Name Billing Class Employee No. Item Line Class Transaction Date Job No. Customer Service Item Notes Payroll Item Billable Employee Paid Day Rate Duration Days Remarks Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet; IT problem; expense report; update PE registered information Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-01 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 8 0 drawing review, analysis report, and MTO Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-02 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 4 0 Willow and Oil Search Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 review drawing for TSR-1778, regulatory stuff for 270L Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-05 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 July 4th Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-06 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 4 0 mid year review, technical spreadsheets, set up meetings with departments and discuss P&A with Odon Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Work with IT on MathCAD problem, expense report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-06 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2.5 0 Willow and Oil Search Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 send closeout to Kyle; Review analysis for increase in padeye rating Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-07 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 2 0 mid year review, technical spreadsheets, set up meetings with departments and discuss P&A with Odon Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 timesheet, Work with IT on MathCAD problem, expense report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-07 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Willow and Oil Search Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.75 0 send closeout to Kyle; Review analysis for increase in padeye rating Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-07 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 1 0 review rig up drawing and obsolete old drawings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-08 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 5 0 mid year review, technical spreadsheets, set up meetings with departments and discuss P&A with Odon Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.75 0 prep for safety moment Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Work with IT on MathCAD problem, expense report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-08 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Willow and Oil Search Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-09 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 1.5 0 mid year review, technical spreadsheets, set up meetings with departments and discuss P&A with Odon Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Work with IT on MathCAD problem, expense report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-09 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1.5 0 Willow and Oil Search Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-09 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 1 0 257B Reactivation Meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-09 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 1 0 review rig up drawing and obsolete old drawings, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-12 Berkut-TSR :Berkut-TSR TSR-01789-BERP HP Cement Line Replacement Regular Pay N 1 0 call GD and review quotes Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-12 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 2.5 0 Pipe Pressure Spreadsheet, meeting with Sheri, request meeting with HSE, Pipe High pressure spreadsheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-12 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 meeting with Oil Search, catwalk modification, project cost estimate, meeting with NOV Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-12 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 SAK weekly meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-12 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 2.75 0 meeting and modify model, redo FEA and analysis report, closeout report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-13 Berkut-TSR :Berkut-TSR TSR-01789-BERP HP Cement Line Replacement Regular Pay N 1 0 call GD and review quotes Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-13 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 1 0 Pipe Pressure Spreadsheet, meeting with Sheri, request meeting with HSE, Pipe High pressure spreadsheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-13 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 meeting with Oil Search, catwalk modification, project cost estimate, meeting with NOV Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 design mods and FEA Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-13 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 4 0 meeting and modify model, redo FEA and analysis report, closeout report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Global townhall Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-14 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2.25 0 meeting with Oil Search, catwalk modification, project cost estimate, meeting with NOV Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4.5 0 design mods and FEA Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-14 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 0.25 0 meeting and modify model, redo FEA and analysis report, closeout report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-15 Berkut-TSR :Berkut-TSR TSR-01789-BERP HP Cement Line Replacement Regular Pay N 0.25 0 call GD and review quotes Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-15 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 5.5 0 Pipe Pressure Spreadsheet, meeting with Sheri, request meeting with HSE, Pipe High pressure spreadsheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-15 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 walking system cost for Bangladesh Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-15 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 2 0 meeting and modify model, redo FEA and analysis report, closeout report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-16 Berkut-TSR :Berkut-TSR TSR-01789-BERP HP Cement Line Replacement Regular Pay N 0.5 0 call GD and review quotes Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-16 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 2.5 0 Pipe Pressure Spreadsheet, meeting with Sheri, request