Name Billing Class Employee No. Item Line Class Transaction Date Job No. Customer Service Item Notes Payroll Item Billable Duration Remarks Agnew, Philip 28299 Agnew, Philip 2013-09-16 APEX :APEX Default Task Regular Pay N 1 Agnew, Philip 28299 Agnew, Philip 2013-09-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 Agnew, Philip 28299 Agnew, Philip 2013-09-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 Agnew, Philip 28299 Agnew, Philip 2013-09-16 OH-009 :OH-009 OH-009-008 2013 Rosneft – Arctic Rig Regular Pay N 2 Agnew, Philip 28299 Agnew, Philip 2013-09-17 APEX :APEX Default Task Regular Pay N 0.5 Agnew, Philip 28299 Agnew, Philip 2013-09-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 Agnew, Philip 28299 Agnew, Philip 2013-09-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 Agnew, Philip 28299 Agnew, Philip 2013-09-18 APEX :APEX Default Task Regular Pay N 0.5 Agnew, Philip 28299 Agnew, Philip 2013-09-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 Agnew, Philip 28299 Agnew, Philip 2013-09-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 Agnew, Philip 28299 Agnew, Philip 2013-09-18 OH-009 :OH-009 OH-009-008 2013 Rosneft – Arctic Rig Regular Pay N 0.5 Agnew, Philip 28299 Agnew, Philip 2013-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 Agnew, Philip 28299 Agnew, Philip 2013-09-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 Agnew, Philip 28299 Agnew, Philip 2013-09-19 OH-009 :OH-009 OH-009-008 2013 Rosneft – Arctic Rig Regular Pay N 1 Agnew, Philip 28299 Agnew, Philip 2013-09-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 Agnew, Philip 28299 Agnew, Philip 2013-09-20 OH-009 :OH-009 OH-009-008 2013 Rosneft – Arctic Rig Regular Pay N 1.5 Agnew, Philip 28299 Agnew, Philip 2013-09-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 Agnew, Philip 28299 Agnew, Philip 2013-09-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 Agnew, Philip 28299 Agnew, Philip 2013-09-24 APEX :APEX Default Task Regular Pay N 1 Agnew, Philip 28299 Agnew, Philip 2013-09-24 Arctic Mobil Rig :Arctic Mobil Rig 00099 Non-Billable Regular Pay N 1 Agnew, Philip 28299 Agnew, Philip 2013-09-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 Agnew, Philip 28299 Agnew, Philip 2013-09-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 Agnew, Philip 28299 Agnew, Philip 2013-09-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 Agnew, Philip 28299 Agnew, Philip 2013-09-26 Arctic Mobil Rig :Arctic Mobil Rig 00099 Non-Billable Regular Pay N 2.5 Agnew, Philip 28299 Agnew, Philip 2013-09-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 Agnew, Philip 28299 Agnew, Philip 2013-09-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 Agnew, Philip 28299 Agnew, Philip 2013-09-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 Agnew, Philip 28299 Agnew, Philip 2013-09-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 7 Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Out sick on Monday Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-17 Arctic Mobil Rig :Arctic Mobil Rig 00099 Non-Billable Regular Pay N 1.5 Enginering research for supplier technical specifications on equipment Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-17 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 5.5 Working on spread sheet for equipment evaluation, functional specification updates as well as report changes on procurement. Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Engineering meeetings including, EMLR, TPP, and Procurement. Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-18 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 6.5 Working on spread sheet for equipment evaluation, functional specification updates as well as report changes on procurement. Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 Engineering meeetings including, EMLR, TPP, and Procurement. Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-19 Arctic Mobil Rig :Arctic Mobil Rig 00099 Non-Billable Regular Pay N 1.5 Enginering research for supplier technical specifications on equipment Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-19 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 5.5 Working on spread sheet for equipment evaluation, functional specification updates as well as report changes on procurement. Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Engineering meeetings including, EMLR, TPP, and Procurement. Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-20 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 7 Working on spread sheet for equipment evaluation, functional specification updates as well as report changes on procurement. Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Engineering meeetings including, EMLR, TPP, and Procurement. Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-23 Arctic Mobil Rig :Arctic Mobil Rig 00099 Non-Billable Regular Pay N 1.5 Research and study for the EMLR project functional requirements Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-23 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 8 Working the functional requirements document changes for the EMLR project. Functional specs included B2,B3,B4,F1,F2,F3,E16, and more. Formatting and reviewing the document as well. Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-24 Arctic Mobil Rig :Arctic Mobil Rig 00099 Non-Billable Regular Pay N 1 Research and study for the EMLR project functional requirements Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-24 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 7 Working the functional requirements document changes for the EMLR project. Functional specs included B2,B3,B4,F1,F2,F3,E16, and more. Formatting and reviewing the document as well. Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Engineering meetings as well as EMLR meetings for review of progress. Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-25 Arctic Mobil Rig :Arctic Mobil Rig 00099 Non-Billable Regular Pay N 0.5 Research and study for the EMLR project functional requirements Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-25 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 6.5 Working the functional requirements document changes for the EMLR project. Functional specs included B2,B3,B4,F1,F2,F3,E16, and more. Formatting and reviewing the document as well. Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 Engineering meetings as well as EMLR meetings for review of progress. Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-26 Arctic Mobil Rig :Arctic Mobil Rig 00099 Non-Billable Regular Pay N 1 Research and study for the EMLR project functional requirements Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-26 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 6 Working the functional requirements document changes for the EMLR project. Functional specs included B2,B3,B4,F1,F2,F3,E16, and more. Formatting and reviewing the document as well. Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 Engineering meetings as well as EMLR meetings for review of progress. Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-27 Arctic Mobil Rig :Arctic Mobil Rig 00099 Non-Billable Regular Pay N 2.5 Research and study for the EMLR project functional requirements Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-27 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 8 Working the functional requirements document changes for the EMLR project. Functional specs included B2,B3,B4,F1,F2,F3,E16, and more. Formatting and reviewing the document as well. Alexanderowicz, Jeffrey 30763 Alexanderowicz, Jeffrey 2013-09-27 Rig 267L-TSR :Rig 267L-TSR TSR-01016-267L Synthetic Grease for Wash Pipe on TDS11 Regular Pay N 1 E-mailed rig for RFI on alignment check of mainshaft endplay before we substitute grease. Ambridge, Brian 30805 Ambridge, Brian 2013-09-16 A.D. :A.D. 7703A10002 ENG SERVICES WORLEY PARSONS Regular Pay N 8.5 Ambridge, Brian 30805 Ambridge, Brian 2013-09-17 A.D. :A.D. 7703A10002 ENG SERVICES WORLEY PARSONS Regular Pay N 8 Ambridge, Brian 30805 Ambridge, Brian 2013-09-18 A.D. :A.D. 7703A10002 ENG SERVICES WORLEY PARSONS Regular Pay N 8.5 Ambridge, Brian 30805 Ambridge, Brian 2013-09-19 A.D. :A.D. 7703A10002 ENG SERVICES WORLEY PARSONS Regular Pay N 9 Ambridge, Brian 30805 Ambridge, Brian 2013-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 Tech. Srv. Meeting Ambridge, Brian 30805 Ambridge, Brian 2013-09-20 A.D. :A.D. 7703A10002 ENG SERVICES WORLEY PARSONS Regular Pay N 6 Ambridge, Brian 30805 Ambridge, Brian 2013-09-23 A.D. :A.D. 7703A10002 ENG SERVICES WORLEY PARSONS Regular Pay N 8.5 Ambridge, Brian 30805 Ambridge, Brian 2013-09-24 A.D. :A.D. 7703A10002 ENG SERVICES WORLEY PARSONS Regular Pay N 8 Ambridge, Brian 30805 Ambridge, Brian 2013-09-25 A.D. :A.D. 7703A10002 ENG SERVICES WORLEY PARSONS Regular Pay N 8.5 Ambridge, Brian 30805 Ambridge, Brian 2013-09-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 PTO Approved Ambridge, Brian 30805 Ambridge, Brian 2013-09-27 A.D. :A.D. 7703A10002 ENG SERVICES WORLEY PARSONS Regular Pay N 8 Bough, Sheri 27768 Bough, Sheri 2013-09-16 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Bough, Sheri 27768 Bough, Sheri 2013-09-17 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 1 Discuss and review RFP for TPPs with Dean and Esperanza. Bough, Sheri 27768 Bough, Sheri 2013-09-17 OH-017 :OH-017 Overhead All Activities Regular Pay N 7 Bough, Sheri 27768 Bough, Sheri 2013-09-18 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Bough, Sheri 27768 Bough, Sheri 2013-09-19 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Bough, Sheri 27768 Bough, Sheri 2013-09-20 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Bough, Sheri 27768 Bough, Sheri 2013-09-23 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Bough, Sheri 27768 Bough, Sheri 2013-09-24 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Bough, Sheri 27768 Bough, Sheri 2013-09-25 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Bough, Sheri 27768 Bough, Sheri 2013-09-26 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Bough, Sheri 27768 Bough, Sheri 2013-09-27 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Brown, Tamyra 18276 Brown, Tamyra 2013-09-16 OH-017 :OH-017 Overhead All Activities Regular Pay N 8.5 Brown, Tamyra 18276 Brown, Tamyra 2013-09-17 OH-017 :OH-017 Overhead All Activities Regular Pay N 8.75 Brown, Tamyra 18276 Brown, Tamyra 2013-09-18 OH-017 :OH-017 Overhead All Activities Regular Pay N 9 Brown, Tamyra 18276 Brown, Tamyra 2013-09-19 OH-017 :OH-017 Overhead All Activities Regular Pay N 8.75 Brown, Tamyra 18276 Brown, Tamyra 2013-09-20 OH-017 :OH-017 Overhead All Activities Regular Pay N 8.25 Brown, Tamyra 18276 Brown, Tamyra 2013-09-23 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Brown, Tamyra 18276 Brown, Tamyra 2013-09-24 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Brown, Tamyra 18276 Brown, Tamyra 2013-09-25 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Brown, Tamyra 18276 Brown, Tamyra 2013-09-26 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Brown, Tamyra 18276 Brown, Tamyra 2013-09-27 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-16 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 4 Transmitting Invoice; tracking documentation; filing. Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-16 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 4 Document routing; receiving/sending transmittals; communication with subcontractor on deliverable status; monitoring deliverables. Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 Working on procedure team; training temps; Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-17 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 7 Document routing; receiving/sending transmittals; communication with subcontractor on deliverable status; monitoring deliverables. Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 Working on procedure team; training temps; Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-18 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 5 Document routing; receiving/sending transmittals; communication with subcontractor on deliverable status; monitoring deliverables. Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.75 Working on procedure team; training temps; Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 0.25 Issuing Closeout Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 1 Project meeting Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-19 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 4 Document routing; receiving/sending transmittals; communication with subcontractor on deliverable status; monitoring deliverables. Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 Monthly Technical Services meeting. Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 Working on procedure team; training temps; Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 Working on procedure team; training temps; Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 9 Archiving files in 272L, training Detra, taking online training courses. Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-23 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 0.25 Issuing CTR. Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-24 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 2 Filing; issuing transmittals; SharePoint reorganization; filing vendor data. Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 PTO Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 Archiving files in 272L, training Detra, taking online training courses. Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 TSR weekly meeting. Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.25 Archiving files in 272L, training Detra, taking online training courses. Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-25 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 1 Weekly meeting Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-26 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 3 Filing; issuing transmittals; SharePoint reorganization; filing vendor data. Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 2 PTO Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 Archiving files in 272L, training Detra, taking online training courses. Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-27 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 1 Filing; issuing transmittals; SharePoint reorganization; filing vendor data. Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 2 PTO Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 Archiving files in 272L, training Detra, taking online training courses. Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-27 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.25 Filing and transmittal. Calpouzos, Reesa 28228 Calpouzos, Reesa 2013-09-27 Rig 266L-TSR :Rig 266L-TSR TSR-01041-266L/267L Electrical Redline Markups Regular Pay N 0.25 Transmitting CTR. Cochran, JB 30785 Cochran, JB 2013-09-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 EMLR mud system: How to build mud, Equalization, sgtructural analysis of rounded bottom - and insulation of drip pans with seals. Cochran, JB 30785 Cochran, JB 2013-09-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 EMLR mud system: How to build mud, Equalization, sgtructural analysis of rounded bottom - and insulation of drip pans with seals. Cochran, JB 30785 Cochran, JB 2013-09-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 7 EMLR mud system: How to build mud, Equalization, sgtructural analysis of rounded bottom - and insulation of drip pans with seals. Cochran, JB 30785 Cochran, JB 2013-09-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 TSR meeting Cochran, JB 30785 Cochran, JB 2013-09-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 EMLR mud system: How to build mud, Equalization, sgtructural analysis of rounded bottom - and insulation of drip pans with seals. Cochran, JB 30785 Cochran, JB 2013-09-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 EMLR mud system: How to build mud, Equalization, sgtructural analysis of rounded bottom - and insulation of drip pans with seals. Cochran, JB 30785 Cochran, JB 2013-09-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Process Flow through mud system---Mixing and building of mud and the selection requirements for these pieces of equipment Cochran, JB 30785 Cochran, JB 2013-09-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Process Flow through mud system---Mixing and building of mud and the selection requirements for these pieces of equipment Cochran, JB 30785 Cochran, JB 2013-09-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 7 Process Flow through mud system---Mixing and building of mud and the selection requirements for these pieces of equipment Cochran, JB 30785 Cochran, JB 2013-09-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 TSR Meeting Cochran, JB 30785 Cochran, JB 2013-09-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Process Flow through mud system---Mixing and building of mud and the selection requirements for these pieces of equipment Cochran, JB 30785 Cochran, JB 2013-09-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Process Flow through mud system---Mixing and building of mud and the selection requirements for these pieces of equipment Coleman, Annie 31732 Coleman, Annie 2013-09-16 APEX :APEX Default Task Regular Pay N 8 Attending Oracle Intercompany Training. Coleman, Annie 31732 Coleman, Annie 2013-09-17 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 8 Worked on Liberty's cost report. Coleman, Annie 31732 Coleman, Annie 2013-09-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 PTO on 9/18 and 9/20. Coleman, Annie 31732 Coleman, Annie 2013-09-19 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 6 Worked on Liberty's cost report. Coleman, Annie 31732 Coleman, Annie 2013-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 Attended Agnew's monthly department meeting and weekly cost report meeting. Coleman, Annie 31732 Coleman, Annie 2013-09-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 PTO on 9/18 and 9/20. Coleman, Annie 31732 Coleman, Annie 2013-09-23 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 4 Worked with Laura on Cameron Invoices, NOV Invoices and Cost Report Coleman, Annie 31732 Coleman, Annie 2013-09-23 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 4 Worked with Jose to turn over Liberty's duties to Jose. Worked on Cost report with Jose Coleman, Annie 31732 Coleman, Annie 2013-09-24 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 6 Worked with Laura on Cameron Invoices, NOV Invoices and Cost Report Coleman, Annie 31732 Coleman, Annie 2013-09-24 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 2 Worked with Jose to turn over Liberty's duties to Jose. Worked on Cost report with Jose Coleman, Annie 31732 Coleman, Annie 2013-09-25 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 6 Worked with Laura on Cameron Invoices, NOV Invoices and Cost Report Coleman, Annie 31732 Coleman, Annie 2013-09-25 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 2 Worked with Jose to turn over Liberty's duties to Jose. Worked on Cost report with Jose Coleman, Annie 31732 Coleman, Annie 2013-09-26 APEX :APEX Default Task Regular Pay N 8 Attended Oracle AR training Coleman, Annie 31732 Coleman, Annie 2013-09-27 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 4 Worked with Laura on Cameron Invoices, NOV Invoices and Cost Report Coleman, Annie 31732 Coleman, Annie 2013-09-27 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 4 Worked with Jose to turn over Liberty's duties to Jose. Worked on Cost report with Jose Coselli, Paul 29574 Coselli, Paul 2013-09-16 OH-017 :OH-017 Overhead All Activities Regular Pay N 9 Coselli, Paul 29574 Coselli, Paul 2013-09-17 OH-017 :OH-017 Overhead All Activities Regular Pay N 10.5 Coselli, Paul 29574 Coselli, Paul 2013-09-18 OH-017 :OH-017 Overhead All Activities Regular Pay N 9.5 Coselli, Paul 29574 Coselli, Paul 2013-09-19 OH-017 :OH-017 Overhead All Activities Regular Pay N 8.5 Coselli, Paul 29574 Coselli, Paul 2013-09-20 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Coselli, Paul 29574 Coselli, Paul 2013-09-23 OH-017 :OH-017 Overhead All Activities Regular Pay N 8.5 Coselli, Paul 29574 Coselli, Paul 2013-09-24 OH-017 :OH-017 Overhead All Activities Regular Pay N 9 Coselli, Paul 29574 Coselli, Paul 2013-09-25 OH-017 :OH-017 Overhead All Activities Regular Pay N 9.5 Coselli, Paul 29574 Coselli, Paul 2013-09-26 OH-017 :OH-017 Overhead All Activities Regular Pay N 9.5 Coselli, Paul 29574 Coselli, Paul 2013-09-27 OH-017 :OH-017 Overhead All Activities Regular Pay N 9.5 CULTON, DETRA DCULTON CULTON, DETRA 2013-09-16 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 8.5 DRILLMEC TRANSMITTALS. SHAREPOINT UPLOAD FILES AND DISTRIBUTE ROUTERS DRILLMEC TRANSMITTALS. SHAREPOINT UPLOAD FILES AND DISTRIBUTE ROUTERS CULTON, DETRA DCULTON CULTON, DETRA 2013-09-17 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 8 DRILLMEC TRANSMITTALS. SHAREPOINT UPLOAD FILES AND DISTRIBUTE ROUTERS DRILLMEC TRANSMITTALS. SHAREPOINT UPLOAD FILES AND DISTRIBUTE ROUTERS CULTON, DETRA DCULTON CULTON, DETRA 2013-09-18 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 8 DRILLMEC TRANSMITTALS. SHAREPOINT UPLOAD FILES AND DISTRIBUTE ROUTERS DRILLMEC TRANSMITTALS. SHAREPOINT UPLOAD FILES AND DISTRIBUTE ROUTERS CULTON, DETRA DCULTON CULTON, DETRA 2013-09-19 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 8 DRILLMEC TRANSMITTALS. SHAREPOINT UPLOAD FILES AND DISTRIBUTE ROUTERS DRILLMEC TRANSMITTALS. SHAREPOINT UPLOAD FILES AND DISTRIBUTE ROUTERS CULTON, DETRA DCULTON CULTON, DETRA 2013-09-20 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 7.5 DRILLMEC TRANSMITTALS. SHAREPOINT UPLOAD FILES AND DISTRIBUTE ROUTERS DRILLMEC TRANSMITTALS. SHAREPOINT UPLOAD FILES AND DISTRIBUTE ROUTERS CULTON, DETRA DCULTON CULTON, DETRA 2013-09-23 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 8 Updated, Vendor Library MDR and SharePoint access for XOM and DM personnel. Received documents from Drillmec and Transmitted DM drawings to and from PKD & XOM. Sent wkly reports and DM timesheets. CULTON, DETRA DCULTON CULTON, DETRA 2013-09-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Sick CULTON, DETRA DCULTON CULTON, DETRA 2013-09-25 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 8 Updated, Vendor Library MDR and SharePoint access for XOM and DM personnel. Received documents from Drillmec and Transmitted DM drawings to and from PKD & XOM. Sent wkly reports and DM timesheets. CULTON, DETRA DCULTON CULTON, DETRA 2013-09-26 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 4 Transmittals: Liberty Timesheets; invoices and weekly progress reports. CULTON, DETRA DCULTON CULTON, DETRA 2013-09-26 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 4 Updated, Vendor Library MDR and SharePoint access for XOM and DM personnel. Received documents from Drillmec and Transmitted DM drawings to and from PKD & XOM. Sent wkly reports and DM timesheets. CULTON, DETRA DCULTON CULTON, DETRA 2013-09-27 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 8 Updated, Vendor Library MDR and SharePoint access for XOM and DM personnel. Received documents from Drillmec and Transmitted DM drawings to and from PKD & XOM. Sent wkly reports and DM timesheets. Dedo, Evan 24702 Dedo, Evan 2013-09-16 OH-018 :OH-018 Overhead All Activities Regular Pay N 8 Dedo, Evan 24702 Dedo, Evan 2013-09-17 OH-018 :OH-018 Overhead All Activities Regular Pay N 8 Dedo, Evan 24702 Dedo, Evan 2013-09-18 OH-018 :OH-018 Overhead All Activities Regular Pay N 8 Dedo, Evan 24702 Dedo, Evan 2013-09-19 OH-018 :OH-018 Overhead All Activities Regular Pay N 8 Dedo, Evan 24702 Dedo, Evan 2013-09-20 OH-018 :OH-018 Overhead All Activities Regular Pay N 8 Disegna, Phyllis 27657 Disegna, Phyllis 2013-09-16 Berkut Houston Procurement :Berkut Houston Procurement Default Task Regular Pay N 0.5 Disegna, Phyllis 27657 Disegna, Phyllis 2013-09-16 Berkut-Spare Parts-Houston- :Berkut-Spare Parts-Houston- Default Task Regular Pay N 1.5 Disegna, Phyllis 27657 Disegna, Phyllis 2013-09-16 OH-017 :OH-017 Overhead All Activities Regular Pay N 6 Assist Ricia with AADU Disegna, Phyllis 27657 Disegna, Phyllis 2013-09-17 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Assist Ricia with AADU Disegna, Phyllis 27657 Disegna, Phyllis 2013-09-18 Berkut-Spare Parts-Houston- :Berkut-Spare Parts-Houston- Default Task Regular Pay N 1 Disegna, Phyllis 27657 Disegna, Phyllis 2013-09-18 OH-017 :OH-017 Overhead All Activities Regular Pay N 7 Assist Ricia with AADU Disegna, Phyllis 27657 Disegna, Phyllis 2013-09-19 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Assist Ricia with AADU Disegna, Phyllis 27657 Disegna, Phyllis 2013-09-20 Berkut Houston Procurement :Berkut Houston Procurement Default Task Regular Pay N 1.5 Disegna, Phyllis 27657 Disegna, Phyllis 2013-09-20 Berkut-Spare Parts-Houston- :Berkut-Spare Parts-Houston- Default Task Regular Pay N 1.5 Disegna, Phyllis 27657 Disegna, Phyllis 2013-09-20 OH-017 :OH-017 Overhead All Activities Regular Pay N 5 Assist Ricia with AADU Disegna, Phyllis 27657 Disegna, Phyllis 2013-09-23 Berkut Houston Procurement :Berkut Houston Procurement Default Task Regular Pay N 1 Disegna, Phyllis 27657 Disegna, Phyllis 2013-09-23 Berkut-Spare Parts-Houston- :Berkut-Spare Parts-Houston- Default Task Regular Pay N 1 Disegna, Phyllis 27657 Disegna, Phyllis 2013-09-23 OH-017 :OH-017 Overhead All Activities Regular Pay N 6 Disegna, Phyllis 27657 Disegna, Phyllis 2013-09-24 Berkut-Spare Parts-Houston- :Berkut-Spare Parts-Houston- Default Task Regular Pay N 1 Disegna, Phyllis 27657 Disegna, Phyllis 2013-09-24 OH-017 :OH-017 Overhead All Activities Regular Pay N 7 Disegna, Phyllis 27657 Disegna, Phyllis 2013-09-25 A.D. PH-2 :A.D. PH-2 ADMIN Administrative Services Regular Pay N 6 Disegna, Phyllis 27657 Disegna, Phyllis 2013-09-25 OH-017 :OH-017 Overhead All Activities Regular Pay N 2 Disegna, Phyllis 27657 Disegna, Phyllis 2013-09-26 A.D. PH-2 :A.D. PH-2 ADMIN Administrative Services Regular Pay N 1 Disegna, Phyllis 27657 Disegna, Phyllis 2013-09-26 Berkut-Spare Parts-Houston- :Berkut-Spare Parts-Houston- Default Task Regular Pay N 1 Disegna, Phyllis 27657 Disegna, Phyllis 2013-09-26 OH-017 :OH-017 Overhead All Activities Regular Pay N 6 Disegna, Phyllis 27657 Disegna, Phyllis 2013-09-27 Berkut Houston Procurement :Berkut Houston Procurement Default Task Regular Pay N 1 Disegna, Phyllis 27657 Disegna, Phyllis 2013-09-27 Berkut-Spare Parts-Houston- :Berkut-Spare Parts-Houston- Default Task Regular Pay N 2 Disegna, Phyllis 27657 Disegna, Phyllis 2013-09-27 OH-017 :OH-017 Overhead All Activities Regular Pay N 5 Enroth, Chris 31135 Enroth, Chris 2013-09-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 9/16-9/18: Administrative Duties. Upgrading electrical and drilling knowledge. 9/19: (1.5 hrs) Gathered information for the meeting with Athens group and M&I. This required preparing the markups that were done for Rig 266. (2.5 hrs) meeting with Athens Group, M&I, and Operations to talk about Rig 266 and Rig 267 issues and the required action plan. 9/20: Worked on rig efficiency for departmental goal. Enroth, Chris 31135 Enroth, Chris 2013-09-16 Rig 262L-TSR :Rig 262L-TSR TSR-00967-262L TSR-00967-262L Regular Pay N 3 9/16: Site visit to Legacy. Creating Notes for the visit. 9/19: Generation and discussion of RFI and general correspondence to properly write the RFI. Enroth, Chris 31135 Enroth, Chris 2013-09-16 Rig 266L-TSR :Rig 266L-TSR TSR-01041-266L/267L Electrical Redline Markups Regular Pay N 4 9/16: Rig 267. Continued to work on Gen 1 and Gen 2. 9/17: Rig 267. Gen 2/3/4. 9/18: Rig 267. Work on MP1,MP2, DWB/RT/TD Converter/Inverter Cabinets. 9/20: Rig 267. Worked on DWB/RT/TD and MCC. Enroth, Chris 31135 Enroth, Chris 2013-09-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 9/17: Weekly TSR meeting Enroth, Chris 31135 Enroth, Chris 2013-09-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 9/16-9/18: Administrative Duties. Upgrading electrical and drilling knowledge. 9/19: (1.5 hrs) Gathered information for the meeting with Athens group and M&I. This required preparing the markups that were done for Rig 266. (2.5 hrs) meeting with Athens Group, M&I, and Operations to talk about Rig 266 and Rig 267 issues and the required action plan. 9/20: Worked on rig efficiency for departmental goal. Enroth, Chris 31135 Enroth, Chris 2013-09-17 Rig 262L-TSR :Rig 262L-TSR TSR-00967-262L TSR-00967-262L Regular Pay N 1.5 9/16: Site visit to Legacy. Creating Notes for the visit. 