Name Billing Class Employee No. Item Line Class Transaction Date Job No. Customer Service Item Notes Payroll Item Billable Employee Paid Day Rate Duration Days Remarks Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-04-21 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 2 0 (04/21/20) Reviewed fab drawings from Loadmaster (A-C). (04/22/20) Reviewed fab drawings from Loadmaster (D-H). (04/23/20) Reviewed fab drawings from Loadmaster (H-J). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-04-22 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 2 0 (04/21/20) Reviewed fab drawings from Loadmaster (A-C). (04/22/20) Reviewed fab drawings from Loadmaster (D-H). (04/23/20) Reviewed fab drawings from Loadmaster (H-J). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-04-23 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 2 0 (04/21/20) Reviewed fab drawings from Loadmaster (A-C). (04/22/20) Reviewed fab drawings from Loadmaster (D-H). (04/23/20) Reviewed fab drawings from Loadmaster (H-J). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2020-05-01 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 1 0 (05/01/20) Reviewed drawings from Loadmaster (transmittal #3). Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-03-02 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 9.5 0 Cost estimate, schedule, monitor and control scope and cost, project panning documents, technicalclarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-03-03 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4.5 0 Cost estimate, schedule, monitor and control scope and cost, project panning documents, technicalclarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-03-04 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 7.5 0 Cost estimate, schedule, monitor and control scope and cost, project panning documents, technicalclarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-03-05 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 9.5 0 Cost estimate, schedule, monitor and control scope and cost, project panning documents, technicalclarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-03-06 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4 0 Cost estimate, schedule, monitor and control scope and cost, project panning documents, technicalclarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-03-09 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 9.5 0 Scope of work, cost estimate, scope, schedule and cost management, technical reviews Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-03-10 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 8.5 0 Scope of work, cost estimate, scope, schedule and cost management, technical reviews Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-03-11 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 9.5 0 Scope of work, cost estimate, scope, schedule and cost management, technical reviews Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-03-12 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 7.5 0 Scope of work, cost estimate, scope, schedule and cost management, technical reviews Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-03-13 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 5 0 Scope of work, cost estimate, scope, schedule and cost management, technical reviews Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-03-16 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 9 0 Scope of work, weekly meeting, technical clarification, monitor and control scope, cost and schedule Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-03-17 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 9 0 Scope of work, weekly meeting, technical clarification, monitor and control scope, cost and schedule Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-03-18 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 5 0 Scope of work, weekly meeting, technical clarification, monitor and control scope, cost and schedule Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-03-19 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 9 0 Scope of work, weekly meeting, technical clarification, monitor and control scope, cost and schedule Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-03-23 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 9 0 Cost estimate, status meetings and reports, monitor and control scope, cost and schedule, technical clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-03-24 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 9 0 Cost estimate, status meetings and reports, monitor and control scope, cost and schedule, technical clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-03-25 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 8 0 Cost estimate, status meetings and reports, monitor and control scope, cost and schedule, technical clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-03-26 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 9 0 Cost estimate, status meetings and reports, monitor and control scope, cost and schedule, technical clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-03-27 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 8 0 Cost estimate, status meetings and reports, monitor and control scope, cost and schedule, technical clarifications Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-03-30 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 9 0 LLE Work Order, Contract terms review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-03-31 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 9 0 LLE Work Order, Contract terms review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-01 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 9 0 Scope management, technical clarifications, weekly status meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-02 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4 0 Scope management, technical clarifications, weekly status meeting Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-02 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 4 0 LLE Work Order, Contract terms review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-06 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 2 0 Scope and cost management, technical clarifications, scope of work Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-06 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 7 0 Procurement delivery verification, subcontract terms, work order draft, stair tower design, contract review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-07 