meeting with HSE, Pipe High pressure spreadsheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-16 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 meeting with Oil Search, catwalk modification, project cost estimate, meeting with NOV Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, Drillmec Open House Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, mid year review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-19 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1.5 0 257B Schedule Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-19 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 SAK meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5 0 Send docs to SAK regulatory for 270L, Review and communicate changes to the design to Jorge, Update analysis report and closeout, Review modifications with Jorge, adjust MTO, and save model on Q, krechet automation meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-20 Berkut-TSR :Berkut-TSR TSR-01789-BERP HP Cement Line Replacement Regular Pay N 0.25 0 Review email and respond to Jerry Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-20 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 0.25 0 review HSE questions Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails, Drillmec Open House Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, mid year review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-20 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 2 0 257B Schedule Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Send docs to SAK regulatory for 270L, Review and communicate changes to the design to Jorge, Update analysis report and closeout, Review modifications with Jorge, adjust MTO, and save model on Q, krechet automation meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-20 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 4 0 Review design and analysis with Kyle, Drawing review with Jorge Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-21 Berkut-TSR :Berkut-TSR TSR-01789-BERP HP Cement Line Replacement Regular Pay N 0.25 0 Review email and respond to Jerry Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.25 0 emails, Drillmec Open House Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-21 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Oil Search and Willow Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-21 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 5 0 257B Schedule Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 Send docs to SAK regulatory for 270L, Review and communicate changes to the design to Jorge, Update analysis report and closeout, Review modifications with Jorge, adjust MTO, and save model on Q, krechet automation meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-21 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 1 0 Review design and analysis with Kyle, Drawing review with Jorge Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-22 Berkut-TSR :Berkut-TSR TSR-01789-BERP HP Cement Line Replacement Regular Pay N 0.75 0 Review email and respond to Jerry Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-22 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 0.5 0 review HSE questions Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.25 0 emails, Drillmec Open House Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 timesheet, mid year review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-22 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1.5 0 Oil Search and Willow Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.25 0 Send docs to SAK regulatory for 270L, Review and communicate changes to the design to Jorge, Update analysis report and closeout, Review modifications with Jorge, adjust MTO, and save model on Q, krechet automation meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-22 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 1 0 Review design and analysis with Kyle, Drawing review with Jorge Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, mid year review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-23 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 3.5 0 Oil Search and Willow Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-26 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 0.5 0 meeting with Dave Castro (no show), accumulator spreadsheet, new meeting with Castro, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.75 0 Computer Issues Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-26 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 0.75 0 Willow and Oil Search Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-26 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 ESG meeting with Chelsi and Bernie, 257B reactivation meeting, create CTR Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-26 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 SAK meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Review 270 BOP cart drawing, review, update Jorge, send out to SAK, automation CTR meeting with Mihovil, update 1770 analysis, review 1770 drawings Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-26 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 3 0 meeting with Kyle, try to find accurate annular weight, update 249L analysis and closeout Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-27 Berkut-TSR :Berkut-TSR TSR-01789-BERP HP Cement Line Replacement Regular Pay N 1 0 talk with Jerry and Kyle and get updated quote, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-27 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 3 0 meeting with Dave Castro (no show), accumulator spreadsheet, new meeting with Castro, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-27 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 0.25 0 Willow and Oil Search Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-27 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 2 0 ESG meeting with Chelsi and Bernie, 257B reactivation meeting, create CTR Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Review 270 BOP cart drawing, review, update Jorge, send out to SAK, automation CTR meeting with Mihovil, update 1770 analysis, review 1770 drawings Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-27 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 1.25 0 meeting with Kyle, try to find accurate annular weight, update 249L analysis and closeout Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-28 Berkut-TSR :Berkut-TSR TSR-01789-BERP HP Cement Line Replacement Regular Pay N 1.25 0 talk with Jerry and Kyle and get updated quote, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-28 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 