9/19: Generation and discussion of RFI and general correspondence to properly write the RFI. Enroth, Chris 31135 Enroth, Chris 2013-09-17 Rig 266L-TSR :Rig 266L-TSR TSR-01041-266L/267L Electrical Redline Markups Regular Pay N 4.5 9/16: Rig 267. Continued to work on Gen 1 and Gen 2. 9/17: Rig 267. Gen 2/3/4. 9/18: Rig 267. Work on MP1,MP2, DWB/RT/TD Converter/Inverter Cabinets. 9/20: Rig 267. Worked on DWB/RT/TD and MCC. Enroth, Chris 31135 Enroth, Chris 2013-09-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 9/16-9/18: Administrative Duties. Upgrading electrical and drilling knowledge. 9/19: (1.5 hrs) Gathered information for the meeting with Athens group and M&I. This required preparing the markups that were done for Rig 266. (2.5 hrs) meeting with Athens Group, M&I, and Operations to talk about Rig 266 and Rig 267 issues and the required action plan. 9/20: Worked on rig efficiency for departmental goal. Enroth, Chris 31135 Enroth, Chris 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2 9/18 Weekly meeting. Also discussed TSRs and CTRs with the Engineering Managers. Spoke with Daniel and Kyle about needed information and expectations for other TSRs. 9/19: Discussion with Kyle and Daniel. This covered the expectations for TSR-1035 to understand expectations. Also discussed the fuel tank and the requirements for it to be either single walled or double wall protection. Enroth, Chris 31135 Enroth, Chris 2013-09-18 Rig 266L-TSR :Rig 266L-TSR TSR-01041-266L/267L Electrical Redline Markups Regular Pay N 4.5 9/16: Rig 267. Continued to work on Gen 1 and Gen 2. 9/17: Rig 267. Gen 2/3/4. 9/18: Rig 267. Work on MP1,MP2, DWB/RT/TD Converter/Inverter Cabinets. 9/20: Rig 267. Worked on DWB/RT/TD and MCC. Enroth, Chris 31135 Enroth, Chris 2013-09-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 5.5 9/16-9/18: Administrative Duties. Upgrading electrical and drilling knowledge. 9/19: (1.5 hrs) Gathered information for the meeting with Athens group and M&I. This required preparing the markups that were done for Rig 266. (2.5 hrs) meeting with Athens Group, M&I, and Operations to talk about Rig 266 and Rig 267 issues and the required action plan. 9/20: Worked on rig efficiency for departmental goal. Enroth, Chris 31135 Enroth, Chris 2013-09-19 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2 9/18 Weekly meeting. Also discussed TSRs and CTRs with the Engineering Managers. Spoke with Daniel and Kyle about needed information and expectations for other TSRs. 9/19: Discussion with Kyle and Daniel. This covered the expectations for TSR-1035 to understand expectations. Also discussed the fuel tank and the requirements for it to be either single walled or double wall protection. Enroth, Chris 31135 Enroth, Chris 2013-09-19 Rig 262L-TSR :Rig 262L-TSR TSR-00967-262L TSR-00967-262L Regular Pay N 1 9/16: Site visit to Legacy. Creating Notes for the visit. 9/19: Generation and discussion of RFI and general correspondence to properly write the RFI. Enroth, Chris 31135 Enroth, Chris 2013-09-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 9/16-9/18: Administrative Duties. Upgrading electrical and drilling knowledge. 9/19: (1.5 hrs) Gathered information for the meeting with Athens group and M&I. This required preparing the markups that were done for Rig 266. (2.5 hrs) meeting with Athens Group, M&I, and Operations to talk about Rig 266 and Rig 267 issues and the required action plan. 9/20: Worked on rig efficiency for departmental goal. Enroth, Chris 31135 Enroth, Chris 2013-09-20 Rig 266L-TSR :Rig 266L-TSR TSR-01041-266L/267L Electrical Redline Markups Regular Pay N 4 9/16: Rig 267. Continued to work on Gen 1 and Gen 2. 9/17: Rig 267. Gen 2/3/4. 9/18: Rig 267. Work on MP1,MP2, DWB/RT/TD Converter/Inverter Cabinets. 9/20: Rig 267. Worked on DWB/RT/TD and MCC. Enroth, Chris 31135 Enroth, Chris 2013-09-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 9/23: (3 hrs) working on the departmental goal Rig efficiency. (3 hrs) General Administrative duties and correspondence. 9/24: (1 hr) Discussion with Bob Wagner about operational rig efficiency and what can be done to improve it. (3 hr) Correspondence with Troy Socha to get information about GOM rig efficiency. Reviewed a program that is currently implemented in GOM. Spoke with Ken French about CAT Gensets and what can be done to improve efficiency. (2.5 hrs) General Administration and research for rig efficiency. 9/25: (1.5 hrs) Reviewing upcoming TSR and coordinating with people to determine if it is possible. (3.5 hrs) Continue to research for rig efficiency and best solutions. Spoke with Steve Carmichael about rig efficiency and best areas to focus on. Biggest issue is personnel turnover and crews not securing Gensets when they are not required. (1.5 hrs) General administration and helping new employees with understanding of policies and procedures. 9/26: (2 hrs) General Administrative Duties. (1 hr) Rig Efficiency research. (1 hr) Assist new hire with understanding of processes and procedures. 9/27: 1 hr helping new hire with understanding the paperwork process for TSR and CTR routing and general idea for developing a CTR. 1 hour general administration. Enroth, Chris 31135 Enroth, Chris 2013-09-23 Rig 247L-TSR :Rig 247L-TSR TSR-01021-247L Erbil - Mud System Assembly in Country Regular Pay N 3 9/23: assisted Rig 247 in gathering information to understand hooking up the level transmitters. Enroth, Chris 31135 Enroth, Chris 2013-09-23 Rig 262L-TSR :Rig 262L-TSR TSR-00967-262L TSR-00967-262L Regular Pay N 0.5 9/23: Meeting with Sakhalin discussing project status and issues. 9/24: Site visit to Legacy to check progress of TSR-967 9/26: Reviewed drawings for the switchgear. Enroth, Chris 31135 Enroth, Chris 2013-09-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 6.5 9/23: (3 hrs) working on the departmental goal Rig efficiency. (3 hrs) General Administrative duties and correspondence. 9/24: (1 hr) Discussion with Bob Wagner about operational rig efficiency and what can be done to improve it. (3 hr) Correspondence with Troy Socha to get information about GOM rig efficiency. Reviewed a program that is currently implemented in GOM. Spoke with Ken French about CAT Gensets and what can be done to improve efficiency. (2.5 hrs) General Administration and research for rig efficiency. 9/25: (1.5 hrs) Reviewing upcoming TSR and coordinating with people to determine if it is possible. (3.5 hrs) Continue to research for rig efficiency and best solutions. Spoke with Steve Carmichael about rig efficiency and best areas to focus on. Biggest issue is personnel turnover and crews not securing Gensets when they are not required. (1.5 hrs) General administration and helping new employees with understanding of policies and procedures. 9/26: (2 hrs) General Administrative Duties. (1 hr) Rig Efficiency research. (1 hr) Assist new hire with understanding of processes and procedures. 9/27: 1 hr helping new hire with understanding the paperwork process for TSR and CTR routing and general idea for developing a CTR. 1 hour general administration. Enroth, Chris 31135 Enroth, Chris 2013-09-24 Rig 262L-TSR :Rig 262L-TSR TSR-00967-262L TSR-00967-262L Regular Pay N 2 9/23: Meeting with Sakhalin discussing project status and issues. 9/24: Site visit to Legacy to check progress of TSR-967 9/26: Reviewed drawings for the switchgear. Enroth, Chris 31135 Enroth, Chris 2013-09-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 9/25: Weekly TSR update meeting Enroth, Chris 31135 Enroth, Chris 2013-09-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 7 9/23: (3 hrs) working on the departmental goal Rig efficiency. (3 hrs) General Administrative duties and correspondence. 9/24: (1 hr) Discussion with Bob Wagner about operational rig efficiency and what can be done to improve it. (3 hr) Correspondence with Troy Socha to get information about GOM rig efficiency. Reviewed a program that is currently implemented in GOM. Spoke with Ken French about CAT Gensets and what can be done to improve efficiency. (2.5 hrs) General Administration and research for rig efficiency. 9/25: (1.5 hrs) Reviewing upcoming TSR and coordinating with people to determine if it is possible. (3.5 hrs) Continue to research for rig efficiency and best solutions. Spoke with Steve Carmichael about rig efficiency and best areas to focus on. Biggest issue is personnel turnover and crews not securing Gensets when they are not required. (1.5 hrs) General administration and helping new employees with understanding of policies and procedures. 9/26: (2 hrs) General Administrative Duties. (1 hr) Rig Efficiency research. (1 hr) Assist new hire with understanding of processes and procedures. 9/27: 1 hr helping new hire with understanding the paperwork process for TSR and CTR routing and general idea for developing a CTR. 1 hour general administration. Enroth, Chris 31135 Enroth, Chris 2013-09-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 9/23: (3 hrs) working on the departmental goal Rig efficiency. (3 hrs) General Administrative duties and correspondence. 9/24: (1 hr) Discussion with Bob Wagner about operational rig efficiency and what can be done to improve it. (3 hr) Correspondence with Troy Socha to get information about GOM rig efficiency. Reviewed a program that is currently implemented in GOM. Spoke with Ken French about CAT Gensets and what can be done to improve efficiency. (2.5 hrs) General Administration and research for rig efficiency. 9/25: (1.5 hrs) Reviewing upcoming TSR and coordinating with people to determine if it is possible. (3.5 hrs) Continue to research for rig efficiency and best solutions. Spoke with Steve Carmichael about rig efficiency and best areas to focus on. Biggest issue is personnel turnover and crews not securing Gensets when they are not required. (1.5 hrs) General administration and helping new employees with understanding of policies and procedures. 9/26: (2 hrs) General Administrative Duties. (1 hr) Rig Efficiency research. (1 hr) Assist new hire with understanding of processes and procedures. 9/27: 1 hr helping new hire with understanding the paperwork process for TSR and CTR routing and general idea for developing a CTR. 1 hour general administration. Enroth, Chris 31135 Enroth, Chris 2013-09-26 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 2 9/26: Speaking with structural understand where they are in the CTR process. Spekaing with PM to determine if any support is needed. 9/27: (2 hr) Updating management on where we are with the project. Answering outstanding items that were of concern. (4.5 hrs) finding autocad drawings to adequately review the current mud pump foundation with the 77B foundation. Will be giving Daniel Lopez factual information about the two structures allowing him to make appropriate decisions. A TSR is currently not approved for any analysis therefore I am only giving a side by side comaprison not an analysis. Enroth, Chris 31135 Enroth, Chris 2013-09-26 Rig 262L-TSR :Rig 262L-TSR TSR-00967-262L TSR-00967-262L Regular Pay N 2 9/23: Meeting with Sakhalin discussing project status and issues. 9/24: Site visit to Legacy to check progress of TSR-967 9/26: Reviewed drawings for the switchgear. Enroth, Chris 31135 Enroth, Chris 2013-09-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 9/23: (3 hrs) working on the departmental goal Rig efficiency. (3 hrs) General Administrative duties and correspondence. 9/24: (1 hr) Discussion with Bob Wagner about operational rig efficiency and what can be done to improve it. (3 hr) Correspondence with Troy Socha to get information about GOM rig efficiency. Reviewed a program that is currently implemented in GOM. Spoke with Ken French about CAT Gensets and what can be done to improve efficiency. (2.5 hrs) General Administration and research for rig efficiency. 9/25: (1.5 hrs) Reviewing upcoming TSR and coordinating with people to determine if it is possible. (3.5 hrs) Continue to research for rig efficiency and best solutions. Spoke with Steve Carmichael about rig efficiency and best areas to focus on. Biggest issue is personnel turnover and crews not securing Gensets when they are not required. (1.5 hrs) General administration and helping new employees with understanding of policies and procedures. 9/26: (2 hrs) General Administrative Duties. (1 hr) Rig Efficiency research. (1 hr) Assist new hire with understanding of processes and procedures. 9/27: 1 hr helping new hire with understanding the paperwork process for TSR and CTR routing and general idea for developing a CTR. 1 hour general administration. Enroth, Chris 31135 Enroth, Chris 2013-09-27 Rig 055B - TSR :Rig 055B - TSR TSR-01031-55B Project Engineer Support Regular Pay N 6.5 9/26: Speaking with structural understand where they are in the CTR process. Spekaing with PM to determine if any support is needed. 9/27: (2 hr) Updating management on where we are with the project. Answering outstanding items that were of concern. (4.5 hrs) finding autocad drawings to adequately review the current mud pump foundation with the 77B foundation. Will be giving Daniel Lopez factual information about the two structures allowing him to make appropriate decisions. A TSR is currently not approved for any analysis therefore I am only giving a side by side comaprison not an analysis. Fremont, Natalie 31606 Fremont, Natalie 2013-09-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 Fremont, Natalie 31606 Fremont, Natalie 2013-09-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 Fremont, Natalie 31606 Fremont, Natalie 2013-09-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 Fremont, Natalie 31606 Fremont, Natalie 2013-09-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 Fremont, Natalie 31606 Fremont, Natalie 2013-09-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 Fremont, Natalie 31606 Fremont, Natalie 2013-09-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 Fremont, Natalie 31606 Fremont, Natalie 2013-09-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 Fremont, Natalie 31606 Fremont, Natalie 2013-09-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 Fremont, Natalie 31606 Fremont, Natalie 2013-09-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 Fremont, Natalie 31606 Fremont, Natalie 2013-09-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 Garzon, Jose 31999 Garzon, Jose 2013-09-23 APEX :APEX Default Task Regular Pay N 2 Mon: Exp. Reppot Thu: AR Training - Day 1 Garzon, Jose 31999 Garzon, Jose 2013-09-23 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 1 Weekly Cost Report Garzon, Jose 31999 Garzon, Jose 2013-09-23 OH-014 :OH-014 Overhead All Activities Regular Pay N 5 Garzon, Jose 31999 Garzon, Jose 2013-09-24 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 1 Weekly Cost Report Garzon, Jose 31999 Garzon, Jose 2013-09-24 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 2 EMLR FEED Contract Kickoff. Scope of work presentation and discussion. Project Invoice process. Contract milestones. Garzon, Jose 31999 Garzon, Jose 2013-09-24 OH-014 :OH-014 Overhead All Activities Regular Pay N 5 Garzon, Jose 31999 Garzon, Jose 2013-09-25 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 1 Weekly Cost Report Garzon, Jose 31999 Garzon, Jose 2013-09-25 OH-014 :OH-014 Overhead All Activities Regular Pay N 7 Garzon, Jose 31999 Garzon, Jose 2013-09-26 APEX :APEX Default Task Regular Pay N 8 Mon: Exp. Reppot Thu: AR Training - Day 1 Garzon, Jose 31999 Garzon, Jose 2013-09-27 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 1 Weekly Cost Report Garzon, Jose 31999 Garzon, Jose 2013-09-27 OH-009 :OH-009 OH-009-008 2013 Rosneft – Arctic Rig Regular Pay N 3 Started Estimate Workbook Garzon, Jose 31999 Garzon, Jose 2013-09-27 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 Garzon, Jose 31999 Garzon, Jose 2013-09-27 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 2 Review Weekly Cost Report & Conference w/ Andre Gasper, James 23139 Gasper, James 2013-09-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.75 (9/16) Updated timesheet and sent for review. Pulled 269 drawings per email request from Paul Cox. Reviewed and approved design group timesheets. Reviewed employee dev. plan and signed. Discussed checker position with Mark. (9/17) Discussed timesheet and hours with Mark. (9/18) Reviewed Document Control procedure Doc. (9/19) Discussed travel policy. (9/20) Talked to Maggie about missing 272 drawings on the Q drive. Gasper, James 23139 Gasper, James 2013-09-16 Rig 247L-TSR :Rig 247L-TSR TSR-01021-247L Erbil - Mud System Assembly in Country Regular Pay N 1 (9/16) Replied to Ken's email drawing request. Sent dwgs. Issued revised process piping drawing for mud process. (9/18) Talked to Ken about 247 charge piping. Gasper, James 23139 Gasper, James 2013-09-16 Rig 247L-TSR :Rig 247L-TSR TSR-01044-247L Design Support Kurdistan Regular Pay N 0.75 (9/16) talked to Ken about Andy's travel plans. Circulated Andy's travel form. (9/18) Transmitted latest spreader bar drawing. Discussed CTR with Leron. Gasper, James 23139 Gasper, James 2013-09-16 Rig 262L-TSR :Rig 262L-TSR TSR-01053-262L Skid Rails Rosneft Scope Regular Pay N 1 (9/16) Talked to Kyle and Juan about skid rail drawings. Gasper, James 23139 Gasper, James 2013-09-16 Rig 270L-TSR :Rig 270L-TSR TSR-01048-270L Trip Tank Level Gauge Regular Pay N 1 (9/16) Discussed drawing changes with Matt and Lam. Gasper, James 23139 Gasper, James 2013-09-16 Rig 270L-TSR :Rig 270L-TSR TSR-01054-270L Suction Piping Modification Regular Pay N 2.5 (9/16) Created CTR and sent for approval. Assigned drawing to juan and discussed. Created TSR folder on the Q. (9/17) reviewed Suction drawing. Assigned P&ID to Ally. Assigned PLot Plan to Jorge. Pulled ref pics for suction review. (9/19) Stamped drawings for approval. Gasper, James 23139 Gasper, James 2013-09-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 (9/17) Weekly TSR meeting. (9/19) Monthly TS meeting. Gasper, James 23139 Gasper, James 2013-09-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 (9/16) Updated timesheet and sent for review. Pulled 269 drawings per email request from Paul Cox. Reviewed and approved design group timesheets. Reviewed employee dev. plan and signed. Discussed checker position with Mark. (9/17) Discussed timesheet and hours with Mark. (9/18) Reviewed Document Control procedure Doc. (9/19) Discussed travel policy. (9/20) Talked to Maggie about missing 272 drawings on the Q drive. Gasper, James 23139 Gasper, James 2013-09-17 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 1 (9/17) Talked to Daniel and Kyle about CTR hours. (9/20) Discussed design with Lam and Kyle. Gasper, James 23139 Gasper, James 2013-09-17 Rig 262L-TSR :Rig 262L-TSR TSR-01052-262L Separation DSM Gas Header Regular Pay N 1 (9/17) Discussed sketch with Kyle and assigned drawing to Andy. Gasper, James 23139 Gasper, James 2013-09-17 Rig 270L-TSR :Rig 270L-TSR TSR-01042-270L Fire Control adn Fire Saving Equipment Redlines Regular Pay N 0.5 (9/17) Revised CTR to cover additional scope. Gasper, James 23139 Gasper, James 2013-09-17 Rig 270L-TSR :Rig 270L-TSR TSR-01054-270L Suction Piping Modification Regular Pay N 1.5 (9/16) Created CTR and sent for approval. Assigned drawing to juan and discussed. Created TSR folder on the Q. (9/17) reviewed Suction drawing. Assigned P&ID to Ally. Assigned PLot Plan to Jorge. Pulled ref pics for suction review. (9/19) Stamped drawings for approval. Gasper, James 23139 Gasper, James 2013-09-17 Rig 272L-TSR :Rig 272L-TSR TSR-00974-272L TSR-00974-272L/273L Regular Pay N 1 (9/17) Final review of UM office cladding drawing. (9/19) Changed titles and issued for construction. (9/20) Assigned Ally to copy/paste drawing over to create 272 drawing. Gasper, James 23139 Gasper, James 2013-09-17 Rig 273L-TSR :Rig 273L-TSR TSR-00989-273L Dummy Well House Padeyes Regular Pay N 1 (9/17) transmitted drawings for both rigs. IFC Gasper, James 23139 Gasper, James 2013-09-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 (9/16) Updated timesheet and sent for review. Pulled 269 drawings per email request from Paul Cox. Reviewed and approved design group timesheets. Reviewed employee dev. plan and signed. Discussed checker position with Mark. (9/17) Discussed timesheet and hours with Mark. (9/18) Reviewed Document Control procedure Doc. (9/19) Discussed travel policy. (9/20) Talked to Maggie about missing 272 drawings on the Q drive. Gasper, James 23139 Gasper, James 2013-09-18 Rig 247L-TSR :Rig 247L-TSR TSR-00971-247L Design Mud System Interface Regular Pay N 1 (9/18) Started to gather information for close out report. (9/20) Started close out. Gasper, James 23139 Gasper, James 2013-09-18 Rig 247L-TSR :Rig 247L-TSR TSR-01021-247L Erbil - Mud System Assembly in Country Regular Pay N 0.5 (9/16) Replied to Ken's email drawing request. Sent dwgs. Issued revised process piping drawing for mud process. (9/18) Talked to Ken about 247 charge piping. Gasper, James 23139 Gasper, James 2013-09-18 Rig 247L-TSR :Rig 247L-TSR TSR-01044-247L Design Support Kurdistan Regular Pay N 0.5 (9/16) talked to Ken about Andy's travel plans. Circulated Andy's travel form. (9/18) Transmitted latest spreader bar drawing. Discussed CTR with Leron. Gasper, James 23139 Gasper, James 2013-09-18 Rig 270L-TSR :Rig 270L-TSR TSR-01055-270L Choke Skid Mods Regular Pay N 0.5 (9/18) Assigned Choke drawings to David and discussed. (9/19) Checked skid drawing. (9/20) Back checked skid drawing. Gasper, James 23139 Gasper, James 2013-09-19 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 2.5 (9/19) Drawing review. (9/20) Drawing review. Gasper, James 23139 Gasper, James 2013-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 (9/17) Weekly TSR meeting. (9/19) Monthly TS meeting. Gasper, James 23139 Gasper, James 2013-09-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 (9/16) Updated timesheet and sent for review. Pulled 269 drawings per email request from Paul Cox. Reviewed and approved design group timesheets. Reviewed employee dev. plan and signed. Discussed checker position with Mark. (9/17) Discussed timesheet and hours with Mark. (9/18) Reviewed Document Control procedure Doc. (9/19) Discussed travel policy. (9/20) Talked to Maggie about missing 272 drawings on the Q drive. Gasper, James 23139 Gasper, James 2013-09-19 Rig 270L-TSR :Rig 270L-TSR TSR-01054-270L Suction Piping Modification Regular Pay N 1 (9/16) Created CTR and sent for approval. Assigned drawing to juan and discussed. Created TSR folder on the Q. (9/17) reviewed Suction drawing. Assigned P&ID to Ally. Assigned PLot Plan to Jorge. Pulled ref pics for suction review. (9/19) Stamped drawings for approval. Gasper, James 23139 Gasper, James 2013-09-19 Rig 270L-TSR :Rig 270L-TSR TSR-01055-270L Choke Skid Mods Regular Pay N 0.5 (9/18) Assigned Choke drawings to David and discussed. (9/19) Checked skid drawing. (9/20) Back checked skid drawing. Gasper, James 23139 Gasper, James 2013-09-19 Rig 272L-TSR :Rig 272L-TSR TSR-00974-272L TSR-00974-272L/273L Regular Pay N 1 (9/17) Final review of UM office cladding drawing. (9/19) Changed titles and issued for construction. (9/20) Assigned Ally to copy/paste drawing over to create 272 drawing. Gasper, James 23139 Gasper, James 2013-09-20 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 2.5 (9/19) Drawing review. (9/20) Drawing review. Gasper, James 23139 Gasper, James 2013-09-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 (9/16) Updated timesheet and sent for review. Pulled 269 drawings per email request from Paul Cox. Reviewed and approved design group timesheets. Reviewed employee dev. plan and signed. Discussed checker position with Mark. (9/17) Discussed timesheet and hours with Mark. (9/18) Reviewed Document Control procedure Doc. (9/19) Discussed travel policy. (9/20) Talked to Maggie about missing 272 drawings on the Q drive. Gasper, James 23139 Gasper, James 2013-09-20 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.5 (9/17) Talked to Daniel and Kyle about CTR hours. (9/20) Discussed design with Lam and Kyle. Gasper, James 23139 Gasper, James 2013-09-20 Rig 247L-TSR :Rig 247L-TSR TSR-00971-247L Design Mud System Interface Regular Pay N 1 (9/18) Started to gather information for close out report. (9/20) Started close out. Gasper, James 23139 Gasper, James 2013-09-20 Rig 267L-TSR :Rig 267L-TSR TSR-01056-267L Skid 4m to Lower Derrick Regular Pay N 1 (9/20) Looked for reference drawing and discussed drawing with Kyle. Gasper, James 23139 Gasper, James 2013-09-20 Rig 270L-TSR :Rig 270L-TSR TSR-01055-270L Choke Skid Mods Regular Pay N 0.5 (9/18) Assigned Choke drawings to David and discussed. (9/19) Checked skid drawing. (9/20) Back checked skid drawing. Gasper, James 23139 Gasper, James 2013-09-20 Rig 272L-TSR :Rig 272L-TSR TSR-00974-272L TSR-00974-272L/273L Regular Pay N 0.5 (9/17) Final review of UM office cladding drawing. (9/19) Changed titles and issued for construction. (9/20) Assigned Ally to copy/paste drawing over to create 272 drawing. Gasper, James 23139 Gasper, James 2013-09-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 (9/23) Updated timesheet and submitted for approval. Reviewed/approved group timesheets. (9/24) Updated AutoCAD user list. Reviewed open TSR list. (9/26) Replied to drawing request from Sakh.- Bag handling skid. Worked with Ally on standard Gusset plate designs. Discussed software needs with Mark. Discussed software with design group. (9/27) Pulled drawings for Sakh and replied to email (hoist). Searched for 247 mast drawings for Mike A. Gasper, James 23139 Gasper, James 2013-09-23 Rig 221L-TSR :Rig 221L-TSR TSR-01049-221L Substructure Level Procedure Regular Pay N 2 (9/23) Assigned sketch to Ally. Redlined sketch and returned. Gasper, James 23139 Gasper, James 2013-09-23 Rig 247L-TSR :Rig 247L-TSR TSR-00971-247L Design Mud System Interface Regular Pay N 4 (9/23) Finished close out and submitted for review. (9/26) Revised and re-submitted close out. Gasper, James 23139 Gasper, James 2013-09-23 Rig 270L-TSR :Rig 270L-TSR TSR-01055-270L Choke Skid Mods Regular Pay N 1 (9/23) Checked Choke Jacking plate drawing. (9/26) Stamped Choke Jacking dwg. Gasper, James 23139 Gasper, James 2013-09-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 (9/23) Updated timesheet and submitted for approval. Reviewed/approved group timesheets. (9/24) Updated AutoCAD user list. Reviewed open TSR list. (9/26) Replied to drawing request from Sakh.- Bag handling skid. Worked with Ally on standard Gusset plate designs. Discussed software needs with Mark. Discussed software with design group. (9/27) Pulled drawings for Sakh and replied to email (hoist). Searched for 247 mast drawings for Mike A. Gasper, James 23139 Gasper, James 2013-09-24 ORLAN-TSR :ORLAN-TSR TSR-01006-ORLAN Spare BOP Stack Regular Pay N 2 (9/24) Checked link drawings. Gasper, James 23139 Gasper, James 2013-09-24 Rig 221L-TSR :Rig 221L-TSR TSR-01049-221L Substructure Level Procedure Regular Pay N 0.5 (9/23) Assigned sketch to Ally. Redlined sketch and returned. Gasper, James 23139 Gasper, James 2013-09-25 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 (9/25) Sick Gasper, James 23139 Gasper, James 2013-09-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 (9/23) Updated timesheet and submitted for approval. Reviewed/approved group timesheets. (9/24) Updated AutoCAD user list. Reviewed open TSR list. (9/26) Replied to drawing request from Sakh.- Bag handling skid. Worked with Ally on standard Gusset plate designs. Discussed software needs with Mark. Discussed software with design group. (9/27) Pulled drawings for Sakh and replied to email (hoist). Searched for 247 mast drawings for Mike A. Gasper, James 23139 Gasper, James 2013-09-26 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 1.5 (9/26) First check of headache rac kdrawing. Discusse design with Kyle/Lam. Gasper, James 23139 Gasper, James 2013-09-26 Rig 247L-TSR :Rig 247L-TSR TSR-00971-247L Design Mud System Interface Regular Pay N 0.5 (9/23) Finished close out and submitted for review. (9/26) Revised and re-submitted close out. Gasper, James 23139 Gasper, James 2013-09-26 Rig 247L-TSR :Rig 247L-TSR TSR-01044-247L Design Support Kurdistan Regular Pay N 1 (9/26) Phone request for standard fork pocket spacing. Pulled reference dimensions and sent to Ken. Gasper, James 23139 Gasper, James 2013-09-26 Rig 270L-TSR :Rig 270L-TSR TSR-01048-270L Trip Tank Level Gauge Regular Pay N 0.5 (9/26) Called Benny about TSR and discussed with Lam. Gasper, James 23139 Gasper, James 2013-09-26 Rig 270L-TSR :Rig 270L-TSR TSR-01054-270L Suction Piping Modification Regular Pay N 1 (9/26) PDF and transmitted drawings as IFC. Gasper, James 23139 Gasper, James 2013-09-26 Rig 270L-TSR :Rig 270L-TSR TSR-01055-270L Choke Skid Mods Regular Pay N 0.5 (9/23) Checked Choke Jacking plate drawing. (9/26) Stamped Choke Jacking dwg. Gasper, James 23139 Gasper, James 2013-09-26 Rig 272L-273L-TSR-OPS :Rig 272L-273L-TSR-OPS TSR-01050-272L/273L Door from Mezzanine to Air Lock Room Regular Pay N 0.5 (9/26) Discussed drawing/design with Maria. Gasper, James 23139 Gasper, James 2013-09-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 (9/27) Meetin with HR. Goal review meeting. Gasper, James 23139 Gasper, James 2013-09-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.75 (9/23) Updated timesheet and submitted for approval. Reviewed/approved group timesheets. (9/24) Updated AutoCAD user list. Reviewed open TSR list. (9/26) Replied to drawing request from Sakh.