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4 0 Scope and cost management, technical clarifications, scope of work Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-07 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 3.5 0 Procurement delivery verification, subcontract terms, work order draft, stair tower design, contract review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-08 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4 0 Scope and cost management, technical clarifications, scope of work Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-08 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 4 0 Procurement delivery verification, subcontract terms, work order draft, stair tower design, contract review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-09 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 2 0 Scope and cost management, technical clarifications, scope of work Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-09 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 6 0 Procurement delivery verification, subcontract terms, work order draft, stair tower design, contract review Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-13 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 2 0 Execution plan, scope of work, operations call updates, change notification-004 Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-13 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 6 0 Subcontract terms, Agreement terms review, draft construction Work Order, validate quotes and deliveries, stair tower Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-14 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4 0 Execution plan, scope of work, operations call updates, change notification-004 Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-14 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 4 0 Subcontract terms, Agreement terms review, draft construction Work Order, validate quotes and deliveries, stair tower Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-15 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4 0 Execution plan, scope of work, operations call updates, change notification-004 Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-15 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 8 0 Subcontract terms, Agreement terms review, draft construction Work Order, validate quotes and deliveries, stair tower Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-16 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 2 0 Execution plan, scope of work, operations call updates, change notification-004 Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-16 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 4 0 Subcontract terms, Agreement terms review, draft construction Work Order, validate quotes and deliveries, stair tower Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-17 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 2 0 Execution plan, scope of work, operations call updates, change notification-004 Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-17 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 3 0 Subcontract terms, Agreement terms review, draft construction Work Order, validate quotes and deliveries, stair tower Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-20 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 8 0 Draft work order, subcontractor quotes and subcontract terms, technical clarifications on quotes, contract scope development Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-21 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 8 0 Draft work order, subcontractor quotes and subcontract terms, technical clarifications on quotes, contract scope development Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-22 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4 0 Technical clarifications, change notice discussion Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-22 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 3 0 Draft work order, subcontractor quotes and subcontract terms, technical clarifications on quotes, contract scope development Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-23 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4 0 Technical clarifications, change notice discussion Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-23 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 5 0 Draft work order, subcontractor quotes and subcontract terms, technical clarifications on quotes, contract scope development Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-24 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 6 0 Draft work order, subcontractor quotes and subcontract terms, technical clarifications on quotes, contract scope development Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-27 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 9 0 Work order development, quote reviews, work order scope of work Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-28 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 9 0 Work order development, quote reviews, work order scope of work Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-29 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 2 0 Weekly meeting, technical clarifications, coordinate engineering activities Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-29 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 7 0 Work order development, quote reviews, work order scope of work Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-04-30 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 9 0 Work order development, quote reviews, work order scope of work Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2020-05-01 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4 0 Weekly meeting, technical clarifications, coordinate engineering activities Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-03-18 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 0.5 0 Scope of Work review / redline Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-03-19 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 1.5 0 Scope of Work review / redline Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-03-25 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 1.5 0 Conference Call with Joshua; review API RP 2A; review internal pad eye standard Review CVX Structural Spec for packaged equipment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-03-27 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 0.5 0 Conference Call with Joshua; review