4.5 0 meeting with Dave Castro (no show), accumulator spreadsheet, new meeting with Castro, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-28 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1.25 0 Willow and Oil Search Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Review 270 BOP cart drawing, review, update Jorge, send out to SAK, automation CTR meeting with Mihovil, update 1770 analysis, review 1770 drawings Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-28 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 1 0 meeting with Kyle, try to find accurate annular weight, update 249L analysis and closeout Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-29 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 6 0 meeting with Dave Castro (no show), accumulator spreadsheet, new meeting with Castro, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-29 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 2 0 ESG meeting with Chelsi and Bernie, 257B reactivation meeting, create CTR Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-29 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Review 270 BOP cart drawing, review, update Jorge, send out to SAK, automation CTR meeting with Mihovil, update 1770 analysis, review 1770 drawings Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-30 Berkut-TSR :Berkut-TSR TSR-01789-BERP HP Cement Line Replacement Regular Pay N 0.75 0 talk with Jerry and Kyle and get updated quote, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-30 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 4 0 meeting with Dave Castro (no show), accumulator spreadsheet, new meeting with Castro, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-07-30 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 0.75 0 Willow and Oil Search Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-01 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 4 0 (07/01/21) Call with Jorge to discuss drawing/status. Organized drawing folders. Checked drawings from Jorge. Created new folders and moved files to 2021 goal folders. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (06/28/21) Review/approve designer timesheets. Updated weekly timesheet and submitted for approval. Update PTO forms and sent. Update call with Lam. Scheduled/completed mid-year reviews with Jorge/Lam. (06/29/21) Updated talent profile information. Update call with Kyle. Update call with Tyler. (07/01/21) Update call with Kyle. Update call with Jorge. (07/02/21) Update call with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-01 Rig 122-TSR :Rig 122-TSR TSR-01787-122L LP Mud System Modifications Regular Pay N 3.5 0 (06/29/21) Call with Dan/Tyler to review LP mud options. Cont drawing changes. (06/30/21 - 07/01/21) Drawing updates per field info from Dan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (06/28/21) Review/approve designer timesheets. Updated weekly timesheet and submitted for approval. Update PTO forms and sent. Update call with Lam. Scheduled/completed mid-year reviews with Jorge/Lam. (06/29/21) Updated talent profile information. Update call with Kyle. Update call with Tyler. (07/01/21) Update call with Kyle. Update call with Jorge. (07/02/21) Update call with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-02 OH-009 :OH-009 OH-009-030 Latin America (LATAM) Regular Pay N 0.75 0 (06/29/21) Searched for rig 165L skidding information. (07/02/21) Cleaned up 221L CAD file and sent for information per BD request. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-02 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 4.75 0 (06/28/21) Back check BOP skid. (06/30/21) Pulled ref info and sent to Jorge. (07/02/21) Started checking general arrangement drawing and ref info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-05 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-06 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 3 0 (07/06/21) Organized LABU drawing folders (moved info from 2020' goals). Created new ground bearing pressure drawing for rig 122L. (07/07/21) Continued work on 122L package. (07/08/21 - 07/09/21) Reviewed 257B SMART goal. Started drawing file clean up on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (07/06/21) Update weekly timesheet and submitted for approval. Update call with Lam. Update call with Jorge. (07/07/21) Update call with Kyle. (07/08/21) Finalized/routed designer performance reviews. Update call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 (07/06/21) Call with Loadmaster to discuss scope of Berkut TSR. (07/07/21) reviewed scope for revised Berkut TSR. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-06 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 3 0 (07/06/21) Finalized GA checking and sent comments to Jorge. Revised reference drawing for obsolete files. Cleaned up TSR drawing folder. (07/08/21) Call with Kyle to review design changes to BOP frame. Call with Tyler to discuss drawing changes. Scheduled meeting to review changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-07 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 4.25 0 (07/06/21) Organized LABU drawing folders (moved info from 2020' goals). Created new ground bearing pressure drawing for rig 122L. (07/07/21) Continued work on 122L package. (07/08/21 - 07/09/21) Reviewed 257B SMART goal. Started drawing file clean up on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (07/06/21) Update weekly timesheet and submitted for approval. Update call with Lam. Update call with Jorge. (07/07/21) Update call with Kyle. (07/08/21) Finalized/routed designer performance reviews. Update call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-07 OH-009 :OH-009 OH-009-030 Latin America (LATAM) Regular Pay N 3.5 0 (07/07/21) Created new folder for 165L skidding option. Added drawings for reference. Searched for additional information. Called Steve C to review skidding history. (07/08/21) Call with German to discuss skidding request for rig 165L. Follow up discussion with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.25 0 (07/06/21) Call with Loadmaster to discuss scope of Berkut TSR. (07/07/21) reviewed scope for revised Berkut TSR. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-08 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 4.75 0 (07/06/21) Organized LABU drawing folders (moved info from 2020' goals). Created new ground bearing pressure drawing for rig 122L. (07/07/21) Continued work on 122L package. (07/08/21 - 07/09/21) Reviewed 257B SMART goal. Started drawing file clean up on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (07/08/21) TSR update call. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 (07/06/21) Update weekly timesheet and submitted for approval. Update call with Lam. Update call with Jorge. (07/07/21) Update call with Kyle. (07/08/21) Finalized/routed designer performance reviews. Update call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-08 OH-009 :OH-009 OH-009-030 Latin America (LATAM) Regular Pay N 2 0 (07/07/21) Created new folder for 165L skidding option. Added drawings for reference. Searched for additional information. Called Steve C to review skidding history. (07/08/21) Call with German to discuss skidding request for rig 165L. Follow up discussion with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-09 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 4.75 0 (07/06/21) Organized LABU drawing folders (moved info from 2020' goals). Created new ground bearing pressure drawing for rig 122L. (07/07/21) Continued work on 122L package. (07/08/21 - 07/09/21) Reviewed 257B SMART goal. Started drawing file clean up on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-09 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 1.75 0 (07/06/21) Finalized GA checking and sent comments to Jorge. Revised reference drawing for obsolete files. Cleaned up TSR drawing folder. (07/08/21) Call with Kyle to review design changes to BOP frame. Call with Tyler to discuss drawing changes. Scheduled meeting to review changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (07/12/21) Update weekly timesheet and submitted for approval. Review/approve designer timesheets. Update call with Lam. (07/13/21) Update with Lam. - discussed goals. (07/14/21) Update call with Tyler. (07/15/21) Update call with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-12 Rig 122-TSR :Rig 122-TSR TSR-01787-122L LP Mud System Modifications Regular Pay N 5.25 0 (07/12/21 - 07/15/21) Reviewed redlines from the field - 122L LP mud system. Started drawing revisions Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-12 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 0.75 0 (07/12/21) Call with Tyler/Jorge to review design changes to frame. (07/14/21) Checked latest drawing updates. Sent redlines to Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 (07/12/21) Update weekly timesheet and submitted for approval. Review/approve designer timesheets. Update call with Lam. (07/13/21) Update with Lam. - discussed goals. (07/14/21) Update call with Tyler. (07/15/21) Update call with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-13 OH-034 :OH-034 OH-034-012 EAFC-Technical Support Regular Pay N 5.75 0 (07/13/21) Researched request for 249L lift plan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-13 Rig 122-TSR :Rig 122-TSR TSR-01787-122L LP Mud System Modifications Regular Pay N 1.5 0 (07/12/21 - 07/15/21) Reviewed redlines from the field - 122L LP mud system. Started drawing revisions Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-14 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 2.25 0 (07/14/21 - 07/15/21) Worked on 257B folder clean-up. Drawing renaming. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 (07/12/21) Update weekly timesheet and submitted for approval. Review/approve designer timesheets. Update call with Lam. (07/13/21) Update with Lam. - discussed goals. (07/14/21) Update call with Tyler. (07/15/21) Update call with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-14 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 5 0 (07/12/21) Call with Tyler/Jorge to review design changes to frame. (07/14/21) Checked latest drawing updates. Sent redlines to Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-15 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 5 0 (07/14/21 - 07/15/21) Worked on 257B folder clean-up. Drawing renaming. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (07/12/21) Update weekly timesheet and submitted for approval. Review/approve designer timesheets. Update call with Lam. (07/13/21) Update with Lam. - discussed goals. (07/14/21) Update call with Tyler. (07/15/21) Update call with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-15 Rig 122-TSR :Rig 122-TSR TSR-01787-122L LP Mud System Modifications Regular Pay N 2.5 0 (07/12/21 - 07/15/21) Reviewed redlines from the field - 122L LP mud system. Started drawing revisions Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-21 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-23 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-28 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (07/29/21) Reviewed emails from field. Update call with Kyle. Update call wit Lam. Update call with Tyler. (07/30/21) Update call with Kyle. Update call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-29 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 4 0 (07/29/21 - 07/30/20) Started pulling background ref drawings for 249L rotary table. Started lift pan layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-29 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 2 0 (07/29/21) Reviewed drawing revisions and sent redlines to Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 (07/29/21) Reviewed emails from field. Update call with Kyle. Update call wit Lam. Update call with Tyler. (07/30/21) Update call with Kyle. Update call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-30 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 6.25 0 (07/29/21 - 07/30/20) Started pulling background ref drawings for 249L rotary table. Started lift pan layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-07-30 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 1 0 (07/30/21) Searched for 253L standpipe manifold information. Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-01 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order, travel to Houston Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-02 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order, travel to Houston Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-03 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order, travel to Houston Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-04 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-05 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-06 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-07 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-08 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-09 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-10 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-11 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-12 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-13 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-14 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-15 