- Bag handling skid. Worked with Ally on standard Gusset plate designs. Discussed software needs with Mark. Discussed software with design group. (9/27) Pulled drawings for Sakh and replied to email (hoist). Searched for 247 mast drawings for Mike A. Gasper, James 23139 Gasper, James 2013-09-27 Rig 262L-TSR :Rig 262L-TSR TSR-01053-262L Skid Rails Rosneft Scope Regular Pay N 0.25 (9/27) Sent PDF for review. Gibson, Maggie 22489 Gibson, Maggie 2013-09-16 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 6 Doc Control Gibson, Maggie 22489 Gibson, Maggie 2013-09-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 training temps. Gibson, Maggie 22489 Gibson, Maggie 2013-09-16 Rig 262L-TSR :Rig 262L-TSR TSR-01052-262L Separation DSM Gas Header Regular Pay N 0.25 doc control Gibson, Maggie 22489 Gibson, Maggie 2013-09-16 Rig 262L-TSR :Rig 262L-TSR TSR-01053-262L Skid Rails Rosneft Scope Regular Pay N 0.25 doc control Gibson, Maggie 22489 Gibson, Maggie 2013-09-16 Rig 270L-TSR :Rig 270L-TSR TSR-01048-270L Trip Tank Level Gauge Regular Pay N 0.25 doc control Gibson, Maggie 22489 Gibson, Maggie 2013-09-16 Rig 270L-TSR :Rig 270L-TSR TSR-01054-270L Suction Piping Modification Regular Pay N 0.25 doc control Gibson, Maggie 22489 Gibson, Maggie 2013-09-17 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 5 Doc Control Gibson, Maggie 22489 Gibson, Maggie 2013-09-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 Weekly Meeting; Monthly TS Meeting Gibson, Maggie 22489 Gibson, Maggie 2013-09-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 training temps. Gibson, Maggie 22489 Gibson, Maggie 2013-09-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 meeting; Reg coord training Gibson, Maggie 22489 Gibson, Maggie 2013-09-17 Rig 270L-TSR :Rig 270L-TSR TSR-00973-270L Sakhalin Regulatory Regular Pay N 1 Velosi discussions Gibson, Maggie 22489 Gibson, Maggie 2013-09-18 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 6 Doc Control Gibson, Maggie 22489 Gibson, Maggie 2013-09-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 training temps. Gibson, Maggie 22489 Gibson, Maggie 2013-09-18 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 meeting; Reg coord training Gibson, Maggie 22489 Gibson, Maggie 2013-09-19 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 6 Doc Control Gibson, Maggie 22489 Gibson, Maggie 2013-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 Weekly Meeting; Monthly TS Meeting Gibson, Maggie 22489 Gibson, Maggie 2013-09-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 training temps. Gibson, Maggie 22489 Gibson, Maggie 2013-09-19 Rig 262L-TSR :Rig 262L-TSR TSR-00967-262L TSR-00967-262L Regular Pay N 0.5 Gibson, Maggie 22489 Gibson, Maggie 2013-09-20 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 2 Doc Control Gibson, Maggie 22489 Gibson, Maggie 2013-09-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 training temps. Gibson, Maggie 22489 Gibson, Maggie 2013-09-20 ORLAN-TSR :ORLAN-TSR TSR-01008-ORLAN Temp Ducting Regular Pay N 0.5 Gibson, Maggie 22489 Gibson, Maggie 2013-09-20 Rig 270L-TSR :Rig 270L-TSR TSR-00963-270L Rig Mobilization Regular Pay N 1 Gibson, Maggie 22489 Gibson, Maggie 2013-09-23 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 5 Gibson, Maggie 22489 Gibson, Maggie 2013-09-23 Berkut-TSR :Berkut-TSR TSR-00991-BERKUT Skid Base Material Handling Regular Pay N 1 Gibson, Maggie 22489 Gibson, Maggie 2013-09-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 training Gibson, Maggie 22489 Gibson, Maggie 2013-09-24 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 6 Gibson, Maggie 22489 Gibson, Maggie 2013-09-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 training Gibson, Maggie 22489 Gibson, Maggie 2013-09-25 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 5 Gibson, Maggie 22489 Gibson, Maggie 2013-09-25 Berkut-TSR :Berkut-TSR TSR-00991-BERKUT Skid Base Material Handling Regular Pay N 1 Gibson, Maggie 22489 Gibson, Maggie 2013-09-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 training Gibson, Maggie 22489 Gibson, Maggie 2013-09-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 Gibson, Maggie 22489 Gibson, Maggie 2013-09-25 ORLAN-TSR :ORLAN-TSR TSR-01006-ORLAN Spare BOP Stack Regular Pay N 0.5 Gibson, Maggie 22489 Gibson, Maggie 2013-09-26 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 5 Gibson, Maggie 22489 Gibson, Maggie 2013-09-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 training Gibson, Maggie 22489 Gibson, Maggie 2013-09-27 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 5 Gibson, Maggie 22489 Gibson, Maggie 2013-09-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 training Gibson, Maggie 22489 Gibson, Maggie 2013-09-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 Gibson, Maggie 22489 Gibson, Maggie 2013-09-27 Rig 270L-TSR :Rig 270L-TSR TSR-01055-270L Choke Skid Mods Regular Pay N 0.5 Gorrell, Chuck 10154 Gorrell, Chuck 2013-09-15 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 12 9/15/13 - Review Documentation, 9/16/13 - Edit Mast Lowering Procedures & Review Documentation, 9/17/13-Attend meetings & edit Mast Lowering Procedures, 9/18/13-Attend meetings & edit Mast Lowering Procedures, 9/19/13-Travel to home port, 9/20/13- Conference call with Dick Siira, Benny Holly, Red McAfee, Benny Flud, & Tony Bernard regarding Slip & Cut Drill Line, Work on editing Slip & Cut Drill Line Procedures, 9/21/13- Edit Slip & Cut Drill Line Procedure. \ \ Gorrell, Chuck 10154 Gorrell, Chuck 2013-09-16 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 12 9/15/13 - Review Documentation, 9/16/13 - Edit Mast Lowering Procedures & Review Documentation, 9/17/13-Attend meetings & edit Mast Lowering Procedures, 9/18/13-Attend meetings & edit Mast Lowering Procedures, 9/19/13-Travel to home port, 9/20/13- Conference call with Dick Siira, Benny Holly, Red McAfee, Benny Flud, & Tony Bernard regarding Slip & Cut Drill Line, Work on editing Slip & Cut Drill Line Procedures, 9/21/13- Edit Slip & Cut Drill Line Procedure. \ \ Gorrell, Chuck 10154 Gorrell, Chuck 2013-09-17 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 12 9/15/13 - Review Documentation, 9/16/13 - Edit Mast Lowering Procedures & Review Documentation, 9/17/13-Attend meetings & edit Mast Lowering Procedures, 9/18/13-Attend meetings & edit Mast Lowering Procedures, 9/19/13-Travel to home port, 9/20/13- Conference call with Dick Siira, Benny Holly, Red McAfee, Benny Flud, & Tony Bernard regarding Slip & Cut Drill Line, Work on editing Slip & Cut Drill Line Procedures, 9/21/13- Edit Slip & Cut Drill Line Procedure. \ \ Gorrell, Chuck 10154 Gorrell, Chuck 2013-09-18 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 12 9/15/13 - Review Documentation, 9/16/13 - Edit Mast Lowering Procedures & Review Documentation, 9/17/13-Attend meetings & edit Mast Lowering Procedures, 9/18/13-Attend meetings & edit Mast Lowering Procedures, 9/19/13-Travel to home port, 9/20/13- Conference call with Dick Siira, Benny Holly, Red McAfee, Benny Flud, & Tony Bernard regarding Slip & Cut Drill Line, Work on editing Slip & Cut Drill Line Procedures, 9/21/13- Edit Slip & Cut Drill Line Procedure. \ \ Gorrell, Chuck 10154 Gorrell, Chuck 2013-09-19 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 12 9/15/13 - Review Documentation, 9/16/13 - Edit Mast Lowering Procedures & Review Documentation, 9/17/13-Attend meetings & edit Mast Lowering Procedures, 9/18/13-Attend meetings & edit Mast Lowering Procedures, 9/19/13-Travel to home port, 9/20/13- Conference call with Dick Siira, Benny Holly, Red McAfee, Benny Flud, & Tony Bernard regarding Slip & Cut Drill Line, Work on editing Slip & Cut Drill Line Procedures, 9/21/13- Edit Slip & Cut Drill Line Procedure. \ \ Gorrell, Chuck 10154 Gorrell, Chuck 2013-09-20 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 12 9/15/13 - Review Documentation, 9/16/13 - Edit Mast Lowering Procedures & Review Documentation, 9/17/13-Attend meetings & edit Mast Lowering Procedures, 9/18/13-Attend meetings & edit Mast Lowering Procedures, 9/19/13-Travel to home port, 9/20/13- Conference call with Dick Siira, Benny Holly, Red McAfee, Benny Flud, & Tony Bernard regarding Slip & Cut Drill Line, Work on editing Slip & Cut Drill Line Procedures, 9/21/13- Edit Slip & Cut Drill Line Procedure. \ \ Gorrell, Chuck 10154 Gorrell, Chuck 2013-09-21 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 4 9/15/13 - Review Documentation, 9/16/13 - Edit Mast Lowering Procedures & Review Documentation, 9/17/13-Attend meetings & edit Mast Lowering Procedures, 9/18/13-Attend meetings & edit Mast Lowering Procedures, 9/19/13-Travel to home port, 9/20/13- Conference call with Dick Siira, Benny Holly, Red McAfee, Benny Flud, & Tony Bernard regarding Slip & Cut Drill Line, Work on editing Slip & Cut Drill Line Procedures, 9/21/13- Edit Slip & Cut Drill Line Procedure. \ \ Gorrell, Chuck 10154 Gorrell, Chuck 2013-09-23 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 8 9/23/13 - Edit Mast Assist Lowering Procedures & Review Documentation, 9/24/13 - Edit Mast Assist Lowering Procedures & Review Documentation, 9/25/13 - Attend conference call with WP/BP, 9/26/13-Review Mast & Mast Assist Lowering Procedures to be submitted as final documentation, 9/27/13- Submitt Mast & Mast Assist Lowering Proceduresw for transmittal to WP/BP. Call with Bill Amidon regarding the Load Cell for the weight indicator on the Liberty Rig, Work on editing Slip & Cut Drill Line Procedures, 9/28/13- Edit Slip & Cut Drill Line Procedure. \ \ Gorrell, Chuck 10154 Gorrell, Chuck 2013-09-24 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 8 9/23/13 - Edit Mast Assist Lowering Procedures & Review Documentation, 9/24/13 - Edit Mast Assist Lowering Procedures & Review Documentation, 9/25/13 - Attend conference call with WP/BP, 9/26/13-Review Mast & Mast Assist Lowering Procedures to be submitted as final documentation, 9/27/13- Submitt Mast & Mast Assist Lowering Proceduresw for transmittal to WP/BP. Call with Bill Amidon regarding the Load Cell for the weight indicator on the Liberty Rig, Work on editing Slip & Cut Drill Line Procedures, 9/28/13- Edit Slip & Cut Drill Line Procedure. \ \ Gorrell, Chuck 10154 Gorrell, Chuck 2013-09-25 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 8 9/23/13 - Edit Mast Assist Lowering Procedures & Review Documentation, 9/24/13 - Edit Mast Assist Lowering Procedures & Review Documentation, 9/25/13 - Attend conference call with WP/BP, 9/26/13-Review Mast & Mast Assist Lowering Procedures to be submitted as final documentation, 9/27/13- Submitt Mast & Mast Assist Lowering Proceduresw for transmittal to WP/BP. Call with Bill Amidon regarding the Load Cell for the weight indicator on the Liberty Rig, Work on editing Slip & Cut Drill Line Procedures, 9/28/13- Edit Slip & Cut Drill Line Procedure. \ \ Gorrell, Chuck 10154 Gorrell, Chuck 2013-09-26 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 8 9/23/13 - Edit Mast Assist Lowering Procedures & Review Documentation, 9/24/13 - Edit Mast Assist Lowering Procedures & Review Documentation, 9/25/13 - Attend conference call with WP/BP, 9/26/13-Review Mast & Mast Assist Lowering Procedures to be submitted as final documentation, 9/27/13- Submitt Mast & Mast Assist Lowering Proceduresw for transmittal to WP/BP. Call with Bill Amidon regarding the Load Cell for the weight indicator on the Liberty Rig, Work on editing Slip & Cut Drill Line Procedures, 9/28/13- Edit Slip & Cut Drill Line Procedure. \ \ Gorrell, Chuck 10154 Gorrell, Chuck 2013-09-27 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 8 9/23/13 - Edit Mast Assist Lowering Procedures & Review Documentation, 9/24/13 - Edit Mast Assist Lowering Procedures & Review Documentation, 9/25/13 - Attend conference call with WP/BP, 9/26/13-Review Mast & Mast Assist Lowering Procedures to be submitted as final documentation, 9/27/13- Submitt Mast & Mast Assist Lowering Proceduresw for transmittal to WP/BP. Call with Bill Amidon regarding the Load Cell for the weight indicator on the Liberty Rig, Work on editing Slip & Cut Drill Line Procedures, 9/28/13- Edit Slip & Cut Drill Line Procedure. \ \ Gorrell, Chuck 10154 Gorrell, Chuck 2013-09-28 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 4 9/23/13 - Edit Mast Assist Lowering Procedures & Review Documentation, 9/24/13 - Edit Mast Assist Lowering Procedures & Review Documentation, 9/25/13 - Attend conference call with WP/BP, 9/26/13-Review Mast & Mast Assist Lowering Procedures to be submitted as final documentation, 9/27/13- Submitt Mast & Mast Assist Lowering Proceduresw for transmittal to WP/BP. Call with Bill Amidon regarding the Load Cell for the weight indicator on the Liberty Rig, Work on editing Slip & Cut Drill Line Procedures, 9/28/13- Edit Slip & Cut Drill Line Procedure. \ \ Guzzi, Rafa 22982 Guzzi, Rafa 2013-09-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Guzzi, Rafa 22982 Guzzi, Rafa 2013-09-17 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Guzzi, Rafa 22982 Guzzi, Rafa 2013-09-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Guzzi, Rafa 22982 Guzzi, Rafa 2013-09-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Guzzi, Rafa 22982 Guzzi, Rafa 2013-09-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Guzzi, Rafa 22982 Guzzi, Rafa 2013-09-23 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Guzzi, Rafa 22982 Guzzi, Rafa 2013-09-24 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Guzzi, Rafa 22982 Guzzi, Rafa 2013-09-25 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Guzzi, Rafa 22982 Guzzi, Rafa 2013-09-26 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Guzzi, Rafa 22982 Guzzi, Rafa 2013-09-27 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Hardie, Danielle 28034 Hardie, Danielle 2013-09-16 APEX :APEX Default Task Regular Pay N 8 AR Mandatory training AR Invoice Conversion Validation Training in PM Group around account string changes Hardie, Danielle 28034 Hardie, Danielle 2013-09-16 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 4 Review Drillmec Manhour reports. Review weekly cost activity. LLE Workflow Process. Hardie, Danielle 28034 Hardie, Danielle 2013-09-17 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 8 Review Drillmec Manhour reports. Review weekly cost activity. LLE Workflow Process. Hardie, Danielle 28034 Hardie, Danielle 2013-09-18 APEX :APEX Default Task Regular Pay N 8 AR Mandatory training AR Invoice Conversion Validation Training in PM Group around account string changes Hardie, Danielle 28034 Hardie, Danielle 2013-09-19 APEX :APEX Default Task Regular Pay N 5 AR Mandatory training AR Invoice Conversion Validation Training in PM Group around account string changes Hardie, Danielle 28034 Hardie, Danielle 2013-09-19 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 1 Review Drillmec Manhour reports. Review weekly cost activity. LLE Workflow Process. Hardie, Danielle 28034 Hardie, Danielle 2013-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 Philip Agnew meeting & Department Shower Hardie, Danielle 28034 Hardie, Danielle 2013-09-20 APEX :APEX Default Task Regular Pay N 8 AR Mandatory training AR Invoice Conversion Validation Training in PM Group around account string changes Hardie, Danielle 28034 Hardie, Danielle 2013-09-23 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 8 Weekly cost report, review of forecast to actuals. ETC for Drillmec for September. Drillmec timesheet review. Discussion with contractor for time reconciliation for time disputed ITD. Meeting - Cost requirements for milestone deliverables. ENL PO Tracking and review of ETC. Hardie, Danielle 28034 Hardie, Danielle 2013-09-24 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 8 Weekly cost report, review of forecast to actuals. ETC for Drillmec for September. Drillmec timesheet review. Discussion with contractor for time reconciliation for time disputed ITD. Meeting - Cost requirements for milestone deliverables. ENL PO Tracking and review of ETC. Hardie, Danielle 28034 Hardie, Danielle 2013-09-25 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 8 Weekly cost report, review of forecast to actuals. ETC for Drillmec for September. Drillmec timesheet review. Discussion with contractor for time reconciliation for time disputed ITD. Meeting - Cost requirements for milestone deliverables. ENL PO Tracking and review of ETC. Hardie, Danielle 28034 Hardie, Danielle 2013-09-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Hardie, Danielle 28034 Hardie, Danielle 2013-09-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Hebert, Andre' 31147 Hebert, Andre' 2013-09-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 5 General help around office, assisting Daniel Lopez, and supporting Site Manager Ken Hebert. Hebert, Andre' 31147 Hebert, Andre' 2013-09-16 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 3 Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting; 55B Schedule Teleconference. Hebert, Andre' 31147 Hebert, Andre' 2013-09-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 Weekly Project Status Meeting; Weekley TSR Status Meeting; Monthly Tech Services Meeting with Agnew Hebert, Andre' 31147 Hebert, Andre' 2013-09-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 General help around office, assisting Daniel Lopez, and supporting Site Manager Ken Hebert. Hebert, Andre' 31147 Hebert, Andre' 2013-09-17 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 7 Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting; 55B Schedule Teleconference. Hebert, Andre' 31147 Hebert, Andre' 2013-09-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 General help around office, assisting Daniel Lopez, and supporting Site Manager Ken Hebert. Hebert, Andre' 31147 Hebert, Andre' 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 5 Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting; 55B Schedule Teleconference. Hebert, Andre' 31147 Hebert, Andre' 2013-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 Weekly Project Status Meeting; Weekley TSR Status Meeting; Monthly Tech Services Meeting with Agnew Hebert, Andre' 31147 Hebert, Andre' 2013-09-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 General help around office, assisting Daniel Lopez, and supporting Site Manager Ken Hebert. Hebert, Andre' 31147 Hebert, Andre' 2013-09-19 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting; 55B Schedule Teleconference. Hebert, Andre' 31147 Hebert, Andre' 2013-09-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 General help around office, assisting Daniel Lopez, and supporting Site Manager Ken Hebert. Hebert, Andre' 31147 Hebert, Andre' 2013-09-20 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 6 Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting; 55B Schedule Teleconference. Hebert, Andre' 31147 Hebert, Andre' 2013-09-23 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 From Houston to New Iberia, LA. Hebert, Andre' 31147 Hebert, Andre' 2013-09-23 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 4 ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting Hebert, Andre' 31147 Hebert, Andre' 2013-09-24 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 8 ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting Hebert, Andre' 31147 Hebert, Andre' 2013-09-25 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 8 ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting Hebert, Andre' 31147 Hebert, Andre' 2013-09-26 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 8 ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting Hebert, Andre' 31147 Hebert, Andre' 2013-09-27 Rig 055B - TSR :Rig 055B - TSR TSR-01029-55B Project Support and Cost Regular Pay N 8 ON RIG 55B SITE in New Iberia, LA. Daily Updating of 55B Weekly Cost Report; 55B Weekly Status Report Meeting Hebert, Kenneth 30783 Hebert, Kenneth 2013-09-15 Rig 247L-TSR :Rig 247L-TSR TSR-01021-247L Erbil - Mud System Assembly in Country Regular Pay N 12 Iddentify pipe segments. Set tanks and pump skids.Install Mud Mix / Charge skid suction lines. Hebert, Kenneth 30783 Hebert, Kenneth 2013-09-16 Rig 247L-TSR :Rig 247L-TSR TSR-01021-247L Erbil - Mud System Assembly in Country Regular Pay N 12 Iddentify pipe segments. Set tanks and pump skids.Install Mud Mix / Charge skid suction lines. Hebert, Kenneth 30783 Hebert, Kenneth 2013-09-17 Rig 247L-TSR :Rig 247L-TSR TSR-01021-247L Erbil - Mud System Assembly in Country Regular Pay N 12 Iddentify pipe segments. Set tanks and pump skids.Install Mud Mix / Charge skid suction lines. Hebert, Kenneth 30783 Hebert, Kenneth 2013-09-18 Rig 247L-TSR :Rig 247L-TSR TSR-01021-247L Erbil - Mud System Assembly in Country Regular Pay N 12 Iddentify pipe segments. Set tanks and pump skids.Install Mud Mix / Charge skid suction lines. Hebert, Kenneth 30783 Hebert, Kenneth 2013-09-19 Rig 247L-TSR :Rig 247L-TSR TSR-01021-247L Erbil - Mud System Assembly in Country Regular Pay N 12 Iddentify pipe segments. Set tanks and pump skids.Install Mud Mix / Charge skid suction lines. Hebert, Kenneth 30783 Hebert, Kenneth 2013-09-20 Rig 247L-TSR :Rig 247L-TSR TSR-01021-247L Erbil - Mud System Assembly in Country Regular Pay N 12 Iddentify pipe segments. Set tanks and pump skids.Install Mud Mix / Charge skid suction lines. Hebert, Kenneth 30783 Hebert, Kenneth 2013-09-21 Rig 247L-TSR :Rig 247L-TSR TSR-01021-247L Erbil - Mud System Assembly in Country Regular Pay N 12 Iddentify pipe segments. Set tanks and pump skids.Install Mud Mix / Charge skid suction lines. Hebert, Kenneth 30783 Hebert, Kenneth 2013-09-22 Rig 247L-TSR :Rig 247L-TSR TSR-01021-247L Erbil - Mud System Assembly in Country Regular Pay N 12 Install Mud Mix / Charge pump suction lines. Install Mud Mix discharge lines. Install Mud Gun Discharge lines. Install shaker walkways. Modify and install mud cleaner. Install hopper piping segments. Set roofs and raincaps 75% Hebert, Kenneth 30783 Hebert, Kenneth 2013-09-23 Rig 247L-TSR :Rig 247L-TSR TSR-01021-247L Erbil - Mud System Assembly in Country Regular Pay N 12 Install Mud Mix / Charge pump suction lines. Install Mud Mix discharge lines. Install Mud Gun Discharge lines. Install shaker walkways. Modify and install mud cleaner. Install hopper piping segments. Set roofs and raincaps 75% Hebert, Kenneth 30783 Hebert, Kenneth 2013-09-24 Rig 247L-TSR :Rig 247L-TSR TSR-01021-247L Erbil - Mud System Assembly in Country Regular Pay N 12 Install Mud Mix / Charge pump suction lines. Install Mud Mix discharge lines. Install Mud Gun Discharge lines. Install shaker walkways. Modify and install mud cleaner. Install hopper piping segments. Set roofs and raincaps 75% Hebert, Kenneth 30783 Hebert, Kenneth 2013-09-25 Rig 247L-TSR :Rig 247L-TSR TSR-01021-247L Erbil - Mud System Assembly in Country Regular Pay N 12 Install Mud Mix / Charge pump suction lines. Install Mud Mix discharge lines. Install Mud Gun Discharge lines. Install shaker walkways. Modify and install mud cleaner. Install hopper piping segments. Set roofs and raincaps 75% Hebert, Kenneth 30783 Hebert, Kenneth 2013-09-26 Rig 247L-TSR :Rig 247L-TSR TSR-01021-247L Erbil - Mud System Assembly in Country Regular Pay N 12 Install Mud Mix / Charge pump suction lines. Install Mud Mix discharge lines. Install Mud Gun Discharge lines. Install shaker walkways. Modify and install mud cleaner. Install hopper piping segments. Set roofs and raincaps 75% Hebert, Kenneth 30783 Hebert, Kenneth 2013-09-27 Rig 247L-TSR :Rig 247L-TSR TSR-01021-247L Erbil - Mud System Assembly in Country Regular Pay N 12 Install Mud Mix / Charge pump suction lines. Install Mud Mix discharge lines. Install Mud Gun Discharge lines. Install shaker walkways. Modify and install mud cleaner. Install hopper piping segments. Set roofs and raincaps 75% Hebert, Kenneth 30783 Hebert, Kenneth 2013-09-28 Rig 247L-TSR :Rig 247L-TSR TSR-01021-247L Erbil - Mud System Assembly in Country Regular Pay N 12 Install Mud Mix / Charge pump suction lines. Install Mud Mix discharge lines. Install Mud Gun Discharge lines. Install shaker walkways. Modify and install mud cleaner. Install hopper piping segments. Set roofs and raincaps 75% Jones, Tommy 10263 Jones, Tommy 2013-09-16 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Jones, Tommy 10263 Jones, Tommy 2013-09-17 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Jones, Tommy 10263 Jones, Tommy 2013-09-18 Berkut-Spare Parts-Houston- :Berkut-Spare Parts-Houston- Default Task Regular Pay N 1 Jones, Tommy 10263 Jones, Tommy 2013-09-18 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Jones, Tommy 10263 Jones, Tommy 2013-09-19 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Jones, Tommy 10263 Jones, Tommy 2013-09-20 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Jones, Tommy 10263 Jones, Tommy 2013-09-23 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Jones, Tommy 10263 Jones, Tommy 2013-09-24 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Jones, Tommy 10263 Jones, Tommy 2013-09-25 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Jones, Tommy 10263 Jones, Tommy 2013-09-26 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Jones, Tommy 10263 Jones, Tommy 2013-09-27 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Juarez, Alex 29653 Juarez, Alex 2013-09-16 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 2 Assisted in reviewing Drillmecs drawings and coordinated with other engineers to provide a complete schedule for Annex J. Worked on Annex J. Juarez, Alex 29653 Juarez, Alex 2013-09-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 Completed some skillsoft leadership course and reviewed 266L/267L drillers console drawings Juarez, Alex 29653 Juarez, Alex 2013-09-16 Rig 270L-TSR :Rig 270L-TSR TSR-01015-270L Fire and Gas System Design and Installation Regular Pay N 2 Juarez, Alex 29653 Juarez, Alex 2013-09-16 Rig 272L-273L-TSR-OPS :Rig 272L-273L-TSR-OPS TSR-01050-272L/273L Door from Mezzanine to Air Lock Room Regular Pay N 2 Juarez, Alex 29653 Juarez, Alex 2013-09-17 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 2 Assisted in reviewing Drillmecs drawings and coordinated with other engineers to provide a complete schedule for Annex J. Worked on Annex J. Juarez, Alex 29653 Juarez, Alex 2013-09-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 Tues- TSR Meeting Weds - Aker meeting Thurs - TS and Supply Chain meeting Juarez, Alex 29653 Juarez, Alex 2013-09-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 Completed some skillsoft leadership course and reviewed 266L/267L drillers console drawings Juarez, Alex 29653 Juarez, Alex 2013-09-17 Rig 270L-TSR :Rig 270L-TSR TSR-01015-270L Fire and Gas System Design and Installation Regular Pay N 2 Juarez, Alex 29653 Juarez, Alex 2013-09-17 Rig 272L-273L-TSR-OPS :Rig 272L-273L-TSR-OPS TSR-01050-272L/273L Door from Mezzanine to Air Lock Room Regular Pay N 1 Juarez, Alex 29653 Juarez, Alex 2013-09-18 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 2 Assisted in reviewing Drillmecs drawings and coordinated with other engineers to provide a complete schedule for Annex J. Worked on Annex J. Juarez, Alex 29653 Juarez, Alex 2013-09-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 Tues- TSR Meeting Weds - Aker meeting Thurs - TS and Supply Chain meeting Juarez, Alex 29653 Juarez, Alex 2013-09-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Completed some skillsoft leadership course and reviewed 266L/267L drillers console drawings Juarez, Alex 29653 Juarez, Alex 2013-09-18 Rig 270L-TSR :Rig 270L-TSR TSR-01015-270L Fire and Gas System Design and Installation Regular Pay N 2 Juarez, Alex 29653 Juarez, Alex 2013-09-19 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 2 Assisted in reviewing Drillmecs drawings and coordinated with other engineers to provide a complete schedule for Annex J. Worked on Annex J. Juarez, Alex 