API RP 2A; review internal pad eye standard Review CVX Structural Spec for packaged equipment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-04-02 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 0.5 0 Review CVX Specification / CC with Joshua L. to update the SOW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-04-03 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 0.75 0 Review CVX Specification / CC with Joshua L. to update the SOW Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-04-13 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 1 0 Scope of Work final review Execution plan review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-04-15 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 2 0 Scope of Work final review Execution plan review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-04-20 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 1.5 0 Reviewing LM construction drawings; CC with Rick from LM; phone calls with JL and JR regarding the drawing review. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-04-21 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 1 0 Reviewing LM construction drawings; CC with Rick from LM; phone calls with JL and JR regarding the drawing review. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-04-22 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 1 0 Reviewing LM construction drawings; CC with Rick from LM; phone calls with JL and JR regarding the drawing review. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-04-23 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 1.5 0 Reviewing LM construction drawings; CC with Rick from LM; phone calls with JL and JR regarding the drawing review. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2020-04-24 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 1 0 Reviewing LM construction drawings; CC with Rick from LM; phone calls with JL and JR regarding the drawing review. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2020-03-31 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 2 0 03/31: transfer Jelec drawings to Parker title block Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-03-03 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4 0 Revised Load list as per CVX comments Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-03-04 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4 0 Revised Load list as per CVX comments Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-03-10 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4 0 Send Quote Req. for 480V Distribution Penal, XFMR . Working on System Oneline Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-03-16 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4 0 Reviewing Dis.Panle Quote from ACS. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-03-20 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4 0 Reviewing Dis.Panle Quote from ACS. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-03-25 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 8 0 Oneline revised. ACS Meeting to complete Quote for XFMR. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-03-26 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 8 0 Oneline revised. ACS Meeting to complete Quote for XFMR. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-03-27 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 8 0 Oneline revised. ACS Meeting to complete Quote for XFMR. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-03-30 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 8 0 Oneline done. Sent to CVX for review. Working on Cable list. ACS Quote revised to correct cable size based on Amps. Waiting for CVX comments back. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-04-01 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 8 0 Oneline done. Sent to CVX for review. Working on Cable list. ACS Quote revised to correct cable size based on Amps. Waiting for CVX comments back. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-04-02 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4 0 Oneline done. Sent to CVX for review. Working on Cable list. ACS Quote revised to correct cable size based on Amps. Waiting for CVX comments back. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-04-03 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4 0 Oneline done. Sent to CVX for review. Working on Cable list. ACS Quote revised to correct cable size based on Amps. Waiting for CVX comments back. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-04-08 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4 0 CVX conference call. Work on Oneline. Send request to ACS to Update Quote . Review ACS quote. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-04-15 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 4 0 CVX Call. Send Request to ACS to Update BOM and Supply Datasheet. Final Quote and Datasheet will be sent Monday. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-04-17 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 4 0 CVX Call. Send Request to ACS to Update BOM and Supply Datasheet. Final Quote and Datasheet will be sent Monday. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-04-20 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 3 0 Final Oneline Done and submitted to CVX Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-04-20 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 4 0 Final Quote submitted to CVX Final All Datasheets provided to CVX Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-04-21 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 3 0 Final Oneline Done and submitted to CVX Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-04-21 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 4 0 Final Quote submitted to CVX Final All Datasheets provided to CVX Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-04-27 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 2 0 One line Updated for extra scope of work. Adding XFMR and LTG Panel Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-04-28 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 2 0 One line Updated for extra scope of work. Adding XFMR and LTG Panel Patel, Ripal Engineer II Patel, Ripal:Engineer II 2020-05-01 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 2 0 One line Updated for extra scope of work. Adding XFMR and LTG Panel Reck, John Engineer I 29656 Reck, John:Engineer I 2020-03-02 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 6.5 0 vendor and company status meetings, IFP