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 4 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-19 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-20 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-21 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-22 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-23 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-24 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-25 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-26 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-27 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-28 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-29 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-07-30 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 8 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-01 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 0.5 0 Meeting with Ceasar F. RE: ESG Spreadsheet Meeting with Pat Garcia Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Conference calls regarding DOA and Service Delivery Reorganization - Wayne F., Mark Todd Total Uganda closeout discussion with TE and GO Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Sakhalin invoicing report 10Q rig count information Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-01 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 0.5 0 CC with Oil Search RE: Tier IV Complinace Willow support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-01 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 0.5 0 Fuze call with GO and LTN RE: CDPU on other platforms Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-01 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 1 0 P&A Calls with Jeff Weitzel Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 Update tracker and send to Arturo Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-01 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 API ESG Form 1.0 Introduction and Review (webinar) Defensive driving Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Review Berkut pipe rack drawings Prepare CTRs for new TSR's CC's with Loadmaster Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-01 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 General support - 122L Skidding support for 165L Closeouts for 122L TSR's - clamp and raising lines Rig 212 Mast / Sub cracks - discuss path forward Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-02 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Review Berkut pipe rack drawings Prepare CTRs for new TSR's CC's with Loadmaster Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-05 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-06 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 PO review and approvals Call with JL and Scotty T. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-07 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 PO review and approvals Call with JL and Scotty T. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Bi-Weekly HTSG meeting Personnel discussion with AP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Mid-Year performance discussions / scheduling calls IHS invoice inquiry Sakhalin invoice FOrecast Arturo P. update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-07 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR tracker update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 TSR closeout review CC with Mihovil Berkut HP cement line support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-07 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.5 0 165L Skidding Meeting and research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-08 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 PO review and approvals Call with JL and Scotty T. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-08 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 0.5 0 counterweight lifting support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Bi-Weekly HTSG meeting Personnel discussion with AP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Mid-Year performance discussions / scheduling calls IHS invoice inquiry Sakhalin invoice FOrecast Arturo P. update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-08 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR tracker update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR closeout review CC with Mihovil Berkut HP cement line support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-08 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 257B Reactivation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-08 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 165L Skidding Meeting and research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-09 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 PO review and approvals Call with JL and Scotty T. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-09 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1 0 counterweight lifting support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Mid-Year performance discussions / scheduling calls IHS invoice inquiry Sakhalin invoice FOrecast Arturo P. update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR closeout review CC with Mihovil Berkut HP cement line support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-09 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 257B Reactivation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-09 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 165L Skidding Meeting and research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-12 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Galveston Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-13 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Galveston Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Phone calls with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Galveston Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Phone calls with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Galveston Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Phone calls with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Galveston Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Phone calls with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-19 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 PO approval Update call with JL Discussion with JR and RP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Monthly geomarket report Monthly HTSG Hours report Weekly report IHS Invoice Mid-year reviews Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-19 