29653 Juarez, Alex 2013-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 Tues- TSR Meeting Weds - Aker meeting Thurs - TS and Supply Chain meeting Juarez, Alex 29653 Juarez, Alex 2013-09-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Completed some skillsoft leadership course and reviewed 266L/267L drillers console drawings Juarez, Alex 29653 Juarez, Alex 2013-09-19 Rig 270L-TSR :Rig 270L-TSR TSR-01015-270L Fire and Gas System Design and Installation Regular Pay N 2 Juarez, Alex 29653 Juarez, Alex 2013-09-19 Rig 272L-273L-TSR-OPS :Rig 272L-273L-TSR-OPS TSR-01050-272L/273L Door from Mezzanine to Air Lock Room Regular Pay N 1.5 Juarez, Alex 29653 Juarez, Alex 2013-09-20 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 4 Assisted in reviewing Drillmecs drawings and coordinated with other engineers to provide a complete schedule for Annex J. Worked on Annex J. Juarez, Alex 29653 Juarez, Alex 2013-09-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 Completed some skillsoft leadership course and reviewed 266L/267L drillers console drawings Juarez, Alex 29653 Juarez, Alex 2013-09-20 Rig 270L-TSR :Rig 270L-TSR TSR-01015-270L Fire and Gas System Design and Installation Regular Pay N 2 Juarez, Alex 29653 Juarez, Alex 2013-09-23 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 2 Assisted in reviewing Drillmecs drawings and coordinated with other engineers to provide a complete schedule for Annex J. Worked on Annex J, consolidated and formatted all PKD's comments into a master document . Juarez, Alex 29653 Juarez, Alex 2013-09-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Juarez, Alex 29653 Juarez, Alex 2013-09-23 Rig 247L-TSR :Rig 247L-TSR TSR-01059-247L Hazardous Area Drawing Regular Pay N 6 Juarez, Alex 29653 Juarez, Alex 2013-09-24 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 3 Assisted in reviewing Drillmecs drawings and coordinated with other engineers to provide a complete schedule for Annex J. Worked on Annex J, consolidated and formatted all PKD's comments into a master document . Juarez, Alex 29653 Juarez, Alex 2013-09-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 Juarez, Alex 29653 Juarez, Alex 2013-09-24 Rig 247L-TSR :Rig 247L-TSR TSR-01059-247L Hazardous Area Drawing Regular Pay N 1 Juarez, Alex 29653 Juarez, Alex 2013-09-24 Rig 270L-TSR :Rig 270L-TSR TSR-01015-270L Fire and Gas System Design and Installation Regular Pay N 1 Juarez, Alex 29653 Juarez, Alex 2013-09-24 Rig 272L-273L-TSR-OPS :Rig 272L-273L-TSR-OPS TSR-01050-272L/273L Door from Mezzanine to Air Lock Room Regular Pay N 1 Juarez, Alex 29653 Juarez, Alex 2013-09-25 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 2 Assisted in reviewing Drillmecs drawings and coordinated with other engineers to provide a complete schedule for Annex J. Worked on Annex J, consolidated and formatted all PKD's comments into a master document . Juarez, Alex 29653 Juarez, Alex 2013-09-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 TSR weekly meeting Juarez, Alex 29653 Juarez, Alex 2013-09-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Juarez, Alex 29653 Juarez, Alex 2013-09-25 Rig 247L-TSR :Rig 247L-TSR TSR-01044-247L Design Support Kurdistan Regular Pay N 4 Assisted with VFD and SCR drawings and parts list. Juarez, Alex 29653 Juarez, Alex 2013-09-26 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 2 Assisted in reviewing Drillmecs drawings and coordinated with other engineers to provide a complete schedule for Annex J. Worked on Annex J, consolidated and formatted all PKD's comments into a master document . Juarez, Alex 29653 Juarez, Alex 2013-09-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Juarez, Alex 29653 Juarez, Alex 2013-09-26 Rig 247L-TSR :Rig 247L-TSR TSR-01044-247L Design Support Kurdistan Regular Pay N 3 Assisted with VFD and SCR drawings and parts list. Juarez, Alex 29653 Juarez, Alex 2013-09-26 Rig 269L-TSR :Rig 269L-TSR TSR-01058-269L Hazardous Area Drawing Regular Pay N 1 Juarez, Alex 29653 Juarez, Alex 2013-09-26 Rig 270L-TSR :Rig 270L-TSR TSR-01015-270L Fire and Gas System Design and Installation Regular Pay N 1 Juarez, Alex 29653 Juarez, Alex 2013-09-27 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 5 Assisted in reviewing Drillmecs drawings and coordinated with other engineers to provide a complete schedule for Annex J. Worked on Annex J, consolidated and formatted all PKD's comments into a master document . Juarez, Alex 29653 Juarez, Alex 2013-09-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Juarez, Alex 29653 Juarez, Alex 2013-09-27 Rig 247L-TSR :Rig 247L-TSR TSR-01044-247L Design Support Kurdistan Regular Pay N 2 Assisted with VFD and SCR drawings and parts list. Juarez, Alex 29653 Juarez, Alex 2013-09-27 Rig 269L-TSR :Rig 269L-TSR TSR-01058-269L Hazardous Area Drawing Regular Pay N 1 Juarez, Alex 29653 Juarez, Alex 2013-09-27 Rig 272L-273L-TSR-OPS :Rig 272L-273L-TSR-OPS TSR-01050-272L/273L Door from Mezzanine to Air Lock Room Regular Pay N 1 Juarez, Alex 29653 Juarez, Alex 2013-09-28 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 5 Assisted in reviewing Drillmecs drawings and coordinated with other engineers to provide a complete schedule for Annex J. Worked on Annex J, consolidated and formatted all PKD's comments into a master document . Kuehn, Matt 22143 Kuehn, Matt 2013-09-16 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 5 TPP Reviews (Bucking Machine, Pipe Handling Crane); Revision to EMLR Functional Requirements; Drillmec Drawing review; Drill Module Stability on SPMT's Kuehn, Matt 22143 Kuehn, Matt 2013-09-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 09/16 - Create, review and approve Timesheets (MK, MS, JB, JR, JA, JW), Renew TX PE and ASME (Expense Reports), MK Employee Development Discussion with MQ, Bryan Little offer; 09/17 - DCDM Engineering Drawing Scan Meeting, Interviews with Jeramy Roberts and Curtis Mize; 09/18 - Interviews with Jeff Schiller and Ravi Garg Kuehn, Matt 22143 Kuehn, Matt 2013-09-17 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 2 TPP Reviews (Bucking Machine, Pipe Handling Crane); Revision to EMLR Functional Requirements; Drillmec Drawing review; Drill Module Stability on SPMT's Kuehn, Matt 22143 Kuehn, Matt 2013-09-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 09/16 - Create, review and approve Timesheets (MK, MS, JB, JR, JA, JW), Renew TX PE and ASME (Expense Reports), MK Employee Development Discussion with MQ, Bryan Little offer; 09/17 - DCDM Engineering Drawing Scan Meeting, Interviews with Jeramy Roberts and Curtis Mize; 09/18 - Interviews with Jeff Schiller and Ravi Garg Kuehn, Matt 22143 Kuehn, Matt 2013-09-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 09/17 - TSR Weekly Meeting Kuehn, Matt 22143 Kuehn, Matt 2013-09-18 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 3.5 TPP Reviews (Bucking Machine, Pipe Handling Crane); Revision to EMLR Functional Requirements; Drillmec Drawing review; Drill Module Stability on SPMT's Kuehn, Matt 22143 Kuehn, Matt 2013-09-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 09/18 - AADU Moving System Question from Billy Burson (Ice Road Requirements) Kuehn, Matt 22143 Kuehn, Matt 2013-09-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 09/16 - Create, review and approve Timesheets (MK, MS, JB, JR, JA, JW), Renew TX PE and ASME (Expense Reports), MK Employee Development Discussion with MQ, Bryan Little offer; 09/17 - DCDM Engineering Drawing Scan Meeting, Interviews with Jeramy Roberts and Curtis Mize; 09/18 - Interviews with Jeff Schiller and Ravi Garg Kuehn, Matt 22143 Kuehn, Matt 2013-09-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 09/19 - PTO; 09/20 - PTO Kuehn, Matt 22143 Kuehn, Matt 2013-09-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 09/19 - PTO; 09/20 - PTO Kuehn, Matt 22143 Kuehn, Matt 2013-09-23 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 09/23 - PTO Kuehn, Matt 22143 Kuehn, Matt 2013-09-24 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 6 Meeting with Stress Engineering; Functional Requirements Revision; Drillmec Drawing Review/Comments; EMLR Module Transportation; EMLR Weekly Meeting With XOM Kuehn, Matt 22143 Kuehn, Matt 2013-09-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 09/23 - Timesheets (MK, MS, JA, JB, JR, JW), Interview Evaluation Forms; 09/27 - Interview with Logan Lancon, HR Support meeting with Brea Kuehn, Matt 22143 Kuehn, Matt 2013-09-24 Rig 216L-TSR :Rig 216L-TSR TSR-01013-216L Upgrade 216L to 3000 HP Regular Pay N 1 Kuehn, Matt 22143 Kuehn, Matt 2013-09-25 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 5 Meeting with Stress Engineering; Functional Requirements Revision; Drillmec Drawing Review/Comments; EMLR Module Transportation; EMLR Weekly Meeting With XOM Kuehn, Matt 22143 Kuehn, Matt 2013-09-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 2013 Engineering Department Goals - Equipment Standardization Review and Engineering Processes; Status Update Meeting Kuehn, Matt 22143 Kuehn, Matt 2013-09-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 09/25 - TSR Weekly Meeting Kuehn, Matt 22143 Kuehn, Matt 2013-09-25 Rig 216L-TSR :Rig 216L-TSR TSR-01013-216L Upgrade 216L to 3000 HP Regular Pay N 1 Kuehn, Matt 22143 Kuehn, Matt 2013-09-26 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 5 Meeting with Stress Engineering; Functional Requirements Revision; Drillmec Drawing Review/Comments; EMLR Module Transportation; EMLR Weekly Meeting With XOM Kuehn, Matt 22143 Kuehn, Matt 2013-09-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 2013 Engineering Department Goals - Equipment Standardization Review and Engineering Processes; Status Update Meeting Kuehn, Matt 22143 Kuehn, Matt 2013-09-26 Orlan-Reactivation :Orlan-Reactivation Default Task Regular Pay N 1 09/26 - Monthly Sakhalin Meeting with ENL Kuehn, Matt 22143 Kuehn, Matt 2013-09-26 ORLAN-TSR :ORLAN-TSR TSR-01006-ORLAN Spare BOP Stack Regular Pay N 1 Kuehn, Matt 22143 Kuehn, Matt 2013-09-26 Rig 262L-TSR :Rig 262L-TSR TSR-00998-262L Spare BOP Stack Regular Pay N 1 Kuehn, Matt 22143 Kuehn, Matt 2013-09-27 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 4 Meeting with Stress Engineering; Functional Requirements Revision; Drillmec Drawing Review/Comments; EMLR Module Transportation; EMLR Weekly Meeting With XOM Kuehn, Matt 22143 Kuehn, Matt 2013-09-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 2013 Engineering Department Goals - Equipment Standardization Review and Engineering Processes; Status Update Meeting Kuehn, Matt 22143 Kuehn, Matt 2013-09-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 09/23 - Timesheets (MK, MS, JA, JB, JR, JW), Interview Evaluation Forms; 09/27 - Interview with Logan Lancon, HR Support meeting with Brea Leonard, Richard 31084 Leonard, Richard 2013-09-16 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 2 Reviewed Drillmec sched rev A. Drillmec will resubmit with more details. Leonard, Richard 31084 Leonard, Richard 2013-09-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Update P&S Procedure w/minor changes Thu. Tech Services mtg Thu. Worked on Career Development Plan. Leonard, Richard 31084 Leonard, Richard 2013-09-16 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 5 Added acts & codes from Act list. Worked on resource loading & durations. Worked in New Iberia w/Daniel, Ken & Andre. Leonard, Richard 31084 Leonard, Richard 2013-09-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Update P&S Procedure w/minor changes Thu. Tech Services mtg Thu. Worked on Career Development Plan. Leonard, Richard 31084 Leonard, Richard 2013-09-17 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 7 Added acts & codes from Act list. Worked on resource loading & durations. Worked in New Iberia w/Daniel, Ken & Andre. Leonard, Richard 31084 Leonard, Richard 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 8 Added acts & codes from Act list. Worked on resource loading & durations. Worked in New Iberia w/Daniel, Ken & Andre. Leonard, Richard 31084 Leonard, Richard 2013-09-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Update P&S Procedure w/minor changes Thu. Tech Services mtg Thu. Worked on Career Development Plan. Leonard, Richard 31084 Leonard, Richard 2013-09-19 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 7 Added acts & codes from Act list. Worked on resource loading & durations. Worked in New Iberia w/Daniel, Ken & Andre. Leonard, Richard 31084 Leonard, Richard 2013-09-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 Update P&S Procedure w/minor changes Thu. Tech Services mtg Thu. Worked on Career Development Plan. Leonard, Richard 31084 Leonard, Richard 2013-09-20 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 6 Added acts & codes from Act list. Worked on resource loading & durations. Worked in New Iberia w/Daniel, Ken & Andre. Leonard, Richard 31084 Leonard, Richard 2013-09-23 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 1 Mon. Reviewed status & prep plan going forward. Wed. reviewed drillmec tracking table & schedule. Leonard, Richard 31084 Leonard, Richard 2013-09-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 7 Mon & Tue: Career development plan (3hrs). Worked on Rig 55B resource loading, Preped several docs for site updating. Leonard, Richard 31084 Leonard, Richard 2013-09-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Mon & Tue: Career development plan (3hrs). Worked on Rig 55B resource loading, Preped several docs for site updating. Leonard, Richard 31084 Leonard, Richard 2013-09-25 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 2 Mon. Reviewed status & prep plan going forward. Wed. reviewed drillmec tracking table & schedule. Leonard, Richard 31084 Leonard, Richard 2013-09-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 Mon & Tue: Career development plan (3hrs). Worked on Rig 55B resource loading, Preped several docs for site updating. Leonard, Richard 31084 Leonard, Richard 2013-09-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Mon & Tue: Career development plan (3hrs). Worked on Rig 55B resource loading, Preped several docs for site updating. Leonard, Richard 31084 Leonard, Richard 2013-09-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Mon & Tue: Career development plan (3hrs). Worked on Rig 55B resource loading, Preped several docs for site updating. Li, Ally 30863 Li, Ally 2013-09-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Inventor trianing. (Modeling Rig247L) Li, Ally 30863 Li, Ally 2013-09-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 7 Inventor trianing. (Modeling Rig247L) Li, Ally 30863 Li, Ally 2013-09-17 Rig 270L-TSR :Rig 270L-TSR TSR-01054-270L Suction Piping Modification Regular Pay N 1 Revise drawing 270L-01-04-001-RH-mud-system-lppf Li, Ally 30863 Li, Ally 2013-09-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Inventor trianing. (Modeling Rig247L) Li, Ally 30863 Li, Ally 2013-09-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Inventor trianing. (Modeling Rig247L) Li, Ally 30863 Li, Ally 2013-09-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Inventor trianing. (Modeling Rig247L) Li, Ally 30863 Li, Ally 2013-09-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 Inventor trianing. (Modeling Rig247L) Li, Ally 30863 Li, Ally 2013-09-23 Rig 221L-TSR :Rig 221L-TSR TSR-01049-221L Substructure Level Procedure Regular Pay N 2 Sketch drawing 221L-01-02-002-1-R0-modification-to-skidding-jacking-window Li, Ally 30863 Li, Ally 2013-09-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 Inventor trianing. (Modeling Rig247L) Li, Ally 30863 Li, Ally 2013-09-24 Rig 221L-TSR :Rig 221L-TSR TSR-01049-221L Substructure Level Procedure Regular Pay N 2 Sketch drawing 221L-01-02-002-1-R0-modification-to-skidding-jacking-window Li, Ally 30863 Li, Ally 2013-09-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Inventor trianing. (Modeling Rig247L) Li, Ally 30863 Li, Ally 2013-09-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Inventor trianing. (Modeling Rig247L) Li, Ally 30863 Li, Ally 2013-09-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Inventor trianing. (Modeling Rig247L) Li, Gar 28293 Li, Gar 2013-09-16 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 6 9/16 & 9/17: work on VFD and MCC TPP datasheets 9/19: review drawings and feed schedule Li, Gar 28293 Li, Gar 2013-09-16 Rig 272L-TSR :Rig 272L-TSR TSR-00985-272L Relocate TD Elevator Switch Regular Pay N 2 Switchgear Shop Visit at Legacy. Li, Gar 28293 Li, Gar 2013-09-17 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 5 9/16 & 9/17: work on VFD and MCC TPP datasheets 9/19: review drawings and feed schedule Li, Gar 28293 Li, Gar 2013-09-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 weekly TSR meeting (1hr) AADU Tax Credit (2hrs) 9/19: Technical services meeting Li, Gar 28293 Li, Gar 2013-09-17 Rig 270L-TSR :Rig 270L-TSR TSR-01024-270L Crown Lightning Rod and Cabling Regular Pay N 1 Li, Gar 28293 Li, Gar 2013-09-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 9/18: PTO 9/20: PTO Li, Gar 28293 Li, Gar 2013-09-19 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 5 9/16 & 9/17: work on VFD and MCC TPP datasheets 9/19: review drawings and feed schedule Li, Gar 28293 Li, Gar 2013-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 weekly TSR meeting (1hr) AADU Tax Credit (2hrs) 9/19: Technical services meeting Li, Gar 28293 Li, Gar 2013-09-19 Rig 216L-TSR :Rig 216L-TSR TSR-01013-216L Upgrade 216L to 3000 HP Regular Pay N 1.5 Review TSR Scope Li, Gar 28293 Li, Gar 2013-09-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 9/18: PTO 9/20: PTO Li, Gar 28293 Li, Gar 2013-09-23 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 4 9/23-9/28: work on Annex J Drilling Functional Requirement, work with lead engineer on electrical and instrumentation system technical query; review drillmec drawings Li, Gar 28293 Li, Gar 2013-09-23 Orlan-Reactivation :Orlan-Reactivation Default Task Regular Pay N 1 Li, Gar 28293 Li, Gar 2013-09-23 Rig 247L-TSR :Rig 247L-TSR TSR-01044-247L Design Support Kurdistan Regular Pay N 2 Rig247L electrical rig up supports Li, Gar 28293 Li, Gar 2013-09-23 Rig 270L-TSR :Rig 270L-TSR TSR-01024-270L Crown Lightning Rod and Cabling Regular Pay N 1 Li, Gar 28293 Li, Gar 2013-09-24 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 4 9/23-9/28: work on Annex J Drilling Functional Requirement, work with lead engineer on electrical and instrumentation system technical query; review drillmec drawings Li, Gar 28293 Li, Gar 2013-09-24 Rig 216L-TSR :Rig 216L-TSR TSR-01013-216L Upgrade 216L to 3000 HP Regular Pay N 2 Li, Gar 28293 Li, Gar 2013-09-24 Rig 247L-TSR :Rig 247L-TSR TSR-01044-247L Design Support Kurdistan Regular Pay N 2 Rig247L electrical rig up supports Li, Gar 28293 Li, Gar 2013-09-25 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 4 9/23-9/28: work on Annex J Drilling Functional Requirement, work with lead engineer on electrical and instrumentation system technical query; review drillmec drawings Li, Gar 28293 Li, Gar 2013-09-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 TSR weekly meeting and 2013 performance goal meeting Li, Gar 28293 Li, Gar 2013-09-25 Rig 247L-TSR :Rig 247L-TSR TSR-01044-247L Design Support Kurdistan Regular Pay N 2 Rig247L electrical rig up supports Li, Gar 28293 Li, Gar 2013-09-25 Rig 270L-TSR :Rig 270L-TSR TSR-01024-270L Crown Lightning Rod and Cabling Regular Pay N 1 Li, Gar 28293 Li, Gar 2013-09-26 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 5 9/23-9/28: work on Annex J Drilling Functional Requirement, work with lead engineer on electrical and instrumentation system technical query; review drillmec drawings Li, Gar 28293 Li, Gar 2013-09-26 Rig 247L-TSR :Rig 247L-TSR TSR-01044-247L Design Support Kurdistan Regular Pay N 1 Rig247L electrical rig up supports Li, Gar 28293 Li, Gar 2013-09-26 Rig 272L-TSR :Rig 272L-TSR TSR-00985-272L Relocate TD Elevator Switch Regular Pay N 3 Li, Gar 28293 Li, Gar 2013-09-27 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 3 9/23-9/28: work on Annex J Drilling Functional Requirement, work with lead engineer on electrical and instrumentation system technical query; review drillmec drawings Li, Gar 28293 Li, Gar 2013-09-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 TSR weekly meeting and 2013 performance goal meeting Li, Gar 28293 Li, Gar 2013-09-28 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 2 9/23-9/28: work on Annex J Drilling Functional Requirement, work with lead engineer on electrical and instrumentation system technical query; review drillmec drawings Lloyd, Lesley 500010 Lloyd, Lesley 2013-09-16 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Lloyd, Lesley 500010 Lloyd, Lesley 2013-09-17 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Lloyd, Lesley 500010 Lloyd, Lesley 2013-09-18 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Lloyd, Lesley 500010 Lloyd, Lesley 2013-09-19 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Lloyd, Lesley 500010 Lloyd, Lesley 2013-09-20 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Lloyd, Lesley 500010 Lloyd, Lesley 2013-09-23 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Lloyd, Lesley 500010 Lloyd, Lesley 2013-09-24 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Lloyd, Lesley 500010 Lloyd, Lesley 2013-09-25 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Lloyd, Lesley 500010 Lloyd, Lesley 2013-09-26 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Lloyd, Lesley 500010 Lloyd, Lesley 2013-09-27 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Lopez, Daniel 13879 Lopez, Daniel 2013-09-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 finalized AADU Tax Credit reports to KPMG; misc Lopez, Daniel 13879 Lopez, Daniel 2013-09-16 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 PO's for most bid jobs are issued; completed installation of Living Qtrs Walkaround; installing Helideck Safety Net panels; completed Mud Pump foundations; Genset foundations at blast yard; completed installation of Mud Tank Sumps; Lopez, Daniel 13879 Lopez, Daniel 2013-09-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 finalized AADU Tax Credit reports to KPMG; misc Lopez, Daniel 13879 Lopez, Daniel 2013-09-17 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 PO's for most bid jobs are issued; completed installation of Living Qtrs Walkaround; installing Helideck Safety Net panels; completed Mud Pump foundations; Genset foundations at blast yard; completed installation of Mud Tank Sumps; Lopez, Daniel 13879 Lopez, Daniel 2013-09-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 finalized AADU Tax Credit reports to KPMG; misc Lopez, Daniel 13879 Lopez, Daniel 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 PO's for most bid jobs are issued; completed installation of Living Qtrs Walkaround; installing Helideck Safety Net panels; completed Mud Pump foundations; Genset foundations at blast yard; completed installation of Mud Tank Sumps; Lopez, Daniel 13879 Lopez, Daniel 2013-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 TS meeting Lopez, Daniel 13879 Lopez, Daniel 2013-09-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 finalized AADU Tax Credit reports to KPMG; misc Lopez, Daniel 13879 Lopez, Daniel 2013-09-19 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 PO's for most bid jobs are issued; completed installation of Living Qtrs Walkaround; installing Helideck Safety Net panels; completed Mud Pump foundations; Genset foundations at blast yard; completed installation of Mud Tank Sumps; Lopez, Daniel 13879 Lopez, Daniel 2013-09-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 finalized AADU Tax Credit reports to KPMG; misc Lopez, Daniel 13879 Lopez, Daniel 2013-09-20 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 PO's for most bid jobs are issued; completed installation of Living Qtrs Walkaround; installing Helideck Safety Net panels; completed Mud Pump foundations; Genset foundations at blast yard; completed installation of Mud Tank Sumps; Lopez, Daniel 13879 Lopez, Daniel 2013-09-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 misc Lopez, Daniel 13879 Lopez, Daniel 2013-09-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 misc Lopez, Daniel 13879 Lopez, Daniel 2013-09-23 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 weeks activities: helideck Safety Net; Stairs - Barge Deck to P-tank room; stairs - barge deck to change room; piperack handrails; rig floor wings; spot p-tank and install piping; stbd side crane pedestal; Lopez, Daniel 13879 Lopez, Daniel 2013-09-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 misc Lopez, Daniel 13879 Lopez, Daniel 2013-09-24 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 weeks activities: helideck Safety Net; Stairs - Barge Deck to P-tank room; stairs - barge deck to change room; piperack handrails; rig floor wings; spot p-tank and install piping; stbd side crane pedestal; Lopez, Daniel 13879 Lopez, Daniel 2013-09-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 misc Lopez, Daniel 13879 Lopez, Daniel 2013-09-25 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 weeks activities: helideck Safety Net; Stairs - Barge Deck to P-tank room; stairs - barge deck to change room; piperack handrails; rig floor wings; spot p-tank and install piping; stbd side crane pedestal; Lopez, Daniel 13879 Lopez, Daniel 2013-09-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 misc Lopez, Daniel 13879 Lopez, Daniel 2013-09-26 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 weeks activities: helideck Safety Net; Stairs - Barge Deck to P-tank room; stairs - barge deck to change room; piperack handrails; rig floor wings; spot p-tank and install piping; stbd side crane pedestal; Lopez, Daniel 13879 Lopez, Daniel 2013-09-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 misc Lopez, Daniel 13879 Lopez, Daniel 2013-09-27 Rig 055B - TSR :Rig 055B - TSR TSR-01027-55B Project Manager - Site Management Regular Pay N 8 weeks activities: helideck Safety Net; Stairs - Barge Deck to P-tank room; stairs - barge deck to change room; piperack handrails; rig floor wings; spot p-tank and install piping; stbd side crane pedestal; Lopez, Daniel 13879 Lopez, Daniel 2013-09-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 misc Magsino, Tony TONYM Magsino, Tony 2013-09-16 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 9 update xom functional requirement doc; review/comment drillmec pre-feed drawings; Magsino, Tony TONYM Magsino, Tony 2013-09-17 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 9 update xom functional requirement doc; review/comment drillmec pre-feed drawings; Magsino, Tony TONYM Magsino, Tony 2013-09-18 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 9 update xom functional requirement doc; review/comment drillmec pre-feed drawings; Magsino, Tony TONYM Magsino, Tony 2013-09-19 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 9 update xom functional requirement doc; review/comment drillmec pre-feed drawings; Magsino, Tony TONYM Magsino, Tony 2013-09-20 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 6 update xom functional requirement doc; review/comment drillmec pre-feed drawings; Magsino, Tony TONYM Magsino, Tony 2013-09-23 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 9 update xom funtional spec doc; review/comment on drillmec submittal; respond to tech queries; Magsino, Tony TONYM Magsino, Tony 2013-09-24 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 7.5 update xom funtional spec doc; review/comment on drillmec submittal; respond to tech queries; Magsino, Tony TONYM Magsino, Tony 2013-09-24 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 complete Code of Conduct and Global Anti-Bribery training modules (CD); Magsino, Tony TONYM Magsino, Tony 2013-09-25 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 7.5 update xom funtional spec doc; review/comment on drillmec submittal; respond to tech queries; Magsino, Tony TONYM Magsino, Tony 2013-09-25 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 complete Code of Conduct and Global Anti-Bribery training modules (CD); Magsino, Tony TONYM Magsino, Tony 2013-09-26 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 9 update xom funtional spec doc; review/comment on drillmec submittal; respond to tech queries; Magsino, Tony TONYM Magsino, Tony 2013-09-27 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 6 update xom funtional spec doc; review/comment on drillmec submittal; respond to tech queries; Martinez, Andy 24887 Martinez, Andy 2013-09-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 9 Inventor drawing - 247. Martinez, Andy 24887 Martinez, Andy 2013-09-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 9 Inventor drawing - 247. Martinez, Andy 24887 Martinez, Andy 2013-09-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 9 Inventor drawing - 247. Martinez, Andy 24887 Martinez, Andy 2013-09-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 9 Inventor drawing - 247. Martinez, Andy 24887 Martinez, Andy 2013-09-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 Inventor drawing - 247. Martinez, Andy 24887 Martinez, Andy 2013-09-22 Rig 247L-TSR :Rig 247L-TSR TSR-01044-247L Design Support Kurdistan Regular Pay N 12 9/22-9/23-Travel 9/24-Travel, blood test, walkaround w/Ken H. 9/25-9/28-Design Support,retrieve lost luggage Martinez, Andy 24887 Martinez, Andy 2013-09-23 Rig 247L-TSR :Rig 247L-TSR TSR-01044-247L Design Support Kurdistan Regular Pay N 12 9/22-9/23-Travel 9/24-Travel, blood test, walkaround w/Ken H. 9/25-9/28-Design Support,retrieve lost luggage Martinez, Andy 24887 Martinez, Andy 2013-09-24 Rig 247L-TSR :Rig 247L-TSR TSR-01044-247L Design Support Kurdistan Regular Pay N 12 9/22-9/23-Travel 9/24-Travel, blood test, walkaround w/Ken H. 9/25-9/28-Design Support,retrieve lost luggage Martinez, Andy 24887 Martinez, Andy 2013-09-25 Rig 247L-TSR :Rig 247L-TSR TSR-01044-247L Design Support Kurdistan Regular Pay N 14 9/22-9/23-Travel 9/24-Travel, blood test, walkaround w/Ken H. 9/25-9/28-Design Support,retrieve lost luggage Martinez, Andy 24887 Martinez, Andy 2013-09-26 Rig 247L-TSR :Rig 247L-TSR TSR-01044-247L Design Support Kurdistan Regular Pay N 12 9/22-9/23-Travel 9/24-Travel, blood test, walkaround w/Ken H. 9/25-9/28-Design Support,retrieve lost luggage Martinez, Andy 24887 Martinez, Andy 2013-09-27 Rig 247L-TSR :Rig 247L-TSR TSR-01044-247L Design Support Kurdistan Regular Pay N 12 9/22-9/23-Travel 9/24-Travel, blood test, walkaround w/Ken H. 9/25-9/28-Design Support,retrieve lost luggage Martinez, Andy 24887 Martinez, Andy 2013-09-28 Rig 247L-TSR :Rig 247L-TSR TSR-01044-247L Design Support Kurdistan Regular Pay N 12 9/22-9/23-Travel 9/24-Travel, blood test, walkaround w/Ken H. 9/25-9/28-Design Support,retrieve lost luggage Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-16 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 1 Drillmec Drawing Review A1, A6, A2, A5 (Functional Requirements) Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 Meeting with Mark about Development Interview for Mechanical (Mark Q. not Available) Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-16 ORLAN-TSR :ORLAN-TSR TSR-01006-ORLAN Spare BOP Stack Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-16 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-16 Rig 221L-TSR :Rig 221L-TSR TSR-01049-221L Substructure Level Procedure Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-16 Rig 262L-TSR :Rig 262L-TSR TSR-01053-262L Skid Rails Rosneft Scope Regular Pay N 1.25 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-17 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 7 Drillmec Drawing Review A1, A6, A2, A5 (Functional Requirements) Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.25 Weekly TSR Mtg (1.25) Document Scanning Meeting (1) TS Monthly Mtg Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 Meeting with Mark about Development Interview for Mechanical (Mark Q. not Available) Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-17 ORLAN-TSR :ORLAN-TSR TSR-01006-ORLAN Spare BOP Stack Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-17 Rig 262L-TSR :Rig 262L-TSR TSR-01052-262L Separation DSM Gas Header Regular Pay N 0.5 Discussion with Fluor Reviewing Sketches Corr. with Exxon (Shea S.) Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-17 Rig 262L-TSR :Rig 262L-TSR TSR-01053-262L Skid Rails Rosneft Scope Regular Pay N 0.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-17 Rig 270L-TSR :Rig 270L-TSR TSR-01055-270L Choke Skid Mods Regular Pay N 0.25 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-18 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00102 Engineering Support Houston Regular Pay N 0.5 Pulling Drawings Cable Length for Chuck G. Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-18 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 2 Drillmec Drawing Review A1, A6, A2, A5 (Functional Requirements) Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.25 Meeting with Mark about Development Interview for Mechanical (Mark Q. not Available) Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-18 ORLAN-TSR :ORLAN-TSR TSR-01006-ORLAN Spare BOP Stack Regular Pay N 0.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-18 Rig 221L-TSR :Rig 221L-TSR TSR-01049-221L Substructure Level Procedure Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-18 Rig 262L-TSR :Rig 262L-TSR TSR-01052-262L Separation DSM Gas Header Regular Pay N 0.5 Discussion with Fluor Reviewing Sketches Corr. with Exxon (Shea S.) Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-18 Rig 270L-TSR :Rig 270L-TSR TSR-01055-270L Choke Skid Mods Regular Pay N 1.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-19 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00102 Engineering Support Houston Regular Pay N 0.5 Pulling Drawings Cable Length for Chuck G. Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-19 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 2 Drillmec Drawing Review A1, A6, A2, A5 (Functional Requirements) Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 Weekly TSR Mtg (1.25) Document Scanning Meeting (1) TS Monthly Mtg Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 Meeting with Mark about Development Interview for Mechanical (Mark Q. not Available) Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-19 Rig 055B - TSR :Rig 055B - TSR TSR-01034-55B Structural Design of the Port Crane Foundation Regular Pay N 0.5 Creating CTR Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-19 Rig 262L-TSR :Rig 262L-TSR TSR-01052-262L Separation DSM Gas Header Regular Pay N 0.5 Discussion with Fluor Reviewing Sketches Corr. with Exxon (Shea S.) Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-20 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 1.5 Drillmec Drawing Review A1, A6, A2, A5 (Functional Requirements) Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 Meeting with Mark about Development Interview for Mechanical (Mark Q. not Available) Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-20 Rig 262L-TSR :Rig 262L-TSR TSR-01052-262L Separation DSM Gas Header Regular Pay N 0.5 Discussion with Fluor Reviewing Sketches Corr. with Exxon (Shea S.) Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-23 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 2 Annex J Write-Ups Annex J Meeting Drillmec Drawing Review Weekly Mtg Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Weekly / Monthly Sakhalin Meeting Compliance Issues Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 New Computer Set-Up IHS Quote Request for Director of Quality Liberty Discussion (Rodney and Matt) HR Meeting Goals Meeting Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-23 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-23 Rig 267L-TSR :Rig 267L-TSR TSR-01056-267L Skid 4m to Lower Derrick Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-24 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 4 Annex J Write-Ups Annex J Meeting Drillmec Drawing Review Weekly Mtg Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 Weekly / Monthly Sakhalin Meeting Compliance Issues Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 New Computer Set-Up IHS Quote Request for Director of Quality Liberty Discussion (Rodney and Matt) HR Meeting Goals Meeting Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-24 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-24 Rig 262L-TSR :Rig 262L-TSR TSR-00998-262L Spare BOP Stack Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-24 Rig 262L-TSR :Rig 262L-TSR TSR-01053-262L Skid Rails Rosneft Scope Regular Pay N 0.25 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-24 Rig 267L-TSR :Rig 267L-TSR TSR-01056-267L Skid 4m to Lower Derrick Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-24 Rig 270L-TSR :Rig 270L-TSR TSR-01055-270L Choke Skid Mods Regular Pay N 1.25 Analysis and Drawing Review Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-25 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 2 Annex J Write-Ups Annex J Meeting Drillmec Drawing Review Weekly Mtg Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 TSR Weekly Mtg Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Weekly / Monthly Sakhalin Meeting Compliance Issues Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 New Computer Set-Up IHS Quote Request for Director of Quality Liberty Discussion (Rodney and Matt) HR Meeting Goals Meeting Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-25 ORLAN-TSR :ORLAN-TSR TSR-01006-ORLAN Spare BOP Stack Regular Pay N 1.25 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-25 Rig 262L-TSR :Rig 262L-TSR TSR-01053-262L Skid Rails Rosneft Scope Regular Pay N 0.75 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-26 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 2 Annex J Write-Ups Annex J Meeting Drillmec Drawing Review Weekly Mtg Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.25 Weekly / Monthly Sakhalin Meeting Compliance Issues Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 New Computer Set-Up IHS Quote Request for Director of Quality Liberty Discussion (Rodney and Matt) HR Meeting Goals Meeting Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-26 Rig 221L-TSR :Rig 221L-TSR TSR-01049-221L Substructure Level Procedure Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-26 Rig 262L-TSR :Rig 262L-TSR TSR-00998-262L Spare BOP Stack Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-26 Rig 262L-TSR :Rig 262L-TSR TSR-01053-262L Skid Rails Rosneft Scope Regular Pay N 1 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-26 Rig 267L-TSR :Rig 267L-TSR TSR-01056-267L Skid 4m to Lower Derrick Regular Pay N 0.5 Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-26 Rig 270L-TSR :Rig 270L-TSR TSR-01055-270L Choke Skid Mods Regular Pay N 3 Analysis and Drawing Review Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-27 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 1 Annex J Write-Ups Annex J Meeting Drillmec Drawing Review Weekly Mtg Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 Weekly / Monthly Sakhalin Meeting Compliance Issues Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 New Computer Set-Up IHS Quote Request for Director of Quality Liberty Discussion (Rodney and Matt) HR Meeting Goals Meeting Mcmullen, Kyle 20461 Mcmullen, Kyle 2013-09-27 Rig 270L-TSR :Rig 270L-TSR TSR-01055-270L Choke Skid Mods Regular Pay N 2 Analysis and Drawing Review McNickle, Margaret MargaretM McNickle, Margaret 2013-09-16 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 McNickle, Margaret MargaretM McNickle, Margaret 2013-09-17 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 McNickle, Margaret MargaretM McNickle, Margaret 2013-09-18 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 McNickle, Margaret MargaretM McNickle, Margaret 2013-09-19 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 McNickle, Margaret MargaretM McNickle, Margaret 2013-09-20 OH-014 :OH-014 Overhead All Activities Regular Pay N 7.75 McNickle, Margaret MargaretM McNickle, Margaret 2013-09-20 Rig 264L-TSR :Rig 264L-TSR TSR-01040-264L Mobilization Planning and Scheduling Regular Pay N 0.25 Closeout transmittal McNickle, Margaret MargaretM McNickle, Margaret 2013-09-23 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 McNickle, Margaret MargaretM McNickle, Margaret 2013-09-24 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 McNickle, Margaret MargaretM McNickle, Margaret 2013-09-25 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 McNickle, Margaret MargaretM McNickle, Margaret 2013-09-26 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 McNickle, Margaret MargaretM McNickle, Margaret 2013-09-27 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 Melgoza, Andres 24898 Melgoza, Andres 2013-09-16 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 8 Monday: Traveling Tuesday: Traveling Wednesday: Traveling Thursday: ENL office presentation, initial discussions with regulatory, drawing review, Parker office Friday: ENL office. Various discussions regarding regulatory, design, doc control procedures. Traveling to Nogliki Sat: Traveling and arrival at 262. Arrival activities (safety, etc.). Toured the rig. Melgoza, Andres 24898 Melgoza, Andres 2013-09-17 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 8 Monday: Traveling Tuesday: Traveling Wednesday: Traveling Thursday: ENL office presentation, initial discussions with regulatory, drawing review, Parker office Friday: ENL office. Various discussions regarding regulatory, design, doc control procedures. Traveling to Nogliki Sat: Traveling and arrival at 262. Arrival activities (safety, etc.). Toured the rig. Melgoza, Andres 24898 Melgoza, Andres 2013-09-18 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 8 Monday: Traveling Tuesday: Traveling Wednesday: Traveling Thursday: ENL office presentation, initial discussions with regulatory, drawing review, Parker office Friday: ENL office. Various discussions regarding regulatory, design, doc control procedures. Traveling to Nogliki Sat: Traveling and arrival at 262. Arrival activities (safety, etc.). Toured the rig. Melgoza, Andres 24898 Melgoza, Andres 2013-09-19 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 10 Monday: Traveling Tuesday: Traveling Wednesday: Traveling Thursday: ENL office presentation, initial discussions with regulatory, drawing review, Parker office Friday: ENL office. Various discussions regarding regulatory, design, doc control procedures. Traveling to Nogliki Sat: Traveling and arrival at 262. Arrival activities (safety, etc.). Toured the rig. Melgoza, Andres 24898 Melgoza, Andres 2013-09-20 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 8 Monday: Traveling Tuesday: Traveling Wednesday: Traveling Thursday: ENL office presentation, initial discussions with regulatory, drawing review, Parker office Friday: ENL office. Various discussions regarding regulatory, design, doc control procedures. Traveling to Nogliki Sat: Traveling and arrival at 262. Arrival activities (safety, etc.). Toured the rig. Melgoza, Andres 24898 Melgoza, Andres 2013-09-21 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 12 Monday: Traveling Tuesday: Traveling Wednesday: Traveling Thursday: ENL office presentation, initial discussions with regulatory, drawing review, Parker office Friday: ENL office. Various discussions regarding regulatory, design, doc control procedures. Traveling to Nogliki Sat: Traveling and arrival at 262. Arrival activities (safety, etc.). Toured the rig. Melgoza, Andres 24898 Melgoza, Andres 2013-09-22 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 10 Sunday: Visit to Odoptu NWS Monday: 262 Rig site/Traveling/ENL office Tuesday: ENL office/Parker Office. Finalization of regulatory meeting schedule. Development of rig visit notes. Wednesday: ENL office regulatory meetings. Various email/design discussions Thursday: Parker office, design discussions with Lorenzo, drawing list assessment. Schedule discussion. Friday: Parker office. Travel home. Melgoza, Andres 24898 Melgoza, Andres 2013-09-23 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 10 Sunday: Visit to Odoptu NWS Monday: 262 Rig site/Traveling/ENL office Tuesday: ENL office/Parker Office. Finalization of regulatory meeting schedule. Development of rig visit notes. Wednesday: ENL office regulatory meetings. Various email/design discussions Thursday: Parker office, design discussions with Lorenzo, drawing list assessment. Schedule discussion. Friday: Parker office. Travel home. Melgoza, Andres 24898 Melgoza, Andres 2013-09-24 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 10 Sunday: Visit to Odoptu NWS Monday: 262 Rig site/Traveling/ENL office Tuesday: ENL office/Parker Office. Finalization of regulatory meeting schedule. Development of rig visit notes. Wednesday: ENL office regulatory meetings. Various email/design discussions Thursday: Parker office, design discussions with Lorenzo, drawing list assessment. Schedule discussion. Friday: Parker office. Travel home. Melgoza, Andres 24898 Melgoza, Andres 2013-09-25 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 10 Sunday: Visit to Odoptu NWS Monday: 262 Rig site/Traveling/ENL office Tuesday: ENL office/Parker Office. Finalization of regulatory meeting schedule. Development of rig visit notes. Wednesday: ENL office regulatory meetings. Various email/design discussions Thursday: Parker office, design discussions with Lorenzo, drawing list assessment. Schedule discussion. Friday: Parker office. Travel home. Melgoza, Andres 24898 Melgoza, Andres 2013-09-26 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 8 Sunday: Visit to Odoptu NWS Monday: 262 Rig site/Traveling/ENL office Tuesday: ENL office/Parker Office. Finalization of regulatory meeting schedule. Development of rig visit notes. Wednesday: ENL office regulatory meetings. Various email/design discussions Thursday: Parker office, design discussions with Lorenzo, drawing list assessment. Schedule discussion. Friday: Parker office. Travel home. Melgoza, Andres 24898 Melgoza, Andres 2013-09-27 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 8 Sunday: Visit to Odoptu NWS Monday: 262 Rig site/Traveling/ENL office Tuesday: ENL office/Parker Office. Finalization of regulatory meeting schedule. Development of rig visit notes. Wednesday: ENL office regulatory meetings. Various email/design discussions Thursday: Parker office, design discussions with Lorenzo, drawing list assessment. Schedule discussion. Friday: Parker office. Travel home. Mitchell, LeRon 31472 Mitchell, LeRon 2013-09-16 APEX :APEX Default Task Regular Pay N 8 AGIS Training Mitchell, LeRon 31472 Mitchell, LeRon 2013-09-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 TSR Review, Projects Weekly Procedure review Department Monthly Mitchell, LeRon 31472 Mitchell, LeRon 2013-09-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 5.75 Follow ups/invoicing Mitchell, LeRon 31472 Mitchell, LeRon 2013-09-17 Rig 247L-TSR :Rig 247L-TSR TSR-01044-247L Design Support Kurdistan Regular Pay N 0.25 CTR1 Transmit Mitchell, LeRon 31472 Mitchell, LeRon 2013-09-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 TSR Review, Projects Weekly Procedure review Department Monthly Mitchell, LeRon 31472 Mitchell, LeRon 2013-09-18 OH-013 :OH-013 Overhead All Activities Regular Pay N 6 Follow ups/invoicing Mitchell, LeRon 31472 Mitchell, LeRon 2013-09-18 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 Oracle Reporting Cost training w/Danielle Mitchell, LeRon 31472 Mitchell, LeRon 2013-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 TSR Review, Projects Weekly Procedure review Department Monthly Mitchell, LeRon 31472 Mitchell, LeRon 2013-09-19 OH-013 :OH-013 Overhead All Activities Regular Pay N 7 Follow ups/invoicing Mitchell, LeRon 31472 Mitchell, LeRon 2013-09-20 OH-013 :OH-013 Overhead All Activities Regular Pay N 6 Follow ups/invoicing Mitchell, LeRon 31472 Mitchell, LeRon 2013-09-20 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 Oracle Reporting Cost training w/Danielle Mitchell, LeRon 31472 Mitchell, LeRon 2013-09-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 7.75 Review hours estimates Mitchell, LeRon 31472 Mitchell, LeRon 2013-09-23 Rig 272L-TSR :Rig 272L-TSR TSR-00985-272L Relocate TD Elevator Switch Regular Pay N 0.25 RFI Transmit Mitchell, LeRon 31472 Mitchell, LeRon 2013-09-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 Procedures Mitchell, LeRon 31472 Mitchell, LeRon 2013-09-24 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 Review hours estimates Mitchell, LeRon 31472 Mitchell, LeRon 2013-09-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 TSR Review Mitchell, LeRon 31472 Mitchell, LeRon 2013-09-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 Procedures Mitchell, LeRon 31472 Mitchell, LeRon 2013-09-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 Review hours estimates Mitchell, LeRon 31472 Mitchell, LeRon 2013-09-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Sick Day Mitchell, LeRon 31472 Mitchell, LeRon 2013-09-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 Procedures Mitchell, LeRon 31472 Mitchell, LeRon 2013-09-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 4.75 Review hours estimates Mitchell, LeRon 31472 Mitchell, LeRon 2013-09-27 Rig 272L-273L-TSR-OPS :Rig 272L-273L-TSR-OPS TSR-01050-272L/273L Door from Mezzanine to Air Lock Room Regular Pay N 0.25 RFI Transmit Nguyen, Lam 27172 Nguyen, Lam 2013-09-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Autodesk Inventor tutorial/training Nguyen, Lam 27172 Nguyen, Lam 2013-09-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Autodesk Inventor tutorial/training Nguyen, Lam 27172 Nguyen, Lam 2013-09-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Autodesk Inventor tutorial/training Nguyen, Lam 27172 Nguyen, Lam 2013-09-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Autodesk Inventor tutorial/training Nguyen, Lam 27172 Nguyen, Lam 2013-09-20 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 8 begin sketches for mast headache rack Nguyen, Lam 27172 Nguyen, Lam 2013-09-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 implimenting Parker standards for Nguyen, Lam 27172 Nguyen, Lam 2013-09-24 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 8 finalization of drawings for 55B's headache rack Nguyen, Lam 27172 Nguyen, Lam 2013-09-25 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 8 finalization of drawings for 55B's headache rack Nguyen, Lam 27172 Nguyen, Lam 2013-09-26 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 8 finalization of drawings for 55B's headache rack Nguyen, Lam 27172 Nguyen, Lam 2013-09-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 implimenting Parker standards for Nguyen, Lam 27172 Nguyen, Lam 2013-09-27 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 4 finalization of drawings for 55B's headache rack Nix, Randy 11891 Nix, Randy 2013-09-15 Berkut-TSR :Berkut-TSR TSR-00976-BERKUT Site Monitoring of Equipment Regular Pay N 8 Conference call, travel to Odessa to visit CRG & witness continuing fabrication of boler houses for Berkut, travel to GA to witness FAT of boilers at Hurst Boilers. Nix, Randy 11891 Nix, Randy 2013-09-16 Berkut-TSR :Berkut-TSR TSR-00976-BERKUT Site Monitoring of Equipment Regular Pay N 10 Conference call, travel to Odessa to visit CRG & witness continuing fabrication of boler houses for Berkut, travel to GA to witness FAT of boilers at Hurst Boilers. Nix, Randy 11891 Nix, Randy 2013-09-16 Berkut-TSR :Berkut-TSR TSR-00980-BERKUT Site Monitoring - Diverter Skid Base Regular Pay N 1 Review drgs submittals, BOD, quotes for Control console & short mousehole for Berkut. Nix, Randy 11891 Nix, Randy 2013-09-17 Berkut-TSR :Berkut-TSR TSR-00976-BERKUT Site Monitoring of Equipment Regular Pay N 6 Conference call, travel to Odessa to visit CRG & witness continuing fabrication of boler houses for Berkut, travel to GA to witness FAT of boilers at Hurst Boilers. Nix, Randy 11891 Nix, Randy 2013-09-17 Berkut-TSR :Berkut-TSR TSR-00980-BERKUT Site Monitoring - Diverter Skid Base Regular Pay N 2 Review drgs submittals, BOD, quotes for Control console & short mousehole for Berkut. Nix, Randy 11891 Nix, Randy 2013-09-17 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 4 Review documents,Mast lowering procedure Nix, Randy 11891 Nix, Randy 2013-09-18 Berkut-TSR :Berkut-TSR TSR-00976-BERKUT Site Monitoring of Equipment Regular Pay N 10 Conference call, travel to Odessa to visit CRG & witness continuing fabrication of boler houses for Berkut, travel to GA to witness FAT of boilers at Hurst Boilers. Nix, Randy 11891 Nix, Randy 2013-09-18 Berkut-TSR :Berkut-TSR TSR-00980-BERKUT Site Monitoring - Diverter Skid Base Regular Pay N 1 Review drgs submittals, BOD, quotes for Control console & short mousehole for Berkut. Nix, Randy 11891 Nix, Randy 2013-09-19 Berkut-TSR :Berkut-TSR TSR-00976-BERKUT Site Monitoring of Equipment Regular Pay N 10 Conference call, travel to Odessa to visit CRG & witness continuing fabrication of boler houses for Berkut, travel to GA to witness FAT of boilers at Hurst Boilers. Nix, Randy 11891 Nix, Randy 2013-09-19 Berkut-TSR :Berkut-TSR TSR-00980-BERKUT Site Monitoring - Diverter Skid Base Regular Pay N 2 Review drgs submittals, BOD, quotes for Control console & short mousehole for Berkut. Nix, Randy 11891 Nix, Randy 2013-09-20 Berkut-TSR :Berkut-TSR TSR-00976-BERKUT Site Monitoring of Equipment Regular Pay N 10 Conference call, travel to Odessa to visit CRG & witness continuing fabrication of boler houses for Berkut, travel to GA to witness FAT of boilers at Hurst Boilers. Nix, Randy 11891 Nix, Randy 2013-09-20 Berkut-TSR :Berkut-TSR TSR-00980-BERKUT Site Monitoring - Diverter Skid Base Regular Pay N 1 Review drgs submittals, BOD, quotes for Control console & short mousehole for Berkut. Nix, Randy 11891 Nix, Randy 2013-09-22 Berkut-TSR :Berkut-TSR TSR-00976-BERKUT Site Monitoring of Equipment Regular Pay N 1 attend conf call GSM/CRG, coordinate boilers, hotbox, condensate pumps, boiler houses for expedient delivery Nix, Randy 11891 Nix, Randy 2013-09-22 Berkut-TSR :Berkut-TSR TSR-00980-BERKUT Site Monitoring - Diverter Skid Base Regular Pay N 2 review submittal drgs, BOD, coordinate remaining drgs, coordiante LF & diverter trolley pkg for expedient delivery Nix, Randy 11891 Nix, Randy 2013-09-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 8 PMP course. Nix, Randy 11891 Nix, Randy 2013-09-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 8 PMP course. Nix, Randy 11891 Nix, Randy 2013-09-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 8 PMP course. Nix, Randy 11891 Nix, Randy 2013-09-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 8 PMP course. Nix, Randy 11891 Nix, Randy 2013-09-27 Berkut-TSR :Berkut-TSR TSR-00976-BERKUT Site Monitoring of Equipment Regular Pay N 3 attend conf call GSM/CRG, coordinate boilers, hotbox, condensate pumps, boiler houses for expedient delivery Nix, Randy 11891 Nix, Randy 2013-09-27 Berkut-TSR :Berkut-TSR TSR-00980-BERKUT Site Monitoring - Diverter Skid Base Regular Pay N 3 review submittal drgs, BOD, coordinate remaining drgs, coordiante LF & diverter trolley pkg for expedient delivery Nutley, Tami 28980 Nutley, Tami 2013-09-16 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Nutley, Tami 28980 Nutley, Tami 2013-09-17 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Nutley, Tami 28980 Nutley, Tami 2013-09-18 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Nutley, Tami 28980 Nutley, Tami 2013-09-19 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Nutley, Tami 28980 Nutley, Tami 2013-09-20 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Nutley, Tami 28980 Nutley, Tami 2013-09-23 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Nutley, Tami 28980 Nutley, Tami 2013-09-24 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Nutley, Tami 28980 Nutley, Tami 2013-09-25 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Nutley, Tami 28980 Nutley, Tami 2013-09-26 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Nutley, Tami 28980 Nutley, Tami 2013-09-27 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Oiboh, Maria 28657 Oiboh, Maria 2013-09-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 09/16 - gather information for fastener standard 09/17 - TSR Review Metting (1) 09/19-dept mtg (1.5) Oiboh, Maria 28657 Oiboh, Maria 2013-09-16 Rig 221L-TSR :Rig 221L-TSR TSR-01049-221L Substructure Level Procedure Regular Pay N 2 Jacking Beam and sucstructure box openning analysis, closeout package. Oiboh, Maria 28657 Oiboh, Maria 2013-09-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 5 09/16 - gather information for fastener standard 09/17 - TSR Review Metting (1) 09/19-dept mtg (1.5) Oiboh, Maria 28657 Oiboh, Maria 2013-09-17 Rig 221L-TSR :Rig 221L-TSR TSR-01049-221L Substructure Level Procedure Regular Pay N 3 Jacking Beam and sucstructure box openning analysis, closeout package. Oiboh, Maria 28657 Oiboh, Maria 2013-09-18 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 1.5 mtg with AKSO Oiboh, Maria 28657 Oiboh, Maria 2013-09-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 09/16 - gather information for fastener