proposal, grasshopper/dragchain clarifications, power swivel electrical clarifications, registers, piping clarifications, sawyer engine installation, 3d model meeting action items completion Reck, John Engineer I 29656 Reck, John:Engineer I 2020-03-03 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 7.5 0 vendor and company status meetings, IFP proposal, grasshopper/dragchain clarifications, power swivel electrical clarifications, registers, piping clarifications, sawyer engine installation, 3d model meeting action items completion Reck, John Engineer I 29656 Reck, John:Engineer I 2020-03-04 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 5.5 0 vendor and company status meetings, IFP proposal, grasshopper/dragchain clarifications, power swivel electrical clarifications, registers, piping clarifications, sawyer engine installation, 3d model meeting action items completion Reck, John Engineer I 29656 Reck, John:Engineer I 2020-03-05 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4.5 0 vendor and company status meetings, IFP proposal, grasshopper/dragchain clarifications, power swivel electrical clarifications, registers, piping clarifications, sawyer engine installation, 3d model meeting action items completion Reck, John Engineer I 29656 Reck, John:Engineer I 2020-03-06 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 1 0 vendor and company status meetings, IFP proposal, grasshopper/dragchain clarifications, power swivel electrical clarifications, registers, piping clarifications, sawyer engine installation, 3d model meeting action items completion Reck, John Engineer I 29656 Reck, John:Engineer I 2020-03-09 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 3 0 vendor clarifications and comments before leaving for a week to Holly Reck, John Engineer I 29656 Reck, John:Engineer I 2020-03-16 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 3 0 vendor clarifications, utilities tie in clarifications, grasshopper/dragchain fit, gaitronics scope, air receiver research and sizing Reck, John Engineer I 29656 Reck, John:Engineer I 2020-03-17 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 0.5 0 vendor clarifications, utilities tie in clarifications, grasshopper/dragchain fit, gaitronics scope, air receiver research and sizing Reck, John Engineer I 29656 Reck, John:Engineer I 2020-03-19 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 1.5 0 vendor clarifications, utilities tie in clarifications, grasshopper/dragchain fit, gaitronics scope, air receiver research and sizing Reck, John Engineer I 29656 Reck, John:Engineer I 2020-03-23 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4.5 0 grasshopper/dragchain clarifications and host list/cost, lessons learned register, status update meetings, air receiver sizing, exhaust routing back pressure, 480v power concept, gaitronics install Reck, John Engineer I 29656 Reck, John:Engineer I 2020-03-24 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4.5 0 grasshopper/dragchain clarifications and host list/cost, lessons learned register, status update meetings, air receiver sizing, exhaust routing back pressure, 480v power concept, gaitronics install Reck, John Engineer I 29656 Reck, John:Engineer I 2020-03-25 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 5.5 0 grasshopper/dragchain clarifications and host list/cost, lessons learned register, status update meetings, air receiver sizing, exhaust routing back pressure, 480v power concept, gaitronics install Reck, John Engineer I 29656 Reck, John:Engineer I 2020-03-26 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 5.5 0 grasshopper/dragchain clarifications and host list/cost, lessons learned register, status update meetings, air receiver sizing, exhaust routing back pressure, 480v power concept, gaitronics install Reck, John Engineer I 29656 Reck, John:Engineer I 2020-03-27 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4 0 grasshopper/dragchain clarifications and host list/cost, lessons learned register, status update meetings, air receiver sizing, exhaust routing back pressure, 480v power concept, gaitronics install Reck, John Engineer I 29656 Reck, John:Engineer I 2020-03-30 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4 0 status meeting conference calls, lessons learned registry creation, gasshopper/dragchain hose cost , use of manlift for pin installation clarifications, new work order review, cost estimate review and discussions , 480V cable clarifications, HPU drawing and datasheet library, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-03-31 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 4.5 0 status meeting conference calls, lessons learned registry creation, gasshopper/dragchain hose cost , use of manlift for pin installation clarifications, new work order review, cost estimate review and discussions , 480V cable clarifications, HPU drawing and datasheet library, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-01 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 7.5 0 status meeting conference calls, lessons learned registry creation, gasshopper/dragchain hose cost , use of manlift for pin installation clarifications, new work order review, cost estimate review and discussions , 480V cable clarifications, HPU drawing and datasheet library, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-02 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 1.5 0 status meeting conference calls, lessons learned registry creation, gasshopper/dragchain hose cost , use of manlift for pin installation clarifications, new work order review, cost estimate review and discussions , 480V cable clarifications, HPU drawing and datasheet library, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-03 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 1 0 status meeting conference calls, lessons learned registry creation, gasshopper/dragchain hose cost , use of manlift for pin installation clarifications, new work order review, cost estimate review and discussions , 480V cable clarifications, HPU drawing and datasheet library, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-06 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 1 0 vendor status update meetings, hpu exhaust clarifications, procurement tracker review, scope of work review, basis of design review and revision, equipment list review and revision, codes and standards research and revision Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-07 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 6 0 vendor status update meetings, hpu exhaust