) WP-0154 drawing updates. Updated tracking sheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-04 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 (05/03/18) Checked drawing. Discussed with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (05/07/18) Updated weekly timesheet and submitted for approval. Reviewed/approved designer's time. (05/08/18) Researched CAD printing issues and submitted IT ticket to resolve. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-07 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 (05/07/18) Researched material information for Dan C. Discussed with Kyle. (05/08/18) Researched 249/258 racking board info. (05/09/18) Discussed racking board chains with Dan Colby. Created padeye/chain sketch and send for info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-07 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4 0 (05/07/18) Started final redline drawing package from Tyler. (05/08/18) Worked on redlines. (05/10/18) Worked on redlines. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-07 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2 0 (05/07/18) Archived completed WP drawings and clean up working folders. Printed next electrical wp and discussed with John. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-08 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2.5 0 (05/08/18) Continued checking drawing package. (05/09/18) Continued checking drawing package. (05/10/18) Checking (05/11/18) Checking Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (05/08/18) Team meeting. (05/10/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (05/07/18) Updated weekly timesheet and submitted for approval. Reviewed/approved designer's time. (05/08/18) Researched CAD printing issues and submitted IT ticket to resolve. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-08 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 (05/07/18) Researched material information for Dan C. Discussed with Kyle. (05/08/18) Researched 249/258 racking board info. (05/09/18) Discussed racking board chains with Dan Colby. Created padeye/chain sketch and send for info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-08 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3 0 (05/07/18) Started final redline drawing package from Tyler. (05/08/18) Worked on redlines. (05/10/18) Worked on redlines. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-09 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 3 0 (05/08/18) Continued checking drawing package. (05/09/18) Continued checking drawing package. (05/10/18) Checking (05/11/18) Checking Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-09 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 5.5 0 (05/07/18) Researched material information for Dan C. Discussed with Kyle. (05/08/18) Researched 249/258 racking board info. (05/09/18) Discussed racking board chains with Dan Colby. Created padeye/chain sketch and send for info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-09 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 (05/08/18) Checked new spool drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-10 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2.5 0 (05/08/18) Continued checking drawing package. (05/09/18) Continued checking drawing package. (05/10/18) Checking (05/11/18) Checking Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (05/08/18) Team meeting. (05/10/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-10 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 (05/10/18) Discussed HP mud spool with Chad T. (05/11/18) HP spool sketch. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-10 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 5 0 (05/07/18) Started final redline drawing package from Tyler. (05/08/18) Worked on redlines. (05/10/18) Worked on redlines. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-11 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 3 0 (05/08/18) Continued checking drawing package. (05/09/18) Continued checking drawing package. (05/10/18) Checking (05/11/18) Checking Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-11 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2 0 (05/10/18) Discussed HP mud spool with Chad T. (05/11/18) HP spool sketch. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-14 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 4.5 0 (05/14/18) Checking drawing package. (05/15/18) Checking. (05/17/18) Checking. (05/18/18) Checking. Discussed final package with Tyler and Dan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (05/14/18) Team meeting. (05/17/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-14 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 4 0 (05/14/18) Searched for bilge pump information per request from Robbie B. (257) (05/16/18) Worked on 257B safety plan and new life boat layout drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-15 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2.5 0 (05/14/18) Checking drawing package. (05/15/18) Checking. (05/17/18) Checking. (05/18/18) Checking. Discussed final package with Tyler and Dan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (05/15/18) Updated weekly timesheet and submitted for approval. Discussed TSR progress with Kyle. Approved designers timsheets. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-15 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.5 0 (05/15/18) Discussed steel grade/welding info with Kyle. 249 request from Dan C. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-15 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3.5 0 (05/15/18) Continued with redline drawings. Updated drawing register to reflect new drawings. Sent clarification email to Leroy. (05/16/18) Continued work on redlines. (05/17/18) Continued work on safety plans for 257B. Sent to Robbie for review. (05/18/18) New redlines for safety plans-257. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-15 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.25 0 (05/15/18) Sent clarification email for electrical redlines. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-15 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 (05/15/18) Archived piping drawing files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-15 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.25 0 (05/15/18) Archived drawing files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-16 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 (05/16/18) Office safety course. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 (05/16/18) Back checked Orlan choke support revisions. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-16 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 6 0 (05/14/18) Searched for bilge pump information per request from Robbie B. (257) (05/16/18) Worked on 257B safety plan and new life boat layout drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-16 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1.5 0 (05/15/18) Continued with redline drawings. Updated drawing register to reflect new drawings. Sent clarification email to Leroy. (05/16/18) Continued work on redlines. (05/17/18) Continued work on safety plans for 257B. Sent to Robbie for review. (05/18/18) New redlines for safety plans-257. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-17 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1.5 0 (05/14/18) Checking drawing package. (05/15/18) Checking. (05/17/18) Checking. (05/18/18) Checking. Discussed final package with Tyler and Dan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (05/14/18) Team meeting. (05/17/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-17 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 6.75 0 (05/14/18) Searched for bilge pump information per request from Robbie B. (257) (05/16/18) Worked on 257B safety plan and new life boat layout drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-18 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2 0 (05/14/18) Checking drawing package. (05/15/18) Checking. (05/17/18) Checking. (05/18/18) Checking. Discussed final package with Tyler and Dan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-18 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1 0 (05/18/18) Checked HP spool drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-18 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3 0 (05/14/18) Searched for bilge pump information per request from Robbie B. (257) (05/16/18) Worked on 257B safety plan and new life boat layout drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (05/21/18) Updated weekly timesheet and submitted for approval. (05/23/18) Discussed open design position with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-21 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 (05/21/18) Updated lifeboat sketch. (05/22/18) Additional update to show rollers. Researched vendors Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-21 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 7 0 (05/21/18) Continued package clean up. Updated progress tracking sheet. (05/22/18) discussed drawings with Tyler and continued clean up. (05/24/18) Started printing final drawings for review. (05/25/18) Finished printing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (05/22/18) Team meeting. (05/24/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-22 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 (05/21/18) Updated lifeboat sketch. (05/22/18) Additional update to show rollers. Researched vendors Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-22 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 6.5 0 (05/21/18) Continued package clean up. Updated progress tracking sheet. (05/22/18) discussed drawings with Tyler and continued clean up. (05/24/18) Started printing final drawings for review. (05/25/18) Finished printing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-23 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 8.5 0 (05/23/18) Continued checking final drawings. Reviewed redlines with Dan. (05/24/18) Cont checking. (05/25/18) Checking - main assembly drawing/last sub assembly. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (05/21/18) Updated weekly timesheet and submitted for approval. (05/23/18) Discussed open design position with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-24 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 5.5 0 (05/23/18) Continued checking final drawings. Reviewed redlines with Dan. (05/24/18) Cont checking. (05/25/18) Checking - main assembly drawing/last sub assembly. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (05/22/18) Team meeting. (05/24/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-24 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 0.5 0 (05/21/18) Continued package clean up. Updated progress tracking sheet. (05/22/18) discussed drawings with Tyler and continued clean up. (05/24/18) Started printing final drawings for review. (05/25/18) Finished printing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-24 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2.5 0 (05/24/18) Checked LP schematic and piping arrangements. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-25 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 5.5 0 (05/23/18) Continued checking final drawings. Reviewed redlines with Dan. (05/24/18) Cont checking. (05/25/18) Checking - main assembly drawing/last sub assembly. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-25 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 0.5 0 (05/21/18) Continued package clean up. Updated progress tracking sheet. (05/22/18) discussed drawings with Tyler and continued clean up. (05/24/18) Started printing final drawings for review. (05/25/18) Finished printing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-28 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (05/29/18) Team meeting. Call with Dan Colby to discuss open MOC request. (05/31/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (05/29/18) Discussed TSR status with Kyle. (05/30/18) Updated weekly timesheet and submitted for approval. (05/31/18) Discussed Dan's offboarding with Kyle. (06/01/18) Approved Dan's timesheet. Approved offboarding request. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-29 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 7.5 0 (05/29/18) Started cellar cover layout. Discussed with Benny. (05/30/18) Continued with drawing. (05/31/18) Cont drawing. (06/01/18) Added hinged hatch and removed handrails. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (05/29/18) Discussed TSR status with Kyle. (05/30/18) Updated weekly timesheet and submitted for approval. (05/31/18) Discussed Dan's offboarding with Kyle. (06/01/18) Approved Dan's timesheet. Approved offboarding request. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-30 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 8 0 (05/29/18) Started cellar cover layout. Discussed with Benny. (05/30/18) Continued with drawing. (05/31/18) Cont drawing. (06/01/18) Added hinged hatch and removed handrails. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (05/29/18) Team meeting. Call with Dan Colby to discuss open MOC request. (05/31/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (05/29/18) Discussed TSR status with Kyle. (05/30/18) Updated weekly timesheet and submitted for approval. (05/31/18) Discussed Dan's offboarding with Kyle. (06/01/18) Approved Dan's timesheet. Approved offboarding request. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-05-31 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 7.25 0 (05/29/18) Started cellar cover layout. Discussed with Benny. (05/30/18) Continued with drawing. (05/31/18) Cont drawing. (06/01/18) Added hinged hatch and removed handrails. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (05/29/18) Discussed TSR status with Kyle. (05/30/18) Updated weekly timesheet and submitted for approval. (05/31/18) Discussed Dan's offboarding with Kyle. (06/01/18) Approved Dan's timesheet. Approved offboarding request. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-01 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 5.5 0 (05/29/18) Started cellar cover layout. Discussed with Benny. (05/30/18) Continued with drawing. (05/31/18) Cont drawing. (06/01/18) Added hinged hatch and removed handrails. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-04 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 (06/04/18) Started new 258L layouts for BP proposal. (06/05/18) Cont layouts. Sent drawings to George. (06/06/18) Discussed drawings with George. Created new matting drawing and sent updates to GW. (06/08/18) Researched new 18 3/4" BOP information for drawing layout. Started drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-04 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 9 0 (06/04/18) continued on cover drawing. (06/05/18) Call with Benny to review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (06/05/18) Team meeting. (06/07/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (06/05/18) Updated weekly timesheet and submitted for approval. (06/06/18) Discussed software package/install info with Lam. (06/07/18) Researched safety/IMS topic for weekly meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-05 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 7 0 (06/04/18) Started new 258L layouts for BP proposal. (06/05/18) Cont layouts. Sent drawings to George. (06/06/18) Discussed drawings with George. Created new matting drawing and sent updates to GW. (06/08/18) Researched new 18 3/4" BOP information for drawing layout. Started drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-05 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 0.5 0 (06/04/18) continued on cover drawing. (06/05/18) Call with Benny to review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-06 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.25 0 (06/06/18) Archived drawing files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 (06/05/18) Updated weekly timesheet and submitted for approval. (06/06/18) Discussed software package/install info with Lam. (06/07/18) Researched safety/IMS topic for weekly meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-06 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 (06/04/18) Started new 258L layouts for BP proposal. (06/05/18) Cont layouts. Sent drawings to George. (06/06/18) Discussed drawings with George. Created new matting drawing and sent updates to GW. (06/08/18) Researched new 18 3/4" BOP information for drawing layout. Started drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-06 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 5.25 0 (06/07/18) Started on final redline comments. (06/08/18) Cont redlines. (06/09/18) Cont redlines. Created binder. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-06 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.25 0 (06/06/18) Archived drawing files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (06/05/18) Team meeting. (06/07/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (06/05/18) Updated weekly timesheet and submitted for approval. (06/06/18) Discussed software package/install info with Lam. (06/07/18) Researched safety/IMS topic for weekly meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-07 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 2 0 (06/07/18) Started on final redline comments. (06/08/18) Cont redlines. (06/09/18) Cont redlines. Created binder. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-07 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1 0 (06/07/18) Checked revised drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-07 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 4 0 (06/07/18) Worked on electrical redlines and discussed with Sachin. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-08 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3.5 0 (06/04/18) Started new 258L layouts for BP proposal. (06/05/18) Cont layouts. Sent drawings to George. (06/06/18) Discussed drawings with George. Created new matting drawing and sent updates to GW. (06/08/18) Researched new 18 3/4" BOP information for drawing layout. Started drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-08 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3 0 (06/07/18) Started on final redline comments. (06/08/18) Cont redlines. (06/09/18) Cont redlines. Created binder. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-11 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 0.25 0 (06/11/18) Checked drawing revision. (06/12/18) Archived drawings on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (06/11/18) Team meeting. (06/14/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (06/11/18)Updated weekly timesheet and submitted for approval. researched payroll issue for Dan. (06/13/18) Reviewed Engineering drawing number standards for IMS. (06/14/18) Pulled ref drawings for Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-11 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 6.75 0 (06/11/18) Revised 18-3/4" BOP and sent to George. Searched for additional RCD information. Discussed BOP weights with Kyle. Created CTR. (06/12/18) Layouts/heights for BOP - George. (06/13/18) Searched for historical cost info (256 skidding) for reference. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-11 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 0.25 0 (06/11/18) Archived drawings on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-12 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 0.25 0 (06/11/18) Checked drawing revision. (06/12/18) Archived drawings on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-12 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 4 0 (06/11/18) Revised 18-3/4" BOP and sent to George. Searched for additional RCD information. Discussed BOP weights with Kyle. Created CTR. (06/12/18) Layouts/heights for BOP - George. (06/13/18) Searched for historical cost info (256 skidding) for reference. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-12 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 2.75 0 (06/12/18) Worked on redlines. (06/13/18) Worked on redlines. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-12 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 2 0 (06/12/18) Finalized CTR and submitted. Discussed drawing with John. (06/13/18) Calc weights for John (06/14/18) Worked on final drawing details. (06/15/18) Finished bom and details. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (06/11/18)Updated weekly timesheet and submitted for approval. researched payroll issue for Dan. (06/13/18) Reviewed Engineering drawing number standards for IMS. (06/14/18) Pulled ref drawings for Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-13 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 8 0 (06/12/18) Worked on redlines. (06/13/18) Worked on redlines. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-13 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 0.5 0 (06/12/18) Finalized CTR and submitted. Discussed drawing with John. (06/13/18) Calc weights for John (06/14/18) Worked on final drawing details. (06/15/18) Finished bom and details. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (06/11/18) Team meeting. (06/14/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (06/11/18)Updated weekly timesheet and submitted for approval. researched payroll issue for Dan. (06/13/18) Reviewed Engineering drawing number standards for IMS. (06/14/18) Pulled ref drawings for Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-14 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 7.25 0 (06/12/18) Finalized CTR and submitted. Discussed drawing with John. (06/13/18) Calc weights for John (06/14/18) Worked on final drawing details. (06/15/18) Finished bom and details. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-15 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 5 0 (06/12/18) Finalized CTR and submitted. Discussed drawing with John. (06/13/18) Calc weights for John (06/14/18) Worked on final drawing details. (06/15/18) Finished bom and details. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 (06/18/18) Updated weekly timesheet and submitted for approval. Discussed bid/proposal process with Lam as part of 2018 SMART goals. Started cleanup of 273L work-in-progress folders in preparation for archiving. (06/19/18) Printed 18' goals and reviewed for discussion. Cont 273L archiving. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-18 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1.5 0 (06/19/18) Researched 272L HP piping information and discussed with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-18 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 5 0 (06/18/18) Discussed 269 substructure/wellhead clearance with Bernie. Created a sketch and sent it for information. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (06/19/18) Mid year review discussion. (06/20/18) Mid year review with Lam. (06/21/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 (06/18/18) Updated weekly timesheet and submitted for approval. Discussed bid/proposal process with Lam as part of 2018 SMART goals. Started cleanup of 273L work-in-progress folders in preparation for archiving. (06/19/18) Printed 18' goals and reviewed for discussion. Cont 273L archiving. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-19 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2 0 (06/19/18) Checking - condensate drawings. (06/22/18) Checked new drawing set for condensate changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-19 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 2 0 (06/19/18) Discussed drawing changes with Kyle - searched for lift point drawing. (06/20/18) Added new lift points and updated sheets. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (06/19/18) Mid year review discussion. (06/20/18) Mid year review with Lam. (06/21/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-20 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 2 0 (06/20/18) MOC discussion with Kyle. Pulled reference info. (06/21/18) Discussed 216 substructure info with Kyle. Searched for info. (06/22/18) Started 249L crown post drawing. Call with Dan C. to discuss open MOC/TSRs. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-20 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 6 0 (06/19/18) Discussed drawing changes with Kyle - searched for lift point drawing. (06/20/18) Added new lift points and updated sheets. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (06/19/18) Mid year review discussion. (06/20/18) Mid year review with Lam. (06/21/18) Weekly TSR meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-21 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1.5 0 (06/20/18) MOC discussion with Kyle. Pulled reference info. (06/21/18) Discussed 216 substructure info with Kyle. Searched for info. (06/22/18) Started 249L crown post drawing. Call with Dan C. to discuss open MOC/TSRs. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-21 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 6.5 0 (06/21/18) Scanned 30B drawing binder. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-22 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 4.5 0 (06/20/18) MOC discussion with Kyle. Pulled reference info. (06/21/18) Discussed 216 substructure info with Kyle. Searched for info. (06/22/18) Started 249L crown post drawing. Call with Dan C. to discuss open MOC/TSRs. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-22 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1.5 0 (06/19/18) Checking - condensate drawings. (06/22/18) Checked new drawing set for condensate changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (06/25/18) Updated weekly timesheet. retyped timesheet info due to projxsense issues. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-25 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1.25 0 (06/25/18) Cleaned up scans. Archived drawings on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-25 Rig 216L-TSR :Rig 216L-TSR TSR-01659-216L Spreader Bar Regular Pay N 6.25 0 (06/25/18) Reviewed scope for TSR and pulled ref info. Started drawing. (06/26/18) Cont drawing. (06/27/18) Cont drawing. (06/28/18) Finalized drawing and created CTR. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-26 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.5 0 (06/26/18) Searched for 216L lift plans. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-26 Rig 216L-TSR :Rig 216L-TSR TSR-01659-216L Spreader Bar Regular Pay N 8.5 0 (06/25/18) Reviewed scope for TSR and pulled ref info. Started drawing. (06/26/18) Cont drawing. (06/27/18) Cont drawing. (06/28/18) Finalized drawing and created CTR. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-27 Rig 216L-TSR :Rig 216L-TSR TSR-01659-216L Spreader Bar Regular Pay N 9 0 (06/25/18) Reviewed scope for TSR and pulled ref info. Started drawing. (06/26/18) Cont drawing. (06/27/18) Cont drawing. (06/28/18) Finalized drawing and created CTR. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-28 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-28 Rig 216L-TSR :Rig 216L-TSR TSR-01659-216L Spreader Bar Regular Pay N 5 0 (06/25/18) Reviewed scope for TSR and pulled ref info. Started drawing. (06/26/18) Cont drawing. (06/27/18) Cont drawing. (06/28/18) Finalized drawing and created CTR. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-06-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (07/02/18) Team meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 7.5 0 (07/02/18) Updated weekly timesheet and submitted. Continued clean up effort/archiving for 273 work-in-progress folders (drawings). (07/03/18) Cont'd 273 archiving. (07/05/18) Archived Canrig TD files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-02 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1 0 (07/02/18) Updated PDF files and discussed package with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 8.5 0 (07/02/18) Updated weekly timesheet and submitted. Continued clean up effort/archiving for 273 work-in-progress folders (drawings). (07/03/18) Cont'd 273 archiving. (07/05/18) Archived Canrig TD files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-03 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 (07/03/18) Revised CG drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (07/02/18) Updated weekly timesheet and submitted. Continued clean up effort/archiving for 273 work-in-progress folders (drawings). (07/03/18) Cont'd 273 archiving. (07/05/18) Archived Canrig TD files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-05 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6.75 0 (07/05/18) 269l site layout for Mat Ellis. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-05 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2 0 (07/05/18) Searched for 269L fuel tank info per field request. discussed 269L temp choke manifold replacement with George. (07/06/18) Started choke manifold replacement layout. Discussed with George. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2018-07-06 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 5.5 0 (07/05/18) Searched for 269L fuel tank info per field request. discussed 269L temp choke manifold replacement with George. (07/06/18) Started choke manifold replacement layout. Discussed with George. Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-02-13 2M-TEK :2M-TEK 1016 PO 0209404, 0409405-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-02-13 2M-TEK :2M-TEK 1016 PO 0209404, 0409405-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-02-14 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-02-14 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-02-15 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-02-15 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-02-16 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-02-16 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-02-17 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-02-20 2M-TEK :2M-TEK -OH-004 Holiday Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-02-21 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Both VF-7 mills worked on this job all week. Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-02-21 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Both VF-7 mills worked on this job all week. Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-02-22 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Both VF-7 mills worked on this job all week. Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-02-22 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Both VF-7 mills worked on this job all week. Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-02-23 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Both VF-7 mills worked on this job all week. Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-02-23 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Both VF-7 mills worked on this job all week. Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-02-24 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Both VF-7 mills worked on this job all week. Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-02-24 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Both VF-7 mills worked on this job all week. Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-02-27 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-02-27 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-02-28 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-02-28 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-01 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-01 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-02 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-02 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-03 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-06 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-06 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-07 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-07 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-08 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-08 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-09 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-09 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-10 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-13 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-13 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-14 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-14 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-15 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-15 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-16 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-16 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-17 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-20 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-20 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-21 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-21 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-22 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-22 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-23 2M-TEK :2M-TEK 1021 PO 0209403(Batch1)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-23 2M-TEK :2M-TEK 1021 PO 0209403(Batch1)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-24 2M-TEK :2M-TEK 1021 PO 0209403(Batch1)-WS Regular Pay N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-24 2M-TEK :2M-TEK 1031 R&S 13-3/8” Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-27 2M-TEK :2M-TEK 1031 R&S 13-3/8” Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-27 2M-TEK :2M-TEK 1031 R&S 13-3/8” Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-28 2M-TEK :2M-TEK 1031 R&S 13-3/8” Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-28 2M-TEK :2M-TEK 1031 R&S 13-3/8” Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-29 2M-TEK :2M-TEK 1031 R&S 13-3/8” Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-29 2M-TEK :2M-TEK 1031 R&S 13-3/8” Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-30 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-30 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-30 2M-TEK :2M-TEK 1031 R&S 13-3/8” Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-30 2M-TEK :2M-TEK 1031 R&S 13-3/8” Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-31 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-03-31 2M-TEK :2M-TEK 1031 R&S 13-3/8” Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-03 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-03 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-03 2M-TEK :2M-TEK 1031 R&S 13-3/8” Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-03 2M-TEK :2M-TEK 1031 R&S 13-3/8” Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-04 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-04 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-04 2M-TEK :2M-TEK 1031 R&S 13-3/8” Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-04 2M-TEK :2M-TEK 1031 R&S 13-3/8” Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-05 2M-TEK :2M-TEK 1031 R&S 13-3/8” Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-05 2M-TEK :2M-TEK 1031 R&S 13-3/8” Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-06 2M-TEK :2M-TEK 1031 R&S 13-3/8” Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-06 2M-TEK :2M-TEK 1031 R&S 13-3/8” Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-07 2M-TEK :2M-TEK 1031 R&S 13-3/8” Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-09 2M-TEK :2M-TEK 1031 R&S 13-3/8” Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-09 2M-TEK :2M-TEK 1031 R&S 13-3/8” Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-11 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-11 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-12 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-12 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-13 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 6 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-14 2M-TEK :2M-TEK -OH-004 Holiday Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-17 2M-TEK :2M-TEK -OH-003 PTO Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-18 2M-TEK :2M-TEK -OH-003 PTO Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-19 2M-TEK :2M-TEK -OH-003 PTO Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-20 2M-TEK :2M-TEK -OH-003 PTO Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-21 2M-TEK :2M-TEK -OH-003 PTO Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-24 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-24 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-25 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-25 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-26 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-26 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-27 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-27 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-04-28 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-05-01 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-05-01 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-05-02 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-05-02 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-05-03 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-05-04 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-05-04 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-05-05 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-05-08 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-05-08 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-05-09 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-05-09 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-05-10 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-05-10 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-05-11 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-05-11 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Overtime Rate N 2 0 Gaudet, Jarett Machinist Gaudet, Jarett:Machinist 2017-05-12 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New year Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1.Weekly Kanban meetings 2. Technical services meeting by Gary Rich 3. Weekly update meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-03 OH-032 :OH-032 Overhead All Activities Regular Pay N 7 0 Load List standard Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-04 OH-032 :OH-032 Overhead All Activities Regular Pay N 8 0 Load List standard Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1.Weekly Kanban meetings 2. Technical services meeting by Gary Rich 3. Weekly update meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-05 OH-032 :OH-032 Overhead All Activities Regular Pay N 7 0 Load List standard Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 1.Weekly Kanban meetings 2. Technical services meeting by Gary Rich 3. Weekly update meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-06 OH-032 :OH-032 Overhead All Activities Regular Pay N 6 0 Load List standard Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1.Weekly Kanban meetings 2. Weekly update meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-09 Rig 270L-TSR :Rig 270L-TSR TSR-01528-270L Odoptu Cellar Covers-closed Regular Pay N 7 0 TSR Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 1.completing of performance Evaluation form . 2. Learning to do closeout, 3. Learning to do hours summary 4 Lear to do updating TSR work sheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 1.completing of performance Evaluation form . 2. Learning to do closeout, 3. Learning to do hours summary 4 Lear to do updating TSR work sheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-11 Rig 270L-TSR :Rig 270L-TSR TSR-01528-270L Odoptu Cellar Covers-closed Regular Pay N 1 0 TSR Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1.Weekly Kanban meetings 2. Weekly update meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 1.completing of performance Evaluation form . 2. Learning to do closeout, 3. Learning to do hours summary 4 Lear to do updating TSR work sheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 1.completing of performance Evaluation form . 2. Learning to do closeout, 3. Learning to do hours summary 4 Lear to do updating TSR work sheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-16 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 2 0 1. Odoptu P209 question and quotes for SCR notching issue. 2, Quotes for new voltage regulator , CVT. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban meeting 2. Weekly department update meeting. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 5 0 1. Updating learning TSR spreadsheet. 2. Closing TSR general query for 2016 . Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-17 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 2 0 1. Odoptu P209 question and quotes for SCR notching issue. 2, Quotes for new voltage regulator , CVT. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 1. Updating learning TSR spreadsheet. 2. Closing TSR general query for 2016 . Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-18 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 2 0 1. Odoptu P209 question and quotes for SCR notching issue. 2, Quotes for new voltage regulator , CVT. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 1. Updating learning TSR spreadsheet. 2. Closing TSR general query for 2016 . Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-19 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 2 0 1. Odoptu P209 question and quotes for SCR notching issue. 2, Quotes for new voltage regulator , CVT. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban meeting 2. Weekly department update meeting. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 5 0 1. Updating learning TSR spreadsheet. 2. Closing TSR general query for 2016 . Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 1. Updating learning TSR spreadsheet. 2. Closing TSR general query for 2016 . Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Updating resume Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-23 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 2 0 1. Odoptu P209 question and quotes for SCR notching issue. 2, Quotes for new voltage regulator , CVT. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban Board update meeting 2. Vendor SSAB meeting 3. HDI vendor visit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 5 0 1. Resume update 2. HDI pressure gauge research 3. Odoptu power SCR notching issue. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-24 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 2 0 1. Odoptu P209 question and quotes for SCR notching issue. 2, Quotes for new voltage regulator , CVT. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 1. Resume update 2. HDI pressure gauge research 3. Odoptu power SCR notching issue. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-25 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 2 0 1. Odoptu P209 question and quotes for SCR notching issue. 2, Quotes for new voltage regulator , CVT. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-25 ARBU-TSRs :ARBU-TSRs TSR-01534-ARBU 1st Quarter 2017 General Query - Alaska Regular Pay N 1 0 1. HDI pressure gauge swap question. Sent drawings and additional information. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban Board update meeting 2. Vendor SSAB meeting 3. HDI vendor visit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 1. Resume update 2. HDI pressure gauge research 3. Odoptu power SCR notching issue. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 TSR Tracker Update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-26 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 2 0 1. Odoptu P209 question and quotes for SCR notching issue. 2, Quotes for new voltage regulator , CVT. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 1. Kanban Board update meeting 2. Vendor SSAB meeting 3. HDI vendor visit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 1. Resume update 2. HDI pressure gauge research 3. Odoptu power SCR notching issue. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 TSR Tracker Update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 5 0 1. Resume update 2. HDI pressure gauge research 3. Odoptu power SCR notching issue. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 Business Development SWOT analysis Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-30 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 1 0 1, Sola HD transformer inspection. 2. review quote for UPS and voltage regulators. 3. Support for lighting issue on Odoptu. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Sprint team Meeting 2. Weekly TS meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 1. technical research on Heat Trace. 2. Technical research Chalmit lighting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Ordering Shirts for TS . Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-01-31 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 8 0 1, Sola HD transformer inspection. 2. review quote for UPS and voltage regulators. 3. Support for lighting issue on Odoptu. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-01 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 1 0 1, Sola HD transformer inspection. 2. review quote for UPS and voltage regulators. 3. Support for lighting issue on Odoptu. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 1. technical research on Heat Trace. 2. Technical research Chalmit lighting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Ordering Shirts for TS . Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-01 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Source Electrical Lunch and Learn, training. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-02 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 1 0 1, Sola HD transformer inspection. 2. review quote for UPS and voltage regulators. 3. Support for lighting issue on Odoptu. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Sprint team Meeting 2. Weekly TS meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 5 0 1. technical research on Heat Trace. 2. Technical research Chalmit lighting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 1. updating TSR spread sheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-03 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 1 0 1, Sola HD transformer inspection. 2. review quote for UPS and voltage regulators. 3. Support for lighting issue on Odoptu. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-03 Berkut-TSR :Berkut-TSR TSR-01541-BERP Gravel Bypass Line (Electrical) Regular Pay N 1 0 study scope of work and creat CTR. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-03 OH-013 :OH-013 Overhead All Activities Regular Pay N 6 0 1. updating TSR spread sheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-06 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 2 0 1. Support for lighting fixture issue on Odoptu. 2. Get quote on UPS Square D distribution panel. 3. get quote on the Chalmit light fixture. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-06 Berkut-TSR :Berkut-TSR TSR-01541-BERP Gravel Bypass Line (Electrical) Regular Pay N 2 0 1. heat Trace deign review. 2. Consult with Thermon to confirm part numbers. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Sprint team Meeting 2. Weekly TS meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 1. Heat Trace Study / research 2. Square D panel research 3. Chalmit light research. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-07 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 2 0 1. Support for lighting fixture issue on Odoptu. 2. Get quote on UPS Square D distribution panel. 3. get quote on the Chalmit light fixture. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 1. Heat Trace Study / research 2. Square D panel research 3. Chalmit light research. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-08 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 2 0 1. Support for lighting fixture issue on Odoptu. 2. Get quote on UPS Square D distribution panel. 3. get quote on the Chalmit light fixture. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-08 Berkut-TSR :Berkut-TSR TSR-01541-BERP Gravel Bypass Line (Electrical) Regular Pay N 2 0 1. heat Trace deign review. 2. Consult with Thermon to confirm part numbers. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Move to 5th Floor Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-08 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 1. Update TSR tracking sheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-09 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 1. First Aid Training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-10 Berkut-TSR :Berkut-TSR TSR-01541-BERP Gravel Bypass Line (Electrical) Regular Pay N 4 0 1. heat Trace deign review. 2. Consult with Thermon to confirm part numbers. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Move to 5th Floor Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 1. Weekly update meeting 2. Safety Moment 3. Quarterly result meeting 4. Oracle training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 1. Moving and sorting files 2. Updating CV and performance evaluation in system. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1, Bids for Chalmit light for 209. 2. Research on lighting issue . Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-14 Berkut-TSR :Berkut-TSR TSR-01541-BERP Gravel Bypass Line (Electrical) Regular Pay N 4 0 1. heat Trace design review 2. TSR closeout. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 1, Bids for Chalmit light for 209. 2. Research on lighting issue . Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-15 Berkut-TSR :Berkut-TSR TSR-01541-BERP Gravel Bypass Line (Electrical) Regular Pay N 4 0 1. heat Trace design review 2. TSR closeout. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 1. Moving and sorting files 2. Updating CV and performance evaluation in system. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 1. Weekly update meeting 2. Safety Moment 3. Quarterly result meeting 4. Oracle training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-16 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 1. New NOV NOVOS system meeting and research. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 1 Reasearch on New TSR for Berkut 1546. 2. Grounding standard update. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-20 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Presidents day Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-21 Berkut-TSR :Berkut-TSR TSR-01541-BERP Gravel Bypass Line (Electrical) Regular Pay N 4 0 TSR Closeout. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 1. Grounding Procedure . Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-22 Berkut-TSR :Berkut-TSR TSR-01546-BER Trip tank feed line flushing (electrical) Regular Pay N 6 0 1. Drawing review of Trip tank Flushing line. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 1. Grounding Procedure . Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TS meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 Tracker update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-23 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Sakhalin meeting , conf call Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Research heat trace design and shut off valve design. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-23 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 2 0 Meeting and understanding scope of work . Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-24 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Research heat trace design and shut off valve design. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-24 Rig 209L-TSR :Rig 209L-TSR TSR-01539-209L Deisel Day Tank Shut-Off Valves Regular Pay N 4 0 1. Review of drawing Diesel shut off valve Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-24 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 2 0 Meeting and understanding scope of work . Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-27 Berkut-TSR :Berkut-TSR TSR-01546-BER Trip tank feed line flushing (electrical) Regular Pay N 2 0 Heat Trace Line TSR Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban Board meeting 2. Weekly TSR Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-27 Rig 209L-TSR :Rig 209L-TSR TSR-01539-209L Deisel Day Tank Shut-Off Valves Regular Pay N 5 0 1. TSR design and MTO review 2. Redline MTO and design drawing Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-02-28 Rig 209L-TSR :Rig 209L-TSR TSR-01539-209L Deisel Day Tank Shut-Off Valves Regular Pay N 8 0 1. TSR design and MTO review 2. Redline MTO and design drawing Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR tracker update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-01 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 1. Vendor meeting HDI 2. ACS vendor meet. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-01 Rig 209L-TSR :Rig 209L-TSR TSR-01539-209L Deisel Day Tank Shut-Off Valves Regular Pay N 6 0 1. TSR design and MTO review 2. Redline MTO and design drawing Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban Board meeting 2. Weekly TSR Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-02 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 1. Vendor meeting HDI 2. ACS vendor meet. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-02 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Sakhalin Call Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 Research for TSR 1539 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Area Class research API 505 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-03 Rig 209L-TSR :Rig 209L-TSR TSR-01539-209L Deisel Day Tank Shut-Off Valves Regular Pay N 7 0 1. TSR design and MTO review 2. Redline MTO and design drawing Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR update meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-06 Rig 209L-TSR :Rig 209L-TSR TSR-01539-209L Deisel Day Tank Shut-Off Valves Regular Pay N 4 0 TSR Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-06 Rig 272L-TSR :Rig 272L-TSR TSR-01551-272L Mud Pump Room Area Clarification Regular Pay N 3 0 1. review of 272 area classification design 2. Updating CAD drawing to change classification boundary. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-07 Rig 272L-TSR :Rig 272L-TSR TSR-01551-272L Mud Pump Room Area Clarification Regular Pay N 8 0 1. review of 272 area classification design 2. Updating CAD drawing to change classification boundary. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-08 Rig 272L-TSR :Rig 272L-TSR TSR-01551-272L Mud Pump Room Area Clarification Regular Pay N 8 0 1. review of 272 area classification design 2. Updating CAD drawing to change classification boundary. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-09 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 8 0 1.Visit to 2Mtek location. 2. Training for Top Tek and Torq Tek system assembly and testing. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-10 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 8 0 1.Visit to 2Mtek location. 2. Training for Top Tek and Torq Tek system assembly and testing. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-13 Berkut-TSR :Berkut-TSR TSR-01546-BER Trip tank feed line flushing (electrical) Regular Pay N 7 0 Heat Trace design review. TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting , Kanban meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-14 2M Tek :2M Tek TSR-01483-2M-TEK Hydraulic Acuator Engineering Support Regular Pay N 4 0 TSR closeout and final report. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-14 Berkut-TSR :Berkut-TSR TSR-01546-BER Trip tank feed line flushing (electrical) Regular Pay N 4 0 Heat Trace design review. TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-15 Rig 231L-TSR :Rig 231L-TSR TSR-01555-231L Skidding Package Regular Pay N 8 0 Design review and research on cable types. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-16 Berkut-TSR :Berkut-TSR TSR-01546-BER Trip tank feed line flushing (electrical) Regular Pay N 1 0 Heat Trace design review. TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting , Kanban meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 TSR worksheet Update and error resolution Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 API 505 I study to check DSM design Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-17 Rig 209L-TSR :Rig 209L-TSR TSR-01558-209L DSM Hazardous Area Classification Regular Pay N 8 0 Design review of DSM area classification. Generated RFI to clarify concerns and possible changes . Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-20 2M Tek :2M Tek TSR-01483-2M-TEK Hydraulic Acuator Engineering Support Regular Pay N 2 0 TSR -Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 1. TSR update meeting 2. Weekly Technical Services meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-20 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 4 0 Rig Documentation asset numbering Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 Study for Area classification and cable sizing, voltage drop Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-21 Rig 231L-TSR :Rig 231L-TSR TSR-01555-231L Skidding Package Regular Pay N 4 0 1.TSR- CTR generation 2. Voltage drop calculations 3. MR review 4. TSR closeout. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-22 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 Updating , rectifying formulas in TSR worksheet. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-22 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 6 0 Rig Documentation asset numbering Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. TSR update meeting 2. Weekly Technical Services meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Updating , rectifying formulas in TSR worksheet. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Study for Area classification and cable sizing, voltage drop Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-23 Rig 231L-TSR :Rig 231L-TSR TSR-01555-231L Skidding Package Regular Pay N 4 0 1.TSR- CTR generation 2. Voltage drop calculations 3. MR review 4. TSR closeout. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-24 Rig 231L-TSR :Rig 231L-TSR TSR-01555-231L Skidding Package Regular Pay N 8 0 1.TSR- CTR generation 2. Voltage drop calculations 3. MR review 4. TSR closeout. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1.TSR review meeting 2. Weekly TS meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 7 0 1. GAP Analysis of customer requirements for bid purpose. RIG -226 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-28 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 226 Gap Analysis Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-29 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 TSR Tracker document update. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-29 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Engineering documents support. 2. Research on Area class standard 3. 270 Documentation research. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 1.TSR review meeting 2. Weekly TS meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 226 Gap Analysis Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-30 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Engineering documents support. 2. Research on Area class standard 3. 270 Documentation research. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-30 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 2 0 1. Asset numbering Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-31 Rig 209L-TSR :Rig 209L-TSR TSR-01558-209L DSM Hazardous Area Classification Regular Pay N 4 0 1. Investigation on RFI reply. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-03-31 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 4 0 1. Asset numbering Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban meeting 2. TSR board review 3. performance Evaluation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-03 Rig 209L-TSR :Rig 209L-TSR TSR-01558-209L DSM Hazardous Area Classification Regular Pay N 3 0 1. Redline drawing and review CAD drawing update. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-03 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 4 0 1. Asset numbering Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban meeting 2. TSR board review 3. performance Evaluation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7 0 1. research for MAC heater motor modification 2. Area classification Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 1. IT SharePoint issue resolution Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-05 Rig 209L-TSR :Rig 209L-TSR TSR-01561-209L MAC Heaters Motor Modification Regular Pay N 4 0 1. Design review 2. Voltage drop calculation and cable sizing. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-06 OH-003 :OH-003 Overhead All Activities Regular Pay N 8 0 Jury Duty Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban meeting 2. TSR board review 3. performance Evaluation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-07 Rig 209L-TSR :Rig 209L-TSR TSR-01558-209L DSM Hazardous Area Classification Regular Pay N 4 0 1. Redline drawing and review CAD drawing update. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-07 Rig 209L-TSR :Rig 209L-TSR TSR-01561-209L MAC Heaters Motor Modification Regular Pay N 3 0 1. Design review 2. Voltage drop calculation and cable sizing. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. TSR review meeting 2. Kanban Board review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-10 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-10 Rig 209L-TSR :Rig 209L-TSR TSR-01558-209L DSM Hazardous Area Classification Regular Pay N 4 0 TSR closeout and drawings update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-10 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 2 0 Document asset numbering Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-11 Rig 209L-TSR :Rig 209L-TSR TSR-01561-209L MAC Heaters Motor Modification Regular Pay N 8 0 1. Design review 2. Request for quotes 3. Cable sizing review 4. Short circuit calculations. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Worksheet update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 1. Research for parts on MAC heater . 2. API 505 research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-12 Rig 209L-TSR :Rig 209L-TSR TSR-01561-209L MAC Heaters Motor Modification Regular Pay N 3 0 1. Design review 2. Request for quotes 3. Cable sizing review 4. Short circuit calculations. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. TSR review meeting 2. Kanban Board review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 1. Research for parts on MAC heater . 2. API 505 research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-13 Rig 209L-TSR :Rig 209L-TSR TSR-01558-209L DSM Hazardous Area Classification Regular Pay N 4 0 TSR closeout and drawings update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-14 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Holiday Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban meeting 2. TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-17 Rig 209L-TSR :Rig 209L-TSR TSR-01561-209L MAC Heaters Motor Modification Regular Pay N 4 0 1. Generated MTO 2. Received quotes from vendor and reviewed quotes. 3. Vendor communication 4. Drawing redline and updated Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-17 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 3 0 1.Finished assigning asset numbers in Excel file. 2. Working on transferring numbers to DCDM SharePoint. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-18 Rig 209L-TSR :Rig 209L-TSR TSR-01561-209L MAC Heaters Motor Modification Regular Pay N 4 0 1. Generated MTO 2. Received quotes from vendor and reviewed quotes. 3. Vendor communication 4. Drawing redline and updated Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-18 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 4 0 1.Finished assigning asset numbers in Excel file. 2. Working on transferring numbers to DCDM SharePoint. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-19 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Tracker update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 Research for transformer part number MAC heater P209. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-19 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 3 0 1.Finished assigning asset numbers in Excel file. 2. Working on transferring numbers to DCDM SharePoint. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 1. resolving IT issues for DCDM access. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-20 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 4 0 1.Finished assigning asset numbers in Excel file. 2. Working on transferring numbers to DCDM SharePoint. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban meeting 2. TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-21 Rig 209L-TSR :Rig 209L-TSR TSR-01561-209L MAC Heaters Motor Modification Regular Pay N 4 0 1. Generated MTO 2. Received quotes from vendor and reviewed quotes. 3. Vendor communication 4. Drawing redline and updated Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-21 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 3 0 1.Finished assigning asset numbers in Excel file. 2. Working on transferring numbers to DCDM SharePoint. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-24 Rig 209L-TSR :Rig 209L-TSR TSR-01561-209L MAC Heaters Motor Modification Regular Pay N 4 0 1. Created MTO 2. Received additional vendor quotes. 3.TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-24 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 3 0 1.Assigned asset numbers in Excel format 2. Copied asset numbers to SharePoint format. 3. Started linking process with help of doc control and IT. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-25 Rig 209L-TSR :Rig 209L-TSR TSR-01561-209L MAC Heaters Motor Modification Regular Pay N 4 0 1. Created MTO 2. Received additional vendor quotes. 3.TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-25 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 4 0 1.Assigned asset numbers in Excel format 2. Copied asset numbers to SharePoint format. 3. Started linking process with help of doc control and IT. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-26 Rig 209L-TSR :Rig 209L-TSR TSR-01561-209L MAC Heaters Motor Modification Regular Pay N 3 0 1. Created MTO 2. Received additional vendor quotes. 3.TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-26 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 4 0 1.Assigned asset numbers in Excel format 2. Copied asset numbers to SharePoint format. 3. Started linking process with help of doc control and IT. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-27 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 7 0 1.Assigned asset numbers in Excel format 2. Copied asset numbers to SharePoint format. 3. Started linking process with help of doc control and IT. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-04-28 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 8 0 1.Assigned asset numbers in Excel format 2. Copied asset numbers to SharePoint format. 3. Started linking process with help of doc control and IT. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. TSR board Review meeting 2. Weekly meeting 3. Quarterly result meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Grounding Procedure Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-01 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 5 0 1. TSR closeout 2. Follow up with IT . 3. Issue IT ticket. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. TSR board Review meeting 2. Weekly meeting 3. Quarterly result meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-02 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 7 0 1. TSR closeout 2. Follow up with IT . 3. Issue IT ticket. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 1. TSR board Review meeting 2. Weekly meeting 3. Quarterly result meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-03 OH-014 :OH-014 Overhead All Activities Regular Pay N 6 0 OTC visit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. TSR board Review meeting 2. Weekly meeting 3. Quarterly result meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 Research for single phase pump Shaker trough Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-04 Rig 209L-TSR :Rig 209L-TSR TSR-01567-209L Shaker Trough Regular Pay N 3 0 TSR research and part search Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-08 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-09 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-10 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 TSR Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-11 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Update TSR worksheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-11 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 5 0 IT follow up, changes as per IT suggestion. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-12 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 KOC document review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-15 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 1. Review of Bids and comparing with Specs. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Weekly TSR meeting. 2. Kanban Board meeting. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-15 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 2 0 1. Area Class drawing 2. Load List creation for proposal. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-15 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-15 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 2 0 Update document list and missing asset numbers. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-16 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 1. Review of Bids and comparing with Specs. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Finding manuals for generator part number. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-16 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 2 0 1. Area Class drawing 2. Load List creation for proposal. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-17 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 1. Review of Bids and comparing with Specs. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-17 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 5 0 1. Area Class drawing 2. Load List creation for proposal. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 1. Updating TSR worksheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-18 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 1. Review of Bids and comparing with Specs. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Weekly TSR meeting. 2. Kanban Board meeting. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 Finding manuals for generator part number. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-18 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 2 0 1. Area Class drawing 2. Load List creation for proposal. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 1. Review of Bids and comparing with Specs. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Weekly TSR meeting. 2. Kanban Board meeting. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-19 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 2 0 1. Area Class drawing 2. Load List creation for proposal. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-19 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 3 0 Update document list and missing asset numbers. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-22 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 1. KOC review of quotes Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban Meeting 2. TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-23 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 1. KOC review of quotes Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-23 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 6 0 Updating and support for 270 documentation. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban Meeting 2. TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-24 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR worksheet update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-24 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Vendor ( Kerui Group) visit and introduction. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-24 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Research for generator part information Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban Meeting 2. TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR worksheet update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6 0 1. Support for Krechet asset numbering Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Spring Cleaning Campaign Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-26 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 5 0 Updating and support for 270 documentation. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-29 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Memorial Day Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-30 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 1. Review of F 7 G proposal. 2. Proposal related questions and document review. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. TSR meeting 2. Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-30 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Kerui vendor visit and presentation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-30 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 4 0 Closeout 270 Documentation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 OTC visit. Presentation preparation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-31 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5 0 Area class Drawing for Rig proposal ( Rig 269 Chevron) Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-31 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR worksheet Update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-05-31 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 1 0 Closeout 270 Documentation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. TSR meeting 2. Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-01 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3 0 Area class Drawing for Rig proposal ( Rig 269 Chevron) Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR worksheet Update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-01 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Kerui vendor visit and presentation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-01 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 1 0 Closeout 270 Documentation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-02 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 1. Review of F 7 G proposal. 2. Proposal related questions and document review. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1 TSR Kanban meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-05 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 4 0 Bid proposal support. Rig 269 South Iraq Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-05 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-05 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 3 0 TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-06 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 1. KOC Project Bid Evaluation 2. HH meeting 3. Commercial Evaluation and vendor communication Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-06 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 4 0 Bid proposal support. Rig 269 South Iraq Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-06 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Vendor communication Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-07 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 1. KOC Project Bid Evaluation 2. HH meeting 3. Commercial Evaluation and vendor communication Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-07 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 4 0 Bid proposal support. Rig 269 South Iraq Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1 TSR Kanban meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-08 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5 0 Bid proposal support. Rig 269 South Iraq Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-08 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Worksheet Update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Follow up On Kretchet Documentation Asset numbering and IT support Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-09 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 1. KOC Project Bid Evaluation 2. HH meeting 3. Commercial Evaluation and vendor communication Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-12 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 1. Bid evaluation F & G 2. Commercial Evaluation F & G 3. Gen load calculation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. TSR Meeting 2. Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-12 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-13 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 1. Bid evaluation F & G 2. Commercial Evaluation F & G 3. Gen load calculation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Review vendor drawing Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-14 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 1. Bid evaluation F & G 2. Commercial Evaluation F & G 3. Gen load calculation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-14 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 1 0 Hibernia TD and control system update options Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-14 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR worksheet update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-14 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Vendor meet ACS Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Review vendor drawing Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. TSR Meeting 2. Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-15 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 8 0 Hibernia TD and control system update options Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-16 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 4 0 Hibernia TD and control system update options Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-19 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 6 0 Hibernia Top Drive control system upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-19 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-19 Rig 209L-TSR :Rig 209L-TSR TSR-01567-209L Shaker Trough Regular Pay N 1 0 Motor research for new motor Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-20 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 2 0 Hibernia Top Drive control system upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-20 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 Drillmec meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-20 Rig 209L-TSR :Rig 209L-TSR TSR-01561-209L MAC Heaters Motor Modification Regular Pay N 3 0 Transformer vendor drawing review and vendor coordination Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-21 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 1. VFD system review 2. Fire gas system bid review . 3.Commercial evaluation. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-21 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 2 0 Hibernia Top Drive control system upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-21 Rig 209L-TSR :Rig 209L-TSR TSR-01581-209L Diesel Transfer Pump Breaker Upgrade Regular Pay N 2 0 TSR review , CTR and breaker part number search Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-22 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 1. VFD system review 2. Fire gas system bid review . 3.Commercial evaluation. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-22 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 Updating TSR sheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-22 Rig 209L-TSR :Rig 209L-TSR TSR-01581-209L Diesel Transfer Pump Breaker Upgrade Regular Pay N 2 0 TSR review , CTR and breaker part number search Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-23 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 1. VFD system review 2. Fire gas system bid review . 3.Commercial evaluation. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-26 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 Business Acumen training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-26 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Sakhalin Weekly call Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-27 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Bid Evaluation VFD house review Area class drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-27 ORLAN-TSR :ORLAN-TSR TSR-01578-ORLP BP Pump Indicator Light Regular Pay N 5 0 TSR review CTR update Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-28 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 Bid Evaluation VFD house review Area class drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-28 Rig 209L-TSR :Rig 209L-TSR TSR-01581-209L Diesel Transfer Pump Breaker Upgrade Regular Pay N 6 0 TSR review CTR update Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-29 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Bid Evaluation VFD house review Area class drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kanban board review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-29 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Worksheet Update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-29 Rig 209L-TSR :Rig 209L-TSR TSR-01561-209L MAC Heaters Motor Modification Regular Pay N 3 0 Transformer Drawing and breaker part number review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-30 ORLAN-TSR :ORLAN-TSR TSR-01578-ORLP BP Pump Indicator Light Regular Pay N 2 0 TSR review CTR update Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-06-30 Rig 209L-TSR :Rig 209L-TSR TSR-01581-209L Diesel Transfer Pump Breaker Upgrade Regular Pay N 2 0 TSR review CTR update Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Independence day Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Independence day Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-05 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 1. Review of F 7 G system 2. VFD system review 3. Attend weekly meeting 4 China trip meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-05 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-05 Rig 209L-TSR :Rig 209L-TSR TSR-01561-209L MAC Heaters Motor Modification Regular Pay N 2 0 Vendor follow up Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-05 Rig 209L-TSR :Rig 209L-TSR TSR-01581-209L Diesel Transfer Pump Breaker Upgrade Regular Pay N 4 0 TSR review , vendor quotation and coordination. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-06 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 1. Review of F 7 G system 2. VFD system review 3. Attend weekly meeting 4 China trip meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 TSR board review Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Worksheet update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-06 Rig 209L-TSR :Rig 209L-TSR TSR-01581-209L Diesel Transfer Pump Breaker Upgrade Regular Pay N 3 0 TSR review , vendor quotation and coordination. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-07 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 1. Review of F 7 G system 2. VFD system review 3. Attend weekly meeting 4 China trip meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-07 ORLAN-TSR :ORLAN-TSR TSR-01578-ORLP BP Pump Indicator Light Regular Pay N 4 0 Generated CTR and TSR review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-10 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 VFD house review Update F & G bid evaluation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-10 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Conference Call Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-10 Rig 209L-TSR :Rig 209L-TSR TSR-01581-209L Diesel Transfer Pump Breaker Upgrade Regular Pay N 3 0 TSR review Vendor interaction TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-11 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 6 0 Meeting with NOV Vendor interaction. Research on of top drive parts and comparison Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-11 Rig 209L-TSR :Rig 209L-TSR TSR-01581-209L Diesel Transfer Pump Breaker Upgrade Regular Pay N 3 0 TSR review Vendor interaction TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Updating TSR worksheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-12 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 3 0 Meeting with NOV Vendor interaction. Research on of top drive parts and comparison Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-12 ORLAN-TSR :ORLAN-TSR TSR-01578-ORLP BP Pump Indicator Light Regular Pay N 3 0 TSR review TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-12 Rig 209L-TSR :Rig 209L-TSR TSR-01580-209L Heat Trace Distribution Panel Regular Pay N 2 0 TSR review CTR update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-13 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Updating TSR worksheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-13 ORLAN-TSR :ORLAN-TSR TSR-01578-ORLP BP Pump Indicator Light Regular Pay N 3 0 TSR review TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-13 Rig 209L-TSR :Rig 209L-TSR TSR-01580-209L Heat Trace Distribution Panel Regular Pay N 3 0 TSR review CTR update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-14 ORLAN-TSR :ORLAN-TSR TSR-01578-ORLP BP Pump Indicator Light Regular Pay N 3 0 TSR review TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-14 ORLAN-TSR :ORLAN-TSR TSR-01582-ORLP Poorboy Degasser (electrical) Regular Pay N 2 0 TSR review CTR update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-17 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 1. Weekly Meeting 2. VFD drawings review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR review Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-17 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-17 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 1, Novos System study, Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-17 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 1. Study TD system project scope. 2. Create power Point 3. Study possible top drive options. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-17 ORLAN-TSR :ORLAN-TSR TSR-01578-ORLP BP Pump Indicator Light Regular Pay N 1 0 1. Design review 2. MTO review 3. TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-18 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 1. Weekly Meeting 2. VFD drawings review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-18 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 1, Novos System study, Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-18 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 1. Study TD system project scope. 2. Create power Point 3. Study possible top drive options. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-18 ORLAN-TSR :ORLAN-TSR TSR-01578-ORLP BP Pump Indicator Light Regular Pay N 3 0 1. Design review 2. MTO review 3. TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-18 Rig 209L-TSR :Rig 209L-TSR TSR-01580-209L Heat Trace Distribution Panel Regular Pay N 1 0 TSR review Design and MTO review. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-19 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 1. Study TD system project scope. 2. Create power Point 3. Study possible top drive options. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-19 ORLAN-TSR :ORLAN-TSR TSR-01578-ORLP BP Pump Indicator Light Regular Pay N 4 0 1. Design review 2. MTO review 3. TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-19 Rig 209L-TSR :Rig 209L-TSR TSR-01580-209L Heat Trace Distribution Panel Regular Pay N 4 0 TSR review Design and MTO review. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR review Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-20 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Worksheet Update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-20 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 1. Study TD system project scope. 2. Create power Point 3. Study possible top drive options. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-20 ORLAN-TSR :ORLAN-TSR TSR-01578-ORLP BP Pump Indicator Light Regular Pay N 3 0 1. Design review 2. MTO review 3. TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-20 Rig 209L-TSR :Rig 209L-TSR TSR-01561-209L MAC Heaters Motor Modification Regular Pay N 1 0 Transformer related vendor questions Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-20 Rig 209L-TSR :Rig 209L-TSR TSR-01580-209L Heat Trace Distribution Panel Regular Pay N 2 0 TSR review Design and MTO review. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR review Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-21 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 4 0 1. Study TD system project scope. 2. Create power Point 3. Study possible top drive options. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-24 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Update meeting Document review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR board Review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-24 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-24 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 1. generate CTR 2. Attend weekly conference call 3. NOV communication Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-24 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 3 0 1. generate Scope of work . 2. Generate TSR 3. Part number research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-24 Rig 209L-TSR :Rig 209L-TSR TSR-01561-209L MAC Heaters Motor Modification Regular Pay N 2 0 Transformer drawing review Shipping procedure review. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-25 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Update meeting Document review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-25 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Art of negotiation training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-25 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 1. generate CTR 2. Attend weekly conference call 3. NOV communication Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-25 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 1. generate Scope of work . 2. Generate TSR 3. Part number research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-25 Rig 209L-TSR :Rig 209L-TSR TSR-01561-209L MAC Heaters Motor Modification Regular Pay N 2 0 Transformer drawing review Shipping procedure review. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR worksheet update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-26 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2 0 1. generate CTR 2. Attend weekly conference call 3. NOV communication Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-26 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 3 0 1. generate Scope of work . 2. Generate TSR 3. Part number research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-26 Rig 209L-TSR :Rig 209L-TSR TSR-01561-209L MAC Heaters Motor Modification Regular Pay N 2 0 Transformer drawing review Shipping procedure review. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR board Review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-27 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2 0 1. generate CTR 2. Attend weekly conference call 3. NOV communication Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-27 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 1. generate Scope of work . 2. Generate TSR 3. Part number research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-27 Rig 209L-TSR :Rig 209L-TSR TSR-01580-209L Heat Trace Distribution Panel Regular Pay N 4 0 TSR review Drawing mark up TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-28 Rig 209L-TSR :Rig 209L-TSR TSR-01580-209L Heat Trace Distribution Panel Regular Pay N 5 0 TSR review Drawing mark up TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-31 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 6 0 1. Top Drive Comparison 2. Meeting with NOV 3. Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-31 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-07-31 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 NOVOS conference call Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 6 0 1. Top Drive Comparison 2. Meeting with NOV 3. Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-01 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 3 0 NOVOS conference call Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-02 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 6 0 1. Top Drive Comparison 2. Meeting with NOV 3. Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Worksheet Update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-02 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 NOVOS conference call Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-03 Rig 209L-TSR :Rig 209L-TSR TSR-01580-209L Heat Trace Distribution Panel Regular Pay N 6 0 Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-04 OH-014 :OH-014 Overhead All Activities Regular Pay N 5 0 Meeting NOVOS system at NOV location Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-07 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 7 0 Top Drive updgrade meeting Top Drive comparison Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-07 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-08 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 Top Drive updgrade meeting Top Drive comparison Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-08 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 Travel Planning , ticketing Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-08 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Medical and Suit fitting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-08 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 1 0 NOVOS upgrade coordination with NOV . Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-09 OH-010 :OH-010 Overhead All Activities Regular Pay N 8 0 Travel Planning , ticketing Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-10 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 Medical and Suit fitting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-11 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 Medical and Suit fitting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-14 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 BST Training for Hibernia Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-15 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 BST Training for Hibernia Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-16 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 BST Training for Hibernia Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-17 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 BST Training for Hibernia Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-18 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 BST Training for Hibernia Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-18 Rig 209L-TSR :Rig 209L-TSR Default Default Task Regular Pay N 4 0 TSR-1588 Steam connection line heat trace Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-21 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 H2S and firefighting training Suit fitting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-22 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 H2S and firefighting training Suit fitting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-23 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 H2S and firefighting training Suit fitting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-24 OH-010 :OH-010 Overhead All Activities Regular Pay N 15 0 St John's to Alaska Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-25 Rig 209L-TSR :Rig 209L-TSR TSR-01588-209L Steam Line Heat Trace Regular Pay N 8 0 Document review and MTO comments. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-28 OH-010 :OH-010 Overhead All Activities Regular Pay N 6 0 Travel From Anchorage to Dead Horse Dead Horse to Houston Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-28 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 4 0 NOV NOVOS system installation witness and inspection. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-29 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 10 0 NOV NOVOS system installation witness and inspection. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-29 Rig 209L-TSR :Rig 209L-TSR TSR-01588-209L Steam Line Heat Trace Regular Pay N 1 0 Review and closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-30 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 10 0 NOV NOVOS system installation witness and inspection. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-30 Rig 209L-TSR :Rig 209L-TSR TSR-01588-209L Steam Line Heat Trace Regular Pay N 1 0 Review and closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-31 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 10 0 NOV NOVOS system installation witness and inspection. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-08-31 Rig 209L-TSR :Rig 209L-TSR TSR-01588-209L Steam Line Heat Trace Regular Pay N 1 0 Review and closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-01 OH-010 :OH-010 Overhead All Activities Regular Pay N 8 0 Travel From Anchorage to Dead Horse Dead Horse to Houston Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-02 OH-010 :OH-010 Overhead All Activities Regular Pay N 8 0 Travel From Anchorage to Dead Horse Dead Horse to Houston Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. Project meeting with vendor 2. Follow up on questions . 3. Review of Atop Drive comparison . 4. Review of Scope of work . Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-05 Rig 209L-TSR :Rig 209L-TSR TSR-01588-209L Steam Line Heat Trace Regular Pay N 1 0 Closeout. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 Updating TSR worksheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-06 Rig 209L-TSR :Rig 209L-TSR TSR-01588-209L Steam Line Heat Trace Regular Pay N 1 0 Closeout. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-06 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 6 0 Mud Master Electrical requirement check Photos and dimensions Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-07 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 9 0 1. Project meeting with vendor 2. Follow up on questions . 3. Review of Atop Drive comparison . 4. Review of Scope of work . Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-08 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 5 0 Travel report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 7 0 1. Scope Of work document 2. VFD location meetings Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-11 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 9 0 1. Scope Of work document 2. VFD location meetings Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. Scope Of work document 2. VFD location meetings Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-13 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR document update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-14 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 1. Scope Of work document 2. VFD location meetings Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-14 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR document update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-14 Rig 209L-TSR :Rig 209L-TSR TSR-01600-209L Desilter Motor Upgrade Regular Pay N 4 0 Review TSR and MTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-15 Rig 209L-TSR :Rig 209L-TSR TSR-01600-209L Desilter Motor Upgrade Regular Pay N 5 0 Review TSR and MTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 1. Wood group SOW 2. VFD house location 3. Site SOW Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly kanban and TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-18 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-18 Rig 209L-TSR :Rig 209L-TSR TSR-01600-209L Desilter Motor Upgrade Regular Pay N 4 0 TSR review and part search for soft starter Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 1. Wood group SOW 2. VFD house location 3. Site SOW Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-19 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 1. Talent management '2. Data cloud Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-19 Rig 209L-TSR :Rig 209L-TSR TSR-01600-209L Desilter Motor Upgrade Regular Pay N 4 0 TSR review and part search for soft starter Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 1. Wood group SOW 2. VFD house location 3. Site SOW Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-20 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Updating TSR document Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-20 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 1. Talent management '2. Data cloud Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-21 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 6 0 1. Wood group SOW 2. VFD house location 3. Site SOW Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly kanban and TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-21 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Updating TSR document Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-22 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 7 0 1. Wood group SOW 2. VFD house location 3. Site SOW Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-22 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 1. Talent management '2. Data cloud Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 6 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-25 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 6 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-26 Rig 209L-TSR :Rig 209L-TSR TSR-01600-209L Desilter Motor Upgrade Regular Pay N 2 0 TSR review and closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Worksheet update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-27 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Online training for Rig WHIMIS, Rig safety Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-28 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-28 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Online training for Rig WHIMIS, Rig safety Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-29 Berkut-TSR :Berkut-TSR Default Task Regular Pay N 2 0 Berkut Documentation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-29 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Load List , One lIne Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-29 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-09-29 OH-014 :OH-014 Overhead All Activities Regular Pay N 3 0 Online training for Rig WHIMIS, Rig safety Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-02 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Electrical Support Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-02 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 6 0 1. Finalizing site survey scope of work. 2. Updating project scope of work 3. Weekly meetings with NOV and wood Group 4. Gathering information and documents for survey. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Electrical Support Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-03 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 1. Finalizing site survey scope of work. 2. Updating project scope of work 3. Weekly meetings with NOV and wood Group 4. Gathering information and documents for survey. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-03 Rig 209L-TSR :Rig 209L-TSR TSR-01600-209L Desilter Motor Upgrade Regular Pay N 2 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-04 Berkut-TSR :Berkut-TSR Default Task Regular Pay N 4 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-04 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 1. Finalizing site survey scope of work. 2. Updating project scope of work 3. Weekly meetings with NOV and wood Group 4. Gathering information and documents for survey. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-04 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. Finalizing site survey scope of work. 2. Updating project scope of work 3. Weekly meetings with NOV and wood Group 4. Gathering information and documents for survey. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-06 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. Finalizing site survey scope of work. 2. Updating project scope of work 3. Weekly meetings with NOV and wood Group 4. Gathering information and documents for survey. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 9 0 Visit to Hibernia platform for survey Option 1. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-10 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 9 0 Visit to Hibernia platform for survey Option 1. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 9 0 Visit to Hibernia platform for survey Option 1. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 9 0 Visit to Hibernia platform for survey Option 1. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 Visit to Hibernia platform for survey Option 1. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-16 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. Site Survey report 2. Drawing for VFD house 3. Rig safety Procedure Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. Site Survey report 2. Drawing for VFD house 3. Rig safety Procedure Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. Site Survey report 2. Drawing for VFD house 3. Rig safety Procedure Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-18 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. Site Survey report 2. Drawing for VFD house 3. Rig safety Procedure Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 1. Site Survey report 2. Drawing for VFD house 3. Rig safety Procedure Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-23 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 1. Update scope of work 2. Block diagram 3 VFD house classification resolution 4. Weekly meetings Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-23 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-23 Rig 209L-TSR :Rig 209L-TSR TSR-01600-209L Desilter Motor Upgrade Regular Pay N 4 0 TSR review and closeout preparation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-24 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 1. Update scope of work 2. Block diagram 3 VFD house classification resolution 4. Weekly meetings Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-24 Rig 209L-TSR :Rig 209L-TSR TSR-01600-209L Desilter Motor Upgrade Regular Pay N 4 0 TSR review and closeout preparation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. Update scope of work 2. Block diagram 3 VFD house classification resolution 4. Weekly meetings Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. Update scope of work 2. Block diagram 3 VFD house classification resolution 4. Weekly meetings Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 1. Update scope of work 2. Block diagram 3 VFD house classification resolution 4. Weekly meetings Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-30 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 7 0 1. Weekly meeting with NOV and Wood group 2. SoW document update 3. Biweekly report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1.Kanban Board meeting 2. Weekly TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-30 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 1. Weekly Sakhalin meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-10-31 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 9 0 1. Weekly meeting with NOV and Wood group 2. SoW document update 3. Biweekly report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 1. Weekly meeting with NOV and Wood group 2. SoW document update 3. Biweekly report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6 0 Berkut documentation asset numbering worksheet ( 10 hours) Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-02 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 1. Weekly meeting with NOV and Wood group 2. SoW document update 3. Biweekly report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1.Kanban Board meeting 2. Weekly TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 1. Updating TSR worksheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-02 ORLAN-TSR :ORLAN-TSR TSR-01582-ORLP Poorboy Degasser (electrical) Regular Pay N 2 0 1. TSR review and MTO review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 Berkut documentation asset numbering worksheet ( 10 hours) Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-03 ORLAN-TSR :ORLAN-TSR TSR-01582-ORLP Poorboy Degasser (electrical) Regular Pay N 1 0 1. TSR review and MTO review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kanban meeting , TSR weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-06 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly Sakhalin meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-06 ORLAN-TSR :ORLAN-TSR TSR-01582-ORLP Poorboy Degasser (electrical) Regular Pay N 7 0 TSR review and closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-07 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 1. Review NOV quote 2. Review wood group quote 3. Create clarifications form on quote 4 Scope of work for DDAS system. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-07 ORLAN-TSR :ORLAN-TSR TSR-01582-ORLP Poorboy Degasser (electrical) Regular Pay N 3 0 TSR review and closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-08 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. Review NOV quote 2. Review wood group quote 3. Create clarifications form on quote 4 Scope of work for DDAS system. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-08 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR worksheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. Review NOV quote 2. Review wood group quote 3. Create clarifications form on quote 4 Scope of work for DDAS system. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kanban meeting , TSR weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-10 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 1. Review NOV quote 2. Review wood group quote 3. Create clarifications form on quote 4 Scope of work for DDAS system. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 7 0 1. Biweekly report 2. Weekly meetings 3. Wood Group quote review 4. NOV quote review 5. SoW Control system Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban Meeting, TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-13 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-14 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 9 0 1. Biweekly report 2. Weekly meetings 3. Wood Group quote review 4. NOV quote review 5. SoW Control system Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 1. Biweekly report 2. Weekly meetings 3. Wood Group quote review 4. NOV quote review 5. SoW Control system Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-15 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Business development program Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-15 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Document search for F & G and HVAC Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-15 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 2 0 TSR review and meeting Document research. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-16 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Load List update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-16 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 1. Biweekly report 2. Weekly meetings 3. Wood Group quote review 4. NOV quote review 5. SoW Control system Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban Meeting, TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-16 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Document search for F & G and HVAC Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-16 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 TSR review and meeting Document research. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 1. Biweekly report 2. Weekly meetings 3. Wood Group quote review 4. NOV quote review 5. SoW Control system Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 6 0 1.SOW for DDAS system 2. Meeting with Rig crew 3. Cable bending radius investigation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban Board Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-20 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-21 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 7 0 1.SOW for DDAS system 2. Meeting with Rig crew 3. Cable bending radius investigation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-21 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 TSR review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-22 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 7 0 1.SOW for DDAS system 2. Meeting with Rig crew 3. Cable bending radius investigation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-22 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 Drawing research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-23 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Thanksgiving Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-24 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Thanksgiving Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-28 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-11-30 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-01 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Floating Holiday Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-07 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 8 0 study of Hibernia survey SoW and travel arrangement. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-08 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. NOV Survey activities for top drive and Driller's cabin 2. Travel Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. NOV Survey activities for top drive and Driller's cabin 2. Travel Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. NOV Survey activities for top drive and Driller's cabin 2. Travel Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-14 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. NOV Survey activities for top drive and Driller's cabin 2. Travel Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. NOV Survey activities for top drive and Driller's cabin 2. Travel Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-16 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. NOV Survey activities for top drive and Driller's cabin 2. Travel Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 10 0 1. NOV survey activities 2 NOV survey report 3.Travel 4.Standby for chopper due to weather on platform Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 10 0 1. NOV survey activities 2 NOV survey report 3.Travel 4.Standby for chopper due to weather on platform Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 10 0 1. NOV survey activities 2 NOV survey report 3.Travel 4.Standby for chopper due to weather on platform Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. NOV survey activities 2 NOV survey report 3.Travel 4.Standby for chopper due to weather on platform Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-21 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 1. NOV survey activities 2 NOV survey report 3.Travel 4.Standby for chopper due to weather on platform Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-22 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 1. NOV survey activities 2 NOV survey report 3.Travel 4.Standby for chopper due to weather on platform Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-25 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 9 0 1. Survey Expense report 2. Arranging survey pictures 3. Survey report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 1. Hibernia NOV survey report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 1. Survey Expense report 2. Arranging survey pictures 3. Survey report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 1. Performance review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-28 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 5 0 1. Rig 253 and 231 drawing review. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 1. Performance review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2017-12-29 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 1 0 1. Rig 253 and 231 drawing review. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-02 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Time Off ( Hibernia Visit) Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1.kanban Board meeting 2. TSR Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-03 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 4 0 1. Kvaerner Platform Power Comparison 2. Reviewing project Document Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-03 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 2 0 1 Creating load list . Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-03 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 1. Internal Controls training 2. Compliance Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 1. Nor survey Document 2 Review SoW document Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 5 0 1 Review Mh Wirth Docuemnts , SoW and proposal Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1.kanban Board meeting 2. TSR Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-04 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Worksheet Update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-04 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 1. Internal Controls training 2. Compliance Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 1. Nor survey Document 2 Review SoW document Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1 Review Mh Wirth Docuemnts , SoW and proposal Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-05 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 1. Kvaerner Platform Power Comparison 2. Reviewing project Document Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-05 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 1. Internal Controls training 2. Compliance Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-08 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 6 0 Review MH wirth documents. Review of SoW documents : 1 TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW 2TSR-01583-SP-MU-00007-RevA-PLC Life Extension 3.TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW 4. TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 1 TSR meeting 2. Kanban meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-08 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Sakhalin Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 NOV survey report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 6 0 Review MH wirth documents. Review of SoW documents : 1 TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW 2TSR-01583-SP-MU-00007-RevA-PLC Life Extension 3.TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW 4. TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-09 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 1. Vendor meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-10 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 6 0 Review MH wirth documents. Review of SoW documents : 1 TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW 2TSR-01583-SP-MU-00007-RevA-PLC Life Extension 3.TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW 4. TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-10 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 1 TSR worksheet update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-10 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 1. Vendor meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 6 0 Review MH wirth documents. Review of SoW documents : 1 TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW 2TSR-01583-SP-MU-00007-RevA-PLC Life Extension 3.TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW 4. TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1 TSR meeting 2. Kanban meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-11 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 2 0 Update and TSR Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 5 0 Review MH wirth documents. Review of SoW documents : 1 TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW 2TSR-01583-SP-MU-00007-RevA-PLC Life Extension 3.TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW 4. TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. MH Wirth meeting 2. Review of MH Wirth proposal 3. Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR board meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-15 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-15 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 4 0 Project Status and closeout report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Snow storm and black icing Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 1. MH Wirth meeting 2. Review of MH Wirth proposal 3. Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Snow storm and black icing Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 5 0 1. MH Wirth meeting 2. Review of MH Wirth proposal 3. Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 Support on old TSR queries Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-18 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 1 0 Project Status and closeout report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. MH Wirth meeting 2. Review of MH Wirth proposal 3. Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-19 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4 0 HH rig visit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-22 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 1. Research on Hibernia documentation for DC field and area class issue. 2. Meeting action item resolution. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Kanban meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-22 OH-014 :OH-014 Overhead All Activities Regular Pay N 5 0 MH wirth visit Toastmasters Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-22 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Sakhlin queries over phone and email Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-23 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. Research on Hibernia documentation for DC field and area class issue. 2. Meeting action item resolution. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-23 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 Rig visit document Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-23 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Gas generator research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-23 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 3 0 Report: NOVOS System Weekly conference calls Gathering information and statistics Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-24 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 1. Review on HM wirth document for new DC top drive Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-24 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. Research on Hibernia documentation for DC field and area class issue. 2. Meeting action item resolution. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-24 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Update weekely worksheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-24 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 MH wirth visit Toastmasters Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-24 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 3 0 Report: NOVOS System Weekly conference calls Gathering information and statistics Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 1. Review on HM wirth document for new DC top drive Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 1. Research on Hibernia documentation for DC field and area class issue. 2. Meeting action item resolution. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 TSR meeting Kanban meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-25 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 4 0 Report: NOVOS System Weekly conference calls Gathering information and statistics Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. Research on Hibernia documentation for DC field and area class issue. 2. Meeting action item resolution. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-26 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Gas generator research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-26 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 3 0 Report: NOVOS System Weekly conference calls Gathering information and statistics Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-29 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Floating holiday Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-30 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 1. Top drive certification and DC field amp research 2. Area class native file research 3. Review of MH Wirth DC top drive documents Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Weekly TSR meeting 2. Kanban board meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-30 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 4 0 Report: NOVOS System Weekly conference calls Gathering information and statistics Presentation for TS team Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-31 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. Top drive certification and DC field amp research 2. Area class native file research 3. Review of MH Wirth DC top drive documents Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-31 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 1. gas generator research 2. Submarine cable research 3. Cost comparison for submarine cable option Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-31 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 1. ACS vendor visit 2. Waukesha facility visit 3.Mandatory compliance training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-01-31 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 4 0 Report: NOVOS System Weekly conference calls Gathering information and statistics Presentation for TS team Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Weekly TSR meeting 2. Kanban board meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-01 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 1. gas generator research 2. Submarine cable research 3. Cost comparison for submarine cable option Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Update worksheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-01 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 1. ACS vendor visit 2. Waukesha facility visit 3.Mandatory compliance training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Weekly TSR meeting 2. Kanban board meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-02 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 1. gas generator research 2. Submarine cable research 3. Cost comparison for submarine cable option Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-02 OH-014 :OH-014 Overhead All Activities Regular Pay N 3 0 1. ACS vendor visit 2. Waukesha facility visit 3.Mandatory compliance training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban Board meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-05 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-05 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 6 0 NOVOS weekly call, Report update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-06 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 1. Review MH Wirth quote 2. Top Drive Comparison Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-06 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 1. Submarine cable support Minkit platform proposal study Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-07 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. Review MH Wirth quote 2. Top Drive Comparison Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Rig equipment worksheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-07 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 1. Submarine cable support Minkit platform proposal study Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 SCR notching issue research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-08 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. Review MH Wirth quote 2. Top Drive Comparison Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Rig equipment worksheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-08 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 1. Submarine cable support Minkit platform proposal study Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-08 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 Fire and gas shutdown research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban Board meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Rig equipment worksheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-09 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 1. Submarine cable support Minkit platform proposal study Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Hibernia TD comparison Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kan ban meetin TSR meeting Earnings call Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Initial IT set up GE PO and MR Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Hibernia TD comparison Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-13 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 BoD document Genesis kickoff meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-13 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Initial IT set up GE PO and MR Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-14 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Hibernia TD comparison Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kan ban meetin TSR meeting Earnings call Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-14 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 worksheet update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Initial IT set up GE PO and MR Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Hibernia TD comparison Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Kan ban meetin TSR meeting Earnings call Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-15 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 BoD document Genesis kickoff meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-16 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Hibernia TD comparison Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-16 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 BoD document Genesis kickoff meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 TD comparison ppt and internal meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 8 0 Gathering information on Berkut ,orlan and comparing with Minkit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 1. TD BoD document preparation. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Gathering information on Berkut ,orlan and comparing with Minkit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 1. TD BoD document preparation. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kanban meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-26 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-26 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Meetings, Timesheet updates, biweekly report, BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 TD comparison document and comments Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Meetings, Timesheet updates, biweekly report, BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-28 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 TD comparison document and comments Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Meetings, Timesheet updates, biweekly report, BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 TD comparison document and comments Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 3 0 BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Meetings, Timesheet updates, biweekly report, BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-02 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 TD comparison Document Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-02 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 3 0 BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Meetings, Timesheet updates, biweekly report, BoD PPT, GA and 3D layout , Power System PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kan Ban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 7 0 1.Electrical Power System Studies 2. BoD modification 3. Action Tracker 4. Timesheet and Weekly report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 1. Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-07 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Business Development training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-07 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 7 0 1.Electrical Power System Studies 2. BoD modification 3. Action Tracker 4. Timesheet and Weekly report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 9 0 1.Electrical Power System Studies 2. BoD modification 3. Action Tracker 4. Timesheet and Weekly report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-09 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 1.Electrical Power System Studies 2. BoD modification 3. Action Tracker 4. Timesheet and Weekly report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-12 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Oracle Module training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-12 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly conference call Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Revised Power System PPT 2. Revised BoD to add option 6 3. Risk register and action tracker 4. Weekly report and timesheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 1, Weekly meetings 2. Document review Weight , CG. 3 Document review Scope split 4 Requisition update 5 GE invoice receiving Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-13 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Oracle Module training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Revised Power System PPT 2. Revised BoD to add option 6 3. Risk register and action tracker 4. Weekly report and timesheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 1, Weekly meetings 2. Document review Weight , CG. 3 Document review Scope split 4 Requisition update 5 GE invoice receiving Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-14 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Oracle Module training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Revised Power System PPT 2. Revised BoD to add option 6 3. Risk register and action tracker 4. Weekly report and timesheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 1, Weekly meetings 2. Document review Weight , CG. 3 Document review Scope split 4 Requisition update 5 GE invoice receiving Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-15 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 4 0 TSR review Electrical part search Schematic Drawing Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-15 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Revised Power System PPT 2. Revised BoD to add option 6 3. Risk register and action tracker 4. Weekly report and timesheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-15 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 1, Weekly meetings 2. Document review Weight , CG. 3 Document review Scope split 4 Requisition update 5 GE invoice receiving Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-16 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 4 0 TSR review Electrical part search Schematic Drawing Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-16 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 1. Revised Power System PPT 2. Revised BoD to add option 6 3. Risk register and action tracker 4. Weekly report and timesheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-16 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 1, Weekly meetings 2. Document review Weight , CG. 3 Document review Scope split 4 Requisition update 5 GE invoice receiving Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban meeting 2 Weekly status meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-19 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-19 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 4 0 1 Schematic Drawing sketch 2. Panel layout 3. MTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly report and timesheet 2. Review of Screening and RAC matrix 3. Scope split ppt Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-20 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 4 0 1 Schematic Drawing sketch 2. Panel layout 3. MTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-20 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 2 0 Novos system conference call System update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly report and timesheet 2. Review of Screening and RAC matrix 3. Scope split ppt Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban meeting 2 Weekly status meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-21 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 vendor interaction Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly report and timesheet 2. Review of Screening and RAC matrix 3. Scope split ppt Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 1. Weekly meetings 2. RIsk matrix 3. Topsides Philosophies 4. Electrical Capex 5. Metocean PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Kanban meeting 2 Weekly status meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-22 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 1 Schematic Drawing sketch 2. Panel layout 3. MTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly report and timesheet 2. Review of Screening and RAC matrix 3. Scope split ppt Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 1. Weekly meetings 2. RIsk matrix 3. Topsides Philosophies 4. Electrical Capex 5. Metocean PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-23 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 1 Schematic Drawing sketch 2. Panel layout 3. MTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 6 0 1. Weekly meetings 2. RIsk matrix 3. Topsides Philosophies 4. Electrical Capex 5. Metocean PPT Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Weekly Kanban Meeting 2 TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-26 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 3 0 1. Weekly report and timesheet 2. RIsk matrix 3. Topsides Philosophies Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 1. Weekly meetings 2. RIsk matrix meeting 3. Topsides Philosophies review 4 Project meetings 5. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 3 0 1. Weekly report and timesheet 2. RIsk matrix 3. Topsides Philosophies Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 1. Weekly meetings 2. RIsk matrix meeting 3. Topsides Philosophies review 4 Project meetings 5. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Weekly Kanban Meeting 2 TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly report and timesheet 2. RIsk matrix 3. Topsides Philosophies Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 1. Weekly meetings 2. RIsk matrix meeting 3. Topsides Philosophies review 4 Project meetings 5. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Weekly Kanban Meeting 2 TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-29 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Worksheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 3 0 1. Weekly report and timesheet 2. RIsk matrix 3. Topsides Philosophies Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 1. Weekly meetings 2. RIsk matrix meeting 3. Topsides Philosophies review 4 Project meetings 5. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-03-30 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly Report and Timesheet 2. RIsk Register 3 Screening Document 4. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 6 0 1. Weekly meetings 2. RIsk Register 3 Screening Document 4. Action register changes Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-03 ORLAN-TSR :ORLAN-TSR TSR-01631-ORLP Flow Meter on Base Oil Supply Line Regular Pay N 1 0 TSR review , generate CTR Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly Report and Timesheet 2. RIsk Register 3 Screening Document 4. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 6 0 1. Weekly meetings 2. RIsk Register 3 Screening Document 4. Action register changes Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly Report and Timesheet 2. RIsk Register 3 Screening Document 4. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 6 0 1. Weekly meetings 2. RIsk Register 3 Screening Document 4. Action register changes Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-05 ORLAN-TSR :ORLAN-TSR TSR-01637-ORLP Centrifugal Pumps Soft Start Regular Pay N 1 0 TSR review , generate CTR Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly Report and Timesheet 2. RIsk Register 3 Screening Document 4. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 1. Weekly meetings 2. RIsk Register 3 Screening Document 4. Action register changes Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 1. Weekly Report and Timesheet 2. RIsk Register 3 Screening Document 4. Action register Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 1. Weekly meetings 2. RIsk Register 3 Screening Document 4. Action register changes Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-09 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-09 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 6 0 1. Create Invoice KV 2. Receive Invoice GE Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-10 ORLAN-TSR :ORLAN-TSR TSR-01631-ORLP Flow Meter on Base Oil Supply Line Regular Pay N 8 0 1. TSR review 2. MTO review 3. TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-11 ORLAN-TSR :ORLAN-TSR TSR-01631-ORLP Flow Meter on Base Oil Supply Line Regular Pay N 6 0 1. TSR review 2. MTO review 3. TSR closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-11 ORLAN-TSR :ORLAN-TSR TSR-01637-ORLP Centrifugal Pumps Soft Start Regular Pay N 2 0 1. TSR review 2. MTO Review 3. TSR Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-12 ORLAN-TSR :ORLAN-TSR TSR-01637-ORLP Centrifugal Pumps Soft Start Regular Pay N 8 0 1. TSR review 2. MTO Review 3. TSR Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-13 ORLAN-TSR :ORLAN-TSR TSR-01637-ORLP Centrifugal Pumps Soft Start Regular Pay N 6 0 1. TSR review 2. MTO Review 3. TSR Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-17 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 KanBan Meeting , TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-23 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 4 0 Research for load list, Invoice receiving , Document research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-23 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-23 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 1 0 Coordination , conference call , review of statistics documents Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 KanBan Meeting , TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-24 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 3 0 Research for load list, Invoice receiving , Document research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-24 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3 0 Research for IEC 60079 and API 505 maintenance Procedure Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-24 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 2 0 Coordination , conference call , review of statistics documents Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 KanBan Meeting , TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-25 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 4 0 Research for load list, Invoice receiving , Document research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-25 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 Research for IEC 60079 and API 505 maintenance Procedure Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-25 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 2 0 Coordination , conference call , review of statistics documents Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 KanBan Meeting , TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-26 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 Research for load list, Invoice receiving , Document research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-26 OH-014 :OH-014 Overhead All Activities Regular Pay N 3 0 Requisition Process , Receiving Process Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-26 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 Research for IEC 60079 and API 505 maintenance Procedure Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-26 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 2 0 Coordination , conference call , review of statistics documents Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 1. TSR -Closeout document research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-27 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 Research for load list, Invoice receiving , Document research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-27 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 Research for IEC 60079 and API 505 maintenance Procedure Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-27 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 2 0 TSR review and CTR Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 KanBan Meeting TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-30 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-30 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3 0 IEC vs API comparison Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-04-30 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 4 0 TSR meeting Closeout document preparation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 5 0 TSR Closeout New TSR documents review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 KanBan Meeting TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-01 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 Crane investigation Standards and codes investigation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-02 OH-014 :OH-014 Overhead All Activities Regular Pay N 9 0 OTC Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-03 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 5 0 TSR Closeout New TSR documents review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 KanBan Meeting TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-03 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 Crane investigation Standards and codes investigation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-04 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 Crane investigation Standards and codes investigation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-04 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 2 0 TSR review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-04 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 2 0 TSR meeting Closeout document preparation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-07 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Meeting Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-07 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 Research on breaker parts for Supply chain department.( Non TSR) research for grounding solution Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-07 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 2 0 TSR review , Discussion with Sakhalin team. suggestion of alternate design Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Meeting Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-08 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 Crane research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-08 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-08 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 2 0 TSR review , Discussion with Sakhalin team. suggestion of alternate design Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-08 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 1 0 Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-09 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 Crane research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-09 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Vendor meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 Research on breaker parts for Supply chain department.( Non TSR) research for grounding solution Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-09 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 1 0 TSR review , Discussion with Sakhalin team. suggestion of alternate design Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Meeting Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-10 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Vendor meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-10 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 5 0 TSR review , Discussion with Sakhalin team. suggestion of alternate design Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-10 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 1 0 Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 Research on breaker parts for Supply chain department.( Non TSR) research for grounding solution Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-11 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 1 0 TSR review , Discussion with Sakhalin team. suggestion of alternate design Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-11 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 2 0 Closeout Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Sick day Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. Hibernia PLC scope review . 2. Hibernia TD rail scope review. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Meeting with vendor Chris from BREUER-MOTOREN GMBH & CO. KG 2.Toastmasters Meeting 3. Weekly kanban meeting 4. TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-15 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 3 0 1. Minkit Load List Update 2. Minkit crane power consumption study Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-15 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 IMS training schedule Security Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-16 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. Hibernia PLC scope review . 2. Hibernia TD rail scope review. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Meeting with vendor Chris from BREUER-MOTOREN GMBH & CO. KG 2.Toastmasters Meeting 3. Weekly kanban meeting 4. TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Breaker trip issue MAC heater 2. Research for grounding issue Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-16 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 4 0 1. TSR review and discussion 2. TSR closeout 3. TSR scope change and CTR update. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Meeting with vendor Chris from BREUER-MOTOREN GMBH & CO. KG 2.Toastmasters Meeting 3. Weekly kanban meeting 4. TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-17 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 1. Minkit Load List Update 2. Minkit crane power consumption study Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Breaker trip issue MAC heater 2. Research for grounding issue Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-17 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 4 0 1. TSR review and discussion 2. TSR closeout 3. TSR scope change and CTR update. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 1. Meeting with vendor Chris from BREUER-MOTOREN GMBH & CO. KG 2.Toastmasters Meeting 3. Weekly kanban meeting 4. TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Breaker trip issue MAC heater 2. Research for grounding issue Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-18 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 1. CTR for TSR-1635 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-21 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 1. Monthly Timesheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1,TSR board meeting 2. Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-21 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 4 0 1. Closeout report NOVOS Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1,TSR board meeting 2. Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Breaker Trip Issue document review. 2. Grounding issue drawing research. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-22 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 1. Research for standard 1458 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-22 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 3 0 1. Closeout report NOVOS Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1,TSR board meeting 2. Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Breaker Trip Issue document review. 2. Grounding issue drawing research. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-23 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 1. Research for standard 1458 Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-23 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 3 0 1. Closeout report NOVOS Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1,TSR board meeting 2. Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-24 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 4 0 1.CTR Update 2.TSR review 3.Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-24 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 3 0 1. Closeout report NOVOS Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-25 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 4 0 1.CTR Update 2.TSR review 3.Drawing review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-25 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 TSR review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-25 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 2 0 1. Closeout report NOVOS Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-28 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Holiday Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-29 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Sakhalin Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-29 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Neutral Grounding Issue Research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-29 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 4 0 1. Drawing Mark Up 2. MTO 3.Part datasheet 4. Design of Test circuit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-29 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 3 0 1.TSR closeout 2. NOVOS system Report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1.Kanban Meeting 2. TSR Meeting 3. Vendor ACS meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-30 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Neutral Grounding Issue Research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-30 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 4 0 1. Drawing Mark Up 2. MTO 3.Part datasheet 4. Design of Test circuit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1.Kanban Meeting 2. TSR Meeting 3. Vendor ACS meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-31 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Neutral Grounding Issue Research Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-31 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 5 0 1. Drawing Mark Up 2. MTO 3.Part datasheet 4. Design of Test circuit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-05-31 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 TSR review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1.Timesheet approval 2. Follow up on NOV quote Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 1.Kanban Meeting 2. TSR Meeting 3. Vendor ACS meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-01 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 3 0 1.TSR closeout 2. NOVOS system Report Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-04 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 1 Weekly meeting 2. Call with Sakhalin engineer Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-04 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 8 0 TSR closeout and MTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Weekly TSR meeting 2. Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-05 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 1 Weekly meeting 2. Call with Sakhalin engineer Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Research for grounding solution options. 2. Research on SCR notching issues, Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-05 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 2 0 TSR closeout and MTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-05 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 TSR review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Weekly TSR meeting 2. Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-06 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 1. Call with Submarine cable vendor and crane vendor Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR Worksheet update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-06 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 1 Weekly meeting 2. Call with Sakhalin engineer Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Research for grounding solution options. 2. Research on SCR notching issues, Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-06 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 TSR review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. Weekly TSR meeting 2. Kanban Meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-07 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 1. Call with Submarine cable vendor and crane vendor Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-07 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 CAT DGB training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Research for grounding solution options. 2. Research on SCR notching issues, Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-07 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 3 0 TSR review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Research for grounding solution options. 2. Research on SCR notching issues, Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-08 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 4 0 TSR review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. TSR board meeting 2. Kanban meeting 3. HDI vendor visit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-11 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 DGB research communication with cable vendor Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-11 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 1. Generator Part number research 2. Research for Kretchet MCC Schematic 3. Review of new star and stop switch design 4. Red line MCC schematic 5. Check code requirements Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-11 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 2 0 Revised MTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-11 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 CTR revision Call with Mark Mcconn Research on power issue solution Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. TSR board meeting 2. Kanban meeting 3. HDI vendor visit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-12 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 DGB research communication with cable vendor Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Generator Part number research 2. Research for Kretchet MCC Schematic 3. Review of new star and stop switch design 4. Red line MCC schematic 5. Check code requirements Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-12 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 2 0 Revised MTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-12 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 CTR revision Call with Mark Mcconn Research on power issue solution Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 1. TSR board meeting 2. Kanban meeting 3. HDI vendor visit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 NOVOS System presentation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-13 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Supply chain IMS training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 1. Generator Part number research 2. Research for Kretchet MCC Schematic 3. Review of new star and stop switch design 4. Red line MCC schematic 5. Check code requirements Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-14 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. NOV quote review 2. Meeting path forward for SOW Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 1. TSR board meeting 2. Kanban meeting 3. HDI vendor visit Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 NOVOS System presentation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-14 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Worksheet Update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 1. Generator Part number research 2. Research for Kretchet MCC Schematic 3. Review of new star and stop switch design 4. Red line MCC schematic 5. Check code requirements Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1. NOV quote review 2. Meeting path forward for SOW Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 NOVOS System presentation Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-15 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 DGB research communication with cable vendor Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-15 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Generator Part number research 2. Research for Kretchet MCC Schematic 3. Review of new star and stop switch design 4. Red line MCC schematic 5. Check code requirements Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Scope of work draft, communication with NOV to clarify scope. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 Scope of work draft, communication with NOV to clarify scope. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Kanban Meeting Safety Moment Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Procurement support for supply chain department Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-19 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 TSR review Coordination with NOV Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Scope of work draft, communication with NOV to clarify scope. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 Scope of work draft, communication with NOV to clarify scope. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Kanban Meeting Safety Moment Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-20 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 Setting up meeting with Submarine cable vendor for Minkit. Vendor meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-20 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 TSR review Coordination with NOV Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-21 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Scope of work draft, communication with NOV to clarify scope. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-21 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Scope of work draft, communication with NOV to clarify scope. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Kanban Meeting Safety Moment Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-21 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Update worksheet Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-21 OH-014 :OH-014 Overhead All Activities Regular Pay N 3 0 NOV Well Data training Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-21 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 TSR review Coordination with NOV Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-22 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Scope of work draft, communication with NOV to clarify scope. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-22 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Scope of work draft, communication with NOV to clarify scope. Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Kanban Meeting Safety Moment Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Procurement support for supply chain department Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-22 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 TSR review Coordination with NOV Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 1.Scope of work for gear ratio upgrade 2. Scope of work for PLS system upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1.Scope of work for gear ratio upgrade 2. Scope of work for PLS system upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-25 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 1 CAT generator DGB upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Uganda Proposal support 2. Revised MTO camp generator Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 1.Scope of work for gear ratio upgrade 2. Scope of work for PLS system upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1.Scope of work for gear ratio upgrade 2. Scope of work for PLS system upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-26 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 1 CAT generator DGB upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Uganda Proposal support 2. Revised MTO camp generator Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-26 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 1 Coordination with NOV 2. Discussion with Mark McConn Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 1.Scope of work for gear ratio upgrade 2. Scope of work for PLS system upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 1.Scope of work for gear ratio upgrade 2. Scope of work for PLS system upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-27 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 1 CAT generator DGB upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Uganda Proposal support 2. Revised MTO camp generator Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-27 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 1 Coordination with NOV 2. Discussion with Mark McConn Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-28 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 1.Scope of work for gear ratio upgrade 2. Scope of work for PLS system upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-28 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 1.Scope of work for gear ratio upgrade 2. Scope of work for PLS system upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1. TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-28 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 1 CAT generator DGB upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 1. Worksheet Update Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Uganda Proposal support 2. Revised MTO camp generator Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-29 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 1.Scope of work for gear ratio upgrade 2. Scope of work for PLS system upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-29 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 1 CAT generator DGB upgrade Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-29 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 1. Uganda Proposal support 2. Revised MTO camp generator Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-06-29 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 1 0 1 Coordination with NOV 2. Discussion with Mark McConn Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-02 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-03 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Holiday Independence day Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-05 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 1. IDS system review 2. Project review Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 Dual Fuel Study research and communication Power issue communication with NOV Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 Dual Fuel Study research and communication Power issue communication with NOV Ghadge, Sachin Senior Engineer 34418 Ghadge, Sachin:Senior Engineer 2018-07-06 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 2 0 NOV communication and conference call for scope discussion Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-02-13 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-02-14 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-02-15 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-02-16 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-02-17 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-02-20 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-02-21 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-02-22 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-02-23 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-02-24 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-02-27 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-02-28 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-03-01 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-03-02 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-03-03 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-03-06 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-03-07 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-03-08 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-03-09 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-03-10 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-03-13 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-03-14 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-03-15 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-03-16 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-03-17 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-03-20 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-03-21 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-03-22 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-03-23 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-03-24 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-03-27 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-03-28 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-03-29 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-03-30 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-03-31 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-04-03 2M-TEK :2M-TEK -OH-003 PTO Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-04-04 2M-TEK :2M-TEK -OH-003 PTO Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-04-05 2M-TEK :2M-TEK -OH-003 PTO Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-04-06 2M-TEK :2M-TEK -OH-003 PTO Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-04-07 2M-TEK :2M-TEK -OH-003 PTO Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-04-10 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-04-11 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-04-12 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-04-13 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-04-14 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-04-17 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-04-18 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-04-19 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-04-20 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-04-21 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-04-24 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-04-25 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-04-26 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-04-27 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-04-28 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-05-01 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-05-02 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-05-03 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-05-04 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-05-05 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-05-08 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-05-09 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-05-10 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-05-11 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gherardi, Andrew Site Manager Gherardi, Andrew:Site Manager 2017-05-12 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Conference Calls/Emails/Document Review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Conference Calls/Emails/Document Review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-06 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 6 0 Conference Calls/Emails/Document Review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 DDAS - Controls Drawing Review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Conference Calls/Emails Correspondence/DDAS - Controls Drawing Review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-10 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Conference Calls/Emails Correspondence/DDAS - Controls Drawing Review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Conference Calls/Emails Correspondence/DDAS - Controls Drawing Review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Conference Calls/Emails Correspondence/DDAS - Controls Drawing Review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Conference Calls/Emails Correspondence/DDAS - Controls Drawing Review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Conference Calls/Emails Correspondence/DADS-Controls Drawing Review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-19 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Conference Call Reel Rig System/Email Correspondence Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3.5 0 Conference Calls/Emails Correspondence/DADS-Controls Drawing Review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 Conference Calls/Emails Correspondence/DADS-Controls Drawing Review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-23 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 Doc. Review/Conference Calls/Emails Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-23 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Reviewing NOV proposed Top Drive single line power/control drawings presented by NOV. Reviewing DDAS Topology drawings for potential upgrade that will be required when entire systems upgrade take place. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Generating SOW Doc's in RFQ form to request day rate and expense markup for Cat/CAN-RIG. Reviewing/translating documentations to satisfy tender. Conference calls/emails Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-24 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 Doc. Review/Conference Calls/Emails Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-24 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing NOV proposed Top Drive single line power/control drawings presented by NOV. Reviewing DDAS Topology drawings for potential upgrade that will be required when entire systems upgrade take place. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Generating SOW Doc's in RFQ form to request day rate and expense markup for Cat/CAN-RIG. Reviewing/translating documentations to satisfy tender. Conference calls/emails Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-25 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 Doc. Review/Conference Calls/Emails Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing NOV proposed Top Drive single line power/control drawings presented by NOV. Reviewing DDAS Topology drawings for potential upgrade that will be required when entire systems upgrade take place. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Generating SOW Doc's in RFQ form to request day rate and expense markup for Cat/CAN-RIG. Reviewing/translating documentations to satisfy tender. Conference calls/emails Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing NOV proposed Top Drive single line power/control drawings presented by NOV. Reviewing DDAS Topology drawings for potential upgrade that will be required when entire systems upgrade take place. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Generating SOW Doc's in RFQ form to request day rate and expense markup for Cat/CAN-RIG. Reviewing/translating documentations to satisfy tender. Conference calls/emails Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Reviewing NOV proposed Top Drive single line power/control drawings presented by NOV. Reviewing DDAS Topology drawings for potential upgrade that will be required when entire systems upgrade take place. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Generating SOW Doc's in RFQ form to request day rate and expense markup for Cat/CAN-RIG. Reviewing/translating documentations to satisfy tender. Conference calls/emails Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-30 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Doc. Review/Conference Calls/Emails. Reviewing the "Reel Rig System" as well as IDS Systems equipment Specs and Data as well as electrical load list. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-30 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Continue to attend Conference Calls Meetings. Reviewing NOV proposed Top Drive single line power/control drawings as well as VFD building drawins presented by NOV. Working with Set Point in developing SOW for their services. Continue ti review DDAS for potential upgrade that will be required when entire systems upgrade take place. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Generating SOW Doc's in the C1/C4 forms for the Bolivian YPFB Project. Conference calls/emails Reviewing/translating documentations to satisfy tender for YPFB. Working on PM Documentation. 2 Hours on Tuesday attending the Husky prep meeting. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-31 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Continue to attend Conference Calls Meetings. Reviewing NOV proposed Top Drive single line power/control drawings as well as VFD building drawins presented by NOV. Working with Set Point in developing SOW for their services. Continue ti review DDAS for potential upgrade that will be required when entire systems upgrade take place. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-10-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Generating SOW Doc's in the C1/C4 forms for the Bolivian YPFB Project. Conference calls/emails Reviewing/translating documentations to satisfy tender for YPFB. Working on PM Documentation. 2 Hours on Tuesday attending the Husky prep meeting. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-01 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Doc. Review/Conference Calls/Emails. Reviewing the "Reel Rig System" as well as IDS Systems equipment Specs and Data as well as electrical load list. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 Continue to attend Conference Calls Meetings. Reviewing NOV proposed Top Drive single line power/control drawings as well as VFD building drawins presented by NOV. Working with Set Point in developing SOW for their services. Continue ti review DDAS for potential upgrade that will be required when entire systems upgrade take place. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Generating SOW Doc's in the C1/C4 forms for the Bolivian YPFB Project. Conference calls/emails Reviewing/translating documentations to satisfy tender for YPFB. Working on PM Documentation. 2 Hours on Tuesday attending the Husky prep meeting. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-02 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Doc. Review/Conference Calls/Emails. Reviewing the "Reel Rig System" as well as IDS Systems equipment Specs and Data as well as electrical load list. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-02 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 Continue to attend Conference Calls Meetings. Reviewing NOV proposed Top Drive single line power/control drawings as well as VFD building drawins presented by NOV. Working with Set Point in developing SOW for their services. Continue ti review DDAS for potential upgrade that will be required when entire systems upgrade take place. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Generating SOW Doc's in the C1/C4 forms for the Bolivian YPFB Project. Conference calls/emails Reviewing/translating documentations to satisfy tender for YPFB. Working on PM Documentation. 2 Hours on Tuesday attending the Husky prep meeting. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-03 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Continue to attend Conference Calls Meetings. Reviewing NOV proposed Top Drive single line power/control drawings as well as VFD building drawins presented by NOV. Working with Set Point in developing SOW for their services. Continue ti review DDAS for potential upgrade that will be required when entire systems upgrade take place. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Generating SOW Doc's in the C1/C4 forms for the Bolivian YPFB Project. Conference calls/emails Reviewing/translating documentations to satisfy tender for YPFB. Working on PM Documentation. 2 Hours on Tuesday attending the Husky prep meeting. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-06 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 6 0 Continue to attend Conference Calls Meetings. Reviewing NOV proposed Top Drive single line power/control drawings as well as VFD building drawings presented by NOV. Reviewing the Set Point proposal SOW for engineering services. Continue the review DDAS for potential upgrade that will be required when entire systems upgrade. Review the Wood Group proposal for the work to be done for the Top Drive upgrade. Conference call with Joshua and Sachin to discuss the Wood Group SOW/Cost Proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-06 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 2 0 Review presentation details for preparation for the Thursday meeting with Wood Group for the Husky Project. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Reviewing PM procedures for AC/DC motors and systems. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Travel to St. John's NF on Tuesday for PM review on the Hibernia Project. Attend PM workshop for Hibernia full day on Wednesday and half a day on Thursday to review "Action Item List that created in Wednesday Work Shop. Return travel on Friday from St. John's. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Travel to St. John's NF on Tuesday for PM review on the Hibernia Project. Attend PM workshop for Hibernia full day on Wednesday and half a day on Thursday to review "Action Item List that created in Wednesday Work Shop. Return travel on Friday from St. John's. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-08 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 2 0 Review presentation details for preparation for the Thursday meeting with Wood Group for the Husky Project. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Continue to attend Conference Calls Meetings. Reviewing NOV proposed Top Drive single line power/control drawings as well as VFD building drawings presented by NOV. Reviewing the Set Point proposal SOW for engineering services. Continue the review DDAS for potential upgrade that will be required when entire systems upgrade. Review the Wood Group proposal for the work to be done for the Top Drive upgrade. Conference call with Joshua and Sachin to discuss the Wood Group SOW/Cost Proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 5 0 Travel to St. John's NF on Tuesday for PM review on the Hibernia Project. Attend PM workshop for Hibernia full day on Wednesday and half a day on Thursday to review "Action Item List that created in Wednesday Work Shop. Return travel on Friday from St. John's. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-09 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 4 0 Review presentation details for preparation for the Thursday meeting with Wood Group for the Husky Project. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-10 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Travel to St. John's NF on Tuesday for PM review on the Hibernia Project. Attend PM workshop for Hibernia full day on Wednesday and half a day on Thursday to review "Action Item List that created in Wednesday Work Shop. Return travel on Friday from St. John's. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 Continue to attend Conference Calls Meetings. Reviewing NOV proposed Top Drive single line power/control drawings as well as VFD building drawings presented by NOV. Reviewing the Set Point proposal SOW for engineering services and proposed PLC's change out. Review the Wood Group proposal for their SOW work to be done for the Top Drive upgrade. Made recommendation to help minimize both labor and cost Conference call with Joshua and Sachin to discuss the Wood Group SOW/Cost Proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-13 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Reviewing Mike Anatra's PM documentation recommended changes for existing procedure to the PKD recommended. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-13 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4 0 Generating SOW Doc's in the C1/C4 forms for the Bolivian YPFB Project. Conference calls/emails reviewing/translating documentations to satisfy tender for YPFB. Working on PM Documentation.Continue to source commissioning documentation from existing jobs to be utilized as presentation data to YPFB. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-14 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Continue to attend Conference Calls Meetings. Reviewing NOV proposed Top Drive single line power/control drawings as well as VFD building drawings presented by NOV. Reviewing the Set Point proposal SOW for engineering services and proposed PLC's change out. Review the Wood Group proposal for their SOW work to be done for the Top Drive upgrade. Made recommendation to help minimize both labor and cost Conference call with Joshua and Sachin to discuss the Wood Group SOW/Cost Proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-14 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Reviewing Mike Anatra's PM documentation recommended changes for existing procedure to the PKD recommended. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Reviewing PM procedures for AC/DC motors and systems. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-14 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 6 0 Generating SOW Doc's in the C1/C4 forms for the Bolivian YPFB Project. Conference calls/emails reviewing/translating documentations to satisfy tender for YPFB. Working on PM Documentation.Continue to source commissioning documentation from existing jobs to be utilized as presentation data to YPFB. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-15 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Reviewing Mike Anatra's PM documentation recommended changes for existing procedure to the PKD recommended. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-15 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 2 0 Reviewing documentation for the Husky Project. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Reviewing PM procedures for AC/DC motors and systems. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-15 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4 0 Generating SOW Doc's in the C1/C4 forms for the Bolivian YPFB Project. Conference calls/emails reviewing/translating documentations to satisfy tender for YPFB. Working on PM Documentation.Continue to source commissioning documentation from existing jobs to be utilized as presentation data to YPFB. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-16 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Continue to attend Conference Calls Meetings. Reviewing NOV proposed Top Drive single line power/control drawings as well as VFD building drawings presented by NOV. Reviewing the Set Point proposal SOW for engineering services and proposed PLC's change out. Review the Wood Group proposal for their SOW work to be done for the Top Drive upgrade. Made recommendation to help minimize both labor and cost Conference call with Joshua and Sachin to discuss the Wood Group SOW/Cost Proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-16 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 2 0 Reviewing documentation for the Husky Project. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-16 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4 0 Generating SOW Doc's in the C1/C4 forms for the Bolivian YPFB Project. Conference calls/emails reviewing/translating documentations to satisfy tender for YPFB. Working on PM Documentation.Continue to source commissioning documentation from existing jobs to be utilized as presentation data to YPFB. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Continue to attend Conference Calls Meetings. Reviewing NOV proposed Top Drive single line power/control drawings as well as VFD building drawings presented by NOV. Reviewing the Set Point proposal SOW for engineering services and proposed PLC's change out. Review the Wood Group proposal for their SOW work to be done for the Top Drive upgrade. Made recommendation to help minimize both labor and cost Conference call with Joshua and Sachin to discuss the Wood Group SOW/Cost Proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-17 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 1 0 Reviewing documentation for the Husky Project. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Reviewing PM procedures for AC/DC motors and systems. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-17 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 5 0 Generating SOW Doc's in the C1/C4 forms for the Bolivian YPFB Project. Conference calls/emails reviewing/translating documentations to satisfy tender for YPFB. Working on PM Documentation.Continue to source commissioning documentation from existing jobs to be utilized as presentation data to YPFB. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 Continue to attend Conference Calls Meetings. Reviewing NOV proposed Top Drive single line power/control drawings as well as VFD building drawings presented by NOV. Reviewing the Set Point proposal SOW for engineering services and proposed PLC's change out. Review the Wood Group proposal for their SOW work to be done for the Top Drive upgrade. Made recommendation to help minimize both labor and cost Conference call with Joshua and Sachin to discuss the Wood Group SOW/Cost Proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-20 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Reviewing Mike Anatra's PM documentation recommended changes for existing procedure to the PKD recommended. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-20 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 3 0 Generating SOW Doc's in the C1/C4 forms for the Bolivian YPFB Project. Conference calls/emails reviewing/translating documentations to satisfy tender for YPFB. Working on PM Documentation.Continue to source commissioning documentation from existing jobs to be utilized as presentation data to YPFB. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-21 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 Continue to attend Conference Calls Meetings. Reviewing NOV proposed Top Drive single line power/control drawings as well as VFD building drawings presented by NOV. Reviewing the Set Point proposal SOW for engineering services and proposed PLC's change out. Review the Wood Group proposal for their SOW work to be done for the Top Drive upgrade. Made recommendation to help minimize both labor and cost Conference call with Joshua and Sachin to discuss the Wood Group SOW/Cost Proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-21 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Reviewing Mike Anatra's PM documentation recommended changes for existing procedure to the PKD recommended. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-21 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 2 0 Generating SOW Doc's in the C1/C4 forms for the Bolivian YPFB Project. Conference calls/emails reviewing/translating documentations to satisfy tender for YPFB. Working on PM Documentation.Continue to source commissioning documentation from existing jobs to be utilized as presentation data to YPFB. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-22 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Continue to attend Conference Calls Meetings. Reviewing NOV proposed Top Drive single line power/control drawings as well as VFD building drawings presented by NOV. Reviewing the Set Point proposal SOW for engineering services and proposed PLC's change out. Review the Wood Group proposal for their SOW work to be done for the Top Drive upgrade. Made recommendation to help minimize both labor and cost Conference call with Joshua and Sachin to discuss the Wood Group SOW/Cost Proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-22 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Reviewing Mike Anatra's PM documentation recommended changes for existing procedure to the PKD recommended. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-22 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 5 0 Generating SOW Doc's in the C1/C4 forms for the Bolivian YPFB Project. Conference calls/emails reviewing/translating documentations to satisfy tender for YPFB. Working on PM Documentation.Continue to source commissioning documentation from existing jobs to be utilized as presentation data to YPFB. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-23 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Thanksgiving Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-24 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Thanksgiving Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 Continue to attend Conference Calls Meetings. reviewing Wood Group proposal for their SOW to be done for the TD upgrade. Reviewing and becoming familiar with the CEC since Wood Group references this code throughout their proposal as well as in Conference Calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-27 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2.5 0 Revising the PM documentation on SharePoint for the Hibernia Platform. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-27 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2.5 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-28 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 Continue to attend Conference Calls Meetings. reviewing Wood Group proposal for their SOW to be done for the TD upgrade. Reviewing and becoming familiar with the CEC since Wood Group references this code throughout their proposal as well as in Conference Calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-28 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 5 0 Revising the PM documentation on SharePoint for the Hibernia Platform. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-29 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Continue to attend Conference Calls Meetings. reviewing Wood Group proposal for their SOW to be done for the TD upgrade. Reviewing and becoming familiar with the CEC since Wood Group references this code throughout their proposal as well as in Conference Calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-29 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Revising the PM documentation on SharePoint for the Hibernia Platform. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-29 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-30 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Revising the PM documentation on SharePoint for the Hibernia Platform. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-11-30 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-01 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-04 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Revising the PM documentation on SharePoint for the Hibernia Platform. Working the 10 items that are due for the TD Package to be presented Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Revising the PM documentation on SharePoint for the Hibernia Platform. Working the 10 items that are due for the TD Package to be presented Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 6 0 Revising the PM documentation on SharePoint for the Hibernia Platform. Working the 10 items that are due for the TD Package to be presented Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 6 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 3 0 Revising the PM documentation on SharePoint for the Hibernia Platform. Working the 10 items that are due for the TD Package to be presented Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-11 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Revising the PM documentation on SharePoint for the Hibernia Platform. Completed working the 10 items that were due for the TD Package to be presented to XOM. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-11 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Researching documentation from the Berkut Project drawing to assist in future development of planned Sakhalin platform. Research documentation for possible work for XOM on the Holley Platform. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Attend conference call with NOV Engineers regarding how to accomplish the required temperature rating of T3 for the Chopper Resistor. Research documentation regarding required temperature ratings of equipment in the CEC. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-12 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Revising the PM documentation on SharePoint for the Hibernia Platform. Completed working the 10 items that were due for the TD Package to be presented to XOM. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-12 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 Researching documentation from the Berkut Project drawing to assist in future development of planned Sakhalin platform. Research documentation for possible work for XOM on the Holley Platform. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Attend conference call with NOV Engineers regarding how to accomplish the required temperature rating of T3 for the Chopper Resistor. Research documentation regarding required temperature ratings of equipment in the CEC. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-13 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Revising the PM documentation on SharePoint for the Hibernia Platform. Completed working the 10 items that were due for the TD Package to be presented to XOM. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-13 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2.5 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-14 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Attend conference call with NOV Engineers regarding how to accomplish the required temperature rating of T3 for the Chopper Resistor. Research documentation regarding required temperature ratings of equipment in the CEC. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-14 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Revising the PM documentation on SharePoint for the Hibernia Platform. Completed working the 10 items that were due for the TD Package to be presented to XOM. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Researching documentation from the Berkut Project drawing to assist in future development of planned Sakhalin platform. Research documentation for possible work for XOM on the Holley Platform. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-15 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1.5 0 Revising the PM documentation on SharePoint for the Hibernia Platform. Completed working the 10 items that were due for the TD Package to be presented to XOM. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Researching documentation from the Berkut Project drawing to assist in future development of planned Sakhalin platform. Research documentation for possible work for XOM on the Holley Platform. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Research documentation regarding required temperature ratings of equipment in the CEC. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-18 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Writing, developing, and completed the "Employee Performance & Development Review" package due back on December 26, 2017 Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Research and writng power summary for G.O regarding how the Berkut power systems are set up and how they operate. This information will be of assistance for his understanding of the systems to help in a presentation that going to be presented in Norway. Reviewing report and equipment survey for the platform in California. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Research documentation regarding required temperature ratings of equipment in the CEC. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-19 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Writing, developing, and completed the "Employee Performance & Development Review" package due back on December 26, 2017 Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Research and writng power summary for G.O regarding how the Berkut power systems are set up and how they operate. This information will be of assistance for his understanding of the systems to help in a presentation that going to be presented in Norway. Reviewing report and equipment survey for the platform in California. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-21 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-25 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-28 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2017-12-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Years Day. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 8 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 6 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW * TSR-01583-SP-MU-00007-RevA-PLC Life Extension * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-10 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW * TSR-01583-SP-MU-00007-RevA-PLC Life Extension * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-10 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW * TSR-01583-SP-MU-00007-RevA-PLC Life Extension * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-11 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Reviewing the Island Rig Major Maintenance Technical Proposal Rev A as well as the 12260 SOW for ITT MM Island Rigs documentation for Rodney Sumner. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SoW * TSR-01583-SP-MU-00007-RevA-PLC Life Extension * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-12 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Reviewing the Island Rig Major Maintenance Technical Proposal Rev A as well as the 12260 SOW for ITT MM Island Rigs documentation for Rodney Sumner. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SOW * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-15 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Monday thru Thursday - Reviewing the Island Rig Major Maintenance Technical Proposal Rev A as well as the 12260 SOW for ITT MM Island Rigs documentation for Rodney Sumner. Look at the 5 year recommended maintenance for the Traveling Blocks/Crown Blocks. Looked at SOW for each and time duration to complete. Friday - Reviewing the information regarding the Holley Platform to be surveyed in February. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-16 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SOW * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-16 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Monday thru Thursday - Reviewing the Island Rig Major Maintenance Technical Proposal Rev A as well as the 12260 SOW for ITT MM Island Rigs documentation for Rodney Sumner. Look at the 5 year recommended maintenance for the Traveling Blocks/Crown Blocks. Looked at SOW for each and time duration to complete. Friday - Reviewing the information regarding the Holley Platform to be surveyed in February. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2.5 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SOW * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-17 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Monday thru Thursday - Reviewing the Island Rig Major Maintenance Technical Proposal Rev A as well as the 12260 SOW for ITT MM Island Rigs documentation for Rodney Sumner. Look at the 5 year recommended maintenance for the Traveling Blocks/Crown Blocks. Looked at SOW for each and time duration to complete. Friday - Reviewing the information regarding the Holley Platform to be surveyed in February. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SOW * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-18 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Monday thru Thursday - Reviewing the Island Rig Major Maintenance Technical Proposal Rev A as well as the 12260 SOW for ITT MM Island Rigs documentation for Rodney Sumner. Look at the 5 year recommended maintenance for the Traveling Blocks/Crown Blocks. Looked at SOW for each and time duration to complete. Friday - Reviewing the information regarding the Holley Platform to be surveyed in February. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing and commenting on the following documentation: * TSR-01583-SP-MU-00001-Rev1 – AC TD, VFD House, Cooling Skid and TB SOW * TSR-01583-SP-MU-00009-RevA-TD Rail Replacement * TSR-01583-SP-MU-00006-RevB- Hibernia HPU Modification SoW * TSR-01583-SP-MU-00008-RevA-PHM Valve, FB Control, Derrickman Station and DW HPU SoW Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-19 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2.5 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Monday thru Thursday - Reviewing the Island Rig Major Maintenance Technical Proposal Rev A as well as the 12260 SOW for ITT MM Island Rigs documentation for Rodney Sumner. Look at the 5 year recommended maintenance for the Traveling Blocks/Crown Blocks. Looked at SOW for each and time duration to complete. Friday - Reviewing the information regarding the Holley Platform to be surveyed in February. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-22 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Monday/Tuesday - Reviewing the information regarding the Holley Platform to be surveyed in February. Found out on the 24 the trip to the Holly Platform to be postponed until further notice. Tues/Wen/Thurs - Reviewing and researching NG Engine application for Drilling. Supply research documentation to GO. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-23 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Monday/Tuesday - Reviewing the information regarding the Holley Platform to be surveyed in February. Found out on the 24 the trip to the Holly Platform to be postponed until further notice. Tues/Wen/Thurs - Reviewing and researching NG Engine application for Drilling. Supply research documentation to GO. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-24 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Monday/Tuesday - Reviewing the information regarding the Holley Platform to be surveyed in February. Found out on the 24 the trip to the Holly Platform to be postponed until further notice. Tues/Wen/Thurs - Reviewing and researching NG Engine application for Drilling. Supply research documentation to GO. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Review NOV Field Service Report regarding torque control for TD and reply back via email to JL Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-25 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Monday/Tuesday - Reviewing the information regarding the Holley Platform to be surveyed in February. Found out on the 24 the trip to the Holly Platform to be postponed until further notice. Tues/Wen/Thurs - Reviewing and researching NG Engine application for Drilling. Supply research documentation to GO. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-25 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 5 0 Research and provide documentation to rig 269 regarding procedural process for alignment of generator to engine package. Exchanged email and phone conversations with Cristian Marcu the Chief Mechanic for rig 269. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-26 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Attended conference calls regarding plans forward and protocols in making the recommended changes for existing procedures to the PKD recommended. Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Monday/Tuesday - Reviewing the information regarding the Holley Platform to be surveyed in February. Found out on the 24 the trip to the Holly Platform to be postponed until further notice. Tues/Wen/Thurs - Reviewing and researching NG Engine application for Drilling. Supply research documentation to GO. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-26 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 5 0 Research and provide documentation to rig 269 regarding procedural process for alignment of generator to engine package. Exchanged email and phone conversations with Cristian Marcu the Chief Mechanic for rig 269. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-28 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 Research and provide documentation to rig 269 regarding procedural process for alignment of generator to engine package. Exchanged email and phone conversations with Cristian Marcu the Chief Mechanic for rig 269. Generator #% complete starting on generators 1 & 4. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-29 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-29 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3 0 Research and provide documentation to rig 269 regarding procedural process for alignment of generator to engine package. Exchanged email and phone conversations with Cristian Marcu the Chief Mechanic for rig 269. Generator #% complete starting on generators 1 & 4. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-30 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 Reviewing MH Wirth TD & Traveling Block information & Drawings. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-30 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-30 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3 0 Research and provide documentation to rig 269 regarding procedural process for alignment of generator to engine package. Exchanged email and phone conversations with Cristian Marcu the Chief Mechanic for rig 269. Generator #% complete starting on generators 1 & 4. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-31 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing MH Wirth TD & Traveling Block information & Drawings. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-31 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Updating SAP Functional Equipment Maintenance Procedures for C101-17-10-B. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-01-31 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 Research and provide documentation to rig 269 regarding procedural process for alignment of generator to engine package. Exchanged email and phone conversations with Cristian Marcu the Chief Mechanic for rig 269. Generator #% complete starting on generators 1 & 4. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-01 OH-010 :OH-010 Overhead All Activities Regular Pay N 9 0 Thursday - Travel to Houston for mandatory required training. Saturday - Travel to OKC 908 miles round-trip Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-02 OH-014 :OH-014 Overhead All Activities Regular Pay N 3 0 Mandatory Corporate Training Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-03 OH-010 :OH-010 Overhead All Activities Regular Pay N 9 0 Thursday - Travel to Houston for mandatory required training. Saturday - Travel to OKC 908 miles round-trip Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing MH Wirth TD & Traveling Block information & Drawings. Reviewing the information that Billy Arnold with NOV sent. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Visiting with RR regarding 7838 Brake Maintenance Procedures. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-05 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Reviewing documentation regarding fuel consumption verses submarine cable option Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-05 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Reviewing documentation from the Holly Platform and visiting with Allen Henley on the phone regarding same. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-06 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing MH Wirth TD & Traveling Block information & Drawings. Reviewing the information that Billy Arnold with NOV sent. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Visiting with RR regarding 7838 Brake Maintenance Procedures. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-06 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Reviewing documentation regarding fuel consumption verses submarine cable option Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-06 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Reviewing documentation from the Holly Platform and visiting with Allen Henley on the phone regarding same. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-07 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing MH Wirth TD & Traveling Block information & Drawings. Reviewing the information that Billy Arnold with NOV sent. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Visiting with RR regarding 7838 Brake Maintenance Procedures. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-07 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Reviewing documentation regarding fuel consumption verses submarine cable option Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-07 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 Reviewing documentation from the Holly Platform and visiting with Allen Henley on the phone regarding same. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-08 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing MH Wirth TD & Traveling Block information & Drawings. Reviewing the information that Billy Arnold with NOV sent. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Visiting with RR regarding 7838 Brake Maintenance Procedures. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-08 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 Reviewing documentation from the Holly Platform and visiting with Allen Henley on the phone regarding same. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Visiting with RR regarding 7838 Brake Maintenance Procedures. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-09 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Reviewing documentation from the Holly Platform and visiting with Allen Henley on the phone regarding same. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-12 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Attending conference call meetings. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-12 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Reviewing documentation from the Holly Platform and visiting with Allen Henley on the phone regarding same. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing MH Wirth TD & Traveling Block information & Drawings. Reviewing the information that Billy Arnold with NOV sent. Attending NOV - Survey Report Review conference meeting call. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-13 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Attending conference call meetings. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-13 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Reviewing documentation from the Holly Platform and visiting with Allen Henley on the phone regarding same. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-14 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Reviewing MH Wirth TD & Traveling Block information & Drawings. Reviewing the information that Billy Arnold with NOV sent. Attending NOV - Survey Report Review conference meeting call. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-14 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Attending conference call meetings. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-14 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Reviewing documentation from the Holly Platform and visiting with Allen Henley on the phone regarding same. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 Reviewing MH Wirth TD & Traveling Block information & Drawings. Reviewing the information that Billy Arnold with NOV sent. Attending NOV - Survey Report Review conference meeting call. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-15 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Attending conference call meetings. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-15 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 Reviewing documentation regarding fuel consumption verses submarine cable option. Reviewing documentation of the BOD located on Q;Drive, attending conference calls Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-15 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Reviewing documentation from the Holly Platform and visiting with Allen Henley on the phone regarding same. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-16 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Updating SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing documentation that MA sent me from the rig in proposed changes in existing maintenance procedures. Attending conference call meetings. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-16 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Reviewing documentation regarding fuel consumption verses submarine cable option. Reviewing documentation of the BOD located on Q;Drive, attending conference calls Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-16 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Reviewing documentation from the Holly Platform and visiting with Allen Henley on the phone regarding same. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 . Reviewing the information that was sent by NOV. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-19 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Continue to review and update SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-19 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Audit Holly Platform and meet with audit team to discuss. Generate report on findings on Friday Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-20 OH-010 :OH-010 Overhead All Activities Regular Pay N 6 0 Travel to/from Santa Barbara Californis to audit the Holly Platform Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-20 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Audit Holly Platform and meet with audit team to discuss. Generate report on findings on Friday Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-21 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 12 0 Audit Holly Platform and meet with audit team to discuss. Generate report on findings on Friday Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-22 OH-010 :OH-010 Overhead All Activities Regular Pay N 6 0 Travel to/from Santa Barbara Californis to audit the Holly Platform Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-22 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Audit Holly Platform and meet with audit team to discuss. Generate report on findings on Friday Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-23 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Reviewed “TSR-01629-PT-MU-00001-RevA BoD Presentation for accuracy. Responded via email. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-23 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 8 0 Audit Holly Platform and meet with audit team to discuss. Generate report on findings on Friday Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-26 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Continue to review and update SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing and discussions BF on documentation Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-26 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 8 0 Working on schedule/SOW document/cost sheet analysis. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-26 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Concept Study Min Kit Opportunities review, TSR-01583 Deliverables Review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-27 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Continue to review and update SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing and discussions BF on documentation Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-27 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 8 0 Working on schedule/SOW document/cost sheet analysis. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-28 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Continue to review and update SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing and discussions BF on documentation Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-28 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 9 0 Working on schedule/SOW document/cost sheet analysis. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-02-28 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Concept Study Min Kit Opportunities review, TSR-01583 Deliverables Review Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-01 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Continue to review and update SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing and discussions BF on documentation Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-01 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 9 0 Working on schedule/SOW document/cost sheet analysis. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Continue to review and update SAP Functional Equipment Maintenance Procedures to ensure the maximum 132 characters per line. Updating the review tracker on SharePoint. Reviewing and discussions BF on documentation Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-02 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 7 0 Working on schedule/SOW document/cost sheet analysis. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-05 OH-010 :OH-010 Overhead All Activities Regular Pay N 8 0 Travel from OKC to Houston - Monday Travel from Houston to OKC - Friday Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-06 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 8 0 Worked on SOW Document and Lump Sum Cost Analysis for the Holly Platform Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-07 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 8 0 Worked on SOW Document and Lump Sum Cost Analysis for the Holly Platform Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-07 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Review of TSR-01629-PT-MU-00003-RevA-Electrical System Sizing and Comparison, Concept 3 Concrete MODU 3D Block Model and GA 03.09.2018– PDF (3D Manipulate), -Concept 3 Concrete MODU 3D Block Model and GA 03.09.2018- PPT Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-08 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 8 0 Worked on SOW Document and Lump Sum Cost Analysis for the Holly Platform Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Review of TSR-01629-PT-MU-00003-RevA-Electrical System Sizing and Comparison, Concept 3 Concrete MODU 3D Block Model and GA 03.09.2018– PDF (3D Manipulate), -Concept 3 Concrete MODU 3D Block Model and GA 03.09.2018- PPT Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-09 OH-010 :OH-010 Overhead All Activities Regular Pay N 8 0 Travel from OKC to Houston - Monday Travel from Houston to OKC - Friday Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-12 OH-010 :OH-010 Overhead All Activities Regular Pay N 8 0 Travel from OKC to Houston Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-13 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 9.5 0 Working on Holly Platform SOW Document, Schedule, Material/Equipment Cost Estimate, reviewing the schedule attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-14 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 10.5 0 Working on Holly Platform SOW Document, Schedule, Material/Equipment Cost Estimate, reviewing the schedule attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-15 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 10.5 0 Working on Holly Platform SOW Document, Schedule, Material/Equipment Cost Estimate, reviewing the schedule attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-16 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 11 0 Working on Holly Platform SOW Document, Schedule, Material/Equipment Cost Estimate, reviewing the schedule attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-17 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 7 0 Working on Holly Platform SOW Document, Schedule, Material/Equipment Cost Estimate, reviewing the schedule attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-18 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 7 0 Working on Holly Platform SOW Document, Schedule, Material/Equipment Cost Estimate, reviewing the schedule attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-19 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 10 0 Working on Holly Platform SOW Document, Schedule, Material/Equipment Cost Estimate, reviewing the schedule attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-20 OH-010 :OH-010 Overhead All Activities Regular Pay N 8 0 Travel from Houston to OKC on Tuesday and Travel to Houston on Friday Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-21 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 4 0 Working on Holly Platform SOW Document, Schedule, Material/Equipment Cost Estimate, reviewing the schedule attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-22 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 4 0 Working on Holly Platform SOW Document, Schedule, Material/Equipment Cost Estimate, reviewing the schedule attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-23 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 6 0 Working on Holly Platform SOW Document, Schedule, Material/Equipment Cost Estimate, reviewing the schedule attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-24 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 4 0 Working on Holly Platform SOW Document, Schedule, Material/Equipment Cost Estimate, reviewing the schedule attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-03-24 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 Travel from Houston to OKC on Tuesday and Travel to Houston on Friday Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-02 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 9 0 Provide support to develop the Tender to XOM for the Holly Platform.Reviewing the Holly Platform SOW Document, Material/Equipment Cost Estimate,the schedule, and attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-03 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 9 0 Provide support to develop the Tender to XOM for the Holly Platform.Reviewing the Holly Platform SOW Document, Material/Equipment Cost Estimate,the schedule, and attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-04 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 9 0 Provide support to develop the Tender to XOM for the Holly Platform.Reviewing the Holly Platform SOW Document, Material/Equipment Cost Estimate,the schedule, and attending meetings and conference calls. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 8 0 Continue to review and update SAP Functional Equipment Maintenance Procedures. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 8 0 Continue to review and update SAP Functional Equipment Maintenance Procedures. Updating the review tracker on SharePoint. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-09 OH-003 :OH-003 Overhead All Activities Regular Pay N 8 0 Jury Duty Oklahoma County Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-10 OH-003 :OH-003 Overhead All Activities Regular Pay N 8 0 Jury Duty Oklahoma County Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-11 OH-003 :OH-003 Overhead All Activities Regular Pay N 8 0 Jury Duty Oklahoma County Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-12 OH-003 :OH-003 Overhead All Activities Regular Pay N 8 0 Jury Duty Oklahoma County Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-13 OH-003 :OH-003 Overhead All Activities Regular Pay N 8 0 Jury Duty Oklahoma County Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-16 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 2 0 Reviewing the Holly Platform SOW Document, Material/Equipment Cost Estimate,the schedule. Reviewing IPS drawings for installation of DC Top Drive or an AC Top Drive. Need to determine what are the potential issues with either. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Reviewing & editing PM procedures in Oracle for all generators, AC/DC motors, SCR systems, transformers, VFD's, Eddi-Current Elmagco Brakes, and electrical systems in general to ensure procedures are accurate and per OEM & National Standards & Codes. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-17 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 2 0 Reviewing the Holly Platform SOW Document, Material/Equipment Cost Estimate,the schedule. Reviewing IPS drawings for installation of DC Top Drive or an AC Top Drive. Need to determine what are the potential issues with either. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Reviewing & editing PM procedures in Oracle for all generators, AC/DC motors, SCR systems, transformers, VFD's, Eddi-Current Elmagco Brakes, and electrical systems in general to ensure procedures are accurate and per OEM & National Standards & Codes. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-18 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 2 0 Reviewing the Holly Platform SOW Document, Material/Equipment Cost Estimate,the schedule. Reviewing IPS drawings for installation of DC Top Drive or an AC Top Drive. Need to determine what are the potential issues with either. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Reviewing & editing PM procedures in Oracle for all generators, AC/DC motors, SCR systems, transformers, VFD's, Eddi-Current Elmagco Brakes, and electrical systems in general to ensure procedures are accurate and per OEM & National Standards & Codes. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-19 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 2 0 Reviewing the Holly Platform SOW Document, Material/Equipment Cost Estimate,the schedule. Reviewing IPS drawings for installation of DC Top Drive or an AC Top Drive. Need to determine what are the potential issues with either. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Reviewing & editing PM procedures in Oracle for all generators, AC/DC motors, SCR systems, transformers, VFD's, Eddi-Current Elmagco Brakes, and electrical systems in general to ensure procedures are accurate and per OEM & National Standards & Codes. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-20 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 2 0 Reviewing the Holly Platform SOW Document, Material/Equipment Cost Estimate,the schedule. Reviewing IPS drawings for installation of DC Top Drive or an AC Top Drive. Need to determine what are the potential issues with either. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Reviewing & editing PM procedures in Oracle for all generators, AC/DC motors, SCR systems, transformers, VFD's, Eddi-Current Elmagco Brakes, and electrical systems in general to ensure procedures are accurate and per OEM & National Standards & Codes. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-23 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 4 0 Reviewing IPS drawings for installation of DC Top Drive or an AC Top Drive.Talked with Gerardo Gamboa on 4/24/18, 4/25/18 & 4/28/18 to clarify the SOS Document included in the tender for Material/Equipment for the technical sections of the proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-24 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 5 0 Reviewing IPS drawings for installation of DC Top Drive or an AC Top Drive.Talked with Gerardo Gamboa on 4/24/18, 4/25/18 & 4/28/18 to clarify the SOS Document included in the tender for Material/Equipment for the technical sections of the proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-25 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 5 0 Reviewing IPS drawings for installation of DC Top Drive or an AC Top Drive.Talked with Gerardo Gamboa on 4/24/18, 4/25/18 & 4/28/18 to clarify the SOS Document included in the tender for Material/Equipment for the technical sections of the proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-26 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 4 0 Reviewing IPS drawings for installation of DC Top Drive or an AC Top Drive.Talked with Gerardo Gamboa on 4/24/18, 4/25/18 & 4/28/18 to clarify the SOS Document included in the tender for Material/Equipment for the technical sections of the proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-27 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 5 0 Reviewing IPS drawings for installation of DC Top Drive or an AC Top Drive.Talked with Gerardo Gamboa on 4/24/18, 4/25/18 & 4/28/18 to clarify the SOS Document included in the tender for Material/Equipment for the technical sections of the proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-04-30 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 5 0 Reviewed IPS drawings for potential installation of DC/AC Top Drive.Talked and answering emails with Allen Henley & Gerardo Gamboa on 04/30/18, 05/01/18, 05/02/18 & 5/05/18 to clarify the SOS/SOW Document included in the tender for Material/Equipment for the technical sections of the proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-01 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 5 0 Reviewed IPS drawings for potential installation of DC/AC Top Drive.Talked and answering emails with Allen Henley & Gerardo Gamboa on 04/30/18, 05/01/18, 05/02/18 & 5/05/18 to clarify the SOS/SOW Document included in the tender for Material/Equipment for the technical sections of the proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-02 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 5 0 Reviewed IPS drawings for potential installation of DC/AC Top Drive.Talked and answering emails with Allen Henley & Gerardo Gamboa on 04/30/18, 05/01/18, 05/02/18 & 5/05/18 to clarify the SOS/SOW Document included in the tender for Material/Equipment for the technical sections of the proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-03 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 5 0 Reviewed IPS drawings for potential installation of DC/AC Top Drive.Talked and answering emails with Allen Henley & Gerardo Gamboa on 04/30/18, 05/01/18, 05/02/18 & 5/05/18 to clarify the SOS/SOW Document included in the tender for Material/Equipment for the technical sections of the proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-04 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 7 0 Reviewed IPS drawings for potential installation of DC/AC Top Drive.Talked and answering emails with Allen Henley & Gerardo Gamboa on 04/30/18, 05/01/18, 05/02/18 & 5/05/18 to clarify the SOS/SOW Document included in the tender for Material/Equipment for the technical sections of the proposal. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-15 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 4 0 Preparing for and attended meeting with XOM at their Houston office regarding the Holly Project. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-16 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 4 0 Preparing for and attended meeting with XOM at their Houston office regarding the Holly Project. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-17 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 2 0 Preparing for and attended meeting with XOM at their Houston office regarding the Holly Project. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-17 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 Travel to and from Houston Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-18 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 5 0 Preparing for and attended meeting with XOM at their Houston office regarding the Holly Project. Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-18 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 Travel to and from Houston Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-21 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-23 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-25 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-28 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Memorial Day Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-30 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-05-31 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Gorrell, Chuck Sr Site Mgr 10154 Gorrell, Chuck:Sr Site Mgr 2018-06-01 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Guzzi, Rafa Administrative Services I 22982 Guzzi, Rafa:Administrative Services I 2017-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Guzzi, Rafa Administrative Services I 22982 Guzzi, Rafa:Administrative Services I 2017-01-03 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 Guzzi, Rafa Administrative Services I 22982 Guzzi, Rafa:Administrative Services I 2017-01-04 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 Guzzi, Rafa Administrative Services I 22982 Guzzi, Rafa:Administrative Services I 2017-01-05 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 Guzzi, Rafa Administrative Services I 22982 Guzzi, Rafa:Administrative Services I 2017-01-06 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 Hopkins, Tamyra Administrative Services I 18276 Hopkins, Tamyra:Administrative Services I 2017-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Hopkins, Tamyra Administrative Services I 18276 Hopkins, Tamyra:Administrative Services I 2017-01-03 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 Hopkins, Tamyra Administrative Services I 18276 Hopkins, Tamyra:Administrative Services I 2017-01-04 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 Hopkins, Tamyra Administrative Services I 18276 Hopkins, Tamyra:Administrative Services I 2017-01-05 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 Hopkins, Tamyra Administrative Services I 18276 Hopkins, Tamyra:Administrative Services I 2017-01-06 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 Jones, Tommy Manager/Staff Consultant 10263 Jones, Tommy:Manager/Staff Consultant 2017-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Jones, Tommy Manager/Staff Consultant 10263 Jones, Tommy:Manager/Staff Consultant 2017-01-03 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 Jones, Tommy Manager/Staff Consultant 10263 Jones, Tommy:Manager/Staff Consultant 2017-01-04 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 Jones, Tommy Manager/Staff Consultant 10263 Jones, Tommy:Manager/Staff Consultant 2017-01-05 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 Jones, Tommy Manager/Staff Consultant 10263 Jones, Tommy:Manager/Staff Consultant 2017-01-06 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Years Holiday Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6 0 Review and edit 1500HP cost estimate; Review and edit workover rig cost estimate; review and edit combined project schedule; interface with rig suppliers on workover rig specs and proposal requirements; review and comment on 1500hp rig drawings; Revise 1500HP Tech Brochure for Drillmec; Create summary email for workover rig Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 01/03/2017 - Weekly Operations Conference Call; 01/06/2016 - Technical Services Department Employee Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 01/03/2017 - MK Timesheet; Annual Compliance Questionnaire; 01/05/2017 - Update MK 2016 Performance Review Spreadsheet 01/06/2017 - 2MTek and iTS Merger Update Meeting with Rob; Update MK 2016 Performance Review Spreadsheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-04 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6 0 Review and edit 1500HP cost estimate; Review and edit workover rig cost estimate; review and edit combined project schedule; interface with rig suppliers on workover rig specs and proposal requirements; review and comment on 1500hp rig drawings; Revise 1500HP Tech Brochure for Drillmec; Create summary email for workover rig Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Start brainstorming 2017 Technical Services BD Plan content Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-05 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 Review and edit 1500HP cost estimate; Review and edit workover rig cost estimate; review and edit combined project schedule; interface with rig suppliers on workover rig specs and proposal requirements; review and comment on 1500hp rig drawings; Revise 1500HP Tech Brochure for Drillmec; Create summary email for workover rig Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 01/03/2017 - MK Timesheet; Annual Compliance Questionnaire; 01/05/2017 - Update MK 2016 Performance Review Spreadsheet 01/06/2017 - 2MTek and iTS Merger Update Meeting with Rob; Update MK 2016 Performance Review Spreadsheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-05 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.5 0 Review and edit 1500HP cost estimate; Review and edit workover rig cost estimate; review and edit combined project schedule; interface with rig suppliers on workover rig specs and proposal requirements; review and comment on 1500hp rig drawings; Revise 1500HP Tech Brochure for Drillmec; Create summary email for workover rig Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 01/03/2017 - Weekly Operations Conference Call; 01/06/2016 - Technical Services Department Employee Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 01/03/2017 - MK Timesheet; Annual Compliance Questionnaire; 01/05/2017 - Update MK 2016 Performance Review Spreadsheet 01/06/2017 - 2MTek and iTS Merger Update Meeting with Rob; Update MK 2016 Performance Review Spreadsheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-06 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 2 0 Rig 270L Lessons Learned Preparation Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-09 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6.5 0 Fill out detailed Rig Tech Spec from TOTAL; Complete closeout report; Assemble closeout report attachments; Work with PKD SCM to sent RFQ to Drillmec for Workover Rig Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 01/09/2017 - MK Timesheet; 01/11/2017 - Meeting with Leslie Nagy regarding accounting for 2M-Tek and iTS R&S merger: 01/12/2017 - Provide Rob with Update on progress towards 2M-Tek merger Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-09 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 1 0 Rig 270L Walking System Project After Action Review Brainstorming Meeting: Review and comment on Rig 270L Mast and Sub Report; Research history of substructure swap with Rig 269L Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-10 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Fill out detailed Rig Tech Spec from TOTAL; Complete closeout report; Assemble closeout report attachments; Work with PKD SCM to sent RFQ to Drillmec for Workover Rig Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 Develop agenda for Tech Services BD Brainstorming Session; Start outline of Tech Services BD Plan; Build Tech Services Target Matrix Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-10 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 3 0 Rig 270L Walking System Project After Action Review Brainstorming Meeting: Review and comment on Rig 270L Mast and Sub Report; Research history of substructure swap with Rig 269L Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-11 ARBU-TSRs :ARBU-TSRs TSR-01534-ARBU 1st Quarter 2017 General Query - Alaska Regular Pay N 1.5 0 Research Lone Start Super Choke Gauge for Luis Casnova inquiry. Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 01/09/2017 - MK Timesheet; 01/11/2017 - Meeting with Leslie Nagy regarding accounting for 2M-Tek and iTS R&S merger: 01/12/2017 - Provide Rob with Update on progress towards 2M-Tek merger Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5.5 0 Develop agenda for Tech Services BD Brainstorming Session; Start outline of Tech Services BD Plan; Build Tech Services Target Matrix Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-12 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6.5 0 Fill out detailed Rig Tech Spec from TOTAL; Complete closeout report; Assemble closeout report attachments; Work with PKD SCM to sent RFQ to Drillmec for Workover Rig Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 01/09/2017 - MK Timesheet; 01/11/2017 - Meeting with Leslie Nagy regarding accounting for 2M-Tek and iTS R&S merger: 01/12/2017 - Provide Rob with Update on progress towards 2M-Tek merger Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Develop agenda for Tech Services BD Brainstorming Session; Start outline of Tech Services BD Plan; Build Tech Services Target Matrix Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-13 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 4 0 Rig 270L Walking System Project After Action Review Brainstorming Meeting: Review and comment on Rig 270L Mast and Sub Report; Research history of substructure swap with Rig 269L Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 01/16/2016 - Weekly Operations Update Conference Call; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 01/16/2016 - MK Timesheet; 2M-Tek Merger Meeting with Accounting, Legal, and Tax; 01/17/2016 - 2M-Tek Merger Meeting with Rob; 01/18/2016 - Review and edit 2m-Tek Merger Schedule Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Develop Tech Services BD Target Matrix; Research Networking events, conferences, and committees; Organize and facilitate BD Brainstorming Meeting; BD Lunch with WJM Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-16 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 2 0 01/16/2016 - Review Rig 270L Project Risk Register and edit as required; 01/17/2016 - Rig 270L Project Risk Register Meeting; Review and comment on Entro and Sawyer Supplier Scorecards; 01/18/2016 - Research and answer queries related to Rig 270L Mast Scoping Yoke and Ground Bearing Pressure Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-16 Rig 270L-TSR :Rig 270L-TSR TSR-01533-270L Temp Rating Regular Pay N 1 0 Review and comment on Revision 0 and Revision 1 of the Temp Rating Report Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-17 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 Review and edit Total Technical Spec Query with more detail per request from Mat Ellis Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 01/16/2016 - MK Timesheet; 2M-Tek Merger Meeting with Accounting, Legal, and Tax; 01/17/2016 - 2M-Tek Merger Meeting with Rob; 01/18/2016 - Review and edit 2m-Tek Merger Schedule Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Develop Tech Services BD Target Matrix; Research Networking events, conferences, and committees; Organize and facilitate BD Brainstorming Meeting; BD Lunch with WJM Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-17 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 2 0 01/16/2016 - Review Rig 270L Project Risk Register and edit as required; 01/17/2016 - Rig 270L Project Risk Register Meeting; Review and comment on Entro and Sawyer Supplier Scorecards; 01/18/2016 - Research and answer queries related to Rig 270L Mast Scoping Yoke and Ground Bearing Pressure Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 01/16/2016 - MK Timesheet; 2M-Tek Merger Meeting with Accounting, Legal, and Tax; 01/17/2016 - 2M-Tek Merger Meeting with Rob; 01/18/2016 - Review and edit 2m-Tek Merger Schedule Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Develop Tech Services BD Target Matrix; Research Networking events, conferences, and committees; Organize and facilitate BD Brainstorming Meeting; BD Lunch with WJM Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-18 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 2 0 01/16/2016 - Review Rig 270L Project Risk Register and edit as required; 01/17/2016 - Rig 270L Project Risk Register Meeting; Review and comment on Entro and Sawyer Supplier Scorecards; 01/18/2016 - Research and answer queries related to Rig 270L Mast Scoping Yoke and Ground Bearing Pressure Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Develop Tech Services BD Target Matrix; Research Networking events, conferences, and committees; Organize and facilitate BD Brainstorming Meeting; BD Lunch with WJM Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-19 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-19 Rig 270L-TSR :Rig 270L-TSR TSR-01533-270L Temp Rating Regular Pay N 1 0 Review and comment on Revision 0 and Revision 1 of the Temp Rating Report Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Develop Tech Services BD Target Matrix; Research Networking events, conferences, and committees; Organize and facilitate BD Brainstorming Meeting; BD Lunch with WJM Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 01/23/2017 - Weekly Operations Update Conference Call; 01/24/2017 - SSAB Lunch and Learn; 01/26/2017 - HDI Lunch and Learn Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 01/23/2017 - MK Timesheet; 01/27/2017 - 2M-Tek Legal Status Update with Rob Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6.5 0 Upgrade Proposal TSR and CTR for Rigs 231L and 253L; Chevron Cabinda Project Research and Tech Specs; SWOT Analysis Session with Technical Services Staff; Development of Technical Services BD Plan; Husky White Rose Meeting; Start Researching Berkut Case Study Brochure Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 01/23/2017 - Weekly Operations Update Conference Call; 01/24/2017 - SSAB Lunch and Learn; 01/26/2017 - HDI Lunch and Learn Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Upgrade Proposal TSR and CTR for Rigs 231L and 253L; Chevron Cabinda Project Research and Tech Specs; SWOT Analysis Session with Technical Services Staff; Development of Technical Services BD Plan; Husky White Rose Meeting; Start Researching Berkut Case Study Brochure Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Upgrade Proposal TSR and CTR for Rigs 231L and 253L; Chevron Cabinda Project Research and Tech Specs; SWOT Analysis Session with Technical Services Staff; Development of Technical Services BD Plan; Husky White Rose Meeting; Start Researching Berkut Case Study Brochure Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 01/23/2017 - Weekly Operations Update Conference Call; 01/24/2017 - SSAB Lunch and Learn; 01/26/2017 - HDI Lunch and Learn Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Upgrade Proposal TSR and CTR for Rigs 231L and 253L; Chevron Cabinda Project Research and Tech Specs; SWOT Analysis Session with Technical Services Staff; Development of Technical Services BD Plan; Husky White Rose Meeting; Start Researching Berkut Case Study Brochure Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 01/23/2017 - MK Timesheet; 01/27/2017 - 2M-Tek Legal Status Update with Rob Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Upgrade Proposal TSR and CTR for Rigs 231L and 253L; Chevron Cabinda Project Research and Tech Specs; SWOT Analysis Session with Technical Services Staff; Development of Technical Services BD Plan; Husky White Rose Meeting; Start Researching Berkut Case Study Brochure Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 02/06/2017 - Weekly Operations Update Conference Call; 02/09/2017 - TSR Weekly Meeting; Prep for Safety Moment Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 02/06/2017 - MK Timesheet; 02/10/2017 - Start Packing for Move to 5th Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Develop Berkut Case Study Brochure; Develop Krechet Case Study Brochure; Strategy Discussion for Wood Group BD Meeting; Develop Info for Wood Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-01-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Develop Berkut Case Study Brochure; Develop Krechet Case Study Brochure; Strategy Discussion for Wood Group BD Meeting; Develop Info for Wood Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Develop Berkut Case Study Brochure; Develop Krechet Case Study Brochure; Strategy Discussion for Wood Group BD Meeting; Develop Info for Wood Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-02 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.5 0 Update Major Equipment List; Review revised Total Specs with Mat Ellis; Revise TSR and CTR based on requested revisions from Total Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 02/06/2017 - Weekly Operations Update Conference Call; 02/09/2017 - TSR Weekly Meeting; Prep for Safety Moment Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 Develop Berkut Case Study Brochure; Develop Krechet Case Study Brochure; Strategy Discussion for Wood Group BD Meeting; Develop Info for Wood Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.5 0 Update Major Equipment List; Review revised Total Specs with Mat Ellis; Revise TSR and CTR based on requested revisions from Total Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 02/06/2017 - MK Timesheet; 02/10/2017 - Start Packing for Move to 5th Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4.5 0 Develop Berkut Case Study Brochure; Develop Krechet Case Study Brochure; Strategy Discussion for Wood Group BD Meeting; Develop Info for Wood Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 02/06/2017 - Weekly Operations Conference Call 02/09/2017 - TSR Weekly Meeting, Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 02/06/2017 - MK Timesheet; 02/08/2017 - Packing for move to 5th floor; 02/09/2017 - Start packing for move to 5th floor; 02/10/2017 - Packing for move to 5th floor; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Strategy Discussion for Wood Group BD Meeting; Develop Presentation Slides for Wood Group; Practice Run Meeting for Wood Group; Meeting at Wood Group; Type and Circulate notes from Wood Group Meeting; Debriefing meeting with Rob, Kyle, and Greg; Sales Force Meeting with Nancy Ngo; Explore Sales Force Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Strategy Discussion for Wood Group BD Meeting; Develop Presentation Slides for Wood Group; Practice Run Meeting for Wood Group; Meeting at Wood Group; Type and Circulate notes from Wood Group Meeting; Debriefing meeting with Rob, Kyle, and Greg; Sales Force Meeting with Nancy Ngo; Explore Sales Force Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 02/06/2017 - MK Timesheet; 02/08/2017 - Packing for move to 5th floor; 02/09/2017 - Start packing for move to 5th floor; 02/10/2017 - Packing for move to 5th floor; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Strategy Discussion for Wood Group BD Meeting; Develop Presentation Slides for Wood Group; Practice Run Meeting for Wood Group; Meeting at Wood Group; Type and Circulate notes from Wood Group Meeting; Debriefing meeting with Rob, Kyle, and Greg; Sales Force Meeting with Nancy Ngo; Explore Sales Force Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-09 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Update Major Equipment List based on feedback from Total; Research and write-up sound attenuation specs for expanded info requested by Total Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 02/06/2017 - Weekly Operations Conference Call 02/09/2017 - TSR Weekly Meeting, Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 02/06/2017 - MK Timesheet; 02/08/2017 - Packing for move to 5th floor; 02/09/2017 - Start packing for move to 5th floor; 02/10/2017 - Packing for move to 5th floor; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Strategy Discussion for Wood Group BD Meeting; Develop Presentation Slides for Wood Group; Practice Run Meeting for Wood Group; Meeting at Wood Group; Type and Circulate notes from Wood Group Meeting; Debriefing meeting with Rob, Kyle, and Greg; Sales Force Meeting with Nancy Ngo; Explore Sales Force Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-10 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Update Major Equipment List based on feedback from Total; Research and write-up sound attenuation specs for expanded info requested by Total Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 02/06/2017 - MK Timesheet; 02/08/2017 - Packing for move to 5th floor; 02/09/2017 - Start packing for move to 5th floor; 02/10/2017 - Packing for move to 5th floor; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Strategy Discussion for Wood Group BD Meeting; Develop Presentation Slides for Wood Group; Practice Run Meeting for Wood Group; Meeting at Wood Group; Type and Circulate notes from Wood Group Meeting; Debriefing meeting with Rob, Kyle, and Greg; Sales Force Meeting with Nancy Ngo; Explore Sales Force Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-13 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Drillmec Clarifications Meeting; Create Meeting Notes from Drillmec Meeting; Research Uganda Noise Restrictions Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 02/13/2017 - Weekly Operations Update Conference Call; 02/14/2017 - 5th Floor Safety Orientation Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 02/13/2017 - MK Timesheet; Unpack boxes from Office Move Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Research and study PKD Due Diligence processes and procedures; Update Tech Services BD Plan Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-14 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 Drillmec Clarifications Meeting; Create Meeting Notes from Drillmec Meeting; Research Uganda Noise Restrictions Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 02/13/2017 - Weekly Operations Update Conference Call; 02/14/2017 - 5th Floor Safety Orientation Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3.5 0 Research and study PKD Due Diligence processes and procedures; Update Tech Services BD Plan Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 02/15/2017 - PTO; 02/16/2017 - PTO; 02/17/2017 - PTO Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 02/15/2017 - PTO; 02/16/2017 - PTO; 02/17/2017 - PTO Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-17 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 02/15/2017 - PTO; 02/16/2017 - PTO; 02/17/2017 - PTO Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-20 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 President's Day Corporate Holiday Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-21 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Review revised quote from Drillmec; Review revised quote from HongHua; Meeting with Environmental Noise Control about Sound Attenuation Specs Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 MK Timesheet; MK 2017 Evaluation and SMART Goals Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 2017 Due Diligence Conference Call With Carlos Cubbedu in Dubai; O&M Growth and Go-to-Market Review Presentation; Salesforce Training Meeting with Nancy Ngo; Create Due Diligence Team Org Chart; Create Template for DD SharePoint Site; DD - EMEA and G5 Conference Call with Whittenburg Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-22 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Review revised quote from Drillmec; Review revised quote from HongHua; Meeting with Environmental Noise Control about Sound Attenuation Specs Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 MK Timesheet; MK 2017 Evaluation and SMART Goals Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 2017 Due Diligence Conference Call With Carlos Cubbedu in Dubai; O&M Growth and Go-to-Market Review Presentation; Salesforce Training Meeting with Nancy Ngo; Create Due Diligence Team Org Chart; Create Template for DD SharePoint Site; DD - EMEA and G5 Conference Call with Whittenburg Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 02/23/2017 - TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 2017 Due Diligence Conference Call With Carlos Cubbedu in Dubai; O&M Growth and Go-to-Market Review Presentation; Salesforce Training Meeting with Nancy Ngo; Create Due Diligence Team Org Chart; Create Template for DD SharePoint Site; DD - EMEA and G5 Conference Call with Whittenburg Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-24 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Review revised quote from Drillmec; Review revised quote from HongHua; Meeting with Environmental Noise Control about Sound Attenuation Specs Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 2017 Due Diligence Conference Call With Carlos Cubbedu in Dubai; O&M Growth and Go-to-Market Review Presentation; Salesforce Training Meeting with Nancy Ngo; Create Due Diligence Team Org Chart; Create Template for DD SharePoint Site; DD - EMEA and G5 Conference Call with Whittenburg Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 02/27/2017 - Weekly Operations Update Conference Call; 03/02/2017 - Russian and Kazakh Certification Services Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Develop DD Kick-Off Presentation; Planning DD conversations with Carlos Cubeddu; Develop DD Travel Cost Estimate; DD Meeting with Compliance Group; Lead DD Kick-off Meeting; Revise DD Kick-Off Meeting Presentation; Organize DD SharePoint Site; Discussion with George Whittenburg on DD priorities for EMEA Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-02-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Develop DD Kick-Off Presentation; Planning DD conversations with Carlos Cubeddu; Develop DD Travel Cost Estimate; DD Meeting with Compliance Group; Lead DD Kick-off Meeting; Revise DD Kick-Off Meeting Presentation; Organize DD SharePoint Site; Discussion with George Whittenburg on DD priorities for EMEA Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Develop DD Kick-Off Presentation; Planning DD conversations with Carlos Cubeddu; Develop DD Travel Cost Estimate; DD Meeting with Compliance Group; Lead DD Kick-off Meeting; Revise DD Kick-Off Meeting Presentation; Organize DD SharePoint Site; Discussion with George Whittenburg on DD priorities for EMEA Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 02/27/2017 - Weekly Operations Update Conference Call; 03/02/2017 - Russian and Kazakh Certification Services Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Develop DD Kick-Off Presentation; Planning DD conversations with Carlos Cubeddu; Develop DD Travel Cost Estimate; DD Meeting with Compliance Group; Lead DD Kick-off Meeting; Revise DD Kick-Off Meeting Presentation; Organize DD SharePoint Site; Discussion with George Whittenburg on DD priorities for EMEA Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Meeting with Drillmec about revised specs; Discussion with Mat Ellis over Total request for smaller rig Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Develop DD Kick-Off Presentation; Planning DD conversations with Carlos Cubeddu; Develop DD Travel Cost Estimate; DD Meeting with Compliance Group; Lead DD Kick-off Meeting; Revise DD Kick-Off Meeting Presentation; Organize DD SharePoint Site; Discussion with George Whittenburg on DD priorities for EMEA Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 03/06/2017 - Weekly Operations Update Conference Call; 03/09/2017 - TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 03/06/2017 - MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Due Diligence Update Conference Call; EMEA Tender & Opportunities Conference Call; Update DD Project Cost Estimate; Create DD Project Charter; Conference Call with TDI to support DD; Write Weekly Update Report; DD Team Planning Meeting; Create Market Economy Justification Approval Email Template Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-07 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 Update 1250HP Technical Spec based on comments from Mat Ellis and Total Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Due Diligence Update Conference Call; EMEA Tender & Opportunities Conference Call; Update DD Project Cost Estimate; Create DD Project Charter; Conference Call with TDI to support DD; Write Weekly Update Report; DD Team Planning Meeting; Create Market Economy Justification Approval Email Template Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Due Diligence Update Conference Call; EMEA Tender & Opportunities Conference Call; Update DD Project Cost Estimate; Create DD Project Charter; Conference Call with TDI to support DD; Write Weekly Update Report; DD Team Planning Meeting; Create Market Economy Justification Approval Email Template Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-08 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 03/08/2017 - 2016 SharePoint Users Training Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 03/06/2017 - Weekly Operations Update Conference Call; 03/09/2017 - TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Due Diligence Update Conference Call; EMEA Tender & Opportunities Conference Call; Update DD Project Cost Estimate; Create DD Project Charter; Conference Call with TDI to support DD; Write Weekly Update Report; DD Team Planning Meeting; Create Market Economy Justification Approval Email Template Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Due Diligence Update Conference Call; EMEA Tender & Opportunities Conference Call; Update DD Project Cost Estimate; Create DD Project Charter; Conference Call with TDI to support DD; Write Weekly Update Report; DD Team Planning Meeting; Create Market Economy Justification Approval Email Template Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 03/13/2017 - Weekly Operations Update Conference Call; 03/16/2017 - TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 03/13/2017 - MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6.5 0 Conduct Due Diligence Progress Update Conference Call; Create Due Diligence Weekly Progress Update Email; Complete Project Charter draft; Complete Critical Success Questionnaire; Review TDI proposal; Update Project Cost Report; Research Visa requirements for Due Diligence Countries; Research Vaccination Requirements for Due Diligence Countries; Create email template for Announcing DD Kick-off for Carlos Compare cost estimate from Wayne Fox versus from Matt Kuehn; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-14 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 Review and comment on technical proposals from HungHua and Drillmec Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Conduct Due Diligence Progress Update Conference Call; Create Due Diligence Weekly Progress Update Email; Complete Project Charter draft; Complete Critical Success Questionnaire; Review TDI proposal; Update Project Cost Report; Research Visa requirements for Due Diligence Countries; Research Vaccination Requirements for Due Diligence Countries; Create email template for Announcing DD Kick-off for Carlos Compare cost estimate from Wayne Fox versus from Matt Kuehn; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Conduct Due Diligence Progress Update Conference Call; Create Due Diligence Weekly Progress Update Email; Complete Project Charter draft; Complete Critical Success Questionnaire; Review TDI proposal; Update Project Cost Report; Research Visa requirements for Due Diligence Countries; Research Vaccination Requirements for Due Diligence Countries; Create email template for Announcing DD Kick-off for Carlos Compare cost estimate from Wayne Fox versus from Matt Kuehn; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 03/13/2017 - Weekly Operations Update Conference Call; 03/16/2017 - TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Conduct Due Diligence Progress Update Conference Call; Create Due Diligence Weekly Progress Update Email; Complete Project Charter draft; Complete Critical Success Questionnaire; Review TDI proposal; Update Project Cost Report; Research Visa requirements for Due Diligence Countries; Research Vaccination Requirements for Due Diligence Countries; Create email template for Announcing DD Kick-off for Carlos Compare cost estimate from Wayne Fox versus from Matt Kuehn; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Conduct Due Diligence Progress Update Conference Call; Create Due Diligence Weekly Progress Update Email; Complete Project Charter draft; Complete Critical Success Questionnaire; Review TDI proposal; Update Project Cost Report; Research Visa requirements for Due Diligence Countries; Research Vaccination Requirements for Due Diligence Countries; Create email template for Announcing DD Kick-off for Carlos Compare cost estimate from Wayne Fox versus from Matt Kuehn; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 KOC Rig Build Contract Forms Review Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 03/20/2017 - Weekly Operations Update Conference Call; 03/23/2017 - TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4.5 0 Due Diligence Weekly Update Report; Due Diligence Weekly Conference Call; Overall Meetings with Seva and Doug on HR support; Revise Critical Success Questionnaires; Questions and quote revisions with TD International Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Due Diligence Weekly Update Report; Due Diligence Weekly Conference Call; Overall Meetings with Seva and Doug on HR support; Revise Critical Success Questionnaires; Questions and quote revisions with TD International Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Due Diligence Weekly Update Report; Due Diligence Weekly Conference Call; Overall Meetings with Seva and Doug on HR support; Revise Critical Success Questionnaires; Questions and quote revisions with TD International Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 03/20/2017 - Weekly Operations Update Conference Call; 03/23/2017 - TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Due Diligence Weekly Update Report; Due Diligence Weekly Conference Call; Overall Meetings with Seva and Doug on HR support; Revise Critical Success Questionnaires; Questions and quote revisions with TD International Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Due Diligence Weekly Update Report; Due Diligence Weekly Conference Call; Overall Meetings with Seva and Doug on HR support; Revise Critical Success Questionnaires; Questions and quote revisions with TD International Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 03/27/2017 - Weekly Operations Update Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 03/27/2017 - MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6.5 0 O&M Brochure Presentation with Robb Parker; Review and comment on O&M Brochure; Conduct Weekly Due Diligence Update Conference Call; Create Weekly Due Diligence Report; Revise Critical Success Questionnaires based on feedback from functional groups; Review Kuwait Critical Success Questionnaire with Bryan Collins; Created MDR for tracking DD documents; Assigned document numbers for DD documents; Review third party services support quotes from TDI, Deloitte, and PwC; Create Project and Country Specific Risk Registers Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 O&M Brochure Presentation with Robb Parker; Review and comment on O&M Brochure; Conduct Weekly Due Diligence Update Conference Call; Create Weekly Due Diligence Report; Revise Critical Success Questionnaires based on feedback from functional groups; Review Kuwait Critical Success Questionnaire with Bryan Collins; Created MDR for tracking DD documents; Assigned document numbers for DD documents; Review third party services support quotes from TDI, Deloitte, and PwC; Create Project and Country Specific Risk Registers Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 O&M Brochure Presentation with Robb Parker; Review and comment on O&M Brochure; Conduct Weekly Due Diligence Update Conference Call; Create Weekly Due Diligence Report; Revise Critical Success Questionnaires based on feedback from functional groups; Review Kuwait Critical Success Questionnaire with Bryan Collins; Created MDR for tracking DD documents; Assigned document numbers for DD documents; Review third party services support quotes from TDI, Deloitte, and PwC; Create Project and Country Specific Risk Registers Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-30 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Review Drillmec commercial proposal for 1250HP rig Review HH commercial proposal for 1250HP rig; Revise project cost estimate Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 O&M Brochure Presentation with Robb Parker; Review and comment on O&M Brochure; Conduct Weekly Due Diligence Update Conference Call; Create Weekly Due Diligence Report; Revise Critical Success Questionnaires based on feedback from functional groups; Review Kuwait Critical Success Questionnaire with Bryan Collins; Created MDR for tracking DD documents; Assigned document numbers for DD documents; Review third party services support quotes from TDI, Deloitte, and PwC; Create Project and Country Specific Risk Registers Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-30 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Russia Sanctions Training Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-31 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Review Drillmec commercial proposal for 1250HP rig Review HH commercial proposal for 1250HP rig; Revise project cost estimate Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-03-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 O&M Brochure Presentation with Robb Parker; Review and comment on O&M Brochure; Conduct Weekly Due Diligence Update Conference Call; Create Weekly Due Diligence Report; Revise Critical Success Questionnaires based on feedback from functional groups; Review Kuwait Critical Success Questionnaire with Bryan Collins; Created MDR for tracking DD documents; Assigned document numbers for DD documents; Review third party services support quotes from TDI, Deloitte, and PwC; Create Project and Country Specific Risk Registers Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Update Project Cost Estimate; Review HH Rig Specs and cost; Request quote for Tubulars and Rolling Stock Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 04/03 - Weekly Operations Update Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 04/03 - MK Timesheet; MK 2016 Performance Evaluation Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3.5 0 Conduct Weekly DD Update Meeting; Create Weekly DD Progress Report; Create DD presentation for LT; Revise Market Economy Justifications; Start researching Kuwait DD Checklist Section 1; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-04 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Update Project Cost Estimate; Review HH Rig Specs and cost; Request quote for Tubulars and Rolling Stock Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Conduct Weekly DD Update Meeting; Create Weekly DD Progress Report; Create DD presentation for LT; Revise Market Economy Justifications; Start researching Kuwait DD Checklist Section 1; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Conduct Weekly DD Update Meeting; Create Weekly DD Progress Report; Create DD presentation for LT; Revise Market Economy Justifications; Start researching Kuwait DD Checklist Section 1; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Conduct Weekly DD Update Meeting; Create Weekly DD Progress Report; Create DD presentation for LT; Revise Market Economy Justifications; Start researching Kuwait DD Checklist Section 1; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Conduct Weekly DD Update Meeting; Create Weekly DD Progress Report; Create DD presentation for LT; Revise Market Economy Justifications; Start researching Kuwait DD Checklist Section 1; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 04/10/2017 - Weekly Operations Update Conference Call; 04/13/2017 - TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 04/10/2017 - MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6.5 0 Follow-up to Tech Services Brainstorming Meeting; Conduct Weekly Due Diligence Update Meeting; Create Weekly DD Progress Report; Complete Kuwait Checklist Section 1; Create DD Issue Escalation Process; Revise DD presentation for LT Meetings; Plan Kuwait DD Kickoff Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Follow-up to Tech Services Brainstorming Meeting; Conduct Weekly Due Diligence Update Meeting; Create Weekly DD Progress Report; Complete Kuwait Checklist Section 1; Create DD Issue Escalation Process; Revise DD presentation for LT Meetings; Plan Kuwait DD Kickoff Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-11 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Conference Call with BP Engineers regarding AADU HVAC and Hazardous Areas Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Follow-up to Tech Services Brainstorming Meeting; Conduct Weekly Due Diligence Update Meeting; Create Weekly DD Progress Report; Complete Kuwait Checklist Section 1; Create DD Issue Escalation Process; Revise DD presentation for LT Meetings; Plan Kuwait DD Kickoff Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 04/10/2017 - Weekly Operations Update Conference Call; 04/13/2017 - TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Follow-up to Tech Services Brainstorming Meeting; Conduct Weekly Due Diligence Update Meeting; Create Weekly DD Progress Report; Complete Kuwait Checklist Section 1; Create DD Issue Escalation Process; Revise DD presentation for LT Meetings; Plan Kuwait DD Kickoff Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-14 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Good Friday Holiday Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 04/17/2017 - Weekly Operations Conference Call; General Update Discussion with Tecky from Genesis Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 04/17/2017 - MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5.5 0 Conduct Due Diligence Weekly Update Conference Call; Create Kuwait DD Kick-off Presentation; Conduct Kuwait DD Kick-off Meeting; Create DD Risk Escalation Process; Discuss KMG Joint Venture Opportunity with George Whittenburg; Research PKD and Competitor Websites; Create Presentation Slides and comparison matrix for competitor websites; Create PKD work in Peru slides for Carlos Cubeddu Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Conduct Due Diligence Weekly Update Conference Call; Create Kuwait DD Kick-off Presentation; Conduct Kuwait DD Kick-off Meeting; Create DD Risk Escalation Process; Discuss KMG Joint Venture Opportunity with George Whittenburg; Research PKD and Competitor Websites; Create Presentation Slides and comparison matrix for competitor websites; Create PKD work in Peru slides for Carlos Cubeddu Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 PTO Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Conduct Due Diligence Weekly Update Conference Call; Create Kuwait DD Kick-off Presentation; Conduct Kuwait DD Kick-off Meeting; Create DD Risk Escalation Process; Discuss KMG Joint Venture Opportunity with George Whittenburg; Research PKD and Competitor Websites; Create Presentation Slides and comparison matrix for competitor websites; Create PKD work in Peru slides for Carlos Cubeddu Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-21 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Conduct Due Diligence Weekly Update Meeting; Create Due Diligence Weekly Report; Create Kuwait Due Diligence Checklist Responsibilities and Due Dates; Work with TDI on Kuwait Scope of Work; Continue working on Southern Iraq Due Diligence Checklist; Prepare for Steering Committee Meeting; Continue research corporate website requirements and scope Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Conduct Due Diligence Weekly Update Meeting; Create Due Diligence Weekly Report; Create Kuwait Due Diligence Checklist Responsibilities and Due Dates; Work with TDI on Kuwait Scope of Work; Continue working on Southern Iraq Due Diligence Checklist; Prepare for Steering Committee Meeting; Continue research corporate website requirements and scope Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Technical Services Update Meeting; Start researching topics for Quarterly Meeting Safety Moment Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Conduct Due Diligence Weekly Update Meeting; Create Due Diligence Weekly Report; Create Kuwait Due Diligence Checklist Responsibilities and Due Dates; Work with TDI on Kuwait Scope of Work; Continue working on Southern Iraq Due Diligence Checklist; Prepare for Steering Committee Meeting; Continue research corporate website requirements and scope Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Technical Services Update Meeting; Start researching topics for Quarterly Meeting Safety Moment Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-04-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Conduct Due Diligence Weekly Update Meeting; Create Due Diligence Weekly Report; Create Kuwait Due Diligence Checklist Responsibilities and Due Dates; Work with TDI on Kuwait Scope of Work; Continue working on Southern Iraq Due Diligence Checklist; Prepare for Steering Committee Meeting; Continue research corporate website requirements and scope Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/01/2017 - Weekly Operations Update Conference Call; 05/03/2017 - PKD 1st Quarter Earnings Meeting and Safety Moment; 05/04/2017 - Technical Services Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 MK Timesheet; Develop and practice safety moment for Quarterly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Discussions with Emma Grosvenor and Nancy Ngo on Corporate Website Redesign Status; Conduct Weekly Due Diligence Update Meeting; Create Weekly Due Diligence Weekly Report; Prepare and conduct Steering Committee Meeting; Continue Due Diligence Research for Southern Iraq Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 MK Timesheet; Develop and practice safety moment for Quarterly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Discussions with Emma Grosvenor and Nancy Ngo on Corporate Website Redesign Status; Conduct Weekly Due Diligence Update Meeting; Create Weekly Due Diligence Weekly Report; Prepare and conduct Steering Committee Meeting; Continue Due Diligence Research for Southern Iraq Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 05/01/2017 - Weekly Operations Update Conference Call; 05/03/2017 - PKD 1st Quarter Earnings Meeting and Safety Moment; 05/04/2017 - Technical Services Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 MK Timesheet; Develop and practice safety moment for Quarterly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Discussions with Emma Grosvenor and Nancy Ngo on Corporate Website Redesign Status; Conduct Weekly Due Diligence Update Meeting; Create Weekly Due Diligence Weekly Report; Prepare and conduct Steering Committee Meeting; Continue Due Diligence Research for Southern Iraq Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/01/2017 - Weekly Operations Update Conference Call; 05/03/2017 - PKD 1st Quarter Earnings Meeting and Safety Moment; 05/04/2017 - Technical Services Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Discussions with Emma Grosvenor and Nancy Ngo on Corporate Website Redesign Status; Conduct Weekly Due Diligence Update Meeting; Create Weekly Due Diligence Weekly Report; Prepare and conduct Steering Committee Meeting; Continue Due Diligence Research for Southern Iraq Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet; Develop and practice safety moment for Quarterly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5.5 0 Discussions with Emma Grosvenor and Nancy Ngo on Corporate Website Redesign Status; Conduct Weekly Due Diligence Update Meeting; Create Weekly Due Diligence Weekly Report; Prepare and conduct Steering Committee Meeting; Continue Due Diligence Research for Southern Iraq Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/08/2017 - Weekly Operations Update Conference Call; 05/11/2017 - TSR Weekly Meeting and Safety Moment Prep Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 05/08/2017 - MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Conduct Due Diligence Update Meeting; Create Weekly Due Diligence Report; Prepare and conduct Kuwait Update and New Country Kick-off Meeting; Visit Concentra and get vaccinations; Create Vaccination Information Emails; Expedite Purchase Order for TDI; Combine Due Diligence Checklist Sections from Rajeev and Jack W to master checklist; Research requirements for Kuwait Direct Investment Promotion Authority (KDIPA); Conference Call with Emma G. about corporate website planning; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Conduct Due Diligence Update Meeting; Create Weekly Due Diligence Report; Prepare and conduct Kuwait Update and New Country Kick-off Meeting; Visit Concentra and get vaccinations; Create Vaccination Information Emails; Expedite Purchase Order for TDI; Combine Due Diligence Checklist Sections from Rajeev and Jack W to master checklist; Research requirements for Kuwait Direct Investment Promotion Authority (KDIPA); Conference Call with Emma G. about corporate website planning; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Conduct Due Diligence Update Meeting; Create Weekly Due Diligence Report; Prepare and conduct Kuwait Update and New Country Kick-off Meeting; Visit Concentra and get vaccinations; Create Vaccination Information Emails; Expedite Purchase Order for TDI; Combine Due Diligence Checklist Sections from Rajeev and Jack W to master checklist; Research requirements for Kuwait Direct Investment Promotion Authority (KDIPA); Conference Call with Emma G. about corporate website planning; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 05/08/2017 - Weekly Operations Update Conference Call; 05/11/2017 - TSR Weekly Meeting and Safety Moment Prep Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Conduct Due Diligence Update Meeting; Create Weekly Due Diligence Report; Prepare and conduct Kuwait Update and New Country Kick-off Meeting; Visit Concentra and get vaccinations; Create Vaccination Information Emails; Expedite Purchase Order for TDI; Combine Due Diligence Checklist Sections from Rajeev and Jack W to master checklist; Research requirements for Kuwait Direct Investment Promotion Authority (KDIPA); Conference Call with Emma G. about corporate website planning; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Conduct Due Diligence Update Meeting; Create Weekly Due Diligence Report; Prepare and conduct Kuwait Update and New Country Kick-off Meeting; Visit Concentra and get vaccinations; Create Vaccination Information Emails; Expedite Purchase Order for TDI; Combine Due Diligence Checklist Sections from Rajeev and Jack W to master checklist; Research requirements for Kuwait Direct Investment Promotion Authority (KDIPA); Conference Call with Emma G. about corporate website planning; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/15/2017 - Weekly Operations Conference Call; 05/18/2017 - TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 05/15/2017 - MK Timesheet; 05/16/2017 - Create Vision Award Nomination for TE and JL Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Conduct Weekly Update Meeting; Create Weekly Report; Prepare for and conduct Kick-off meeting with TDI and Kuwait; Create Peru Market Economy Justification; Create Peru Critical Success Questionnaire; Meetings with Julio Salazar-Garcia on Peru Opportunities Develop travel cost estimate for Website Planning Trip in Dubai; Review Updates in Salesforce from BD Managers Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 05/15/2017 - MK Timesheet; 05/16/2017 - Create Vision Award Nomination for TE and JL Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Conduct Weekly Update Meeting; Create Weekly Report; Prepare for and conduct Kick-off meeting with TDI and Kuwait; Create Peru Market Economy Justification; Create Peru Critical Success Questionnaire; Meetings with Julio Salazar-Garcia on Peru Opportunities Develop travel cost estimate for Website Planning Trip in Dubai; Review Updates in Salesforce from BD Managers Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 05/16/2017 - Rig 270L Closeout Meeting with Exxon Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Conduct Weekly Update Meeting; Create Weekly Report; Prepare for and conduct Kick-off meeting with TDI and Kuwait; Create Peru Market Economy Justification; Create Peru Critical Success Questionnaire; Meetings with Julio Salazar-Garcia on Peru Opportunities Develop travel cost estimate for Website Planning Trip in Dubai; Review Updates in Salesforce from BD Managers Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/15/2017 - Weekly Operations Conference Call; 05/18/2017 - TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Conduct Weekly Update Meeting; Create Weekly Report; Prepare for and conduct Kick-off meeting with TDI and Kuwait; Create Peru Market Economy Justification; Create Peru Critical Success Questionnaire; Meetings with Julio Salazar-Garcia on Peru Opportunities Develop travel cost estimate for Website Planning Trip in Dubai; Review Updates in Salesforce from BD Managers Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Conduct Weekly Update Meeting; Create Weekly Report; Prepare for and conduct Kick-off meeting with TDI and Kuwait; Create Peru Market Economy Justification; Create Peru Critical Success Questionnaire; Meetings with Julio Salazar-Garcia on Peru Opportunities Develop travel cost estimate for Website Planning Trip in Dubai; Review Updates in Salesforce from BD Managers Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/22/2017 - Weekly Operations Update Conference Call; 05/25/2017 - KOC Tender Rig Builder Award Recommendation; TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet; Office Spring Cleaning Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6.5 0 Create Website and rebranding tracking matrix; Review and edit website and rebranding schedule; Organize and conduct Weekly Update Meeting with TDI; Create TDI Meeting Notes/Actions; Respond to Doug DeLaMorena email regarding New Country Entry Competencies; Conduct Weekly Update Conference Call; Create Weekly Update Report; Continue Southern Iraq Due Diligence Checklist; Answer Peru Tax Liability Questions Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-22 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 05/22/2017 - IDR Spring Cleaning Kick-Off Training Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Create Website and rebranding tracking matrix; Review and edit website and rebranding schedule; Organize and conduct Weekly Update Meeting with TDI; Create TDI Meeting Notes/Actions; Respond to Doug DeLaMorena email regarding New Country Entry Competencies; Conduct Weekly Update Conference Call; Create Weekly Update Report; Continue Southern Iraq Due Diligence Checklist; Answer Peru Tax Liability Questions Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Create Website and rebranding tracking matrix; Review and edit website and rebranding schedule; Organize and conduct Weekly Update Meeting with TDI; Create TDI Meeting Notes/Actions; Respond to Doug DeLaMorena email regarding New Country Entry Competencies; Conduct Weekly Update Conference Call; Create Weekly Update Report; Continue Southern Iraq Due Diligence Checklist; Answer Peru Tax Liability Questions Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-24 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Research pressure vessel examination requirements for Matt Hoffman Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 05/22/2017 - Weekly Operations Update Conference Call; 05/25/2017 - KOC Tender Rig Builder Award Recommendation; TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Create Website and rebranding tracking matrix; Review and edit website and rebranding schedule; Organize and conduct Weekly Update Meeting with TDI; Create TDI Meeting Notes/Actions; Respond to Doug DeLaMorena email regarding New Country Entry Competencies; Conduct Weekly Update Conference Call; Create Weekly Update Report; Continue Southern Iraq Due Diligence Checklist; Answer Peru Tax Liability Questions Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-25 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 Assist Bryan Little with Accumulator Sizing Calculations for Shell Proposal Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 MK Timesheet; Office Spring Cleaning Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Create Website and rebranding tracking matrix; Review and edit website and rebranding schedule; Organize and conduct Weekly Update Meeting with TDI; Create TDI Meeting Notes/Actions; Respond to Doug DeLaMorena email regarding New Country Entry Competencies; Conduct Weekly Update Conference Call; Create Weekly Update Report; Continue Southern Iraq Due Diligence Checklist; Answer Peru Tax Liability Questions Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-29 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Memorial Day Holiday Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 05/30 - MK Timesheet; Complete SER for Alex Juarez 05/31 - Initiation of Project Management Services – Guidance Matrix; 06/01 - Revisions to Initiation of Project Management Services – Guidance Matrix Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Website RFP Meeting with Steering Committee; review and comment on Website RFP document; Review potential suppliers for website overhaul; Due Diligence Update Meeting; Continue Southern Iraq DD Checklist; Conduct Update meeting with TDI Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 05/30 - MK Timesheet; Complete SER for Alex Juarez 05/31 - Initiation of Project Management Services – Guidance Matrix; 06/01 - Revisions to Initiation of Project Management Services – Guidance Matrix Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-05-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Website RFP Meeting with Steering Committee; review and comment on Website RFP document; Review potential suppliers for website overhaul; Due Diligence Update Meeting; Continue Southern Iraq DD Checklist; Conduct Update meeting with TDI Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 05/30 - MK Timesheet; Complete SER for Alex Juarez 05/31 - Initiation of Project Management Services – Guidance Matrix; 06/01 - Revisions to Initiation of Project Management Services – Guidance Matrix Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Website RFP Meeting with Steering Committee; review and comment on Website RFP document; Review potential suppliers for website overhaul; Due Diligence Update Meeting; Continue Southern Iraq DD Checklist; Conduct Update meeting with TDI Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-02 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-07 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-08 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-09 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 06/12/2017 - Weekly Operations Update Conference Call; 06/13/2017 - PKD Townhall Meeting 06/14/2017 - Product and Services SME Program Meeting; 06/15/2017 - Technical Services Update Meeting; NOV Desert Rig Lunch and Learn Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Review Total Uganda Tender with DD Team; Work on Due Diligence Opportunity Assessment Review Spreadsheet; Review New Zealand Critical Success Questionnaire and Market Economy Justification for Gary Bourne; Conduct Weekly Due Diligence Update Conference Call; Conduct TDI Weekly Update Conference Call; Create Weekly Due Diligence Weekly Update Report; Create RFP Evaluations Spreadsheet for Website and Marketing Services; Create Due Diligence Update Slides for Carlos Cubeddu presentation to LT Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 06/12/2017 - Weekly Operations Update Conference Call; 06/13/2017 - PKD Townhall Meeting 06/14/2017 - Product and Services SME Program Meeting; 06/15/2017 - Technical Services Update Meeting; NOV Desert Rig Lunch and Learn Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Review Total Uganda Tender with DD Team; Work on Due Diligence Opportunity Assessment Review Spreadsheet; Review New Zealand Critical Success Questionnaire and Market Economy Justification for Gary Bourne; Conduct Weekly Due Diligence Update Conference Call; Conduct TDI Weekly Update Conference Call; Create Weekly Due Diligence Weekly Update Report; Create RFP Evaluations Spreadsheet for Website and Marketing Services; Create Due Diligence Update Slides for Carlos Cubeddu presentation to LT Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 06/12/2017 - Weekly Operations Update Conference Call; 06/13/2017 - PKD Townhall Meeting 06/14/2017 - Product and Services SME Program Meeting; 06/15/2017 - Technical Services Update Meeting; NOV Desert Rig Lunch and Learn Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Review Total Uganda Tender with DD Team; Work on Due Diligence Opportunity Assessment Review Spreadsheet; Review New Zealand Critical Success Questionnaire and Market Economy Justification for Gary Bourne; Conduct Weekly Due Diligence Update Conference Call; Conduct TDI Weekly Update Conference Call; Create Weekly Due Diligence Weekly Update Report; Create RFP Evaluations Spreadsheet for Website and Marketing Services; Create Due Diligence Update Slides for Carlos Cubeddu presentation to LT Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 06/12/2017 - Weekly Operations Update Conference Call; 06/13/2017 - PKD Townhall Meeting 06/14/2017 - Product and Services SME Program Meeting; 06/15/2017 - Technical Services Update Meeting; NOV Desert Rig Lunch and Learn Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Review Total Uganda Tender with DD Team; Work on Due Diligence Opportunity Assessment Review Spreadsheet; Review New Zealand Critical Success Questionnaire and Market Economy Justification for Gary Bourne; Conduct Weekly Due Diligence Update Conference Call; Conduct TDI Weekly Update Conference Call; Create Weekly Due Diligence Weekly Update Report; Create RFP Evaluations Spreadsheet for Website and Marketing Services; Create Due Diligence Update Slides for Carlos Cubeddu presentation to LT Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Review Total Uganda Tender with DD Team; Work on Due Diligence Opportunity Assessment Review Spreadsheet; Review New Zealand Critical Success Questionnaire and Market Economy Justification for Gary Bourne; Conduct Weekly Due Diligence Update Conference Call; Conduct TDI Weekly Update Conference Call; Create Weekly Due Diligence Weekly Update Report; Create RFP Evaluations Spreadsheet for Website and Marketing Services; Create Due Diligence Update Slides for Carlos Cubeddu presentation to LT Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 06/19/2017 - Weekly Operations Update Conference Call; 06/20/2017 - Drillmec Striker Presentation Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5.5 0 Conduct Weekly Due Diligence Update Meeting; Create Weekly Due Diligence Update Report; Develop Technical Services Marketing Slides for Carlos; Create Total Uganda Kick-off Meeting Presentation; Review TDI Kuwait Deliverables; Host TDI Kuwait Debriefing Meeting; Conduct Uganda Diligence Kick-off Meeting; Create Website Roll-Out Spreadsheet; Review and Comment on Website RFP Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 06/19/2017 - Weekly Operations Update Conference Call; 06/20/2017 - Drillmec Striker Presentation Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Conduct Weekly Due Diligence Update Meeting; Create Weekly Due Diligence Update Report; Develop Technical Services Marketing Slides for Carlos; Create Total Uganda Kick-off Meeting Presentation; Review TDI Kuwait Deliverables; Host TDI Kuwait Debriefing Meeting; Conduct Uganda Diligence Kick-off Meeting; Create Website Roll-Out Spreadsheet; Review and Comment on Website RFP Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-21 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Review Total Specs with Tyler; Tender requirements planning with Joe Lochridge and Marina J. Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Conduct Weekly Due Diligence Update Meeting; Create Weekly Due Diligence Update Report; Develop Technical Services Marketing Slides for Carlos; Create Total Uganda Kick-off Meeting Presentation; Review TDI Kuwait Deliverables; Host TDI Kuwait Debriefing Meeting; Conduct Uganda Diligence Kick-off Meeting; Create Website Roll-Out Spreadsheet; Review and Comment on Website RFP Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-22 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Review Total Specs with Tyler; Tender requirements planning with Joe Lochridge and Marina J. Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Conduct Weekly Due Diligence Update Meeting; Create Weekly Due Diligence Update Report; Develop Technical Services Marketing Slides for Carlos; Create Total Uganda Kick-off Meeting Presentation; Review TDI Kuwait Deliverables; Host TDI Kuwait Debriefing Meeting; Conduct Uganda Diligence Kick-off Meeting; Create Website Roll-Out Spreadsheet; Review and Comment on Website RFP Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Conduct Weekly Due Diligence Update Meeting; Create Weekly Due Diligence Update Report; Develop Technical Services Marketing Slides for Carlos; Create Total Uganda Kick-off Meeting Presentation; Review TDI Kuwait Deliverables; Host TDI Kuwait Debriefing Meeting; Conduct Uganda Diligence Kick-off Meeting; Create Website Roll-Out Spreadsheet; Review and Comment on Website RFP Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 06/26/2017 - Weekly Operations Update Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Conduct Weekly Due Diligence Update; Create Weekly Due Diligence Report; Organize and facilitate Kuwait Business Structure Meeting; Start Kuwait Business Structure Roadmap; Host Weekly TDI Meeting; Create Evaluation Template for TDI Kuwait Deliverables; Work on Uganda Due Diligence Checklist; Create Tracker for Kuwait and Southern Iraq Due Diligence Deliverables; Update Due Diligence Information on SharePoint Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Conduct Weekly Due Diligence Update; Create Weekly Due Diligence Report; Organize and facilitate Kuwait Business Structure Meeting; Start Kuwait Business Structure Roadmap; Host Weekly TDI Meeting; Create Evaluation Template for TDI Kuwait Deliverables; Work on Uganda Due Diligence Checklist; Create Tracker for Kuwait and Southern Iraq Due Diligence Deliverables; Update Due Diligence Information on SharePoint Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Conduct Weekly Due Diligence Update; Create Weekly Due Diligence Report; Organize and facilitate Kuwait Business Structure Meeting; Start Kuwait Business Structure Roadmap; Host Weekly TDI Meeting; Create Evaluation Template for TDI Kuwait Deliverables; Work on Uganda Due Diligence Checklist; Create Tracker for Kuwait and Southern Iraq Due Diligence Deliverables; Update Due Diligence Information on SharePoint Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Conduct Weekly Due Diligence Update; Create Weekly Due Diligence Report; Organize and facilitate Kuwait Business Structure Meeting; Start Kuwait Business Structure Roadmap; Host Weekly TDI Meeting; Create Evaluation Template for TDI Kuwait Deliverables; Work on Uganda Due Diligence Checklist; Create Tracker for Kuwait and Southern Iraq Due Diligence Deliverables; Update Due Diligence Information on SharePoint Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-06-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Conduct Weekly Due Diligence Update; Create Weekly Due Diligence Report; Organize and facilitate Kuwait Business Structure Meeting; Start Kuwait Business Structure Roadmap; Host Weekly TDI Meeting; Create Evaluation Template for TDI Kuwait Deliverables; Work on Uganda Due Diligence Checklist; Create Tracker for Kuwait and Southern Iraq Due Diligence Deliverables; Update Due Diligence Information on SharePoint Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 July 3rd and 4th Holiday Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 July 3rd and 4th Holiday Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Continue Kuwait Business Structure Roadmap; Interface with TDI on Kuwait and Uganda Issues; Work on internal NDA with Ed; Continue working on Uganda Due Diligence Checklist; Discuss accounting code for TDI Uganda work with Wayne Fox Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 07/08/2017 - HH and Kerui Trip Debriefing Meeting; TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Continue Kuwait Business Structure Roadmap; Interface with TDI on Kuwait and Uganda Issues; Work on internal NDA with Ed; Continue working on Uganda Due Diligence Checklist; Discuss accounting code for TDI Uganda work with Wayne Fox Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-07 OH-003 :OH-003 Overhead All Activities Regular Pay N 8 0 Jury Duty Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-10 OH-003 :OH-003 Overhead All Activities Regular Pay N 8 0 Jury Duty Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet; Check and respond to emails. Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-11 OH-003 :OH-003 Overhead All Activities Regular Pay N 8 0 Jury Duty Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-12 OH-003 :OH-003 Overhead All Activities Regular Pay N 8 0 Jury Duty Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-13 OH-003 :OH-003 Overhead All Activities Regular Pay N 8 0 Jury Duty Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-14 OH-003 :OH-003 Overhead All Activities Regular Pay N 8 0 Jury Duty Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-17 OH-003 :OH-003 Overhead All Activities Regular Pay N 8 0 Jury Duty Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Create Due Diligence Weekly Report; Conduct Due Diligence Weekly Update Meeting; Attend TDI Uganda Meeting; Start Creating Kuwait Closeout Report; Update Southern Iraq Due Diligence Checklist; Update Uganda Due Diligence Checklist with Info from Tyler and Gary Bourne; Create Website NDA Roll-Out Plan; Attend Halliburton Brainstorming Session with Carlos Cubeddu and Luis Casanova; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 5 0 07/19/2017 - Astros Game with Gary Rich 07/20/2017 - TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 Create Due Diligence Weekly Report; Conduct Due Diligence Weekly Update Meeting; Attend TDI Uganda Meeting; Start Creating Kuwait Closeout Report; Update Southern Iraq Due Diligence Checklist; Update Uganda Due Diligence Checklist with Info from Tyler and Gary Bourne; Create Website NDA Roll-Out Plan; Attend Halliburton Brainstorming Session with Carlos Cubeddu and Luis Casanova; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 07/19/2017 - Astros Game with Gary Rich 07/20/2017 - TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Create Due Diligence Weekly Report; Conduct Due Diligence Weekly Update Meeting; Attend TDI Uganda Meeting; Start Creating Kuwait Closeout Report; Update Southern Iraq Due Diligence Checklist; Update Uganda Due Diligence Checklist with Info from Tyler and Gary Bourne; Create Website NDA Roll-Out Plan; Attend Halliburton Brainstorming Session with Carlos Cubeddu and Luis Casanova; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Create Due Diligence Weekly Report; Conduct Due Diligence Weekly Update Meeting; Attend TDI Uganda Meeting; Start Creating Kuwait Closeout Report; Update Southern Iraq Due Diligence Checklist; Update Uganda Due Diligence Checklist with Info from Tyler and Gary Bourne; Create Website NDA Roll-Out Plan; Attend Halliburton Brainstorming Session with Carlos Cubeddu and Luis Casanova; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 07/24/2017 - Weekly Operations Update Conference Call 07/27/2017 - Create Safety Moment for TSR Meeting; Attend TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Create MPDR Case Study; Create Roll-Out Plan for Corporate Project; Set-Up SharePoint Site for Corporate Project; Create RFP Cost Evaluation for Corporate Project; Create Technical Services "Sales" Presentation; Create Technical Services "101" Presentation; Brainstorm Tech Services Competitors with K. McMullen; Revise Krechet and Berkut Case Studies; Attend TDI Debrief Meeting for Uganda; Create Due Diligence Weekly Report; Review TDI Deliverables for Uganda Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Create MPDR Case Study; Create Roll-Out Plan for Corporate Project; Set-Up SharePoint Site for Corporate Project; Create RFP Cost Evaluation for Corporate Project; Create Technical Services "Sales" Presentation; Create Technical Services "101" Presentation; Brainstorm Tech Services Competitors with K. McMullen; Revise Krechet and Berkut Case Studies; Attend TDI Debrief Meeting for Uganda; Create Due Diligence Weekly Report; Review TDI Deliverables for Uganda Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-25 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 The Art and Science of Effective Negotiations Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Create MPDR Case Study; Create Roll-Out Plan for Corporate Project; Set-Up SharePoint Site for Corporate Project; Create RFP Cost Evaluation for Corporate Project; Create Technical Services "Sales" Presentation; Create Technical Services "101" Presentation; Brainstorm Tech Services Competitors with K. McMullen; Revise Krechet and Berkut Case Studies; Attend TDI Debrief Meeting for Uganda; Create Due Diligence Weekly Report; Review TDI Deliverables for Uganda Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 07/24/2017 - Weekly Operations Update Conference Call 07/27/2017 - Create Safety Moment for TSR Meeting; Attend TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Create MPDR Case Study; Create Roll-Out Plan for Corporate Project; Set-Up SharePoint Site for Corporate Project; Create RFP Cost Evaluation for Corporate Project; Create Technical Services "Sales" Presentation; Create Technical Services "101" Presentation; Brainstorm Tech Services Competitors with K. McMullen; Revise Krechet and Berkut Case Studies; Attend TDI Debrief Meeting for Uganda; Create Due Diligence Weekly Report; Review TDI Deliverables for Uganda Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Create MPDR Case Study; Create Roll-Out Plan for Corporate Project; Set-Up SharePoint Site for Corporate Project; Create RFP Cost Evaluation for Corporate Project; Create Technical Services "Sales" Presentation; Create Technical Services "101" Presentation; Brainstorm Tech Services Competitors with K. McMullen; Revise Krechet and Berkut Case Studies; Attend TDI Debrief Meeting for Uganda; Create Due Diligence Weekly Report; Review TDI Deliverables for Uganda Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 07/31/2017 - Operations Weekly Conference Call; IMS Outstanding Procedures Meeting 08/03/2017 - TSR Weekly Meeting, PKD 2nd Qtr Earnings Review; 08/04/2017 - NOV Novos Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 07/31/2017 - MK Timehseet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-07-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Conduct Weekly Due Diligence Update Meeting; Review TDI Uganda Above Ground Risk Report; Review TDI Proposal for Peru; Meeting with Jim Tolsma and LABU to review Peru opportunity; Create Weekly Due Diligence Update Report; Continue Development of Corporate Project RFP Evaluation Spreadsheet (set up equations); Review and Evaluate RFP's for Corporate Project; Revise Technical Services Brochures and Case Studies based on feedback from Rob, Kyle, and Greg Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Conduct Weekly Due Diligence Update Meeting; Review TDI Uganda Above Ground Risk Report; Review TDI Proposal for Peru; Meeting with Jim Tolsma and LABU to review Peru opportunity; Create Weekly Due Diligence Update Report; Continue Development of Corporate Project RFP Evaluation Spreadsheet (set up equations); Review and Evaluate RFP's for Corporate Project; Revise Technical Services Brochures and Case Studies based on feedback from Rob, Kyle, and Greg Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Conduct Weekly Due Diligence Update Meeting; Review TDI Uganda Above Ground Risk Report; Review TDI Proposal for Peru; Meeting with Jim Tolsma and LABU to review Peru opportunity; Create Weekly Due Diligence Update Report; Continue Development of Corporate Project RFP Evaluation Spreadsheet (set up equations); Review and Evaluate RFP's for Corporate Project; Revise Technical Services Brochures and Case Studies based on feedback from Rob, Kyle, and Greg Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 07/31/2017 - Operations Weekly Conference Call; IMS Outstanding Procedures Meeting 08/03/2017 - TSR Weekly Meeting, PKD 2nd Qtr Earnings Review; 08/04/2017 - NOV Novos Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Conduct Weekly Due Diligence Update Meeting; Review TDI Uganda Above Ground Risk Report; Review TDI Proposal for Peru; Meeting with Jim Tolsma and LABU to review Peru opportunity; Create Weekly Due Diligence Update Report; Continue Development of Corporate Project RFP Evaluation Spreadsheet (set up equations); Review and Evaluate RFP's for Corporate Project; Revise Technical Services Brochures and Case Studies based on feedback from Rob, Kyle, and Greg Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 07/31/2017 - Operations Weekly Conference Call; IMS Outstanding Procedures Meeting 08/03/2017 - TSR Weekly Meeting, PKD 2nd Qtr Earnings Review; 08/04/2017 - NOV Novos Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Conduct Weekly Due Diligence Update Meeting; Review TDI Uganda Above Ground Risk Report; Review TDI Proposal for Peru; Meeting with Jim Tolsma and LABU to review Peru opportunity; Create Weekly Due Diligence Update Report; Continue Development of Corporate Project RFP Evaluation Spreadsheet (set up equations); Review and Evaluate RFP's for Corporate Project; Revise Technical Services Brochures and Case Studies based on feedback from Rob, Kyle, and Greg Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 08/07/2017 - Weekly Operations Update Conference Call; 08/08/2017 - 2017 Tech Services IMS Document Update Meeting; 08/10/2017 - Tech Services Weekly Meeting; 08/11/2017 - MK Goals Review Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 08/07/2017 - MK Timesheet; 08/10/2017 - Project Budget Tracking Template; Project WBS Template; 08/11/2017 - Project WBS Template; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Account Management Introduction Conference Call; Review Account Management Requirements Presentation from Carlos; Organize Internal Corporate Project CA's; Organize Kuwait Due Diligence Closeout Meeting; Create Kuwait Due Diligence Closeout meeting presentation template; Meeting with Kelly Thorman on compliance for Kuwait Due Diligence; Host Weekly Due Diligence Update Meeting; Create Weekly Due Diligence Update Report; Host Peru Due Diligence Authority to Proceed Meeting with Steering Committee; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 08/07/2017 - Weekly Operations Update Conference Call; 08/08/2017 - 2017 Tech Services IMS Document Update Meeting; 08/10/2017 - Tech Services Weekly Meeting; 08/11/2017 - MK Goals Review Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Account Management Introduction Conference Call; Review Account Management Requirements Presentation from Carlos; Organize Internal Corporate Project CA's; Organize Kuwait Due Diligence Closeout Meeting; Create Kuwait Due Diligence Closeout meeting presentation template; Meeting with Kelly Thorman on compliance for Kuwait Due Diligence; Host Weekly Due Diligence Update Meeting; Create Weekly Due Diligence Update Report; Host Peru Due Diligence Authority to Proceed Meeting with Steering Committee; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Account Management Introduction Conference Call; Review Account Management Requirements Presentation from Carlos; Organize Internal Corporate Project CA's; Organize Kuwait Due Diligence Closeout Meeting; Create Kuwait Due Diligence Closeout meeting presentation template; Meeting with Kelly Thorman on compliance for Kuwait Due Diligence; Host Weekly Due Diligence Update Meeting; Create Weekly Due Diligence Update Report; Host Peru Due Diligence Authority to Proceed Meeting with Steering Committee; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 08/07/2017 - Weekly Operations Update Conference Call; 08/08/2017 - 2017 Tech Services IMS Document Update Meeting; 08/10/2017 - Tech Services Weekly Meeting; 08/11/2017 - MK Goals Review Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 08/07/2017 - MK Timesheet; 08/10/2017 - Project Budget Tracking Template; Project WBS Template; 08/11/2017 - Project WBS Template; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Account Management Introduction Conference Call; Review Account Management Requirements Presentation from Carlos; Organize Internal Corporate Project CA's; Organize Kuwait Due Diligence Closeout Meeting; Create Kuwait Due Diligence Closeout meeting presentation template; Meeting with Kelly Thorman on compliance for Kuwait Due Diligence; Host Weekly Due Diligence Update Meeting; Create Weekly Due Diligence Update Report; Host Peru Due Diligence Authority to Proceed Meeting with Steering Committee; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 08/07/2017 - Weekly Operations Update Conference Call; 08/08/2017 - 2017 Tech Services IMS Document Update Meeting; 08/10/2017 - Tech Services Weekly Meeting; 08/11/2017 - MK Goals Review Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 08/07/2017 - MK Timesheet; 08/10/2017 - Project Budget Tracking Template; Project WBS Template; 08/11/2017 - Project WBS Template; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2.5 0 Account Management Introduction Conference Call; Review Account Management Requirements Presentation from Carlos; Organize Internal Corporate Project CA's; Organize Kuwait Due Diligence Closeout Meeting; Create Kuwait Due Diligence Closeout meeting presentation template; Meeting with Kelly Thorman on compliance for Kuwait Due Diligence; Host Weekly Due Diligence Update Meeting; Create Weekly Due Diligence Update Report; Host Peru Due Diligence Authority to Proceed Meeting with Steering Committee; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 08/14/2017 - Weekly Operations Update Conference Call; 08/16/2017 - PKD Contracts / DataJudo Meeting with Rob and Carlos; 08/17/2017 - TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Conduct Wood Group Engagement Brainstorming Meeting; Create Wood Group Engagement Plan; Create Wood Group Elevator Speech; Conduct Weekly Due Diligence Update Conference Call; Create Slides for Kuwait Due Diligence Closeout; Continue to review RFP proposals for Internal Corporate Project; Organize RFP meeting with Vendors Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Conduct Wood Group Engagement Brainstorming Meeting; Create Wood Group Engagement Plan; Create Wood Group Elevator Speech; Conduct Weekly Due Diligence Update Conference Call; Create Slides for Kuwait Due Diligence Closeout; Continue to review RFP proposals for Internal Corporate Project; Organize RFP meeting with Vendors Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 08/14/2017 - Weekly Operations Update Conference Call; 08/16/2017 - PKD Contracts / DataJudo Meeting with Rob and Carlos; 08/17/2017 - TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Conduct Wood Group Engagement Brainstorming Meeting; Create Wood Group Engagement Plan; Create Wood Group Elevator Speech; Conduct Weekly Due Diligence Update Conference Call; Create Slides for Kuwait Due Diligence Closeout; Continue to review RFP proposals for Internal Corporate Project; Organize RFP meeting with Vendors Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 08/14/2017 - Weekly Operations Update Conference Call; 08/16/2017 - PKD Contracts / DataJudo Meeting with Rob and Carlos; 08/17/2017 - TSR Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Conduct Wood Group Engagement Brainstorming Meeting; Create Wood Group Engagement Plan; Create Wood Group Elevator Speech; Conduct Weekly Due Diligence Update Conference Call; Create Slides for Kuwait Due Diligence Closeout; Continue to review RFP proposals for Internal Corporate Project; Organize RFP meeting with Vendors Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Conduct Wood Group Engagement Brainstorming Meeting; Create Wood Group Engagement Plan; Create Wood Group Elevator Speech; Conduct Weekly Due Diligence Update Conference Call; Create Slides for Kuwait Due Diligence Closeout; Continue to review RFP proposals for Internal Corporate Project; Organize RFP meeting with Vendors Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 08/21/2017 - Weekly Operations Update Conference Call; 08/24/2017 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Internal Corporate Project - Meetings with Vendors; Internal Corporate Project - Notes and Action Items from Meetings with Vendors; Internal Corporate Project - Vendor Recommendation Presentation; Internal Corporate Project - Vendor RFP Evaluation Spreadsheet; Create Business Development Place Mat; Discussions with Carlos on upcoming DD activities; Continue Kuwait Closeout Presentation Development; Review Angola Preliminary Due Diligence Documents; Start planning Steering Committee Meeting for Angola Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Internal Corporate Project - Meetings with Vendors; Internal Corporate Project - Notes and Action Items from Meetings with Vendors; Internal Corporate Project - Vendor Recommendation Presentation; Internal Corporate Project - Vendor RFP Evaluation Spreadsheet; Create Business Development Place Mat; Discussions with Carlos on upcoming DD activities; Continue Kuwait Closeout Presentation Development; Review Angola Preliminary Due Diligence Documents; Start planning Steering Committee Meeting for Angola Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Internal Corporate Project - Meetings with Vendors; Internal Corporate Project - Notes and Action Items from Meetings with Vendors; Internal Corporate Project - Vendor Recommendation Presentation; Internal Corporate Project - Vendor RFP Evaluation Spreadsheet; Create Business Development Place Mat; Discussions with Carlos on upcoming DD activities; Continue Kuwait Closeout Presentation Development; Review Angola Preliminary Due Diligence Documents; Start planning Steering Committee Meeting for Angola Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 08/21/2017 - Weekly Operations Update Conference Call; 08/24/2017 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Internal Corporate Project - Meetings with Vendors; Internal Corporate Project - Notes and Action Items from Meetings with Vendors; Internal Corporate Project - Vendor Recommendation Presentation; Internal Corporate Project - Vendor RFP Evaluation Spreadsheet; Create Business Development Place Mat; Discussions with Carlos on upcoming DD activities; Continue Kuwait Closeout Presentation Development; Review Angola Preliminary Due Diligence Documents; Start planning Steering Committee Meeting for Angola Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Internal Corporate Project - Meetings with Vendors; Internal Corporate Project - Notes and Action Items from Meetings with Vendors; Internal Corporate Project - Vendor Recommendation Presentation; Internal Corporate Project - Vendor RFP Evaluation Spreadsheet; Create Business Development Place Mat; Discussions with Carlos on upcoming DD activities; Continue Kuwait Closeout Presentation Development; Review Angola Preliminary Due Diligence Documents; Start planning Steering Committee Meeting for Angola Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-28 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Hurricane Harvey Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-29 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Hurricane Harvey Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-30 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Hurricane Harvey Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 MK Timesheet; Read and respond to emails received during hurricane Review and edit Project Scope of Work IMS Template Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-08-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Work on TDI scope of work for Angola; Update Kuwait Due Diligence Closeout presentation with Financial data from Srijit; Update Angola preliminary due diligence documents for Bryan Collins; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 MK Timesheet; Read and respond to emails received during hurricane Review and edit Project Scope of Work IMS Template Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Work on TDI scope of work for Angola; Update Kuwait Due Diligence Closeout presentation with Financial data from Srijit; Update Angola preliminary due diligence documents for Bryan Collins; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Labor Day Holiday Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Market Intelligence Spreadsheet Creation for Carlos; Due Diligence Update; Kuwait Financing Options Meeting; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-06 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 Perform BOP Evaluation for 1500HP DEEP rigs Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Technical Services SME Presentation Review with Emma, Rob, and Robb Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Market Intelligence Spreadsheet Creation for Carlos; Due Diligence Update; Kuwait Financing Options Meeting; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Market Intelligence Spreadsheet Creation for Carlos; Due Diligence Update; Kuwait Financing Options Meeting; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-07 OH-011 :OH-011 Overhead All Activities Regular Pay N 7 0 Assist with Demo and Cleanup of Bruce Korver's House Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-08 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Perform BOP Evaluation for 1500HP DEEP rigs Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Market Intelligence Spreadsheet Creation for Carlos; Due Diligence Update; Kuwait Financing Options Meeting; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-11 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 Continue BOP Evaluation for Cameron, Control Flow, GE, and RongSheng Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 09/11/2017 - Weekly Operations Conference Call; 09/14/2017 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Continue Development of Technical Services 101 Presentation; Revise Woodside MPDR Case Study; Revise Krechet Case Study; Internal Corporate Project Internal Audit; Internal Corporate Project Reference Call on Potential Suppliers Kuwait Financing Options Conference Call; Develop Material Requisition for TDI in Angola; Develop Due Diligence Team for Argentina and Angola Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-12 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 Continue BOP Evaluation for Cameron, Control Flow, GE, and RongSheng Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Continue Development of Technical Services 101 Presentation; Revise Woodside MPDR Case Study; Revise Krechet Case Study; Internal Corporate Project Internal Audit; Internal Corporate Project Reference Call on Potential Suppliers Kuwait Financing Options Conference Call; Develop Material Requisition for TDI in Angola; Develop Due Diligence Team for Argentina and Angola Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Continue Development of Technical Services 101 Presentation; Revise Woodside MPDR Case Study; Revise Krechet Case Study; Internal Corporate Project Internal Audit; Internal Corporate Project Reference Call on Potential Suppliers Kuwait Financing Options Conference Call; Develop Material Requisition for TDI in Angola; Develop Due Diligence Team for Argentina and Angola Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-13 OH-011 :OH-011 Overhead All Activities Regular Pay N 2 0 PKD Hurricane Assistance - Moving Olga Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 09/11/2017 - Weekly Operations Conference Call; 09/14/2017 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Continue Development of Technical Services 101 Presentation; Revise Woodside MPDR Case Study; Revise Krechet Case Study; Internal Corporate Project Internal Audit; Internal Corporate Project Reference Call on Potential Suppliers Kuwait Financing Options Conference Call; Develop Material Requisition for TDI in Angola; Develop Due Diligence Team for Argentina and Angola Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Continue Development of Technical Services 101 Presentation; Revise Woodside MPDR Case Study; Revise Krechet Case Study; Internal Corporate Project Internal Audit; Internal Corporate Project Reference Call on Potential Suppliers Kuwait Financing Options Conference Call; Develop Material Requisition for TDI in Angola; Develop Due Diligence Team for Argentina and Angola Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 09/18/2017 - Weekly Operations Conference Call; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Revise Due Diligence Team for Argentina; Chase down PO for TDI Angola; Prep calls with TDI for Angola; Due Diligence Presentations for Leadership Team Meetings; Revision to Technical Services 101 Presentation; Revisions to Technical Services Case Studies; Internal Corporate Project Meeting with LT; Internal Corporate Project - Cost Estimate; Internal Corporate Project - Develop MS Project Schedule; Internal Corporate Project - Develop Scope of Work Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Revise Due Diligence Team for Argentina; Chase down PO for TDI Angola; Prep calls with TDI for Angola; Due Diligence Presentations for Leadership Team Meetings; Revision to Technical Services 101 Presentation; Revisions to Technical Services Case Studies; Internal Corporate Project Meeting with LT; Internal Corporate Project - Cost Estimate; Internal Corporate Project - Develop MS Project Schedule; Internal Corporate Project - Develop Scope of Work Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Revise Due Diligence Team for Argentina; Chase down PO for TDI Angola; Prep calls with TDI for Angola; Due Diligence Presentations for Leadership Team Meetings; Revision to Technical Services 101 Presentation; Revisions to Technical Services Case Studies; Internal Corporate Project Meeting with LT; Internal Corporate Project - Cost Estimate; Internal Corporate Project - Develop MS Project Schedule; Internal Corporate Project - Develop Scope of Work Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Revise Due Diligence Team for Argentina; Chase down PO for TDI Angola; Prep calls with TDI for Angola; Due Diligence Presentations for Leadership Team Meetings; Revision to Technical Services 101 Presentation; Revisions to Technical Services Case Studies; Internal Corporate Project Meeting with LT; Internal Corporate Project - Cost Estimate; Internal Corporate Project - Develop MS Project Schedule; Internal Corporate Project - Develop Scope of Work Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Revise Due Diligence Team for Argentina; Chase down PO for TDI Angola; Prep calls with TDI for Angola; Due Diligence Presentations for Leadership Team Meetings; Revision to Technical Services 101 Presentation; Revisions to Technical Services Case Studies; Internal Corporate Project Meeting with LT; Internal Corporate Project - Cost Estimate; Internal Corporate Project - Develop MS Project Schedule; Internal Corporate Project - Develop Scope of Work Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 09/25/2017 - Weekly Operations Conference Call; 09/28/2017 - NOV Improve Rig Performance Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 09/25/2017 - MK Timesheet; 09/26/2017 - MK Monthly Review Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Create Argentina Due Diligence Kick-off Presentation; Conduct Argentina Due Diligence Kick-off Meeting; Create Kuwait Due Diligence Closeout Report; Internal Corporate Project Weekly Meeting; Internal Corporate Project Subcontract Review; Internal Corporate Project Cost Estimate; Internal Corporate Project Schedule; Internal Corporate Project Accounting Codes Meeting with Leslie Nagy; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 09/25/2017 - MK Timesheet; 09/26/2017 - MK Monthly Review Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Create Argentina Due Diligence Kick-off Presentation; Conduct Argentina Due Diligence Kick-off Meeting; Create Kuwait Due Diligence Closeout Report; Internal Corporate Project Weekly Meeting; Internal Corporate Project Subcontract Review; Internal Corporate Project Cost Estimate; Internal Corporate Project Schedule; Internal Corporate Project Accounting Codes Meeting with Leslie Nagy; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Create Argentina Due Diligence Kick-off Presentation; Conduct Argentina Due Diligence Kick-off Meeting; Create Kuwait Due Diligence Closeout Report; Internal Corporate Project Weekly Meeting; Internal Corporate Project Subcontract Review; Internal Corporate Project Cost Estimate; Internal Corporate Project Schedule; Internal Corporate Project Accounting Codes Meeting with Leslie Nagy; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 09/25/2017 - Weekly Operations Conference Call; 09/28/2017 - NOV Improve Rig Performance Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Create Argentina Due Diligence Kick-off Presentation; Conduct Argentina Due Diligence Kick-off Meeting; Create Kuwait Due Diligence Closeout Report; Internal Corporate Project Weekly Meeting; Internal Corporate Project Subcontract Review; Internal Corporate Project Cost Estimate; Internal Corporate Project Schedule; Internal Corporate Project Accounting Codes Meeting with Leslie Nagy; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-09-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Create Argentina Due Diligence Kick-off Presentation; Conduct Argentina Due Diligence Kick-off Meeting; Create Kuwait Due Diligence Closeout Report; Internal Corporate Project Weekly Meeting; Internal Corporate Project Subcontract Review; Internal Corporate Project Cost Estimate; Internal Corporate Project Schedule; Internal Corporate Project Accounting Codes Meeting with Leslie Nagy; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 10/02/2017 - Weekly Operations Conference Call; 10/05/2017 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Due Diligence Meeting with Ed Menger about Argentina; Internal Corporate Project Weekly Meeting; Internal Corporate Project Subcontract Review; Internal Corporate Project Cost Estimate; Internal Corporate Project Schedule; Internal Corporate Project Scope of Work Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Due Diligence Meeting with Ed Menger about Argentina; Internal Corporate Project Weekly Meeting; Internal Corporate Project Subcontract Review; Internal Corporate Project Cost Estimate; Internal Corporate Project Schedule; Internal Corporate Project Scope of Work Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-03 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Business Development Program - Procurement Management Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Due Diligence Meeting with Ed Menger about Argentina; Internal Corporate Project Weekly Meeting; Internal Corporate Project Subcontract Review; Internal Corporate Project Cost Estimate; Internal Corporate Project Schedule; Internal Corporate Project Scope of Work Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 10/02/2017 - Weekly Operations Conference Call; 10/05/2017 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Due Diligence Meeting with Ed Menger about Argentina; Internal Corporate Project Weekly Meeting; Internal Corporate Project Subcontract Review; Internal Corporate Project Cost Estimate; Internal Corporate Project Schedule; Internal Corporate Project Scope of Work Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Due Diligence Meeting with Ed Menger about Argentina; Internal Corporate Project Weekly Meeting; Internal Corporate Project Subcontract Review; Internal Corporate Project Cost Estimate; Internal Corporate Project Schedule; Internal Corporate Project Scope of Work Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 10/09/2017 - Weekly Operations Conference Call; 10/12/2017 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Internal Corporate Project Activities; Kuwait Financing Options Update Meeting and Notes; Figure out invoicing issues with TDI Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-09 OH-014 :OH-014 Overhead All Activities Regular Pay N 7 0 10/09/2017 - Negotiation Training (Day 1); 10/10/2017 - Negotiation Training (Day 2) 10/12/2017 - Business Development Training - Tech Services Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 Internal Corporate Project Activities; Kuwait Financing Options Update Meeting and Notes; Figure out invoicing issues with TDI Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-10 OH-014 :OH-014 Overhead All Activities Regular Pay N 6 0 10/09/2017 - Negotiation Training (Day 1); 10/10/2017 - Negotiation Training (Day 2) 10/12/2017 - Business Development Training - Tech Services Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Internal Corporate Project Activities; Kuwait Financing Options Update Meeting and Notes; Figure out invoicing issues with TDI Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 10/09/2017 - Weekly Operations Conference Call; 10/12/2017 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Internal Corporate Project Activities; Kuwait Financing Options Update Meeting and Notes; Figure out invoicing issues with TDI Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-12 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 10/09/2017 - Negotiation Training (Day 1); 10/10/2017 - Negotiation Training (Day 2) 10/12/2017 - Business Development Training - Tech Services Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Internal Corporate Project Activities; Kuwait Financing Options Update Meeting and Notes; Figure out invoicing issues with TDI Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Weekly Operations Conference Call; Meet and Greet with Mike Sumruld; Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Kuwait Rig Leasing Options Meetings - HH and Kerui; KOC Tender Discussion Meetings and Meeting Notes; Continue Kuwait Due Diligence Closeout Report; Argentina Due Diligence Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Kuwait Rig Leasing Options Meetings - HH and Kerui; KOC Tender Discussion Meetings and Meeting Notes; Continue Kuwait Due Diligence Closeout Report; Argentina Due Diligence Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-17 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Business Development Program - Rig Management Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Kuwait Rig Leasing Options Meetings - HH and Kerui; KOC Tender Discussion Meetings and Meeting Notes; Continue Kuwait Due Diligence Closeout Report; Argentina Due Diligence Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call; Meet and Greet with Mike Sumruld; Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Kuwait Rig Leasing Options Meetings - HH and Kerui; KOC Tender Discussion Meetings and Meeting Notes; Continue Kuwait Due Diligence Closeout Report; Argentina Due Diligence Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Kuwait Rig Leasing Options Meetings - HH and Kerui; KOC Tender Discussion Meetings and Meeting Notes; Continue Kuwait Due Diligence Closeout Report; Argentina Due Diligence Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-22 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 Travel to Amsterdam; Travel back to Houston Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-23 OH-010 :OH-010 Overhead All Activities Regular Pay N 8 0 Travel to Amsterdam; Travel back to Houston Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-24 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 IADC Advance Rig Technology Conference Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-25 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 IADC Advance Rig Technology Conference Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-26 OH-010 :OH-010 Overhead All Activities Regular Pay N 12 0 Travel to Amsterdam; Travel back to Houston Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 10/30/2017 - Weekly Operations Conference Call; 11/02/2017 - Tech Services Weekly Meeting; 3rd Quarter Earning Meeting; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet; MK Monthly Review with Greg; MK Texas PE Audit Material Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 TDI Due Diligence Meeting On Angola; Answer questions about Argentina Due Diligence; Due Diligence Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-30 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Business Development Program - BOP Rentals Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 MK Timesheet; MK Monthly Review with Greg; MK Texas PE Audit Material Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-10-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 TDI Due Diligence Meeting On Angola; Answer questions about Argentina Due Diligence; Due Diligence Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 TDI Due Diligence Meeting On Angola; Answer questions about Argentina Due Diligence; Due Diligence Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 10/30/2017 - Weekly Operations Conference Call; 11/02/2017 - Tech Services Weekly Meeting; 3rd Quarter Earning Meeting; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6.5 0 TDI Due Diligence Meeting On Angola; Answer questions about Argentina Due Diligence; Due Diligence Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 MK Timesheet; MK Monthly Review with Greg; MK Texas PE Audit Material Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 TDI Due Diligence Meeting On Angola; Answer questions about Argentina Due Diligence; Due Diligence Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 11/06/2017 - Weekly Operations Conference Call; 11/09/2017 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet; Continue on MK Continuing Education Audit Documents Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Continue working on Uganda Closeout Report; Due Diligence Weekly Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 MK Timesheet; Continue on MK Continuing Education Audit Documents Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Continue working on Uganda Closeout Report; Due Diligence Weekly Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 11/06/2017 - Weekly Operations Conference Call; 11/09/2017 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Continue working on Uganda Closeout Report; Due Diligence Weekly Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-09 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Business Development Program - Training Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Continue working on Uganda Closeout Report; Due Diligence Weekly Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 11/13/2017 - Weekly Operations Conference Call; 11/16/2017 - Technical Services Weekly Meeting and IADC ART Conference Info Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Business Development Presentations for Uganda; Data for BP Opportunity; Research Angola Oilfield Services Companies; Fill Out Rig Information Table for Carlos; DD Bi-Weekly Update Meeting ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Business Development Presentations for Uganda; Data for BP Opportunity; Research Angola Oilfield Services Companies; Fill Out Rig Information Table for Carlos; DD Bi-Weekly Update Meeting ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Business Development Presentations for Uganda; Data for BP Opportunity; Research Angola Oilfield Services Companies; Fill Out Rig Information Table for Carlos; DD Bi-Weekly Update Meeting ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-15 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Business Development Program - Quail Tools Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 11/13/2017 - Weekly Operations Conference Call; 11/16/2017 - Technical Services Weekly Meeting and IADC ART Conference Info Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Business Development Presentations for Uganda; Data for BP Opportunity; Research Angola Oilfield Services Companies; Fill Out Rig Information Table for Carlos; DD Bi-Weekly Update Meeting ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Business Development Presentations for Uganda; Data for BP Opportunity; Research Angola Oilfield Services Companies; Fill Out Rig Information Table for Carlos; DD Bi-Weekly Update Meeting ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Business Development Presentations for Uganda; Data for BP Opportunity; Research Angola Oilfield Services Companies; Fill Out Rig Information Table for Carlos; DD Bi-Weekly Update Meeting ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 Work on Total Presentation; Conference Calls with Carlos and Joe prior to Total Presentation; Attend Total Conference Call; ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 11/20/2017 - Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Work on Total Presentation; Conference Calls with Carlos and Joe prior to Total Presentation; Attend Total Conference Call; ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Work on Total Presentation; Conference Calls with Carlos and Joe prior to Total Presentation; Attend Total Conference Call; ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-21 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Business Development Program Training - BHA's Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-23 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Thanksgiving and Day After Thanksgiving Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-24 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Thanksgiving and Day After Thanksgiving Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 11/27/2017 - Weekly Operations Conference Call 11/30/2017 - Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet; MK Monthly Review with Greg Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Angola Due Diligence Prep for Traveling Team; Review Angola DD Checklist from Robbie Bennett; Weekly Due Diligence Conference Call; Brainstorming Technical Services Case Studies; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Angola Due Diligence Prep for Traveling Team; Review Angola DD Checklist from Robbie Bennett; Weekly Due Diligence Conference Call; Brainstorming Technical Services Case Studies; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet; MK Monthly Review with Greg Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Angola Due Diligence Prep for Traveling Team; Review Angola DD Checklist from Robbie Bennett; Weekly Due Diligence Conference Call; Brainstorming Technical Services Case Studies; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-29 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Internal Controls Refresher Course Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-11-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Angola Due Diligence Prep for Traveling Team; Review Angola DD Checklist from Robbie Bennett; Weekly Due Diligence Conference Call; Brainstorming Technical Services Case Studies; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Angola Due Diligence Prep for Traveling Team; Review Angola DD Checklist from Robbie Bennett; Weekly Due Diligence Conference Call; Brainstorming Technical Services Case Studies; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 12/04/2017 - Weekly Operations Conference Call; 12/06/2017 - OFI Monthly Meeting; 12/07/2017 - Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina Due Diligence Activities; Angola Due Diligence Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Argentina Due Diligence Activities; Angola Due Diligence Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 12/04/2017 - Weekly Operations Conference Call; 12/06/2017 - OFI Monthly Meeting; 12/07/2017 - Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Argentina Due Diligence Activities; Angola Due Diligence Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 12/04/2017 - Weekly Operations Conference Call; 12/06/2017 - OFI Monthly Meeting; 12/07/2017 - Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Argentina Due Diligence Activities; Angola Due Diligence Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Argentina Due Diligence Activities; Angola Due Diligence Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 12/11/2017 - Weekly Operations Conference Call; 12/12/2017 - PKD Holiday Party Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6.5 0 Argentina Due Diligence Meetings and Closeout Report Review; Biweekly Due Diligence Update Meeting; Total Uganda presentation work and meetings; Internal Corporate Project Activities; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-11 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 2017 Compliance Training Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 12/11/2017 - Weekly Operations Conference Call; 12/12/2017 - PKD Holiday Party Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina Due Diligence Meetings and Closeout Report Review; Biweekly Due Diligence Update Meeting; Total Uganda presentation work and meetings; Internal Corporate Project Activities; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Argentina Due Diligence Meetings and Closeout Report Review; Biweekly Due Diligence Update Meeting; Total Uganda presentation work and meetings; Internal Corporate Project Activities; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina Due Diligence Meetings and Closeout Report Review; Biweekly Due Diligence Update Meeting; Total Uganda presentation work and meetings; Internal Corporate Project Activities; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Argentina Due Diligence Meetings and Closeout Report Review; Biweekly Due Diligence Update Meeting; Total Uganda presentation work and meetings; Internal Corporate Project Activities; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 12/18/2017 - Weekly Operations Conference Call; 12/19/2017 - Brainstorming for 2018 SMART Goals Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet; MK 2017 Evaluation and SMART Goals (PDR Website) Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Due Diligence Biweekly Updates, Review DD work in Argentina with Juan Carlos and Patricia, Modify Spider Graph for Argentina DD; Internal Corporate Project Activities. Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 12/18/2017 - Weekly Operations Conference Call; 12/19/2017 - Brainstorming for 2018 SMART Goals Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Due Diligence Biweekly Updates, Review DD work in Argentina with Juan Carlos and Patricia, Modify Spider Graph for Argentina DD; Internal Corporate Project Activities. Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Due Diligence Biweekly Updates, Review DD work in Argentina with Juan Carlos and Patricia, Modify Spider Graph for Argentina DD; Internal Corporate Project Activities. Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 MK Timesheet; MK 2017 Evaluation and SMART Goals (PDR Website) Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Due Diligence Biweekly Updates, Review DD work in Argentina with Juan Carlos and Patricia, Modify Spider Graph for Argentina DD; Internal Corporate Project Activities. Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 MK Timesheet; MK 2017 Evaluation and SMART Goals (PDR Website) Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Due Diligence Biweekly Updates, Review DD work in Argentina with Juan Carlos and Patricia, Modify Spider Graph for Argentina DD; Internal Corporate Project Activities. Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-25 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Christmas Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet; Texas PE SER for Brian Waligura at Loadmaster Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Argentina Due Diligence; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 MK Timesheet; Texas PE SER for Brian Waligura at Loadmaster Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Argentina Due Diligence; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-28 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2017-12-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Years Day Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Due Diligence - Review Report Data and Presentations; Revise Argentina DD Spider Graph Equations; ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Due Diligence - Review Report Data and Presentations; Revise Argentina DD Spider Graph Equations; ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina Due Diligence - Review Report Data and Presentations; Revise Argentina DD Spider Graph Equations; ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Argentina Due Diligence - Review Report Data and Presentations; Revise Argentina DD Spider Graph Equations; ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina Due Diligence Closeout Meeting; Business Development Workshop Day 1; Business Development Workshop Day 2; Business Development Team Building Event Develop Technical Services goals related to Business Development; ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call; Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Argentina Due Diligence Closeout Meeting; Business Development Workshop Day 1; Business Development Workshop Day 2; Business Development Team Building Event Develop Technical Services goals related to Business Development; ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 12 0 Argentina Due Diligence Closeout Meeting; Business Development Workshop Day 1; Business Development Workshop Day 2; Business Development Team Building Event Develop Technical Services goals related to Business Development; ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Argentina Due Diligence Closeout Meeting; Business Development Workshop Day 1; Business Development Workshop Day 2; Business Development Team Building Event Develop Technical Services goals related to Business Development; ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call; Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina Due Diligence Closeout Meeting; Business Development Workshop Day 1; Business Development Workshop Day 2; Business Development Team Building Event Develop Technical Services goals related to Business Development; ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Argentina Due Diligence Closeout Meeting; Business Development Workshop Day 1; Business Development Workshop Day 2; Business Development Team Building Event Develop Technical Services goals related to Business Development; ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 01/15/2018 - Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet; Update 2018 Goals based on Feedback from GO Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Business Develop Support for Argentina; Review Angola trip with Wayne Fox ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Business Develop Support for Argentina; Review Angola trip with Wayne Fox ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 4 0 The Great Ice Blizzard of 2018 Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Business Develop Support for Argentina; Review Angola trip with Wayne Fox ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 6 0 The Great Ice Blizzard of 2018 Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 MK Timesheet; Update 2018 Goals based on Feedback from GO Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Business Develop Support for Argentina; Review Angola trip with Wayne Fox ICP Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 01/22/2018 - Weekly Operations Conference Call; 01/25/2018 - Technical Services Weekly Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Argentina Due Diligence Closeout Form; Argentina Entity Planning; Angola Due Diligence Trip Debrief Meeting; Due Diligence Weekly Update Call; Create Rig List for SLB Master Service Agreement; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 12 0 Argentina Due Diligence Closeout Form; Argentina Entity Planning; Angola Due Diligence Trip Debrief Meeting; Due Diligence Weekly Update Call; Create Rig List for SLB Master Service Agreement; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Argentina Due Diligence Closeout Form; Argentina Entity Planning; Angola Due Diligence Trip Debrief Meeting; Due Diligence Weekly Update Call; Create Rig List for SLB Master Service Agreement; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 01/22/2018 - Weekly Operations Conference Call; 01/25/2018 - Technical Services Weekly Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Due Diligence Closeout Form; Argentina Entity Planning; Angola Due Diligence Trip Debrief Meeting; Due Diligence Weekly Update Call; Create Rig List for SLB Master Service Agreement; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Due Diligence Closeout Form; Argentina Entity Planning; Angola Due Diligence Trip Debrief Meeting; Due Diligence Weekly Update Call; Create Rig List for SLB Master Service Agreement; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 01/29/2018 - Weekly Operations Conference Call; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 01/29/2018 - MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 SLB MSA Meeting - Rig Specs and KPI's; SOCAR AQS Due Diligence Meeting for Azerbaijan; Start assembling Angola Due Diligence report; Collect notes and contacts from Angola trip; Continue development of DD Tiers; Argentina Due Diligence Closeout form; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 SLB MSA Meeting - Rig Specs and KPI's; SOCAR AQS Due Diligence Meeting for Azerbaijan; Start assembling Angola Due Diligence report; Collect notes and contacts from Angola trip; Continue development of DD Tiers; Argentina Due Diligence Closeout form; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-01-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 SLB MSA Meeting - Rig Specs and KPI's; SOCAR AQS Due Diligence Meeting for Azerbaijan; Start assembling Angola Due Diligence report; Collect notes and contacts from Angola trip; Continue development of DD Tiers; Argentina Due Diligence Closeout form; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 SLB MSA Meeting - Rig Specs and KPI's; SOCAR AQS Due Diligence Meeting for Azerbaijan; Start assembling Angola Due Diligence report; Collect notes and contacts from Angola trip; Continue development of DD Tiers; Argentina Due Diligence Closeout form; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 SLB MSA Meeting - Rig Specs and KPI's; SOCAR AQS Due Diligence Meeting for Azerbaijan; Start assembling Angola Due Diligence report; Collect notes and contacts from Angola trip; Continue development of DD Tiers; Argentina Due Diligence Closeout form; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet; MK PDR Review Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Start Angola Due Diligence Closeout Report; Conduct Angola DD Meeting with Wayne, Ed, Nathan, and Carlos; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 MK Timesheet; MK PDR Review Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Start Angola Due Diligence Closeout Report; Conduct Angola DD Meeting with Wayne, Ed, Nathan, and Carlos; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Start Angola Due Diligence Closeout Report; Conduct Angola DD Meeting with Wayne, Ed, Nathan, and Carlos; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Start Angola Due Diligence Closeout Report; Conduct Angola DD Meeting with Wayne, Ed, Nathan, and Carlos; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Start Angola Due Diligence Closeout Report; Conduct Angola DD Meeting with Wayne, Ed, Nathan, and Carlos; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 02/12/2018 - Weekly Operations Conference Call; 02/15/2018 - Tech Services Weekly Meeting; PKD 4th QTR Earnings Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Angola Due Diligence Report; Angola Due Diligence Opportunity Assessment Meeting; Angola Risk Spider Graph; Trip notes from Angola DD ; Argentina Due Diligence Entity Update Meeting; Argentina Due Diligence Closeout Report (Chase Signatures); Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Angola Due Diligence Report; Angola Due Diligence Opportunity Assessment Meeting; Angola Risk Spider Graph; Trip notes from Angola DD ; Argentina Due Diligence Entity Update Meeting; Argentina Due Diligence Closeout Report (Chase Signatures); Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Angola Due Diligence Report; Angola Due Diligence Opportunity Assessment Meeting; Angola Risk Spider Graph; Trip notes from Angola DD ; Argentina Due Diligence Entity Update Meeting; Argentina Due Diligence Closeout Report (Chase Signatures); Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 02/12/2018 - Weekly Operations Conference Call; 02/15/2018 - Tech Services Weekly Meeting; PKD 4th QTR Earnings Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Angola Due Diligence Report; Angola Due Diligence Opportunity Assessment Meeting; Angola Risk Spider Graph; Trip notes from Angola DD ; Argentina Due Diligence Entity Update Meeting; Argentina Due Diligence Closeout Report (Chase Signatures); Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Angola Due Diligence Report; Angola Due Diligence Opportunity Assessment Meeting; Angola Risk Spider Graph; Trip notes from Angola DD ; Argentina Due Diligence Entity Update Meeting; Argentina Due Diligence Closeout Report (Chase Signatures); Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Presidents Day Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 12 0 Due Diligence Weekly Meeting; Angola Due Diligence Tender Meeting; Angola Due Diligence Closeout Report; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10.5 0 Due Diligence Weekly Meeting; Angola Due Diligence Tender Meeting; Angola Due Diligence Closeout Report; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Due Diligence Weekly Meeting; Angola Due Diligence Tender Meeting; Angola Due Diligence Closeout Report; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Due Diligence Weekly Meeting; Angola Due Diligence Tender Meeting; Angola Due Diligence Closeout Report; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 02/26/2018 - Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10.5 0 Argentina Due Diligence and Entity Set-Up Angola Due Diligence Report; Internal Corporate Project Activities; Presentation to ELT Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Argentina Due Diligence and Entity Set-Up Angola Due Diligence Report; Internal Corporate Project Activities; Presentation to ELT Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-02-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Argentina Due Diligence and Entity Set-Up Angola Due Diligence Report; Internal Corporate Project Activities; Presentation to ELT Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 12 0 Argentina Due Diligence and Entity Set-Up Angola Due Diligence Report; Internal Corporate Project Activities; Presentation to ELT Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Due Diligence and Entity Set-Up Angola Due Diligence Report; Internal Corporate Project Activities; Presentation to ELT Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 03/05/2018 - Weekly Operations Conference Call; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Argentina Due Diligence Update Meeting for HR Leadership Team; Continue on Angola Due Diligence Closeout Report; Due Diligence Weekly Meeting Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 12 0 Argentina Due Diligence Update Meeting for HR Leadership Team; Continue on Angola Due Diligence Closeout Report; Due Diligence Weekly Meeting Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 12 0 Argentina Due Diligence Update Meeting for HR Leadership Team; Continue on Angola Due Diligence Closeout Report; Due Diligence Weekly Meeting Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11.5 0 Argentina Due Diligence Update Meeting for HR Leadership Team; Continue on Angola Due Diligence Closeout Report; Due Diligence Weekly Meeting Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Due Diligence Update Meeting for HR Leadership Team; Continue on Angola Due Diligence Closeout Report; Due Diligence Weekly Meeting Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 03/12/2018 - Weekly Operations Conference Call; Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina New Market Entry Action Items - New Entity Start-Up; Angola Due Diligence Report; Angola DD Partner Research; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Argentina New Market Entry Action Items - New Entity Start-Up; Angola Due Diligence Report; Angola DD Partner Research; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina New Market Entry Action Items - New Entity Start-Up; Angola Due Diligence Report; Angola DD Partner Research; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Argentina New Market Entry Action Items - New Entity Start-Up; Angola Due Diligence Report; Angola DD Partner Research; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina New Market Entry Action Items - New Entity Start-Up; Angola Due Diligence Report; Angola DD Partner Research; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 03/19/2019 - Weekly Operations Conference Call; 03/22/2018 - Weekly Tech Services Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Argentina Entity Planning; Total Uganda Presentation Preparation; Due Diligence Weekly Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Argentina Entity Planning; Total Uganda Presentation Preparation; Due Diligence Weekly Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Argentina Entity Planning; Total Uganda Presentation Preparation; Due Diligence Weekly Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 03/19/2019 - Weekly Operations Conference Call; 03/22/2018 - Weekly Tech Services Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Entity Planning; Total Uganda Presentation Preparation; Due Diligence Weekly Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina Entity Planning; Total Uganda Presentation Preparation; Due Diligence Weekly Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 03/26/2018 - Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 03/26/2018 - MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Total Presentation - Review meetings and updating presentation; Argentina Entity Start-Up Activities; Internal Corporate Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Total Presentation - Review meetings and updating presentation; Argentina Entity Start-Up Activities; Internal Corporate Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Total Presentation - Review meetings and updating presentation; Argentina Entity Start-Up Activities; Internal Corporate Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Total Presentation - Review meetings and updating presentation; Argentina Entity Start-Up Activities; Internal Corporate Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-03-30 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Holiday - Good Friday Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 04/02/2018 - Weekly Operations Conference Call; 04/05/2018 - Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10.5 0 Argentina Entity Start-Up and Further Due Diligence; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Argentina Entity Start-Up and Further Due Diligence; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Argentina Entity Start-Up and Further Due Diligence; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 04/02/2018 - Weekly Operations Conference Call; 04/05/2018 - Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Entity Start-Up and Further Due Diligence; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Argentina Entity Start-Up and Further Due Diligence; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Argentina Entity Start-Up Oversight; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Entity Start-Up Oversight; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-11 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-12 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-13 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 04/16/2018 - Weekly Operations Conference Call; 04/19/2018 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Develop Argentina New Country Start-Up Project Schedule; Conduct Biweekly Argentina Start-Up Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11.5 0 Develop Argentina New Country Start-Up Project Schedule; Conduct Biweekly Argentina Start-Up Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 12 0 Develop Argentina New Country Start-Up Project Schedule; Conduct Biweekly Argentina Start-Up Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 04/16/2018 - Weekly Operations Conference Call; 04/19/2018 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Develop Argentina New Country Start-Up Project Schedule; Conduct Biweekly Argentina Start-Up Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Develop Argentina New Country Start-Up Project Schedule; Conduct Biweekly Argentina Start-Up Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 04/23/2018 - Weekly Operations Conference Call; 04/26/2018 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Argentina Entity Start-Up Planning with Functional Groups; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Argentina Entity Start-Up Planning with Functional Groups; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Argentina Entity Start-Up Planning with Functional Groups; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 04/23/2018 - Weekly Operations Conference Call; 04/26/2018 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Entity Start-Up Planning with Functional Groups; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Argentina Entity Start-Up Planning with Functional Groups; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 04/30/2018 - Weekly Operations Conference Call; 05/02/2018 - 1st Qtr Earning Call and Update Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Argentina Start-up Biweekly Meeting; Ethiopia Due Diligence Documents; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-04-30 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 OTC Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Argentina Start-up Biweekly Meeting; Ethiopia Due Diligence Documents; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 04/30/2018 - Weekly Operations Conference Call; 05/02/2018 - 1st Qtr Earning Call and Update Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Argentina Start-up Biweekly Meeting; Ethiopia Due Diligence Documents; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Argentina Start-up Biweekly Meeting; Ethiopia Due Diligence Documents; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Argentina Start-up Biweekly Meeting; Ethiopia Due Diligence Documents; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/07/2018 - Weekly Operations Conference Call; 05/10/2018 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Ethiopia Due Diligence Kick-Off Meeting; Update Argentina New Entity Start-Up schedule; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Ethiopia Due Diligence Kick-Off Meeting; Update Argentina New Entity Start-Up schedule; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 11 0 Ethiopia Due Diligence Kick-Off Meeting; Update Argentina New Entity Start-Up schedule; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-09 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Intellectual Property Presentation by Andrews Kurth Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/07/2018 - Weekly Operations Conference Call; 05/10/2018 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Ethiopia Due Diligence Kick-Off Meeting; Update Argentina New Entity Start-Up schedule; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Ethiopia Due Diligence Kick-Off Meeting; Update Argentina New Entity Start-Up schedule; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/14/2018 - Weekly Operations Update Meeting; 05/17/2018 - Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Argentina Entity Start-Up Biweekly meeting; Argentina Start-Up schedule update; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Argentina Entity Start-Up Biweekly meeting; Argentina Start-Up schedule update; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Argentina Entity Start-Up Biweekly meeting; Argentina Start-Up schedule update; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-16 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 IMS Training - HSE for Office & Security Program Overview Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/14/2018 - Weekly Operations Update Meeting; 05/17/2018 - Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina Entity Start-Up Biweekly meeting; Argentina Start-Up schedule update; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Argentina Entity Start-Up Biweekly meeting; Argentina Start-Up schedule update; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/21/2018 - Weekly Operations Conference Call; 05/24/2018 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Argentina Entity Updates; Create Technical Services Content for BD; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Entity Updates; Create Technical Services Content for BD; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Entity Updates; Create Technical Services Content for BD; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/21/2018 - Weekly Operations Conference Call; 05/24/2018 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina Entity Updates; Create Technical Services Content for BD; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Argentina Entity Updates; Create Technical Services Content for BD; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-28 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Memorial Day Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Entity Start-Up Meetings and Schedule; Internal Corporate Project Activities; Weekly Update Meeting with Jon-Al Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Argentina Entity Start-Up Meetings and Schedule; Internal Corporate Project Activities; Weekly Update Meeting with Jon-Al Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-05-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Argentina Entity Start-Up Meetings and Schedule; Internal Corporate Project Activities; Weekly Update Meeting with Jon-Al Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6.5 0 Argentina Entity Start-Up Meetings and Schedule; Internal Corporate Project Activities; Weekly Update Meeting with Jon-Al Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 06/04/2018 - Weekly Operations Conference Call; 06/07/2018 - Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Argentina Entity Start-Up Project; Internal Corporate Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Entity Start-Up Project; Internal Corporate Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Entity Start-Up Project; Internal Corporate Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 06/04/2018 - Weekly Operations Conference Call; 06/07/2018 - Tech Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Entity Start-Up Project; Internal Corporate Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Argentina Entity Start-Up Project; Internal Corporate Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 06/11/2018 - Weekly Operations Conference Call; 06/14/2018 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Argentina Entity Start-Up Planning, Schedule, and Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Entity Start-Up Planning, Schedule, and Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina Entity Start-Up Planning, Schedule, and Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 06/11/2018 - Weekly Operations Conference Call; 06/14/2018 - Technical Services Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina Entity Start-Up Planning, Schedule, and Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina Entity Start-Up Planning, Schedule, and Update Meeting; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-18 OH-010 :OH-010 Overhead All Activities Regular Pay N 12 0 Travel to Copenhagen; Travel to Houston Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-19 OH-014 :OH-014 Overhead All Activities Regular Pay N 9 0 IADC World Drilling Conference Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-20 OH-014 :OH-014 Overhead All Activities Regular Pay N 9 0 IADC World Drilling Conference Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-21 OH-010 :OH-010 Overhead All Activities Regular Pay N 12 0 Travel to Copenhagen; Travel to Houston Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet; MK Mid-Year PDR Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Argentina New Entity Start-Up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina New Entity Start-Up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet; MK Mid-Year PDR Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Argentina New Entity Start-Up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Argentina New Entity Start-Up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-06-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Argentina New Entity Start-Up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina Start-Up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Argentina Start-Up Activities; Internal Corporate Project Activities Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 4th of July Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2018-07-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Paid Time Off Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Holiday Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 RFQ support, project schedule and cost estimate, Brainstorming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-03 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 0.5 0 MDR research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Technical services meetings, timesheet, Performance evaluation, SolidWorks IT installation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-03 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 2 0 Change management Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-03 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 1 0 Cost and labor variance update, Documentation close-out, Invoicing, Logistics tracking and expediting, Timesheets, Lessons learned, Technical support for walking shoe pressure gauge usability for weighing of rig, Sakhalin interface Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-03 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 2 0 Torque tube tie-back expediting, subcontracts coordinating, procurements of filters for flushing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-04 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 RFQ support, project schedule and cost estimate, Brainstorming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Technical services meetings, timesheet, Performance evaluation, SolidWorks IT installation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-04 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 3 0 Cost and labor variance update, Documentation close-out, Invoicing, Logistics tracking and expediting, Timesheets, Lessons learned, Technical support for walking shoe pressure gauge usability for weighing of rig, Sakhalin interface Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-04 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 1 0 Torque tube tie-back expediting, subcontracts coordinating, procurements of filters for flushing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-05 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 RFQ support, project schedule and cost estimate, Brainstorming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Technical services meetings, timesheet, Performance evaluation, SolidWorks IT installation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-05 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 3.5 0 Cost and labor variance update, Documentation close-out, Invoicing, Logistics tracking and expediting, Timesheets, Lessons learned, Technical support for walking shoe pressure gauge usability for weighing of rig, Sakhalin interface Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 RFQ support, project schedule and cost estimate, Brainstorming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Technical services meetings, timesheet, Performance evaluation, SolidWorks IT installation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-06 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 4 0 Cost and labor variance update, Documentation close-out, Invoicing, Logistics tracking and expediting, Timesheets, Lessons learned, Technical support for walking shoe pressure gauge usability for weighing of rig, Sakhalin interface Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-06 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 1 0 Torque tube tie-back expediting, subcontracts coordinating, procurements of filters for flushing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-09 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 0.5 0 Research for hammer Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-09 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 0.5 0 Expedite documentation close-out, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-09 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 2.5 0 IAT procedure review, coordinate punch list close-out, IAT vendor support coordination, Internal alignment for scope management of Odoptu work Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-09 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 1 0 Sakhalin interface, timesheets, contract revision, cost and labor update, Invoicing, regulatory, biweekly report, timesheets, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-09 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 0.5 0 torque tube tie-back procurement, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-09 Rig 270L-TSR :Rig 270L-TSR TSR-01533-270L Temp Rating Regular Pay N 3 0 API monogram research, temp rating research, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 Timesheet, Weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-10 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 1.5 0 Internal procurement and invoice expediting, Sakhalin interface, timesheet correction, documentation handover to IDR, Lessons learned and AAR Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-10 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 0.5 0 IAT procedure review, coordinate punch list close-out, IAT vendor support coordination, Internal alignment for scope management of Odoptu work Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-10 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 2.75 0 Sakhalin interface, timesheets, contract revision, cost and labor update, Invoicing, regulatory, biweekly report, timesheets, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-10 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 0.5 0 torque tube tie-back procurement, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-10 Rig 270L-TSR :Rig 270L-TSR TSR-01533-270L Temp Rating Regular Pay N 2 0 API monogram research, temp rating research, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-11 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 2 0 Internal procurement and invoice expediting, Sakhalin interface, timesheet correction, documentation handover to IDR, Lessons learned and AAR Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-11 Rig 270L-TSR :Rig 270L-TSR TSR-01401-270L Walking System - Logistics Regular Pay N 1 0 coordinate and expedite logistics Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-11 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 5 0 Sakhalin interface, timesheets, contract revision, cost and labor update, Invoicing, regulatory, biweekly report, timesheets, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-12 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 2.75 0 Internal procurement and invoice expediting, Sakhalin interface, timesheet correction, documentation handover to IDR, Lessons learned and AAR Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-12 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 1 0 Expedite documentation close-out, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-12 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 1.5 0 IAT procedure review, coordinate punch list close-out, IAT vendor support coordination, Internal alignment for scope management of Odoptu work Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-12 Rig 270L-TSR :Rig 270L-TSR TSR-01401-270L Walking System - Logistics Regular Pay N 0.25 0 coordinate and expedite logistics Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-12 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 2.5 0 Sakhalin interface, timesheets, contract revision, cost and labor update, Invoicing, regulatory, biweekly report, timesheets, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-13 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 6 0 Internal procurement and invoice expediting, Sakhalin interface, timesheet correction, documentation handover to IDR, Lessons learned and AAR Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-13 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 0.5 0 Sakhalin interface, timesheets, contract revision, cost and labor update, Invoicing, regulatory, biweekly report, timesheets, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-13 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 0.5 0 torque tube tie-back procurement, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-16 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 0.5 0 Rolling stock documentation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-16 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 2 0 Customer feedback scorecard development, IDR handover, Supplier scorecards, Internal expediting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-16 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 2 0 Documentation close-out, Change management, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-16 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 2 0 Vendor call-out procurement, ccordinate punch list close-out, work packs Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-16 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 1 0 Weekly Kanban, Cost and labor variance update, Timesheets, Invoicing, Logistics coordination, Risk register update and control action Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-16 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 1 0 Update rig move brochure, subcontracts. logistics expediting, native files for commissioning procedures Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-17 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 2.5 0 Customer feedback scorecard development, IDR handover, Supplier scorecards, Internal expediting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-17 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 1 0 Documentation close-out, Change management, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-17 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 4 0 Weekly Kanban, Cost and labor variance update, Timesheets, Invoicing, Logistics coordination, Risk register update and control action Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-17 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 0.5 0 Update rig move brochure, subcontracts. logistics expediting, native files for commissioning procedures Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-18 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 2 0 Customer feedback scorecard development, IDR handover, Supplier scorecards, Internal expediting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-18 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 1.5 0 Vendor call-out procurement, ccordinate punch list close-out, work packs Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-18 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 2.5 0 Weekly Kanban, Cost and labor variance update, Timesheets, Invoicing, Logistics coordination, Risk register update and control action Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-18 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 2 0 Update rig move brochure, subcontracts. logistics expediting, native files for commissioning procedures Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-19 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 1 0 Customer feedback scorecard development, IDR handover, Supplier scorecards, Internal expediting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-19 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 2 0 Vendor call-out procurement, ccordinate punch list close-out, work packs Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-19 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 2 0 Weekly Kanban, Cost and labor variance update, Timesheets, Invoicing, Logistics coordination, Risk register update and control action Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-19 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 2 0 Update rig move brochure, subcontracts. logistics expediting, native files for commissioning procedures Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-20 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 0.5 0 Rolling stock documentation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-20 OH-013 :OH-013 Overhead All Activities Regular Pay N 4.5 0 Asia Pacific rig research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-20 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 1 0 Customer feedback scorecard development, IDR handover, Supplier scorecards, Internal expediting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-20 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 1.5 0 Vendor call-out procurement, ccordinate punch list close-out, work packs Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-20 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 0.5 0 Weekly Kanban, Cost and labor variance update, Timesheets, Invoicing, Logistics coordination, Risk register update and control action Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Technical services brainstorm session, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 5 0 231 and 253 research, TSR and CTR for 270 documentation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-23 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 1 0 Lessons learned meeting and AAR Report, 270 Handover Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-23 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 1 0 Cost and labor variance report, contract email revision, Sakhalin interface, Invoicing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 iTS and 2M-Tek position description, learning and information sharing, SSAB lunch and learn, IT access, iTS and 2M-Tek projxsesnse coordination, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-24 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 3 0 Lessons learned meeting and AAR Report, 270 Handover Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-24 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 1 0 IAT call-out procurement, Field report review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-24 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 2 0 Cost and labor variance report, contract email revision, Sakhalin interface, Invoicing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 iTS and 2M-Tek position description, learning and information sharing, SSAB lunch and learn, IT access, iTS and 2M-Tek projxsesnse coordination, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 231 and 253 research, TSR and CTR for 270 documentation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-25 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 1.5 0 Lessons learned meeting and AAR Report, 270 Handover Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-25 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 2 0 Cost and labor variance report, contract email revision, Sakhalin interface, Invoicing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-25 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 0.5 0 IMS brochure update Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-26 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 Rolling stock documentation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 iTS and 2M-Tek position description, learning and information sharing, SSAB lunch and learn, IT access, iTS and 2M-Tek projxsesnse coordination, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 231 and 253 research, TSR and CTR for 270 documentation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-26 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 3 0 Cost and labor variance report, contract email revision, Sakhalin interface, Invoicing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 iTS and 2M-Tek position description, learning and information sharing, SSAB lunch and learn, IT access, iTS and 2M-Tek projxsesnse coordination, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 231 and 253 research, TSR and CTR for 270 documentation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-27 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 1 0 IAT call-out procurement, Field report review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-27 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 1 0 Cost and labor variance report, contract email revision, Sakhalin interface, Invoicing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-30 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 0.5 0 Rolling stock documentation, supplier feedback to IFS Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 iTS and 2M-Tek position description, learning and information sharing, travel to 2M-tek, Engineering work forecast, iTS and 2M-Tek projxsesnse coordination, iTS NCR meeting, AWT vendor add, IT issues, hardware upgrade, shipping documentation issue resolution, access requests, End user certificate coordination, Whipstock WPS/PQR implementation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-30 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 2 0 Scope handover Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-30 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 1 0 Coordinate call-out for Sawyer Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-30 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 1 0 Cost and labor variance report, contract email revision, Sakhalin interface, Invoicing. timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-31 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 Rolling stock documentation, supplier feedback to IFS Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 iTS and 2M-Tek position description, learning and information sharing, travel to 2M-tek, Engineering work forecast, iTS and 2M-Tek projxsesnse coordination, iTS NCR meeting, AWT vendor add, IT issues, hardware upgrade, shipping documentation issue resolution, access requests, End user certificate coordination, Whipstock WPS/PQR implementation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-31 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 1 0 Scope handover Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-01-31 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 1 0 Coordinate call-out for Sawyer Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 11 0 iTS and 2M-Tek position description, learning and information sharing, travel to 2M-tek, Engineering work forecast, iTS and 2M-Tek projxsesnse coordination, iTS NCR meeting, AWT vendor add, IT issues, hardware upgrade, shipping documentation issue resolution, access requests, End user certificate coordination, Whipstock WPS/PQR implementation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-02 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 0.5 0 Rolling stock documentation, supplier feedback to IFS Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 iTS and 2M-Tek position description, learning and information sharing, travel to 2M-tek, Engineering work forecast, iTS and 2M-Tek projxsesnse coordination, iTS NCR meeting, AWT vendor add, IT issues, hardware upgrade, shipping documentation issue resolution, access requests, End user certificate coordination, Whipstock WPS/PQR implementation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-02 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 2 0 Scope handover Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-02 Rig 270L-TSR :Rig 270L-TSR TSR-01420-270L Rig 270L Walking System Project Management and Support Regular Pay N 1 0 Cost and labor variance report, contract email revision, Sakhalin interface, Invoicing. timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 iTS and 2M-Tek position description, learning and information sharing, travel to 2M-tek, Engineering work forecast, iTS and 2M-Tek projxsesnse coordination, iTS NCR meeting, AWT vendor add, IT issues, hardware upgrade, shipping documentation issue resolution, access requests, End user certificate coordination, Whipstock WPS/PQR implementation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-03 OH-026 :OH-026 01.06 2016 270 W/S PM / Site Mngmnt Regular Pay N 2 0 Scope handover Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 8.5 0 iTS and 2MTek: Engineering work forecast, projxSense setup, timesheets, TS weekly meeting. 2MTek Oracle upload, drawing numbering specification, stakeholder update, ARB research, Draft TSR-01544 for ARB, hardware upgrade, MSV testing guideline notification Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 270 handover, invoicing follow up Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 iTS and 2MTek: Engineering work forecast, projxSense setup, timesheets, TS weekly meeting. 2MTek Oracle upload, drawing numbering specification, stakeholder update, ARB research, Draft TSR-01544 for ARB, hardware upgrade, MSV testing guideline notification Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 270 handover, invoicing follow up Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 9 0 iTS and 2MTek: Engineering work forecast, projxSense setup, timesheets, TS weekly meeting. 2MTek Oracle upload, drawing numbering specification, stakeholder update, ARB research, Draft TSR-01544 for ARB, hardware upgrade, MSV testing guideline notification Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 270 handover, invoicing follow up Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 9 0 iTS and 2MTek: Engineering work forecast, projxSense setup, timesheets, TS weekly meeting. 2MTek Oracle upload, drawing numbering specification, stakeholder update, ARB research, Draft TSR-01544 for ARB, hardware upgrade, MSV testing guideline notification Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 270 handover, invoicing follow up Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 iTS and 2MTek: Engineering work forecast, projxSense setup, timesheets, TS weekly meeting. 2MTek Oracle upload, drawing numbering specification, stakeholder update, ARB research, Draft TSR-01544 for ARB, hardware upgrade, MSV testing guideline notification Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 270 handover, invoicing follow up Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-13 2M Tek :2M Tek TSR-01487-2M-TEK Mud Valve Testing Regular Pay N 3 0 MVS work pack Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-13 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 2 0 Solidworks modeling and analysis Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-13 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 Lafayette drive Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-13 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Providing on the job training and guidance to new SolidWorks user, ProjXSense training Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-14 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 6 0 Solidworks modeling and analysis Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-14 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 1 0 Coordinate ProjXSense setup, coordinate engineering activities for ARB design support Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 IT upgrade, iTS weekly meeting setup Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-14 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 Lafayette drive Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-14 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Providing on the job training and guidance to new SolidWorks user, ProjXSense training Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-15 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 6 0 Solidworks modeling and analysis Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-15 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 2 0 Coordinate ProjXSense setup, coordinate engineering activities for ARB design support Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 IT upgrade, iTS weekly meeting setup Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-15 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-17 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-20 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Presidents day Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-21 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 5 0 ARB design and FEA, drawing review, update SolidWorks templates Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Computer hardware, performance evaluation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-21 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Providing on the job training and guidance to new SolidWorks user Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-22 2M Tek :2M Tek TSR-01487-2M-TEK Mud Valve Testing Regular Pay N 0.5 0 Work pack Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-22 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 7 0 ARB design and FEA, drawing review, update SolidWorks templates Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-22 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 1 0 Internal billing rate, Research on MSV equipment Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-22 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 Providing on the job training and guidance to new SolidWorks user Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-23 2M Tek :2M Tek TSR-01487-2M-TEK Mud Valve Testing Regular Pay N 2 0 Work pack Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-23 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 5 0 ARB design and FEA, drawing review, update SolidWorks templates Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-23 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 2 0 Internal billing rate, Research on MSV equipment Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-23 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Providing on the job training and guidance to new SolidWorks user Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-24 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 8 0 ARB design and FEA, drawing review, update SolidWorks templates Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-24 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 1 0 Internal billing rate, Research on MSV equipment Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-27 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 4 0 Engineering file naming procedure, Engineering forecast, Oracle master list, TSR and CTR development, WPS and PQR implementation for Whipstock fab, MSV field testing work pack, RACI Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-27 2M Tek :2M Tek TSR-01557-2M-TEK Actuator Testing and Analysis Regular Pay N 2 0 Meeting with SES to review test procedure, Research on current testing procedure Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-27 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 2 0 Weekly engineering meeting, End user form coordination, TSR and CTR development, TH-Hill purchase coordination, Coordinate shipping documentation, PO iTS Singapore review, Coordinate drawing release to 2M-Tek Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Tech Services weekly meeting, timesheet, PMP certification renewal, expense report, Solidworks iT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-28 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 4 0 Engineering file naming procedure, Engineering forecast, Oracle master list, TSR and CTR development, WPS and PQR implementation for Whipstock fab, MSV field testing work pack, RACI Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-28 2M Tek :2M Tek TSR-01557-2M-TEK Actuator Testing and Analysis Regular Pay N 3 0 Meeting with SES to review test procedure, Research on current testing procedure Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Tech Services weekly meeting, timesheet, PMP certification renewal, expense report, Solidworks iT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-02-28 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 0.5 0 Halliburton proposal support, Project charter Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-01 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 1 0 Support solid works drafting, review drawings Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-01 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 5 0 Engineering file naming procedure, Engineering forecast, Oracle master list, TSR and CTR development, WPS and PQR implementation for Whipstock fab, MSV field testing work pack, RACI Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-01 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 3 0 Weekly engineering meeting, End user form coordination, TSR and CTR development, TH-Hill purchase coordination, Coordinate shipping documentation, PO iTS Singapore review, Coordinate drawing release to 2M-Tek Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Tech Services weekly meeting, timesheet, PMP certification renewal, expense report, Solidworks iT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-02 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 1 0 Support solid works drafting, review drawings Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-02 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 2.5 0 Engineering file naming procedure, Engineering forecast, Oracle master list, TSR and CTR development, WPS and PQR implementation for Whipstock fab, MSV field testing work pack, RACI Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-02 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 3 0 Weekly engineering meeting, End user form coordination, TSR and CTR development, TH-Hill purchase coordination, Coordinate shipping documentation, PO iTS Singapore review, Coordinate drawing release to 2M-Tek Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Tech Services weekly meeting, timesheet, PMP certification renewal, expense report, Solidworks iT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-02 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2 0 Halliburton proposal support, Project charter Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-03 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 4 0 Support solid works drafting, review drawings Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-03 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 3 0 Engineering file naming procedure, Engineering forecast, Oracle master list, TSR and CTR development, WPS and PQR implementation for Whipstock fab, MSV field testing work pack, RACI Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-03 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 1 0 Weekly engineering meeting, End user form coordination, TSR and CTR development, TH-Hill purchase coordination, Coordinate shipping documentation, PO iTS Singapore review, Coordinate drawing release to 2M-Tek Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-06 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 0.5 0 Operating manual review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-06 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 4.5 0 Engineering numbering system, Weld Procedure development, Engineering forecast and man-hour estimate. TSR/CTR development Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-06 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 3 0 Weekly Engineering meeting, NCR drilling jar, Coordinate drawing clarifications with m manufacturer Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, IT support, Expense report, PTO request Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 270 Invoicing coordination Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-07 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 6 0 Engineering numbering system, Weld Procedure development, Engineering forecast and man-hour estimate. TSR/CTR development Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-07 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 2 0 Weekly Engineering meeting, NCR drilling jar, Coordinate drawing clarifications with m manufacturer Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, IT support, Expense report, PTO request Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-08 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 6 0 Engineering numbering system, Weld Procedure development, Engineering forecast and man-hour estimate. TSR/CTR development Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-08 2M Tek :2M Tek TSR-01557-2M-TEK Actuator Testing and Analysis Regular Pay N 1 0 TSR and CTR, Review of testing procedure Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, IT support, Expense report, PTO request Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-09 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 0.5 0 Operating manual review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-09 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 1 0 Engineering numbering system, Weld Procedure development, Engineering forecast and man-hour estimate. TSR/CTR development Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-09 2M Tek :2M Tek TSR-01557-2M-TEK Actuator Testing and Analysis Regular Pay N 2.5 0 TSR and CTR, Review of testing procedure Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-09 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 4 0 Weekly Engineering meeting, NCR drilling jar, Coordinate drawing clarifications with m manufacturer Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-09 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 2M-Tek Lafayette Travel Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-10 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 2.5 0 Engineering numbering system, Weld Procedure development, Engineering forecast and man-hour estimate. TSR/CTR development Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-10 2M Tek :2M Tek TSR-01557-2M-TEK Actuator Testing and Analysis Regular Pay N 3 0 TSR and CTR, Review of testing procedure Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet, IT support, Expense report, PTO request Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-10 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 2M-Tek Lafayette Travel Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-13 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 4 0 AWT procurement, Naming convention procedure, Oracle master list coordination. NDA with AWT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-13 2M Tek :2M Tek TSR-01557-2M-TEK Actuator Testing and Analysis Regular Pay N 0.5 0 Create test procedure, casing procurement, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 Timesheet, weekly TS meeting, SMART Goal discussion, Expense report, IT Issue, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-14 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 4 0 AWT procurement, Naming convention procedure, Oracle master list coordination. NDA with AWT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-14 2M Tek :2M Tek TSR-01557-2M-TEK Actuator Testing and Analysis Regular Pay N 3 0 Create test procedure, casing procurement, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet, weekly TS meeting, SMART Goal discussion, Expense report, IT Issue, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-15 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 2.5 0 AWT procurement, Naming convention procedure, Oracle master list coordination. NDA with AWT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-15 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 4 0 Weekly Engineering Meeting, Man-hour estimate for Dynasty order, shear pin drawing update, Engineering coordination Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Timesheet, weekly TS meeting, SMART Goal discussion, Expense report, IT Issue, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-16 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 1 0 AWT procurement, Naming convention procedure, Oracle master list coordination. NDA with AWT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-16 2M Tek :2M Tek TSR-01557-2M-TEK Actuator Testing and Analysis Regular Pay N 2 0 Create test procedure, casing procurement, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-16 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 3 0 Weekly Engineering Meeting, Man-hour estimate for Dynasty order, shear pin drawing update, Engineering coordination Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet, weekly TS meeting, SMART Goal discussion, Expense report, IT Issue, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-16 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 CRT modeling and familiarization Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-17 2M Tek :2M Tek TSR-01557-2M-TEK Actuator Testing and Analysis Regular Pay N 5 0 Create test procedure, casing procurement, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-17 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 1 0 Weekly Engineering Meeting, Man-hour estimate for Dynasty order, shear pin drawing update, Engineering coordination Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, weekly TS meeting, SMART Goal discussion, Expense report, IT Issue, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-17 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 CRT modeling and familiarization Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-20 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 5.5 0 Oracle go-live support and coordination, AWT procurement and NDA, TSR close-out review, part numbering procedure Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-20 2M Tek :2M Tek TSR-01557-2M-TEK Actuator Testing and Analysis Regular Pay N 0.5 0 Casing procurement, test procedure finalize, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-20 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 3 0 Man-hour estimate, part numbering convention, weekly engineering meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-21 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 8 0 Oracle go-live support and coordination, AWT procurement and NDA, TSR close-out review, part numbering procedure Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly TS meeting, work front focus discussion, coordinate to offer support for 2M and iTS Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-22 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 6 0 Oracle go-live support and coordination, AWT procurement and NDA, TSR close-out review, part numbering procedure Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-22 2M Tek :2M Tek TSR-01557-2M-TEK Actuator Testing and Analysis Regular Pay N 2 0 Casing procurement, test procedure finalize, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly TS meeting, work front focus discussion, coordinate to offer support for 2M and iTS Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-23 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 5 0 Oracle go-live support and coordination, AWT procurement and NDA, TSR close-out review, part numbering procedure Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-23 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 2 0 Man-hour estimate, part numbering convention, weekly engineering meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly TS meeting, work front focus discussion, coordinate to offer support for 2M and iTS Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-24 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 4 0 Oracle go-live support and coordination, AWT procurement and NDA, TSR close-out review, part numbering procedure Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-24 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Contract research, initial engagement and discussions Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Weekly TS meeting, work front focus discussion, coordinate to offer support for 2M and iTS Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-27 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 Contract review, TPP development, BDE TCs, BDE procurement strategy, HH technical presentation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 2M-Tek and iTS handover, weekly TS meeting, iT issues, performance review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-28 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9.5 0 Contract review, TPP development, BDE TCs, BDE procurement strategy, HH technical presentation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 2M-Tek and iTS handover, weekly TS meeting, iT issues, performance review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-29 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 Contract review, TPP development, BDE TCs, BDE procurement strategy, HH technical presentation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 2M-Tek and iTS handover, weekly TS meeting, iT issues, performance review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-30 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 Contract review, TPP development, BDE TCs, BDE procurement strategy, HH technical presentation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 2M-Tek and iTS handover, weekly TS meeting, iT issues, performance review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-31 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Contract review, TPP development, BDE TCs, BDE procurement strategy, HH technical presentation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-31 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 close-out summary schedule Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-03-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 2M-Tek and iTS handover, weekly TS meeting, iT issues, performance review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-03 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6.5 0 BDE TPPs, TCs, RFP Bulletin Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Timesheet, Weekly TS meeting, IT issues, PMP certification Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-04 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9.5 0 BDE TPPs, TCs, RFP Bulletin Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-05 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 BDE TPPs, TCs, RFP Bulletin Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-06 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9.5 0 BDE TPPs, TCs, RFP Bulletin Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Timesheet, Weekly TS meeting, IT issues, PMP certification Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-07 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8.5 0 BDE TPPs, TCs, RFP Bulletin Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet, Weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-10 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 10 0 TPP development, BDE terms and conditions coordination, Camp Supplier engagement and conference calls Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-11 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 10 0 TPP development, BDE terms and conditions coordination, Camp Supplier engagement and conference calls Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-12 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 TPP development, BDE terms and conditions coordination, Camp Supplier engagement and conference calls Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-13 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 TPP development, BDE terms and conditions coordination, Camp Supplier engagement and conference calls Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-14 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Easter Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-17 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9.5 0 TPP development, BDE terms and conditions coordination, Camp Supplier engagement and conference calls, RFP cover letter and issuance Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet, OTC registration and research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-18 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 TPP development, BDE terms and conditions coordination, Camp Supplier engagement and conference calls, RFP cover letter and issuance Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, OTC registration and research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 TPP development, BDE terms and conditions coordination, Camp Supplier engagement and conference calls, RFP cover letter and issuance Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 11 0 TPP development, BDE terms and conditions coordination, Camp Supplier engagement and conference calls, RFP cover letter and issuance Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-21 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 TPP development, BDE terms and conditions coordination, Camp Supplier engagement and conference calls, RFP cover letter and issuance Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-24 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 TPP development, BDE and rig build legal and commercial, Procurement planning, RFP cover letter and issuance, Technical clarification with Suppliers, Proposal evaluation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly TS meeting, Expense report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-25 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 TPP development, BDE and rig build legal and commercial, Procurement planning, RFP cover letter and issuance, Technical clarification with Suppliers, Proposal evaluation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-26 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 TPP development, BDE and rig build legal and commercial, Procurement planning, RFP cover letter and issuance, Technical clarification with Suppliers, Proposal evaluation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-27 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7.5 0 TPP development, BDE and rig build legal and commercial, Procurement planning, RFP cover letter and issuance, Technical clarification with Suppliers, Proposal evaluation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Timesheet, Weekly TS meeting, Expense report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-04-28 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 TPP development, BDE and rig build legal and commercial, Procurement planning, RFP cover letter and issuance, Technical clarification with Suppliers, Proposal evaluation Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-01 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8.5 0 TPP development, BDE and rig build legal and commercial, Procurement planning, RFP cover letter and issuance, Technical clarification with Suppliers, Proposal evaluations, Weekly report, Supplier engagement meetings Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet, Weekly TS meeting, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-02 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6.5 0 TPP development, BDE and rig build legal and commercial, Procurement planning, RFP cover letter and issuance, Technical clarification with Suppliers, Proposal evaluations, Weekly report, Supplier engagement meetings Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-02 OH-014 :OH-014 Overhead All Activities Regular Pay N 3.5 0 OTC Luncheon, NOV Ideal rig visit Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-03 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 TPP development, BDE and rig build legal and commercial, Procurement planning, RFP cover letter and issuance, Technical clarification with Suppliers, Proposal evaluations, Weekly report, Supplier engagement meetings Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-03 OH-014 :OH-014 Overhead All Activities Regular Pay N 6 0 OTC Luncheon, NOV Ideal rig visit Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-04 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8.5 0 TPP development, BDE and rig build legal and commercial, Procurement planning, RFP cover letter and issuance, Technical clarification with Suppliers, Proposal evaluations, Weekly report, Supplier engagement meetings Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly TS meeting, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-05 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 TPP development, BDE and rig build legal and commercial, Procurement planning, RFP cover letter and issuance, Technical clarification with Suppliers, Proposal evaluations, Weekly report, Supplier engagement meetings Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-08 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 TPP development, BDE and rig build legal and commercial, Procurement planning, RFP cover letter and issuance, Technical clarification with Suppliers, Proposal evaluations, Weekly report, Supplier engagement meetings Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-09 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 TPP development, BDE and rig build legal and commercial, Procurement planning, RFP cover letter and issuance, Technical clarification with Suppliers, Proposal evaluations, Weekly report, Supplier engagement meetings Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-10 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 TPP development, BDE and rig build legal and commercial, Procurement planning, RFP cover letter and issuance, Technical clarification with Suppliers, Proposal evaluations, Weekly report, Supplier engagement meetings Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-11 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-12 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-15 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8.5 0 BDE and rig build legal and commercial evaluation, RFP cover letter and issuance, Technical clarification with Suppliers, Proposal evaluations, Vendor adds Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet, Weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-16 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9.5 0 BDE and rig build legal and commercial evaluation, RFP cover letter and issuance, Technical clarification with Suppliers, Proposal evaluations, Vendor adds Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-17 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 BDE and rig build legal and commercial evaluation, RFP cover letter and issuance, Technical clarification with Suppliers, Proposal evaluations, Vendor adds Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-18 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 BDE and rig build legal and commercial evaluation, RFP cover letter and issuance, Technical clarification with Suppliers, Proposal evaluations, Vendor adds Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 BDE and rig build legal and commercial evaluation, RFP cover letter and issuance, Technical clarification with Suppliers, Proposal evaluations, Vendor adds Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-22 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Vendor adds Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet, Weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-23 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Vendor adds Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-24 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Vendor adds Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-25 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Vendor adds Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-26 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Vendor adds Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-29 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-30 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8.5 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Vendor adds Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet, weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-31 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Vendor adds Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-05-31 OH-014 :OH-014 Overhead All Activities Regular Pay N 7 0 Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-01 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Vendor adds Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-02 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Vendor adds Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-06 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3.5 0 HH Technical clarification meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-07 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-08 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-09 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-12 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 10 0 BOP technical commercial evaluation, BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Vendor adds, Well control TPPs Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet, weekly ts meeting, townhall meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-13 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 BOP technical commercial evaluation, BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Vendor adds, Well control TPPs Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-14 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 BOP technical commercial evaluation, BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Vendor adds, Well control TPPs Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-14 OH-003 :OH-003 Overhead All Activities Regular Pay N 4 0 Jury duty Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-15 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 BOP technical commercial evaluation, BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Vendor adds, Well control TPPs Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Timesheet, weekly ts meeting, townhall meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-16 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3.5 0 BOP technical commercial evaluation, BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Vendor adds, Well control TPPs Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 BOP technical commercial evaluation, BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheets, weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 10 0 BOP technical commercial evaluation, BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-21 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 BOP technical commercial evaluation, BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-22 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 10 0 BOP technical commercial evaluation, BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-23 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4.5 0 BOP technical commercial evaluation, BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-26 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8.5 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings, technical clarifications with HH Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 IT desk move, timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-27 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings, technical clarifications with HH Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-28 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings, technical clarifications with HH Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-29 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings, technical clarifications with HH Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-06-30 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings, technical clarifications with HH Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Holiday Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Holiday Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-05 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8.5 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings, technical clarifications with HH Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet, weekly meeting, HR oracle benefits review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-06 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 10 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings, technical clarifications with HH Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, weekly meeting, HR oracle benefits review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-07 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings, technical clarifications with HH Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, weekly meeting, HR oracle benefits review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-10 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7.5 0 API 16D research, BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings, technical clarifications with HH Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 2M-Tek new scope discussion, Timesheet, Weekly meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-11 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 API 16D research, BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings, technical clarifications with HH Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-12 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 API 16D research, BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings, technical clarifications with HH Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-13 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8.5 0 API 16D research, BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings, technical clarifications with HH Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 2M-Tek new scope discussion, Timesheet, Weekly meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-14 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 API 16D research, BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings, technical clarifications with HH Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-17 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9.5 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet, Weekly meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-18 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 10 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-21 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-24 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-24 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 5 0 Top Drive Upgrade Research, Client meetings, Supplier coordination, Prelim schedule Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-25 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-25 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 7 0 Top Drive Upgrade Research, Client meetings, Supplier coordination, Prelim schedule Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-26 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 BDE and rig build proposal technical, legal and commercial evaluation, Technical and commercial clarifications with Suppliers, Supplier meetings, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-26 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 9 0 Top Drive Upgrade Research, Client meetings, Supplier coordination, Prelim schedule Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-28 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-31 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3.5 0 Technical Gap Aanalysis, Document Turnover Plan review, BDE technical legal review, Rig Builder Technical and legal review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-31 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 Develop budgetary scope of work for NOV, Coordinate SCR inspection additional scope, Meet with NOV Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet, Weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-07-31 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Knuckle boom crane discussion, training coordination, equipment research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-01 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 Technical Gap Aanalysis, Document Turnover Plan review, BDE technical legal review, Rig Builder Technical and legal review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 Develop budgetary scope of work for NOV, Coordinate SCR inspection additional scope, Meet with NOV Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-01 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 Knuckle boom crane discussion, training coordination, equipment research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-02 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Technical Gap Aanalysis, Document Turnover Plan review, BDE technical legal review, Rig Builder Technical and legal review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-02 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 Develop budgetary scope of work for NOV, Coordinate SCR inspection additional scope, Meet with NOV Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-02 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 Knuckle boom crane discussion, training coordination, equipment research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-03 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 Technical Gap Aanalysis, Document Turnover Plan review, BDE technical legal review, Rig Builder Technical and legal review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-03 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Develop budgetary scope of work for NOV, Coordinate SCR inspection additional scope, Meet with NOV Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-03 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Knuckle boom crane discussion, training coordination, equipment research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-04 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 Technical Gap Aanalysis, Document Turnover Plan review, BDE technical legal review, Rig Builder Technical and legal review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-04 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Knuckle boom crane discussion, training coordination, equipment research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-07 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8.5 0 Technical Gap Aanalysis, Document Turnover Plan review, BDE technical legal review, Rig Builder Technical and legal review, Update cost estimate, Tender support, Project Financing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet, Weekly TS meeting ,training request Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-08 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8.5 0 Technical Gap Aanalysis, Document Turnover Plan review, BDE technical legal review, Rig Builder Technical and legal review, Update cost estimate, Tender support, Project Financing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-08 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Platform research for TD upgrade, TD project update for new project team members, KBC upgrade Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-09 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 Technical Gap Aanalysis, Document Turnover Plan review, BDE technical legal review, Rig Builder Technical and legal review, Update cost estimate, Tender support, Project Financing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.5 0 Develop budgetary scope of work for NOV, Coordinate SCR inspection additional scope, Meet with NOV Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet, Weekly TS meeting ,training request Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-09 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Platform research for TD upgrade, TD project update for new project team members, KBC upgrade Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-10 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 Technical Gap Aanalysis, Document Turnover Plan review, BDE technical legal review, Rig Builder Technical and legal review, Update cost estimate, Tender support, Project Financing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-10 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1.5 0 Develop budgetary scope of work for NOV, Coordinate SCR inspection additional scope, Meet with NOV Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly TS meeting ,training request Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-11 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 Technical Gap Aanalysis, Document Turnover Plan review, BDE technical legal review, Rig Builder Technical and legal review, Update cost estimate, Tender support, Project Financing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Develop budgetary scope of work for NOV, Coordinate SCR inspection additional scope, Meet with NOV Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-14 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 10 0 Clarifications, Technical Gap Analysis, BDE technical legal review, Rig Builder Technical and legal review, Update cost estimate, Tender support, Project Financing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-14 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Develop budgetary scope of work for NOV, Coordinate SCR inspection additional scope, Meet with NOV, Meeting minutes Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-15 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5.5 0 Clarifications, Technical Gap Analysis, BDE technical legal review, Rig Builder Technical and legal review, Update cost estimate, Tender support, Project Financing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Develop budgetary scope of work for NOV, Coordinate SCR inspection additional scope, Meet with NOV, Meeting minutes Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Mid-year goals, timesheet, weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-15 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 3 0 Pluspetrol contract review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-16 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 Clarifications, Technical Gap Analysis, BDE technical legal review, Rig Builder Technical and legal review, Update cost estimate, Tender support, Project Financing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-16 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 Hibernia upgrade internal coordination and research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-17 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 Clarifications, Technical Gap Analysis, BDE technical legal review, Rig Builder Technical and legal review, Update cost estimate, Tender support, Project Financing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Develop budgetary scope of work for NOV, Coordinate SCR inspection additional scope, Meet with NOV, Meeting minutes Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Mid-year goals, timesheet, weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-18 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 Clarifications, Technical Gap Analysis, BDE technical legal review, Rig Builder Technical and legal review, Update cost estimate, Tender support, Project Financing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Develop budgetary scope of work for NOV, Coordinate SCR inspection additional scope, Meet with NOV, Meeting minutes Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-21 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 Clarifications, Technical Gap Analysis, BDE technical legal review, Rig Builder Technical and legal review, Update cost estimate, Tender support, Project Financing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-21 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Develop budgetary scope of work , Review SCR survey, Meet with NOV, Meeting minutes, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-21 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 Internal coordination and research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-22 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 12 0 Clarifications, Technical Gap Analysis, BDE technical legal review, Rig Builder Technical and legal review, Update cost estimate, Tender support, Project Financing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Interview discussions, Weekly TS meeting, Supplier lnch Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-23 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Clarifications, Technical Gap Analysis, BDE technical legal review, Rig Builder Technical and legal review, Update cost estimate, Tender support, Project Financing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-23 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Develop budgetary scope of work , Review SCR survey, Meet with NOV, Meeting minutes, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Interview discussions, Weekly TS meeting, Supplier lnch Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-23 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Internal coordination and research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-24 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6.5 0 Clarifications, Technical Gap Analysis, BDE technical legal review, Rig Builder Technical and legal review, Update cost estimate, Tender support, Project Financing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-24 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Develop budgetary scope of work , Review SCR survey, Meet with NOV, Meeting minutes, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Interview discussions, Weekly TS meeting, Supplier lnch Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-25 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Clarifications, Technical Gap Analysis, BDE technical legal review, Rig Builder Technical and legal review, Update cost estimate, Tender support, Project Financing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Develop budgetary scope of work , Review SCR survey, Meet with NOV, Meeting minutes, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-25 OH-008 :OH-008 Overhead All Activities Regular Pay N 4 0 Office closure Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-25 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Internal coordination and research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-28 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-28 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Wood group budgetary proposal meeting, Supplier meetings, Meeting minutes, Quote review, Scope of work development Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-28 OH-011 :OH-011 Overhead All Activities Regular Pay N 3 0 Weather office closure and delays Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-29 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-29 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Wood group budgetary proposal meeting, Supplier meetings, Meeting minutes, Quote review, Scope of work development Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Training request Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-29 OH-011 :OH-011 Overhead All Activities Regular Pay N 4 0 Weather office closure and delays Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-30 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-30 OH-011 :OH-011 Overhead All Activities Regular Pay N 3 0 Weather office closure and delays Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-08-31 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-01 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Wood group budgetary proposal meeting, Supplier meetings, Meeting minutes, Quote review, Scope of work development Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Labor Day Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-05 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 10 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-05 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Internal coordination of work for TD Upgade project Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-06 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 12 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-07 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-07 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Supplier weekly meeting, Minutes and action items update, Quote review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-08 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5.5 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 PTO request Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-08 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Internal coordination of work for TD Upgade project Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-11 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing, Hisogram Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Timesheet, Weekly TS meeting, Anti bribery training, PE certification renewal, IT training, Supplier lunch Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-11 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Internal coordination of work for TD Upgade project Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-12 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6.5 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing, Hisogram Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Supplier weekly meeting, Minutes and action items update, Quote review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Timesheet, Weekly TS meeting, Anti bribery training, PE certification renewal, IT training, Supplier lunch Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-13 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing, Hisogram Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 Supplier weekly meeting, Minutes and action items update, Quote review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-14 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8.5 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing, Hisogram Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-14 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Supplier weekly meeting, Minutes and action items update, Quote review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Timesheet, Weekly TS meeting, Anti bribery training, PE certification renewal, IT training, Supplier lunch Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-15 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing, Hisogram Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Supplier weekly meeting, Minutes and action items update, Quote review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-16 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing, Hisogram Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-17 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing, Histogram, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-18 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing, Histogram, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Supplier weekly meeting, Minutes and action items update, Quote review, Develop Survey scope of work, Biweekly report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing, Histogram, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Supplier weekly meeting, Minutes and action items update, Quote review, Develop Survey scope of work, Biweekly report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly TS Meeting, IADC Lunch and Learn Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing, Histogram, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 Supplier weekly meeting, Minutes and action items update, Quote review, Develop Survey scope of work, Biweekly report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-21 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing, Histogram, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-21 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Supplier weekly meeting, Minutes and action items update, Quote review, Develop Survey scope of work, Biweekly report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet, Weekly TS Meeting, IADC Lunch and Learn Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-22 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing, Histogram, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-22 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 Supplier weekly meeting, Minutes and action items update, Quote review, Develop Survey scope of work, Biweekly report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-22 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 Coordinate getting drawings to support proposal Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-25 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6.5 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing, Histogram, TC Clarifications Vallourec Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Supplier weekly meeting, Minutes and action items update, Quote review, Develop Survey scope of work, Cost tracking, Technical scope development Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Weekly TS meeting, Timesheet, Monthly performance review, Lunch with Supplier TQSI Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-26 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing, Histogram, TC Clarifications Vallourec Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Supplier weekly meeting, Minutes and action items update, Quote review, Develop Survey scope of work, Cost tracking, Technical scope development Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Weekly TS meeting, Timesheet, Monthly performance review, Lunch with Supplier TQSI Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-27 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing, Histogram, TC Clarifications Vallourec Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5.5 0 Supplier weekly meeting, Minutes and action items update, Quote review, Develop Survey scope of work, Cost tracking, Technical scope development Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-27 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Hibernia PM Project, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-28 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing, Histogram, TC Clarifications Vallourec Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-28 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 Supplier weekly meeting, Minutes and action items update, Quote review, Develop Survey scope of work, Cost tracking, Technical scope development Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly TS meeting, Timesheet, Monthly performance review, Lunch with Supplier TQSI Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-29 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Tender Clarifications, Project Financing, Histogram, TC Clarifications Vallourec Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-09-29 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 6 0 Supplier weekly meeting, Minutes and action items update, Quote review, Develop Survey scope of work, Cost tracking, Technical scope development Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-02 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9.5 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Quote evaluations, Project Financing, TC Clarifications Vallourec, Bidders details Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly TS meeting, Timesheet, Monthly performance review, Lunch with Supplier TQSI Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-02 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Timesheets, Billing coordination, CTR Revision, Life extension survey discussion, Cost tracking Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-03 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Quote evaluations, Project Financing, TC Clarifications Vallourec, Bidders details Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-03 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 Supplier weekly meeting, Minutes and action items update, Quote review, Develop Survey scope of work, Cost tracking, Technical scope development, biweekly report, Coordinate survey, Travel requests, Bardex callout Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-03 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Timesheets, Billing coordination, CTR Revision, Life extension survey discussion, Cost tracking Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-04 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Quote evaluations, Project Financing, TC Clarifications Vallourec, Bidders details Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-04 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Supplier weekly meeting, Minutes and action items update, Quote review, Develop Survey scope of work, Cost tracking, Technical scope development, biweekly report, Coordinate survey, Travel requests, Bardex callout Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-04 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 4 0 Timesheets, Billing coordination, CTR Revision, Life extension survey discussion, Cost tracking Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-05 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Quote evaluations, Project Financing, TC Clarifications Vallourec, Bidders details Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Supplier weekly meeting, Minutes and action items update, Quote review, Develop Survey scope of work, Cost tracking, Technical scope development, biweekly report, Coordinate survey, Travel requests, Bardex callout Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly TS meeting, Timesheet, Monthly performance review, Lunch with Supplier TQSI Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-05 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 3 0 Timesheets, Billing coordination, CTR Revision, Life extension survey discussion, Cost tracking Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-06 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 Clarifications, Technical Specification Comparison, Analysis, Update cost estimate, Tender support, Quote evaluations, Project Financing, TC Clarifications Vallourec, Bidders details Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-06 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Supplier weekly meeting, Minutes and action items update, Quote review, Develop Survey scope of work, Cost tracking, Technical scope development, biweekly report, Coordinate survey, Travel requests, Bardex callout Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Weekly TS meeting, Timesheet, Monthly performance review, Lunch with Supplier TQSI Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-06 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Timesheets, Billing coordination, CTR Revision, Life extension survey discussion, Cost tracking Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-08 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Bidders Details, Clarifications, Technical Specification Comparison, Analysis, Tender support, Quote evaluations, Project Financing, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-09 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 Bidders Details, Clarifications, Technical Specification Comparison, Analysis, Tender support, Quote evaluations, Project Financing, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-10 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 10 0 Bidders Details, Clarifications, Technical Specification Comparison, Analysis, Tender support, Quote evaluations, Project Financing, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-11 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Bidders Details, Clarifications, Technical Specification Comparison, Analysis, Tender support, Quote evaluations, Project Financing, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 Supplier weekly meeting, Minutes and action items update, Develop Survey scope of work, Cost tracking, Technical scope development, biweekly report, Coordinate survey, Travel requests, Bardex callout Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-12 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Bidders Details, Clarifications, Technical Specification Comparison, Analysis, Tender support, Quote evaluations, Project Financing, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 7 0 Supplier weekly meeting, Minutes and action items update, Develop Survey scope of work, Cost tracking, Technical scope development, biweekly report, Coordinate survey, Travel requests, Bardex callout Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly TS Meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4.5 0 Supplier weekly meeting, Minutes and action items update, Develop Survey scope of work, Cost tracking, Technical scope development, biweekly report, Coordinate survey, Travel requests, Bardex callout Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet, Weekly TS Meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-16 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 Bidders Details, Clarifications, Technical Specification Comparison, Analysis, Tender support, Quote evaluations, Project Financing, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-17 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 Bidders Details, Clarifications, Technical Specification Comparison, Analysis, Tender support, Quote evaluations, Project Financing, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-18 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 Bidders Details, Clarifications, Technical Specification Comparison, Analysis, Tender support, Quote evaluations, Project Financing, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Supplier weekly meeting, Minutes and action items update, Develop Survey scope of work, Cost tracking, Technical scope development, biweekly report, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 Bidders Details, Clarifications, Technical Specification Comparison, Analysis, Tender support, Quote evaluations, Project Financing, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5.5 0 Supplier weekly meeting, Minutes and action items update, Develop Survey scope of work, Cost tracking, Technical scope development, biweekly report, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly TS Meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1.5 0 Bidders Details, Clarifications, Technical Specification Comparison, Analysis, Tender support, Quote evaluations, Project Financing, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 Supplier weekly meeting, Minutes and action items update, Develop Survey scope of work, Cost tracking, Technical scope development, biweekly report, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet, Weekly TS Meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-23 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 Supplier weekly meeting, Minutes and action items updateCost tracking, Technical scope development, biweekly report, schedule Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 WebEx setup, Weekly TS meeting, timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-23 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 3 0 Timesheets and billing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-24 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 Supplier weekly meeting, Minutes and action items updateCost tracking, Technical scope development, biweekly report, schedule Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-24 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Timesheets and billing Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 Supplier weekly meeting, Minutes and action items updateCost tracking, Technical scope development, biweekly report, schedule Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 Supplier weekly meeting, Minutes and action items updateCost tracking, Technical scope development, biweekly report, schedule Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 WebEx setup, Weekly TS meeting, timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 Supplier weekly meeting, Minutes and action items updateCost tracking, Technical scope development, biweekly report, schedule Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 WebEx setup, Weekly TS meeting, timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-30 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 Schedule, Cost estimate, Weekly meeting, minutes of meeting, technical clarifications, biweekly report, cost tracking, DDAS SetPoint, FoxDrill engagement for competitive quote Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly TS meeting, Quarterly meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-10-31 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 9 0 Schedule, Cost estimate, Weekly meeting, minutes of meeting, technical clarifications, biweekly report, cost tracking, DDAS SetPoint, FoxDrill engagement for competitive quote Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 10.5 0 Schedule, Cost estimate, Weekly meeting, minutes of meeting, technical clarifications, biweekly report, cost tracking, DDAS SetPoint, FoxDrill engagement for competitive quote Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-02 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 10 0 Schedule, Cost estimate, Weekly meeting, minutes of meeting, technical clarifications, biweekly report, cost tracking, DDAS SetPoint, FoxDrill engagement for competitive quote Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet, Weekly TS meeting, Quarterly meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 Histogram review, Scopr of work document Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-03 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Schedule, Cost estimate, Weekly meeting, minutes of meeting, technical clarifications, biweekly report, cost tracking, DDAS SetPoint, FoxDrill engagement for competitive quote Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Timesheet, Weekly TS meeting, Quarterly meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 Histogram review, Scopr of work document Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-06 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Closeout Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-06 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 Schedule, Cost estimate, Weekly meeting, minutes of meeting, technical clarifications, DDAS SetPoint, FoxDrill engagement for competitive quote, Quote clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-07 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 9 0 Schedule, Cost estimate, Weekly meeting, minutes of meeting, technical clarifications, DDAS SetPoint, FoxDrill engagement for competitive quote, Quote clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-08 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 9 0 Schedule, Cost estimate, Weekly meeting, minutes of meeting, technical clarifications, DDAS SetPoint, FoxDrill engagement for competitive quote, Quote clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 Schedule, Cost estimate, Weekly meeting, minutes of meeting, technical clarifications, DDAS SetPoint, FoxDrill engagement for competitive quote, Quote clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly TS meeting, Internal coordination for acceptable payment terms Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-10 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Schedule, Cost estimate, Weekly meeting, minutes of meeting, technical clarifications, DDAS SetPoint, FoxDrill engagement for competitive quote, Quote clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet, Weekly TS meeting, Internal coordination for acceptable payment terms Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 9 0 Schedule, Cost estimate, Weekly meeting, minutes of meeting, technical clarifications, Supplier recommendation, Quote clarifications, Biweekly report, Request for quotes Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-14 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 9 0 Schedule, Cost estimate, Weekly meeting, minutes of meeting, technical clarifications, Supplier recommendation, Quote clarifications, Biweekly report, Request for quotes Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 9 0 Schedule, Cost estimate, Weekly meeting, minutes of meeting, technical clarifications, Supplier recommendation, Quote clarifications, Biweekly report, Request for quotes Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-16 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 8 0 Schedule, Cost estimate, Weekly meeting, minutes of meeting, technical clarifications, Supplier recommendation, Quote clarifications, Biweekly report, Request for quotes Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 Schedule, Cost estimate, Weekly meeting, minutes of meeting, technical clarifications, Supplier recommendation, Quote clarifications, Biweekly report, Request for quotes Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-19 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 3 0 Discussion and research for drill pipe applicability to Hibernia, Internal discussion on procurement, Correcting weekly cost report errors from previous week, discussion with legal on flowdown terms, Timesheet cost tracking update, Timesheets Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 Update Schedule, Cost estimate, technical clarifications, Quote clarifications, coordinate estimate review meetings, rig crew controls brainstorm meeting, Internal review of estimates Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Schedule lunch meeting with Kerui, Lunch meeting with Vallourec Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-20 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Discussion and research for drill pipe applicability to Hibernia, Internal discussion on procurement, Correcting weekly cost report errors from previous week, discussion with legal on flowdown terms, Timesheet cost tracking update, Timesheets Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Schedule lunch meeting with Kerui, Lunch meeting with Vallourec Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-21 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 5 0 Discussion and research for drill pipe applicability to Hibernia, Internal discussion on procurement, Correcting weekly cost report errors from previous week, discussion with legal on flowdown terms, Timesheet cost tracking update, Timesheets Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-22 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Update Schedule, Cost estimate, technical clarifications, Quote clarifications, coordinate estimate review meetings, rig crew controls brainstorm meeting, Internal review of estimates Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-22 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 Discussion and research for drill pipe applicability to Hibernia, Internal discussion on procurement, Correcting weekly cost report errors from previous week, discussion with legal on flowdown terms, Timesheet cost tracking update, Timesheets Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-23 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-24 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 Draft presentation of estimate and schedule, Update Schedule, Cost estimate, technical clarifications, Quote clarifications, coordinate, biweekly report, PPT and cost estimate for Life extension and TD upgrade projects Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 ProjXSense Timesheets approval changes, Kerui lunch, Monthly performance review meeting, SW license renewal Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-27 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 CTR Revision, Draft presentation of estimate and schedule, PM project administration, procurement strategy discussions Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-28 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 6 0 Draft presentation of estimate and schedule, Update Schedule, Cost estimate, technical clarifications, Quote clarifications, coordinate, biweekly report, PPT and cost estimate for Life extension and TD upgrade projects Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 ProjXSense Timesheets approval changes, Kerui lunch, Monthly performance review meeting, SW license renewal Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-28 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 CTR Revision, Draft presentation of estimate and schedule, PM project administration, procurement strategy discussions Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-29 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 Draft presentation of estimate and schedule, Update Schedule, Cost estimate, technical clarifications, Quote clarifications, coordinate, biweekly report, PPT and cost estimate for Life extension and TD upgrade projects Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 ProjXSense Timesheets approval changes, Kerui lunch, Monthly performance review meeting, SW license renewal Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-29 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2.5 0 CTR Revision, Draft presentation of estimate and schedule, PM project administration, procurement strategy discussions Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-30 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 7 0 Draft presentation of estimate and schedule, Update Schedule, Cost estimate, technical clarifications, Quote clarifications, coordinate, biweekly report, PPT and cost estimate for Life extension and TD upgrade projects Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-11-30 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 CTR Revision, Draft presentation of estimate and schedule, PM project administration, procurement strategy discussions Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Draft presentation of estimate and schedule, Update Schedule, Cost estimate, technical clarifications, Quote clarifications, coordinate, biweekly report, PPT and cost estimate for Life extension and TD upgrade projects Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 ProjXSense Timesheets approval changes, Kerui lunch, Monthly performance review meeting, SW license renewal Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-01 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 CTR Revision, Draft presentation of estimate and schedule, PM project administration, procurement strategy discussions Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Setup non-billable in ProjXSense, Align on billable man-hour approach Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-04 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 8 0 Revised CTR, Travel request Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 Created Life Extension and TD Upgrade Project Overview Slide Pack, Revised cost estimate and schedule per HMDC Comments, Coordinated NOV survey, Provide initial comments to MHWirth DC TD option, Coordinate RFI to Bardex, Research Heritage and Harmony information Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-05 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 5 0 Revised CTR, Travel request Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-06 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Led NOV survey scope review meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-06 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 Created Life Extension and TD Upgrade Project Overview Slide Pack, Revised cost estimate and schedule per HMDC Comments, Coordinated NOV survey, Provide initial comments to MHWirth DC TD option, Coordinate RFI to Bardex, Research Heritage and Harmony information Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Timesheet, Setup non-billable in ProjXSense, Align on billable man-hour approach Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-06 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Revised CTR, Travel request Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-07 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 Created Life Extension and TD Upgrade Project Overview Slide Pack, Revised cost estimate and schedule per HMDC Comments, Coordinated NOV survey, Provide initial comments to MHWirth DC TD option, Coordinate RFI to Bardex, Research Heritage and Harmony information Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Timesheet, Setup non-billable in ProjXSense, Align on billable man-hour approach Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-07 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Revised CTR, Travel request Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-08 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 5 0 Created Life Extension and TD Upgrade Project Overview Slide Pack, Revised cost estimate and schedule per HMDC Comments, Coordinated NOV survey, Provide initial comments to MHWirth DC TD option, Coordinate RFI to Bardex, Research Heritage and Harmony information Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 5 0 Attend weekly meeting with NOV, NOV quote clarifications, Discussion on chopper design for VFD house, Comparison of DDM1000 to TDS6S, Split out scope of work document for PLC life extension, Update cost estimate to split Life Extension Project and TD Upgrade Project, Coordinate NOV survey Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 2017 Holiday party. Compliance training, timesheet, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 6.5 0 Attend weekly meeting with NOV, NOV quote clarifications, Discussion on chopper design for VFD house, Comparison of DDM1000 to TDS6S, Split out scope of work document for PLC life extension, Update cost estimate to split Life Extension Project and TD Upgrade Project, Coordinate NOV survey Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 2017 Holiday party. Compliance training, timesheet, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 5 0 Attend weekly meeting with NOV, NOV quote clarifications, Discussion on chopper design for VFD house, Comparison of DDM1000 to TDS6S, Split out scope of work document for PLC life extension, Update cost estimate to split Life Extension Project and TD Upgrade Project, Coordinate NOV survey Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-13 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Biweekly meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-13 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 Vendor call-out process support Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-14 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 Attend weekly meeting with NOV, NOV quote clarifications, Discussion on chopper design for VFD house, Comparison of DDM1000 to TDS6S, Split out scope of work document for PLC life extension, Update cost estimate to split Life Extension Project and TD Upgrade Project, Coordinate NOV survey Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 2017 Holiday party. Compliance training, timesheet, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-14 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 New rig build scope familiarization, scope of work for contract proposal, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Split out scope of work documents for PLC Life Extension, HPU Life Extension, and TD Upgrade, Coordinate travel changes for the NOV survey, NOV proposal clarifications, Engaged MHwirth Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Smart goals, Timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-18 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 5 0 Draft the contract scope of work and concept development schedule Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-18 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 3 0 Non-billable reporting, Timesheet submittal Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Split out scope of work documents for PLC Life Extension, HPU Life Extension, and TD Upgrade, Coordinate travel changes for the NOV survey, NOV proposal clarifications, Engaged MHwirth Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Smart goals, Timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-19 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 6.5 0 Draft the contract scope of work and concept development schedule Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 Split out scope of work documents for PLC Life Extension, HPU Life Extension, and TD Upgrade, Coordinate travel changes for the NOV survey, NOV proposal clarifications, Engaged MHwirth Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-20 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Draft the contract scope of work and concept development schedule Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-20 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 3 0 Non-billable reporting, Timesheet submittal Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Smart goals, Timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-21 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Draft the contract scope of work and concept development schedule Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-21 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 Non-billable reporting, Timesheet submittal Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-25 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Christmas Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-28 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2017-12-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Years Day Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-02 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 (01.02) Review Survey report,(01.04-01.05),Technical comparison of the MHWirthh TD to the TDX-1000. Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-02 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 (01.02-03) SoW document split for Life Extension and TD Upgrade, MHWirth survey follow up(01.05) Research and verification of TDS6S specs for MHWirth comparison, Organize clarifications for MHWirth Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 (01.02)Timesheet, Sakhalin research, (01.03) Sakhalin research (01.04) Review of IDR documents, Weekly TS meeting, Daily update with Manager, (01.05) Timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 (01.02-03) SoW document split for Life Extension and TD Upgrade, MHWirth survey follow up(01.05) Research and verification of TDS6S specs for MHWirth comparison, Organize clarifications for MHWirth Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 (01.02)Timesheet, Sakhalin research, (01.03) Sakhalin research (01.04) Review of IDR documents, Weekly TS meeting, Daily update with Manager, (01.05) Timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-03 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 (01.03) Kvaerner scope of work review, Brainstorming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-04 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1.5 0 (01.04) Close-out repprt Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1.5 0 (01.02) Review Survey report,(01.04-01.05),Technical comparison of the MHWirthh TD to the TDX-1000. Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 (01.02-03) SoW document split for Life Extension and TD Upgrade, MHWirth survey follow up(01.05) Research and verification of TDS6S specs for MHWirth comparison, Organize clarifications for MHWirth Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 (01.02)Timesheet, Sakhalin research, (01.03) Sakhalin research (01.04) Review of IDR documents, Weekly TS meeting, Daily update with Manager, (01.05) Timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 (01.02) Review Survey report,(01.04-01.05),Technical comparison of the MHWirthh TD to the TDX-1000. Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 (01.02-03) SoW document split for Life Extension and TD Upgrade, MHWirth survey follow up(01.05) Research and verification of TDS6S specs for MHWirth comparison, Organize clarifications for MHWirth Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (01.02)Timesheet, Sakhalin research, (01.03) Sakhalin research (01.04) Review of IDR documents, Weekly TS meeting, Daily update with Manager, (01.05) Timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-05 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 (01.05) Man-hour billable and non-billable tracking Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-08 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 7 0 NOV Survey report review, Scope of Work document split, TD Rails, AC TD, PLC, Research Hibernia material specifications, Expense reports Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet approvals, 2M-Tek torque sub scope meeting, TS weekly meeting, MHWirth lunch meeting, PKD W-4 update, Training research, Lamar holding BD opportunity discussion, Document control review, Husky research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-08 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Deliverable man-hour estimate draft Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 NOV Survey report review, Scope of Work document split, TD Rails, AC TD, PLC, Research Hibernia material specifications, Expense reports Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Timesheet approvals, 2M-Tek torque sub scope meeting, TS weekly meeting, MHWirth lunch meeting, PKD W-4 update, Training research, Lamar holding BD opportunity discussion, Document control review, Husky research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-09 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 Deliverable man-hour estimate draft Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-10 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 NOV Survey report review, Scope of Work document split, TD Rails, AC TD, PLC, Research Hibernia material specifications, Expense reports Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet approvals, 2M-Tek torque sub scope meeting, TS weekly meeting, MHWirth lunch meeting, PKD W-4 update, Training research, Lamar holding BD opportunity discussion, Document control review, Husky research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-10 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 Deliverable man-hour estimate draft Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 (1.11) MHWirth Scope clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 NOV Survey report review, Scope of Work document split, TD Rails, AC TD, PLC, Research Hibernia material specifications, Expense reports Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Timesheet approvals, 2M-Tek torque sub scope meeting, TS weekly meeting, MHWirth lunch meeting, PKD W-4 update, Training research, Lamar holding BD opportunity discussion, Document control review, Husky research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet approvals, 2M-Tek torque sub scope meeting, TS weekly meeting, MHWirth lunch meeting, PKD W-4 update, Training research, Lamar holding BD opportunity discussion, Document control review, Husky research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-12 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 Deliverable man-hour estimate draft Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2.5 0 MHWirth TD Clarifications, Lead MHWirth technical review meeting and update action tracker, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 UDoc access, Training and certification costs, W-4 update, Skype Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-15 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 MDR and SharePoint folder setup, KV deliverable list Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-16 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 2 0 TSR and CTR for test machine Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-16 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 St John updates and alignment, TD Rail replacement SoW, AC TD SoW, Update NDA with MHWirth, PLC Life Extension SoW, MHWirth clarification references Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-16 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 MDR and SharePoint folder setup, KV deliverable list Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 MHWirth TD Clarifications, Lead MHWirth technical review meeting and update action tracker, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 St John updates and alignment, TD Rail replacement SoW, AC TD SoW, Update NDA with MHWirth, PLC Life Extension SoW, MHWirth clarification references Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-17 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 MDR and SharePoint folder setup, KV deliverable list Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-18 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 TSR and CTR for test machine Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 St John updates and alignment, TD Rail replacement SoW, AC TD SoW, Update NDA with MHWirth, PLC Life Extension SoW, MHWirth clarification references Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-18 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 MDR and SharePoint folder setup, KV deliverable list Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-18 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Non-billable update Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-19 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Review and brainstorm the design scope for the test machine, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 St John updates and alignment, TD Rail replacement SoW, AC TD SoW, Update NDA with MHWirth, PLC Life Extension SoW, MHWirth clarification references Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 UDoc access, Training and certification costs, W-4 update, Skype Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-19 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 4 0 HH 1500 HP rig visit, documenting pictures of the rig Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-19 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 0.5 0 MDR and SharePoint folder setup, KV deliverable list Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-22 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 MHWirth technical clarifications, update technical comparison, Provide feedback for 2012 test machine, Update MHWirth action tracker and clarification list Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-22 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Update NDA with MHWirth, TDS6S technical comparison, Review Bardex survey report, review NOV survey report, Discuss torque testing scope with David, Update email to David Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 Timesheet, TQSI lunch, MHWirth equipment tour, travel to and from, Hr payroll documents, AutoCAD install, Vallourec buyout notification, Coordinate WPI shop visit, keyboard replacement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-22 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 0.5 0 Organize pictures from HH Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-23 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Update NDA with MHWirth, TDS6S technical comparison, Review Bardex survey report, review NOV survey report, Discuss torque testing scope with David, Update email to David Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-23 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Biweekly Meeting and action items, Mass PM plan upload template meetings, travel to XOM campus Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Timesheet, TQSI lunch, MHWirth equipment tour, travel to and from, Hr payroll documents, AutoCAD install, Vallourec buyout notification, Coordinate WPI shop visit, keyboard replacement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-23 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 Deliverable list and MDR review, NG Genset research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-23 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Monthly timesheet submittal Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-24 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 0.5 0 Research existing machines Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-24 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 MHWirth technical clarifications, update technical comparison, Provide feedback for 2012 test machine, Update MHWirth action tracker and clarification list Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-24 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Update NDA with MHWirth, TDS6S technical comparison, Review Bardex survey report, review NOV survey report, Discuss torque testing scope with David, Update email to David Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-24 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Biweekly Meeting and action items, Mass PM plan upload template meetings, travel to XOM campus Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet, TQSI lunch, MHWirth equipment tour, travel to and from, Hr payroll documents, AutoCAD install, Vallourec buyout notification, Coordinate WPI shop visit, keyboard replacement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-24 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 Deliverable list and MDR review, NG Genset research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-24 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 Monthly timesheet submittal Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-25 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Action tracker and design brainstorm Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.5 0 MHWirth technical clarifications, update technical comparison, Provide feedback for 2012 test machine, Update MHWirth action tracker and clarification list Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1.5 0 Update NDA with MHWirth, TDS6S technical comparison, Review Bardex survey report, review NOV survey report, Discuss torque testing scope with David, Update email to David Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-25 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4.5 0 Biweekly Meeting and action items, Mass PM plan upload template meetings, travel to XOM campus Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, TQSI lunch, MHWirth equipment tour, travel to and from, Hr payroll documents, AutoCAD install, Vallourec buyout notification, Coordinate WPI shop visit, keyboard replacement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-25 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Deliverable list and MDR review, NG Genset research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 MHWirth technical clarifications, update technical comparison, Provide feedback for 2012 test machine, Update MHWirth action tracker and clarification list Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 Update NDA with MHWirth, TDS6S technical comparison, Review Bardex survey report, review NOV survey report, Discuss torque testing scope with David, Update email to David Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, TQSI lunch, MHWirth equipment tour, travel to and from, Hr payroll documents, AutoCAD install, Vallourec buyout notification, Coordinate WPI shop visit, keyboard replacement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-26 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Deliverable list and MDR review, NG Genset research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-29 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Create template for technical and commercial evaluation, Torque limitation electrical clarification, TD comparison PPT, MH Wirth Clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-29 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 0.5 0 Distribute FIMS documents, Review tracker update to align with percent complete Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-29 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1.5 0 Clarification to how project percent complete is calculated, Update action tracker, Template meeting follow ups Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 WPI Facility visit, Bardex MSA, clarification for legal on Hibernia, research training for mud pumps, weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-29 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 NG Genset reasearch, GE meeting to review man-hours, Basis of Design Review and PPT generation, Document control PPT, Review TCs Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-30 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Disucssions on integration of MHWirth TD into Derrick, Survey report reviews Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 WPI Facility visit, Bardex MSA, clarification for legal on Hibernia, research training for mud pumps, weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-30 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 NG Genset reasearch, GE meeting to review man-hours, Basis of Design Review and PPT generation, Document control PPT, Review TCs Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-30 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 TSR for torque testing on M72 Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-31 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.5 0 Create template for technical and commercial evaluation, Torque limitation electrical clarification, TD comparison PPT, MH Wirth Clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-31 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Disucssions on integration of MHWirth TD into Derrick, Survey report reviews Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-31 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 0.5 0 Clarification to how project percent complete is calculated, Update action tracker, Template meeting follow ups Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 WPI Facility visit, Bardex MSA, clarification for legal on Hibernia, research training for mud pumps, weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-01-31 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4.5 0 NG Genset reasearch, GE meeting to review man-hours, Basis of Design Review and PPT generation, Document control PPT, Review TCs Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 WPI Facility visit, Bardex MSA, clarification for legal on Hibernia, research training for mud pumps, weekly TS meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-01 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 6 0 NG Genset reasearch, GE meeting to review man-hours, Basis of Design Review and PPT generation, Document control PPT, Review TCs Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-02 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Design review with Dan Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Distribute FIMS documents, Review tracker update to align with percent complete Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Clarification to how project percent complete is calculated, Update action tracker, Template meeting follow ups Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-02 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 5.5 0 NG Genset reasearch, GE meeting to review man-hours, Basis of Design Review and PPT generation, Document control PPT, Review TCs Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-05 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1.5 0 Draft CTR, XOM MTG Debrief, Genesis services procurement, Deliverables revision, JU research with KA, SharePoint setup for file sharing with GE Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-05 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 TH hill training Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-06 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 TH hill training Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 WebEx bi-weekly meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-07 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 TH hill training Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-08 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Design brainstorming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-08 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Technical and commercial evaluation for MHWirth TD, DC TD clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-08 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Planning survey review meetin Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Expense report, PDR meeting, Vendor lunch with Control flow Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-08 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 Draft CTR, XOM MTG Debrief, Genesis services procurement, Deliverables revision, JU research with KA, SharePoint setup for file sharing with GE Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-08 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 TSR and CTR for torque and electrical test Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.5 0 Technical and commercial evaluation for MHWirth TD, DC TD clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Expense report, PDR meeting, Vendor lunch with Control flow Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-09 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 5.5 0 Draft CTR, XOM MTG Debrief, Genesis services procurement, Deliverables revision, JU research with KA, SharePoint setup for file sharing with GE Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-12 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Design review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 MHWirth technical clarifications and analysis, NOV survey review meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Discussion with david, NOV, survey review meeting, discussion with MHWirth Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-12 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Coordinate with team to align on weekly priorities, BoD presentation, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 CTR for KV, Project setup in Oracle, PO issuance to GE, Weekly meeting with KV, SP setup, Genesis access for PKD office, Deliverable list and CTR development with Genesis, Email approval for Genesis subcontractor, Lead Genesis kick-off meeting, Project setup Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.5 0 MHWirth technical clarifications and analysis, NOV survey review meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-13 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 9 0 CTR for KV, Project setup in Oracle, PO issuance to GE, Weekly meeting with KV, SP setup, Genesis access for PKD office, Deliverable list and CTR development with Genesis, Email approval for Genesis subcontractor, Lead Genesis kick-off meeting, Project setup Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-14 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1.5 0 MHWirth technical clarifications and analysis, NOV survey review meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-14 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Discussion with david, NOV, survey review meeting, discussion with MHWirth Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-14 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 Coordinate with team to align on weekly priorities, BoD presentation, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5.5 0 CTR for KV, Project setup in Oracle, PO issuance to GE, Weekly meeting with KV, SP setup, Genesis access for PKD office, Deliverable list and CTR development with Genesis, Email approval for Genesis subcontractor, Lead Genesis kick-off meeting, Project setup Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 Discussion with david, NOV, survey review meeting, discussion with MHWirth Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly TS meeting, Timesheet, SCM entro address update Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-15 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 8.5 0 CTR for KV, Project setup in Oracle, PO issuance to GE, Weekly meeting with KV, SP setup, Genesis access for PKD office, Deliverable list and CTR development with Genesis, Email approval for Genesis subcontractor, Lead Genesis kick-off meeting, Project setup Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-16 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 0.5 0 Update percent complete in template Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Weekly TS meeting, Timesheet, SCM entro address update Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-16 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 CTR for KV, Project setup in Oracle, PO issuance to GE, Weekly meeting with KV, SP setup, Genesis access for PKD office, Deliverable list and CTR development with Genesis, Email approval for Genesis subcontractor, Lead Genesis kick-off meeting, Project setup Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Holiday Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 TD comparison review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 8 0 Setup cost report template, support Genesis access to PKD systems and facility, researching files for reference, weekly meeting with Kvaerner and ENL, invoicing procedure, setup project risk template, discussions on concept, Email approval for steel CVN testing, Combining powerpoints for BoD Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-21 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Weekly meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-21 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 Timesheets and tracker updates Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-21 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 Basis of Design Presentation, Weekly Report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Setup cost report template, support Genesis access to PKD systems and facility, researching files for reference, weekly meeting with Kvaerner and ENL, invoicing procedure, setup project risk template, discussions on concept, Email approval for steel CVN testing, Combining powerpoints for BoD Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 7 0 Basis of Design Presentation, Weekly Report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Setup cost report template, support Genesis access to PKD systems and facility, researching files for reference, weekly meeting with Kvaerner and ENL, invoicing procedure, setup project risk template, discussions on concept, Email approval for steel CVN testing, Combining powerpoints for BoD Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 Basis of Design Presentation, Weekly Report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Setup cost report template, support Genesis access to PKD systems and facility, researching files for reference, weekly meeting with Kvaerner and ENL, invoicing procedure, setup project risk template, discussions on concept, Email approval for steel CVN testing, Combining powerpoints for BoD Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Weekly TS meeting, Timesheet, PTO forms, Compliance questionnaire, Provide schedule go-by to M Hoffman Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-26 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 7 0 Basis of Design Presentation initial submittal and revision, review of 3D block layouts, Clarifications to Kvaerner Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Weekly XOM meeting, KV alignment meeting, training Sachin on timesheets and weekly report, Research into go-bys, Internal coordination meeting, Invoicing procedure, Invoicing procedure, steering commitee, Revised CTR, Genesis timesheet approval Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Weekly TS meeting, Timesheet, PTO forms, Compliance questionnaire, Provide schedule go-by to M Hoffman Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 Basis of Design Presentation initial submittal and revision, review of 3D block layouts, Clarifications to Kvaerner Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Weekly XOM meeting, KV alignment meeting, training Sachin on timesheets and weekly report, Research into go-bys, Internal coordination meeting, Invoicing procedure, Invoicing procedure, steering commitee, Revised CTR, Genesis timesheet approval Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-28 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.5 0 Review and issue TD comparison PPT, Bid evaluation and TD technical comparison Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Weekly TS meeting, Timesheet, PTO forms, Compliance questionnaire, Provide schedule go-by to M Hoffman Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 Basis of Design Presentation initial submittal and revision, review of 3D block layouts, Clarifications to Kvaerner Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Weekly XOM meeting, KV alignment meeting, training Sachin on timesheets and weekly report, Research into go-bys, Internal coordination meeting, Invoicing procedure, Invoicing procedure, steering commitee, Revised CTR, Genesis timesheet approval Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-01 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Design review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Review and issue TD comparison PPT, Bid evaluation and TD technical comparison Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly TS meeting, Timesheet, PTO forms, Compliance questionnaire, Provide schedule go-by to M Hoffman Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 3 0 Basis of Design Presentation initial submittal and revision, review of 3D block layouts, Clarifications to Kvaerner Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Weekly XOM meeting, KV alignment meeting, training Sachin on timesheets and weekly report, Research into go-bys, Internal coordination meeting, Invoicing procedure, Invoicing procedure, steering commitee, Revised CTR, Genesis timesheet approval Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly TS meeting, Timesheet, PTO forms, Compliance questionnaire, Provide schedule go-by to M Hoffman Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Weekly XOM meeting, KV alignment meeting, training Sachin on timesheets and weekly report, Research into go-bys, Internal coordination meeting, Invoicing procedure, Invoicing procedure, steering commitee, Revised CTR, Genesis timesheet approval Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-05 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 Design review, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 TD recommendation ppt review, Award recommendation ppt slide Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet, New role Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 9.5 0 03.05 Concept study block layout option 1 and 2 review, coordination meeting to guide the team, Revise BOD per initial comments, clarifications to Kvaerner, RFI--002 seismic assessment 03.06-Review weekly report, technical BOD review with XOM, update action and decision register, update BOD, Review responsibility matrix 03.07- Equipment weight research, 3d model reviews, clarifications on seismic and weights 03.08-Power sizing review, winterization discussion and review, 3d model review, RFI-002 seismic, concept 6 incorporation to BoD, review execution and level 1 schedule 03.09-3D model review, seismic technical discussion, issue execution and level 1 schedule, update histogram cost tracker Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 Internal meetings, research into go-bys, weekly status meeting with XOM, travel to and from XOM, clarification for XOM SME on seismic, invoicing alignment Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-06 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.5 0 TD recommendation ppt review, Award recommendation ppt slide Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-06 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 TD recommendation ppt review - IT Issues, Team update on TD project Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 10.5 0 03.05 Concept study block layout option 1 and 2 review, coordination meeting to guide the team, Revise BOD per initial comments, clarifications to Kvaerner, RFI--002 seismic assessment 03.06-Review weekly report, technical BOD review with XOM, update action and decision register, update BOD, Review responsibility matrix 03.07- Equipment weight research, 3d model reviews, clarifications on seismic and weights 03.08-Power sizing review, winterization discussion and review, 3d model review, RFI-002 seismic, concept 6 incorporation to BoD, review execution and level 1 schedule 03.09-3D model review, seismic technical discussion, issue execution and level 1 schedule, update histogram cost tracker Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 Internal meetings, research into go-bys, weekly status meeting with XOM, travel to and from XOM, clarification for XOM SME on seismic, invoicing alignment Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-07 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 TD recommendation ppt review - IT Issues, Team update on TD project Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 0.5 0 Weekly meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-07 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 6 0 03.05 Concept study block layout option 1 and 2 review, coordination meeting to guide the team, Revise BOD per initial comments, clarifications to Kvaerner, RFI--002 seismic assessment 03.06-Review weekly report, technical BOD review with XOM, update action and decision register, update BOD, Review responsibility matrix 03.07- Equipment weight research, 3d model reviews, clarifications on seismic and weights 03.08-Power sizing review, winterization discussion and review, 3d model review, RFI-002 seismic, concept 6 incorporation to BoD, review execution and level 1 schedule 03.09-3D model review, seismic technical discussion, issue execution and level 1 schedule, update histogram cost tracker Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-07 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 Internal meetings, research into go-bys, weekly status meeting with XOM, travel to and from XOM, clarification for XOM SME on seismic, invoicing alignment Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-08 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Design review, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 03.05 Concept study block layout option 1 and 2 review, coordination meeting to guide the team, Revise BOD per initial comments, clarifications to Kvaerner, RFI--002 seismic assessment 03.06-Review weekly report, technical BOD review with XOM, update action and decision register, update BOD, Review responsibility matrix 03.07- Equipment weight research, 3d model reviews, clarifications on seismic and weights 03.08-Power sizing review, winterization discussion and review, 3d model review, RFI-002 seismic, concept 6 incorporation to BoD, review execution and level 1 schedule 03.09-3D model review, seismic technical discussion, issue execution and level 1 schedule, update histogram cost tracker Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Internal meetings, research into go-bys, weekly status meeting with XOM, travel to and from XOM, clarification for XOM SME on seismic, invoicing alignment Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, New role Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-09 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 6 0 03.05 Concept study block layout option 1 and 2 review, coordination meeting to guide the team, Revise BOD per initial comments, clarifications to Kvaerner, RFI--002 seismic assessment 03.06-Review weekly report, technical BOD review with XOM, update action and decision register, update BOD, Review responsibility matrix 03.07- Equipment weight research, 3d model reviews, clarifications on seismic and weights 03.08-Power sizing review, winterization discussion and review, 3d model review, RFI-002 seismic, concept 6 incorporation to BoD, review execution and level 1 schedule 03.09-3D model review, seismic technical discussion, issue execution and level 1 schedule, update histogram cost tracker Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-09 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Internal meetings, research into go-bys, weekly status meeting with XOM, travel to and from XOM, clarification for XOM SME on seismic, invoicing alignment Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 Internal discussions, XOM discussion for remaining upgrade work, clarifications to Suppliers Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Guide team on technical writing, provide go-bys to Hazel Fraser Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 Guide, coordinate and expedite the team. 03.12 - Winterization BoD, Weight Clarification, Coordinate deliverable responsibility for team, issues informal weekly report, Costing template for GustoMSC, review concept 6 3D model 03.13 - Review and issue weekly report, coordinate with team to start risk register, weight clarification, J/U weight estimate and unit costs for GustoMSC, Research J/U mast test temps, concept screening and scoring 03.14 Screening matrix review, Review lifting feasibility and updated concept 1 3D model, coordinate team reviews for topsides philosophy, review weight report and CG 03.15 - Lifting feasibility review, review and issue electrical sizing, review concept 6 3D model, review weight and CGs, issue clarification to KBR, electrical clarifications 03.16-LQ weight clarification, request estimated pricing differences for low-temp steel, request budgetary pricing for platform cranes, issue weight and cg report, KBR scope split, BoD concept 6 update, issue updated 3D models, coordinate review for KBR topsides, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Internal meetings and discussions, man-hour forecast, research offshore crane options, NDA with KBR Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2.5 0 Internal discussions, XOM discussion for remaining upgrade work, clarifications to Suppliers Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Guide team on technical writing, provide go-bys to Hazel Fraser Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 7 0 Guide, coordinate and expedite the team. 03.12 - Winterization BoD, Weight Clarification, Coordinate deliverable responsibility for team, issues informal weekly report, Costing template for GustoMSC, review concept 6 3D model 03.13 - Review and issue weekly report, coordinate with team to start risk register, weight clarification, J/U weight estimate and unit costs for GustoMSC, Research J/U mast test temps, concept screening and scoring 03.14 Screening matrix review, Review lifting feasibility and updated concept 1 3D model, coordinate team reviews for topsides philosophy, review weight report and CG 03.15 - Lifting feasibility review, review and issue electrical sizing, review concept 6 3D model, review weight and CGs, issue clarification to KBR, electrical clarifications 03.16-LQ weight clarification, request estimated pricing differences for low-temp steel, request budgetary pricing for platform cranes, issue weight and cg report, KBR scope split, BoD concept 6 update, issue updated 3D models, coordinate review for KBR topsides, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 Guide, coordinate and expedite the team. 03.12 - Winterization BoD, Weight Clarification, Coordinate deliverable responsibility for team, issues informal weekly report, Costing template for GustoMSC, review concept 6 3D model 03.13 - Review and issue weekly report, coordinate with team to start risk register, weight clarification, J/U weight estimate and unit costs for GustoMSC, Research J/U mast test temps, concept screening and scoring 03.14 Screening matrix review, Review lifting feasibility and updated concept 1 3D model, coordinate team reviews for topsides philosophy, review weight report and CG 03.15 - Lifting feasibility review, review and issue electrical sizing, review concept 6 3D model, review weight and CGs, issue clarification to KBR, electrical clarifications 03.16-LQ weight clarification, request estimated pricing differences for low-temp steel, request budgetary pricing for platform cranes, issue weight and cg report, KBR scope split, BoD concept 6 update, issue updated 3D models, coordinate review for KBR topsides, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Internal meetings and discussions, man-hour forecast, research offshore crane options, NDA with KBR Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-15 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 9.5 0 Guide, coordinate and expedite the team. 03.12 - Winterization BoD, Weight Clarification, Coordinate deliverable responsibility for team, issues informal weekly report, Costing template for GustoMSC, review concept 6 3D model 03.13 - Review and issue weekly report, coordinate with team to start risk register, weight clarification, J/U weight estimate and unit costs for GustoMSC, Research J/U mast test temps, concept screening and scoring 03.14 Screening matrix review, Review lifting feasibility and updated concept 1 3D model, coordinate team reviews for topsides philosophy, review weight report and CG 03.15 - Lifting feasibility review, review and issue electrical sizing, review concept 6 3D model, review weight and CGs, issue clarification to KBR, electrical clarifications 03.16-LQ weight clarification, request estimated pricing differences for low-temp steel, request budgetary pricing for platform cranes, issue weight and cg report, KBR scope split, BoD concept 6 update, issue updated 3D models, coordinate review for KBR topsides, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-15 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Internal meetings and discussions, man-hour forecast, research offshore crane options, NDA with KBR Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-16 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2 0 Review FEA in Solidworks, advise on FEA modeling Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet, Guide team on technical writing, provide go-bys to Hazel Fraser Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-16 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5.5 0 Guide, coordinate and expedite the team. 03.12 - Winterization BoD, Weight Clarification, Coordinate deliverable responsibility for team, issues informal weekly report, Costing template for GustoMSC, review concept 6 3D model 03.13 - Review and issue weekly report, coordinate with team to start risk register, weight clarification, J/U weight estimate and unit costs for GustoMSC, Research J/U mast test temps, concept screening and scoring 03.14 Screening matrix review, Review lifting feasibility and updated concept 1 3D model, coordinate team reviews for topsides philosophy, review weight report and CG 03.15 - Lifting feasibility review, review and issue electrical sizing, review concept 6 3D model, review weight and CGs, issue clarification to KBR, electrical clarifications 03.16-LQ weight clarification, request estimated pricing differences for low-temp steel, request budgetary pricing for platform cranes, issue weight and cg report, KBR scope split, BoD concept 6 update, issue updated 3D models, coordinate review for KBR topsides, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1.5 0 Request for quote on DC TD. coordinate team for close-out and new TSR, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, compliance questionnaire, IT followup Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.19 Liehberr RFQ, KBR Scope split PPT, Revise BoD for Concept 6 and winterization, concept ranking system 03.20 Screening matrix review and ranking, scope split PPT 03.21 Review and revise weight and CG PPT, scope split review and document update 03.22 Review KBR sketches for topsides, revised weight and CG for concept 6, review topsides philosophy by KBR, send capex template, CAPEX deliverable Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Concept screening and scoring, weekly status meeting with Kvaerner and XOM, research industry offshore lifts, internal discussions, NDA with KBR, research on Berkut weather conditions, update weight and CG based on internal comments, NDA coordination Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 10.5 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.19 Liehberr RFQ, KBR Scope split PPT, Revise BoD for Concept 6 and winterization, concept ranking system 03.20 Screening matrix review and ranking, scope split PPT 03.21 Review and revise weight and CG PPT, scope split review and document update 03.22 Review KBR sketches for topsides, revised weight and CG for concept 6, review topsides philosophy by KBR, send capex template, CAPEX deliverable Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Concept screening and scoring, weekly status meeting with Kvaerner and XOM, research industry offshore lifts, internal discussions, NDA with KBR, research on Berkut weather conditions, update weight and CG based on internal comments, NDA coordination Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.19 Liehberr RFQ, KBR Scope split PPT, Revise BoD for Concept 6 and winterization, concept ranking system 03.20 Screening matrix review and ranking, scope split PPT 03.21 Review and revise weight and CG PPT, scope split review and document update 03.22 Review KBR sketches for topsides, revised weight and CG for concept 6, review topsides philosophy by KBR, send capex template, CAPEX deliverable Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Concept screening and scoring, weekly status meeting with Kvaerner and XOM, research industry offshore lifts, internal discussions, NDA with KBR, research on Berkut weather conditions, update weight and CG based on internal comments, NDA coordination Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-22 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 0.5 0 Guidance on FEA Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 7 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.19 Liehberr RFQ, KBR Scope split PPT, Revise BoD for Concept 6 and winterization, concept ranking system 03.20 Screening matrix review and ranking, scope split PPT 03.21 Review and revise weight and CG PPT, scope split review and document update 03.22 Review KBR sketches for topsides, revised weight and CG for concept 6, review topsides philosophy by KBR, send capex template, CAPEX deliverable Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Concept screening and scoring, weekly status meeting with Kvaerner and XOM, research industry offshore lifts, internal discussions, NDA with KBR, research on Berkut weather conditions, update weight and CG based on internal comments, NDA coordination Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, compliance questionnaire, IT followup Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-23 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 6.5 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.19 Liehberr RFQ, KBR Scope split PPT, Revise BoD for Concept 6 and winterization, concept ranking system 03.20 Screening matrix review and ranking, scope split PPT 03.21 Review and revise weight and CG PPT, scope split review and document update 03.22 Review KBR sketches for topsides, revised weight and CG for concept 6, review topsides philosophy by KBR, send capex template, CAPEX deliverable Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Concept screening and scoring, weekly status meeting with Kvaerner and XOM, research industry offshore lifts, internal discussions, NDA with KBR, research on Berkut weather conditions, update weight and CG based on internal comments, NDA coordination Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Weekly meeting timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.26-Review screening summary, draft of CAPEX estimates, clarifications on CAPEX, review schedule, draft of screening comparison 03.27-Dimensional clarifications, update concept 6 3D model, clarification for concept 4 float-over, seismic benchmark, topsides philosophy review 03.28-Technical meeting with KBR and Kvaerner, research alternative Jack-Ups, RFQ for Pioneering Spirit, CAPEX summary, CAPEX Concept 4 03.29-CAPEX estimate, clarification for float-over, risk and HSE register and PPT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Internal discussions and meetings, float-over feasibility, pioneering spirit RFQ, electric versus diesel crane, time tracker update, timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 follow up on quotes for DC TD Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-27 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 Timesheets Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 7 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.26-Review screening summary, draft of CAPEX estimates, clarifications on CAPEX, review schedule, draft of screening comparison 03.27-Dimensional clarifications, update concept 6 3D model, clarification for concept 4 float-over, seismic benchmark, topsides philosophy review 03.28-Technical meeting with KBR and Kvaerner, research alternative Jack-Ups, RFQ for Pioneering Spirit, CAPEX summary, CAPEX Concept 4 03.29-CAPEX estimate, clarification for float-over, risk and HSE register and PPT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Internal discussions and meetings, float-over feasibility, pioneering spirit RFQ, electric versus diesel crane, time tracker update, timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.26-Review screening summary, draft of CAPEX estimates, clarifications on CAPEX, review schedule, draft of screening comparison 03.27-Dimensional clarifications, update concept 6 3D model, clarification for concept 4 float-over, seismic benchmark, topsides philosophy review 03.28-Technical meeting with KBR and Kvaerner, research alternative Jack-Ups, RFQ for Pioneering Spirit, CAPEX summary, CAPEX Concept 4 03.29-CAPEX estimate, clarification for float-over, risk and HSE register and PPT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Internal discussions and meetings, float-over feasibility, pioneering spirit RFQ, electric versus diesel crane, time tracker update, timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly meeting timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 7 0 General - Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report 03.26-Review screening summary, draft of CAPEX estimates, clarifications on CAPEX, review schedule, draft of screening comparison 03.27-Dimensional clarifications, update concept 6 3D model, clarification for concept 4 float-over, seismic benchmark, topsides philosophy review 03.28-Technical meeting with KBR and Kvaerner, research alternative Jack-Ups, RFQ for Pioneering Spirit, CAPEX summary, CAPEX Concept 4 03.29-CAPEX estimate, clarification for float-over, risk and HSE register and PPT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Internal discussions and meetings, float-over feasibility, pioneering spirit RFQ, electric versus diesel crane, time tracker update, timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-03-30 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Holiday Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, weekly meeting, Jeff discussion on Krechet procurement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report, CAPEX, Risk and HSE Register, report out presentation, estimate, weight and CG revision, risk register revision, concept screening review, screening report review, revised BoD, draft close-out letter Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Internal meeting and disucssions, time tracking Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 9 0 Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report, CAPEX, Risk and HSE Register, report out presentation, estimate, weight and CG revision, risk register revision, concept screening review, screening report review, revised BoD, draft close-out letter Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Internal meeting and disucssions, time tracking Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 9 0 Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report, CAPEX, Risk and HSE Register, report out presentation, estimate, weight and CG revision, risk register revision, concept screening review, screening report review, revised BoD, draft close-out letter Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2.5 0 Internal meeting and disucssions, time tracking Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, weekly meeting, Jeff discussion on Krechet procurement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 8 0 Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report, CAPEX, Risk and HSE Register, report out presentation, estimate, weight and CG revision, risk register revision, concept screening review, screening report review, revised BoD, draft close-out letter Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3.5 0 Internal meeting and disucssions, time tracking Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, weekly meeting, Jeff discussion on Krechet procurement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 6 0 Coordinate and expedite team to complete deliverables, address clarifications from the client review weekly timesheets and status report, issue informal report, CAPEX, Risk and HSE Register, report out presentation, estimate, weight and CG revision, risk register revision, concept screening review, screening report review, revised BoD, draft close-out letter Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Internal meeting and disucssions, time tracking Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 IT, Weekly timesheet, internal discussion on finance, market research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-09 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 8 0 Report out meeting at XOM campus, Client clarifications, final weekly report, final timesheets. client invoice, acceptance letter, internal discussions, report closeout, issue screening report, revise report out presentation, schedule after action review, discussion with Client Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 IT, Weekly timesheet, internal discussion on finance, market research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-10 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 8 0 Report out meeting at XOM campus, Client clarifications, final weekly report, final timesheets. client invoice, acceptance letter, internal discussions, report closeout, issue screening report, revise report out presentation, schedule after action review, discussion with Client Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-11 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 9.5 0 Report out meeting at XOM campus, Client clarifications, final weekly report, final timesheets. client invoice, acceptance letter, internal discussions, report closeout, issue screening report, revise report out presentation, schedule after action review, discussion with Client Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 Follow up on gearbox modification, delivery for TD rails Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 IT, Weekly timesheet, internal discussion on finance, market research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-12 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 research arctic land rigs, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Report out meeting at XOM campus, Client clarifications, final weekly report, final timesheets. client invoice, acceptance letter, internal discussions, report closeout, issue screening report, revise report out presentation, schedule after action review, discussion with Client Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 IT, Weekly timesheet, internal discussion on finance, market research Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-13 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 research arctic land rigs, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-13 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Report out meeting at XOM campus, Client clarifications, final weekly report, final timesheets. client invoice, acceptance letter, internal discussions, report closeout, issue screening report, revise report out presentation, schedule after action review, discussion with Client Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly TS meeting, IMS training planning, OTC registration, Research conferences, benefits Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-16 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 5 0 Market survey for modularized arctic rigs, internet research, powerpoint, NOV Kostroma clarifications, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-16 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 CTR and TSR for TD Rail replacement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-16 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Close-out report, Acceptance letter, invoice, Timesheet, Review clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly TS meeting, IMS training planning, OTC registration, Research conferences, benefits Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-17 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 7 0 Market survey for modularized arctic rigs, internet research, powerpoint, NOV Kostroma clarifications, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-17 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Close-out report, Acceptance letter, invoice, Timesheet, Review clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-18 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Review and discuss FEA report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-18 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 6 0 Market survey for modularized arctic rigs, internet research, powerpoint, NOV Kostroma clarifications, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Russian CUTR support for new choke manifold Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet, Weekly TS meeting, IMS training planning, OTC registration, Research conferences, benefits Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-19 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 5 0 Market survey for modularized arctic rigs, internet research, powerpoint, NOV Kostroma clarifications, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly TS meeting, IMS training planning, OTC registration, Research conferences, benefits Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-20 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 4.5 0 CTR and TSR for TD Rail replacement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 Close-out report, Acceptance letter, invoice, Timesheet, Review clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-23 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 Review FEA report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Internal FEA disucssion Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-23 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 Cost estimate for mini minkit, waterfall for deep dive Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 XOM clarifications and steerig committee meeting, Invoice clarification, weight basis, revise screening report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-24 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Review FEA report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Internal FEA disucssion Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-24 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 3 0 Cost estimate for mini minkit, waterfall for deep dive Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-24 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 XOM clarifications and steerig committee meeting, Invoice clarification, weight basis, revise screening report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Internal FEA disucssion Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-25 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 4.5 0 Cost estimate for mini minkit, waterfall for deep dive Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-25 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Timesheets Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-25 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 XOM clarifications and steerig committee meeting, Invoice clarification, weight basis, revise screening report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IMS training, IMS document review, Weekly TS meeting, Timesheet, Q1 earnings, invoice clarification, OTC reserach Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-04-30 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 7 0 Minkit reduced rig cost estimate, Krechet as-built specs, Low temp steel spec research, Client calls, deliverable list for deep dive Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-01 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 Internal discussion on cost estimate Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 OTC Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-01 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 Minkit reduced rig cost estimate, Krechet as-built specs, Low temp steel spec research, Client calls, deliverable list for deep dive Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 IMS training, IMS document review, Weekly TS meeting, Timesheet, Q1 earnings, invoice clarification, OTC reserach Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4.5 0 TSR closeout and closeout report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-02 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Follow up on gearbox upgrade Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 IMS training, IMS document review, Weekly TS meeting, Timesheet, Q1 earnings, invoice clarification, OTC reserach Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-03 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 6 0 Minkit reduced rig cost estimate, Krechet as-built specs, Low temp steel spec research, Client calls, deliverable list for deep dive Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 TSR closeout and closeout report Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.5 0 IMS training, IMS document review, Weekly TS meeting, Timesheet, Q1 earnings, invoice clarification, OTC reserach Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-04 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 0.5 0 Minkit reduced rig cost estimate, Krechet as-built specs, Low temp steel spec research, Client calls, deliverable list for deep dive Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 weekly TS meeting, timesheet, Contract management procedure, IP presentation, invoice follow up, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-07 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 6 0 Liehberr meeting on platform cranes, TSR closeout report for minkit Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-07 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 TSR and CTR for TD rail replacement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-08 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 review scope of work documents Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-08 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 review scope of work documents Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-08 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 Gearbox follow up Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 weekly TS meeting, timesheet, Contract management procedure, IP presentation, invoice follow up, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-08 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 Liehberr meeting on platform cranes, TSR closeout report for minkit Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-08 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 TSR and CTR for TD rail replacement Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 weekly TS meeting, timesheet, Contract management procedure, IP presentation, invoice follow up, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-09 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 Liehberr meeting on platform cranes, TSR closeout report for minkit Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 weekly TS meeting, timesheet, Contract management procedure, IP presentation, invoice follow up, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-10 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 6 0 Liehberr meeting on platform cranes, TSR closeout report for minkit Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 weekly TS meeting, timesheet, Contract management procedure, IP presentation, invoice follow up, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-11 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 3 0 Liehberr meeting on platform cranes, TSR closeout report for minkit Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-14 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Review scope of work documents Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-14 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 Review scope of work documents Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Research Sakhalin rig thesis, timesheet, Weekly TS meeting, IMS Cost management procedure, Equipment training research, Expense report, George excel help, Handover Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-15 Hibernia Platform :Hibernia Platform TSR-01646-HIBP Top Drive Rail Replacement Regular Pay N 6 0 Create Material Requisition Specification for TD Rails and TD rail Replacement Scope of Work Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Research Sakhalin rig thesis, timesheet, Weekly TS meeting, IMS Cost management procedure, Equipment training research, Expense report, George excel help, Handover Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-16 Hibernia Platform :Hibernia Platform TSR-01646-HIBP Top Drive Rail Replacement Regular Pay N 6 0 Create Material Requisition Specification for TD Rails and TD rail Replacement Scope of Work Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Research Sakhalin rig thesis, timesheet, Weekly TS meeting, IMS Cost management procedure, Equipment training research, Expense report, George excel help, Handover Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-17 Hibernia Platform :Hibernia Platform TSR-01646-HIBP Top Drive Rail Replacement Regular Pay N 0.5 0 Create Material Requisition Specification for TD Rails and TD rail Replacement Scope of Work Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 Research Sakhalin rig thesis, timesheet, Weekly TS meeting, IMS Cost management procedure, Equipment training research, Expense report, George excel help, Handover Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Follow-up on gearbox replacement and scope alignment meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-18 Hibernia Platform :Hibernia Platform TSR-01646-HIBP Top Drive Rail Replacement Regular Pay N 0.5 0 Create Material Requisition Specification for TD Rails and TD rail Replacement Scope of Work Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Research Sakhalin rig thesis, timesheet, Weekly TS meeting, IMS Cost management procedure, Equipment training research, Expense report, George excel help, Handover Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-21 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-23 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-25 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-28 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Memorial Day Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-30 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-31 Hibernia Platform :Hibernia Platform TSR-01646-HIBP Top Drive Rail Replacement Regular Pay N 2 0 Material Requisition and Scope of Work Internal update and issue for approval Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Weekly TS meeting, PDC benefits paperwork, Status discussion Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-05-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Total-Uganda technical spec review, Brainstorming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Weekly TS meeting, PDC benefits paperwork, Status discussion Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Total-Uganda technical spec review, Brainstorming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-04 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Research TDS-6S upgrades, Follow up on TDS-6S Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Weekly TS meeting, Site manager lunch. DGB presentation, IMS training Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Total Uganda Cashflow, Scope review, Rig builder interface for milestone dates, Execution brainstorming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Total Uganda Cashflow, Scope review, Rig builder interface for milestone dates, Execution brainstorming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-06 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 Research TDS-6S upgrades, Follow up on TDS-6S Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet, Weekly TS meeting, Site manager lunch. DGB presentation, IMS training Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Total Uganda Cashflow, Scope review, Rig builder interface for milestone dates, Execution brainstorming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Timesheet, Weekly TS meeting, Site manager lunch. DGB presentation, IMS training Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Total Uganda Cashflow, Scope review, Rig builder interface for milestone dates, Execution brainstorming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Total Uganda Cashflow, Scope review, Rig builder interface for milestone dates, Execution brainstorming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 TS weekly, timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 total Uganda technical spec review, cost estimate, cashflow, procurement plan by PO, execution brainstroming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 total Uganda technical spec review, cost estimate, cashflow, procurement plan by PO, execution brainstroming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 total Uganda technical spec review, cost estimate, cashflow, procurement plan by PO, execution brainstroming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-14 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 Review technical scope and align on path forward Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 TS weekly, timesheet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 total Uganda technical spec review, cost estimate, cashflow, procurement plan by PO, execution brainstroming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6.5 0 total Uganda technical spec review, cost estimate, cashflow, procurement plan by PO, execution brainstroming Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-18 Hibernia Platform :Hibernia Platform TSR-01646-HIBP Top Drive Rail Replacement Regular Pay N 0.5 0 Route scope documents for review, Follow-up Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IMS cost templates, Weekly TS meeting, timesheet, IT tickets, Mid-year review, Drillwell discussion with NOV Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Total-Uganda planning. Cashflow, Histogram Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 Internal discussions on scope for pipe handling and gear ratio upgrade Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 IMS cost templates, Weekly TS meeting, timesheet, IT tickets, Mid-year review, Drillwell discussion with NOV Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Total-Uganda planning. Cashflow, Histogram Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 Internal discussions on scope for pipe handling and gear ratio upgrade Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Total-Uganda planning. Cashflow, Histogram Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-21 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Clarifications on scope with NOV, Review scope of work for top drive gear ratio upgrade Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 IMS cost templates, Weekly TS meeting, timesheet, IT tickets, Mid-year review, Drillwell discussion with NOV Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Total-Uganda planning. Cashflow, Histogram Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4.5 0 Total-Uganda planning. Cashflow, Histogram Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Coordinate facility visits, Project Engineer Lunch meet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Update Cashflow, Technical clarifications, HH financing, File formats for XOM minkit model Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Timesheet, Coordinate facility visits, Project Engineer Lunch meet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Update Cashflow, Technical clarifications, HH financing, File formats for XOM minkit model Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Coordinate facility visits, Project Engineer Lunch meet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Update Cashflow, Technical clarifications, HH financing, File formats for XOM minkit model Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Coordinate facility visits, Project Engineer Lunch meet Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Update Cashflow, Technical clarifications, HH financing, File formats for XOM minkit model Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-06-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Update Cashflow, Technical clarifications, HH financing, File formats for XOM minkit model Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, Canrig facility visit, IDS facility visit Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 HH meeting on Sinosure, Financing, Cashflow update, Internal discussion on Sinsosure, Technical discussion on IP Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 Timesheet, Canrig facility visit, IDS facility visit Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4.5 0 HH meeting on Sinosure, Financing, Cashflow update, Internal discussion on Sinsosure, Technical discussion on IP Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 HH meeting on Sinosure, Financing, Cashflow update, Internal discussion on Sinsosure, Technical discussion on IP Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Timesheet, Canrig facility visit, IDS facility visit Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5.5 0 HH meeting on Sinosure, Financing, Cashflow update, Internal discussion on Sinsosure, Technical discussion on IP Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2018-07-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 HH meeting on Sinosure, Financing, Cashflow update, Internal discussion on Sinsosure, Technical discussion on IP Lara, Bobbie Cost Analyst 39297 Lara, Bobbie:Cost Analyst 2017-01-02 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Approved TimeSheet Lara, Bobbie Cost Analyst 39297 Lara, Bobbie:Cost Analyst 2017-01-03 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Approved TimeSheet Lara, Bobbie Cost Analyst 39297 Lara, Bobbie:Cost Analyst 2017-01-04 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Approved TimeSheet Lara, Bobbie Cost Analyst 39297 Lara, Bobbie:Cost Analyst 2017-01-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Approved TimeSheet Lara, Bobbie Cost Analyst 39297 Lara, Bobbie:Cost Analyst 2017-01-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Approved TimeSheet Lara, Bobbie Cost Analyst 39297 Lara, Bobbie:Cost Analyst 2017-01-09 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Lara, Bobbie Cost Analyst 39297 Lara, Bobbie:Cost Analyst 2017-01-10 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Lara, Bobbie Cost Analyst 39297 Lara, Bobbie:Cost Analyst 2017-01-11 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Lara, Bobbie Cost Analyst 39297 Lara, Bobbie:Cost Analyst 2017-01-12 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Lara, Bobbie Cost Analyst 39297 Lara, Bobbie:Cost Analyst 2017-01-13 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Little, Bryan Engineer III 31369 Little, Bryan:Engineer III 2017-08-15 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Little, Bryan Engineer III 31369 Little, Bryan:Engineer III 2017-08-16 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Little, Bryan Engineer III 31369 Little, Bryan:Engineer III 2017-08-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Little, Bryan Engineer III 31369 Little, Bryan:Engineer III 2017-08-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 Little, Bryan Engineer III 31369 Little, Bryan:Engineer III 2017-08-21 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 Little, Bryan Engineer III 31369 Little, Bryan:Engineer III 2017-08-24 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 5 0 Little, Bryan Engineer III 31369 Little, Bryan:Engineer III 2017-08-28 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Little, Bryan Engineer III 31369 Little, Bryan:Engineer III 2017-08-31 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Little, Bryan Engineer III 31369 Little, Bryan:Engineer III 2017-09-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Little, Bryan Engineer III 31369 Little, Bryan:Engineer III 2017-09-06 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Little, Bryan Engineer III 31369 Little, Bryan:Engineer III 2017-09-07 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Little, Bryan Engineer III 31369 Little, Bryan:Engineer III 2017-09-08 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Little, Bryan Engineer III 31369 Little, Bryan:Engineer III 2017-09-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Little, Bryan Engineer III 31369 Little, Bryan:Engineer III 2017-09-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Little, Bryan Engineer III 31369 Little, Bryan:Engineer III 2017-09-21 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Little, Bryan Engineer III 31369 Little, Bryan:Engineer III 2017-09-22 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Little, Bryan Engineer III 31369 Little, Bryan:Engineer III 2017-09-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Little, Bryan Engineer III 31369 Little, Bryan:Engineer III 2017-09-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Little, Bryan Engineer III 31369 Little, Bryan:Engineer III 2017-09-28 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Little, Bryan Engineer III 31369 Little, Bryan:Engineer III 2017-09-29 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-03 Latin America Region-TSR :Latin America Region-TSR TSR-01532-LABU 1st Quarter 2017 General Query- Mexico Regular Pay N 1 0 Supporting HAL Tender (Al Mingo) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 weekly operation phone call meeting with rob and Greg SharePoint conversion meeting with Greg Sprint team meetings IDR coordinator meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 GoM Compliance Documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 2016 performance evaluation compliance questionnaire creating TSR's for Sakhalin Ops training matrix update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-03 Rig 209L-TSR :Rig 209L-TSR TSR-01516-209L Bucking Machine HPU Enclosure Regular Pay N 0.5 0 drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-03 Rig 209L-TSR :Rig 209L-TSR TSR-01519-209L Fire Pump Circulation Line Regular Pay N 0.5 0 Documentation review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-03 Rig 270L-TSR :Rig 270L-TSR TSR-01528-270L Odoptu Cellar Covers-closed Regular Pay N 1 0 drawing review / calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-04 Latin America Region-TSR :Latin America Region-TSR TSR-01532-LABU 1st Quarter 2017 General Query- Mexico Regular Pay N 2 0 Supporting HAL Tender (Al Mingo) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 weekly operation phone call meeting with rob and Greg SharePoint conversion meeting with Greg Sprint team meetings IDR coordinator meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-04 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 GoM Compliance Documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 2016 performance evaluation compliance questionnaire creating TSR's for Sakhalin Ops training matrix update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-04 Rig 209L-TSR :Rig 209L-TSR TSR-01525-209L BOP Tie Backs Regular Pay N 1.5 0 calculation review / dwg review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-04 Rig 270L-TSR :Rig 270L-TSR TSR-01528-270L Odoptu Cellar Covers-closed Regular Pay N 1.5 0 drawing review / calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-09 Latin America Region-TSR :Latin America Region-TSR TSR-01532-LABU 1st Quarter 2017 General Query- Mexico Regular Pay N 0.75 0 Information sent to Al for pony sub (HAL tender) BOP stack-up review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 weekly ops phone call weekly mtg with Rob and Greg meeting with Chuck Gorrell sprint team meetings meeting with Jason Geach meeting with Jason Geach and accounting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 GoM documentation to Rachel timekeeping system admin SAFI and AutoCAD renewals Sakhalin document control issues timesheet / approving timesheets remaining 2016 PTO admin self-appraisal IHS account admin setting up lunch and learn with SSAB Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-09 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 preparation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-09 OH-032 :OH-032 Overhead All Activities Regular Pay N 1 0 training matrix Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-09 Rig 209L-TSR :Rig 209L-TSR TSR-01519-209L Fire Pump Circulation Line Regular Pay N 0.75 0 closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-09 Rig 270L-TSR :Rig 270L-TSR TSR-01533-270L Temp Rating Regular Pay N 6 0 Research / phone conf with CG, DL, others / putting together documentation package and report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly ops phone call weekly mtg with Rob and Greg meeting with Chuck Gorrell sprint team meetings meeting with Jason Geach meeting with Jason Geach and accounting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 reviewing 1st quarter 2017 general queries and CTR's padeye registry template discussion with Sarah 209L Completions spooler tele-conf Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 GoM documentation to Rachel timekeeping system admin SAFI and AutoCAD renewals Sakhalin document control issues timesheet / approving timesheets remaining 2016 PTO admin self-appraisal IHS account admin setting up lunch and learn with SSAB Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-10 Rig 249L-TSR :Rig 249L-TSR TSR-01523-249L Safety & Grounding Plans Regular Pay N 0.5 0 closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-10 Rig 270L-TSR :Rig 270L-TSR TSR-01533-270L Temp Rating Regular Pay N 4 0 Research / phone conf with CG, DL, others / putting together documentation package and report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-11 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.25 0 review / redline closeout document Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 reviewing 1st quarter 2017 general queries and CTR's padeye registry template discussion with Sarah 209L Completions spooler tele-conf Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 GoM documentation to Rachel timekeeping system admin SAFI and AutoCAD renewals Sakhalin document control issues timesheet / approving timesheets remaining 2016 PTO admin self-appraisal IHS account admin setting up lunch and learn with SSAB Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-11 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR/Weekly Meeting TSR administration/tracker update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-11 Rig 209L-TSR :Rig 209L-TSR TSR-01516-209L Bucking Machine HPU Enclosure Regular Pay N 0.75 0 closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-11 Rig 270L-TSR :Rig 270L-TSR TSR-01533-270L Temp Rating Regular Pay N 2.5 0 Research / phone conf with CG, DL, others / putting together documentation package and report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-12 Latin America Region-TSR :Latin America Region-TSR TSR-01532-LABU 1st Quarter 2017 General Query- Mexico Regular Pay N 0.25 0 Information sent to Al for pony sub (HAL tender) BOP stack-up review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 reviewing 1st quarter 2017 general queries and CTR's padeye registry template discussion with Sarah 209L Completions spooler tele-conf Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 GoM documentation to Rachel timekeeping system admin SAFI and AutoCAD renewals Sakhalin document control issues timesheet / approving timesheets remaining 2016 PTO admin self-appraisal IHS account admin setting up lunch and learn with SSAB Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR/Weekly Meeting TSR administration/tracker update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-12 OH-032 :OH-032 Overhead All Activities Regular Pay N 0.5 0 training matrix Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-12 Rig 270L-TSR :Rig 270L-TSR TSR-01528-270L Odoptu Cellar Covers-closed Regular Pay N 1 0 closeout approval finished calcs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-12 Rig 270L-TSR :Rig 270L-TSR TSR-01533-270L Temp Rating Regular Pay N 2.5 0 Research / phone conf with CG, DL, others / putting together documentation package and report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly ops phone call weekly mtg with Rob and Greg meeting with Chuck Gorrell sprint team meetings meeting with Jason Geach meeting with Jason Geach and accounting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 reviewing 1st quarter 2017 general queries and CTR's padeye registry template discussion with Sarah 209L Completions spooler tele-conf Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 GoM documentation to Rachel timekeeping system admin SAFI and AutoCAD renewals Sakhalin document control issues timesheet / approving timesheets remaining 2016 PTO admin self-appraisal IHS account admin setting up lunch and learn with SSAB Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-13 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 TSR/Weekly Meeting TSR administration/tracker update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-13 OH-031 :OH-031 01.01 2016 270 W/S Engineering Regular Pay N 2 0 AAR Meeting with Joshua, MK, TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-13 OH-032 :OH-032 Overhead All Activities Regular Pay N 0.5 0 training matrix Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-13 Rig 270L-TSR :Rig 270L-TSR TSR-01533-270L Temp Rating Regular Pay N 2.5 0 Research / phone conf with CG, DL, others / putting together documentation package and report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly ops phone call TS Weekly Mtg with JS, RS & GO Sakhalin Conf Call regarding 270L rating Business Development Workshop Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 209L spooler platform (discussion with RC regarding additional calcs) BOMCO drawworks info to GHW discussion 209L power (SCR notching) issues with GO and Sachin Ground bearing pressure calcs for 247/265 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-16 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly conf call and prep Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-16 Rig 216L-TSR :Rig 216L-TSR TSR-01520-216L Safety Plans Regular Pay N 0.5 0 closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-16 Rig 270L-TSR :Rig 270L-TSR TSR-01533-270L Temp Rating Regular Pay N 6 0 Report, risk register and conf calls CTR Equipment research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly ops phone call TS Weekly Mtg with JS, RS & GO Sakhalin Conf Call regarding 270L rating Business Development Workshop Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 209L spooler platform (discussion with RC regarding additional calcs) BOMCO drawworks info to GHW discussion 209L power (SCR notching) issues with GO and Sachin Ground bearing pressure calcs for 247/265 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 SSAB Lunch and Learn (setting up) Timesheet User Guide Filing all received self appraisals timesheet/timesheet review personnel changes made in DrillBIT 4th Qtr 2016 and 1st qtr 2017 general query admin Lessons learned database discussion with RC Lunch with WJM management personnel roster for RS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-17 Rig 270L-TSR :Rig 270L-TSR TSR-01533-270L Temp Rating Regular Pay N 5 0 Report, risk register and conf calls CTR Equipment research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly ops phone call TS Weekly Mtg with JS, RS & GO Sakhalin Conf Call regarding 270L rating Business Development Workshop Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 209L spooler platform (discussion with RC regarding additional calcs) BOMCO drawworks info to GHW discussion 209L power (SCR notching) issues with GO and Sachin Ground bearing pressure calcs for 247/265 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 SSAB Lunch and Learn (setting up) Timesheet User Guide Filing all received self appraisals timesheet/timesheet review personnel changes made in DrillBIT 4th Qtr 2016 and 1st qtr 2017 general query admin Lessons learned database discussion with RC Lunch with WJM management personnel roster for RS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-18 Rig 270L-TSR :Rig 270L-TSR TSR-01533-270L Temp Rating Regular Pay N 4 0 Report, risk register and conf calls CTR Equipment research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 209L spooler platform (discussion with RC regarding additional calcs) BOMCO drawworks info to GHW discussion 209L power (SCR notching) issues with GO and Sachin Ground bearing pressure calcs for 247/265 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 SSAB Lunch and Learn (setting up) Timesheet User Guide Filing all received self appraisals timesheet/timesheet review personnel changes made in DrillBIT 4th Qtr 2016 and 1st qtr 2017 general query admin Lessons learned database discussion with RC Lunch with WJM management personnel roster for RS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-19 Rig 270L-TSR :Rig 270L-TSR TSR-01528-270L Odoptu Cellar Covers-closed Regular Pay N 0.5 0 discussion with Daniel; transmittal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-19 Rig 270L-TSR :Rig 270L-TSR TSR-01533-270L Temp Rating Regular Pay N 4 0 Report, risk register and conf calls CTR Equipment research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 weekly ops phone call TS Weekly Mtg with JS, RS & GO Sakhalin Conf Call regarding 270L rating Business Development Workshop Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 209L spooler platform (discussion with RC regarding additional calcs) BOMCO drawworks info to GHW discussion 209L power (SCR notching) issues with GO and Sachin Ground bearing pressure calcs for 247/265 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 SSAB Lunch and Learn (setting up) Timesheet User Guide Filing all received self appraisals timesheet/timesheet review personnel changes made in DrillBIT 4th Qtr 2016 and 1st qtr 2017 general query admin Lessons learned database discussion with RC Lunch with WJM management personnel roster for RS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-20 Rig 270L-TSR :Rig 270L-TSR TSR-01533-270L Temp Rating Regular Pay N 2 0 Report, risk register and conf calls CTR Equipment research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-20 Rig 270L-TSR :Rig 270L-TSR TSR-01535-270L BOP-Diverter Stack-Up Drawings Regular Pay N 0.5 0 Discussion and review with JG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-21 EHBU-TSRs :EHBU-TSRs TSR-01530-EHBU 1st Quarter 2017 General Query- Aksai Regular Pay N 1 0 Drawworks research and information sent to Robbie and George Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-21 Rig 270L-TSR :Rig 270L-TSR TSR-01535-270L BOP-Diverter Stack-Up Drawings Regular Pay N 0.5 0 Discussion and review with JG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-23 OH-002 :OH-002 Overhead All Activities Regular Pay N 8 0 Funeral Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-24 ARBU-TSRs :ARBU-TSRs TSR-01534-ARBU 1st Quarter 2017 General Query - Alaska Regular Pay N 0.5 0 NACE Requirements (assigned to John Reck) Loadmaster Crown Drawings and info sent to MQ Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 2M Tek / iTS meeting weekly tech services meeting w/ RS, GO Phone conf with Jennifer S (Eastern Canada) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 AutoCAD Invoice Canadian Engineering Licensure Requirements TSR reviews; Sakhalin document numbering corrections; timesheet; timesheet reviews; SSAB lunch and learn set-up Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-24 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 SSAB Lunch and Learn Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-24 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 review meeting notes Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-24 Rig 209L-TSR :Rig 209L-TSR TSR-01500-209L 2016 General Query Regular Pay N 0.5 0 closeout review; revisions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-24 Rig 270L-TSR :Rig 270L-TSR TSR-01535-270L BOP-Diverter Stack-Up Drawings Regular Pay N 0.5 0 CTR review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-25 2M Tek :2M Tek TSR-01478-2M-TEK 500T Actuator Drawings Regular Pay N 0.75 0 closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-25 ITS :ITS TSR-01366-ITSP ITS Energy Whipstock Anchor Design Regular Pay N 0.5 0 closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 2M Tek / iTS meeting weekly tech services meeting w/ RS, GO Phone conf with Jennifer S (Eastern Canada) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.75 0 Bomco ground bearing pressure email; discussed with ME Conf call with Odoptu site team regarding open TSR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 AutoCAD Invoice Canadian Engineering Licensure Requirements TSR reviews; Sakhalin document numbering corrections; timesheet; timesheet reviews; SSAB lunch and learn set-up Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 reviewing tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-25 Rig 209L-TSR :Rig 209L-TSR TSR-01500-209L 2016 General Query Regular Pay N 0.5 0 closeout review; revisions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-25 Rig 209L-TSR :Rig 209L-TSR TSR-01525-209L BOP Tie Backs Regular Pay N 1 0 closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-26 ARBU-TSRs :ARBU-TSRs TSR-01534-ARBU 1st Quarter 2017 General Query - Alaska Regular Pay N 0.75 0 NACE Requirements (assigned to John Reck) Loadmaster Crown Drawings and info sent to MQ Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 2M Tek / iTS meeting weekly tech services meeting w/ RS, GO Phone conf with Jennifer S (Eastern Canada) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Bomco ground bearing pressure email; discussed with ME Conf call with Odoptu site team regarding open TSR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.75 0 AutoCAD Invoice Canadian Engineering Licensure Requirements TSR reviews; Sakhalin document numbering corrections; timesheet; timesheet reviews; SSAB lunch and learn set-up Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 reviewing tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-26 Rig 209L-TSR :Rig 209L-TSR TSR-01500-209L 2016 General Query Regular Pay N 1.5 0 closeout review; revisions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-26 Rig 270L-TSR :Rig 270L-TSR TSR-01533-270L Temp Rating Regular Pay N 1 0 BOP information ;discussing CO with Tyler E Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-27 ARBU-TSRs :ARBU-TSRs TSR-01534-ARBU 1st Quarter 2017 General Query - Alaska Regular Pay N 1.25 0 NACE Requirements (assigned to John Reck) Loadmaster Crown Drawings and info sent to MQ Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Bomco ground bearing pressure email; discussed with ME Conf call with Odoptu site team regarding open TSR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 AutoCAD Invoice Canadian Engineering Licensure Requirements TSR reviews; Sakhalin document numbering corrections; timesheet; timesheet reviews; SSAB lunch and learn set-up Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.25 0 Hibernia / White Rose Meeting w/ ARBU Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 reviewing tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-27 Rig 270L-TSR :Rig 270L-TSR TSR-01533-270L Temp Rating Regular Pay N 1 0 BOP information ;discussing CO with Tyler E Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 weekly ops phone conf.; weekly TS meeting w/ GO and RS; phone call with Beth regarding Canadian Eng Licensure; meeting with Stephan M.; conf. call with MQ Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Loadmaster email for wind wall cutout approval; working with Joshua on rental tool coordinator position; GoM compliance documents; trailer damage (Aksai) material specification to Dan Colby; 209L drawing review (mast windwall cutout and door); Bomco ground bearing pressure; Bomco - adding Bogeys to rig 265 & 247; utility hoist fdn. to GoM; platform analysis review (209L, non-billable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Office move (administration); timesheet guidance sheet; timekeeping system admin; timesheet and timesheet review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-30 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Mtg prep and notes for RC and JR Phone conf. with Mihovil Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-30 Rig 209L-TSR :Rig 209L-TSR TSR-01524-209L CRI Brine Transfer Line Regular Pay N 1 0 closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-30 Rig 270L-TSR :Rig 270L-TSR TSR-01533-270L Temp Rating Regular Pay N 1 0 closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly ops phone conf.; weekly TS meeting w/ GO and RS; phone call with Beth regarding Canadian Eng Licensure; meeting with Stephan M.; conf. call with MQ Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-31 OH-005 :OH-005 Overhead All Activities Regular Pay N 3.5 0 Loadmaster email for wind wall cutout approval; working with Joshua on rental tool coordinator position; GoM compliance documents; trailer damage (Aksai) material specification to Dan Colby; 209L drawing review (mast windwall cutout and door); Bomco ground bearing pressure; Bomco - adding Bogeys to rig 265 & 247; utility hoist fdn. to GoM; platform analysis review (209L, non-billable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Office move (administration); timesheet guidance sheet; timekeeping system admin; timesheet and timesheet review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 WRE project - mtgs, marketing sheets, Wood Group mtg preparation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-01-31 Rig 249L-TSR :Rig 249L-TSR TSR-01523-249L Safety & Grounding Plans Regular Pay N 0.5 0 closeout review (rev. 1) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly ops phone conf.; weekly TS meeting w/ GO and RS; phone call with Beth regarding Canadian Eng Licensure; meeting with Stephan M.; conf. call with MQ Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 Loadmaster email for wind wall cutout approval; working with Joshua on rental tool coordinator position; GoM compliance documents; trailer damage (Aksai) material specification to Dan Colby; 209L drawing review (mast windwall cutout and door); Bomco ground bearing pressure; Bomco - adding Bogeys to rig 265 & 247; utility hoist fdn. to GoM; platform analysis review (209L, non-billable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Office move (administration); timesheet guidance sheet; timekeeping system admin; timesheet and timesheet review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 WRE project - mtgs, marketing sheets, Wood Group mtg preparation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 business unit reports; updating TSR tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 Loadmaster email for wind wall cutout approval; working with Joshua on rental tool coordinator position; GoM compliance documents; trailer damage (Aksai) material specification to Dan Colby; 209L drawing review (mast windwall cutout and door); Bomco ground bearing pressure; Bomco - adding Bogeys to rig 265 & 247; utility hoist fdn. to GoM; platform analysis review (209L, non-billable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Office move (administration); timesheet guidance sheet; timekeeping system admin; timesheet and timesheet review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 WRE project - mtgs, marketing sheets, Wood Group mtg preparation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 business unit reports; updating TSR tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-02 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Mtg prep and notes for RC and JR Phone conf. with Mihovil Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 weekly ops phone conf.; weekly TS meeting w/ GO and RS; phone call with Beth regarding Canadian Eng Licensure; meeting with Stephan M.; conf. call with MQ Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 3.5 0 Loadmaster email for wind wall cutout approval; working with Joshua on rental tool coordinator position; GoM compliance documents; trailer damage (Aksai) material specification to Dan Colby; 209L drawing review (mast windwall cutout and door); Bomco ground bearing pressure; Bomco - adding Bogeys to rig 265 & 247; utility hoist fdn. to GoM; platform analysis review (209L, non-billable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Office move (administration); timesheet guidance sheet; timekeeping system admin; timesheet and timesheet review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 WRE project - mtgs, marketing sheets, Wood Group mtg preparation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-03 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 business unit reports; updating TSR tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-06 ARBU-TSRs :ARBU-TSRs TSR-01505-ARBU Fourth Quarter General Query - Sakhalin Regular Pay N 0.5 0 Odoptu Support - wind speed limitation while skidding Reviewed electrical inspection report from Sachin (SOLA Transformers); odoptu diverter line discussion Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-06 Berkut-TSR :Berkut-TSR TSR-01540-BERP Trip Tank Line Flushing Regular Pay N 0.5 0 CTR review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-06 Berkut-TSR :Berkut-TSR TSR-01541-BERP Gravel Bypass Line (Electrical) Regular Pay N 0.5 0 CTR review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 3.5 0 272/273/257 Hazard Insurance Meetings with Greg O; sprint team meetings; weekly ops call; weekly TS Mgmt mtg; TSR process revision mtg; iTS and 2M Tek timesheet and tracking mtg Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 GoM Compliance Documentation PEGNL Licensure Odoptu cellar panels (preliminary review) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Wood Group Meeting Preparation Wood Group Meeting Debrief Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-06 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 meeting prep and review with engineers; document control memo Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-07 ARBU-TSRs :ARBU-TSRs TSR-01505-ARBU Fourth Quarter General Query - Sakhalin Regular Pay N 0.5 0 Odoptu Support - wind speed limitation while skidding Reviewed electrical inspection report from Sachin (SOLA Transformers); odoptu diverter line discussion Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-07 ARBU-TSRs :ARBU-TSRs TSR-01534-ARBU 1st Quarter 2017 General Query - Alaska Regular Pay N 2 0 diverter line requirements NACE requirements Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 272/273/257 Hazard Insurance Meetings with Greg O; sprint team meetings; weekly ops call; weekly TS Mgmt mtg; TSR process revision mtg; iTS and 2M Tek timesheet and tracking mtg Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 GoM Compliance Documentation PEGNL Licensure Odoptu cellar panels (preliminary review) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 timesheet and timesheet approval Oracle set-up OFI approvals and document reviews office move - packing my office and reference materials Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Wood Group Meeting Preparation Wood Group Meeting Debrief Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-08 ARBU-TSRs :ARBU-TSRs TSR-01505-ARBU Fourth Quarter General Query - Sakhalin Regular Pay N 1.5 0 Odoptu Support - wind speed limitation while skidding Reviewed electrical inspection report from Sachin (SOLA Transformers); odoptu diverter line discussion Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-08 ARBU-TSRs :ARBU-TSRs TSR-01534-ARBU 1st Quarter 2017 General Query - Alaska Regular Pay N 0.5 0 diverter line requirements NACE requirements Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 272/273/257 Hazard Insurance Meetings with Greg O; sprint team meetings; weekly ops call; weekly TS Mgmt mtg; TSR process revision mtg; iTS and 2M Tek timesheet and tracking mtg Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 GoM Compliance Documentation PEGNL Licensure Odoptu cellar panels (preliminary review) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 timesheet and timesheet approval Oracle set-up OFI approvals and document reviews office move - packing my office and reference materials Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 Wood Group Meeting Preparation Wood Group Meeting Debrief Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-08 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 meeting prep and review with engineers; document control memo Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-09 OH-003 :OH-003 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 272/273/257 Hazard Insurance Meetings with Greg O; sprint team meetings; weekly ops call; weekly TS Mgmt mtg; TSR process revision mtg; iTS and 2M Tek timesheet and tracking mtg Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 timesheet and timesheet approval Oracle set-up OFI approvals and document reviews office move - packing my office and reference materials Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-13 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 1.5 0 209L-Cellar Deck Modifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Weekly Operations Meeting TS Weekly Meeting with Rob and Greg Drill-Mec Meeting for TOTAL Uganda Mtg with GO and NH about marketing brochures Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Odoptu (Genesis) PO closeout with Supply Chain Timesheet and timesheet approvals Evaluation reviews General personnel planning Finished self-appraisal 2017 SMART goals Scotty Davis Retirement Lunch TSR process rollout and timesheet guidance timekeeping system revisions 4th quarter luncheon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-13 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 5 0 Meeting with Jennifer S. Meeting with Nick H. Preparation for trip to NL Set-up meeting with Maderra Set-up meeting with PEGNL Exxon presentation and example documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-13 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Weekly Operations Meeting TS Weekly Meeting with Rob and Greg Drill-Mec Meeting for TOTAL Uganda Mtg with GO and NH about marketing brochures Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Odoptu (Genesis) PO closeout with Supply Chain Timesheet and timesheet approvals Evaluation reviews General personnel planning Finished self-appraisal 2017 SMART goals Scotty Davis Retirement Lunch TSR process rollout and timesheet guidance timekeeping system revisions 4th quarter luncheon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 TOTAL Uganda - email back to ME regarding pony subs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-14 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 2 0 Meeting with Jennifer S. Meeting with Nick H. Preparation for trip to NL Set-up meeting with Maderra Set-up meeting with PEGNL Exxon presentation and example documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-15 Berkut-TSR :Berkut-TSR TSR-01540-BERP Trip Tank Line Flushing Regular Pay N 1 0 closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-15 Berkut-TSR :Berkut-TSR TSR-01541-BERP Gravel Bypass Line (Electrical) Regular Pay N 1 0 closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 270L Mud gas separator research 2M Tek Analysis Review with RC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Odoptu (Genesis) PO closeout with Supply Chain Timesheet and timesheet approvals Evaluation reviews General personnel planning Finished self-appraisal 2017 SMART goals Scotty Davis Retirement Lunch TSR process rollout and timesheet guidance timekeeping system revisions 4th quarter luncheon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-15 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 3 0 Meeting with Jennifer S. Meeting with Nick H. Preparation for trip to NL Set-up meeting with Maderra Set-up meeting with PEGNL Exxon presentation and example documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-15 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Weekly meeting and tracker update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-15 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 1 0 closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Meeting TS Weekly Meeting with Rob and Greg Drill-Mec Meeting for TOTAL Uganda Mtg with GO and NH about marketing brochures Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 270L Mud gas separator research 2M Tek Analysis Review with RC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Odoptu (Genesis) PO closeout with Supply Chain Timesheet and timesheet approvals Evaluation reviews General personnel planning Finished self-appraisal 2017 SMART goals Scotty Davis Retirement Lunch TSR process rollout and timesheet guidance timekeeping system revisions 4th quarter luncheon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-16 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 2 0 Meeting with Jennifer S. Meeting with Nick H. Preparation for trip to NL Set-up meeting with Maderra Set-up meeting with PEGNL Exxon presentation and example documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Weekly meeting and tracker update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-16 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 NOV NOVOS Presentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-17 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 1 0 209L-Cellar Deck Modifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 270L Mud gas separator research 2M Tek Analysis Review with RC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Odoptu (Genesis) PO closeout with Supply Chain Timesheet and timesheet approvals Evaluation reviews General personnel planning Finished self-appraisal 2017 SMART goals Scotty Davis Retirement Lunch TSR process rollout and timesheet guidance timekeeping system revisions 4th quarter luncheon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-17 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 4 0 Meeting with Jennifer S. Meeting with Nick H. Preparation for trip to NL Set-up meeting with Maderra Set-up meeting with PEGNL Exxon presentation and example documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-20 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Presidents Day Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-21 OH-010 :OH-010 Overhead All Activities Regular Pay N 9 0 Houston to St. Johns (roundtrip) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Evaluation Review Grounding Standard discussion with CG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-22 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 8 0 PEGNL Meeting Exxon Presentation Exxon Meeting Maderra Meeting Cahill Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Evaluation Review Grounding Standard discussion with CG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-23 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 8 0 PEGNL Meeting Exxon Presentation Exxon Meeting Maderra Meeting Cahill Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Evaluation Review Grounding Standard discussion with CG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-24 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 4 0 PEGNL Meeting Exxon Presentation Exxon Meeting Maderra Meeting Cahill Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-24 OH-010 :OH-010 Overhead All Activities Regular Pay N 10 0 Houston to St. Johns (roundtrip) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-27 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 0.75 0 Cost/schedule review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Weekly Ops Conf Call Weekly TS Meeting w/ Rob and Greg TSR Review Mtg (updating board) Mtg with Bryan Little Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet / Timesheet review Performance Appraisals Discuss Eng License with tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-27 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 1.25 0 Job Description (sent to Jennifer and Jeff) Canadian Engineering License Work Permit Experience Record Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-27 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Mtg preparation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-27 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Compliance Documents (crew boats) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-27 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1.25 0 Preliminary calculations Contact Loadmaster / mtg with same Contact RAM Winch Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-27 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 0.5 0 Contact Loadmaster Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-27 Rig 270L-TSR :Rig 270L-TSR TSR-01401-270L Walking System - Logistics Regular Pay N 0.5 0 Closeout Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-28 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 Meeting with Greg Osten / Jack W. Meetings with Drillmec and HH Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Ops Conf Call Weekly TS Meeting w/ Rob and Greg TSR Review Mtg (updating board) Mtg with Bryan Little Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 2M Tek / iTS discussions with Joshua/Rob Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet / Timesheet review Performance Appraisals Discuss Eng License with tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-28 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 2.5 0 Job Description (sent to Jennifer and Jeff) Canadian Engineering License Work Permit Experience Record Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 209L Snubbing Padeye Review 270L Substructure Damage 270L TT tie-back kit Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-28 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 0.5 0 review/approve diverter box drawing and diverter line GA Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-28 Rig 253L-TSR :Rig 253L-TSR TSR-01554-253L Skidding Beam Repair Regular Pay N 1 0 TSR Closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-02-28 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 0.5 0 Preliminary calculations Contact Loadmaster / mtg with same Contact RAM Winch Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-01 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 0.75 0 Cost/schedule review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-01 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.75 0 Meeting with Greg Osten / Jack W. Meetings with Drillmec and HH Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 Weekly Ops Conf Call Weekly TS Meeting w/ Rob and Greg TSR Review Mtg (updating board) Mtg with Bryan Little Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Timesheet / Timesheet review Performance Appraisals Discuss Eng License with tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-01 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 1.5 0 Job Description (sent to Jennifer and Jeff) Canadian Engineering License Work Permit Experience Record Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-01 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1.25 0 Hibernia Integrated Controls Mtg w/ NOV Mousehole drawings to Steve Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-01 Rig 253L-TSR :Rig 253L-TSR TSR-01554-253L Skidding Beam Repair Regular Pay N 1 0 TSR Closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Ops Conf Call Weekly TS Meeting w/ Rob and Greg TSR Review Mtg (updating board) Mtg with Bryan Little Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-02 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 2 0 Job Description (sent to Jennifer and Jeff) Canadian Engineering License Work Permit Experience Record Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.75 0 Meeting and update spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.75 0 209L Snubbing Padeye Review 270L Substructure Damage 270L TT tie-back kit Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-02 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 Hibernia Integrated Controls Mtg w/ NOV Mousehole drawings to Steve Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-02 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.25 0 Compliance Documents (crew boats) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-02 Rig 209L-TSR :Rig 209L-TSR TSR-01539-209L Deisel Day Tank Shut-Off Valves Regular Pay N 0.5 0 CTR Approval Documentation review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-02 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 0.5 0 review/approve diverter box drawing and diverter line GA Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-02 Rig 209L-TSR :Rig 209L-TSR TSR-01545-209L DSM-DM Steam Connection Regular Pay N 0.5 0 CTR and CO Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-02 Rig 253L-TSR :Rig 253L-TSR TSR-01554-253L Skidding Beam Repair Regular Pay N 0.75 0 TSR Closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-03 Berkut-TSR :Berkut-TSR TSR-01546-BER Trip tank feed line flushing (electrical) Regular Pay N 0.5 0 CTR approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-03 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3.5 0 Meeting with Greg Osten / Jack W. Meetings with Drillmec and HH Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Ops Conf Call Weekly TS Meeting w/ Rob and Greg TSR Review Mtg (updating board) Mtg with Bryan Little Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-03 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 1 0 Job Description (sent to Jennifer and Jeff) Canadian Engineering License Work Permit Experience Record Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3.5 0 209L Snubbing Padeye Review 270L Substructure Damage 270L TT tie-back kit Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-03 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.25 0 Compliance Documents (crew boats) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-03 Rig 209L-TSR :Rig 209L-TSR TSR-01539-209L Deisel Day Tank Shut-Off Valves Regular Pay N 0.5 0 CTR Approval Documentation review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-03 Rig 209L-TSR :Rig 209L-TSR TSR-01545-209L DSM-DM Steam Connection Regular Pay N 0.75 0 CTR and CO Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-03 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 0.5 0 Preliminary calculations Contact Loadmaster / mtg with same Contact RAM Winch Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-03 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 0.5 0 Contact Loadmaster Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 209L Snubbing Padeye Review 270L Substructure Damage 270L TT tie-back kit Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 270L Substructure Damage (final report, secondary analysis review, phone conf. with field personnel) 270L TDS tie-back drawing review and discussions with field Electrical material issues; work pack issues Approval of 209L drawings not associated with TSR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Ops Conf. Call TS Planning Meeting Discussion of HH contract 2M-Tek AFE Meeting TSR Board Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 TSR Status Discussion Timesheet and timesheet approvals Lessons Learned approvals Expense report 2M-Tek/iTS Administration Performance Evaluations PTO/Expense report Administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 9.5 0 270L Substructure Damage (final report, secondary analysis review, phone conf. with field personnel) 270L TDS tie-back drawing review and discussions with field Electrical material issues; work pack issues Approval of 209L drawings not associated with TSR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-07 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 0.25 0 closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Ops Conf. Call TS Planning Meeting Discussion of HH contract 2M-Tek AFE Meeting TSR Board Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 TSR Status Discussion Timesheet and timesheet approvals Lessons Learned approvals Expense report 2M-Tek/iTS Administration Performance Evaluations PTO/Expense report Administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-07 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 SharePoint training Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.75 0 270L Substructure Damage (final report, secondary analysis review, phone conf. with field personnel) 270L TDS tie-back drawing review and discussions with field Electrical material issues; work pack issues Approval of 209L drawings not associated with TSR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-07 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 USCG Documentation Administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-07 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 0.75 0 CTR revision review closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-07 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 Review proposal' discussion with Doug at Loadmaster; CTR approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-07 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 0.25 0 Discuss options with RS; discuss with LM Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-08 2M Tek :2M Tek TSR-01544-2M-TEK ARB Design Support Regular Pay N 1.25 0 closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-08 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 Review of contract and RFP documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-08 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 1 0 review of closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Weekly Ops Conf. Call TS Planning Meeting Discussion of HH contract 2M-Tek AFE Meeting TSR Board Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 TSR Status Discussion Timesheet and timesheet approvals Lessons Learned approvals Expense report 2M-Tek/iTS Administration Performance Evaluations PTO/Expense report Administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-08 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 Updating TSR tracking spreadsheet Weekly Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 270L Substructure Damage (final report, secondary analysis review, phone conf. with field personnel) 270L TDS tie-back drawing review and discussions with field Electrical material issues; work pack issues Approval of 209L drawings not associated with TSR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-08 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.25 0 Discuss work permit requirements Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-08 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 USCG Documentation Administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-08 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 0.5 0 Discuss options with RS; discuss with LM Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-09 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 Review of contract and RFP documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Ops Conf. Call TS Planning Meeting Discussion of HH contract 2M-Tek AFE Meeting TSR Board Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 TSR Status Discussion Timesheet and timesheet approvals Lessons Learned approvals Expense report 2M-Tek/iTS Administration Performance Evaluations PTO/Expense report Administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-09 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 Updating TSR tracking spreadsheet Weekly Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.25 0 270L Substructure Damage (final report, secondary analysis review, phone conf. with field personnel) 270L TDS tie-back drawing review and discussions with field Electrical material issues; work pack issues Approval of 209L drawings not associated with TSR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-09 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 Discuss work permit requirements Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-09 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 USCG Documentation Administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-09 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 1 0 CTR revision review closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-09 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 0.5 0 Review proposal' discussion with Doug at Loadmaster; CTR approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-09 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 0.25 0 Discuss options with RS; discuss with LM Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-10 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 Review of contract and RFP documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Ops Conf. Call TS Planning Meeting Discussion of HH contract 2M-Tek AFE Meeting TSR Board Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 TSR Status Discussion Timesheet and timesheet approvals Lessons Learned approvals Expense report 2M-Tek/iTS Administration Performance Evaluations PTO/Expense report Administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 270L Substructure Damage (final report, secondary analysis review, phone conf. with field personnel) 270L TDS tie-back drawing review and discussions with field Electrical material issues; work pack issues Approval of 209L drawings not associated with TSR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-10 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 Review proposal' discussion with Doug at Loadmaster; CTR approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-10 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1 0 Discuss options with RS; discuss with LM Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Ops Conf Call TSR Board Mtgs Weekly TS Meeting (RS, GO) Mtg with Nick Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Performance Evaluations 2017 SMART Goals Timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-13 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 0.5 0 Canadian Eng Licensure Work Permit Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 209L HPU Platforms - torsion issues 270L Substructure Damage Documentation Outline Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-15 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 Material Equivalents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ops Conf Call TSR Board Mtgs Weekly TS Meeting (RS, GO) Mtg with Nick Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Performance Evaluations 2017 SMART Goals Timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-15 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 Update tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-15 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 209L HPU Platforms - torsion issues 270L Substructure Damage Documentation Outline Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-15 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 0.5 0 discussion with Ralph, meetings with Loadmaster Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-15 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 0.5 0 discussion with Ralph, meetings with Loadmaster Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-16 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 Material Equivalents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Ops Conf Call TSR Board Mtgs Weekly TS Meeting (RS, GO) Mtg with Nick Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Performance Evaluations 2017 SMART Goals Timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 Update tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 209L HPU Platforms - torsion issues 270L Substructure Damage Documentation Outline Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-16 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 272L HAZ Area Drawing Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-16 Rig 231L-TSR :Rig 231L-TSR TSR-01555-231L Skidding Package Regular Pay N 1 0 TSR Review and Discussion with Gary B. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-16 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1 0 discussion with Ralph, meetings with Loadmaster Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-17 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 Material Equivalents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Ops Conf Call TSR Board Mtgs Weekly TS Meeting (RS, GO) Mtg with Nick Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Performance Evaluations 2017 SMART Goals Timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-17 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 0.5 0 Canadian Eng Licensure Work Permit Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-17 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 272L HAZ Area Drawing Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-17 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 0.5 0 discussion with Ralph, meetings with Loadmaster Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1.5 0 contract meeting; KOC tender material review meeting formatting contract spreadsheets Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Ops Conf Call Weekly TS Management Mtg Weekly TSR meeting Dan S. / Joshua L. path forward Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 performance Evaluations; meeting with RS to discuss Performance Evaluations PE Renewal AISC renewal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-20 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 0.5 0 PEGNL conf call Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-20 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 preparation; discussion with RC and JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 270L Racking Board Repair Procedure and Report 209L Jacking Claw Failure Raising cylinder trunion weld cracks (Saturday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-20 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 272L diverter line discussion with MQ and JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Weekly Ops Conf Call Weekly TS Management Mtg Weekly TSR meeting Dan S. / Joshua L. path forward Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 performance Evaluations; meeting with RS to discuss Performance Evaluations PE Renewal AISC renewal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5 0 270L Racking Board Repair Procedure and Report 209L Jacking Claw Failure Raising cylinder trunion weld cracks (Saturday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Ops Conf Call Weekly TS Management Mtg Weekly TSR meeting Dan S. / Joshua L. path forward Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-22 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 updating TSR tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5.5 0 270L Racking Board Repair Procedure and Report 209L Jacking Claw Failure Raising cylinder trunion weld cracks (Saturday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-22 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 0.5 0 status of report and conf call with LM Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-22 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1 0 request for updated proposal; discussion of path forward Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-23 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1.5 0 contract meeting; KOC tender material review meeting formatting contract spreadsheets Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Ops Conf Call Weekly TS Management Mtg Weekly TSR meeting Dan S. / Joshua L. path forward Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 updating TSR tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 270L Racking Board Repair Procedure and Report 209L Jacking Claw Failure Raising cylinder trunion weld cracks (Saturday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-23 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 compliance documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-23 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 1 0 closeout final review - issuance Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-23 Rig 231L-TSR :Rig 231L-TSR TSR-01555-231L Skidding Package Regular Pay N 0.5 0 approve CTR and discuss with Gary and Sachin Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-23 Rig 272L-TSR :Rig 272L-TSR TSR-01551-272L Mud Pump Room Area Clarification Regular Pay N 1 0 review / revise closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-24 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 contract meeting; KOC tender material review meeting formatting contract spreadsheets Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Weekly Ops Conf Call Weekly TS Management Mtg Weekly TSR meeting Dan S. / Joshua L. path forward Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 performance Evaluations; meeting with RS to discuss Performance Evaluations PE Renewal AISC renewal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 PlusPetrol / 226 Gap Analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-24 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 270L Racking Board Repair Procedure and Report 209L Jacking Claw Failure Raising cylinder trunion weld cracks (Saturday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-24 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 272L diverter line discussion with MQ and JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-24 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 compliance documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-24 Rig 231L-TSR :Rig 231L-TSR TSR-01555-231L Skidding Package Regular Pay N 0.5 0 approve CTR and discuss with Gary and Sachin Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 270L Racking Board Repair Procedure and Report 209L Jacking Claw Failure Raising cylinder trunion weld cracks (Saturday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Weekly Operations Phone Call Weekly TS Mgmt. Meeting TSR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet; timesheet approvals; performance evaluations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 GAP analysis; phone conf with Carlos Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-27 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1.5 0 15B Generator Removal Beam Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-27 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 reviewing scope of TSR and discussing path forward with RC and JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-27 Rig 231L-TSR :Rig 231L-TSR TSR-01555-231L Skidding Package Regular Pay N 1 0 Closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-27 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 BOP Weight Spreadsheet Chevron Tender; secondary retention drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-28 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Board Meetings; review of technical specifications; meeting with HH Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Operations Phone Call Weekly TS Mgmt. Meeting TSR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet; timesheet approvals; performance evaluations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-28 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Informal EAM module training with Ricky Smith Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 270L Cameron BOP lift plates Open TSR status; setting priorities Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-28 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1.5 0 15B Generator Removal Beam Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-28 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 reviewing scope of TSR and discussing path forward with RC and JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-28 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 2 0 BOP Weight Spreadsheet Chevron Tender; secondary retention drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-29 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Board Meetings; review of technical specifications; meeting with HH Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Operations Phone Call Weekly TS Mgmt. Meeting TSR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet; timesheet approvals; performance evaluations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 GAP analysis; phone conf with Carlos Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-29 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Tracker update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-29 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 15B Generator Removal Beam Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-29 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 2 0 BOP Weight Spreadsheet Chevron Tender; secondary retention drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-29 Rig 272L-TSR :Rig 272L-TSR TSR-01551-272L Mud Pump Room Area Clarification Regular Pay N 0.5 0 review drawings and final closeout revisions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-30 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Board Meetings; review of technical specifications; meeting with HH Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Phone Call Weekly TS Mgmt. Meeting TSR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet; timesheet approvals; performance evaluations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-30 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 270L Cameron BOP lift plates Open TSR status; setting priorities Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-30 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 15B Generator Removal Beam Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-30 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 reviewing scope of TSR and discussing path forward with RC and JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-30 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1 0 discussing options with Lam and John R. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-30 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 BOP Weight Spreadsheet Chevron Tender; secondary retention drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-30 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1.5 0 Discussions with Loadmaster and Operations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-30 Rig 272L-TSR :Rig 272L-TSR TSR-01551-272L Mud Pump Room Area Clarification Regular Pay N 0.5 0 review drawings and final closeout revisions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-03-31 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Weekly Operations Conf Call Weekly Technical Services Mgmt Meeting Daily TSR review meeting meeting with Bruce Harline (HMDC) Meeting with Tanya and GO to discuss handover Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Performance Evaluations Cellular Phone Administration Personnel assignment discussions Timesheet and timesheet approval/admin Personnel administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.25 0 PlusPetrol Gap Analysis, meetings Geothermal BOP stack-ups for Gary B. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-03 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1 0 Chevron Tender Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.75 0 TSR updates; non-billable TSR tasks Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-03 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 compliance documentation/radio licenses and COI renewal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-03 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 discussion with operations and engineering/design team Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-04 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 TPP reviews, board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 Weekly Operations Conf Call Weekly Technical Services Mgmt Meeting Daily TSR review meeting meeting with Bruce Harline (HMDC) Meeting with Tanya and GO to discuss handover Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Performance Evaluations Cellular Phone Administration Personnel assignment discussions Timesheet and timesheet approval/admin Personnel administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 PlusPetrol Gap Analysis, meetings Geothermal BOP stack-ups for Gary B. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-04 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 plume dispersion modeling meeting - review material Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-04 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1.75 0 compliance documentation/radio licenses and COI renewal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-04 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 Discussion with Mat E and vendors Coordination with Loadmaster Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-04 Rig 272L-TSR :Rig 272L-TSR TSR-01563-272L Crown Removal Regular Pay N 0.5 0 weight estimate discussions with operations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-05 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 TPP reviews, board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Operations Conf Call Weekly Technical Services Mgmt Meeting Daily TSR review meeting meeting with Bruce Harline (HMDC) Meeting with Tanya and GO to discuss handover Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Performance Evaluations Cellular Phone Administration Personnel assignment discussions Timesheet and timesheet approval/admin Personnel administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.25 0 PlusPetrol Gap Analysis, meetings Geothermal BOP stack-ups for Gary B. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-05 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1 0 Chevron Tender Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-05 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Updating tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.75 0 TSR updates; non-billable TSR tasks Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-05 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 compliance documentation/radio licenses and COI renewal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-05 Rig 272L-TSR :Rig 272L-TSR TSR-01563-272L Crown Removal Regular Pay N 0.5 0 weight estimate discussions with operations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-06 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 TPP reviews, board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Weekly Operations Conf Call Weekly Technical Services Mgmt Meeting Daily TSR review meeting meeting with Bruce Harline (HMDC) Meeting with Tanya and GO to discuss handover Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Performance Evaluations Cellular Phone Administration Personnel assignment discussions Timesheet and timesheet approval/admin Personnel administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-06 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 0.5 0 coordination with Loadmaster Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-06 Rig 272L-TSR :Rig 272L-TSR TSR-01563-272L Crown Removal Regular Pay N 0.5 0 weight estimate discussions with operations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conf Call Weekly Technical Services Mgmt Meeting Daily TSR review meeting meeting with Bruce Harline (HMDC) Meeting with Tanya and GO to discuss handover Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Performance Evaluations Cellular Phone Administration Personnel assignment discussions Timesheet and timesheet approval/admin Personnel administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 PlusPetrol Gap Analysis, meetings Geothermal BOP stack-ups for Gary B. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-07 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1 0 Chevron Tender Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR updates; non-billable TSR tasks Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-07 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 plume dispersion modeling meeting - review material Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-07 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 discussion with operations and engineering/design team Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-07 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 Discussion with Mat E and vendors Coordination with Loadmaster Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-07 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 0.5 0 coordination with Loadmaster Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-07 Rig 272L-TSR :Rig 272L-TSR TSR-01563-272L Crown Removal Regular Pay N 1 0 weight estimate discussions with operations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-10 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1.5 0 reviewing camp tpp's Gap Analysis Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Weekly Ops Phone Call TSR status mtgs Weekly TS Meeting (Thursday) Weekly Mgmt. Meeting (Monday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Performance Evaluation with RS PEGNL application; phone conf's; references timesheet; timesheet review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-10 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 Chevron Tender Support (technical) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-10 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-11 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 reviewing camp tpp's Gap Analysis Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Weekly Ops Phone Call TSR status mtgs Weekly TS Meeting (Thursday) Weekly Mgmt. Meeting (Monday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Performance Evaluation with RS PEGNL application; phone conf's; references timesheet; timesheet review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-11 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2 0 gas dispersion modeling mtg and preparation; completing action items Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Ops Phone Call TSR status mtgs Weekly TS Meeting (Thursday) Weekly Mgmt. Meeting (Monday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Performance Evaluation with RS PEGNL application; phone conf's; references timesheet; timesheet review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 PlusPetrol Support (Peru) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-12 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.75 0 gas dispersion modeling mtg and preparation; completing action items Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-12 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 Chevron Tender Support (technical) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-12 Rig 209L-TSR :Rig 209L-TSR TSR-01510-209L DSM-PB HPU Cantilever Regular Pay N 1 0 drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-12 Rig 209L-TSR :Rig 209L-TSR TSR-01558-209L DSM Hazardous Area Classification Regular Pay N 0.5 0 discussion with Sachin Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-12 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 review of claw modeling and meetings with JR and RC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-12 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1 0 MR/PO review and approval discussion with Operations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.75 0 Weekly Ops Phone Call TSR status mtgs Weekly TS Meeting (Thursday) Weekly Mgmt. Meeting (Monday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Performance Evaluation with RS PEGNL application; phone conf's; references timesheet; timesheet review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 PlusPetrol Support (Peru) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-13 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 Chevron Tender Support (technical) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-13 Rig 209L-TSR :Rig 209L-TSR TSR-01558-209L DSM Hazardous Area Classification Regular Pay N 0.25 0 discussion with Sachin Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-13 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 review of claw modeling and meetings with JR and RC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-13 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1 0 MR/PO review and approval discussion with Operations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-14 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-17 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 reviewing TPP's and GAP analysis discussions with GO Board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 3.5 0 Weekly Operations Phone Call Weekly TS Mgmt. Meeting Parker website meeting TSR board review meetings KAZ joint venture meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 OTC Schedule for Engineering/Design group PTO schedule Canadian Engineering License (references) Meeting with Jacqui regarding forecast Meetings regarding Sawyer issues / 270L Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Prep for Monday conf call 270L Conference Call / operating on rails / workover rig reviewing new TSR's 10" diverter spool drawing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-17 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 FCC Radio License Issues Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-17 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 reviewing drawings and discussing analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-17 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 0.5 0 Meeting with LM BOP lifting with blocks meeting with GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-17 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 0.5 0 Meeting with LM Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-18 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 reviewing TPP's and GAP analysis discussions with GO Board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Weekly Operations Phone Call Weekly TS Mgmt. Meeting Parker website meeting TSR board review meetings KAZ joint venture meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 OTC Schedule for Engineering/Design group PTO schedule Canadian Engineering License (references) Meeting with Jacqui regarding forecast Meetings regarding Sawyer issues / 270L Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Prep for Monday conf call 270L Conference Call / operating on rails / workover rig reviewing new TSR's 10" diverter spool drawing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-18 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 reviewing drawings and discussing analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-18 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 Meeting with LM BOP lifting with blocks meeting with GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-18 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 0.5 0 Meeting with LM Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-18 Rig 270L-TSR :Rig 270L-TSR TSR-01568-270L Rotary Hose Connection Spool Regular Pay N 0.5 0 Discussing spool with Benny and reviewing drawing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Weekly Operations Phone Call Weekly TS Mgmt. Meeting Parker website meeting TSR board review meetings KAZ joint venture meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 OTC Schedule for Engineering/Design group PTO schedule Canadian Engineering License (references) Meeting with Jacqui regarding forecast Meetings regarding Sawyer issues / 270L Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-19 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 Spreadsheet Update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Prep for Monday conf call 270L Conference Call / operating on rails / workover rig reviewing new TSR's 10" diverter spool drawing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-19 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 FCC Radio License Issues Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-19 Rig 209L-TSR :Rig 209L-TSR TSR-01558-209L DSM Hazardous Area Classification Regular Pay N 0.5 0 Drawing review; CO review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-19 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1.5 0 Meeting with LM BOP lifting with blocks meeting with GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 reviewing TPP's and GAP analysis discussions with GO Board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Operations Phone Call Weekly TS Mgmt. Meeting Parker website meeting TSR board review meetings KAZ joint venture meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 OTC Schedule for Engineering/Design group PTO schedule Canadian Engineering License (references) Meeting with Jacqui regarding forecast Meetings regarding Sawyer issues / 270L Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-20 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 Spreadsheet Update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Prep for Monday conf call 270L Conference Call / operating on rails / workover rig reviewing new TSR's 10" diverter spool drawing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-20 Rig 209L-TSR :Rig 209L-TSR TSR-01558-209L DSM Hazardous Area Classification Regular Pay N 1 0 Drawing review; CO review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-20 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.25 0 reviewing drawings and discussing analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-20 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 Meeting with LM BOP lifting with blocks meeting with GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-20 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 0.5 0 Meeting with LM Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-20 Rig 270L-TSR :Rig 270L-TSR TSR-01566-270L Acummulator Modifications Regular Pay N 0.75 0 Reviewing TSR and discussing with Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-20 Rig 270L-TSR :Rig 270L-TSR TSR-01568-270L Rotary Hose Connection Spool Regular Pay N 0.5 0 Discussing spool with Benny and reviewing drawing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-21 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.75 0 reviewing TPP's and GAP analysis discussions with GO Board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Operations Phone Call Weekly TS Mgmt. Meeting Parker website meeting TSR board review meetings KAZ joint venture meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 OTC Schedule for Engineering/Design group PTO schedule Canadian Engineering License (references) Meeting with Jacqui regarding forecast Meetings regarding Sawyer issues / 270L Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Prep for Monday conf call 270L Conference Call / operating on rails / workover rig reviewing new TSR's 10" diverter spool drawing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-21 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 FCC Radio License Issues Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-21 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 reviewing drawings and discussing analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-21 Rig 209L-TSR :Rig 209L-TSR TSR-01567-209L Shaker Trough Regular Pay N 0.75 0 reviewing TSR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-21 Rig 270L-TSR :Rig 270L-TSR TSR-01568-270L Rotary Hose Connection Spool Regular Pay N 0.5 0 Discussing spool with Benny and reviewing drawing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Weekly Operations Conference Call Daily TSR Board Meetings Weekly TS Mgmt Meeting Keppel Amfels arctic jack-up meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 setting up meetings for OTC IHS renewal discussion Sakhalin Staff Engineer Position (HR and Rob Shank) time sheet approvals (reviews) personnel discussions with mgmt. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-24 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 TSR status review / update conf call with Mihovil Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-24 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 FCC Radio License Issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-24 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1 0 Discussions with Lam, JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-24 Rig 270L-TSR :Rig 270L-TSR TSR-01566-270L Acummulator Modifications Regular Pay N 1 0 Discussion with Tyler; reviewing valve placement Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-24 Rig 270L-TSR :Rig 270L-TSR TSR-01568-270L Rotary Hose Connection Spool Regular Pay N 1 0 drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-25 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 Document review; interface with Bomco; update meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Operations Conference Call Daily TSR Board Meetings Weekly TS Mgmt Meeting Keppel Amfels arctic jack-up meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 setting up meetings for OTC IHS renewal discussion Sakhalin Staff Engineer Position (HR and Rob Shank) time sheet approvals (reviews) personnel discussions with mgmt. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 TSR Invoicing Training w/ JS Updating tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 270L Batch Drilling Layout Drawings 209L HPU Cantilever CO review skidding claw meeting with RC and JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-25 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Hazardous Area drawings sent to BP for dispersion modeling Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-25 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 269L tender support; Loadmaster interface; discussions with ME; Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-25 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 FCC Radio License Issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-25 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 drawing review and redline Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-25 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 0.5 0 Discussion with LM and RC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-25 Rig 272L-TSR :Rig 272L-TSR TSR-01563-272L Crown Removal Regular Pay N 0.5 0 TSR review and review of crown layout; discussion with MQ Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Weekly Operations Conference Call Daily TSR Board Meetings Weekly TS Mgmt Meeting Keppel Amfels arctic jack-up meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 setting up meetings for OTC IHS renewal discussion Sakhalin Staff Engineer Position (HR and Rob Shank) time sheet approvals (reviews) personnel discussions with mgmt. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 PlusPetrol Meeting 270L Contract Extension Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 TSR Invoicing Training w/ JS Updating tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-26 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Hazardous Area drawings sent to BP for dispersion modeling Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-26 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 269L tender support; Loadmaster interface; discussions with ME; Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-26 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 FCC Radio License Issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-27 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 Document review; interface with Bomco; update meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Conference Call Daily TSR Board Meetings Weekly TS Mgmt Meeting Keppel Amfels arctic jack-up meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 setting up meetings for OTC IHS renewal discussion Sakhalin Staff Engineer Position (HR and Rob Shank) time sheet approvals (reviews) personnel discussions with mgmt. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 TSR Invoicing Training w/ JS Updating tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 270L Batch Drilling Layout Drawings 209L HPU Cantilever CO review skidding claw meeting with RC and JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-27 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 269L tender support; Loadmaster interface; discussions with ME; Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-27 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 FCC Radio License Issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-27 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 drawing review and redline Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-27 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 0.5 0 Discussions with Lam, JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-27 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 0.5 0 Layouts; discussions with RC and GHW CoG analysis; review of RC analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-27 Rig 270L-TSR :Rig 270L-TSR TSR-01568-270L Rotary Hose Connection Spool Regular Pay N 0.5 0 drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-27 Rig 272L-TSR :Rig 272L-TSR TSR-01563-272L Crown Removal Regular Pay N 0.5 0 TSR review and review of crown layout; discussion with MQ Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-28 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 Document review; interface with Bomco; update meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Operations Conference Call Daily TSR Board Meetings Weekly TS Mgmt Meeting Keppel Amfels arctic jack-up meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 setting up meetings for OTC IHS renewal discussion Sakhalin Staff Engineer Position (HR and Rob Shank) time sheet approvals (reviews) personnel discussions with mgmt. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-28 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 TSR status review / update conf call with Mihovil Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 270L Batch Drilling Layout Drawings 209L HPU Cantilever CO review skidding claw meeting with RC and JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-28 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Hazardous Area drawings sent to BP for dispersion modeling Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-28 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 269L tender support; Loadmaster interface; discussions with ME; Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-28 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 drawing review and redline Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-28 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 Layouts; discussions with RC and GHW CoG analysis; review of RC analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-28 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 0.5 0 Discussion with LM and RC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-04-28 Rig 270L-TSR :Rig 270L-TSR TSR-01566-270L Acummulator Modifications Regular Pay N 0.5 0 Discussion with Tyler; reviewing valve placement Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Monday-weekly operations phone call, conf call with Sarah Osmond, board meeting Meeting with Axxess group based out of the UK Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet and timesheet approval IHS subscription discussion with David Villarreal; sent response to IHS discuss Sakhalin position with Kevin Patterson and Rob Shank Firm PE registration review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-01 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 0.5 0 Meetings with Cahill and Hatch @ OTC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-01 OH-014 :OH-014 Overhead All Activities Regular Pay N 3.5 0 Monday OTC - Kuwait Upstream Challenges: Strategic Directions 2030 Thursday OTC - Texas Board of Professional Engineers: Professional Practice Update/Ethics Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-01 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.25 0 Prep for weekly conf call Conf call with Yulia and Matt Hoffman regarding specifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 270L HP spool support 209L jacking claw support 270L Belly Board Support 270L South Odoptu Layouts Procurement support 209L PB stanchion issue Berkut HP hose research and coordination with supply chain Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-01 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.75 0 Conf call with Mat Ellis Input MR for cable tray skid reinforcement reviewing proposed SOW with JJG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-02 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Tender bulletin review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approval IHS subscription discussion with David Villarreal; sent response to IHS discuss Sakhalin position with Kevin Patterson and Rob Shank Firm PE registration review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 review of pluspetrol specification Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-02 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Prep for weekly conf call Conf call with Yulia and Matt Hoffman regarding specifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 270L HP spool support 209L jacking claw support 270L Belly Board Support 270L South Odoptu Layouts Procurement support 209L PB stanchion issue Berkut HP hose research and coordination with supply chain Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-02 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1.5 0 Conf call with Mat Ellis Input MR for cable tray skid reinforcement reviewing proposed SOW with JJG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-02 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Compliance documentation; radio license issues; COI documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-03 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 Tender bulletin review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Monday-weekly operations phone call, conf call with Sarah Osmond, board meeting Meeting with Axxess group based out of the UK Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approval IHS subscription discussion with David Villarreal; sent response to IHS discuss Sakhalin position with Kevin Patterson and Rob Shank Firm PE registration review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 review of pluspetrol specification Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-03 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 Conf call with Mat Ellis Input MR for cable tray skid reinforcement reviewing proposed SOW with JJG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-03 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Compliance documentation; radio license issues; COI documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-03 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1.5 0 reviewing repair documents reviewing PB and DM analysis fabrication support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-03 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1 0 reviewing 3D model with LTN Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-04 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 Tender bulletin review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approval IHS subscription discussion with David Villarreal; sent response to IHS discuss Sakhalin position with Kevin Patterson and Rob Shank Firm PE registration review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-04 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 1 0 Meetings with Cahill and Hatch @ OTC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-04 OH-014 :OH-014 Overhead All Activities Regular Pay N 3 0 Monday OTC - Kuwait Upstream Challenges: Strategic Directions 2030 Thursday OTC - Texas Board of Professional Engineers: Professional Practice Update/Ethics Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 270L HP spool support 209L jacking claw support 270L Belly Board Support 270L South Odoptu Layouts Procurement support 209L PB stanchion issue Berkut HP hose research and coordination with supply chain Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-04 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Compliance documentation; radio license issues; COI documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-04 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 reviewing repair documents reviewing PB and DM analysis fabrication support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet and timesheet approval IHS subscription discussion with David Villarreal; sent response to IHS discuss Sakhalin position with Kevin Patterson and Rob Shank Firm PE registration review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 270L HP spool support 209L jacking claw support 270L Belly Board Support 270L South Odoptu Layouts Procurement support 209L PB stanchion issue Berkut HP hose research and coordination with supply chain Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-05 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Conf call with Mat Ellis Input MR for cable tray skid reinforcement reviewing proposed SOW with JJG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-05 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Compliance documentation; radio license issues; COI documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-05 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1.5 0 reviewing repair documents reviewing PB and DM analysis fabrication support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-05 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1 0 reviewing 3D model with LTN Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-05 Rig 270L-TSR :Rig 270L-TSR TSR-01535-270L BOP-Diverter Stack-Up Drawings Regular Pay N 1.5 0 CTR and drwaing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 3.25 0 Weekly operations phone call Weekly TS Mgmt. meeting TSR review mtgs. (daily and weekly) 2017 Performance meeting with RS 209L documentation meeting with corp doc control Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 IHS Renewal IHS additional documents research and quote (David Villarreal) Firm Engineering Registration Drawing register issue - conf call with Yulia (SAK) Department scheduling support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Plus Petrol Opportunity Meeting (HH and internal) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Berkut Tech. Spec. for HP drag chain hoses Review well control diagram PB pipe stanchions sheave mounting location (270L) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-08 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1.5 0 Additional skidding claw assembly drawings for quote; revised drawings to include new weld design Conf call with CG (evening) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-08 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 0.5 0 Reviewing alternative designs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-08 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 1 0 review CO and discuss with Sachin Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-09 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Bomco Rig Modifications Personnel discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly operations phone call Weekly TS Mgmt. meeting TSR review mtgs. (daily and weekly) 2017 Performance meeting with RS 209L documentation meeting with corp doc control Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 IHS Renewal IHS additional documents research and quote (David Villarreal) Firm Engineering Registration Drawing register issue - conf call with Yulia (SAK) Department scheduling support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Plus Petrol Opportunity Meeting (HH and internal) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 Berkut Tech. Spec. for HP drag chain hoses Review well control diagram PB pipe stanchions sheave mounting location (270L) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-09 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 Conf call with Jess and Sarah Engineering license admin. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-09 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 Reviewing rig modification drawings (Chevron contract) - 269L Choke manifold review with JJG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-09 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 Additional skidding claw assembly drawings for quote; revised drawings to include new weld design Conf call with CG (evening) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-09 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 secondary retention review CTR revision - review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-10 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 Bomco Rig Modifications Personnel discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Weekly operations phone call Weekly TS Mgmt. meeting TSR review mtgs. (daily and weekly) 2017 Performance meeting with RS 209L documentation meeting with corp doc control Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IHS Renewal IHS additional documents research and quote (David Villarreal) Firm Engineering Registration Drawing register issue - conf call with Yulia (SAK) Department scheduling support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-10 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 0.5 0 reviewing tender documents and meetings to determine path forward 271L pony sub cost estimate Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-10 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Conf call with Jess and Sarah Engineering license admin. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-10 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 Reviewing rig modification drawings (Chevron contract) - 269L Choke manifold review with JJG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-10 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Compliance documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-10 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 0.5 0 Reviewing alternative designs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-10 Rig 209L-TSR :Rig 209L-TSR TSR-01564-209L Diesel Day Tank Shut-Off Valves (Mechanical) Regular Pay N 1 0 closeout review/approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-10 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 0.5 0 PO administration / reviewing LM drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-11 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 Bomco Rig Modifications Personnel discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly operations phone call Weekly TS Mgmt. meeting TSR review mtgs. (daily and weekly) 2017 Performance meeting with RS 209L documentation meeting with corp doc control Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IHS Renewal IHS additional documents research and quote (David Villarreal) Firm Engineering Registration Drawing register issue - conf call with Yulia (SAK) Department scheduling support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-11 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 2 0 reviewing tender documents and meetings to determine path forward 271L pony sub cost estimate Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-11 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Updating spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Berkut Tech. Spec. for HP drag chain hoses Review well control diagram PB pipe stanchions sheave mounting location (270L) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-11 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 Conf call with Jess and Sarah Engineering license admin. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-11 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 Reviewing rig modification drawings (Chevron contract) - 269L Choke manifold review with JJG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-11 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.25 0 Compliance documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-11 Rig 270L-TSR :Rig 270L-TSR TSR-01568-270L Rotary Hose Connection Spool Regular Pay N 0.5 0 drawing review fabrication updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Weekly operations phone call Weekly TS Mgmt. meeting TSR review mtgs. (daily and weekly) 2017 Performance meeting with RS 209L documentation meeting with corp doc control Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IHS Renewal IHS additional documents research and quote (David Villarreal) Firm Engineering Registration Drawing register issue - conf call with Yulia (SAK) Department scheduling support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-12 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 0.5 0 reviewing tender documents and meetings to determine path forward 271L pony sub cost estimate Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.25 0 Berkut Tech. Spec. for HP drag chain hoses Review well control diagram PB pipe stanchions sheave mounting location (270L) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-12 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 Conf call with Jess and Sarah Engineering license admin. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-12 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1.5 0 Reviewing rig modification drawings (Chevron contract) - 269L Choke manifold review with JJG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-12 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.25 0 Additional skidding claw assembly drawings for quote; revised drawings to include new weld design Conf call with CG (evening) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-12 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 0.25 0 Reviewing alternative designs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-12 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 0.5 0 PO administration / reviewing LM drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-12 Rig 270L-TSR :Rig 270L-TSR TSR-01568-270L Rotary Hose Connection Spool Regular Pay N 0.5 0 drawing review fabrication updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Weekly Operations Conference Call Weekly TS Mgmt Meeting TSR Board Review Meetings TSR/TS Weekly Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Completed Texas Engineering Firm Registration iHS Documents (David Villarreal) timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Plus Petrol Meetings, Attachment B, HH drawings, weight document Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-15 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 0.5 0 Shell Bolivia Tender (drawings, general support) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-15 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting prep; discussions with Operations and HR regarding open position Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-15 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 209L MDR Issues; spooler mast platform - review new design 270L support; meetings with field personnel; clarifications regarding spreader beam; materials support for Jeff A. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-15 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 GoM Compliance Documentation (crew boats) Updated compliance spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Operations Conference Call Weekly TS Mgmt Meeting TSR Board Review Meetings TSR/TS Weekly Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Completed Texas Engineering Firm Registration iHS Documents (David Villarreal) timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Plus Petrol Meetings, Attachment B, HH drawings, weight document Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 209L MDR Issues; spooler mast platform - review new design 270L support; meetings with field personnel; clarifications regarding spreader beam; materials support for Jeff A. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-16 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 fabrication support; spare claw fabrications quote support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-16 Rig 209L-TSR :Rig 209L-TSR TSR-01573-209L Wellhead Spreader Beam Regular Pay N 0.5 0 reviewing TSR and initial calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-17 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Histogram Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Completed Texas Engineering Firm Registration iHS Documents (David Villarreal) timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Plus Petrol Meetings, Attachment B, HH drawings, weight document Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-17 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting prep; discussions with Operations and HR regarding open position Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 209L MDR Issues; spooler mast platform - review new design 270L support; meetings with field personnel; clarifications regarding spreader beam; materials support for Jeff A. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-17 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 GoM Compliance Documentation (crew boats) Updated compliance spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-17 Rig 209L-TSR :Rig 209L-TSR TSR-01573-209L Wellhead Spreader Beam Regular Pay N 1 0 reviewing TSR and initial calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-17 Rig 270L-TSR :Rig 270L-TSR TSR-01568-270L Rotary Hose Connection Spool Regular Pay N 1 0 closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Completed Texas Engineering Firm Registration iHS Documents (David Villarreal) timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Plus Petrol Meetings, Attachment B, HH drawings, weight document Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-18 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 1 0 Shell Bolivia Tender (drawings, general support) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-18 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Weekly meeting prep; discussions with Operations and HR regarding open position Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 209L MDR Issues; spooler mast platform - review new design 270L support; meetings with field personnel; clarifications regarding spreader beam; materials support for Jeff A. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-18 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 fabrication support; spare claw fabrications quote support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-18 Rig 209L-TSR :Rig 209L-TSR TSR-01573-209L Wellhead Spreader Beam Regular Pay N 1 0 reviewing TSR and initial calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-18 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 0.5 0 Loadmaster update; review status with RC and ME Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-18 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 0.5 0 Loadmaster update; review status with RC and ME Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Completed Texas Engineering Firm Registration iHS Documents (David Villarreal) timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3.5 0 Plus Petrol Meetings, Attachment B, HH drawings, weight document Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 209L MDR Issues; spooler mast platform - review new design 270L support; meetings with field personnel; clarifications regarding spreader beam; materials support for Jeff A. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-19 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 fabrication support; spare claw fabrications quote support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Weekly Ops Conf Call, Weekly TS Mgmt Meeting, TSR Board review, TS Team Meeting Document Control Meeting with Steve C. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Ralph Christman assignment letter and discussions; preparation for Canada trip Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Plus Petrol - schedule update, weight update, Attachment update. meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-22 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Sakhalin TSR review with team prior to mtg Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 270L walking with 1/2 setback (conf call) Conference call with Yulia to discuss 209L documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Ops Conf Call, Weekly TS Mgmt Meeting, TSR Board review, TS Team Meeting Document Control Meeting with Steve C. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Ralph Christman assignment letter and discussions; preparation for Canada trip Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2.5 0 Plus Petrol - schedule update, weight update, Attachment update. meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-23 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 Engineering exam review; completed practice exam(s) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-23 Rig 209L-TSR :Rig 209L-TSR TSR-01570-209L Diverter Spool Inspection Regular Pay N 0.5 0 closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-23 Rig 209L-TSR :Rig 209L-TSR TSR-01573-209L Wellhead Spreader Beam Regular Pay N 2.5 0 revised drawing for spreader beam Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-23 Rig 209L-TSR :Rig 209L-TSR TSR-01574-209L Casing Push Tool Regular Pay N 1 0 review model Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-24 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 meeting with GO Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Weekly Ops Conf Call, Weekly TS Mgmt Meeting, TSR Board review, TS Team Meeting Document Control Meeting with Steve C. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Ralph Christman assignment letter and discussions; preparation for Canada trip Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.75 0 Plus Petrol - schedule update, weight update, Attachment update. meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-24 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 Engineering exam review; completed practice exam(s) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-24 Rig 209L-TSR :Rig 209L-TSR TSR-01573-209L Wellhead Spreader Beam Regular Pay N 1.25 0 revised drawing for spreader beam Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-24 Rig 209L-TSR :Rig 209L-TSR TSR-01574-209L Casing Push Tool Regular Pay N 1.5 0 review model Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-25 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 meeting with GO Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Ops Conf Call, Weekly TS Mgmt Meeting, TSR Board review, TS Team Meeting Document Control Meeting with Steve C. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Ralph Christman assignment letter and discussions; preparation for Canada trip Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Plus Petrol - schedule update, weight update, Attachment update. meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-25 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1.5 0 Engineering exam review; completed practice exam(s) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-29 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-30 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1.25 0 technical clarification document review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 weekly ts mgmt meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 timesheet and timesheet review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-30 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 3 0 Nitrogen Vent Line Drawing Review, Meeting with bp Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-30 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 Exam Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-05-31 OH-010 :OH-010 Overhead All Activities Regular Pay N 10 0 Houston to St. John's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-01 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 Professional Engineers of Newfoundland / Labrador Seminal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-02 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 Professional Engineers of Newfoundland / Labrador Seminal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-03 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 4 0 Exam Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-04 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 4 0 Canadian Exam Review Exam Meeting with Exxon reviewing TSR SOW's; approving CTR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-05 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 9 0 Canadian Exam Review Exam Meeting with Exxon reviewing TSR SOW's; approving CTR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-06 OH-010 :OH-010 Overhead All Activities Regular Pay N 9 0 Travel from St. John's to Houston Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-07 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1.5 0 document control meeting planning trip to china misc. reviews Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 timesheet and timesheet approvals meeting to discuss all outstanding tsr-s before going on PTO discussed NDT specification with Matt Hoffman Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-07 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Canadian Exam Review Exam Meeting with Exxon reviewing TSR SOW's; approving CTR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-07 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2.5 0 269L start-up support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-07 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 Shalapa 206 well structure - review with operations and Bryan Little Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-08 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 document control meeting planning trip to china misc. reviews Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals meeting to discuss all outstanding tsr-s before going on PTO discussed NDT specification with Matt Hoffman Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-08 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Canadian Exam Review Exam Meeting with Exxon reviewing TSR SOW's; approving CTR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-08 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 269L start-up support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-08 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 2 0 Shalapa 206 well structure - review with operations and Bryan Little Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-09 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-12 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-13 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-14 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 China Trip planning returned to Houston office passport Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-14 OH-011 :OH-011 Overhead All Activities Regular Pay N 4 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly ops phone call DrillMec Striker Presentation TSR Update Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 timesheet and timesheet approvals China Trip preparation; visa, LOI, agendas, etc... SAFI invoicing issues Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-19 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 custom substructure design / meetings and discussions with Engineers Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-19 OH-019 :OH-019 Overhead All Activities Regular Pay N 1.25 0 meeting preparation and document control issues Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-19 Rig 209L-TSR :Rig 209L-TSR TSR-01573-209L Wellhead Spreader Beam Regular Pay N 1.25 0 closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-19 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 1 0 closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-19 Rig 272L-TSR :Rig 272L-TSR TSR-01563-272L Crown Removal Regular Pay N 0.5 0 discussion with operations and research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 weekly ops phone call DrillMec Striker Presentation TSR Update Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet and timesheet approvals China Trip preparation; visa, LOI, agendas, etc... SAFI invoicing issues Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-20 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 custom substructure design / meetings and discussions with Engineers Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 MDR review Pipe Barn Stanchion meeting with Ralph CTR revisions and approvals TSR status review meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-20 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 compliance documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-20 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 reviewed BOP secondary retention drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-20 Rig 272L-TSR :Rig 272L-TSR TSR-01563-272L Crown Removal Regular Pay N 1.5 0 discussion with operations and research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly ops phone call DrillMec Striker Presentation TSR Update Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 timesheet and timesheet approvals China Trip preparation; visa, LOI, agendas, etc... SAFI invoicing issues Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.25 0 Total Uganda Tender Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 MDR review Pipe Barn Stanchion meeting with Ralph CTR revisions and approvals TSR status review meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-21 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.75 0 compliance documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-21 Rig 209L-TSR :Rig 209L-TSR TSR-01579-209L Wireline Deflector Sheave Installation Regular Pay N 1.5 0 discussion and closeout review/approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-21 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 0.5 0 reviewed BOP secondary retention drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly ops phone call DrillMec Striker Presentation TSR Update Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 timesheet and timesheet approvals China Trip preparation; visa, LOI, agendas, etc... SAFI invoicing issues Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Total Uganda Tender Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-22 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 custom substructure design / meetings and discussions with Engineers Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 MDR review Pipe Barn Stanchion meeting with Ralph CTR revisions and approvals TSR status review meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-22 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 internal discussion regarding billing and scopes of work for Hibernia. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly ops phone call DrillMec Striker Presentation TSR Update Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 timesheet and timesheet approvals China Trip preparation; visa, LOI, agendas, etc... SAFI invoicing issues Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Total Uganda Tender Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-23 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 internal discussion regarding billing and scopes of work for Hibernia. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-25 OH-010 :OH-010 Overhead All Activities Regular Pay N 16 0 Travel from IAH to Tokyo to Chengdu, China Chengdu, China to Dogying, China Dongying to Shanghai Shanghai to Chicago to Houston (IAH) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-26 OH-010 :OH-010 Overhead All Activities Regular Pay N 8 0 Travel from IAH to Tokyo to Chengdu, China Chengdu, China to Dogying, China Dongying to Shanghai Shanghai to Chicago to Houston (IAH) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-27 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 Hunghua Site Visit Kerui Site Visit Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-28 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 Hunghua Site Visit Kerui Site Visit Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-29 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 9 0 Hunghua Site Visit Kerui Site Visit Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-29 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 Travel from IAH to Tokyo to Chengdu, China Chengdu, China to Dogying, China Dongying to Shanghai Shanghai to Chicago to Houston (IAH) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-30 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 Hunghua Site Visit Kerui Site Visit Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-06-30 OH-010 :OH-010 Overhead All Activities Regular Pay N 8 0 Travel from IAH to Tokyo to Chengdu, China Chengdu, China to Dogying, China Dongying to Shanghai Shanghai to Chicago to Houston (IAH) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-01 OH-010 :OH-010 Overhead All Activities Regular Pay N 18 0 Travel from IAH to Tokyo to Chengdu, China Chengdu, China to Dogying, China Dongying to Shanghai Shanghai to Chicago to Houston (IAH) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-05 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 China trip download and mtg. minutes Bid evaluation meeting Summary meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily TSR board meeting weekly TS meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Expense report Email responses Status updates due to my absence Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3.5 0 MDR review and revision Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-05 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 EAMR review and discussion Top Drive and Control System - review of EAMR, meeting with Tom Yost, discussed with GO Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-05 ORLAN-TSR :ORLAN-TSR TSR-01565-ORLP Baker-Valves Regular Pay N 1 0 closeout revision 2 review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-06 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2.25 0 China trip download and mtg. minutes Bid evaluation meeting Summary meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 daily TSR board meeting weekly TS meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Expense report Email responses Status updates due to my absence Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 MDR review and revision Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-06 ORLAN-TSR :ORLAN-TSR TSR-01578-ORLP BP Pump Indicator Light Regular Pay N 0.5 0 CTR review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-06 Rig 209L-TSR :Rig 209L-TSR TSR-01581-209L Diesel Transfer Pump Breaker Upgrade Regular Pay N 0.5 0 CTR review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Expense report Email responses Status updates due to my absence Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 MDR review and revision Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-07 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 3 0 EAMR review and discussion Top Drive and Control System - review of EAMR, meeting with Tom Yost, discussed with GO Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Weekly operations phone call Weekly TS Mgmt. Meeting TSR Board Meeting(s) Weekly TS Group Meeting Lee. C. Moore Presentation (meeting) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Engineering Advisory Time sheet and timesheet approval Ralph Christman ESC Setting up industry safe website Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 MDR revisions and interface with Yulia TSR updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-10 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 CTR's development and transmittal Meeting with Exxon regarding top drive replacement Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-10 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 0.5 0 closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-10 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1 0 closeout development, review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-11 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 drawing redline conf call with HH Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly operations phone call Weekly TS Mgmt. Meeting TSR Board Meeting(s) Weekly TS Group Meeting Lee. C. Moore Presentation (meeting) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Engineering Advisory Time sheet and timesheet approval Ralph Christman ESC Setting up industry safe website Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 MDR revisions and interface with Yulia TSR updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-11 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 CTR's development and transmittal Meeting with Exxon regarding top drive replacement Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-11 Rig 209L-TSR :Rig 209L-TSR TSR-01574-209L Casing Push Tool Regular Pay N 1 0 closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-11 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-11 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 0.5 0 closeout development, review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-12 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.75 0 drawing redline conf call with HH Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly operations phone call Weekly TS Mgmt. Meeting TSR Board Meeting(s) Weekly TS Group Meeting Lee. C. Moore Presentation (meeting) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Engineering Advisory Time sheet and timesheet approval Ralph Christman ESC Setting up industry safe website Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-12 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 SAFI training Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 MDR revisions and interface with Yulia TSR updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-12 Rig 269L-TSR :Rig 269L-TSR TSR-01553-269L Belly Board Upgrade Regular Pay N 1 0 closeout development, review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-13 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 drawing redline conf call with HH Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 Weekly operations phone call Weekly TS Mgmt. Meeting TSR Board Meeting(s) Weekly TS Group Meeting Lee. C. Moore Presentation (meeting) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Engineering Advisory Time sheet and timesheet approval Ralph Christman ESC Setting up industry safe website Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-13 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 SAFI training Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 MDR revisions and interface with Yulia TSR updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-13 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 CTR's development and transmittal Meeting with Exxon regarding top drive replacement Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-13 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 COI for crew boats Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-13 Rig 209L-TSR :Rig 209L-TSR TSR-01571-209L BOP Mechanical Seal Platform Regular Pay N 0.5 0 drawing and analysis review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-14 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 drawing redline conf call with HH Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Weekly operations phone call Weekly TS Mgmt. Meeting TSR Board Meeting(s) Weekly TS Group Meeting Lee. C. Moore Presentation (meeting) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Engineering Advisory Time sheet and timesheet approval Ralph Christman ESC Setting up industry safe website Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-14 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 CTR's development and transmittal Meeting with Exxon regarding top drive replacement Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-14 Rig 209L-TSR :Rig 209L-TSR TSR-01571-209L BOP Mechanical Seal Platform Regular Pay N 1 0 drawing and analysis review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-17 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 tech spec review meetings cost estimate drawing revisions environmental mitigation letter Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 TS weekly mgmt. meeting TSR board mtgs Weekly TS meeting (all) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IHS custom collection (Villarreal) timesheet and approvals engineering advisory mtg with RS regarding goals and objectives Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 PlusPetrol - meetings, revising proposals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-17 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 MDR update pulling all drawings for bulk transmittal block cradle on 262L Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-17 ORLAN-TSR :ORLAN-TSR TSR-01582-ORLP Poorboy Degasser (electrical) Regular Pay N 0.75 0 CTR review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-18 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 tech spec review meetings cost estimate drawing revisions environmental mitigation letter Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS weekly mgmt. meeting TSR board mtgs Weekly TS meeting (all) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IHS custom collection (Villarreal) timesheet and approvals engineering advisory mtg with RS regarding goals and objectives Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 MDR update pulling all drawings for bulk transmittal block cradle on 262L Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-18 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1 0 drawing and model review stamped drawing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-19 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 tech spec review meetings cost estimate drawing revisions environmental mitigation letter Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 well control spec / proposal review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS weekly mgmt. meeting TSR board mtgs Weekly TS meeting (all) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 IHS custom collection (Villarreal) timesheet and approvals engineering advisory mtg with RS regarding goals and objectives Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 PlusPetrol - meetings, revising proposals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 MDR update pulling all drawings for bulk transmittal block cradle on 262L Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-19 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1 0 drawing and model review stamped drawing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-19 Rig 209L-TSR :Rig 209L-TSR TSR-01571-209L BOP Mechanical Seal Platform Regular Pay N 0.5 0 drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-20 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 tech spec review meetings cost estimate drawing revisions environmental mitigation letter Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 well control spec / proposal review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS weekly mgmt. meeting TSR board mtgs Weekly TS meeting (all) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IHS custom collection (Villarreal) timesheet and approvals engineering advisory mtg with RS regarding goals and objectives Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-20 ORLAN-TSR :ORLAN-TSR TSR-01578-ORLP BP Pump Indicator Light Regular Pay N 1 0 closeout approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-21 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 tech spec review meetings cost estimate drawing revisions environmental mitigation letter Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS weekly mgmt. meeting TSR board mtgs Weekly TS meeting (all) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 IHS custom collection (Villarreal) timesheet and approvals engineering advisory mtg with RS regarding goals and objectives Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 MDR update pulling all drawings for bulk transmittal block cradle on 262L Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-21 Rig 209L-TSR :Rig 209L-TSR TSR-01571-209L BOP Mechanical Seal Platform Regular Pay N 1 0 drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-24 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 reviewing received quotes / comparing to requirements of other tenders Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 weekly ops phone conf daily TSR board review Weekly TS Mgmt meeting Weekly TS Group Mtg meeting with Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Safety moment for the weekly ops phone conf IADC conference Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Total Uganda support and meetings PlusPetrol support (cost estimate) and meetings Talos Opportunity meeting with Matt K. to discuss BD slides Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-24 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 control line spreader beam meetings; reviewing RC documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-24 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Top Drive Upgrade Mtgs Knuckle boom crane Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-24 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 269L air drilling manifold hang-off padeye Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly ops phone conf daily TSR board review Weekly TS Mgmt meeting Weekly TS Group Mtg meeting with Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Safety moment for the weekly ops phone conf IADC conference Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 Total Uganda support and meetings PlusPetrol support (cost estimate) and meetings Talos Opportunity meeting with Matt K. to discuss BD slides Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 control line spreader beam meetings; reviewing RC documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-25 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 Top Drive Upgrade Mtgs Knuckle boom crane Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-25 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1 0 meetings with RC; reviewing model and support documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-25 Rig 272L-TSR :Rig 272L-TSR TSR-01586-272L Update Choke/Flow Line Drawings Regular Pay N 1 0 review and approve closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly ops phone conf daily TSR board review Weekly TS Mgmt meeting Weekly TS Group Mtg meeting with Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Total Uganda support and meetings PlusPetrol support (cost estimate) and meetings Talos Opportunity meeting with Matt K. to discuss BD slides Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 control line spreader beam meetings; reviewing RC documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-26 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 Top Drive Upgrade Mtgs Knuckle boom crane Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-26 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 Suction dampener hose issue Suction valve issue (dan Colby) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-26 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1.5 0 269L air drilling manifold hang-off padeye Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-26 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1.5 0 meetings with RC; reviewing model and support documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-27 Hibernia Platform :Hibernia Platform TSR-01576-HIBP Top Drive Maintenance Platform Regular Pay N 1 0 drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.75 0 weekly ops phone conf daily TSR board review Weekly TS Mgmt meeting Weekly TS Group Mtg meeting with Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Safety moment for the weekly ops phone conf IADC conference Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2.25 0 Total Uganda support and meetings PlusPetrol support (cost estimate) and meetings Talos Opportunity meeting with Matt K. to discuss BD slides Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 control line spreader beam meetings; reviewing RC documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-27 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Discussing various scopes of work related to summer maintenance Looking at flow line proposed mods Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-27 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 Top Drive Upgrade Mtgs Knuckle boom crane Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-27 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 Suction dampener hose issue Suction valve issue (dan Colby) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly ops phone conf daily TSR board review Weekly TS Mgmt meeting Weekly TS Group Mtg meeting with Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Safety moment for the weekly ops phone conf IADC conference Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Total Uganda support and meetings PlusPetrol support (cost estimate) and meetings Talos Opportunity meeting with Matt K. to discuss BD slides Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 control line spreader beam meetings; reviewing RC documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-28 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Discussing various scopes of work related to summer maintenance Looking at flow line proposed mods Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-28 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 Suction dampener hose issue Suction valve issue (dan Colby) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-31 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 KOC Tender Document Control Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 KOC Document Management (turnover) Plan Weekly Ops Phone Conf Weekly TS Mgmt meeting Weekly TS Group mtg TSR board review Mtg with Derrick Equipment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Time sheets and timesheet approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 PlusPetrol cost estimate, meetings and schedule Talos Proposal / Presentation / meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-31 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Meeting with Ralph Christman related to open TSR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-31 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 knuckle boom crane meeting (internal) knuckle boom crane meeting (Genesis) Internal meeting regarding top drive called PEGNL to determine status of application Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-07-31 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 249/258 Valve Issues 216L HP piping support / George W. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 KOC Document Management (turnover) Plan Weekly Ops Phone Conf Weekly TS Mgmt meeting Weekly TS Group mtg TSR board review Mtg with Derrick Equipment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Time sheets and timesheet approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 PlusPetrol cost estimate, meetings and schedule Talos Proposal / Presentation / meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-01 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2.5 0 knuckle boom crane meeting (internal) knuckle boom crane meeting (Genesis) Internal meeting regarding top drive called PEGNL to determine status of application Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-01 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 249/258 Valve Issues 216L HP piping support / George W. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-02 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1.5 0 NOV Meeting reviewing NOV SOW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 KOC Document Management (turnover) Plan Weekly Ops Phone Conf Weekly TS Mgmt meeting Weekly TS Group mtg TSR board review Mtg with Derrick Equipment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Time sheets and timesheet approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2.5 0 PlusPetrol cost estimate, meetings and schedule Talos Proposal / Presentation / meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 review tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-02 Rig 209L-TSR :Rig 209L-TSR TSR-01571-209L BOP Mechanical Seal Platform Regular Pay N 0.5 0 drawing review analysis supplement review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-02 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 1 0 design review / proposal of alternatives Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-03 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.75 0 NOV Meeting reviewing NOV SOW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 KOC Document Management (turnover) Plan Weekly Ops Phone Conf Weekly TS Mgmt meeting Weekly TS Group mtg TSR board review Mtg with Derrick Equipment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Time sheets and timesheet approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 PlusPetrol cost estimate, meetings and schedule Talos Proposal / Presentation / meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-03 Rig 209L-TSR :Rig 209L-TSR TSR-01580-209L Heat Trace Distribution Panel Regular Pay N 1 0 closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-04 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 KOC Tender Document Control Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 KOC Document Management (turnover) Plan Weekly Ops Phone Conf Weekly TS Mgmt meeting Weekly TS Group mtg TSR board review Mtg with Derrick Equipment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Time sheets and timesheet approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-04 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 knuckle boom crane meeting (internal) knuckle boom crane meeting (Genesis) Internal meeting regarding top drive called PEGNL to determine status of application Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-04 Rig 209L-TSR :Rig 209L-TSR TSR-01571-209L BOP Mechanical Seal Platform Regular Pay N 1 0 drawing review analysis supplement review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-04 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 1 0 design review / proposal of alternatives Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 weekly ops phone conf weekly TS mgmt meeting TSR board mtgs IMS Document mtg weekly TS meeting (group) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Interviews for project engineer x 3 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Pluspetrol Meetings, Cost Estimate, Tender Documentation, peer review Conf call with Julio regarding geothermal work (Bolivia) Ford Steel Site Visit Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-07 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Sakhalin document control issues Sakhalin TSR update email to Chelsi regarding advisory Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-07 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 knuckle boom crane internal discussion and meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-07 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 1 0 review and approve closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-08 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1.5 0 KOC tender document review and meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly ops phone conf weekly TS mgmt meeting TSR board mtgs IMS Document mtg weekly TS meeting (group) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Interviews for project engineer x 3 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Pluspetrol Meetings, Cost Estimate, Tender Documentation, peer review Conf call with Julio regarding geothermal work (Bolivia) Ford Steel Site Visit Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-08 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 2 0 drawing for completion spooler spreader beam padeye; review of analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-08 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 discussing design change with Benny Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-08 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 0.5 0 discussing design with James and John Reck Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly ops phone conf weekly TS mgmt meeting TSR board mtgs IMS Document mtg weekly TS meeting (group) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Interviews for project engineer x 3 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Pluspetrol Meetings, Cost Estimate, Tender Documentation, peer review Conf call with Julio regarding geothermal work (Bolivia) Ford Steel Site Visit Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-09 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1.5 0 knuckle boom crane internal discussion and meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 weekly ops phone conf weekly TS mgmt meeting TSR board mtgs IMS Document mtg weekly TS meeting (group) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Interviews for project engineer x 3 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Pluspetrol Meetings, Cost Estimate, Tender Documentation, peer review Conf call with Julio regarding geothermal work (Bolivia) Ford Steel Site Visit Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Sakhalin document control issues Sakhalin TSR update email to Chelsi regarding advisory Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-10 Rig 209L-TSR :Rig 209L-TSR TSR-01497-209L Increase-PB-Tubular-Storage Regular Pay N 1 0 Closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-10 Rig 209L-TSR :Rig 209L-TSR TSR-01571-209L BOP Mechanical Seal Platform Regular Pay N 1 0 Closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-10 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 0.5 0 discussing design with James and John Reck Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-11 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-15 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1.5 0 KOC tender kick-off meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board meetings TSR weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approval interviews interview debrief Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Woodgroup Client Engagement Meeting Pluspetrol Path Forward Meeting Finalizing Pluspetrol documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-15 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Knuckle Boom Crane TSR Knuckle Boom Crane Meeting with JS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-15 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 working on new BOP stop locations HKN Tender Tech Specifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-15 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Looking into SEM's package for 77B 77B choke line information Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-15 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1 0 PO issuance to Loadmaster Reviewing RC analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-15 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 0.5 0 Reviewing preliminary drawings and analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-16 Hibernia Platform :Hibernia Platform TSR-01594-HIBP Knuckle Boom Crane Regular Pay N 0.5 0 writing knuckle boom crane TSR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approval interviews interview debrief Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 updating TSR tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Meeting with Jeff A. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-16 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Knuckle Boom Crane TSR Knuckle Boom Crane Meeting with JS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-16 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 3.5 0 working on new BOP stop locations HKN Tender Tech Specifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-16 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 0.5 0 Reviewing preliminary drawings and analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-17 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 clarifications meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-17 Hibernia Platform :Hibernia Platform TSR-01594-HIBP Knuckle Boom Crane Regular Pay N 1 0 writing knuckle boom crane TSR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR board meetings TSR weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approval interviews interview debrief Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-17 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 working on new BOP stop locations HKN Tender Tech Specifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-17 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1.5 0 Looking into SEM's package for 77B 77B choke line information Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-17 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 0.5 0 PO issuance to Loadmaster Reviewing RC analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-17 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 1 0 Reviewing preliminary drawings and analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-18 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 clarifications meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board meetings TSR weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 timesheet and timesheet approval interviews interview debrief Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Woodgroup Client Engagement Meeting Pluspetrol Path Forward Meeting Finalizing Pluspetrol documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-18 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 0.5 0 Review TSR SOW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-18 Rig 249L-TSR :Rig 249L-TSR TSR-01590-249L Air Hoist Installation Regular Pay N 1 0 closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-18 Rig 270L-TSR :Rig 270L-TSR TSR-01575-270L Circulation Spool Drawings Regular Pay N 0.5 0 review drawing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-21 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.25 0 Clarifications (1 & 2), noise abatement summary, Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS Mgmt. Meeting Weekly TS Meeting (Thursday) TSR Board Meeting(s) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-21 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8 0 Shell/Oilserv Tender Documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-21 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 Meeting and preparation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-21 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 77B Choke Line Documents 77B Barge Tank Layout sent to Leroy Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-21 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 1 0 Discussion with Mark Q., layout discussion with LTN and JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-22 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 Clarifications (1 & 2), noise abatement summary, Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-22 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 1 0 Email and discussion with Sarah Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS Mgmt. Meeting Weekly TS Meeting (Thursday) TSR Board Meeting(s) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Loadmaster Invoices TSR status; board updates, timesheets Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-22 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5 0 Shell/Oilserv Tender Documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 270L Operations on Skid Rails (create TSR and discuss with LM) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-23 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7 0 Clarifications (1 & 2), noise abatement summary, Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-23 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 SOW document review and formatting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS Mgmt. Meeting Weekly TS Meeting (Thursday) TSR Board Meeting(s) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-23 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Top Drive Upgrade (non-billable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-24 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 Clarifications (1 & 2), noise abatement summary, Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS Mgmt. Meeting Weekly TS Meeting (Thursday) TSR Board Meeting(s) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Loadmaster Invoices TSR status; board updates, timesheets Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-24 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 Update Spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-24 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 77B Choke Line Documents 77B Barge Tank Layout sent to Leroy Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-24 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 1 0 Discussion with Mark Q., layout discussion with LTN and JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-25 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 Clarifications (1 & 2), noise abatement summary, Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-25 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 0.5 0 Email and discussion with Sarah Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS Mgmt. Meeting Weekly TS Meeting (Thursday) TSR Board Meeting(s) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Loadmaster Invoices TSR status; board updates, timesheets Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-25 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 0.5 0 Discussion with Mark Q., layout discussion with LTN and JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 Clarifications (1 & 2), noise abatement summary, Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-28 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Flood Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-29 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Flood Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-30 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Flood Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-08-31 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Flood Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-01 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 Clarifications; meeting with Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Status of personnel; TSR review (incoming) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-01 OH-011 :OH-011 Overhead All Activities Regular Pay N 3 0 Flood Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-05 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 Clarifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-05 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 1 0 calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet, timesheet review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-05 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 updating spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-05 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 1 0 discussions with mark and john; Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-06 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 1 0 review TSR and discuss with Lam and Dan Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR Board review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 updating spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-06 OH-014 :OH-014 Overhead All Activities Regular Pay N 3 0 Employment Law 101 - Day 1 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-06 ORLAN-TSR :ORLAN-TSR TSR-01601-ORLP Nitrogen Pre-Charge Valve Wrench Regular Pay N 1 0 Discussed TSR with John Reck and reviewed drawing and TSR scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-06 Rig 209L-TSR :Rig 209L-TSR TSR-01588-209L Steam Line Heat Trace Regular Pay N 1.5 0 closeout comments, review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-06 Rig 270L-TSR :Rig 270L-TSR TSR-01575-270L Circulation Spool Drawings Regular Pay N 1 0 closeout review/approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-06 Rig 270L-TSR :Rig 270L-TSR TSR-01595-270L Skidding Pony Sub Regular Pay N 0.75 0 conference call with Loadmaster Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-07 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Helping Bruce Korver after floods Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-08 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Insurance Adjuster (Harvey) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-11 Berkut-TSR :Berkut-TSR TSR-01598-BERP Catwalk Skate Adaptor Tool Regular Pay N 2 0 Analysis and closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-11 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 0.5 0 drawing review analysis report revision Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Weekly OPS conference call Weekly TS Mgmt Meeting Daily TSR board review 2017 goals mtg with RS Weekly TS Meeting (Thurs) Financial document review meeting OFI Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Time sheets and PTO Administration Financial document review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-11 OH-019 :OH-019 Overhead All Activities Regular Pay N 2 0 Conference call with Mihovil Weekly Conference Call with Operations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 General review and status update for all open TSR's / inquiries Review DSM spooler platform drawing red lines Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-11 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Flowmeter install preliminary work (pre-TSR) AADU bearing pressure research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-11 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1 0 Obtaining Loadmaster approval letter detailed email to Loadmaster related to otheir review report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-11 Rig 209L-TSR :Rig 209L-TSR TSR-01599-209L Cameron X-mas Tree Stump Modification Regular Pay N 1 0 Review TSR and discuss with TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-11 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 1 0 Closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-12 Berkut-TSR :Berkut-TSR TSR-01598-BERP Catwalk Skate Adaptor Tool Regular Pay N 2 0 Analysis and closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-12 EHBU-TSRs :EHBU-TSRs TSR-01418-EHBU Total Rig Proposal - Uganda Regular Pay N 1 0 Clarifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 Weekly OPS conference call Weekly TS Mgmt Meeting Daily TSR board review 2017 goals mtg with RS Weekly TS Meeting (Thurs) Financial document review meeting OFI Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-12 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.75 0 Flowmeter install preliminary work (pre-TSR) AADU bearing pressure research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-12 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 3 0 Tesco interface Phone meetings with Joseph Wink Analysis of new top drive install Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-12 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1.5 0 Obtaining Loadmaster approval letter detailed email to Loadmaster related to otheir review report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-13 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 0.5 0 Discussion with Sakhalin and John Reck Reviewing TSR SOW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-13 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 Histogram review / meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly OPS conference call Weekly TS Mgmt Meeting Daily TSR board review 2017 goals mtg with RS Weekly TS Meeting (Thurs) Financial document review meeting OFI Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Time sheets and PTO Administration Financial document review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-13 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1 0 Halliburton and HKN Tender Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.75 0 General review and status update for all open TSR's / inquiries Review DSM spooler platform drawing red lines Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-13 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Flowmeter install preliminary work (pre-TSR) AADU bearing pressure research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-13 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 VFD House placement meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-13 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 0.75 0 Tesco interface Phone meetings with Joseph Wink Analysis of new top drive install Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-13 ORLAN-TSR :ORLAN-TSR TSR-01601-ORLP Nitrogen Pre-Charge Valve Wrench Regular Pay N 0.5 0 CTR and quote review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-13 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1 0 Obtaining Loadmaster approval letter detailed email to Loadmaster related to otheir review report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-13 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 0.5 0 review TSR and preliminary design Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-13 Rig 209L-TSR :Rig 209L-TSR TSR-01599-209L Cameron X-mas Tree Stump Modification Regular Pay N 0.5 0 Review TSR and discuss with TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-14 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 0.5 0 Discussion with Sakhalin and John Reck Reviewing TSR SOW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-14 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Histogram review / meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Weekly OPS conference call Weekly TS Mgmt Meeting Daily TSR board review 2017 goals mtg with RS Weekly TS Meeting (Thurs) Financial document review meeting OFI Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Time sheets and PTO Administration Financial document review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-14 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1 0 Halliburton and HKN Tender Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-14 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR tracker update review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-14 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.75 0 Flowmeter install preliminary work (pre-TSR) AADU bearing pressure research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-14 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 1 0 Tesco interface Phone meetings with Joseph Wink Analysis of new top drive install Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-14 ORLAN-TSR :ORLAN-TSR TSR-01601-ORLP Nitrogen Pre-Charge Valve Wrench Regular Pay N 0.5 0 CTR and quote review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-14 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 0.25 0 review TSR and preliminary design Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-15 EHBU-TSRs :EHBU-TSRs TSR-01418-EHBU Total Rig Proposal - Uganda Regular Pay N 0.5 0 Clarifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-15 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1.25 0 Histogram review / meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-15 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 1 0 drawing review analysis report revision Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Time sheets and PTO Administration Financial document review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-15 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2 0 Mud tank volume spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-15 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 0.5 0 Tesco interface Phone meetings with Joseph Wink Analysis of new top drive install Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-15 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 0.25 0 review TSR and preliminary design Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-18 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.75 0 Meeting with GO, RS, Rodney Histogram final review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-18 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 1.5 0 Analysis report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet and timesheet reviews IT issues (MS Project) Technical Services hours summary through september Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-18 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 BD Series - Tubular Running Services Lunch and Learn - IADC Conference Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-18 OH-019 :OH-019 Overhead All Activities Regular Pay N 1.5 0 Weekly meeting and document control meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Support Jeff A. - Bishop Lifting preparing general query tsr Conf call with CRG regarding Berkut winterization 262L equipment documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-18 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1.5 0 Bearing pressure research and sending MQ information Non-billable work related to Mudmaster flow meter install Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-18 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 1 0 CTR and scope of work development Discuss cost estimate with operations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1.75 0 Meeting with GO, RS, Rodney Histogram final review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board reviews Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet and timesheet reviews IT issues (MS Project) Technical Services hours summary through september Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 CNOOC / Halliburton tender review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-19 OH-014 :OH-014 Overhead All Activities Regular Pay N 0.75 0 BD Series - Tubular Running Services Lunch and Learn - IADC Conference Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Support Jeff A. - Bishop Lifting preparing general query tsr Conf call with CRG regarding Berkut winterization 262L equipment documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-19 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1.5 0 Bearing pressure research and sending MQ information Non-billable work related to Mudmaster flow meter install Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-19 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 VFD location meeting scope of work review for TD replacement Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-20 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 Clarification support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board reviews Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet and timesheet reviews IT issues (MS Project) Technical Services hours summary through september Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Support Jeff A. - Bishop Lifting preparing general query tsr Conf call with CRG regarding Berkut winterization 262L equipment documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-20 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Bearing pressure research and sending MQ information Non-billable work related to Mudmaster flow meter install Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-20 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 VFD location meeting scope of work review for TD replacement Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-20 Rig 209L-TSR :Rig 209L-TSR TSR-01588-209L Steam Line Heat Trace Regular Pay N 1 0 SOW and CTR approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-20 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 0.5 0 CTR and scope of work development Discuss cost estimate with operations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-21 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 Clarification support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet and timesheet reviews IT issues (MS Project) Technical Services hours summary through september Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 CNOOC / Halliburton tender review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-21 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 0.5 0 meetings to discuss 77B SEM's package Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-21 OH-011 :OH-011 Overhead All Activities Regular Pay N 4 0 Worked from home - repair contractors Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-21 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Bearing pressure research and sending MQ information Non-billable work related to Mudmaster flow meter install Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-22 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 Clarification support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board reviews Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet and timesheet reviews IT issues (MS Project) Technical Services hours summary through september Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 CNOOC / Halliburton tender review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-22 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 0.5 0 meetings to discuss 77B SEM's package Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Support Jeff A. - Bishop Lifting preparing general query tsr Conf call with CRG regarding Berkut winterization 262L equipment documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-22 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Bearing pressure research and sending MQ information Non-billable work related to Mudmaster flow meter install Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-22 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 VFD location meeting scope of work review for TD replacement Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-25 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 0.5 0 Discussion with Sakhalin Meeting with CRG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-25 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Clarification 07 Drawings Meeting with HH Meeting(s) with George and Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-25 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 1 0 Closeout revision / final review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Weekly Ops Call Weekly TS Mgmt. Meeting TSR Board Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Travel Arrangements for France Timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 CNOOC/Halibuton Tender Pluspetrol Meeting(s) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-25 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 1 0 Cydsa Substructure Conference Call Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-25 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 General TSR Support / meeting(s) with RC discussing open TSR's and upcoming TSR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-25 Rig 209L-TSR :Rig 209L-TSR TSR-01600-209L Desilter Motor Upgrade Regular Pay N 1 0 closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-26 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 0.5 0 Discussion with Sakhalin Meeting with CRG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7 0 Clarification 07 Drawings Meeting with HH Meeting(s) with George and Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3.5 0 CNOOC/Halibuton Tender Pluspetrol Meeting(s) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 General TSR Support / meeting(s) with RC discussing open TSR's and upcoming TSR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-26 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Top Drive Upgrade SOW Review General document review Reviewing contents of shipped harddrive Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6 0 Clarification 07 Drawings Meeting with HH Meeting(s) with George and Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Ops Call Weekly TS Mgmt. Meeting TSR Board Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Travel Arrangements for France Timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 General TSR Support / meeting(s) with RC discussing open TSR's and upcoming TSR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-28 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 Clarification 07 Drawings Meeting with HH Meeting(s) with George and Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Travel Arrangements for France Timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 Reviewing tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 General TSR Support / meeting(s) with RC discussing open TSR's and upcoming TSR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-28 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Top Drive Upgrade SOW Review General document review Reviewing contents of shipped harddrive Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-29 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 Clarification 07 Drawings Meeting with HH Meeting(s) with George and Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Ops Call Weekly TS Mgmt. Meeting TSR Board Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-29 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 General TSR Support / meeting(s) with RC discussing open TSR's and upcoming TSR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-09-29 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Top Drive Upgrade SOW Review General document review Reviewing contents of shipped harddrive Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-02 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4.5 0 Preparation for meeting Meeting with HH Reviewing drawings Mtgs with GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Weekly TS Mgmt Meeting TSR Board Review Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet and timesheet approvals personnel discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Pluspetrol Conference calls x 3 HKN clarifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-02 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 Preparation for meeting Meeting with HH Reviewing drawings Mtgs with GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-03 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Cost estimate review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet and timesheet approvals personnel discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-03 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Procurement training session Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-03 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2.5 0 Hibernia time sheets and invoicing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-04 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6 0 Preparation for meeting Meeting with HH Reviewing drawings Mtgs with GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Pluspetrol Conference calls x 3 HKN clarifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-04 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 Tracker review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-04 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Report review for ice road meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-04 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Hibernia time sheets and invoicing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-05 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 Preparation for meeting Meeting with HH Reviewing drawings Mtgs with GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals personnel discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Pluspetrol Conference calls x 3 HKN clarifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-05 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Report review for ice road meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.5 0 Preparation for meeting Meeting with HH Reviewing drawings Mtgs with GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Pluspetrol Conference calls x 3 HKN clarifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-06 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Report review for ice road meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-06 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.5 0 Dan Colby MOC support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-09 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 6 0 Meetings with Total in Pau Preparation for meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Personnel meeting and preparation Timesheet TSR Administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-10 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Meetings with Total in Pau Preparation for meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-10 OH-010 :OH-010 Overhead All Activities Regular Pay N 9 0 Houston to Paris Paris to Pau, France Return Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-11 OH-010 :OH-010 Overhead All Activities Regular Pay N 12 0 Houston to Paris Paris to Pau, France Return Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-12 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 8 0 Meetings with Total in Pau Preparation for meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-13 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 8 0 Meetings with Total in Pau Preparation for meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-14 OH-010 :OH-010 Overhead All Activities Regular Pay N 12 0 Houston to Paris Paris to Pau, France Return Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-16 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.5 0 meeting with IDS meetings with Tyler clarification(s) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 TS weekly mgmt meeting Weekly ops phone call Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet and timesheet approvals personnel discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-16 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 3 0 presentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-17 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Carrie's surgery Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Carrie's surgery Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals personnel discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-19 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1 0 drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-19 Rig 249L-TSR :Rig 249L-TSR TSR-01607-249/258L LP Mud Lines Regular Pay N 1 0 drawing and closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-19 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 5 0 presentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-19 Rig 272L-TSR :Rig 272L-TSR TSR-01609-272L-273L Rig GA & BOP Stack Updates Regular Pay N 1 0 drawing and closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-20 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 meeting with IDS meetings with Tyler clarification(s) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet and timesheet approvals personnel discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-20 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 5 0 presentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-22 OH-010 :OH-010 Overhead All Activities Regular Pay N 12 0 Houston to Denver to AK AK to Denver to Houston Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-23 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Meeting with Chuck, conf call with HH, clarifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-23 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 8 0 Debrief with Nick meetings in AK with COPA Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-24 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Meeting with Chuck, conf call with HH, clarifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-24 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 8 0 Debrief with Nick meetings in AK with COPA Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-25 OH-010 :OH-010 Overhead All Activities Regular Pay N 12 0 Houston to Denver to AK AK to Denver to Houston Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 Meeting with Chuck, conf call with HH, clarifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 answering emails, timesheet and timesheet approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-26 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Employment Law Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-26 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 0.5 0 CTR approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-26 Rig 209L-TSR :Rig 209L-TSR TSR-01600-209L Desilter Motor Upgrade Regular Pay N 1.5 0 Closeout revision and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Meeting with Chuck, conf call with HH, clarifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 answering emails, timesheet and timesheet approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-27 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Compliance spreadsheet update for crew boats COI's for Ms Risa and Ms Dorothy sent to EJ Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-27 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 1 0 Debrief with Nick meetings in AK with COPA Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-30 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Clarifications review Conference call Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-30 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 Review NOV Structural Report Review cost estimate Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Weekly Ops Phone Conf. Weekly TS Mgmt. Meeting Weekly TS Meeting (Thursday) Budget Mtg (Thursday) Quarterly Earnings Mtg with Matt Hoffman about IMS / Specifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Time sheet and timesheet approval Project workbook sent to Rodney; mtg with Matt K. Timesheet user verification Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-30 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 Rentals training Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-30 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Weekly mtg Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-30 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Meeting with Nick H. to discuss 270L path forward 270L winterization closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-30 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 TSR status Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-31 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.5 0 Clarifications review Conference call Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Ops Phone Conf. Weekly TS Mgmt. Meeting Weekly TS Meeting (Thursday) Budget Mtg (Thursday) Quarterly Earnings Mtg with Matt Hoffman about IMS / Specifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Time sheet and timesheet approval Project workbook sent to Rodney; mtg with Matt K. Timesheet user verification Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-31 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1.75 0 analysis review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-31 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 0.5 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-10-31 Rig 209L-TSR :Rig 209L-TSR TSR-01599-209L Cameron X-mas Tree Stump Modification Regular Pay N 1.25 0 Closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-01 Berkut-TSR :Berkut-TSR TSR-01605-BERP Snubbing Post Regular Pay N 2 0 drawing review and analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-01 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 Clarifications review Conference call Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.5 0 Review NOV Structural Report Review cost estimate Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Ops Phone Conf. Weekly TS Mgmt. Meeting Weekly TS Meeting (Thursday) Budget Mtg (Thursday) Quarterly Earnings Mtg with Matt Hoffman about IMS / Specifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Time sheet and timesheet approval Project workbook sent to Rodney; mtg with Matt K. Timesheet user verification Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Meeting with Nick H. to discuss 270L path forward 270L winterization closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-01 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 TSR status Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-01 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1 0 Additional changes and general support (numerous issues) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-02 Berkut-TSR :Berkut-TSR TSR-01605-BERP Snubbing Post Regular Pay N 1 0 drawing review and analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.25 0 Weekly Ops Phone Conf. Weekly TS Mgmt. Meeting Weekly TS Meeting (Thursday) Budget Mtg (Thursday) Quarterly Earnings Mtg with Matt Hoffman about IMS / Specifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-02 Rig 270L-TSR :Rig 270L-TSR TSR-01595-270L Skidding Pony Sub Regular Pay N 6 0 ROM Cost Estimate Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Clarifications review Conference call Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-03 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.75 0 Review NOV Structural Report Review cost estimate Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Ops Phone Conf. Weekly TS Mgmt. Meeting Weekly TS Meeting (Thursday) Budget Mtg (Thursday) Quarterly Earnings Mtg with Matt Hoffman about IMS / Specifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-03 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1 0 Additional changes and general support (numerous issues) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-03 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2.5 0 Reviewing drawings; discussing with Lam and John Reck; verifying dimensions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-03 Rig 270L-TSR :Rig 270L-TSR TSR-01595-270L Skidding Pony Sub Regular Pay N 0.5 0 ROM Cost Estimate Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-04 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 0.75 0 Additional changes and general support (numerous issues) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-06 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.75 0 Cost Estimate Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Weekly Ops Phone Call Weekly TS Mgmt Meeting TSR Board Mtgs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Time sheet and timesheet review PEGNL License Renewal CE credits Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-06 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 A0 Bulkhead Discussion with Joshua Non-billable top drive upgrade discussion with JL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-06 Rig 209L-TSR :Rig 209L-TSR TSR-01501-209L BOP Hoist Test Beam Regular Pay N 1.25 0 Monday afternoon/Monday night - issue was cleared / no testing required Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-06 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 2 0 New pad eye placement for tie-down of spoolers; platform drawing review; analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-06 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1 0 drawing review; field verification; scope review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-07 Berkut-TSR :Berkut-TSR TSR-01614-BERP Cement Unit Jib Lifting Tool Regular Pay N 2 0 Drawing review; MTO review; analysis; closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-07 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 Histogram / scope verification with HH Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Time sheet and timesheet review PEGNL License Renewal CE credits Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3.5 0 PLUSPETROL - histogram review, revenue/expense layout for 2018/19 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-07 OH-016 :OH-016 Overhead All Activities Regular Pay N 1 0 Review suspension of ABS class for 257 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-07 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 0.5 0 drawing review; field verification; scope review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-08 Berkut-TSR :Berkut-TSR TSR-01605-BERP Snubbing Post Regular Pay N 1 0 closeout / and attachments Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-08 Berkut-TSR :Berkut-TSR TSR-01614-BERP Cement Unit Jib Lifting Tool Regular Pay N 1 0 Drawing review; MTO review; analysis; closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Ops Phone Call Weekly TS Mgmt Meeting TSR Board Mtgs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Time sheet and timesheet review PEGNL License Renewal CE credits Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 PLUSPETROL - histogram review, revenue/expense layout for 2018/19 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-08 OH-016 :OH-016 Overhead All Activities Regular Pay N 0.5 0 Review suspension of ABS class for 257 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-08 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 A0 Bulkhead Discussion with Joshua Non-billable top drive upgrade discussion with JL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-08 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 platform weights for RS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-08 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 0.25 0 New pad eye placement for tie-down of spoolers; platform drawing review; analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-08 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2 0 drawing review; field verification; scope review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-08 Rig 270L-TSR :Rig 270L-TSR TSR-01595-270L Skidding Pony Sub Regular Pay N 0.5 0 ROM cost estimate and assumptions to Exxon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-09 Berkut-TSR :Berkut-TSR TSR-01605-BERP Snubbing Post Regular Pay N 2 0 closeout / and attachments Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-09 Berkut-TSR :Berkut-TSR TSR-01614-BERP Cement Unit Jib Lifting Tool Regular Pay N 1 0 Drawing review; MTO review; analysis; closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-09 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 Histogram / scope verification with HH Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Ops Phone Call Weekly TS Mgmt Meeting TSR Board Mtgs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Time sheet and timesheet review PEGNL License Renewal CE credits Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 PLUSPETROL - histogram review, revenue/expense layout for 2018/19 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-09 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 0.25 0 New pad eye placement for tie-down of spoolers; platform drawing review; analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-09 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1 0 drawing review; field verification; scope review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-09 Rig 270L-TSR :Rig 270L-TSR TSR-01595-270L Skidding Pony Sub Regular Pay N 0.5 0 ROM cost estimate and assumptions to Exxon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-10 Berkut-TSR :Berkut-TSR TSR-01605-BERP Snubbing Post Regular Pay N 1.5 0 closeout / and attachments Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-10 Berkut-TSR :Berkut-TSR TSR-01614-BERP Cement Unit Jib Lifting Tool Regular Pay N 0.5 0 Drawing review; MTO review; analysis; closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Ops Phone Call Weekly TS Mgmt Meeting TSR Board Mtgs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Time sheet and timesheet review PEGNL License Renewal CE credits Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 PLUSPETROL - histogram review, revenue/expense layout for 2018/19 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-10 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1.5 0 drawing review; field verification; scope review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-10 Rig 270L-TSR :Rig 270L-TSR TSR-01595-270L Skidding Pony Sub Regular Pay N 0.5 0 ROM cost estimate and assumptions to Exxon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-13 Berkut-TSR :Berkut-TSR TSR-01605-BERP Snubbing Post Regular Pay N 2 0 closeout review / approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Weekly Ops Phone Call Weekly TS Mgmt. Meeting TSR Board Meetings BP Background Data Meeting Total Meeting Preparation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 PEGNL License Renewal Timesheet and timesheet approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-13 OH-016 :OH-016 Overhead All Activities Regular Pay N 1.5 0 Research ABS class suspension for 257B Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-13 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 GoM COD's for crew boats and barge rigs - forms, check request research platform weights for RS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-13 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 0.5 0 Closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-14 Berkut-TSR :Berkut-TSR TSR-01605-BERP Snubbing Post Regular Pay N 0.75 0 closeout review / approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Ops Phone Call Weekly TS Mgmt. Meeting TSR Board Meetings BP Background Data Meeting Total Meeting Preparation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 PEGNL License Renewal Timesheet and timesheet approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-14 OH-016 :OH-016 Overhead All Activities Regular Pay N 0.5 0 Research ABS class suspension for 257B Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-14 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 GoM COD's for crew boats and barge rigs - forms, check request research platform weights for RS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-14 Rig 209L-TSR :Rig 209L-TSR TSR-01515-209L Control Line Spooler Placement Regular Pay N 1.5 0 tie-down padeye request from JA - analysis and drawing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-14 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1 0 Revised drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-14 Rig 209L-TSR :Rig 209L-TSR TSR-01612-209L Mud Pump Gooseneck Regular Pay N 0.75 0 CTR review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-14 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 1.5 0 Closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Ops Phone Call Weekly TS Mgmt. Meeting TSR Board Meetings BP Background Data Meeting Total Meeting Preparation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 PEGNL License Renewal Timesheet and timesheet approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 comments to Mk regarding TOTAL presentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-15 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 257B / 258L Tender for BP - Equipment List Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-15 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Tracking spreadsheet update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-15 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 GoM COD's for crew boats and barge rigs - forms, check request research platform weights for RS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-15 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 3 0 Drawing and scope review / meetings with JR and GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-16 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Clarification No. 12 electrical Clarification Meeting with GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Ops Phone Call Weekly TS Mgmt. Meeting TSR Board Meetings BP Background Data Meeting Total Meeting Preparation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 PEGNL License Renewal Timesheet and timesheet approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.25 0 comments to Mk regarding TOTAL presentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-16 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 257B / 258L Tender for BP - Equipment List Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Tracking spreadsheet update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-16 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1.5 0 Cost estimate review, schedule review for top drive upgrade Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-16 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 GoM COD's for crew boats and barge rigs - forms, check request research platform weights for RS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-16 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 0.25 0 Drawing and scope review / meetings with JR and GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-17 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.5 0 Clarification No. 12 electrical Clarification Meeting with GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 PEGNL License Renewal Timesheet and timesheet approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-17 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 257B / 258L Tender for BP - Equipment List Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-17 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1 0 Drawing and scope review / meetings with JR and GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Deer Lease Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-21 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1.5 0 review and revise PLC SOW Document Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 PTO Administration Timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-21 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 review and approve timesheets Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-21 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Bulk COD Renewal Check request Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-21 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1 0 beam clamp calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-21 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 3 0 meeting with GHW Meeting with HP Piping Solutions review drawings meeting with Southwest review pulsation dampener options Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Board review review of all NEW TSR's with LTN Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-22 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 1.5 0 Starr Energy Layouts / Mtgs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-22 OH-011 :OH-011 Overhead All Activities Regular Pay N 2 0 Left Early for Holiday Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-22 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 update TSR tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-22 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 Bulk COD Renewal Check request Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-22 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 3 0 meeting with GHW Meeting with HP Piping Solutions review drawings meeting with Southwest review pulsation dampener options Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-23 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Thanksgiving Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-24 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Thanksgiving Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Weekly Ops Phone Call Weekly TS Mgmt. Meeting TSR Board Meetings Training discussion with Bo Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 SolidWorks Renewal Process PEGNL License Renewal Liability Insurance Issue for Licensing in Canada Expense report coding for GoM Reviewing performance evaluations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 BP Tender (257/258) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-27 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 SOW review Cost estimate review CTR revision review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-27 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.75 0 Rig 107L racking board request - meeting with JG to answer Randy's email Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-27 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 USCG Check Issue for renewal of COD's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-27 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 0.5 0 closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-27 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 0.5 0 scope of work review and assign to DS preliminary drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-27 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1.5 0 Updating cost estimate CC with GHW CC with Dan Colby Mtg with Southwest Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-28 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 IDS Site Visit and Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Ops Phone Call Weekly TS Mgmt. Meeting TSR Board Meetings Training discussion with Bo Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 SolidWorks Renewal Process PEGNL License Renewal Liability Insurance Issue for Licensing in Canada Expense report coding for GoM Reviewing performance evaluations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 BP Tender (257/258) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-28 OH-010 :OH-010 Overhead All Activities Regular Pay N 1.5 0 Round-trip to IDS in North Houston Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-28 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 internal controls overview meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-28 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 USCG Check Issue for renewal of COD's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-28 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 0.5 0 closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-28 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 Scope and CTR review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Ops Phone Call Weekly TS Mgmt. Meeting TSR Board Meetings Training discussion with Bo Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 SolidWorks Renewal Process PEGNL License Renewal Liability Insurance Issue for Licensing in Canada Expense report coding for GoM Reviewing performance evaluations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-29 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 TSR tracking spreadsheet update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-29 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.75 0 Torque tube tie back discussion with BF Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-29 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 USCG Check Issue for renewal of COD's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-29 ORLAN-TSR :ORLAN-TSR TSR-01601-ORLP Nitrogen Pre-Charge Valve Wrench Regular Pay N 1 0 closeout review / approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-29 Rig 209L-TSR :Rig 209L-TSR TSR-01612-209L Mud Pump Gooseneck Regular Pay N 1 0 closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-29 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 0.5 0 scope of work review and assign to DS preliminary drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-29 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 0.5 0 Updating cost estimate CC with GHW CC with Dan Colby Mtg with Southwest Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-29 Rig 270L-TSR :Rig 270L-TSR TSR-01481-270L Mobilization and Rig up Planning Support Regular Pay N 1 0 closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-29 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 1.25 0 Meeting with Genesis and reviewing CTR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Ops Phone Call Weekly TS Mgmt. Meeting TSR Board Meetings Training discussion with Bo Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 SolidWorks Renewal Process PEGNL License Renewal Liability Insurance Issue for Licensing in Canada Expense report coding for GoM Reviewing performance evaluations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 BP Tender (257/258) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-30 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR tracking spreadsheet update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-30 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 SOW review Cost estimate review CTR revision review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-30 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.25 0 Torque tube tie back discussion with BF Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-30 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 USCG Check Issue for renewal of COD's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-30 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 Scope and CTR review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-30 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 0.25 0 scope of work review and assign to DS preliminary drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-30 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1.5 0 Updating cost estimate CC with GHW CC with Dan Colby Mtg with Southwest Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-11-30 Rig 270L-TSR :Rig 270L-TSR TSR-01397-270L Walking System - Substructure Modifications Regular Pay N 1 0 closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Ops Phone Call Weekly TS Mgmt. Meeting TSR Board Meetings Training discussion with Bo Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 SolidWorks Renewal Process PEGNL License Renewal Liability Insurance Issue for Licensing in Canada Expense report coding for GoM Reviewing performance evaluations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-01 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 SOW review Cost estimate review CTR revision review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-01 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 USCG Check Issue for renewal of COD's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-01 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 0.5 0 closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-01 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2 0 Updating cost estimate CC with GHW CC with Dan Colby Mtg with Southwest Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-04 Berkut-TSR :Berkut-TSR TSR-01614-BERP Cement Unit Jib Lifting Tool Regular Pay N 1 0 review of updated drawing (IFC) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 weekly global ops phone call weekly TS management meeting lunch meeting with Rachel Koen with Loadmaster IADC Spark TANK meeting (attended with Rob S) OFI meeting with Quality TSR weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 performance evaluation review / excel file updates Timesheet and timesheet review PTO administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Reviewing and approving TSR-1420 CO TSR status mtg with Engineers Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-04 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2 0 update cost estimate identify issues with various options Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 weekly global ops phone call weekly TS management meeting lunch meeting with Rachel Koen with Loadmaster IADC Spark TANK meeting (attended with Rob S) OFI meeting with Quality TSR weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 performance evaluation review / excel file updates Timesheet and timesheet review PTO administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-05 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Meeting with Greg and Rob Reviewing various options Setting up SWOT template Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-05 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 review of revised CTR / meeting with Canada Ops Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-05 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 1 0 conference call with Joseph Wink (Starr Energy Proposal) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-05 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1.5 0 update cost estimate identify issues with various options Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 5 0 weekly global ops phone call weekly TS management meeting lunch meeting with Rachel Koen with Loadmaster IADC Spark TANK meeting (attended with Rob S) OFI meeting with Quality TSR weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-06 OH-010 :OH-010 Overhead All Activities Regular Pay N 1.25 0 trip to IADC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Updating tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-06 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1 0 finalize closeout / approve / transmit Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-06 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1 0 update cost estimate identify issues with various options Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 weekly global ops phone call weekly TS management meeting lunch meeting with Rachel Koen with Loadmaster IADC Spark TANK meeting (attended with Rob S) OFI meeting with Quality TSR weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 performance evaluation review / excel file updates Timesheet and timesheet review PTO administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-07 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 0.5 0 Meeting with Greg and Rob Reviewing various options Setting up SWOT template Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Reviewing and approving TSR-1420 CO TSR status mtg with Engineers Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-07 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 269L torque tube tie-back Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-07 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 0.5 0 conference call with Joseph Wink (Starr Energy Proposal) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-07 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 1 0 CTR approval FEA review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly global ops phone call weekly TS management meeting lunch meeting with Rachel Koen with Loadmaster IADC Spark TANK meeting (attended with Rob S) OFI meeting with Quality TSR weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 performance evaluation review / excel file updates Timesheet and timesheet review PTO administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-08 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Meeting with Greg and Rob Reviewing various options Setting up SWOT template Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-08 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 review of revised CTR / meeting with Canada Ops Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-08 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 269L torque tube tie-back Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-08 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 USCH Compliance Sent API 4G info to LB Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-08 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1 0 update cost estimate identify issues with various options Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-11 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nashville Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-12 Hibernia Platform :Hibernia Platform TSR-01576-HIBP Top Drive Maintenance Platform Regular Pay N 1 0 revise drawings revise calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.75 0 Holiday Luncheon Mtg with RS and GO regarding personnel TSR weekly meeting Mtg with RS regarding 2017-2018 goals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IT/Call Forwarding Issue timesheet performance evaluation development of smart goals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-12 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1.5 0 Internal meetings with GO and RS External meetings with Kvaerner CTR Development CTR Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-12 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 PLC SOW Document Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-12 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1.5 0 Analysis and closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-12 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1.25 0 Discussion with Performance Pulsation Updating cost estimate Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-13 Hibernia Platform :Hibernia Platform TSR-01576-HIBP Top Drive Maintenance Platform Regular Pay N 0.5 0 revise drawings revise calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 IT/Call Forwarding Issue timesheet performance evaluation development of smart goals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-13 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 Internal meetings with GO and RS External meetings with Kvaerner CTR Development CTR Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-13 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 compliance training Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-13 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 0.5 0 Discussion with Performance Pulsation Updating cost estimate Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Holiday Luncheon Mtg with RS and GO regarding personnel TSR weekly meeting Mtg with RS regarding 2017-2018 goals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IT/Call Forwarding Issue timesheet performance evaluation development of smart goals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-14 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4.25 0 Internal meetings with GO and RS External meetings with Kvaerner CTR Development CTR Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-14 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 PLC SOW Document Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-14 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1.25 0 Discussion with Performance Pulsation Updating cost estimate Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Holiday Luncheon Mtg with RS and GO regarding personnel TSR weekly meeting Mtg with RS regarding 2017-2018 goals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IT/Call Forwarding Issue timesheet performance evaluation development of smart goals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-15 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Internal meetings with GO and RS External meetings with Kvaerner CTR Development CTR Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-18 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Total Clarifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Weekly Operations Phone Call Weekly TS Meeting (Thursday) TSR Board Review 2018 SMART Goals Brainstorming session Meeting with AutoCAD provider (ECAD) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet and timesheet approvals Performance Evaluations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-18 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 Pluspetrol Argentina - Gap Analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-18 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 CTR Scope of Work Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-19 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Total Clarifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Weekly Operations Phone Call Weekly TS Meeting (Thursday) TSR Board Review 2018 SMART Goals Brainstorming session Meeting with AutoCAD provider (ECAD) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet and timesheet approvals Performance Evaluations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-19 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1.5 0 Pluspetrol Argentina - Gap Analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-19 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 CTR Scope of Work Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-19 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 0.75 0 Cost estimate and technical details Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-20 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Total Clarifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Phone Call Weekly TS Meeting (Thursday) TSR Board Review 2018 SMART Goals Brainstorming session Meeting with AutoCAD provider (ECAD) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Timesheet and timesheet approvals Performance Evaluations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-20 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 0.5 0 CTR Scope of Work Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-20 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1.5 0 Timesheet approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-20 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1 0 Cost estimate and technical details Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-21 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Total Clarifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Timesheet and timesheet approvals Performance Evaluations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-21 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 CTR Scope of Work Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-21 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 1 0 conference call with Joseph Wink Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-22 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Total Clarifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet and timesheet approvals Performance Evaluations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-22 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 0.5 0 Pluspetrol Argentina - Gap Analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-22 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 CTR Scope of Work Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-22 OH-011 :OH-011 Overhead All Activities Regular Pay N 3 0 Christmas Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-25 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-28 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2017-12-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR Board Meetings (daily) AutoCAD renewal meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Reviewing PKD 10-K filing incl. rig details Discussing training with Chris Lerma AutoCAD renewal discussion IHS subscription for Canada Performance Appraisals Computer Issues (IT support) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-02 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 SOW review general discussions with GO and JL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 discuss 209L rig move with Genesis general sakhalinTSR support / status updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-02 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 USCG check issue Renewing COI's for ROBERT PARKER and CISSY 2017 COD renewal (2nd check sent out) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-02 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1 0 schedule review with tyler update cost estimate Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Board Meetings (daily) AutoCAD renewal meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Reviewing PKD 10-K filing incl. rig details Discussing training with Chris Lerma AutoCAD renewal discussion IHS subscription for Canada Performance Appraisals Computer Issues (IT support) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-03 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 SOW review general discussions with GO and JL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 discuss 209L rig move with Genesis general sakhalinTSR support / status updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-03 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 USCG check issue Renewing COI's for ROBERT PARKER and CISSY 2017 COD renewal (2nd check sent out) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Board Meetings (daily) AutoCAD renewal meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Reviewing PKD 10-K filing incl. rig details Discussing training with Chris Lerma AutoCAD renewal discussion IHS subscription for Canada Performance Appraisals Computer Issues (IT support) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-04 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 SOW review general discussions with GO and JL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 discuss 209L rig move with Genesis general sakhalinTSR support / status updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-04 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 USCG check issue Renewing COI's for ROBERT PARKER and CISSY 2017 COD renewal (2nd check sent out) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-04 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1 0 schedule review with tyler update cost estimate Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR Board Meetings (daily) AutoCAD renewal meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Reviewing PKD 10-K filing incl. rig details Discussing training with Chris Lerma AutoCAD renewal discussion IHS subscription for Canada Performance Appraisals Computer Issues (IT support) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-05 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 0.5 0 SOW review general discussions with GO and JL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 discuss 209L rig move with Genesis general sakhalinTSR support / status updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-05 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 USCG check issue Renewing COI's for ROBERT PARKER and CISSY 2017 COD renewal (2nd check sent out) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-05 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1.5 0 schedule review with tyler update cost estimate Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-08 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 3.25 0 Weekly Operations Phone Conf. Call Weekly TS Mgmt. Meeting 2M Tek Meeting with Dan, Joshua and AJ Client owned asset drawings - meeting Parker Technology Title Block meeting IHS subscription meeting with Quality Dept. Rolling forecast meeting with JS, RS and GO Weekly TSR meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 A&E Insurance Renewal Performance Evaluations IHS subscription for Canada - starting process timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-08 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 Check Issue; sending out new check Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-08 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 RFI review ;/ Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-08 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 0.5 0 Review of FEA with JR Drawing review and issuance Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-08 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 1 0 Meeting with MQ and Genesis regarding the SOW producing CTR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 reviewing various scopes of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operations Phone Conf. Call Weekly TS Mgmt. Meeting 2M Tek Meeting with Dan, Joshua and AJ Client owned asset drawings - meeting Parker Technology Title Block meeting IHS subscription meeting with Quality Dept. Rolling forecast meeting with JS, RS and GO Weekly TSR meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 A&E Insurance Renewal Performance Evaluations IHS subscription for Canada - starting process timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Pluspetrol Argentina (meeting with Omar, review of budgetary cost) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-09 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Bridal line issue (MQ) meeting with JR to discuss ventilation issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-09 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Check Issue; sending out new check Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-09 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1 0 Drawing review and approval existing platform analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-09 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 0.5 0 Review of FEA with JR Drawing review and issuance Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-09 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 0.5 0 Cost estimate meetings reviewing documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-10 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 reviewing various scopes of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Weekly Operations Phone Conf. Call Weekly TS Mgmt. Meeting 2M Tek Meeting with Dan, Joshua and AJ Client owned asset drawings - meeting Parker Technology Title Block meeting IHS subscription meeting with Quality Dept. Rolling forecast meeting with JS, RS and GO Weekly TSR meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 A&E Insurance Renewal Performance Evaluations IHS subscription for Canada - starting process timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Pluspetrol Argentina (meeting with Omar, review of budgetary cost) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 general support - discussing Orlan derrick inspection Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-10 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Bridal line issue (MQ) meeting with JR to discuss ventilation issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-10 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Check Issue; sending out new check Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-10 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 0.5 0 Drawing review and approval existing platform analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-10 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 0.5 0 Cost estimate meetings reviewing documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-10 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 0.5 0 Meeting with MQ and Genesis regarding the SOW producing CTR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 reviewing various scopes of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 3.5 0 Weekly Operations Phone Conf. Call Weekly TS Mgmt. Meeting 2M Tek Meeting with Dan, Joshua and AJ Client owned asset drawings - meeting Parker Technology Title Block meeting IHS subscription meeting with Quality Dept. Rolling forecast meeting with JS, RS and GO Weekly TSR meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 A&E Insurance Renewal Performance Evaluations IHS subscription for Canada - starting process timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 Pluspetrol Argentina (meeting with Omar, review of budgetary cost) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-11 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 0.5 0 Drawing review and approval existing platform analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-11 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 0.5 0 Cost estimate meetings reviewing documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-11 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 0.5 0 Meeting with MQ and Genesis regarding the SOW producing CTR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 reviewing various scopes of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Weekly Operations Phone Conf. Call Weekly TS Mgmt. Meeting 2M Tek Meeting with Dan, Joshua and AJ Client owned asset drawings - meeting Parker Technology Title Block meeting IHS subscription meeting with Quality Dept. Rolling forecast meeting with JS, RS and GO Weekly TSR meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 A&E Insurance Renewal Performance Evaluations IHS subscription for Canada - starting process timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-12 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 0.5 0 Drawing review and approval existing platform analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-12 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 0.5 0 Cost estimate meetings reviewing documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 A&E Insurance Renewal Performance Evaluations IHS subscription for Canada - starting process timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 (Sunday) Performance Appraisals; 18-Month Rolling Forecast Spreadsheet; Technical Services Hours Summary for 2017 Update IMS TSR and CTR forms and complete MOC Issuing PO to Genesis for Alaska work Meet with RS to discuss Performance Evaluations (x4) 269L belly board documentation sent to DCDM IHS subscription for Canada and Russia Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Weekly Ops Phone Call Weekly TS Mgmt Mtg TSR board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 (Sunday) Performance Appraisals; 18-Month Rolling Forecast Spreadsheet; Technical Services Hours Summary for 2017 Update IMS TSR and CTR forms and complete MOC Issuing PO to Genesis for Alaska work Meet with RS to discuss Performance Evaluations (x4) 269L belly board documentation sent to DCDM IHS subscription for Canada and Russia Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 Pluspetrol Argentina - visit HH to inspect 1500 HP rig Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-15 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 1 0 Discussing issues with Genesis and Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (Sunday) Performance Appraisals; 18-Month Rolling Forecast Spreadsheet; Technical Services Hours Summary for 2017 Update IMS TSR and CTR forms and complete MOC Issuing PO to Genesis for Alaska work Meet with RS to discuss Performance Evaluations (x4) 269L belly board documentation sent to DCDM IHS subscription for Canada and Russia Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 7 0 Ice Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (Sunday) Performance Appraisals; 18-Month Rolling Forecast Spreadsheet; Technical Services Hours Summary for 2017 Update IMS TSR and CTR forms and complete MOC Issuing PO to Genesis for Alaska work Meet with RS to discuss Performance Evaluations (x4) 269L belly board documentation sent to DCDM IHS subscription for Canada and Russia Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 6.5 0 Ice Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-17 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.5 0 Regulatory changes to four (4) rigs site plans Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.75 0 Reviewing PLC scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 (Sunday) Performance Appraisals; 18-Month Rolling Forecast Spreadsheet; Technical Services Hours Summary for 2017 Update IMS TSR and CTR forms and complete MOC Issuing PO to Genesis for Alaska work Meet with RS to discuss Performance Evaluations (x4) 269L belly board documentation sent to DCDM IHS subscription for Canada and Russia Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 Pluspetrol Argentina - visit HH to inspect 1500 HP rig Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-18 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.5 0 Regulatory changes to four (4) rigs site plans Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-18 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 COD Status Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-18 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2 0 Discussing issues with Genesis and Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (Sunday) Performance Appraisals; 18-Month Rolling Forecast Spreadsheet; Technical Services Hours Summary for 2017 Update IMS TSR and CTR forms and complete MOC Issuing PO to Genesis for Alaska work Meet with RS to discuss Performance Evaluations (x4) 269L belly board documentation sent to DCDM IHS subscription for Canada and Russia Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2.5 0 Pluspetrol Argentina - visit HH to inspect 1500 HP rig Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-19 OH-010 :OH-010 Overhead All Activities Regular Pay N 0.75 0 Travel to HH America Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-19 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.25 0 Regulatory changes to four (4) rigs site plans Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-21 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Email response to Joe L. regarding additional clarifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-22 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 TSR and CTR approval Meeting with JL, TE, and DS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Weekly Operations Phone Conference Weekly TS Mgmt. Meeting TSR Board Mtgs. SparkCognition Meeting with RS 18 Month Rolling Forecast Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IHS Subscription set-up for Canada and Russia Revising performance appraisals Connie Simms (GoM Assets / insurance) Support AutoCAD 2018 Install IMS Audit review of TSR procedure Hyperion Installation / IT ticket Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 Pluspetrol Argentina - meeting with client; general submittal support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-22 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 0.5 0 MDR review and meeting with JL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-22 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 review of open TSR's and discussion with JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-22 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.75 0 Randy Crowsen drawing revision request - fuel tanks and camp Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-22 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1.25 0 Closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Weekly Operations Phone Conference Weekly TS Mgmt. Meeting TSR Board Mtgs. SparkCognition Meeting with RS 18 Month Rolling Forecast Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IHS Subscription set-up for Canada and Russia Revising performance appraisals Connie Simms (GoM Assets / insurance) Support AutoCAD 2018 Install IMS Audit review of TSR procedure Hyperion Installation / IT ticket Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 General supoport (Jeff A.) - material questions, fabrications questions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-23 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Timesheet approval Review GO's Husky presentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-23 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2.5 0 Check and payment issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-23 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 1.5 0 Genesis Meeting @ PKD Offices Weight verification GA review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Weekly Operations Phone Conference Weekly TS Mgmt. Meeting TSR Board Mtgs. SparkCognition Meeting with RS 18 Month Rolling Forecast Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IHS Subscription set-up for Canada and Russia Revising performance appraisals Connie Simms (GoM Assets / insurance) Support AutoCAD 2018 Install IMS Audit review of TSR procedure Hyperion Installation / IT ticket Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-24 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1.25 0 MDR review and meeting with JL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-24 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 review tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-24 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 General supoport (Jeff A.) - material questions, fabrications questions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-24 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Check and payment issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-24 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1.25 0 Hand Calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-24 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 0.5 0 Genesis Meeting @ PKD Offices Weight verification GA review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-25 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 0.75 0 TSR and CTR approval Meeting with JL, TE, and DS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Weekly Operations Phone Conference Weekly TS Mgmt. Meeting TSR Board Mtgs. SparkCognition Meeting with RS 18 Month Rolling Forecast Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IHS Subscription set-up for Canada and Russia Revising performance appraisals Connie Simms (GoM Assets / insurance) Support AutoCAD 2018 Install IMS Audit review of TSR procedure Hyperion Installation / IT ticket Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-25 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.25 0 SaferUnion presentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 General supoport (Jeff A.) - material questions, fabrications questions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-25 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Timesheet approval Review GO's Husky presentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-25 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 Check and payment issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-25 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 1.25 0 Hand Calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-25 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 0.5 0 Genesis Meeting @ PKD Offices Weight verification GA review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IHS Subscription set-up for Canada and Russia Revising performance appraisals Connie Simms (GoM Assets / insurance) Support AutoCAD 2018 Install IMS Audit review of TSR procedure Hyperion Installation / IT ticket Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.75 0 Pluspetrol Argentina - meeting with client; general submittal support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 General supoport (Jeff A.) - material questions, fabrications questions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-26 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Check and payment issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-26 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 1 0 Genesis Meeting @ PKD Offices Weight verification GA review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-29 OH-003 :OH-003 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 TSR weekly meeting TSR board meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-30 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 5 0 Meetings with team Meetings with Genesis Meeting with Exxon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-30 OH-010 :OH-010 Overhead All Activities Regular Pay N 1.75 0 Greenway to Exxon (round trip) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-30 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1.5 0 Crew boats and rig COD's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-30 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 1.5 0 Kick-Off Meeting Preparation Seismic and Material research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.5 0 IHS Subscription for Canada and Russia ECAD Invoice WED - John Reck and James Gasper performance evaluation THURS - Sachin and Tyler performance evaluation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-31 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1.5 0 Meetings with team Meetings with Genesis Meeting with Exxon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-31 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1 0 closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-31 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 1 0 closeout review and approva Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-01-31 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 1 0 Kick-Off Meeting Preparation Seismic and Material research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-01 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 reviewing current design Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR weekly meeting TSR board meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IHS Subscription for Canada and Russia ECAD Invoice WED - John Reck and James Gasper performance evaluation THURS - Sachin and Tyler performance evaluation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 TSR tracker update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-01 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 Torque and electrical testing TSR and CTR review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-01 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 CTR rev 1 review and approval w/ revisions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-01 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 0.25 0 CTR review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-01 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 3.5 0 Kick-Off Meeting Preparation Seismic and Material research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-02 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-02 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 Torque and electrical testing TSR and CTR review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-02 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 1 0 Kick-Off Meeting Preparation Seismic and Material research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Weekly TS Mgmt. Meeting Weekly TSR review meeting TSR Board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Performance Evaluation closeout Personnel meeting with RS SAFI license update Intern paperwork Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-05 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Subsea power cable slide review BOD slide review Internal meetings Seismic research - LM and Genesis discussions PO Process; meeting with Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR Administration and support Conference call with island to discuss rig move to SWS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-05 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 ESD Philosophy to Dan Colby; interface with EMD and CG Review of GHW email regarding 258 stack-up drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-05 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Compliance Documentation Payment for COI User Fee - MR PERRY, PB DB 3 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-05 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 3 0 Preparation for Meeting WED - meeting with Kvaerner THURS - meeting at Exxon; debrief with Kvaerner Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly TS Mgmt. Meeting Weekly TSR review meeting TSR Board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Performance Evaluation closeout Personnel meeting with RS SAFI license update Intern paperwork Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-06 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Subsea power cable slide review BOD slide review Internal meetings Seismic research - LM and Genesis discussions PO Process; meeting with Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 TSR Administration and support Conference call with island to discuss rig move to SWS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-06 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.5 0 ESD Philosophy to Dan Colby; interface with EMD and CG Review of GHW email regarding 258 stack-up drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-06 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 2 0 Meeting with Genesis and TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-06 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 2 0 Preparation for Meeting WED - meeting with Kvaerner THURS - meeting at Exxon; debrief with Kvaerner Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly TS Mgmt. Meeting Weekly TSR review meeting TSR Board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Creating spreadsheet for Bryan C. (based on info provided by RS) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-07 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Subsea power cable slide review BOD slide review Internal meetings Seismic research - LM and Genesis discussions PO Process; meeting with Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR Administration and support Conference call with island to discuss rig move to SWS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-07 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 ESD Philosophy to Dan Colby; interface with EMD and CG Review of GHW email regarding 258 stack-up drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-07 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Compliance Documentation Payment for COI User Fee - MR PERRY, PB DB 3 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-07 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 2 0 report review and meeting with SG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-07 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 4 0 Preparation for Meeting WED - meeting with Kvaerner THURS - meeting at Exxon; debrief with Kvaerner Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-08 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 Review of various designs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-08 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Subsea power cable slide review BOD slide review Internal meetings Seismic research - LM and Genesis discussions PO Process; meeting with Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-08 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 Round trip to Exxon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-08 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Compliance Documentation Payment for COI User Fee - MR PERRY, PB DB 3 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-08 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 8 0 Preparation for Meeting WED - meeting with Kvaerner THURS - meeting at Exxon; debrief with Kvaerner Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-09 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 Review of various designs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Performance Evaluation closeout Personnel meeting with RS SAFI license update Intern paperwork Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-09 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2.5 0 Subsea power cable slide review BOD slide review Internal meetings Seismic research - LM and Genesis discussions PO Process; meeting with Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-09 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.75 0 ESD Philosophy to Dan Colby; interface with EMD and CG Review of GHW email regarding 258 stack-up drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-09 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1.25 0 Compliance Documentation Payment for COI User Fee - MR PERRY, PB DB 3 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Weekly Operations Phone Conference Weekly TS Mgmt. Meeting Daily TSR board meeting Weekly TSR meeting (earning conf call) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals IHS invoice ECAD Performance Appraisal Meeting with Rob Earnings Update Luncheon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-12 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 update compliance tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-12 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 0.5 0 CO review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-12 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 1 0 reviewing report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-12 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 1.5 0 Review Genesis report / meeting with MDQ Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Board meetings Setting up timekeeping system Genesis on boarding Weekly Exxon Meeting Genesis PO SharePoint Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-13 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 Design review Meetings with Tyler and Dan Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Operations Phone Conference Weekly TS Mgmt. Meeting Daily TSR board meeting Weekly TSR meeting (earning conf call) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 timesheet and timesheet approvals IHS invoice ECAD Performance Appraisal Meeting with Rob Earnings Update Luncheon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-13 ORLAN-TSR :ORLAN-TSR TSR-01623-ORLP Orlan Service Beam CRI HP Pump Regular Pay N 1 0 Drawing review and hand calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-13 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 1 0 CO review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-13 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 1 0 Review Genesis report / meeting with MDQ Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-13 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2.5 0 Board meetings Setting up timekeeping system Genesis on boarding Weekly Exxon Meeting Genesis PO SharePoint Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-14 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 Design review Meetings with Tyler and Dan Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Operations Phone Conference Weekly TS Mgmt. Meeting Daily TSR board meeting Weekly TSR meeting (earning conf call) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals IHS invoice ECAD Performance Appraisal Meeting with Rob Earnings Update Luncheon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-14 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 257B BOP stack-up drawings Quote for Rig Saver for EMD gensets (257) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-14 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 1.5 0 comparison sketch between 264L and 1500 HP rig (Starr Energy) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-14 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 1 0 CO review / approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-14 ORLAN-TSR :ORLAN-TSR TSR-01623-ORLP Orlan Service Beam CRI HP Pump Regular Pay N 0.5 0 Drawing review and hand calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-14 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 0.5 0 CTR review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-14 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 1 0 CO review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-14 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 0.5 0 reviewing report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 Board meetings Setting up timekeeping system Genesis on boarding Weekly Exxon Meeting Genesis PO SharePoint Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-15 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 Design review Meetings with Tyler and Dan Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Weekly Operations Phone Conference Weekly TS Mgmt. Meeting Daily TSR board meeting Weekly TSR meeting (earning conf call) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 timesheet and timesheet approvals IHS invoice ECAD Performance Appraisal Meeting with Rob Earnings Update Luncheon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-15 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1.5 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-15 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 257B BOP stack-up drawings Quote for Rig Saver for EMD gensets (257) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-15 ORLAN-TSR :ORLAN-TSR TSR-01623-ORLP Orlan Service Beam CRI HP Pump Regular Pay N 0.5 0 Drawing review and hand calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-15 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Board meetings Setting up timekeeping system Genesis on boarding Weekly Exxon Meeting Genesis PO SharePoint Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals IHS invoice ECAD Performance Appraisal Meeting with Rob Earnings Update Luncheon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-16 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 257B BOP stack-up drawings Quote for Rig Saver for EMD gensets (257) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-16 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 Basis of Design Kick-Off Meeting Review of BOD / provide comments Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-16 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Board meetings Setting up timekeeping system Genesis on boarding Weekly Exxon Meeting Genesis PO SharePoint Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-20 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 Top Drive Technical and Commercial Evaluation Mtg. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Meeting with Brian Waligura (informal interview) TSR weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet and timesheet approvals Parking and Office access for Tecky S. Processing of ECAD refund check Discussing 2-12 forecast Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Review of open TSR's and prioritization Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-20 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.75 0 257B BOP Stack-Ups EMD Rig Saver quote sent to Dan Colby Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-20 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 Proposed Mexico TSR for Tender Submission Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-20 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 0.5 0 Final review and issue Genesis report Review and issue closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.25 0 Document reviews incl. BOD KanBan Board Meeting Emails regarding storage on platform Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Timesheet and timesheet approvals Parking and Office access for Tecky S. Processing of ECAD refund check Discussing 2-12 forecast Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-21 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 0.75 0 DNO tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-21 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Hyperion Training Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Review of open TSR's and prioritization Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-21 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.75 0 Hibernia timesheet review and approval Well control testing procedure review / meeting on Friday with Operations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-21 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 DROP's email from Dan Colby - discuss with Rob Johnson Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-21 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 1 0 Final review and issue Genesis report Review and issue closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Document reviews incl. BOD KanBan Board Meeting Emails regarding storage on platform Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Meeting with Brian Waligura (informal interview) TSR weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet and timesheet approvals Parking and Office access for Tecky S. Processing of ECAD refund check Discussing 2-12 forecast Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-22 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2 0 Well control 3rd party inspection document; review and discuss with MDQ Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-22 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Hibernia timesheet review and approval Well control testing procedure review / meeting on Friday with Operations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-22 ORLAN-TSR :ORLAN-TSR TSR-01623-ORLP Orlan Service Beam CRI HP Pump Regular Pay N 2 0 Review, analysis and closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-22 Rig 272L-TSR :Rig 272L-TSR TSR-01608-272L Colville River Ice Bridge Crossing Regular Pay N 1 0 Final review and issue Genesis report Review and issue closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 BOD Presentation review and comment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Document reviews incl. BOD KanBan Board Meeting Emails regarding storage on platform Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet and timesheet approvals Parking and Office access for Tecky S. Processing of ECAD refund check Discussing 2-12 forecast Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-23 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Well control 3rd party inspection document; review and discuss with MDQ Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-23 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Hibernia timesheet review and approval Well control testing procedure review / meeting on Friday with Operations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-23 ORLAN-TSR :ORLAN-TSR TSR-01623-ORLP Orlan Service Beam CRI HP Pump Regular Pay N 0.5 0 Review, analysis and closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.5 0 BOD Presentation review and comment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Document reviews incl. BOD KanBan Board Meeting Emails regarding storage on platform Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Weekly Ops Phone Conf. Weekly TS Mgmt. Meeting TSR Board Meetings TSR / TS Weekly Meeting Meeting to discuss 257B scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 GSM Contract Issue Timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Pluspetrol Argentina - discussions with TE and meeting with Omar Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-26 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Hibernia BOP transport frame discussed with Steve Sharpe and Bishop Lifting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-26 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 GoM Compliance Documents Interoffice mail - PD DB-3 COD sent to EJ Holly Support (Chuck Gorrell) 30B drawing for Perry Landry Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Model Review(s) BOD Reviews Exxon Meeting Internal Meetings KV Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Ops Phone Conf. Weekly TS Mgmt. Meeting TSR Board Meetings TSR / TS Weekly Meeting Meeting to discuss 257B scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 GSM Contract Issue Timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-27 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 0.5 0 DNO Tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Meeting with Genesis regarding 209L move to SWS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-27 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 GoM Compliance Documents Interoffice mail - PD DB-3 COD sent to EJ Holly Support (Chuck Gorrell) 30B drawing for Perry Landry Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-27 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 0.5 0 Demolition drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 Option "1" Model Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2.5 0 Model Review(s) BOD Reviews Exxon Meeting Internal Meetings KV Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-28 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 phone conf with GHW and JL regarding clarification and cost re-work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-28 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.5 0 Review and revise TD comparison documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Ops Phone Conf. Weekly TS Mgmt. Meeting TSR Board Meetings TSR / TS Weekly Meeting Meeting to discuss 257B scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 Update TSR tracker and review hours for all open TSR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Meeting with Genesis regarding 209L move to SWS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-28 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1.25 0 Hibernia BOP transport frame discussed with Steve Sharpe and Bishop Lifting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-28 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1.5 0 GoM Compliance Documents Interoffice mail - PD DB-3 COD sent to EJ Holly Support (Chuck Gorrell) 30B drawing for Perry Landry Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-28 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 email to Jonathon Marsh (Exxon) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2.5 0 Model Review(s) BOD Reviews Exxon Meeting Internal Meetings KV Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-01 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Design review meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-01 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 phone conf with GHW and JL regarding clarification and cost re-work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1.25 0 Review and revise TD comparison documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.25 0 Weekly Ops Phone Conf. Weekly TS Mgmt. Meeting TSR Board Meetings TSR / TS Weekly Meeting Meeting to discuss 257B scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 GSM Contract Issue Timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Pluspetrol Argentina - discussions with TE and meeting with Omar Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Model Review(s) BOD Reviews Exxon Meeting Internal Meetings KV Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-02 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-05 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 0.5 0 Reviewing and revising SOW document - multiple revisions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 18 Month Rolling Forecast Meeting TS Mgmt Meeting Weekly TS TSR Meeting TSR Board Review Meetings Meeting with Tyler and John Reck regarding personnel issues/opportunities Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 Rig Fleet data sheet for RS and BC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Personnel Discussions with Sachin and Joshua and R.S. TS Standards into IMS x 2 Revenue recognition Meetings with JS Administrative actions sent to Jazqui Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Pluspetrol Argentina - Meeting with NOV Gap Analysis discussion with TE Bauer Neo-Rig Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 Minkit 3D model review Minkit Seismic meeting with KV Weekly Meeting with Exxon/KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Model Reviews, general meetings, BOD review. general documentation review. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 clarification review cost estimate review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-06 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 0.5 0 Reviewing and revising SOW document - multiple revisions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 18 Month Rolling Forecast Meeting TS Mgmt Meeting Weekly TS TSR Meeting TSR Board Review Meetings Meeting with Tyler and John Reck regarding personnel issues/opportunities Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Rig Fleet data sheet for RS and BC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Personnel Discussions with Sachin and Joshua and R.S. TS Standards into IMS x 2 Revenue recognition Meetings with JS Administrative actions sent to Jazqui Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Pluspetrol Argentina - Meeting with NOV Gap Analysis discussion with TE Bauer Neo-Rig Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 Minkit 3D model review Minkit Seismic meeting with KV Weekly Meeting with Exxon/KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Model Reviews, general meetings, BOD review. general documentation review. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-07 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 2 0 Reviewing and revising SOW document - multiple revisions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 18 Month Rolling Forecast Meeting TS Mgmt Meeting Weekly TS TSR Meeting TSR Board Review Meetings Meeting with Tyler and John Reck regarding personnel issues/opportunities Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Personnel Discussions with Sachin and Joshua and R.S. TS Standards into IMS x 2 Revenue recognition Meetings with JS Administrative actions sent to Jazqui Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 Pluspetrol Argentina - Meeting with NOV Gap Analysis discussion with TE Bauer Neo-Rig Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Meeting preparation Prioritization of TSR's / Updates Non-TSR work actions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-07 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Model Reviews, general meetings, BOD review. general documentation review. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-08 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 clarification review cost estimate review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-08 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 1 0 Reviewing and revising SOW document - multiple revisions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 18 Month Rolling Forecast Meeting TS Mgmt Meeting Weekly TS TSR Meeting TSR Board Review Meetings Meeting with Tyler and John Reck regarding personnel issues/opportunities Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Rig Fleet data sheet for RS and BC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Personnel Discussions with Sachin and Joshua and R.S. TS Standards into IMS x 2 Revenue recognition Meetings with JS Administrative actions sent to Jazqui Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 Pluspetrol Argentina - Meeting with NOV Gap Analysis discussion with TE Bauer Neo-Rig Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Meeting preparation Prioritization of TSR's / Updates Non-TSR work actions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 Model Reviews, general meetings, BOD review. general documentation review. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 18 Month Rolling Forecast Meeting TS Mgmt Meeting Weekly TS TSR Meeting TSR Board Review Meetings Meeting with Tyler and John Reck regarding personnel issues/opportunities Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Rig Fleet data sheet for RS and BC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Personnel Discussions with Sachin and Joshua and R.S. TS Standards into IMS x 2 Revenue recognition Meetings with JS Administrative actions sent to Jazqui Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Meeting preparation Prioritization of TSR's / Updates Non-TSR work actions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-09 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Minkit 3D model review Minkit Seismic meeting with KV Weekly Meeting with Exxon/KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Weekly Ops Phone Call Weekly TS Mgmt. Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 NEO Rig Lunch and Meeting for Argentina (LABU) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Status of BOP inspection in Singapore Preparation for Weekly Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-12 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 257B Discussions KPO Contract Discussion (KMGDS) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Documentation Review (BoD slides, Electrical Slides, 3D models) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Review Weight and CG Documents 3D Modeling Revisions 3D file conversions Various documentation review meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-13 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 0.5 0 FEA review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-13 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 Meeting with Sawyer regarding hydraulic design 2M Test frame review meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 IMS Documents / MoC Process (Paint and NDT) Personnel discussion with Rob S. meeting with RS and JR regarding BU report IHS invoice review / produce breakdown Safety moment schedule Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-13 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 257B Discussions KPO Contract Discussion (KMGDS) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-13 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Documentation sent to Danielle and Jenn Frias regarding payments to USCG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Review Weight and CG Documents 3D Modeling Revisions 3D file conversions Various documentation review meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-14 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 0.75 0 Schedule review SOW review with CG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IMS Documents / MoC Process (Paint and NDT) Personnel discussion with Rob S. meeting with RS and JR regarding BU report IHS invoice review / produce breakdown Safety moment schedule Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Status of BOP inspection in Singapore Preparation for Weekly Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-14 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 Meeting with Bishop Lifting and Canadian Operations regarding BOP Lift Frames Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-14 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 257B Discussions KPO Contract Discussion (KMGDS) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-14 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1.5 0 Documentation sent to Danielle and Jenn Frias regarding payments to USCG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-14 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 review KA weight reports and send to project team Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Review Weight and CG Documents 3D Modeling Revisions 3D file conversions Various documentation review meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-15 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 Meeting with Sawyer regarding hydraulic design 2M Test frame review meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IMS Documents / MoC Process (Paint and NDT) Personnel discussion with Rob S. meeting with RS and JR regarding BU report IHS invoice review / produce breakdown Safety moment schedule Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-15 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 Meeting with Bishop Lifting and Canadian Operations regarding BOP Lift Frames Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-15 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 257B Discussions KPO Contract Discussion (KMGDS) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-15 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 Documentation sent to Danielle and Jenn Frias regarding payments to USCG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-15 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 Documentation Review (BoD slides, Electrical Slides, 3D models) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-15 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Review Weight and CG Documents 3D Modeling Revisions 3D file conversions Various documentation review meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-16 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 0.75 0 Schedule review SOW review with CG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IMS Documents / MoC Process (Paint and NDT) Personnel discussion with Rob S. meeting with RS and JR regarding BU report IHS invoice review / produce breakdown Safety moment schedule Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-16 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.75 0 Documentation sent to Danielle and Jenn Frias regarding payments to USCG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-16 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Documentation Review (BoD slides, Electrical Slides, 3D models) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-16 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Review Weight and CG Documents 3D Modeling Revisions 3D file conversions Various documentation review meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-19 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 1.5 0 drawings for Bob W., review SOW, rates to Bryan L. personnel discussion Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 weekly ops phone conf weekly TS mgmt meeting TSR board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 timesheet and timesheet approvals; TS personnel discussion IHS invoice Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-19 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-19 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3 0 choke manifold quote for KMGDS 257B Tender Support (mtg with Alexander-Ryan, conf calls with Ops, review documentation) 257B drawing review and organization Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-19 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 0.5 0 drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1.5 0 review and revise latest revision of BoD; review pipe barn proposal for Concept 6 weight/CG PowerPoint slide review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Berkut/Orlan reference documentation; scope split meeting meeting to discuss scoring of concepts weekly meetings with Exxon and KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-20 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 updating cost estimate; conf call(s) with Rodney and TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 timesheet and timesheet approvals; TS personnel discussion IHS invoice Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-20 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 choke manifold quote for KMGDS 257B Tender Support (mtg with Alexander-Ryan, conf calls with Ops, review documentation) 257B drawing review and organization Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-20 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 revised CTR; reviewing additional scope Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 review and revise latest revision of BoD; review pipe barn proposal for Concept 6 weight/CG PowerPoint slide review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 Berkut/Orlan reference documentation; scope split meeting meeting to discuss scoring of concepts weekly meetings with Exxon and KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals; TS personnel discussion IHS invoice Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-21 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 updating tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Discussing upcoming TSR's with Jeff; TSR prioritization Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-21 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.75 0 review 3000HP KOC specification and discuss with Carlos C. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-21 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 51B crane pedestal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-21 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 revised CTR; reviewing additional scope Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-21 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 0.5 0 drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.5 0 review and revise latest revision of BoD; review pipe barn proposal for Concept 6 weight/CG PowerPoint slide review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2.75 0 Berkut/Orlan reference documentation; scope split meeting meeting to discuss scoring of concepts weekly meetings with Exxon and KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-22 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 0.5 0 drawings for Bob W., review SOW, rates to Bryan L. personnel discussion Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 weekly ops phone conf weekly TS mgmt meeting TSR board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet and timesheet approvals; TS personnel discussion IHS invoice Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Discussing upcoming TSR's with Jeff; TSR prioritization Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-22 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.5 0 BOP lift frame administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-22 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2.5 0 choke manifold quote for KMGDS 257B Tender Support (mtg with Alexander-Ryan, conf calls with Ops, review documentation) 257B drawing review and organization Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-22 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 51B crane pedestal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-22 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 calculations; drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.5 0 review and revise latest revision of BoD; review pipe barn proposal for Concept 6 weight/CG PowerPoint slide review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-23 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.75 0 updating cost estimate; conf call(s) with Rodney and TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 timesheet and timesheet approvals; TS personnel discussion IHS invoice Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-23 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 choke manifold quote for KMGDS 257B Tender Support (mtg with Alexander-Ryan, conf calls with Ops, review documentation) 257B drawing review and organization Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-23 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 revised CTR; reviewing additional scope Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-23 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 calculations; drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 Berkut/Orlan reference documentation; scope split meeting meeting to discuss scoring of concepts weekly meetings with Exxon and KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 JR recommendation letter timesheet and timesheet approvals RAL number revision to paint specification; IMS document submittal sent JS updated forecast information Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.5 0 HH cost increase; reviewing documentation with TE; bid sheet review and updates Conference call with BU Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 weekly ops phone conf call weekly TS mgmt meeting TSR board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 JR recommendation letter timesheet and timesheet approvals RAL number revision to paint specification; IMS document submittal sent JS updated forecast information Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-26 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-26 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 257B drawing clean-up; helideck cost support for Rodney; lifeboat support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-26 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 1 0 Preliminary calculations; wheel loading from NOV document Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Screening matrix review Seismic conf call with Genesis weekly conf call with Exxon weekly conf call with KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-27 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 CTR issues; CTR transmitted to 2M-Tek Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 HH cost increase; reviewing documentation with TE; bid sheet review and updates Conference call with BU Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 JR recommendation letter timesheet and timesheet approvals RAL number revision to paint specification; IMS document submittal sent JS updated forecast information Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-27 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 drawing review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Risk register review / workshop topside philosophy document review and comments Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2.25 0 Screening matrix review Seismic conf call with Genesis weekly conf call with Exxon weekly conf call with KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-28 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.25 0 HH cost increase; reviewing documentation with TE; bid sheet review and updates Conference call with BU Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 weekly ops phone conf call weekly TS mgmt meeting TSR board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 JR recommendation letter timesheet and timesheet approvals RAL number revision to paint specification; IMS document submittal sent JS updated forecast information Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 updating tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-28 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.75 0 257B drawing clean-up; helideck cost support for Rodney; lifeboat support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-28 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 updating compliance tracker; paying COI annual user fees Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Risk register review / workshop topside philosophy document review and comments Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 Screening matrix review Seismic conf call with Genesis weekly conf call with Exxon weekly conf call with KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-29 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 HH cost increase; reviewing documentation with TE; bid sheet review and updates Conference call with BU Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 weekly ops phone conf call weekly TS mgmt meeting TSR board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-29 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.5 0 257B drawing clean-up; helideck cost support for Rodney; lifeboat support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-29 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 0.5 0 Preliminary calculations; wheel loading from NOV document Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.5 0 Risk register review / workshop topside philosophy document review and comments Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Screening matrix review Seismic conf call with Genesis weekly conf call with Exxon weekly conf call with KV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-03-30 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-02 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 0.5 0 Hours Summary review of design / status of project / setting up design review meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 weekly operations phone call\\ weekly TS mgmt meeting TSR board meetings weekly TSR meeting (MINKIT mtg replaced this week) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals personnel package and meeting invite 2018 talent review spreadsheet MOC approvals for new IMS documents monthly PDR review meeting with Rob S. 10Q reporting - rig count Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-02 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 weekly meeting and preparation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.75 0 TSR status review with John Reck reviewing and prioritizing new electrical TSR's with Sachin **unbillable** rig move to SWS (209L) general support inquiries from Jeff A. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-02 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2.5 0 257B Tender Support / Review spreadsheet and compile engineering hours / schedule Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-02 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 reviewing ALE report; meeting with ALE and ENL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 final review of screening report and other deliverables Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 concept 3 - cost and execution meeting review of final deliverables and preparation for closeout mtg at Exxon weekly meeting(s) mtg to review report out slides Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly operations phone call\\ weekly TS mgmt meeting TSR board meetings weekly TSR meeting (MINKIT mtg replaced this week) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 timesheet and timesheet approvals personnel package and meeting invite 2018 talent review spreadsheet MOC approvals for new IMS documents monthly PDR review meeting with Rob S. 10Q reporting - rig count Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.75 0 TSR status review with John Reck reviewing and prioritizing new electrical TSR's with Sachin **unbillable** rig move to SWS (209L) general support inquiries from Jeff A. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-03 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3 0 257B Tender Support / Review spreadsheet and compile engineering hours / schedule Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 final review of screening report and other deliverables Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 concept 3 - cost and execution meeting review of final deliverables and preparation for closeout mtg at Exxon weekly meeting(s) mtg to review report out slides Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 timesheet and timesheet approvals personnel package and meeting invite 2018 talent review spreadsheet MOC approvals for new IMS documents monthly PDR review meeting with Rob S. 10Q reporting - rig count Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-04 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 updating spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR status review with John Reck reviewing and prioritizing new electrical TSR's with Sachin **unbillable** rig move to SWS (209L) general support inquiries from Jeff A. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-04 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 257B Tender Support / Review spreadsheet and compile engineering hours / schedule Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-04 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 reviewing ALE report; meeting with ALE and ENL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 final review of screening report and other deliverables Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 concept 3 - cost and execution meeting review of final deliverables and preparation for closeout mtg at Exxon weekly meeting(s) mtg to review report out slides Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly operations phone call\\ weekly TS mgmt meeting TSR board meetings weekly TSR meeting (MINKIT mtg replaced this week) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 timesheet and timesheet approvals personnel package and meeting invite 2018 talent review spreadsheet MOC approvals for new IMS documents monthly PDR review meeting with Rob S. 10Q reporting - rig count Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 TSR status review with John Reck reviewing and prioritizing new electrical TSR's with Sachin **unbillable** rig move to SWS (209L) general support inquiries from Jeff A. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-05 ORLAN-TSR :ORLAN-TSR TSR-01631-ORLP Flow Meter on Base Oil Supply Line Regular Pay N 1 0 review TSR scope of work and approve CTR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-05 ORLAN-TSR :ORLAN-TSR TSR-01637-ORLP Centrifugal Pumps Soft Start Regular Pay N 1 0 review TSR scope of work and approve CTR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-05 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1.5 0 closeout review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1.5 0 final review of screening report and other deliverables Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-06 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 0.5 0 Hours Summary review of design / status of project / setting up design review meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly operations phone call\\ weekly TS mgmt meeting TSR board meetings weekly TSR meeting (MINKIT mtg replaced this week) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet and timesheet approvals personnel package and meeting invite 2018 talent review spreadsheet MOC approvals for new IMS documents monthly PDR review meeting with Rob S. 10Q reporting - rig count Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 TSR status review with John Reck reviewing and prioritizing new electrical TSR's with Sachin **unbillable** rig move to SWS (209L) general support inquiries from Jeff A. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-06 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 257B Tender Support / Review spreadsheet and compile engineering hours / schedule Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 final review of screening report and other deliverables Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 concept 3 - cost and execution meeting review of final deliverables and preparation for closeout mtg at Exxon weekly meeting(s) mtg to review report out slides Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 TSR status review with John Reck reviewing and prioritizing new electrical TSR's with Sachin **unbillable** rig move to SWS (209L) general support inquiries from Jeff A. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 weekly meetings (Monday) TSR meeting (daily) TSR weekly mtg Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 called bronco regarding oime draw works CVN material cost sent to JL Sakhalin document control meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals IMS documentation uploaded to SharePoint personnel discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-09 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 min kit platform / continuing support after action review alternative rigs for platform Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-09 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 review status of all TSR's with JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Orlan choke manifold issues customs union certificate review standpipe TSR (draft) and send comments back to field weekly meeting regarding rig move / waiting for approved CTR NDA sent to Oliver at ALE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-09 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 0.5 0 documentation review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-10 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2 0 review analysis report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 called bronco regarding oime draw works CVN material cost sent to JL Sakhalin document control meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet and timesheet approvals IMS documentation uploaded to SharePoint personnel discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-10 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 3.25 0 min kit platform / continuing support after action review alternative rigs for platform Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.25 0 Orlan choke manifold issues customs union certificate review standpipe TSR (draft) and send comments back to field weekly meeting regarding rig move / waiting for approved CTR NDA sent to Oliver at ALE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-10 ORLAN-TSR :ORLAN-TSR TSR-01637-ORLP Centrifugal Pumps Soft Start Regular Pay N 1.25 0 review closeout and approve Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly meetings (Monday) TSR meeting (daily) TSR weekly mtg Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet and timesheet approvals IMS documentation uploaded to SharePoint personnel discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-11 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 update tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Orlan choke manifold issues customs union certificate review standpipe TSR (draft) and send comments back to field weekly meeting regarding rig move / waiting for approved CTR NDA sent to Oliver at ALE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-11 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Discussion with Mark Quinlan regarding upcoming TSR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-11 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2.75 0 no-go bar review / approval 257B tender support 258L Tender Support logistics cost request Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-11 Rig 216L-TSR :Rig 216L-TSR TSR-01645-216L HP Piping Repair Regular Pay N 1.5 0 reviewing TSR and sending email with weld procedure and typical weld details Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-12 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 0.5 0 review analysis report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-12 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 clarification no. 20 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 weekly meetings (Monday) TSR meeting (daily) TSR weekly mtg Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals IMS documentation uploaded to SharePoint personnel discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 update tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Orlan choke manifold issues customs union certificate review standpipe TSR (draft) and send comments back to field weekly meeting regarding rig move / waiting for approved CTR NDA sent to Oliver at ALE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-12 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3 0 no-go bar review / approval 257B tender support 258L Tender Support logistics cost request Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-13 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 clarification no. 20 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly meetings (Monday) TSR meeting (daily) TSR weekly mtg Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 timesheet and timesheet approvals IMS documentation uploaded to SharePoint personnel discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.75 0 Orlan choke manifold issues customs union certificate review standpipe TSR (draft) and send comments back to field weekly meeting regarding rig move / waiting for approved CTR NDA sent to Oliver at ALE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-13 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1.25 0 review tsr and ctr for top drive rail replacement Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-13 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 no-go bar review / approval 257B tender support 258L Tender Support logistics cost request Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-16 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 review hand calculations review meetings with Tyler and Rob Shank Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approval talent identification document HR meeting with Rob S. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-16 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 0.75 0 review of ttopco documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-16 OH-010 :OH-010 Overhead All Activities Regular Pay N 2.25 0 travel to and from Exxon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-16 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 updating hours in spreadsheet; meeting with GO; spreadsheet to Rodney; review meeting on Tuesday Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-16 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5.5 0 meeting at Exxon; internal debrief meeting; support for closeout; discuss 270 on platform Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-17 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2.5 0 review hand calculations review meetings with Tyler and Rob Shank Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approval talent identification document HR meeting with Rob S. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 updating tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Rig move CTR revision start Genesis PO process for rig move TSR reference documents to Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-17 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2.5 0 updating hours in spreadsheet; meeting with GO; spreadsheet to Rodney; review meeting on Tuesday Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-17 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 document research for EJ in New Iberia updating compliance tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.25 0 timesheet and timesheet approval talent identification document HR meeting with Rob S. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-18 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 updating tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Rig move CTR revision start Genesis PO process for rig move TSR reference documents to Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-18 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2.5 0 updating hours in spreadsheet; meeting with GO; spreadsheet to Rodney; review meeting on Tuesday Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-18 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 document research for EJ in New Iberia updating compliance tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-18 ORLAN-TSR :ORLAN-TSR TSR-01637-ORLP Centrifugal Pumps Soft Start Regular Pay N 0.5 0 Discuss TSR with Sachin; review sow Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-18 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 meeting with Genesis Discuss sow with Odoptu Staff Eng. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-18 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 1 0 drawing review and provide comments Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-18 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 meeting at Exxon; internal debrief meeting; support for closeout; discuss 270 on platform Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-19 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 review hand calculations review meetings with Tyler and Rob Shank Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 timesheet and timesheet approval talent identification document HR meeting with Rob S. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Rig move CTR revision start Genesis PO process for rig move TSR reference documents to Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-19 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 updating hours in spreadsheet; meeting with GO; spreadsheet to Rodney; review meeting on Tuesday Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-19 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 document research for EJ in New Iberia updating compliance tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-19 ORLAN-TSR :ORLAN-TSR TSR-01631-ORLP Flow Meter on Base Oil Supply Line Regular Pay N 1.5 0 review and approve CO Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-19 ORLAN-TSR :ORLAN-TSR TSR-01637-ORLP Centrifugal Pumps Soft Start Regular Pay N 0.5 0 Discuss TSR with Sachin; review sow Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-19 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 meeting with Genesis Discuss sow with Odoptu Staff Eng. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-19 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 meeting at Exxon; internal debrief meeting; support for closeout; discuss 270 on platform Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Weekly Operation Conf. Call Weekly TS Mgmt. Meeting TSR Board Meeting TSR Weekly Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Intern discussions with Jim Tolsma and Neil Slater Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-23 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 0.5 0 Min Kit Activities Meeting at Exxon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-23 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Monday meeting preparation Meeting with Lam and JR to discuss status and priority Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Minkit Meeting at Exxon Conf. Call with Ralph C. Discussion of Rig Move PO, Issue PO to Genesis, set-up kick-off mtg. Conf. Call with Bohan regarding JA Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-23 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 NOVOS Conf. Call Reviewing NOVOS documentaiton Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-23 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 216 Schedule 258 Tender Support 257 Tender Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-23 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 Review of TSR, development of design, sent out 3D concept Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-24 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2.5 0 Min Kit Activities Meeting at Exxon Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-24 OH-010 :OH-010 Overhead All Activities Regular Pay N 2.5 0 Travel to Exxon and return Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-24 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 Minkit Meeting at Exxon Conf. Call with Ralph C. Discussion of Rig Move PO, Issue PO to Genesis, set-up kick-off mtg. Conf. Call with Bohan regarding JA Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-24 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 216 Schedule 258 Tender Support 257 Tender Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-24 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 Closeout review and Approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-25 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Meeting with GHW Clarification No. 21 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Intern discussions with Jim Tolsma and Neil Slater Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Updating tracing sheet; updating timesheet with new TSR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Minkit Meeting at Exxon Conf. Call with Ralph C. Discussion of Rig Move PO, Issue PO to Genesis, set-up kick-off mtg. Conf. Call with Bohan regarding JA Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-25 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1.5 0 NOVOS Conf. Call Reviewing NOVOS documentaiton Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-25 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 Review of TSR, development of design, sent out 3D concept Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Meeting with GHW Clarification No. 21 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Operation Conf. Call Weekly TS Mgmt. Meeting TSR Board Meeting TSR Weekly Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Intern discussions with Jim Tolsma and Neil Slater Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 Updating tracing sheet; updating timesheet with new TSR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Minkit Meeting at Exxon Conf. Call with Ralph C. Discussion of Rig Move PO, Issue PO to Genesis, set-up kick-off mtg. Conf. Call with Bohan regarding JA Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-26 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.25 0 216 Schedule 258 Tender Support 257 Tender Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-26 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.75 0 BOP stacks sent to Benny Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-26 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 Review of TSR, development of design, sent out 3D concept Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-26 Rig 216L-TSR :Rig 216L-TSR TSR-01645-216L HP Piping Repair Regular Pay N 0.5 0 Reviewing documents Email to Robbie Bennett Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-27 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 2 0 TSR review, preliminary calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Meeting with GHW Clarification No. 21 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Intern discussions with Jim Tolsma and Neil Slater Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Minkit Meeting at Exxon Conf. Call with Ralph C. Discussion of Rig Move PO, Issue PO to Genesis, set-up kick-off mtg. Conf. Call with Bohan regarding JA Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-27 Rig 216L-TSR :Rig 216L-TSR TSR-01645-216L HP Piping Repair Regular Pay N 1 0 Reviewing documents Email to Robbie Bennett Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 weekly operations phone call TSR board meetings Weekly TSR meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 looking over 4-8 forecast data timesheet and timesheet approval internship planning 270L TSR / change order (working with Lana) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-30 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 review of Sakhalin TSR's and setting priority Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-30 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.5 0 BP Tender support (onshore and offshore); review NCOC tender package; meetings with GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-30 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Ms Risa / Ms Dorothy EPIRB renewal Mr. Shelby COI User Fee renewal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-30 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 Set-up SharePoint site; bi-weekly meeting; DM trailer layouts sent to team Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-30 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 drawing review and comment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-04-30 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 2 0 TSR review and preliminary calcs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-01 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 0.5 0 CTR revision review and meetings with Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-01 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 0.5 0 discussion with Sakhalin operations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-01 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 reviewing histogram IADC DDR research and meetings with Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly operations phone call TSR board meetings Weekly TSR meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 looking over 4-8 forecast data timesheet and timesheet approval internship planning 270L TSR / change order (working with Lana) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 update TSR tracker and upl.oad new TSR's into timekeeping system Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Rig move administrations General TSR support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-01 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Correspondence and uploading Liberty drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-01 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 BP Tender support (onshore and offshore); review NCOC tender package; meetings with GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-01 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 Set-up SharePoint site; bi-weekly meeting; DM trailer layouts sent to team Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-02 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 reviewing histogram IADC DDR research and meetings with Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 looking over 4-8 forecast data timesheet and timesheet approval internship planning 270L TSR / change order (working with Lana) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-02 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 0.5 0 GO meeting to review Krechet specifications; deliverables review for deep dive Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 update TSR tracker and upl.oad new TSR's into timekeeping system Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-02 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.25 0 AISC Webinar - "Tariffs and trade Issues" Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Rig move administrations General TSR support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-02 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Correspondence and uploading Liberty drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-02 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 Ms Risa / Ms Dorothy EPIRB renewal Mr. Shelby COI User Fee renewal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-02 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1.5 0 Set-up SharePoint site; bi-weekly meeting; DM trailer layouts sent to team Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-02 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 concept and drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-03 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 0.5 0 CTR revision review and meetings with Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-03 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 review and approve CTR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 reviewing histogram IADC DDR research and meetings with Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly operations phone call TSR board meetings Weekly TSR meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 looking over 4-8 forecast data timesheet and timesheet approval internship planning 270L TSR / change order (working with Lana) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-03 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 0.75 0 GO meeting to review Krechet specifications; deliverables review for deep dive Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Rig move administrations General TSR support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-03 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 BP Tender support (onshore and offshore); review NCOC tender package; meetings with GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-03 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 Ms Risa / Ms Dorothy EPIRB renewal Mr. Shelby COI User Fee renewal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-03 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 reviewing closeout report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 looking over 4-8 forecast data timesheet and timesheet approval internship planning 270L TSR / change order (working with Lana) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-04 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 0.5 0 TTopCo Tender - Drawing package Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Rig move administrations General TSR support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-04 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Correspondence and uploading Liberty drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-04 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.5 0 BP Tender support (onshore and offshore); review NCOC tender package; meetings with GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-04 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 concept and drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-04 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 reviewing closeout report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-07 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 Fabrication TPP Hydraulics TPP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-07 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 histogram meeting(s) with GHW and Tyler conference call with Rodney Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 TSR board meetings Weekly TSR meeting (Thursday) 4-8 forecast review meeting meeting with AMASE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 4-8 forecast data timesheet and timesheet approval internship planning renewed PTI engineering firm registration technical services hours summary Job descriptions sent to Bo and held conf call to discuss setting up support CTR with Genesis IHS subscription for Quail Tools Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-07 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 review of Sakhalin TSR's and priority Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-07 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Liberty files Reviewing historical documents conference call with team and Gary (Liberty) HP gate valve procurement support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-07 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 BP Tender Support (258 and 257) 216L Support for KPO tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-07 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 EPIRB renewal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-07 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 baseline assumptions; review of trailer layout from ALE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-08 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 0.5 0 Fabrication TPP Hydraulics TPP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-08 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 histogram meeting(s) with GHW and Tyler conference call with Rodney Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 3.5 0 TSR board meetings Weekly TSR meeting (Thursday) 4-8 forecast review meeting meeting with AMASE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 4-8 forecast data timesheet and timesheet approval internship planning renewed PTI engineering firm registration technical services hours summary Job descriptions sent to Bo and held conf call to discuss setting up support CTR with Genesis IHS subscription for Quail Tools Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-08 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1 0 TTopCO clarification\\ Electrical spreadsheet review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-08 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Liberty files Reviewing historical documents conference call with team and Gary (Liberty) HP gate valve procurement support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-08 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.25 0 BP Tender Support (258 and 257) 216L Support for KPO tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-08 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 EPIRB renewal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-09 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 TSR and CTR review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-09 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 histogram meeting(s) with GHW and Tyler conference call with Rodney Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board meetings Weekly TSR meeting (Thursday) 4-8 forecast review meeting meeting with AMASE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 4-8 forecast data timesheet and timesheet approval internship planning renewed PTI engineering firm registration technical services hours summary Job descriptions sent to Bo and held conf call to discuss setting up support CTR with Genesis IHS subscription for Quail Tools Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-09 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1 0 TTopCO clarification\\ Electrical spreadsheet review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-09 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 update TSR tracker and upload new TSR's into timekeeping system Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-09 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.25 0 Hunton Andrews and Kurth Lunch and Learn (IP) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Rig move (unbillable) TSR support (unbillable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-09 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 BP Tender Support (258 and 257) 216L Support for KPO tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-10 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 histogram meeting(s) with GHW and Tyler conference call with Rodney Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 TSR board meetings Weekly TSR meeting (Thursday) 4-8 forecast review meeting meeting with AMASE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 4-8 forecast data timesheet and timesheet approval internship planning renewed PTI engineering firm registration technical services hours summary Job descriptions sent to Bo and held conf call to discuss setting up support CTR with Genesis IHS subscription for Quail Tools Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-10 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 update TSR tracker and upload new TSR's into timekeeping system Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-10 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Liberty files Reviewing historical documents conference call with team and Gary (Liberty) HP gate valve procurement support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-10 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 BP Tender Support (258 and 257) 216L Support for KPO tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-10 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 baseline assumptions; review of trailer layout from ALE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-10 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 drawing review and approval (as-built) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-11 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 Fabrication TPP Hydraulics TPP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-11 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 histogram meeting(s) with GHW and Tyler conference call with Rodney Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board meetings Weekly TSR meeting (Thursday) 4-8 forecast review meeting meeting with AMASE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 4-8 forecast data timesheet and timesheet approval internship planning renewed PTI engineering firm registration technical services hours summary Job descriptions sent to Bo and held conf call to discuss setting up support CTR with Genesis IHS subscription for Quail Tools Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-11 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1.5 0 GO meeting to review Krechet/Berkut specifications Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-11 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2.5 0 Liberty files Reviewing historical documents conference call with team and Gary (Liberty) HP gate valve procurement support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-14 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.5 0 Total Uganda Scope of Work review creating slides GHW meeting (wed) email/discussion to supply chain regarding Uganda bids clarification review Mtg with Total on Thursday morning Starting Tech Spec for contract Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 weekly ops conf call weekly TS mgmt. meeting weekly TSR review meeting TSR daily board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals Review Genesis blanket CTR intern discussion Contract Mgmt. IMS document review intern scope of work personnel discussions with RS and GO Quail IHS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-14 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 preparation and meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-14 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2 0 Liberty - reviewing emails, documents General conf call with Alaska ops. (Conoco, Alpine, Doyon, etc..) valve specification Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-14 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 257B tender support (technical) 249 tender support (bp) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-14 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 review 30B incident report compliance Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-14 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 conf call with Tecky (x3) email to ALE review of Genesis preliminary results Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-14 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 final drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-15 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 Total Uganda Scope of Work review creating slides GHW meeting (wed) email/discussion to supply chain regarding Uganda bids clarification review Mtg with Total on Thursday morning Starting Tech Spec for contract Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly ops conf call weekly TS mgmt. meeting weekly TSR review meeting TSR daily board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 timesheet and timesheet approvals Review Genesis blanket CTR intern discussion Contract Mgmt. IMS document review intern scope of work personnel discussions with RS and GO Quail IHS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-15 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Liberty - reviewing emails, documents General conf call with Alaska ops. (Conoco, Alpine, Doyon, etc..) valve specification Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-15 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 257B tender support (technical) 249 tender support (bp) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-15 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 0.5 0 final approval of closeout discussion about weld procedure with JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-16 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.5 0 Total Uganda Scope of Work review creating slides GHW meeting (wed) email/discussion to supply chain regarding Uganda bids clarification review Mtg with Total on Thursday morning Starting Tech Spec for contract Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-16 Hibernia Platform :Hibernia Platform TSR-01646-HIBP Top Drive Rail Replacement Regular Pay N 1 0 scope of work and MTO review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 timesheet and timesheet approvals Review Genesis blanket CTR intern discussion Contract Mgmt. IMS document review intern scope of work personnel discussions with RS and GO Quail IHS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 updating tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-16 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 IMS security training Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-16 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2 0 Liberty - reviewing emails, documents General conf call with Alaska ops. (Conoco, Alpine, Doyon, etc..) valve specification Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-16 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 257B tender support (technical) 249 tender support (bp) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-16 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 1 0 discuss with Jon Richardson and Sachin; review closeout and make revisions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-17 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 Total Uganda Scope of Work review creating slides GHW meeting (wed) email/discussion to supply chain regarding Uganda bids clarification review Mtg with Total on Thursday morning Starting Tech Spec for contract Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly ops conf call weekly TS mgmt. meeting weekly TSR review meeting TSR daily board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 updating tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 boiler condensate line issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-17 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Liberty - reviewing emails, documents General conf call with Alaska ops. (Conoco, Alpine, Doyon, etc..) valve specification Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-17 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 257B tender support (technical) 249 tender support (bp) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-17 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 review 30B incident report compliance Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-17 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 conf call with Tecky (x3) email to ALE review of Genesis preliminary results Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-17 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 closeout review and approval; Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-18 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Total Uganda Scope of Work review creating slides GHW meeting (wed) email/discussion to supply chain regarding Uganda bids clarification review Mtg with Total on Thursday morning Starting Tech Spec for contract Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly ops conf call weekly TS mgmt. meeting weekly TSR review meeting TSR daily board meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals Review Genesis blanket CTR intern discussion Contract Mgmt. IMS document review intern scope of work personnel discussions with RS and GO Quail IHS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-18 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 257B tender support (technical) 249 tender support (bp) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-18 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 conf call with Tecky (x3) email to ALE review of Genesis preliminary results Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-18 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 0.5 0 final approval of closeout discussion about weld procedure with JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-21 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 scope of work review; discussions with GHW and RS technical requirements review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Lunch with Logan Industries (Chad Trumps, Rob Shank) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Sachin's MBA recommendation Brendon white PE recommendation timesheet and timesheet approvals Personnel admin IADC rig inspection training research Intern SOW and discussions with Ops Quail ITS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-21 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 meeting preparation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-21 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 0.75 0 timesheet review and approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-21 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.75 0 257B / 258L tender support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-21 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Ms. Cissy compliance 77B draft calcs for Leroy Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-21 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 conf call(s) with Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-22 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 scope of work review; discussions with GHW and RS technical requirements review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Lunch with Logan Industries (Chad Trumps, Rob Shank) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Sachin's MBA recommendation Brendon white PE recommendation timesheet and timesheet approvals Personnel admin IADC rig inspection training research Intern SOW and discussions with Ops Quail ITS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-22 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 Ms. Cissy compliance 77B draft calcs for Leroy Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-22 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 0.5 0 Drawing package review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-22 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 conf call(s) with Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-22 Rig 209L-TSR :Rig 209L-TSR TSR-01635-209L Dirty Power Issue Regular Pay N 0.5 0 TSR review and CTR approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-22 Rig 216L-TSR :Rig 216L-TSR TSR-01645-216L HP Piping Repair Regular Pay N 2 0 closeout preparation and review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-23 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 scope of work review; discussions with GHW and RS technical requirements review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Lunch with Logan Industries (Chad Trumps, Rob Shank) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Sachin's MBA recommendation Brendon white PE recommendation timesheet and timesheet approvals Personnel admin IADC rig inspection training research Intern SOW and discussions with Ops Quail ITS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-23 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 1 0 Meeting with Alisa and Tolsma regarding YPF and XTO Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Updating TSR tracker; safety moment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 status updates with JR; unbillable hours for open TSR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-23 Rig 216L-TSR :Rig 216L-TSR TSR-01645-216L HP Piping Repair Regular Pay N 0.5 0 closeout preparation and review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-24 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 1 0 discussion with JR; review of solid works model. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-24 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 scope of work review; discussions with GHW and RS technical requirements review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Sachin's MBA recommendation Brendon white PE recommendation timesheet and timesheet approvals Personnel admin IADC rig inspection training research Intern SOW and discussions with Ops Quail ITS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-24 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Updating TSR tracker; safety moment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-24 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 status updates with JR; unbillable hours for open TSR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-24 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Ms. Cissy compliance 77B draft calcs for Leroy Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-24 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 review of status; review of red lines; discussion with James and Lam Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-24 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 conf call(s) with Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-25 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 scope of work review; discussions with GHW and RS technical requirements review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.75 0 Sachin's MBA recommendation Brendon white PE recommendation timesheet and timesheet approvals Personnel admin IADC rig inspection training research Intern SOW and discussions with Ops Quail ITS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 status updates with JR; unbillable hours for open TSR's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-25 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1.5 0 Drawing package review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-25 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 conf call(s) with Genesis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-28 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-29 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1 0 Drawing package review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-29 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 0.5 0 review of model / discussion with JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-29 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Scope of Work review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Intern Planning incl. SOW, schedule and travel planning Quail PE reference form Timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-29 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 review of open TSR's and ensuring schedule is being met Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-29 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 review all MOC's sent in by Robbie and/or Dan C. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-29 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 257B Tender support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-29 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 265L cellar cover Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-29 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 Crew boat documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-29 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 1 0 drawing package review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-29 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1.5 0 Bi-weekly meeting; conf call with Tecky Hours summary Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-29 Rig 272L-TSR :Rig 272L-TSR TSR-01591-272L NOVOS System Installation Regular Pay N 1 0 closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-30 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 1.5 0 Drawing package review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-30 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 0.5 0 review of model / discussion with JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-30 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Scope of Work review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Intern Planning incl. SOW, schedule and travel planning Quail PE reference form Timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-30 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 TSR tracker update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-30 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.75 0 crown sheave cluster information sent to Luis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-30 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.5 0 review all MOC's sent in by Robbie and/or Dan C. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-30 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1.5 0 265L cellar cover Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-30 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 Crew boat documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-30 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 0.5 0 drawing package review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-31 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 0.5 0 Drawing package review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-31 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 review of spool drawing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-31 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 2 0 TSR review and analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-31 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.5 0 Scope of Work review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly TSR meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Intern Planning incl. SOW, schedule and travel planning Quail PE reference form Timesheet and timesheet approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-31 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 TSR tracker update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-05-31 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.5 0 review all MOC's sent in by Robbie and/or Dan C. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-01 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-04 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Scope of Work Procurement Plan Kan Ban Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 operations weekly conf call daily TSR board meetings Weekly TSR meeting CAT DGB Meeting Lunch with intern and RS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 intern guidance / administration vendor add - Logan Industries Dan Slack off boarding technical services hours summary IMS document review and red lines Forecast review meeting preparation phone call with Ravi Garg (Saturday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-04 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Sakhalin personnel discussions DSM cantilever walkway review (non-billable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-04 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.5 0 Supporting supply chain for 216 start-up 258 BOP hoists - info sent to GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-04 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 KPO and BP tender support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-04 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 Ms Dorothy Mr Robert Parker Compliance sheet update 30B tugger line site visit - set-up Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-04 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.75 0 drill module report review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-04 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 0.5 0 reviewing proposed design Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-05 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 1 0 additional analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-05 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 Scope of Work Procurement Plan Kan Ban Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 operations weekly conf call daily TSR board meetings Weekly TSR meeting CAT DGB Meeting Lunch with intern and RS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 intern guidance / administration vendor add - Logan Industries Dan Slack off boarding technical services hours summary IMS document review and red lines Forecast review meeting preparation phone call with Ravi Garg (Saturday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Sakhalin personnel discussions DSM cantilever walkway review (non-billable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-05 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1.5 0 Supporting supply chain for 216 start-up 258 BOP hoists - info sent to GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-05 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 KPO and BP tender support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-05 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.25 0 Ms Dorothy Mr Robert Parker Compliance sheet update 30B tugger line site visit - set-up Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-05 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.75 0 drill module report review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-06 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Scope of Work Procurement Plan Kan Ban Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 operations weekly conf call daily TSR board meetings Weekly TSR meeting CAT DGB Meeting Lunch with intern and RS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 intern guidance / administration vendor add - Logan Industries Dan Slack off boarding technical services hours summary IMS document review and red lines Forecast review meeting preparation phone call with Ravi Garg (Saturday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 updating TSR tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Sakhalin personnel discussions DSM cantilever walkway review (non-billable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-06 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Crown sheave removal Discussion with Lam regarding cellar area drawings and models Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-06 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 Supporting supply chain for 216 start-up 258 BOP hoists - info sent to GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-06 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 KPO and BP tender support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-06 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 1 0 closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-06 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 1 0 reviewing proposed design Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-07 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Scope of Work Procurement Plan Kan Ban Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.75 0 operations weekly conf call daily TSR board meetings Weekly TSR meeting CAT DGB Meeting Lunch with intern and RS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 intern guidance / administration vendor add - Logan Industries Dan Slack off boarding technical services hours summary IMS document review and red lines Forecast review meeting preparation phone call with Ravi Garg (Saturday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-07 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 updating TSR tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Sakhalin personnel discussions DSM cantilever walkway review (non-billable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-07 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.5 0 Supporting supply chain for 216 start-up 258 BOP hoists - info sent to GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-07 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 Ms Dorothy Mr Robert Parker Compliance sheet update 30B tugger line site visit - set-up Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-07 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 0.5 0 reviewing new design Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-07 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.25 0 drill module report review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-07 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 1 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-08 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Scope of Work Procurement Plan Kan Ban Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 operations weekly conf call daily TSR board meetings Weekly TSR meeting CAT DGB Meeting Lunch with intern and RS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 intern guidance / administration vendor add - Logan Industries Dan Slack off boarding technical services hours summary IMS document review and red lines Forecast review meeting preparation phone call with Ravi Garg (Saturday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Sakhalin personnel discussions DSM cantilever walkway review (non-billable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-08 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.25 0 Crown sheave removal Discussion with Lam regarding cellar area drawings and models Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-08 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.5 0 Supporting supply chain for 216 start-up 258 BOP hoists - info sent to GHW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-08 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.75 0 Ms Dorothy Mr Robert Parker Compliance sheet update 30B tugger line site visit - set-up Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-08 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 0.5 0 reviewing new design Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 intern guidance / administration vendor add - Logan Industries Dan Slack off boarding technical services hours summary IMS document review and red lines Forecast review meeting preparation phone call with Ravi Garg (Saturday) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-11 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 1.5 0 weld calculations Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-11 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 reviewing Tech Spec reviewing Total specifications and contract Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-11 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 0.5 0 drawing review (revision) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Ops weekly conf call Weekly TS mgmt. meeting TSR board meetings TSR weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 timesheet and timesheet approvals intern admin (timesheet, trip, workload) discussion with NH and GO SAFI invoice Quail IHS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-11 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR administration - setting priorities phone calls with island Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-11 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 18-3/4" 15M weight sent to GHW BP Tender support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-11 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 0.5 0 CTR revision - review/approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-11 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 reviewing drill module and PBM reports; conf calls with Tecky Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-12 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 0.5 0 reviewing solidworks model reviewing hand calcs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-12 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 reviewing Tech Spec reviewing Total specifications and contract Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals intern admin (timesheet, trip, workload) discussion with NH and GO SAFI invoice Quail IHS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 updating TSR tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-12 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1.5 0 Accumulator issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-12 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 18-3/4" 15M weight sent to GHW BP Tender support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-12 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 265 cellar cover Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-12 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 30B Trip Planning Compliance renewals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-12 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 reviewing drill module and PBM reports; conf calls with Tecky Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-13 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 0.5 0 reviewing solidworks model reviewing hand calcs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-13 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 reviewing Tech Spec reviewing Total specifications and contract Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet and timesheet approvals intern admin (timesheet, trip, workload) discussion with NH and GO SAFI invoice Quail IHS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-13 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 18-3/4" 15M weight sent to GHW BP Tender support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-13 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 265 cellar cover Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-14 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 reviewing Tech Spec reviewing Total specifications and contract Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ops weekly conf call Weekly TS mgmt. meeting TSR board meetings TSR weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 timesheet and timesheet approvals intern admin (timesheet, trip, workload) discussion with NH and GO SAFI invoice Quail IHS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-14 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 updating TSR tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR administration - setting priorities phone calls with island Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-14 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Accumulator issue Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-14 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 30B Trip Planning Compliance renewals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-14 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 reviewing drill module and PBM reports; conf calls with Tecky Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-15 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 1 0 reviewing solidworks model reviewing hand calcs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-15 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 reviewing Tech Spec reviewing Total specifications and contract Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Ops weekly conf call Weekly TS mgmt. meeting TSR board meetings TSR weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet and timesheet approvals intern admin (timesheet, trip, workload) discussion with NH and GO SAFI invoice Quail IHS subscription Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-15 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 265 cellar cover Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-15 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 reviewing drill module and PBM reports; conf calls with Tecky Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-18 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 0.5 0 drawing and analysis review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-18 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 0.5 0 drawing and analysis review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-18 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 cash flow meeting with GO and JL tech spec review and board meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 weekly ops phone call weekly TS mgmt meeting (Thursday) TSR board meetings weekly TS meeting (Thursday) meeting with NOV (Mike Murray) meeting with Ford Steel Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 personnel meeting with GO and RS; timesheet and timesheet approvals J. Gasper mid-year review J. Reck mid-year review meeting with HR regarding ATH Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-18 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 prepare for mtg with JR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR updates; TSR reviews; planning Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-18 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.75 0 Contract question from Mark Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-18 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 269L rig down over wellhead Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-19 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 1 0 drawing and analysis review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-19 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 1 0 drawing and analysis review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-19 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 cash flow meeting with GO and JL tech spec review and board meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-19 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 2 0 inputting all serial numbers; discussion path forward with Sachin; creating spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly ops phone call weekly TS mgmt meeting (Thursday) TSR board meetings weekly TS meeting (Thursday) meeting with NOV (Mike Murray) meeting with Ford Steel Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 personnel meeting with GO and RS; timesheet and timesheet approvals J. Gasper mid-year review J. Reck mid-year review meeting with HR regarding ATH Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-19 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 2 0 Genesis report review starting Co reviewing LTN's sketches / redlines Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-20 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 cash flow meeting with GO and JL tech spec review and board meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-20 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 1 0 inputting all serial numbers; discussion path forward with Sachin; creating spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly ops phone call weekly TS mgmt meeting (Thursday) TSR board meetings weekly TS meeting (Thursday) meeting with NOV (Mike Murray) meeting with Ford Steel Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 personnel meeting with GO and RS; timesheet and timesheet approvals J. Gasper mid-year review J. Reck mid-year review meeting with HR regarding ATH Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-20 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 TSR updates; TSR reviews; planning Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-20 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 Genesis report review starting Co reviewing LTN's sketches / redlines Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-20 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 1 0 drawing review and discussion with James Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-21 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 0.5 0 drawing and analysis review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 weekly ops phone call weekly TS mgmt meeting (Thursday) TSR board meetings weekly TS meeting (Thursday) meeting with NOV (Mike Murray) meeting with Ford Steel Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.25 0 personnel meeting with GO and RS; timesheet and timesheet approvals J. Gasper mid-year review J. Reck mid-year review meeting with HR regarding ATH Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-21 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-21 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 216L ground bearing pressure Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-21 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 cydsa platform; discussion with RS; review of previously submitted work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-21 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 Genesis report review starting Co reviewing LTN's sketches / redlines Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-21 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 0.5 0 drawing review and discussion with James Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-22 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 1 0 drawing and analysis review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-22 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 cash flow meeting with GO and JL tech spec review and board meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-22 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 1 0 inputting all serial numbers; discussion path forward with Sachin; creating spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 weekly ops phone call weekly TS mgmt meeting (Thursday) TSR board meetings weekly TS meeting (Thursday) meeting with NOV (Mike Murray) meeting with Ford Steel Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 personnel meeting with GO and RS; timesheet and timesheet approvals J. Gasper mid-year review J. Reck mid-year review meeting with HR regarding ATH Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-22 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.5 0 cydsa platform; discussion with RS; review of previously submitted work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-22 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1 0 CO revision review and approval Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-25 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 tech spec review meetings with TE Meeting with HH Cash flow review HH meeting agenda review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Ops Conference Call TSR Board Meetings meeting with Derrick Equipment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 mid-year review with RS intern administration technical services hours summary Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-25 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 Rig Move - non-billable general support Rig Move - Phase II scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-25 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 3 0 Closeout Conference Calls Bi-weekly meeting with ENL, ALE meeting notes Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-26 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 tech spec review meetings with TE Meeting with HH Cash flow review HH meeting agenda review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-26 HTSG-TSR :HTSG-TSR TSR-01654-HTSG Global Dual Fuel Study Regular Pay N 1 0 conf call with CAT Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ops Conference Call TSR Board Meetings meeting with Derrick Equipment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 mid-year review with RS intern administration technical services hours summary Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Rig Move - non-billable general support Rig Move - Phase II scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-26 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 time sheets Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-26 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 Conf call with GHW, Randy Crowsen, and Andy Young - KPO lifting requirements Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-26 Rig 216L-TSR :Rig 216L-TSR TSR-01659-216L Spreader Bar Regular Pay N 1 0 review analysis and drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Ops Conference Call TSR Board Meetings meeting with Derrick Equipment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 mid-year review with RS intern administration technical services hours summary Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 updating tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Rig Move - non-billable general support Rig Move - Phase II scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-27 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1.25 0 review closeout / approve / transmit Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-27 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 2 0 Closeout Conference Calls Bi-weekly meeting with ENL, ALE meeting notes Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-27 Rig 216L-TSR :Rig 216L-TSR TSR-01659-216L Spreader Bar Regular Pay N 0.75 0 review analysis and drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-28 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 4 0 tech spec review meetings with TE Meeting with HH Cash flow review HH meeting agenda review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Ops Conference Call TSR Board Meetings meeting with Derrick Equipment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 mid-year review with RS intern administration technical services hours summary Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 updating tracking spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Rig Move - non-billable general support Rig Move - Phase II scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-28 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 269L additional fuel tank Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-28 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 Closeout Conference Calls Bi-weekly meeting with ENL, ALE meeting notes Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-28 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 0.75 0 review closeout revision Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-29 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 1 0 review closoeut Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.75 0 mid-year review with RS intern administration technical services hours summary Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-29 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Rig Move - non-billable general support Rig Move - Phase II scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-29 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 crown removal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2018-06-29 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 Closeout Conference Calls Bi-weekly meeting with ENL, ALE meeting notes Michael, Ard Welder Michael, Ard:Welder 2017-05-01 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 7 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-01 2M-TEK :2M-TEK 1031 R&S 13-3/8” Regular Pay N 1 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-03 2M-TEK :2M-TEK 1016 PO 0209404, 0409405-WS Regular Pay N 2 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-03 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 2 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-03 2M-TEK :2M-TEK 1031 R&S 13-3/8” Regular Pay N 2 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-04 2M-TEK :2M-TEK 1016 PO 0209404, 0409405-WS Regular Pay N 6 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-04 2M-TEK :2M-TEK 1031 R&S 13-3/8” Regular Pay N 2 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-05 2M-TEK :2M-TEK 1016 PO 0209404, 0409405-WS Regular Pay N 7 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-08 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 6 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-08 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 2 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-09 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-10 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-11 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-12 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-15 2M-TEK :2M-TEK 1033 R&S Validate Welding Procedures Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-16 2M-TEK :2M-TEK 1033 R&S Validate Welding Procedures Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-17 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 4 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-17 2M-TEK :2M-TEK 1033 R&S Validate Welding Procedures Regular Pay N 4 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-18 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 6 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-18 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 2 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-19 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-22 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 4 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-22 2M-TEK :2M-TEK 1033 R&S Validate Welding Procedures Regular Pay N 4 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-23 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-24 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 5 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-24 2M-TEK :2M-TEK 1036 R&S ITS PO 50950 9-5/8” MM and 2 9-5/8” WM Regular Pay N 3 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-25 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-26 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-29 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-30 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-05-31 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-01 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-02 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-05 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 4 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-05 2M-TEK :2M-TEK 1033 R&S Validate Welding Procedures Regular Pay N 4 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-06 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 4 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-06 2M-TEK :2M-TEK 1033 R&S Validate Welding Procedures Regular Pay N 4 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-07 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 4 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-07 2M-TEK :2M-TEK 1033 R&S Validate Welding Procedures Regular Pay N 4 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-08 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 4 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-08 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 4 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-09 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 4 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-09 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 4 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-12 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-13 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-14 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-15 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-16 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-19 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-20 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-21 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-22 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-23 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-26 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-27 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-28 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-29 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-06-30 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-07-03 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-07-04 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-07-05 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-07-06 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-07-07 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-07-10 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-07-11 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-07-12 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-07-13 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 4 0 Michael, Ard Welder Michael, Ard:Welder 2017-07-14 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-07-17 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-07-18 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-07-19 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-07-20 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-07-21 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-07-24 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-07-25 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-07-26 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-07-27 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-07-28 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-07-31 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-08-01 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-08-02 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-08-03 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-08-04 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-08-07 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-08-08 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-08-09 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-08-10 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-08-11 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-08-21 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-08-22 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-08-23 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-08-24 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Michael, Ard Welder Michael, Ard:Welder 2017-08-25 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Holiday Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-03 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 8 0 Generated and transmitted invoice for PTI December Labor, updated 209 drawing MDR on Share Point, received missing Cameron Backup Riser Docs- routed for approval, received and checked Cameron Hardcopies, routed NOV Tubular Shuttle As Builts, created and transmitted monthly close out progress report Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-04 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 2 0 Generated and transmitted invoice for PTI December Labor, updated 209 drawing MDR on Share Point, received missing Cameron Backup Riser Docs- routed for approval, received and checked Cameron Hardcopies, routed NOV Tubular Shuttle As Builts, created and transmitted monthly close out progress report Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 IDR Meeting, General TSR Meeting Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-04 OH-013 :OH-013 Overhead All Activities Regular Pay N 5.5 0 TSR invoices for November activity, provided accruals for Dec TRS, 270 Labor Variance Report, transmitted drawing 209L-01-03-401, created new TSR in ProjXense for 01525 Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-05 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 6 0 Generated and transmitted invoice for PTI December Labor, updated 209 drawing MDR on Share Point, received missing Cameron Backup Riser Docs- routed for approval, received and checked Cameron Hardcopies, routed NOV Tubular Shuttle As Builts, created and transmitted monthly close out progress report Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 IDR Meeting, General TSR Meeting Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-05 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR invoices for November activity, provided accruals for Dec TRS, 270 Labor Variance Report, transmitted drawing 209L-01-03-401, created new TSR in ProjXense for 01525 Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-09 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 4 0 Cameron documentation- routing, review, issue discussion, Ram Spooler OIM Manual- review,routing, NOV Diverter Additional manuals- routing, Batch 8 Documentation List- Pressure Vessel Docs added, conf. call - Final Doc. Turnover, NOV Power Systems Manual- routing, NOV Floor Monkey As Builts dwgs- routing Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-09 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 DCDM transition discussion, DCDM transition plan, DCDM site- working with IT on data issue Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 ProjXense- Set up correct approvers + inactivate users, Pulled up PTO time per G.Osten request, added new OH code for Legal Support in ProjXense, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-09 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 issued dwg #, inbox managing, storing documents, updated 209 MDR, signed and returned old transmittals to Sakh. Doc. Control, transmitted TSR-1519-CO, TSR-1525 CTR, 1516-CO,1523-CO,1518-CTR 270 Labor variance report, 270, 209 drawings transmittal, general query TSRs Q1 2017+ added into ProjXense, Meeting with Kyle on TSR tracking, 270- timesheets correction+ new timesheets for past 2 weeks, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-10 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 2 0 Cameron documentation- routing, review, issue discussion, Ram Spooler OIM Manual- review,routing, NOV Diverter Additional manuals- routing, Batch 8 Documentation List- Pressure Vessel Docs added, conf. call - Final Doc. Turnover, NOV Power Systems Manual- routing, NOV Floor Monkey As Builts dwgs- routing Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 ProjXense- Set up correct approvers + inactivate users, Pulled up PTO time per G.Osten request, added new OH code for Legal Support in ProjXense, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-10 OH-013 :OH-013 Overhead All Activities Regular Pay N 5 0 issued dwg #, inbox managing, storing documents, updated 209 MDR, signed and returned old transmittals to Sakh. Doc. Control, transmitted TSR-1519-CO, TSR-1525 CTR, 1516-CO,1523-CO,1518-CTR 270 Labor variance report, 270, 209 drawings transmittal, general query TSRs Q1 2017+ added into ProjXense, Meeting with Kyle on TSR tracking, 270- timesheets correction+ new timesheets for past 2 weeks, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-11 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 3 0 Cameron documentation- routing, review, issue discussion, Ram Spooler OIM Manual- review,routing, NOV Diverter Additional manuals- routing, Batch 8 Documentation List- Pressure Vessel Docs added, conf. call - Final Doc. Turnover, NOV Power Systems Manual- routing, NOV Floor Monkey As Builts dwgs- routing Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 ProjXense- Set up correct approvers + inactivate users, Pulled up PTO time per G.Osten request, added new OH code for Legal Support in ProjXense, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-11 OH-013 :OH-013 Overhead All Activities Regular Pay N 4.5 0 issued dwg #, inbox managing, storing documents, updated 209 MDR, signed and returned old transmittals to Sakh. Doc. Control, transmitted TSR-1519-CO, TSR-1525 CTR, 1516-CO,1523-CO,1518-CTR 270 Labor variance report, 270, 209 drawings transmittal, general query TSRs Q1 2017+ added into ProjXense, Meeting with Kyle on TSR tracking, 270- timesheets correction+ new timesheets for past 2 weeks, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-12 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 4 0 Cameron documentation- routing, review, issue discussion, Ram Spooler OIM Manual- review,routing, NOV Diverter Additional manuals- routing, Batch 8 Documentation List- Pressure Vessel Docs added, conf. call - Final Doc. Turnover, NOV Power Systems Manual- routing, NOV Floor Monkey As Builts dwgs- routing Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-12 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 DCDM transition discussion, DCDM transition plan, DCDM site- working with IT on data issue Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 General Department Meeting Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 issued dwg #, inbox managing, storing documents, updated 209 MDR, signed and returned old transmittals to Sakh. Doc. Control, transmitted TSR-1519-CO, TSR-1525 CTR, 1516-CO,1523-CO,1518-CTR 270 Labor variance report, 270, 209 drawings transmittal, general query TSRs Q1 2017+ added into ProjXense, Meeting with Kyle on TSR tracking, 270- timesheets correction+ new timesheets for past 2 weeks, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-13 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 3 0 Cameron documentation- routing, review, issue discussion, Ram Spooler OIM Manual- review,routing, NOV Diverter Additional manuals- routing, Batch 8 Documentation List- Pressure Vessel Docs added, conf. call - Final Doc. Turnover, NOV Power Systems Manual- routing, NOV Floor Monkey As Builts dwgs- routing Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-13 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 2 0 DCDM transition discussion, DCDM transition plan, DCDM site- working with IT on data issue Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-13 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 issued dwg #, inbox managing, storing documents, updated 209 MDR, signed and returned old transmittals to Sakh. Doc. Control, transmitted TSR-1519-CO, TSR-1525 CTR, 1516-CO,1523-CO,1518-CTR 270 Labor variance report, 270, 209 drawings transmittal, general query TSRs Q1 2017+ added into ProjXense, Meeting with Kyle on TSR tracking, 270- timesheets correction+ new timesheets for past 2 weeks, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-16 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 2 0 Revised Documentation Turnover Plan, received revised Cameron MRB- checked, routed, followed up on po 1000011615 delivery Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-16 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 2 0 Uploaded Pressure Vessels Docs to DCDM, Searching and saving COCs on DCDM. meeting with IDR, MOM for Monday meeting, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 4 0 TSR-1508, 1528, 1520, 1523, 1518, 1505, 1506, 1507, 1508, 1534, 1533 Transmittal, Alaska Q1 2017 TSR, manage TSR inbox, saved Docs on SP, 270 Labor Variance and timesheets, updated 209 MDR, drawing numbers, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-17 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 5 0 Uploaded Pressure Vessels Docs to DCDM, Searching and saving COCs on DCDM. meeting with IDR, MOM for Monday meeting, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 TSR-1508, 1528, 1520, 1523, 1518, 1505, 1506, 1507, 1508, 1534, 1533 Transmittal, Alaska Q1 2017 TSR, manage TSR inbox, saved Docs on SP, 270 Labor Variance and timesheets, updated 209 MDR, drawing numbers, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-18 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 1 0 Revised Documentation Turnover Plan, received revised Cameron MRB- checked, routed, followed up on po 1000011615 delivery Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-18 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 4 0 Uploaded Pressure Vessels Docs to DCDM, Searching and saving COCs on DCDM. meeting with IDR, MOM for Monday meeting, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-18 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 TSR-1508, 1528, 1520, 1523, 1518, 1505, 1506, 1507, 1508, 1534, 1533 Transmittal, Alaska Q1 2017 TSR, manage TSR inbox, saved Docs on SP, 270 Labor Variance and timesheets, updated 209 MDR, drawing numbers, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-19 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 3 0 Uploaded Pressure Vessels Docs to DCDM, Searching and saving COCs on DCDM. meeting with IDR, MOM for Monday meeting, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Tech Services Weekly Meeting Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 research PTO per G. Osten request, managing ProjXense Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-19 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 TSR-1508, 1528, 1520, 1523, 1518, 1505, 1506, 1507, 1508, 1534, 1533 Transmittal, Alaska Q1 2017 TSR, manage TSR inbox, saved Docs on SP, 270 Labor Variance and timesheets, updated 209 MDR, drawing numbers, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-20 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 1 0 Revised Documentation Turnover Plan, received revised Cameron MRB- checked, routed, followed up on po 1000011615 delivery Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-20 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 5 0 Uploaded Pressure Vessels Docs to DCDM, Searching and saving COCs on DCDM. meeting with IDR, MOM for Monday meeting, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 research PTO per G. Osten request, managing ProjXense Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-20 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR-1508, 1528, 1520, 1523, 1518, 1505, 1506, 1507, 1508, 1534, 1533 Transmittal, Alaska Q1 2017 TSR, manage TSR inbox, saved Docs on SP, 270 Labor Variance and timesheets, updated 209 MDR, drawing numbers, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-23 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 2 0 Processed payment to Cameron PO 11411- MS-3B, Cameron Back-Up Riser Documentation- routing, followed up on PO 11516 delivery, received and checked Top Drive User manual, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-23 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 3 0 created Excel spreadsheet with all docs in DCDM Ztesting folder, uploaded new docs on DCDM, fill out messing info for docs in Ztesting, MOM from weekly meeting, added new Asset #, reclass activities for 0705, research missing documentation for Diverter and Risers, requested from suppliers Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 BD Meeting on Monday, Weekly Tech. Services Meeting On Thurs Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 TSR inbox- saving received docs on SP, Transmittals: 270 drawings, TSR-01526, 1535, 1534, 1536,1500 1525,1478 , Genesis TSR invoice-checked, TSR invoices for December, new TSRs in to ProjXense,, new TSR numbers, met with J. Lambert on 270 documentation, drafted TSR for 270 docs, new Drawings numbers provided, updated MDR Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-24 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 1 0 Processed payment to Cameron PO 11411- MS-3B, Cameron Back-Up Riser Documentation- routing, followed up on PO 11516 delivery, received and checked Top Drive User manual, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-24 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 4 0 created Excel spreadsheet with all docs in DCDM Ztesting folder, uploaded new docs on DCDM, fill out messing info for docs in Ztesting, MOM from weekly meeting, added new Asset #, reclass activities for 0705, research missing documentation for Diverter and Risers, requested from suppliers Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-24 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 TSR inbox- saving received docs on SP, Transmittals: 270 drawings, TSR-01526, 1535, 1534, 1536,1500 1525,1478 , Genesis TSR invoice-checked, TSR invoices for December, new TSRs in to ProjXense,, new TSR numbers, met with J. Lambert on 270 documentation, drafted TSR for 270 docs, new Drawings numbers provided, updated MDR Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-25 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 1 0 Processed payment to Cameron PO 11411- MS-3B, Cameron Back-Up Riser Documentation- routing, followed up on PO 11516 delivery, received and checked Top Drive User manual, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-25 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 3 0 created Excel spreadsheet with all docs in DCDM Ztesting folder, uploaded new docs on DCDM, fill out messing info for docs in Ztesting, MOM from weekly meeting, added new Asset #, reclass activities for 0705, research missing documentation for Diverter and Risers, requested from suppliers Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 4 0 TSR inbox- saving received docs on SP, Transmittals: 270 drawings, TSR-01526, 1535, 1534, 1536,1500 1525,1478 , Genesis TSR invoice-checked, TSR invoices for December, new TSRs in to ProjXense,, new TSR numbers, met with J. Lambert on 270 documentation, drafted TSR for 270 docs, new Drawings numbers provided, updated MDR Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-26 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 2 0 created Excel spreadsheet with all docs in DCDM Ztesting folder, uploaded new docs on DCDM, fill out messing info for docs in Ztesting, MOM from weekly meeting, added new Asset #, reclass activities for 0705, research missing documentation for Diverter and Risers, requested from suppliers Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 BD Meeting on Monday, Weekly Tech. Services Meeting On Thurs Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 5 0 TSR inbox- saving received docs on SP, Transmittals: 270 drawings, TSR-01526, 1535, 1534, 1536,1500 1525,1478 , Genesis TSR invoice-checked, TSR invoices for December, new TSRs in to ProjXense,, new TSR numbers, met with J. Lambert on 270 documentation, drafted TSR for 270 docs, new Drawings numbers provided, updated MDR Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-27 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 3 0 created Excel spreadsheet with all docs in DCDM Ztesting folder, uploaded new docs on DCDM, fill out messing info for docs in Ztesting, MOM from weekly meeting, added new Asset #, reclass activities for 0705, research missing documentation for Diverter and Risers, requested from suppliers Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shirts Order Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 TSR inbox- saving received docs on SP, Transmittals: 270 drawings, TSR-01526, 1535, 1534, 1536,1500 1525,1478 , Genesis TSR invoice-checked, TSR invoices for December, new TSRs in to ProjXense,, new TSR numbers, met with J. Lambert on 270 documentation, drafted TSR for 270 docs, new Drawings numbers provided, updated MDR Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-30 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 4 0 PO 8093 Docs- Saved on SP & Routed, Documentation, DCDM meeting on Monday, added new asset # to DCDM, PO 0.8093 dos- uploaded to DCDM & assigned asset, MOM for Monday's meeting, Top Drive manual follow up, Odoptu January accruals, uploaded new rolling stock docs from PRC & SM to DCDM, assigned asset # Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shirts Order, ProjXense discussions, ProjXense- cleaned, deactivated users, processed Greg Osten Expense report, 2016 performance evaluation Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-30 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 Assigned new TSR numbers, TSR inbox- saved new docs, distribution, signed transmittals, Transmitted TSR-01524, 1533, 1395,1520,1510, 1523, 1521 249-drawings scanned, saved, sent out TSR invoices for Dec, 270 docum. TSR, Labor Variance report and timesheets 270, Provided accruals file to Sakhalin for January TSRs, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-01-31 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 8 0 January timesheets, Prepared January Labor invoice, Uploaded Batch 8 documentation to flash drives & Turnover Folder on SP, drafted Cameron Backup Riser MCC Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-01 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 PO 8093 Docs- Saved on SP & Routed, Documentation, DCDM meeting on Monday, added new asset # to DCDM, PO 0.8093 dos- uploaded to DCDM & assigned asset, MOM for Monday's meeting, Top Drive manual follow up, Odoptu January accruals, uploaded new rolling stock docs from PRC & SM to DCDM, assigned asset # Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shirts Order, ProjXense discussions, ProjXense- cleaned, deactivated users, processed Greg Osten Expense report, 2016 performance evaluation Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 Assigned new TSR numbers, TSR inbox- saved new docs, distribution, signed transmittals, Transmitted TSR-01524, 1533, 1395,1520,1510, 1523, 1521 249-drawings scanned, saved, sent out TSR invoices for Dec, 270 docum. TSR, Labor Variance report and timesheets 270, Provided accruals file to Sakhalin for January TSRs, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-02 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 0.5 0 PO 8093 Docs- Saved on SP & Routed, Documentation, DCDM meeting on Monday, added new asset # to DCDM, PO 0.8093 dos- uploaded to DCDM & assigned asset, MOM for Monday's meeting, Top Drive manual follow up, Odoptu January accruals, uploaded new rolling stock docs from PRC & SM to DCDM, assigned asset # Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Tech Services weekly meeting, SharePoint Upgrade Beta 1 meeting Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shirts Order, ProjXense discussions, ProjXense- cleaned, deactivated users, processed Greg Osten Expense report, 2016 performance evaluation Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 4 0 Assigned new TSR numbers, TSR inbox- saved new docs, distribution, signed transmittals, Transmitted TSR-01524, 1533, 1395,1520,1510, 1523, 1521 249-drawings scanned, saved, sent out TSR invoices for Dec, 270 docum. TSR, Labor Variance report and timesheets 270, Provided accruals file to Sakhalin for January TSRs, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-03 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 3 0 PO 8093 Docs- Saved on SP & Routed, Documentation, DCDM meeting on Monday, added new asset # to DCDM, PO 0.8093 dos- uploaded to DCDM & assigned asset, MOM for Monday's meeting, Top Drive manual follow up, Odoptu January accruals, uploaded new rolling stock docs from PRC & SM to DCDM, assigned asset # Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shirts Order, ProjXense discussions, ProjXense- cleaned, deactivated users, processed Greg Osten Expense report, 2016 performance evaluation Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-03 OH-011 :OH-011 Overhead All Activities Regular Pay N 2 0 Doctor's appointment Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-03 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 Assigned new TSR numbers, TSR inbox- saved new docs, distribution, signed transmittals, Transmitted TSR-01524, 1533, 1395,1520,1510, 1523, 1521 249-drawings scanned, saved, sent out TSR invoices for Dec, 270 docum. TSR, Labor Variance report and timesheets 270, Provided accruals file to Sakhalin for January TSRs, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-06 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 4 0 Created and transmitted January Labor invoice, updated cost report, Cameron audit request, followed up on Cameron documentation, uploaded new rolling stock manuals to DCDM, finalize DCDM site, Panalpina documentation clarification to Yulia, research old ODPL transmittal per Ops Manager request, followed up on Diverter documentation, followed up on shear pump delivery, received review Russian user manual- Top Drive Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 4 0 TSR inbox managing, saved received documents, created new TSR numbers, Transmittals: 270 workpacks, 258 drawings,209 drawings, TSR-0154 15420, drwg # requests, 270 labor variance report and timesheets Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-07 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 3 0 Created and transmitted January Labor invoice, updated cost report, Cameron audit request, followed up on Cameron documentation, uploaded new rolling stock manuals to DCDM, finalize DCDM site, Panalpina documentation clarification to Yulia, research old ODPL transmittal per Ops Manager request, followed up on Diverter documentation, followed up on shear pump delivery, received review Russian user manual- Top Drive Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 2Mteck/ITS set up in projXense meeting, Tech. Services weekly meeting Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-07 OH-013 :OH-013 Overhead All Activities Regular Pay N 4 0 TSR inbox managing, saved received documents, created new TSR numbers, Transmittals: 270 workpacks, 258 drawings,209 drawings, TSR-0154 15420, drwg # requests, 270 labor variance report and timesheets Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-08 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 2 0 Created and transmitted January Labor invoice, updated cost report, Cameron audit request, followed up on Cameron documentation, uploaded new rolling stock manuals to DCDM, finalize DCDM site, Panalpina documentation clarification to Yulia, research old ODPL transmittal per Ops Manager request, followed up on Diverter documentation, followed up on shear pump delivery, received review Russian user manual- Top Drive Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 added 2Mteck & ITS to ProjXense- all employees and WBS codes, SharePount- Beta1 review- completed, packing up office to move to 5 floor, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-08 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 TSR inbox managing, saved received documents, created new TSR numbers, Transmittals: 270 workpacks, 258 drawings,209 drawings, TSR-0154 15420, drwg # requests, 270 labor variance report and timesheets Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-08 OH-014 :OH-014 Overhead All Activities Regular Pay N 0.5 0 IDR training, provided examples of records to IDR group prior to training Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-09 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 Created and transmitted January Labor invoice, updated cost report, Cameron audit request, followed up on Cameron documentation, uploaded new rolling stock manuals to DCDM, finalize DCDM site, Panalpina documentation clarification to Yulia, research old ODPL transmittal per Ops Manager request, followed up on Diverter documentation, followed up on shear pump delivery, received review Russian user manual- Top Drive Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 2Mteck/ITS set up in projXense meeting, Tech. Services weekly meeting Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 added 2Mteck & ITS to ProjXense- all employees and WBS codes, SharePount- Beta1 review- completed, packing up office to move to 5 floor, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-09 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 TSR inbox managing, saved received documents, created new TSR numbers, Transmittals: 270 workpacks, 258 drawings,209 drawings, TSR-0154 15420, drwg # requests, 270 labor variance report and timesheets Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-10 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 2 0 Created and transmitted January Labor invoice, updated cost report, Cameron audit request, followed up on Cameron documentation, uploaded new rolling stock manuals to DCDM, finalize DCDM site, Panalpina documentation clarification to Yulia, research old ODPL transmittal per Ops Manager request, followed up on Diverter documentation, followed up on shear pump delivery, received review Russian user manual- Top Drive Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 added 2Mteck & ITS to ProjXense- all employees and WBS codes, SharePount- Beta1 review- completed, packing up office to move to 5 floor, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-10 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 TSR inbox managing, saved received documents, created new TSR numbers, Transmittals: 270 workpacks, 258 drawings,209 drawings, TSR-0154 15420, drwg # requests, 270 labor variance report and timesheets Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-10 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 IDR training, provided examples of records to IDR group prior to training Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-13 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 3 0 NOV Russian Manuals Meeting, Documentation meeting, Odoptu LLE reconciliation meeting, follow up on 11615 delivery, HPU documentation- Updated manuals rev, routed, updated MDR, updated DCDM, created NOV Rus manuals tracker, Russian manuals review, Floor Monkey- new manual revs- routing, updated MDR, updated DCDM, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet, 2M TEK Set up in ProjXense, Showed J. Lambert how to pull timesheets and add tasks in ProjXense, closed projects in ProjXense, Add OH-009 new sub-tasks and OH-034 Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-13 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 TSR inbox, saving documents on SP, created new TSR & drawings numbers, updated 209 MDR, 270 documentation- revised TSR draft, transmitted TSR-01538, 01540, 01541, 270 drawings, 15B drawings, TSR Genesis Invoice status, 270 weekly timesheets and labor variance, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-14 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 3 0 NOV Russian Manuals Meeting, Documentation meeting, Odoptu LLE reconciliation meeting, follow up on 11615 delivery, HPU documentation- Updated manuals rev, routed, updated MDR, updated DCDM, created NOV Rus manuals tracker, Russian manuals review, Floor Monkey- new manual revs- routing, updated MDR, updated DCDM, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 5h floor safety orientation, Tech Services weekly meeting, 4th Q Earnings review Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Timesheet, 2M TEK Set up in ProjXense, Showed J. Lambert how to pull timesheets and add tasks in ProjXense, closed projects in ProjXense, Add OH-009 new sub-tasks and OH-034 Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-14 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 TSR inbox, saving documents on SP, created new TSR & drawings numbers, updated 209 MDR, 270 documentation- revised TSR draft, transmitted TSR-01538, 01540, 01541, 270 drawings, 15B drawings, TSR Genesis Invoice status, 270 weekly timesheets and labor variance, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-15 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 3 0 NOV Russian Manuals Meeting, Documentation meeting, Odoptu LLE reconciliation meeting, follow up on 11615 delivery, HPU documentation- Updated manuals rev, routed, updated MDR, updated DCDM, created NOV Rus manuals tracker, Russian manuals review, Floor Monkey- new manual revs- routing, updated MDR, updated DCDM, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet, 2M TEK Set up in ProjXense, Showed J. Lambert how to pull timesheets and add tasks in ProjXense, closed projects in ProjXense, Add OH-009 new sub-tasks and OH-034 Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-15 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 TSR inbox, saving documents on SP, created new TSR & drawings numbers, updated 209 MDR, 270 documentation- revised TSR draft, transmitted TSR-01538, 01540, 01541, 270 drawings, 15B drawings, TSR Genesis Invoice status, 270 weekly timesheets and labor variance, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-16 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 0.5 0 NOV Russian Manuals Meeting, Documentation meeting, Odoptu LLE reconciliation meeting, follow up on 11615 delivery, HPU documentation- Updated manuals rev, routed, updated MDR, updated DCDM, created NOV Rus manuals tracker, Russian manuals review, Floor Monkey- new manual revs- routing, updated MDR, updated DCDM, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 5h floor safety orientation, Tech Services weekly meeting, 4th Q Earnings review Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet, 2M TEK Set up in ProjXense, Showed J. Lambert how to pull timesheets and add tasks in ProjXense, closed projects in ProjXense, Add OH-009 new sub-tasks and OH-034 Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 TSR inbox, saving documents on SP, created new TSR & drawings numbers, updated 209 MDR, 270 documentation- revised TSR draft, transmitted TSR-01538, 01540, 01541, 270 drawings, 15B drawings, TSR Genesis Invoice status, 270 weekly timesheets and labor variance, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-17 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 2 0 NOV Russian Manuals Meeting, Documentation meeting, Odoptu LLE reconciliation meeting, follow up on 11615 delivery, HPU documentation- Updated manuals rev, routed, updated MDR, updated DCDM, created NOV Rus manuals tracker, Russian manuals review, Floor Monkey- new manual revs- routing, updated MDR, updated DCDM, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet, 2M TEK Set up in ProjXense, Showed J. Lambert how to pull timesheets and add tasks in ProjXense, closed projects in ProjXense, Add OH-009 new sub-tasks and OH-034 Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 4 0 TSR inbox, saving documents on SP, created new TSR & drawings numbers, updated 209 MDR, 270 documentation- revised TSR draft, transmitted TSR-01538, 01540, 01541, 270 drawings, 15B drawings, TSR Genesis Invoice status, 270 weekly timesheets and labor variance, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-20 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Holiday Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-21 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 3 0 Received Cameron Russian MRB, reviewed, prepared and submitted MCC, added rolling stock and pressure Vessel tech PAssport to Batch 8, uploaded new docs to DCDM, uploded new doc to turnover folder on SP and flash drives for Batch 8, updated Supplier MDR, darfted completion letters for Rynuon & Drillmec Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, ProjXense - added new tasks for new TSRs Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-21 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 TSR inbox, Provided TSR#01549, 1550, 1551, provided drawing numbers, transmitted 209 rig model,diverter drawings,TSR-01551,1552,1546,1554, 1555 new TSR filling- RIg 272, 269, drafted TSR-1547, 270 timesheets and labor variance, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-21 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 1 0 Received and uploaded to DCDM COC for C&K manifold, started uploading Walking System Documents to DCDM Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-22 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 Received Cameron Russian MRB, reviewed, prepared and submitted MCC, added rolling stock and pressure Vessel tech PAssport to Batch 8, uploaded new docs to DCDM, uploded new doc to turnover folder on SP and flash drives for Batch 8, updated Supplier MDR, darfted completion letters for Rynuon & Drillmec Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-22 OH-013 :OH-013 Overhead All Activities Regular Pay N 7 0 TSR inbox, Provided TSR#01549, 1550, 1551, provided drawing numbers, transmitted 209 rig model,diverter drawings,TSR-01551,1552,1546,1554, 1555 new TSR filling- RIg 272, 269, drafted TSR-1547, 270 timesheets and labor variance, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-23 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 3 0 Received Cameron Russian MRB, reviewed, prepared and submitted MCC, added rolling stock and pressure Vessel tech PAssport to Batch 8, uploaded new docs to DCDM, uploded new doc to turnover folder on SP and flash drives for Batch 8, updated Supplier MDR, darfted completion letters for Rynuon & Drillmec Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Tech Services Weekly Meeting Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, ProjXense - added new tasks for new TSRs Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 TSR inbox, Provided TSR#01549, 1550, 1551, provided drawing numbers, transmitted 209 rig model,diverter drawings,TSR-01551,1552,1546,1554, 1555 new TSR filling- RIg 272, 269, drafted TSR-1547, 270 timesheets and labor variance, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-24 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 2 0 Received Cameron Russian MRB, reviewed, prepared and submitted MCC, added rolling stock and pressure Vessel tech PAssport to Batch 8, uploaded new docs to DCDM, uploded new doc to turnover folder on SP and flash drives for Batch 8, updated Supplier MDR, darfted completion letters for Rynuon & Drillmec Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet, ProjXense - added new tasks for new TSRs Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-24 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 TSR inbox, Provided TSR#01549, 1550, 1551, provided drawing numbers, transmitted 209 rig model,diverter drawings,TSR-01551,1552,1546,1554, 1555 new TSR filling- RIg 272, 269, drafted TSR-1547, 270 timesheets and labor variance, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-24 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 2 0 Received and uploaded to DCDM COC for C&K manifold, started uploading Walking System Documents to DCDM Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-27 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 3 0 NOV change order for PO 11615, Invoice fro Cameron MS-4 PO 11411, on 2/27- Documentation meeting, close out subcontracts- Drillmec & Runyon Photos, Cameron receipt in Oracle, Accruals, rolling stock documents, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Sprint Team Meeting, FBI meeting, Weekly Tech Services Meeting, Meeting with Russian Cert. Agency TMS rep., Prepared safety moment and IMS moment for Thursday meeting Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 2.5 0 TSR inbox, Drawing numbers, transmittal:TSR-1401-CO, 1556 TSR&CTR,1545 CTR& TSR,1546 CTR, 1554 CTR & CO, 209 drawings, update MDR, access to 270 Share Point site, TSR invoices for Sakhalin, Accruals for Feb Sak TSRs Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-28 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 2 0 NOV change order for PO 11615, Invoice fro Cameron MS-4 PO 11411, on 2/27- Documentation meeting, close out subcontracts- Drillmec & Runyon Photos, Cameron receipt in Oracle, Accruals, rolling stock documents, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-28 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2 0 Tech Services rates for Texas Work, New SharePoint Site for Halliburton Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-02-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 4 0 TSR inbox, Drawing numbers, transmittal:TSR-1401-CO, 1556 TSR&CTR,1545 CTR& TSR,1546 CTR, 1554 CTR & CO, 209 drawings, update MDR, access to 270 Share Point site, TSR invoices for Sakhalin, Accruals for Feb Sak TSRs Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-01 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 2 0 NOV change order for PO 11615, Invoice fro Cameron MS-4 PO 11411, on 2/27- Documentation meeting, close out subcontracts- Drillmec & Runyon Photos, Cameron receipt in Oracle, Accruals, rolling stock documents, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Sprint Team Meeting, FBI meeting, Weekly Tech Services Meeting, Meeting with Russian Cert. Agency TMS rep., Prepared safety moment and IMS moment for Thursday meeting Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-01 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2 0 Tech Services rates for Texas Work, New SharePoint Site for Halliburton Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 TSR inbox, Drawing numbers, transmittal:TSR-1401-CO, 1556 TSR&CTR,1545 CTR& TSR,1546 CTR, 1554 CTR & CO, 209 drawings, update MDR, access to 270 Share Point site, TSR invoices for Sakhalin, Accruals for Feb Sak TSRs Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Sprint Team Meeting, FBI meeting, Weekly Tech Services Meeting, Meeting with Russian Cert. Agency TMS rep., Prepared safety moment and IMS moment for Thursday meeting Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-02 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2 0 Tech Services rates for Texas Work, New SharePoint Site for Halliburton Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 4.5 0 TSR inbox, Drawing numbers, transmittal:TSR-1401-CO, 1556 TSR&CTR,1545 CTR& TSR,1546 CTR, 1554 CTR & CO, 209 drawings, update MDR, access to 270 Share Point site, TSR invoices for Sakhalin, Accruals for Feb Sak TSRs Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-03 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2 0 Tech Services rates for Texas Work, New SharePoint Site for Halliburton Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-03 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 TSR inbox, Drawing numbers, transmittal:TSR-1401-CO, 1556 TSR&CTR,1545 CTR& TSR,1546 CTR, 1554 CTR & CO, 209 drawings, update MDR, access to 270 Share Point site, TSR invoices for Sakhalin, Accruals for Feb Sak TSRs Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-03 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 3 0 Uploading Walking System documents to DCDM with meta data Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-06 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 NOV Shear Pump receiving documents, invoiced, transmitted to XOM, LLE reconciliations, NOV Russian Manual review- Rotary Table Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 TSR inbox, Transmittals:1539,1548, 1557, 1552, 1535, 1544, 270, 209 drawings, new drwg and TSR # assigned, MDR updated, loadmaster MR, 270 timesheets Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-06 Rig 270L-TSR :Rig 270L-TSR TSR-01538-270L Rig 270 Documentation Regular Pay N 4 0 Uploaded Walking System documents with meta data Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-07 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 RFP cover letters, compensation appendix, compensation appendix, coordination procedure, meetings to discuss, document # research- created, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-07 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 NOV Shear Pump receiving documents, invoiced, transmitted to XOM, LLE reconciliations, NOV Russian Manual review- Rotary Table Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-07 OH-013 :OH-013 Overhead All Activities Regular Pay N 4 0 TSR inbox, Transmittals:1539,1548, 1557, 1552, 1535, 1544, 270, 209 drawings, new drwg and TSR # assigned, MDR updated, loadmaster MR, 270 timesheets Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-07 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Share Point training Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-08 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 RFP cover letters, compensation appendix, compensation appendix, coordination procedure, meetings to discuss, document # research- created, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-08 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 2 0 NOV Shear Pump receiving documents, invoiced, transmitted to XOM, LLE reconciliations, NOV Russian Manual review- Rotary Table Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-08 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 TSR inbox, Transmittals:1539,1548, 1557, 1552, 1535, 1544, 270, 209 drawings, new drwg and TSR # assigned, MDR updated, loadmaster MR, 270 timesheets Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-09 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 RFP cover letters, compensation appendix, compensation appendix, coordination procedure, meetings to discuss, document # research- created, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-09 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 3 0 NOV Shear Pump receiving documents, invoiced, transmitted to XOM, LLE reconciliations, NOV Russian Manual review- Rotary Table Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Tech Services Meeting Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-09 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 TSR inbox, Transmittals:1539,1548, 1557, 1552, 1535, 1544, 270, 209 drawings, new drwg and TSR # assigned, MDR updated, loadmaster MR, 270 timesheets Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-10 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 RFP cover letters, compensation appendix, compensation appendix, coordination procedure, meetings to discuss, document # research- created, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-10 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 TSR inbox, Transmittals:1539,1548, 1557, 1552, 1535, 1544, 270, 209 drawings, new drwg and TSR # assigned, MDR updated, loadmaster MR, 270 timesheets Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-13 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Compensation Appendix A-3, foreign exchange rates, Milestone completion notice Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-13 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 2 0 mailed out 2 last invoices, updated cost report, saved invoices on SP, odoptu cash received, Batch 8 Electronic: added documents, updated MDR, uploaded documents on USBs, Transmitted Electronic Batch 8, mailed USBs, Batch 8 Hard Copies- repacked boxes, did packing lists for each box, sent a not to Exxon with boxes dimensions Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR meeting, Tech services weekly meeting Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheets, Beat 2 Share Point review- Sites: Odoptu, 2170, 262, Liberty, COPA, 55 B, ArktunDagi, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-13 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 TSR inbox, provided Drawing numbers, updated MDR, Loadmaster MR, transmitted TSR-1546, 1554, 1551, 1558 Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-14 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 Compensation Appendix A-3, foreign exchange rates, Milestone completion notice Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-14 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 mailed out 2 last invoices, updated cost report, saved invoices on SP, odoptu cash received, Batch 8 Electronic: added documents, updated MDR, uploaded documents on USBs, Transmitted Electronic Batch 8, mailed USBs, Batch 8 Hard Copies- repacked boxes, did packing lists for each box, sent a not to Exxon with boxes dimensions Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-14 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 TSR inbox, provided Drawing numbers, updated MDR, Loadmaster MR, transmitted TSR-1546, 1554, 1551, 1558 Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-15 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Compensation Appendix A-3, foreign exchange rates, Milestone completion notice Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-15 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 mailed out 2 last invoices, updated cost report, saved invoices on SP, odoptu cash received, Batch 8 Electronic: added documents, updated MDR, uploaded documents on USBs, Transmitted Electronic Batch 8, mailed USBs, Batch 8 Hard Copies- repacked boxes, did packing lists for each box, sent a not to Exxon with boxes dimensions Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Timesheets, Beat 2 Share Point review- Sites: Odoptu, 2170, 262, Liberty, COPA, 55 B, ArktunDagi, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-15 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 TSR inbox, provided Drawing numbers, updated MDR, Loadmaster MR, transmitted TSR-1546, 1554, 1551, 1558 Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-16 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 4 0 mailed out 2 last invoices, updated cost report, saved invoices on SP, odoptu cash received, Batch 8 Electronic: added documents, updated MDR, uploaded documents on USBs, Transmitted Electronic Batch 8, mailed USBs, Batch 8 Hard Copies- repacked boxes, did packing lists for each box, sent a not to Exxon with boxes dimensions Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting, Tech services weekly meeting Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheets, Beat 2 Share Point review- Sites: Odoptu, 2170, 262, Liberty, COPA, 55 B, ArktunDagi, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR inbox, provided Drawing numbers, updated MDR, Loadmaster MR, transmitted TSR-1546, 1554, 1551, 1558 Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-17 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Compensation Appendix A-3, foreign exchange rates, Milestone completion notice Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-17 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 4 0 mailed out 2 last invoices, updated cost report, saved invoices on SP, odoptu cash received, Batch 8 Electronic: added documents, updated MDR, uploaded documents on USBs, Transmitted Electronic Batch 8, mailed USBs, Batch 8 Hard Copies- repacked boxes, did packing lists for each box, sent a not to Exxon with boxes dimensions Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheets, Beat 2 Share Point review- Sites: Odoptu, 2170, 262, Liberty, COPA, 55 B, ArktunDagi, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR inbox, provided Drawing numbers, updated MDR, Loadmaster MR, transmitted TSR-1546, 1554, 1551, 1558 Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Mon- KOC meeting-contract review, Cost Estimates meeting, compensation tables, OFE comparison table, Kan-Ban Meeting, formating contract appendix, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-20 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 2 0 Batch 8 hard copies, research PO 11952 credit memo, clarification to ENL on previous documentation shipment- Houston -Office Boxes- research packing lists for Keppel docs, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-20 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 TSR inbox, 270 timesheets, 2MTeK & ITS timesheets, transmittal TSR-1518, 1543, 1558 in projXense, 270 drawings, 1483,1555, new tsr numbers created, saved files on Sharepoint Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-21 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Mon- KOC meeting-contract review, Cost Estimates meeting, compensation tables, OFE comparison table, Kan-Ban Meeting, formating contract appendix, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-21 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 2 0 Batch 8 hard copies, research PO 11952 credit memo, clarification to ENL on previous documentation shipment- Houston -Office Boxes- research packing lists for Keppel docs, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-21 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 TSR inbox, 270 timesheets, 2MTeK & ITS timesheets, transmittal TSR-1518, 1543, 1558 in projXense, 270 drawings, 1483,1555, new tsr numbers created, saved files on Sharepoint Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-22 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 Mon- KOC meeting-contract review, Cost Estimates meeting, compensation tables, OFE comparison table, Kan-Ban Meeting, formating contract appendix, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-22 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 2 0 Batch 8 hard copies, research PO 11952 credit memo, clarification to ENL on previous documentation shipment- Houston -Office Boxes- research packing lists for Keppel docs, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-22 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 TSR inbox, 270 timesheets, 2MTeK & ITS timesheets, transmittal TSR-1518, 1543, 1558 in projXense, 270 drawings, 1483,1555, new tsr numbers created, saved files on Sharepoint Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-23 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 Mon- KOC meeting-contract review, Cost Estimates meeting, compensation tables, OFE comparison table, Kan-Ban Meeting, formating contract appendix, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-23 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 2 0 Batch 8 hard copies, research PO 11952 credit memo, clarification to ENL on previous documentation shipment- Houston -Office Boxes- research packing lists for Keppel docs, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly tech. services meeting. Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 TSR inbox, 270 timesheets, 2MTeK & ITS timesheets, transmittal TSR-1518, 1543, 1558 in projXense, 270 drawings, 1483,1555, new tsr numbers created, saved files on Sharepoint Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-24 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Mon- KOC meeting-contract review, Cost Estimates meeting, compensation tables, OFE comparison table, Kan-Ban Meeting, formating contract appendix, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-24 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 Batch 8 hard copies, research PO 11952 credit memo, clarification to ENL on previous documentation shipment- Houston -Office Boxes- research packing lists for Keppel docs, Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-24 OH-011 :OH-011 Overhead All Activities Regular Pay N 1.5 0 Doctor's appt. Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-24 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 TSR inbox, 270 timesheets, 2MTeK & ITS timesheets, transmittal TSR-1518, 1543, 1558 in projXense, 270 drawings, 1483,1555, new tsr numbers created, saved files on Sharepoint Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-27 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 Meetings: Instructions and Evaluations, Sprint Meetings, Vendor T&Cs, HH presentation, prepared Instructions to seller with attachments, cover letters, RFP Evaluation process, RFP package, compensation tables Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 TSR inbox, TSR invoices, transmittals, MDR updates, provided drawing numbers and new TSR numbers, transmittals Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-28 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 Meetings: Instructions and Evaluations, Sprint Meetings, Vendor T&Cs, HH presentation, prepared Instructions to seller with attachments, cover letters, RFP Evaluation process, RFP package, compensation tables Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 TSR inbox, TSR invoices, transmittals, MDR updates, provided drawing numbers and new TSR numbers, transmittals Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-29 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 Meetings: Instructions and Evaluations, Sprint Meetings, Vendor T&Cs, HH presentation, prepared Instructions to seller with attachments, cover letters, RFP Evaluation process, RFP package, compensation tables Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-29 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 TSR inbox, TSR invoices, transmittals, MDR updates, provided drawing numbers and new TSR numbers, transmittals Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-30 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Meetings: Instructions and Evaluations, Sprint Meetings, Vendor T&Cs, HH presentation, prepared Instructions to seller with attachments, cover letters, RFP Evaluation process, RFP package, compensation tables Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-30 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 Provided Batch 8 Shipping clarifications, NOV revised documents uploaded on SP and DCDM Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-30 OH-013 :OH-013 Overhead All Activities Regular Pay N 4 0 TSR inbox, TSR invoices, transmittals, MDR updates, provided drawing numbers and new TSR numbers, transmittals Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-31 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 Meetings: Instructions and Evaluations, Sprint Meetings, Vendor T&Cs, HH presentation, prepared Instructions to seller with attachments, cover letters, RFP Evaluation process, RFP package, compensation tables Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-31 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 3 0 Provided Batch 8 Shipping clarifications, NOV revised documents uploaded on SP and DCDM Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TSR meeting Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-03-31 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 TSR inbox, TSR invoices, transmittals, MDR updates, provided drawing numbers and new TSR numbers, transmittals Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-04-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Added new job # for 2MTEK in ProjXenxe. trained Lam on transmittals and projXenses Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-04-03 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 TSR inbox, new TSR # issued, transmittal TRS-01551, TSR-01510- RFI, 270 timesheets and labor variance, issued new Drw numbers, TSR Match Accruals for Sakhalin, transmittal TSR-01543, 1561 Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-04-03 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 oracle asset management training with R.Smith Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-04-04 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 2 0 Applied payment, scheduled payments for CRG and NOV, transmitted project close-out report Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-04-04 OH-013 :OH-013 Overhead All Activities Regular Pay N 4 0 TSR inbox, new TSR # issued, transmittal TRS-01551, TSR-01510- RFI, 270 timesheets and labor variance, issued new Drw numbers, TSR Match Accruals for Sakhalin, transmittal TSR-01543, 1561 Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-04-05 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR inbox, new TSR # issued, transmittal TRS-01551, TSR-01510- RFI, 270 timesheets and labor variance, issued new Drw numbers, TSR Match Accruals for Sakhalin, transmittal TSR-01543, 1561 Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-04-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Meeting on Greg and Kyle about distribution of Tanya's responsibilities Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Added new job # for 2MTEK in ProjXenxe. trained Lam on transmittals and projXenses Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-04-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR inbox, new TSR # issued, transmittal TRS-01551, TSR-01510- RFI, 270 timesheets and labor variance, issued new Drw numbers, TSR Match Accruals for Sakhalin, transmittal TSR-01543, 1561 Mikitsionak, Tanya Cost Analyst 33342 Mikitsionak, Tanya:Cost Analyst 2017-04-07 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 Applied payment, scheduled payments for CRG and NOV, transmitted project close-out report Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Years Holiday Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 7 0 general revisions to drawings, conversions to and from PDF's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 daily SCRUMS/Kanban board meeting (30 mins) 01/02: weekly TSR meeting (1 hour) 01/04: IDR overview meeting 01/05: weekly Tech. Services update meeting (1 hour) 01/06: Technical Services Department Employee Meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-03 Rig 270L-TSR :Rig 270L-TSR TSR-01528-270L Odoptu Cellar Covers-closed Regular Pay N 0.5 0 CAD drawings for the cellar covers on rig 270. Drawing number 270L-01-03-066 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 daily SCRUMS/Kanban board meeting (30 mins) 01/02: weekly TSR meeting (1 hour) 01/04: IDR overview meeting 01/05: weekly Tech. Services update meeting (1 hour) 01/06: Technical Services Department Employee Meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-04 Rig 270L-TSR :Rig 270L-TSR TSR-01528-270L Odoptu Cellar Covers-closed Regular Pay N 6.5 0 CAD drawings for the cellar covers on rig 270. Drawing number 270L-01-03-066 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 daily SCRUMS/Kanban board meeting (30 mins) 01/02: weekly TSR meeting (1 hour) 01/04: IDR overview meeting 01/05: weekly Tech. Services update meeting (1 hour) 01/06: Technical Services Department Employee Meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-05 Rig 270L-TSR :Rig 270L-TSR TSR-01528-270L Odoptu Cellar Covers-closed Regular Pay N 6.5 0 CAD drawings for the cellar covers on rig 270. Drawing number 270L-01-03-066 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 daily SCRUMS/Kanban board meeting (30 mins) 01/02: weekly TSR meeting (1 hour) 01/04: IDR overview meeting 01/05: weekly Tech. Services update meeting (1 hour) 01/06: Technical Services Department Employee Meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-06 Rig 270L-TSR :Rig 270L-TSR TSR-01528-270L Odoptu Cellar Covers-closed Regular Pay N 6.5 0 CAD drawings for the cellar covers on rig 270. Drawing number 270L-01-03-066 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 daily SCRUMS/Kanban board meeting (30 mins) 01/09: weekly TSR meeting (1 hour) 01/12: weekly Tech. Services update meeting (1 hour) 01/06: Technical Services Department Employee Meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-09 Rig 209L-TSR :Rig 209L-TSR TSR-01510-209L DSM-PB HPU Cantilever Regular Pay N 7 0 Continue detail drawing package for the DSM/PB HPU cantilever platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 daily SCRUMS/Kanban board meeting (30 mins) 01/09: weekly TSR meeting (1 hour) 01/12: weekly Tech. Services update meeting (1 hour) 01/06: Technical Services Department Employee Meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-10 Rig 209L-TSR :Rig 209L-TSR TSR-01510-209L DSM-PB HPU Cantilever Regular Pay N 7.5 0 Continue detail drawing package for the DSM/PB HPU cantilever platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 daily SCRUMS/Kanban board meeting (30 mins) 01/09: weekly TSR meeting (1 hour) 01/12: weekly Tech. Services update meeting (1 hour) 01/06: Technical Services Department Employee Meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-11 Rig 209L-TSR :Rig 209L-TSR TSR-01510-209L DSM-PB HPU Cantilever Regular Pay N 7.5 0 Continue detail drawing package for the DSM/PB HPU cantilever platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 Modification to AutoCAD standards (menus, routines, title block, etc.) Contact ECAD for pricing and quotes for Autodesk products. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 daily SCRUMS/Kanban board meeting (30 mins) 01/09: weekly TSR meeting (1 hour) 01/12: weekly Tech. Services update meeting (1 hour) 01/06: Technical Services Department Employee Meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-12 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 4 0 Design door/window opening in mast for control line spooler. Web meeting to discuss design restrictions and limitations. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Modification to AutoCAD standards (menus, routines, title block, etc.) Contact ECAD for pricing and quotes for Autodesk products. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 daily SCRUMS/Kanban board meeting (30 mins) 01/09: weekly TSR meeting (1 hour) 01/12: weekly Tech. Services update meeting (1 hour) 01/06: Technical Services Department Employee Meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-13 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 6 0 Design door/window opening in mast for control line spooler. Web meeting to discuss design restrictions and limitations. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 daily SCRUMS/Kanban board meeting (30 mins) 01/16: weekly TSR meeting (1 hour) 01/19: weekly Tech. Services update meeting (1 hour) 01/20: updating CV's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-16 Rig 209L-TSR :Rig 209L-TSR TSR-01510-209L DSM-PB HPU Cantilever Regular Pay N 7 0 Continue detail drawing package for the DSM/PB HPU cantilever platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 01/17: Web meeting/conference with Sakhalin to discuss mast window modifications for control lines. 01/19: model exports sent in a PDF package for review in Sakhalin & panic line as-built drawings from DPR 1/19: modifications/conversions of CAD GA's for rigs 226, 231, & 253 01/20: PDF file request for the 1st and 2nd level GA's for the DSM Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 daily SCRUMS/Kanban board meeting (30 mins) 01/16: weekly TSR meeting (1 hour) 01/19: weekly Tech. Services update meeting (1 hour) 01/20: updating CV's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-17 Rig 209L-TSR :Rig 209L-TSR TSR-01510-209L DSM-PB HPU Cantilever Regular Pay N 3 0 Continue detail drawing package for the DSM/PB HPU cantilever platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 daily SCRUMS/Kanban board meeting (30 mins) 01/16: weekly TSR meeting (1 hour) 01/19: weekly Tech. Services update meeting (1 hour) 01/20: updating CV's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-18 Rig 209L-TSR :Rig 209L-TSR TSR-01515-209L Control Line Spooler Placement Regular Pay N 7.5 0 Design door/window opening in mast for control line spooler. Web meeting to discuss design restrictions and limitations. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 5.5 0 01/17: Web meeting/conference with Sakhalin to discuss mast window modifications for control lines. 01/19: model exports sent in a PDF package for review in Sakhalin & panic line as-built drawings from DPR 1/19: modifications/conversions of CAD GA's for rigs 226, 231, & 253 01/20: PDF file request for the 1st and 2nd level GA's for the DSM Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 daily SCRUMS/Kanban board meeting (30 mins) 01/16: weekly TSR meeting (1 hour) 01/19: weekly Tech. Services update meeting (1 hour) 01/20: updating CV's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-19 Rig 209L-TSR :Rig 209L-TSR TSR-01515-209L Control Line Spooler Placement Regular Pay N 1 0 Design door/window opening in mast for control line spooler. Web meeting to discuss design restrictions and limitations. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 01/17: Web meeting/conference with Sakhalin to discuss mast window modifications for control lines. 01/19: model exports sent in a PDF package for review in Sakhalin & panic line as-built drawings from DPR 1/19: modifications/conversions of CAD GA's for rigs 226, 231, & 253 01/20: PDF file request for the 1st and 2nd level GA's for the DSM Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 daily SCRUMS/Kanban board meeting (30 mins) 01/16: weekly TSR meeting (1 hour) 01/19: weekly Tech. Services update meeting (1 hour) 01/20: updating CV's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Technical Services Business Development - Brainstorming Session Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 daily SCRUMS/Kanban board meeting (30 mins) 01/16: weekly TSR meeting (1 hour) 01/19: weekly Tech. Services update meeting (1 hour) 01/20: updating CV's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-23 Rig 270L-TSR :Rig 270L-TSR TSR-01528-270L Odoptu Cellar Covers-closed Regular Pay N 5 0 Picked up cellar cover red lines from site. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-25 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 1/25: CAD drawing request for GA of the DM DF power frames and discussion regarding mast windwall door for control line spooler. 01/26: Web meeting/conference with Sakhalin to discuss mast window modifications for control lines. 1/27: export AADU 273 mud module model shots to PDF. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 daily SCRUMS/Kanban board meeting (30 mins) 01/16: weekly TSR meeting (1 hour) 01/19: weekly Tech. Services update meeting (1 hour) 01/20: updating CV's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 1/25: CAD drawing request for GA of the DM DF power frames and discussion regarding mast windwall door for control line spooler. 01/26: Web meeting/conference with Sakhalin to discuss mast window modifications for control lines. 1/27: export AADU 273 mud module model shots to PDF. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 daily SCRUMS/Kanban board meeting (30 mins) 01/16: weekly TSR meeting (1 hour) 01/19: weekly Tech. Services update meeting (1 hour) 01/20: updating CV's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-26 Rig 209L-TSR :Rig 209L-TSR TSR-01510-209L DSM-PB HPU Cantilever Regular Pay N 4.5 0 Continue detail drawing package for the DSM/PB HPU cantilever platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 1/25: CAD drawing request for GA of the DM DF power frames and discussion regarding mast windwall door for control line spooler. 01/26: Web meeting/conference with Sakhalin to discuss mast window modifications for control lines. 1/27: export AADU 273 mud module model shots to PDF. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 daily SCRUMS/Kanban board meeting (30 mins) 01/16: weekly TSR meeting (1 hour) 01/19: weekly Tech. Services update meeting (1 hour) 01/20: updating CV's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-27 Rig 209L-TSR :Rig 209L-TSR TSR-01510-209L DSM-PB HPU Cantilever Regular Pay N 5.5 0 Continue detail drawing package for the DSM/PB HPU cantilever platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily sprint team meeting (30 mins) 01/30: weekly meeting (30 mins); timesheets 02/02: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 timesheets and online project sense timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-30 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 6 0 1/30: finalization of control line door addition. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily sprint team meeting (30 mins) 01/30: weekly meeting (30 mins); timesheets 02/02: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-31 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 1/31: Render images of Odoptu rig for brochures/business development case studies; redlines; 02/03: requested CAD drawings of diverter spools. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-31 Rig 209L-TSR :Rig 209L-TSR TSR-01510-209L DSM-PB HPU Cantilever Regular Pay N 1 0 Continue detail drawing package for the DSM/PB HPU cantilever platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-01-31 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 2.5 0 1/30: finalization of control line door addition. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-01 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily sprint team meeting (30 mins) 01/30: weekly meeting (30 mins); timesheets 02/02: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-02 Rig 209L-TSR :Rig 209L-TSR TSR-01510-209L DSM-PB HPU Cantilever Regular Pay N 6.5 0 Continue detail drawing package for the DSM/PB HPU cantilever platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-02 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 0.5 0 1/30: finalization of control line door addition. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-03 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 1/31: Render images of Odoptu rig for brochures/business development case studies; redlines; 02/03: requested CAD drawings of diverter spools. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-03 Rig 209L-TSR :Rig 209L-TSR TSR-01510-209L DSM-PB HPU Cantilever Regular Pay N 3 0 Continue detail drawing package for the DSM/PB HPU cantilever platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily sprint team meeting (15 mins) 02/06: weekly meeting (30 mins) 02/09: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 02/06: cleaned up and scaled drawing for CRI line routing. 02/07: cleaned up electtrical sketch drawing for UPS system on Odoptu. 02/08: request for drawings, modifications, & PDF conversions regarding diverter cart drawing/ well tree drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 02/06: timesheets and online project sense timesheets; 02/10: office moves and preparation for drawing transmittals. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-06 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 5.5 0 02/06-07: diverter piping spool drawing 209L-01-03-610 02/07-09: dm cellar door modifications drawing 209L-01-03-609 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily sprint team meeting (15 mins) 02/06: weekly meeting (30 mins) 02/09: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.25 0 02/06: cleaned up and scaled drawing for CRI line routing. 02/07: cleaned up electtrical sketch drawing for UPS system on Odoptu. 02/08: request for drawings, modifications, & PDF conversions regarding diverter cart drawing/ well tree drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-07 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 6.5 0 02/06-07: diverter piping spool drawing 209L-01-03-610 02/07-09: dm cellar door modifications drawing 209L-01-03-609 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily sprint team meeting (15 mins) 02/06: weekly meeting (30 mins) 02/09: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-08 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 7.75 0 02/06-07: diverter piping spool drawing 209L-01-03-610 02/07-09: dm cellar door modifications drawing 209L-01-03-609 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily sprint team meeting (15 mins) 02/06: weekly meeting (30 mins) 02/09: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 02/06: cleaned up and scaled drawing for CRI line routing. 02/07: cleaned up electtrical sketch drawing for UPS system on Odoptu. 02/08: request for drawings, modifications, & PDF conversions regarding diverter cart drawing/ well tree drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-09 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 6 0 02/06-07: diverter piping spool drawing 209L-01-03-610 02/07-09: dm cellar door modifications drawing 209L-01-03-609 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily sprint team meeting (15 mins) 02/06: weekly meeting (30 mins) 02/09: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.25 0 02/06: timesheets and online project sense timesheets; 02/10: office moves and preparation for drawing transmittals. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-10 OH-014 :OH-014 Overhead All Activities Regular Pay N 3.5 0 IDR coordinator training Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily TSR meeting (15 mins) 02/13: weekly meeting (30 mins) 02/14: safety orientation (30 mins) 02/16: weekly Tech. Services update meeting (1 hour) 02/16: PKD quarterly update meeting (1.5 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-13 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 6.5 0 conceptual sketches for cuttings bin hood design. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 daily TSR meeting (15 mins) 02/13: weekly meeting (30 mins) 02/14: safety orientation (30 mins) 02/16: weekly Tech. Services update meeting (1 hour) 02/16: PKD quarterly update meeting (1.5 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-14 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 7.25 0 conceptual sketches for cuttings bin hood design. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) 02/13: weekly meeting (30 mins) 02/14: safety orientation (30 mins) 02/16: weekly Tech. Services update meeting (1 hour) 02/16: PKD quarterly update meeting (1.5 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-15 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 7.75 0 conceptual sketches for cuttings bin hood design. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 daily TSR meeting (15 mins) 02/13: weekly meeting (30 mins) 02/14: safety orientation (30 mins) 02/16: weekly Tech. Services update meeting (1 hour) 02/16: PKD quarterly update meeting (1.5 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-16 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 5.5 0 conceptual sketches for cuttings bin hood design. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) 02/13: weekly meeting (30 mins) 02/14: safety orientation (30 mins) 02/16: weekly Tech. Services update meeting (1 hour) 02/16: PKD quarterly update meeting (1.5 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-17 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 7.75 0 conceptual sketches for cuttings bin hood design. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-20 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 President's Day holiday Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) 02/23: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Assigning a new "drawing number" to Odoptu model and having it officially transmitted to Sakhalin Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-21 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 6.75 0 209L-01-05-302 – DM diverter piping spools 209L-01-03-609 – DM cellar door modifications 209L-01-03-610 – DM diverter piping supports Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) 02/23: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-22 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 7.75 0 209L-01-05-302 – DM diverter piping spools 209L-01-03-609 – DM cellar door modifications 209L-01-03-610 – DM diverter piping supports Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 daily TSR meeting (15 mins) 02/23: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-23 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 6.75 0 209L-01-05-302 – DM diverter piping spools 209L-01-03-609 – DM cellar door modifications 209L-01-03-610 – DM diverter piping supports Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) 02/23: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-24 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 7.75 0 209L-01-05-302 – DM diverter piping spools 209L-01-03-609 – DM cellar door modifications 209L-01-03-610 – DM diverter piping supports Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) 02/23: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-02-28 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 7.75 0 209L-01-05-301-RA - diverter line piping arrangement plan Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) 02/23: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 IDR documentation requests; transferring evaluations to online forms; search for 251 drawings from Greenway 3. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-01 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 4.75 0 209L-01-05-301-RA - diverter line piping arrangement plan Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 daily TSR meeting (15 mins) 02/23: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-02 Rig 209L-TSR :Rig 209L-TSR TSR-01510-209L DSM-PB HPU Cantilever Regular Pay N 6.75 0 finalization of north HPU cantilever drawing on DSM. 209L-01-03-404. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) 02/23: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-03 Rig 209L-TSR :Rig 209L-TSR TSR-01510-209L DSM-PB HPU Cantilever Regular Pay N 7.75 0 finalization of north HPU cantilever drawing on DSM. 209L-01-03-404. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) 02/23: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 7.75 0 finalization of stairs drawings for HPU cantilever on DSM. 209L-01-03-406. final redline markups for north HPU cantilever platform, dwg 209-01-03-404 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) 02/23: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 7.75 0 finalization of stairs drawings for HPU cantilever on DSM. 209L-01-03-406. final redline markups for north HPU cantilever platform, dwg 209-01-03-404 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) 02/23: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 7.75 0 finalization of stairs drawings for HPU cantilever on DSM. 209L-01-03-406. final redline markups for north HPU cantilever platform, dwg 209-01-03-404 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 daily TSR meeting (15 mins) 02/23: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 6.75 0 finalization of stairs drawings for HPU cantilever on DSM. 209L-01-03-406. final redline markups for north HPU cantilever platform, dwg 209-01-03-404 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) 02/23: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 7.75 0 finalization of stairs drawings for HPU cantilever on DSM. 209L-01-03-406. final redline markups for north HPU cantilever platform, dwg 209-01-03-404 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) daily update conference call to Sakhalin (15 mins) 03/16: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 6.75 0 south HPU cantilever platform, dwg 209-01-03-405 finalization of stairs drawings for HPU cantilever on DSM. 209L-01-03-406. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 03/13: get timesheets approved and signed. online timesheets. PDF conversions. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) daily update conference call to Sakhalin (15 mins) 03/16: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 3.75 0 south HPU cantilever platform, dwg 209-01-03-405 finalization of stairs drawings for HPU cantilever on DSM. 209L-01-03-406. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily TSR meeting (15 mins) daily update conference call to Sakhalin (15 mins) 03/16: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 6.75 0 south HPU cantilever platform, dwg 209-01-03-405 finalization of stairs drawings for HPU cantilever on DSM. 209L-01-03-406. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.25 0 skidding claw drawing clean-up from Sakhalin, Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily TSR meeting (15 mins) daily update conference call to Sakhalin (15 mins) 03/16: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 6.75 0 south HPU cantilever platform, dwg 209-01-03-405 finalization of stairs drawings for HPU cantilever on DSM. 209L-01-03-406. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.75 0 skidding claw drawing clean-up from Sakhalin, Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily TSR meeting (15 mins) daily update conference call to Sakhalin (15 mins) 03/16: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 online timesheets, drawing support (finding/sending) for Sakhalin, PDF conversions Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 finalization of south HPU cantilever platform, dwg 209-01-03-405 revisions of stairs drawings for HPU cantilever on DSM. 209L-01-03-406. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily TSR meeting (15 mins) daily update conference call to Sakhalin (15 mins) 03/16: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 7.5 0 finalization of south HPU cantilever platform, dwg 209-01-03-405 revisions of stairs drawings for HPU cantilever on DSM. 209L-01-03-406. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily TSR meeting (15 mins) daily update conference call to Sakhalin (15 mins) 03/16: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.25 0 online timesheets, drawing support (finding/sending) for Sakhalin, PDF conversions Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 7.25 0 finalization of south HPU cantilever platform, dwg 209-01-03-405 revisions of stairs drawings for HPU cantilever on DSM. 209L-01-03-406. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 daily TSR meeting (15 mins) daily update conference call to Sakhalin (15 mins) 03/16: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.75 0 finalization of south HPU cantilever platform, dwg 209-01-03-405 revisions of stairs drawings for HPU cantilever on DSM. 209L-01-03-406. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily TSR meeting (15 mins) daily update conference call to Sakhalin (15 mins) 03/16: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.25 0 online timesheets, drawing support (finding/sending) for Sakhalin, PDF conversions Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 7.25 0 finalization of south HPU cantilever platform, dwg 209-01-03-405 revisions of stairs drawings for HPU cantilever on DSM. 209L-01-03-406. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) 03/16: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 7.5 0 begin detail drawings for HPU cantilever on PB. 209L-01-03-201. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-27 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.25 0 daily update conference call to Sakhalin (15 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) 03/16: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 5.75 0 begin detail drawings for HPU cantilever on PB. 209L-01-03-201. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 update AutoCAD menus and standards with updated title block and menus for packaged-roll out. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-28 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.25 0 daily update conference call to Sakhalin (15 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily TSR meeting (15 mins) 03/16: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.75 0 update AutoCAD menus and standards with updated title block and menus for packaged-roll out. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-30 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.25 0 daily update conference call to Sakhalin (15 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-30 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 web meeting with Jeff to discuss new mast window/door concept for control line spooler (weather strips) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) 03/16: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 7.5 0 update AutoCAD menus and standards with updated title block and menus for packaged-roll out. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-03-31 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.25 0 daily update conference call to Sakhalin (15 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) 03/16: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 7.5 0 Daily: Update AutoCAD menus and standards with updated title block and menus for packaged-roll out. 04/04: Performance Review with James (1 hour) Administrative tasks for TSR's (sending/filing/receiving) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-03 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.25 0 daily update conference call to Sakhalin (15 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) 03/16: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 7.75 0 Daily: Update AutoCAD menus and standards with updated title block and menus for packaged-roll out. 04/04: Performance Review with James (1 hour) Administrative tasks for TSR's (sending/filing/receiving) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) 03/16: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 7.75 0 Daily: Update AutoCAD menus and standards with updated title block and menus for packaged-roll out. 04/04: Performance Review with James (1 hour) Administrative tasks for TSR's (sending/filing/receiving) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily TSR meeting (15 mins) 03/16: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Daily: Update AutoCAD menus and standards with updated title block and menus for packaged-roll out. 04/04: Performance Review with James (1 hour) Administrative tasks for TSR's (sending/filing/receiving) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) 03/16: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.75 0 Daily: Update AutoCAD menus and standards with updated title block and menus for packaged-roll out. 04/04: Performance Review with James (1 hour) Administrative tasks for TSR's (sending/filing/receiving) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-07 Rig 209L-TSR :Rig 209L-TSR TSR-01558-209L DSM Hazardous Area Classification Regular Pay N 1 0 update drawing P209-E007 REV 5 DSM hazardous area classifications. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) 03/16: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 04/10: Time sheet online/scanned. Daily: Update AutoCAD menus and standards with updated title block and menus for packaged-roll out. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-10 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 daily: TSR inbox upkeep. Transmittal TSR-1565 Orlan Baker Valves Transmittal TSR-1564,1560, 209L DSM cantilever platforms New TSR number assigned: TSR-01566 270L Koomey modifications Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-10 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Project sense and SharePoint training with Tanya Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-10 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.25 0 daily update conference call to Sakhalin (15 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) 03/16: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.75 0 04/10: Time sheet online/scanned. Daily: Update AutoCAD menus and standards with updated title block and menus for packaged-roll out. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-11 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 daily: TSR inbox upkeep. Transmittal TSR-1565 Orlan Baker Valves Transmittal TSR-1564,1560, 209L DSM cantilever platforms New TSR number assigned: TSR-01566 270L Koomey modifications Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-11 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 3 0 modeled the mast wireline window "flapper" to be sent to Sakhalin for review. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) 03/16: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.25 0 04/10: Time sheet online/scanned. Daily: Update AutoCAD menus and standards with updated title block and menus for packaged-roll out. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 4 0 daily: TSR inbox upkeep. Transmittal TSR-1565 Orlan Baker Valves Transmittal TSR-1564,1560, 209L DSM cantilever platforms New TSR number assigned: TSR-01566 270L Koomey modifications Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-12 Rig 209L-TSR :Rig 209L-TSR TSR-01561-209L MAC Heaters Motor Modification Regular Pay N 1.5 0 modifications to Keppel AmFels' MAC heater CAD drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily TSR meeting (15 mins) 03/16: weekly Tech. Services update meeting (1 hour) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 04/10: Time sheet online/scanned. Daily: Update AutoCAD menus and standards with updated title block and menus for packaged-roll out. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-13 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 daily: TSR inbox upkeep. Transmittal TSR-1565 Orlan Baker Valves Transmittal TSR-1564,1560, 209L DSM cantilever platforms New TSR number assigned: TSR-01566 270L Koomey modifications Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-13 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Project sense and SharePoint training with Tanya Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-14 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Good Friday Holiday Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.25 0 04/17: Time sheet online Daily: Update AutoCAD menus and standards with updated title block and menus for packaged-roll out. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 4/17: TSR-01553-269-CTR 4/18: assign TSR numbers 4/20: skidding shoe repair dwg IFI update/file mailbox 4/21: skidding shoe repair revB IFI, TSR-1558 209L-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-17 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 weekly update meeting for Sakhalin TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-17 Rig 209L-TSR :Rig 209L-TSR TSR-01561-209L MAC Heaters Motor Modification Regular Pay N 3 0 modification drawings for the MAC Heater electrical drawings for 209L. PDF'd and sent to Sakhalin (Chuck) for review. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.25 0 04/17: Time sheet online Daily: Update AutoCAD menus and standards with updated title block and menus for packaged-roll out. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-18 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 4/17: TSR-01553-269-CTR 4/18: assign TSR numbers 4/20: skidding shoe repair dwg IFI update/file mailbox 4/21: skidding shoe repair revB IFI, TSR-1558 209L-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 HP mud/cement standpipe drawing from Loadmaster model export sent to Jake. PDF conversions Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-18 Rig 209L-TSR :Rig 209L-TSR TSR-01561-209L MAC Heaters Motor Modification Regular Pay N 1 0 modification drawings for the MAC Heater electrical drawings for 209L. PDF'd and sent to Sakhalin (Chuck) for review. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-18 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 2 0 4/18: Web meeting to discuss new design concept for wireline window in mast 4/19-20: modeled preliminary sketch/design for wireline window to send to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-19 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 3.75 0 repaired skidding claw drawing for Sakhalin (Chuck) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-19 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 4 0 4/18: Web meeting to discuss new design concept for wireline window in mast 4/19-20: modeled preliminary sketch/design for wireline window to send to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 04/17: Time sheet online Daily: Update AutoCAD menus and standards with updated title block and menus for packaged-roll out. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-20 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 4/17: TSR-01553-269-CTR 4/18: assign TSR numbers 4/20: skidding shoe repair dwg IFI update/file mailbox 4/21: skidding shoe repair revB IFI, TSR-1558 209L-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-20 Rig 209L-TSR :Rig 209L-TSR TSR-01492-209L Choke Manifold Piping Regular Pay N 2 0 Well Control Schematic red lines Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-20 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 repaired skidding claw drawing for Sakhalin (Chuck) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-20 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 2 0 4/18: Web meeting to discuss new design concept for wireline window in mast 4/19-20: modeled preliminary sketch/design for wireline window to send to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily TSR meeting (15 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.75 0 04/17: Time sheet online Daily: Update AutoCAD menus and standards with updated title block and menus for packaged-roll out. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-21 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 4/17: TSR-01553-269-CTR 4/18: assign TSR numbers 4/20: skidding shoe repair dwg IFI update/file mailbox 4/21: skidding shoe repair revB IFI, TSR-1558 209L-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-21 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Payroll's new time sheet forms and transmittal process. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 04/27: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 04/24: online timesheet update & signed timesheet submitted to payroll. daily: Update CAD blocks and menus for packaged roll out. 04/28: update new machine with new software Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-24 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 04/24: assign/reserve TSR-01569 04/25: transmit RFI for TSR-01566; assign/reserve 209L dwg# for manbasket; transmit dwgs for TSR-01561 MAC heater mods 04/26: transmit MAC heater mods CO 04/27: organize/move files to SharePoint 04/28: transmit CTR for control line window TSR-1562; dwgs for 209 DSM skidding shoes TSR-1560; CO for DSM/PB cantilever platform Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-24 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 weekly update meeting for Sakhalin TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-24 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 4 0 update/clean drawings for 272 hazardous area classifications Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-24 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1.75 0 modeled CAD sketches from Daniel regarding the mast wireline platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 04/27: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 04/24: assign/reserve TSR-01569 04/25: transmit RFI for TSR-01566; assign/reserve 209L dwg# for manbasket; transmit dwgs for TSR-01561 MAC heater mods 04/26: transmit MAC heater mods CO 04/27: organize/move files to SharePoint 04/28: transmit CTR for control line window TSR-1562; dwgs for 209 DSM skidding shoes TSR-1560; CO for DSM/PB cantilever platform Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-25 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 3 0 update/clean drawings for 272 hazardous area classifications Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-25 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 2.75 0 modeled CAD sketches from Daniel regarding the mast wireline platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 04/27: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 04/24: online timesheet update & signed timesheet submitted to payroll. daily: Update CAD blocks and menus for packaged roll out. 04/28: update new machine with new software Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 04/24: assign/reserve TSR-01569 04/25: transmit RFI for TSR-01566; assign/reserve 209L dwg# for manbasket; transmit dwgs for TSR-01561 MAC heater mods 04/26: transmit MAC heater mods CO 04/27: organize/move files to SharePoint 04/28: transmit CTR for control line window TSR-1562; dwgs for 209 DSM skidding shoes TSR-1560; CO for DSM/PB cantilever platform Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-26 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 6 0 modeled CAD sketches from Daniel regarding the mast wireline platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (15 mins) 04/27: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 04/24: online timesheet update & signed timesheet submitted to payroll. daily: Update CAD blocks and menus for packaged roll out. 04/28: update new machine with new software Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 04/24: assign/reserve TSR-01569 04/25: transmit RFI for TSR-01566; assign/reserve 209L dwg# for manbasket; transmit dwgs for TSR-01561 MAC heater mods 04/26: transmit MAC heater mods CO 04/27: organize/move files to SharePoint 04/28: transmit CTR for control line window TSR-1562; dwgs for 209 DSM skidding shoes TSR-1560; CO for DSM/PB cantilever platform Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-27 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 update/clean drawings for 272 hazardous area classifications Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-27 Rig 209L-TSR :Rig 209L-TSR TSR-01510-209L DSM-PB HPU Cantilever Regular Pay N 1 0 close out documentation for DSM/PB HPU cantilever platforms and stairs. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 04/27: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.75 0 04/24: online timesheet update & signed timesheet submitted to payroll. daily: Update CAD blocks and menus for packaged roll out. 04/28: update new machine with new software Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-04-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 04/24: assign/reserve TSR-01569 04/25: transmit RFI for TSR-01566; assign/reserve 209L dwg# for manbasket; transmit dwgs for TSR-01561 MAC heater mods 04/26: transmit MAC heater mods CO 04/27: organize/move files to SharePoint 04/28: transmit CTR for control line window TSR-1562; dwgs for 209 DSM skidding shoes TSR-1560; CO for DSM/PB cantilever platform Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 05/03: quarterly PKD company updates 05/04: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 daily: symbols/menu to CAD standards 05/01: online timesheets 05/02: update AutoCAD license file on network server 05/04: update Dan's Machine to new 2018 AutoCAD. 05/05: update Ralph's Machine to new 2018 AutoCAD. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 05/03: transmit 209 claws and 270 drawings to AMC/Sakhalin. 05/05: transmit 209 claws dwgs & 270 BOP stack dwgs/CTR to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-01 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly update meeting for Sakhalin TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Well control schematic redlines 05/03: DW cooling line hoses Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-01 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 3.75 0 05/01: model platform to be sent to Sakhalin for approval. 05/03: Preliminary BOM for Jeff to verify availability. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 05/03: quarterly PKD company updates 05/04: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.75 0 daily: symbols/menu to CAD standards 05/01: online timesheets 05/02: update AutoCAD license file on network server 05/04: update Dan's Machine to new 2018 AutoCAD. 05/05: update Ralph's Machine to new 2018 AutoCAD. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 05/03: transmit 209 claws and 270 drawings to AMC/Sakhalin. 05/05: transmit 209 claws dwgs & 270 BOP stack dwgs/CTR to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-02 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 2 0 modifications to DSM skidding claw drawing. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 daily: TSR board meeting update (15 mins) 05/03: quarterly PKD company updates 05/04: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-03 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 05/03: transmit 209 claws and 270 drawings to AMC/Sakhalin. 05/05: transmit 209 claws dwgs & 270 BOP stack dwgs/CTR to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Well control schematic redlines 05/03: DW cooling line hoses Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-03 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 3 0 05/01: model platform to be sent to Sakhalin for approval. 05/03: Preliminary BOM for Jeff to verify availability. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (15 mins) 05/03: quarterly PKD company updates 05/04: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 daily: symbols/menu to CAD standards 05/01: online timesheets 05/02: update AutoCAD license file on network server 05/04: update Dan's Machine to new 2018 AutoCAD. 05/05: update Ralph's Machine to new 2018 AutoCAD. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-04 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 05/03: transmit 209 claws and 270 drawings to AMC/Sakhalin. 05/05: transmit 209 claws dwgs & 270 BOP stack dwgs/CTR to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-04 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 3.5 0 05/01: model platform to be sent to Sakhalin for approval. 05/03: Preliminary BOM for Jeff to verify availability. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 05/03: quarterly PKD company updates 05/04: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 daily: symbols/menu to CAD standards 05/01: online timesheets 05/02: update AutoCAD license file on network server 05/04: update Dan's Machine to new 2018 AutoCAD. 05/05: update Ralph's Machine to new 2018 AutoCAD. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-05 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 05/03: transmit 209 claws and 270 drawings to AMC/Sakhalin. 05/05: transmit 209 claws dwgs & 270 BOP stack dwgs/CTR to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Well control schematic redlines 05/03: DW cooling line hoses Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-05 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1.25 0 05/01: model platform to be sent to Sakhalin for approval. 05/03: Preliminary BOM for Jeff to verify availability. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 05/11: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.25 0 daily: symbols/menu to CAD standards 05/08: assist IT with getting AutoCAD installed for Mat Ellis 05/11: assist IT with getting AutoCAD installed for Sarah Osmond Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-08 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly update meeting for Sakhalin TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 teleconferences/webmeetings from Sakhalin for various tasks. 05/12: dust collector drawing Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-08 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 2 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 05/11: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-09 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 05/11: transmittal for 209L: well control dwg, TSR-1497-CTR, TSR-1564-CO; 270L: TSR-1568-CTR; 269L: TSR-1552-CTR. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-09 Rig 209L-TSR :Rig 209L-TSR TSR-01497-209L Increase-PB-Tubular-Storage Regular Pay N 1.5 0 phone call with Jeff and Ralph regarding the PB stanchions Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-09 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 1.25 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-09 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 3 0 CAD detailing while awaiting confirmation from Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 05/11: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-10 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 05/11: transmittal for 209L: well control dwg, TSR-1497-CTR, TSR-1564-CO; 270L: TSR-1568-CTR; 269L: TSR-1552-CTR. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 teleconferences/webmeetings from Sakhalin for various tasks. 05/12: dust collector drawing Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-10 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 5.75 0 CAD detailing while awaiting confirmation from Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (15 mins) 05/11: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 daily: symbols/menu to CAD standards 05/08: assist IT with getting AutoCAD installed for Mat Ellis 05/11: assist IT with getting AutoCAD installed for Sarah Osmond Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-11 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 05/11: transmittal for 209L: well control dwg, TSR-1497-CTR, TSR-1564-CO; 270L: TSR-1568-CTR; 269L: TSR-1552-CTR. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 teleconferences/webmeetings from Sakhalin for various tasks. 05/12: dust collector drawing Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 05/11: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 daily: symbols/menu to CAD standards 05/08: assist IT with getting AutoCAD installed for Mat Ellis 05/11: assist IT with getting AutoCAD installed for Sarah Osmond Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6 0 teleconferences/webmeetings from Sakhalin for various tasks. 05/12: dust collector drawing Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 05/18: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 05/15: online timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-15 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 2.75 0 05/15-05/16: plot plan for rig 271 05/17&05/18: hazardous area drawings for rig 271 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-15 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly TSR call-in with Sakhalin Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-15 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 05/15: scrubbed CAD drawing for DSM HP mud flange tool; 05/19: clash check for xmas tree, spreader beam, and cellar doors using updated PDF drawings from Cameron Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-16 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 3 0 05/15-05/16: plot plan for rig 271 05/17&05/18: hazardous area drawings for rig 271 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 05/16: 209L: TSR-01570-CTR 05/19: 270L: TSR-01568-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 05/15: scrubbed CAD drawing for DSM HP mud flange tool; 05/19: clash check for xmas tree, spreader beam, and cellar doors using updated PDF drawings from Cameron Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-16 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 0.5 0 updated drawings based on information/photos sent from Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-16 Rig 209L-TSR :Rig 209L-TSR TSR-01573-209L Wellhead Spreader Beam Regular Pay N 2 0 telelconference and drawn sketches for xmas tree spreader beam. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 05/18: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-17 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 3.75 0 05/15-05/16: plot plan for rig 271 05/17&05/18: hazardous area drawings for rig 271 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-17 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 4 0 modeled new platform concept sent in from Jeff. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 05/18: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-19 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 4.5 0 05/15-05/16: plot plan for rig 271 05/17&05/18: hazardous area drawings for rig 271 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-19 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 05/16: 209L: TSR-01570-CTR 05/19: 270L: TSR-01568-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 05/15: scrubbed CAD drawing for DSM HP mud flange tool; 05/19: clash check for xmas tree, spreader beam, and cellar doors using updated PDF drawings from Cameron Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-19 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 1.25 0 updated drawings based on information/photos sent from Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 05/25: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 05/22: timesheets to Payroll; online timesheets PDF conversions, CAD administrative tasks, Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-22 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 3.25 0 finalization of hazardous area drawings for 271. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-22 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 05/22: assign drawing numbers and TSR numbers; added job for 2M-Tek on project sense; transmit TSR-01570-CO; 05/25: transmit 209L-01-03-620 wellhead spreader beam; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-22 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly call-in meeting with Sakhalin regarding the TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 05/25: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 05/22: assign drawing numbers and TSR numbers; added job for 2M-Tek on project sense; transmit TSR-01570-CO; 05/25: transmit 209L-01-03-620 wellhead spreader beam; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-23 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 1.5 0 BOM sent to Sakhalin to verify availability. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-23 Rig 209L-TSR :Rig 209L-TSR TSR-01573-209L Wellhead Spreader Beam Regular Pay N 4 0 scrubbed and cleaned 209L-01-03-408 wellhead spreader beam drawing Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-23 Rig 209L-TSR :Rig 209L-TSR TSR-01574-209L Casing Push Tool Regular Pay N 1.75 0 05/24: web meeting with Gerardo and Jeff to discuss design and modifications of casing tool. 05/25: design/send part dimensions to site to have casing push tool table built. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 05/25: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 05/22: timesheets to Payroll; online timesheets PDF conversions, CAD administrative tasks, Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-24 Rig 209L-TSR :Rig 209L-TSR TSR-01573-209L Wellhead Spreader Beam Regular Pay N 2 0 scrubbed and cleaned 209L-01-03-408 wellhead spreader beam drawing Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-24 Rig 209L-TSR :Rig 209L-TSR TSR-01574-209L Casing Push Tool Regular Pay N 5 0 05/24: web meeting with Gerardo and Jeff to discuss design and modifications of casing tool. 05/25: design/send part dimensions to site to have casing push tool table built. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (15 mins) 05/25: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 05/22: assign drawing numbers and TSR numbers; added job for 2M-Tek on project sense; transmit TSR-01570-CO; 05/25: transmit 209L-01-03-620 wellhead spreader beam; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 search and find 262 drawings for Jeff & Gerardo. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-25 Rig 209L-TSR :Rig 209L-TSR TSR-01574-209L Casing Push Tool Regular Pay N 5.5 0 05/24: web meeting with Gerardo and Jeff to discuss design and modifications of casing tool. 05/25: design/send part dimensions to site to have casing push tool table built. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-29 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Memorial Day Holiday Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 06/01: weekly TSR meeting; meeting with Kerui rig builders Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-30 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 4 0 269 Hazardous Area Plans Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-30 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 05/30: Organize received drawings/TSR's; email Yulila regarding MDR. 05/31: Organize and update MDR with transmitted/received drawings. 06/01: transmitted TSR-01572-RFI; TSR-01566-CO 06/02: transmit TSR-01565-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-30 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.25 0 05/30: web meeting discussing the wireline platform in the mast. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-30 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 2 0 begin detail parts and assembly of the control line spooler platform and window. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 06/01: weekly TSR meeting; meeting with Kerui rig builders Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-31 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 2.25 0 269 Hazardous Area Plans Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-31 OH-013 :OH-013 Overhead All Activities Regular Pay N 4 0 05/30: Organize received drawings/TSR's; email Yulila regarding MDR. 05/31: Organize and update MDR with transmitted/received drawings. 06/01: transmitted TSR-01572-RFI; TSR-01566-CO 06/02: transmit TSR-01565-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-05-31 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 05/30: web meeting discussing the wireline platform in the mast. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 daily: TSR board meeting update (15 mins) 06/01: weekly TSR meeting; meeting with Kerui rig builders Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-01 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 4 0 269 Hazardous Area Plans Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 05/30: Organize received drawings/TSR's; email Yulila regarding MDR. 05/31: Organize and update MDR with transmitted/received drawings. 06/01: transmitted TSR-01572-RFI; TSR-01566-CO 06/02: transmit TSR-01565-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board meeting update (15 mins) 06/01: weekly TSR meeting; meeting with Kerui rig builders Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 06/02: web meeting/CAD export for control line sheave hang off. Modification to new Parker PowerPoint Presentation template Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-02 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 2.5 0 269 Hazardous Area Plans Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 05/30: Organize received drawings/TSR's; email Yulila regarding MDR. 05/31: Organize and update MDR with transmitted/received drawings. 06/01: transmitted TSR-01572-RFI; TSR-01566-CO 06/02: transmit TSR-01565-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-02 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 3.25 0 begin detail parts and assembly of the control line spooler platform and window. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 5.75 0 06/05-06/06: AADU elevation and plan views for all modules per BP/M. Quinlan request 06/09: title block update for 3D PDF Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 06/05: online timesheets and timesheet sent to Payroll 06/06-06/09: 3D PDF exploration; experimentation; title block; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-05 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 06/06: Meeting with Sakhalin regarding TSR documentation process with client; transmittal TSR-01569-CO; 06/07: transmittal TSR-01574-CTR 06/09: transmittal TSR-01572-CTR; TSR-01576-CTR; TSR-01577-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-05 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 weekly TSR update meeting with Sakhalin Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 06/05-06/06: AADU elevation and plan views for all modules per BP/M. Quinlan request 06/09: title block update for 3D PDF Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 06/05: online timesheets and timesheet sent to Payroll 06/06-06/09: 3D PDF exploration; experimentation; title block; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 06/06: Meeting with Sakhalin regarding TSR documentation process with client; transmittal TSR-01569-CO; 06/07: transmittal TSR-01574-CTR 06/09: transmittal TSR-01572-CTR; TSR-01576-CTR; TSR-01577-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.25 0 panic line documentation Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 7.25 0 06/05: online timesheets and timesheet sent to Payroll 06/06-06/09: 3D PDF exploration; experimentation; title block; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-07 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 06/06: Meeting with Sakhalin regarding TSR documentation process with client; transmittal TSR-01569-CO; 06/07: transmittal TSR-01574-CTR 06/09: transmittal TSR-01572-CTR; TSR-01576-CTR; TSR-01577-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-08 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 06/05-06/06: AADU elevation and plan views for all modules per BP/M. Quinlan request 06/09: title block update for 3D PDF Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 06/05: online timesheets and timesheet sent to Payroll 06/06-06/09: 3D PDF exploration; experimentation; title block; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-09 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 06/06: Meeting with Sakhalin regarding TSR documentation process with client; transmittal TSR-01569-CO; 06/07: transmittal TSR-01574-CTR 06/09: transmittal TSR-01572-CTR; TSR-01576-CTR; TSR-01577-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 panic line documentation Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 06/13: town hall meeting with G. Rich regarding C. Weber's leave 06/14: conference with Sarah about guardrail TSR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 06/11: generic mast drawing with top drive/traveling block for D. Villerreal; 06/13: Hibernia Guardrail extension PDF 06/14: modification of mast drawing for D. Villerreal; 06/16: update AADU model into Navisworks to show all 3 modules Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.75 0 06/12-13: online timesheets; 3D PDF template finalization for future sketches; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-12 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 weekly TSR update meeting with Sakhalin Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.25 0 matting board drawings from Sakhalin for D. Lopez Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 daily: TSR board meeting update (15 mins) 06/13: town hall meeting with G. Rich regarding C. Weber's leave 06/14: conference with Sarah about guardrail TSR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 06/11: generic mast drawing with top drive/traveling block for D. Villerreal; 06/13: Hibernia Guardrail extension PDF 06/14: modification of mast drawing for D. Villerreal; 06/16: update AADU model into Navisworks to show all 3 modules Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.25 0 06/12-13: online timesheets; 3D PDF template finalization for future sketches; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 daily: TSR board meeting update (15 mins) 06/13: town hall meeting with G. Rich regarding C. Weber's leave 06/14: conference with Sarah about guardrail TSR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 06/11: generic mast drawing with top drive/traveling block for D. Villerreal; 06/13: Hibernia Guardrail extension PDF 06/14: modification of mast drawing for D. Villerreal; 06/16: update AADU model into Navisworks to show all 3 modules Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-14 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 06/13: assign drawing and TSR numbers; transmittal TSR-01571-CTR; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-14 Rig 209L-TSR :Rig 209L-TSR TSR-01574-209L Casing Push Tool Regular Pay N 1.75 0 detailed drawing for casing push tool Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 daily: TSR board meeting update (15 mins) 06/13: town hall meeting with G. Rich regarding C. Weber's leave 06/14: conference with Sarah about guardrail TSR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-15 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 06/13: assign drawing and TSR numbers; transmittal TSR-01571-CTR; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-15 Rig 209L-TSR :Rig 209L-TSR TSR-01574-209L Casing Push Tool Regular Pay N 5.75 0 detailed drawing for casing push tool Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 06/13: town hall meeting with G. Rich regarding C. Weber's leave 06/14: conference with Sarah about guardrail TSR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.75 0 06/11: generic mast drawing with top drive/traveling block for D. Villerreal; 06/13: Hibernia Guardrail extension PDF 06/14: modification of mast drawing for D. Villerreal; 06/16: update AADU model into Navisworks to show all 3 modules Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 06/13: assign drawing and TSR numbers; transmittal TSR-01571-CTR; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-16 Rig 209L-TSR :Rig 209L-TSR TSR-01574-209L Casing Push Tool Regular Pay N 5 0 detailed drawing for casing push tool Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 06/20: signed timesheets to payroll; online timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-20 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 daily; organize and file incoming TSR's; 06/21: transmit TSR-01572-TPP 06/22: transmit TSR-01560-CTR; 01565-CO; TSR-1538-CO; TSR-01573-CO; TSR-01579-CO; TSR-01579-CTR 06/23: transmit TSR-1552-DWGS; TSR-01576-CTR; TSR-01572-TPP Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4.75 0 3D model/PDF file of 209 sack storage and driller's cabin to Sahalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-21 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 daily; organize and file incoming TSR's; 06/21: transmit TSR-01572-TPP 06/22: transmit TSR-01560-CTR; 01565-CO; TSR-1538-CO; TSR-01573-CO; TSR-01579-CO; TSR-01579-CTR 06/23: transmit TSR-1552-DWGS; TSR-01576-CTR; TSR-01572-TPP Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 3D model/PDF file of 209 sack storage and driller's cabin to Sahalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-21 Rig 209L-TSR :Rig 209L-TSR TSR-01574-209L Casing Push Tool Regular Pay N 2.75 0 convert PDF redlines of as-built casing push tool into construction drawings and IFC to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-22 OH-013 :OH-013 Overhead All Activities Regular Pay N 2.75 0 daily; organize and file incoming TSR's; 06/21: transmit TSR-01572-TPP 06/22: transmit TSR-01560-CTR; 01565-CO; TSR-1538-CO; TSR-01573-CO; TSR-01579-CO; TSR-01579-CTR 06/23: transmit TSR-1552-DWGS; TSR-01576-CTR; TSR-01572-TPP Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-22 Rig 209L-TSR :Rig 209L-TSR TSR-01574-209L Casing Push Tool Regular Pay N 5 0 convert PDF redlines of as-built casing push tool into construction drawings and IFC to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 daily; organize and file incoming TSR's; 06/21: transmit TSR-01572-TPP 06/22: transmit TSR-01560-CTR; 01565-CO; TSR-1538-CO; TSR-01573-CO; TSR-01579-CO; TSR-01579-CTR 06/23: transmit TSR-1552-DWGS; TSR-01576-CTR; TSR-01572-TPP Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-23 Rig 209L-TSR :Rig 209L-TSR TSR-01574-209L Casing Push Tool Regular Pay N 5.75 0 convert PDF redlines of as-built casing push tool into construction drawings and IFC to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 06/26: TSR board updates. 06/27: 3D PDF standard updates, CAD standard tweaks/tasks. 06/30: signed timesheets to payroll; online timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 2.25 0 daily: processing drawings, organizing emails/transmitals, 06/26: transmital of revised CTR's for 1576 and 1577. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-26 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 06/26: weekly Sakhalin call to discuss TSR updates. 06/28: call to discuss path forward on completion spooler window "flapper" design Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-26 Rig 270L-TSR :Rig 270L-TSR TSR-01575-270L Circulation Spool Drawings Regular Pay N 4 0 revision to P&ID for circulation spool addition. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.25 0 06/26: TSR board updates. 06/27: 3D PDF standard updates, CAD standard tweaks/tasks. 06/30: signed timesheets to payroll; online timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 daily: processing drawings, organizing emails/transmitals, 06/26: transmital of revised CTR's for 1576 and 1577. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-27 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 2 0 redlines for control line spooler platform on DSM. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 daily: processing drawings, organizing emails/transmitals, 06/26: transmital of revised CTR's for 1576 and 1577. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-28 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 06/26: weekly Sakhalin call to discuss TSR updates. 06/28: call to discuss path forward on completion spooler window "flapper" design Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 evaluation of crown pad eyes for control line spooler sheave spreader beam Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-28 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 2.25 0 06/28-29: review of possible locations for control line sheave cluster placement and relocation clashes, possible mount points. 06/30: begin detailing of platform window "step down" drawing Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-29 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 daily: processing drawings, organizing emails/transmitals, 06/26: transmital of revised CTR's for 1576 and 1577. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-29 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 6.25 0 06/28-29: review of possible locations for control line sheave cluster placement and relocation clashes, possible mount points. 06/30: begin detailing of platform window "step down" drawing Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 06/26: TSR board updates. 06/27: 3D PDF standard updates, CAD standard tweaks/tasks. 06/30: signed timesheets to payroll; online timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-30 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 daily: processing drawings, organizing emails/transmitals, 06/26: transmital of revised CTR's for 1576 and 1577. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-06-30 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 5.25 0 06/28-29: review of possible locations for control line sheave cluster placement and relocation clashes, possible mount points. 06/30: begin detailing of platform window "step down" drawing Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Independence Holiday Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Independence Holiday Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-07 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 07/13: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.25 0 07/10: Online timesheets; AutoCAD lisp updates; IDR tasks (review records, sign documents) 07/11: sent cellar drawings to Jeff, created PDF's 07/12: updated Ralph's computer for AutoCAD. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-10 OH-013 :OH-013 Overhead All Activities Regular Pay N 3.5 0 07/10: update MDR with transmittal #'s; transmit TSR-01574-DWG, TSR-01581-CTR; TSR-01552-CO; TSR-01565-CO; TSR-01578-CTR. 07/11: Transmit TSR-01497-DWG; TSR-01574-CO 07/12: Transmit TSR-01580-CTR; TSR-01553-CO 07/14: Transmit TSR-01581-CO; TSR-01485-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-10 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin meeting to report TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 07/13: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 07/10: Online timesheets; AutoCAD lisp updates; IDR tasks (review records, sign documents) 07/11: sent cellar drawings to Jeff, created PDF's 07/12: updated Ralph's computer for AutoCAD. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-11 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 07/10: update MDR with transmittal #'s; transmit TSR-01574-DWG, TSR-01581-CTR; TSR-01552-CO; TSR-01565-CO; TSR-01578-CTR. 07/11: Transmit TSR-01497-DWG; TSR-01574-CO 07/12: Transmit TSR-01580-CTR; TSR-01553-CO 07/14: Transmit TSR-01581-CO; TSR-01485-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-11 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 4.5 0 07/11: Created cut sheet detail for platform and sent to Jeff for verification and fit-up; sent PDF of tie-back point in mast for spreader beam. 07/12: updated mast platform per Jeff's comments and started creating drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-11 Rig 209L-TSR :Rig 209L-TSR TSR-01574-209L Casing Push Tool Regular Pay N 1.5 0 Create close-out document for Ralph. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 07/13: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 07/10: Online timesheets; AutoCAD lisp updates; IDR tasks (review records, sign documents) 07/11: sent cellar drawings to Jeff, created PDF's 07/12: updated Ralph's computer for AutoCAD. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-12 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 6.25 0 07/11: Created cut sheet detail for platform and sent to Jeff for verification and fit-up; sent PDF of tie-back point in mast for spreader beam. 07/12: updated mast platform per Jeff's comments and started creating drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 daily: TSR board meeting update (15 mins) 07/13: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 07/10: Online timesheets; AutoCAD lisp updates; IDR tasks (review records, sign documents) 07/11: sent cellar drawings to Jeff, created PDF's 07/12: updated Ralph's computer for AutoCAD. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-13 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 07/10: update MDR with transmittal #'s; transmit TSR-01574-DWG, TSR-01581-CTR; TSR-01552-CO; TSR-01565-CO; TSR-01578-CTR. 07/11: Transmit TSR-01497-DWG; TSR-01574-CO 07/12: Transmit TSR-01580-CTR; TSR-01553-CO 07/14: Transmit TSR-01581-CO; TSR-01485-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-13 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 3.5 0 07/11: Created cut sheet detail for platform and sent to Jeff for verification and fit-up; sent PDF of tie-back point in mast for spreader beam. 07/12: updated mast platform per Jeff's comments and started creating drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 07/13: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 review Jeff's cellar stair drawing before submitting to Sakhalin Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-14 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 07/10: update MDR with transmittal #'s; transmit TSR-01574-DWG, TSR-01581-CTR; TSR-01552-CO; TSR-01565-CO; TSR-01578-CTR. 07/11: Transmit TSR-01497-DWG; TSR-01574-CO 07/12: Transmit TSR-01580-CTR; TSR-01553-CO 07/14: Transmit TSR-01581-CO; TSR-01485-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-14 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Lee C. Moore equipment presentation Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-14 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 2 0 07/11: Created cut sheet detail for platform and sent to Jeff for verification and fit-up; sent PDF of tie-back point in mast for spreader beam. 07/12: updated mast platform per Jeff's comments and started creating drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 07/20: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.25 0 07/17: review cellar door clash with well head tree; conference with Jeff about solution and path forward. 07/19: Scale CAD files and clean up for Benny (269L) 07/20: review BOP platform drawings (209L) 07/21: review brine tank sump drawings (272L) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 7/17: online timesheets and signed timesheets to Payroll. 07/19: IDR tasks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 07/17: organize MDR submittals for Yulia, and submit missing transmittals. 07/18: assign TSR numbers; TSR-01582-CTR; 07/21: Transmit TSR-01562-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-17 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin meeting (TSR updates) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 07/20: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 07/17: review cellar door clash with well head tree; conference with Jeff about solution and path forward. 07/19: Scale CAD files and clean up for Benny (269L) 07/20: review BOP platform drawings (209L) 07/21: review brine tank sump drawings (272L) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-18 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 2 0 07/18-07/21: Total Uganda Support - site plot plans, HP mud sys P&ID, rig safety plans Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-18 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.75 0 07/17: organize MDR submittals for Yulia, and submit missing transmittals. 07/18: assign TSR numbers; TSR-01582-CTR; 07/21: Transmit TSR-01562-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-18 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 3 0 07/18: locate new tie-off points and create PDF with sling lengths for SLBG. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 07/20: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 7/17: online timesheets and signed timesheets to Payroll. 07/19: IDR tasks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-19 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 6 0 07/18-07/21: Total Uganda Support - site plot plans, HP mud sys P&ID, rig safety plans Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-19 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 0.5 0 07/18: locate new tie-off points and create PDF with sling lengths for SLBG. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 daily: TSR board meeting update (15 mins) 07/20: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 07/17: review cellar door clash with well head tree; conference with Jeff about solution and path forward. 07/19: Scale CAD files and clean up for Benny (269L) 07/20: review BOP platform drawings (209L) 07/21: review brine tank sump drawings (272L) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-20 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 6.25 0 07/18-07/21: Total Uganda Support - site plot plans, HP mud sys P&ID, rig safety plans Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 07/20: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.75 0 07/17: review cellar door clash with well head tree; conference with Jeff about solution and path forward. 07/19: Scale CAD files and clean up for Benny (269L) 07/20: review BOP platform drawings (209L) 07/21: review brine tank sump drawings (272L) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-21 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 6 0 07/18-07/21: Total Uganda Support - site plot plans, HP mud sys P&ID, rig safety plans Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-21 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 07/17: organize MDR submittals for Yulia, and submit missing transmittals. 07/18: assign TSR numbers; TSR-01582-CTR; 07/21: Transmit TSR-01562-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 07/27: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 07/24: online timesheets 07/25: PDF to CAD conversions, send preliminary drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-24 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-24 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1 0 07/24: meeting with Schlumberger and Ralph regarding sling tie-back points and lengths 07/25: sent fleet angle and length and dimensions for all spooler lines from DSM 07/26: sent angles and lengths for tie-back points from mast to spreader beam. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-24 Rig 272L-TSR :Rig 272L-TSR TSR-01586-272L Update Choke/Flow Line Drawings Regular Pay N 4.75 0 update 272L HP mud line P&ID and updated flow line piping arrangement drawing package. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-25 Hibernia Platform :Hibernia Platform TSR-01576-HIBP Top Drive Maintenance Platform Regular Pay N 2 0 07/26-07/28: create construction drawings for guardrail extension Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 07/27: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 07/25: clean up 269L pad eye drawing 07/27: locate 209L hp mud line drawings with platform; 209L MGS platform drawings 07/28: find additional information regarding BOP platform structure Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 07/24: online timesheets 07/25: PDF to CAD conversions, send preliminary drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 07/25: transmit TSR-01586-DWG 07/26: transmit TSR-01586-CTR/CO 07/28: transmit TSR-01587-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-25 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1.25 0 07/24: meeting with Schlumberger and Ralph regarding sling tie-back points and lengths 07/25: sent fleet angle and length and dimensions for all spooler lines from DSM 07/26: sent angles and lengths for tie-back points from mast to spreader beam. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-25 Rig 272L-TSR :Rig 272L-TSR TSR-01586-272L Update Choke/Flow Line Drawings Regular Pay N 1.5 0 update 272L HP mud line P&ID and updated flow line piping arrangement drawing package. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-26 Hibernia Platform :Hibernia Platform TSR-01576-HIBP Top Drive Maintenance Platform Regular Pay N 4.75 0 07/26-07/28: create construction drawings for guardrail extension Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 07/27: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 07/25: transmit TSR-01586-DWG 07/26: transmit TSR-01586-CTR/CO 07/28: transmit TSR-01587-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-26 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 2 0 07/24: meeting with Schlumberger and Ralph regarding sling tie-back points and lengths 07/25: sent fleet angle and length and dimensions for all spooler lines from DSM 07/26: sent angles and lengths for tie-back points from mast to spreader beam. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-27 Hibernia Platform :Hibernia Platform TSR-01576-HIBP Top Drive Maintenance Platform Regular Pay N 6 0 07/26-07/28: create construction drawings for guardrail extension Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 daily: TSR board meeting update (15 mins) 07/27: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.75 0 07/25: clean up 269L pad eye drawing 07/27: locate 209L hp mud line drawings with platform; 209L MGS platform drawings 07/28: find additional information regarding BOP platform structure Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-28 Hibernia Platform :Hibernia Platform TSR-01576-HIBP Top Drive Maintenance Platform Regular Pay N 5 0 07/26-07/28: create construction drawings for guardrail extension Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 07/27: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.75 0 07/25: clean up 269L pad eye drawing 07/27: locate 209L hp mud line drawings with platform; 209L MGS platform drawings 07/28: find additional information regarding BOP platform structure Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 07/25: transmit TSR-01586-DWG 07/26: transmit TSR-01586-CTR/CO 07/28: transmit TSR-01587-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 08/03: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 online timesheets and signed timesheets to payroll. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-31 OH-019 :OH-019 Overhead All Activities Regular Pay N 1.5 0 weekly TSR update meeting with Sakhalin conference call with Ralph about TSR's and additional tasks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-31 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 5 0 updated drawings from red lines for the spooler platforms on the DSM. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-07-31 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 0.75 0 additional information regarding sling lengths and angles of wire control lines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 3.75 0 08/01: 269 air drilling manifold padeyes; review drawings, review BOP structural platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 08/01: transmit TSR-01586-DWG; 08/02: transmit TSR-01586-CTR/CO; 08/04: transmit TSR-01587-DWG; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-01 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 3 0 additional information regarding sling lengths and angles of wire control lines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-02 Hibernia Platform :Hibernia Platform TSR-01576-HIBP Top Drive Maintenance Platform Regular Pay N 3.75 0 hand rail extensions for top drive support platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 08/03: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 08/01: transmit TSR-01586-DWG; 08/02: transmit TSR-01586-CTR/CO; 08/04: transmit TSR-01587-DWG; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-02 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 3 0 additional information regarding sling lengths and angles of wire control lines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-03 Hibernia Platform :Hibernia Platform TSR-01576-HIBP Top Drive Maintenance Platform Regular Pay N 2 0 hand rail extensions for top drive support platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 daily: TSR board meeting update (15 mins) 08/03: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4.75 0 search and create background data for 209L DSM/DM HP mud lines and platform and DM MSG platform Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-04 Hibernia Platform :Hibernia Platform TSR-01576-HIBP Top Drive Maintenance Platform Regular Pay N 4.25 0 hand rail extensions for top drive support platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 08/03: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-04 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 08/01: transmit TSR-01586-DWG; 08/02: transmit TSR-01586-CTR/CO; 08/04: transmit TSR-01587-DWG; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-04 Rig 270L-TSR :Rig 270L-TSR TSR-01575-270L Circulation Spool Drawings Regular Pay N 2.5 0 P&ID and piping arrangement for 270 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 08/10: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-07 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 08/07: transmit TSR-01400-CO; TSR-1571-DWG 08/08: transmit TSR-01589-CTR 08/09: transmit TSR-01497-DWG 08/10: transmit TSR-01497-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-07 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly TSR update meeting with Sakhalin conference call with Ralph about TSR's and additional tasks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-07 Rig 270L-TSR :Rig 270L-TSR TSR-01575-270L Circulation Spool Drawings Regular Pay N 5.75 0 finalization of circulation system piping arrangement drawings (270L-01-04-001) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-08 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 2 0 update completions spreader hang-off pad eye drawing (209L-01-03-625) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-08 Rig 270L-TSR :Rig 270L-TSR TSR-01575-270L Circulation Spool Drawings Regular Pay N 6 0 finalization of circulation system piping arrangement drawings (270L-01-04-001) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 plot Hibernia drawings Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-09 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 3 0 Rig 30B tank drawing update Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-09 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 3.75 0 update completions spreader hang-off pad eye drawing (209L-01-03-625) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (15 mins) 08/10: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 create a camp drawing from RedSea PDF's for Total proposal. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-10 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 2.5 0 08/10: general updates and revisions to proposal plan and elevation drawings for PlusPetrol Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-10 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1.5 0 Rig 30B tank drawing update Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 08/10: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.75 0 Monkey board layout and concept for Hibernia. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 create a camp drawing from RedSea PDF's for Total proposal. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 08/17: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.25 0 update AADU data; ODOPTU rig model data Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 online timesheets and signed timesheets to payroll. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-14 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly TSR update meeting with Sakhalin conference call with Ralph about TSR's and additional tasks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-14 Rig 209L-TSR :Rig 209L-TSR TSR-01567-209L Shaker Trough Regular Pay N 5 0 update Keppel shaker trough P&ID drawings (P209-5702-01) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-15 Hibernia Platform :Hibernia Platform TSR-01576-HIBP Top Drive Maintenance Platform Regular Pay N 3 0 finalization of drawing HIBP-01-03-001 TD guard rail extensions Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 08/17: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 3.75 0 update AADU data; ODOPTU rig model data Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-15 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 08/15: transmit TSR-01497-CO; TSR-01567-CTR; TSR-01571-CO 08/16: transmit TSR-01567-CO 08/17: transmit TSR-01592-CTR; TSR-1087-CTR 08/18: transmit TSR-01590-CTR&CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 08/17: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 08/15: transmit TSR-01497-CO; TSR-01567-CTR; TSR-01571-CO 08/16: transmit TSR-01567-CO 08/17: transmit TSR-01592-CTR; TSR-1087-CTR 08/18: transmit TSR-01590-CTR&CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-16 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 7 0 created dust collector model to integrate into compiled Navisworks ODOPTU model. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (15 mins) 08/17: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 update AADU data; ODOPTU rig model data Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 08/15: transmit TSR-01497-CO; TSR-01567-CTR; TSR-01571-CO 08/16: transmit TSR-01567-CO 08/17: transmit TSR-01592-CTR; TSR-1087-CTR 08/18: transmit TSR-01590-CTR&CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-17 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 4 0 created dust collector model to integrate into compiled Navisworks ODOPTU model. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-18 Hibernia Platform :Hibernia Platform TSR-01577-HIBP Monkey Board Handrail Assembly Regular Pay N 5 0 gather background information regarding Hibernia monkey board structure to begin conceptual design. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 08/17: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.75 0 update AADU data; ODOPTU rig model data Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-18 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 08/15: transmit TSR-01497-CO; TSR-01567-CTR; TSR-01571-CO 08/16: transmit TSR-01567-CO 08/17: transmit TSR-01592-CTR; TSR-1087-CTR 08/18: transmit TSR-01590-CTR&CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 08/24: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 08/21: model and check new flow meter for incoming TSR 08/22-08/23: create concept model of 270 on Odoptu 08/24: start compiling data for incoming dust collector TSR. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 online timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-21 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly TSR update meeting with Sakhalin conference call with Ralph about TSR's and additional tasks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3.25 0 08/21: scrubbed and cleaned drawing for spreader beam clamp drawing (209L-01-03-626) 08/25: PDF conversions; created drawings for 270 rig move. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-21 Rig 209L-TSR :Rig 209L-TSR TSR-01492-209L Choke Manifold Piping Regular Pay N 1 0 update BOP well control drawing for regulatory Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-22 Hibernia Platform :Hibernia Platform TSR-01576-HIBP Top Drive Maintenance Platform Regular Pay N 0.5 0 08/22-08/23: finalize drawings for Hibernia TSR-01576 TD guardrail extensions. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 08/24: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 5.75 0 08/21: model and check new flow meter for incoming TSR 08/22-08/23: create concept model of 270 on Odoptu 08/24: start compiling data for incoming dust collector TSR. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-22 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 1.5 0 update TOTAL camp drawings Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-23 Hibernia Platform :Hibernia Platform TSR-01576-HIBP Top Drive Maintenance Platform Regular Pay N 1 0 08/22-08/23: finalize drawings for Hibernia TSR-01576 TD guardrail extensions. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 08/24: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 6.25 0 08/21: model and check new flow meter for incoming TSR 08/22-08/23: create concept model of 270 on Odoptu 08/24: start compiling data for incoming dust collector TSR. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 08/23: transmit TSR-01492-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 daily: TSR board meeting update (15 mins) 08/24: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 08/21: model and check new flow meter for incoming TSR 08/22-08/23: create concept model of 270 on Odoptu 08/24: start compiling data for incoming dust collector TSR. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-24 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 0.75 0 update TOTAL camp drawings Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 08/24: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-25 OH-011 :OH-011 Overhead All Activities Regular Pay N 4 0 Office Closure Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3.75 0 08/21: scrubbed and cleaned drawing for spreader beam clamp drawing (209L-01-03-626) 08/25: PDF conversions; created drawings for 270 rig move. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-28 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Office Closure Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-29 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Office Closure Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-30 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Office Closure Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-31 Hibernia Platform :Hibernia Platform TSR-01577-HIBP Monkey Board Handrail Assembly Regular Pay N 1.5 0 08/31: created a visual concept for handrail extensions to Sarah. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 08/24: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 online time sheets and signed timesheets to payroll. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-31 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 08/31: transmit LP P&ID for 209L 09/01: transmit TSR-01576-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-31 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 2 0 compile data to check for hazardous area classification. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-08-31 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 2 0 08/31: model and check for clashes of MudMaster flow meter. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 4.5 0 gather model data for incoming TSR: Berkut Winterization study Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-01 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 3 0 additional camp drawings created: operations support area Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 08/31: transmit LP P&ID for 209L 09/01: transmit TSR-01576-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Labor Day Holiday Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.75 0 09/05: created CO for TSR-01575 09/06: clean-up Hung Hoa drawing for 270 walking shoes 09/07-09/08: sketch a concept model of rig 270 on Odoptu site. 09/08: converting/creating BOP configuration template for Mat Ellis. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 online ProjectSense timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-05 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.75 0 09/05: transmit drawings for TSR-01589; process and file incoming TSR's; 09/06: trasmit TSR-01588-CO; TSR-01575-DWG & CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-05 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 5 0 09/04: preliminary layout and structural design for dust collector. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 09/05: created CO for TSR-01575 09/06: clean-up Hung Hoa drawing for 270 walking shoes 09/07-09/08: sketch a concept model of rig 270 on Odoptu site. 09/08: converting/creating BOP configuration template for Mat Ellis. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 09/05: transmit drawings for TSR-01589; process and file incoming TSR's; 09/06: trasmit TSR-01588-CO; TSR-01575-DWG & CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-06 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 4.25 0 09/06: modeled new 16" MudMaster flow meter and checked for clashes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 09/05: created CO for TSR-01575 09/06: clean-up Hung Hoa drawing for 270 walking shoes 09/07-09/08: sketch a concept model of rig 270 on Odoptu site. 09/08: converting/creating BOP configuration template for Mat Ellis. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-07 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1.5 0 09/04: preliminary layout and structural design for dust collector. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-07 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 0.5 0 09/06: modeled new 16" MudMaster flow meter and checked for clashes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 5.75 0 09/05: created CO for TSR-01575 09/06: clean-up Hung Hoa drawing for 270 walking shoes 09/07-09/08: sketch a concept model of rig 270 on Odoptu site. 09/08: converting/creating BOP configuration template for Mat Ellis. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-08 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 2.25 0 09/04: preliminary layout and structural design for dust collector. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-11 Hibernia Platform :Hibernia Platform TSR-01577-HIBP Monkey Board Handrail Assembly Regular Pay N 2 0 09/11-09/14: split up hr extensions & hr assembly drawings into 2 separate drawing files. drawing clean-up and red lines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 09/11: online timesheets and timesheets signed to be sent to Payroll. 09/13: updated TSR board Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-11 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly general TSR update meeting with Sakhalin Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-11 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 3.75 0 09/11, 09/14-09/15: update model to show 16" flow meter 09/15: Meeting with Mark and Dan to review model of MudMaster and potential clashes/issues. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-12 Hibernia Platform :Hibernia Platform TSR-01577-HIBP Monkey Board Handrail Assembly Regular Pay N 2.5 0 09/11-09/14: split up hr extensions & hr assembly drawings into 2 separate drawing files. drawing clean-up and red lines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 daily: TSR board meeting update (15 mins) 09/12: Security Awareness Training 09/14: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.75 0 09/12: export 209L a-frame to STP file format for Sakhalin (Jeff) 09/13: general revisions for CAD drawings from Jeff. 09/15: check mousehole on 209L for clearance with BOP cart when installed. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 09/12: transmit TSR-01589-CO; TSR-01598-CTR; TSR-01599-RFI 09/13: transmit TSR-01518-DWG; 272 updated GA drawings; 09/14: transmit TSR-01549-CTR; TSR-01598-CO; TSR-01601-CTR; TSR-01584-CTR; 09/15: transmit TSR-01562-DWG; TSR-01563-CTR&CO; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-13 Hibernia Platform :Hibernia Platform TSR-01577-HIBP Monkey Board Handrail Assembly Regular Pay N 3.25 0 09/11-09/14: split up hr extensions & hr assembly drawings into 2 separate drawing files. drawing clean-up and red lines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 09/12: export 209L a-frame to STP file format for Sakhalin (Jeff) 09/13: general revisions for CAD drawings from Jeff. 09/15: check mousehole on 209L for clearance with BOP cart when installed. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.25 0 09/11: online timesheets and timesheets signed to be sent to Payroll. 09/13: updated TSR board Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-13 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 09/12: transmit TSR-01589-CO; TSR-01598-CTR; TSR-01599-RFI 09/13: transmit TSR-01518-DWG; 272 updated GA drawings; 09/14: transmit TSR-01549-CTR; TSR-01598-CO; TSR-01601-CTR; TSR-01584-CTR; 09/15: transmit TSR-01562-DWG; TSR-01563-CTR&CO; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-14 Hibernia Platform :Hibernia Platform TSR-01577-HIBP Monkey Board Handrail Assembly Regular Pay N 1.75 0 09/11-09/14: split up hr extensions & hr assembly drawings into 2 separate drawing files. drawing clean-up and red lines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (15 mins) 09/12: Security Awareness Training 09/14: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-14 OH-013 :OH-013 Overhead All Activities Regular Pay N 2.25 0 09/12: transmit TSR-01589-CO; TSR-01598-CTR; TSR-01599-RFI 09/13: transmit TSR-01518-DWG; 272 updated GA drawings; 09/14: transmit TSR-01549-CTR; TSR-01598-CO; TSR-01601-CTR; TSR-01584-CTR; 09/15: transmit TSR-01562-DWG; TSR-01563-CTR&CO; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-14 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1.5 0 update 209 model to check for clashes with hazardous areas classifications Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-14 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 1.5 0 09/11, 09/14-09/15: update model to show 16" flow meter 09/15: Meeting with Mark and Dan to review model of MudMaster and potential clashes/issues. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 09/12: export 209L a-frame to STP file format for Sakhalin (Jeff) 09/13: general revisions for CAD drawings from Jeff. 09/15: check mousehole on 209L for clearance with BOP cart when installed. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-15 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 09/12: transmit TSR-01589-CO; TSR-01598-CTR; TSR-01599-RFI 09/13: transmit TSR-01518-DWG; 272 updated GA drawings; 09/14: transmit TSR-01549-CTR; TSR-01598-CO; TSR-01601-CTR; TSR-01584-CTR; 09/15: transmit TSR-01562-DWG; TSR-01563-CTR&CO; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-15 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 2.75 0 09/11, 09/14-09/15: update model to show 16" flow meter 09/15: Meeting with Mark and Dan to review model of MudMaster and potential clashes/issues. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 09/19: IADC conference lunch and learn. 09/21: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-18 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 09/18: transmit TSR-01479-CO; 09/20: transmit TSR-01588-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-18 OH-019 :OH-019 Overhead All Activities Regular Pay N 2 0 09/18: weekly TSR update meeting with Sakhalin. 09/18: teleconference call with Sakhalin regarding MDR for Rig 262. 09/22: model review of updated 272 DM/MM for flow meter installation. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-18 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 5 0 09/18-09/19: update shaker trough and general model and create a PDF package for Mark and Dan. 09/22: meeting with Mark regarding TSR. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 daily: TSR board meeting update (15 mins) 09/19: IADC conference lunch and learn. 09/21: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-19 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 3.25 0 convert and compile data to check for clashes of choke manifold. create a PDF for John to send email Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-19 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 3.5 0 09/18-09/19: update shaker trough and general model and create a PDF package for Mark and Dan. 09/22: meeting with Mark regarding TSR. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.75 0 09/20: prepare Navisworks model for Berkut. 09/21: file conversions and general revisions for Jeff. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-20 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 09/18: transmit TSR-01479-CO; 09/20: transmit TSR-01588-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-20 Rig 209L-TSR :Rig 209L-TSR TSR-01600-209L Desilter Motor Upgrade Regular Pay N 3 0 convert PDF to CAD and clash check for electrical parts inside of explosion proof enclosure. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-20 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 1.5 0 09/18-09/19: update shaker trough and general model and create a PDF package for Mark and Dan. 09/22: meeting with Mark regarding TSR. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (15 mins) 09/19: IADC conference lunch and learn. 09/21: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 09/20: prepare Navisworks model for Berkut. 09/21: file conversions and general revisions for Jeff. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-21 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 5 0 updated CTR and begin another design for the completion window platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 find drawing files for Nick regarding 270 plot plan. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-22 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 09/18: weekly TSR update meeting with Sakhalin. 09/18: teleconference call with Sakhalin regarding MDR for Rig 262. 09/22: model review of updated 272 DM/MM for flow meter installation. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-22 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 4.75 0 updated CTR and begin another design for the completion window platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-22 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 1 0 09/18-09/19: update shaker trough and general model and create a PDF package for Mark and Dan. 09/22: meeting with Mark regarding TSR. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 09/28: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.25 0 update Odoptu and AADU models; examine and view 3D scan files of Hibernia Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 online timesheets and timesheets to payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.75 0 09/25: transmit TSR-01549-CO; TSR-01562-CTR; TSR-01600-CTR 09/29: transmit TSR-01577-DWG; TSR-01584-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-25 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin TSR update conference call. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-25 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 2.75 0 update model and webmeeting to discuss changes with Ralph. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 update Odoptu and AADU models; examine and view 3D scan files of Hibernia Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-26 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 compile data from drawings into 3D model. modify model and check for clashes. created PDF and Navisworks file to send to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 update Odoptu and AADU models; examine and view 3D scan files of Hibernia Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-27 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 5 0 compile data from drawings into 3D model. modify model and check for clashes. created PDF and Navisworks file to send to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (15 mins) 09/28: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 update Odoptu and AADU models; examine and view 3D scan files of Hibernia Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-28 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 6 0 compile data from drawings into 3D model. modify model and check for clashes. created PDF and Navisworks file to send to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-29 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 updated PDF files of man camps, mini camps, and HP P&IDs. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-29 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 09/25: transmit TSR-01549-CO; TSR-01562-CTR; TSR-01600-CTR 09/29: transmit TSR-01577-DWG; TSR-01584-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-09-29 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 6 0 compile data from drawings into 3D model. modify model and check for clashes. created PDF and Navisworks file to send to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-02 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3.5 0 10/02-10/04:walking shoes sequence for well rows; rig GA over well rows. PDF conversions and comparisons. electrical one-liners Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 10/05: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 updated Odoptu model in preparation for incoming TSRs Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 10/02-03: setting up employees to be able to charge time to Hibernia on ProjectSense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-02 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin TSR update conference call. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-02 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.75 0 create 3D PDF and update model to show possible solution for valve interference. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.75 0 10/02-10/04:walking shoes sequence for well rows; rig GA over well rows. PDF conversions and comparisons. electrical one-liners Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 updated Odoptu model in preparation for incoming TSRs Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 10/02-03: setting up employees to be able to charge time to Hibernia on ProjectSense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-03 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 2 0 CNOOC GA update. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-03 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 10/03: transmit TSR-01584-CO; 10/04: transmit TSR-01599-RFI; 10/05: transmit TSR-01583-CTR; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-04 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5.75 0 10/02-10/04:walking shoes sequence for well rows; rig GA over well rows. PDF conversions and comparisons. electrical one-liners Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-04 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 10/03: transmit TSR-01584-CO; 10/04: transmit TSR-01599-RFI; 10/05: transmit TSR-01583-CTR; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-04 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1.5 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (15 mins) 10/05: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 updated Odoptu model in preparation for incoming TSRs Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-05 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 10/03: transmit TSR-01584-CO; 10/04: transmit TSR-01599-RFI; 10/05: transmit TSR-01583-CTR; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-05 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 4 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-06 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 10/12: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-09 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin TSR update conference call. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-09 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 6.75 0 design and draft drawings for updated 209L mast control line spooler platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 10/12: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-10 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 TSR's received from Sakhalin and Arctic divisions. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-10 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 7.25 0 design and draft drawings for updated 209L mast control line spooler platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 10/11: updated 270 model on Odoptu site. 10/13: updated Odoptu model with as-built drawings Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-11 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.25 0 TSR's received from Sakhalin and Arctic divisions. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-11 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 4.75 0 design and draft drawings for updated 209L mast control line spooler platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (15 mins) 10/12: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 10/12: search SharePoint for MTR's on HP mud spool (cracked). Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-12 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 5.5 0 design and draft drawings for updated 209L mast control line spooler platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 10/11: updated 270 model on Odoptu site. 10/13: updated Odoptu model with as-built drawings Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-13 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 6 0 design and draft drawings for updated 209L mast control line spooler platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 10/19: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 transmittal: documents to Hibernia vendors Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-16 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin TSR update conference call. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-16 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 5.75 0 create CAD drawings for mast control line platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-17 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 8 0 create CAD drawings for mast control line platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-18 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 8 0 create CAD drawings for mast control line platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (15 mins) 10/19: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-19 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 9.5 0 create CAD drawings for mast control line platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-20 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.25 0 update plot plan to mirror client's request. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Project Sense tasks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-20 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 3.75 0 create CAD drawings for mast control line platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-23 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2.5 0 Total Uganda updates and changes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 online timesheets (ProjectSense) and timesheet to be sent to Payroll. Various tasks on ProjectSense for Greg. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 10/23: transmit TSR-01607-CTR&CO 10/25: transmit TSR-01582-RFI; TSR-01609-CTR; TSR-01607-DWG 10/26: transmit TSR-01593-CTR; TSR-01600-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-23 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 weekly Sakhalin TSR update conference call. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-23 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 3.5 0 mark-ups and comments for the mast control line platform drawing set Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 online timesheets (ProjectSense) and timesheet to be sent to Payroll. Various tasks on ProjectSense for Greg. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 10/23: transmit TSR-01607-CTR&CO 10/25: transmit TSR-01582-RFI; TSR-01609-CTR; TSR-01607-DWG 10/26: transmit TSR-01593-CTR; TSR-01600-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-25 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Helpdesk's new ticketing system training Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-25 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1.75 0 mark-ups and comments for the mast control line platform drawing set Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-26 Hibernia Platform :Hibernia Platform TSR-01577-HIBP Monkey Board Handrail Assembly Regular Pay N 2 0 Closeout Documentation Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 10/23: transmit TSR-01607-CTR&CO 10/25: transmit TSR-01582-RFI; TSR-01609-CTR; TSR-01607-DWG 10/26: transmit TSR-01593-CTR; TSR-01600-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-26 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 4.75 0 mark-ups and comments for the mast control line platform drawing set Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 online timesheets (ProjectSense) and timesheet to be sent to Payroll. Various tasks on ProjectSense for Greg. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-27 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 7 0 mark-ups and comments for the mast control line platform drawing set Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-30 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 update GA drawings for plot plan Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 11/02: weekly TSR meeting & quarterly earnings meeting and lunch Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 general updates to ODOPTU model Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-30 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 10/30: transmit TSR-01492-CO; 11/1: transmit TSR-0197-CO; TSR-01599-CO; 11/2: transmit TSR-0138-RFI Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-30 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin TSR update conference call. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-10-31 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 8 0 modification to existing choke manifold skid. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 11/02: weekly TSR meeting & quarterly earnings meeting and lunch Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 10/30: transmit TSR-01492-CO; 11/1: transmit TSR-0197-CO; TSR-01599-CO; 11/2: transmit TSR-0138-RFI Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-01 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2.5 0 modification to existing choke manifold skid. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-01 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 4 0 picked up redlines for as-built conditions Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 daily: TSR board meeting update (15 mins) 11/02: weekly TSR meeting & quarterly earnings meeting and lunch Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 10/30: transmit TSR-01492-CO; 11/1: transmit TSR-0197-CO; TSR-01599-CO; 11/2: transmit TSR-0138-RFI Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-02 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 5 0 picked up redlines for as-built conditions Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-03 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 6.5 0 layout of preliminary HP piping drawing for 216 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-03 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1.5 0 picked up redlines for as-built conditions Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 11/09: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-06 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin TSR update conference call. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-06 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 6.75 0 PLACEHOLDER: 216 HP piping upgrade Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-07 OH-013 :OH-013 Overhead All Activities Regular Pay N 2.5 0 11/07: transmit TSR-01609-DWG; TSR-01582-CO 11/10: transmit TSR-01614-CTR&CO; TSR-01609-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-07 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 3.5 0 PLACEHOLDER: 216 HP piping upgrade Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-07 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 2 0 11/07-11/08: 6.5mT pad eye detail drawing, with updated model Preliminary work: updated CAD for HPPS TSR to George Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 11/09: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 11/08: meeting with Kyle and Rob to discuss SolidWorks license renewals 11/09: updated 209L model data Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-08 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 2 0 11/07-11/08: 6.5mT pad eye detail drawing, with updated model Preliminary work: updated CAD for HPPS TSR to George Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (15 mins) 11/09: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-09 OH-013 :OH-013 Overhead All Activities Regular Pay N 3.5 0 11/07: transmit TSR-01609-DWG; TSR-01582-CO 11/10: transmit TSR-01614-CTR&CO; TSR-01609-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-10 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 11/07: transmit TSR-01609-DWG; TSR-01582-CO 11/10: transmit TSR-01614-CTR&CO; TSR-01609-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-10 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 4.5 0 11/07-11/08: 6.5mT pad eye detail drawing, with updated model Preliminary work: updated CAD for HPPS TSR to George Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-10 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 1.5 0 Closeout Documentation preparation for 216L Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 11/16: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 SolidWorks meeting/contracts 11/17: projectsense timesheet & timesheet to payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-13 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin TSR update conference call. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-13 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 updated model of Orlan's choke & kill manifold and created spools for cement standpipe. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-13 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1.75 0 11/13-11/14: 6.5mT DSM spooler tie-down pad eyes Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-13 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2 0 completed drawings for HPPS to bid proposal. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 11/16: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-14 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 11/14: transmit TSR-01518-DWG; TSR-01605-CO; TSR-01597-CO; TSR-01518-DWG; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-14 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 2 0 11/13-11/14: 6.5mT DSM spooler tie-down pad eyes Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-14 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 3.75 0 completed drawings for HPPS to bid proposal. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-14 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 0.5 0 quick conference call with Luis regarding scope of work. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 SolidWorks meeting/contracts 11/17: projectsense timesheet & timesheet to payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-15 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 6 0 updated model of Orlan's choke & kill manifold and created spools for cement standpipe. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-15 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1.5 0 Shaker trough modifications Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (15 mins) 11/16: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-16 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 5 0 updated model of Orlan's choke & kill manifold and created spools for cement standpipe. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-16 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2 0 Shaker trough modifications Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 SolidWorks meeting/contracts 11/17: projectsense timesheet & timesheet to payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-17 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 updated model of Orlan's choke & kill manifold and created spools for cement standpipe. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-17 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 5 0 Shaker trough modifications Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-20 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin TSR update conference call. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-20 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 5 0 modeled HP piping and modifications necessary to complete connections Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-20 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1.75 0 completion of various tasks for red lines Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-21 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 transmit: TSR-01593-RFI Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-21 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 modeled HP piping and modifications necessary to complete connections Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-21 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 5 0 updated CAD drawings to be sent to supplier/fabricator Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.75 0 update menu items for CAD standard; SolidWorks license issues Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-22 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 6 0 completion of various tasks for red lines Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-23 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-24 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 11/30: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-27 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin TSR update conference call. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-27 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2 0 updated P&ID drawing; discussed CTR hours with Kyle Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-27 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 4.75 0 layout of DM external stairs into compiled 3D model Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 11/28: transmit TSR-01562-DWG; 11/29: transmit TSR-01592-DWG; TSR-01601-CO; TSR-001481-CO; TSR-01583-CTR; 11/30: transmit TSR-01397-CO; TSR-01602-CTR: TSR-01610-RFI Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-28 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Internal Controls Refresher Course Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-28 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 6 0 layout of DM external stairs into compiled 3D model Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 11/29: Solidworks licenses administrative tasks 11/30: troubleshoot CAD license issues with Ralph. 12/01: timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-29 OH-013 :OH-013 Overhead All Activities Regular Pay N 2.5 0 11/28: transmit TSR-01562-DWG; 11/29: transmit TSR-01592-DWG; TSR-01601-CO; TSR-001481-CO; TSR-01583-CTR; 11/30: transmit TSR-01397-CO; TSR-01602-CTR: TSR-01610-RFI Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-29 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 5 0 layout of DM external stairs into compiled 3D model Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (15 mins) 11/30: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 11/29: Solidworks licenses administrative tasks 11/30: troubleshoot CAD license issues with Ralph. 12/01: timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-30 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 11/28: transmit TSR-01562-DWG; 11/29: transmit TSR-01592-DWG; TSR-01601-CO; TSR-001481-CO; TSR-01583-CTR; 11/30: transmit TSR-01397-CO; TSR-01602-CTR: TSR-01610-RFI Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-11-30 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 3 0 layout of DM external stairs into compiled 3D model Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 3.25 0 update compiled model data; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 11/29: Solidworks licenses administrative tasks 11/30: troubleshoot CAD license issues with Ralph. 12/01: timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-01 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 4 0 layout of DM external stairs into compiled 3D model Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (15 mins) 12/07: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 12/04: online timesheets & timesheets to Payroll 12/05: email correspondence with Sarah regarding TSR-01576 12/08: created meeting invite for TSR-01616-HIBP; sarah responds and cancels TSR; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-04 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 12/04: transmit TSR-01592-CO; TSR-01612-CO; TSR-1420-CO; 12/05: general correspondence emails to Sakhalin 12/06: transmit TSR-01618-CTR; 12/07; transmit TSR-01610-RFI; 12/08: transmit TSR-01615-CO; modifications made in ProjectSense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-04 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin TSR update conference call. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-04 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 3 0 12/04: closeout documentation for TSR-01562 12/05: history of 209L mast control line platform (including TSR-01518) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-04 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 1.5 0 12/04: web meeting for site to review preliminary concept 12/05: modeled existing as-built drawings into model 12/06: web meeting to confirm design concept with site; MTO sent for confirmation; 12/08: 3D PDF sent for review Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 12/04: online timesheets & timesheets to Payroll 12/05: email correspondence with Sarah regarding TSR-01576 12/08: created meeting invite for TSR-01616-HIBP; sarah responds and cancels TSR; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-05 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 12/04: transmit TSR-01592-CO; TSR-01612-CO; TSR-1420-CO; 12/05: general correspondence emails to Sakhalin 12/06: transmit TSR-01618-CTR; 12/07; transmit TSR-01610-RFI; 12/08: transmit TSR-01615-CO; modifications made in ProjectSense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-05 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 6.75 0 12/04: web meeting for site to review preliminary concept 12/05: modeled existing as-built drawings into model 12/06: web meeting to confirm design concept with site; MTO sent for confirmation; 12/08: 3D PDF sent for review Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 12/04: transmit TSR-01592-CO; TSR-01612-CO; TSR-1420-CO; 12/05: general correspondence emails to Sakhalin 12/06: transmit TSR-01618-CTR; 12/07; transmit TSR-01610-RFI; 12/08: transmit TSR-01615-CO; modifications made in ProjectSense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-06 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 2.5 0 12/04: closeout documentation for TSR-01562 12/05: history of 209L mast control line platform (including TSR-01518) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-06 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 4.5 0 12/04: web meeting for site to review preliminary concept 12/05: modeled existing as-built drawings into model 12/06: web meeting to confirm design concept with site; MTO sent for confirmation; 12/08: 3D PDF sent for review Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-07 Hibernia Platform :Hibernia Platform TSR-01577-HIBP Monkey Board Handrail Assembly Regular Pay N 3 0 rev'd drawing up per site comments; closeout documentation created. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (15 mins) 12/07: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-07 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 12/04: transmit TSR-01592-CO; TSR-01612-CO; TSR-1420-CO; 12/05: general correspondence emails to Sakhalin 12/06: transmit TSR-01618-CTR; 12/07; transmit TSR-01610-RFI; 12/08: transmit TSR-01615-CO; modifications made in ProjectSense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-07 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 3 0 12/04: web meeting for site to review preliminary concept 12/05: modeled existing as-built drawings into model 12/06: web meeting to confirm design concept with site; MTO sent for confirmation; 12/08: 3D PDF sent for review Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 12/04: online timesheets & timesheets to Payroll 12/05: email correspondence with Sarah regarding TSR-01576 12/08: created meeting invite for TSR-01616-HIBP; sarah responds and cancels TSR; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-08 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 12/04: transmit TSR-01592-CO; TSR-01612-CO; TSR-1420-CO; 12/05: general correspondence emails to Sakhalin 12/06: transmit TSR-01618-CTR; 12/07; transmit TSR-01610-RFI; 12/08: transmit TSR-01615-CO; modifications made in ProjectSense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-08 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 5.5 0 12/04: web meeting for site to review preliminary concept 12/05: modeled existing as-built drawings into model 12/06: web meeting to confirm design concept with site; MTO sent for confirmation; 12/08: 3D PDF sent for review Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board meeting update (30 mins) 12/12: 2017 Holiday Party/Luncheon 12/14: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 12/11: Performance and Development Goals/Evaluation. 12/12-13: ProjectSense administration tasks/troubleshooting users 12/15: correspondence with ECAD Inc to discuss license renewals Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-11 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin TSR update conference call. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-11 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 2.5 0 start CAD drawings for east external stairs Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 daily: TSR board meeting update (30 mins) 12/12: 2017 Holiday Party/Luncheon 12/14: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.75 0 Autodesk ReCap with Hibernia 3D point cloud data Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 12/11: Performance and Development Goals/Evaluation. 12/12-13: ProjectSense administration tasks/troubleshooting users 12/15: correspondence with ECAD Inc to discuss license renewals Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-12 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 12/12: 2017 Annual Complicance Training 12/14: Vendor presentation with AES and their pulsation dampener technology. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 12/11: Performance and Development Goals/Evaluation. 12/12-13: ProjectSense administration tasks/troubleshooting users 12/15: correspondence with ECAD Inc to discuss license renewals Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-13 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 12/13: transmit TSR-01560-CO; TSR-1576-DWG; 12/14: transmit TSR-01562-CO; email correspondence with Sakhalin Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-13 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 5 0 review valve displacements from model data. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-13 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 0.5 0 start CAD drawings for east external stairs Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (30 mins) 12/12: 2017 Holiday Party/Luncheon 12/14: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-14 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 3D model and exports for concept review/proposal Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-14 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 12/13: transmit TSR-01560-CO; TSR-1576-DWG; 12/14: transmit TSR-01562-CO; email correspondence with Sakhalin Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-14 OH-014 :OH-014 Overhead All Activities Regular Pay N 2.5 0 12/12: 2017 Annual Complicance Training 12/14: Vendor presentation with AES and their pulsation dampener technology. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 12/11: Performance and Development Goals/Evaluation. 12/12-13: ProjectSense administration tasks/troubleshooting users 12/15: correspondence with ECAD Inc to discuss license renewals Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-15 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 3D model and exports for concept review/proposal Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-15 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 6.5 0 start CAD drawings for east external stairs Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 12/18: timesheets to payroll and online timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-18 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin meeting regarding TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 12/19: HSTG Luncheon discussing departmental goals 12/20: Meeting with ECAD regarding Autodesk Product subscriptions Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.5 0 12/18: timesheets to payroll and online timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-19 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 TSR incoming email correspondence Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 12/19: HSTG Luncheon discussing departmental goals 12/20: Meeting with ECAD regarding Autodesk Product subscriptions Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 7.5 0 12/18: timesheets to payroll and online timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 12/18: timesheets to payroll and online timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-21 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 6 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Floating Holiday Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-25 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Christmas Holiday Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-28 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2017-12-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Year's Holiday Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board meeting update (30 mins) 01/05: ECAD Price Discussion Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 01/02: Time sheets to payroll and ProjectSense; update status on TSR documentation 01/03: Plot Orlan and Berkut drawings on large format; 01/05: resolve issues with users and ProjectSense. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-02 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 6 0 DM external stairs Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board meeting update (30 mins) 01/05: ECAD Price Discussion Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 01/02: Time sheets to payroll and ProjectSense; update status on TSR documentation 01/03: Plot Orlan and Berkut drawings on large format; 01/05: resolve issues with users and ProjectSense. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-03 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 6 0 DM external stairs Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-04 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 8 0 DM external stairs Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board meeting update (30 mins) 01/05: ECAD Price Discussion Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 01/02: Time sheets to payroll and ProjectSense; update status on TSR documentation 01/03: Plot Orlan and Berkut drawings on large format; 01/05: resolve issues with users and ProjectSense. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-05 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 6.5 0 DM external stairs Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board meeting update (30 mins) 01/11: weekly TSR meeting update 01/12: meeting to finalize title block changes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 01/08: ECAD Autodesk quotes and work with IT to update software; big plots on large plotter. 01/10: troubleshoot Sarah's CAD license issues. 01/11: IT helpdesk ticket submittal and explanation. 01/12: implementing changes from title block meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-08 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin meeting regarding TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-08 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 4.75 0 switching from east bridge walkway to west stairwell with adjustable platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-09 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 01/09: transmit TSR-01605-CTR; TSR-01492-CTR; TSR-01599-CTR; TSR-01618-DWG 01/10: transmit TSR-01559-CO 01/11: transmit TSR-01608-CTR; TSR-01572-RFI; TSR-01617-RFI 01/12: transmit TSR-01593-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-09 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 5 0 switching from east bridge walkway to west stairwell with adjustable platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-10 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board meeting update (30 mins) 01/11: weekly TSR meeting update 01/12: meeting to finalize title block changes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 01/08: ECAD Autodesk quotes and work with IT to update software; big plots on large plotter. 01/10: troubleshoot Sarah's CAD license issues. 01/11: IT helpdesk ticket submittal and explanation. 01/12: implementing changes from title block meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-10 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 01/09: transmit TSR-01605-CTR; TSR-01492-CTR; TSR-01599-CTR; TSR-01618-DWG 01/10: transmit TSR-01559-CO 01/11: transmit TSR-01608-CTR; TSR-01572-RFI; TSR-01617-RFI 01/12: transmit TSR-01593-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-10 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 1.75 0 switching from east bridge walkway to west stairwell with adjustable platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (30 mins) 01/11: weekly TSR meeting update 01/12: meeting to finalize title block changes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 01/08: ECAD Autodesk quotes and work with IT to update software; big plots on large plotter. 01/10: troubleshoot Sarah's CAD license issues. 01/11: IT helpdesk ticket submittal and explanation. 01/12: implementing changes from title block meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-11 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 01/09: transmit TSR-01605-CTR; TSR-01492-CTR; TSR-01599-CTR; TSR-01618-DWG 01/10: transmit TSR-01559-CO 01/11: transmit TSR-01608-CTR; TSR-01572-RFI; TSR-01617-RFI 01/12: transmit TSR-01593-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-11 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 5.5 0 switching from east bridge walkway to west stairwell with adjustable platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 daily: TSR board meeting update (30 mins) 01/11: weekly TSR meeting update 01/12: meeting to finalize title block changes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 01/08: ECAD Autodesk quotes and work with IT to update software; big plots on large plotter. 01/10: troubleshoot Sarah's CAD license issues. 01/11: IT helpdesk ticket submittal and explanation. 01/12: implementing changes from title block meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 01/09: transmit TSR-01605-CTR; TSR-01492-CTR; TSR-01599-CTR; TSR-01618-DWG 01/10: transmit TSR-01559-CO 01/11: transmit TSR-01608-CTR; TSR-01572-RFI; TSR-01617-RFI 01/12: transmit TSR-01593-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-12 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 1.75 0 switching from east bridge walkway to west stairwell with adjustable platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (30 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 1/15: CAD to PDF conversions; AutoCAD standard changes. 1/18: IT support help 1/19: timesheets; testing ProjectSense with Manjula (java update) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-15 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin meeting regarding TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-15 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 5.25 0 finalization of west stairwell with adjustable platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 winter storm office closure Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 winter storm office closure Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.5 0 NOV top drive CAD clean up Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 1/15: CAD to PDF conversions; AutoCAD standard changes. 1/18: IT support help 1/19: timesheets; testing ProjectSense with Manjula (java update) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-18 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 6.5 0 finalization of west stairwell with adjustable platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 1/15: CAD to PDF conversions; AutoCAD standard changes. 1/18: IT support help 1/19: timesheets; testing ProjectSense with Manjula (java update) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-19 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 6.25 0 finalization of west stairwell with adjustable platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (30 mins) 01/25: SaferUnion product presentation. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 01/22: setup new tasks in ProjectSense; assist IT with AutoCAD installations. 1/25: search for 273 pad eyes assembly for Genesis. 01/24: CAD issues; Hightail uploads; Globalmeet meeting setup for John Reck. 01/26: ProjectSense timesheets and timesheets to Payroll; create a CAD standards deployment (for off-site users) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-22 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 01/22: transmit TSR-01613-CO; 01/24: transmit TSR-01621-TSR; 01/25; resend transmittals to Hibernia for a signed reciept. 01/26: locate and email commissioning report for rotary table; transmit TSR-01593-DWG; send files to Genesis. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-22 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin meeting regarding TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-22 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 4.5 0 finalization of east and west stairwell with adjustable platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-23 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (30 mins) 01/25: SaferUnion product presentation. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 01/22: setup new tasks in ProjectSense; assist IT with AutoCAD installations. 1/25: search for 273 pad eyes assembly for Genesis. 01/24: CAD issues; Hightail uploads; Globalmeet meeting setup for John Reck. 01/26: ProjectSense timesheets and timesheets to Payroll; create a CAD standards deployment (for off-site users) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-24 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 01/22: transmit TSR-01613-CO; 01/24: transmit TSR-01621-TSR; 01/25; resend transmittals to Hibernia for a signed reciept. 01/26: locate and email commissioning report for rotary table; transmit TSR-01593-DWG; send files to Genesis. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-24 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 5.75 0 finalization of east and west stairwell with adjustable platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (30 mins) 01/25: SaferUnion product presentation. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 01/22: setup new tasks in ProjectSense; assist IT with AutoCAD installations. 1/25: search for 273 pad eyes assembly for Genesis. 01/24: CAD issues; Hightail uploads; Globalmeet meeting setup for John Reck. 01/26: ProjectSense timesheets and timesheets to Payroll; create a CAD standards deployment (for off-site users) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 01/22: transmit TSR-01613-CO; 01/24: transmit TSR-01621-TSR; 01/25; resend transmittals to Hibernia for a signed reciept. 01/26: locate and email commissioning report for rotary table; transmit TSR-01593-DWG; send files to Genesis. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-25 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 5.75 0 finalization of east and west stairwell with adjustable platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 0.75 0 Top Drive drawing updates for MHWirth Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 01/22: setup new tasks in ProjectSense; assist IT with AutoCAD installations. 1/25: search for 273 pad eyes assembly for Genesis. 01/24: CAD issues; Hightail uploads; Globalmeet meeting setup for John Reck. 01/26: ProjectSense timesheets and timesheets to Payroll; create a CAD standards deployment (for off-site users) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 4.25 0 01/22: transmit TSR-01613-CO; 01/24: transmit TSR-01621-TSR; 01/25; resend transmittals to Hibernia for a signed reciept. 01/26: locate and email commissioning report for rotary table; transmit TSR-01593-DWG; send files to Genesis. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-29 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 update CAD drawings for traveling block and top drive arrangement Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (30 mins) 01/31: performance meeting 02/01: weekly TSR meeting update. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 01/29: timesheets online and to payroll daily:AutoCAD standards preparation for deployment; working with EJ to assist with CAD installs; ECAD payment issues; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-29 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1.75 0 01/29: update model for AADU to reflect signage on mast. 01/31: find and send AADU equipment drawings/models Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-29 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 01/29: TSR number reservations 01/30: retransmit TSR's to Hibernia 01/31: transmit TSR-01593-CO; 02/01: transmit TSR-01620-CTR; TSR-01619-CTR; 02/02: updated MDR for Orlan Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-29 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting with Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-30 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.25 0 update CAD drawings for traveling block and top drive arrangement Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board meeting update (30 mins) 01/31: performance meeting 02/01: weekly TSR meeting update. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 01/29: timesheets online and to payroll daily:AutoCAD standards preparation for deployment; working with EJ to assist with CAD installs; ECAD payment issues; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-30 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 01/29: TSR number reservations 01/30: retransmit TSR's to Hibernia 01/31: transmit TSR-01593-CO; 02/01: transmit TSR-01620-CTR; TSR-01619-CTR; 02/02: updated MDR for Orlan Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-30 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 3.25 0 edit drawings per TSR package Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-30 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 1.5 0 red lines for drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-31 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 0.25 0 update CAD drawings for traveling block and top drive arrangement Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (30 mins) 01/31: performance meeting 02/01: weekly TSR meeting update. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 01/29: timesheets online and to payroll daily:AutoCAD standards preparation for deployment; working with EJ to assist with CAD installs; ECAD payment issues; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-31 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1.5 0 01/29: update model for AADU to reflect signage on mast. 01/31: find and send AADU equipment drawings/models Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-31 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 01/29: TSR number reservations 01/30: retransmit TSR's to Hibernia 01/31: transmit TSR-01593-CO; 02/01: transmit TSR-01620-CTR; TSR-01619-CTR; 02/02: updated MDR for Orlan Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-31 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1.75 0 edit drawings per TSR package Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-01-31 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 0.5 0 red lines for drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board meeting update (30 mins) 01/31: performance meeting 02/01: weekly TSR meeting update. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 01/29: timesheets online and to payroll daily:AutoCAD standards preparation for deployment; working with EJ to assist with CAD installs; ECAD payment issues; Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 01/29: TSR number reservations 01/30: retransmit TSR's to Hibernia 01/31: transmit TSR-01593-CO; 02/01: transmit TSR-01620-CTR; TSR-01619-CTR; 02/02: updated MDR for Orlan Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-01 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 1 0 red lines for drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-02 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1.5 0 model platform concept Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 01/29: TSR number reservations 01/30: retransmit TSR's to Hibernia 01/31: transmit TSR-01593-CO; 02/01: transmit TSR-01620-CTR; TSR-01619-CTR; 02/02: updated MDR for Orlan Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-02 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 6 0 edit drawings per TSR package Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board meeting update (30 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 02/05: PDF conversions from CAD files; 02/05-02/07: CAD standards for deployment 02/06: send converted 3D model file of 209 DM skidding claw/cylinder Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-05 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 MinKit Platform 3D concept and conversion to 3D PDF Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-05 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 02/05: transmit TSR-01622-CTR; TSR-01610-CTR 02/06: transmit TSR-01572-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-05 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting with Sakhalin. 02/06-02/09: meeting with Jeff regarding incoming TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board meeting update (30 mins) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 02/05: PDF conversions from CAD files; 02/05-02/07: CAD standards for deployment 02/06: send converted 3D model file of 209 DM skidding claw/cylinder Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-06 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4.5 0 MinKit Platform 3D concept and conversion to 3D PDF Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 02/05: transmit TSR-01622-CTR; TSR-01610-CTR 02/06: transmit TSR-01572-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-06 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.25 0 weekly meeting with Sakhalin. 02/06-02/09: meeting with Jeff regarding incoming TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 02/05: PDF conversions from CAD files; 02/05-02/07: CAD standards for deployment 02/06: send converted 3D model file of 209 DM skidding claw/cylinder Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-07 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 weekly meeting with Sakhalin. 02/06-02/09: meeting with Jeff regarding incoming TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-07 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 3.5 0 completion of SWP-0120, SWP-0103, & SWP-097 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 02/05: PDF conversions from CAD files; 02/05-02/07: CAD standards for deployment 02/06: send converted 3D model file of 209 DM skidding claw/cylinder Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-08 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 weekly meeting with Sakhalin. 02/06-02/09: meeting with Jeff regarding incoming TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-08 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2.5 0 completion of SWP-0120, SWP-0103, & SWP-097 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-08 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 model concept for site review of door relocation in PB and access stair and platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-09 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 weekly meeting with Sakhalin. 02/06-02/09: meeting with Jeff regarding incoming TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-09 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1.5 0 completion of SWP-0120, SWP-0103, & SWP-097 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-09 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 6 0 model concept for site review of door relocation in PB and access stair and platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1.5 0 compiled CAD drawings from NOV and MHWirth to check for pipe handling clearance. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 daily: TSR board meeting update (30 mins) 02/12: online time sheets and time sheets to payroll 02/15: weekly TSR meeting/quarterly earning update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 02/12: update Projectsense to include Genesis for time keeping 02/14: install/update AutoCAD standard for all users in HTSG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 02/12: transmit TSR-01615-DWG 02/13: transmit TSR-01615-CO; TSR-01619-CO 02/14: transmit TSR-01626-CTR; TSR-01622-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-12 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting with Sakhalin regarding ongoing TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-12 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1.5 0 model concept for site review of door relocation in PB and access stair and platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-13 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 02/12: transmit TSR-01615-DWG 02/13: transmit TSR-01615-CO; TSR-01619-CO 02/14: transmit TSR-01626-CTR; TSR-01622-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-13 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 7 0 model concept for site review of door relocation in PB and access stair and platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board meeting update (30 mins) 02/12: online time sheets and time sheets to payroll 02/15: weekly TSR meeting/quarterly earning update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 02/12: update Projectsense to include Genesis for time keeping 02/14: install/update AutoCAD standard for all users in HTSG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-14 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 model concept for site review of door relocation in PB and access stair and platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-14 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1.5 0 updated Option 1: Krechet on GBS build Maersk CJ70 model and integrate with GBS and created 3D PDF file Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 daily: TSR board meeting update (30 mins) 02/12: online time sheets and time sheets to payroll 02/15: weekly TSR meeting/quarterly earning update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-15 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2 0 convert PDF files to CAD drawing for BOP clearance on 257 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-16 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 3 0 model concept for site review of door relocation in PB and access stair and platform. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-16 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 updated Option 1: Krechet on GBS build Maersk CJ70 model and integrate with GBS and created 3D PDF file Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 President's Day Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 02/21: send tutorial email for users to access and input time into ProjectSense. 02/22: update ProjectSense to allow for two approvals. 02/23: online time sheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-21 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 02/21: transmit TSR-01608-RPT; TSR-01623-CTR 02/23: transmit TSR-01623-CO; TSR-01608-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-21 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 export and dimension center line drawings for WOM to build c/k manifold spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-21 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 0.5 0 begin construction drawings from concept model sent. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-21 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 02/21: verify BoD dimensions and tank capacities 02/22: KanBan alignment meeting; build model Concept D: CJ50 on GBS and created 3D PDF file. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 02/21: send tutorial email for users to access and input time into ProjectSense. 02/22: update ProjectSense to allow for two approvals. 02/23: online time sheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-22 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 begin construction drawings from concept model sent. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4.5 0 02/21: verify BoD dimensions and tank capacities 02/22: KanBan alignment meeting; build model Concept D: CJ50 on GBS and created 3D PDF file. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 02/21: send tutorial email for users to access and input time into ProjectSense. 02/22: update ProjectSense to allow for two approvals. 02/23: online time sheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 02/21: transmit TSR-01608-RPT; TSR-01623-CTR 02/23: transmit TSR-01623-CO; TSR-01608-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-23 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 6 0 begin construction drawings from concept model sent. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board review update meeting 03/01: weekly HTSG TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 02/26: timesheets online and to payroll 03/02: ProjectSense updates; timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-26 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin TSR update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-26 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 3.5 0 demo drawing and door frame installation drawing to be sent to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-26 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2.5 0 02/26-03/01: model updates of option 1 and support for BOD updates. 03/01-03/02: model update for option 2 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 02/27: incoming TSR's to be filed; assigning TSR numbers 02/28: transmit TSR-01626-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-27 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 3 0 demo drawing and door frame installation drawing to be sent to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2.5 0 02/26-03/01: model updates of option 1 and support for BOD updates. 03/01-03/02: model update for option 2 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 02/27: meeting for Brainstorm Plan for Bocks Layouts and 3D models 02/28: meeting for 3D model Layouts 03/01: Kan-Ban board meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board review update meeting 03/01: weekly HTSG TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 02/27: incoming TSR's to be filed; assigning TSR numbers 02/28: transmit TSR-01626-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-28 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 demo drawing and door frame installation drawing to be sent to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 3.25 0 02/26-03/01: model updates of option 1 and support for BOD updates. 03/01-03/02: model update for option 2 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 02/27: meeting for Brainstorm Plan for Bocks Layouts and 3D models 02/28: meeting for 3D model Layouts 03/01: Kan-Ban board meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board review update meeting 03/01: weekly HTSG TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 02/26: timesheets online and to payroll 03/02: ProjectSense updates; timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-01 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2.25 0 demo drawing and door frame installation drawing to be sent to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5.5 0 02/26-03/01: model updates of option 1 and support for BOD updates. 03/01-03/02: model update for option 2 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 02/27: meeting for Brainstorm Plan for Bocks Layouts and 3D models 02/28: meeting for 3D model Layouts 03/01: Kan-Ban board meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 02/26: timesheets online and to payroll 03/02: ProjectSense updates; timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-02 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 3 0 demo drawing and door frame installation drawing to be sent to Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-02 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 02/26-03/01: model updates of option 1 and support for BOD updates. 03/01-03/02: model update for option 2 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 03/05: TSR board update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-05 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 03/05: transmit TSR-01626-DWG-R1 03/06: assign TSRs, file incoming documents, assign drawing numbers. 03/08: transmit TSR-01572-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-05 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly call with Sakhalin for TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5.75 0 03/05: update models; export PPT slides; create 3D PDF files. 03/06: updated model concepts options 2 & 4 (3D PDF & PPT slides) 03/07: create concept model option 3 (3D PDF & PPT slides) 03/08: create option 6A&B for review and discussion 03/09: update option 6B to include living quarters and helideck Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1.5 0 03/05: meeting to review 3D concept models Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 03/05: transmit TSR-01626-DWG-R1 03/06: assign TSRs, file incoming documents, assign drawing numbers. 03/08: transmit TSR-01572-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-06 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 5 0 create CAD files for choke manifold valve stands and updated 3D model. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4.5 0 03/05: update models; export PPT slides; create 3D PDF files. 03/06: updated model concepts options 2 & 4 (3D PDF & PPT slides) 03/07: create concept model option 3 (3D PDF & PPT slides) 03/08: create option 6A&B for review and discussion 03/09: update option 6B to include living quarters and helideck Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 03/05: TSR board update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-07 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 create CAD files for choke manifold valve stands and updated 3D model. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-07 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 6 0 03/05: update models; export PPT slides; create 3D PDF files. 03/06: updated model concepts options 2 & 4 (3D PDF & PPT slides) 03/07: create concept model option 3 (3D PDF & PPT slides) 03/08: create option 6A&B for review and discussion 03/09: update option 6B to include living quarters and helideck Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-08 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 03/05: transmit TSR-01626-DWG-R1 03/06: assign TSRs, file incoming documents, assign drawing numbers. 03/08: transmit TSR-01572-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-08 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 create drawing 209L-01-03-207 access relocation Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 03/05: update models; export PPT slides; create 3D PDF files. 03/06: updated model concepts options 2 & 4 (3D PDF & PPT slides) 03/07: create concept model option 3 (3D PDF & PPT slides) 03/08: create option 6A&B for review and discussion 03/09: update option 6B to include living quarters and helideck Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 03/05: meeting to review 3D concept models Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-09 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 4 0 create drawing 209L-01-03-207 access relocation Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-09 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 03/05: update models; export PPT slides; create 3D PDF files. 03/06: updated model concepts options 2 & 4 (3D PDF & PPT slides) 03/07: create concept model option 3 (3D PDF & PPT slides) 03/08: create option 6A&B for review and discussion 03/09: update option 6B to include living quarters and helideck Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 03/12: ProjeXSense time sheets and time sheets to payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 03/12: assign new TSR numbers; transmit TSR-01602-DWGs. 30/15: transmit TSR-01576-DWG; TSR-01625-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-12 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly TSR status update meeting with Sakhalin Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-12 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1.5 0 red lines/mark ups for 1st batch of Work PACS. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-12 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2.25 0 03/12-13: finalize PB rig access stair extension drawing/red lines. 03/16: electrical sketch for lighting sensors in PBM Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.75 0 complete 3D model of options 6B (symmetrical two-shaft GBS). 03/16: added max skidding slides for options 3 & 4. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.5 0 Minkit Kanban update meeting; support for Minkit Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.75 0 creating template for 3D fittings Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-13 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2 0 red lines/mark ups for 1st batch of Work PACS. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-13 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 03/12-13: finalize PB rig access stair extension drawing/red lines. 03/16: electrical sketch for lighting sensors in PBM Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1.25 0 complete 3D model of options 6B (symmetrical two-shaft GBS). 03/16: added max skidding slides for options 3 & 4. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Minkit Kanban update meeting; support for Minkit Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 creating template for 3D fittings Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-14 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 3 0 begin 3D model concept for hatch access below cellar floor area. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 complete 3D model of options 6B (symmetrical two-shaft GBS). 03/16: added max skidding slides for options 3 & 4. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Minkit Kanban update meeting; support for Minkit Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-15 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 03/12: assign new TSR numbers; transmit TSR-01602-DWGs. 30/15: transmit TSR-01576-DWG; TSR-01625-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-15 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 2 0 begin 3D model concept for hatch access below cellar floor area. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-15 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5.5 0 complete 3D model of options 6B (symmetrical two-shaft GBS). 03/16: added max skidding slides for options 3 & 4. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-16 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1.25 0 red lines/mark ups for 1st batch of Work PACS. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-16 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 2.25 0 begin 3D model concept for hatch access below cellar floor area. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-16 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 03/12-13: finalize PB rig access stair extension drawing/red lines. 03/16: electrical sketch for lighting sensors in PBM Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-16 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2.5 0 complete 3D model of options 6B (symmetrical two-shaft GBS). 03/16: added max skidding slides for options 3 & 4. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheets on ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-19 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly TSR update meeting with Sakhalin Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-19 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 03/19: Started on SWP-0106 work table in mud pump room. 03/21: updated SWP-0044; SWP-0096; SWP-0097; SWP-0103 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-19 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 4.5 0 03/19: modeled cellar deck area and created 3D PDF for site approval. 03/20: created CAD file of pad eyes. 03/23: created 3D concept model of access hatch and removable stairs for site review Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.25 0 verifications between current model and updated Kvaerner GBS specs 03/22: updated concept 6 with 21m capping beam spacing/Kyle's PBM dimensions. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.25 0 Minkit Kanban update meeting; support for Minkit Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-20 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.75 0 03/20: transmit TSR-01626-DWG; TSR-01625-DWG; TSR-01572-DWG; 03/21: transmit TSR-01572-CTR; 03/23: transmit TSR-01626-DWG; assign new TSR numbers. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-20 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1.5 0 03/19: Started on SWP-0106 work table in mud pump room. 03/21: updated SWP-0044; SWP-0096; SWP-0097; SWP-0103 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-20 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 3.5 0 03/19: modeled cellar deck area and created 3D PDF for site approval. 03/20: created CAD file of pad eyes. 03/23: created 3D concept model of access hatch and removable stairs for site review Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-20 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 03/20: modified stair extension drawings from flippable to fixed. 03/23: updated Keppel Amfel's GA's. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.25 0 Minkit Kanban update meeting; support for Minkit Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-21 EHBU-TSRs :EHBU-TSRs TSR-01356-EHBU Aksai General Query-4th Qtr Regular Pay N 0.75 0 03/21: updated man camp drawings and rev'd up to revision E. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-21 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 03/20: transmit TSR-01626-DWG; TSR-01625-DWG; TSR-01572-DWG; 03/21: transmit TSR-01572-CTR; 03/23: transmit TSR-01626-DWG; assign new TSR numbers. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-21 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2 0 03/19: Started on SWP-0106 work table in mud pump room. 03/21: updated SWP-0044; SWP-0096; SWP-0097; SWP-0103 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-21 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 3.75 0 03/19: modeled cellar deck area and created 3D PDF for site approval. 03/20: created CAD file of pad eyes. 03/23: created 3D concept model of access hatch and removable stairs for site review Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.5 0 verifications between current model and updated Kvaerner GBS specs 03/22: updated concept 6 with 21m capping beam spacing/Kyle's PBM dimensions. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 03/20: transmit TSR-01626-DWG; TSR-01625-DWG; TSR-01572-DWG; 03/21: transmit TSR-01572-CTR; 03/23: transmit TSR-01626-DWG; assign new TSR numbers. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-23 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 3.5 0 03/19: modeled cellar deck area and created 3D PDF for site approval. 03/20: created CAD file of pad eyes. 03/23: created 3D concept model of access hatch and removable stairs for site review Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-23 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1.5 0 03/20: modified stair extension drawings from flippable to fixed. 03/23: updated Keppel Amfel's GA's. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-23 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 2 0 verifications between current model and updated Kvaerner GBS specs 03/22: updated concept 6 with 21m capping beam spacing/Kyle's PBM dimensions. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 03/29: weekly TSR update meeting daily: TSR board update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 time sheets on ProjXsense and to payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 03/26: sign/file incoming transmittals and assign TSR numbers, 03/27: transmit TSR-01621-CTR 03/28: transmit TSR-01602-DWG 03/29: transmit TSR-01602-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-26 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly TSR update meeting with Sakhalin Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-26 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 3.75 0 03/26: SWP-0106 Mud Pump Room work table. 03/26-03/27: update DM and PB GA's/safety egress/hazardous area classification to reflect changes in TSR-01593, TSR-01615, & TSR-01626 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.25 0 Minkit Kanban update meeting; support for Minkit Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 03/26: sign/file incoming transmittals and assign TSR numbers, 03/27: transmit TSR-01621-CTR 03/28: transmit TSR-01602-DWG 03/29: transmit TSR-01602-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-27 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 3.5 0 03/26: SWP-0106 Mud Pump Room work table. 03/26-03/27: update DM and PB GA's/safety egress/hazardous area classification to reflect changes in TSR-01593, TSR-01615, & TSR-01626 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-27 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1.75 0 general concept model to check for interferences and potential clashes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.5 0 concept 3 verification of Kvaerner's GBS with topside arrangement. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 03/29: weekly TSR update meeting daily: TSR board update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 03/26: sign/file incoming transmittals and assign TSR numbers, 03/27: transmit TSR-01621-CTR 03/28: transmit TSR-01602-DWG 03/29: transmit TSR-01602-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-28 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.75 0 03/26: SWP-0106 Mud Pump Room work table. 03/26-03/27: update DM and PB GA's/safety egress/hazardous area classification to reflect changes in TSR-01593, TSR-01615, & TSR-01626 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-28 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 5.25 0 general concept model to check for interferences and potential clashes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.25 0 Minkit Kanban update meeting; support for Minkit Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 03/29: weekly TSR update meeting daily: TSR board update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-29 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 03/26: sign/file incoming transmittals and assign TSR numbers, 03/27: transmit TSR-01621-CTR 03/28: transmit TSR-01602-DWG 03/29: transmit TSR-01602-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-29 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.75 0 general concept model to check for interferences and potential clashes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-29 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 6 0 03/29: 3D concept approved; begin drafting phase of cellar access hatch. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-03-30 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board updated meeting 04/05: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 timesheets in ProjXsense. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 04/02: assign TSR numbers; sent CAD and MDR to Sakhalin; transmit TSR-01602-DWG WorkPAC drawing. 04/03: transmit TSR-01572-DWG; TSR-01636-CTR 04-05: transmit TSR-01631-CTR; assign TSR numbers Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-02 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin open TSR meeting update Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-02 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 4.25 0 04/02: drafting hatch and ladder access in cellar. 04/05: resuming drafting for hatch & access ladder Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 0.25 0 Minkit Kanban update meeting; support for Minkit Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board updated meeting 04/05: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-03 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 04/02: assign TSR numbers; sent CAD and MDR to Sakhalin; transmit TSR-01602-DWG WorkPAC drawing. 04/03: transmit TSR-01572-DWG; TSR-01636-CTR 04-05: transmit TSR-01631-CTR; assign TSR numbers Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-03 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 6.25 0 04/03: continue modeling 3D concept for premix piping: 04/04-04/06: begin modeling concept for equalizer piping Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-04 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 8 0 04/03: continue modeling 3D concept for premix piping: 04/04-04/06: begin modeling concept for equalizer piping Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board updated meeting 04/05: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-05 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 04/02: assign TSR numbers; sent CAD and MDR to Sakhalin; transmit TSR-01602-DWG WorkPAC drawing. 04/03: transmit TSR-01572-DWG; TSR-01636-CTR 04-05: transmit TSR-01631-CTR; assign TSR numbers Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-05 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 4.25 0 04/03: continue modeling 3D concept for premix piping: 04/04-04/06: begin modeling concept for equalizer piping Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-05 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 04/02: drafting hatch and ladder access in cellar. 04/05: resuming drafting for hatch & access ladder Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 0.75 0 update presentation material for concepts 2-6 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheets in ProjXsense. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-06 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1.5 0 04/03: continue modeling 3D concept for premix piping: 04/04-04/06: begin modeling concept for equalizer piping Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-06 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 3 0 04/02: drafting hatch and ladder access in cellar. 04/05: resuming drafting for hatch & access ladder Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 3 0 update presentation material for concepts 2-6 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board updated meeting 04/05: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 04/09: scale site drawing for Benny Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 04/09: timesheets to payroll and timesheets on ProjXsense 04/11: ProjXsense administrative tasks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-09 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 04/09: assign drawing number; transmit TSR-01626-CO 04/10: transmit TSR-01617-CTR; 04/11: process incoming transmittal; transmit TSR-01638-DWG; 04/12: transmit TSR-01631-CO; 04/13: assign TSR and drawing numbers Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-09 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin open TSR meeting update Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-09 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 3 0 redlines received from Jeff (condensate piping and mud trough modifications) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-09 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 begin drafting of east equalizer line spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 daily: TSR board updated meeting 04/05: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-10 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 04/09: assign drawing number; transmit TSR-01626-CO 04/10: transmit TSR-01617-CTR; 04/11: process incoming transmittal; transmit TSR-01638-DWG; 04/12: transmit TSR-01631-CO; 04/13: assign TSR and drawing numbers Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-10 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 4 0 begin drafting of east equalizer line spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-10 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 2.75 0 finalization of access hatch details and ladder. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 04/09: timesheets to payroll and timesheets on ProjXsense 04/11: ProjXsense administrative tasks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-11 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 04/09: assign drawing number; transmit TSR-01626-CO 04/10: transmit TSR-01617-CTR; 04/11: process incoming transmittal; transmit TSR-01638-DWG; 04/12: transmit TSR-01631-CO; 04/13: assign TSR and drawing numbers Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-11 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2 0 begin drafting of east equalizer line spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-11 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 4 0 finalization of access hatch details and ladder. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board updated meeting 04/05: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 04/09: assign drawing number; transmit TSR-01626-CO 04/10: transmit TSR-01617-CTR; 04/11: process incoming transmittal; transmit TSR-01638-DWG; 04/12: transmit TSR-01631-CO; 04/13: assign TSR and drawing numbers Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-12 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 5.5 0 finalization of access hatch details and ladder. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-13 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 04/09: assign drawing number; transmit TSR-01626-CO 04/10: transmit TSR-01617-CTR; 04/11: process incoming transmittal; transmit TSR-01638-DWG; 04/12: transmit TSR-01631-CO; 04/13: assign TSR and drawing numbers Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-13 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 5 0 redlines received from Jeff (condensate piping and mud trough modifications) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-13 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2.25 0 begin drafting of east equalizer line spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 daily: TSR board updated meeting 04/18: meeting regarding ODPL drawings 04/19: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 04/16: assign TSR numbers and file transmittals. 04/17: transmit TSR-01637-CO; 249L-01-03-190 No Go Bar. 04/19: transmit: TSR-01645-CTR 04/20: transmit: TSR-01625-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-16 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 04/16: weekly Sakhalin open TSR meeting update 04/18: export and conversion of Berkut Navisworks model to OBJ format for Sakhalin. 04/19: discussion with Jeff regarding ODPL drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-16 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 5.25 0 removal of ladder; revision to set of hatch access drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 04/16: assign TSR numbers and file transmittals. 04/17: transmit TSR-01637-CO; 249L-01-03-190 No Go Bar. 04/19: transmit: TSR-01645-CTR 04/20: transmit: TSR-01625-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-17 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 6.5 0 removal of ladder; revision to set of hatch access drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board updated meeting 04/18: meeting regarding ODPL drawings 04/19: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-18 OH-019 :OH-019 Overhead All Activities Regular Pay N 1.5 0 04/16: weekly Sakhalin open TSR meeting update 04/18: export and conversion of Berkut Navisworks model to OBJ format for Sakhalin. 04/19: discussion with Jeff regarding ODPL drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-18 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1.5 0 finalization of equalizer lines in active tank and tank penetrations. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-18 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 4 0 removal of ladder; revision to set of hatch access drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 daily: TSR board updated meeting 04/18: meeting regarding ODPL drawings 04/19: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-19 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 04/16: assign TSR numbers and file transmittals. 04/17: transmit TSR-01637-CO; 249L-01-03-190 No Go Bar. 04/19: transmit: TSR-01645-CTR 04/20: transmit: TSR-01625-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-19 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 04/16: weekly Sakhalin open TSR meeting update 04/18: export and conversion of Berkut Navisworks model to OBJ format for Sakhalin. 04/19: discussion with Jeff regarding ODPL drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-19 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 5.75 0 04/19: meeting to discuss ga's and plans for TSR; export of GA blocks for ALE. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 04/20: assist with Solidworks title block standardization. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 04/20: timesheets to payroll and timesheets on ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-20 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 04/16: assign TSR numbers and file transmittals. 04/17: transmit TSR-01637-CO; 249L-01-03-190 No Go Bar. 04/19: transmit: TSR-01645-CTR 04/20: transmit: TSR-01625-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-20 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 3 0 04/19: meeting to discuss ga's and plans for TSR; export of GA blocks for ALE. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 SolidWorks AutoCAD title block layering and lineweight standard Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 04/23: timesheets to payroll and online ProjXsense 04/26: resolving FEED MDR file size issues on SharePoint Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 04/23: file incoming TSR files. 04/25: transmit TSR-01625-CO; TSR-01634-CTR 04/27: transmit TSR-01640-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-23 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly TSR update meeting for Sakhalin TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-23 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2 0 04/23: tank penetration drawings for equalizer addition. 04/25: finalizing details of active tank equalizer line and pipe penetrations; 04/27: pick up red lines and begin as-builts for east side piping spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 04/23: file incoming TSR files. 04/25: transmit TSR-01625-CO; TSR-01634-CTR 04/27: transmit TSR-01640-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-25 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 4 0 04/23: tank penetration drawings for equalizer addition. 04/25: finalizing details of active tank equalizer line and pipe penetrations; 04/27: pick up red lines and begin as-builts for east side piping spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-25 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 3.25 0 create model concept of casing jetting tool from hand sketches Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 04/23: timesheets to payroll and online ProjXsense 04/26: resolving FEED MDR file size issues on SharePoint Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 04/23: file incoming TSR files. 04/25: transmit TSR-01625-CO; TSR-01634-CTR 04/27: transmit TSR-01640-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-26 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 5.75 0 create model concept of casing jetting tool from hand sketches Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-27 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 6.5 0 04/23: tank penetration drawings for equalizer addition. 04/25: finalizing details of active tank equalizer line and pipe penetrations; 04/27: pick up red lines and begin as-builts for east side piping spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-27 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1.5 0 create model concept of casing jetting tool from hand sketches Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 04/30: NOVOS presentation from NOV 05/01: TSR board update meeting 05/02: Parker Earnings Update Meeting 05/03: TSR update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-30 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.75 0 04/30: transmit TSR-01620-DWG; TSR-01643-CTR; 05/01-05/02: transmit ODPL P&ID's. preparation for transmittal of obsolete ODPL drawing package 05/04: transmit TSR-01602-DWG; TSR-01639-CTR; process and file transmittals from Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-30 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly TSR update meeting for Sakhalin TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-04-30 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 4.25 0 created CAD blocks of PBM and DM for ALE Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 04/30: NOVOS presentation from NOV 05/01: TSR board update meeting 05/02: Parker Earnings Update Meeting 05/03: TSR update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 3.5 0 04/30: transmit TSR-01620-DWG; TSR-01643-CTR; 05/01-05/02: transmit ODPL P&ID's. preparation for transmittal of obsolete ODPL drawing package 05/04: transmit TSR-01602-DWG; TSR-01639-CTR; process and file transmittals from Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-01 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 4 0 05/04: pickup red lines on drawings for bid purposes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 04/30: NOVOS presentation from NOV 05/01: TSR board update meeting 05/02: Parker Earnings Update Meeting 05/03: TSR update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 04/30: transmit TSR-01620-DWG; TSR-01643-CTR; 05/01-05/02: transmit ODPL P&ID's. preparation for transmittal of obsolete ODPL drawing package 05/04: transmit TSR-01602-DWG; TSR-01639-CTR; process and file transmittals from Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-02 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 5 0 05/04: pickup red lines on drawings for bid purposes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 04/30: NOVOS presentation from NOV 05/01: TSR board update meeting 05/02: Parker Earnings Update Meeting 05/03: TSR update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-03 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 7 0 05/04: pickup red lines on drawings for bid purposes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 ProjXSense timesheets Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-04 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.25 0 04/30: transmit TSR-01620-DWG; TSR-01643-CTR; 05/01-05/02: transmit ODPL P&ID's. preparation for transmittal of obsolete ODPL drawing package 05/04: transmit TSR-01602-DWG; TSR-01639-CTR; process and file transmittals from Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-04 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2.75 0 05/04: continue as-builts of active tank premix piping in DSM. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-04 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 3 0 05/04: pickup red lines on drawings for bid purposes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 05/07: ProjXSense timesheets and timesheets to payroll. 05/10: Hightail support: sending files to H: drive. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-07 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 05/07: TSR-01629-CO 05/08: TSR-01646-TSR&CTR 05/09: TSR-01633-CTR 05/11: TSR-01647-CTR; TSR-01620-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-07 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly TSR update meeting for Sakhalin TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-07 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2.25 0 daily: drafting changes; red lines from drafting review to piping spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-07 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 3 0 05/07-05/08: red lines and additional comments Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 05/10: TSR board update meeting 05/08: TSR update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-08 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 05/07: TSR-01629-CO 05/08: TSR-01646-TSR&CTR 05/09: TSR-01633-CTR 05/11: TSR-01647-CTR; TSR-01620-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-08 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 3.5 0 daily: drafting changes; red lines from drafting review to piping spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-08 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 3 0 05/07-05/08: red lines and additional comments Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-09 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 05/07: TSR-01629-CO 05/08: TSR-01646-TSR&CTR 05/09: TSR-01633-CTR 05/11: TSR-01647-CTR; TSR-01620-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-09 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 5.5 0 Red Lines for condensation vent lines Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-09 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2 0 daily: drafting changes; red lines from drafting review to piping spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/10: TSR board update meeting 05/08: TSR update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 05/07: ProjXSense timesheets and timesheets to payroll. 05/10: Hightail support: sending files to H: drive. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-10 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 4.75 0 Red Lines for condensation vent lines Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-10 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1.25 0 daily: drafting changes; red lines from drafting review to piping spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-11 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 05/07: TSR-01629-CO 05/08: TSR-01646-TSR&CTR 05/09: TSR-01633-CTR 05/11: TSR-01647-CTR; TSR-01620-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-11 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 5.25 0 Red Lines for condensation vent lines Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-11 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1.25 0 05/07-05/08: red lines and additional comments Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-14 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1.5 0 05/14: begin drafting of choke and kill line spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 PTO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 05/14: TSR board update meeting (30 mins) 05/16: QHSSE IMS safety training 05/17: TSR update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-14 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 05/14 & 05/17: process incoming TSR emails and signed documents 05/15: troubleshoot Sakhalin hightail issues with IT. 05/16: transmit TSR-01640-DWG; TSR-01638-CO; TSR-01572-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-14 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 05/14: continue red lines of condensate vent lines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-14 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.75 0 05/14: red lines and mark-ups of casing jetting tool Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-15 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 6.5 0 05/14: begin drafting of choke and kill line spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 05/14: TSR board update meeting (30 mins) 05/16: QHSSE IMS safety training 05/17: TSR update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-15 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 05/14 & 05/17: process incoming TSR emails and signed documents 05/15: troubleshoot Sakhalin hightail issues with IT. 05/16: transmit TSR-01640-DWG; TSR-01638-CO; TSR-01572-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-16 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 4.25 0 05/14: begin drafting of choke and kill line spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 05/14: TSR board update meeting (30 mins) 05/16: QHSSE IMS safety training 05/17: TSR update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 05/16: troubleshoot SolidWorks licensing issue for Dan 05/17: timesheets to payroll and online timesheets on ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.75 0 05/14 & 05/17: process incoming TSR emails and signed documents 05/15: troubleshoot Sakhalin hightail issues with IT. 05/16: transmit TSR-01640-DWG; TSR-01638-CO; TSR-01572-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-17 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 3.5 0 05/14: begin drafting of choke and kill line spools Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/14: TSR board update meeting (30 mins) 05/16: QHSSE IMS safety training 05/17: TSR update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 05/16: troubleshoot SolidWorks licensing issue for Dan 05/17: timesheets to payroll and online timesheets on ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 05/14 & 05/17: process incoming TSR emails and signed documents 05/15: troubleshoot Sakhalin hightail issues with IT. 05/16: transmit TSR-01640-DWG; TSR-01638-CO; TSR-01572-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-17 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2.5 0 updating Keppel AmFels' P&IDs, piping arrangement drawings, and tank penetrations Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-21 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 PTO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 05/22: TSR board meeting 05/24: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-22 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 05/22: transmit TSR-01645-CO 05/23: transmit TSR-01634-CTR and TSR-01635-CTR. 05/25: fowarded emails (MOC) from 216L and 249L Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 05/22: search and find spool & fitting information for 209L LP mud from DSM transfer pump to DM trip tank. 05/24: find weights of external stairs for DM Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-22 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1.5 0 05/22: updating KA drawing for tank penetration as-built, picked up red-lines for P&ID and piping arrangements Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 05/22: transmit TSR-01645-CO 05/23: transmit TSR-01634-CTR and TSR-01635-CTR. 05/25: fowarded emails (MOC) from 216L and 249L Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-23 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1.5 0 begin condensate redlines Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-23 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 5.5 0 05/22: updating KA drawing for tank penetration as-built, picked up red-lines for P&ID and piping arrangements Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-24 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 1.75 0 begin model concept and integration study with Berkut model Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/22: TSR board meeting 05/24: weekly TSR meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-24 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 05/22: search and find spool & fitting information for 209L LP mud from DSM transfer pump to DM trip tank. 05/24: find weights of external stairs for DM Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-24 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 3.75 0 begin condensate redlines Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-25 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 4 0 begin model concept and integration study with Berkut model Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 05/25: online timesheet for ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 05/22: transmit TSR-01645-CO 05/23: transmit TSR-01634-CTR and TSR-01635-CTR. 05/25: fowarded emails (MOC) from 216L and 249L Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-25 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2.5 0 begin condensate redlines Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-28 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 05/28: Memorial Day Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-29 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 3 0 05/29-05/31: revised choke line drawing BERP-01-05-004 to rev.C Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 05/29: TSR board update meeeting 05/31: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-29 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 05/29: transmit TSR-01591-CO; TSR-01639-DWG; process incoming TSR's and transmittals 06/01: transmit TSR-01639-DWG-R1 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-29 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly call in with Sakhalin regarding TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-29 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2 0 update condensate as-builts for KA piping arrangement drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-30 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 3 0 05/29-05/31: revised choke line drawing BERP-01-05-004 to rev.C Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.25 0 finding loadmaster information for sheave cluster platform for Luis (AADU) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 05/30: print out of AADU drawings 06/01: timesheets for ProjXsense and payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-30 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 2.5 0 05/30: update model concept to show frame using W6x20 and W8x40 05/31: sent preliminary pad eyes to Jeff Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-30 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 0.5 0 electrical schematic sketch of the ground fault Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-30 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.25 0 updated drawing and BOM details Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-31 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 05/29-05/31: revised choke line drawing BERP-01-05-004 to rev.C Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-31 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 1.5 0 model concept for the NW corner of the Berkut cellar floor. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/29: TSR board update meeeting 05/31: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-31 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1.5 0 05/30: update model concept to show frame using W6x20 and W8x40 05/31: sent preliminary pad eyes to Jeff Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-31 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 update condensate as-builts for KA piping arrangement drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-05-31 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 3 0 electrical schematic sketch of the ground fault Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-01 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 0.5 0 model concept for the NW corner of the Berkut cellar floor. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 05/30: print out of AADU drawings 06/01: timesheets for ProjXsense and payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 05/29: transmit TSR-01591-CO; TSR-01639-DWG; process incoming TSR's and transmittals 06/01: transmit TSR-01639-DWG-R1 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-01 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 5 0 updated piping line/valve registers and updated drawings accordlingly. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-01 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 1 0 electrical schematic sketch of the ground fault Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-04 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 1.25 0 update 2 of 3 posts (west) and update compiled model. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 06/04: online timesheet on JProjXsense and to payroll. 06/06: download setup files for AutoCAD 2019 AEC collection 06/07: timesheets and explaination of timesheet to Brandon Swearinger Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-04 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 06/05: transmit TSR-01620-CO; TSR-01634-CO; 06/07: transmit TSR-01647-CO; 06/08: transmit TSR-01592-DWG; TSR-01621-DWG&DOCS Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-04 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin meeting for TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-04 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1.25 0 finalize dust collector frame for installation and welding onto M-3130. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-04 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2.5 0 red lines for Keppel AmFels' drawing packages Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-04 Rig 209L-TSR :Rig 209L-TSR TSR-01634-209L Camp Generator Ground Fault Issue Regular Pay N 0.25 0 red lines for ground fault electrical schematic. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board review 06/07: TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-05 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 7.5 0 finalize dust collector frame for installation and welding onto M-3130. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 06/04: online timesheet on JProjXsense and to payroll. 06/06: download setup files for AutoCAD 2019 AEC collection 06/07: timesheets and explaination of timesheet to Brandon Swearinger Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-06 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 4.5 0 finalize dust collector frame for installation and welding onto M-3130. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-07 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 3 0 update 2 of 3 posts (west) and update compiled model. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR board review 06/07: TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 06/04: online timesheet on JProjXsense and to payroll. 06/06: download setup files for AutoCAD 2019 AEC collection 06/07: timesheets and explaination of timesheet to Brandon Swearinger Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-07 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 06/05: transmit TSR-01620-CO; TSR-01634-CO; 06/07: transmit TSR-01647-CO; 06/08: transmit TSR-01592-DWG; TSR-01621-DWG&DOCS Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-07 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 2.75 0 finalize dust collector frame for installation and welding onto M-3130. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-08 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 4.75 0 update 2 of 3 posts (west) and update compiled model. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.25 0 search and send cellar/BOP area drawings for 272L to Luis (upcoming TSR) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-08 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 06/05: transmit TSR-01620-CO; TSR-01634-CO; 06/07: transmit TSR-01647-CO; 06/08: transmit TSR-01592-DWG; TSR-01621-DWG&DOCS Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-11 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 1.5 0 updated PDF/concept model package to send to Sakhalin for drafting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-11 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 0.75 0 updated winch drawing to reflect comments from site. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Autodesk AEC Suite installation; CAD administrative tasks; customization of new 2019 software. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-11 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 06/08: transmit TSR-01649-CTR; TSR-01584-DWG; 06/15: transmit TSR-01592-CTR; TSR-01643-CTR; TSR-01635-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-11 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly teleconference with Sakhalin regarding TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 modeled condensate lines for DM and built the haunch for PBM on 209L Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Autodesk AEC Suite installation; CAD administrative tasks; customization of new 2019 software. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-13 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Autodesk AEC Suite installation; CAD administrative tasks; customization of new 2019 software. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-15 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 06/08: transmit TSR-01649-CTR; TSR-01584-DWG; 06/15: transmit TSR-01592-CTR; TSR-01643-CTR; TSR-01635-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-15 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1.5 0 condensate red lines: updating Keppel AmFels' drawings. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 06/18: timesheets to payroll 06/21: troubleshoot 2019 Autodesk AEC license issues Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-18 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.25 0 file incoming TSR's and reserve/assign TSR numbers 06/22: transmit TSR-01592-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-18 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly conference calls to Sakhalin regarding TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-18 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 6.5 0 condensate red lines for Keppel AmFels Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-19 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.25 0 file incoming TSR's and reserve/assign TSR numbers 06/22: transmit TSR-01592-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-19 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 3.75 0 condensate red lines for Keppel AmFels Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-19 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 4 0 created drawing package for DM and PBM showing origin datum and CG's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 06/20: meeting regarding mid-year goals and development. 06/21: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-20 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 4.5 0 condensate red lines for Keppel AmFels Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-20 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 2.5 0 created drawing package for DM and PBM showing origin datum and CG's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 06/20: meeting regarding mid-year goals and development. 06/21: weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 06/21: convert Minkit model to OBJ file (client request); find old 209L CAD files. 06/22: model concept of production line protection shed for 209L Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 06/18: timesheets to payroll 06/21: troubleshoot 2019 Autodesk AEC license issues Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-21 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2 0 condensate red lines for Keppel AmFels Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 06/21: convert Minkit model to OBJ file (client request); find old 209L CAD files. 06/22: model concept of production line protection shed for 209L Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 06/18: timesheets to payroll 06/21: troubleshoot 2019 Autodesk AEC license issues Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-22 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 file incoming TSR's and reserve/assign TSR numbers 06/22: transmit TSR-01592-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-22 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.25 0 condensate red lines for Keppel AmFels Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.25 0 troubleshoot license issues and continue drafting standards and templates. 06/29: online timesheets for ProjXsense and timesheets to Payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 06/25: process incoming TSR for 216L spreader beam 06/27: transmit TSR-01602-CO; assign TSR numbers 06/28: transmit TSR-01634-CO; TSR-01617-CO; assign 262L dwg numbers. 06/29: transmit TSR-01643-CO; process incoming TSR. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-25 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly Sakhalin conference call for TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-25 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 4 0 06/25&26: create CG drawings from Genesis' reports. 06/26: create CG drawing for PBM option 2 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 troubleshoot license issues and continue drafting standards and templates. 06/29: online timesheets for ProjXsense and timesheets to Payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-26 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2 0 create and edit closeout documentation for TSR-01602. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-26 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 4 0 06/25&26: create CG drawings from Genesis' reports. 06/26: create CG drawing for PBM option 2 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 06/25: process incoming TSR for 216L spreader beam 06/27: transmit TSR-01602-CO; assign TSR numbers 06/28: transmit TSR-01634-CO; TSR-01617-CO; assign 262L dwg numbers. 06/29: transmit TSR-01643-CO; process incoming TSR. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-27 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 2 0 create and edit closeout documentation for TSR-01602. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-27 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 4.5 0 06/25&26: create CG drawings from Genesis' reports. 06/26: create CG drawing for PBM option 2 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR board update meeting. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 troubleshoot license issues and continue drafting standards and templates. 06/29: online timesheets for ProjXsense and timesheets to Payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 06/25: process incoming TSR for 216L spreader beam 06/27: transmit TSR-01602-CO; assign TSR numbers 06/28: transmit TSR-01634-CO; TSR-01617-CO; assign 262L dwg numbers. 06/29: transmit TSR-01643-CO; process incoming TSR. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 troubleshoot license issues and continue drafting standards and templates. 06/29: online timesheets for ProjXsense and timesheets to Payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-06-29 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 06/25: process incoming TSR for 216L spreader beam 06/27: transmit TSR-01602-CO; assign TSR numbers 06/28: transmit TSR-01634-CO; TSR-01617-CO; assign 262L dwg numbers. 06/29: transmit TSR-01643-CO; process incoming TSR. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 07/02: TSR board update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.25 0 AutoCAD piping standards and templates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 2.25 0 07/02: transmit 77B SEMS drawing package. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-02 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Sakhalin weekly update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-03 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Independence Day Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 AutoCAD piping standards and templates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2018-07-06 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 4 0 Rig 269 on KM10 plot plan hand sketch Nutley, Tami Administrative Services I 28980 Nutley, Tami:Administrative Services I 2017-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Nutley, Tami Administrative Services I 28980 Nutley, Tami:Administrative Services I 2017-01-03 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 Nutley, Tami Administrative Services I 28980 Nutley, Tami:Administrative Services I 2017-01-04 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 Nutley, Tami Administrative Services I 28980 Nutley, Tami:Administrative Services I 2017-01-05 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 Nutley, Tami Administrative Services I 28980 Nutley, Tami:Administrative Services I 2017-01-06 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 On 1/2, Holiday Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-03 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 4 0 On 1/3, sent NOV BOP accumulator 30 gallon pressure vessel U-1A, manual and drawing to startup team. On 1/5, equipment as-built transmittals. On 1/6, provided FMC chicksan catalogue to Completions Mgr. Established weekly documentation closeout meeting for January, 2017. Researched and clarified missing Cameron backup risers COC and docs in MRB for adaptor spool. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 1/3, weekly meeting and timesheets and invoices. On 1/4, reviewed SharePoint site content with K McMullen M Kuehn for first milestone Jan 15 for 2013 sharepoint migration. On 1/5, weekly dept meeting. SharePoint data archive reviews. IDR transfer meeting. on 1/6, meeting for Lana Wilson position in legal. Attended company organization meeting. Provide self appraisal direction to team. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 On 1/3, weekly meeting and timesheets and invoices. On 1/4, reviewed SharePoint site content with K McMullen M Kuehn for first milestone Jan 15 for 2013 sharepoint migration. On 1/5, weekly dept meeting. SharePoint data archive reviews. IDR transfer meeting. on 1/6, meeting for Lana Wilson position in legal. Attended company organization meeting. Provide self appraisal direction to team. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-05 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 1 0 On 1/3, sent NOV BOP accumulator 30 gallon pressure vessel U-1A, manual and drawing to startup team. On 1/5, equipment as-built transmittals. On 1/6, provided FMC chicksan catalogue to Completions Mgr. Established weekly documentation closeout meeting for January, 2017. Researched and clarified missing Cameron backup risers COC and docs in MRB for adaptor spool. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 On 1/3, weekly meeting and timesheets and invoices. On 1/4, reviewed SharePoint site content with K McMullen M Kuehn for first milestone Jan 15 for 2013 sharepoint migration. On 1/5, weekly dept meeting. SharePoint data archive reviews. IDR transfer meeting. on 1/6, meeting for Lana Wilson position in legal. Attended company organization meeting. Provide self appraisal direction to team. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-06 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 3 0 On 1/3, sent NOV BOP accumulator 30 gallon pressure vessel U-1A, manual and drawing to startup team. On 1/5, equipment as-built transmittals. On 1/6, provided FMC chicksan catalogue to Completions Mgr. Established weekly documentation closeout meeting for January, 2017. Researched and clarified missing Cameron backup risers COC and docs in MRB for adaptor spool. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-06 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 2 0 On 1/6, Provide Jon Richardson 2016 PTO payout reference clauses from Brownsville assignment letter. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 1/3, weekly meeting and timesheets and invoices. On 1/4, reviewed SharePoint site content with K McMullen M Kuehn for first milestone Jan 15 for 2013 sharepoint migration. On 1/5, weekly dept meeting. SharePoint data archive reviews. IDR transfer meeting. on 1/6, meeting for Lana Wilson position in legal. Attended company organization meeting. Provide self appraisal direction to team. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-09 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 2 0 On 1/9, contacted PecoFacet Spain to review regulatory certification requirements and agreement. Provided Eng Mgr PecoFacet contact. On 1/10, Sent Pecofacet tech documents to startup team. Held final phase doc control turnover meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 On 1/9, weekly TS mtg, TSR Kan-Ban. On 1/10, coordinate with HR to evaluate Jon Richardson PTO payout request. On 1/11, meet with J Lambert to revise Amendment 26 email approval from hourly Houston rate to hourly Sakhalin rate. On 1/12, 270 AAR. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-10 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 3 0 On 1/9, contacted PecoFacet Spain to review regulatory certification requirements and agreement. Provided Eng Mgr PecoFacet contact. On 1/10, Sent Pecofacet tech documents to startup team. Held final phase doc control turnover meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-10 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 On 1/11, 1/12 and 1/13, assign missing asset numbers in DCDM site. On 1/10, Sakhalin conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 On 1/9, weekly TS mtg, TSR Kan-Ban. On 1/10, coordinate with HR to evaluate Jon Richardson PTO payout request. On 1/11, meet with J Lambert to revise Amendment 26 email approval from hourly Houston rate to hourly Sakhalin rate. On 1/12, 270 AAR. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-11 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 6 0 On 1/11, 1/12 and 1/13, assign missing asset numbers in DCDM site. On 1/10, Sakhalin conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 1/9, weekly TS mtg, TSR Kan-Ban. On 1/10, coordinate with HR to evaluate Jon Richardson PTO payout request. On 1/11, meet with J Lambert to revise Amendment 26 email approval from hourly Houston rate to hourly Sakhalin rate. On 1/12, 270 AAR. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-12 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 7 0 On 1/11, 1/12 and 1/13, assign missing asset numbers in DCDM site. On 1/10, Sakhalin conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 1/9, weekly TS mtg, TSR Kan-Ban. On 1/10, coordinate with HR to evaluate Jon Richardson PTO payout request. On 1/11, meet with J Lambert to revise Amendment 26 email approval from hourly Houston rate to hourly Sakhalin rate. On 1/12, 270 AAR. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-13 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 9 0 On 1/11, 1/12 and 1/13, assign missing asset numbers in DCDM site. On 1/10, Sakhalin conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-16 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 8 0 On 1/16, weekly IDR doc turnover meeting. On 1/17, 1/18, 1/19, 1/20, daily Odoptu kan-ban. On 1/17, weekly Sakhalin mtg. On 1/19, 1/18, 1/17, 1/16 assign asset #'s and finalize DCDM COCs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 1/16, weekly ops update. Weekly TS planning mtg. On 1/20, TS BD brainstorming. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-17 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 8 0 On 1/16, weekly IDR doc turnover meeting. On 1/17, 1/18, 1/19, 1/20, daily Odoptu kan-ban. On 1/17, weekly Sakhalin mtg. On 1/19, 1/18, 1/17, 1/16 assign asset #'s and finalize DCDM COCs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-18 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 8 0 On 1/16, weekly IDR doc turnover meeting. On 1/17, 1/18, 1/19, 1/20, daily Odoptu kan-ban. On 1/17, weekly Sakhalin mtg. On 1/19, 1/18, 1/17, 1/16 assign asset #'s and finalize DCDM COCs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-19 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 8 0 On 1/16, weekly IDR doc turnover meeting. On 1/17, 1/18, 1/19, 1/20, daily Odoptu kan-ban. On 1/17, weekly Sakhalin mtg. On 1/19, 1/18, 1/17, 1/16 assign asset #'s and finalize DCDM COCs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-20 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 On 1/16, weekly IDR doc turnover meeting. On 1/17, 1/18, 1/19, 1/20, daily Odoptu kan-ban. On 1/17, weekly Sakhalin mtg. On 1/19, 1/18, 1/17, 1/16 assign asset #'s and finalize DCDM COCs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 On 1/20, PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 1/16, weekly ops update. Weekly TS planning mtg. On 1/20, TS BD brainstorming. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-23 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 4 0 On 1/22, correspondence with Primorski ops regulatory for PV passports for startup.On 1/23, 24, 25, asset # queries to Kreceht PM coordinator. On 1/23, B Flud PTO payout request correspondence with HR. On 1/23, finailize Krechet DCDm Oracle document links. On 1/27, DCDM asset #s. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 1/23, Indonesia conf call for 253 and 231 life extension. On 1/24, Chevron BBLT opportunity conf call with G.Whittenburg. On 1/25, Chevron BBLT opportunity conf call with S.. Buben. On 1/24, call with R. Sumner for GMS opportunity. On 1/27, white rose BD meeting and support, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-24 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 3 0 On 1/22, correspondence with Primorski ops regulatory for PV passports for startup.On 1/23, 24, 25, asset # queries to Kreceht PM coordinator. On 1/23, B Flud PTO payout request correspondence with HR. On 1/23, finailize Krechet DCDm Oracle document links. On 1/27, DCDM asset #s. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 On 1/23, Indonesia conf call for 253 and 231 life extension. On 1/24, Chevron BBLT opportunity conf call with G.Whittenburg. On 1/25, Chevron BBLT opportunity conf call with S.. Buben. On 1/24, call with R. Sumner for GMS opportunity. On 1/27, white rose BD meeting and support, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-25 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 3 0 On 1/22, correspondence with Primorski ops regulatory for PV passports for startup.On 1/23, 24, 25, asset # queries to Kreceht PM coordinator. On 1/23, B Flud PTO payout request correspondence with HR. On 1/23, finailize Krechet DCDm Oracle document links. On 1/27, DCDM asset #s. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 1/25, weekly TS planning meeting. On 1/26, weekly TS dept mtg. On 1/25, SharePoint migrations file identification. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 1/23, Indonesia conf call for 253 and 231 life extension. On 1/24, Chevron BBLT opportunity conf call with G.Whittenburg. On 1/25, Chevron BBLT opportunity conf call with S.. Buben. On 1/24, call with R. Sumner for GMS opportunity. On 1/27, white rose BD meeting and support, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 On 1/25, weekly TS planning meeting. On 1/26, weekly TS dept mtg. On 1/25, SharePoint migrations file identification. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-27 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 4 0 On 1/22, correspondence with Primorski ops regulatory for PV passports for startup.On 1/23, 24, 25, asset # queries to Kreceht PM coordinator. On 1/23, B Flud PTO payout request correspondence with HR. On 1/23, finailize Krechet DCDm Oracle document links. On 1/27, DCDM asset #s. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 1/23, Indonesia conf call for 253 and 231 life extension. On 1/24, Chevron BBLT opportunity conf call with G.Whittenburg. On 1/25, Chevron BBLT opportunity conf call with S.. Buben. On 1/24, call with R. Sumner for GMS opportunity. On 1/27, white rose BD meeting and support, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-30 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 4 0 On 1/30, forward PPC asme PV docs to Sakhalin regulatory. Weekly doc control mtg. On 1/31, Krechet asset # assignments in DCDM site. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 1/30, timesheet corrections, weekly TS mtg, and weekly ops meeting. On 2/1, 270 DCDM documentation CTR. On 2/2, support 2017 rig insurance policy estimates. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-31 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 4 0 On 1/30, forward PPC asme PV docs to Sakhalin regulatory. Weekly doc control mtg. On 1/31, Krechet asset # assignments in DCDM site. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-01-31 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 4 0 On 2/1, Chevron Cabinda Opportunity follow up. On 1/30, 1/31, 2/1 and 2/2, support Husky Opportunity Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 1/30, timesheet corrections, weekly TS mtg, and weekly ops meeting. On 2/1, 270 DCDM documentation CTR. On 2/2, support 2017 rig insurance policy estimates. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-01 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 4 0 On 2/1, Chevron Cabinda Opportunity follow up. On 1/30, 1/31, 2/1 and 2/2, support Husky Opportunity Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 1/30, timesheet corrections, weekly TS mtg, and weekly ops meeting. On 2/1, 270 DCDM documentation CTR. On 2/2, support 2017 rig insurance policy estimates. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-02 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 4 0 On 2/1, Chevron Cabinda Opportunity follow up. On 1/30, 1/31, 2/1 and 2/2, support Husky Opportunity Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-03 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 On 2/6, 2/7 and 2/8, 2017 rig insurance forecast. On 2/7, weekly Sakhalin conf call. On 2/10, 2017 272 and 273 level 5 cost estimates for replacement insurance. On 2/10, office move. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 2/6, 2/7 and 2/8, 2017 rig insurance forecast. On 2/7, weekly Sakhalin conf call. On 2/10, 2017 272 and 273 level 5 cost estimates for replacement insurance. On 2/10, office move. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-07 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 5 0 On 2/7, prepared for Wood Group meeting. On 2/8, arranged and attended Wood group introductory meeting with B. Collins, N. Henley and M. Kuehn. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 2/6, 2/7 and 2/8, 2017 rig insurance forecast. On 2/7, weekly Sakhalin conf call. On 2/10, 2017 272 and 273 level 5 cost estimates for replacement insurance. On 2/10, office move. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-08 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 6 0 On 2/7, prepared for Wood Group meeting. On 2/8, arranged and attended Wood group introductory meeting with B. Collins, N. Henley and M. Kuehn. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-09 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 4 0 On 2/9 and 2/10, PecoFacet and Vernon pressure vessel certifications. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 2/6, 2/7 and 2/8, 2017 rig insurance forecast. On 2/7, weekly Sakhalin conf call. On 2/10, 2017 272 and 273 level 5 cost estimates for replacement insurance. On 2/10, office move. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-10 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 On 2/9 and 2/10, PecoFacet and Vernon pressure vessel certifications. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 On 2/6, 2/7 and 2/8, 2017 rig insurance forecast. On 2/7, weekly Sakhalin conf call. On 2/10, 2017 272 and 273 level 5 cost estimates for replacement insurance. On 2/10, office move. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-13 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 4 0 On 2/13, bi-weekly doc turnover and DCDM mtg. Review Russian Top Drive manual. On 2/14, Pecofacet end user form and PV documentation mtg. Weekly Sakhalin mtg. On 2/15, account reconciliation mtg. Chris Enroth lunch meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 2/13, weekly TS mtg. Weekly ops meeting. On 2/16, TS weekly mtg. NOV NOVOS presentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 2/13-17, Due Diligence meetings and execution planning with m Kuehn. On 2/17, visited Exxon for Chayvo Startup Study Scope of work. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-14 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 4 0 On 2/13, bi-weekly doc turnover and DCDM mtg. Review Russian Top Drive manual. On 2/14, Pecofacet end user form and PV documentation mtg. Weekly Sakhalin mtg. On 2/15, account reconciliation mtg. Chris Enroth lunch meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 2/13, weekly TS mtg. Weekly ops meeting. On 2/16, TS weekly mtg. NOV NOVOS presentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 2/13-17, Due Diligence meetings and execution planning with m Kuehn. On 2/17, visited Exxon for Chayvo Startup Study Scope of work. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-15 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 2 0 On 2/13, bi-weekly doc turnover and DCDM mtg. Review Russian Top Drive manual. On 2/14, Pecofacet end user form and PV documentation mtg. Weekly Sakhalin mtg. On 2/15, account reconciliation mtg. Chris Enroth lunch meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 On 2/13, weekly TS mtg. Weekly ops meeting. On 2/16, TS weekly mtg. NOV NOVOS presentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 2/13-17, Due Diligence meetings and execution planning with m Kuehn. On 2/17, visited Exxon for Chayvo Startup Study Scope of work. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 On 2/13, weekly TS mtg. Weekly ops meeting. On 2/16, TS weekly mtg. NOV NOVOS presentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 2/13-17, Due Diligence meetings and execution planning with m Kuehn. On 2/17, visited Exxon for Chayvo Startup Study Scope of work. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 2/13-17, Due Diligence meetings and execution planning with m Kuehn. On 2/17, visited Exxon for Chayvo Startup Study Scope of work. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-20 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 On 2/20, Presidents Day Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-21 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 3 0 On 2/21, 2/22, 2/23 Chayvo Startup Study. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 On 2/21,2/22 Krechet SWOT team PDRs and bus class flights. Propose project engineer candidates for Odoptu SWS startup. Lana Wilson ICCM assessment. On 2/23, timesheets, perf appraisals. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-22 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 3 0 On 2/21, 2/22, 2/23 Chayvo Startup Study. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 On 2/21,2/22 Krechet SWOT team PDRs and bus class flights. Propose project engineer candidates for Odoptu SWS startup. Lana Wilson ICCM assessment. On 2/23, timesheets, perf appraisals. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-23 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 3 0 On 2/21, 2/22, 2/23 Chayvo Startup Study. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 On 2/21,2/22 Krechet SWOT team PDRs and bus class flights. Propose project engineer candidates for Odoptu SWS startup. Lana Wilson ICCM assessment. On 2/23, timesheets, perf appraisals. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-24 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 3 0 On 2/24, Pecofacet Tech passport application. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 On 2/21,2/22 Krechet SWOT team PDRs and bus class flights. Propose project engineer candidates for Odoptu SWS startup. Lana Wilson ICCM assessment. On 2/23, timesheets, perf appraisals. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-27 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 2 0 On 2/27-3/2, Option A&B Class 5 cost estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 2/27-3/2, Halliburton opportunity execution plan. On 3/2, DD mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-27 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 On 2/27, FBI training. timesheets Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-28 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 2 0 On 2/27-3/2, Option A&B Class 5 cost estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-02-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 On 2/27-3/2, Halliburton opportunity execution plan. On 3/2, DD mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-01 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 2 0 On 2/27-3/2, Option A&B Class 5 cost estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 On 2/27-3/2, Halliburton opportunity execution plan. On 3/2, DD mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-02 ARBU-TSRs :ARBU-TSRs TSR-01547-ARBU Chayvo Start Up Study Regular Pay N 4 0 On 2/27-3/2, Option A&B Class 5 cost estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 2/27-3/2, Halliburton opportunity execution plan. On 3/2, DD mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 3/3, timesheets Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-03 OH-009 :OH-009 OH-009-024 KOC Tender - New Rigbuilds Regular Pay N 6 0 On 3/3, HH 7 Drillmec meetings for quotes. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-06 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 On 3/6-3/9, KOC RFP exhibits and Market Cost Survey. On 3/10, legal and Controller meeting to discuss KOC rigbuild entity and legal redlines for perf bond, indemnities, etc. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 3/6, Ops mtg. On 3/7, TS planning mtg. On 3/9, TS mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-07 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 On 3/6-3/9, KOC RFP exhibits and Market Cost Survey. On 3/10, legal and Controller meeting to discuss KOC rigbuild entity and legal redlines for perf bond, indemnities, etc. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-07 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 On 3/7, Sakhalin startup call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 3/6, Ops mtg. On 3/7, TS planning mtg. On 3/9, TS mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-08 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 On 3/6-3/9, KOC RFP exhibits and Market Cost Survey. On 3/10, legal and Controller meeting to discuss KOC rigbuild entity and legal redlines for perf bond, indemnities, etc. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 3/8, DD kickoff mtg. On 3/9, Chevron Angola call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-09 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 On 3/6-3/9, KOC RFP exhibits and Market Cost Survey. On 3/10, legal and Controller meeting to discuss KOC rigbuild entity and legal redlines for perf bond, indemnities, etc. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 3/6, Ops mtg. On 3/7, TS planning mtg. On 3/9, TS mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-10 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 On 3/6-3/9, KOC RFP exhibits and Market Cost Survey. On 3/10, legal and Controller meeting to discuss KOC rigbuild entity and legal redlines for perf bond, indemnities, etc. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-13 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 On 3/13, support RFP package prep for HH and Drillmec rig build quotes. Meet with HR for China visa requirements. On 3/16, review KOC new build schedule with team and start contract and project risk register. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-13 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 On 3/14, contact PecoFacet for final Tech passport agreement and docs. On 3/13, bi-weekly Odoptu documentation conf call with Primorski.. On 3/17, coordinate with Tanya for final Batch 8 turnover to Exxon. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 3/13, weekly Ops mtg. On 3/16, TS dept mtg. On 3/17, PDR performance appraisals. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-14 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 On 3/13, support RFP package prep for HH and Drillmec rig build quotes. Meet with HR for China visa requirements. On 3/16, review KOC new build schedule with team and start contract and project risk register. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-14 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 2 0 On 3/14, contact PecoFacet for final Tech passport agreement and docs. On 3/13, bi-weekly Odoptu documentation conf call with Primorski.. On 3/17, coordinate with Tanya for final Batch 8 turnover to Exxon. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-15 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 On 3/13, support RFP package prep for HH and Drillmec rig build quotes. Meet with HR for China visa requirements. On 3/16, review KOC new build schedule with team and start contract and project risk register. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-16 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 On 3/13, support RFP package prep for HH and Drillmec rig build quotes. Meet with HR for China visa requirements. On 3/16, review KOC new build schedule with team and start contract and project risk register. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 3/13, weekly Ops mtg. On 3/16, TS dept mtg. On 3/17, PDR performance appraisals. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 3/16, review KOC RFPs. On 3/16, Due Diligence conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-17 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 On 3/14, contact PecoFacet for final Tech passport agreement and docs. On 3/13, bi-weekly Odoptu documentation conf call with Primorski.. On 3/17, coordinate with Tanya for final Batch 8 turnover to Exxon. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 3/13, weekly Ops mtg. On 3/16, TS dept mtg. On 3/17, PDR performance appraisals. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 3/16, review KOC RFPs. On 3/16, Due Diligence conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 On 3/20, Rig build RFP contract review with departments. On 3/21, China Visa process, Rig build quotes, Rig build RFP PD review for L/Ds and Performance bond. On 3/23, provide redlines of rig build RFP schedule exhibit to Tyler Elenburg. On 3/23, provide guidance to Tanya Mikitsionak for rig build cost estimates. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 3/20, weekly TS planning mtg. On 3/22, meeting with J. Whitley and N. Henley for L. Wilson forward plan for various work scopes; legal, compliance, TS, SCM, ABD contracts. On 3/23, TS weekly meeting. On 3/24, review Lana Wilson forward work scope and handover to Tanya Mikitsionak. On 3/24, onboard Joshua Lambert to KOC new build opportunity. Handover Buyer's Designated Equipment TPP work scope. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-21 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 On 3/20, Rig build RFP contract review with departments. On 3/21, China Visa process, Rig build quotes, Rig build RFP PD review for L/Ds and Performance bond. On 3/23, provide redlines of rig build RFP schedule exhibit to Tyler Elenburg. On 3/23, provide guidance to Tanya Mikitsionak for rig build cost estimates. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-21 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 2 0 On 3/21, contacted PecoFacet to follow up with request for signed agreement and Pressure vessel ISO documents. Signed agreement is pending. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 3/21, DD progress weekly mtg. On 3/22, meeting with VP HR and M Kuehn for HR comments to DD process. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 On 3/20, weekly TS planning mtg. On 3/22, meeting with J. Whitley and N. Henley for L. Wilson forward plan for various work scopes; legal, compliance, TS, SCM, ABD contracts. On 3/23, TS weekly meeting. On 3/24, review Lana Wilson forward work scope and handover to Tanya Mikitsionak. On 3/24, onboard Joshua Lambert to KOC new build opportunity. Handover Buyer's Designated Equipment TPP work scope. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 3/21, DD progress weekly mtg. On 3/22, meeting with VP HR and M Kuehn for HR comments to DD process. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-23 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 On 3/20, Rig build RFP contract review with departments. On 3/21, China Visa process, Rig build quotes, Rig build RFP PD review for L/Ds and Performance bond. On 3/23, provide redlines of rig build RFP schedule exhibit to Tyler Elenburg. On 3/23, provide guidance to Tanya Mikitsionak for rig build cost estimates. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 3/20, weekly TS planning mtg. On 3/22, meeting with J. Whitley and N. Henley for L. Wilson forward plan for various work scopes; legal, compliance, TS, SCM, ABD contracts. On 3/23, TS weekly meeting. On 3/24, review Lana Wilson forward work scope and handover to Tanya Mikitsionak. On 3/24, onboard Joshua Lambert to KOC new build opportunity. Handover Buyer's Designated Equipment TPP work scope. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 On 3/20, weekly TS planning mtg. On 3/22, meeting with J. Whitley and N. Henley for L. Wilson forward plan for various work scopes; legal, compliance, TS, SCM, ABD contracts. On 3/23, TS weekly meeting. On 3/24, review Lana Wilson forward work scope and handover to Tanya Mikitsionak. On 3/24, onboard Joshua Lambert to KOC new build opportunity. Handover Buyer's Designated Equipment TPP work scope. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-27 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 On 3/27-3/28, KOC 3000HP & 1500HP Rig RFP Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-28 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 On 3/27-3/28, KOC 3000HP & 1500HP Rig RFP Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-29 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 On 3/27-3/28, KOC 3000HP & 1500HP Rig RFP Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-30 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 On 3/27-3/28, KOC 3000HP & 1500HP Rig RFP Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-30 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 On 3/30, contact PecoFacet for TP agreement and documentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-31 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 On 3/27-3/28, KOC 3000HP & 1500HP Rig RFP Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-03-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 3/31, T Mikitsionak and J. Lambert 2016 PDR review and 2017 Goals. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-03 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 On 4/3, review HSE equipment scope of supply split with R Sumner and team. On 4/4, weekly KOC sprint team. On 4/5, conference call with R Sumner. On 4/6, review Rig build RFP Bulletin and complete distribution matrix. On 4/7, review draft BDE RFQ letter and issue weekly report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 4/4, start planning for Tanya transfer to finance dept, monthly performance appraisal. On 4/4, complete performance appraisals for Chuck Gorrell team. On 4/3, weekly ops mtg, Matt Kuehn performance appraisal and weekly TS planning mtg. On4/6, complete Tanya Mikitsionak job duties turnover plan and meet with Kyle and Tanya. On 4/3, 4/4, 4/5, 4/6 support IT for startup of Tech Services SharePoint sites and TS personnel access. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-03 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 On 4/3, Oracle EAM training with Ricky Smith. Apply for Oracle EAM access. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-04 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 On 4/3, review HSE equipment scope of supply split with R Sumner and team. On 4/4, weekly KOC sprint team. On 4/5, conference call with R Sumner. On 4/6, review Rig build RFP Bulletin and complete distribution matrix. On 4/7, review draft BDE RFQ letter and issue weekly report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 On 4/4, start planning for Tanya transfer to finance dept, monthly performance appraisal. On 4/4, complete performance appraisals for Chuck Gorrell team. On 4/3, weekly ops mtg, Matt Kuehn performance appraisal and weekly TS planning mtg. On4/6, complete Tanya Mikitsionak job duties turnover plan and meet with Kyle and Tanya. On 4/3, 4/4, 4/5, 4/6 support IT for startup of Tech Services SharePoint sites and TS personnel access. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 4/4, Due diligence weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-05 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 On 4/3, review HSE equipment scope of supply split with R Sumner and team. On 4/4, weekly KOC sprint team. On 4/5, conference call with R Sumner. On 4/6, review Rig build RFP Bulletin and complete distribution matrix. On 4/7, review draft BDE RFQ letter and issue weekly report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-05 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 On 4/5, contact PecoFacet for ASME COC. Complete Odoptu closeout report and issue to Exxon to complete EPCm contract obligations. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 4/4, start planning for Tanya transfer to finance dept, monthly performance appraisal. On 4/4, complete performance appraisals for Chuck Gorrell team. On 4/3, weekly ops mtg, Matt Kuehn performance appraisal and weekly TS planning mtg. On4/6, complete Tanya Mikitsionak job duties turnover plan and meet with Kyle and Tanya. On 4/3, 4/4, 4/5, 4/6 support IT for startup of Tech Services SharePoint sites and TS personnel access. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-06 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 On 4/3, review HSE equipment scope of supply split with R Sumner and team. On 4/4, weekly KOC sprint team. On 4/5, conference call with R Sumner. On 4/6, review Rig build RFP Bulletin and complete distribution matrix. On 4/7, review draft BDE RFQ letter and issue weekly report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 4/4, start planning for Tanya transfer to finance dept, monthly performance appraisal. On 4/4, complete performance appraisals for Chuck Gorrell team. On 4/3, weekly ops mtg, Matt Kuehn performance appraisal and weekly TS planning mtg. On4/6, complete Tanya Mikitsionak job duties turnover plan and meet with Kyle and Tanya. On 4/3, 4/4, 4/5, 4/6 support IT for startup of Tech Services SharePoint sites and TS personnel access. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-07 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 On 4/3, review HSE equipment scope of supply split with R Sumner and team. On 4/4, weekly KOC sprint team. On 4/5, conference call with R Sumner. On 4/6, review Rig build RFP Bulletin and complete distribution matrix. On 4/7, review draft BDE RFQ letter and issue weekly report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-07 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 4 0 On 4/5, contact PecoFacet for ASME COC. Complete Odoptu closeout report and issue to Exxon to complete EPCm contract obligations. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 4/4, start planning for Tanya transfer to finance dept, monthly performance appraisal. On 4/4, complete performance appraisals for Chuck Gorrell team. On 4/3, weekly ops mtg, Matt Kuehn performance appraisal and weekly TS planning mtg. On4/6, complete Tanya Mikitsionak job duties turnover plan and meet with Kyle and Tanya. On 4/3, 4/4, 4/5, 4/6 support IT for startup of Tech Services SharePoint sites and TS personnel access. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-07 OH-011 :OH-011 Overhead All Activities Regular Pay N 3 0 On 4/7, dentist appointment Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-10 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 On 4/10, KOC PO t's & c's meeting with legal for Cameron BOP RFP t's and c's. On 4/11, KOC SPRINT team. Review BOP TPP. Continue KOC Bomco conversion cost estimate. On 4/12, review BOP RFP cover letter. Continue Bomco KOC cost estimate. On 4/13, weekly KOC report, Shenkai RFP review and Bomco cost estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 On 4/10, weekly ops meeting, Complete weekly timesheet, weekly TS planning mtg, mtg with Chris Lerma for Tanya new assignment. Apply for Oracle access similar to Tanya access. On 4/11, L. Wilson meeting to discuss near term TS needs for contract admin. Continue Oracle access IT tickets. In 4/13, TS weekly meeting and provide Krechet steel order PO to K McMullen. Submit for Odoptu sharepoint access for PKD ops personnel. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-11 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 On 4/10, KOC PO t's & c's meeting with legal for Cameron BOP RFP t's and c's. On 4/11, KOC SPRINT team. Review BOP TPP. Continue KOC Bomco conversion cost estimate. On 4/12, review BOP RFP cover letter. Continue Bomco KOC cost estimate. On 4/13, weekly KOC report, Shenkai RFP review and Bomco cost estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 4/10, weekly ops meeting, Complete weekly timesheet, weekly TS planning mtg, mtg with Chris Lerma for Tanya new assignment. Apply for Oracle access similar to Tanya access. On 4/11, L. Wilson meeting to discuss near term TS needs for contract admin. Continue Oracle access IT tickets. In 4/13, TS weekly meeting and provide Krechet steel order PO to K McMullen. Submit for Odoptu sharepoint access for PKD ops personnel. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-12 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 On 4/10, KOC PO t's & c's meeting with legal for Cameron BOP RFP t's and c's. On 4/11, KOC SPRINT team. Review BOP TPP. Continue KOC Bomco conversion cost estimate. On 4/12, review BOP RFP cover letter. Continue Bomco KOC cost estimate. On 4/13, weekly KOC report, Shenkai RFP review and Bomco cost estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 On 4/12, BD brainstorming mtg and distribute conference tracker/sign up. Due Diligence weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-13 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 On 4/10, KOC PO t's & c's meeting with legal for Cameron BOP RFP t's and c's. On 4/11, KOC SPRINT team. Review BOP TPP. Continue KOC Bomco conversion cost estimate. On 4/12, review BOP RFP cover letter. Continue Bomco KOC cost estimate. On 4/13, weekly KOC report, Shenkai RFP review and Bomco cost estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-13 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 Contact PecoFacet for ASME U1A COC. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 4/10, weekly ops meeting, Complete weekly timesheet, weekly TS planning mtg, mtg with Chris Lerma for Tanya new assignment. Apply for Oracle access similar to Tanya access. On 4/11, L. Wilson meeting to discuss near term TS needs for contract admin. Continue Oracle access IT tickets. In 4/13, TS weekly meeting and provide Krechet steel order PO to K McMullen. Submit for Odoptu sharepoint access for PKD ops personnel. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-14 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 On 4/14, Good Friday Holiday Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-17 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 4 0 On 4/17, researched PRC potential warranty claim for Krechet diesel pump station pressure vessel. On 4/18, contact PRC for pressure vessel invoices for tech passport. On 4/19, request invoices from PRC and Southwest Filter for 2 pressure vessel tech passport applications. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 4/17, weekly TS planning mtg and website development project. On 4/18, registered for OTC and tech sessions. Submitted Oracle IT user tickets. On 4/17, submit and approve timesheets. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-18 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 On 4/18 and 4/20, KOC kan-ban mtg. On 4/17, BOMCO gap analysis and cost estimate. On 4/19, review RFP packs for camps and progress BOMCO gap analysis. On 4/21, complete first draft of BOMCO conversion estimate and issue weekly report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-18 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 On 4/17, researched PRC potential warranty claim for Krechet diesel pump station pressure vessel. On 4/18, contact PRC for pressure vessel invoices for tech passport. On 4/19, request invoices from PRC and Southwest Filter for 2 pressure vessel tech passport applications. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 4/17, weekly TS planning mtg and website development project. On 4/18, registered for OTC and tech sessions. Submitted Oracle IT user tickets. On 4/17, submit and approve timesheets. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 4/18, DD weekly mtg. On 4/18, KNG JV support discussion. On 4/19, DD Kuwait kickoff meeting. On 4/19, Uganda DD visit for T Elenburg mtg with K McMullen.On 4/20, provide Krechet PM hours to B Little for Hibernia PM cost estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 On 4/18 and 4/20, KOC kan-ban mtg. On 4/17, BOMCO gap analysis and cost estimate. On 4/19, review RFP packs for camps and progress BOMCO gap analysis. On 4/21, complete first draft of BOMCO conversion estimate and issue weekly report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-19 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 2 0 On 4/17, researched PRC potential warranty claim for Krechet diesel pump station pressure vessel. On 4/18, contact PRC for pressure vessel invoices for tech passport. On 4/19, request invoices from PRC and Southwest Filter for 2 pressure vessel tech passport applications. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 4/18, DD weekly mtg. On 4/18, KNG JV support discussion. On 4/19, DD Kuwait kickoff meeting. On 4/19, Uganda DD visit for T Elenburg mtg with K McMullen.On 4/20, provide Krechet PM hours to B Little for Hibernia PM cost estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 On 4/18 and 4/20, KOC kan-ban mtg. On 4/17, BOMCO gap analysis and cost estimate. On 4/19, review RFP packs for camps and progress BOMCO gap analysis. On 4/21, complete first draft of BOMCO conversion estimate and issue weekly report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 4/18, DD weekly mtg. On 4/18, KNG JV support discussion. On 4/19, DD Kuwait kickoff meeting. On 4/19, Uganda DD visit for T Elenburg mtg with K McMullen.On 4/20, provide Krechet PM hours to B Little for Hibernia PM cost estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-21 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 On 4/18 and 4/20, KOC kan-ban mtg. On 4/17, BOMCO gap analysis and cost estimate. On 4/19, review RFP packs for camps and progress BOMCO gap analysis. On 4/21, complete first draft of BOMCO conversion estimate and issue weekly report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-24 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 On 4/24, review KOC RFP letters for camps. On 4/25, provide 247 completed maintenance PMs/WO's to KOC opportunity team. Submit RFQs to K McMullen for 247 Mast break-over, Bomco equipment re-certs. Submit RFQ to J Waddill for NOV Top Drive and HP Mud Pumps. On 4/26, review BOP clarifications. On 4/27, map procurement process options with J. Lambert. On 4/28, review Rig builder quotes Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-24 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 On 4/24, review status with S. Licea for final Oracle links for equipment manuals to DCDM. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 On 4/24, timesheet and timesheet approvals.On 4/24, 4/26, continue with gaining sharepoint access for Odoptu/270 personnel. On 4/24, weekly TS meeting and weekly Ops mtg. On 4/26, complete Keppel Amfels customer survey. On 4/27, sharepoint access. On 4/28, timesheets Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-25 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 On 4/24, review KOC RFP letters for camps. On 4/25, provide 247 completed maintenance PMs/WO's to KOC opportunity team. Submit RFQs to K McMullen for 247 Mast break-over, Bomco equipment re-certs. Submit RFQ to J Waddill for NOV Top Drive and HP Mud Pumps. On 4/26, review BOP clarifications. On 4/27, map procurement process options with J. Lambert. On 4/28, review Rig builder quotes Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-25 OH-014 :OH-014 Overhead All Activities Regular Pay N 6 0 On 4/25, coordinated with R Rouse, R Smith, Sesha to obtain EAM access and pull Oracle reports and understand Oracle does not contain equipment data prior to Feb, 2015 and Oracle or SharePoint does not contain all equipment inspection. documents. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-26 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 On 4/24, review KOC RFP letters for camps. On 4/25, provide 247 completed maintenance PMs/WO's to KOC opportunity team. Submit RFQs to K McMullen for 247 Mast break-over, Bomco equipment re-certs. Submit RFQ to J Waddill for NOV Top Drive and HP Mud Pumps. On 4/26, review BOP clarifications. On 4/27, map procurement process options with J. Lambert. On 4/28, review Rig builder quotes Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 4/24, timesheet and timesheet approvals.On 4/24, 4/26, continue with gaining sharepoint access for Odoptu/270 personnel. On 4/24, weekly TS meeting and weekly Ops mtg. On 4/26, complete Keppel Amfels customer survey. On 4/27, sharepoint access. On 4/28, timesheets Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 4.26, attend Keppel Amfels artic presentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-27 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 On 4/24, review KOC RFP letters for camps. On 4/25, provide 247 completed maintenance PMs/WO's to KOC opportunity team. Submit RFQs to K McMullen for 247 Mast break-over, Bomco equipment re-certs. Submit RFQ to J Waddill for NOV Top Drive and HP Mud Pumps. On 4/26, review BOP clarifications. On 4/27, map procurement process options with J. Lambert. On 4/28, review Rig builder quotes Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 4/24, timesheet and timesheet approvals.On 4/24, 4/26, continue with gaining sharepoint access for Odoptu/270 personnel. On 4/24, weekly TS meeting and weekly Ops mtg. On 4/26, complete Keppel Amfels customer survey. On 4/27, sharepoint access. On 4/28, timesheets Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-28 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 On 4/24, review KOC RFP letters for camps. On 4/25, provide 247 completed maintenance PMs/WO's to KOC opportunity team. Submit RFQs to K McMullen for 247 Mast break-over, Bomco equipment re-certs. Submit RFQ to J Waddill for NOV Top Drive and HP Mud Pumps. On 4/26, review BOP clarifications. On 4/27, map procurement process options with J. Lambert. On 4/28, review Rig builder quotes Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-04-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 4/24, timesheet and timesheet approvals.On 4/24, 4/26, continue with gaining sharepoint access for Odoptu/270 personnel. On 4/24, weekly TS meeting and weekly Ops mtg. On 4/26, complete Keppel Amfels customer survey. On 4/27, sharepoint access. On 4/28, timesheets Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-01 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 On 5/1, review camp quotes. Enter rig build, camp cost into cash flow estimate Review Bomco equipment recert quote and enter into cash flow estrimate. On 5/3, review BOP quotes and enter into estimate. On 5/4, review Drillemc proposal and Kan-Ban. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 5/1, timesheet and approvals. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 5/2, attended OTC Caspian Sea session and Keppel Amfels reception. On 5/3, Angola DD tax and legal conf call. On 5/4, Due diligence Angola checklist. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-02 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 On 5/2, attended OTC general displays. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-03 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 On 5/1, review camp quotes. Enter rig build, camp cost into cash flow estimate Review Bomco equipment recert quote and enter into cash flow estrimate. On 5/3, review BOP quotes and enter into estimate. On 5/4, review Drillemc proposal and Kan-Ban. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-03 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 On 5/4, contact Pecofacet for signed PV support agreement. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 5/2, attended OTC Caspian Sea session and Keppel Amfels reception. On 5/3, Angola DD tax and legal conf call. On 5/4, Due diligence Angola checklist. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-04 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 On 5/1, review camp quotes. Enter rig build, camp cost into cash flow estimate Review Bomco equipment recert quote and enter into cash flow estrimate. On 5/3, review BOP quotes and enter into estimate. On 5/4, review Drillemc proposal and Kan-Ban. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-04 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 On 5/4, contact Pecofacet for signed PV support agreement. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 On 5/2, attended OTC Caspian Sea session and Keppel Amfels reception. On 5/3, Angola DD tax and legal conf call. On 5/4, Due diligence Angola checklist. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 5/5, PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-08 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 On 5/8, KOC supplier eval formats. On 5/9, completed BDE commercial and technical evaluation template. Started camp quotes evaluation. On 5/10, complete camp evaluation. On 5/11, KOC sprint team. On 5/12, update 3,000HP cost estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 5/8, timesheets, weekly tech services planning meeting. On 5/10, obtain vaccinations. On 5/11, TS weekly meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 5/8, weekly ops mtg, weekly TS mtg, Plus petrol meeting. On 5/9, attend Due diligence weekly meeting. On 5/9, attend goals review. On 5/11, organize conf call for Angola opportunity. DD new country kickoff meeting. On 5/12, update DD team with opportunity deferred status. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-09 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 On 5/8, KOC supplier eval formats. On 5/9, completed BDE commercial and technical evaluation template. Started camp quotes evaluation. On 5/10, complete camp evaluation. On 5/11, KOC sprint team. On 5/12, update 3,000HP cost estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-09 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 On 5/9, forwarded PecoFacet signed agreement to Sakhalin regulatory coordinator. Responded to Odoptu PM coordinator request for COCs. On 5/11, compile missing rolling stock list from local POs. On 5/12, Odoptu tub shuttle drawing transmittal meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 5/8, weekly ops mtg, weekly TS mtg, Plus petrol meeting. On 5/9, attend Due diligence weekly meeting. On 5/9, attend goals review. On 5/11, organize conf call for Angola opportunity. DD new country kickoff meeting. On 5/12, update DD team with opportunity deferred status. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-09 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 On 5/9, reviewed RFP evaluation process with Joshua Lambert and Tyler Elenburg Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-10 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 On 5/8, KOC supplier eval formats. On 5/9, completed BDE commercial and technical evaluation template. Started camp quotes evaluation. On 5/10, complete camp evaluation. On 5/11, KOC sprint team. On 5/12, update 3,000HP cost estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 5/8, timesheets, weekly tech services planning meeting. On 5/10, obtain vaccinations. On 5/11, TS weekly meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-11 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 On 5/8, KOC supplier eval formats. On 5/9, completed BDE commercial and technical evaluation template. Started camp quotes evaluation. On 5/10, complete camp evaluation. On 5/11, KOC sprint team. On 5/12, update 3,000HP cost estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-11 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 3 0 On 5/9, forwarded PecoFacet signed agreement to Sakhalin regulatory coordinator. Responded to Odoptu PM coordinator request for COCs. On 5/11, compile missing rolling stock list from local POs. On 5/12, Odoptu tub shuttle drawing transmittal meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 5/8, timesheets, weekly tech services planning meeting. On 5/10, obtain vaccinations. On 5/11, TS weekly meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 On 5/8, weekly ops mtg, weekly TS mtg, Plus petrol meeting. On 5/9, attend Due diligence weekly meeting. On 5/9, attend goals review. On 5/11, organize conf call for Angola opportunity. DD new country kickoff meeting. On 5/12, update DD team with opportunity deferred status. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-12 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 On 5/8, KOC supplier eval formats. On 5/9, completed BDE commercial and technical evaluation template. Started camp quotes evaluation. On 5/10, complete camp evaluation. On 5/11, KOC sprint team. On 5/12, update 3,000HP cost estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-12 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 On 5/9, forwarded PecoFacet signed agreement to Sakhalin regulatory coordinator. Responded to Odoptu PM coordinator request for COCs. On 5/11, compile missing rolling stock list from local POs. On 5/12, Odoptu tub shuttle drawing transmittal meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 On 5/8, weekly ops mtg, weekly TS mtg, Plus petrol meeting. On 5/9, attend Due diligence weekly meeting. On 5/9, attend goals review. On 5/11, organize conf call for Angola opportunity. DD new country kickoff meeting. On 5/12, update DD team with opportunity deferred status. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-15 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 On 5/15, review documentation requirements with Sergio and Marilyn for KOC opportunity. On 5/16, create EPC histogram. On 5/17, Camp quotes t's and c's review. On 5/19, review rig builder tech & commercial award recommendation Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-15 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 2 0 On 5/15, meeting for NOV tub shuttle transmittal and filing on DCDM. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 5/15, Monday operations meeting and TS weekly planning meeting. On 5/19, timesheets. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-16 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 On 5/15, review documentation requirements with Sergio and Marilyn for KOC opportunity. On 5/16, create EPC histogram. On 5/17, Camp quotes t's and c's review. On 5/19, review rig builder tech & commercial award recommendation Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 5/16, weekly DD meeting. On 5/17, Kuwait TDI kickoff. On 5/18, attend IADC onshore conference. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-17 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 On 5/15, review documentation requirements with Sergio and Marilyn for KOC opportunity. On 5/16, create EPC histogram. On 5/17, Camp quotes t's and c's review. On 5/19, review rig builder tech & commercial award recommendation Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 5/16, weekly DD meeting. On 5/17, Kuwait TDI kickoff. On 5/18, attend IADC onshore conference. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 5/16, weekly DD meeting. On 5/17, Kuwait TDI kickoff. On 5/18, attend IADC onshore conference. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 On 5/15, review documentation requirements with Sergio and Marilyn for KOC opportunity. On 5/16, create EPC histogram. On 5/17, Camp quotes t's and c's review. On 5/19, review rig builder tech & commercial award recommendation Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 5/15, Monday operations meeting and TS weekly planning meeting. On 5/19, timesheets. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-22 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 On 5/22, KOC sprint team mtg. Review HSE requirements with R. Sumner. On 5/24, KOC histogram review with Engineering Mgr. On 5/25, rig builder award recommendation mtg. KOC sprint team mtg. On 5/25, review KOC draft org charts and histogram with S. Licea and M. Griffin and discuss plan fwd for doc mgt plan. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 5/22, weekly operations mtg. Summer hours mtg with HR panel. Weekly TS planning mtg. On 5/23, Asst PM II assignment letter. On 5/24, Asst PM position. On 5/25, TS weekly mtg and tiemsheets. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-23 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 On 5/22, KOC sprint team mtg. Review HSE requirements with R. Sumner. On 5/24, KOC histogram review with Engineering Mgr. On 5/25, rig builder award recommendation mtg. KOC sprint team mtg. On 5/25, review KOC draft org charts and histogram with S. Licea and M. Griffin and discuss plan fwd for doc mgt plan. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 5/22, weekly operations mtg. Summer hours mtg with HR panel. Weekly TS planning mtg. On 5/23, Asst PM II assignment letter. On 5/24, Asst PM position. On 5/25, TS weekly mtg and tiemsheets. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-24 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 On 5/22, KOC sprint team mtg. Review HSE requirements with R. Sumner. On 5/24, KOC histogram review with Engineering Mgr. On 5/25, rig builder award recommendation mtg. KOC sprint team mtg. On 5/25, review KOC draft org charts and histogram with S. Licea and M. Griffin and discuss plan fwd for doc mgt plan. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-24 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 On 5/24, obtain Sak doc control access to Odoptu sharepoint. On 5/25, meet with IDR to review status of NOV tub shuttle as-built dwgs posting to DCDM and IDR access to NOV HED bookshelf site for Odoptu equipment docs (done). Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 5/22, weekly operations mtg. Summer hours mtg with HR panel. Weekly TS planning mtg. On 5/23, Asst PM II assignment letter. On 5/24, Asst PM position. On 5/25, TS weekly mtg and tiemsheets. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 5/24, KOC Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-25 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 On 5/22, KOC sprint team mtg. Review HSE requirements with R. Sumner. On 5/24, KOC histogram review with Engineering Mgr. On 5/25, rig builder award recommendation mtg. KOC sprint team mtg. On 5/25, review KOC draft org charts and histogram with S. Licea and M. Griffin and discuss plan fwd for doc mgt plan. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-25 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 2 0 On 5/24, obtain Sak doc control access to Odoptu sharepoint. On 5/25, meet with IDR to review status of NOV tub shuttle as-built dwgs posting to DCDM and IDR access to NOV HED bookshelf site for Odoptu equipment docs (done). Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 5/22, weekly operations mtg. Summer hours mtg with HR panel. Weekly TS planning mtg. On 5/23, Asst PM II assignment letter. On 5/24, Asst PM position. On 5/25, TS weekly mtg and tiemsheets. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 5/26, PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-29 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 On 5/29, memorial day Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-30 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 On 5/30 and 6/1, KOC sprint team mtg. On 6/2, update 3000HP cost estimate with quiotes. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 On 5/30, review TS assignment letter with Chris Enroth. Schedule Loadmaster training. Review appraisals. On 5/31, project engagement slides. On 5/30, TS weekly planning mtg. On 6/1, TS detp. mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 5/30, DD meeting. On 6/1, S. Iraq kickoff mtg. Meet with Kerui rig builder. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-31 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 On 5/30 and 6/1, KOC sprint team mtg. On 6/2, update 3000HP cost estimate with quiotes. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-05-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 On 5/30, review TS assignment letter with Chris Enroth. Schedule Loadmaster training. Review appraisals. On 5/31, project engagement slides. On 5/30, TS weekly planning mtg. On 6/1, TS detp. mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-01 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 On 5/30 and 6/1, KOC sprint team mtg. On 6/2, update 3000HP cost estimate with quiotes. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 5/30, review TS assignment letter with Chris Enroth. Schedule Loadmaster training. Review appraisals. On 5/31, project engagement slides. On 5/30, TS weekly planning mtg. On 6/1, TS detp. mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 On 5/30, DD meeting. On 6/1, S. Iraq kickoff mtg. Meet with Kerui rig builder. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-02 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 On 5/30 and 6/1, KOC sprint team mtg. On 6/2, update 3000HP cost estimate with quiotes. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-05 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 On 6/5, KOC PM draft assignment letter. Review plan for LLE AFE & MR entry into Oracle. On 6/6, meet with HH for technical clarifications. On 6/8, IDR mtg for doc control plan development and Kan-Ban. On 6/9, complete risk register. On 6/8, assemble BOP commercial summary and organize additional quotes. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 6/5, weekly ops mtg. On 6/5, review Berkut OEM electronic docs with Assets & IDR for plan to link to Oracle. On 6/8, organize China HH & Kerui trip. On 6/6, Chris Enroth PTO request review with HR. On 6/7, organize agenda for HH trip, timesheet approvals. Coordinate IT for HH email access. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 6/5, review DD slides with tax and SCM. On 6/6, DD meeting. On 6/7, TDI Kuwait DD mtg and minutes. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-06 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 On 6/5, KOC PM draft assignment letter. Review plan for LLE AFE & MR entry into Oracle. On 6/6, meet with HH for technical clarifications. On 6/8, IDR mtg for doc control plan development and Kan-Ban. On 6/9, complete risk register. On 6/8, assemble BOP commercial summary and organize additional quotes. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 6/5, weekly ops mtg. On 6/5, review Berkut OEM electronic docs with Assets & IDR for plan to link to Oracle. On 6/8, organize China HH & Kerui trip. On 6/6, Chris Enroth PTO request review with HR. On 6/7, organize agenda for HH trip, timesheet approvals. Coordinate IT for HH email access. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 6/5, weekly ops mtg. On 6/5, review Berkut OEM electronic docs with Assets & IDR for plan to link to Oracle. On 6/8, organize China HH & Kerui trip. On 6/6, Chris Enroth PTO request review with HR. On 6/7, organize agenda for HH trip, timesheet approvals. Coordinate IT for HH email access. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 6/5, review DD slides with tax and SCM. On 6/6, DD meeting. On 6/7, TDI Kuwait DD mtg and minutes. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-08 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 On 6/5, KOC PM draft assignment letter. Review plan for LLE AFE & MR entry into Oracle. On 6/6, meet with HH for technical clarifications. On 6/8, IDR mtg for doc control plan development and Kan-Ban. On 6/9, complete risk register. On 6/8, assemble BOP commercial summary and organize additional quotes. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 6/5, weekly ops mtg. On 6/5, review Berkut OEM electronic docs with Assets & IDR for plan to link to Oracle. On 6/8, organize China HH & Kerui trip. On 6/6, Chris Enroth PTO request review with HR. On 6/7, organize agenda for HH trip, timesheet approvals. Coordinate IT for HH email access. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-09 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 On 6/5, KOC PM draft assignment letter. Review plan for LLE AFE & MR entry into Oracle. On 6/6, meet with HH for technical clarifications. On 6/8, IDR mtg for doc control plan development and Kan-Ban. On 6/9, complete risk register. On 6/8, assemble BOP commercial summary and organize additional quotes. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-12 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 On 6/12, review KOC draft histogram, BOPs review. On 6/13, KOC sprint team. On 6/13, TPP approvals with S. Carmichael. On 6/15, KOC sprint team mtg. Revise cost estimate. Review draft assignment letters for China. Kerui assessment for rig builder risk mitigation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 6/12, weekly TS planning mtg. On 6/12, 6/13 and 6/14, goals review. On 6/14 and 6/15, organize China rig builder itinerary. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-13 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 On 6/12, review KOC draft histogram, BOPs review. On 6/13, KOC sprint team. On 6/13, TPP approvals with S. Carmichael. On 6/15, KOC sprint team mtg. Revise cost estimate. Review draft assignment letters for China. Kerui assessment for rig builder risk mitigation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 6/16, Hibernia Top Drive powerpoint options slides. On 6/13, DD mtg. On 6/13, TQSI drill pipe inspection meeting. Kerui introduction meeting. On 6/14, Hibernia Top Drive conf call. On 6/14, DD conf call, SME program planning. On 6/15, NOV desert rig presentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 6/12, weekly TS planning mtg. On 6/12, 6/13 and 6/14, goals review. On 6/14 and 6/15, organize China rig builder itinerary. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 On 6/16, Hibernia Top Drive powerpoint options slides. On 6/13, DD mtg. On 6/13, TQSI drill pipe inspection meeting. Kerui introduction meeting. On 6/14, Hibernia Top Drive conf call. On 6/14, DD conf call, SME program planning. On 6/15, NOV desert rig presentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-15 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 On 6/12, review KOC draft histogram, BOPs review. On 6/13, KOC sprint team. On 6/13, TPP approvals with S. Carmichael. On 6/15, KOC sprint team mtg. Revise cost estimate. Review draft assignment letters for China. Kerui assessment for rig builder risk mitigation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 6/12, weekly TS planning mtg. On 6/12, 6/13 and 6/14, goals review. On 6/14 and 6/15, organize China rig builder itinerary. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 6/16, Hibernia Top Drive powerpoint options slides. On 6/13, DD mtg. On 6/13, TQSI drill pipe inspection meeting. Kerui introduction meeting. On 6/14, Hibernia Top Drive conf call. On 6/14, DD conf call, SME program planning. On 6/15, NOV desert rig presentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 6/16, Hibernia Top Drive powerpoint options slides. On 6/13, DD mtg. On 6/13, TQSI drill pipe inspection meeting. Kerui introduction meeting. On 6/14, Hibernia Top Drive conf call. On 6/14, DD conf call, SME program planning. On 6/15, NOV desert rig presentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 On 6/19, BOP supplier reviews Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 On 6/19, BOP supplier reviews Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 6/19, weekly ops mtg. On 6/20, BD mtg. Drillmec striker-800 presentation. On 6/21, TDI Kuwait debrief mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 6/19, weekly ops mtg. On 6/20, BD mtg. Drillmec striker-800 presentation. On 6/21, TDI Kuwait debrief mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 On 6/20, weekly TS mtg. China travel itineraries and prep. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 6/19, weekly ops mtg. On 6/20, BD mtg. Drillmec striker-800 presentation. On 6/21, TDI Kuwait debrief mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 6/22 and 6/23, PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-23 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 6/22 and 6/23, PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-25 OH-010 :OH-010 Overhead All Activities Regular Pay N 12 0 On 6/25 and 6/26, travelled from Houston to China. On 6/29, travelled from Chengdu, China to Dongying, China. On 7/1,travelled from China to Houston. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-26 OH-010 :OH-010 Overhead All Activities Regular Pay N 12 0 On 6/25 and 6/26, travelled from Houston to China. On 6/29, travelled from Chengdu, China to Dongying, China. On 7/1,travelled from China to Houston. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-27 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 On 6/27, 6/28 and 6/29, visited HH Chengdu fabrication shops and engineering offices. On 6/30, visited Kerui fabrication shops and engineering offices. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-28 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 On 6/27, 6/28 and 6/29, visited HH Chengdu fabrication shops and engineering offices. On 6/30, visited Kerui fabrication shops and engineering offices. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-29 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 On 6/27, 6/28 and 6/29, visited HH Chengdu fabrication shops and engineering offices. On 6/30, visited Kerui fabrication shops and engineering offices. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-29 OH-010 :OH-010 Overhead All Activities Regular Pay N 6 0 On 6/25 and 6/26, travelled from Houston to China. On 6/29, travelled from Chengdu, China to Dongying, China. On 7/1,travelled from China to Houston. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-06-30 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 On 6/27, 6/28 and 6/29, visited HH Chengdu fabrication shops and engineering offices. On 6/30, visited Kerui fabrication shops and engineering offices. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-01 OH-010 :OH-010 Overhead All Activities Regular Pay N 24 0 On 6/25 and 6/26, travelled from Houston to China. On 6/29, travelled from Chengdu, China to Dongying, China. On 7/1,travelled from China to Houston. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 On 7/3, 7/4 July 4th holiday Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 On 7/3, 7/4 July 4th holiday Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-05 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 On 7/6, review BOP evals and generate actions. On 7/6, mtg for early LLE AFE's and MR's. On 7/5, HH & Kerui minutes. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 7/5, timesheet approvals and China expense report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-06 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 On 7/6, review BOP evals and generate actions. On 7/6, mtg for early LLE AFE's and MR's. On 7/5, HH & Kerui minutes. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 On 7/6, HH & Kerui debriefing. On 7/6, TS weekly mtg. On 7/6, Berkut and Orlan Oracle asset links. On 7/7, monthly goals mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 7/5, SBM lunch/mtg. On 7/6, review Husky ppt slides and execution options. On 7/7, Husky opportunity meeting. On 7/7, Hibernia Top Drive EAMR and CTR review. On 7/7, prepare for HH conference call for Total Uganda revised technically compliant quote. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 On 7/6, HH & Kerui debriefing. On 7/6, TS weekly mtg. On 7/6, Berkut and Orlan Oracle asset links. On 7/7, monthly goals mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 On 7/5, SBM lunch/mtg. On 7/6, review Husky ppt slides and execution options. On 7/7, Husky opportunity meeting. On 7/7, Hibernia Top Drive EAMR and CTR review. On 7/7, prepare for HH conference call for Total Uganda revised technically compliant quote. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-10 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 On 7/10, BOP quote action items. On 7/11, FOB logistics planning. On 7/12, FOB terms meeting with SCM and Risk. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 On 7/10, weekly Ops conf call. Weekly Timesheet approvals. TS planning meeting. On 7/14, Berkut & Orlan Oracle links. On 7/14, Chris Enroth resignation discussion. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-11 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 On 7/10, BOP quote action items. On 7/11, FOB logistics planning. On 7/12, FOB terms meeting with SCM and Risk. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-11 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 2 0 On 7/11 and 7/12, WREP conf calls. On 7/14, Lee C Moore presentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 7/11, Due diligence mtg. On 7/12, TDI DD feedback. On 7/13, TDI Uganda kickoff meeting and discussions. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-11 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 2 0 On 7/11, Total Uganda conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-12 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 On 7/10, BOP quote action items. On 7/11, FOB logistics planning. On 7/12, FOB terms meeting with SCM and Risk. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-12 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 3 0 On 7/11 and 7/12, WREP conf calls. On 7/14, Lee C Moore presentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 7/11, Due diligence mtg. On 7/12, TDI DD feedback. On 7/13, TDI Uganda kickoff meeting and discussions. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 7/11, Due diligence mtg. On 7/12, TDI DD feedback. On 7/13, TDI Uganda kickoff meeting and discussions. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 7/10, weekly Ops conf call. Weekly Timesheet approvals. TS planning meeting. On 7/14, Berkut & Orlan Oracle links. On 7/14, Chris Enroth resignation discussion. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-14 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 2 0 On 7/11 and 7/12, WREP conf calls. On 7/14, Lee C Moore presentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-17 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 On 7/17, Total Uganda proposal support. On 7/18, Total Uganda clarifications and read Total ITT. On 7/19, Total Uganda cost estimate review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 7/17, timesheets. Weekly TS planning meeting. HR meeting for Chris Enroth last day. On 7/18, outdated conf rm mtg deletions. On 7/19, J. Sentmanat access to sharepoint. On 7/20, TS dept mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 On 7/17, PLuspetrol conf call and proposal support. On 7/18, Kuwait conf call and update. On 7/18, Pluspetrol conf call. On 7/20, meet with Kerui for KOC RFP. On 7/20, TDI Uganda due diligence meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-18 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 5 0 On 7/17, Total Uganda proposal support. On 7/18, Total Uganda clarifications and read Total ITT. On 7/19, Total Uganda cost estimate review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 7/17, timesheets. Weekly TS planning meeting. HR meeting for Chris Enroth last day. On 7/18, outdated conf rm mtg deletions. On 7/19, J. Sentmanat access to sharepoint. On 7/20, TS dept mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 7/17, PLuspetrol conf call and proposal support. On 7/18, Kuwait conf call and update. On 7/18, Pluspetrol conf call. On 7/20, meet with Kerui for KOC RFP. On 7/20, TDI Uganda due diligence meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 On 7/18, establish meeting for Berkut asset oracle links. On 7/19, previewed Hibernia pedestal crane upgrade. On 7/21, host Berkut & Orlan asset numbering and Oracle linking meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-19 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 On 7/17, Total Uganda proposal support. On 7/18, Total Uganda clarifications and read Total ITT. On 7/19, Total Uganda cost estimate review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 On 7/20, KOC sprint team meeting. BOP control unit and F&G award recommendation meeting. D&B report reviews. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 7/17, timesheets. Weekly TS planning meeting. HR meeting for Chris Enroth last day. On 7/18, outdated conf rm mtg deletions. On 7/19, J. Sentmanat access to sharepoint. On 7/20, TS dept mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 7/17, PLuspetrol conf call and proposal support. On 7/18, Kuwait conf call and update. On 7/18, Pluspetrol conf call. On 7/20, meet with Kerui for KOC RFP. On 7/20, TDI Uganda due diligence meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-19 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 1 0 On 7/19, Hibernia Top drive upgrade. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 On 7/18, establish meeting for Berkut asset oracle links. On 7/19, previewed Hibernia pedestal crane upgrade. On 7/21, host Berkut & Orlan asset numbering and Oracle linking meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 On 7/20, KOC sprint team meeting. BOP control unit and F&G award recommendation meeting. D&B report reviews. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 7/17, timesheets. Weekly TS planning meeting. HR meeting for Chris Enroth last day. On 7/18, outdated conf rm mtg deletions. On 7/19, J. Sentmanat access to sharepoint. On 7/20, TS dept mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 7/17, PLuspetrol conf call and proposal support. On 7/18, Kuwait conf call and update. On 7/18, Pluspetrol conf call. On 7/20, meet with Kerui for KOC RFP. On 7/20, TDI Uganda due diligence meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 7/17, PLuspetrol conf call and proposal support. On 7/18, Kuwait conf call and update. On 7/18, Pluspetrol conf call. On 7/20, meet with Kerui for KOC RFP. On 7/20, TDI Uganda due diligence meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 On 7/18, establish meeting for Berkut asset oracle links. On 7/19, previewed Hibernia pedestal crane upgrade. On 7/21, host Berkut & Orlan asset numbering and Oracle linking meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-24 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 On 7/24, review KOC doc mgt plan. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 7/24, weekly TS planning mtg. On 7/27, weekly TS meeting. On 7/28, monthly tech services OFi review. Sr Project Engineer JD and meeting with HR. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 On 7.24, PP mtg and cost estimate. On 77/25 and /26, Hibernia Top Drive opportunity. Pluspetrol conf call, specs and histogram. On 7/27, TDI DD checklist debrief. On 7/28, Talos opportunity ppt slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 7.24, PP mtg and cost estimate. On 77/25 and /26, Hibernia Top Drive opportunity. Pluspetrol conf call, specs and histogram. On 7/27, TDI DD checklist debrief. On 7/28, Talos opportunity ppt slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 7.24, PP mtg and cost estimate. On 77/25 and /26, Hibernia Top Drive opportunity. Pluspetrol conf call, specs and histogram. On 7/27, TDI DD checklist debrief. On 7/28, Talos opportunity ppt slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 On 7/24, weekly TS planning mtg. On 7/27, weekly TS meeting. On 7/28, monthly tech services OFi review. Sr Project Engineer JD and meeting with HR. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 On 7.24, PP mtg and cost estimate. On 77/25 and /26, Hibernia Top Drive opportunity. Pluspetrol conf call, specs and histogram. On 7/27, TDI DD checklist debrief. On 7/28, Talos opportunity ppt slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 7/24, weekly TS planning mtg. On 7/27, weekly TS meeting. On 7/28, monthly tech services OFi review. Sr Project Engineer JD and meeting with HR. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 On 7.24, PP mtg and cost estimate. On 77/25 and /26, Hibernia Top Drive opportunity. Pluspetrol conf call, specs and histogram. On 7/27, TDI DD checklist debrief. On 7/28, Talos opportunity ppt slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 7/31, review KOC doc turnover plan. Review IMS procedures status. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-07-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 7/31, 8/1, Due diligence update mtg. On 8/1 and 8//2, prepare and review Talos opportunity concept study ppt slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 On 8/1 and 8/2, Hibernia Top Drive Upgrade opportunity Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 7/31, 8/1, Due diligence update mtg. On 8/1 and 8//2, prepare and review Talos opportunity concept study ppt slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 On 8/1 and 8/2, Hibernia Top Drive Upgrade opportunity Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 7/31, 8/1, Due diligence update mtg. On 8/1 and 8//2, prepare and review Talos opportunity concept study ppt slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-03 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 8/3 and 8/4, PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-04 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 8/3 and 8/4, PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 On 8/7, projects planning meeting with J. Lambert. Weekly ops mtg. Berkut Oracle links mtg. Department meeting. On 8/9, asset mgt culture mtg. On 8/10, TS dept mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 On 8/7, 3 personnel interviews for open Sr Project position and evaluations.. Review goals. review candidates with HR. On 8/10, interview Sr project engineer candidate. Review July financials. On 8/11, M. Kuehn goals. Provide Krechet MDR guide to Yulia. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-08 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 On 8/8, attend KOC tender planning mtg. HH meeting for lease/purchase. On 8/9, LLE AFEs & MRs entry into Oracle. On 8/10, Sprint team. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 8/7, 3 personnel interviews for open Sr Project position and evaluations.. Review goals. review candidates with HR. On 8/10, interview Sr project engineer candidate. Review July financials. On 8/11, M. Kuehn goals. Provide Krechet MDR guide to Yulia. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 On 8/8, Kuwait DD. On 8/8, Hibernia Top Drive planning. On 8/9, Pluspetrol revenue schedule. On 8/10, Pluspetrol entity meeting. Hibernia Top drive upgrade conf call. Follow up questions for Hibernia knuckle boom crane. On 8/11, create Pluspetrol scope of services exhibit A. Respond for PP quotes. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-09 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 On 8/8, attend KOC tender planning mtg. HH meeting for lease/purchase. On 8/9, LLE AFEs & MRs entry into Oracle. On 8/10, Sprint team. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 On 8/7, projects planning meeting with J. Lambert. Weekly ops mtg. Berkut Oracle links mtg. Department meeting. On 8/9, asset mgt culture mtg. On 8/10, TS dept mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 On 8/8, Kuwait DD. On 8/8, Hibernia Top Drive planning. On 8/9, Pluspetrol revenue schedule. On 8/10, Pluspetrol entity meeting. Hibernia Top drive upgrade conf call. Follow up questions for Hibernia knuckle boom crane. On 8/11, create Pluspetrol scope of services exhibit A. Respond for PP quotes. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-10 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 On 8/8, attend KOC tender planning mtg. HH meeting for lease/purchase. On 8/9, LLE AFEs & MRs entry into Oracle. On 8/10, Sprint team. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 On 8/7, projects planning meeting with J. Lambert. Weekly ops mtg. Berkut Oracle links mtg. Department meeting. On 8/9, asset mgt culture mtg. On 8/10, TS dept mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 8/7, 3 personnel interviews for open Sr Project position and evaluations.. Review goals. review candidates with HR. On 8/10, interview Sr project engineer candidate. Review July financials. On 8/11, M. Kuehn goals. Provide Krechet MDR guide to Yulia. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 8/8, Kuwait DD. On 8/8, Hibernia Top Drive planning. On 8/9, Pluspetrol revenue schedule. On 8/10, Pluspetrol entity meeting. Hibernia Top drive upgrade conf call. Follow up questions for Hibernia knuckle boom crane. On 8/11, create Pluspetrol scope of services exhibit A. Respond for PP quotes. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 8/7, 3 personnel interviews for open Sr Project position and evaluations.. Review goals. review candidates with HR. On 8/10, interview Sr project engineer candidate. Review July financials. On 8/11, M. Kuehn goals. Provide Krechet MDR guide to Yulia. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 On 8/8, Kuwait DD. On 8/8, Hibernia Top Drive planning. On 8/9, Pluspetrol revenue schedule. On 8/10, Pluspetrol entity meeting. Hibernia Top drive upgrade conf call. Follow up questions for Hibernia knuckle boom crane. On 8/11, create Pluspetrol scope of services exhibit A. Respond for PP quotes. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 8/14, weekly ops meeting and TS planning mtg. On 8/15, Joshua Lambert 2017 goals review. On 8/15, Due diligence weekly meeting. On 8/16, interview Sr Project Engineer candidate. On 8/17, Tech services weekly meeting. On 8/18, Joshua Lambert DS-1 training approval. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 On 8/14, Pluspetrol clarifications and ESA. On 8/15, support Hibernia Top Drive upgrade. On 8/15, KOC kickoff meeting. Pluspetrol ESA scoep of work. On 8/16, Pluspetrol ESA Scope or fowrk and redlines. On 8/17, Top Drive upgrade planning meeting. On 8/18, Pluspetrol engineering clarifications. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 8/14, weekly ops meeting and TS planning mtg. On 8/15, Joshua Lambert 2017 goals review. On 8/15, Due diligence weekly meeting. On 8/16, interview Sr Project Engineer candidate. On 8/17, Tech services weekly meeting. On 8/18, Joshua Lambert DS-1 training approval. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 On 8/14, Pluspetrol clarifications and ESA. On 8/15, support Hibernia Top Drive upgrade. On 8/15, KOC kickoff meeting. Pluspetrol ESA scoep of work. On 8/16, Pluspetrol ESA Scope or fowrk and redlines. On 8/17, Top Drive upgrade planning meeting. On 8/18, Pluspetrol engineering clarifications. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 8/14, weekly ops meeting and TS planning mtg. On 8/15, Joshua Lambert 2017 goals review. On 8/15, Due diligence weekly meeting. On 8/16, interview Sr Project Engineer candidate. On 8/17, Tech services weekly meeting. On 8/18, Joshua Lambert DS-1 training approval. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 On 8/14, Pluspetrol clarifications and ESA. On 8/15, support Hibernia Top Drive upgrade. On 8/15, KOC kickoff meeting. Pluspetrol ESA scoep of work. On 8/16, Pluspetrol ESA Scope or fowrk and redlines. On 8/17, Top Drive upgrade planning meeting. On 8/18, Pluspetrol engineering clarifications. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-17 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 On 8/17, Kerui financial proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 8/14, weekly ops meeting and TS planning mtg. On 8/15, Joshua Lambert 2017 goals review. On 8/15, Due diligence weekly meeting. On 8/16, interview Sr Project Engineer candidate. On 8/17, Tech services weekly meeting. On 8/18, Joshua Lambert DS-1 training approval. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 On 8/14, Pluspetrol clarifications and ESA. On 8/15, support Hibernia Top Drive upgrade. On 8/15, KOC kickoff meeting. Pluspetrol ESA scoep of work. On 8/16, Pluspetrol ESA Scope or fowrk and redlines. On 8/17, Top Drive upgrade planning meeting. On 8/18, Pluspetrol engineering clarifications. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 8/14, weekly ops meeting and TS planning mtg. On 8/15, Joshua Lambert 2017 goals review. On 8/15, Due diligence weekly meeting. On 8/16, interview Sr Project Engineer candidate. On 8/17, Tech services weekly meeting. On 8/18, Joshua Lambert DS-1 training approval. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-18 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 4 0 On 8/18, White Rose Extension O&M EOI questionaire. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 8/14, Pluspetrol clarifications and ESA. On 8/15, support Hibernia Top Drive upgrade. On 8/15, KOC kickoff meeting. Pluspetrol ESA scoep of work. On 8/16, Pluspetrol ESA Scope or fowrk and redlines. On 8/17, Top Drive upgrade planning meeting. On 8/18, Pluspetrol engineering clarifications. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 5 0 On 8/21, attend NOV Hibernia Top Drive conf call. Support Option 1 Top Drive upgrade scope of work document. On 8/24, Hibernia Top drive upgrade conference call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 8/21, weekly ops call. TS weekly planning meeting. On 8/23, Sr Project Engineer feedback meeting. On 8/24, TS weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 8/22, Argentina YPFB (3) rig O&M conference call for equipment survey estimate. On 8/22 and 8/23, assemble rig equipment survey cost estimate for LABU YPFB opportunity. On 8/23 and 8/24, assemble rig builder SWOT and financing summary. Assemble Husky EOI technical response. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 8/21, weekly ops call. TS weekly planning meeting. On 8/23, Sr Project Engineer feedback meeting. On 8/24, TS weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 On 8/22, Argentina YPFB (3) rig O&M conference call for equipment survey estimate. On 8/22 and 8/23, assemble rig equipment survey cost estimate for LABU YPFB opportunity. On 8/23 and 8/24, assemble rig builder SWOT and financing summary. Assemble Husky EOI technical response. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 On 8/21, attend NOV Hibernia Top Drive conf call. Support Option 1 Top Drive upgrade scope of work document. On 8/24, Hibernia Top drive upgrade conference call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 8/21, weekly ops call. TS weekly planning meeting. On 8/23, Sr Project Engineer feedback meeting. On 8/24, TS weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 On 8/22, Argentina YPFB (3) rig O&M conference call for equipment survey estimate. On 8/22 and 8/23, assemble rig equipment survey cost estimate for LABU YPFB opportunity. On 8/23 and 8/24, assemble rig builder SWOT and financing summary. Assemble Husky EOI technical response. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-25 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 8/25, PTO in prep for Hurricane Harvey landfall. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 On 8/28, attend Wood Group & Exxon conf call for Hibernia Top Drive upgrade. Support scope of work document. On 8/31, finalize and approve Hibernia scope of work with Wood Group comments. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 8/28, attend weekly ops conf call.On 8/28-8/30, work from home and coordinate with TS for Harvey response.On 8/31, finalize IMS scope of work template and route for comment. On 9/1, timesheets and organize desktop. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 8/28, assemble Husky WRE pre-Ops support org chart. On 8/29, attend Husky WRE conf call. On 8/30, attend WRE Wood Group conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 On 8/28, attend weekly ops conf call.On 8/28-8/30, work from home and coordinate with TS for Harvey response.On 8/31, finalize IMS scope of work template and route for comment. On 9/1, timesheets and organize desktop. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 On 8/28, assemble Husky WRE pre-Ops support org chart. On 8/29, attend Husky WRE conf call. On 8/30, attend WRE Wood Group conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 On 8/28, attend weekly ops conf call.On 8/28-8/30, work from home and coordinate with TS for Harvey response.On 8/31, finalize IMS scope of work template and route for comment. On 9/1, timesheets and organize desktop. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 8/28, assemble Husky WRE pre-Ops support org chart. On 8/29, attend Husky WRE conf call. On 8/30, attend WRE Wood Group conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-31 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 On 8/28, attend Wood Group & Exxon conf call for Hibernia Top Drive upgrade. Support scope of work document. On 8/31, finalize and approve Hibernia scope of work with Wood Group comments. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-08-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 On 8/28, attend weekly ops conf call.On 8/28-8/30, work from home and coordinate with TS for Harvey response.On 8/31, finalize IMS scope of work template and route for comment. On 9/1, timesheets and organize desktop. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 8/28, attend weekly ops conf call.On 8/28-8/30, work from home and coordinate with TS for Harvey response.On 8/31, finalize IMS scope of work template and route for comment. On 9/1, timesheets and organize desktop. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-01 OH-011 :OH-011 Overhead All Activities Regular Pay N 4 0 On 9/1, Friday half day. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-01 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 On 9/1, IT online training Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 On 9/4, labor day holiday. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-05 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 On 9/5, Kerui proposal review. On 9/6, KOC finance conf call lead by Srijit. KOC rig builder finance meeting.Finance On 9/7, KOC SCM conf call for H PCG and down payment response. On 9/8, reviewed TDX-1000 auxiliary requirements. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 On 9/5, monthly goals review. Review MOCR for Scope of Work template with S. Licea for final routing. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-06 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 On 9/5, Kerui proposal review. On 9/6, KOC finance conf call lead by Srijit. KOC rig builder finance meeting.Finance On 9/7, KOC SCM conf call for H PCG and down payment response. On 9/8, reviewed TDX-1000 auxiliary requirements. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-06 OH-014 :OH-014 Overhead All Activities Regular Pay N 3 0 On 9/6, Legal training for Parker Drilling leaders. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-07 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 On 9/5, Kerui proposal review. On 9/6, KOC finance conf call lead by Srijit. KOC rig builder finance meeting.Finance On 9/7, KOC SCM conf call for H PCG and down payment response. On 9/8, reviewed TDX-1000 auxiliary requirements. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-07 OH-011 :OH-011 Overhead All Activities Regular Pay N 7 0 On 9/7, perform Hurricane Harvey repairs to Bruce Korver house. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-08 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 On 9/5, Kerui proposal review. On 9/6, KOC finance conf call lead by Srijit. KOC rig builder finance meeting.Finance On 9/7, KOC SCM conf call for H PCG and down payment response. On 9/8, reviewed TDX-1000 auxiliary requirements. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-08 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 7 0 On 9/8, formatted and submitted Husky White Rose Extension EOI Tech Services responses. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 9/8, provide Oracle MR entry guidance to Matt Kuehn with T. Mikitsionak support. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 9/11, weekly Ops meeting. M. Keuhn Oracle access. TS planning mtg. Support Krechet doc turnover presentation. On 9/12, M. Kuehn Oracle access. Support Krechet doc turnover presentation. On 9/13 and 9/14, progress WBS code IMS standard in support of KOC LLE and Rig AFE's. On 9/13, TS weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-11 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 5 0 On 9/11, complete Husky EOI TS response. On 9/14, YPFb rig equipment survey meeting. Monthly TS OFI review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-12 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 On 9/12, KOC HH financing response. On 9/13, Kuwait financing options meeting. HH LOC mtg. On 9/14, KOC histogram review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 9/11, weekly Ops meeting. M. Keuhn Oracle access. TS planning mtg. Support Krechet doc turnover presentation. On 9/12, M. Kuehn Oracle access. Support Krechet doc turnover presentation. On 9/13 and 9/14, progress WBS code IMS standard in support of KOC LLE and Rig AFE's. On 9/13, TS weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-13 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 On 9/12, KOC HH financing response. On 9/13, Kuwait financing options meeting. HH LOC mtg. On 9/14, KOC histogram review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 9/11, weekly Ops meeting. M. Keuhn Oracle access. TS planning mtg. Support Krechet doc turnover presentation. On 9/12, M. Kuehn Oracle access. Support Krechet doc turnover presentation. On 9/13 and 9/14, progress WBS code IMS standard in support of KOC LLE and Rig AFE's. On 9/13, TS weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 9/13, attend Top Drive VFD House location meeting and support/guide potential Top Drive upgrade project. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-14 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 On 9/12, KOC HH financing response. On 9/13, Kuwait financing options meeting. HH LOC mtg. On 9/14, KOC histogram review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 On 9/11, weekly Ops meeting. M. Keuhn Oracle access. TS planning mtg. Support Krechet doc turnover presentation. On 9/12, M. Kuehn Oracle access. Support Krechet doc turnover presentation. On 9/13 and 9/14, progress WBS code IMS standard in support of KOC LLE and Rig AFE's. On 9/13, TS weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-14 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 1 0 On 9/11, complete Husky EOI TS response. On 9/14, YPFb rig equipment survey meeting. Monthly TS OFI review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 9/15, PTO. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-18 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 On 9/18, histogram review. On 9/19, histogram review. On 9/22, KOC rates and subcontracts meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 9/18, timesheet and timesheet approvals, receive TDI Uganda PO and invoice in Oracle, Berkut Oracle asset links planning. On 9/19, TS weekly planning mtg and OFI asset #'s mtg. On 9/20, review Berkut Oracle asset link scope of work with S. Ghadge. On 9/21, TS weekly mtg and Oracle Projects module. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 9/18, weekly Ops mtg. On 9/19, Hibernia VFD house location. On 9/20, Hibernia Wood Group weekly mtg. On 9/21, Hibernia weekly Wood Group mtg and TDI Angola PO. On 9/22, Hibernia Top Drive project schedule template. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-18 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 On 9/18, CRT rental training. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 On 9/18, histogram review. On 9/19, histogram review. On 9/22, KOC rates and subcontracts meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 9/18, timesheet and timesheet approvals, receive TDI Uganda PO and invoice in Oracle, Berkut Oracle asset links planning. On 9/19, TS weekly planning mtg and OFI asset #'s mtg. On 9/20, review Berkut Oracle asset link scope of work with S. Ghadge. On 9/21, TS weekly mtg and Oracle Projects module. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 9/18, weekly Ops mtg. On 9/19, Hibernia VFD house location. On 9/20, Hibernia Wood Group weekly mtg. On 9/21, Hibernia weekly Wood Group mtg and TDI Angola PO. On 9/22, Hibernia Top Drive project schedule template. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 9/18, timesheet and timesheet approvals, receive TDI Uganda PO and invoice in Oracle, Berkut Oracle asset links planning. On 9/19, TS weekly planning mtg and OFI asset #'s mtg. On 9/20, review Berkut Oracle asset link scope of work with S. Ghadge. On 9/21, TS weekly mtg and Oracle Projects module. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 9/18, weekly Ops mtg. On 9/19, Hibernia VFD house location. On 9/20, Hibernia Wood Group weekly mtg. On 9/21, Hibernia weekly Wood Group mtg and TDI Angola PO. On 9/22, Hibernia Top Drive project schedule template. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 9/18, timesheet and timesheet approvals, receive TDI Uganda PO and invoice in Oracle, Berkut Oracle asset links planning. On 9/19, TS weekly planning mtg and OFI asset #'s mtg. On 9/20, review Berkut Oracle asset link scope of work with S. Ghadge. On 9/21, TS weekly mtg and Oracle Projects module. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 On 9/18, weekly Ops mtg. On 9/19, Hibernia VFD house location. On 9/20, Hibernia Wood Group weekly mtg. On 9/21, Hibernia weekly Wood Group mtg and TDI Angola PO. On 9/22, Hibernia Top Drive project schedule template. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-22 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 On 9/18, histogram review. On 9/19, histogram review. On 9/22, KOC rates and subcontracts meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 9/18, weekly Ops mtg. On 9/19, Hibernia VFD house location. On 9/20, Hibernia Wood Group weekly mtg. On 9/21, Hibernia weekly Wood Group mtg and TDI Angola PO. On 9/22, Hibernia Top Drive project schedule template. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-22 OH-011 :OH-011 Overhead All Activities Regular Pay N 4 0 On 9/22, 1/2 day Friday Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 On 9/25, weekly Ops meeting. On 9/27, continue supporting NOV survey scope of work development. Review Berkut asset links with S. Ghadge. On 9/28, NOV presentation Legacy rigs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 On 9/25, monthly reviews M. Kuehn & J. Lambert. Timesheet and timesheet approvals. On 9/25, 9/26, develop WBS standard. On 9/26, support engineers to develop Top Drive survey scope of work. On 9/27, HR Tools testing meeting. On 9/27, Hibernia survey scope of work. Hibernia Pm project. Conf call for Hibernia PM On 9/25, timesheet and approvals. On 9/28, weekly TS mtg. On 9/29, conference call for handover of Hibernia PM optimization project from Arctic BU to Tech Services. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-26 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 On 9/26, review subcontracts redlines. On 9/28, Kuwait financing options conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 On 9/25, monthly reviews M. Kuehn & J. Lambert. Timesheet and timesheet approvals. On 9/25, 9/26, develop WBS standard. On 9/26, support engineers to develop Top Drive survey scope of work. On 9/27, HR Tools testing meeting. On 9/27, Hibernia survey scope of work. Hibernia Pm project. Conf call for Hibernia PM On 9/25, timesheet and approvals. On 9/28, weekly TS mtg. On 9/29, conference call for handover of Hibernia PM optimization project from Arctic BU to Tech Services. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 On 9/26 and 9/27, support EPC contractor survey scope definition and conference call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 On 9/25, weekly Ops meeting. On 9/27, continue supporting NOV survey scope of work development. Review Berkut asset links with S. Ghadge. On 9/28, NOV presentation Legacy rigs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 On 9/25, monthly reviews M. Kuehn & J. Lambert. Timesheet and timesheet approvals. On 9/25, 9/26, develop WBS standard. On 9/26, support engineers to develop Top Drive survey scope of work. On 9/27, HR Tools testing meeting. On 9/27, Hibernia survey scope of work. Hibernia Pm project. Conf call for Hibernia PM On 9/25, timesheet and approvals. On 9/28, weekly TS mtg. On 9/29, conference call for handover of Hibernia PM optimization project from Arctic BU to Tech Services. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-28 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 On 9/26, review subcontracts redlines. On 9/28, Kuwait financing options conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-28 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 On 9/26 and 9/27, support EPC contractor survey scope definition and conference call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 On 9/25, weekly Ops meeting. On 9/27, continue supporting NOV survey scope of work development. Review Berkut asset links with S. Ghadge. On 9/28, NOV presentation Legacy rigs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 9/25, monthly reviews M. Kuehn & J. Lambert. Timesheet and timesheet approvals. On 9/25, 9/26, develop WBS standard. On 9/26, support engineers to develop Top Drive survey scope of work. On 9/27, HR Tools testing meeting. On 9/27, Hibernia survey scope of work. Hibernia Pm project. Conf call for Hibernia PM On 9/25, timesheet and approvals. On 9/28, weekly TS mtg. On 9/29, conference call for handover of Hibernia PM optimization project from Arctic BU to Tech Services. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 On 9/28 and 9/29, Pluspetrol commercial and technical clarifications. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 9/25, monthly reviews M. Kuehn & J. Lambert. Timesheet and timesheet approvals. On 9/25, 9/26, develop WBS standard. On 9/26, support engineers to develop Top Drive survey scope of work. On 9/27, HR Tools testing meeting. On 9/27, Hibernia survey scope of work. Hibernia Pm project. Conf call for Hibernia PM On 9/25, timesheet and approvals. On 9/28, weekly TS mtg. On 9/29, conference call for handover of Hibernia PM optimization project from Arctic BU to Tech Services. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 9/28 and 9/29, Pluspetrol commercial and technical clarifications. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-09-29 OH-011 :OH-011 Overhead All Activities Regular Pay N 3 0 On 9/29, 1/2 day Friday Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 10/2, weekly TS mtg. On 10/2, interview Sr Project Engineer candidate. On 10/4, travel requests. On 10/5, TS mtg. Hibernia equipment life extension mtg with S. Carmichael and J. Lambert. Monthly goals review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 On 10/2, weekly Ops mtg. Pluspetrol rig build conf call. On 10/3, BD review of SCM. On 10/5, Pluspetrol clarifications. On 10/6, Pluspetrol proposal clarifications. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-03 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 On 10/3, KOC estimate review. On 10/4, Vallourec t's & c's comments. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 10/2, weekly TS mtg. On 10/2, interview Sr Project Engineer candidate. On 10/4, travel requests. On 10/5, TS mtg. Hibernia equipment life extension mtg with S. Carmichael and J. Lambert. Monthly goals review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 10/2, weekly Ops mtg. Pluspetrol rig build conf call. On 10/3, BD review of SCM. On 10/5, Pluspetrol clarifications. On 10/6, Pluspetrol proposal clarifications. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-04 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 On 10/3, KOC estimate review. On 10/4, Vallourec t's & c's comments. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 On 10/4, conference call with HMDC for PM review workshop agenda and timing. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 10/2, weekly TS mtg. On 10/2, interview Sr Project Engineer candidate. On 10/4, travel requests. On 10/5, TS mtg. Hibernia equipment life extension mtg with S. Carmichael and J. Lambert. Monthly goals review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 On 10/2, weekly Ops mtg. Pluspetrol rig build conf call. On 10/3, BD review of SCM. On 10/5, Pluspetrol clarifications. On 10/6, Pluspetrol proposal clarifications. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 On 10/5, RDS & HMDC conf call Top Drive EPC contractor scope of work. On 10/6, support Top Drive controls integration scope of work. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 On 10/2, weekly TS mtg. On 10/2, interview Sr Project Engineer candidate. On 10/4, travel requests. On 10/5, TS mtg. Hibernia equipment life extension mtg with S. Carmichael and J. Lambert. Monthly goals review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 On 10/2, weekly Ops mtg. Pluspetrol rig build conf call. On 10/3, BD review of SCM. On 10/5, Pluspetrol clarifications. On 10/6, Pluspetrol proposal clarifications. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-06 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 On 10/5, RDS & HMDC conf call Top Drive EPC contractor scope of work. On 10/6, support Top Drive controls integration scope of work. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 10/2, weekly TS mtg. On 10/2, interview Sr Project Engineer candidate. On 10/4, travel requests. On 10/5, TS mtg. Hibernia equipment life extension mtg with S. Carmichael and J. Lambert. Monthly goals review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 10/2, weekly Ops mtg. Pluspetrol rig build conf call. On 10/3, BD review of SCM. On 10/5, Pluspetrol clarifications. On 10/6, Pluspetrol proposal clarifications. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-06 OH-011 :OH-011 Overhead All Activities Regular Pay N 1 0 On 10/6, 1/2 day time off. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 10/9, timesheet approvals. On 10/11, TS budget review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-09 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 On 10/9 and 10/10, negotiation training. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-10 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 On 10/9 and 10/10, negotiation training. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-11 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 On 10/11, Kuwait financing meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-11 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 On 10/11, Wood Group survey scope of work findings. On 10/13, assembled Hibernia Top Drive cost estimate option 1. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-11 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 On 10/11, organize PM review by phase. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 On 10/11, NOV Hibernia scope of work survey review. On 10/12, Hibernia Top Drive conf call with NOV. On 10/12, searched for HP mud 5" elbow and wel neck MTRs in as-built docs. On 10/13, attended NOV Amphion meeting for Hibernia Top Drive Upgrade. On 10/13, continue estimate formatting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 10/9, timesheet approvals. On 10/11, TS budget review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 10/11, Kuwait financing options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 On 10/11, NOV Hibernia scope of work survey review. On 10/12, Hibernia Top Drive conf call with NOV. On 10/12, searched for HP mud 5" elbow and wel neck MTRs in as-built docs. On 10/13, attended NOV Amphion meeting for Hibernia Top Drive Upgrade. On 10/13, continue estimate formatting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-13 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 On 10/11, Wood Group survey scope of work findings. On 10/13, assembled Hibernia Top Drive cost estimate option 1. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 On 10/11, NOV Hibernia scope of work survey review. On 10/12, Hibernia Top Drive conf call with NOV. On 10/12, searched for HP mud 5" elbow and wel neck MTRs in as-built docs. On 10/13, attended NOV Amphion meeting for Hibernia Top Drive Upgrade. On 10/13, continue estimate formatting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-16 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 On 10/16, attend Kerui and HH lease proposal meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 On 10/16, send Drawworks FAT reports to Sakhalin Ops for drawworks downtime event. On 10/18, support Sachin Ghadge format and complete survey report. On 10/19, attend derrick analysis review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 10/16, support Tyler with commissioning go-by reports. On 10/16, CFO meet and greet. TS weekly planning meeting. WebEx setup for Hibernia. On 10/18, webex set up. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 10/16, weekly ops meeting. on 10/19, review YPFb Inspection services tender. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 On 10/17, Hibernia Top Drive Cost Estimate. On 10/18, review Accumulator Survey Scope of Work. Review Sachin Ghadge Survey report. On 10/19, EPCI estimate for Top Drive Upgrade. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-17 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 On 10/17, create progress tracker for PM review tasks. On 10/18, set up progress tracker. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 10/16, support Tyler with commissioning go-by reports. On 10/16, CFO meet and greet. TS weekly planning meeting. WebEx setup for Hibernia. On 10/18, webex set up. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-18 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 On 10/17, Hibernia Top Drive Cost Estimate. On 10/18, review Accumulator Survey Scope of Work. Review Sachin Ghadge Survey report. On 10/19, EPCI estimate for Top Drive Upgrade. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-18 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 On 10/17, create progress tracker for PM review tasks. On 10/18, set up progress tracker. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 On 10/16, send Drawworks FAT reports to Sakhalin Ops for drawworks downtime event. On 10/18, support Sachin Ghadge format and complete survey report. On 10/19, attend derrick analysis review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 10/16, support Tyler with commissioning go-by reports. On 10/16, CFO meet and greet. TS weekly planning meeting. WebEx setup for Hibernia. On 10/18, webex set up. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-19 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 4 0 On 10/17, Hibernia Top Drive Cost Estimate. On 10/18, review Accumulator Survey Scope of Work. Review Sachin Ghadge Survey report. On 10/19, EPCI estimate for Top Drive Upgrade. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 On 10/16, send Drawworks FAT reports to Sakhalin Ops for drawworks downtime event. On 10/18, support Sachin Ghadge format and complete survey report. On 10/19, attend derrick analysis review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 10/16, weekly ops meeting. on 10/19, review YPFb Inspection services tender. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 10/20, PTO. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-23 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 On 10/23, meet with SCM to hold all KOC Supplier contract negotiations. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-23 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 On 10/23, assemble workshop agenda and travel schedule. On 10/24, progress phase tracker. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 On 10/23, support Sakhalin Krechet Area Supt with Rotary Table Free-rotating specs. Provide BOP control system parts lists to Tommy Jones and provide Krechet equipment library links to T. Jones. On 10/24, search for Krechet HP mud MTRs. Support Sakhalin Eng Supv with Rig as-built docs library. on 10/25, support Hibernia Top Drive schedule and estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 On 10/23, weekly TS meeting. Revise and sign Hibernia Sept and Oct timesheets. On 10/24, J. Lambert monthly Performance Review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 10/23, weekly ops mtg. On 10/24, progress YPFb tender clarifications, scope of work and estimate. Timesheets. On 10/25, host conf call for YPFb clarifications. On 10/26, YPFb rig equipment survey revised CTR and histogram and conf call. On 10/27, YPFb equip review Tender responses. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-24 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 On 10/24, review VFD House rating and obtain benchmarks. On 10/25, Wood conf call for Top Drive scope of work. On 10/26, NOV conf call for NOV action items. On 10/27, cost estimate and schedule development. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-24 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 0.5 0 On 10/23, assemble workshop agenda and travel schedule. On 10/24, progress phase tracker. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 On 10/23, support Sakhalin Krechet Area Supt with Rotary Table Free-rotating specs. Provide BOP control system parts lists to Tommy Jones and provide Krechet equipment library links to T. Jones. On 10/24, search for Krechet HP mud MTRs. Support Sakhalin Eng Supv with Rig as-built docs library. on 10/25, support Hibernia Top Drive schedule and estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 10/23, weekly TS meeting. Revise and sign Hibernia Sept and Oct timesheets. On 10/24, J. Lambert monthly Performance Review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 10/23, weekly ops mtg. On 10/24, progress YPFb tender clarifications, scope of work and estimate. Timesheets. On 10/25, host conf call for YPFb clarifications. On 10/26, YPFb rig equipment survey revised CTR and histogram and conf call. On 10/27, YPFb equip review Tender responses. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-25 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 On 10/24, review VFD House rating and obtain benchmarks. On 10/25, Wood conf call for Top Drive scope of work. On 10/26, NOV conf call for NOV action items. On 10/27, cost estimate and schedule development. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 On 10/23, support Sakhalin Krechet Area Supt with Rotary Table Free-rotating specs. Provide BOP control system parts lists to Tommy Jones and provide Krechet equipment library links to T. Jones. On 10/24, search for Krechet HP mud MTRs. Support Sakhalin Eng Supv with Rig as-built docs library. on 10/25, support Hibernia Top Drive schedule and estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 10/23, weekly ops mtg. On 10/24, progress YPFb tender clarifications, scope of work and estimate. Timesheets. On 10/25, host conf call for YPFb clarifications. On 10/26, YPFb rig equipment survey revised CTR and histogram and conf call. On 10/27, YPFb equip review Tender responses. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-25 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 On 10/25, Service desk training. On 10/26, legal make up training. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-26 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 On 10/24, review VFD House rating and obtain benchmarks. On 10/25, Wood conf call for Top Drive scope of work. On 10/26, NOV conf call for NOV action items. On 10/27, cost estimate and schedule development. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 On 10/23, weekly ops mtg. On 10/24, progress YPFb tender clarifications, scope of work and estimate. Timesheets. On 10/25, host conf call for YPFb clarifications. On 10/26, YPFb rig equipment survey revised CTR and histogram and conf call. On 10/27, YPFb equip review Tender responses. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-26 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 On 10/25, Service desk training. On 10/26, legal make up training. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-27 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 3 0 On 10/24, review VFD House rating and obtain benchmarks. On 10/25, Wood conf call for Top Drive scope of work. On 10/26, NOV conf call for NOV action items. On 10/27, cost estimate and schedule development. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 On 10/23, weekly ops mtg. On 10/24, progress YPFb tender clarifications, scope of work and estimate. Timesheets. On 10/25, host conf call for YPFb clarifications. On 10/26, YPFb rig equipment survey revised CTR and histogram and conf call. On 10/27, YPFb equip review Tender responses. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-30 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 On 10/30, review TD scope of work, PLC upgrade list and add edits/comments. On 10/31, review TD upgrade full project schedule. Review objectives of DDAS integration scope of work document and alternate quote from Setpoint. On 11/1, Wood conf call for TD upgrade scope and budget development. On 11/2, Hibernia NOV weekly mtg to define Top drive upgrade scope and cost estimate. Review cost estimate with team for new scope changes in VFD house (A0). Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 On 10/30, send summary findings for HP mud piping MTRs in Keppel Amfels rig documentation to M Dejonovic. Begin assembling NCR content. On 11/1, review S Ghadge Berkut asset links for Oracle PM manuals required by IMS and ENL. Review NCR basis with C Gorrell And B Flud for Keppel Amfels material traceability documents. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 10/30 timesheet approvals. Weekly TS mtg. On 10/31, monthly goals review with M Kuehn. Organize and meet with team for process to rebill expense reports. On 11/2, TS weekly mtg. 2018 budget review. On 11/3 timesheet and approvals. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 On 10/30, weekly Ops mtg. Organize St. John's PM review travel. On 10/31, Husky WRE mtg to prep for mtg with Wood in St. John's. Organize St John's travel. On 11/1, develop Husky WRE ppt slides for mtg in St. John's next week. Review C Gorrell LABU rig equipment survey histogram. On 11/2, Angola TDI due diligence. Husky WRE Pre-Ops office and ops startup schedule mtg with N Henley and M. Todd/. LABU rig equipment survey conf call for Tender response. Continue developing Husky WRE ppt slides for Wood mtg in St. John's next week. Support C Gorrell for LABU rig equipment survey histogram, experience and schedule. On 11/3, LABU pluspetrol peer review and support. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-31 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 On 10/30, review TD scope of work, PLC upgrade list and add edits/comments. On 10/31, review TD upgrade full project schedule. Review objectives of DDAS integration scope of work document and alternate quote from Setpoint. On 11/1, Wood conf call for TD upgrade scope and budget development. On 11/2, Hibernia NOV weekly mtg to define Top drive upgrade scope and cost estimate. Review cost estimate with team for new scope changes in VFD house (A0). Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 10/30 timesheet approvals. Weekly TS mtg. On 10/31, monthly goals review with M Kuehn. Organize and meet with team for process to rebill expense reports. On 11/2, TS weekly mtg. 2018 budget review. On 11/3 timesheet and approvals. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-10-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 On 10/30, weekly Ops mtg. Organize St. John's PM review travel. On 10/31, Husky WRE mtg to prep for mtg with Wood in St. John's. Organize St John's travel. On 11/1, develop Husky WRE ppt slides for mtg in St. John's next week. Review C Gorrell LABU rig equipment survey histogram. On 11/2, Angola TDI due diligence. Husky WRE Pre-Ops office and ops startup schedule mtg with N Henley and M. Todd/. LABU rig equipment survey conf call for Tender response. Continue developing Husky WRE ppt slides for Wood mtg in St. John's next week. Support C Gorrell for LABU rig equipment survey histogram, experience and schedule. On 11/3, LABU pluspetrol peer review and support. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 On 10/30, review TD scope of work, PLC upgrade list and add edits/comments. On 10/31, review TD upgrade full project schedule. Review objectives of DDAS integration scope of work document and alternate quote from Setpoint. On 11/1, Wood conf call for TD upgrade scope and budget development. On 11/2, Hibernia NOV weekly mtg to define Top drive upgrade scope and cost estimate. Review cost estimate with team for new scope changes in VFD house (A0). Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-01 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 On 11/1, PM review meeting to status tracker and plan workshop agenda. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 On 10/30, send summary findings for HP mud piping MTRs in Keppel Amfels rig documentation to M Dejonovic. Begin assembling NCR content. On 11/1, review S Ghadge Berkut asset links for Oracle PM manuals required by IMS and ENL. Review NCR basis with C Gorrell And B Flud for Keppel Amfels material traceability documents. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 On 10/30, weekly Ops mtg. Organize St. John's PM review travel. On 10/31, Husky WRE mtg to prep for mtg with Wood in St. John's. Organize St John's travel. On 11/1, develop Husky WRE ppt slides for mtg in St. John's next week. Review C Gorrell LABU rig equipment survey histogram. On 11/2, Angola TDI due diligence. Husky WRE Pre-Ops office and ops startup schedule mtg with N Henley and M. Todd/. LABU rig equipment survey conf call for Tender response. Continue developing Husky WRE ppt slides for Wood mtg in St. John's next week. Support C Gorrell for LABU rig equipment survey histogram, experience and schedule. On 11/3, LABU pluspetrol peer review and support. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-02 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 2 0 On 10/30, review TD scope of work, PLC upgrade list and add edits/comments. On 10/31, review TD upgrade full project schedule. Review objectives of DDAS integration scope of work document and alternate quote from Setpoint. On 11/1, Wood conf call for TD upgrade scope and budget development. On 11/2, Hibernia NOV weekly mtg to define Top drive upgrade scope and cost estimate. Review cost estimate with team for new scope changes in VFD house (A0). Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 On 10/30 timesheet approvals. Weekly TS mtg. On 10/31, monthly goals review with M Kuehn. Organize and meet with team for process to rebill expense reports. On 11/2, TS weekly mtg. 2018 budget review. On 11/3 timesheet and approvals. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6.5 0 On 10/30, weekly Ops mtg. Organize St. John's PM review travel. On 10/31, Husky WRE mtg to prep for mtg with Wood in St. John's. Organize St John's travel. On 11/1, develop Husky WRE ppt slides for mtg in St. John's next week. Review C Gorrell LABU rig equipment survey histogram. On 11/2, Angola TDI due diligence. Husky WRE Pre-Ops office and ops startup schedule mtg with N Henley and M. Todd/. LABU rig equipment survey conf call for Tender response. Continue developing Husky WRE ppt slides for Wood mtg in St. John's next week. Support C Gorrell for LABU rig equipment survey histogram, experience and schedule. On 11/3, LABU pluspetrol peer review and support. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 10/30 timesheet approvals. Weekly TS mtg. On 10/31, monthly goals review with M Kuehn. Organize and meet with team for process to rebill expense reports. On 11/2, TS weekly mtg. 2018 budget review. On 11/3 timesheet and approvals. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 On 10/30, weekly Ops mtg. Organize St. John's PM review travel. On 10/31, Husky WRE mtg to prep for mtg with Wood in St. John's. Organize St John's travel. On 11/1, develop Husky WRE ppt slides for mtg in St. John's next week. Review C Gorrell LABU rig equipment survey histogram. On 11/2, Angola TDI due diligence. Husky WRE Pre-Ops office and ops startup schedule mtg with N Henley and M. Todd/. LABU rig equipment survey conf call for Tender response. Continue developing Husky WRE ppt slides for Wood mtg in St. John's next week. Support C Gorrell for LABU rig equipment survey histogram, experience and schedule. On 11/3, LABU pluspetrol peer review and support. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 On 11/6 and 11/10, travel from Houston to St. John's and St. John's to Houston. On 11/7, prepare slides and agenda material for PM refresh kickoff workshop in St. John's. On 11/8 and 11/9, PM refresh kickoff workshop in St. John's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-06 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 On 11/6 and 11/10, additional hours of travel from Houston to St. John's and St. John's to Houston. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-07 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 On 11/7 and 11/8, support review and optimization of Wood Top drive estimate to reduce power cables. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 On 11/6 and 11/10, travel from Houston to St. John's and St. John's to Houston. On 11/7, prepare slides and agenda material for PM refresh kickoff workshop in St. John's. On 11/8 and 11/9, PM refresh kickoff workshop in St. John's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 11/7 and 11/8, timesheets and general opportunity support. Rate sheet. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-08 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 On 11/7 and 11/8, support review and optimization of Wood Top drive estimate to reduce power cables. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 On 11/6 and 11/10, travel from Houston to St. John's and St. John's to Houston. On 11/7, prepare slides and agenda material for PM refresh kickoff workshop in St. John's. On 11/8 and 11/9, PM refresh kickoff workshop in St. John's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 11/7 and 11/8, timesheets and general opportunity support. Rate sheet. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 On 11/6 and 11/10, travel from Houston to St. John's and St. John's to Houston. On 11/7, prepare slides and agenda material for PM refresh kickoff workshop in St. John's. On 11/8 and 11/9, PM refresh kickoff workshop in St. John's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-09 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 6 0 On 11/9, Wood meeting in St. John's for Husky WRE. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-10 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 On 11/6 and 11/10, travel from Houston to St. John's and St. John's to Houston. On 11/7, prepare slides and agenda material for PM refresh kickoff workshop in St. John's. On 11/8 and 11/9, PM refresh kickoff workshop in St. John's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-10 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 On 11/6 and 11/10, additional hours of travel from Houston to St. John's and St. John's to Houston. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 On 11/13, St. John's timesheet and timesheet procedure for PM Refresh team. Meeting with L. Wilson for review of potential TS contract work scope. On 11/14, review timesheets. Set up webex. On 11/15, expense report support and cost tracking for PM project. On 11/16, TS mtg and Orlan DCDM asset #'s for Oracle links. On 11/17, Orlan asset #'s and Hibernia TD estimate review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 11/13, weekly Ops meeting and weekly TS dept planning mtg. Review and support BP platform opportunities. Rig equipment survey meeting for experience documents. On 11/14, LABU rig equipment survey support. On 11/15, Total presentation mtg and BD support. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-14 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 On 11/14, Wood Budgetary estimate optimization conference call. On 11/17, review estimate and drill pipe specs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-14 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 On 11/14, PM refresh weekly meeting to progress action tracker. Set up bi-weekly meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 11/13, St. John's timesheet and timesheet procedure for PM Refresh team. Meeting with L. Wilson for review of potential TS contract work scope. On 11/14, review timesheets. Set up webex. On 11/15, expense report support and cost tracking for PM project. On 11/16, TS mtg and Orlan DCDM asset #'s for Oracle links. On 11/17, Orlan asset #'s and Hibernia TD estimate review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 On 11/13, weekly Ops meeting and weekly TS dept planning mtg. Review and support BP platform opportunities. Rig equipment survey meeting for experience documents. On 11/14, LABU rig equipment survey support. On 11/15, Total presentation mtg and BD support. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 11/13, St. John's timesheet and timesheet procedure for PM Refresh team. Meeting with L. Wilson for review of potential TS contract work scope. On 11/14, review timesheets. Set up webex. On 11/15, expense report support and cost tracking for PM project. On 11/16, TS mtg and Orlan DCDM asset #'s for Oracle links. On 11/17, Orlan asset #'s and Hibernia TD estimate review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 On 11/13, weekly Ops meeting and weekly TS dept planning mtg. Review and support BP platform opportunities. Rig equipment survey meeting for experience documents. On 11/14, LABU rig equipment survey support. On 11/15, Total presentation mtg and BD support. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 9 0 On 11/13, St. John's timesheet and timesheet procedure for PM Refresh team. Meeting with L. Wilson for review of potential TS contract work scope. On 11/14, review timesheets. Set up webex. On 11/15, expense report support and cost tracking for PM project. On 11/16, TS mtg and Orlan DCDM asset #'s for Oracle links. On 11/17, Orlan asset #'s and Hibernia TD estimate review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-17 Hibernia Platform :Hibernia Platform TSR-01583-HIBP Top Drive & Control System Upgrade Regular Pay N 1 0 On 11/14, Wood Budgetary estimate optimization conference call. On 11/17, review estimate and drill pipe specs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 11/13, St. John's timesheet and timesheet procedure for PM Refresh team. Meeting with L. Wilson for review of potential TS contract work scope. On 11/14, review timesheets. Set up webex. On 11/15, expense report support and cost tracking for PM project. On 11/16, TS mtg and Orlan DCDM asset #'s for Oracle links. On 11/17, Orlan asset #'s and Hibernia TD estimate review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 11/20, 11/21, 11/22, PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-21 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 11/20, 11/21, 11/22, PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 11/20, 11/21, 11/22, PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-23 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 On 11/23 and 11/24, Thanksgiving Holiday. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-24 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 On 11/23 and 11/24, Thanksgiving Holiday. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 On 11/30 and 12/1, support J. Lambert CTR revisions & Client discussions. On 11/27, Canadian code comments for Hibernia Top drive Wood scope of work. Support with procurement options and drill pipe upgrade. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 11/30, break apart 5,032 page Hibernia Derrick manual for PM team use. On 12/1, start breaking apart 640 page Derrick MRB for PM team use. On 11/30, goals discussion with J. Lambert. 11/29, Goals discussion with M. Kuehn. Hibernia Estimate support. On 11/28 OFI meeting. On 11/27 weekly TS mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 11/29, attend Kvaerner conf call. On 11/28, Kerui lunch. On 11/27, weekly BD update. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-28 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 On 11/29, bi-weekly PM Refresh conference call. On 11/28, prep action tracker and PM tracker. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 On 11/30 and 12/1, support J. Lambert CTR revisions & Client discussions. On 11/27, Canadian code comments for Hibernia Top drive Wood scope of work. Support with procurement options and drill pipe upgrade. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 11/30, break apart 5,032 page Hibernia Derrick manual for PM team use. On 12/1, start breaking apart 640 page Derrick MRB for PM team use. On 11/30, goals discussion with J. Lambert. 11/29, Goals discussion with M. Kuehn. Hibernia Estimate support. On 11/28 OFI meeting. On 11/27 weekly TS mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 11/29, attend Kvaerner conf call. On 11/28, Kerui lunch. On 11/27, weekly BD update. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-29 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 On 11/29, bi-weekly PM Refresh conference call. On 11/28, prep action tracker and PM tracker. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 11/30, break apart 5,032 page Hibernia Derrick manual for PM team use. On 12/1, start breaking apart 640 page Derrick MRB for PM team use. On 11/30, goals discussion with J. Lambert. 11/29, Goals discussion with M. Kuehn. Hibernia Estimate support. On 11/28 OFI meeting. On 11/27 weekly TS mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 11/29, attend Kvaerner conf call. On 11/28, Kerui lunch. On 11/27, weekly BD update. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-29 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 On 11/29, internal controls refresher training. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 On 11/30 and 12/1, support J. Lambert CTR revisions & Client discussions. On 11/27, Canadian code comments for Hibernia Top drive Wood scope of work. Support with procurement options and drill pipe upgrade. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-11-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 On 11/30, break apart 5,032 page Hibernia Derrick manual for PM team use. On 12/1, start breaking apart 640 page Derrick MRB for PM team use. On 11/30, goals discussion with J. Lambert. 11/29, Goals discussion with M. Kuehn. Hibernia Estimate support. On 11/28 OFI meeting. On 11/27 weekly TS mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 On 11/30 and 12/1, support J. Lambert CTR revisions & Client discussions. On 11/27, Canadian code comments for Hibernia Top drive Wood scope of work. Support with procurement options and drill pipe upgrade. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 11/30, break apart 5,032 page Hibernia Derrick manual for PM team use. On 12/1, start breaking apart 640 page Derrick MRB for PM team use. On 11/30, goals discussion with J. Lambert. 11/29, Goals discussion with M. Kuehn. Hibernia Estimate support. On 11/28 OFI meeting. On 11/27 weekly TS mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 5 0 On 12/5, PM review internal weekly meeting with Asset mgt. On 12/4, separated Rotary table OEM manual into 22 separate pdf files for ease of locating maintenance procedures, drawings and technical data. On 12/4, 12/5, and 12/7 separated Drawworks OEM manual into 21 separate pdf files for ease of locating maintenance procedures, drawings and technical data. On 12/4, separated Brake cooling unit OEM manual into 9 separate pdf files for ease of locating maintenance procedures, drawings and technical data. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 12/4, weekly Ops mtg. On 12/6, OFI monthly meeting. On 12/7 weekly TS meeting. On 12/6 & 12/7, plan Top Drive billable/non-billable split for next pre-feed phase and conf call with C Gorrell. On 12/8 timesheets. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 12/5, Kvaerner opportunity meeting. On 12/4 & 12/8, Kvaener ppt slides opportunity support. On 12/6, Hibernia BOM refresh meeting with SCM and Asset mgt. On 12/7, Hibernia BOM refresh conference call with St. John's Ops and issue meeting minutes. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 On 12/5, PM review internal weekly meeting with Asset mgt. On 12/4, separated Rotary table OEM manual into 22 separate pdf files for ease of locating maintenance procedures, drawings and technical data. On 12/4, 12/5, and 12/7 separated Drawworks OEM manual into 21 separate pdf files for ease of locating maintenance procedures, drawings and technical data. On 12/4, separated Brake cooling unit OEM manual into 9 separate pdf files for ease of locating maintenance procedures, drawings and technical data. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 12/5, Kvaerner opportunity meeting. On 12/4 & 12/8, Kvaener ppt slides opportunity support. On 12/6, Hibernia BOM refresh meeting with SCM and Asset mgt. On 12/7, Hibernia BOM refresh conference call with St. John's Ops and issue meeting minutes. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-05 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 On 12/5, Business Acumen training Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-06 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 3 0 On 12/6, provide preliminary review of DDM DC Top drive and gaps/technical clarifications for MHWirth to address. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 On 12/4, weekly Ops mtg. On 12/6, OFI monthly meeting. On 12/7 weekly TS meeting. On 12/6 & 12/7, plan Top Drive billable/non-billable split for next pre-feed phase and conf call with C Gorrell. On 12/8 timesheets. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 12/5, Kvaerner opportunity meeting. On 12/4 & 12/8, Kvaener ppt slides opportunity support. On 12/6, Hibernia BOM refresh meeting with SCM and Asset mgt. On 12/7, Hibernia BOM refresh conference call with St. John's Ops and issue meeting minutes. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 On 12/5, PM review internal weekly meeting with Asset mgt. On 12/4, separated Rotary table OEM manual into 22 separate pdf files for ease of locating maintenance procedures, drawings and technical data. On 12/4, 12/5, and 12/7 separated Drawworks OEM manual into 21 separate pdf files for ease of locating maintenance procedures, drawings and technical data. On 12/4, separated Brake cooling unit OEM manual into 9 separate pdf files for ease of locating maintenance procedures, drawings and technical data. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 12/4, weekly Ops mtg. On 12/6, OFI monthly meeting. On 12/7 weekly TS meeting. On 12/6 & 12/7, plan Top Drive billable/non-billable split for next pre-feed phase and conf call with C Gorrell. On 12/8 timesheets. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 On 12/5, Kvaerner opportunity meeting. On 12/4 & 12/8, Kvaener ppt slides opportunity support. On 12/6, Hibernia BOM refresh meeting with SCM and Asset mgt. On 12/7, Hibernia BOM refresh conference call with St. John's Ops and issue meeting minutes. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 12/4, weekly Ops mtg. On 12/6, OFI monthly meeting. On 12/7 weekly TS meeting. On 12/6 & 12/7, plan Top Drive billable/non-billable split for next pre-feed phase and conf call with C Gorrell. On 12/8 timesheets. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 12/5, Kvaerner opportunity meeting. On 12/4 & 12/8, Kvaener ppt slides opportunity support. On 12/6, Hibernia BOM refresh meeting with SCM and Asset mgt. On 12/7, Hibernia BOM refresh conference call with St. John's Ops and issue meeting minutes. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-11 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 On 12/13, bi-weekly conf call. On 12/11 and 12/13, review TDS6 pm plan revisions. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-11 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 5 0 On 12/14, Kvaerner conf call. On 12/11, 12/12 and 12/15, arctic platform opportunity prep and reasearch. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-12 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 4 0 On 12/12, review revised estimate, MH TD specs, Hibernia electrical system capacity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-12 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 On 12/14, Kvaerner conf call. On 12/11, 12/12 and 12/15, arctic platform opportunity prep and reasearch. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-12 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 On 12/12, compliance training. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-13 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 5 0 On 12/13, bi-weekly conf call. On 12/11 and 12/13, review TDS6 pm plan revisions. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 12/13 and 12/14, total slides review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 12/14, TS weekly mtg. On 12/15, TS projects planning mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 On 12/13 and 12/14, total slides review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-14 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 5 0 On 12/14, Kvaerner conf call. On 12/11, 12/12 and 12/15, arctic platform opportunity prep and reasearch. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 12/14, TS weekly mtg. On 12/15, TS projects planning mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-15 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 On 12/14, Kvaerner conf call. On 12/11, 12/12 and 12/15, arctic platform opportunity prep and reasearch. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-18 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 5 0 ON 12/18-21, travel and attendance at Kvaerner meetings in Oslo, Norway. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-18 OH-010 :OH-010 Overhead All Activities Regular Pay N 9 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-19 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 ON 12/18-21, travel and attendance at Kvaerner meetings in Oslo, Norway. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-19 OH-010 :OH-010 Overhead All Activities Regular Pay N 6 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-20 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 12 0 ON 12/18-21, travel and attendance at Kvaerner meetings in Oslo, Norway. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-21 OH-010 :OH-010 Overhead All Activities Regular Pay N 15 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-22 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 On 12/22, review NOV survey reports. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 12/22, timesheet, self assessment 2017 goals, expense report Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-22 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 ON 12/18-21, travel and attendance at Kvaerner meetings in Oslo, Norway. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-25 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 On 12/25, Christmas Holiday Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 12/26-12/29, PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 12/26-12/29, PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-28 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 12/26-12/29, PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2017-12-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 12/26-12/29, PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 On 1/1, New Years Holiday. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-02 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 9 0 On 1/2-1/5, Arctic platform research. Review and provide comments to Kvaerner proposal scope of work. Review draft execution plans with GE and team. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 1/3, review and comment on new draft project equipment procurement standards. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-03 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 5 0 On 1/2-1/5, Arctic platform research. Review and provide comments to Kvaerner proposal scope of work. Review draft execution plans with GE and team. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 1/3, review and comment on new draft project equipment procurement standards. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-04 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 7 0 On 1/2-1/5, Arctic platform research. Review and provide comments to Kvaerner proposal scope of work. Review draft execution plans with GE and team. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 On 1/5, review draft PKD survey report (NOV trip) and MH Wirth comp drive comparison Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 On 1/5, issue PM refresh weekly meetings. Review status with tteam. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-05 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 On 1/2-1/5, Arctic platform research. Review and provide comments to Kvaerner proposal scope of work. Review draft execution plans with GE and team. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 On 1/8, issue 2018 PM refresh mtg invites. On 1/9, PM refresh weekly mtg. Review MH Wirth surveys. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 1/8, weekly TS planning mtg. Review potential rig build advisor for possible TX rig build. On 1/9, review timesheets. On 1/10, review and edit Lambert and Kuehn PDRs. On1/11, TS weekly mtg. Mtg and plan Client owned asset tech docs site and std. TS Forecast mtg. On 1/12, review j. Lambert PDR. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 1/8, weekly Ops call. O&M assessments mtg. On 1/9, support Pluspetrol non-binding offer. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-08 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 On 1/8, consolidate Orlan reference as-builts on Q WIP drive. assemble OFI slides for Client owned asset sharepoint site. On 1/10, plan Delierables list and MDR with J. Lambert. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 On 1/9, review TD rail SOW,AC Top drive SOW, HPU SOW. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 On 1/8, issue 2018 PM refresh mtg invites. On 1/9, PM refresh weekly mtg. Review MH Wirth surveys. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 1/8, weekly TS planning mtg. Review potential rig build advisor for possible TX rig build. On 1/9, review timesheets. On 1/10, review and edit Lambert and Kuehn PDRs. On1/11, TS weekly mtg. Mtg and plan Client owned asset tech docs site and std. TS Forecast mtg. On 1/12, review j. Lambert PDR. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 1/8, weekly Ops call. O&M assessments mtg. On 1/9, support Pluspetrol non-binding offer. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-09 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 On 1/8, consolidate Orlan reference as-builts on Q WIP drive. assemble OFI slides for Client owned asset sharepoint site. On 1/10, plan Delierables list and MDR with J. Lambert. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 On 1/8, weekly TS planning mtg. Review potential rig build advisor for possible TX rig build. On 1/9, review timesheets. On 1/10, review and edit Lambert and Kuehn PDRs. On1/11, TS weekly mtg. Mtg and plan Client owned asset tech docs site and std. TS Forecast mtg. On 1/12, review j. Lambert PDR. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-10 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 On 1/8, consolidate Orlan reference as-builts on Q WIP drive. assemble OFI slides for Client owned asset sharepoint site. On 1/10, plan Delierables list and MDR with J. Lambert. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 On 1/8, weekly TS planning mtg. Review potential rig build advisor for possible TX rig build. On 1/9, review timesheets. On 1/10, review and edit Lambert and Kuehn PDRs. On1/11, TS weekly mtg. Mtg and plan Client owned asset tech docs site and std. TS Forecast mtg. On 1/12, review j. Lambert PDR. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-11 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 On 1/8, consolidate Orlan reference as-builts on Q WIP drive. assemble OFI slides for Client owned asset sharepoint site. On 1/10, plan Delierables list and MDR with J. Lambert. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 1/8, weekly TS planning mtg. Review potential rig build advisor for possible TX rig build. On 1/9, review timesheets. On 1/10, review and edit Lambert and Kuehn PDRs. On1/11, TS weekly mtg. Mtg and plan Client owned asset tech docs site and std. TS Forecast mtg. On 1/12, review j. Lambert PDR. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-12 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 4 0 On 1/12, prep for Husky WRE mtg in St. John's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 1/15, TS Planning mtg, timesheets. On 1/18, PDR revisions. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 1/19, review Orlan nat gas study options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-15 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 On 1/15, Concept study planning w/ J. Lambert. On 1/17, review MDR & Deliverables Lists and review MHWirth conf call actions. On 1/19, Minkit prep slides for Exxon mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-16 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 2 0 On 1/16, review Hibernia scopes of work. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 6 0 On 1/16 & 1/17, office closure due to iced roads. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-17 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 On 1/15, Concept study planning w/ J. Lambert. On 1/17, review MDR & Deliverables Lists and review MHWirth conf call actions. On 1/19, Minkit prep slides for Exxon mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 6 0 On 1/16 & 1/17, office closure due to iced roads. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-18 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 On 1/18, PM refresh weekly mtg. On 1/19, PM Refresh bi-weekly report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 1/15, TS Planning mtg, timesheets. On 1/18, PDR revisions. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-19 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 6 0 On 1/18, PM refresh weekly mtg. On 1/19, PM Refresh bi-weekly report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 1/19, review Orlan nat gas study options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-22 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 On 1/22, review Top Drive quotes and provide comments. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-22 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 On 1/22, prep for PM refresh mtgs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 1/22, approve timesheets and update cost report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-22 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 2 0 On 1/24, 1/25 prepare slides for WRE pre-Tender presentation to Husky. On 1/26, prepare slides with team and present to Husky in St. John's for pre-Tender phase. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-22 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 On 1/22 and 1/24, coordinate with Engineers to research nat gas gensets in the industry. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-23 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 0.5 0 On 1/22 and 1/24, coordinate with Engineers to research nat gas gensets in the industry. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-23 OH-010 :OH-010 Overhead All Activities Regular Pay N 8 0 On 1/22 and 1/26, round trip travel Houston to St. John's for Husky Pre-Tender presentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-24 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 8 0 On 1/24, 1/25 prepare slides for WRE pre-Tender presentation to Husky. On 1/26, prepare slides with team and present to Husky in St. John's for pre-Tender phase. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-24 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 On 1/22 and 1/24, coordinate with Engineers to research nat gas gensets in the industry. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-25 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 8 0 On 1/24, 1/25 prepare slides for WRE pre-Tender presentation to Husky. On 1/26, prepare slides with team and present to Husky in St. John's for pre-Tender phase. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-26 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 8 0 On 1/24, 1/25 prepare slides for WRE pre-Tender presentation to Husky. On 1/26, prepare slides with team and present to Husky in St. John's for pre-Tender phase. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-26 OH-010 :OH-010 Overhead All Activities Regular Pay N 7.5 0 On 1/22 and 1/26, round trip travel Houston to St. John's for Husky Pre-Tender presentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 1/29, weekly ops mtg. On 1/30, review PDRs. On 1/31, review asset numbering process with Ops and QHSE. On 2/1, projects summary histogram. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-29 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 3 0 On 1/29, Huksy presentation debrief. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-29 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 On 1/29, MInkit mtg prep. On 1/30, meeting at XOM office for Minkit. On 1/31, Minkit BOD. On 2/1, Minkit Basis of Design review. On 2/2, additional Minkit prep. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 1/29, weekly ops mtg. On 1/30, review PDRs. On 1/31, review asset numbering process with Ops and QHSE. On 2/1, projects summary histogram. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-30 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 On 1/29, MInkit mtg prep. On 1/30, meeting at XOM office for Minkit. On 1/31, Minkit BOD. On 2/1, Minkit Basis of Design review. On 2/2, additional Minkit prep. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 1/29, weekly ops mtg. On 1/30, review PDRs. On 1/31, review asset numbering process with Ops and QHSE. On 2/1, projects summary histogram. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-01-31 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 6 0 On 1/29, MInkit mtg prep. On 1/30, meeting at XOM office for Minkit. On 1/31, Minkit BOD. On 2/1, Minkit Basis of Design review. On 2/2, additional Minkit prep. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 1/29, weekly ops mtg. On 1/30, review PDRs. On 1/31, review asset numbering process with Ops and QHSE. On 2/1, projects summary histogram. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-01 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 On 1/29, MInkit mtg prep. On 1/30, meeting at XOM office for Minkit. On 1/31, Minkit BOD. On 2/1, Minkit Basis of Design review. On 2/2, additional Minkit prep. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-01 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 6 0 On 2/1 and 2/2, prepare Kickoff BOD slides subsea cable and rig comparison. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-02 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 On 1/29, MInkit mtg prep. On 1/30, meeting at XOM office for Minkit. On 1/31, Minkit BOD. On 2/1, Minkit Basis of Design review. On 2/2, additional Minkit prep. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-02 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 4 0 On 2/1 and 2/2, prepare Kickoff BOD slides subsea cable and rig comparison. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 2/5, timesheets. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-05 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 On 2/5-2/9, prep for and attend Minkit meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-05 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 4 0 On 2/5, 2/6, prepare BOD presentation slides. On 2/7, meet with Kvaerner to prepare consolidated kickoff slides. On 2/8, attend Kickoff workshop and present BOD slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-06 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 On 2/5-2/9, prep for and attend Minkit meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-06 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 4 0 On 2/5, 2/6, prepare BOD presentation slides. On 2/7, meet with Kvaerner to prepare consolidated kickoff slides. On 2/8, attend Kickoff workshop and present BOD slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-07 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 6 0 On 2/5-2/9, prep for and attend Minkit meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-07 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 2 0 On 2/5, 2/6, prepare BOD presentation slides. On 2/7, meet with Kvaerner to prepare consolidated kickoff slides. On 2/8, attend Kickoff workshop and present BOD slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-08 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 6 0 On 2/5-2/9, prep for and attend Minkit meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-08 TSR-01629 :TSR-01629 TSR-01629-001 February Kick-Off Meeting Regular Pay N 4 0 On 2/5, 2/6, prepare BOD presentation slides. On 2/7, meet with Kvaerner to prepare consolidated kickoff slides. On 2/8, attend Kickoff workshop and present BOD slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-09 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 8 0 On 2/5-2/9, prep for and attend Minkit meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 2/12, timesheets, weekly mtg and ops conf call. On 2/15, weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-12 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/12-2/16, continue BOD template and entries into BOD. Guide Minkit team formation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 On 2/12-2/16, continue BOD template and entries into BOD. On 2/13, XOM conf call update. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-13 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/12-2/16, continue BOD template and entries into BOD. Guide Minkit team formation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-13 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 2/12-2/16, continue BOD template and entries into BOD. On 2/13, XOM conf call update. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-14 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 On 2/14-2/16, PM review mtg, bi-weekly report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-14 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/12-2/16, continue BOD template and entries into BOD. Guide Minkit team formation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 2/12-2/16, continue BOD template and entries into BOD. On 2/13, XOM conf call update. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-15 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 On 2/14-2/16, PM review mtg, bi-weekly report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 2/12, timesheets, weekly mtg and ops conf call. On 2/15, weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-15 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/12-2/16, continue BOD template and entries into BOD. Guide Minkit team formation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-15 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 2/12-2/16, continue BOD template and entries into BOD. On 2/13, XOM conf call update. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-16 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 On 2/14-2/16, PM review mtg, bi-weekly report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-16 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/12-2/16, continue BOD template and entries into BOD. Guide Minkit team formation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-16 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 On 2/12-2/16, continue BOD template and entries into BOD. On 2/13, XOM conf call update. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 On 2/19, president's Day Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-20 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 On 2/02, 2/21, weekly PM refresh meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 2/20, timesheets Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-20 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/20-2/23, support and review BOD Deliverable. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 2/20-2/23, support and review BOD Deliverable. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-21 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 On 2/02, 2/21, weekly PM refresh meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-21 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/20-2/23, support and review BOD Deliverable. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 2/20-2/23, support and review BOD Deliverable. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/20-2/23, support and review BOD Deliverable. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 8 0 On 2/20-2/23, support and review BOD Deliverable. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/20-2/23, support and review BOD Deliverable. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 On 2/20-2/23, support and review BOD Deliverable. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 2/26, timesheet approvals, weekly TS planning mtg. On 3/1, provide final TS forecast comments for personnel. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 2/26, weekly Ops mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 6 0 On 2/26-3/2, present at Project Sponsor mtg. Attend KV weekly mtg. Review and comment BODs and 3D GAs. Review and edit KV Simple Engineering t's and c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-27 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 On 2/27, attend weekly PM refresh mtg. on 3/2, issue bi-weekly PM refresh report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/26-3/2, review and edit 3d GA's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 2/26-3/2, present at Project Sponsor mtg. Attend KV weekly mtg. Review and comment BODs and 3D GAs. Review and edit KV Simple Engineering t's and c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/26-3/2, review and edit 3d GA's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 8 0 On 2/26-3/2, present at Project Sponsor mtg. Attend KV weekly mtg. Review and comment BODs and 3D GAs. Review and edit KV Simple Engineering t's and c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-01 Hibernia Platform :Hibernia Platform TSR-01583-HIBP. (Non-Billable): Top Drive & Control System Upgrade Regular Pay N 1 0 On 3/1, review TD recommendation slides and provide comments/edits. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 2/26, timesheet approvals, weekly TS planning mtg. On 3/1, provide final TS forecast comments for personnel. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/26-3/2, review and edit 3d GA's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 2/26-3/2, present at Project Sponsor mtg. Attend KV weekly mtg. Review and comment BODs and 3D GAs. Review and edit KV Simple Engineering t's and c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 On 2/27, attend weekly PM refresh mtg. on 3/2, issue bi-weekly PM refresh report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-02 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 2/26-3/2, review and edit 3d GA's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 On 2/26-3/2, present at Project Sponsor mtg. Attend KV weekly mtg. Review and comment BODs and 3D GAs. Review and edit KV Simple Engineering t's and c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 On 3/5, weekly Ops mtg and weekly TS planning mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 3/5, timesheets and forecast mtg. On 3/9, HR mtg for J. Lambert promotion. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-05 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 On 3/5, 3/6, 3/7, review Holly Scope of Work document and provide comments. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/5-3/9, review 3d block GAs, Electrical philosophy slides and include KV comments into Execution slides, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 On 3/5-3/9, support KV t's and c's alignment, comment on BOD, review Electrical philosophy slides, include KV comments into Execution slides, assemble Kfels bulk $/ton rates for CAPEX Deliverable. Attend concept study conference calls. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 On 3/6, 3/7, PM review weekly mtgs (PKD and HMDC). Review Maintenance plan quality collection content with asset mgt. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 3/5, timesheets and forecast mtg. On 3/9, HR mtg for J. Lambert promotion. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-06 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2 0 On 3/5, 3/6, 3/7, review Holly Scope of Work document and provide comments. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/5-3/9, review 3d block GAs, Electrical philosophy slides and include KV comments into Execution slides, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 On 3/5-3/9, support KV t's and c's alignment, comment on BOD, review Electrical philosophy slides, include KV comments into Execution slides, assemble Kfels bulk $/ton rates for CAPEX Deliverable. Attend concept study conference calls. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 On 3/6, 3/7, PM review weekly mtgs (PKD and HMDC). Review Maintenance plan quality collection content with asset mgt. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-07 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2 0 On 3/5, 3/6, 3/7, review Holly Scope of Work document and provide comments. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-07 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/5-3/9, review 3d block GAs, Electrical philosophy slides and include KV comments into Execution slides, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-07 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 On 3/5-3/9, support KV t's and c's alignment, comment on BOD, review Electrical philosophy slides, include KV comments into Execution slides, assemble Kfels bulk $/ton rates for CAPEX Deliverable. Attend concept study conference calls. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/5-3/9, review 3d block GAs, Electrical philosophy slides and include KV comments into Execution slides, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-08 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 3/5-3/9, support KV t's and c's alignment, comment on BOD, review Electrical philosophy slides, include KV comments into Execution slides, assemble Kfels bulk $/ton rates for CAPEX Deliverable. Attend concept study conference calls. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 3/5, timesheets and forecast mtg. On 3/9, HR mtg for J. Lambert promotion. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-09 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/5-3/9, review 3d block GAs, Electrical philosophy slides and include KV comments into Execution slides, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-09 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 On 3/5-3/9, support KV t's and c's alignment, comment on BOD, review Electrical philosophy slides, include KV comments into Execution slides, assemble Kfels bulk $/ton rates for CAPEX Deliverable. Attend concept study conference calls. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On weekly Ops conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/12 and 3/13, support Concept Study CAPEX estimate Deliverable. On 3/14, support Concept development. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 6 0 On 3/12 and 3/13, support Concept Study CAPEX estimate Deliverable. On 3/14, attend Kvaerner weekly mtg and provide recommended actions. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/12 and 3/13, support Concept Study CAPEX estimate Deliverable. On 3/14, support Concept development. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 3/12 and 3/13, support Concept Study CAPEX estimate Deliverable. On 3/14, attend Kvaerner weekly mtg and provide recommended actions. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 On 3/14-3/16, Spring break PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/12 and 3/13, support Concept Study CAPEX estimate Deliverable. On 3/14, support Concept development. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 On 3/12 and 3/13, support Concept Study CAPEX estimate Deliverable. On 3/14, attend Kvaerner weekly mtg and provide recommended actions. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 3/14-3/16, Spring break PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 3/14-3/16, Spring break PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-19 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 On 3/19, 3/20, bi-weekly report and issue hold on PM refresh project. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 3/19, timesheets. On 3/22, TS weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 3/19, weekly ops mtg. On 3/20, Conf call for KOC SLB opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 On 3/19-3/23, Minkit CAPEX estimates, OPEX estimate, XOM conf calls, KV conf calls, KV PO t's & c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-20 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 On 3/19, 3/20, bi-weekly report and issue hold on PM refresh project. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 3/19, weekly ops mtg. On 3/20, Conf call for KOC SLB opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 On 3/19-3/23, Minkit CAPEX estimates, OPEX estimate, XOM conf calls, KV conf calls, KV PO t's & c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 3/19-3/23, Minkit CAPEX estimates, OPEX estimate, XOM conf calls, KV conf calls, KV PO t's & c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 3/19, timesheets. On 3/22, TS weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-22 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 6 0 On 3/19-3/23, Minkit CAPEX estimates, OPEX estimate, XOM conf calls, KV conf calls, KV PO t's & c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-23 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 3/19-3/23, Minkit CAPEX estimates, OPEX estimate, XOM conf calls, KV conf calls, KV PO t's & c's. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 3/26, timesheets and weekly TS mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 3/26, weekly Ops mtg . On 3/29, Total presentation review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/26-3/30, assemble Drillex cost, review CAPEX summary, review Risks. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/26-3/30, assemble Drillex cost, review CAPEX summary, review Risks. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/26-3/30, assemble Drillex cost, review CAPEX summary, review Risks. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 On 3/26, weekly Ops mtg . On 3/29, Total presentation review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/26-3/30, assemble Drillex cost, review CAPEX summary, review Risks. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 5 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-30 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 1 0 On 3/26-3/30, assemble Drillex cost, review CAPEX summary, review Risks. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-03-30 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 4/2, Weekly Ops mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 On 4/2-4/6, prepare Drillex estimate and Screening Report slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 On 4/4, weekly KV conf call and prepare report out slides. On 4/6, prepare and present Minkit report out slides Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 4/3, 4/4, complete talent mgt file. On 4/5, weekly TS mtg. On 4/5, review IMS contract templates with L. Wilson. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 On 4/2-4/6, prepare Drillex estimate and Screening Report slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 On 4/4, weekly KV conf call and prepare report out slides. On 4/6, prepare and present Minkit report out slides Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 On 4/4, PM refresh turnover conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 4/3, 4/4, complete talent mgt file. On 4/5, weekly TS mtg. On 4/5, review IMS contract templates with L. Wilson. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 On 4/2-4/6, prepare Drillex estimate and Screening Report slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 On 4/4, weekly KV conf call and prepare report out slides. On 4/6, prepare and present Minkit report out slides Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 4/3, 4/4, complete talent mgt file. On 4/5, weekly TS mtg. On 4/5, review IMS contract templates with L. Wilson. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 On 4/2-4/6, prepare Drillex estimate and Screening Report slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 On 4/4, weekly KV conf call and prepare report out slides. On 4/6, prepare and present Minkit report out slides Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 5 0 On 4/2-4/6, prepare Drillex estimate and Screening Report slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 On 4/4, weekly KV conf call and prepare report out slides. On 4/6, prepare and present Minkit report out slides Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 4/9, timesheets and 4/12 TS weekly mtg. On 4/10-4/13, support Minkit screening study closeout. On 4/11, review timesheet status with S. Wilson. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-09 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 7 0 On 4/9, present Minkit screening study at Exxon. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 9 0 On 4/9, timesheets and 4/12 TS weekly mtg. On 4/10-4/13, support Minkit screening study closeout. On 4/11, review timesheet status with S. Wilson. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 On 4/9, timesheets and 4/12 TS weekly mtg. On 4/10-4/13, support Minkit screening study closeout. On 4/11, review timesheet status with S. Wilson. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 4/11, review 257 engineering estimated hours with K. McMullen. Lunch meeting with Keppel Amfels (M. Holcomb, TO Cheung). Lunch meeting with Wood (A. Maitland). On 4/13, review HH, Bentec, NOV arctic rig solutions in prep for Deep Dive. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 On 4/9, timesheets and 4/12 TS weekly mtg. On 4/10-4/13, support Minkit screening study closeout. On 4/11, review timesheet status with S. Wilson. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 On 4/11, review 257 engineering estimated hours with K. McMullen. Lunch meeting with Keppel Amfels (M. Holcomb, TO Cheung). Lunch meeting with Wood (A. Maitland). On 4/13, review HH, Bentec, NOV arctic rig solutions in prep for Deep Dive. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 On 4/9, timesheets and 4/12 TS weekly mtg. On 4/10-4/13, support Minkit screening study closeout. On 4/11, review timesheet status with S. Wilson. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 On 4/11, review 257 engineering estimated hours with K. McMullen. Lunch meeting with Keppel Amfels (M. Holcomb, TO Cheung). Lunch meeting with Wood (A. Maitland). On 4/13, review HH, Bentec, NOV arctic rig solutions in prep for Deep Dive. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 4/16, weekly Ops conf call, TS weekly mtg. On 4/17, support ppt slides for MInkit non-arctic rig options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 4/17, minkit AAR mtg. On 4/19, TS weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 On 4/16, weekly Ops conf call, TS weekly mtg. On 4/17, support ppt slides for MInkit non-arctic rig options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-17 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 On 4/17, IMS IDR training. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 4/16, weekly Ops conf call, TS weekly mtg. On 4/17, support ppt slides for MInkit non-arctic rig options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 4/17, minkit AAR mtg. On 4/19, TS weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 4/16, weekly Ops conf call, TS weekly mtg. On 4/17, support ppt slides for MInkit non-arctic rig options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-20 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 On 4/20, vacation day. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 4/23, timesheet and approvals. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 On 4/23, weekly Ops mtg. On 4/23-4/27, support planning for Minkit Deep Dive; scope of work, value added engineering, assemble Krechet spec list. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 4/23, weekly Ops mtg. On 4/23-4/27, support planning for Minkit Deep Dive; scope of work, value added engineering, assemble Krechet spec list. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 4/23, weekly Ops mtg. On 4/23-4/27, support planning for Minkit Deep Dive; scope of work, value added engineering, assemble Krechet spec list. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 4/23, weekly Ops mtg. On 4/23-4/27, support planning for Minkit Deep Dive; scope of work, value added engineering, assemble Krechet spec list. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 4/23, weekly Ops mtg. On 4/23-4/27, support planning for Minkit Deep Dive; scope of work, value added engineering, assemble Krechet spec list. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 7 0 On 4/30, assemble Krechet spec list summary in preparation for MInkit Deep Dive. On 5/2, review Krechet spec list summary with KM, SG, JL, JR. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-04-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 4/30 weekly ops mtg. On 5/1, attend OTC technical papers Shell Malikai project and Hebron project, attend Kfels reception. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 On 4/30 weekly ops mtg. On 5/1, attend OTC technical papers Shell Malikai project and Hebron project, attend Kfels reception. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 7 0 On 4/30, assemble Krechet spec list summary in preparation for MInkit Deep Dive. On 5/2, review Krechet spec list summary with KM, SG, JL, JR. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-02 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 On 5/2, HSE Overview training. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 5/3, TS weekly mtg (J. Lambert reviewed DS-1 training, G. Osten reviewed Shell Malikai paper). On 5/4, monthly PDR review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 On 4/30 weekly ops mtg. On 5/1, attend OTC technical papers Shell Malikai project and Hebron project, attend Kfels reception. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 5/3, TS weekly mtg (J. Lambert reviewed DS-1 training, G. Osten reviewed Shell Malikai paper). On 5/4, monthly PDR review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 On 4/30 weekly ops mtg. On 5/1, attend OTC technical papers Shell Malikai project and Hebron project, attend Kfels reception. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 On 5/7, developed TS projects schedule and planned resources. On 5/9, review IMS contract procedures. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 5/8, review L. Wilson revised Contract procedure and associated new contract templates. On 5/10, attended TS forecast and TS engineering resource planning mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 5/7, weekly Ops mtg. On 5/8, assembled Holly project files on Q drive. On 5/9-5/11, discussions with K. McMullen regarding Total Uganda scope of work and planning. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 On 5/8, review L. Wilson revised Contract procedure and associated new contract templates. On 5/10, attended TS forecast and TS engineering resource planning mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 5/7, weekly Ops mtg. On 5/8, assembled Holly project files on Q drive. On 5/9-5/11, discussions with K. McMullen regarding Total Uganda scope of work and planning. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 On 5/7, developed TS projects schedule and planned resources. On 5/9, review IMS contract procedures. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 5/7, weekly Ops mtg. On 5/8, assembled Holly project files on Q drive. On 5/9-5/11, discussions with K. McMullen regarding Total Uganda scope of work and planning. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-09 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 On 5/9, 5/10 and 5/11, support Krechet vs. Berkut spec comparison in preparation for Concept deep dive. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-09 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 On 5/9, IP training session. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-10 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 On 5/10 and 5/11, create and review PM review turnover ppt slides with M. Anatra. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 5/8, review L. Wilson revised Contract procedure and associated new contract templates. On 5/10, attended TS forecast and TS engineering resource planning mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 5/7, weekly Ops mtg. On 5/8, assembled Holly project files on Q drive. On 5/9-5/11, discussions with K. McMullen regarding Total Uganda scope of work and planning. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-10 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 On 5/9, 5/10 and 5/11, support Krechet vs. Berkut spec comparison in preparation for Concept deep dive. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-11 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 On 5/10 and 5/11, create and review PM review turnover ppt slides with M. Anatra. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 On 5/7, weekly Ops mtg. On 5/8, assembled Holly project files on Q drive. On 5/9-5/11, discussions with K. McMullen regarding Total Uganda scope of work and planning. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-11 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 On 5/9, 5/10 and 5/11, support Krechet vs. Berkut spec comparison in preparation for Concept deep dive. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-14 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 On 5/14, review draft Pm review turnover ppt slides with St. John's office and Asset mgt. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 5/14, timesheets. On 5/15, review IMS contract procedures after comments were included into final version. On 5/17, IMS cost estimate and wbs template. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 On 5/14, weekly Ops call and weekly TS planning mtg. Minkit concept study response to Exxon. On 5/15, 5/16, Total Uganda mtg, provide input for Uganda schedule, project scope of work and provide draft project document list. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 5/14, timesheets. On 5/15, review IMS contract procedures after comments were included into final version. On 5/17, IMS cost estimate and wbs template. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 5/14, weekly Ops call and weekly TS planning mtg. Minkit concept study response to Exxon. On 5/15, 5/16, Total Uganda mtg, provide input for Uganda schedule, project scope of work and provide draft project document list. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 5/14, weekly Ops call and weekly TS planning mtg. Minkit concept study response to Exxon. On 5/15, 5/16, Total Uganda mtg, provide input for Uganda schedule, project scope of work and provide draft project document list. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 On 5/14, timesheets. On 5/15, review IMS contract procedures after comments were included into final version. On 5/17, IMS cost estimate and wbs template. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 5/18, PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 5/21, attend weekly ops meeting. On 5/21-5/25, review Total Uganda Appendix 9 tech spec and identify gaps and risks. Support T. Elenburg create Project Scope of Work for Total Uganda rig builds. Create project document list with estimated hours. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 5/21, attend weekly ops meeting. On 5/21-5/25, review Total Uganda Appendix 9 tech spec and identify gaps and risks. Support T. Elenburg create Project Scope of Work for Total Uganda rig builds. Create project document list with estimated hours. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 5/21, attend weekly ops meeting. On 5/21-5/25, review Total Uganda Appendix 9 tech spec and identify gaps and risks. Support T. Elenburg create Project Scope of Work for Total Uganda rig builds. Create project document list with estimated hours. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 On 5/24, TS weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 5/24 and 5/25, plan next Skills VX Lunch and Learn review session for department. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 On 5/21, attend weekly ops meeting. On 5/21-5/25, review Total Uganda Appendix 9 tech spec and identify gaps and risks. Support T. Elenburg create Project Scope of Work for Total Uganda rig builds. Create project document list with estimated hours. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 5/24 and 5/25, plan next Skills VX Lunch and Learn review session for department. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 On 5/21, attend weekly ops meeting. On 5/21-5/25, review Total Uganda Appendix 9 tech spec and identify gaps and risks. Support T. Elenburg create Project Scope of Work for Total Uganda rig builds. Create project document list with estimated hours. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 5/28, timesheets. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 On 5/28, attend weekly Ops mtg. On 5/28-6/1, support Uganda Appendix 9 gap analysis & review. Pull Uganda govt. regs for team. Review App. 9 technical gaps/risks with team. Continue storing project templates on Q drive for Uganda (rig build RFP). Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 5/28, attend weekly Ops mtg. On 5/28-6/1, support Uganda Appendix 9 gap analysis & review. Pull Uganda govt. regs for team. Review App. 9 technical gaps/risks with team. Continue storing project templates on Q drive for Uganda (rig build RFP). Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 5/28, attend weekly Ops mtg. On 5/28-6/1, support Uganda Appendix 9 gap analysis & review. Pull Uganda govt. regs for team. Review App. 9 technical gaps/risks with team. Continue storing project templates on Q drive for Uganda (rig build RFP). Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-05-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 5/28, attend weekly Ops mtg. On 5/28-6/1, support Uganda Appendix 9 gap analysis & review. Pull Uganda govt. regs for team. Review App. 9 technical gaps/risks with team. Continue storing project templates on Q drive for Uganda (rig build RFP). Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 5/28, attend weekly Ops mtg. On 5/28-6/1, support Uganda Appendix 9 gap analysis & review. Pull Uganda govt. regs for team. Review App. 9 technical gaps/risks with team. Continue storing project templates on Q drive for Uganda (rig build RFP). Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 6/4-6/8, support assembly/review of Total Uganda Rig build RFP. Continue gap analysis of Appendix 9 and HH quote and compile findings in project action item list. On 6/4, weekly Ops mtg. On 6/7, CAT meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 6/4-6/8, support assembly/review of Total Uganda Rig build RFP. Continue gap analysis of Appendix 9 and HH quote and compile findings in project action item list. On 6/4, weekly Ops mtg. On 6/7, CAT meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 6/4-6/8, support assembly/review of Total Uganda Rig build RFP. Continue gap analysis of Appendix 9 and HH quote and compile findings in project action item list. On 6/4, weekly Ops mtg. On 6/7, CAT meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 6/4-6/8, support assembly/review of Total Uganda Rig build RFP. Continue gap analysis of Appendix 9 and HH quote and compile findings in project action item list. On 6/4, weekly Ops mtg. On 6/7, CAT meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 On 6/4-6/8, support assembly/review of Total Uganda Rig build RFP. Continue gap analysis of Appendix 9 and HH quote and compile findings in project action item list. On 6/4, weekly Ops mtg. On 6/7, CAT meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 6/11-6/15, support assembly/review of Total Uganda Rig build RFP. On 6/11, weekly Ops mtg. On 6/7, CAT meetings. On 6/14 and 6/15, attend PanAmerican presentations, potential ITT. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 6/11-6/15, support assembly/review of Total Uganda Rig build RFP. On 6/11, weekly Ops mtg. On 6/7, CAT meetings. On 6/14 and 6/15, attend PanAmerican presentations, potential ITT. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 6/11-6/15, support assembly/review of Total Uganda Rig build RFP. On 6/11, weekly Ops mtg. On 6/7, CAT meetings. On 6/14 and 6/15, attend PanAmerican presentations, potential ITT. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 6/11-6/15, support assembly/review of Total Uganda Rig build RFP. On 6/11, weekly Ops mtg. On 6/7, CAT meetings. On 6/14 and 6/15, attend PanAmerican presentations, potential ITT. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 On 6/11-6/15, support assembly/review of Total Uganda Rig build RFP. On 6/11, weekly Ops mtg. On 6/7, CAT meetings. On 6/14 and 6/15, attend PanAmerican presentations, potential ITT. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 On 6/18-6/21, assign asset numbers to Orlan ops manuals on DCDM. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 On 6/18-6/21, support Uganda opportunity, planning documents, cash flow forecast. Monday morning weekly Ops mtg. On 6/21, NOV welldata, Drillwell presentation, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 On 6/18-6/21, assign asset numbers to Orlan ops manuals on DCDM. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 On 6/19, J. Lambert 2018 mid year review. On 6/21, weekly TS mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 On 6/18-6/21, support Uganda opportunity, planning documents, cash flow forecast. Monday morning weekly Ops mtg. On 6/21, NOV welldata, Drillwell presentation, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 On 6/18-6/21, assign asset numbers to Orlan ops manuals on DCDM. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 On 6/18-6/21, support Uganda opportunity, planning documents, cash flow forecast. Monday morning weekly Ops mtg. On 6/21, NOV welldata, Drillwell presentation, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 On 6/18-6/21, assign asset numbers to Orlan ops manuals on DCDM. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 On 6/19, J. Lambert 2018 mid year review. On 6/21, weekly TS mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 On 6/18-6/21, support Uganda opportunity, planning documents, cash flow forecast. Monday morning weekly Ops mtg. On 6/21, NOV welldata, Drillwell presentation, Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 6/22, PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-25 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 4 0 On 6/25-6/28, attend calls with Husky Whote Rose Ext Area Supt M. Wohl to support Husky WRE O&M tender Corpus Christi rate buildup. Review Husky O&M tender and meet with Eugene. On 6/29, meet with E. Ona for Corpus Christ rig crew and TS rate buildup. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Support J. Lambert Uganda opportunity HH project financing options and review cash flow forecasts. Attend weekly ops call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-26 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 4 0 On 6/25-6/28, attend calls with Husky Whote Rose Ext Area Supt M. Wohl to support Husky WRE O&M tender Corpus Christi rate buildup. Review Husky O&M tender and meet with Eugene. On 6/29, meet with E. Ona for Corpus Christ rig crew and TS rate buildup. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Support J. Lambert Uganda opportunity HH project financing options and review cash flow forecasts. Attend weekly ops call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 On 6/27, meet with M. Kuehn to complete mid-year review. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-27 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 4 0 On 6/25-6/28, attend calls with Husky Whote Rose Ext Area Supt M. Wohl to support Husky WRE O&M tender Corpus Christi rate buildup. Review Husky O&M tender and meet with Eugene. On 6/29, meet with E. Ona for Corpus Christ rig crew and TS rate buildup. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Support J. Lambert Uganda opportunity HH project financing options and review cash flow forecasts. Attend weekly ops call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-28 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 4 0 On 6/25-6/28, attend calls with Husky Whote Rose Ext Area Supt M. Wohl to support Husky WRE O&M tender Corpus Christi rate buildup. Review Husky O&M tender and meet with Eugene. On 6/29, meet with E. Ona for Corpus Christ rig crew and TS rate buildup. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Support J. Lambert Uganda opportunity HH project financing options and review cash flow forecasts. Attend weekly ops call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-29 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 4 0 On 6/25-6/28, attend calls with Husky Whote Rose Ext Area Supt M. Wohl to support Husky WRE O&M tender Corpus Christi rate buildup. Review Husky O&M tender and meet with Eugene. On 6/29, meet with E. Ona for Corpus Christ rig crew and TS rate buildup. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-06-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Support J. Lambert Uganda opportunity HH project financing options and review cash flow forecasts. Attend weekly ops call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 7/2 and 7/3, support Oxy BD mtg for Permian. Support Karma tech eval of rigs for XTO Permian. Support J. Lambert Uganda opportunity HH project financing options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 On 7/2 and 7/3, support Oxy BD mtg for Permian. Support Karma tech eval of rigs for XTO Permian. Support J. Lambert Uganda opportunity HH project financing options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 On 7/4, July 4th holiday. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 7/5, 7/6, PTO. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2018-07-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 7/5, 7/6, PTO. Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-01 2M-TEK :2M-TEK 1031 R&S 13-3/8” Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-02 2M-TEK :2M-TEK 1031 R&S 13-3/8” Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-03 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-04 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-05 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-08 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 2 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-08 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 6 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-09 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-10 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-11 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-12 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-22 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 4 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-22 2M-TEK :2M-TEK 1033 R&S Validate Welding Procedures Regular Pay N 4 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-23 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 4 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-23 2M-TEK :2M-TEK 1036 R&S ITS PO 50950 9-5/8” MM and 2 9-5/8” WM Regular Pay N 4 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-24 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 4 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-24 2M-TEK :2M-TEK 1036 R&S ITS PO 50950 9-5/8” MM and 2 9-5/8” WM Regular Pay N 4 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-25 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 4 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-25 2M-TEK :2M-TEK 1033 R&S Validate Welding Procedures Regular Pay N 2 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-25 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 2 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-26 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 4 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-26 2M-TEK :2M-TEK 1033 R&S Validate Welding Procedures Regular Pay N 2 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-26 2M-TEK :2M-TEK 1036 R&S ITS PO 50950 9-5/8” MM and 2 9-5/8” WM Regular Pay N 2 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-29 2M-TEK :2M-TEK 1036 R&S ITS PO 50950 9-5/8” MM and 2 9-5/8” WM Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-30 2M-TEK :2M-TEK 1036 R&S ITS PO 50950 9-5/8” MM and 2 9-5/8” WM Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-05-31 2M-TEK :2M-TEK 1036 R&S ITS PO 50950 9-5/8” MM and 2 9-5/8” WM Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-01 2M-TEK :2M-TEK 1036 R&S ITS PO 50950 9-5/8” MM and 2 9-5/8” WM Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-02 2M-TEK :2M-TEK 1036 R&S ITS PO 50950 9-5/8” MM and 2 9-5/8” WM Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-05 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-06 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 4 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-06 2M-TEK :2M-TEK 1036 R&S ITS PO 50950 9-5/8” MM and 2 9-5/8” WM Regular Pay N 4 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-07 2M-TEK :2M-TEK 1033 R&S Validate Welding Procedures Regular Pay N 4 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-07 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 2 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-07 2M-TEK :2M-TEK 1036 R&S ITS PO 50950 9-5/8” MM and 2 9-5/8” WM Regular Pay N 2 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-08 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 4 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-08 2M-TEK :2M-TEK 1033 R&S Validate Welding Procedures Regular Pay N 2 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-08 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 2 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-09 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-12 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-13 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-14 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-15 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-16 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-19 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-20 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-21 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-22 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-23 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 4 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-26 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-27 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-28 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-29 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-06-30 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-07-03 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-07-04 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-07-05 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-07-06 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-07-07 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-07-10 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-07-11 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-07-12 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-07-13 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-07-14 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-07-17 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-07-18 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-07-19 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-07-20 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-07-21 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-07-24 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-07-25 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-07-26 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-07-27 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-07-28 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-07-31 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-08-01 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-08-02 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-08-03 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-08-04 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-08-07 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-08-08 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-08-09 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-08-10 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-08-11 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-08-21 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-08-22 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-08-23 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-08-24 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Pizano, Fidel Welder Pizano, Fidel:Welder 2017-08-25 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Years Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Kanban stickys and meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet, transmitals Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-03 Rig 209L-TSR :Rig 209L-TSR TSR-01503-209L HP Mud Pump Spools Regular Pay N 1 0 Closeout Review, Vendor email coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-03 Rig 209L-TSR :Rig 209L-TSR TSR-01524-209L CRI Brine Transfer Line Regular Pay N 4 0 Drawing/MTO Review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-04 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-09 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 1.5 0 Odoptu Panic and Spool Vendor communication, Berkut CRI Valve Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Kanban meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Timesheet, administrative tasks, performance evaluation, Safety mo3ment, IMS moment Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-09 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly Meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-09 Rig 209L-TSR :Rig 209L-TSR TSR-01524-209L CRI Brine Transfer Line Regular Pay N 0.5 0 Drawing/MTO Review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-10 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 1 0 Odoptu Panic and Spool Vendor communication, Berkut CRI Valve Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Kanban meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet, administrative tasks, performance evaluation, Safety mo3ment, IMS moment Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-10 Rig 209L-TSR :Rig 209L-TSR TSR-01524-209L CRI Brine Transfer Line Regular Pay N 7 0 Drawing/MTO Review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Kanban meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 7.5 0 Timesheet, administrative tasks, performance evaluation, Safety mo3ment, IMS moment Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Kanban meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 Timesheet, administrative tasks, performance evaluation, Safety mo3ment, IMS moment Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-13 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-17 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-18 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 1.5 0 Odoptu HP Piping correspondance, Odoptu ATC Lite operation, Berkut CRI valve clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 Arctic hose research, seal temperature rating research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 CV revision, Timesheet overhead items Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-18 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 2 0 Mast Window Sketch review and meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-19 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 0.5 0 Odoptu HP Piping correspondance, Odoptu ATC Lite operation, Berkut CRI valve clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 CV revision, Timesheet overhead items Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-19 Rig 209L-TSR :Rig 209L-TSR TSR-01524-209L CRI Brine Transfer Line Regular Pay N 6 0 Began Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 CV revision, Timesheet overhead items Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Business Development meeting, TS meeting. kanban meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 timesheet, TS timesheet overhead items, CV revision, sharepoint permissions Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-23 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-23 Rig 209L-TSR :Rig 209L-TSR TSR-01524-209L CRI Brine Transfer Line Regular Pay N 1 0 Finished Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-24 ARBU-TSRs :ARBU-TSRs TSR-01529-ARBU 1st Quarter 2017 General Query- Sakhalin Regular Pay N 1.5 0 Odoptu ATC Lite Hose lengths, 270 tarps Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Business Development meeting, TS meeting. kanban meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Hibernia rig research, Hibernia sharepoint access, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet, TS timesheet overhead items, CV revision, sharepoint permissions Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-24 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 SAAB Lunch and Learn Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-24 Rig 209L-TSR :Rig 209L-TSR TSR-01524-209L CRI Brine Transfer Line Regular Pay N 1 0 Finished Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-25 ARBU-TSRs :ARBU-TSRs TSR-01534-ARBU 1st Quarter 2017 General Query - Alaska Regular Pay N 3 0 Gasket NACE Requirments Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Business Development meeting, TS meeting. kanban meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 Hibernia rig research, Hibernia sharepoint access, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, TS timesheet overhead items, CV revision, sharepoint permissions Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-25 Rig 209L-TSR :Rig 209L-TSR TSR-01524-209L CRI Brine Transfer Line Regular Pay N 1 0 Finished Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Business Development meeting, TS meeting. kanban meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 5.5 0 Hibernia rig research, Hibernia sharepoint access, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, TS timesheet overhead items, CV revision, sharepoint permissions Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-27 Hibernia Platform :Hibernia Platform TSR-01526-HIBP Mud Pump Jib/Overhead Crane/Hoist Regular Pay N 3 0 Reviewed TSR, RFI-001 Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Business Development meeting, TS meeting. kanban meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 timesheet, TS timesheet overhead items, CV revision, sharepoint permissions Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-30 Berkut-TSR :Berkut-TSR TSR-01540-BERP Trip Tank Line Flushing Regular Pay N 5 0 Drawing/MTO review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 kanban meeting, TS meeting, Hibernia conference call Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 TS timesheet table, timesheet, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 kanban meeting, TS meeting, Hibernia conference call Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 TS timesheet table, timesheet, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-01-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Kretchet Brochure Creation Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-01 Hibernia Platform :Hibernia Platform TSR-01526-HIBP Mud Pump Jib/Overhead Crane/Hoist Regular Pay N 4 0 Operations coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 kanban meeting, TS meeting, Hibernia conference call Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 TS timesheet table, timesheet, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-01 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Source IEC training Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-02 Berkut-TSR :Berkut-TSR TSR-01540-BERP Trip Tank Line Flushing Regular Pay N 3 0 Drawing/MTO review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 kanban meeting, TS meeting, Hibernia conference call Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 Hibernia Document control procedures/ Hibernia, hibernia research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 TS timesheet table, timesheet, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-03 Berkut-TSR :Berkut-TSR TSR-01540-BERP Trip Tank Line Flushing Regular Pay N 4 0 Drawing/MTO review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 kanban meeting, TS meeting, Hibernia conference call Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Hibernia Document control procedures/ Hibernia, hibernia research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 TS timesheet table, timesheet, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-06 Berkut-TSR :Berkut-TSR TSR-01540-BERP Trip Tank Line Flushing Regular Pay N 3 0 Completed drawing review, Began closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS meeting, daily TSR meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Packing and cleaning desk, cleaning drawers at unoccupied desks Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-06 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly Sakhalin meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-07 Berkut-TSR :Berkut-TSR TSR-01540-BERP Trip Tank Line Flushing Regular Pay N 6.5 0 Completed drawing review, Began closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS meeting, daily TSR meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Packing and cleaning desk, cleaning drawers at unoccupied desks Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-08 ARBU-TSRs :ARBU-TSRs TSR-01534-ARBU 1st Quarter 2017 General Query - Alaska Regular Pay N 3 0 Diverter Discharge Force Calculations Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS meeting, daily TSR meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Hibernia document control clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Packing and cleaning desk, cleaning drawers at unoccupied desks Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-08 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 1.5 0 TSR review, create CTR, design review, RFI, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 TS meeting, daily TSR meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Packing and cleaning desk, cleaning drawers at unoccupied desks Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-09 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 5 0 TSR review, create CTR, design review, RFI, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS meeting, daily TSR meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Packing and cleaning desk, cleaning drawers at unoccupied desks Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-10 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 2.5 0 TSR review, create CTR, design review, RFI, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS meeting, board meeting, quarterly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 TS tracker, timesheet, transfer performance review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-13 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Sakhalin meeting and update consolidation Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-13 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 2 0 drawing review, correspondence on scope increase Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-13 Rig 209L-TSR :Rig 209L-TSR TSR-01545-209L DSM-DM Steam Connection Regular Pay N 3.5 0 TSR review, create CTR, begin drawing/MTO review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-14 Berkut-TSR :Berkut-TSR TSR-01540-BERP Trip Tank Line Flushing Regular Pay N 1.5 0 finished closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS meeting, board meeting, quarterly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-14 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 4 0 drawing review, correspondence on scope increase Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-14 Rig 209L-TSR :Rig 209L-TSR TSR-01545-209L DSM-DM Steam Connection Regular Pay N 2 0 TSR review, create CTR, begin drawing/MTO review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS meeting, board meeting, quarterly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-15 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 2 0 drawing review, correspondence on scope increase Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-15 Rig 209L-TSR :Rig 209L-TSR TSR-01545-209L DSM-DM Steam Connection Regular Pay N 5.5 0 TSR review, create CTR, begin drawing/MTO review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 TS meeting, board meeting, quarterly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 diverter pressure research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-16 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 3 0 drawing review, correspondence on scope increase Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS meeting, board meeting, quarterly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 TS tracker, timesheet, transfer performance review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3.5 0 Calculations for mud mix pump pressure at hopper Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-19 OH-034 :OH-034 OH-034-011 Kuwait Regular Pay N 11 0 Attended GE Hydril BOP Double Pressure Test, worked on FAT report Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-20 OH-034 :OH-034 OH-034-011 Kuwait Regular Pay N 11 0 Attended GE Hydril BOP Double Pressure Test, worked on FAT report Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 finished performance review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 calculations for hopper pressure Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-21 OH-034 :OH-034 OH-034-011 Kuwait Regular Pay N 2 0 Attended GE Hydril BOP Double Pressure Test, worked on FAT report Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-21 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 1 0 Diverter discharge hood concept development, diverter stand review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-21 Rig 209L-TSR :Rig 209L-TSR TSR-01545-209L DSM-DM Steam Connection Regular Pay N 2 0 finished drawing/mto review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 research on BOP shear testing, Annular testing requirements Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-22 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Environmental Noise Control presentation Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-22 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 4 0 Diverter discharge hood concept development, diverter stand review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-23 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Time off from performing pressure tests over holiday weekend Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-24 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Time off from performing pressure tests over holiday weekend Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS meeting, Board meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-27 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Sakhalin meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-27 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 2 0 Drawing review, began closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-27 Rig 209L-TSR :Rig 209L-TSR TSR-01545-209L DSM-DM Steam Connection Regular Pay N 4 0 Completed Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS meeting, Board meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 correspondence of padeye, wellhead cover, and cellar drawing reviews without TSR, hopper pressure correspondence, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-28 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 1 0 Drawing review, began closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-02-28 Rig 209L-TSR :Rig 209L-TSR TSR-01545-209L DSM-DM Steam Connection Regular Pay N 4.5 0 Completed Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS meeting, Board meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 correspondence of padeye, wellhead cover, and cellar drawing reviews without TSR, hopper pressure correspondence, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-01 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 1 0 Drawing review, began closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-01 Rig 209L-TSR :Rig 209L-TSR TSR-01545-209L DSM-DM Steam Connection Regular Pay N 4.5 0 Completed Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 TS meeting, Board meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 hydraulic circuit design research, pneumatic regulator research, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-02 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 2 0 hydraulic opening mechanism design, pneumatic cylinder spec Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-02 Rig 209L-TSR :Rig 209L-TSR TSR-01542-209L Diverter Line Regular Pay N 1 0 Drawing review, began closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS meeting, Board meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 hydraulic circuit design research, pneumatic regulator research, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 correspondence of padeye, wellhead cover, and cellar drawing reviews without TSR, hopper pressure correspondence, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-03 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 2 0 hydraulic opening mechanism design, pneumatic cylinder spec Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-03 Rig 209L-TSR :Rig 209L-TSR TSR-01545-209L DSM-DM Steam Connection Regular Pay N 1 0 Completed Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 API research, B31.3 research, mousehole research, diverter discharge zoning, pipe schedule table Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-06 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly sakhalin meeting and update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 trip tank check valve failure check, Finished Diverter Closeout, API 505 support Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-06 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 3 0 Mousehole 2 spring concept and drawing search Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 API research, B31.3 research, mousehole research, diverter discharge zoning, pipe schedule table Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3.5 0 trip tank check valve failure check, Finished Diverter Closeout, API 505 support Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-07 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Mousehole 2 spring concept and drawing search Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 API research, B31.3 research, mousehole research, diverter discharge zoning, pipe schedule table Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, help with TSR tracker, new laptop help desk ticket Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 trip tank check valve failure check, Finished Diverter Closeout, API 505 support Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-08 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2 0 material allowable stesses, hazardous area questions Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-08 Rig 209L-TSR :Rig 209L-TSR TSR-01518-209L Completion Spooler Placement (DSM) Regular Pay N 2 0 Cylinder Quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 API research, B31.3 research, mousehole research, diverter discharge zoning, pipe schedule table Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, help with TSR tracker, new laptop help desk ticket Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 trip tank check valve failure check, Finished Diverter Closeout, API 505 support Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-09 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 material allowable stesses, hazardous area questions Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 API research, B31.3 research, mousehole research, diverter discharge zoning, pipe schedule table Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 timesheet, help with TSR tracker, new laptop help desk ticket Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 trip tank check valve failure check, Finished Diverter Closeout, API 505 support Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 pneumatics research, check valve research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-13 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 created overhead tracking sheet Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-13 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 skidding claw information, boiler house information, trip tank pump check valve information Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-14 OH-013 :OH-013 Overhead All Activities Regular Pay N 7.5 0 created overhead tracking sheet Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-15 OH-013 :OH-013 Overhead All Activities Regular Pay N 7.5 0 created overhead tracking sheet Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 pneumatics research, check valve research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 repaired broken cells on TSR tracking sheet, new computer hook up Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 skidding claw information, boiler house information, trip tank pump check valve information Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 repaired broken cells on TSR tracking sheet, new computer hook up Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 skidding claw information, boiler house information, trip tank pump check valve information Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 multiphase flow research for diverters, Bernoulis equations research, Diverter downhole pressure research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-20 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 unofficial weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 DSM claw documentation and root cause support Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-20 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2.5 0 Created table for 16" diverter line from API 64 Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 multiphase flow research for diverters, Bernoulis equations research, Diverter downhole pressure research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, TSR tracker fix Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 DSM claw documentation and root cause support Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-21 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2.5 0 Created table for 16" diverter line from API 64 Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 multiphase flow research for diverters, Bernoulis equations research, Diverter downhole pressure research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, TSR tracker fix Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 DSM claw documentation and root cause support Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-22 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 3 0 Created table for 16" diverter line from API 64 Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 DSM claw documentation and root cause support Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-23 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 5 0 Created table for 16" diverter line from API 64 Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 226 rig research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 226 PluPetrol Tender Gap Analysis spreadsheet and comment meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-27 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly sakhalin meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 226 PluPetrol Tender Gap Analysis spreadsheet and comment meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6.5 0 226 PluPetrol Tender Gap Analysis spreadsheet and comment meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-30 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 7 0 Solid works model creation, began simulation Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-03-31 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 7.5 0 Solid works model creation, began simulation Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, performance review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 226 PlusPetrol gap analysis and conference call Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-03 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-03 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 4 0 Model and simulate DSM failed claw, create new claw design Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, performance review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-04 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 KOC rig research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-04 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 5 0 Model and simulate DSM failed claw, create new claw design Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-05 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 247, 265, 269 KOC gap analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Board meeting, performance review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 KOC rig research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet, safety moment prep Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-06 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7.5 0 247, 265, 269 KOC gap analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, performance review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-07 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5.5 0 247, 265, 269 KOC gap analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, performance review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-07 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 2 0 Model and simulate DSM failed claw, create new claw design Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-10 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 247, 265, 269 KOC gap analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, performance review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-10 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-11 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2.5 0 247, 265, 269 KOC gap analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, performance review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-11 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 5 0 Model and simulate DSM failed claw, create new claw design Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Board meeting, performance review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet, safety moment prep Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-12 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 3.5 0 Model and simulate DSM failed claw, create new claw design Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-12 Rig 209L-TSR :Rig 209L-TSR TSR-01564-209L Diesel Day Tank Shut-Off Valves (Mechanical) Regular Pay N 1 0 TSR review and CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, performance review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 stress concentration and weld research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-13 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 3.5 0 Model and simulate DSM failed claw, create new claw design Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-13 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 2 0 Research and email to not recommend flap Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-14 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Good Friday Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-17 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-17 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 6 0 preliminary drawing creation, send drawings for quote drawing review, design simulation, calculation review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-18 ORLAN-TSR :ORLAN-TSR TSR-01565-ORLP Baker-Valves Regular Pay N 2 0 Vendor communications, working with Supply chain for flanges Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-18 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 5.5 0 preliminary drawing creation, send drawings for quote drawing review, design simulation, calculation review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-19 ORLAN-TSR :ORLAN-TSR TSR-01565-ORLP Baker-Valves Regular Pay N 1 0 Vendor communications, working with Supply chain for flanges Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-19 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 5.5 0 preliminary drawing creation, send drawings for quote drawing review, design simulation, calculation review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-20 ORLAN-TSR :ORLAN-TSR TSR-01565-ORLP Baker-Valves Regular Pay N 1 0 Vendor communications, working with Supply chain for flanges Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-20 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 6 0 preliminary drawing creation, send drawings for quote drawing review, design simulation, calculation review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-20 Rig 209L-TSR :Rig 209L-TSR TSR-01564-209L Diesel Day Tank Shut-Off Valves (Mechanical) Regular Pay N 0.5 0 reviewed MTO, began drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-21 ORLAN-TSR :ORLAN-TSR TSR-01565-ORLP Baker-Valves Regular Pay N 1.5 0 Vendor communications, working with Supply chain for flanges Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-21 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 preliminary drawing creation, send drawings for quote drawing review, design simulation, calculation review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-21 Rig 209L-TSR :Rig 209L-TSR TSR-01564-209L Diesel Day Tank Shut-Off Valves (Mechanical) Regular Pay N 5.5 0 reviewed MTO, began drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-24 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-24 ORLAN-TSR :ORLAN-TSR TSR-01565-ORLP Baker-Valves Regular Pay N 1 0 vendor clarifications, quote reviews Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-24 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 3 0 Fillet clarification, drawing review, quote review, repair clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-24 Rig 209L-TSR :Rig 209L-TSR TSR-01564-209L Diesel Day Tank Shut-Off Valves (Mechanical) Regular Pay N 2.5 0 drawing review, mto review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-25 ORLAN-TSR :ORLAN-TSR TSR-01565-ORLP Baker-Valves Regular Pay N 1 0 vendor clarifications, quote reviews Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-25 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 4.5 0 Fillet clarification, drawing review, quote review, repair clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-25 Rig 209L-TSR :Rig 209L-TSR TSR-01564-209L Diesel Day Tank Shut-Off Valves (Mechanical) Regular Pay N 2 0 drawing review, mto review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 submersible pump research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 OTC registration, timesheet Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-26 ORLAN-TSR :ORLAN-TSR TSR-01565-ORLP Baker-Valves Regular Pay N 1 0 vendor clarifications, quote reviews Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-26 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 Fillet clarification, drawing review, quote review, repair clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-26 Rig 209L-TSR :Rig 209L-TSR TSR-01564-209L Diesel Day Tank Shut-Off Valves (Mechanical) Regular Pay N 1 0 drawing review, mto review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-27 ORLAN-TSR :ORLAN-TSR TSR-01565-ORLP Baker-Valves Regular Pay N 1 0 vendor clarifications, quote reviews Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-27 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 Fillet clarification, drawing review, quote review, repair clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-27 Rig 209L-TSR :Rig 209L-TSR TSR-01567-209L Shaker Trough Regular Pay N 2 0 TSR review, pump selection Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-27 Rig 270L-TSR :Rig 270L-TSR TSR-01568-270L Rotary Hose Connection Spool Regular Pay N 3 0 drawing review, addition of 5 x 5 spool Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-28 ORLAN-TSR :ORLAN-TSR TSR-01565-ORLP Baker-Valves Regular Pay N 1 0 vendor clarifications, quote reviews Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-28 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 4 0 Fillet clarification, drawing review, quote review, repair clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-04-28 Rig 209L-TSR :Rig 209L-TSR TSR-01567-209L Shaker Trough Regular Pay N 2.5 0 TSR review, pump selection Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7.5 0 Researched choke bypass PO for inspection, Visited NOV for choke bypass inspection, corresponded to resolve issues, followup report of issues Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Researched choke bypass PO for inspection, Visited NOV for choke bypass inspection, corresponded to resolve issues, followup report of issues Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-02 ORLAN-TSR :ORLAN-TSR TSR-01565-ORLP Baker-Valves Regular Pay N 1 0 vendor clarification, woodco bevel sizing Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-02 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 3.5 0 Visited AMC to discuss construction drwaings, reviewed construction drawings, clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-02 Rig 209L-TSR :Rig 209L-TSR TSR-01570-209L Diverter Spool Inspection Regular Pay N 2 0 Visited AMC Conroe for final inspection, TPP clarifications, created TSR Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-03 OH-014 :OH-014 Overhead All Activities Regular Pay N 5 0 OTC Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-03 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 3 0 Visited AMC to discuss construction drwaings, reviewed construction drawings, clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Researched choke bypass PO for inspection, Visited NOV for choke bypass inspection, corresponded to resolve issues, followup report of issues Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-04 ORLAN-TSR :ORLAN-TSR TSR-01565-ORLP Baker-Valves Regular Pay N 1 0 vendor clarification, woodco bevel sizing Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-04 Rig 209L-TSR :Rig 209L-TSR TSR-01564-209L Diesel Day Tank Shut-Off Valves (Mechanical) Regular Pay N 3 0 Drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-04 Rig 209L-TSR :Rig 209L-TSR TSR-01567-209L Shaker Trough Regular Pay N 2 0 Pump research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-05 Rig 209L-TSR :Rig 209L-TSR TSR-01570-209L Diverter Spool Inspection Regular Pay N 8 0 Visited AMC Conroe for final inspection, TPP clarifications, created TSR Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-08 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-08 ORLAN-TSR :ORLAN-TSR TSR-01565-ORLP Baker-Valves Regular Pay N 1 0 vendor coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-08 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 AMC inspection, vendor coorespondance, daily updates Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-08 Rig 209L-TSR :Rig 209L-TSR TSR-01564-209L Diesel Day Tank Shut-Off Valves (Mechanical) Regular Pay N 3.5 0 Finished drawing review, Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-08 Rig 209L-TSR :Rig 209L-TSR TSR-01570-209L Diverter Spool Inspection Regular Pay N 1 0 Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-09 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 AMC inspection, vendor coorespondance, daily updates Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-09 Rig 209L-TSR :Rig 209L-TSR TSR-01564-209L Diesel Day Tank Shut-Off Valves (Mechanical) Regular Pay N 3.5 0 Finished drawing review, Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-09 Rig 209L-TSR :Rig 209L-TSR TSR-01567-209L Shaker Trough Regular Pay N 1 0 pump research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-09 Rig 209L-TSR :Rig 209L-TSR TSR-01570-209L Diverter Spool Inspection Regular Pay N 2 0 Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 steel material research, welding procedure and size research, weld inspection research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-10 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 AMC inspection, vendor coorespondance, daily updates Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-10 Rig 209L-TSR :Rig 209L-TSR TSR-01564-209L Diesel Day Tank Shut-Off Valves (Mechanical) Regular Pay N 2 0 Finished drawing review, Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-10 Rig 209L-TSR :Rig 209L-TSR TSR-01567-209L Shaker Trough Regular Pay N 1 0 pump research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 steel material research, welding procedure and size research, weld inspection research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-11 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Petro Control Systems Meeting for electric pop offs Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-11 ORLAN-TSR :ORLAN-TSR TSR-01565-ORLP Baker-Valves Regular Pay N 1 0 vendor coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-11 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 2 0 AMC inspection, vendor coorespondance, daily updates Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 Choke manifold bypass inspection Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-12 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 5 0 AMC inspection, vendor coorespondance, daily updates Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-15 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-15 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Follow up on choke manifold bypass inspection and missing blind flange. Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-15 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 6 0 Inspection of skidding shoe fabrication, daily update report,, paint clarification, quote for additional shoes Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3.5 0 Follow up on choke manifold bypass inspection and missing blind flange. Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-16 ORLAN-TSR :ORLAN-TSR TSR-01565-ORLP Baker-Valves Regular Pay N 1 0 vendor clarification, woodco update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-16 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 Inspection of skidding shoe fabrication, daily update report,, paint clarification, quote for additional shoes Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-16 Rig 270L-TSR :Rig 270L-TSR TSR-01568-270L Rotary Hose Connection Spool Regular Pay N 2 0 completed closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 OTC presentation, timesheet Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-17 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 6 0 Inspection of skidding shoe fabrication, daily update report,, paint clarification, quote for additional shoes Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Derrick research, pyro accumulator research, rotary hose research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Follow up on choke manifold bypass inspection and missing blind flange. Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-18 ORLAN-TSR :ORLAN-TSR TSR-01565-ORLP Baker-Valves Regular Pay N 1 0 vendor clarification, woodco update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-18 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 Inspection of skidding shoe fabrication, daily update report,, paint clarification, quote for additional shoes Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-18 Rig 270L-TSR :Rig 270L-TSR TSR-01568-270L Rotary Hose Connection Spool Regular Pay N 2 0 completed closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-19 ORLAN-TSR :ORLAN-TSR TSR-01565-ORLP Baker-Valves Regular Pay N 0.5 0 vendor clarification, woodco update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-19 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 6 0 Inspection of skidding shoe fabrication, daily update report,, paint clarification, quote for additional shoes Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-19 Rig 270L-TSR :Rig 270L-TSR TSR-01568-270L Rotary Hose Connection Spool Regular Pay N 1 0 completed closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board Meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-22 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-22 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 4 0 TSR review, began TPP, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-22 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 2 0 Coorespondance on DSM shipment and paint, new 14 shoe spare quote review, vendor coorespondance, Exxon clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-23 Hibernia Platform :Hibernia Platform TSR-01526-HIBP Mud Pump Jib/Overhead Crane/Hoist Regular Pay N 0.5 0 TSR review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 research of previous Orlan Choke TSR's 1274 & 1339, 3D model viewing program, assist Hibernia with TSR process Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 clean up of 7th floor rot, timesheet Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-23 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 TSR review, began TPP, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-23 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1.5 0 Coorespondance on DSM shipment and paint, new 14 shoe spare quote review, vendor coorespondance, Exxon clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 research of previous Orlan Choke TSR's 1274 & 1339, 3D model viewing program, assist Hibernia with TSR process Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-24 OH-014 :OH-014 Overhead All Activities Regular Pay N 0.5 0 introduction to Kerui Group Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-24 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 TSR review, began TPP, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-24 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 Coorespondance on DSM shipment and paint, new 14 shoe spare quote review, vendor coorespondance, Exxon clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-24 Rig 209L-TSR :Rig 209L-TSR TSR-01573-209L Wellhead Spreader Beam Regular Pay N 4 0 Solidworks Beam Analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board Meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 research of previous Orlan Choke TSR's 1274 & 1339, 3D model viewing program, assist Hibernia with TSR process Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-25 ORLAN-TSR :ORLAN-TSR TSR-01565-ORLP Baker-Valves Regular Pay N 1.5 0 coordinated final inspection, Attended pressure test Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-25 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 TSR review, began TPP, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-25 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 2.5 0 Coorespondance on DSM shipment and paint, new 14 shoe spare quote review, vendor coorespondance, Exxon clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 clean up of 7th floor rot, timesheet Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-26 ORLAN-TSR :ORLAN-TSR TSR-01565-ORLP Baker-Valves Regular Pay N 6 0 coordinated final inspection, Attended pressure test Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-29 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Memorial Day Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-30 Hibernia Platform :Hibernia Platform TSR-01526-HIBP Mud Pump Jib/Overhead Crane/Hoist Regular Pay N 1 0 Created CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-30 ORLAN-TSR :ORLAN-TSR TSR-01565-ORLP Baker-Valves Regular Pay N 1 0 created closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-30 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 Created CTR, TPP work, RFI Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-30 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 2 0 CTR revision, Vendor correspondence, quote clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-30 Rig 209L-TSR :Rig 209L-TSR TSR-01567-209L Shaker Trough Regular Pay N 0.5 0 status update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-30 Rig 270L-TSR :Rig 270L-TSR TSR-01569-270L BOP/Diverter Stack-Up Drawings Regular Pay N 1.5 0 created closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-31 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Hibernia continual improvement research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 timesheet, TSR process clarifications for Hiberia Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-31 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 3 0 Created CTR, TPP work, RFI Reck, John Engineer I 29656 Reck, John:Engineer I 2017-05-31 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 CTR revision, Vendor correspondence, quote clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board Meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Hibernia continual improvement research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, TSR process clarifications for Hiberia Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-01 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Kurui Introduction Session Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-01 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 Created CTR, TPP work, RFI Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-01 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 2 0 CTR revision, Vendor correspondence, quote clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-02 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 4 0 South Iraq 269 rig equipment list Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-02 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 Created CTR, TPP work, RFI Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-02 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 CTR revision, Vendor correspondence, quote clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-05 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 4 0 Clarifications on 247 walking system, South Iraq tender for 247, 269, 265, & 270, Appendix 1 for South Iraq tender, 269 & 247 side saddle concept Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-05 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-05 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 TPP work, clarification with operations Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-05 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 Status update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 HIbernia CTR process Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-06 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 2.5 0 Clarifications on 247 walking system, South Iraq tender for 247, 269, 265, & 270, Appendix 1 for South Iraq tender, 269 & 247 side saddle concept Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-06 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 4 0 TPP work, clarification with operations Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-06 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 Status update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-07 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8 0 Clarifications on 247 walking system, South Iraq tender for 247, 269, 265, & 270, Appendix 1 for South Iraq tender, 269 & 247 side saddle concept Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-08 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 7.5 0 Clarifications on 247 walking system, South Iraq tender for 247, 269, 265, & 270, Appendix 1 for South Iraq tender, 269 & 247 side saddle concept Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-09 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5.5 0 Clarifications on 247 walking system, South Iraq tender for 247, 269, 265, & 270, Appendix 1 for South Iraq tender, 269 & 247 side saddle concept Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-12 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6 0 South Iraq tender for 247, 269, 265, & 270, Appendix 1 for South Iraq tender, 269 & 247 side saddle concept, cost estimate for 247 upgrade, created mobilization gantt chart of 247, 269, and 265, gap analysis for 247, map route for mobilization from Kurdistan to south iraq, Middle east conference calls, South Iraq tender meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-12 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-13 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 7.5 0 South Iraq tender for 247, 269, 265, & 270, Appendix 1 for South Iraq tender, 269 & 247 side saddle concept, cost estimate for 247 upgrade, created mobilization gantt chart of 247, 269, and 265, gap analysis for 247, map route for mobilization from Kurdistan to south iraq, Middle east conference calls, South Iraq tender meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-14 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Review of Choke manifold and BOP controls TPP. Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-14 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6.5 0 South Iraq tender for 247, 269, 265, & 270, Appendix 1 for South Iraq tender, 269 & 247 side saddle concept, cost estimate for 247 upgrade, created mobilization gantt chart of 247, 269, and 265, gap analysis for 247, map route for mobilization from Kurdistan to south iraq, Middle east conference calls, South Iraq tender meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-15 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Review of Choke manifold and BOP controls TPP. Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-15 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8 0 South Iraq tender for 247, 269, 265, & 270, Appendix 1 for South Iraq tender, 269 & 247 side saddle concept, cost estimate for 247 upgrade, created mobilization gantt chart of 247, 269, and 265, gap analysis for 247, map route for mobilization from Kurdistan to south iraq, Middle east conference calls, South Iraq tender meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-15 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 NOV desert rig presentation Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-16 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Review of Choke manifold and BOP controls TPP. Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-16 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3.5 0 South Iraq tender for 247, 269, 265, & 270, Appendix 1 for South Iraq tender, 269 & 247 side saddle concept, cost estimate for 247 upgrade, created mobilization gantt chart of 247, 269, and 265, gap analysis for 247, map route for mobilization from Kurdistan to south iraq, Middle east conference calls, South Iraq tender meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Choke manifold clarifications, BOP controls clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4.5 0 Uganda tender support - Drillmech tender gap analysis, camp spec, BOP spec, matting board sketch drawing, ITS drill string and fishing clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-19 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-19 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 Created TPP, Revised TPP, vendor clarifications, Gantt chart Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Choke manifold clarifications, BOP controls clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3.5 0 Uganda tender support - Drillmech tender gap analysis, camp spec, BOP spec, matting board sketch drawing, ITS drill string and fishing clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-20 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Drillmech presentation Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-20 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 Created TPP, Revised TPP, vendor clarifications, Gantt chart Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-20 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 vendor clarifications, PO status Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-21 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Choke manifold clarifications, BOP controls clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-21 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 7 0 Created TPP, Revised TPP, vendor clarifications, Gantt chart Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-22 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Choke manifold clarifications, BOP controls clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5.5 0 Uganda tender support - Drillmech tender gap analysis, camp spec, BOP spec, matting board sketch drawing, ITS drill string and fishing clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-22 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 Created TPP, Revised TPP, vendor clarifications, Gantt chart Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-23 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Choke manifold clarifications, BOP controls clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Uganda tender support - Drillmech tender gap analysis, camp spec, BOP spec, matting board sketch drawing, ITS drill string and fishing clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-23 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 Created TPP, Revised TPP, vendor clarifications, Gantt chart Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-23 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 vendor clarifications, PO status Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-26 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 choke manifold meeting, cameron clarifications, TPP review, WOM meeting and clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Drillmech tender gap analysis, camp spec, BOP spec, matting board sketch drawing, ITS drill string and fishing clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-26 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-26 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 vendor clarifications, gantt chart, TPP revision Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-27 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 choke manifold meeting, cameron clarifications, TPP review, WOM meeting and clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6.5 0 Drillmech tender gap analysis, camp spec, BOP spec, matting board sketch drawing, ITS drill string and fishing clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-27 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 vendor clarifications, gantt chart, TPP revision Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-28 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1.5 0 choke manifold meeting, cameron clarifications, TPP review, WOM meeting and clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Drillmech tender gap analysis, camp spec, BOP spec, matting board sketch drawing, ITS drill string and fishing clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-28 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 vendor clarifications, gantt chart, TPP revision Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Drillmech tender gap analysis, camp spec, BOP spec, matting board sketch drawing, ITS drill string and fishing clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-29 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 vendor clarifications, gantt chart, TPP revision Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3.5 0 Drillmech tender gap analysis, camp spec, BOP spec, matting board sketch drawing, ITS drill string and fishing clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-06-30 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 vendor clarifications, gantt chart, TPP revision Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 4th of July Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 4th of July Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5.5 0 Uganda tender - drillmech clarifications, camp clarifications, status updates, BOP comments, quote reviews Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-05 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-05 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 vendor clarifications, gantt chart Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-05 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 status update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5.5 0 Uganda tender - drillmech clarifications, camp clarifications, status updates, BOP comments, quote reviews Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-06 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 vendor clarifications, gantt chart Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-07 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-10 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6.5 0 Uganda tender - HH quote meetings and clarifications, HH proposal review, HH drawing redlines, Owner furnished equipment quote review, Appendix 9, cost estimate Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-10 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-11 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5.5 0 Uganda tender - HH quote meetings and clarifications, HH proposal review, HH drawing redlines, Owner furnished equipment quote review, Appendix 9, cost estimate Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-11 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 Safi Training Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-11 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 Quote review, Standpippe connection clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-12 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 well control clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-12 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5 0 Uganda tender - HH quote meetings and clarifications, HH proposal review, HH drawing redlines, Owner furnished equipment quote review, Appendix 9, cost estimate Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-12 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Safi Training Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-12 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 Status Update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-13 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 well control clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-13 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6 0 Uganda tender - HH quote meetings and clarifications, HH proposal review, HH drawing redlines, Owner furnished equipment quote review, Appendix 9, cost estimate Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-13 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 Quote review, Standpippe connection clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-14 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5.5 0 Uganda tender - HH quote meetings and clarifications, HH proposal review, HH drawing redlines, Owner furnished equipment quote review, Appendix 9, cost estimate Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6.5 0 Total Uganda - Cost estimate, quote reviews, technical spec, review meetings, conference calls, HH quote revision, drawing review and revision, sound mitigation Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-17 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 PO clarifications, Status Update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-18 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 choke and kill clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Total Uganda - Cost estimate, quote reviews, technical spec, review meetings, conference calls, HH quote revision, drawing review and revision, sound mitigation Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-18 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Total Uganda - Cost estimate, quote reviews, technical spec, review meetings, conference calls, HH quote revision, drawing review and revision, sound mitigation Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7 0 Total Uganda - Cost estimate, quote reviews, technical spec, review meetings, conference calls, HH quote revision, drawing review and revision, sound mitigation Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-20 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 Status Update, drawing clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-21 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 choke and kill clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Total Uganda - Cost estimate, quote reviews, technical spec, review meetings, conference calls, HH quote revision, drawing review and revision, sound mitigation Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-21 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 PO clarifications, Status Update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-21 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 Status Update, drawing clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6.5 0 Total Uganda - Tripping Calculations, cost estimate, quote reviews, technical spec, review meetings, conference calls, HH quote revision, drawing review and revision, sound mitigation Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-24 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-25 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Choke clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6.5 0 Total Uganda - Tripping Calculations, cost estimate, quote reviews, technical spec, review meetings, conference calls, HH quote revision, drawing review and revision, sound mitigation Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-25 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 Status Update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 7.5 0 Total Uganda - Tripping Calculations, cost estimate, quote reviews, technical spec, review meetings, conference calls, HH quote revision, drawing review and revision, sound mitigation Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-26 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 PO update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3.5 0 Total Uganda - Tripping Calculations, cost estimate, quote reviews, technical spec, review meetings, conference calls, HH quote revision, drawing review and revision, sound mitigation Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-27 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 Safi Practice Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Total Uganda - Tripping Calculations, cost estimate, quote reviews, technical spec, review meetings, conference calls, HH quote revision, drawing review and revision, sound mitigation Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-28 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 Status Update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board Meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 5,000 to 7,500 psi system upgrade quotes for potential tender, Total Uganda Tender clarifications and closeout assistance Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-31 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-31 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 Status Update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-07-31 Rig 272L-TSR :Rig 272L-TSR TSR-01587-272L Brine Tank Sumps Regular Pay N 1 0 Create CTR, Review Drawings, Create Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-01 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 Choke clarifications and reviews, BOP clarifications and reviews Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 5,000 to 7,500 psi system upgrade quotes for potential tender, Total Uganda Tender clarifications and closeout assistance Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 Orlan Weld procedure Clarifications, HP valve destructive testing clarifications, 209 TSR preliminary reviews, 209 operations clarifications on barite system Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-01 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 4 0 Vendor Visit, Status Update, weld clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Beam Shape Research, AISC Code Research, Safi Help research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 5,000 to 7,500 psi system upgrade quotes for potential tender, Total Uganda Tender clarifications and closeout assistance Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Orlan Weld procedure Clarifications, HP valve destructive testing clarifications, 209 TSR preliminary reviews, 209 operations clarifications on barite system Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-02 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 Vendor Visit, Status Update, weld clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-02 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 2 0 TSR Review, Concept Design, Create CTR, Operations Clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board Meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Beam Shape Research, AISC Code Research, Safi Help research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-03 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 Vendor Visit, Status Update, weld clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-03 Rig 272L-TSR :Rig 272L-TSR TSR-01587-272L Brine Tank Sumps Regular Pay N 1 0 Create CTR, Review Drawings, Create Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-03 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 3.5 0 TSR Review, Concept Design, Create CTR, Operations Clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-04 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 0.5 0 Choke clarifications and reviews, BOP clarifications and reviews Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Orlan Weld procedure Clarifications, HP valve destructive testing clarifications, 209 TSR preliminary reviews, 209 operations clarifications on barite system Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-04 Rig 272L-TSR :Rig 272L-TSR TSR-01587-272L Brine Tank Sumps Regular Pay N 1 0 Create CTR, Review Drawings, Create Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-04 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 3 0 TSR Review, Concept Design, Create CTR, Operations Clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Update meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-07 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-07 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 status update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-07 Rig 249L-TSR :Rig 249L-TSR TSR-01590-249L Air Hoist Installation Regular Pay N 1 0 TSR review, field clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-07 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 4 0 drawing review, structural analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Update meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-08 Rig 209L-TSR :Rig 209L-TSR TSR-01567-209L Shaker Trough Regular Pay N 2 0 Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-08 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1 0 TSR review, drawing collection, manual review, haz area review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-08 Rig 249L-TSR :Rig 249L-TSR TSR-01590-249L Air Hoist Installation Regular Pay N 1 0 TSR review, field clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-08 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 3.5 0 drawing review, structural analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Update meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-09 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 7.5 0 drawing review, structural analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Update meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-10 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1 0 TSR review, drawing collection, manual review, haz area review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-10 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 6 0 drawing review, structural analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Update meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-11 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 5.5 0 vender visit, status update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-11 Rig 249L-TSR :Rig 249L-TSR TSR-01590-249L Air Hoist Installation Regular Pay N 2 0 TSR review, field clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 updates meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-14 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-14 Rig 249L-TSR :Rig 249L-TSR TSR-01590-249L Air Hoist Installation Regular Pay N 4 0 Completed analysis, completed closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-14 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 2 0 drawing review, analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 updates meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-15 Rig 249L-TSR :Rig 249L-TSR TSR-01590-249L Air Hoist Installation Regular Pay N 7.5 0 Completed analysis, completed closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 updates meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-16 Rig 249L-TSR :Rig 249L-TSR TSR-01590-249L Air Hoist Installation Regular Pay N 6.5 0 Completed analysis, completed closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-16 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 1 0 drawing review, analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 updates meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-17 Rig 249L-TSR :Rig 249L-TSR TSR-01590-249L Air Hoist Installation Regular Pay N 7 0 Completed analysis, completed closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 updates meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-18 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 4 0 Site visit, status report Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-18 Rig 249L-TSR :Rig 249L-TSR TSR-01590-249L Air Hoist Installation Regular Pay N 3.5 0 Completed analysis, completed closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-21 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-21 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 1.5 0 Drawing review, Changed analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-21 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 5 0 Preliminary flow calcs for feasibility Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-22 Rig 270L-TSR :Rig 270L-TSR TSR-01087-270L Winterization Regular Pay N 5 0 Requote CRG scope, Existing boiler house regulatory, clarifications from rig Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-22 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 2 0 Drawing review, Changed analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-22 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 1 0 Preliminary flow calcs for feasibility Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-23 OH-014 :OH-014 Overhead All Activities Regular Pay N 8.5 0 Hydraulic Symposium, Vendor information Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-24 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 4 0 vendor visit, status report Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-24 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1 0 TSR review, Haz area research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-24 Rig 270L-TSR :Rig 270L-TSR TSR-01087-270L Winterization Regular Pay N 2.5 0 Requote CRG scope, Existing boiler house regulatory, clarifications from rig Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-25 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 vendor visit, status report Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-25 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 4 0 TSR review, Haz area research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-25 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 1 0 Preliminary flow calcs for feasibility Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-28 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Hurricane Harvey Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-29 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Hurricane Harvey Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-30 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Hurricane Harvey Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Assist with Uganda clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-31 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5 0 HKN Tender Support Reck, John Engineer I 29656 Reck, John:Engineer I 2017-08-31 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1 0 Concept development, TSR review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Assist with Uganda clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-01 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5 0 HKN Tender Support Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-01 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1 0 Concept development, TSR review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Labor Day Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-05 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 3.5 0 Pipe Repair procedure Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-05 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 correspondence with AMC Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-05 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 2 0 Foundation concept, operations clarifications, haz area research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-05 Rig 270L-TSR :Rig 270L-TSR TSR-01087-270L Winterization Regular Pay N 1.5 0 Regulatory clarifications, CRG clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-05 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 1 0 Coorespondance with Able, 16" concept development Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-06 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 3.5 0 Solidworks analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-06 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Pipe Repair procedure Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-06 Rig 270L-TSR :Rig 270L-TSR TSR-01087-270L Winterization Regular Pay N 2 0 Regulatory clarifications, CRG clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-06 Rig 272L-TSR :Rig 272L-TSR TSR-01589-272L Cutting Chute Platform Regular Pay N 2 0 Revised Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-07 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 status update, vendor skid clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-07 ORLAN-TSR :ORLAN-TSR TSR-01601-ORLP Nitrogen Pre-Charge Valve Wrench Regular Pay N 1 0 TSR Review, out for quote Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-07 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1.5 0 Foundation concept, operations clarifications, haz area research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-07 Rig 270L-TSR :Rig 270L-TSR TSR-01087-270L Winterization Regular Pay N 1.5 0 Regulatory clarifications, CRG clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-07 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 2 0 Coorespondance with Able, 16" concept development Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-08 ORLAN-TSR :ORLAN-TSR TSR-01601-ORLP Nitrogen Pre-Charge Valve Wrench Regular Pay N 2 0 TSR Review, out for quote Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-08 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 correspondence with AMC Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-08 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 3.5 0 Foundation concept, operations clarifications, haz area research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-11 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 1.5 0 Meeting for vendor selection, TSR review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-11 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Winterization company research, Odoptu TSR clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-11 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2.5 0 Coorespondance with WOM, skid clarifications, vlave placement, status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-11 Rig 270L-TSR :Rig 270L-TSR TSR-01087-270L Winterization Regular Pay N 1.5 0 Boiler Regulatory clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-12 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 1 0 Drawing review, Analysis revision Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-12 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 Hacking Training Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-12 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 Coorespondance with WOM, skid clarifications, vlave placement, status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-12 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 2 0 Padeye Loadmaster clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-12 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 2.5 0 Preliminary design, material selection Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-13 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 1 0 Drawing review, Analysis revision Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-13 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 5 0 HKN Tech Spec revision Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-13 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 2 0 Padeye Loadmaster clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-14 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 4 0 Vendor visit, status report Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-14 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 2 0 Preliminary design, material selection Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-14 Rig 270L-TSR :Rig 270L-TSR TSR-01087-270L Winterization Regular Pay N 1.5 0 Boiler Regulatory clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-15 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 Coorespondance with WOM, skid clarifications, vlave placement, status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-15 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1.5 0 Preliminary design, material selection Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-15 Rig 270L-TSR :Rig 270L-TSR TSR-01087-270L Winterization Regular Pay N 1 0 Boiler Regulatory clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-15 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 2.5 0 Flowmeter placement study, conference call Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, TS meeting, IADC Conference Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-18 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-18 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 Vendor update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-18 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 6 0 Cost estimate, Concept development, Able clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-19 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 1 0 Vendor concept, screenshots, steam line clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 board meeting, TS meeting, IADC Conference Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 SAFI research and training Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-19 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 0.5 0 HKN Schedule Creation, HKN tech spec clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-19 Rig 209L-TSR :Rig 209L-TSR TSR-01492-209L Choke Manifold Piping Regular Pay N 1.5 0 scope of work clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-19 Rig 209L-TSR :Rig 209L-TSR TSR-01600-209L Desilter Motor Upgrade Regular Pay N 0.5 0 calculation review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-19 Rig 270L-TSR :Rig 270L-TSR TSR-01087-270L Winterization Regular Pay N 1.5 0 vendor regulatory clarifications, received quotes, cost estimate Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-19 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 1 0 Cost estimate, Concept development, Able clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-20 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 2.5 0 Vendor concept, screenshots, steam line clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TS meeting, IADC Conference Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 SAFI research and training Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-20 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1 0 Foundation concept development,structural analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-20 Rig 209L-TSR :Rig 209L-TSR TSR-01600-209L Desilter Motor Upgrade Regular Pay N 1 0 calculation review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-20 Rig 270L-TSR :Rig 270L-TSR TSR-01087-270L Winterization Regular Pay N 2.5 0 vendor regulatory clarifications, received quotes, cost estimate Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, TS meeting, IADC Conference Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-21 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 4 0 HKN Schedule Creation, HKN tech spec clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-21 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 Vendor update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-21 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 2.5 0 Foundation concept development,structural analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TS meeting, IADC Conference Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-22 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1 0 HKN Schedule Creation, HKN tech spec clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-22 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 Vendor update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-22 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 4 0 Foundation concept development,structural analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-25 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 0.5 0 Study coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 SAFI research and training Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-25 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 New TSR clarifications, General Query, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-25 Rig 209L-TSR :Rig 209L-TSR TSR-01600-209L Desilter Motor Upgrade Regular Pay N 1.5 0 calculation review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-25 Rig 272L-TSR :Rig 272L-TSR TSR-01597-272L Mudmaster Installation Study Regular Pay N 1 0 Able Clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 SAFI research and training Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-26 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 Recieved drawings, 3D model review, moved valve, skid modification study Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-26 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1.5 0 Began Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-26 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 3 0 Foundation drawing review, structural analysis, material selection Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-26 Rig 209L-TSR :Rig 209L-TSR TSR-01600-209L Desilter Motor Upgrade Regular Pay N 1.5 0 calculation review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-27 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 0.5 0 Study coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 New TSR clarifications, General Query, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-27 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 6.5 0 Foundation drawing review, structural analysis, material selection Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-28 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 7.5 0 Foundation drawing review, structural analysis, material selection Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-09-29 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 5.5 0 Recieved drawings, 3D model review, moved valve, skid modification study Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-02 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 1 0 Quote, Status update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-02 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Diesel Thermal Expansion Calc Questions Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-02 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 3 0 Drawing review, 3D model clash study Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-03 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 0.5 0 Quote, Status update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-03 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 Drawing review, 3D model clash study Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-03 ORLAN-TSR :ORLAN-TSR TSR-01601-ORLP Nitrogen Pre-Charge Valve Wrench Regular Pay N 1 0 AMC status update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-03 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 Shipment coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-03 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1 0 Foundation drawing review, structural analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-03 Rig 209L-TSR :Rig 209L-TSR TSR-01600-209L Desilter Motor Upgrade Regular Pay N 2 0 Calc review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-04 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 1 0 Quote, Status update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-04 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 Drawing review, 3D model clash study Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-04 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 Shipment coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-04 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 3.5 0 Foundation drawing review, structural analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-05 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 7 0 Foundation drawing review, structural analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-09 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 0.5 0 Status Update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-09 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-09 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 Drawing Review, Skid Modification Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-09 ORLAN-TSR :ORLAN-TSR TSR-01601-ORLP Nitrogen Pre-Charge Valve Wrench Regular Pay N 0.5 0 Status Update, yard clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-09 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 Shipping Clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-09 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 2 0 Dust Collector Drawing Review, Padeye Analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-09 Rig 209L-TSR :Rig 209L-TSR TSR-01600-209L Desilter Motor Upgrade Regular Pay N 1 0 Closeout work Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-10 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8 0 Crescent 269 Tender Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-11 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8 0 Crescent 269 Tender Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 TSR Tracker Update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Mud Pump discharge spool crack Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-12 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 4.5 0 Dust Collector Drawing Review, Padeye Analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-13 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 0.5 0 Status Update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Mud Pump discharge spool crack Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-13 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 Drawing Review, Skid Modification Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-13 ORLAN-TSR :ORLAN-TSR TSR-01601-ORLP Nitrogen Pre-Charge Valve Wrench Regular Pay N 0.5 0 Status Update, yard clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-13 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 Shipping Clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-13 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1.5 0 Dust Collector Drawing Review, Padeye Analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-13 Rig 209L-TSR :Rig 209L-TSR TSR-01600-209L Desilter Motor Upgrade Regular Pay N 0.5 0 Closeout work Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-16 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 0.5 0 status update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-16 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-16 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 3 0 drawing review, standpipe connections Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-16 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 status update, Panalpina clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-16 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 2.5 0 structural analysis, drawing review, analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-17 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 Appendix B sections for HH, Kurie, and OTC Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-18 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5.5 0 Appendix B sections for HH, Kurie, and OTC Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-18 Rig 270L-TSR :Rig 270L-TSR TSR-01595-270L Skidding Pony Sub Regular Pay N 2.5 0 Scope meeting, Phase 1 CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Appendix B sections for HH, Kurie, and OTC Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 TSR Tracker update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 mud pump discharge quote Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-19 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 drawing review, standpipe connections Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-19 ORLAN-TSR :ORLAN-TSR TSR-01601-ORLP Nitrogen Pre-Charge Valve Wrench Regular Pay N 1 0 status update, heat treat clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-19 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 status update, Panalpina clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-19 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 0.5 0 structural analysis, drawing review, analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 mud pump discharge quote Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-20 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 drawing review, standpipe connections Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-20 ORLAN-TSR :ORLAN-TSR TSR-01601-ORLP Nitrogen Pre-Charge Valve Wrench Regular Pay N 0.5 0 status update, heat treat clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-20 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 status update, Panalpina clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-20 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1.5 0 structural analysis, drawing review, analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-20 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1 0 TSR Review, CTR Review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-20 Rig 209L-TSR :Rig 209L-TSR TSR-01600-209L Desilter Motor Upgrade Regular Pay N 0.5 0 Closeout compilation Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-20 Rig 270L-TSR :Rig 270L-TSR TSR-01595-270L Skidding Pony Sub Regular Pay N 0.5 0 Scope meeting, Phase 1 CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-23 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-23 ORLAN-TSR :ORLAN-TSR TSR-01601-ORLP Nitrogen Pre-Charge Valve Wrench Regular Pay N 1 0 Scrapped part clarifications, inspection set up Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-23 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 3 0 Concept review, drawing review, CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-23 Rig 209L-TSR :Rig 209L-TSR TSR-01600-209L Desilter Motor Upgrade Regular Pay N 1 0 Finished CO Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-23 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1.5 0 TSR review, concept development, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-24 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 1 0 status update, Norseman research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-24 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 4 0 finished structural analysis, MTO CO Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-24 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 3 0 Concept review, drawing review, CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-25 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 Drawing review, shipment clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-25 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 6 0 finished structural analysis, MTO CO Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-25 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1 0 Concept review, drawing review, CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 TSR spreadsheet update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 steam heater clarifications, rotary table torque questions Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-26 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 Drawing review, shipment clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-26 ORLAN-TSR :ORLAN-TSR TSR-01582-ORLP Poorboy Degasser (electrical) Regular Pay N 1 0 TSR review, RFI Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-26 ORLAN-TSR :ORLAN-TSR TSR-01601-ORLP Nitrogen Pre-Charge Valve Wrench Regular Pay N 1 0 Scrapped part clarifications, inspection set up Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-26 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1.5 0 Drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-26 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1.5 0 Concept review, drawing review, CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-27 Rig 209L-TSR :Rig 209L-TSR TSR-01562-209L Completion Spooler Window on DM Regular Pay N 1 0 Drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-27 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 4.5 0 finished structural analysis, MTO CO Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-30 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 0.5 0 Norseman contact and clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-30 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-30 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 standpipe manifold connections, shipment details Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-30 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1 0 closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-30 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 4 0 Design review, Began analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-31 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2 0 ASME inspection clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-10-31 ORLAN-TSR :ORLAN-TSR TSR-01601-ORLP Nitrogen Pre-Charge Valve Wrench Regular Pay N 6 0 Wrench inspection before shipment, began closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-01 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 0.5 0 Norseman contact and clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Mud Pump Spool Gooseneck, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-01 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 standpipe manifold connections, shipment details Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-01 ORLAN-TSR :ORLAN-TSR TSR-01582-ORLP Poorboy Degasser (electrical) Regular Pay N 1 0 piping review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-01 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1.5 0 repair report Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-01 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1 0 Design review, Began analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-02 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 0.5 0 Norseman contact and clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-02 Berkut-TSR :Berkut-TSR TSR-01605-BERP Snubbing Post Regular Pay N 1 0 TSR review, drawing review, began closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 TSR register Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Mud Pump Spool Gooseneck, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-02 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 standpipe manifold connections, shipment details Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-02 ORLAN-TSR :ORLAN-TSR TSR-01601-ORLP Nitrogen Pre-Charge Valve Wrench Regular Pay N 1 0 Wrench inspection before shipment, began closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-02 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 0.5 0 closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-02 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 2 0 Design review, Began analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-03 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 0.5 0 Norseman contact and clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-03 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 5.5 0 216 mud piping upgrade Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS meeting and daily meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-06 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-06 ORLAN-TSR :ORLAN-TSR TSR-01582-ORLP Poorboy Degasser (electrical) Regular Pay N 1.5 0 Closeout assistance Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-06 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 5 0 Gap analysis, Southwest review, drawing review, valve dimensions, vendor meeting, drawing redlines Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS meeting and daily meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-07 ORLAN-TSR :ORLAN-TSR TSR-01601-ORLP Nitrogen Pre-Charge Valve Wrench Regular Pay N 2 0 Closeout, material documentation Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-07 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 6 0 Analysis report, Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS meeting and daily meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-08 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 0.5 0 Analysis report, Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-08 Rig 209L-TSR :Rig 209L-TSR TSR-01612-209L Mud Pump Gooseneck Regular Pay N 7.5 0 Drawing review, vendor quote, vendor clarifications, clamp clarifications, dimensions Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-09 Berkut-TSR :Berkut-TSR TSR-01614-BERP Cement Unit Jib Lifting Tool Regular Pay N 3.5 0 FEA analysis, Closeout review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS meeting and daily meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-09 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 4 0 Gap analysis, Southwest review, drawing review, valve dimensions, vendor meeting, drawing redlines Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-10 Berkut-TSR :Berkut-TSR TSR-01605-BERP Snubbing Post Regular Pay N 2 0 Padeye calc, closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-10 Berkut-TSR :Berkut-TSR TSR-01614-BERP Cement Unit Jib Lifting Tool Regular Pay N 0.5 0 FEA analysis, Closeout review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS meeting and daily meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-10 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 3 0 Gap analysis, Southwest review, drawing review, valve dimensions, vendor meeting, drawing redlines Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-13 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 1 0 Vendor research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Update meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-13 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 dust collector drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-13 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 1 0 closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-13 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1.5 0 Drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-13 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 meeting, TSR review, conference call Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Update meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-14 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 4 0 nozzle spool locations and review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-14 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 3 0 meeting, drawing review, quote Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-14 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 meeting, TSR review, conference call Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Update meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-15 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 dust collector drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-15 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 2 0 closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-15 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 2 0 Drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-15 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 3 0 meeting, drawing review, quote Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Update meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-16 Rig 209L-TSR :Rig 209L-TSR TSR-01612-209L Mud Pump Gooseneck Regular Pay N 6.5 0 Witnessed hydro, final dimension check Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-16 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1 0 meeting, drawing review, quote Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Update meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-17 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 3 0 meeting, drawing review, quote Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-17 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 2.5 0 meeting, TSR review, conference call Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-20 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-20 ORLAN-TSR :ORLAN-TSR TSR-01601-ORLP Nitrogen Pre-Charge Valve Wrench Regular Pay N 0.5 0 Documentation, Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-20 Rig 209L-TSR :Rig 209L-TSR TSR-01612-209L Mud Pump Gooseneck Regular Pay N 3 0 Documentation, Supports, Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-20 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2.5 0 Clarifications, drawings, popoff research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 209 Dust Collector revision and drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-21 ORLAN-TSR :ORLAN-TSR TSR-01601-ORLP Nitrogen Pre-Charge Valve Wrench Regular Pay N 0.5 0 Documentation, Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-21 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 2 0 Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-21 Rig 209L-TSR :Rig 209L-TSR TSR-01612-209L Mud Pump Gooseneck Regular Pay N 1.5 0 Documentation, Supports, Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-21 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1.5 0 Clarifications, drawings, popoff research Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-23 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Thanksgiving Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-24 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Thanksgiving Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 209 Dust Collector MTO clarifications & completed closeout, Skidding Shoes Closeout, Russian Fittings comments, LP mud system questions Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-28 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 End user certificate, choke supplier clarifications, Spools MTO Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-28 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 0.5 0 Concept development Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-28 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 2 0 Concept Development, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-28 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1 0 Pulsation Dampener option, Sigma contact, southwest re quote, popoff quote, HPPS quote review, fluid end dimensions Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-29 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2.5 0 End user certificate, choke supplier clarifications, Spools MTO Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-29 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 CTR review, Hours, Drawing reviews Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-29 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 0.5 0 Concept Development, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-29 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 4 0 Pulsation Dampener option, Sigma contact, southwest re quote, popoff quote, HPPS quote review, fluid end dimensions Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board Meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-30 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 209 Dust Collector MTO clarifications & completed closeout, Skidding Shoes Closeout, Russian Fittings comments, LP mud system questions Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-30 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 CTR review, Hours, Drawing reviews Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-30 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 1 0 Concept development Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-30 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 0.5 0 Concept Development, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-11-30 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2 0 Pulsation Dampener option, Sigma contact, southwest re quote, popoff quote, HPPS quote review, fluid end dimensions Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 209 Dust Collector MTO clarifications & completed closeout, Skidding Shoes Closeout, Russian Fittings comments, LP mud system questions Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-01 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 End user certificate, choke supplier clarifications, Spools MTO Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-01 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 0.5 0 Concept Development, Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-01 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2.5 0 Pulsation Dampener option, Sigma contact, southwest re quote, popoff quote, HPPS quote review, fluid end dimensions Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-04 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Skidding shoes closeout, LP mud clarifications, Centrifuge feed pump questions, derrick contact info, dust collector MTO clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-04 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 End user letter updates and clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-04 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1 0 drawing review, platform analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-04 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 1 0 concept development Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-04 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2.5 0 Pulsation dampener quotes and clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Hydraulic presentation, SAFI training Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Skidding shoes closeout, LP mud clarifications, Centrifuge feed pump questions, derrick contact info, dust collector MTO clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-05 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1 0 drawing review, platform analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-05 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 3.5 0 Pulsation dampener quotes and clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Hydraulic presentation, SAFI training Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Skidding shoes closeout, LP mud clarifications, Centrifuge feed pump questions, derrick contact info, dust collector MTO clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-06 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1 0 drawing review, platform analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-06 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 1 0 concept development Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-06 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2 0 Pulsation dampener quotes and clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-06 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 Conference call, RFI Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-07 Berkut-TSR :Berkut-TSR TSR-01614-BERP Cement Unit Jib Lifting Tool Regular Pay N 1 0 Concept 1 redesign Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Hydraulic presentation, SAFI training Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-07 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 Mast Tie Back Beam Quote Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-07 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 4 0 drawing review, platform analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-07 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1.5 0 Conference call, RFI Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Skidding shoes closeout, LP mud clarifications, Centrifuge feed pump questions, derrick contact info, dust collector MTO clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-08 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 Mast Tie Back Beam Quote Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-08 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 End user letter updates and clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-08 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 2.5 0 drawing review, platform analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-08 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 0.5 0 Conference call, RFI Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting, Christmas lunch and teambuilding Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-11 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 209 - Bleed Line Tee, Equalizer spec, HP mud gate valves Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-11 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 New spool MTO and quote, spool dimensions Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-11 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1.5 0 Suitcase platform analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-11 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 1 0 Concept review, Southside adjustable Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-11 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2 0 pulsation dampener quotes, cost estimate, piping change review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Board meeting, TS meeting, Christmas lunch and teambuilding Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-12 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Compliance Training, Sigma drilling products presentation Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 209 - Bleed Line Tee, Equalizer spec, HP mud gate valves Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-12 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 1 0 shackle dimensions, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-12 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2 0 pulsation dampener quotes, cost estimate, piping change review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting, Christmas lunch and teambuilding Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-13 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 4 0 New spool MTO and quote, spool dimensions Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-13 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1 0 Suitcase platform analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-13 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 0.5 0 Concept review, Southside adjustable Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-13 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 1 0 shackle dimensions, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-13 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1 0 pulsation dampener quotes, cost estimate, piping change review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting, Christmas lunch and teambuilding Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-14 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Compliance Training, Sigma drilling products presentation Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 209 - Bleed Line Tee, Equalizer spec, HP mud gate valves Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-14 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 4 0 Suitcase platform analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-14 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1 0 pulsation dampener quotes, cost estimate, piping change review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Brainstorming for 2018 goals, board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-18 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-18 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 choke clarifications, spool details, fitting materials Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-18 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1.5 0 Platform Analysis, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-18 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 0.5 0 concept review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-18 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2.5 0 pulsation valve layout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-18 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 0.5 0 status update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Brainstorming for 2018 goals, board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-19 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 2.5 0 Platform Analysis, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-19 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 0.5 0 concept review Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-19 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2.5 0 pulsation valve layout Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-21 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-25 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Xmas Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Performance Evaluation Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-27 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1 0 drawing review, cantilever concept Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-27 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 4 0 Performance pulsation dampener, sigma clarifications, valve clarifications, fluid end info Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-27 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 0.5 0 Status Update Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Performance Evaluation Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-28 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 status update, piping clarifications, charpy testing Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-28 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 2 0 drawing review, cantilever concept Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-28 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2 0 Performance pulsation dampener, sigma clarifications, valve clarifications, fluid end info Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-29 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 status update, piping clarifications, charpy testing Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-29 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 2.5 0 drawing review, cantilever concept Reck, John Engineer I 29656 Reck, John:Engineer I 2017-12-29 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2.5 0 Performance pulsation dampener, sigma clarifications, valve clarifications, fluid end info Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Years Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Berkut 3D elbow procurement clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-02 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 Spool quote clarifications, support MTO, support clarifications, testing schedule Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-02 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1.5 0 concept review, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-02 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 1 0 drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-02 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 3 0 new quote revisions, standpipe clarifications, rootary hose clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Help desk config check for failing hard drive Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-03 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 Spool quote clarifications, support MTO, support clarifications, testing schedule Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-03 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1 0 concept review, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-03 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1.5 0 meeting with Genesis, TSR review, RFI clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-03 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 3 0 new quote revisions, standpipe clarifications, rootary hose clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Help desk config check for failing hard drive Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-04 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 Spool quote clarifications, support MTO, support clarifications, testing schedule Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-04 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1 0 concept review, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-04 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 meeting with Genesis, TSR review, RFI clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-04 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 1 0 drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-04 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 TSR review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-04 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1.5 0 new quote revisions, standpipe clarifications, rootary hose clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 Berkut 3D elbow procurement clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-05 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 Spool quote clarifications, support MTO, support clarifications, testing schedule Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-05 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1 0 concept review, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-05 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 1 0 new quote revisions, standpipe clarifications, rootary hose clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-08 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-08 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 2 0 Drawing review, analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-08 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 4.5 0 piping review, dampener review, field clarifications, write TSR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-09 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 status update, piping quote, structural material Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-09 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 2 0 Drawing review, analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-09 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1.5 0 Document research, RFI clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-09 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 1.5 0 Drawing review, CO, analysis review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-09 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 TSR review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-09 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2 0 piping review, dampener review, field clarifications, write TSR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-10 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 status update, piping quote, structural material Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-10 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 3 0 Drawing review, analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-10 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 TSR review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-10 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2 0 piping review, dampener review, field clarifications, write TSR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-11 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 2 0 Drawing review, analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-11 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 Document research, RFI clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-11 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 2 0 Drawing review, CO, analysis review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-11 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 3 0 piping review, dampener review, field clarifications, write TSR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-12 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1.5 0 Drawing review, analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-12 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 Document research, RFI clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-12 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 1.5 0 Drawing review, CO, analysis review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-12 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2 0 piping review, dampener review, field clarifications, write TSR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-15 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-15 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 2 0 Drawing revision, Analysis report, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-15 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 0.5 0 Analysis review, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-15 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 4.5 0 CO, final quotes, TSR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Office Closed from Ice Storm Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Office Closed from Ice Storm Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-18 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 FAT set up Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-18 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 1 0 TSR review, meeting set up Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-18 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 2 0 Drawing revision, Analysis report, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-18 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 1.5 0 Analysis review, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-18 Rig 216L-TSR :Rig 216L-TSR TSR-01613-216L 7500 PSI Mud Upgrade Regular Pay N 2.5 0 CO, final quotes, TSR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-19 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 1 0 TSR review, meeting set up Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-19 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 3.5 0 Drawing revision, Analysis report, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-19 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 1 0 Analysis review, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-22 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-22 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 FAT witness, clarifications, fat planning Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-22 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 1 0 gauge research and presentation, quote request, in shop visit Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-22 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1 0 Analysis report, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-22 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 meeting discussion, RFI questions, document review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-22 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 2 0 analysis, drawing review, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-23 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 4 0 Analysis report, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-23 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 meeting discussion, RFI questions, document review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-23 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 1 0 analysis, drawing review, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-23 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1.5 0 TSR review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-24 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 2 0 gauge research and presentation, quote request, in shop visit Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-24 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 2.5 0 Analysis report, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-24 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 3 0 analysis, drawing review, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-25 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 4 0 FAT witness, clarifications, fat planning Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-25 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 4 0 gauge research and presentation, quote request, in shop visit Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board/ Update meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-29 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-29 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 Access platform analysis and CO, Lift tool analysis and CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-29 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 FAT clarifications, Shipping updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-29 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 0.5 0 Quote request, gauge research and presentation, quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-29 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 1 0 Drawing review, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-29 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 0.5 0 Drawing review, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board/ Update meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-30 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3.5 0 Access platform analysis and CO, Lift tool analysis and CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-30 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 FAT clarifications, Shipping updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-30 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 2 0 Quote request, gauge research and presentation, quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-30 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 0.5 0 Drawing review, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-30 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1.5 0 Concept review, piping material Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board/ Update meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Performance evaluation Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-31 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 FAT clarifications, Shipping updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-31 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 1 0 Quote request, gauge research and presentation, quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-31 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 ALE documents review, scope research, Geology document review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-31 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 2.5 0 Drawing review, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-31 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 Concept review, piping material Reck, John Engineer I 29656 Reck, John:Engineer I 2018-01-31 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1.5 0 scope clarification, fan research Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board/ Update meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Access platform analysis and CO, Lift tool analysis and CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-01 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 FAT clarifications, Shipping updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-01 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 1.5 0 Quote request, gauge research and presentation, quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-01 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 0.5 0 Drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-01 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 ALE documents review, scope research, Geology document review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-01 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 0.5 0 Drawing review, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-01 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1.5 0 Concept review, piping material Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board/ Update meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-02 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 FAT clarifications, Shipping updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-02 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 0.5 0 Quote request, gauge research and presentation, quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-02 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 1 0 Drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-02 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 2 0 ALE documents review, scope research, Geology document review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-05 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-05 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2.5 0 FAT report, pictures, shipping clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-05 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 1 0 Quote clarification, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-05 ORLAN-TSR :ORLAN-TSR TSR-01623-ORLP Orlan Service Beam CRI HP Pump Regular Pay N 0.5 0 TSR review, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-05 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-05 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 TSR review, preliminary piping layout, platform concept Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-05 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 Concept development, TSR review, piping changes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 API flange research, Class 600 flange research, gasket research Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-06 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 4 0 Diverter valve clarifications and review for 249 Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-06 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 FAT report, pictures, shipping clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-06 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 0.5 0 Quote clarification, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-07 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 Diverter valve clarifications and review for 249 Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-07 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 FAT report, pictures, shipping clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-07 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 1 0 Quote clarification, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-07 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 1 0 Closeout, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-07 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-07 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2 0 TSR review, preliminary piping layout, platform concept Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-07 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1.5 0 conference call, field request Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-08 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 FAT report, pictures, shipping clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-08 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 3 0 Quote clarification, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-08 ORLAN-TSR :ORLAN-TSR TSR-01623-ORLP Orlan Service Beam CRI HP Pump Regular Pay N 1 0 TSR review, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-08 Rig 209L-TSR :Rig 209L-TSR TSR-01615-209L DM External Stairs Regular Pay N 0.5 0 Closeout, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-08 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 TSR review, preliminary piping layout, platform concept Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-08 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 Concept development, TSR review, piping changes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-08 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 0.5 0 conference call, field request Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-09 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 FAT report, pictures, shipping clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-09 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 1.5 0 Quote clarification, CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-09 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 3 0 Concept development, TSR review, piping changes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Earnings call and earnings meeting, Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-12 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 pipe inspection pipe rotator fabrication questions, base oil fittings questions, drains under rotary review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-12 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 10" diverter valve and line clarifications, quote check, gaps Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-12 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 3 0 HPPS PO status, center line review, WOM shipments coordination, fittings clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-12 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 concept check, piping spec Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-12 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 concept development, 3D review, piping spec Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Earnings call and earnings meeting, Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-13 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 10" diverter valve and line clarifications, quote check, gaps Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-13 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2.5 0 HPPS PO status, center line review, WOM shipments coordination, fittings clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-13 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 0.5 0 quote recommendation Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-13 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1.5 0 concept check, piping spec Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-13 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 3 0 concept development, 3D review, piping spec Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Earnings call and earnings meeting, Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 pipe inspection pipe rotator fabrication questions, base oil fittings questions, drains under rotary review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-14 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 10" diverter valve and line clarifications, quote check, gaps Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-14 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 HPPS PO status, center line review, WOM shipments coordination, fittings clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-14 ORLAN-TSR :ORLAN-TSR TSR-01619-ORLP Choke Manifold Pressure Gauge Regular Pay N 0.5 0 quote recommendation Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-14 ORLAN-TSR :ORLAN-TSR TSR-01623-ORLP Orlan Service Beam CRI HP Pump Regular Pay N 1.5 0 drawing review, calculations review, FEA analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-14 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 concept development, 3D review, piping spec Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Earnings call and earnings meeting, Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-15 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 pipe inspection pipe rotator fabrication questions, base oil fittings questions, drains under rotary review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-15 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 10" diverter valve and line clarifications, quote check, gaps Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-15 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 HPPS PO status, center line review, WOM shipments coordination, fittings clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-15 ORLAN-TSR :ORLAN-TSR TSR-01623-ORLP Orlan Service Beam CRI HP Pump Regular Pay N 1 0 drawing review, calculations review, FEA analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Earnings call and earnings meeting, Board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-16 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 HPPS PO status, center line review, WOM shipments coordination, fittings clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-16 ORLAN-TSR :ORLAN-TSR TSR-01623-ORLP Orlan Service Beam CRI HP Pump Regular Pay N 4.5 0 drawing review, calculations review, FEA analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 presidents day Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS meeting, board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Safety moment/IMS prep, update TSR tracker, computer software installation Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Dorma door quote clarifications, door hardware specs, pipe inspection rollers vendors, MR to PO process Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-20 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3.5 0 10" ball valve clarifications, diverter drawing review, flare line drawing research, API flange spec Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-20 ORLAN-TSR :ORLAN-TSR TSR-01623-ORLP Orlan Service Beam CRI HP Pump Regular Pay N 3 0 Complete FEA, complete CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS meeting, board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-21 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 charpy testing clarifications, PO status, fitting clarifications, manifold shipping clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-21 ORLAN-TSR :ORLAN-TSR TSR-01623-ORLP Orlan Service Beam CRI HP Pump Regular Pay N 5.5 0 Complete FEA, complete CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-21 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 ALE drawing review, marsh email Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-21 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 information request, status Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS meeting, board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Safety moment/IMS prep, update TSR tracker, computer software installation Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Dorma door quote clarifications, door hardware specs, pipe inspection rollers vendors, MR to PO process Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-22 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 charpy testing clarifications, PO status, fitting clarifications, manifold shipping clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-22 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 3.5 0 concept review, door specs, drawing review, piping MTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TS meeting, board meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 Dorma door quote clarifications, door hardware specs, pipe inspection rollers vendors, MR to PO process Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-23 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 charpy testing clarifications, PO status, fitting clarifications, manifold shipping clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-23 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 ALE drawing review, marsh email Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-23 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 0.5 0 concept review, door specs, drawing review, piping MTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-26 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 Berkut winterization contract clarifications, 209 Door clarifications, MTO unit clarifications, Orlan tee cross clarifications, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-26 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 10" diverter ball valve cameron questions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-26 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 scope meeting, email requests Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-26 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 Drawing review, platform clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-27 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 0.5 0 DNO Iraq Tender Technical Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Berkut winterization contract clarifications, 209 Door clarifications, MTO unit clarifications, Orlan tee cross clarifications, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-27 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 10" diverter ball valve cameron questions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-27 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 2 0 scope meeting, email requests Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-27 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 Drawing review, platform clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-27 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1.5 0 Field request Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-28 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3.5 0 DNO Iraq Tender Technical Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-28 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 scope meeting, email requests Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-28 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 Drawing review, platform clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-02-28 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 Field request Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 TSR tracker update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-01 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6.5 0 DNO Iraq Tender Technical Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-02 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR status updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-05 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3.5 0 DNO tender 269 technical evaluation Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-05 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-05 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 Typical stand drawing concept and review, status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-05 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1.5 0 Genesis CTR review, PKD CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-05 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 Drawing review, platform concept development Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-05 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 0.5 0 picture request, picture review, conference call Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR status updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-06 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 7 0 DNO tender 269 technical evaluation Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Orlan cross clarifications, Orlan bull plug dimensions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR status updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Paint and NDT standard for IMS Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-07 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 Typical stand drawing concept and review, status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR status updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Paint and NDT standard for IMS Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-08 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 Typical stand drawing concept and review, status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-08 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 Drawing review, platform concept development Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-08 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 picture request, picture review, conference call Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR status updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Paint and NDT standard for IMS Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Orlan cross clarifications, Orlan bull plug dimensions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-09 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 Typical stand drawing concept and review, status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-09 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1.5 0 Genesis CTR review, PKD CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-09 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 Concept review and discussion with fiel Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-09 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 0.5 0 Drawing review, platform concept development Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR tracker meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-12 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 209 Boiler blowdown questions, 209 diesel transfer station popoff Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-12 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 status update, HPPS dates, piping iso details Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-12 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 Genesis CTR, field communication CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-12 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 0.5 0 CTR, Concept review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-12 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 Drawing review, structural analysis of platform Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 TSR tracker meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 209 Boiler blowdown questions, 209 diesel transfer station popoff Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-13 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 status update, HPPS dates, piping iso details Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-13 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 Genesis CTR, field communication CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-13 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 Drawing review, structural analysis of platform Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-13 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 Field info review, requested quote Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR tracker meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-14 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Hibernia BOP Lift frame meeting and info Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-14 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 status update, HPPS dates, piping iso details Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-14 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 CTR, Concept review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-14 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 4 0 Drawing review, structural analysis of platform Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-14 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 Field info review, requested quote Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-15 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 6 0 Scope of Work report, create schedule, meeting for personnel requirements Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR tracker meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-15 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 Drawing review, structural analysis of platform Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-16 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 3 0 Scope of Work report, create schedule, meeting for personnel requirements Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR tracker meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Paint Spec IMS research Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-19 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 1 0 Henly meeting, Manning list, schedule revision, mud pump selection, equipment quotes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Status meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 IMS paint spec and NDT Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-19 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-19 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 skid drawing concept, status updates, Masterflo choke questions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-19 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 drawing reviews Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-19 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 structural analysis, padeye check, ladder location Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-19 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 drawing review, structural analysis, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-20 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 2 0 Henly meeting, Manning list, schedule revision, mud pump selection, equipment quotes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Status meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 IMS paint spec and NDT Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-20 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 genesis CTR, scope clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-20 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 2.5 0 structural analysis, padeye check, ladder location Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-20 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1.5 0 drawing review, structural analysis, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-21 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 3 0 Henly meeting, Manning list, schedule revision, mud pump selection, equipment quotes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Status meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-21 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 skid drawing concept, status updates, Masterflo choke questions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-21 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 2 0 structural analysis, padeye check, ladder location Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-21 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 2 0 conference call for concepts, status update, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-22 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 2 0 Henly meeting, Manning list, schedule revision, mud pump selection, equipment quotes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Status meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-22 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 skid drawing concept, status updates, Masterflo choke questions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-22 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1.5 0 drawing reviews Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-22 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 genesis CTR, scope clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-22 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 0.5 0 structural analysis, padeye check, ladder location Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-22 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 0.5 0 drawing review, structural analysis, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-22 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 0.5 0 conference call for concepts, status update, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-23 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 2.5 0 Henly meeting, Manning list, schedule revision, mud pump selection, equipment quotes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Status meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 IMS paint spec and NDT Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-23 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 skid drawing concept, status updates, Masterflo choke questions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-23 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 drawing reviews Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-23 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 0.5 0 drawing review, structural analysis, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-26 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 1 0 Manning list, schedule revision, equipment delivery dates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-26 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-26 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 skid drawing review, piping update, fittings clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-26 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-26 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 ENL meeting, genesis scope change Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-26 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 Drawing review, clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-26 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 1 0 concept development, plate selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-27 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 2 0 Manning list, schedule revision, equipment delivery dates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-27 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 skid drawing review, piping update, fittings clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-27 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-27 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 2 0 ENL meeting, genesis scope change Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-27 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 ladder/hatch concept Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-27 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 0.5 0 concept development, plate selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-28 GOM-TSR :GOM-TSR TSR-01632-GOM Holly Platform (Non-Billable - Tender) Regular Pay N 4 0 Manning list, schedule revision, equipment delivery dates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-28 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 skid drawing review, piping update, fittings clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-28 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 2 0 concept development, plate selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-28 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-03-30 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Good Friday Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Minkit presentation, update meetings, board meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-02 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-02 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 Skid drawing review and transmittal, status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-02 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2 0 calculations review, concept development, piping sizing, valve selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-02 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2.5 0 Structural Analysis report, closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-02 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 0.5 0 Plate sizing, sketch review, structural analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Minkit presentation, update meetings, board meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 choke/accumulator questions and quotes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-03 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 Skid drawing review and transmittal, status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-03 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 calculations review, concept development, piping sizing, valve selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-03 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 Ladder/hatch review, iiclarification Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-03 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 4 0 Structural Analysis report, closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-03 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 0.5 0 Plate sizing, sketch review, structural analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Minkit presentation, update meetings, board meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-04 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 2 0 ENL/ALE meeting and review, action item list Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-04 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 calculations review, concept development, piping sizing, valve selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-04 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2.5 0 Structural Analysis report, closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-04 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 2 0 Plate sizing, sketch review, structural analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-04 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 0.5 0 quote review, vendor clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Minkit presentation, update meetings, board meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 choke/accumulator questions and quotes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-05 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 ENL/ALE meeting and review, action item list Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-05 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1.5 0 calculations review, concept development, piping sizing, valve selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-05 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1.5 0 Ladder/hatch review, iiclarification Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-05 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 2.5 0 Plate sizing, sketch review, structural analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-05 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 quote review, vendor clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Minkit presentation, update meetings, board meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 209 loadmaster questions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-06 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 Skid drawing review and transmittal, status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-06 ORLAN-TSR :ORLAN-TSR TSR-01631-ORLP Flow Meter on Base Oil Supply Line Regular Pay N 2.5 0 P&ID review, redline review, MTO review, flow meter size Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-06 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 calculations review, concept development, piping sizing, valve selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-06 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 0.5 0 Structural Analysis report, closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-06 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 0.5 0 Plate sizing, sketch review, structural analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-06 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 0.5 0 quote review, vendor clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meetings, status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-09 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 0.5 0 Schedule B 247 for TTOpCo Tender, Revised Schedule B 269 for TTOpCo Tender Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-09 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-09 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 status update, documentation clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-09 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2 0 Completed Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-09 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 3 0 concept development, drawing review, structural analysis, field changes, material selection, gap clearance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-10 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1.5 0 Schedule B 247 for TTOpCo Tender, Revised Schedule B 269 for TTOpCo Tender Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-10 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 2.5 0 Completed Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-10 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 4 0 concept development, drawing review, structural analysis, field changes, material selection, gap clearance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-11 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1 0 Schedule B 247 for TTOpCo Tender, Revised Schedule B 269 for TTOpCo Tender Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-11 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 Hatch drawing review, concept development, padeye clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-11 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 1 0 Completed Closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-11 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 4 0 concept development, drawing review, structural analysis, field changes, material selection, gap clearance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-11 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 Quote review, clarification emails, meeting setup Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meetings, status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 249 no go bar drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-12 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3.5 0 Schedule B 247 for TTOpCo Tender, Revised Schedule B 269 for TTOpCo Tender Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-12 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 Hatch drawing review, concept development, padeye clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-12 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 2.5 0 concept development, drawing review, structural analysis, field changes, material selection, gap clearance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 249 no go bar drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-13 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3 0 Schedule B 247 for TTOpCo Tender, Revised Schedule B 269 for TTOpCo Tender Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-13 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 1 0 Hatch drawing review, concept development, padeye clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-13 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 Quote review, clarification emails, meeting setup Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meetings, status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 customs union research, importation research, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-16 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 1.5 0 Schedule B 247 for TTOpCo Tender, Revised Schedule B 269 for TTOpCo Tender Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-16 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 ODPL drawing obsolete, 209 drawing number discussions, desilter sheave belt clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-16 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 coorespondance with WOM and SGS for CU Cert, review of spool pictures, elbow fitting clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-16 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2 0 concept review, drawing review, pipe sizing, fitting selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-16 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 0.5 0 Quote review, Conference Call Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-17 Berkut-TSR :Berkut-TSR TSR-01596-BERP DES Winterization Study Regular Pay N 1 0 coorespondance with Legal about vendor data Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-17 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1.5 0 TSR review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-17 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1.5 0 TSR Review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 ODPL drawing obsolete, 209 drawing number discussions, desilter sheave belt clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-17 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 concept review, drawing review, pipe sizing, fitting selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-17 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1.5 0 Quote review, Conference Call Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 customs union research, importation research, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-18 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 4 0 coorespondance with WOM and SGS for CU Cert, review of spool pictures, elbow fitting clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-18 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 conference call, sketches for ALE Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-18 Rig 209L-TSR :Rig 209L-TSR TSR-01638-209L Gantry Crane Support Structure Regular Pay N 1 0 Extension of top plate, drawing comments Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meetings, status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 customs union research, importation research, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-19 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 coorespondance with WOM and SGS for CU Cert, review of spool pictures, elbow fitting clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-19 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 conference call, sketches for ALE Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-19 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 concept review, drawing review, pipe sizing, fitting selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-19 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 3 0 hatch design, drawing review, completed closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-20 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 coorespondance with WOM and SGS for CU Cert, review of spool pictures, elbow fitting clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-20 Rig 209L-TSR :Rig 209L-TSR TSR-01625-209L Casing Alignment Pad Eyes in Cellar & Stairs Regular Pay N 4.5 0 hatch design, drawing review, completed closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meetings, status meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-23 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-23 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 CU Cert Updates, Fitting procurement, status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-23 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2 0 Piping MTO, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-23 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 0.5 0 TSR Review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-23 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 GSM/Cundiff Proposal review, coorespondance with Operations, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-23 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 1 0 API 64 review, GE coorespondance, scope review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, status meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-24 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 CU Cert Updates, Fitting procurement, status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-24 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 Piping MTO, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-24 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 3 0 Concept development Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-24 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 3 0 API 64 review, GE coorespondance, scope review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, status meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-25 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 3 0 CU Cert Updates, Fitting procurement, status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-25 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 Weekly call, created MR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-25 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 2 0 GSM/Cundiff Proposal review, coorespondance with Operations, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-25 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 2 0 API 64 review, GE coorespondance, scope review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meetings, status meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-26 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 Weekly call, created MR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-26 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 Piping MTO, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-26 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1.5 0 GSM/Cundiff Proposal review, coorespondance with Operations, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-26 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 4 0 API 64 review, GE coorespondance, scope review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, status meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-27 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 Piping MTO, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-27 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1.5 0 Concept development Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-27 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 3 0 API 64 review, GE coorespondance, scope review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Status updates, TS meeting, Kretchet spec meeting, earnings report meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-30 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-30 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1.5 0 CU coorespondance, fittings from UK, shipping changes, PO revision Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-30 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 genesis kickoff, sharepoint setup, biweekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-30 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2 0 Drawing review, MTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-04-30 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 2 0 Correspondence with GE, Diverter Valve research, sections from operations Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-01 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 0.5 0 TSR and CTR review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Status updates, TS meeting, Kretchet spec meeting, earnings report meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 Odoptu Transfer station obsolete drawings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-01 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 CU coorespondance, fittings from UK, shipping changes, PO revision Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-01 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-01 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 genesis kickoff, sharepoint setup, biweekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-01 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 Drawing review, MTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-01 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 drawing review, stress on plate calculations, request for quotes, casing clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-01 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 0.5 0 TSR review, created CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-01 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 2 0 fan research, fan selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-01 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 1 0 Correspondence with GE, Diverter Valve research, sections from operations Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-02 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1.5 0 TSR review, Sketch review, created CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Status updates, TS meeting, Kretchet spec meeting, earnings report meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 Odoptu Transfer station obsolete drawings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-02 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 CU coorespondance, fittings from UK, shipping changes, PO revision Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-02 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-02 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 genesis kickoff, sharepoint setup, biweekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-02 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 drawing review, stress on plate calculations, request for quotes, casing clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-02 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 0.5 0 TSR review, created CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-02 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 1 0 Correspondence with GE, Diverter Valve research, sections from operations Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-03 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1 0 TSR review, Sketch review, created CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Status updates, TS meeting, Kretchet spec meeting, earnings report meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-03 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 CU coorespondance, fittings from UK, shipping changes, PO revision Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-03 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 genesis kickoff, sharepoint setup, biweekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-03 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 2 0 fan research, fan selection Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-03 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 1 0 Correspondence with GE, Diverter Valve research, sections from operations Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-04 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 TSR review, Sketch review, created CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Status updates, TS meeting, Kretchet spec meeting, earnings report meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-04 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 CU coorespondance, fittings from UK, shipping changes, PO revision Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-04 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 3.5 0 drawing review, stress on plate calculations, request for quotes, casing clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-04 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 0.5 0 Correspondence with GE, Diverter Valve research, sections from operations Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-07 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 Document collection, Tech Spec Review, Created CTR, Began TPP Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, board meetings, TS meeting, berkut kretchet specs Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 timesheet Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-07 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-07 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 2 0 Drawing review, vendor clarifications, quote questions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-07 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1 0 Fan selection and clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-07 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 2 0 coorespondance with GE about annular, compilation of operations input Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-08 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 2.5 0 Document collection, Tech Spec Review, Created CTR, Began TPP Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-08 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 MTO review Flange clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-08 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 0.5 0 TSR review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, board meetings, TS meeting, berkut kretchet specs Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 field questions on platforms Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-08 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 Visit HPPS for inspection, spool clarifications, Choke documentation Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-08 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 condensate drawing numbers, electrical clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-08 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 status update, genesis preliminary information Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-08 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 0.5 0 Fan selection and clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-08 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 0.5 0 coorespondance with GE about annular, compilation of operations input Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, board meetings, TS meeting, berkut kretchet specs Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-09 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 6 0 Visit HPPS for inspection, spool clarifications, Choke documentation Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-09 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 condensate drawing numbers, electrical clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-09 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 as built drawing review, P&ID redline Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-09 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 Drawing review, vendor clarifications, quote questions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-10 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1.5 0 Document collection, Tech Spec Review, Created CTR, Began TPP Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-10 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1 0 MTO review Flange clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, board meetings, TS meeting, berkut kretchet specs Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-10 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 Visit HPPS for inspection, spool clarifications, Choke documentation Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-10 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 condensate drawing numbers, electrical clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-10 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 status update, genesis preliminary information Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-10 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 2 0 as built drawing review, P&ID redline Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-11 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 Document collection, Tech Spec Review, Created CTR, Began TPP Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-11 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 1 0 TSR review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, board meetings, TS meeting, berkut kretchet specs Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-11 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 as built drawing review, P&ID redline Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-11 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 Drawing review, vendor clarifications, quote questions Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-11 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 1 0 coorespondance with GE about annular, compilation of operations input Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-14 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 Created TPP, Cameron vendor coordination Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meetings, status updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 Safety Moment, Timesheet Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-14 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-14 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 Status updates, PO revision, CU Cert Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-14 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1.5 0 Electrical redlines clarification, Condensate drawings review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-14 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 Drawing review, P&ID redlines Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-14 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1.5 0 Drawing review, Casing Procurement, vendor clarifications, quote review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-14 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 1 0 GE Response and call, valve research Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-15 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1.5 0 Drawing review, API 17D clarifications, flange dimensions, Spool OAL Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, status updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-15 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 Security Training Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-15 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 209 Condensate lines Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-15 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 Status updates, PO revision, CU Cert Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-15 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 Genesis review, biweekly conference call, action tracker update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-15 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 1.5 0 Fan Selection, Closed out Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-15 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 2 0 GE Response and call, valve research Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board meetings, status updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-16 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1.5 0 Genesis review, biweekly conference call, action tracker update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-16 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 Drawing review, P&ID redlines Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-16 Rig 272L-TSR :Rig 272L-TSR TSR-01610-272L-273L Mud Pump Room Ventilation Regular Pay N 6 0 Fan Selection, Closed out Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-17 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 3.5 0 Created TPP, Cameron vendor coordination Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-17 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1 0 Drawing review, API 17D clarifications, flange dimensions, Spool OAL Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board meetings, status updates, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 Safety Moment, Timesheet Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-17 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 Electrical redlines clarification, Condensate drawings review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-17 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 Drawing review, P&ID redlines Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-17 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 Drawing review, Casing Procurement, vendor clarifications, quote review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-18 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 3 0 Structural Analysis, Calc Check Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-18 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 Status updates, PO revision, CU Cert Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-18 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 Drawing review, Casing Procurement, vendor clarifications, quote review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-18 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 2 0 GE Response and call, valve research Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-21 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 TPP review, Cameron coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-21 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1.5 0 Drawing review, MTO review, material specifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, TS meeting, status meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-21 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 209 Condensate piping Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-21 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 valve numbers, line numbers, electrical clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-21 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 2.5 0 valve clarifications, worksheet update, conference call Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-22 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 TPP review, Cameron coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-22 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1.5 0 Drawing review, MTO review, material specifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TS meeting, status meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 209 Condensate piping Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-22 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-22 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 valve numbers, line numbers, electrical clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-22 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 P&ID review, revisions review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-22 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1.5 0 Drawing review, drawing revision, Quote review, welding procedure Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-22 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 1 0 valve clarifications, worksheet update, conference call Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-23 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 0.5 0 TPP review, Cameron coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-23 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 Drawing review, MTO review, material specifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-23 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 3 0 Post analysis, new concept, north side clashes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TS meeting, status meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-23 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 1 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-23 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 valve numbers, line numbers, electrical clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-23 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-23 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 P&ID review, revisions review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-23 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 Drawing review, drawing revision, Quote review, welding procedure Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-23 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 0.5 0 valve clarifications, worksheet update, conference call Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-24 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 Drawing review, MTO review, material specifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-24 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 4 0 Post analysis, new concept, north side clashes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 board meeting, TS meeting, status meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-24 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-24 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 P&ID review, revisions review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-24 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 2 0 Drawing review, drawing revision, Quote review, welding procedure Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-25 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 TPP review, Cameron coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-25 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 Drawing review, MTO review, material specifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-25 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 2.5 0 Post analysis, new concept, north side clashes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 board meeting, TS meeting, status meetings Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-25 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-25 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 1 0 valve clarifications, worksheet update, conference call Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-28 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Memorial Day Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-29 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 TPP to Cameron, status updates, email coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-29 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1 0 flange clarifications, drawing revision, quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status meetings, board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-29 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-29 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-29 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 0.5 0 Reopened TSR for design changes, new analysis, concept development, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-29 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 drawing review, redline clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-29 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1.5 0 ENL meeting, action tracker, email coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-29 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 drawing review, drawing redlines, began closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-29 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 1 0 conference call, status update, started CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-30 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 0.5 0 TPP to Cameron, status updates, email coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-30 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1 0 flange clarifications, drawing revision, quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-30 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 2 0 North/East new flange design review and analysis, new scope clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status meetings, board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-30 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 2 0 Reopened TSR for design changes, new analysis, concept development, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-30 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 ENL meeting, action tracker, email coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-30 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 drawing review, drawing redlines, began closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-30 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 quote revision, email clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-30 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 0.5 0 conference call, status update, started CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-31 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 TPP to Cameron, status updates, email coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-31 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 6 0 North/East new flange design review and analysis, new scope clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status meetings, board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-31 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 0.5 0 Reopened TSR for design changes, new analysis, concept development, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-05-31 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 0.5 0 drawing review, drawing redlines, began closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-01 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 flange clarifications, drawing revision, quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-01 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 3 0 North/East new flange design review and analysis, new scope clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status meetings, board meetings, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-01 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 ENL meeting, action tracker, email coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-01 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 1 0 drawing review, drawing redlines, began closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-01 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 quote revision, email clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-04 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-04 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 status updates, quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-04 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 help the intern Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-04 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-04 Rig 209L-TSR :Rig 209L-TSR TSR-01620-209L Active Tank Premix Piping Modification Regular Pay N 5 0 Completed CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-05 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 status updates, quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-05 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 0.5 0 structural analysis of stiffener design, revised CTR, concept and analysis of new post, clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 help the intern Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-05 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 2 0 Completed analysis, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-05 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-05 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 4 0 Completed CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-06 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-06 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 2.5 0 structural analysis of stiffener design, revised CTR, concept and analysis of new post, clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-06 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-06 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 2 0 DM report review, coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-06 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 quote review, status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-06 Rig 272L-TSR :Rig 272L-TSR TSR-01647-272L API 64 Gap Analysis Regular Pay N 2 0 Completed CO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-07 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 4.5 0 structural analysis of stiffener design, revised CTR, concept and analysis of new post, clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-07 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 Cat DGB presentation Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 PB platform lifting eyes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-07 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 DM report review, coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-07 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 0.5 0 quote review, status update Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-08 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-08 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 2 0 structural analysis of stiffener design, revised CTR, concept and analysis of new post, clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, board meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 PB platform lifting eyes Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-08 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 1 0 Completed analysis, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-11 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 status update, quote review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-11 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 4 0 New design analysis, stiffener thickness, revised CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-11 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-11 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 biweekly meeting, Genesis report review, clartifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-11 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 1 0 structural review, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-12 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 4 0 New design analysis, stiffener thickness, revised CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-12 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 3 0 review of local analysis, global analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-12 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 biweekly meeting, Genesis report review, clartifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-13 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 4 0 review of local analysis, global analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-13 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 1 0 trip information, ops coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-13 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 biweekly meeting, Genesis report review, clartifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-13 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 2 0 structural review, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-14 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 0.5 0 status update, quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-14 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 status update, quote review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-14 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 4.5 0 review of local analysis, global analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-14 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 1 0 trip information, ops coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-14 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 1 0 beam deflection assistance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-15 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 status update, quote clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-15 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 status update, quote review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-15 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 1.5 0 New design analysis, stiffener thickness, revised CTR Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-15 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 1 0 review of local analysis, global analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-15 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 0.5 0 trip information, ops coorespondance Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-15 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 biweekly meeting, Genesis report review, clartifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-15 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 0.5 0 structural review, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-18 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 2 0 global analysis, correspondence, solidworks review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status meeting, TS meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-18 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-18 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 PB report review, phase 2 scope of work Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-18 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 1 0 hand calc review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-18 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 2 0 drawing review, analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-19 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 3 0 Cameron exceptions, sanctions end user letter Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-19 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 2.5 0 drawing review, design analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-19 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 1 0 global analysis, correspondence, solidworks review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status meeting, TS meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-19 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 1 0 Visit set up, Rig visit and travel Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status meeting, TS meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-20 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 11 0 Visit set up, Rig visit and travel Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-21 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1 0 quote review, Woodco elbow exception Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-21 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 2 0 drawing review, design analysis Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-21 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 2 0 global analysis, correspondence, solidworks review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status meeting, TS meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-21 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 2 0 PB report review, phase 2 scope of work Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-25 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-26 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 5 0 final analysis, closeout, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-26 Rig 030B-TSR :Rig 030B-TSR TSR-01653-30B Tugger Line Routing Regular Pay N 1 0 field clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-26 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 1 0 condensate drawings review, clarifications, CO review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-26 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 weekly meeting, genesis report review, closeout review, phase 2 scope Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-26 Rig 265L-TSR :Rig 265L-TSR TSR-01650-265L Cellar Cover (Crescent) Regular Pay N 0.5 0 drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-27 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 0.5 0 exception log, quote clarifications, documentation requirements Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-27 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 5.5 0 final analysis, closeout, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-27 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 condensate drawings review, clarifications, CO review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-27 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 2 0 weekly meeting, genesis report review, closeout review, phase 2 scope Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-28 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 0.5 0 exception log, quote clarifications, documentation requirements Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-28 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 1 0 RFQ to new vendors Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-28 Berkut-TSR :Berkut-TSR TSR-01643-BERP Wireline Unit Structural Posts Regular Pay N 5.5 0 final analysis, closeout, drawing review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-28 Rig 209L-TSR :Rig 209L-TSR TSR-01602-209L Red Lines for Engineering Work PACS Regular Pay N 0.5 0 condensate drawings review, clarifications, CO review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-28 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 weekly meeting, genesis report review, closeout review, phase 2 scope Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-29 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 exception log, quote clarifications, documentation requirements Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-29 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 3.5 0 final analysis, closeout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-06-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-02 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1 0 cameron exception list, RUSD standard clarifications, quote review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-02 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 new vendor RFQ, vendor clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-02 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 3.5 0 analysis UC comparison, flange load clarifications, cloaseout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 status meetings, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-02 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-02 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 ALE call for scope, Lief call for scope, phase 2 scope, clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-02 Rig 209L-TSR :Rig 209L-TSR TSR-01640-209L Casing Jetting Tool Regular Pay N 1 0 vendor clarifications, casing procurement Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-03 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 7 0 analysis UC comparison, flange load clarifications, cloaseout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status meetings, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-03 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 0.5 0 ALE call for scope, Lief call for scope, phase 2 scope, clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 4th of July Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-05 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 new vendor RFQ, vendor clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-05 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 6 0 analysis UC comparison, flange load clarifications, cloaseout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status meetings, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-05 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 ALE call for scope, Lief call for scope, phase 2 scope, clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-06 Berkut-TSR :Berkut-TSR TSR-01633-BERP Choke Manifold Replacement Regular Pay N 1.5 0 cameron exception list, RUSD standard clarifications, quote review Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-06 Berkut-TSR :Berkut-TSR TSR-01639-BERP Choke and Kill Lines Regular Pay N 0.5 0 new vendor RFQ, vendor clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-06 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 2.5 0 analysis UC comparison, flange load clarifications, cloaseout Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 status meetings, Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-06 Rig 209L-TSR :Rig 209L-TSR TSR-01617-209L Rig Move to SWS Regular Pay N 1 0 ALE call for scope, Lief call for scope, phase 2 scope, clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2018-07-06 Rig 209L-TSR :Rig 209L-TSR TSR-01644-209L Electrical Workshop Trolley Beam Regular Pay N 1 0 tsr review, hand calc clarifications Reyna, Esperanza Buyer 27952 Reyna, Esperanza:Buyer 2017-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Year's Holiday Reyna, Esperanza Buyer 27952 Reyna, Esperanza:Buyer 2017-01-03 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 Ongoing support to Sakhalin, ODOPTU Rig 209 Commissioning. Reyna, Esperanza Buyer 27952 Reyna, Esperanza:Buyer 2017-01-04 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 Ongoing support to Sakhalin, ODOPTU Rig 209 Commissioning. Reyna, Esperanza Buyer 27952 Reyna, Esperanza:Buyer 2017-01-05 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 Ongoing support to Sakhalin, ODOPTU Rig 209 Commissioning. Reyna, Esperanza Buyer 27952 Reyna, Esperanza:Buyer 2017-01-06 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 Ongoing support to Sakhalin, ODOPTU Rig 209 Commissioning. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-09-18 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Completed Steps 1 & 2 on Maintenance Plans 10119920, 10080279, 10080324, 10080331 for C101-08-10 & 20. 1 Hour SAP Remote tutorial Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-09-19 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Completed Steps 1 & 2 on Maintenance Plans 10119920, 10080279, 10080324, 10080331 for C101-08-10 & 20. 1 Hour SAP Remote tutorial Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-09-20 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 3 0 Completed Steps 1 & 2 on Maintenance Plans 10119920, 10080279, 10080324, 10080331 for C101-08-10 & 20. 1 Hour SAP Remote tutorial Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-09-21 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Completed Steps 1 & 2 on Maintenance Plans 10119920, 10080279, 10080324, 10080331 for C101-08-10 & 20. 1 Hour SAP Remote tutorial Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-09-22 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Completed Steps 1 & 2 on Maintenance Plans 10119920, 10080279, 10080324, 10080331 for C101-08-10 & 20. 1 Hour SAP Remote tutorial Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-09-25 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Completed Step 1 on Maintenance Plans 10080294, 10080325, 10080326, 10119921 for C101-08-10 & 20. 1-1/2 Hour Project Handover meeting Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-10-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Completed Step 2 on Maintenance Plans 10080294, 10080325, 10080326, 10119921 for C101-08-10 & 20. Completed Steps 1 & 2 on Maintenance Plans 10080309, 10080327, 10080328, 10080329, 10119922, 10126143 for C101-08-10 & 20. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-10-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Completed Step 2 on Maintenance Plans 10080294, 10080325, 10080326, 10119921 for C101-08-10 & 20. Completed Steps 1 & 2 on Maintenance Plans 10080309, 10080327, 10080328, 10080329, 10119922, 10126143 for C101-08-10 & 20. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-10-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 5 0 Completed Step 2 on Maintenance Plans 10080294, 10080325, 10080326, 10119921 for C101-08-10 & 20. Completed Steps 1 & 2 on Maintenance Plans 10080309, 10080327, 10080328, 10080329, 10119922, 10126143 for C101-08-10 & 20. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-10-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Completed Step 2 on Maintenance Plans 10080294, 10080325, 10080326, 10119921 for C101-08-10 & 20. Completed Steps 1 & 2 on Maintenance Plans 10080309, 10080327, 10080328, 10080329, 10119922, 10126143 for C101-08-10 & 20. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-10-10 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Completed Steps 1 & 2 on Maintenance Plans 10080280, 10080285, 10080287, 10080291, 10080295, 10080300, 10080302, 10080306, 10080315, 10080316, 10080321, 10080335, 10080340, 10080342, 10080346, 10080350, 10080355, 10080357, 10080361, 10080365, 10080370, 10080371 for C101-08-10 & 20. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-10-11 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Completed Steps 1 & 2 on Maintenance Plans 10080280, 10080285, 10080287, 10080291, 10080295, 10080300, 10080302, 10080306, 10080315, 10080316, 10080321, 10080335, 10080340, 10080342, 10080346, 10080350, 10080355, 10080357, 10080361, 10080365, 10080370, 10080371 for C101-08-10 & 20. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-10-12 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Completed Steps 1 & 2 on Maintenance Plans 10080280, 10080285, 10080287, 10080291, 10080295, 10080300, 10080302, 10080306, 10080315, 10080316, 10080321, 10080335, 10080340, 10080342, 10080346, 10080350, 10080355, 10080357, 10080361, 10080365, 10080370, 10080371 for C101-08-10 & 20. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-10-13 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Completed Steps 1 & 2 on Maintenance Plans 10080280, 10080285, 10080287, 10080291, 10080295, 10080300, 10080302, 10080306, 10080315, 10080316, 10080321, 10080335, 10080340, 10080342, 10080346, 10080350, 10080355, 10080357, 10080361, 10080365, 10080370, 10080371 for C101-08-10 & 20. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-10-18 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Completed step 2 on Maintenance Plans 10087453, 10087454, 10087455, 10087456, 10087457, & 10087458. Completed step 1 on maintenance plans 10080289, 10080293,10080304, 10080308,10080319, 10080323, 10080344, 10080348, 10080359, 10080363, & 10080374. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-10-24 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Completed step 2 on maintenance plans 10080289, 10080293,10080304, 10080308,10080319, 10080323, 10080344, 10080348, 10080359, 10080363, & 10080374. Completed step 1 & 2 on maintenance plans 10080289, 10080330 10080376, 10080378 10080384, 10080387 10080385, 10080332 10080386, 10080333. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-10-25 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Completed step 2 on maintenance plans 10080289, 10080293,10080304, 10080308,10080319, 10080323, 10080344, 10080348, 10080359, 10080363, & 10080374. Completed step 1 & 2 on maintenance plans 10080289, 10080330 10080376, 10080378 10080384, 10080387 10080385, 10080332 10080386, 10080333. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-11-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 3 0 Associate equipment numbers to all maintenance plans in C101-08-10 & 20. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-11-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 11/05 :Depart LFT @ 0945 & Arrive YYT 0120 11/06: Review maintenance task issues in SAP & how the system is being used; with Ron Taaffe, Steve Sharpe, & Jeffery Weitzel 11/07: Continue to study maintenance task update issues with Parker personnel & prepare to discuss with Exxon Mobil 11/08: Discuss options for updating SAP maintenance tasks, asset criticality, failures and counters for the Hibernia and explore unused functionality in SAP with Parker and Exxon Mobil personnel 11/09: Plan forward approach to SAP maintenance tasks updates, assignment for asset criticality, and exploration of unused SAP functionality 11/10: Depart YYT @ 1330 & Arrive LFT @ 2200 Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-11-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 7.5 0 11/05 :Depart LFT @ 0945 & Arrive YYT 0120 11/06: Review maintenance task issues in SAP & how the system is being used; with Ron Taaffe, Steve Sharpe, & Jeffery Weitzel 11/07: Continue to study maintenance task update issues with Parker personnel & prepare to discuss with Exxon Mobil 11/08: Discuss options for updating SAP maintenance tasks, asset criticality, failures and counters for the Hibernia and explore unused functionality in SAP with Parker and Exxon Mobil personnel 11/09: Plan forward approach to SAP maintenance tasks updates, assignment for asset criticality, and exploration of unused SAP functionality 11/10: Depart YYT @ 1330 & Arrive LFT @ 2200 Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-11-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 11/05 :Depart LFT @ 0945 & Arrive YYT 0120 11/06: Review maintenance task issues in SAP & how the system is being used; with Ron Taaffe, Steve Sharpe, & Jeffery Weitzel 11/07: Continue to study maintenance task update issues with Parker personnel & prepare to discuss with Exxon Mobil 11/08: Discuss options for updating SAP maintenance tasks, asset criticality, failures and counters for the Hibernia and explore unused functionality in SAP with Parker and Exxon Mobil personnel 11/09: Plan forward approach to SAP maintenance tasks updates, assignment for asset criticality, and exploration of unused SAP functionality 11/10: Depart YYT @ 1330 & Arrive LFT @ 2200 Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-11-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 11/05 :Depart LFT @ 0945 & Arrive YYT 0120 11/06: Review maintenance task issues in SAP & how the system is being used; with Ron Taaffe, Steve Sharpe, & Jeffery Weitzel 11/07: Continue to study maintenance task update issues with Parker personnel & prepare to discuss with Exxon Mobil 11/08: Discuss options for updating SAP maintenance tasks, asset criticality, failures and counters for the Hibernia and explore unused functionality in SAP with Parker and Exxon Mobil personnel 11/09: Plan forward approach to SAP maintenance tasks updates, assignment for asset criticality, and exploration of unused SAP functionality 11/10: Depart YYT @ 1330 & Arrive LFT @ 2200 Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-11-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 11/05 :Depart LFT @ 0945 & Arrive YYT 0120 11/06: Review maintenance task issues in SAP & how the system is being used; with Ron Taaffe, Steve Sharpe, & Jeffery Weitzel 11/07: Continue to study maintenance task update issues with Parker personnel & prepare to discuss with Exxon Mobil 11/08: Discuss options for updating SAP maintenance tasks, asset criticality, failures and counters for the Hibernia and explore unused functionality in SAP with Parker and Exxon Mobil personnel 11/09: Plan forward approach to SAP maintenance tasks updates, assignment for asset criticality, and exploration of unused SAP functionality 11/10: Depart YYT @ 1330 & Arrive LFT @ 2200 Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-11-10 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 11/05 :Depart LFT @ 0945 & Arrive YYT 0120 11/06: Review maintenance task issues in SAP & how the system is being used; with Ron Taaffe, Steve Sharpe, & Jeffery Weitzel 11/07: Continue to study maintenance task update issues with Parker personnel & prepare to discuss with Exxon Mobil 11/08: Discuss options for updating SAP maintenance tasks, asset criticality, failures and counters for the Hibernia and explore unused functionality in SAP with Parker and Exxon Mobil personnel 11/09: Plan forward approach to SAP maintenance tasks updates, assignment for asset criticality, and exploration of unused SAP functionality 11/10: Depart YYT @ 1330 & Arrive LFT @ 2200 Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-11-16 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Review Top Drive DC Motor Maintenance assignment. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-11-21 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Analyze maintenance planes for DC Top Drive motors & J-Boxes for equipment numbers 10414891 & 10414901. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-11-22 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 3 0 Analyze maintenance planes for DC Top Drive motors & J-Boxes for equipment numbers 10414891 & 10414901. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-11-28 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 PM Review Projects Meetings 1 HR each on Nov. 28, 29, 30. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-11-29 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 PM Review Projects Meetings 1 HR each on Nov. 28, 29, 30. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-11-30 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Reviewing & organizing Top Drive maintenance from SAP, original documentation, and Parker drilling maintenance plans. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-11-30 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 PM Review Projects Meetings 1 HR each on Nov. 28, 29, 30. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-12-01 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 3 0 Reviewing & organizing Top Drive maintenance from SAP, original documentation, and Parker drilling maintenance plans. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-12-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Reviewing and updating maintenance plans 10080753, 10080756, 10080763, 10080806, & 101126262. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-12-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Reviewing and updating maintenance plans 10080753, 10080756, 10080763, 10080806, & 101126262. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-12-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 12/5/17 Project meeting. 1 Hour 12/6/17 & 12/7/17 Reviewing TDS-6S OEM manual for mechanical maintenance & PKD TDS-4S mechanical maintenance. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-12-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Reviewing and updating maintenance plans 10080753, 10080756, 10080763, 10080806, & 101126262. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-12-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 12/5/17 Project meeting. 1 Hour 12/6/17 & 12/7/17 Reviewing TDS-6S OEM manual for mechanical maintenance & PKD TDS-4S mechanical maintenance. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-12-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Reviewing and updating maintenance plans 10080753, 10080756, 10080763, 10080806, & 101126262. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-12-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 12/5/17 Project meeting. 1 Hour 12/6/17 & 12/7/17 Reviewing TDS-6S OEM manual for mechanical maintenance & PKD TDS-4S mechanical maintenance. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-12-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Reviewing and updating maintenance plans 10080753, 10080756, 10080763, 10080806, & 101126262. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-12-11 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Review and identify duplicates in TDS-6S mechanical tasks and standardizing those operations. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-12-12 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Meetings each day for Hibernia PM review status. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-12-13 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Meetings each day for Hibernia PM review status. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-12-14 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 0.5 0 Meetings each day for Hibernia PM review status. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-12-20 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 0.5 0 Unable to log into SAP Report login failure Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2017-12-27 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 0.5 0 Unable to log into SAP Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1.5 0 Review SAP mass loading template for asset data. Updating asset data is not within the project scope, though the data is severely lacking. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-01-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 1 0 Review maintenance data from C101-17-10-A & C101-17-10-J for assets 10399857 & 10399937 for completeness. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-01-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Review status meeting with Greg and Mike. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-01-24 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 1/24 - Review SAP Data templates and user guide. 1/25 - Travel to Exxon office & participate in meeting for use of data templates for mass loading data. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-01-25 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 1/24 - Review SAP Data templates and user guide. 1/25 - Travel to Exxon office & participate in meeting for use of data templates for mass loading data. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-01 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Updating reviewed maintenance tasks to meet template requirements. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Compiling revised LTV Energy FC-1600 maintenance tasks. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Updating reviewed maintenance tasks to meet template requirements. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Two hours for project meetings. Create and submit templates for tong text updates. (No issues) Reviewing task list update template. Reviewing submitted maintenance updates. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-07 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 1 0 Two hours for project meetings. Create and submit templates for tong text updates. (No issues) Reviewing task list update template. Reviewing submitted maintenance updates. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Updating Aux Brake proposed maintenance tasks. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Two hours for project meetings. Create and submit templates for tong text updates. (No issues) Reviewing task list update template. Reviewing submitted maintenance updates. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Two hours for project meetings. Create and submit templates for tong text updates. (No issues) Reviewing task list update template. Reviewing submitted maintenance updates. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-13 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Research O&M manuals for LTV Energy FC-1600 Mud Pumps Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-15 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Research O&M manuals for LTV Energy FC-1600 Mud Pumps Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-16 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 3 0 Revising maintenance plans 10080279, 10080294, & 10080309 on the FC-1600 Mud Pumps. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-21 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Reviewing and updating formatting of previously submitted maintenance operations. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-22 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Reviewing and updating formatting of previously submitted maintenance operations. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-23 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Reviewing and updating formatting of previously submitted maintenance operations. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-26 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Reviewing and updating formatting of previously submitted maintenance operations. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-02-28 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Reviewing and updating formatting of previously submitted maintenance operations. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-03-01 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Reviewing and updating formatting of previously submitted maintenance operations. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-03-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Reviewing and updating formatting of previously submitted maintenance operations. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-03-05 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Reviewing and updating formatting of previously submitted maintenance operations. Accessing test database and reviewing loaded test data for long text updates. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-03-06 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Reviewing and updating formatting of previously submitted maintenance operations. Accessing test database and reviewing loaded test data for long text updates. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-03-08 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 2 0 Updating maintenance tasks for FC-1600 Mud Pumps Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-03-09 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Reviewing and updating formatting of previously submitted maintenance operations. Accessing test database and reviewing loaded test data for long text updates. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-03-28 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 5 0 Added maintenance plan 10099394 to the file TD PKG Equip 10379079 RTL MA 2-15-2018 on the TD PKG #10379079 and Task Listing Long Text Updates worksheet Building monthly maintenance plan for 1600 Mud Pumps. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-04-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Reviewing Project status, and preparing for turnover meeting. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-04-11 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Research data request for Mark and Adam for Oracle maintenance on heat exchangers. Provide CAT III & IV Mast Inspections. Provide example of rewrite of SAP maintenance plan for heat exchanger. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-04-12 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Research data request for Mark and Adam for Oracle maintenance on heat exchangers. Provide CAT III & IV Mast Inspections. Provide example of rewrite of SAP maintenance plan for heat exchanger. Rouse, Roger Maintenance Supervisor ROGERROUSE Rouse, Roger:Maintenance Supervisor 2018-04-25 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Research and review heat exchanger maintenance plans with Mark & Adam. Still unable to launch SAP desktop. Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-01-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-01-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-01-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-01-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-01-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-01-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-01-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-01-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-01-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-01-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-01-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-01-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-01-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-01-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-01-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-01-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-01-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-01-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-01-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-02-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-02-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-02-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-02-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-02-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-02-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-02-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-02-13 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-02-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-02-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-02-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-02-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-02-20 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-02-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-02-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-02-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-02-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-02-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-02-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-03-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-03-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-03-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-03-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-03-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-03-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-03-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-03-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-03-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-03-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-03-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-03-17 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-03-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-03-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-03-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-03-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-03-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-03-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-03-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-03-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-03-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-03-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-04-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-04-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-04-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-04-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-04-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-04-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-04-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-04-14 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-04-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-04-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-04-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-04-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-04-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-04-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-04-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-04-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-04-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Sentmanat, Jacqueline Group Controller I 39034 Sentmanat, Jacqueline:Group Controller I 2017-04-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-03 OH-018 :OH-018 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-05 OH-018 :OH-018 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-06 OH-018 :OH-018 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-09 OH-018 :OH-018 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-10 OH-010 :OH-010 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-10 OH-018 :OH-018 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-11 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-11 OH-018 :OH-018 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-12 OH-018 :OH-018 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-13 OH-018 :OH-018 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-18 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-18 OH-018 :OH-018 Overhead All Activities Regular Pay N 9 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Global Marine Services - review proposal from Middle East & conference calls. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-19 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Global Marine Services - review proposal from Middle East & conference calls. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Global Marine Services - review proposal from Middle East & conference calls. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-24 OH-018 :OH-018 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-25 OH-018 :OH-018 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-26 OH-018 :OH-018 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Ops call & preparation for same; other misc meetings Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Husky development & whipstock sales Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-30 OH-018 :OH-018 Overhead All Activities Regular Pay N 3 0 2M-tek & Whipstocks Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Ops call & preparation for same; other misc meetings Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Husky development & whipstock sales Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-01-31 OH-018 :OH-018 Overhead All Activities Regular Pay N 1 0 2M-tek & Whipstocks Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-01 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 to/from 2M-TEK Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-01 OH-018 :OH-018 Overhead All Activities Regular Pay N 8 0 2M-tek & Whipstocks Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-02 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 to/from 2M-TEK Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-02 OH-018 :OH-018 Overhead All Activities Regular Pay N 3 0 2M-tek & Whipstocks Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Husky development & whipstock sales Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-03 OH-018 :OH-018 Overhead All Activities Regular Pay N 4 0 2M-tek & Whipstocks Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-06 OH-018 :OH-018 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 3.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-07 OH-018 :OH-018 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-08 OH-018 :OH-018 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-09 OH-018 :OH-018 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-10 OH-018 :OH-018 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-13 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-14 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-15 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-16 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-17 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-20 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-21 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-22 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-22 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-23 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-23 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-24 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-27 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-27 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 FBI special agent Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-28 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-02-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-01 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-02 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-03 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-06 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 3.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-07 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-07 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-08 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-08 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-09 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-09 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 sharepoint 2016 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-10 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-10 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 sharepoint 2016 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-13 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-15 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-17 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-21 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-22 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-22 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 PlusPetrol Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 PlusPetrol Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-24 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 PlusPetrol Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-27 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 handover to 2M; general phone calls with AJ Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-27 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1.5 0 KOC contract review meetings; writing email to Bryan C and Leadership advising them to start the full DD for Kuwait Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 weekly ops call; weekly team meetings; catch up meetings with support staff Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 annual performance reviews; Operational excellence planning & work Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-28 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 KOC contract review meetings; writing email to Bryan C and Leadership advising them to start the full DD for Kuwait Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly ops call; weekly team meetings; catch up meetings with support staff Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 annual performance reviews; Operational excellence planning & work Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly ops call; weekly team meetings; catch up meetings with support staff Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 annual performance reviews; Operational excellence planning & work Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 DD discussions on various countries Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 weekly ops call; weekly team meetings; catch up meetings with support staff Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 annual performance reviews; Operational excellence planning & work Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-31 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 handover to 2M; general phone calls with AJ Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-31 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 KOC contract review meetings; writing email to Bryan C and Leadership advising them to start the full DD for Kuwait Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly ops call; weekly team meetings; catch up meetings with support staff Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-03-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 annual performance reviews; Operational excellence planning & work Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 year-end reviews; operational excellence development; summary of role changes; reviewing 269 AFE; general email Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Pluspetrol Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-04 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 year-end reviews; operational excellence development; summary of role changes; reviewing 269 AFE; general email Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 year-end reviews; operational excellence development; summary of role changes; reviewing 269 AFE; general email Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Pluspetrol Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-07 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 3.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-12 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1.5 0 signing checks to vendors; general discussion with AJ while he was here in the office; research on company using TOP-TEK pictures for their own marketing Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-14 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2.5 0 discussion & developing slides for Peru - Geothermal Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 3.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-04-21 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 meeting with Cahill (st.Johns) & networking dinners Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-01 OH-010 :OH-010 Overhead All Activities Regular Pay N 1 0 travel to/from OTC Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 meeting with Cahill (st.Johns) & networking dinners Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-02 OH-010 :OH-010 Overhead All Activities Regular Pay N 1 0 travel to/from OTC Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-02 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 Attending OTC technical sessions Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 meeting with Cahill (st.Johns) & networking dinners Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-03 OH-010 :OH-010 Overhead All Activities Regular Pay N 1 0 travel to/from OTC Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-03 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 Attending OTC technical sessions Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-04 OH-010 :OH-010 Overhead All Activities Regular Pay N 1 0 travel to/from OTC Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-04 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 Attending OTC technical sessions Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 meeting with Cahill (st.Johns) & networking dinners Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 working on PlusPetrol technical tender. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 working on PlusPetrol technical tender. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 working on PlusPetrol technical tender. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-15 OH-010 :OH-010 Overhead All Activities Regular Pay N 3.5 0 Driving to/from Galveston Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-15 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 TapRoot Training in Galveston Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-16 OH-010 :OH-010 Overhead All Activities Regular Pay N 3.5 0 Driving to/from Galveston Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-16 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 TapRoot Training in Galveston Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-17 OH-010 :OH-010 Overhead All Activities Regular Pay N 3.5 0 Driving to/from Galveston Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-17 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 TapRoot Training in Galveston Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-18 OH-010 :OH-010 Overhead All Activities Regular Pay N 1.5 0 Driving to/from Galveston Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-18 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 TapRoot Training in Galveston Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-19 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 Driving to/from Galveston Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-19 OH-014 :OH-014 Overhead All Activities Regular Pay N 5 0 TapRoot Training in Galveston Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 weekly ops call; Pluspetrol discussions; IDR ROT campeign; Operations Excellence discussions; Review KOC rig bids; IADC ART committee Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Operations excellence review; Procedural discipline development; IDR ROT work; emails; timesheets; IADC ART committee preparation; discussions re: 1/2-day Fridays; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 weekly ops call; Pluspetrol discussions; IDR ROT campeign; Operations Excellence discussions; Review KOC rig bids; IADC ART committee Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Operations excellence review; Procedural discipline development; IDR ROT work; emails; timesheets; IADC ART committee preparation; discussions re: 1/2-day Fridays; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Pluspetrol; KOC Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 3.5 0 weekly ops call; Pluspetrol discussions; IDR ROT campeign; Operations Excellence discussions; Review KOC rig bids; IADC ART committee Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Operations excellence review; Procedural discipline development; IDR ROT work; emails; timesheets; IADC ART committee preparation; discussions re: 1/2-day Fridays; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Pluspetrol; KOC Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 weekly ops call; Pluspetrol discussions; IDR ROT campeign; Operations Excellence discussions; Review KOC rig bids; IADC ART committee Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.5 0 Operations excellence review; Procedural discipline development; IDR ROT work; emails; timesheets; IADC ART committee preparation; discussions re: 1/2-day Fridays; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Operations excellence review; Procedural discipline development; IDR ROT work; emails; timesheets; IADC ART committee preparation; discussions re: 1/2-day Fridays; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-29 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 BoD Presentation slides review; Rig271 - Bolivia tender review; Weekly team meeting Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 5/30: reviewing 271 tender docs to prepare for review meeting. 5/31: Russia BD discussions with Shane H. 6/01: XOM/SLB kickoff for S.Iraq Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 BoD Presentation slides review; Rig271 - Bolivia tender review; Weekly team meeting Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-05-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 5/30: reviewing 271 tender docs to prepare for review meeting. 5/31: Russia BD discussions with Shane H. 6/01: XOM/SLB kickoff for S.Iraq Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 BoD Presentation slides review; Rig271 - Bolivia tender review; Weekly team meeting Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 5/30: reviewing 271 tender docs to prepare for review meeting. 5/31: Russia BD discussions with Shane H. 6/01: XOM/SLB kickoff for S.Iraq Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 BoD Presentation slides review; Rig271 - Bolivia tender review; Weekly team meeting Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-07 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-08 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-09 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 6/12: weekly ops call; weekly GDOE meeting; catch-up with Jeana S; Presentation review wtih Bryan C; 6/13: introduction to Kerui; discussions with Ed M. and Kelly T.; review 2017 perf. goals with GO and Steve C 6/15: TS update meeting; David V to understand 2017 scope of Audits 6/16: discussions with Carlos C re: marketing to EPC contractors Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 6/14: lunch w/ Greg Carter 6/15: total Uganda kickoff; meeting with Robb P to discuss developing marketing materials Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 6/12: weekly ops call; weekly GDOE meeting; catch-up with Jeana S; Presentation review wtih Bryan C; 6/13: introduction to Kerui; discussions with Ed M. and Kelly T.; review 2017 perf. goals with GO and Steve C 6/15: TS update meeting; David V to understand 2017 scope of Audits 6/16: discussions with Carlos C re: marketing to EPC contractors Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 6/14: lunch w/ Greg Carter 6/15: total Uganda kickoff; meeting with Robb P to discuss developing marketing materials Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-14 OH-010 :OH-010 Overhead All Activities Regular Pay N 0.5 0 6/13: drive to/from lunch 6/15: drive to Rig-Serve office in Sugarland Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 6/12: weekly ops call; weekly GDOE meeting; catch-up with Jeana S; Presentation review wtih Bryan C; 6/13: introduction to Kerui; discussions with Ed M. and Kelly T.; review 2017 perf. goals with GO and Steve C 6/15: TS update meeting; David V to understand 2017 scope of Audits 6/16: discussions with Carlos C re: marketing to EPC contractors Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 6/14: lunch w/ Greg Carter 6/15: total Uganda kickoff; meeting with Robb P to discuss developing marketing materials Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-15 OH-010 :OH-010 Overhead All Activities Regular Pay N 1 0 6/13: drive to/from lunch 6/15: drive to Rig-Serve office in Sugarland Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 6/12: weekly ops call; weekly GDOE meeting; catch-up with Jeana S; Presentation review wtih Bryan C; 6/13: introduction to Kerui; discussions with Ed M. and Kelly T.; review 2017 perf. goals with GO and Steve C 6/15: TS update meeting; David V to understand 2017 scope of Audits 6/16: discussions with Carlos C re: marketing to EPC contractors Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-19 OH-010 :OH-010 Overhead All Activities Regular Pay N 10 0 flights to/from St. Johns Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Meetings in St.Johns and attending the NOIA conference Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Meetings in St.Johns and attending the NOIA conference Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 Meetings in St.Johns and attending the NOIA conference Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-23 OH-010 :OH-010 Overhead All Activities Regular Pay N 10 0 flights to/from St. Johns Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-28 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-06-30 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 3.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-06 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-07 OH-009 :OH-009 OH-009-003 Husky Energy WREP Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-10 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-17 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 2.5 0 Reviewing cost estimates, rig layout and bid preparation meetings Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-18 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 working on the iTS R&S sublease agreement Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Bolivia high-altitude rig Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Bolivia high-altitude rig Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-19 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 1 0 Reviewing cost estimates, rig layout and bid preparation meetings Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-20 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 working on the iTS R&S sublease agreement Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Bolivia high-altitude rig Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-21 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 2 0 Reviewing cost estimates, rig layout and bid preparation meetings Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 ENAP, Pluspetrol & Talos Energy Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-24 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 2 0 bid review, IT costing, finance review Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-25 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 sublease of Bourgeois Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 ENAP, Pluspetrol & Talos Energy Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-25 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 3 0 bid review, IT costing, finance review Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 ENAP, Pluspetrol & Talos Energy Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-26 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 3 0 bid review, IT costing, finance review Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 ENAP, Pluspetrol & Talos Energy Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-27 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 4 0 bid review, IT costing, finance review Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-31 OH-003 :OH-003 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-07-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Projects for Bryan Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Projects for Bryan Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Talos energy Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Projects for Bryan Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Talos energy Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Projects for Bryan Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Talos energy Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-03 OH-010 :OH-010 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Projects for Bryan Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 weekly ops update, monthly maintenance telecon, IADC meeting, Asset Management change project, IMS document review Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 email, timesheets, other projects Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Pluspetrol and KOC reviews Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 3.5 0 weekly ops update, monthly maintenance telecon, IADC meeting, Asset Management change project, IMS document review Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 email, timesheets, other projects Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Pluspetrol and KOC reviews Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 5 0 weekly ops update, monthly maintenance telecon, IADC meeting, Asset Management change project, IMS document review Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 email, timesheets, other projects Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-09 OH-010 :OH-010 Overhead All Activities Regular Pay N 1.5 0 to/from IADC meeting Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 weekly ops update, monthly maintenance telecon, IADC meeting, Asset Management change project, IMS document review Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 email, timesheets, other projects Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Pluspetrol and KOC reviews Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 email, timesheets, other projects Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-21 OH-011 :OH-011 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-25 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Project and department meetings. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-28 OH-011 :OH-011 Overhead All Activities Regular Pay N 6 0 Time-off for Harvey Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-29 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Time-off for Harvey Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Various department & Team projects Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-30 OH-011 :OH-011 Overhead All Activities Regular Pay N 6 0 Time-off for Harvey Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Project and department meetings. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-08-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Various department & Team projects Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Project and department meetings. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Various department & Team projects Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 KOC tender Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 KOC tender Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-06 OH-014 :OH-014 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-07 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-08 OH-011 :OH-011 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 KOC tender & YPFB Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 KOC tender & YPFB Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-14 OH-010 :OH-010 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 8 0 Monday: Drilling Team Meeting w/BC Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-19 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 Working on Sublease agreement for iTS -Houston office & removal of overhead crane from workshop Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Monday: Drilling Team Meeting w/BC Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-20 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 Working on Sublease agreement for iTS -Houston office & removal of overhead crane from workshop Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-21 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 2 0 Working on Sublease agreement for iTS -Houston office & removal of overhead crane from workshop Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Monday: Drilling Team Meeting w/BC Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-22 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 Working on Sublease agreement for iTS -Houston office & removal of overhead crane from workshop Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Monday: Drilling Team Meeting w/BC Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-25 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 Crane removal Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Cydsa & KOC Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-26 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 3 0 Crane removal Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-26 OH-010 :OH-010 Overhead All Activities Regular Pay N 1 0 driving from iTS to GW5 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-28 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 Crane removal Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 3.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Cydsa & KOC Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-29 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 Crane removal Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-09-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Cydsa & KOC Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-02 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 Moveout of iTS Houston facility & crane removal. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 KOC and PlusPetrol support Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-03 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 2 0 Moveout of iTS Houston facility & crane removal. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 KOC and PlusPetrol support Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-04 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 7 0 Moveout of iTS Houston facility & crane removal. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-04 OH-010 :OH-010 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-05 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 Moveout of iTS Houston facility & crane removal. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 KOC and PlusPetrol support Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-06 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 Moveout of iTS Houston facility & crane removal. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2.5 0 KOC and PlusPetrol support Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 KOC, PlusPetrol & Total-Uganda Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-10 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 KOC, PlusPetrol & Total-Uganda Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-12 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 KOC, PlusPetrol & Total-Uganda Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 KOC, PlusPetrol & Total-Uganda Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 KOC; TOTAL Uganda; Pluspetrol Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 KOC; TOTAL Uganda; Pluspetrol Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-18 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 Reviewing files from the iTS office; chasing the Sublease. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 KOC; TOTAL Uganda; Pluspetrol Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 KOC; TOTAL Uganda; Pluspetrol Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-24 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 serviceNow and Legal for managers Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-25 OH-011 :OH-011 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-26 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 serviceNow and Legal for managers Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 customer meetings with Whistler & Talos Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-31 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 customer meetings with Whistler & Talos Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-10-31 OH-010 :OH-010 Overhead All Activities Regular Pay N 3 0 Driving from home to Whistler to Talos to home Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 customer meetings with Whistler & Talos Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-01 OH-010 :OH-010 Overhead All Activities Regular Pay N 1 0 Driving from home to Whistler to Talos to home Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 customer meetings with Whistler & Talos Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 customer meetings with Whistler & Talos Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 BP Meeting prep; Kvaerner meeting; review of Hibernia tender; Salesforce data input Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 BP Meeting prep; Kvaerner meeting; review of Hibernia tender; Salesforce data input Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-14 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 to/from Woodlands for meeting with Kvaerner Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 BP Meeting prep; Kvaerner meeting; review of Hibernia tender; Salesforce data input Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 BP Meeting prep; Kvaerner meeting; review of Hibernia tender; Salesforce data input Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 BP Meeting prep; Kvaerner meeting; review of Hibernia tender; Salesforce data input Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 Kvaerner & TOTAL Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Kvaerner & TOTAL Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Kvaerner & TOTAL Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-22 OH-011 :OH-011 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-23 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-24 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Kvaerner - EM Platform Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-28 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 facility rent Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Kvaerner - EM Platform Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-28 OH-010 :OH-010 Overhead All Activities Regular Pay N 0.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-29 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 Kvaerner - EM Platform Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-11-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Kvaerner - EM Platform Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Working on Kvaerner project & travel plans Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Working on Kvaerner project & travel plans Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Working on Kvaerner project & travel plans Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-06 OH-010 :OH-010 Overhead All Activities Regular Pay N 1 0 driving to/from IADC meeting; driving to/from HR Conference downtown. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-07 OH-010 :OH-010 Overhead All Activities Regular Pay N 1 0 driving to/from IADC meeting; driving to/from HR Conference downtown. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-08 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 reviewing iTS termination lease Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-11 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 drive to iTS - Houston and survey the facility in preparation for lease cancellation. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 12/12 & 12/13: ABU/LABU annual meetings Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 8 0 12/12 & 12/13: ABU/LABU annual meetings Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-13 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 1 0 drive to iTS - Houston and survey the facility in preparation for lease cancellation. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 12/12 & 12/13: ABU/LABU annual meetings Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-14 2M-TEK :2M-TEK -OH-002 Gen. Dept. Administration Regular Pay N 2 0 drive to iTS - Houston and survey the facility in preparation for lease cancellation. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-14 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 annual compliance Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 12/12 & 12/13: ABU/LABU annual meetings Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-18 OH-010 :OH-010 Overhead All Activities Regular Pay N 8 0 flight from IAH to Oslo & return Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Trip to Kvaerner Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-19 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 flight from IAH to Oslo & return Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Trip to Kvaerner Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-21 OH-010 :OH-010 Overhead All Activities Regular Pay N 12 0 flight from IAH to Oslo & return Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-25 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-28 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2017-12-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-02 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-03 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-04 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 weekly ops call; TSR meetings; weekly TS meeting; HR catch-up; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Spent most of the time working on the Ops Discipline Playbook and Performance Development Assessments (self and others); year-end financial review & 18-mo lookahead Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 BD general meeting - client O&M; PlusPetrol 1500hp rig review; ENL/Kvaerner project Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly ops call; TSR meetings; weekly TS meeting; HR catch-up; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Spent most of the time working on the Ops Discipline Playbook and Performance Development Assessments (self and others); year-end financial review & 18-mo lookahead Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 BD general meeting - client O&M; PlusPetrol 1500hp rig review; ENL/Kvaerner project Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Spent most of the time working on the Ops Discipline Playbook and Performance Development Assessments (self and others); year-end financial review & 18-mo lookahead Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 BD general meeting - client O&M; PlusPetrol 1500hp rig review; ENL/Kvaerner project Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly ops call; TSR meetings; weekly TS meeting; HR catch-up; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Spent most of the time working on the Ops Discipline Playbook and Performance Development Assessments (self and others); year-end financial review & 18-mo lookahead Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 weekly ops call; TSR meetings; weekly TS meeting; HR catch-up; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Spent most of the time working on the Ops Discipline Playbook and Performance Development Assessments (self and others); year-end financial review & 18-mo lookahead Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-15 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 7 0 Ice days Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 6 0 Ice days Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-18 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.5 0 PDR's Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-22 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1.5 0 meeting preparation Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 PDR's Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 pluspetrol Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 PDR's Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-24 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 meeting preparation Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 PDR's Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 PDR's Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 pluspetrol Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-26 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 meeting preparation Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-29 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 1 0 Husky Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-29 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Meeting prep; meeting & debrief; building scope of study; setup PTI as a vendor to Kvaerner Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-30 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 4 0 Meeting prep; meeting & debrief; building scope of study; setup PTI as a vendor to Kvaerner Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-30 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 driving to/from Exxon Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-31 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 1 0 Husky Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-01-31 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Meeting prep; meeting & debrief; building scope of study; setup PTI as a vendor to Kvaerner Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-01 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Meeting prep; meeting & debrief; building scope of study; setup PTI as a vendor to Kvaerner Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-02 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Meeting prep; meeting & debrief; building scope of study; setup PTI as a vendor to Kvaerner Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Performance Development Reviews Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-05 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Preparations for and participation in Kickoff meeting. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Performance Development Reviews Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-06 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 Preparations for and participation in Kickoff meeting. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Performance Development Reviews Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-07 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 6 0 Preparations for and participation in Kickoff meeting. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-08 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 9 0 Preparations for and participation in Kickoff meeting. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Performance Development Reviews Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-09 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Preparations for and participation in Kickoff meeting. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-12 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-13 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-14 OH-011 :OH-011 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-15 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-16 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-27 OH-014 :OH-014 Overhead All Activities Regular Pay N 7 0 Auditor training Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Contract T&C's; customer visits Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Contract T&C's; customer visits Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-01 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 driving to/from Exxon Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Contract T&C's; customer visits Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 1 0 Contract T&C's; customer visits Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 at Exxon Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-06 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 driving to/from Exxon Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-07 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-07 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-08 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-08 OH-014 :OH-014 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 5 0 weekly ops call; discussions with NEORig / Bauer Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 weekly ops call; discussions with NEORig / Bauer Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 weekly ops call; discussions with NEORig / Bauer Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-14 OH-011 :OH-011 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-19 OH-014 :OH-014 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-20 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-21 OH-014 :OH-014 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-27 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-28 OH-011 :OH-011 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-03-30 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-04 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-09 OH-010 :OH-010 Overhead All Activities Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-09 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 rig 257; Shell GoM opportunity Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-10 OH-011 :OH-011 Overhead All Activities Regular Pay N 2 0 dentist appointment Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 rig 257; Shell GoM opportunity Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 rig 257; Shell GoM opportunity Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-17 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Meeting with Shaun Z - XOM Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-18 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 4/23 & 4/24: preparation for Shell meeting 4/25: introduction to Shell; PKD's O&M opportunities Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 4/23 & 4/24: preparation for Shell meeting 4/25: introduction to Shell; PKD's O&M opportunities Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-24 OH-009 :OH-009 OH-009-024 MinKit Offshore Platform Regular Pay N 2 0 4/24: follow-up on Minkit Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-24 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 4/24: driving to/from Exxon; 4/25: travel to/from Shell - NOLA Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 4/23 & 4/24: preparation for Shell meeting 4/25: introduction to Shell; PKD's O&M opportunities Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-25 OH-010 :OH-010 Overhead All Activities Regular Pay N 6 0 4/24: driving to/from Exxon; 4/25: travel to/from Shell - NOLA Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-04-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-01 OH-011 :OH-011 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 at OTC Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-02 OH-010 :OH-010 Overhead All Activities Regular Pay N 1 0 travel to/from OTC Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-02 OH-014 :OH-014 Overhead All Activities Regular Pay N 7 0 Attending OTC Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-03 OH-010 :OH-010 Overhead All Activities Regular Pay N 1 0 travel to/from OTC Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-03 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 Attending OTC Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 weekly ops call; maintenance call; forecast meetings; discussing rig 30B incident; PDR reviews Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Holly and NuclearSafe Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 weekly ops call; maintenance call; forecast meetings; discussing rig 30B incident; PDR reviews Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 weekly ops call; maintenance call; forecast meetings; discussing rig 30B incident; PDR reviews Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Holly and NuclearSafe Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-09 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 IP and patent law training Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 weekly ops call; maintenance call; forecast meetings; discussing rig 30B incident; PDR reviews Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Holly and NuclearSafe Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Holly and NuclearSafe Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-11 OH-011 :OH-011 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Weekly ops call; various catch-up meetings; weekly TS meeting; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 emails; stuff for Bryan; review Contract Mgt IMS docs Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 NuclearSafe; Oxy; Holly; Uganda Discussions Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 emails; stuff for Bryan; review Contract Mgt IMS docs Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-15 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 NuclearSafe; Oxy; Holly; Uganda Discussions Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-15 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 HSE annual Training Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Weekly ops call; various catch-up meetings; weekly TS meeting; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 emails; stuff for Bryan; review Contract Mgt IMS docs Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 NuclearSafe; Oxy; Holly; Uganda Discussions Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly ops call; various catch-up meetings; weekly TS meeting; Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 emails; stuff for Bryan; review Contract Mgt IMS docs Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 NuclearSafe; Oxy; Holly; Uganda Discussions Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 emails; stuff for Bryan; review Contract Mgt IMS docs Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 NuclearSafe; Oxy; Holly; Uganda Discussions Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Ops discipline Playbook; Penguin; finalize lease closure of Bourgeois Rd.; review TS-Contracts IMS docs Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 Ops discipline Playbook; Penguin; finalize lease closure of Bourgeois Rd.; review TS-Contracts IMS docs Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Ops discipline Playbook; Penguin; finalize lease closure of Bourgeois Rd.; review TS-Contracts IMS docs Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Letter to Gary (Liberty de-mob); Argentina rig tender; Uganda tender (DrillMec); XOM Holly - rework hours estimate for repairs. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Ops discipline Playbook; Penguin; finalize lease closure of Bourgeois Rd.; review TS-Contracts IMS docs Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Letter to Gary (Liberty de-mob); Argentina rig tender; Uganda tender (DrillMec); XOM Holly - rework hours estimate for repairs. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Ops discipline Playbook; Penguin; finalize lease closure of Bourgeois Rd.; review TS-Contracts IMS docs Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Letter to Gary (Liberty de-mob); Argentina rig tender; Uganda tender (DrillMec); XOM Holly - rework hours estimate for repairs. Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-28 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 mid-year review with Bryan; PDR discussion with GO; weekly TS meeting; BOP discussion and other maintenance issues Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 7.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 follow-up on Liberty rig/NuclearSAFE Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-30 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 1.5 0 review SOW document; discussions with George; bi-weekly status update meeting Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-30 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 coaching session Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 mid-year review with Bryan; PDR discussion with GO; weekly TS meeting; BOP discussion and other maintenance issues Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-05-31 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 0.5 0 review SOW document; discussions with George; bi-weekly status update meeting Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 mid-year review with Bryan; PDR discussion with GO; weekly TS meeting; BOP discussion and other maintenance issues Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-01 OH-009 :OH-009 OH-009-011 2016 02 – Total Uganda pad drilling Regular Pay N 1 0 review SOW document; discussions with George; bi-weekly status update meeting Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-04 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 rig comparison for XTO Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 7.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 6/12: at XOM - Brad Barton 6/14: developing PAE presentation Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-12 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 6/12: driving to/from XOM; 6/13: driving to/from training Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-13 OH-010 :OH-010 Overhead All Activities Regular Pay N 2 0 6/12: driving to/from XOM; 6/13: driving to/from training Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-13 OH-014 :OH-014 Overhead All Activities Regular Pay N 3 0 IADC Technology Forum Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-14 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 6/12: at XOM - Brad Barton 6/14: developing PAE presentation Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-18 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 supporting John R. - rig 30B Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-20 OH-010 :OH-010 Overhead All Activities Regular Pay N 6 0 driving to/from rig 30B Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-20 OH-013 :OH-013 Overhead All Activities Regular Pay N 5 0 supporting John R. - rig 30B Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-21 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-28 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-06-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-02 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-03 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Shank, Rob Manager/Staff Consultant 35358 Shank, Rob:Manager/Staff Consultant 2018-07-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Years Holiday Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-03 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 8 0 Revise Hook detail for nozzle. WS1-055-E-101_rB. DXF for 9 5/8" blades. Revise 096-A-027 Whipstock for 125" split & 2M-TEK required details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-04 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 8 0 Revise Hook detail for nozzle. WS1-055-E-101_rB. DXF for 9 5/8" blades. Revise 096-A-027 Whipstock for 125" split & 2M-TEK required details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-05 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 8 0 Revise Hook detail for nozzle. WS1-055-E-101_rB. DXF for 9 5/8" blades. Revise 096-A-027 Whipstock for 125" split & 2M-TEK required details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-06 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 8 0 Revise Hook detail for nozzle. WS1-055-E-101_rB. DXF for 9 5/8" blades. Revise 096-A-027 Whipstock for 125" split & 2M-TEK required details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-09 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 8 0 Created drawings for 4" FH connections for the 9 5/8" Mill, Assembly, & Watermelon - WS1-096-C-A014, WS1-096-C-041 & WS1-096-C-105. Issued 9 5/8" Concave for 125" Dimension WS1-096-A-027_rD. Get nozzle parts ordered for 5 1/2" hook (single trip ) WS1-055-E-101, revise detail for shop modification. Trip to LA to pick up hook on Thursday. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-10 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 8 0 Created drawings for 4" FH connections for the 9 5/8" Mill, Assembly, & Watermelon - WS1-096-C-A014, WS1-096-C-041 & WS1-096-C-105. Issued 9 5/8" Concave for 125" Dimension WS1-096-A-027_rD. Get nozzle parts ordered for 5 1/2" hook (single trip ) WS1-055-E-101, revise detail for shop modification. Trip to LA to pick up hook on Thursday. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-11 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 8 0 Created drawings for 4" FH connections for the 9 5/8" Mill, Assembly, & Watermelon - WS1-096-C-A014, WS1-096-C-041 & WS1-096-C-105. Issued 9 5/8" Concave for 125" Dimension WS1-096-A-027_rD. Get nozzle parts ordered for 5 1/2" hook (single trip ) WS1-055-E-101, revise detail for shop modification. Trip to LA to pick up hook on Thursday. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-12 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 8 0 Created drawings for 4" FH connections for the 9 5/8" Mill, Assembly, & Watermelon - WS1-096-C-A014, WS1-096-C-041 & WS1-096-C-105. Issued 9 5/8" Concave for 125" Dimension WS1-096-A-027_rD. Get nozzle parts ordered for 5 1/2" hook (single trip ) WS1-055-E-101, revise detail for shop modification. Trip to LA to pick up hook on Thursday. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-13 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 8 0 Created drawings for 4" FH connections for the 9 5/8" Mill, Assembly, & Watermelon - WS1-096-C-A014, WS1-096-C-041 & WS1-096-C-105. Issued 9 5/8" Concave for 125" Dimension WS1-096-A-027_rD. Get nozzle parts ordered for 5 1/2" hook (single trip ) WS1-055-E-101, revise detail for shop modification. Trip to LA to pick up hook on Thursday. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-16 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 8 0 Issue drawings, create dxf's for quotes for 13 3/8" Multi Mill. WS1-133-C-015 thru 020, Issue multi-mill body for quote WS1-133-C-014_rB and create .SAT file. Revise to WS1-133-C-014_rC. Check drawing issue dates for WS1-096-A-027_rA thru rD. for mistake 2MTEK on making rA instead of rC as per P.O. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-17 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 8 0 Issue drawings, create dxf's for quotes for 13 3/8" Multi Mill. WS1-133-C-015 thru 020, Issue multi-mill body for quote WS1-133-C-014_rB and create .SAT file. Revise to WS1-133-C-014_rC. Check drawing issue dates for WS1-096-A-027_rA thru rD. for mistake 2MTEK on making rA instead of rC as per P.O. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-18 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 8 0 Issue drawings, create dxf's for quotes for 13 3/8" Multi Mill. WS1-133-C-015 thru 020, Issue multi-mill body for quote WS1-133-C-014_rB and create .SAT file. Revise to WS1-133-C-014_rC. Check drawing issue dates for WS1-096-A-027_rA thru rD. for mistake 2MTEK on making rA instead of rC as per P.O. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-19 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 7 0 Issue drawings, create dxf's for quotes for 13 3/8" Multi Mill. WS1-133-C-015 thru 020, Issue multi-mill body for quote WS1-133-C-014_rB and create .SAT file. Revise to WS1-133-C-014_rC. Check drawing issue dates for WS1-096-A-027_rA thru rD. for mistake 2MTEK on making rA instead of rC as per P.O. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Update Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-20 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 8 0 Issue drawings, create dxf's for quotes for 13 3/8" Multi Mill. WS1-133-C-015 thru 020, Issue multi-mill body for quote WS1-133-C-014_rB and create .SAT file. Revise to WS1-133-C-014_rC. Check drawing issue dates for WS1-096-A-027_rA thru rD. for mistake 2MTEK on making rA instead of rC as per P.O. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-23 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 7 0 Send part turn down information to 2MTEK for turn down of existing 7" multimill. Crated part number for 7" mill assembly and preliminary chart for 7" multimill for 2MTEK requirement for turning down the mill to finished dia. 070-C-A02-021. Created / started WS1-070-C-A02_rA. Review and revised 13 3/8" multi-mill drawings WS1-133-C-A001_ra, WS1-133-C-014_rC. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Technical Services Business Development - Brainstorming Session Mon. Thursday TSR Update Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Sick day (allergies bad) Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-25 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 8 0 Send part turn down information to 2MTEK for turn down of existing 7" multimill. Crated part number for 7" mill assembly and preliminary chart for 7" multimill for 2MTEK requirement for turning down the mill to finished dia. 070-C-A02-021. Created / started WS1-070-C-A02_rA. Review and revised 13 3/8" multi-mill drawings WS1-133-C-A001_ra, WS1-133-C-014_rC. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-26 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 7 0 Send part turn down information to 2MTEK for turn down of existing 7" multimill. Crated part number for 7" mill assembly and preliminary chart for 7" multimill for 2MTEK requirement for turning down the mill to finished dia. 070-C-A02-021. Created / started WS1-070-C-A02_rA. Review and revised 13 3/8" multi-mill drawings WS1-133-C-A001_ra, WS1-133-C-014_rC. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Technical Services Business Development - Brainstorming Session Mon. Thursday TSR Update Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-27 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 8 0 Send part turn down information to 2MTEK for turn down of existing 7" multimill. Crated part number for 7" mill assembly and preliminary chart for 7" multimill for 2MTEK requirement for turning down the mill to finished dia. 070-C-A02-021. Created / started WS1-070-C-A02_rA. Review and revised 13 3/8" multi-mill drawings WS1-133-C-A001_ra, WS1-133-C-014_rC. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-30 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 8 0 Revised 133-c-014 Multi Mill Body connection to 6 5/8" reg. Revised Multi-Mill Blades on 13 3/8" for small od body - 133-C-015, 17 & 18. Revised Anchor Assembly 133-D-A02 for body rev. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-01-31 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 8 0 Revised 133-c-014 Multi Mill Body connection to 6 5/8" reg. Revised Multi-Mill Blades on 13 3/8" for small od body - 133-C-015, 17 & 18. Revised Anchor Assembly 133-D-A02 for body rev. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-02-01 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 8 0 Revised 133-c-014 Multi Mill Body connection to 6 5/8" reg. Revised Multi-Mill Blades on 13 3/8" for small od body - 133-C-015, 17 & 18. Revised Anchor Assembly 133-D-A02 for body rev. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-02-02 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 7 0 Revised 133-c-014 Multi Mill Body connection to 6 5/8" reg. Revised Multi-Mill Blades on 13 3/8" for small od body - 133-C-015, 17 & 18. Revised Anchor Assembly 133-D-A02 for body rev. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-02-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Update Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-02-03 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 8 0 Revised 133-c-014 Multi Mill Body connection to 6 5/8" reg. Revised Multi-Mill Blades on 13 3/8" for small od body - 133-C-015, 17 & 18. Revised Anchor Assembly 133-D-A02 for body rev. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-02-06 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 8 0 Revise 133-D-011 & 133-D-A02, 13 3/8" Anchor Assembly and body. Revised EasyTrak Marketing Dimensional catalog sheet. Revised 133-A-008_rB 13 3/8" 2 degree concave,, Created WS1-133-A-A03_rA 2 degree top level assembly drawing. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-02-07 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 8 0 Revise 133-D-011 & 133-D-A02, 13 3/8" Anchor Assembly and body. Revised EasyTrak Marketing Dimensional catalog sheet. Revised 133-A-008_rB 13 3/8" 2 degree concave,, Created WS1-133-A-A03_rA 2 degree top level assembly drawing. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-02-08 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 8 0 Revise 133-D-011 & 133-D-A02, 13 3/8" Anchor Assembly and body. Revised EasyTrak Marketing Dimensional catalog sheet. Revised 133-A-008_rB 13 3/8" 2 degree concave,, Created WS1-133-A-A03_rA 2 degree top level assembly drawing. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-02-09 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 7 0 Revise 133-D-011 & 133-D-A02, 13 3/8" Anchor Assembly and body. Revised EasyTrak Marketing Dimensional catalog sheet. Revised 133-A-008_rB 13 3/8" 2 degree concave,, Created WS1-133-A-A03_rA 2 degree top level assembly drawing. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-02-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TSR Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-02-10 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 5 0 Revise 133-D-011 & 133-D-A02, 13 3/8" Anchor Assembly and body. Revised EasyTrak Marketing Dimensional catalog sheet. Revised 133-A-008_rB 13 3/8" 2 degree concave,, Created WS1-133-A-A03_rA 2 degree top level assembly drawing. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-02-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Pack and move from 7th floor to 5th floor. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-02-13 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 8 0 Revised 9 5/8" Multi Mill Weld on blades for A572-50 material. 096-C-031, 033, 034, 035, 040. Revised Multi Mill Assembly 096-C-A013, A014 for 4" F.H. Connection Variation. Created WS1-133-A-A04_rA 2.3 degree Whipstock Assembly, Issue 13 3/8" 2.3 Degree Whipstock to sharepoint. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-02-14 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 6 0 Revised 9 5/8" Multi Mill Weld on blades for A572-50 material. 096-C-031, 033, 034, 035, 040. Revised Multi Mill Assembly 096-C-A013, A014 for 4" F.H. Connection Variation. Created WS1-133-A-A04_rA 2.3 degree Whipstock Assembly, Issue 13 3/8" 2.3 Degree Whipstock to sharepoint. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-02-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 5th floor safety meeting, Weekly engineering Update Meeting iTS/2MTEK, Q4 Earnings Review, TSR Update Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-02-15 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 7 0 Revised 9 5/8" Multi Mill Weld on blades for A572-50 material. 096-C-031, 033, 034, 035, 040. Revised Multi Mill Assembly 096-C-A013, A014 for 4" F.H. Connection Variation. Created WS1-133-A-A04_rA 2.3 degree Whipstock Assembly, Issue 13 3/8" 2.3 Degree Whipstock to sharepoint. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-02-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 5th floor safety meeting, Weekly engineering Update Meeting iTS/2MTEK, Q4 Earnings Review, TSR Update Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-02-16 ITS :ITS TSR-01522 ITS Whipstock Anchor Design Regular Pay N 5 0 Revised 9 5/8" Multi Mill Weld on blades for A572-50 material. 096-C-031, 033, 034, 035, 040. Revised Multi Mill Assembly 096-C-A013, A014 for 4" F.H. Connection Variation. Created WS1-133-A-A04_rA 2.3 degree Whipstock Assembly, Issue 13 3/8" 2.3 Degree Whipstock to sharepoint. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-02-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 5th floor safety meeting, Weekly engineering Update Meeting iTS/2MTEK, Q4 Earnings Review, TSR Update Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-02-16 Rig 270L-TSR :Rig 270L-TSR TSR-01400-270L Walking System - Walking Shoes Installation, Inspections and function Test Regular Pay N 2 0 Revised Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-02-17 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Sick Day - Eye Dr. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-02 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 7 0 -SATURDAY HOURS are to correct timesheet "glitch" - Revised 13 3/8" Anchor Drawings for more spring force for slip. WS1-133-D-018 rB, WS1-133-D-023 ra, WS1-133-D-016 rB. Issued Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 -SATURDAY HOURS are to correct timesheet "glitch" - Weekly TSR Meeting. Weekly 2MTEK/iTS Engineering Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-03 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 4 0 -SATURDAY HOURS are to correct timesheet "glitch" - 2M TEK Oracle meeting, Review Oracle Upload list for 2MTEK Parts and assemblies, convert bom's to excel format and adjust for Oracle input. Check drawing number list needed for all 2M TEK upload parts & Assemblies. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-03 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 4 0 -SATURDAY HOURS are to correct timesheet "glitch" - Revised 13 3/8" Anchor Drawings for more spring force for slip. WS1-133-D-018 rB, WS1-133-D-023 ra, WS1-133-D-016 rB. Issued Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-04 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 1 0 -SATURDAY HOURS are to correct timesheet "glitch" - 2M TEK Oracle meeting, Review Oracle Upload list for 2MTEK Parts and assemblies, convert bom's to excel format and adjust for Oracle input. Check drawing number list needed for all 2M TEK upload parts & Assemblies. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-04 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 22 0 -SATURDAY HOURS are to correct timesheet "glitch" - Revised 13 3/8" Anchor Drawings for more spring force for slip. WS1-133-D-018 rB, WS1-133-D-023 ra, WS1-133-D-016 rB. Issued Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 -SATURDAY HOURS are to correct timesheet "glitch" - Weekly TSR Meeting. Weekly 2MTEK/iTS Engineering Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-06 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 4 0 Update excel spreadsheet for Oracle upload - 20" & 24" top plate, MK II Actuator - 500 Ton. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-06 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 3 0 Update excel spreadsheet for Oracle Upload - 13 3/8" & 9 5/8" parts. Upload ECNs to folder on sharepoint, Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TSR Meeting. Weekly 2MTEK/iTS Engineering Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-07 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 8 0 Update excel spreadsheet for Oracle Upload - 13 3/8" & 9 5/8" parts. Upload ECNs to folder on sharepoint, Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-08 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 8 0 Update excel spreadsheet for Oracle Upload - 13 3/8" & 9 5/8" parts. Upload ECNs to folder on sharepoint, Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-09 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 3 0 Update excel spreadsheet for Oracle upload - 20" & 24" top plate, MK II Actuator - 500 Ton. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-09 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 4 0 Update excel spreadsheet for Oracle Upload - 13 3/8" & 9 5/8" parts. Upload ECNs to folder on sharepoint, Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TSR Meeting. Weekly 2MTEK/iTS Engineering Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-10 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 8 0 Update excel spreadsheet for Oracle upload - 20" & 24" top plate, MK II Actuator - 500 Ton. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-13 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 7 0 Update excel spreadsheet for Oracle upload - Mark 1 Actuator, 4 1/2" grippers, 5 1/2" grippers. Review new drawing naming convention. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-13 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 1 0 Weekly engineering meeting, Estimate man-hours for 7 5/8" Revise WS1-133-C-021 rB to locate ID band for 2MTEK. Discussions about not needed radius on connection. Revised WS1-096-a-004 rF 9 5/8" Shear Bolt drawing for 4140 Material. Revise and input 7" whipstock drawings into sharepoint. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-14 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 8 0 Update excel spreadsheet for Oracle upload - Mark 1 Actuator, 4 1/2" grippers, 5 1/2" grippers. Review new drawing naming convention. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-15 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 8 0 Weekly engineering meeting, Estimate man-hours for 7 5/8" Revise WS1-133-C-021 rB to locate ID band for 2MTEK. Discussions about not needed radius on connection. Revised WS1-096-a-004 rF 9 5/8" Shear Bolt drawing for 4140 Material. Revise and input 7" whipstock drawings into sharepoint. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-16 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 7 0 Weekly engineering meeting, Estimate man-hours for 7 5/8" Revise WS1-133-C-021 rB to locate ID band for 2MTEK. Discussions about not needed radius on connection. Revised WS1-096-a-004 rF 9 5/8" Shear Bolt drawing for 4140 Material. Revise and input 7" whipstock drawings into sharepoint. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TSR Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-17 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 8 0 Weekly engineering meeting, Estimate man-hours for 7 5/8" Revise WS1-133-C-021 rB to locate ID band for 2MTEK. Discussions about not needed radius on connection. Revised WS1-096-a-004 rF 9 5/8" Shear Bolt drawing for 4140 Material. Revise and input 7" whipstock drawings into sharepoint. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-20 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 8 0 Revised 7" drawings for 2M-Tek manufacture, Uploaded 7" parts to SharePoint - 7" Anchor drawings. Meeting for new numbering convention for parts moving forward. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-21 2M Tek :2M Tek TSR-01548-2M-TEK Annual General Query Regular Pay N 1 0 Item Master Meeting for uploading parts into oracle. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-21 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 7 0 Revised 7" drawings for 2M-Tek manufacture, Uploaded 7" parts to SharePoint - 7" Anchor drawings. Meeting for new numbering convention for parts moving forward. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-22 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 8 0 Revised 7" drawings for 2M-Tek manufacture, Uploaded 7" parts to SharePoint - 7" Anchor drawings. Meeting for new numbering convention for parts moving forward. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-23 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 7 0 Revised 7" drawings for 2M-Tek manufacture, Uploaded 7" parts to SharePoint - 7" Anchor drawings. Meeting for new numbering convention for parts moving forward. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Meeting, Path forward meeting for moving on from iTS. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-24 ITS :ITS TSR-01556-iTS iTS RnS Annual General Query Regular Pay N 7.5 0 Revised 7" drawings for 2M-Tek manufacture, Uploaded 7" parts to SharePoint - 7" Anchor drawings. Meeting for new numbering convention for parts moving forward. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR Meeting, Path forward meeting for moving on from iTS. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Convert 7" Whipstock drawings for 2MTEK fabrication, Upload MultiMill Drawings too SharePoint. WS1-070-C-A02_rA ,WS1-070-C-036_rA, WS1-070-A-013_rB,WS1-070-A-018_rA, WS1-070-A-006_rD, and all MultiMill Blades / parts. - Thursday Handover meeting to finish out work for iTS for quarterly/yearly TSR's. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Convert 7" Whipstock drawings for 2MTEK fabrication, Upload MultiMill Drawings too SharePoint. WS1-070-C-A02_rA ,WS1-070-C-036_rA, WS1-070-A-013_rB,WS1-070-A-018_rA, WS1-070-A-006_rD, and all MultiMill Blades / parts. - Thursday Handover meeting to finish out work for iTS for quarterly/yearly TSR's. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-29 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 Convert 7" Whipstock drawings for 2MTEK fabrication, Upload MultiMill Drawings too SharePoint. WS1-070-C-A02_rA ,WS1-070-C-036_rA, WS1-070-A-013_rB,WS1-070-A-018_rA, WS1-070-A-006_rD, and all MultiMill Blades / parts. - Thursday Handover meeting to finish out work for iTS for quarterly/yearly TSR's. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-29 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 2 0 Revised 269L-P01350-250-RB-main-camp-layout & 269L-P01350-251-RB-rig-camp-layout to show number of rooms and add clearer descriptions of buildings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Convert 7" Whipstock drawings for 2MTEK fabrication, Upload MultiMill Drawings too SharePoint. WS1-070-C-A02_rA ,WS1-070-C-036_rA, WS1-070-A-013_rB,WS1-070-A-018_rA, WS1-070-A-006_rD, and all MultiMill Blades / parts. - Thursday Handover meeting to finish out work for iTS for quarterly/yearly TSR's. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-30 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6 0 Revised 269L-P01350-250-RB-main-camp-layout & 269L-P01350-251-RB-rig-camp-layout to show number of rooms and add clearer descriptions of buildings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-03-31 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8 0 Revised 269L-P01350-250-RB-main-camp-layout & 269L-P01350-251-RB-rig-camp-layout to show number of rooms and add clearer descriptions of buildings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-03 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 8 0 Created Rig Stack Up drawings for rig 258, 2 options. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Performance Review, weekly TSR meeting, Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-04 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 7 0 Created Rig Stack Up drawings for rig 258, 2 options. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-05 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8 0 Research and fill out Canrig Catwalk Survey worksheet Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Performance Review, weekly TSR meeting, Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-06 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 2 0 Research and fill out Canrig Catwalk Survey worksheet Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-06 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 5 0 Created Rig Stack Up drawings for rig 258, 2 options. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-07 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily update meeting, TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-10 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 7.5 0 Created BOP Secondary Hang-Off Arrangement and Detail drawings - 269L-01-03-066-1&2, 269L-01-03-067-1&2, Layout interferences with new trolleys & bigger stack. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily update meeting, TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-11 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 7.5 0 Created BOP Secondary Hang-Off Arrangement and Detail drawings - 269L-01-03-066-1&2, 269L-01-03-067-1&2, Layout interferences with new trolleys & bigger stack. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily update meeting, TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-12 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 7.5 0 Created BOP Secondary Hang-Off Arrangement and Detail drawings - 269L-01-03-066-1&2, 269L-01-03-067-1&2, Layout interferences with new trolleys & bigger stack. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily update meeting, TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-13 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 6 0 Create 209L-01-03-408-1 thru 5, Convert Parker drawings into Solidworks format. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-13 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 Created BOP Secondary Hang-Off Arrangement and Detail drawings - 269L-01-03-066-1&2, 269L-01-03-067-1&2, Layout interferences with new trolleys & bigger stack. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-14 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Easter Holiday Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily update meeting, Lunch and Learn for the New Non-exempt timesheet and submittal process Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 3.5 0 Converted Parker Standard title block for use in Solidworks, worked on procedures for using Soldiworks for Detail Drawings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-17 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 4 0 Created 209L-01-03-408-01 thru 05 DSM Skidding Shoe Details Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily update meeting, Lunch and Learn for the New Non-exempt timesheet and submittal process Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 3.5 0 Converted Parker Standard title block for use in Solidworks, worked on procedures for using Soldiworks for Detail Drawings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-18 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 4 0 Created 209L-01-03-408-01 thru 05 DSM Skidding Shoe Details Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily update meeting, Lunch and Learn for the New Non-exempt timesheet and submittal process Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 3.5 0 Converted Parker Standard title block for use in Solidworks, worked on procedures for using Soldiworks for Detail Drawings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-19 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 4 0 Created 209L-01-03-408-01 thru 05 DSM Skidding Shoe Details Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Converted Parker Standard title block for use in Solidworks, worked on procedures for using Soldiworks for Detail Drawings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-20 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 4 0 Created 209L-01-03-408-01 thru 05 DSM Skidding Shoe Details Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Daily update meeting, Lunch and Learn for the New Non-exempt timesheet and submittal process Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 Converted Parker Standard title block for use in Solidworks, worked on procedures for using Soldiworks for Detail Drawings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-21 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 4 0 Created 209L-01-03-408-01 thru 05 DSM Skidding Shoe Details Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily production meeting, Thursday TSR Update meeting. Timesheet glitch/issues on Thursday. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-24 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 7.5 0 Issue skidding claw assembly for construction 209L-01-03-408 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily production meeting, Thursday TSR Update meeting. Timesheet glitch/issues on Thursday. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-25 Rig 209L-TSR :Rig 209L-TSR TSR-01560-209L Rig Skidding Claw(s) Regular Pay N 6 0 Issue skidding claw assembly for construction 209L-01-03-408 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-25 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1.5 0 Create 269L-01-03-067 bop secondary hang off drawings (from 270) change to new border layout. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily production meeting, Thursday TSR Update meeting. Timesheet glitch/issues on Thursday. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-26 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 7.5 0 Create 269L-01-03-067 bop secondary hang off drawings (from 270) change to new border layout. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Daily production meeting, Thursday TSR Update meeting. Timesheet glitch/issues on Thursday. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-27 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 6 0 Created 270L-01-SK-021 THRU 23 ODOPTU South rig site plans, options for batch drilling top hole sections. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily production meeting, Thursday TSR Update meeting. Timesheet glitch/issues on Thursday. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-04-28 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 7.5 0 Created 270L-01-SK-021 THRU 23 ODOPTU South rig site plans, options for batch drilling top hole sections. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily team meeting, Wed. 1st Quarter earnings overview. Thursday TSR update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-01 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 7.5 0 Create 269L-01-03-067 & 066 bop secondary hang off drawings (from 270) change to new border layout. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily team meeting, Wed. 1st Quarter earnings overview. Thursday TSR update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-02 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 7.5 0 Created 270L-01-SK-021 THRU 23 ODOPTU South rig site plans, options for batch drilling top hole sections. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily team meeting, Wed. 1st Quarter earnings overview. Thursday TSR update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-03 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 7 0 Created 270L-01-SK-021 THRU 23 ODOPTU South rig site plans, options for batch drilling top hole sections. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily team meeting, Wed. 1st Quarter earnings overview. Thursday TSR update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-04 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 7 0 Created 270L-01-SK-021 THRU 23 ODOPTU South rig site plans, options for batch drilling top hole sections. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily team meeting, Wed. 1st Quarter earnings overview. Thursday TSR update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-05 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 7.5 0 Create 269L-01-03-067 & 066 bop secondary hang off drawings (from 270) change to new border layout. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly & daily TSR Update meetings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-08 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 7.5 0 Create 269L-01-03-067 & 066 bop secondary hang off drawings (from 270)Layouts and send to Mat. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly & daily TSR Update meetings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-09 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 7.5 0 Create 269L-01-03-067 & 066 bop secondary hang off drawings (from 270)Layouts and send to Mat. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly & daily TSR Update meetings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-10 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 7.5 0 Create 269L-01-03-067 & 066 bop secondary hang off drawings (from 270)Layouts and send to Mat. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly & daily TSR Update meetings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-11 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 7 0 Create 269L-01-03-067 & 066 bop secondary hang off drawings (from 270)Layouts and send to Mat. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly & daily TSR Update meetings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-12 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 7.5 0 Create 269L-01-03-067 & 066 bop secondary hang off drawings (from 270)Layouts and send to Mat. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly & daily TSR Update meetings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-15 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 7.5 0 Created 269L-01-03-069-1-RA-bop-lift-device-mods 269L-01-03-070-1-RA-bop-lift-device-mods Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly & daily TSR Update meetings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-16 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 7.5 0 271 Tender Colombia - Created 271L-P01362-212-1-RA-13.625-10m-bop-stack 271L-P01362-213-1-RB-21.25-5m-bop-stack 271L-P01362-214-1-RB-30-1M-div-stack Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly & daily TSR Update meetings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-17 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 7.5 0 271 Tender Colombia - Created 271L-P01362-212-1-RA-13.625-10m-bop-stack 271L-P01362-213-1-RB-21.25-5m-bop-stack 271L-P01362-214-1-RB-30-1M-div-stack Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly & daily TSR Update meetings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-18 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 7 0 Created 269L-01-03-069-1-RA-bop-lift-device-mods 269L-01-03-070-1-RA-bop-lift-device-mods Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO - Greece! Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO - Greece! Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-23 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO - Greece! Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO - Greece! Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-25 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO - Greece! Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO - Greece! Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-29 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Memorial Day Holiday Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-30 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO (Return) Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 TSR Update meetings, Daily and Weekly. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-05-31 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 7.5 0 Revised Secondary retention drawings for stack revisions / background. Send for approval. 269L-01-03-067 thru 070. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Update meetings, Daily and Weekly. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-01 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 7 0 Revised Secondary retention drawings for stack revisions / background. Send for approval. 269L-01-03-067 thru 070. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR Update meetings, Daily and Weekly. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-02 Rig 209L-TSR :Rig 209L-TSR TSR-01497-209L Increase-PB-Tubular-Storage Regular Pay N 4 0 Revised Pipe Rack Stanton extensions. 209L-01-03-200 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-02 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 3 0 Revised Secondary retention drawings for stack revisions / background. Send for approval. 269L-01-03-067 thru 070. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-05 Rig 209L-TSR :Rig 209L-TSR TSR-01497-209L Increase-PB-Tubular-Storage Regular Pay N 7.75 0 Revised Pipe Rack Stanton extensions. 209L-01-03-200 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-06 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 7.75 0 Revised Secondary retention drawings for per field comments. Send for approval. 269L-01-03-067 thru 070. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-07 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 7.75 0 Revised Secondary retention drawings for per field comments. Send for approval. 269L-01-03-067 thru 070. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-08 Rig 209L-TSR :Rig 209L-TSR TSR-01497-209L Increase-PB-Tubular-Storage Regular Pay N 4 0 Revised Pipe Rack Stanton extensions. 209L-01-03-200 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-08 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 4 0 Revised Secondary retention drawings for per field comments. Send for approval. 269L-01-03-067 thru 070. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-09 Rig 209L-TSR :Rig 209L-TSR TSR-01497-209L Increase-PB-Tubular-Storage Regular Pay N 7.75 0 Revised Pipe Rack Stanton extensions. 209L-01-03-200 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting. Tuesday Town Hall for CFO departure from company. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-12 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 7.75 0 Revised drawings for hang off installation, make pdf's and send to area. 269L-01-03-067 thru 070. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily Team Meeting. Tuesday Town Hall for CFO departure from company. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-13 Rig 209L-TSR :Rig 209L-TSR TSR-01497-209L Increase-PB-Tubular-Storage Regular Pay N 7 0 Revised 209L-01-03 Pipe rack Extension drawing, send to area. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting. Tuesday Town Hall for CFO departure from company. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-14 Rig 209L-TSR :Rig 209L-TSR TSR-01497-209L Increase-PB-Tubular-Storage Regular Pay N 7.75 0 Revised 209L-01-03 Pipe rack Extension drawing, send to area. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-15 Rig 209L-TSR :Rig 209L-TSR TSR-01571-209L BOP Mechanical Seal Platform Regular Pay N 8 0 Create 3d models from new platform modification drawings, send concept to area for approval. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting. Tuesday Town Hall for CFO departure from company. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-16 Rig 209L-TSR :Rig 209L-TSR TSR-01571-209L BOP Mechanical Seal Platform Regular Pay N 7.75 0 Create 3d models from new platform modification drawings, send concept to area for approval. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-19 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 2 0 Created P01364-000-1, 001-1, 002-1. Rigless concept platform drawings, send to Brian Little. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-19 Rig 209L-TSR :Rig 209L-TSR TSR-01571-209L BOP Mechanical Seal Platform Regular Pay N 5.75 0 Create 3d models from new platform modification drawings, send concept to area for approval Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-20 Rig 209L-TSR :Rig 209L-TSR TSR-01571-209L BOP Mechanical Seal Platform Regular Pay N 7.75 0 Create 3d models from new platform modification drawings, send concept to area for approval Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-21 Rig 209L-TSR :Rig 209L-TSR TSR-01497-209L Increase-PB-Tubular-Storage Regular Pay N 2 0 Revised 209L-01-03 Pipe rack Extension drawing, send to area. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-21 Rig 209L-TSR :Rig 209L-TSR TSR-01571-209L BOP Mechanical Seal Platform Regular Pay N 3.75 0 Create 3d models from new platform modification drawings, send concept to area for approval Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-21 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 2 0 Revised drawings for hang off installation, make pdf's. 269L-01-03-067 thru 070. Issued for Construction drawings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-22 Rig 209L-TSR :Rig 209L-TSR TSR-01571-209L BOP Mechanical Seal Platform Regular Pay N 6.75 0 Create 3d models from new platform modification drawings, send concept to area for approval Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-22 Rig 269L-TSR :Rig 269L-TSR TSR-01552-269L BOP Hoist Upgrade Regular Pay N 1 0 Revised drawings for hang off installation, make pdf's. 269L-01-03-067 thru 070. Issued for Construction drawings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-23 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 7.75 0 Created P01364-000-1, 001-1, 002-1. Rigless concept platform drawings, send to Brian Little. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-26 Rig 209L-TSR :Rig 209L-TSR TSR-01497-209L Increase-PB-Tubular-Storage Regular Pay N 7.75 0 Revised 209L-01-03-01 Pipe rack Extension drawing, Created 209L-01-03-02 Pipe rack Extension details. revised Pin detail. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-27 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 5.25 0 Revised P01364-000-1, 001-1, 002-1. Rigless concept platform drawings, help with materials and design time required for estimate. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-27 Rig 209L-TSR :Rig 209L-TSR TSR-01497-209L Increase-PB-Tubular-Storage Regular Pay N 2.5 0 Revised 209L-01-03-01 Pipe rack Extension drawing, Created 209L-01-03-02 Pipe rack Extension details. revised Pin detail. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-28 Rig 209L-TSR :Rig 209L-TSR TSR-01571-209L BOP Mechanical Seal Platform Regular Pay N 7.75 0 Revised 209L-01-03-617-01, -02 mechanical Seal Platform Arrangement and details, layout out platform details and create fabrication drawings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-29 Rig 209L-TSR :Rig 209L-TSR TSR-01571-209L BOP Mechanical Seal Platform Regular Pay N 7.75 0 Revised 209L-01-03-617-01, -02 mechanical Seal Platform Arrangement and details, layout out platform details and create fabrication drawings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-06-30 Rig 209L-TSR :Rig 209L-TSR TSR-01571-209L BOP Mechanical Seal Platform Regular Pay N 7.75 0 Revised 209L-01-03-617-01, -02 mechanical Seal Platform Arrangement and details, layout out platform details and create fabrication drawings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 July 4th Holiday Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 July 4th Holiday Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Meeting, Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7.75 0 Created 209L-01-03-617-01, -02 -03 mechanical Seal Platform Arrangement and details, create fabrication drawings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily Meeting, Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7 0 Created 209L-01-03-617-01, -02 -03 mechanical Seal Platform Arrangement and details, create fabrication drawings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Meeting, Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7.75 0 Created 209L-01-03-617-01, -02 -03 mechanical Seal Platform Arrangement and details, create fabrication drawings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily update meeting, Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7.75 0 Revised 209L-01-03-617-01, -02 -03 mechanical Seal Platform Arrangement and details, update per field comments, issued for construction. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily update meeting, Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7.75 0 Revised 209L-01-03-617-01, -02 -03 mechanical Seal Platform Arrangement and details, update per field comments, issued for construction. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily update meeting, Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7.75 0 Revised 209L-01-03-617-01, -02 -03 mechanical Seal Platform Arrangement and details, update per field comments, issued for construction. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily update meeting, Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7 0 Revised 209L-01-03-617-01, -02 -03 mechanical Seal Platform Arrangement and details, update per field comments, issued for construction. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily update meeting, Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7.75 0 Revised 209L-01-03-617-01, -02 -03 mechanical Seal Platform Arrangement and details, update per field comments, issued for construction. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily update meeting, Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-17 Rig 272L-TSR :Rig 272L-TSR TSR-01587-272L Brine Tank Sumps Regular Pay N 7.75 0 Created 272L-01-02-213-1-R0-mm-brine-tank-sump-additions, issued for fabrication Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily update meeting, Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.25 0 Revised 209L-01-03-617-01, -02 -03 mechanical Seal Platform Arrangement and details, update per field comments Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-18 Rig 272L-TSR :Rig 272L-TSR TSR-01587-272L Brine Tank Sumps Regular Pay N 6.5 0 Created 272L-01-02-213-1-R0-mm-brine-tank-sump-additions, issued for fabrication Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily update meeting, Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-19 Rig 272L-TSR :Rig 272L-TSR TSR-01587-272L Brine Tank Sumps Regular Pay N 7.75 0 Created 272L-01-02-213-1-R0-mm-brine-tank-sump-additions, issued for fabrication Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily update meeting, Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 Revised 209L-01-03-617-01, -02 -03 mechanical Seal Platform Arrangement and details, update per field comments Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-20 Rig 272L-TSR :Rig 272L-TSR TSR-01587-272L Brine Tank Sumps Regular Pay N 4 0 Created 272L-01-02-213-1-R0-mm-brine-tank-sump-additions, issued for fabrication Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily update meeting, Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3.75 0 Revised 209L-01-03-617-01, -02 -03 mechanical Seal Platform Arrangement and details, update per field comments Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-21 Rig 272L-TSR :Rig 272L-TSR TSR-01587-272L Brine Tank Sumps Regular Pay N 4 0 Created 272L-01-02-213-1-R0-mm-brine-tank-sump-additions, issued for fabrication Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-25 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-28 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Meetings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-07-31 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7.75 0 Revised 209L-01-03-617-01, -02 -03 mechanical Seal Platform Arrangement and details, update per field comments Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Meetings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5.75 0 Revised 209L-01-03-617-01, -02 -03 mechanical Seal Platform Arrangement and details, update per field comments Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-01 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2 0 269L Trolley Beam sketch for BOP Stop to Benny. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Meetings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7.75 0 Revised 209L-01-03-617-01, -02 -03 mechanical Seal Platform Arrangement and details, update per field comments Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-03 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Sick/recovery day Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Meetings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7.75 0 Revised 209L-01-03-617-01, -02 -03 mechanical Seal Platform Arrangement and details, update per field comments Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Meeting, Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7.75 0 Revised 209L-01-03-204 Pipe Rack Extension drawings - changed quantity for (4) bays instead of 3. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Meeting, Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-08 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 7.75 0 Created 10'X3' Cuttings bin platform sketch. Revised to 4'x3' angle platform, revised per comments (removed handrail) and detail BOM. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Meeting, Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-09 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 5.75 0 Created 10'X3' Cuttings bin platform sketch. Revised to 4'x3' angle platform, revised per comments (removed handrail) and detail BOM. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-09 Rig 272L-TSR :Rig 272L-TSR TSR-01563-272L Crown Removal Regular Pay N 2 0 Created drawing 272L-01-SK-020, Crown Sheave Removal Layout. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily Meeting, Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-10 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Created 10'X3' Cuttings bin platform sketch. Revised to 4'x3' angle platform, revised per comments (removed handrail) and detail BOM. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-10 Rig 272L-TSR :Rig 272L-TSR TSR-01563-272L Crown Removal Regular Pay N 3 0 Created drawing 272L-01-SK-020, Crown Sheave Removal Layout. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Meeting, Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Revised 209L-01-03-204 Pipe Rack Extension drawings - changed quantity for (4) bays instead of 3. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-11 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2.75 0 Created 10'X3' Cuttings bin platform sketch. Revised to 4'x3' angle platform, revised per comments (removed handrail) and detail BOM. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-11 Rig 272L-TSR :Rig 272L-TSR TSR-01563-272L Crown Removal Regular Pay N 4 0 Created drawing 272L-01-SK-020, Crown Sheave Removal Layout. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Meeting, Thursday TSR Meeting. - Timesheet and work review meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-14 Rig 272L-TSR :Rig 272L-TSR TSR-01563-272L Crown Removal Regular Pay N 7.75 0 Created drawing 272L-01-SK-020, Crown Sheave Removal Layout - Revise and send to Kyle / Area. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Meeting, Thursday TSR Meeting. - Timesheet and work review meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-15 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Revised 30B-01-03-002-1-RA-cuttings-bin-platform 48 for construction details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-15 Rig 272L-TSR :Rig 272L-TSR TSR-01563-272L Crown Removal Regular Pay N 3.75 0 Created drawing 272L-01-SK-020, Crown Sheave Removal Layout - Revise and send to Kyle / Area. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Meeting, Thursday TSR Meeting. - Timesheet and work review meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7.75 0 Layout MGS to Drill Floor walkway - size beams/channels for assembly. Created Diving Board Walkway drawing Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily Meeting, Thursday TSR Meeting. - Timesheet and work review meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7 0 Layout MGS to Drill Floor walkway - size beams/channels for assembly. Created Diving Board Walkway drawing Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 Daily Meeting, Thursday TSR Meeting. - Timesheet and work review meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6.75 0 Layout MGS to Drill Floor walkway - size beams/channels for assembly. Created Diving Board Walkway drawing Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-21 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 4 0 Created HIBP-01-03-002 sheets 1 & 2. Layouts for worm gear hand winch. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily meeting, weekly TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-21 Rig 272L-TSR :Rig 272L-TSR TSR-01563-272L Crown Removal Regular Pay N 3.75 0 Create closeout documents, CTR Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-22 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 4 0 Created HIBP-01-03-002 sheets 1 & 2. Layouts for worm gear hand winch. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily meeting, weekly TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-22 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1.5 0 Revised 30B-01-03-002-1-RA-cuttings-bin-platform 48 for construction details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-22 Rig 272L-TSR :Rig 272L-TSR TSR-01563-272L Crown Removal Regular Pay N 2.25 0 Create closeout documents, CTR Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-23 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 4 0 Created HIBP-01-03-002 sheets 1 & 2. Layouts for worm gear hand winch. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily meeting, weekly TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-23 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3.75 0 Revised 30B-01-03-002-1-RA-cuttings-bin-platform 48 for construction details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily meeting, weekly TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-24 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 Revised 30B-01-03-002-1-RA-cuttings-bin-platform 48 for construction details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-24 Rig 272L-TSR :Rig 272L-TSR TSR-01563-272L Crown Removal Regular Pay N 4 0 Create closeout documents, CTR Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-25 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 3.75 0 Created HIBP-01-03-002 sheets 1 & 2. Layouts for worm gear hand winch. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily meeting, weekly TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-25 Rig 272L-TSR :Rig 272L-TSR TSR-01563-272L Crown Removal Regular Pay N 4 0 Create closeout documents, CTR Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-28 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Hurricane Harvey - Weather Pay Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-29 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Hurricane Harvey - Weather Pay Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-30 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Hurricane Harvey - Weather Pay Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-08-31 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Hurricane Harvey - Weather Pay Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-01 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Hurricane Harvey - Weather Pay Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Labor Day, Floating Holiday on Thursday 9/7 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-05 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 4 0 Created HIBP-01-03-002 sheets 1 & 2. Layouts for worm gear hand winch. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily meeting, Thursday TSR meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 3.75 0 Layouts for SMART goals - revise Drafting Standard Manual for new border/drawing initiative. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily meeting, Thursday TSR meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.75 0 Layouts for SMART goals - revise Drafting Standard Manual for new border/drawing initiative. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6 0 Check feasibility of winterization for DES Module. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-07 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Labor Day, Floating Holiday on Thursday 9/7 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-08 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 4 0 Created HIBP-01-03-002 sheets 1 & 2. Layouts for worm gear hand winch. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily meeting, Thursday TSR meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.75 0 Layouts for SMART goals - revise Drafting Standard Manual for new border/drawing initiative. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 Check feasibility of winterization for DES Module. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-11 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 4 0 Revised HIBP-01-03-002 sheets 1 & 2. Layouts for worm gear hand winch. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Weekly meeting - TSR Update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 3.75 0 (4hr) 209L Mousehole issue with BOP Platform., layout section to see interferences and check modifications on 209L-01-03-617 drawings. (14.25) Layouts for SMART goals - revise Parker Standard Drawing Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-12 Hibernia Platform :Hibernia Platform TSR-01584-HIBP Worm Gear Hand Winch Install Regular Pay N 2 0 Revised HIBP-01-03-002 sheets 1 & 2. Layouts for worm gear hand winch. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Weekly meeting - TSR Update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 3.75 0 (4hr) 209L Mousehole issue with BOP Platform., layout section to see interferences and check modifications on 209L-01-03-617 drawings. (14.25) Layouts for SMART goals - revise Parker Standard Drawing Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-12 Rig 272L-TSR :Rig 272L-TSR TSR-01563-272L Crown Removal Regular Pay N 2 0 Create closeout and CTR for crown removal. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Weekly meeting - TSR Update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 3.75 0 (4hr) 209L Mousehole issue with BOP Platform., layout section to see interferences and check modifications on 209L-01-03-617 drawings. (14.25) Layouts for SMART goals - revise Parker Standard Drawing Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-13 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 2 training classes - PD - Advanced Global Anti-Bribery Kevin Mitnick Security Awareness Training Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly meeting - TSR Update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 (4hr) 209L Mousehole issue with BOP Platform., layout section to see interferences and check modifications on 209L-01-03-617 drawings. (14.25) Layouts for SMART goals - revise Parker Standard Drawing Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-14 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 4 0 Create drawings 209L-01-03-410-1&2 Dust Collector Foundation Details Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Weekly meeting - TSR Update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 (4hr) 209L Mousehole issue with BOP Platform., layout section to see interferences and check modifications on 209L-01-03-617 drawings. (14.25) Layouts for SMART goals - revise Parker Standard Drawing Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-15 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 3.75 0 Create drawings 209L-01-03-410-1&2 Dust Collector Foundation Details Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily meeting, weekly TSR meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Layouts for SMART goals - revise Parker Standard Drawing Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-18 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 3.75 0 Create drawings 209L-01-03-410-1, 2 & 3 Dust Collector Foundation Details, iso views. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily meeting, weekly TSR meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Layouts for SMART goals - revise Parker Standard Drawing Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-19 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 3.75 0 Create drawings 209L-01-03-410-1, 2 & 3 Dust Collector Foundation Details, iso views. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily meeting, weekly TSR meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-20 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 7.75 0 Create drawings 209L-01-03-410-1, 2 & 3 Dust Collector Foundation Details, iso views. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily meeting, weekly TSR meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-21 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 7 0 Create drawings 209L-01-03-410-1, 2 & 3 Dust Collector Foundation Details, iso views. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily meeting, weekly TSR meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Layouts for SMART goals - revise Parker Standard Drawing Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-22 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 5.75 0 Create drawings 209L-01-03-410-1, 2 & 3 Dust Collector Foundation Details, iso views. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Weekly Team meeting. Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-25 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 7.75 0 Create drawings 209L-01-03-410-1, 2 & 3 Dust Collector Foundation Details, iso views. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Weekly Team meeting. Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Install Meshlab to computer and convert point cloud data for Hibernia to useable information. Import photo into blender to get a usable view of mud pump room. 10 hr. Layouts for SMART goals - revise chapter 1.0 - how to create a new drawing (border additions) - create screen shots Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-26 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 3.75 0 Create drawings 209L-01-03-410-1, 2 & 3 Dust Collector Foundation Details, iso views. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Weekly Team meeting. Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 5 0 Install Meshlab to computer and convert point cloud data for Hibernia to useable information. Import photo into blender to get a usable view of mud pump room. 10 hr. Layouts for SMART goals - revise chapter 1.0 - how to create a new drawing (border additions) - create screen shots Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-27 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 2.75 0 Create drawings 209L-01-03-410-1, 2 & 3 Dust Collector Foundation Details, iso views. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly Team meeting. Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 7 0 Install Meshlab to computer and convert point cloud data for Hibernia to useable information. Import photo into blender to get a usable view of mud pump room. 10 hr. Layouts for SMART goals - revise chapter 1.0 - how to create a new drawing (border additions) - create screen shots Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-28 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 0.5 0 Create drawings 209L-01-03-410-1, 2 & 3 Dust Collector Foundation Details, iso views. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Weekly Team meeting. Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-29 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Install Meshlab to computer and convert point cloud data for Hibernia to useable information. Import photo into blender to get a usable view of mud pump room. 10 hr. Layouts for SMART goals - revise chapter 1.0 - how to create a new drawing (border additions) - create screen shots Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-09-29 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 3.75 0 Create drawings 209L-01-03-410-1, 2 & 3 Dust Collector Foundation Details, iso views. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-02 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 7.75 0 Revised P01356-001-1-RD-concept-site-plan-HH, Created P01356-040-1-RA-drill-floor Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Weekly TSR meeting, daily meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 8 0 Revised P01356-001-1-RD-concept-site-plan-HH, Created P01356-040-1-RA-drill-floor Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-04 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 8 0 Revised P01356-001-1-RD-concept-site-plan-HH, Created P01356-040-1-RA-drill-floor Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly TSR meeting, daily meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 4.5 0 SMART goals - revising chapter 1.0 - how to create a new drawing (border additions) - create screen shots & revise descriptions. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-05 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 3 0 Modify & redlines to drawings 209L-01-03-410-1, 2 & 3 Dust Collector Foundation Details, iso views. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 4.75 0 SMART goals - revising chapter 1.0 - how to create a new drawing (border additions) - create screen shots & revise descriptions. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-06 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 3.25 0 Modify & redlines to drawings 209L-01-03-410-1, 2 & 3 Dust Collector Foundation Details, iso views. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.25 0 Fix problems with 209L drawings - Overage - Revise drawings 209L-01-03-410-1, 2 & 3 Dust Collector, connection lug position, iso views.. Revised P209-5740-01 Rev 5 Bulk P&ID, P209-D003-01 thru 8 r5 DSM GA Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-09 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1.5 0 Convert ply scan file to 3d file for AutoCAD M33 West - Scan 5.obj for Hybernia overhead jib crane 1526 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-09 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 4 0 Revise drawings 209L-01-03-410-1, 2 & 3 Dust Collector, connection lug position, iso views.. Revised P209-5740-01 Rev 5 Bulk P&ID, P209-D003-01 thru 8 r5 DSM GA Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.25 0 Fix problems with 209L drawings - Overage - Revise drawings 209L-01-03-410-1, 2 & 3 Dust Collector, connection lug position, iso views.. Revised P209-5740-01 Rev 5 Bulk P&ID, P209-D003-01 thru 8 r5 DSM GA Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-10 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1.5 0 Convert ply scan file to 3d file for AutoCAD M33 West - Scan 5.obj for Hybernia overhead jib crane 1526 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-10 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 4 0 Revise drawings 209L-01-03-410-1, 2 & 3 Dust Collector, connection lug position, iso views.. Revised P209-5740-01 Rev 5 Bulk P&ID, P209-D003-01 thru 8 r5 DSM GA Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Fix problems with 209L drawings - Overage - Revise drawings 209L-01-03-410-1, 2 & 3 Dust Collector, connection lug position, iso views.. Revised P209-5740-01 Rev 5 Bulk P&ID, P209-D003-01 thru 8 r5 DSM GA Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-11 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 4 0 Revise drawings 209L-01-03-410-1, 2 & 3 Dust Collector, connection lug position, iso views.. Revised P209-5740-01 Rev 5 Bulk P&ID, P209-D003-01 thru 8 r5 DSM GA Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-12 Hibernia Platform :Hibernia Platform TSR-01526-HIBP Mud Pump Jib/Overhead Crane/Hoist Regular Pay N 3 0 Convert ply scan file to 3d file for AutoCAD M33 West - Scan 5.obj for Hybernia overhead jib crane 1526 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily Team Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Fix problems with 209L drawings - Overage - Revise drawings 209L-01-03-410-1, 2 & 3 Dust Collector, connection lug position, iso views.. Revised P209-5740-01 Rev 5 Bulk P&ID, P209-D003-01 thru 8 r5 DSM GA Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-12 Rig 209L-TSR :Rig 209L-TSR TSR-01592-209L Dust Collector Regular Pay N 3 0 Revise drawings 209L-01-03-410-1, 2 & 3 Dust Collector, connection lug position, iso views.. Revised P209-5740-01 Rev 5 Bulk P&ID, P209-D003-01 thru 8 r5 DSM GA Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-13 Hibernia Platform :Hibernia Platform TSR-01526-HIBP Mud Pump Jib/Overhead Crane/Hoist Regular Pay N 1 0 Convert ply scan file to 3d file for AutoCAD M33 West - Scan 5.obj for Hybernia overhead jib crane 1526 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-13 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 1 0 Convert ply scan file to 3d file for AutoCAD M33 West - Scan 5.obj for Hybernia overhead jib crane 1526 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-13 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 6 0 Layout drawing, sketches from Ralph. Layout DSM to Drill floor walkway, pin connection details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team meeting - Weekly TSR update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheets, Solidworks help for Ralph, license loading problem. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-16 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 6.75 0 Created 209L-01-03-629-1 & 2_RA-suitcase-access-platform-ga & Details. Create CTR for review for TSR 01593. Create 209L-01-03-411-01 MGS Access Platfrorm Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-17 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 8 0 Created 209L-01-03-629-1 & 2_RA-suitcase-access-platform-ga & Details. Create CTR for review for TSR 01593. Create 209L-01-03-411-01 MGS Access Platfrorm Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-18 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 8 0 Created 209L-01-03-629-1 & 2_RA-suitcase-access-platform-ga & Details. Create CTR for review for TSR 01593. Create 209L-01-03-411-01 MGS Access Platfrorm Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily Team meeting - Weekly TSR update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-19 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 7 0 Created 209L-01-03-629-1 & 2_RA-suitcase-access-platform-ga & Details. Create CTR for review for TSR 01593. Create 209L-01-03-411-01 MGS Access Platfrorm Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-20 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 8 0 Created 209L-01-03-629-1 & 2_RA-suitcase-access-platform-ga & Details. Create CTR for review for TSR 01593. Create 209L-01-03-411-01 MGS Access Platfrorm Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 Timesheets, File drawings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-23 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 7.5 0 Revise per field comments Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily Team meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-24 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 7.5 0 Revise per field comments Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-25 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 8 0 Revise per field comments Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-26 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 8 0 Revise per field comments Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-27 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Created Electrical Reel power diagram - P 1356-171-1-RA-Uganda-Total-Rig-Reel-Power-Diagram Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-27 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 7 0 Revise per field comments Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily Team Meeting, Monday area meeting with Sakhlin. Weekly TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheets Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-30 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 6 0 Created detail drawings 209L-01-03-629-5_RA-suitcase-access-platform-beam-details, 209L-01-03-629-4_RA-suitcase-access-platform-details Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting, Monday area meeting with Sakhlin. Weekly TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-10-31 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 7.75 0 Created detail drawings 209L-01-03-629-5_RA-suitcase-access-platform-beam-details, 209L-01-03-629-4_RA-suitcase-access-platform-details Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-01 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 8 0 Created detail drawings 209L-01-03-629-5_RA-suitcase-access-platform-beam-details, 209L-01-03-629-4_RA-suitcase-access-platform-details Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily Team Meeting, Monday area meeting with Sakhlin. Weekly TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-02 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 7 0 Created detail drawings 209L-01-03-629-5_RA-suitcase-access-platform-beam-details, 209L-01-03-629-4_RA-suitcase-access-platform-details Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-03 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 8 0 Created detail drawings 209L-01-03-629-5_RA-suitcase-access-platform-beam-details, 209L-01-03-629-4_RA-suitcase-access-platform-details Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily Team Meeting, Monday area meeting with Sakhlin. Weekly TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 Timesheets Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6.5 0 Created 209L-01-03-629-6_RA-suitcase-access-platform-handrail-details & 209L-01-03-629-7_RA-suitcase-access-platform-handrail-details. Revise drawings to rotate beams and finish details for moving connection to top beam. Overflow hours for TSR 1593 for drafting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 8 0 Created 209L-01-03-629-6_RA-suitcase-access-platform-handrail-details & 209L-01-03-629-7_RA-suitcase-access-platform-handrail-details. Revise drawings to rotate beams and finish details for moving connection to top beam. Overflow hours for TSR 1593 for drafting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 8 0 Created 209L-01-03-629-6_RA-suitcase-access-platform-handrail-details & 209L-01-03-629-7_RA-suitcase-access-platform-handrail-details. Revise drawings to rotate beams and finish details for moving connection to top beam. Overflow hours for TSR 1593 for drafting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily Team Meeting, Monday area meeting with Sakhlin. Weekly TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7.5 0 Created 209L-01-03-629-6_RA-suitcase-access-platform-handrail-details & 209L-01-03-629-7_RA-suitcase-access-platform-handrail-details. Revise drawings to rotate beams and finish details for moving connection to top beam. Overflow hours for TSR 1593 for drafting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 8 0 Created 209L-01-03-629-6_RA-suitcase-access-platform-handrail-details & 209L-01-03-629-7_RA-suitcase-access-platform-handrail-details. Revise drawings to rotate beams and finish details for moving connection to top beam. Overflow hours for TSR 1593 for drafting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Sakhalin meeting Monday, Daily TSR meeting, weekly TSR meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 Timesheets Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6.5 0 Created 209L-01-03-411-2,3,4_RA-dsm-dm-access-walkway--details.dwgs. Cantilever walkway sections and details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 8 0 Created 209L-01-03-411-2,3,4_RA-dsm-dm-access-walkway--details.dwgs. Cantilever walkway sections and details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Sakhalin meeting Monday, Daily TSR meeting, weekly TSR meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-15 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7.75 0 Created 209L-01-03-411-2,3,4_RA-dsm-dm-access-walkway--details.dwgs. Cantilever walkway sections and details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Sakhalin meeting Monday, Daily TSR meeting, weekly TSR meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7 0 Created 209L-01-03-411-2,3,4_RA-dsm-dm-access-walkway--details.dwgs. Cantilever walkway sections and details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 8 0 Created 209L-01-03-411-2,3,4_RA-dsm-dm-access-walkway--details.dwgs. Cantilever walkway sections and details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Timesheets, TSR meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7.5 0 Create 209L-01-03-411-1_RA-dsm-dm-access-walkway-plan-elevation.dwg Send RF!-001 for TSR 01593 to clarify platform breakdown for installation request. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 8 0 Create 209L-01-03-411-1_RA-dsm-dm-access-walkway-plan-elevation.dwg Send RF!-001 for TSR 01593 to clarify platform breakdown for installation request. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 8 0 Create 209L-01-03-411-1_RA-dsm-dm-access-walkway-plan-elevation.dwg Send RF!-001 for TSR 01593 to clarify platform breakdown for installation request. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-23 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Thanksgiving Holiday Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-24 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Thanksgiving Holiday Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Sakhalin Monday meeting, daily TSR meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-27 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 7 0 Design lifting tool for SBOP Upper Assembly, create layout drawing and sketches and send to Sakhalin for review and design discussions. Create 3D model Lift Tool and run analysis, size up all plate sizes. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Sakhalin Monday meeting, daily TSR meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-28 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Internal Controls Refresher Course Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-28 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 6.75 0 Design lifting tool for SBOP Upper Assembly, create layout drawing and sketches and send to Sakhalin for review and design discussions. Create 3D model Lift Tool and run analysis, size up all plate sizes. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-29 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 8 0 Design lifting tool for SBOP Upper Assembly, create layout drawing and sketches and send to Sakhalin for review and design discussions. Create 3D model Lift Tool and run analysis, size up all plate sizes. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Sakhalin Monday meeting, daily TSR meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-11-30 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 7 0 Design lifting tool for SBOP Upper Assembly, create layout drawing and sketches and send to Sakhalin for review and design discussions. Create 3D model Lift Tool and run analysis, size up all plate sizes. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-01 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 8 0 Design lifting tool for SBOP Upper Assembly, create layout drawing and sketches and send to Sakhalin for review and design discussions. Create 3D model Lift Tool and run analysis, size up all plate sizes. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Sakhalin Monday meeting, daily TSR meeting. Thursday TSR Update Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-04 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 7 0 Finalize Analysis and modify for better C.G. location. Create 209L-01-03-633-1,2,3_RA-lift-tool-for-sbop-upper-assembly drawings and details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Sakhalin Monday meeting, daily TSR meeting. Thursday TSR Update Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-05 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 7.75 0 Finalize Analysis and modify for better C.G. location. Create 209L-01-03-633-1,2,3_RA-lift-tool-for-sbop-upper-assembly drawings and details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Sakhalin Monday meeting, daily TSR meeting. Thursday TSR Update Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-06 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 7.75 0 Finalize Analysis and modify for better C.G. location. Create 209L-01-03-633-1,2,3_RA-lift-tool-for-sbop-upper-assembly drawings and details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Sakhalin Monday meeting, daily TSR meeting. Thursday TSR Update Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-07 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 7 0 Finalize Analysis and modify for better C.G. location. Create 209L-01-03-633-1,2,3_RA-lift-tool-for-sbop-upper-assembly drawings and details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-08 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 8 0 Finalize Analysis and modify for better C.G. location. Create 209L-01-03-633-1,2,3_RA-lift-tool-for-sbop-upper-assembly drawings and details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Sakhalin Monday meeting, daily TSR meeting. Thursday TSR Update Meeting. 3D Scan meeting & Holliday party on Tuesday. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheets, update files, separate drawings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-11 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 6 0 Revise Analysis and modify for Arm position. Revise 209L-01-03-633-1,2,3_RA-lift-tool-for-sbop-upper-assembly drawings and details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 3.25 0 Sakhalin Monday meeting, daily TSR meeting. Thursday TSR Update Meeting. 3D Scan meeting & Holliday party on Tuesday. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-12 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 217 Annual Compliance Training Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-12 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 2.75 0 Revise Analysis and modify for Arm position. Revise 209L-01-03-633-1,2,3_RA-lift-tool-for-sbop-upper-assembly drawings and details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-13 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 8 0 Revise Analysis and modify for Arm position. Revise 209L-01-03-633-1,2,3_RA-lift-tool-for-sbop-upper-assembly drawings and details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Sakhalin Monday meeting, daily TSR meeting. Thursday TSR Update Meeting. 3D Scan meeting & Holliday party on Tuesday. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-14 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 7 0 Revise Analysis and modify for Arm position. Revise 209L-01-03-633-1,2,3_RA-lift-tool-for-sbop-upper-assembly drawings and details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-15 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 Create Sketch drawings for quotes, choke and trip tank lines. 2.5 DS3K-KK-1926-1-001_Choke Line from HP Drilling & 2.4 DS3K-LM-1907-001 Mod For Quote - Choke Manifold to TripTank - Isometric drawing Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-15 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 6 0 Revise Analysis and modify for Arm position. Revise 209L-01-03-633-1,2,3_RA-lift-tool-for-sbop-upper-assembly drawings and details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Brainstorming for 2018 SMART Goals Tuesday. Monday Sakhalin meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 For Lifting Tool revisions TSR 01618 - Revised for tool access @ additional 6" clearance. 209L-01-03-633-1 thru 3 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-18 Rig 209L-TSR :Rig 209L-TSR TSR-01618-209L Lift Tool for SBOP Upper Assembly Regular Pay N 6 0 For Lifting Tool revisions TSR 01618 - Revised for tool access @ additional 6" clearance. 209L-01-03-633-1 thru 3 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Brainstorming for 2018 SMART Goals Tuesday. Monday Sakhalin meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7 0 For Lifting Tool revisions TSR 01618 - Revised for tool access @ additional 6" clearance. 209L-01-03-633-1 thru 3 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 8 0 For Lifting Tool revisions TSR 01618 - Revised for tool access @ additional 6" clearance. 209L-01-03-633-1 thru 3 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-22 OH-011 :OH-011 Overhead All Activities Regular Pay N 3 0 Early Dismissal for Christmas Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5 0 For Lifting Tool revisions TSR 01618 - Revised for tool access @ additional 6" clearance. 209L-01-03-633-1 thru 3 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-25 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Christmas Day Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 The 2017 Performance & Development Review - fill out and submit Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 For Lifting Tool revisions TSR 01618 - Revised for arm modifications / design change. 209L-01-03-633-1 thru 3 - run analysis. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 8 0 For Lifting Tool revisions TSR 01618 - Revised for arm modifications / design change. 209L-01-03-633-1 thru 3 - run analysis. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-28 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 8 0 Added WT6x22.5 connection detail, update for rev B. 209L-01-03-629-1 thru 7 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2017-12-29 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 8 0 Added WT6x22.5 connection detail, update for rev B. 209L-01-03-629-1 thru 7 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-01 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Years Day Holiday Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily Team meeting, Thursday TSR Update meeting. Timesheets. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-02 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 7.5 0 209L-01-03-411-1 thru 7 Revise drawings issued for construction, revise per comments. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-03 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 8 0 209L-01-03-411-1 thru 7 Revise drawings issued for construction, revise per comments. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily Team meeting, Thursday TSR Update meeting. Timesheets. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 For Lifting Tool revisions TSR 01618 - Revised for arm modifications / design change. 209L-01-03-633-1 thru 3 - run analysis. (Static 4) Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-04 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 5 0 209L-01-03-411-1 thru 7 Revise drawings issued for construction, revise per comments. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team meeting, Thursday TSR Update meeting. Timesheets. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 For Lifting Tool revisions TSR 01618 - Revised for arm modifications / design change. 209L-01-03-633-1 thru 3 - run analysis. (Static 4) Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-05 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 3.75 0 209L-01-03-411-1 thru 7 Revise drawings issued for construction, revise per comments. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Sakhalin Meeting, Daily Team meeting. Thursday Weekly TSR Meeting. Thrusday 2M Tek meeting for Test Frame Assembly. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7.75 0 For TSR 1593 & 1618 - 209L-01-03-633-1 thru 3 SBOP Lifting Ring - 209L-01-03-411-1 thru 6 Cantilever Walkway - 209L-01-03-629-1 thru 7 DSM Suitcase Access Platform - drawings issued for construction, revise per comments. Plate size changes on cantilever walkway. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Sakhalin Meeting, Daily Team meeting. Thursday Weekly TSR Meeting. Thrusday 2M Tek meeting for Test Frame Assembly. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-09 Rig 209L-TSR :Rig 209L-TSR TSR-01593-209L Suitcase Platform & DSM-DM Walkway Regular Pay N 7.75 0 209L-01-03-411-1 thru 6 Cantilever Walkway - 209L-01-03-629-1 thru 7 DSM Suitcase Access Platform - drawings issued for construction, revise per comments. Plate size changes on cantilever walkway. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 8 0 For TSR 1593 & 1618 - 209L-01-03-633-1 thru 3 SBOP Lifting Ring - 209L-01-03-411-1 thru 6 Cantilever Walkway - 209L-01-03-629-1 thru 7 DSM Suitcase Access Platform - drawings issued for construction, revise per comments. Plate size changes on cantilever walkway. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Sakhalin Meeting, Daily Team meeting. Thursday Weekly TSR Meeting. Thrusday 2M Tek meeting for Test Frame Assembly. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5.5 0 For TSR 1593 & 1618 - 209L-01-03-633-1 thru 3 SBOP Lifting Ring - 209L-01-03-411-1 thru 6 Cantilever Walkway - 209L-01-03-629-1 thru 7 DSM Suitcase Access Platform - drawings issued for construction, revise per comments. Plate size changes on cantilever walkway. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 8 0 For TSR 1593 & 1618 - 209L-01-03-633-1 thru 3 SBOP Lifting Ring - 209L-01-03-411-1 thru 6 Cantilever Walkway - 209L-01-03-629-1 thru 7 DSM Suitcase Access Platform - drawings issued for construction, revise per comments. Plate size changes on cantilever walkway. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-15 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1.5 0 Meeting to review Torque sub calibration frame & review TSR/CTR. Go over parts to be modified in model. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily Team meeting, timesheets Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-15 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Revised 209L-01-03-411-R0-dsm-dm-access-walkway, fix BOM & Material call outs. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-15 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4 0 Created 077B-01-04-008-1-RA-compressed-air-system-p&id drawing per field sketches. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Inclement Weather Days Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Inclement Weather Days Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-18 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2.5 0 Meeting to review Torque sub calibration frame & review TSR/CTR. Go over parts to be modified in model. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team meeting, timesheets Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.25 0 Revised 209L-01-03-411-R0-dsm-dm-access-walkway, fix BOM & Material call outs. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-18 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 4 0 Created 077B-01-04-008-1-RA-compressed-air-system-p&id drawing per field sketches. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-19 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5 0 Meeting to review Torque sub calibration frame & review TSR/CTR. Go over parts to be modified in model. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-19 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 3 0 Created 077B-01-04-008-1-RA-compressed-air-system-p&id drawing per field sketches. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-22 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 3 0 Meeting to review Torque Go over parts to be modified in model, review clamp / torque connections, move torque connections to adapter sub pieces. shorten model and run FEA on existing "Top Hat" part for new pull design requirement. Design a new adjustable torque connection for adapter pieces. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Monday Morning Meeting with Sakhalin, Daily Team Meeting. Thursday TSR Update Meeting. Thursday Safer union product Presentation. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Revised 209L-01-03-411-R0-dsm-dm-access-walkway, fix handrail bom and details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-22 Rig 077B-TSR :Rig 077B-TSR TSR-01603-077B SEMS Package Regular Pay N 2 0 Finalize and check 077B-01-04-008-1-RA-compressed-air-system-p&id drawing per field sketches. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-23 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5.75 0 Meeting to review Torque Go over parts to be modified in model, review clamp / torque connections, move torque connections to adapter sub pieces. shorten model and run FEA on existing "Top Hat" part for new pull design requirement. Design a new adjustable torque connection for adapter pieces. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Monday Morning Meeting with Sakhalin, Daily Team Meeting. Thursday TSR Update Meeting. Thursday Safer union product Presentation. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Revised 209L-01-03-411-R0-dsm-dm-access-walkway, fix handrail bom and details. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-24 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.75 0 Meeting to review Torque Go over parts to be modified in model, review clamp / torque connections, move torque connections to adapter sub pieces. shorten model and run FEA on existing "Top Hat" part for new pull design requirement. Design a new adjustable torque connection for adapter pieces. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Monday Morning Meeting with Sakhalin, Daily Team Meeting. Thursday TSR Update Meeting. Thursday Safer union product Presentation. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-25 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 6 0 Meeting to review Torque Go over parts to be modified in model, review clamp / torque connections, move torque connections to adapter sub pieces. shorten model and run FEA on existing "Top Hat" part for new pull design requirement. Design a new adjustable torque connection for adapter pieces. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Monday Morning Meeting with Sakhalin, Daily Team Meeting. Thursday TSR Update Meeting. Thursday Safer union product Presentation. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-26 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Meeting to review Torque Go over parts to be modified in model, review clamp / torque connections, move torque connections to adapter sub pieces. shorten model and run FEA on existing "Top Hat" part for new pull design requirement. Design a new adjustable torque connection for adapter pieces. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-29 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 6.75 0 Finalize Torque Sub Calibration Machine Layout Design, meetings to go over layout Adjustable anchor location layout and cylinder positions. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 Thursday TSR Meeting. Monday Sakhalin meeting. Daily Team Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-30 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.75 0 Finalize Torque Sub Calibration Machine Layout Design, meetings to go over layout Adjustable anchor location layout and cylinder positions. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Thursday TSR Meeting. Monday Sakhalin meeting. Daily Team Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-31 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.75 0 Finalize Torque Sub Calibration Machine Layout Design, meetings to go over layout Adjustable anchor location layout and cylinder positions. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-01-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Thursday TSR Meeting. Monday Sakhalin meeting. Daily Team Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-01 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7 0 Finalize Torque Sub Calibration Machine Layout Design, meetings to go over layout Adjustable anchor location layout and cylinder positions. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Thursday TSR Meeting. Monday Sakhalin meeting. Daily Team Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-02 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Finalize Torque Sub Calibration Machine Layout Design, meetings to go over layout Adjustable anchor location layout and cylinder positions. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-05 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.75 0 Layout torque sub test machine for maximum / minimum torque sub lengths, layout connections for horizontal torque attachment and discuss with Andrew on Friday meeting, finalized design discussion. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily team meeting. No TSR meeting this week. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-06 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.75 0 Layout torque sub test machine for maximum / minimum torque sub lengths, layout connections for horizontal torque attachment and discuss with Andrew on Friday meeting, finalized design discussion. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily team meeting. No TSR meeting this week. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-07 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 8 0 Created 270L-01-SK-024-RA-Chayvo-water-well-plot-plan (4 sheets). 270L-01-SK-025-1-RA-Chayvo-water-well-walking-path-layout (14 sheets) 270L-01-SK-026-01-RA-Chayvo-water-well-plot-plan-north-south-well-rows (4 sheets) 270L-01-SK-027-01-RA-Chayvo-water-well-plot-plan-east-west-well-rows (4 sheets) All modified from existing 270 water well drawings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-08 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 Layout torque sub test machine for maximum / minimum torque sub lengths, layout connections for horizontal torque attachment and discuss with Andrew on Friday meeting, finalized design discussion. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-08 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 6 0 Created 270L-01-SK-024-RA-Chayvo-water-well-plot-plan (4 sheets). 270L-01-SK-025-1-RA-Chayvo-water-well-walking-path-layout (14 sheets) 270L-01-SK-026-01-RA-Chayvo-water-well-plot-plan-north-south-well-rows (4 sheets) 270L-01-SK-027-01-RA-Chayvo-water-well-plot-plan-east-west-well-rows (4 sheets) All modified from existing 270 water well drawings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-09 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 Layout torque sub test machine for maximum / minimum torque sub lengths, layout connections for horizontal torque attachment and discuss with Andrew on Friday meeting, finalized design discussion. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-09 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 6 0 Created 270L-01-SK-024-RA-Chayvo-water-well-plot-plan (4 sheets). 270L-01-SK-025-1-RA-Chayvo-water-well-walking-path-layout (14 sheets) 270L-01-SK-026-01-RA-Chayvo-water-well-plot-plan-north-south-well-rows (4 sheets) 270L-01-SK-027-01-RA-Chayvo-water-well-plot-plan-east-west-well-rows (4 sheets) All modified from existing 270 water well drawings. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily meeting, TSR Update Meeting, Timesheets. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-12 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 7.75 0 Options for walking 1A, 1B & 2 with matting layouts. 270L-01-SK-026-RA-Chayvo-water-well-plot-plan-north-south-well-rows, 270L-01-SK-028-RA-Chayvo-water-well-walking-path-layout-north-south-well-rows, 270L-01-SK-029-RA-Chayvo-water-well-walking-path-layout-east-west-well-rows, 270L-01-SK-024-RA-Chayvo-water-well-plot-plan, 270L-01-SK-027-RA-Chayvo-water-well-plot-plan-east-west-well-rows. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-13 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 8 0 Options for walking 1A, 1B & 2 with matting layouts. 270L-01-SK-026-RA-Chayvo-water-well-plot-plan-north-south-well-rows, 270L-01-SK-028-RA-Chayvo-water-well-walking-path-layout-north-south-well-rows, 270L-01-SK-029-RA-Chayvo-water-well-walking-path-layout-east-west-well-rows, 270L-01-SK-024-RA-Chayvo-water-well-plot-plan, 270L-01-SK-027-RA-Chayvo-water-well-plot-plan-east-west-well-rows. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-14 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5.75 0 Discuss design layout options Advantages vs. Disadvantages, Options for designs 1-4, create 3 model display modes for long sub, short sub & torque position for design option 4 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily meeting, TSR Update Meeting, Timesheets. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-14 Rig 270L-TSR :Rig 270L-TSR TSR-01622-270L Rig Layout Options 2018 Regular Pay N 2 0 Options for walking 1A, 1B & 2 with matting layouts. 270L-01-SK-026-RA-Chayvo-water-well-plot-plan-north-south-well-rows, 270L-01-SK-028-RA-Chayvo-water-well-walking-path-layout-north-south-well-rows, 270L-01-SK-029-RA-Chayvo-water-well-walking-path-layout-east-west-well-rows, 270L-01-SK-024-RA-Chayvo-water-well-plot-plan, 270L-01-SK-027-RA-Chayvo-water-well-plot-plan-east-west-well-rows. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-15 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7 0 Discuss design layout options Advantages vs. Disadvantages, Options for designs 1-4, create 3 model display modes for long sub, short sub & torque position for design option 4 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily meeting, TSR Update Meeting, Timesheets. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-16 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Floating Holiday Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Presidents Day Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-20 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5 0 Go to Lafayette to inspect existing machine for Tension Testing / Calibration. Tues. go to Stress Eng. for Pull Test on parts. Thurs. Friday. Adjust model for new larger size cylinders for tension. and set up torq plates for stress analysis. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-20 OH-010 :OH-010 Overhead All Activities Regular Pay N 3 0 Travel from 2M-TEK in Lafayette. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-21 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Go to Lafayette to inspect existing machine for Tension Testing / Calibration. Tues. go to Stress Eng. for Pull Test on parts. Thurs. Friday. Adjust model for new larger size cylinders for tension. and set up torq plates for stress analysis. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-22 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7 0 Go to Lafayette to inspect existing machine for Tension Testing / Calibration. Tues. go to Stress Eng. for Pull Test on parts. Thurs. Friday. Adjust model for new larger size cylinders for tension. and set up torq plates for stress analysis. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-23 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Go to Lafayette to inspect existing machine for Tension Testing / Calibration. Tues. go to Stress Eng. for Pull Test on parts. Thurs. Friday. Adjust model for new larger size cylinders for tension. and set up torq plates for stress analysis. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-26 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7 0 Adjust width of test machine to fit torque arm at 12". Finalize model for design review on Thursday. Thursday Create Design Review renderings for Hyd. Review. Detail Design Review Friday Analysis Overview. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily Team Meeting. Update PTO with Payroll. (Mon.) Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-27 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Adjust width of test machine to fit torque arm at 12". Finalize model for design review on Thursday. Thursday Create Design Review renderings for Hyd. Review. Detail Design Review Friday Analysis Overview. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-02-28 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Adjust width of test machine to fit torque arm at 12". Finalize model for design review on Thursday. Thursday Create Design Review renderings for Hyd. Review. Detail Design Review Friday Analysis Overview. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-01 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Adjust width of test machine to fit torque arm at 12". Finalize model for design review on Thursday. Thursday Create Design Review renderings for Hyd. Review. Detail Design Review Friday Analysis Overview. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-02 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 4 0 Adjust width of test machine to fit torque arm at 12". Finalize model for design review on Thursday. Thursday Create Design Review renderings for Hyd. Review. Detail Design Review Friday Analysis Overview. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-02 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 PTO Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-05 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.5 0 TSCM - TOP Hat Assembly FEA, TSCM - Anchor Assembly-Nonlinear FEA. New Head End plate redesign, FEA. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-06 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5 0 TSCM - TOP Hat Assembly FEA, TSCM - Anchor Assembly-Nonlinear FEA. New Head End plate redesign, FEA. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-07 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 9 0 TSCM - TOP Hat Assembly FEA, TSCM - Anchor Assembly-Nonlinear FEA. New Head End plate redesign, FEA. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-08 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 9.5 0 TSCM - TOP Hat Assembly FEA, TSCM - Anchor Assembly-Nonlinear FEA. New Head End plate redesign, FEA. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-09 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8.5 0 TSCM - TOP Hat Assembly FEA, TSCM - Anchor Assembly-Nonlinear FEA. New Head End plate redesign, FEA. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-12 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.5 0 Created new model for single plate head assemblies, model for FEA end head assemblies. FEA meeting to discuss nonlinear analysis. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Whiteboard Meetings Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-13 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.5 0 Created new model for single plate head assemblies, model for FEA end head assemblies. FEA meeting to discuss nonlinear analysis. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Whiteboard Meetings Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-14 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Created new model for single plate head assemblies, model for FEA end head assemblies. FEA meeting to discuss nonlinear analysis. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-15 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.5 0 Created new model for single plate head assemblies, model for FEA end head assemblies. FEA meeting to discuss nonlinear analysis. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-15 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Whiteboard Meetings Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-16 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Created new model for single plate head assemblies, model for FEA end head assemblies. FEA meeting to discuss nonlinear analysis. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-19 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 6.5 0 Meet with Josh to discuss FEA Layout for End frame, Set up FEA for Middle frame assembly. Clean up folder structure, path for Final Assembly model. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily Team Meeting, Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-19 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 Revise existing Hyundai drawing for choke line DS3K-KK-1926-1, put changes in and revise title block. Revise ORLP-01-03-009 1 thru 3, Layout for new choke support positions, detail new support installation and locations. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-20 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 4 0 Meet with Josh to discuss FEA Layout for End frame, Set up FEA for Middle frame assembly. Clean up folder structure, path for Final Assembly model. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-20 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 4 0 Revise electrical one line sketch, create sketch drawing 209L-01-SK-001-RA-crane-warning-light-elec-schematic, Revise and add electrical box detail. Look up part sizes for box arrangement drawing. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-21 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 Meet with Josh to discuss FEA Layout for End frame, Set up FEA for Middle frame assembly. Clean up folder structure, path for Final Assembly model. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting, Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-21 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 6.75 0 Revise existing Hyundai drawing for choke line DS3K-KK-1926-1, put changes in and revise title block. Revise ORLP-01-03-009 1 thru 3, Layout for new choke support positions, detail new support installation and locations. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-22 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 1 0 Meet with Josh to discuss FEA Layout for End frame, Set up FEA for Middle frame assembly. Clean up folder structure, path for Final Assembly model. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily Team Meeting, Thursday TSR Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-22 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 Revise existing Hyundai drawing for choke line DS3K-KK-1926-1, put changes in and revise title block. Revise ORLP-01-03-009 1 thru 3, Layout for new choke support positions, detail new support installation and locations. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-22 Rig 209L-TSR :Rig 209L-TSR TSR-01626-209L Rig Access Relocation from PBM to DM-DSM Regular Pay N 3 0 Revise electrical one line sketch, create sketch drawing 209L-01-SK-001-RA-crane-warning-light-elec-schematic, Revise and add electrical box detail. Look up part sizes for box arrangement drawing. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-23 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5 0 Meet with Josh to discuss FEA Layout for End frame, Set up FEA for Middle frame assembly. Clean up folder structure, path for Final Assembly model. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-23 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 2 0 Revise existing Hyundai drawing for choke line DS3K-KK-1926-1, put changes in and revise title block. Revise ORLP-01-03-009 1 thru 3, Layout for new choke support positions, detail new support installation and locations. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily team meeting, Thursday TSR Update Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-26 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 8.75 0 Create ORLP-01-03-009 4, 5, & 6, detail new support installation and locations. Friday redlines for supports, detail baseplate attachments. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily team meeting, Thursday TSR Update Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-27 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 7.75 0 Create ORLP-01-03-009 4, 5, & 6, detail new support installation and locations. Friday redlines for supports, detail baseplate attachments. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-28 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 3 0 Wed. Modified materials on middle frame assembly, run FEA model. Thurs. Modified both end assemblies for new material and new style anchor pieces., run FEA model. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily team meeting, Thursday TSR Update Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-28 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 4.75 0 Create ORLP-01-03-009 4, 5, & 6, detail new support installation and locations. Friday redlines for supports, detail baseplate attachments. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-29 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 3 0 Wed. Modified materials on middle frame assembly, run FEA model. Thurs. Modified both end assemblies for new material and new style anchor pieces., run FEA model. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Daily team meeting, Thursday TSR Update Meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-29 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 3.5 0 Create ORLP-01-03-009 4, 5, & 6, detail new support installation and locations. Friday redlines for supports, detail baseplate attachments. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-03-30 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Good Friday Holilday Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-02 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 4.75 0 FEA Analysis for Anchor end mounts, and snapshots for Anchor Ends, Mount Plates, Main Head, Middle frame Torsion & Tension FEA setup Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting, Thursday TSR Update Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-02 ORLAN-TSR :ORLAN-TSR TSR-01572-ORLP Choke Manifold Replacement Regular Pay N 3 0 Revise ORLP-01-03-009 1-6, pick up redlines. Issue for Fab. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-03 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.75 0 FEA Analysis for Anchor end mounts, and snapshots for Anchor Ends, Mount Plates, Main Head, Middle frame Torsion & Tension FEA setup Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting, Thursday TSR Update Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-04 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.75 0 FEA Analysis for Anchor end mounts, and snapshots for Anchor Ends, Mount Plates, Main Head, Middle frame Torsion & Tension FEA setup Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting, Thursday TSR Update Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-05 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7 0 FEA Analysis for Anchor end mounts, and snapshots for Anchor Ends, Mount Plates, Main Head, Middle frame Torsion & Tension FEA setup Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily Team Meeting, Thursday TSR Update Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-06 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.75 0 FEA Analysis for Anchor end mounts, and snapshots for Anchor Ends, Mount Plates, Main Head, Middle frame Torsion & Tension FEA setup Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting, Thursday TSR Update Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-09 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7 0 Final FEA snapshots, Torque Clevis, Leg/Pin Assembly, Middle frame torsion FEA. Create Bid Drawings for Middle frame assembly, End assembly, Head Assembly, Roller Frame Assembly Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily Team Meeting, Weekly TSR Update Meeting. Monday Sakhalin update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-10 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Final FEA snapshots, Torque Clevis, Leg/Pin Assembly, Middle frame torsion FEA. Create Bid Drawings for Middle frame assembly, End assembly, Head Assembly, Roller Frame Assembly Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-11 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.75 0 Final FEA snapshots, Torque Clevis, Leg/Pin Assembly, Middle frame torsion FEA. Create Bid Drawings for Middle frame assembly, End assembly, Head Assembly, Roller Frame Assembly Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting, Weekly TSR Update Meeting. Monday Sakhalin update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-12 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7 0 Final FEA snapshots, Torque Clevis, Leg/Pin Assembly, Middle frame torsion FEA. Create Bid Drawings for Middle frame assembly, End assembly, Head Assembly, Roller Frame Assembly Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily Team Meeting, Weekly TSR Update Meeting. Monday Sakhalin update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-13 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Final FEA snapshots, Torque Clevis, Leg/Pin Assembly, Middle frame torsion FEA. Create Bid Drawings for Middle frame assembly, End assembly, Head Assembly, Roller Frame Assembly Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-16 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7.75 0 Adjust end plates on main assembly into weldment assemblies., Revise skid assembly for 10X6X5/8 tube. Add Lift lugs on plate assemblies. Adjust rollers and make new roller gussets to align with new skid frame tube. Create drawings from models for end assembly.2MTEK-01-01-020 thur 028. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting, Weekly TSR Update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-17 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8.75 0 Adjust end plates on main assembly into weldment assemblies., Revise skid assembly for 10X6X5/8 tube. Add Lift lugs on plate assemblies. Adjust rollers and make new roller gussets to align with new skid frame tube. Create drawings from models for end assembly.2MTEK-01-01-020 thur 028. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting, Weekly TSR Update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-18 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8.75 0 Adjust end plates on main assembly into weldment assemblies., Revise skid assembly for 10X6X5/8 tube. Add Lift lugs on plate assemblies. Adjust rollers and make new roller gussets to align with new skid frame tube. Create drawings from models for end assembly.2MTEK-01-01-020 thur 028. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 Daily Team Meeting, Weekly TSR Update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-19 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Adjust end plates on main assembly into weldment assemblies., Revise skid assembly for 10X6X5/8 tube. Add Lift lugs on plate assemblies. Adjust rollers and make new roller gussets to align with new skid frame tube. Create drawings from models for end assembly.2MTEK-01-01-020 thur 028. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Daily Team Meeting, Weekly TSR Update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-20 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5 0 Adjust end plates on main assembly into weldment assemblies., Revise skid assembly for 10X6X5/8 tube. Add Lift lugs on plate assemblies. Adjust rollers and make new roller gussets to align with new skid frame tube. Create drawings from models for end assembly.2MTEK-01-01-020 thur 028. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-23 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Revise End Assembly drawings 2MTEK-01-11-020 thru 028 and assembly model, iron out drawing numbers and update dwg register. Create Main Assembly Snapshot for report. Create Roller Skid Assembly Drawing 2M-TEK-01-10-000 1&2. Start Head Assembly drawing 2M-TEK-01-10-001 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-24 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Revise End Assembly drawings 2MTEK-01-11-020 thru 028 and assembly model, iron out drawing numbers and update dwg register. Create Main Assembly Snapshot for report. Create Roller Skid Assembly Drawing 2M-TEK-01-10-000 1&2. Start Head Assembly drawing 2M-TEK-01-10-001 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-25 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Revise End Assembly drawings 2MTEK-01-11-020 thru 028 and assembly model, iron out drawing numbers and update dwg register. Create Main Assembly Snapshot for report. Create Roller Skid Assembly Drawing 2M-TEK-01-10-000 1&2. Start Head Assembly drawing 2M-TEK-01-10-001 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-26 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7 0 Revise End Assembly drawings 2MTEK-01-11-020 thru 028 and assembly model, iron out drawing numbers and update dwg register. Create Main Assembly Snapshot for report. Create Roller Skid Assembly Drawing 2M-TEK-01-10-000 1&2. Start Head Assembly drawing 2M-TEK-01-10-001 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TSR Update Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-27 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Revise End Assembly drawings 2MTEK-01-11-020 thru 028 and assembly model, iron out drawing numbers and update dwg register. Create Main Assembly Snapshot for report. Create Roller Skid Assembly Drawing 2M-TEK-01-10-000 1&2. Start Head Assembly drawing 2M-TEK-01-10-001 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-04-30 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Sick Days Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-01 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Redlines for 2M-TEK-01-10-000-RA-Roller-Skid-Assembly, Created: 2MTEK-01-10-001-RA-Head-Assembly 2M-TEK-01-11-007-RA-Triangular-Plate-Inside 2M-TEK-01-11-008-RA-Triangular-Plate 2M-TEK-01-11-009-RA-Cylinder-Plate. 2M-TEK-01-11-010-RA-Roller-Gusset-Plate 2M-TEK-01-11-011-RA-Roller-Gusset-Plate-Inside 2MTEK-01-11-012-RA-Head-Plate-Inside 2M-TEK-01-11-013-RA-Roller-Head-Assembly 2M-TEK-01-11-014-RA-Roller-Pin-Head-Assembly 2MTEK-01-11-015-RA-End-Plate 2M-TEK-01-11-058-RA-Roller-Support-Plate Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-02 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 3 0 Redlines for 2M-TEK-01-10-000-RA-Roller-Skid-Assembly, Created: 2MTEK-01-10-001-RA-Head-Assembly 2M-TEK-01-11-007-RA-Triangular-Plate-Inside 2M-TEK-01-11-008-RA-Triangular-Plate 2M-TEK-01-11-009-RA-Cylinder-Plate. 2M-TEK-01-11-010-RA-Roller-Gusset-Plate 2M-TEK-01-11-011-RA-Roller-Gusset-Plate-Inside 2MTEK-01-11-012-RA-Head-Plate-Inside 2M-TEK-01-11-013-RA-Roller-Head-Assembly 2M-TEK-01-11-014-RA-Roller-Pin-Head-Assembly 2MTEK-01-11-015-RA-End-Plate 2M-TEK-01-11-058-RA-Roller-Support-Plate Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1st Quarter Results meeting Wed., Weekly TSR Update Meeting Thursday. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-02 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 OTC Event, information on rig equipment. PALFINGER cranes & Misc. rig equipment. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-03 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 7 0 Redlines for 2M-TEK-01-10-000-RA-Roller-Skid-Assembly, Created: 2MTEK-01-10-001-RA-Head-Assembly 2M-TEK-01-11-007-RA-Triangular-Plate-Inside 2M-TEK-01-11-008-RA-Triangular-Plate 2M-TEK-01-11-009-RA-Cylinder-Plate. 2M-TEK-01-11-010-RA-Roller-Gusset-Plate 2M-TEK-01-11-011-RA-Roller-Gusset-Plate-Inside 2MTEK-01-11-012-RA-Head-Plate-Inside 2M-TEK-01-11-013-RA-Roller-Head-Assembly 2M-TEK-01-11-014-RA-Roller-Pin-Head-Assembly 2MTEK-01-11-015-RA-End-Plate 2M-TEK-01-11-058-RA-Roller-Support-Plate Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 1st Quarter Results meeting Wed., Weekly TSR Update Meeting Thursday. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-04 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Sick Days Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-07 2M Tek :2M Tek Default Default Task Regular Pay N 8 0 Created drawings for assemblies: Back Checks for Head Assembly 2M-TEK-01-10-001, Drawings 2M-TEK-01-11-006 thru 014 Created drawings: Middle Frame Assembly 2M-TEK-01-10-002, Drawings 2M-TEK-01-11-022 thru 035 Part Drawings: 2M-TEK-01-11-037 thru 040, 044 thru 046, & 049 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-08 2M Tek :2M Tek Default Default Task Regular Pay N 7 0 Created drawings for assemblies: Back Checks for Head Assembly 2M-TEK-01-10-001, Drawings 2M-TEK-01-11-006 thru 014 Created drawings: Middle Frame Assembly 2M-TEK-01-10-002, Drawings 2M-TEK-01-11-022 thru 035 Part Drawings: 2M-TEK-01-11-037 thru 040, 044 thru 046, & 049 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Team meeting Tuesday, TSR Update meeting Thrusday. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-09 2M Tek :2M Tek Default Default Task Regular Pay N 8 0 Created drawings for assemblies: Back Checks for Head Assembly 2M-TEK-01-10-001, Drawings 2M-TEK-01-11-006 thru 014 Created drawings: Middle Frame Assembly 2M-TEK-01-10-002, Drawings 2M-TEK-01-11-022 thru 035 Part Drawings: 2M-TEK-01-11-037 thru 040, 044 thru 046, & 049 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-10 2M Tek :2M Tek Default Default Task Regular Pay N 4 0 Created drawings for assemblies: Back Checks for Head Assembly 2M-TEK-01-10-001, Drawings 2M-TEK-01-11-006 thru 014 Created drawings: Middle Frame Assembly 2M-TEK-01-10-002, Drawings 2M-TEK-01-11-022 thru 035 Part Drawings: 2M-TEK-01-11-037 thru 040, 044 thru 046, & 049 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Team meeting Tuesday, TSR Update meeting Thrusday. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-11 2M Tek :2M Tek Default Default Task Regular Pay N 9 0 Created drawings for assemblies: Back Checks for Head Assembly 2M-TEK-01-10-001, Drawings 2M-TEK-01-11-006 thru 014 Created drawings: Middle Frame Assembly 2M-TEK-01-10-002, Drawings 2M-TEK-01-11-022 thru 035 Part Drawings: 2M-TEK-01-11-037 thru 040, 044 thru 046, & 049 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-12 2M Tek :2M Tek Default Default Task Regular Pay N 2 0 Created drawings for assemblies: Back Checks for Head Assembly 2M-TEK-01-10-001, Drawings 2M-TEK-01-11-006 thru 014 Created drawings: Middle Frame Assembly 2M-TEK-01-10-002, Drawings 2M-TEK-01-11-022 thru 035 Part Drawings: 2M-TEK-01-11-037 thru 040, 044 thru 046, & 049 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 Computer Harddrive Crash, time spent getting back up and running. (Temp computer to run Solidworks, and installing Solidworks on new machine.) Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-15 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 Created Middle Frame detail drawings, Crossover sub details, Anchor Drawings 2M-TEK-01-11-034 thru 040. And 2M-TEK-01-11-042 thru 57 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 Computer Harddrive Crash, time spent getting back up and running. (Temp computer to run Solidworks, and installing Solidworks on new machine.) Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-16 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 2 0 Created Middle Frame detail drawings, Crossover sub details, Anchor Drawings 2M-TEK-01-11-034 thru 040. And 2M-TEK-01-11-042 thru 57 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-16 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2 0 Modify existing assemblies, constraint problems and adjustments, Revise detail sheets for bolt clearances Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Computer Harddrive Crash, time spent getting back up and running. (Temp computer to run Solidworks, and installing Solidworks on new machine.) Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-17 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 5 0 Created Middle Frame detail drawings, Crossover sub details, Anchor Drawings 2M-TEK-01-11-034 thru 040. And 2M-TEK-01-11-042 thru 57 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-17 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 2 0 Modify existing assemblies, constraint problems and adjustments, Revise detail sheets for bolt clearances Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly TSR Update meeting. Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-18 2M Tek :2M Tek TSR-01621-2M-TEK Torque Sub Calibration Machine Regular Pay N 8 0 Created Middle Frame detail drawings, Crossover sub details, Anchor Drawings 2M-TEK-01-11-034 thru 040. And 2M-TEK-01-11-042 thru 57 Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-21 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 8 0 Created drawings: 2M-TEK-01-10-005-RA-End Assembly Outside 2MTEK-01-10-004-RA-Split-Sub-Assembly Finished 2M-TEK-01-10-003-RA-Middle-Frame Started 2MTEK-01-09-000-RA-Main-Assembly Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-22 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 7.5 0 Created drawings: 2M-TEK-01-10-005-RA-End Assembly Outside 2MTEK-01-10-004-RA-Split-Sub-Assembly Finished 2M-TEK-01-10-003-RA-Middle-Frame Started 2MTEK-01-09-000-RA-Main-Assembly Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Board Meeting, Weekly TSR Update Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-23 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 8 0 Created drawings: 2M-TEK-01-10-005-RA-End Assembly Outside 2MTEK-01-10-004-RA-Split-Sub-Assembly Finished 2M-TEK-01-10-003-RA-Middle-Frame Started 2MTEK-01-09-000-RA-Main-Assembly Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-24 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 7 0 Created drawings: 2M-TEK-01-10-005-RA-End Assembly Outside 2MTEK-01-10-004-RA-Split-Sub-Assembly Finished 2M-TEK-01-10-003-RA-Middle-Frame Started 2MTEK-01-09-000-RA-Main-Assembly Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Board Meeting, Weekly TSR Update Meeting Slack, Dan Senior Designer 30809 Slack, Dan:Senior Designer 2018-05-25 2M Tek :2M Tek TSR-01621-2M-TEK. (Non-Billable): Torque Sub Calibration Machine Regular Pay N 8 0 Created drawings: 2M-TEK-01-10-005-RA-End Assembly Outside 2MTEK-01-10-004-RA-Split-Sub-Assembly Finished 2M-TEK-01-10-003-RA-Middle-Frame Started 2MTEK-01-09-000-RA-Main-Assembly Smith, James Administrative Services I 40499 Smith, James:Administrative Services I 2017-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Smith, James Administrative Services I 40499 Smith, James:Administrative Services I 2017-01-03 OH-023 :OH-023 Overhead All Activities Regular Pay N 8 0 Smith, James Administrative Services I 40499 Smith, James:Administrative Services I 2017-01-04 OH-023 :OH-023 Overhead All Activities Regular Pay N 8 0 Smith, James Administrative Services I 40499 Smith, James:Administrative Services I 2017-01-05 OH-023 :OH-023 Overhead All Activities Regular Pay N 8 0 Smith, James Administrative Services I 40499 Smith, James:Administrative Services I 2017-01-06 OH-023 :OH-023 Overhead All Activities Regular Pay N 8 0 Smith, Ricky Manager/Staff Consultant RICKYSMITH Smith, Ricky :Manager/Staff Consultant 2018-02-20 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item. Removing Preliminary Work Instructions from PM task Smith, Ricky Manager/Staff Consultant RICKYSMITH Smith, Ricky :Manager/Staff Consultant 2018-02-21 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item. Removing Preliminary Work Instructions from PM task Smith, Ricky Manager/Staff Consultant RICKYSMITH Smith, Ricky :Manager/Staff Consultant 2018-02-22 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item. Removing Preliminary Work Instructions from PM task Smith, Ricky Manager/Staff Consultant RICKYSMITH Smith, Ricky :Manager/Staff Consultant 2018-02-23 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item. Removing Preliminary Work Instructions from PM task Smith, Ricky Manager/Staff Consultant RICKYSMITH Smith, Ricky :Manager/Staff Consultant 2018-02-26 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item. Removing Preliminary Work Instructions from PM task Smith, Ricky Manager/Staff Consultant RICKYSMITH Smith, Ricky :Manager/Staff Consultant 2018-02-27 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item. Removing Preliminary Work Instructions from PM task Smith, Ricky Manager/Staff Consultant RICKYSMITH Smith, Ricky :Manager/Staff Consultant 2018-02-28 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item. Removing Preliminary Work Instructions from PM task Smith, Ricky Manager/Staff Consultant RICKYSMITH Smith, Ricky :Manager/Staff Consultant 2018-03-01 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 3 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item. Removing Preliminary Work Instructions from PM task Smith, Ricky Manager/Staff Consultant RICKYSMITH Smith, Ricky :Manager/Staff Consultant 2018-03-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 2 0 Review and update PM task – Reduce PM task procedures to 132 characters or less per line item. Removing Preliminary Work Instructions from PM task SMITH, STEPHANIE Doc Control 34129 SMITH, STEPHANIE:Doc Control 2017-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Years Holiday SMITH, STEPHANIE Doc Control 34129 SMITH, STEPHANIE:Doc Control 2017-01-03 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Approved PTO SMITH, STEPHANIE Doc Control 34129 SMITH, STEPHANIE:Doc Control 2017-01-04 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Approved PTO SMITH, STEPHANIE Doc Control 34129 SMITH, STEPHANIE:Doc Control 2017-01-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Approved PTO SMITH, STEPHANIE Doc Control 34129 SMITH, STEPHANIE:Doc Control 2017-01-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Approved PTO SMITH, STEPHANIE Doc Control 34129 SMITH, STEPHANIE:Doc Control 2017-01-09 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Approved PTO SMITH, STEPHANIE Doc Control 34129 SMITH, STEPHANIE:Doc Control 2017-01-10 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Approved PTO Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-04 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 Employee orientation. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-05 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 Employee orientation. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-05 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 4 0 Research for Alaska trip. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-06 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 8 0 Hatch Solidworks design. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-07 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 6 0 Hatch Solidworks design. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Weekly meeting and CAT meeting. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-08 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 8 0 Hatch Solidworks design. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-11 Berkut-TSR :Berkut-TSR TSR-01649-BERP Reinforced Drill Deck Hatch Regular Pay N 6 0 Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-11 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2 0 Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-12 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-12 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 4 0 Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6 0 Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-13 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2 0 Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-14 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 6 0 Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-15 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 8 0 Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-17 OH-010 :OH-010 Overhead All Activities Overtime Rate N 8 0 Travel to Alaska. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-18 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 HR safety and rig access training. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-19 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 HR safety and rig access training. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-19 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 4 0 Visit rigs 272 and 273 with Mark. Studied Alaskan operation and rig design. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-20 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 8 0 Visit rigs 272 and 273 with Mark. Studied Alaskan operation and rig design. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-21 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 8 0 Visit rigs 272 and 273 with Mark. Studied Alaskan operation and rig design. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-22 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 8 0 Visit rigs 272 and 273 with Mark. Studied Alaskan operation and rig design. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-24 OH-010 :OH-010 Overhead All Activities Overtime Rate N 8 0 Travel back from Alaska. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Industry studying. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-25 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 4 0 Solidworks and analysis of Spreader beam for TSR-01659. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Industry studying. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-26 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 4 0 Solidworks and analysis of Spreader beam for TSR-01659. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-27 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 8 0 Solidworks and analysis of Spreader beam for TSR-01659. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-28 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 8 0 Solidworks and analysis of Spreader beam for TSR-01659. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-06-29 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 8 0 Solidworks and analysis of Spreader beam for TSR-01659. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-02 Rig 216L-TSR :Rig 216L-TSR TSR-01659-216L Spreader Bar Regular Pay N 8 0 Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Canrig facility visit, and IDS facility visit. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-03 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 4 0 Spreader beam analysis and close out. Also, analysis of the new air hoist installation. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-04 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Canrig facility visit, and IDS facility visit. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-05 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Reading of Oil Industry books. Created Alaska presentation. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-05 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 4 0 Spreader beam analysis and close out. Also, analysis of the new air hoist installation. Swearingen, Brandon Engineer I Swearingen, Brandon:Engineer I 2018-07-06 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 Reading of Oil Industry books. Created Alaska presentation. Tjoa, Haydi Administrative Services I 10398 Tjoa, Haydi:Administrative Services I 2017-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Tjoa, Haydi Administrative Services I 10398 Tjoa, Haydi:Administrative Services I 2017-01-03 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Tjoa, Haydi Administrative Services I 10398 Tjoa, Haydi:Administrative Services I 2017-01-04 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Tjoa, Haydi Administrative Services I 10398 Tjoa, Haydi:Administrative Services I 2017-01-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Tjoa, Haydi Administrative Services I 10398 Tjoa, Haydi:Administrative Services I 2017-01-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Trumps, Chad Administrative Services I 20718 Trumps, Chad:Administrative Services I 2017-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Trumps, Chad Administrative Services I 20718 Trumps, Chad:Administrative Services I 2017-01-03 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 Trumps, Chad Administrative Services I 20718 Trumps, Chad:Administrative Services I 2017-01-04 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 Trumps, Chad Administrative Services I 20718 Trumps, Chad:Administrative Services I 2017-01-05 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 Trumps, Chad Administrative Services I 20718 Trumps, Chad:Administrative Services I 2017-01-06 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-02-13 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-02-14 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 4 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-02-14 ITS -NON TSR :ITS -NON TSR 1001 050-425-WS-Internal Regular Pay N 4 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-02-15 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 4 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-02-15 ITS -NON TSR :ITS -NON TSR 1001 050-425-WS-Internal Regular Pay N 4 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-02-16 ITS -NON TSR :ITS -NON TSR 1001 050-425-WS-Internal Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-02-17 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-02-20 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-02-21 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-02-22 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 4 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-02-22 ITS -NON TSR :ITS -NON TSR 1001 050-425-WS-Internal Regular Pay N 4 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-02-23 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-02-24 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-03-06 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 3 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-03-06 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-03-06 ITS -NON TSR :ITS -NON TSR 1001 050-425-WS-Internal Regular Pay N 4 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-03-07 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 3 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-03-07 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 1 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-03-07 ITS -NON TSR :ITS -NON TSR 1001 050-425-WS-Internal Regular Pay N 4 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-03-08 ITS -NON TSR :ITS -NON TSR 1001 050-425-WS-Internal Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-03-09 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-03-10 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-03-13 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-03-14 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-03-15 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-03-16 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-03-17 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-03-20 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-03-21 ITS -NON TSR :ITS -NON TSR 1001 050-425-WS-Internal Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-03-22 ITS -NON TSR :ITS -NON TSR 1001 050-425-WS-Internal Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-03-23 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-03-24 ITS -NON TSR :ITS -NON TSR 1001 050-425-WS-Internal Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-03-27 2M-TEK :2M-TEK -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-03-28 2M-TEK :2M-TEK -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-03-29 2M-TEK :2M-TEK -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-03-30 2M-TEK :2M-TEK -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-03-31 2M-TEK :2M-TEK -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-04-03 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Oracle related Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-04-04 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Oracle related Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-04-05 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Oracle related Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-04-06 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Oracle related Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-04-07 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Oracle related Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-04-10 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Oracle Related Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-04-11 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Oracle Related Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-04-12 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Oracle Related Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-04-13 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Oracle Related Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-04-14 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Oracle Related Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-04-17 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 8 0 oracle register Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-04-18 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 8 0 oracle register Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-04-19 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 8 0 oracle register Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-04-20 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-04-21 ITS -NON TSR :ITS -NON TSR -OH-003 PTO Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-04-24 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-04-25 ITS -NON TSR :ITS -NON TSR -OH-002 Gen. Dept. Administration Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-04-26 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-04-27 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-04-28 ITS -NON TSR :ITS -NON TSR -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-05-01 2M-TEK :2M-TEK -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 updates for oracle Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-05-02 2M-TEK :2M-TEK -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 updates for oracle Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-05-03 2M-TEK :2M-TEK -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 updates for oracle Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-05-04 2M-TEK :2M-TEK -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 updates for oracle Turcios , Irvin Designer II Turcios , Irvin :Designer II 2017-05-05 2M-TEK :2M-TEK -OH-001 Gen. Dept. Engineering Regular Pay N 8 0 updates for oracle WADDILL, JOHN Logistics Specialist JOHNWADDILL WADDILL, JOHN:Logistics Specialist 2017-01-02 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Year's Day Holiday WADDILL, JOHN Logistics Specialist JOHNWADDILL WADDILL, JOHN:Logistics Specialist 2017-01-03 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 KDC PO's and quotes, Hibernia parts support, fair market value search. WADDILL, JOHN Logistics Specialist JOHNWADDILL WADDILL, JOHN:Logistics Specialist 2017-01-04 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 KDC PO's and quotes, Hibernia parts support, fair market value search. WADDILL, JOHN Logistics Specialist JOHNWADDILL WADDILL, JOHN:Logistics Specialist 2017-01-05 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 KDC PO's and quotes, Hibernia parts support, fair market value search. WADDILL, JOHN Logistics Specialist JOHNWADDILL WADDILL, JOHN:Logistics Specialist 2017-01-06 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 0 KDC PO's and quotes, Hibernia parts support, fair market value search. White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-01 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 1 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-01 2M-TEK :2M-TEK 1031 R&S 13-3/8” Regular Pay N 3 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-01 2M-TEK :2M-TEK 1037 4-1/2” Mandrel to Stress for pull test - CRT Regular Pay N 4 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-02 2M-TEK :2M-TEK 1016 PO 0209404, 0409405-WS Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-02 2M-TEK :2M-TEK 1025 PO 50437-CRT Regular Pay N 1 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-02 2M-TEK :2M-TEK 1031 R&S 13-3/8” Regular Pay N 5 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-03 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-03 2M-TEK :2M-TEK 1031 R&S 13-3/8” Regular Pay N 4 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-03 2M-TEK :2M-TEK 1037 4-1/2” Mandrel to Stress for pull test - CRT Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-04 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-04 2M-TEK :2M-TEK 1025 PO 50437-CRT Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-04 2M-TEK :2M-TEK 1031 R&S 13-3/8” Regular Pay N 4 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-05 2M-TEK :2M-TEK 1021B PO 0209403(Batch2)-WS Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-05 2M-TEK :2M-TEK 1025 PO 50437-CRT Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-05 2M-TEK :2M-TEK 1031 R&S 13-3/8” Regular Pay N 4 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-08 2M-TEK :2M-TEK 1008 PO 50478, 0000000043-CRT Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-08 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 4 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-08 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-09 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-10 2M-TEK :2M-TEK 1008 PO 50478, 0000000043-CRT Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-10 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 4 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-10 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-11 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 6 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-11 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-12 2M-TEK :2M-TEK 1008 PO 50478, 0000000043-CRT Regular Pay N 1 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-12 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 6 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-12 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 1 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-15 2M-TEK :2M-TEK 1003 New R&D Actuators Regular Pay N 4 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-15 2M-TEK :2M-TEK 1040 ITS Colombia PO 51059 for Top-Tek and accessories Regular Pay N 4 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-16 2M-TEK :2M-TEK 1003 New R&D Actuators Regular Pay N 4 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-16 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 4 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-17 2M-TEK :2M-TEK 1003 New R&D Actuators Regular Pay N 6 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-17 2M-TEK :2M-TEK 1040 ITS Colombia PO 51059 for Top-Tek and accessories Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-18 2M-TEK :2M-TEK 1003 New R&D Actuators Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-18 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 4 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-18 2M-TEK :2M-TEK 1040 ITS Colombia PO 51059 for Top-Tek and accessories Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-19 2M-TEK :2M-TEK 1003 New R&D Actuators Regular Pay N 1 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-19 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-19 2M-TEK :2M-TEK 1040 ITS Colombia PO 51059 for Top-Tek and accessories Regular Pay N 5 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-22 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 4 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-22 2M-TEK :2M-TEK 1024 PO 50438-CRT Regular Pay N 1 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-22 2M-TEK :2M-TEK 1025 PO 50437-CRT Regular Pay N 1 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-22 2M-TEK :2M-TEK 1038 ITS PO 51173 – Packer Cups for Mud Valve Regular Pay N 1 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-22 2M-TEK :2M-TEK 1045 Actuator for Revalca PO 51059 Regular Pay N 1 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-23 2M-TEK :2M-TEK 1024 PO 50438-CRT Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-23 2M-TEK :2M-TEK 1025 PO 50437-CRT Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-23 2M-TEK :2M-TEK 1038 ITS PO 51173 – Packer Cups for Mud Valve Regular Pay N 1 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-23 2M-TEK :2M-TEK 1045 Actuator for Revalca PO 51059 Regular Pay N 3 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-24 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 4 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-24 2M-TEK :2M-TEK 1036 R&S ITS PO 50950 9-5/8” MM and 2 9-5/8” WM Regular Pay N 4 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-25 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-25 2M-TEK :2M-TEK 1036 R&S ITS PO 50950 9-5/8” MM and 2 9-5/8” WM Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-25 2M-TEK :2M-TEK 1045 Actuator for Revalca PO 51059 Regular Pay N 4 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-26 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-26 2M-TEK :2M-TEK 1024 PO 50438-CRT Regular Pay N 1 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-26 2M-TEK :2M-TEK 1025 PO 50437-CRT Regular Pay N 1 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-26 2M-TEK :2M-TEK 1036 R&S ITS PO 50950 9-5/8” MM and 2 9-5/8” WM Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-26 2M-TEK :2M-TEK 1038 ITS PO 51173 – Packer Cups for Mud Valve Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-29 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-30 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-05-31 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-01 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 4 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-01 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 4 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-02 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 4 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-02 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 4 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-05 2M-TEK :2M-TEK 1015 PO 49652-CRT Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-05 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-05 2M-TEK :2M-TEK 1025 PO 50437-CRT Regular Pay N 4 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-06 2M-TEK :2M-TEK 1015 PO 49652-CRT Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-06 2M-TEK :2M-TEK 1025 PO 50437-CRT Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-06 2M-TEK :2M-TEK 1033 R&S Validate Welding Procedures Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-06 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-07 2M-TEK :2M-TEK 1015 PO 49652-CRT Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-07 2M-TEK :2M-TEK 1025 PO 50437-CRT Regular Pay N 4 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-07 2M-TEK :2M-TEK 1033 R&S Validate Welding Procedures Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-08 2M-TEK :2M-TEK 1015 PO 49652-CRT Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-08 2M-TEK :2M-TEK 1025 PO 50437-CRT Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-08 2M-TEK :2M-TEK 1033 R&S Validate Welding Procedures Regular Pay N 4 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-09 2M-TEK :2M-TEK 1015 PO 49652-CRT Regular Pay N 4 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-09 2M-TEK :2M-TEK 1025 PO 50437-CRT Regular Pay N 4 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-12 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 2 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-12 2M-TEK :2M-TEK 1025 PO 50437-CRT Regular Pay N 6 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-13 2M-TEK :2M-TEK 1025 PO 50437-CRT Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-14 2M-TEK :2M-TEK 1025 PO 50437-CRT Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-15 2M-TEK :2M-TEK 1025 PO 50437-CRT Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-16 2M-TEK :2M-TEK 1025 PO 50437-CRT Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-19 2M-TEK :2M-TEK 1025 PO 50437-CRT Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-20 2M-TEK :2M-TEK 1025 PO 50437-CRT Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-21 2M-TEK :2M-TEK 1025 PO 50437-CRT Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-22 2M-TEK :2M-TEK 1025 PO 50437-CRT Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-23 2M-TEK :2M-TEK 1025 PO 50437-CRT Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-26 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-27 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-28 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-29 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-06-30 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-07-10 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-07-11 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-07-12 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-07-13 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-07-14 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-07-17 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-07-18 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-07-19 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-07-20 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-07-21 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-07-24 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-07-25 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-07-26 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-07-27 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-07-28 2M-TEK :2M-TEK 1021C PO 0209403(Batch3)-WS Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-07-31 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-08-01 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-08-02 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-08-03 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-08-04 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-08-07 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-08-08 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-08-09 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-08-10 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-08-11 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-08-21 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-08-22 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-08-23 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-08-24 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 White, Anthony Shop Tech White, Anthony:Shop Tech 2017-08-25 2M-TEK :2M-TEK 1034 R&S 9-5/8” MM for stock after ITS R&S ordered incorrect mills w/4.5 IF connections for Best Win Jo Regular Pay N 8 0 Wilson, Gary Sr. Electrical Engineer GARYWILSON Wilson, Gary:Sr. Electrical Engineer 2018-01-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 8 0 Tuesday 1/2: Adjust procedure and templates for J-17101 Drillers Control Console 10474751 A,B,C, J-17146 Purge Control Panel 10474802, J-1709 Control Panel No 1 10474776, J-17167 Control Panel No 3 10474901. Wednesday 1/3: Adjust template and procedures for J-17108 Drawworks PLC Checks 1/4W 10441929, N-75008 DC Drives Control Console 4W 10457614, Thursday 1/4: J-17101 Drilling Control Console (E) 48W, Drillers Ctrl Console 12W, N-75008 Drilling SCR Emergency Shutdown 10457614 Wilson, Gary Sr. Electrical Engineer GARYWILSON Wilson, Gary:Sr. Electrical Engineer 2018-01-02 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Tuesday 1/2: Review operator/maintenance materials for driller and purge control panels in order to verify and/or adjust the maintenance procedures. Wednesday 1/3: Review documentation of Drawworks Purge Air Control A/B/C, J-17108 Drawworks PLC Checks - 10441929, N-75008 DC Drives Control Console - 10457614. Thursday 1/4: Search and Review manuals for drawworks control consoles. Wilson, Gary Sr. Electrical Engineer GARYWILSON Wilson, Gary:Sr. Electrical Engineer 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 4 0 Tuesday 1/2: Adjust procedure and templates for J-17101 Drillers Control Console 10474751 A,B,C, J-17146 Purge Control Panel 10474802, J-1709 Control Panel No 1 10474776, J-17167 Control Panel No 3 10474901. Wednesday 1/3: Adjust template and procedures for J-17108 Drawworks PLC Checks 1/4W 10441929, N-75008 DC Drives Control Console 4W 10457614, Thursday 1/4: J-17101 Drilling Control Console (E) 48W, Drillers Ctrl Console 12W, N-75008 Drilling SCR Emergency Shutdown 10457614 Wilson, Gary Sr. Electrical Engineer GARYWILSON Wilson, Gary:Sr. Electrical Engineer 2018-01-03 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Tuesday 1/2: Review operator/maintenance materials for driller and purge control panels in order to verify and/or adjust the maintenance procedures. Wednesday 1/3: Review documentation of Drawworks Purge Air Control A/B/C, J-17108 Drawworks PLC Checks - 10441929, N-75008 DC Drives Control Console - 10457614. Thursday 1/4: Search and Review manuals for drawworks control consoles. Wilson, Gary Sr. Electrical Engineer GARYWILSON Wilson, Gary:Sr. Electrical Engineer 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP PM Review Change Order 5 Regular Pay N 6 0 Tuesday 1/2: Adjust procedure and templates for J-17101 Drillers Control Console 10474751 A,B,C, J-17146 Purge Control Panel 10474802, J-1709 Control Panel No 1 10474776, J-17167 Control Panel No 3 10474901. Wednesday 1/3: Adjust template and procedures for J-17108 Drawworks PLC Checks 1/4W 10441929, N-75008 DC Drives Control Console 4W 10457614, Thursday 1/4: J-17101 Drilling Control Console (E) 48W, Drillers Ctrl Console 12W, N-75008 Drilling SCR Emergency Shutdown 10457614 Wilson, Gary Sr. Electrical Engineer GARYWILSON Wilson, Gary:Sr. Electrical Engineer 2018-01-04 Hibernia Platform :Hibernia Platform TSR-01606-HIBP. (Non-Billable): PM Review Change Order 5 Regular Pay N 4 0 Tuesday 1/2: Review operator/maintenance materials for driller and purge control panels in order to verify and/or adjust the maintenance procedures. Wednesday 1/3: Review documentation of Drawworks Purge Air Control A/B/C, J-17108 Drawworks PLC Checks - 10441929, N-75008 DC Drives Control Console - 10457614. Thursday 1/4: Search and Review manuals for drawworks control consoles. WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-02 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-03 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-04 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-06 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 4 0 Cameron documents, close out documents verification/revision, NOV close out WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Legal/TS department transition meetings, 2M-TEK & iTS combined entity meting, TS department meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Cameron documentation meeting, Odoptu/legal support daily update meetings, 2M-TEK status update meeting, monthly legal/compliance meeting, meeting with Finance on 2M-TEK HF process WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-09 OH-033 :OH-033 Overhead All Activities Regular Pay N 7 0 Transition activities, development of written consent action re electing directors, written consent action re officers for Parker corporations and LLCs, introduction to Proxy statement process WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Cameron documentation meeting, Odoptu/legal support daily update meetings, 2M-TEK status update meeting, monthly legal/compliance meeting, meeting with Finance on 2M-TEK HF process WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-10 OH-033 :OH-033 Overhead All Activities Regular Pay N 7 0 Transition activities, development of written consent action re electing directors, written consent action re officers for Parker corporations and LLCs, introduction to Proxy statement process WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-11 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 1 0 Close out letter Exhibit D (commissioning materials) update, NOV completion certificate issue resolution WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Cameron documentation meeting, Odoptu/legal support daily update meetings, 2M-TEK status update meeting, monthly legal/compliance meeting, meeting with Finance on 2M-TEK HF process WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-11 OH-033 :OH-033 Overhead All Activities Regular Pay N 6 0 Transition activities, development of written consent action re electing directors, written consent action re officers for Parker corporations and LLCs, introduction to Proxy statement process WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-12 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 1 0 Close out letter Exhibit D (commissioning materials) update, NOV completion certificate issue resolution WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Cameron documentation meeting, Odoptu/legal support daily update meetings, 2M-TEK status update meeting, monthly legal/compliance meeting, meeting with Finance on 2M-TEK HF process WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-12 OH-033 :OH-033 Overhead All Activities Regular Pay N 6 0 Transition activities, development of written consent action re electing directors, written consent action re officers for Parker corporations and LLCs, introduction to Proxy statement process WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Cameron documentation meeting, Odoptu/legal support daily update meetings, 2M-TEK status update meeting, monthly legal/compliance meeting, meeting with Finance on 2M-TEK HF process WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-13 OH-033 :OH-033 Overhead All Activities Regular Pay N 7 0 Transition activities, development of written consent action re electing directors, written consent action re officers for Parker corporations and LLCs, introduction to Proxy statement process WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-16 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 Daily Odoptu close -out/ Kan-ban meetings WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Meetings with various department on GMS contract, 2M-TEK, Technical Services meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-16 OH-033 :OH-033 Overhead All Activities Regular Pay N 6 0 Documents verification, schedule development for 2M-TEK combined entity, Power of Attorney database development and update, Contract template for GMS review WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-17 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 Daily Odoptu close -out/ Kan-ban meetings WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Meetings with various department on GMS contract, 2M-TEK, Technical Services meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-17 OH-033 :OH-033 Overhead All Activities Regular Pay N 6 0 Documents verification, schedule development for 2M-TEK combined entity, Power of Attorney database development and update, Contract template for GMS review WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-18 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 Daily Odoptu close -out/ Kan-ban meetings WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Meetings with various department on GMS contract, 2M-TEK, Technical Services meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-18 OH-033 :OH-033 Overhead All Activities Regular Pay N 6 0 Documents verification, schedule development for 2M-TEK combined entity, Power of Attorney database development and update, Contract template for GMS review WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-19 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 Daily Odoptu close -out/ Kan-ban meetings WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Meetings with various department on GMS contract, 2M-TEK, Technical Services meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-19 OH-033 :OH-033 Overhead All Activities Regular Pay N 6 0 Documents verification, schedule development for 2M-TEK combined entity, Power of Attorney database development and update, Contract template for GMS review WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-20 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 Daily Odoptu close -out/ Kan-ban meetings WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Meetings with various department on GMS contract, 2M-TEK, Technical Services meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-20 OH-033 :OH-033 Overhead All Activities Regular Pay N 6 0 Documents verification, schedule development for 2M-TEK combined entity, Power of Attorney database development and update, Contract template for GMS review WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Compliance handover meeting, Odoptu update daily meetings, 2 M-TEK status update, Ampio/Broadleaf and Parker Governance Committee meeting, Management Kick off - SharePoint meeting, Technical Services Business Development WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-23 OH-033 :OH-033 Overhead All Activities Regular Pay N 5 0 Apostille process for Kazakhstan, preparation of requests for POAs folder, separations of existing POAs, archived and expired POAs (3 folders) on SharePoint, update of POAs log, created log for US entities consent actions, checked 2 lists of named insured for insurance renewal WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Compliance handover meeting, Odoptu update daily meetings, 2 M-TEK status update, Ampio/Broadleaf and Parker Governance Committee meeting, Management Kick off - SharePoint meeting, Technical Services Business Development WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-24 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Performance & Development Goal Setting (PDR) Training WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-24 OH-033 :OH-033 Overhead All Activities Regular Pay N 4 0 Apostille process for Kazakhstan, preparation of requests for POAs folder, separations of existing POAs, archived and expired POAs (3 folders) on SharePoint, update of POAs log, created log for US entities consent actions, checked 2 lists of named insured for insurance renewal WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Compliance handover meeting, Odoptu update daily meetings, 2 M-TEK status update, Ampio/Broadleaf and Parker Governance Committee meeting, Management Kick off - SharePoint meeting, Technical Services Business Development WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-25 OH-033 :OH-033 Overhead All Activities Regular Pay N 7 0 Apostille process for Kazakhstan, preparation of requests for POAs folder, separations of existing POAs, archived and expired POAs (3 folders) on SharePoint, update of POAs log, created log for US entities consent actions, checked 2 lists of named insured for insurance renewal WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-26 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 1 0 Regulatory documentation follow up with Peco Focet Spain and Vernon manufacturing WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Compliance handover meeting, Odoptu update daily meetings, 2 M-TEK status update, Ampio/Broadleaf and Parker Governance Committee meeting, Management Kick off - SharePoint meeting, Technical Services Business Development WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-26 OH-033 :OH-033 Overhead All Activities Regular Pay N 5 0 Apostille process for Kazakhstan, preparation of requests for POAs folder, separations of existing POAs, archived and expired POAs (3 folders) on SharePoint, update of POAs log, created log for US entities consent actions, checked 2 lists of named insured for insurance renewal WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-27 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 1 0 Regulatory documentation follow up with Peco Focet Spain and Vernon manufacturing WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Compliance handover meeting, Odoptu update daily meetings, 2 M-TEK status update, Ampio/Broadleaf and Parker Governance Committee meeting, Management Kick off - SharePoint meeting, Technical Services Business Development WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-27 OH-033 :OH-033 Overhead All Activities Regular Pay N 4 0 Apostille process for Kazakhstan, preparation of requests for POAs folder, separations of existing POAs, archived and expired POAs (3 folders) on SharePoint, update of POAs log, created log for US entities consent actions, checked 2 lists of named insured for insurance renewal WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Odoptu close out meeting, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-30 OH-033 :OH-033 Overhead All Activities Regular Pay N 7 0 Compliance questionnaire analysis results update, business justification for iTS RnS dissolution, handover of Legal contract files, Global contracts database review WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-31 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 1 0 Odoptu documents preparation for handover, Regulatory documents follow up WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-01-31 OH-033 :OH-033 Overhead All Activities Regular Pay N 7 0 Compliance questionnaire analysis results update, business justification for iTS RnS dissolution, handover of Legal contract files, Global contracts database review WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-01 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-02 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-03 ODOPTU Project :ODOPTU Project 7715A00202 ODOPTU-Rig Build-Project Management Regular Pay N 1 0 Odoptu documents preparation for handover, Regulatory documents follow up WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-03 OH-033 :OH-033 Overhead All Activities Regular Pay N 7 0 Compliance questionnaire analysis results update, business justification for iTS RnS dissolution, handover of Legal contract files, Global contracts database review WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-06 OH-033 :OH-033 Overhead All Activities Regular Pay N 8 0 Log of customer contracts and update of customer contracts folder, meeting with Tax/Legal manager on Latin America contracts, meeting with Sakhalin contract manager on Sakhalin contracts, follow up with Eastern Hemisphere attorneys on contracts, 2M-TEK business justification preparation, Survey Monkey analysis (Compliance0 WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 TS meeting, Legal/compliance meeting, Odoptu close out meeting, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-07 OH-033 :OH-033 Overhead All Activities Regular Pay N 6 0 Log of customer contracts and update of customer contracts folder, meeting with Tax/Legal manager on Latin America contracts, meeting with Sakhalin contract manager on Sakhalin contracts, follow up with Eastern Hemisphere attorneys on contracts, 2M-TEK business justification preparation, Survey Monkey analysis (Compliance0 WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-08 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 IDR Training, IACCM training WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-08 OH-033 :OH-033 Overhead All Activities Regular Pay N 7 0 Log of customer contracts and update of customer contracts folder, meeting with Tax/Legal manager on Latin America contracts, meeting with Sakhalin contract manager on Sakhalin contracts, follow up with Eastern Hemisphere attorneys on contracts, 2M-TEK business justification preparation, Survey Monkey analysis (Compliance0 WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-09 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 Regulatory documentation follow up with Peco Facet and Vernon. End User From for PecoFacet, communication with SouthWest WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 TS meeting, Legal/compliance meeting, Odoptu close out meeting, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-09 OH-033 :OH-033 Overhead All Activities Regular Pay N 5 0 Log of customer contracts and update of customer contracts folder, meeting with Tax/Legal manager on Latin America contracts, meeting with Sakhalin contract manager on Sakhalin contracts, follow up with Eastern Hemisphere attorneys on contracts, 2M-TEK business justification preparation, Survey Monkey analysis (Compliance0 WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-10 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 Regulatory documentation follow up with Peco Facet and Vernon. End User From for PecoFacet, communication with SouthWest WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-10 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 IDR Training, IACCM training WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-10 OH-033 :OH-033 Overhead All Activities Regular Pay N 5 0 Log of customer contracts and update of customer contracts folder, meeting with Tax/Legal manager on Latin America contracts, meeting with Sakhalin contract manager on Sakhalin contracts, follow up with Eastern Hemisphere attorneys on contracts, 2M-TEK business justification preparation, Survey Monkey analysis (Compliance0 WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-13 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 Vernon Manufacturing contract signed, Odoptu close out meetings, quality check of NOV translated user manuals, NOV close out pending issues, end user form for PecoFacet, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-13 OH-033 :OH-033 Overhead All Activities Regular Pay N 7 0 Discussion on SharePoint site for Legal department, chasing info about contracts in Latin America, ITS (UAE), Kazakhstan, Survey Monkey results analysis, SM update, reminder update, questionnaire translation revision WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-14 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 Vernon Manufacturing contract signed, Odoptu close out meetings, quality check of NOV translated user manuals, NOV close out pending issues, end user form for PecoFacet, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Performance review, meeting with BD WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-14 OH-033 :OH-033 Overhead All Activities Regular Pay N 5 0 Discussion on SharePoint site for Legal department, chasing info about contracts in Latin America, ITS (UAE), Kazakhstan, Survey Monkey results analysis, SM update, reminder update, questionnaire translation revision WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-15 OH-033 :OH-033 Overhead All Activities Regular Pay N 8 0 Discussion on SharePoint site for Legal department, chasing info about contracts in Latin America, ITS (UAE), Kazakhstan, Survey Monkey results analysis, SM update, reminder update, questionnaire translation revision WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-16 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 Vernon Manufacturing contract signed, Odoptu close out meetings, quality check of NOV translated user manuals, NOV close out pending issues, end user form for PecoFacet, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Technical Services weekly meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-16 OH-033 :OH-033 Overhead All Activities Regular Pay N 6 0 Discussion on SharePoint site for Legal department, chasing info about contracts in Latin America, ITS (UAE), Kazakhstan, Survey Monkey results analysis, SM update, reminder update, questionnaire translation revision WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-17 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 Vernon Manufacturing contract signed, Odoptu close out meetings, quality check of NOV translated user manuals, NOV close out pending issues, end user form for PecoFacet, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Performance review, meeting with BD WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-17 OH-033 :OH-033 Overhead All Activities Regular Pay N 6 0 Discussion on SharePoint site for Legal department, chasing info about contracts in Latin America, ITS (UAE), Kazakhstan, Survey Monkey results analysis, SM update, reminder update, questionnaire translation revision WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-20 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 meeting with BD manager on Hibernia and Sakhalin contracts review, Odoptu close out meetings, TS weekly meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-21 OH-033 :OH-033 Overhead All Activities Regular Pay N 7 0 Review and correction of Code of Conduct translation, review and correction of Compliance T&Cs translation, update of Survey Monkey report, revision of Russian version of questionnaire, questionnaire reminder, Latin America contract data update, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-22 OH-033 :OH-033 Overhead All Activities Regular Pay N 8 0 Review and correction of Code of Conduct translation, review and correction of Compliance T&Cs translation, update of Survey Monkey report, revision of Russian version of questionnaire, questionnaire reminder, Latin America contract data update, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-23 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 PecoFacet communication, End User form for PecoFacet, close out letters for Drillmec and Runyon, creations of folder for regulatory contracts WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 meeting with BD manager on Hibernia and Sakhalin contracts review, Odoptu close out meetings, TS weekly meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-23 OH-033 :OH-033 Overhead All Activities Regular Pay N 5 0 Review and correction of Code of Conduct translation, review and correction of Compliance T&Cs translation, update of Survey Monkey report, revision of Russian version of questionnaire, questionnaire reminder, Latin America contract data update, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-24 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 3 0 PecoFacet communication, End User form for PecoFacet, close out letters for Drillmec and Runyon, creations of folder for regulatory contracts WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-24 OH-033 :OH-033 Overhead All Activities Regular Pay N 5 0 Review and correction of Code of Conduct translation, review and correction of Compliance T&Cs translation, update of Survey Monkey report, revision of Russian version of questionnaire, questionnaire reminder, Latin America contract data update, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-27 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 Close out letters to Drillmec and Runyon, NOV change order review, follow up with regulatory pending update items, Odoptu close out meetings WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Compliance training session, TS weekly meeting. meeting with TMS RUS WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Hibernia contract review and read, Change Order 004 review/revision/discussion, Act of Acceptance for Rig Camp, contract audit spreadsheet WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-27 OH-033 :OH-033 Overhead All Activities Regular Pay N 3 0 Contracts database update, meeting on 3rd party representatives responsibilities, legal forms review for IMS WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-28 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 Close out letters to Drillmec and Runyon, NOV change order review, follow up with regulatory pending update items, Odoptu close out meetings WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-28 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Hibernia contract review and read, Change Order 004 review/revision/discussion, Act of Acceptance for Rig Camp, contract audit spreadsheet WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-02-28 OH-033 :OH-033 Overhead All Activities Regular Pay N 5 0 Contracts database update, meeting on 3rd party representatives responsibilities, legal forms review for IMS WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-01 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 1 0 Close out letters to Drillmec and Runyon, NOV change order review, follow up with regulatory pending update items, Odoptu close out meetings WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 Hibernia contract review and read, Change Order 004 review/revision/discussion, Act of Acceptance for Rig Camp, contract audit spreadsheet WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-01 OH-033 :OH-033 Overhead All Activities Regular Pay N 4 0 Contracts database update, meeting on 3rd party representatives responsibilities, legal forms review for IMS WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Compliance training session, TS weekly meeting. meeting with TMS RUS WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 Hibernia contract review and read, Change Order 004 review/revision/discussion, Act of Acceptance for Rig Camp, contract audit spreadsheet WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-02 OH-033 :OH-033 Overhead All Activities Regular Pay N 3 0 Contracts database update, meeting on 3rd party representatives responsibilities, legal forms review for IMS WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Hibernia contract review and read, Change Order 004 review/revision/discussion, Act of Acceptance for Rig Camp, contract audit spreadsheet WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-03 OH-033 :OH-033 Overhead All Activities Regular Pay N 6 0 Contracts database update, meeting on 3rd party representatives responsibilities, legal forms review for IMS WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-06 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 Obtained contract form from law firm, Principal document review and revision, Appendix G development, Appendix D development, Appendix F development, meeting with functional groups Legal, Compliance, Tax, SCM, PM, Finance, Eng. WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Change Order/Amendment list for Hibernia, O&M, 270 and Alaska contracts, end user form for NOV, developed new form of CO, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-06 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 SharePoint training WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-07 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 5 0 Obtained contract form from law firm, Principal document review and revision, Appendix G development, Appendix D development, Appendix F development, meeting with functional groups Legal, Compliance, Tax, SCM, PM, Finance, Eng. WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Change Order/Amendment list for Hibernia, O&M, 270 and Alaska contracts, end user form for NOV, developed new form of CO, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-07 OH-033 :OH-033 Overhead All Activities Regular Pay N 1 0 Monthly meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-08 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 7 0 Obtained contract form from law firm, Principal document review and revision, Appendix G development, Appendix D development, Appendix F development, meeting with functional groups Legal, Compliance, Tax, SCM, PM, Finance, Eng. WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Change Order/Amendment list for Hibernia, O&M, 270 and Alaska contracts, end user form for NOV, developed new form of CO, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-09 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 Obtained contract form from law firm, Principal document review and revision, Appendix G development, Appendix D development, Appendix F development, meeting with functional groups Legal, Compliance, Tax, SCM, PM, Finance, Eng. WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS weekly meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Change Order/Amendment list for Hibernia, O&M, 270 and Alaska contracts, end user form for NOV, developed new form of CO, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-10 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 Obtained contract form from law firm, Principal document review and revision, Appendix G development, Appendix D development, Appendix F development, meeting with functional groups Legal, Compliance, Tax, SCM, PM, Finance, Eng. WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Change Order/Amendment list for Hibernia, O&M, 270 and Alaska contracts, end user form for NOV, developed new form of CO, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-13 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 Change order/RFC form development, KOC contract review, New Rig build contracts (HH and Drillmec) update, Risk review meeting, Appendix E - Completion certificate update, meeting with HR, meeting with Supply Chain, new appendices H and I for rig build contract, RFp instruction update, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-14 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 Change order/RFC form development, KOC contract review, New Rig build contracts (HH and Drillmec) update, Risk review meeting, Appendix E - Completion certificate update, meeting with HR, meeting with Supply Chain, new appendices H and I for rig build contract, RFp instruction update, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-15 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 Change order/RFC form development, KOC contract review, New Rig build contracts (HH and Drillmec) update, Risk review meeting, Appendix E - Completion certificate update, meeting with HR, meeting with Supply Chain, new appendices H and I for rig build contract, RFp instruction update, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-16 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 6 0 Change order/RFC form development, KOC contract review, New Rig build contracts (HH and Drillmec) update, Risk review meeting, Appendix E - Completion certificate update, meeting with HR, meeting with Supply Chain, new appendices H and I for rig build contract, RFp instruction update, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-16 OH-033 :OH-033 Overhead All Activities Regular Pay N 2 0 CO logs update (BD), CO# 5 development (BD), Compliance questionnaire update, analysis, responses collection WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-17 OH-033 :OH-033 Overhead All Activities Regular Pay N 8 0 CO logs update (BD), CO# 5 development (BD), Compliance questionnaire update, analysis, responses collection WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 Contract risk register, KOC contract read, meeting with HR on visas, new definitions foe the contract, contract review with stakeholders, meeting with Risk on insurance provision. Appendix E development, contract update, meeting with Finance on the contract issues, RFP additional changes, KanBan meeting, Bid evaluation plan development, follow up on contract content for both bidders, technical evaluation form development WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-21 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 Contract risk register, KOC contract read, meeting with HR on visas, new definitions foe the contract, contract review with stakeholders, meeting with Risk on insurance provision. Appendix E development, contract update, meeting with Finance on the contract issues, RFP additional changes, KanBan meeting, Bid evaluation plan development, follow up on contract content for both bidders, technical evaluation form development WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-22 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 Contract risk register, KOC contract read, meeting with HR on visas, new definitions foe the contract, contract review with stakeholders, meeting with Risk on insurance provision. Appendix E development, contract update, meeting with Finance on the contract issues, RFP additional changes, KanBan meeting, Bid evaluation plan development, follow up on contract content for both bidders, technical evaluation form development WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-23 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 Contract risk register, KOC contract read, meeting with HR on visas, new definitions foe the contract, contract review with stakeholders, meeting with Risk on insurance provision. Appendix E development, contract update, meeting with Finance on the contract issues, RFP additional changes, KanBan meeting, Bid evaluation plan development, follow up on contract content for both bidders, technical evaluation form development WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-24 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 Contract risk register, KOC contract read, meeting with HR on visas, new definitions foe the contract, contract review with stakeholders, meeting with Risk on insurance provision. Appendix E development, contract update, meeting with Finance on the contract issues, RFP additional changes, KanBan meeting, Bid evaluation plan development, follow up on contract content for both bidders, technical evaluation form development WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-27 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 Development of additional definitions for the contract, comparison of both contract versions, files check, delivery schedule alignment, additional provisions development, contract risk register update, development of PB exhibit, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-28 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 Development of additional definitions for the contract, comparison of both contract versions, files check, delivery schedule alignment, additional provisions development, contract risk register update, development of PB exhibit, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-29 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 Development of additional definitions for the contract, comparison of both contract versions, files check, delivery schedule alignment, additional provisions development, contract risk register update, development of PB exhibit, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-30 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 Development of additional definitions for the contract, comparison of both contract versions, files check, delivery schedule alignment, additional provisions development, contract risk register update, development of PB exhibit, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-03-31 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Development of additional definitions for the contract, comparison of both contract versions, files check, delivery schedule alignment, additional provisions development, contract risk register update, development of PB exhibit, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-04-17 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 3 0 Odoptu files handover to Legal, EPCm close out letter update (warranties list, regulatory docs list, commissioning materials certificate) WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-04-20 ODOPTU Project :ODOPTU Project 7715A00204 ODOPTU-Rig Build-Non-billable Regular Pay N 3 0 Odoptu files handover to Legal, EPCm close out letter update (warranties list, regulatory docs list, commissioning materials certificate) WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-05-01 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Redlines review (HH, Drillmec), Sprint team meetings, TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-05-02 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Redlines review (HH, Drillmec), Sprint team meetings, TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-05-04 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Redlines review (HH, Drillmec), Sprint team meetings, TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-05-11 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Spring team meeting, TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-05-16 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Sprint team, TS meetings. Shenkai redlines review, meeting with Risk, regulatory log update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-05-17 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Sprint team, TS meetings. Shenkai redlines review, meeting with Risk, regulatory log update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-05-18 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Sprint team, TS meetings. Shenkai redlines review, meeting with Risk, regulatory log update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-05-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Sprint team, TS meetings. Shenkai redlines review, meeting with Risk, regulatory log update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-05-23 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Sprint team, TS meetings WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-05-25 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Sprint team, TS meetings WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-06-06 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 KanBan meetings, communication with Shenkai on insurance provisions, follow up of Cameron contract terms WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-06-08 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 KanBan meetings, communication with Shenkai on insurance provisions, follow up of Cameron contract terms WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-06-12 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Meeting with Risk department, follow up with Shenkai on contract changes, follow up with Cameron for addendum, NDA with Axon, NDA with WPI, follow up with Vallourec and OTC, meeting with Treasury, Kan Ban meeting, TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-06-13 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Meeting with Risk department, follow up with Shenkai on contract changes, follow up with Cameron for addendum, NDA with Axon, NDA with WPI, follow up with Vallourec and OTC, meeting with Treasury, Kan Ban meeting, TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-06-14 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Meeting with Risk department, follow up with Shenkai on contract changes, follow up with Cameron for addendum, NDA with Axon, NDA with WPI, follow up with Vallourec and OTC, meeting with Treasury, Kan Ban meeting, TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-06-15 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Meeting with Risk department, follow up with Shenkai on contract changes, follow up with Cameron for addendum, NDA with Axon, NDA with WPI, follow up with Vallourec and OTC, meeting with Treasury, Kan Ban meeting, TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-06-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Cameron addendum routing, NDAs with Axon, Control Flow, WPI - complete, following up on NDAs for Vallourec, Weir, HPP, and WOM, follow up with Legal on PCG and PB for Shenkai contract, KanBan meetings WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-06-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Cameron addendum routing, NDAs with Axon, Control Flow, WPI - complete, following up on NDAs for Vallourec, Weir, HPP, and WOM, follow up with Legal on PCG and PB for Shenkai contract, KanBan meetings WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-06-21 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Cameron addendum routing, NDAs with Axon, Control Flow, WPI - complete, following up on NDAs for Vallourec, Weir, HPP, and WOM, follow up with Legal on PCG and PB for Shenkai contract, KanBan meetings WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-06-22 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 1 0 Cameron addendum routing, NDAs with Axon, Control Flow, WPI - complete, following up on NDAs for Vallourec, Weir, HPP, and WOM, follow up with Legal on PCG and PB for Shenkai contract, KanBan meetings WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-06-26 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Meeting with Legal, sprint team meeting, TS meeting Shenkai - negotiations over PCG/PB, review of CAD Control system redlines review , review with Risk department, NDA with WOM, NDA with Vallourec, HPP contract verification, contract summary for contract routing slip WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-06-27 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Meeting with Legal, sprint team meeting, TS meeting Shenkai - negotiations over PCG/PB, review of CAD Control system redlines review , review with Risk department, NDA with WOM, NDA with Vallourec, HPP contract verification, contract summary for contract routing slip WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-06-28 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Meeting with Legal, sprint team meeting, TS meeting Shenkai - negotiations over PCG/PB, review of CAD Control system redlines review , review with Risk department, NDA with WOM, NDA with Vallourec, HPP contract verification, contract summary for contract routing slip WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-06-29 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Meeting with Legal, sprint team meeting, TS meeting Shenkai - negotiations over PCG/PB, review of CAD Control system redlines review , review with Risk department, NDA with WOM, NDA with Vallourec, HPP contract verification, contract summary for contract routing slip WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-06-30 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Meeting with Legal, sprint team meeting, TS meeting Shenkai - negotiations over PCG/PB, review of CAD Control system redlines review , review with Risk department, NDA with WOM, NDA with Vallourec, HPP contract verification, contract summary for contract routing slip WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-07-18 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Sprint team meeting, TS meeting, follow up on CPC terms and conditions, KOC BOP Control Unit and Fire Gas evaluation review WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-07-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Sprint team meeting, TS meeting, follow up on CPC terms and conditions, KOC BOP Control Unit and Fire Gas evaluation review WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-07-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Sprint team meeting, TS meeting, follow up on CPC terms and conditions, KOC BOP Control Unit and Fire Gas evaluation review WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-07-21 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Sprint team meeting, TS meeting, follow up on CPC terms and conditions, KOC BOP Control Unit and Fire Gas evaluation review WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-07-24 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Spring team meeting, TS meting, follow up on Mahatta T7Cs, negotiation of Shenkai contract, follow up on CPC t&cs and WOM, financial statement summary for suppliers, Vallourec redlines review, requested a review from Compliance group WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-07-25 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Spring team meeting, TS meting, follow up on Mahatta T7Cs, negotiation of Shenkai contract, follow up on CPC t&cs and WOM, financial statement summary for suppliers, Vallourec redlines review, requested a review from Compliance group WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-07-26 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Spring team meeting, TS meting, follow up on Mahatta T7Cs, negotiation of Shenkai contract, follow up on CPC t&cs and WOM, financial statement summary for suppliers, Vallourec redlines review, requested a review from Compliance group WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-07-27 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Spring team meeting, TS meting, follow up on Mahatta T7Cs, negotiation of Shenkai contract, follow up on CPC t&cs and WOM, financial statement summary for suppliers, Vallourec redlines review, requested a review from Compliance group WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-07-28 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Spring team meeting, TS meting, follow up on Mahatta T7Cs, negotiation of Shenkai contract, follow up on CPC t&cs and WOM, financial statement summary for suppliers, Vallourec redlines review, requested a review from Compliance group WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-07-31 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 Sprint team meeting, Mahatta contract signing process, Shenkai contract negotiation and revision, follow up on Vallourec terms and conditions, follow up on WOM redlines to contract, follow up of NOV redlines, NOV redlines review and preparation of initial response, comments, distribution to Risk and Tax departments, contract status update, negotiations with Shenkai, follow up contracts review with SMEs. WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-08-01 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 Sprint team meeting, Mahatta contract signing process, Shenkai contract negotiation and revision, follow up on Vallourec terms and conditions, follow up on WOM redlines to contract, follow up of NOV redlines, NOV redlines review and preparation of initial response, comments, distribution to Risk and Tax departments, contract status update, negotiations with Shenkai, follow up contracts review with SMEs. WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-08-02 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 Sprint team meeting, Mahatta contract signing process, Shenkai contract negotiation and revision, follow up on Vallourec terms and conditions, follow up on WOM redlines to contract, follow up of NOV redlines, NOV redlines review and preparation of initial response, comments, distribution to Risk and Tax departments, contract status update, negotiations with Shenkai, follow up contracts review with SMEs. WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-08-03 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 Sprint team meeting, Mahatta contract signing process, Shenkai contract negotiation and revision, follow up on Vallourec terms and conditions, follow up on WOM redlines to contract, follow up of NOV redlines, NOV redlines review and preparation of initial response, comments, distribution to Risk and Tax departments, contract status update, negotiations with Shenkai, follow up contracts review with SMEs. WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-08-04 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 3 0 Sprint team meeting, Mahatta contract signing process, Shenkai contract negotiation and revision, follow up on Vallourec terms and conditions, follow up on WOM redlines to contract, follow up of NOV redlines, NOV redlines review and preparation of initial response, comments, distribution to Risk and Tax departments, contract status update, negotiations with Shenkai, follow up contracts review with SMEs. WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-08-07 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Sprint team, TS team, comparison of older KOC contract with new contract included into the KOC tender, identification of risks, required clarifications, meetings with Legal, negotiation of Shenkai contract, WOM contract preparations, contract status preparation WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-08-08 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Sprint team, TS team, comparison of older KOC contract with new contract included into the KOC tender, identification of risks, required clarifications, meetings with Legal, negotiation of Shenkai contract, WOM contract preparations, contract status preparation WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-08-09 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Sprint team, TS team, comparison of older KOC contract with new contract included into the KOC tender, identification of risks, required clarifications, meetings with Legal, negotiation of Shenkai contract, WOM contract preparations, contract status preparation WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-08-10 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Sprint team, TS team, comparison of older KOC contract with new contract included into the KOC tender, identification of risks, required clarifications, meetings with Legal, negotiation of Shenkai contract, WOM contract preparations, contract status preparation WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-08-11 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Sprint team, TS team, comparison of older KOC contract with new contract included into the KOC tender, identification of risks, required clarifications, meetings with Legal, negotiation of Shenkai contract, WOM contract preparations, contract status preparation WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-08-14 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Sprint meetings, TS meeting, meetings with Legal, prepared and signed contract with Mahatta, developed NDA for NOV and got it signed, negotiation with Shenkai on LOC language, KOC kick-off meeting, development of Accountability Matrixes for KOC tender, NDA with RongSheng, commercial review (KOC), meeting with Legal WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-08-15 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Sprint meetings, TS meeting, meetings with Legal, prepared and signed contract with Mahatta, developed NDA for NOV and got it signed, negotiation with Shenkai on LOC language, KOC kick-off meeting, development of Accountability Matrixes for KOC tender, NDA with RongSheng, commercial review (KOC), meeting with Legal WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-08-16 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 8 0 Sprint meetings, TS meeting, meetings with Legal, prepared and signed contract with Mahatta, developed NDA for NOV and got it signed, negotiation with Shenkai on LOC language, KOC kick-off meeting, development of Accountability Matrixes for KOC tender, NDA with RongSheng, commercial review (KOC), meeting with Legal WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-08-17 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Sprint meetings, TS meeting, meetings with Legal, prepared and signed contract with Mahatta, developed NDA for NOV and got it signed, negotiation with Shenkai on LOC language, KOC kick-off meeting, development of Accountability Matrixes for KOC tender, NDA with RongSheng, commercial review (KOC), meeting with Legal WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-08-18 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Sprint meetings, TS meeting, meetings with Legal, prepared and signed contract with Mahatta, developed NDA for NOV and got it signed, negotiation with Shenkai on LOC language, KOC kick-off meeting, development of Accountability Matrixes for KOC tender, NDA with RongSheng, commercial review (KOC), meeting with Legal WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-08-21 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Conference call with NOV on redlines to master contract, meeting with Joshua, review of Kerui commercial docs for tender, changes to Instructions to Seller, changes to contract and proposal letter, other changes, clarifications spreadsheet for KOC, NDA with Rongsheng, status update for KOC contracts, follow up with Tax department, review of WOM redlines, comparison/verification of tender docs for KOC WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-08-22 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Conference call with NOV on redlines to master contract, meeting with Joshua, review of Kerui commercial docs for tender, changes to Instructions to Seller, changes to contract and proposal letter, other changes, clarifications spreadsheet for KOC, NDA with Rongsheng, status update for KOC contracts, follow up with Tax department, review of WOM redlines, comparison/verification of tender docs for KOC WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-08-23 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Conference call with NOV on redlines to master contract, meeting with Joshua, review of Kerui commercial docs for tender, changes to Instructions to Seller, changes to contract and proposal letter, other changes, clarifications spreadsheet for KOC, NDA with Rongsheng, status update for KOC contracts, follow up with Tax department, review of WOM redlines, comparison/verification of tender docs for KOC WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-08-24 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Conference call with NOV on redlines to master contract, meeting with Joshua, review of Kerui commercial docs for tender, changes to Instructions to Seller, changes to contract and proposal letter, other changes, clarifications spreadsheet for KOC, NDA with Rongsheng, status update for KOC contracts, follow up with Tax department, review of WOM redlines, comparison/verification of tender docs for KOC WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-08-25 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 4 0 Conference call with NOV on redlines to master contract, meeting with Joshua, review of Kerui commercial docs for tender, changes to Instructions to Seller, changes to contract and proposal letter, other changes, clarifications spreadsheet for KOC, NDA with Rongsheng, status update for KOC contracts, follow up with Tax department, review of WOM redlines, comparison/verification of tender docs for KOC WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-08-28 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Office closure - Aug 28 - 30 Harvey disaster/flood relief time off permitted by Parker management WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-08-29 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Office closure - Aug 28 - 30 Harvey disaster/flood relief time off permitted by Parker management WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-08-30 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Office closure - Aug 28 - 30 Harvey disaster/flood relief time off permitted by Parker management WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-08-31 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Office closure - Aug 28 - 30 Harvey disaster/flood relief time off permitted by Parker management WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-09-01 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Office closure - Aug 28 - 30 Harvey disaster/flood relief time off permitted by Parker management WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-09-04 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Harvey disaster/flood relief time off permitted by Parker management WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-09-05 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Harvey disaster/flood relief time off permitted by Parker management WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-09-06 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Harvey disaster/flood relief time off permitted by Parker management WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-09-07 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Harvey disaster/flood relief time off permitted by Parker management WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-09-08 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Harvey disaster/flood relief time off permitted by Parker management WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-09-11 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Formal letter on documentation handover for Odoptu, meeting on KOC project update, CPC contract final version preparation, sent a query to OTC, GE, follow up with Vallourec, CC contract routing for signature, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-09-12 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Formal letter on documentation handover for Odoptu, meeting on KOC project update, CPC contract final version preparation, sent a query to OTC, GE, follow up with Vallourec, CC contract routing for signature, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-09-13 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Formal letter on documentation handover for Odoptu, meeting on KOC project update, CPC contract final version preparation, sent a query to OTC, GE, follow up with Vallourec, CC contract routing for signature, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-09-14 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Formal letter on documentation handover for Odoptu, meeting on KOC project update, CPC contract final version preparation, sent a query to OTC, GE, follow up with Vallourec, CC contract routing for signature, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-09-15 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 Formal letter on documentation handover for Odoptu, meeting on KOC project update, CPC contract final version preparation, sent a query to OTC, GE, follow up with Vallourec, CC contract routing for signature, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-09-18 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 follow up on WOM contract, meeting on commercial evaluation of Vallourec revisions to the contract, meeting on commercial changes, exceptions log preparation WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-09-19 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 follow up on WOM contract, meeting on commercial evaluation of Vallourec revisions to the contract, meeting on commercial changes, exceptions log preparation WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-09-20 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 follow up on WOM contract, meeting on commercial evaluation of Vallourec revisions to the contract, meeting on commercial changes, exceptions log preparation WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-09-21 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 follow up on WOM contract, meeting on commercial evaluation of Vallourec revisions to the contract, meeting on commercial changes, exceptions log preparation WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-09-21 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 IACCM training (offsite) WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2017-09-22 EHBU-TSRs :EHBU-TSRs TSR-01559-EHBU KOC Tender- New Rig Build Regular Pay N 2 0 follow up on WOM contract, meeting on commercial evaluation of Vallourec revisions to the contract, meeting on commercial changes, exceptions log preparation WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-12 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 Project related activities: kanban, T&C redline. drafted letter to Genesis, check on Contract flow down compliance WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-13 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 Project related activities: kanban, T&C redline. drafted letter to Genesis, check on Contract flow down compliance WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-14 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 Project related activities: kanban, T&C redline. drafted letter to Genesis, check on Contract flow down compliance WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-15 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 Project related activities: kanban, T&C redline. drafted letter to Genesis, check on Contract flow down compliance WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-16 TSR-01629 :TSR-01629 TSR-01629-002 Screening Phase - Parker Drilling Regular Pay N 4 0 Project related activities: kanban, T&C redline. drafted letter to Genesis, check on Contract flow down compliance WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Genesis T&Cs legal compliance confirmation, Kvaerner T&Cs review, Invoicing procedure meeting, Kanban meeting, meeting with Legal, Finance, contract strategy discussion, changes tracker update, clean version of T&Cs WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Genesis T&Cs legal compliance confirmation, Kvaerner T&Cs review, Invoicing procedure meeting, Kanban meeting, meeting with Legal, Finance, contract strategy discussion, changes tracker update, clean version of T&Cs WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Genesis T&Cs legal compliance confirmation, Kvaerner T&Cs review, Invoicing procedure meeting, Kanban meeting, meeting with Legal, Finance, contract strategy discussion, changes tracker update, clean version of T&Cs WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Genesis T&Cs legal compliance confirmation, Kvaerner T&Cs review, Invoicing procedure meeting, Kanban meeting, meeting with Legal, Finance, contract strategy discussion, changes tracker update, clean version of T&Cs WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Meeting with legal. Kanban, meetings of Kvaerner T&Cs, meeting with KV, internal meeting on T&Cs, Special conditions review, noted from, T&Cs summary, consulting agreement template, contract development, T&Cs review WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Meeting with legal. Kanban, meetings of Kvaerner T&Cs, meeting with KV, internal meeting on T&Cs, Special conditions review, noted from, T&Cs summary, consulting agreement template, contract development, T&Cs review WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-02-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Meeting with legal. Kanban, meetings of Kvaerner T&Cs, meeting with KV, internal meeting on T&Cs, Special conditions review, noted from, T&Cs summary, consulting agreement template, contract development, T&Cs review WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-01 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Meeting with legal. Kanban, meetings of Kvaerner T&Cs, meeting with KV, internal meeting on T&Cs, Special conditions review, noted from, T&Cs summary, consulting agreement template, contract development, T&Cs review WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Meeting with legal. Kanban, meetings of Kvaerner T&Cs, meeting with KV, internal meeting on T&Cs, Special conditions review, noted from, T&Cs summary, consulting agreement template, contract development, T&Cs review WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 New proposed changes review (KV T&Cs), tracker update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-06 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 New proposed changes review (KV T&Cs), tracker update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-07 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-08 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 0 WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-09 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 3 0 New proposed changes review (KV T&Cs), tracker update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-12 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Special contitions with Kvaerner review, tracker update, Special conditions comments, NDA, request for info exchange with KBR, meeting with KV, letter to KBR, NDA with KBR, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-13 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Special contitions with Kvaerner review, tracker update, Special conditions comments, NDA, request for info exchange with KBR, meeting with KV, letter to KBR, NDA with KBR, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-14 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Special contitions with Kvaerner review, tracker update, Special conditions comments, NDA, request for info exchange with KBR, meeting with KV, letter to KBR, NDA with KBR, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-15 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Special contitions with Kvaerner review, tracker update, Special conditions comments, NDA, request for info exchange with KBR, meeting with KV, letter to KBR, NDA with KBR, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-16 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Special contitions with Kvaerner review, tracker update, Special conditions comments, NDA, request for info exchange with KBR, meeting with KV, letter to KBR, NDA with KBR, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-19 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 meeting on Kvaerner T&Cs, FEED agreement drafting, tracker preparations, Kanban meeting, close out notice for Screening phase, NDA with Alseas NDA with GustoMSC WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-20 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 meeting on Kvaerner T&Cs, FEED agreement drafting, tracker preparations, Kanban meeting, close out notice for Screening phase, NDA with Alseas NDA with GustoMSC WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-21 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 meeting on Kvaerner T&Cs, FEED agreement drafting, tracker preparations, Kanban meeting, close out notice for Screening phase, NDA with Alseas NDA with GustoMSC WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-22 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 meeting on Kvaerner T&Cs, FEED agreement drafting, tracker preparations, Kanban meeting, close out notice for Screening phase, NDA with Alseas NDA with GustoMSC WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-23 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 meeting on Kvaerner T&Cs, FEED agreement drafting, tracker preparations, Kanban meeting, close out notice for Screening phase, NDA with Alseas NDA with GustoMSC WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-26 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Kvaerner final T&Cs verification clean up, NDA with Allseas, meeting with Tax.Legal< Kanban meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-27 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Kvaerner final T&Cs verification clean up, NDA with Allseas, meeting with Tax.Legal< Kanban meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-28 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Kvaerner final T&Cs verification clean up, NDA with Allseas, meeting with Tax.Legal< Kanban meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-03-29 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Kvaerner final T&Cs verification clean up, NDA with Allseas, meeting with Tax.Legal< Kanban meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-02 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Minkit presentation review/feedback WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-03 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Minkit presentation review/feedback WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-04 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Minkit presentation review/feedback WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-05 TSR-01629 :TSR-01629 TSR-01629-004 Screening Phase - Non-Billable (PKD Only) Regular Pay N 4 0 Minkit presentation review/feedback WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Project Contract Procedure development WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure for Project Management procedure development (forms,), forms register update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure for Project Management procedure development (forms,), forms register update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure for Project Management procedure development (forms,), forms register update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure for Project Management procedure development (forms,), forms register update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure for Project Management procedure development (forms,), forms register update WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Minkit after action review, development of contract folder on SP for Minkit concept study, SP issues resolutions, update in SalesForce, procedure development WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Minkit after action review, development of contract folder on SP for Minkit concept study, SP issues resolutions, update in SalesForce, procedure development WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Minkit after action review, development of contract folder on SP for Minkit concept study, SP issues resolutions, update in SalesForce, procedure development WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Minkit after action review, development of contract folder on SP for Minkit concept study, SP issues resolutions, update in SalesForce, procedure development WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Minkit after action review, development of contract folder on SP for Minkit concept study, SP issues resolutions, update in SalesForce, procedure development WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Developed TS.FOR.064 - NDA, TS.FOR.065 - T&Cs, TS>FOR.066 - Subcontract, TS.FOR.067 - Eng. Services, started flow chart for General Contract Management, revision of procedure WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Developed TS.FOR.064 - NDA, TS.FOR.065 - T&Cs, TS>FOR.066 - Subcontract, TS.FOR.067 - Eng. Services, started flow chart for General Contract Management, revision of procedure WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Developed TS.FOR.064 - NDA, TS.FOR.065 - T&Cs, TS>FOR.066 - Subcontract, TS.FOR.067 - Eng. Services, started flow chart for General Contract Management, revision of procedure WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Developed TS.FOR.064 - NDA, TS.FOR.065 - T&Cs, TS>FOR.066 - Subcontract, TS.FOR.067 - Eng. Services, started flow chart for General Contract Management, revision of procedure WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Developed TS.FOR.064 - NDA, TS.FOR.065 - T&Cs, TS>FOR.066 - Subcontract, TS.FOR.067 - Eng. Services, started flow chart for General Contract Management, revision of procedure WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-04-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Technical services CO rates verifications (rig 270), docs for Yastreb, meeting with NOVOS, procedure development and submittal, meeting on Invoicing for Minkit for next phase WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Technical services CO rates verifications (rig 270), docs for Yastreb, meeting with NOVOS, procedure development and submittal, meeting on Invoicing for Minkit for next phase WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Technical services CO rates verifications (rig 270), docs for Yastreb, meeting with NOVOS, procedure development and submittal, meeting on Invoicing for Minkit for next phase WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Technical services CO rates verifications (rig 270), docs for Yastreb, meeting with NOVOS, procedure development and submittal, meeting on Invoicing for Minkit for next phase WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure meetings, Contract negotiations tracker, other forms and procedure update/revision/reprint WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure meetings, Contract negotiations tracker, other forms and procedure update/revision/reprint WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure meetings, Contract negotiations tracker, other forms and procedure update/revision/reprint WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure meetings, Contract negotiations tracker, other forms and procedure update/revision/reprint WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure revision, MOC form, Uganda procurement process meeting, IMS Audit training, TS meeting, procedure update, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure revision, MOC form, Uganda procurement process meeting, IMS Audit training, TS meeting, procedure update, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure revision, MOC form, Uganda procurement process meeting, IMS Audit training, TS meeting, procedure update, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure revision, MOC form, Uganda procurement process meeting, IMS Audit training, TS meeting, procedure update, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Contract procedure revision, MOC form, Uganda procurement process meeting, IMS Audit training, TS meeting, procedure update, WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-28 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Memorial Day WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-30 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-05-31 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-01 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS department: Meetings on Uganda projects, procedure review, Chinese visa info, info on importation to Uganda, project SOW (Uganda), TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS department: Meetings on Uganda projects, procedure review, Chinese visa info, info on importation to Uganda, project SOW (Uganda), TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS department: Meetings on Uganda projects, procedure review, Chinese visa info, info on importation to Uganda, project SOW (Uganda), TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS department: Meetings on Uganda projects, procedure review, Chinese visa info, info on importation to Uganda, project SOW (Uganda), TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: meetings on Uganda projects, rig build contract redlining/discussions, contract and com/invoice, exhibits development, Contract management procedure revision WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: meetings on Uganda projects, rig build contract redlining/discussions, contract and com/invoice, exhibits development, Contract management procedure revision WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: meetings on Uganda projects, rig build contract redlining/discussions, contract and com/invoice, exhibits development, Contract management procedure revision WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: meetings on Uganda projects, rig build contract redlining/discussions, contract and com/invoice, exhibits development, Contract management procedure revision WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: meetings on Uganda projects, rig build contract redlining/discussions, contract and com/invoice, exhibits development, Contract management procedure revision WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: Uganda contract matrix, questions for a meeting with HH, Kanban meetings, contract revision, meeting with Legal, MOC from for CM Procedures, TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: Uganda contract matrix, questions for a meeting with HH, Kanban meetings, contract revision, meeting with Legal, MOC from for CM Procedures, TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: Uganda contract matrix, questions for a meeting with HH, Kanban meetings, contract revision, meeting with Legal, MOC from for CM Procedures, TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: Uganda contract matrix, questions for a meeting with HH, Kanban meetings, contract revision, meeting with Legal, MOC from for CM Procedures, TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-06-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: Uganda contract matrix, questions for a meeting with HH, Kanban meetings, contract revision, meeting with Legal, MOC from for CM Procedures, TS meeting WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-07-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: Kanban meetings, NDA with IDS, HH principal document revision, Canrig facility visit, HH financial options meeting, IDS facility visit, meeting with Legal WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-07-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: Kanban meetings, NDA with IDS, HH principal document revision, Canrig facility visit, HH financial options meeting, IDS facility visit, meeting with Legal WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-07-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: Kanban meetings, NDA with IDS, HH principal document revision, Canrig facility visit, HH financial options meeting, IDS facility visit, meeting with Legal WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-07-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: Kanban meetings, NDA with IDS, HH principal document revision, Canrig facility visit, HH financial options meeting, IDS facility visit, meeting with Legal WILSON, SVETLANA Administrative Services I 33746 WILSON, SVETLANA:Administrative Services I 2018-07-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 This timesheet reflects time for TS: Kanban meetings, NDA with IDS, HH principal document revision, Canrig facility visit, HH financial options meeting, IDS facility visit, meeting with Legal