standard 09/17 - TSR Review Metting (1) 09/19-dept mtg (1.5) Oiboh, Maria 28657 Oiboh, Maria 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 0.5 Revise Closeout Package Oiboh, Maria 28657 Oiboh, Maria 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 3 Headache Rack Analysis Oiboh, Maria 28657 Oiboh, Maria 2013-09-18 Rig 221L-TSR :Rig 221L-TSR TSR-01049-221L Substructure Level Procedure Regular Pay N 2 Jacking Beam and sucstructure box openning analysis, closeout package. Oiboh, Maria 28657 Oiboh, Maria 2013-09-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 09/16 - gather information for fastener standard 09/17 - TSR Review Metting (1) 09/19-dept mtg (1.5) Oiboh, Maria 28657 Oiboh, Maria 2013-09-19 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 4 Headache Rack Analysis Oiboh, Maria 28657 Oiboh, Maria 2013-09-19 Rig 221L-TSR :Rig 221L-TSR TSR-01049-221L Substructure Level Procedure Regular Pay N 2 Jacking Beam and sucstructure box openning analysis, closeout package. Oiboh, Maria 28657 Oiboh, Maria 2013-09-20 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 5 Headache Rack Analysis Oiboh, Maria 28657 Oiboh, Maria 2013-09-20 Rig 221L-TSR :Rig 221L-TSR TSR-01049-221L Substructure Level Procedure Regular Pay N 1 Jacking Beam and sucstructure box openning analysis, closeout package. Oiboh, Maria 28657 Oiboh, Maria 2013-09-20 Rig 267L-TSR :Rig 267L-TSR TSR-01056-267L Skid 4m to Lower Derrick Regular Pay N 2 Review TSR & email Bomco Oiboh, Maria 28657 Oiboh, Maria 2013-09-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 09/23 - Researching barge design, 09/24 - Reseach 55 B crane information (2.0) 09/25-TSR Review Mtg .5 hrs Oiboh, Maria 28657 Oiboh, Maria 2013-09-23 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 4 Headache rack analysis Oiboh, Maria 28657 Oiboh, Maria 2013-09-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 09/23 - Researching barge design, 09/24 - Reseach 55 B crane information (2.0) 09/25-TSR Review Mtg .5 hrs Oiboh, Maria 28657 Oiboh, Maria 2013-09-24 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 5 Headache rack analysis Oiboh, Maria 28657 Oiboh, Maria 2013-09-24 Rig 221L-TSR :Rig 221L-TSR TSR-01049-221L Substructure Level Procedure Regular Pay N 1 Check jacking beam, closeout Oiboh, Maria 28657 Oiboh, Maria 2013-09-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 09/23 - Researching barge design, 09/24 - Reseach 55 B crane information (2.0) 09/25-TSR Review Mtg .5 hrs Oiboh, Maria 28657 Oiboh, Maria 2013-09-25 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 5 Headache rack analysis Oiboh, Maria 28657 Oiboh, Maria 2013-09-25 Rig 221L-TSR :Rig 221L-TSR TSR-01049-221L Substructure Level Procedure Regular Pay N 1 Check jacking beam, closeout Oiboh, Maria 28657 Oiboh, Maria 2013-09-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 09/23 - Researching barge design, 09/24 - Reseach 55 B crane information (2.0) 09/25-TSR Review Mtg .5 hrs Oiboh, Maria 28657 Oiboh, Maria 2013-09-26 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 2 Headache rack analysis Oiboh, Maria 28657 Oiboh, Maria 2013-09-26 Rig 221L-TSR :Rig 221L-TSR TSR-01049-221L Substructure Level Procedure Regular Pay N 4 Check jacking beam, closeout Oiboh, Maria 28657 Oiboh, Maria 2013-09-26 Rig 272L-273L-TSR-OPS :Rig 272L-273L-TSR-OPS TSR-01050-272L/273L Door from Mezzanine to Air Lock Room Regular Pay N 0.5 RFI Oiboh, Maria 28657 Oiboh, Maria 2013-09-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 5 09/23 - Researching barge design, 09/24 - Reseach 55 B crane information (2.0) 09/25-TSR Review Mtg .5 hrs Oiboh, Maria 28657 Oiboh, Maria 2013-09-27 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 1 Headache rack analysis Oiboh, Maria 28657 Oiboh, Maria 2013-09-27 Rig 267L-TSR :Rig 267L-TSR TSR-01056-267L Skid 4m to Lower Derrick Regular Pay N 2 Closeout Osten, Greg 23110 Osten, Greg 2013-09-16 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 4 On 9/16, reveiwed Drillmec FEED kickoff actions. On 9/17, attended Drillmec weekly meeting. On 9/18, reviewed LLE RFP and entity status. On 9/19, reviewed MDR status. On 9/20, reviewed Stress scope. Osten, Greg 23110 Osten, Greg 2013-09-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 PTO on 9/16, 9/19 and 9/20. Osten, Greg 23110 Osten, Greg 2013-09-17 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 8 On 9/16, reveiwed Drillmec FEED kickoff actions. On 9/17, attended Drillmec weekly meeting. On 9/18, reviewed LLE RFP and entity status. On 9/19, reviewed MDR status. On 9/20, reviewed Stress scope. Osten, Greg 23110 Osten, Greg 2013-09-18 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 8 On 9/16, reveiwed Drillmec FEED kickoff actions. On 9/17, attended Drillmec weekly meeting. On 9/18, reviewed LLE RFP and entity status. On 9/19, reviewed MDR status. On 9/20, reviewed Stress scope. Osten, Greg 23110 Osten, Greg 2013-09-19 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 4 On 9/16, reveiwed Drillmec FEED kickoff actions. On 9/17, attended Drillmec weekly meeting. On 9/18, reviewed LLE RFP and entity status. On 9/19, reviewed MDR status. On 9/20, reviewed Stress scope. Osten, Greg 23110 Osten, Greg 2013-09-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 PTO on 9/16, 9/19 and 9/20. Osten, Greg 23110 Osten, Greg 2013-09-20 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 4 On 9/16, reveiwed Drillmec FEED kickoff actions. On 9/17, attended Drillmec weekly meeting. On 9/18, reviewed LLE RFP and entity status. On 9/19, reviewed MDR status. On 9/20, reviewed Stress scope. Osten, Greg 23110 Osten, Greg 2013-09-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 PTO on 9/16, 9/19 and 9/20. Osten, Greg 23110 Osten, Greg 2013-09-23 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 On 9/23, 9/26, 9/27 PTO. Osten, Greg 23110 Osten, Greg 2013-09-24 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 8 On 9/24, Drillmec meeting. On 9/25, LLE procurement, weights and cg's. Osten, Greg 23110 Osten, Greg 2013-09-25 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 8 On 9/24, Drillmec meeting. On 9/25, LLE procurement, weights and cg's. Osten, Greg 23110 Osten, Greg 2013-09-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 On 9/23, 9/26, 9/27 PTO. Osten, Greg 23110 Osten, Greg 2013-09-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 On 9/23, 9/26, 9/27 PTO. Perez, Jorge 29841 Perez, Jorge 2013-09-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Inventor practice-Reseve Mud Pit #1. Perez, Jorge 29841 Perez, Jorge 2013-09-17 OH-001 :OH-001 Overhead All Activities Regular Pay N 3 Perez, Jorge 29841 Perez, Jorge 2013-09-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 5 Inventor practice-Reseve Mud Pit #1. Perez, Jorge 29841 Perez, Jorge 2013-09-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 Inventor practice-Reseve Mud Pit #1. Perez, Jorge 29841 Perez, Jorge 2013-09-18 Rig 270L-TSR :Rig 270L-TSR TSR-01054-270L Suction Piping Modification Regular Pay N 3 270L-01-00-010-RK, 270L-01-05-019-1-R0, 270L-01-05-019-2-R0 Perez, Jorge 29841 Perez, Jorge 2013-09-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 9 Inventor practice-Reseve Mud Pit #1. Perez, Jorge 29841 Perez, Jorge 2013-09-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 Inventor practice-Reseve Mud Pit #1. Perez, Jorge 29841 Perez, Jorge 2013-09-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Inventor Practice-Rig247L-02-02-020 Mud Mix Charging Pump Skid Perez, Jorge 29841 Perez, Jorge 2013-09-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 8.5 Inventor Practice-Rig247L-02-02-020 Mud Mix Charging Pump Skid Perez, Jorge 29841 Perez, Jorge 2013-09-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Inventor Practice-Rig247L-02-02-020 Mud Mix Charging Pump Skid Perez, Jorge 29841 Perez, Jorge 2013-09-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 8.5 Inventor Practice-Rig247L-02-02-020 Mud Mix Charging Pump Skid Perez, Jorge 29841 Perez, Jorge 2013-09-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 7 Inventor Practice-Rig247L-02-02-020 Mud Mix Charging Pump Skid Powers, Brian 30165 Powers, Brian 2013-09-16 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 8.5 9/16 - Table 3.1 RFP / TPP / SDRL review, back to back equipment subcontracts, drillmec subcontract 9/17 - Table 3.2 RFP / TPP / sdrl review, finalized drillmec subcontract 9/18 - procurement mtg, Table 3.2 RFP / TPP / sdrl review 9/19 - FEED planning, schedule / planning, weekly report 9/20 - weekly emlr mtg @ greenspoint, preparing stress analysis subcontract / commercial requirements, Powers, Brian 30165 Powers, Brian 2013-09-17 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 8 9/16 - Table 3.1 RFP / TPP / SDRL review, back to back equipment subcontracts, drillmec subcontract 9/17 - Table 3.2 RFP / TPP / sdrl review, finalized drillmec subcontract 9/18 - procurement mtg, Table 3.2 RFP / TPP / sdrl review 9/19 - FEED planning, schedule / planning, weekly report 9/20 - weekly emlr mtg @ greenspoint, preparing stress analysis subcontract / commercial requirements, Powers, Brian 30165 Powers, Brian 2013-09-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 9/17 - projects wkly mtg 9/18 - tech services, wkly cost mtg Powers, Brian 30165 Powers, Brian 2013-09-18 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 9.5 9/16 - Table 3.1 RFP / TPP / SDRL review, back to back equipment subcontracts, drillmec subcontract 9/17 - Table 3.2 RFP / TPP / sdrl review, finalized drillmec subcontract 9/18 - procurement mtg, Table 3.2 RFP / TPP / sdrl review 9/19 - FEED planning, schedule / planning, weekly report 9/20 - weekly emlr mtg @ greenspoint, preparing stress analysis subcontract / commercial requirements, Powers, Brian 30165 Powers, Brian 2013-09-19 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 8.5 9/16 - Table 3.1 RFP / TPP / SDRL review, back to back equipment subcontracts, drillmec subcontract 9/17 - Table 3.2 RFP / TPP / sdrl review, finalized drillmec subcontract 9/18 - procurement mtg, Table 3.2 RFP / TPP / sdrl review 9/19 - FEED planning, schedule / planning, weekly report 9/20 - weekly emlr mtg @ greenspoint, preparing stress analysis subcontract / commercial requirements, Powers, Brian 30165 Powers, Brian 2013-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 9/17 - projects wkly mtg 9/18 - tech services, wkly cost mtg Powers, Brian 30165 Powers, Brian 2013-09-20 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 6 9/16 - Table 3.1 RFP / TPP / SDRL review, back to back equipment subcontracts, drillmec subcontract 9/17 - Table 3.2 RFP / TPP / sdrl review, finalized drillmec subcontract 9/18 - procurement mtg, Table 3.2 RFP / TPP / sdrl review 9/19 - FEED planning, schedule / planning, weekly report 9/20 - weekly emlr mtg @ greenspoint, preparing stress analysis subcontract / commercial requirements, Powers, Brian 30165 Powers, Brian 2013-09-23 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 6.5 9/23 - Oct FEED planning, FEED schedule discussions / review, subcontract prep for Stress analysis 9/24 - Quality Plan, Management of Change Plan, Stress Engineering mtg, 9/25 - Procurement mtg, procurement planning 9/26 - weekly report, bank guarantee planning mtg, 9/27 - weekly exxon mtg, procurement planning / discussions, regulatory prep planning Powers, Brian 30165 Powers, Brian 2013-09-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 9/23 - weekly projects mtg, generations fabricatino mtg Powers, Brian 30165 Powers, Brian 2013-09-24 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 8 9/23 - Oct FEED planning, FEED schedule discussions / review, subcontract prep for Stress analysis 9/24 - Quality Plan, Management of Change Plan, Stress Engineering mtg, 9/25 - Procurement mtg, procurement planning 9/26 - weekly report, bank guarantee planning mtg, 9/27 - weekly exxon mtg, procurement planning / discussions, regulatory prep planning Powers, Brian 30165 Powers, Brian 2013-09-25 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 8.5 9/23 - Oct FEED planning, FEED schedule discussions / review, subcontract prep for Stress analysis 9/24 - Quality Plan, Management of Change Plan, Stress Engineering mtg, 9/25 - Procurement mtg, procurement planning 9/26 - weekly report, bank guarantee planning mtg, 9/27 - weekly exxon mtg, procurement planning / discussions, regulatory prep planning Powers, Brian 30165 Powers, Brian 2013-09-26 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 8 9/23 - Oct FEED planning, FEED schedule discussions / review, subcontract prep for Stress analysis 9/24 - Quality Plan, Management of Change Plan, Stress Engineering mtg, 9/25 - Procurement mtg, procurement planning 9/26 - weekly report, bank guarantee planning mtg, 9/27 - weekly exxon mtg, procurement planning / discussions, regulatory prep planning Powers, Brian 30165 Powers, Brian 2013-09-27 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 8 9/23 - Oct FEED planning, FEED schedule discussions / review, subcontract prep for Stress analysis 9/24 - Quality Plan, Management of Change Plan, Stress Engineering mtg, 9/25 - Procurement mtg, procurement planning 9/26 - weekly report, bank guarantee planning mtg, 9/27 - weekly exxon mtg, procurement planning / discussions, regulatory prep planning Presas, David 29609 Presas, David 2013-09-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Inventer Presas, David 29609 Presas, David 2013-09-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Inventer Presas, David 29609 Presas, David 2013-09-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 Inventer Presas, David 29609 Presas, David 2013-09-18 Rig 270L-TSR :Rig 270L-TSR TSR-01055-270L Choke Skid Mods Regular Pay N 4 As built drawings for Choke manifold master skid Presas, David 29609 Presas, David 2013-09-19 Rig 270L-TSR :Rig 270L-TSR TSR-01055-270L Choke Skid Mods Regular Pay N 8 As built drawings for Choke manifold master skid Presas, David 29609 Presas, David 2013-09-20 Rig 270L-TSR :Rig 270L-TSR TSR-01055-270L Choke Skid Mods Regular Pay N 8 As built drawings for Choke manifold master skid Presas, David 29609 Presas, David 2013-09-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 Inventer Presas, David 29609 Presas, David 2013-09-23 Rig 270L-TSR :Rig 270L-TSR TSR-01055-270L Choke Skid Mods Regular Pay N 2 As built drawings for Choke manifold master skid. Changed to skid to Russian beams. Presas, David 29609 Presas, David 2013-09-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 Inventer Presas, David 29609 Presas, David 2013-09-24 Rig 270L-TSR :Rig 270L-TSR TSR-01055-270L Choke Skid Mods Regular Pay N 2 As built drawings for Choke manifold master skid. Changed to skid to Russian beams. Presas, David 29609 Presas, David 2013-09-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 Inventer Presas, David 29609 Presas, David 2013-09-25 Rig 270L-TSR :Rig 270L-TSR TSR-01055-270L Choke Skid Mods Regular Pay N 4 As built drawings for Choke manifold master skid. Changed to skid to Russian beams. Presas, David 29609 Presas, David 2013-09-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Inventer Presas, David 29609 Presas, David 2013-09-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 Inventer Presas, David 29609 Presas, David 2013-09-27 Rig 270L-TSR :Rig 270L-TSR TSR-01055-270L Choke Skid Mods Regular Pay N 2 As built drawings for Choke manifold master skid. Changed to skid to Russian beams. Queen, Jason 29048 Queen, Jason 2013-09-16 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Queen, Jason 29048 Queen, Jason 2013-09-17 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Queen, Jason 29048 Queen, Jason 2013-09-18 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Queen, Jason 29048 Queen, Jason 2013-09-19 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Queen, Jason 29048 Queen, Jason 2013-09-20 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Queen, Jason 29048 Queen, Jason 2013-09-23 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Queen, Jason 29048 Queen, Jason 2013-09-24 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Queen, Jason 29048 Queen, Jason 2013-09-25 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Queen, Jason 29048 Queen, Jason 2013-09-26 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Queen, Jason 29048 Queen, Jason 2013-09-27 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Quinlan, Mark 15605 Quinlan, Mark 2013-09-16 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 1 AoA's for manifolds, skidding and CRI packages. Ivara approvals. Kearney Gravis Japan trip information reseach and delivery. Jon Richardson position change. Quinlan, Mark 15605 Quinlan, Mark 2013-09-16 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 2 Set discussion with ENL. TPP reviews for choke and kill manifolds, Pipe Barn pipe handling cranes, horizontal makeup / breakout units, etc. Functional requirements document discussion and organization. Timesheet conversations. Requests for proposals. Long Lead Equipment. EMLR project discussion at Greenspoint. Seismic variable definition. Yuzhno contacts. Functional Requirements discussion with internal team. Quinlan, Mark 15605 Quinlan, Mark 2013-09-16 Liberty Demob Phase I :Liberty Demob Phase I 7714A00102 Engineering Support Houston Regular Pay N 1 Mast and mast assist drawings with planning for delivery and access. Quinlan, Mark 15605 Quinlan, Mark 2013-09-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 Timesheets. 2012 W2 information from PKD. Cell phone policy research and employee response. Recruiting information for Bryan Little (Petroleum Engineer). Engineering management process research. Employee Development Plans. Jeramy Roberts - ME1 interview. Curtis Mize - ME1 interview. Russian Regulatory / Certification position discussions. Designer candidate discussion - Troy Posinski. Quinlan, Mark 15605 Quinlan, Mark 2013-09-16 Rig 221L-TSR :Rig 221L-TSR TSR-01049-221L Substructure Level Procedure Regular Pay N 1.5 Clarification discussions. Jacking beams, windows, matting boards, etc. Talk with Operations. Quinlan, Mark 15605 Quinlan, Mark 2013-09-16 Rig 247L-TSR :Rig 247L-TSR TSR-01044-247L Design Support Kurdistan Regular Pay N 0.5 Travel authorization. CTR review and approval. Quinlan, Mark 15605 Quinlan, Mark 2013-09-17 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 1 AoA's for manifolds, skidding and CRI packages. Ivara approvals. Kearney Gravis Japan trip information reseach and delivery. Jon Richardson position change. Quinlan, Mark 15605 Quinlan, Mark 2013-09-17 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 1 Set discussion with ENL. TPP reviews for choke and kill manifolds, Pipe Barn pipe handling cranes, horizontal makeup / breakout units, etc. Functional requirements document discussion and organization. Timesheet conversations. Requests for proposals. Long Lead Equipment. EMLR project discussion at Greenspoint. Seismic variable definition. Yuzhno contacts. Functional Requirements discussion with internal team. Quinlan, Mark 15605 Quinlan, Mark 2013-09-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 Document Control - Digitizing Engineering drawings. Biweekly TS discussion. Monthly TS meeting preparation, meeting and follow ups. Quinlan, Mark 15605 Quinlan, Mark 2013-09-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 Timesheets. 2012 W2 information from PKD. Cell phone policy research and employee response. Recruiting information for Bryan Little (Petroleum Engineer). Engineering management process research. Employee Development Plans. Jeramy Roberts - ME1 interview. Curtis Mize - ME1 interview. Russian Regulatory / Certification position discussions. Designer candidate discussion - Troy Posinski. Quinlan, Mark 15605 Quinlan, Mark 2013-09-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 TSR weekly meeting. TSR progress milestone review and update with process. Quinlan, Mark 15605 Quinlan, Mark 2013-09-17 ORLAN-TSR :ORLAN-TSR Default Task Regular Pay N 0.5 Orlan derrick specification and purchase order research for Operations. Quinlan, Mark 15605 Quinlan, Mark 2013-09-17 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 0.5 Closeout review and comment. Closeout approval. Quinlan, Mark 15605 Quinlan, Mark 2013-09-17 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 1 TSR processing and discussions. Scope discussions. Quinlan, Mark 15605 Quinlan, Mark 2013-09-17 Rig 055B - TSR :Rig 055B - TSR TSR-01033-55B Mast Headache Rack Regular Pay N 0.5 Discussion and guidance. Quinlan, Mark 15605 Quinlan, Mark 2013-09-18 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 6.5 Set discussion with ENL. TPP reviews for choke and kill manifolds, Pipe Barn pipe handling cranes, horizontal makeup / breakout units, etc. Functional requirements document discussion and organization. Timesheet conversations. Requests for proposals. Long Lead Equipment. EMLR project discussion at Greenspoint. Seismic variable definition. Yuzhno contacts. Functional Requirements discussion with internal team. Quinlan, Mark 15605 Quinlan, Mark 2013-09-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 Timesheets. 2012 W2 information from PKD. Cell phone policy research and employee response. Recruiting information for Bryan Little (Petroleum Engineer). Engineering management process research. Employee Development Plans. Jeramy Roberts - ME1 interview. Curtis Mize - ME1 interview. Russian Regulatory / Certification position discussions. Designer candidate discussion - Troy Posinski. Quinlan, Mark 15605 Quinlan, Mark 2013-09-18 Rig 055B - TSR :Rig 055B - TSR TSR-01026-55B Drawing list assessment Regular Pay N 1 Closeout review and comment. Closeout approval. Quinlan, Mark 15605 Quinlan, Mark 2013-09-19 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 1 AoA's for manifolds, skidding and CRI packages. Ivara approvals. Kearney Gravis Japan trip information reseach and delivery. Jon Richardson position change. Quinlan, Mark 15605 Quinlan, Mark 2013-09-19 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 2.5 Set discussion with ENL. TPP reviews for choke and kill manifolds, Pipe Barn pipe handling cranes, horizontal makeup / breakout units, etc. Functional requirements document discussion and organization. Timesheet conversations. Requests for proposals. Long Lead Equipment. EMLR project discussion at Greenspoint. Seismic variable definition. Yuzhno contacts. Functional Requirements discussion with internal team. Quinlan, Mark 15605 Quinlan, Mark 2013-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 Document Control - Digitizing Engineering drawings. Biweekly TS discussion. Monthly TS meeting preparation, meeting and follow ups. Quinlan, Mark 15605 Quinlan, Mark 2013-09-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 Timesheets. 2012 W2 information from PKD. Cell phone policy research and employee response. Recruiting information for Bryan Little (Petroleum Engineer). Engineering management process research. Employee Development Plans. Jeramy Roberts - ME1 interview. Curtis Mize - ME1 interview. Russian Regulatory / Certification position discussions. Designer candidate discussion - Troy Posinski. Quinlan, Mark 15605 Quinlan, Mark 2013-09-19 OH-009 :OH-009 OH-009-008 2013 Rosneft – Arctic Rig Regular Pay N 2 MOU discussions. Schedule planning. BD discussions. Concept and FEED activities planning. Management discussion. Quinlan, Mark 15605 Quinlan, Mark 2013-09-19 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 0.5 TSR processing and discussions. Scope discussions. Quinlan, Mark 15605 Quinlan, Mark 2013-09-19 Rig 270L-TSR :Rig 270L-TSR TSR-01054-270L Suction Piping Modification Regular Pay N 1 Drawing review and discussion with Mechanical. Quinlan, Mark 15605 Quinlan, Mark 2013-09-20 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 2.5 Set discussion with ENL. TPP reviews for choke and kill manifolds, Pipe Barn pipe handling cranes, horizontal makeup / breakout units, etc. Functional requirements document discussion and organization. Timesheet conversations. Requests for proposals. Long Lead Equipment. EMLR project discussion at Greenspoint. Seismic variable definition. Yuzhno contacts. Functional Requirements discussion with internal team. Quinlan, Mark 15605 Quinlan, Mark 2013-09-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 Leave early on Friday. Quinlan, Mark 15605 Quinlan, Mark 2013-09-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 Timesheets. 