clarifications, procurement tracker review, scope of work review, basis of design review and revision, equipment list review and revision, codes and standards research and revision Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-08 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 6 0 vendor status update meetings, hpu exhaust clarifications, procurement tracker review, scope of work review, basis of design review and revision, equipment list review and revision, codes and standards research and revision Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-09 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 7 0 vendor status update meetings, hpu exhaust clarifications, procurement tracker review, scope of work review, basis of design review and revision, equipment list review and revision, codes and standards research and revision Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-13 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 5.5 0 Vendor/client update meetings, codes and standards clarifications, HPU exhaust clarifications, basis of design revision and review, equipment list revision, grasshopper/dragchain utilities, loadmaster drawing review, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-14 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 7.5 0 Vendor/client update meetings, codes and standards clarifications, HPU exhaust clarifications, basis of design revision and review, equipment list revision, grasshopper/dragchain utilities, loadmaster drawing review, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-15 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 7.5 0 Vendor/client update meetings, codes and standards clarifications, HPU exhaust clarifications, basis of design revision and review, equipment list revision, grasshopper/dragchain utilities, loadmaster drawing review, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-16 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 7.5 0 Vendor/client update meetings, codes and standards clarifications, HPU exhaust clarifications, basis of design revision and review, equipment list revision, grasshopper/dragchain utilities, loadmaster drawing review, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-17 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 5 0 Vendor/client update meetings, codes and standards clarifications, HPU exhaust clarifications, basis of design revision and review, equipment list revision, grasshopper/dragchain utilities, loadmaster drawing review, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-20 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 1 0 Loadmaster drawing review, BOD revision review Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-20 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 6.5 0 Venturetech quote review, Grasshopper routing, vendor status meetings, HPU air change calculations, HPU watermist/CO2 system integration and standards, HPU exhaust system drill line spooler review and discussion Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-21 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 0.5 0 Loadmaster drawing review, BOD revision review Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-21 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 4 0 Venturetech quote review, Grasshopper routing, vendor status meetings, HPU air change calculations, HPU watermist/CO2 system integration and standards, HPU exhaust system drill line spooler review and discussion Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-22 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 1 0 Loadmaster drawing review, BOD revision review Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-22 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 6.5 0 Venturetech quote review, Grasshopper routing, vendor status meetings, HPU air change calculations, HPU watermist/CO2 system integration and standards, HPU exhaust system drill line spooler review and discussion Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-23 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 5.5 0 Loadmaster drawing review, BOD revision review Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-23 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 1 0 Venturetech quote review, Grasshopper routing, vendor status meetings, HPU air change calculations, HPU watermist/CO2 system integration and standards, HPU exhaust system drill line spooler review and discussion Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-24 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 5 0 Venturetech quote review, Grasshopper routing, vendor status meetings, HPU air change calculations, HPU watermist/CO2 system integration and standards, HPU exhaust system drill line spooler review and discussion Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-27 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 2 0 weekly status meetings, loadmaster transmittal 3 review, BOD revision Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-27 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 4.5 0 BOD load table comparison, loadmaster technical quote review, grasshopper utility routing, utility hose cost, HPU exhaust spec and routing, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-28 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 5.5 0 BOD load table comparison, loadmaster technical quote review, grasshopper utility routing, utility hose cost, HPU exhaust spec and routing, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-29 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 1 0 weekly status meetings, loadmaster transmittal 3 review, BOD revision Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-29 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 3.5 0 BOD load table comparison, loadmaster technical quote review, grasshopper utility routing, utility hose cost, HPU exhaust spec and routing, Reck, John Engineer I 29656 Reck, John:Engineer I 2020-04-30 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 2 0 weekly status meetings, loadmaster transmittal 3 review, BOD revision Reck, John Engineer I 29656 Reck, John:Engineer I 2020-05-01 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 1 0 weekly status meetings, loadmaster transmittal 3 review, BOD revision Reck, John Engineer I 29656 Reck, John:Engineer I 2020-05-01 CVX Genesis :CVX Genesis TSR-1725-GENP-02 Initiation and Procurement Regular Pay N 3.5 0 BOD load table comparison, loadmaster technical quote review, grasshopper utility routing, utility hose cost, HPU exhaust spec and routing,