2012 W2 information from PKD. Cell phone policy research and employee response. Recruiting information for Bryan Little (Petroleum Engineer). Engineering management process research. Employee Development Plans. Jeramy Roberts - ME1 interview. Curtis Mize - ME1 interview. Russian Regulatory / Certification position discussions. Designer candidate discussion - Troy Posinski. Quinlan, Mark 15605 Quinlan, Mark 2013-09-20 OH-009 :OH-009 OH-009-008 2013 Rosneft – Arctic Rig Regular Pay N 0.5 MOU discussions. Schedule planning. BD discussions. Concept and FEED activities planning. Management discussion. Quinlan, Mark 15605 Quinlan, Mark 2013-09-23 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Funeral in Oklahoma. Quinlan, Mark 15605 Quinlan, Mark 2013-09-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Funeral in Oklahoma. Quinlan, Mark 15605 Quinlan, Mark 2013-09-25 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 2 Jon Richardson discussion for job scope, etc. Ivara reviews and approvals. Aker-Wirth. NOV. Bardex. Cameron. Halliburton. Quinlan, Mark 15605 Quinlan, Mark 2013-09-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 PKD Engineering 2013 Goals and Objectives discussion with managers. Discussions with PM and Alaska regarding annual maintenance and potential engineering support moving forward. AADU construction materials listings. Quinlan, Mark 15605 Quinlan, Mark 2013-09-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 Timesheets. Work review following time out of office. Recruiting for Checker and Mechanical positions. Troy Posinski potential. Mechanical I Interview: Logan Lancon. HR weekly discussion with Engineering and Project Management. Quinlan, Mark 15605 Quinlan, Mark 2013-09-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 Weekly TSR meeting. Process progress regarding reviews, approvals, CTRs, etc. Quinlan, Mark 15605 Quinlan, Mark 2013-09-25 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 1.5 Weekly project conference call and update discussion with New Iberia. TSR discussions and processing. Clarifications. Quinlan, Mark 15605 Quinlan, Mark 2013-09-25 Rig 270L-TSR :Rig 270L-TSR TSR-01054-270L Suction Piping Modification Regular Pay N 0.5 Piping suction analysis discussions. Quinlan, Mark 15605 Quinlan, Mark 2013-09-26 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 1 Monitoring. Annex J updates. Organization discussions. Weekly conference call. Russian fabricator discussion. Quinlan, Mark 15605 Quinlan, Mark 2013-09-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 Timesheets. Work review following time out of office. Recruiting for Checker and Mechanical positions. Troy Posinski potential. Mechanical I Interview: Logan Lancon. HR weekly discussion with Engineering and Project Management. Quinlan, Mark 15605 Quinlan, Mark 2013-09-26 OH-009 :OH-009 OH-009-008 2013 Rosneft – Arctic Rig Regular Pay N 2 Planning discussions. Update discussions from Alaskan visit. Quinlan, Mark 15605 Quinlan, Mark 2013-09-26 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 Project APEX Training: Invoice Coding and Approvals. Quinlan, Mark 15605 Quinlan, Mark 2013-09-26 ORLAN-TSR :ORLAN-TSR Default Task Regular Pay N 0.5 Monthly ENL conference call. Quinlan, Mark 15605 Quinlan, Mark 2013-09-26 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 2 Weekly project conference call and update discussion with New Iberia. TSR discussions and processing. Clarifications. Quinlan, Mark 15605 Quinlan, Mark 2013-09-26 Rig 221L-TSR :Rig 221L-TSR TSR-01049-221L Substructure Level Procedure Regular Pay N 1 Scope and CTR discussions. Reviews, etc. Quinlan, Mark 15605 Quinlan, Mark 2013-09-26 Rig 262L-TSR :Rig 262L-TSR Default Task Regular Pay N 0.5 Monthly ENL conference call. Quinlan, Mark 15605 Quinlan, Mark 2013-09-27 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 1 Jon Richardson discussion for job scope, etc. Ivara reviews and approvals. Aker-Wirth. NOV. Bardex. Cameron. Halliburton. Quinlan, Mark 15605 Quinlan, Mark 2013-09-27 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 1.5 Monitoring. Annex J updates. Organization discussions. Weekly conference call. Russian fabricator discussion. Quinlan, Mark 15605 Quinlan, Mark 2013-09-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 PKD Engineering 2013 Goals and Objectives discussion with managers. Discussions with PM and Alaska regarding annual maintenance and potential engineering support moving forward. AADU construction materials listings. Quinlan, Mark 15605 Quinlan, Mark 2013-09-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 Timesheets. Work review following time out of office. Recruiting for Checker and Mechanical positions. Troy Posinski potential. Mechanical I Interview: Logan Lancon. HR weekly discussion with Engineering and Project Management. Quinlan, Mark 15605 Quinlan, Mark 2013-09-27 Rig 055B - TSR :Rig 055B - TSR TSR-01030-55B Planning and Scheduling Regular Pay N 0.5 Weekly project conference call and update discussion with New Iberia. TSR discussions and processing. Clarifications. Quinlan, Mark 15605 Quinlan, Mark 2013-09-27 Rig 221L-TSR :Rig 221L-TSR TSR-01049-221L Substructure Level Procedure Regular Pay N 0.5 Scope and CTR discussions. Reviews, etc. Quinlan, Mark 15605 Quinlan, Mark 2013-09-27 Rig 270L-TSR :Rig 270L-TSR TSR-01054-270L Suction Piping Modification Regular Pay N 1 Piping suction analysis discussions. Raughter, Keith 20966 Raughter, Keith 2013-09-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 9 Inventor training Install and configure AutoCAD abd Inventor for Andy Martinez Raughter, Keith 20966 Raughter, Keith 2013-09-17 Rig 266L-TSR :Rig 266L-TSR TSR-01041-266L/267L Electrical Redline Markups Regular Pay N 9 Raughter, Keith 20966 Raughter, Keith 2013-09-18 Rig 266L-TSR :Rig 266L-TSR TSR-01041-266L/267L Electrical Redline Markups Regular Pay N 9 Raughter, Keith 20966 Raughter, Keith 2013-09-19 Rig 266L-TSR :Rig 266L-TSR TSR-01041-266L/267L Electrical Redline Markups Regular Pay N 9 Raughter, Keith 20966 Raughter, Keith 2013-09-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 Inventor training Install and configure AutoCAD abd Inventor for Andy Martinez Raughter, Keith 20966 Raughter, Keith 2013-09-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 Inventor install Raughter, Keith 20966 Raughter, Keith 2013-09-23 Rig 266L-TSR :Rig 266L-TSR TSR-01041-266L/267L Electrical Redline Markups Regular Pay N 6 Raughter, Keith 20966 Raughter, Keith 2013-09-24 Rig 266L-TSR :Rig 266L-TSR TSR-01041-266L/267L Electrical Redline Markups Regular Pay N 9 Raughter, Keith 20966 Raughter, Keith 2013-09-25 Rig 266L-TSR :Rig 266L-TSR TSR-01041-266L/267L Electrical Redline Markups Regular Pay N 9 Raughter, Keith 20966 Raughter, Keith 2013-09-26 Rig 266L-TSR :Rig 266L-TSR TSR-01041-266L/267L Electrical Redline Markups Regular Pay N 9 Raughter, Keith 20966 Raughter, Keith 2013-09-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Inventor install Raughter, Keith 20966 Raughter, Keith 2013-09-27 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 Defensive driving Reck, John 29656 Reck, John 2013-09-16 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 7 Triple Simulation in catwalk and PB Gantry Crane. Worked on compressed air, water, and tubular functional specs Reck, John 29656 Reck, John 2013-09-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Reck, John 29656 Reck, John 2013-09-17 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 7 Triple Simulation in catwalk and PB Gantry Crane. Worked on compressed air, water, and tubular functional specs Reck, John 29656 Reck, John 2013-09-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Reck, John 29656 Reck, John 2013-09-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Reck, John 29656 Reck, John 2013-09-19 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 7 Triple Simulation in catwalk and PB Gantry Crane. Worked on compressed air, water, and tubular functional specs Reck, John 29656 Reck, John 2013-09-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Reck, John 29656 Reck, John 2013-09-20 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 5 Triple Simulation in catwalk and PB Gantry Crane. Worked on compressed air, water, and tubular functional specs Reck, John 29656 Reck, John 2013-09-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Reck, John 29656 Reck, John 2013-09-20 Rig 270L-TSR :Rig 270L-TSR TSR-01054-270L Suction Piping Modification Regular Pay N 2 Performed suction calcs Reck, John 29656 Reck, John 2013-09-23 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 7 Worked on A11 and C1 for Exhibit J. Reviewed other work. Formatting. Reck, John 29656 Reck, John 2013-09-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Daily work emails and communications Reck, John 29656 Reck, John 2013-09-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Daily work emails and communications Reck, John 29656 Reck, John 2013-09-24 Rig 216L-TSR :Rig 216L-TSR TSR-01013-216L Upgrade 216L to 3000 HP Regular Pay N 7 Gathered information on previous survey and equipment info for rigs 216, 165, and 221 to begin CTR process Reck, John 29656 Reck, John 2013-09-25 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 6 Worked on A11 and C1 for Exhibit J. Reviewed other work. Formatting. Reck, John 29656 Reck, John 2013-09-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 TSR meeting Reck, John 29656 Reck, John 2013-09-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Daily work emails and communications Reck, John 29656 Reck, John 2013-09-26 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 7 Worked on A11 and C1 for Exhibit J. Reviewed other work. Formatting. Reck, John 29656 Reck, John 2013-09-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Daily work emails and communications Reck, John 29656 Reck, John 2013-09-27 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 7 Worked on A11 and C1 for Exhibit J. Reviewed other work. Formatting. Reck, John 29656 Reck, John 2013-09-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Daily work emails and communications Reyna, Esperanza 27952 Reyna, Esperanza 2013-09-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 PTO Reyna, Esperanza 27952 Reyna, Esperanza 2013-09-17 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 8 EMLR LLE, TABLES 3.1 AND 3.2. RPF PROCESS AND COORDINATION Reyna, Esperanza 27952 Reyna, Esperanza 2013-09-18 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 8 EMLR LLE, TABLES 3.1 AND 3.2. RPF PROCESS AND COORDINATION Reyna, Esperanza 27952 Reyna, Esperanza 2013-09-19 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 10 EMLR LLE, TABLES 3.1 AND 3.2. RPF PROCESS AND COORDINATION Reyna, Esperanza 27952 Reyna, Esperanza 2013-09-20 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 9 EMLR LLE, TABLES 3.1 AND 3.2. RPF PROCESS AND COORDINATION Reyna, Esperanza 27952 Reyna, Esperanza 2013-09-23 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 6 Ongoing work on RFP process: Answering/directing vendor queries; confirming and coordination vendor mtgs with engineering; ongoing meetings and discussions with project management on procurement plan and processes Reyna, Esperanza 27952 Reyna, Esperanza 2013-09-23 OH-017 :OH-017 Overhead All Activities Regular Pay N 2 4.0 Hrs - AADU 11.0 Hrs - Drill Pipe Reyna, Esperanza 27952 Reyna, Esperanza 2013-09-24 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 6 Ongoing work on RFP process: Answering/directing vendor queries; confirming and coordination vendor mtgs with engineering; ongoing meetings and discussions with project management on procurement plan and processes Reyna, Esperanza 27952 Reyna, Esperanza 2013-09-24 OH-017 :OH-017 Overhead All Activities Regular Pay N 2 4.0 Hrs - AADU 11.0 Hrs - Drill Pipe Reyna, Esperanza 27952 Reyna, Esperanza 2013-09-25 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 3 Ongoing work on RFP process: Answering/directing vendor queries; confirming and coordination vendor mtgs with engineering; ongoing meetings and discussions with project management on procurement plan and processes Reyna, Esperanza 27952 Reyna, Esperanza 2013-09-25 OH-017 :OH-017 Overhead All Activities Regular Pay N 5 4.0 Hrs - AADU 11.0 Hrs - Drill Pipe Reyna, Esperanza 27952 Reyna, Esperanza 2013-09-26 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 5 Ongoing work on RFP process: Answering/directing vendor queries; confirming and coordination vendor mtgs with engineering; ongoing meetings and discussions with project management on procurement plan and processes Reyna, Esperanza 27952 Reyna, Esperanza 2013-09-26 OH-017 :OH-017 Overhead All Activities Regular Pay N 3 4.0 Hrs - AADU 11.0 Hrs - Drill Pipe Reyna, Esperanza 27952 Reyna, Esperanza 2013-09-27 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 5 Ongoing work on RFP process: Answering/directing vendor queries; confirming and coordination vendor mtgs with engineering; ongoing meetings and discussions with project management on procurement plan and processes Reyna, Esperanza 27952 Reyna, Esperanza 2013-09-27 OH-017 :OH-017 Overhead All Activities Regular Pay N 3 4.0 Hrs - AADU 11.0 Hrs - Drill Pipe Richardson, Jon 22756 Richardson, Jon 2013-09-15 AD-Korea :AD-Korea AD-001 General Engineering Overtime Rate N 10 Customer Approved Overtime and work through the Korean Chu‐Seok Holiday Richardson, Jon 22756 Richardson, Jon 2013-09-16 AD-Korea :AD-Korea AD-001 General Engineering Regular Pay N 10 Customer Approved Overtime and work through the Korean Chu‐Seok Holiday Richardson, Jon 22756 Richardson, Jon 2013-09-17 AD-Korea :AD-Korea AD-001 General Engineering Regular Pay N 10 Customer Approved Overtime and work through the Korean Chu‐Seok Holiday Richardson, Jon 22756 Richardson, Jon 2013-09-18 AD-Korea :AD-Korea AD-001 General Engineering Overtime Rate N 10 Customer Approved Overtime and work through the Korean Chu‐Seok Holiday Richardson, Jon 22756 Richardson, Jon 2013-09-18 OH-008 :OH-008 Overhead All Activities Regular Pay N 10 30 Hours worked through the Project Holiday Richardson, Jon 22756 Richardson, Jon 2013-09-19 AD-Korea :AD-Korea AD-001 General Engineering Overtime Rate N 10 Customer Approved Overtime and work through the Korean Chu‐Seok Holiday Richardson, Jon 22756 Richardson, Jon 2013-09-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 10 30 Hours worked through the Project Holiday Richardson, Jon 22756 Richardson, Jon 2013-09-20 AD-Korea :AD-Korea AD-001 General Engineering Overtime Rate N 10 Customer Approved Overtime and work through the Korean Chu‐Seok Holiday Richardson, Jon 22756 Richardson, Jon 2013-09-20 OH-008 :OH-008 Overhead All Activities Regular Pay N 10 30 Hours worked through the Project Holiday Richardson, Jon 22756 Richardson, Jon 2013-09-21 AD-Korea :AD-Korea AD-001 General Engineering Overtime Rate N 10 Customer Approved Overtime and work through the Korean Chu‐Seok Holiday Richardson, Jon 22756 Richardson, Jon 2013-09-22 AD-Korea :AD-Korea AD-001 General Engineering Overtime Rate N 10 Customer Approved Overtime Richardson, Jon 22756 Richardson, Jon 2013-09-23 AD-Korea :AD-Korea AD-001 General Engineering Regular Pay N 10 Customer Approved Overtime Richardson, Jon 22756 Richardson, Jon 2013-09-24 AD-Korea :AD-Korea AD-001 General Engineering Regular Pay N 10 Customer Approved Overtime Richardson, Jon 22756 Richardson, Jon 2013-09-25 AD-Korea :AD-Korea AD-001 General Engineering Regular Pay N 10 Customer Approved Overtime Richardson, Jon 22756 Richardson, Jon 2013-09-26 AD-Korea :AD-Korea AD-001 General Engineering Regular Pay N 10 Customer Approved Overtime Richardson, Jon 22756 Richardson, Jon 2013-09-27 AD-Korea :AD-Korea AD-001 General Engineering Regular Pay N 10 Customer Approved Overtime Richardson, Jon 22756 Richardson, Jon 2013-09-28 AD-Korea :AD-Korea AD-001 General Engineering Overtime Rate N 10 Customer Approved Overtime Riley, Ricia 28979 Riley, Ricia 2013-09-16 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Riley, Ricia 28979 Riley, Ricia 2013-09-17 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Riley, Ricia 28979 Riley, Ricia 2013-09-18 OH-017 :OH-017 Overhead All Activities Regular Pay N 7.5 Riley, Ricia 28979 Riley, Ricia 2013-09-19 OH-017 :OH-017 Overhead All Activities Regular Pay N 8.5 Riley, Ricia 28979 Riley, Ricia 2013-09-20 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Riley, Ricia 28979 Riley, Ricia 2013-09-23 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Riley, Ricia 28979 Riley, Ricia 2013-09-24 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Riley, Ricia 28979 Riley, Ricia 2013-09-25 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Riley, Ricia 28979 Riley, Ricia 2013-09-26 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Riley, Ricia 28979 Riley, Ricia 2013-09-27 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Rojas, Jose 27313 Rojas, Jose 2013-09-16 OH-017 :OH-017 Overhead All Activities Regular Pay N 12 Rojas, Jose 27313 Rojas, Jose 2013-09-17 OH-017 :OH-017 Overhead All Activities Regular Pay N 12 Rojas, Jose 27313 Rojas, Jose 2013-09-18 OH-017 :OH-017 Overhead All Activities Regular Pay N 12 Rojas, Jose 27313 Rojas, Jose 2013-09-19 OH-017 :OH-017 Overhead All Activities Regular Pay N 12 Rojas, Jose 27313 Rojas, Jose 2013-09-20 OH-017 :OH-017 Overhead All Activities Regular Pay N 12 Rojas, Jose 27313 Rojas, Jose 2013-09-23 OH-017 :OH-017 Overhead All Activities Regular Pay N 12 Rojas, Jose 27313 Rojas, Jose 2013-09-24 OH-017 :OH-017 Overhead All Activities Regular Pay N 12 Rojas, Jose 27313 Rojas, Jose 2013-09-25 OH-017 :OH-017 Overhead All Activities Regular Pay N 12 Rojas, Jose 27313 Rojas, Jose 2013-09-26 OH-017 :OH-017 Overhead All Activities Regular Pay N 12 Rojas, Jose 27313 Rojas, Jose 2013-09-27 OH-017 :OH-017 Overhead All Activities Regular Pay N 12 Sandell, Billy 156665 Sandell, Billy 2013-09-16 A.D. :A.D. 7703A01001 RECLASS Regular Pay N 6 Sandell, Billy 156665 Sandell, Billy 2013-09-16 Berkut-Spare Parts-Houston- :Berkut-Spare Parts-Houston- Default Task Regular Pay N 2 Sandell, Billy 156665 Sandell, Billy 2013-09-17 A.D. :A.D. 7703A01001 RECLASS Regular Pay N 7 Sandell, Billy 156665 Sandell, Billy 2013-09-17 Berkut-Spare Parts-Houston- :Berkut-Spare Parts-Houston- Default Task Regular Pay N 2 Sandell, Billy 156665 Sandell, Billy 2013-09-18 A.D. :A.D. 7703A01001 RECLASS Regular Pay N 6 Sandell, Billy 156665 Sandell, Billy 2013-09-18 Berkut-Spare Parts-Houston- :Berkut-Spare Parts-Houston- Default Task Regular Pay N 3 Sandell, Billy 156665 Sandell, Billy 2013-09-19 A.D. :A.D. 7703A01001 RECLASS Regular Pay N 6 Sandell, Billy 156665 Sandell, Billy 2013-09-19 Berkut-Spare Parts-Houston- :Berkut-Spare Parts-Houston- Default Task Regular Pay N 2 Sandell, Billy 156665 Sandell, Billy 2013-09-20 A.D. :A.D. 7703A01001 RECLASS Regular Pay N 6 Sandell, Billy 156665 Sandell, Billy 2013-09-20 Berkut-Spare Parts-Houston- :Berkut-Spare Parts-Houston- Default Task Regular Pay N 2 Sandell, Billy 156665 Sandell, Billy 2013-09-23 A.D. :A.D. 7703A01001 RECLASS Regular Pay N 6 Sandell, Billy 156665 Sandell, Billy 2013-09-23 Berkut-Spare Parts-Houston- :Berkut-Spare Parts-Houston- Default Task Regular Pay N 2 Sandell, Billy 156665 Sandell, Billy 2013-09-24 A.D. :A.D. 7703A01001 RECLASS Regular Pay N 7 Sandell, Billy 156665 Sandell, Billy 2013-09-24 Berkut-Spare Parts-Houston- :Berkut-Spare Parts-Houston- Default Task Regular Pay N 1 Sandell, Billy 156665 Sandell, Billy 2013-09-25 A.D. :A.D. 7703A01001 RECLASS Regular Pay N 6 Sandell, Billy 156665 Sandell, Billy 2013-09-25 Berkut-Spare Parts-Houston- :Berkut-Spare Parts-Houston- Default Task Regular Pay N 2 Sandell, Billy 156665 Sandell, Billy 2013-09-26 A.D. :A.D. 7703A01001 RECLASS Regular Pay N 7 Sandell, Billy 156665 Sandell, Billy 2013-09-26 Berkut-Spare Parts-Houston- :Berkut-Spare Parts-Houston- Default Task Regular Pay N 1 Sandell, Billy 156665 Sandell, Billy 2013-09-27 A.D. :A.D. 7703A01001 RECLASS Regular Pay N 6 Sandell, Billy 156665 Sandell, Billy 2013-09-27 Berkut-Spare Parts-Houston- :Berkut-Spare Parts-Houston- Default Task Regular Pay N 2 Shahab, Muhammad 29283 Shahab, Muhammad 2013-09-16 Berkut-TSR :Berkut-TSR TSR-00991-BERKUT Skid Base Material Handling Regular Pay N 4 BOD review Drawings review Shahab, Muhammad 29283 Shahab, Muhammad 2013-09-16 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 5 Exhibit J Section E Well Control System Exhibit J Section A11 Auxiliary Equipment Equipment Selection Report Review of Drillmec drawings Shahab, Muhammad 29283 Shahab, Muhammad 2013-09-17 Berkut-TSR :Berkut-TSR TSR-00991-BERKUT Skid Base Material Handling Regular Pay N 1 BOD review Drawings review Shahab, Muhammad 29283 Shahab, Muhammad 2013-09-17 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 8 Exhibit J Section E Well Control System Exhibit J Section A11 Auxiliary Equipment Equipment Selection Report Review of Drillmec drawings Shahab, Muhammad 29283 Shahab, Muhammad 2013-09-18 Berkut-TSR :Berkut-TSR TSR-00991-BERKUT Skid Base Material Handling Regular Pay N 2 BOD review Drawings review Shahab, Muhammad 29283 Shahab, Muhammad 2013-09-18 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 7 Exhibit J Section E Well Control System Exhibit J Section A11 Auxiliary Equipment Equipment Selection Report Review of Drillmec drawings Shahab, Muhammad 29283 Shahab, Muhammad 2013-09-19 Berkut-TSR :Berkut-TSR TSR-00991-BERKUT Skid Base Material Handling Regular Pay N 3 BOD review Drawings review Shahab, Muhammad 29283 Shahab, Muhammad 2013-09-19 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 5 Exhibit J Section E Well Control System Exhibit J Section A11 Auxiliary Equipment Equipment Selection Report Review of Drillmec drawings Shahab, Muhammad 29283 Shahab, Muhammad 2013-09-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Meeting Technical Services Operations Support Maintenance and Supply Chain Shahab, Muhammad 29283 Shahab, Muhammad 2013-09-20 Berkut-TSR :Berkut-TSR TSR-00991-BERKUT Skid Base Material Handling Regular Pay N 4 BOD review Drawings review Shahab, Muhammad 29283 Shahab, Muhammad 2013-09-20 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 6 Exhibit J Section E Well Control System Exhibit J Section A11 Auxiliary Equipment Equipment Selection Report Review of Drillmec drawings Shahab, Muhammad 29283 Shahab, Muhammad 2013-09-23 Berkut-TSR :Berkut-TSR TSR-00991-BERKUT Skid Base Material Handling Regular Pay N 1 BOD review Hydraulic Control Panel schematic review and comment Scope of work redefine between PKD and WP Shahab, Muhammad 29283 Shahab, Muhammad 2013-09-23 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 7 Exhibit J Section E Mud Gas Separator Exhibit J Section D2 Tubular Handling Exhibit J Section F review EMLR Weekly Progress Meeting Shahab, Muhammad 29283 Shahab, Muhammad 2013-09-24 Berkut-TSR :Berkut-TSR TSR-00991-BERKUT Skid Base Material Handling Regular Pay N 0.5 BOD review Hydraulic Control Panel schematic review and comment Scope of work redefine between PKD and WP Shahab, Muhammad 29283 Shahab, Muhammad 2013-09-24 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 8 Exhibit J Section E Mud Gas Separator Exhibit J Section D2 Tubular Handling Exhibit J Section F review EMLR Weekly Progress Meeting Shahab, Muhammad 29283 Shahab, Muhammad 2013-09-25 Berkut-TSR :Berkut-TSR TSR-00991-BERKUT Skid Base Material Handling Regular Pay N 1 BOD review Hydraulic Control Panel schematic review and comment Scope of work redefine between PKD and WP Shahab, Muhammad 29283 Shahab, Muhammad 2013-09-25 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 8 Exhibit J Section E Mud Gas Separator Exhibit J Section D2 Tubular Handling Exhibit J Section F review EMLR Weekly Progress Meeting Shahab, Muhammad 29283 Shahab, Muhammad 2013-09-26 Berkut-TSR :Berkut-TSR TSR-00991-BERKUT Skid Base Material Handling Regular Pay N 2 BOD review Hydraulic Control Panel schematic review and comment Scope of work redefine between PKD and WP Shahab, Muhammad 29283 Shahab, Muhammad 2013-09-26 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 7 Exhibit J Section E Mud Gas Separator Exhibit J Section D2 Tubular Handling Exhibit J Section F review EMLR Weekly Progress Meeting Shahab, Muhammad 29283 Shahab, Muhammad 2013-09-27 Berkut-TSR :Berkut-TSR TSR-00991-BERKUT Skid Base Material Handling Regular Pay N 1 BOD review Hydraulic Control Panel schematic review and comment Scope of work redefine between PKD and WP Shahab, Muhammad 29283 Shahab, Muhammad 2013-09-27 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 7 Exhibit J Section E Mud Gas Separator Exhibit J Section D2 Tubular Handling Exhibit J Section F review EMLR Weekly Progress Meeting Silva, Juan 29514 Silva, Juan 2013-09-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 3.75 Inventor tutorials Silva, Juan 29514 Silva, Juan 2013-09-16 Rig 270L-TSR :Rig 270L-TSR TSR-01054-270L Suction Piping Modification Regular Pay N 5 Charge pump suction piping mods Silva, Juan 29514 Silva, Juan 2013-09-17 Rig 262L-TSR :Rig 262L-TSR TSR-01053-262L Skid Rails Rosneft Scope Regular Pay N 6.75 CWS skid rail 30m extension Silva, Juan 29514 Silva, Juan 2013-09-17 Rig 270L-TSR :Rig 270L-TSR TSR-01054-270L Suction Piping Modification Regular Pay N 2 Charge pump suction piping mods Silva, Juan 29514 Silva, Juan 2013-09-18 Rig 262L-TSR :Rig 262L-TSR TSR-01053-262L Skid Rails Rosneft Scope Regular Pay N 8.75 CWS skid rail 30m extension Silva, Juan 29514 Silva, Juan 2013-09-19 Rig 262L-TSR :Rig 262L-TSR TSR-01053-262L Skid Rails Rosneft Scope Regular Pay N 8.75 CWS skid rail 30m extension Silva, Juan 29514 Silva, Juan 2013-09-20 Rig 262L-TSR :Rig 262L-TSR TSR-01053-262L Skid Rails Rosneft Scope Regular Pay N 5 CWS skid rail 30m extension Silva, Juan 29514 Silva, Juan 2013-09-23 Rig 262L-TSR :Rig 262L-TSR TSR-01053-262L Skid Rails Rosneft Scope Regular Pay N 8.75 Cws skid rail beam extension Silva, Juan 29514 Silva, Juan 2013-09-24 Rig 262L-TSR :Rig 262L-TSR TSR-01053-262L Skid Rails Rosneft Scope Regular Pay N 8.75 Cws skid rail beam extension Silva, Juan 29514 Silva, Juan 2013-09-25 Rig 262L-TSR :Rig 262L-TSR TSR-01053-262L Skid Rails Rosneft Scope Regular Pay N 8.75 Cws skid rail beam extension Silva, Juan 29514 Silva, Juan 2013-09-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.75 Inventor tutorials Silva, Juan 29514 Silva, Juan 2013-09-26 Rig 262L-TSR :Rig 262L-TSR TSR-01053-262L Skid Rails Rosneft Scope Regular Pay N 6 Cws skid rail beam extension Silva, Juan 29514 Silva, Juan 2013-09-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 Inventor tutorials Silva, Juan 29514 Silva, Juan 2013-09-27 Rig 262L-TSR :Rig 262L-TSR TSR-01053-262L Skid Rails Rosneft Scope Regular Pay N 2 Cws skid rail beam extension Silvers, Dean 27523 Silvers, Dean 2013-09-16 OH-017 :OH-017 Overhead All Activities Regular Pay N 9 Silvers, Dean 27523 Silvers, Dean 2013-09-17 OH-017 :OH-017 Overhead All Activities Regular Pay N 9 Silvers, Dean 27523 Silvers, Dean 2013-09-18 OH-017 :OH-017 Overhead All Activities Regular Pay N 9 Silvers, Dean 27523 Silvers, Dean 2013-09-19 OH-017 :OH-017 Overhead All Activities Regular Pay N 9 Silvers, Dean 27523 Silvers, Dean 2013-09-20 OH-017 :OH-017 Overhead All Activities Regular Pay N 7 Silvers, Dean 27523 Silvers, Dean 2013-09-23 OH-017 :OH-017 Overhead All Activities Regular Pay N 9 Silvers, Dean 27523 Silvers, Dean 2013-09-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Silvers, Dean 27523 Silvers, Dean 2013-09-25 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 1 Silvers, Dean 27523 Silvers, Dean 2013-09-25 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Silvers, Dean 27523 Silvers, Dean 2013-09-26 OH-017 :OH-017 Overhead All Activities Regular Pay N 9 Silvers, Dean 27523 Silvers, Dean 2013-09-27 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 1 Silvers, Dean 27523 Silvers, Dean 2013-09-27 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Slack, Dan 30809 Slack, Dan 2013-09-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Vacation Slack, Dan 30809 Slack, Dan 2013-09-17 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Vacation Slack, Dan 30809 Slack, Dan 2013-09-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Vacation Slack, Dan 30809 Slack, Dan 2013-09-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Vacation Slack, Dan 30809 Slack, Dan 2013-09-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Vacation Slack, Dan 30809 Slack, Dan 2013-09-23 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Vacation Slack, Dan 30809 Slack, Dan 2013-09-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 Inventor Training / questions for 247L & 273 Items. BOM setup / research. 247L-02-03-044 Stair Assembly in Inventor Slack, Dan 30809 Slack, Dan 2013-09-25 Rig 262L-TSR :Rig 262L-TSR TSR-00998-262L Spare BOP Stack Regular Pay N 8 For spare BOP Rig 262L - Created 262L-01-05-056 Well Control Schematic, 262L-01-05-055 HP Schematic, Revised 262L:-01-05-054 Stack LIft & 262L-01-05-052 BOP Stack drawings. Created 262L-01-05-053 Spool Detail Slack, Dan 30809 Slack, Dan 2013-09-26 Rig 262L-TSR :Rig 262L-TSR TSR-00998-262L Spare BOP Stack Regular Pay N 8 For spare BOP Rig 262L - Created 262L-01-05-056 Well Control Schematic, 262L-01-05-055 HP Schematic, Revised 262L:-01-05-054 Stack LIft & 262L-01-05-052 BOP Stack drawings. Created 262L-01-05-053 Spool Detail Slack, Dan 30809 Slack, Dan 2013-09-27 Rig 262L-TSR :Rig 262L-TSR TSR-00998-262L Spare BOP Stack Regular Pay N 8 For spare BOP Rig 262L - Created 262L-01-05-056 Well Control Schematic, 262L-01-05-055 HP Schematic, Revised 262L:-01-05-054 Stack LIft & 262L-01-05-052 BOP Stack drawings. Created 262L-01-05-053 Spool Detail Stasiuk, Mark 16450 Stasiuk, Mark 2013-09-16 AD-Korea :AD-Korea AD-001 General Engineering Regular Pay N 10 Work Stasiuk, Mark 16450 Stasiuk, Mark 2013-09-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 10 Time off (Holiday with ENL approval) Stasiuk, Mark 16450 Stasiuk, Mark 2013-09-18 OH-008 :OH-008 Overhead All Activities Regular Pay N 10 Chuseok Holiday Korean Thanksgiving Stasiuk, Mark 16450 Stasiuk, Mark 2013-09-19 OH-008 :OH-008 Overhead All Activities Regular Pay N 10 Chuseok Holiday Korean Thanksgiving Stasiuk, Mark 16450 Stasiuk, Mark 2013-09-20 OH-008 :OH-008 Overhead All Activities Regular Pay N 10 Chuseok Holiday Korean Thanksgiving Stasiuk, Mark 16450 Stasiuk, Mark 2013-09-23 AD-Korea :AD-Korea AD-001 General Engineering Regular Pay N 10 Note: Work AD Project: Sept. 23 & 24 full days Sept. 25 half day Work Hebron Project: Sept. 25 half day Sept. 26 & 27 full days Stasiuk, Mark 16450 Stasiuk, Mark 2013-09-24 AD-Korea :AD-Korea AD-001 General Engineering Regular Pay N 10 Note: Work AD Project: Sept. 23 & 24 full days Sept. 25 half day Work Hebron Project: Sept. 25 half day Sept. 26 & 27 full days Stasiuk, Mark 16450 Stasiuk, Mark 2013-09-25 AD-Korea :AD-Korea AD-001 General Engineering Regular Pay N 10 Note: Work AD Project: Sept. 23 & 24 full days Sept. 25 half day Work Hebron Project: Sept. 25 half day Sept. 26 & 27 full days Stasiuk, Mark 16450 Stasiuk, Mark 2013-09-26 AD-Korea :AD-Korea AD-001 General Engineering Regular Pay N 10 Note: Work AD Project: Sept. 23 & 24 full days Sept. 25 half day Work Hebron Project: Sept. 25 half day Sept. 26 & 27 full days Stasiuk, Mark 16450 Stasiuk, Mark 2013-09-27 AD-Korea :AD-Korea AD-001 General Engineering Regular Pay N 10 Note: Work AD Project: Sept. 23 & 24 full days Sept. 25 half day Work Hebron Project: Sept. 25 half day Sept. 26 & 27 full days Sumner, Rodney 28971 Sumner, Rodney 2013-09-16 A.D. :A.D. ADMIN Administrative Services Regular Pay N 2 Sumner, Rodney 28971 Sumner, Rodney 2013-09-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 Sumner, Rodney 28971 Sumner, Rodney 2013-09-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 Sumner, Rodney 28971 Sumner, Rodney 2013-09-16 OH-009 :OH-009 OH-009-008 2013 Rosneft – Arctic Rig Regular Pay N 4 Sumner, Rodney 28971 Sumner, Rodney 2013-09-17 A.D. :A.D. ADMIN Administrative Services Regular Pay N 2 Sumner, Rodney 28971 Sumner, Rodney 2013-09-17 APEX :APEX Overhead All Activities Regular Pay N 4 Sumner, Rodney 28971 Sumner, Rodney 2013-09-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 Sumner, Rodney 28971 Sumner, Rodney 2013-09-17 OH-009 :OH-009 OH-009-008 2013 Rosneft – Arctic Rig Regular Pay N 2 Sumner, Rodney 28971 Sumner, Rodney 2013-09-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 Sumner, Rodney 28971 Sumner, Rodney 2013-09-18 APEX :APEX Overhead All Activities Regular Pay N 2 Sumner, Rodney 28971 Sumner, Rodney 2013-09-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 Sumner, Rodney 28971 Sumner, Rodney 2013-09-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 Sumner, Rodney 28971 Sumner, Rodney 2013-09-18 OH-009 :OH-009 OH-009-008 2013 Rosneft – Arctic Rig Regular Pay N 2 Sumner, Rodney 28971 Sumner, Rodney 2013-09-18 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 Sumner, Rodney 28971 Sumner, Rodney 2013-09-19 A.D. :A.D. ADMIN Administrative Services Regular Pay N 1 Sumner, Rodney 28971 Sumner, Rodney 2013-09-19 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00107 Non-Billable Labor Regular Pay N 2 Sumner, Rodney 28971 Sumner, Rodney 2013-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 Sumner, Rodney 28971 Sumner, Rodney 2013-09-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 Sumner, Rodney 28971 Sumner, Rodney 2013-09-19 OH-009 :OH-009 OH-009-008 2013 Rosneft – Arctic Rig Regular Pay N 3 Sumner, Rodney 28971 Sumner, Rodney 2013-09-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 Sumner, Rodney 28971 Sumner, Rodney 2013-09-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 Sumner, Rodney 28971 Sumner, Rodney 2013-09-20 OH-009 :OH-009 OH-009-008 2013 Rosneft – Arctic Rig Regular Pay N 4 Sumner, Rodney 28971 Sumner, Rodney 2013-09-22 OH-009 :OH-009 OH-009-008 2013 Rosneft – Arctic Rig Regular Pay N 8 Sumner, Rodney 28971 Sumner, Rodney 2013-09-23 OH-009 :OH-009 OH-009-008 2013 Rosneft – Arctic Rig Regular Pay N 8 Sumner, Rodney 28971 Sumner, Rodney 2013-09-24 OH-009 :OH-009 OH-009-008 2013 Rosneft – Arctic Rig Regular Pay N 8 Sumner, Rodney 28971 Sumner, Rodney 2013-09-25 OH-009 :OH-009 OH-009-008 2013 Rosneft – Arctic Rig Regular Pay N 8 Sumner, Rodney 28971 Sumner, Rodney 2013-09-26 APEX :APEX Default Task Regular Pay N 2 training - AP coding and ap inquiry / reports Sumner, Rodney 28971 Sumner, Rodney 2013-09-26 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00107 Non-Billable Labor Regular Pay N 1 review status Sumner, Rodney 28971 Sumner, Rodney 2013-09-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 Sumner, Rodney 28971 Sumner, Rodney 2013-09-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 Sumner, Rodney 28971 Sumner, Rodney 2013-09-26 OH-009 :OH-009 OH-009-008 2013 Rosneft – Arctic Rig Regular Pay N 2 Sumner, Rodney 28971 Sumner, Rodney 2013-09-27 A.D. :A.D. ADMIN Administrative Services Regular Pay N 2 discuss richardson duties, coord with XOM Sumner, Rodney 28971 Sumner, Rodney 2013-09-27 APEX :APEX Default Task Regular Pay N 2 training - AP coding and ap inquiry / reports Sumner, Rodney 28971 Sumner, Rodney 2013-09-27 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 2 nonbillable. monitor conference, review status reports Sumner, Rodney 28971 Sumner, Rodney 2013-09-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 Sumner, Rodney 28971 Sumner, Rodney 2013-09-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 Sutton, William 30184 Sutton, William 2013-09-16 A.D. :A.D. ADMIN Administrative Services Regular Pay N 1 Cameron Seismic Analysis; Loadmsater RTN Sutton, William 30184 Sutton, William 2013-09-16 Arctic Mobil Rig :Arctic Mobil Rig 00106 Administrative Support Regular Pay N 4 RFPs / NOV Procurement; Weekly Procurement Meetings; RFO-CTRs; NDAs-New Cust Forms. Sutton, William 30184 Sutton, William 2013-09-16 Berkut-TSR :Berkut-TSR TSR-00991-BERKUT Skid Base Material Handling Regular Pay N 1 IDE Mousehole CO revisions and Quote. Sutton, William 30184 Sutton, William 2013-09-16 OH-009 :OH-009 OH-009-008 2013 Rosneft – Arctic Rig Regular Pay N 2 Rosneft Consultancy Agreeement; Sutton, William 30184 Sutton, William 2013-09-17 Arctic Mobil Rig :Arctic Mobil Rig 00106 Administrative Support Regular Pay N 4 RFPs / NOV Procurement; Weekly Procurement Meetings; RFO-CTRs; NDAs-New Cust Forms. Sutton, William 30184 Sutton, William 2013-09-17 Berkut-TSR :Berkut-TSR TSR-00991-BERKUT Skid Base Material Handling Regular Pay N 2 IDE Mousehole CO revisions and Quote. Sutton, William 30184 Sutton, William 2013-09-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 Weekly Projects; Weekly Cost; Monthly Tech Services. Sutton, William 30184 Sutton, William 2013-09-17 OH-009 :OH-009 OH-009-008 2013 Rosneft – Arctic Rig Regular Pay N 2 Rosneft Consultancy Agreeement; Sutton, William 30184 Sutton, William 2013-09-18 A.D. :A.D. ADMIN Administrative Services Regular Pay N 1 Cameron Seismic Analysis; Loadmsater RTN Sutton, William 30184 Sutton, William 2013-09-18 Arctic Mobil Rig :Arctic Mobil Rig 00106 Administrative Support Regular Pay N 4 RFPs / NOV Procurement; Weekly Procurement Meetings; RFO-CTRs; NDAs-New Cust Forms. Sutton, William 30184 Sutton, William 2013-09-18 OH-009 :OH-009 OH-009-008 2013 Rosneft – Arctic Rig Regular Pay N 3 Rosneft Consultancy Agreeement; Sutton, William 30184 Sutton, William 2013-09-19 Arctic Mobil Rig :Arctic Mobil Rig 00106 Administrative Support Regular Pay N 3 RFPs / NOV Procurement; Weekly Procurement Meetings; RFO-CTRs; NDAs-New Cust Forms. Sutton, William 30184 Sutton, William 2013-09-19 Berkut-TSR :Berkut-TSR TSR-00991-BERKUT Skid Base Material Handling Regular Pay N 2 IDE Mousehole CO revisions and Quote. Sutton, William 30184 Sutton, William 2013-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 Weekly Projects; Weekly Cost; Monthly Tech Services. Sutton, William 30184 Sutton, William 2013-09-20 A.D. :A.D. ADMIN Administrative Services Regular Pay N 2 Cameron Seismic Analysis; Loadmsater RTN Sutton, William 30184 Sutton, William 2013-09-20 Arctic Mobil Rig :Arctic Mobil Rig 00106 Administrative Support Regular Pay N 4 RFPs / NOV Procurement; Weekly Procurement Meetings; RFO-CTRs; NDAs-New Cust Forms. Sutton, William 30184 Sutton, William 2013-09-20 Berkut-TSR :Berkut-TSR TSR-00991-BERKUT Skid Base Material Handling Regular Pay N 2 IDE Mousehole CO revisions and Quote. Sutton, William 30184 Sutton, William 2013-09-23 A.D. :A.D. ADMIN Administrative Services Regular Pay N 2 Korean ENL consultancy - Jrichardson; MI SWACO - Commissioning; (8001) Parker Work Order 10, Mod 1; Sutton, William 30184 Sutton, William 2013-09-23 Berkut-TSR :Berkut-TSR TSR-00991-BERKUT Skid Base Material Handling Regular Pay N 2 CO 11 Revision; Mousehole revision; Control Panel. Sutton, William 30184 Sutton, William 2013-09-23 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 4 Stress Engineering; Drillmec Subcontract; RFO -001 & 002 revisions; Rusisian Ship yards; RTN NDA; LLE Procurement Meetings; Drillmec Invoice & timesheet review; Sutton, William 30184 Sutton, William 2013-09-24 A.D. :A.D. ADMIN Administrative Services Regular Pay N 2 Korean ENL consultancy - Jrichardson; MI SWACO - Commissioning; (8001) Parker Work Order 10, Mod 1; Sutton, William 30184 Sutton, William 2013-09-24 Berkut-TSR :Berkut-TSR TSR-00991-BERKUT Skid Base Material Handling Regular Pay N 2 CO 11 Revision; Mousehole revision; Control Panel. Sutton, William 30184 Sutton, William 2013-09-24 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 3 Stress Engineering; Drillmec Subcontract; RFO -001 & 002 revisions; Rusisian Ship yards; RTN NDA; LLE Procurement Meetings; Drillmec Invoice & timesheet review; Sutton, William 30184 Sutton, William 2013-09-24 Liberty Demob Phase I :Liberty Demob Phase I 7714A00101 Project Management Houston Regular Pay N 1 MR / Invoice - Delta Sutton, William 30184 Sutton, William 2013-09-25 A.D. :A.D. ADMIN Administrative Services Regular Pay N 1 Korean ENL consultancy - Jrichardson; MI SWACO - Commissioning; (8001) Parker Work Order 10, Mod 1; Sutton, William 30184 Sutton, William 2013-09-25 Berkut-TSR :Berkut-TSR TSR-00991-BERKUT Skid Base Material Handling Regular Pay N 3 CO 11 Revision; Mousehole revision; Control Panel. Sutton, William 30184 Sutton, William 2013-09-25 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 4 Stress Engineering; Drillmec Subcontract; RFO -001 & 002 revisions; Rusisian Ship yards; RTN NDA; LLE Procurement Meetings; Drillmec Invoice & timesheet review; Sutton, William 30184 Sutton, William 2013-09-26 A.D. :A.D. ADMIN Administrative Services Regular Pay N 2 Korean ENL consultancy - Jrichardson; MI SWACO - Commissioning; (8001) Parker Work Order 10, Mod 1; Sutton, William 30184 Sutton, William 2013-09-26 Berkut-TSR :Berkut-TSR TSR-00991-BERKUT Skid Base Material Handling Regular Pay N 3 CO 11 Revision; Mousehole revision; Control Panel. Sutton, William 30184 Sutton, William 2013-09-26 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 3 Stress Engineering; Drillmec Subcontract; RFO -001 & 002 revisions; Rusisian Ship yards; RTN NDA; LLE Procurement Meetings; Drillmec Invoice & timesheet review; Sutton, William 30184 Sutton, William 2013-09-27 A.D. :A.D. ADMIN Administrative Services Regular Pay N 2 Korean ENL consultancy - Jrichardson; MI SWACO - Commissioning; (8001) Parker Work Order 10, Mod 1; Sutton, William 30184 Sutton, William 2013-09-27 Berkut-TSR :Berkut-TSR TSR-00991-BERKUT Skid Base Material Handling Regular Pay N 2 CO 11 Revision; Mousehole revision; Control Panel. Sutton, William 30184 Sutton, William 2013-09-27 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00201 FEED - Project Management Labor (Non-Engineer Labor) Regular Pay N 3 Stress Engineering; Drillmec Subcontract; RFO -001 & 002 revisions; Rusisian Ship yards; RTN NDA; LLE Procurement Meetings; Drillmec Invoice & timesheet review; Sutton, William 30184 Sutton, William 2013-09-27 Liberty Demob Phase I :Liberty Demob Phase I 7714A00101 Project Management Houston Regular Pay N 1 MR / Invoice - Delta Taylor, Billy 29655 Taylor, Billy 2013-09-16 OH-017 :OH-017 Overhead All Activities Regular Pay N 9 Taylor, Billy 29655 Taylor, Billy 2013-09-17 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Taylor, Billy 29655 Taylor, Billy 2013-09-18 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Taylor, Billy 29655 Taylor, Billy 2013-09-19 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Taylor, Billy 29655 Taylor, Billy 2013-09-20 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Taylor, Billy 29655 Taylor, Billy 2013-09-23 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Taylor, Billy 29655 Taylor, Billy 2013-09-24 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Taylor, Billy 29655 Taylor, Billy 2013-09-25 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Taylor, Billy 29655 Taylor, Billy 2013-09-26 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Taylor, Billy 29655 Taylor, Billy 2013-09-27 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Tellez, Antonio 32002 Tellez, Antonio 2013-09-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 Tellez, Antonio 32002 Tellez, Antonio 2013-09-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 Tellez, Antonio 32002 Tellez, Antonio 2013-09-24 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 Tellez, Antonio 32002 Tellez, Antonio 2013-09-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 Tellez, Antonio 32002 Tellez, Antonio 2013-09-25 Rig 216L-TSR :Rig 216L-TSR TSR-01013-216L Upgrade 216L to 3000 HP Regular Pay N 7 Tellez, Antonio 32002 Tellez, Antonio 2013-09-26 Rig 216L-TSR :Rig 216L-TSR TSR-01013-216L Upgrade 216L to 3000 HP Regular Pay N 8 Tellez, Antonio 32002 Tellez, Antonio 2013-09-27 Rig 216L-TSR :Rig 216L-TSR TSR-01013-216L Upgrade 216L to 3000 HP Regular Pay N 8 Tjoa, Haydi 10398 Tjoa, Haydi 2013-09-16 OH-017 :OH-017 Overhead All Activities Regular Pay N 9.5 Tjoa, Haydi 10398 Tjoa, Haydi 2013-09-17 OH-017 :OH-017 Overhead All Activities Regular Pay N 9.5 Tjoa, Haydi 10398 Tjoa, Haydi 2013-09-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Tjoa, Haydi 10398 Tjoa, Haydi 2013-09-19 OH-017 :OH-017 Overhead All Activities Regular Pay N 9.5 Tjoa, Haydi 10398 Tjoa, Haydi 2013-09-20 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Tjoa, Haydi 10398 Tjoa, Haydi 2013-09-23 OH-017 :OH-017 Overhead All Activities Regular Pay N 9.5 Tjoa, Haydi 10398 Tjoa, Haydi 2013-09-24 OH-017 :OH-017 Overhead All Activities Regular Pay N 8 Tjoa, Haydi 10398 Tjoa, Haydi 2013-09-25 OH-017 :OH-017 Overhead All Activities Regular Pay N 9.5 Tjoa, Haydi 10398 Tjoa, Haydi 2013-09-26 OH-017 :OH-017 Overhead All Activities Regular Pay N 9.5 Tjoa, Haydi 10398 Tjoa, Haydi 2013-09-27 OH-017 :OH-017 Overhead All Activities Regular Pay N 7 Tran, Laura LTRAN Tran, Laura 2013-09-16 A.D. :A.D. 7703A10002 ENG SERVICES WORLEY PARSONS Regular Pay N 9 Tran, Laura LTRAN Tran, Laura 2013-09-17 A.D. :A.D. 7703A10002 ENG SERVICES WORLEY PARSONS Regular Pay N 9 Tran, Laura LTRAN Tran, Laura 2013-09-18 A.D. :A.D. 7703A10002 ENG SERVICES WORLEY PARSONS Regular Pay N 9 Tran, Laura LTRAN Tran, Laura 2013-09-19 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 9 Tran, Laura LTRAN Tran, Laura 2013-09-20 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 4 Tran, Laura LTRAN Tran, Laura 2013-09-23 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 8 Tran, Laura LTRAN Tran, Laura 2013-09-24 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 8 Tran, Laura LTRAN Tran, Laura 2013-09-25 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 8 Tran, Laura LTRAN Tran, Laura 2013-09-26 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 8 Tran, Laura LTRAN Tran, Laura 2013-09-27 A.D. :A.D. 7703A10001 ENG SERVICES PKD OFFICES Regular Pay N 8 Trumps, Chad 20718 Trumps, Chad 2013-09-16 OH-017 :OH-017 Overhead All Activities Regular Pay N 10 Trumps, Chad 20718 Trumps, Chad 2013-09-17 OH-017 :OH-017 Overhead All Activities Regular Pay N 10 Trumps, Chad 20718 Trumps, Chad 2013-09-18 OH-017 :OH-017 Overhead All Activities Regular Pay N 10 Trumps, Chad 20718 Trumps, Chad 2013-09-19 OH-017 :OH-017 Overhead All Activities Regular Pay N 10 Trumps, Chad 20718 Trumps, Chad 2013-09-20 OH-017 :OH-017 Overhead All Activities Regular Pay N 9 Trumps, Chad 20718 Trumps, Chad 2013-09-23 OH-017 :OH-017 Overhead All Activities Regular Pay N 9 Trumps, Chad 20718 Trumps, Chad 2013-09-24 OH-017 :OH-017 Overhead All Activities Regular Pay N 9 Trumps, Chad 20718 Trumps, Chad 2013-09-25 OH-017 :OH-017 Overhead All Activities Regular Pay N 9 Trumps, Chad 20718 Trumps, Chad 2013-09-26 OH-017 :OH-017 Overhead All Activities Regular Pay N 9 Trumps, Chad 20718 Trumps, Chad 2013-09-27 OH-017 :OH-017 Overhead All Activities Regular Pay N 9 Valencia, Lupe 30864 Valencia, Lupe 2013-09-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 Valencia, Lupe 30864 Valencia, Lupe 2013-09-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 Valencia, Lupe 30864 Valencia, Lupe 2013-09-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 Valencia, Lupe 30864 Valencia, Lupe 2013-09-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 Valencia, Lupe 30864 Valencia, Lupe 2013-09-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Valencia, Lupe 30864 Valencia, Lupe 2013-09-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 Valencia, Lupe 30864 Valencia, Lupe 2013-09-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 Valencia, Lupe 30864 Valencia, Lupe 2013-09-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 Valencia, Lupe 30864 Valencia, Lupe 2013-09-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 Valencia, Lupe 30864 Valencia, Lupe 2013-09-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 Wagner, Nathaniel 30884 Wagner, Nathaniel 2013-09-16 Liberty Demob Phase I :Liberty Demob Phase I 7714A00101 Project Management Houston Regular Pay N 5 Supporting Chuck Gorrell in Arcadia, CA, operational procedures for Parker and Loadmaster, Execution Plan review, ATP review, Weekly progress report, cost report review, LIberty Project Forecast Wagner, Nathaniel 30884 Wagner, Nathaniel 2013-09-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 Weekly Review, Cost Report Meting, Status Update Meetings Wagner, Nathaniel 30884 Wagner, Nathaniel 2013-09-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 Generating Department Proceddures/Template for Technical Services, development plan review Wagner, Nathaniel 30884 Wagner, Nathaniel 2013-09-17 Liberty Demob Phase I :Liberty Demob Phase I 7714A00101 Project Management Houston Regular Pay N 5 Supporting Chuck Gorrell in Arcadia, CA, operational procedures for Parker and Loadmaster, Execution Plan review, ATP review, Weekly progress report, cost report review, LIberty Project Forecast Wagner, Nathaniel 30884 Wagner, Nathaniel 2013-09-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 Generating Department Proceddures/Template for Technical Services, development plan review Wagner, Nathaniel 30884 Wagner, Nathaniel 2013-09-17 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 Project Management Review Course Wagner, Nathaniel 30884 Wagner, Nathaniel 2013-09-18 Liberty Demob Phase I :Liberty Demob Phase I 7714A00101 Project Management Houston Regular Pay N 4 Supporting Chuck Gorrell in Arcadia, CA, operational procedures for Parker and Loadmaster, Execution Plan review, ATP review, Weekly progress report, cost report review, LIberty Project Forecast Wagner, Nathaniel 30884 Wagner, Nathaniel 2013-09-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 Weekly Review, Cost Report Meting, Status Update Meetings Wagner, Nathaniel 30884 Wagner, Nathaniel 2013-09-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 Generating Department Proceddures/Template for Technical Services, development plan review Wagner, Nathaniel 30884 Wagner, Nathaniel 2013-09-18 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 Project Management Review Course Wagner, Nathaniel 30884 Wagner, Nathaniel 2013-09-19 Liberty Demob Phase I :Liberty Demob Phase I 7714A00101 Project Management Houston Regular Pay N 5 Supporting Chuck Gorrell in Arcadia, CA, operational procedures for Parker and Loadmaster, Execution Plan review, ATP review, Weekly progress report, cost report review, LIberty Project Forecast Wagner, Nathaniel 30884 Wagner, Nathaniel 2013-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 Weekly Review, Cost Report Meting, Status Update Meetings Wagner, Nathaniel 30884 Wagner, Nathaniel 2013-09-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 Generating Department Proceddures/Template for Technical Services, development plan review Wagner, Nathaniel 30884 Wagner, Nathaniel 2013-09-20 Liberty Demob Phase I :Liberty Demob Phase I 7714A00101 Project Management Houston Regular Pay N 6 Supporting Chuck Gorrell in Arcadia, CA, operational procedures for Parker and Loadmaster, Execution Plan review, ATP review, Weekly progress report, cost report review, LIberty Project Forecast Wagner, Nathaniel 30884 Wagner, Nathaniel 2013-09-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 Generating Department Proceddures/Template for Technical Services, development plan review Wagner, Nathaniel 30884 Wagner, Nathaniel 2013-09-23 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 4 Preparing Operational Procedures, Work Packages, HSSE Execution Plans, and ATPs for Liberty Demob Field Services Operation Wagner, Nathaniel 30884 Wagner, Nathaniel 2013-09-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 Procedures Development Wagner, Nathaniel 30884 Wagner, Nathaniel 2013-09-24 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 4 Preparing Operational Procedures, Work Packages, HSSE Execution Plans, and ATPs for Liberty Demob Field Services Operation Wagner, Nathaniel 30884 Wagner, Nathaniel 2013-09-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 Procedures Development Wagner, Nathaniel 30884 Wagner, Nathaniel 2013-09-25 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 8 Preparing Operational Procedures, Work Packages, HSSE Execution Plans, and ATPs for Liberty Demob Field Services Operation Wagner, Nathaniel 30884 Wagner, Nathaniel 2013-09-26 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 5 Preparing Operational Procedures, Work Packages, HSSE Execution Plans, and ATPs for Liberty Demob Field Services Operation Wagner, Nathaniel 30884 Wagner, Nathaniel 2013-09-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 Procedures Development Wagner, Nathaniel 30884 Wagner, Nathaniel 2013-09-27 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 7 Preparing Operational Procedures, Work Packages, HSSE Execution Plans, and ATPs for Liberty Demob Field Services Operation Wagner, Nathaniel 30884 Wagner, Nathaniel 2013-09-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 Procedure Development Meeting and Planning Willis, Joshua 31309 Willis, Joshua 2013-09-16 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 Floating Holiday. (Sick Day) Willis, Joshua 31309 Willis, Joshua 2013-09-17 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Sick Days, Willis, Joshua 31309 Willis, Joshua 2013-09-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Sick Days, Willis, Joshua 31309 Willis, Joshua 2013-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 Technical Services Monthly Meeting Willis, Joshua 31309 Willis, Joshua 2013-09-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 Time Sheet, Emails, General Engineering Discussions Willis, Joshua 31309 Willis, Joshua 2013-09-19 ORLAN-TSR :ORLAN-TSR TSR-01008-ORLAN Temp Ducting Regular Pay N 3 Finalized Closeout Report Willis, Joshua 31309 Willis, Joshua 2013-09-19 Rig 605L-TSR :Rig 605L-TSR TSR-01018-605L Talisman Mod - Tong Pull Line Regular Pay N 2 Finalized Closeout Report Willis, Joshua 31309 Willis, Joshua 2013-09-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 Time Sheet, Emails, General Engineering Discussions Willis, Joshua 31309 Willis, Joshua 2013-09-20 ORLAN-TSR :ORLAN-TSR TSR-01008-ORLAN Temp Ducting Regular Pay N 2 Finalized Closeout Report Willis, Joshua 31309 Willis, Joshua 2013-09-20 Rig 605L-TSR :Rig 605L-TSR TSR-01018-605L Talisman Mod - Tong Pull Line Regular Pay N 1 Finalized Closeout Report Willis, Joshua 31309 Willis, Joshua 2013-09-20 Rig 605L-TSR :Rig 605L-TSR TSR-01039-605L Talisman Mod - Rotary Table Regular Pay N 2 Worked on setting up a gantt chart for the TSR process requested by Talisman Willis, Joshua 31309 Willis, Joshua 2013-09-20 Rig 605L-TSR :Rig 605L-TSR TSR-01047-605L Talisman Modification - Hydromatic Brake Regular Pay N 1 Conversations with NOV Willis, Joshua 31309 Willis, Joshua 2013-09-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 Sakhalin Engineering Meeting, Weekly TSR Meeting Willis, Joshua 31309 Willis, Joshua 2013-09-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 Time Sheet, Emails, General Engineering Discussions, Read up on current Parker and Industry News Willis, Joshua 31309 Willis, Joshua 2013-09-23 ORLAN-TSR :ORLAN-TSR TSR-01006-ORLAN Spare BOP Stack Regular Pay N 5.5 Finished BOP accumulator size review and write up, Reviewed Stack up and created necessary Low Pressure spool drawings, BOP hoist/lift ring review, Sakhalin NOV BOP stack hook up study review and write up. Willis, Joshua 31309 Willis, Joshua 2013-09-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Time Sheet, Emails, General Engineering Discussions, Read up on current Parker and Industry News Willis, Joshua 31309 Willis, Joshua 2013-09-24 Rig 262L-TSR :Rig 262L-TSR TSR-00998-262L Spare BOP Stack Regular Pay N 11 Finished BOP accumulator size review and write up, created new BOP Stack Up with necessary HP spool callouts drawing, New HP Mud and Well Control Diagram revisions, BOP hoist/lift ring review, Sakhalin NOV BOP stack hook up study review and write up, wrote the closeout report. Willis, Joshua 31309 Willis, Joshua 2013-09-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 Sakhalin Engineering Meeting, Weekly TSR Meeting Willis, Joshua 31309 Willis, Joshua 2013-09-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Time Sheet, Emails, General Engineering Discussions, Read up on current Parker and Industry News Willis, Joshua 31309 Willis, Joshua 2013-09-25 ORLAN-TSR :ORLAN-TSR TSR-01006-ORLAN Spare BOP Stack Regular Pay N 3 Finished BOP accumulator size review and write up, Reviewed Stack up and created necessary Low Pressure spool drawings, BOP hoist/lift ring review, Sakhalin NOV BOP stack hook up study review and write up. Willis, Joshua 31309 Willis, Joshua 2013-09-25 Rig 262L-TSR :Rig 262L-TSR TSR-00998-262L Spare BOP Stack Regular Pay N 8.5 Finished BOP accumulator size review and write up, created new BOP Stack Up with necessary HP spool callouts drawing, New HP Mud and Well Control Diagram revisions, BOP hoist/lift ring review, Sakhalin NOV BOP stack hook up study review and write up, wrote the closeout report. Willis, Joshua 31309 Willis, Joshua 2013-09-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 Time Sheet, Emails, General Engineering Discussions, Read up on current Parker and Industry News Willis, Joshua 31309 Willis, Joshua 2013-09-26 ORLAN-TSR :ORLAN-TSR TSR-01006-ORLAN Spare BOP Stack Regular Pay N 2 Finished BOP accumulator size review and write up, Reviewed Stack up and created necessary Low Pressure spool drawings, BOP hoist/lift ring review, Sakhalin NOV BOP stack hook up study review and write up. Willis, Joshua 31309 Willis, Joshua 2013-09-26 Rig 262L-TSR :Rig 262L-TSR TSR-00998-262L Spare BOP Stack Regular Pay N 5.5 Finished BOP accumulator size review and write up, created new BOP Stack Up with necessary HP spool callouts drawing, New HP Mud and Well Control Diagram revisions, BOP hoist/lift ring review, Sakhalin NOV BOP stack hook up study review and write up, wrote the closeout report. Willis, Joshua 31309 Willis, Joshua 2013-09-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 Time Sheet, Emails, General Engineering Discussions, Read up on current Parker and Industry News Willis, Joshua 31309 Willis, Joshua 2013-09-27 Rig 262L-TSR :Rig 262L-TSR TSR-00998-262L Spare BOP Stack Regular Pay N 7 Finished BOP accumulator size review and write up, created new BOP Stack Up with necessary HP spool callouts drawing, New HP Mud and Well Control Diagram revisions, BOP hoist/lift ring review, Sakhalin NOV BOP stack hook up study review and write up, wrote the closeout report. Zaidi, Shadab 30807 Zaidi, Shadab 2013-09-16 APEX :APEX Default Task Regular Pay N 8 Attended I/C Oracle training Zaidi, Shadab 30807 Zaidi, Shadab 2013-09-17 A.D. :A.D. ADMIN Administrative Services Regular Pay N 4 Updated and reviewed Berkut cost reports Zaidi, Shadab 30807 Zaidi, Shadab 2013-09-17 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 4 Reviewed timesummary and cost report Zaidi, Shadab 30807 Zaidi, Shadab 2013-09-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 Departmental meeting, Cost meeting, Oracle training Zaidi, Shadab 30807 Zaidi, Shadab 2013-09-18 EMLR - FEED and Equipment :EMLR - FEED and Equipment 7715A00101 FEED - Engineering Labor Regular Pay N 4 Worked on cost report for week ending 21st. Reviewed sub contractor timesummary Zaidi, Shadab 30807 Zaidi, Shadab 2013-09-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 Doctor appointments Zaidi, Shadab 30807 Zaidi, Shadab 2013-09-19 A.D. :A.D. ADMIN Administrative Services Regular Pay N 6 Updated and reviewed Berkut cost reports Zaidi, Shadab 30807 Zaidi, Shadab 2013-09-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 Departmental meeting, Cost meeting, Oracle training Zaidi, Shadab 30807 Zaidi, Shadab 2013-09-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 8 Departmental meeting, Cost meeting, Oracle training Zaidi, Shadab 30807 Zaidi, Shadab 2013-09-23 A.D. :A.D. ADMIN Administrative Services Regular Pay N 1 Worked on invoiced log, updated cost report. Zaidi, Shadab 30807 Zaidi, Shadab 2013-09-23 APEX :APEX Default Task Regular Pay N 2 Attended I/C training, AP and AR training Zaidi, Shadab 30807 Zaidi, Shadab 2013-09-23 Arctic Mobil Rig :Arctic Mobil Rig 00111 Project Controls Regular Pay N 4 Reviswed Cost report. Met with the project team to review client and subcontractor invoice procedure for the FEED contract Zaidi, Shadab 30807 Zaidi, Shadab 2013-09-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 Researched and answered questions related to invoices for the external auditors Zaidi, Shadab 30807 Zaidi, Shadab 2013-09-24 A.D. :A.D. ADMIN Administrative Services Regular Pay N 2 Worked on invoiced log, updated cost report. Zaidi, Shadab 30807 Zaidi, Shadab 2013-09-24 Arctic Mobil Rig :Arctic Mobil Rig 00111 Project Controls Regular Pay N 2 Reviswed Cost report. Met with the project team to review client and subcontractor invoice procedure for the FEED contract Zaidi, Shadab 30807 Zaidi, Shadab 2013-09-24 BP Liberty DEMOB Phase II :BP Liberty DEMOB Phase II 7714A00101 Project Management Houston Regular Pay N 4 Reviewed the timesheets and the cost report. Zaidi, Shadab 30807 Zaidi, Shadab 2013-09-25 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 Zaidi, Shadab 30807 Zaidi, Shadab 2013-09-26 APEX :APEX Default Task Regular Pay N 8 Attended I/C training, AP and AR training Zaidi, Shadab 30807 Zaidi, Shadab 2013-09-27 OH-014 :OH-014 Overhead All Activities Regular Pay N 8 Attended Defensive Driving class