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 0.75 0 CVX Banladesh Star Energy Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-19 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.25 0 Finished defensive driving Drillmec open house Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 209L Automation Upgrade - CC with NOV, CC with Bohon, Review old documentation NOV Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-19 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 257B Reactivation Schedule Review, CTR, and Meetings BOP Transport Frame Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-20 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 PO approval Update call with JL Discussion with JR and RP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 P&A Monthly Meeting HTSG Bi-Weekly Meeting Service Delivery Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Monthly geomarket report Monthly HTSG Hours report Weekly report IHS Invoice Mid-year reviews Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-20 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Finished defensive driving Drillmec open house Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-20 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 257B Reactivation Schedule Review, CTR, and Meetings BOP Transport Frame Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-20 OH-036 :OH-036 OH-036-01 Technology Think Tank Regular Pay N 1 0 TRS Meetings Working with Aaron S. on TRS workshop Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-20 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 2 0 Drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-21 Berkut-TSR :Berkut-TSR TSR-01789-BERP HP Cement Line Replacement Regular Pay N 1 0 Updated quote from GD Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-21 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.5 0 PO approval Update call with JL Discussion with JR and RP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 P&A Monthly Meeting HTSG Bi-Weekly Meeting Service Delivery Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Monthly geomarket report Monthly HTSG Hours report Weekly report IHS Invoice Mid-year reviews Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-21 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 0.5 0 CVX Banladesh Star Energy Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 209L Automation Upgrade - CC with NOV, CC with Bohon, Review old documentation NOV Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-21 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 257B Reactivation Schedule Review, CTR, and Meetings BOP Transport Frame Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-22 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 PO approval Update call with JL Discussion with JR and RP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 P&A Monthly Meeting HTSG Bi-Weekly Meeting Service Delivery Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Monthly geomarket report Monthly HTSG Hours report Weekly report IHS Invoice Mid-year reviews Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-22 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1.5 0 Chevron Meeting SLide Pack Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-22 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 0.75 0 CVX Banladesh Star Energy Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 209L Automation Upgrade - CC with NOV, CC with Bohon, Review old documentation NOV Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-22 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.75 0 257B Reactivation Schedule Review, CTR, and Meetings BOP Transport Frame Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-22 OH-036 :OH-036 OH-036-01 Technology Think Tank Regular Pay N 1 0 TRS Meetings Working with Aaron S. on TRS workshop Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-23 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 PO approval Update call with JL Discussion with JR and RP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 P&A Monthly Meeting HTSG Bi-Weekly Meeting Service Delivery Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Monthly geomarket report Monthly HTSG Hours report Weekly report IHS Invoice Mid-year reviews Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-23 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 Chevron Meeting SLide Pack Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-23 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 2 0 CVX Banladesh Star Energy Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 209L Automation Upgrade - CC with NOV, CC with Bohon, Review old documentation NOV Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-23 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 257B Reactivation Schedule Review, CTR, and Meetings BOP Transport Frame Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Monthly geomarket report Monthly HTSG Hours report Weekly report IHS Invoice Mid-year reviews Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-24 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.75 0 209L Automation Upgrade - CC with NOV, CC with Bohon, Review old documentation NOV Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-24 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.75 0 257B Reactivation Schedule Review, CTR, and Meetings BOP Transport Frame Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-25 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1.5 0 Preparation and presentation to Chevron facilities Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-26 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.75 0 General support PO approval(s) Hydraulics Vendor - Logan Industries Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-26 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 0.5 0 CC with Chelsi Meeting w/ Pat G. Updating spreadsheet / inputting data Daily drilling reports - supporting Chelsi Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet review and administration Finalizing mid-year reviews Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-26 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 0.5 0 NOV Meeting for Willow Conference Call with Larry Reed Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-26 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2.5 0 Preparation and presentation to Chevron facilities Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-26 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1.75 0 Chevron Bangladesh Shell Brunei Tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 BOP test stump drawing review 209L rig move and automation upgrade Berkut cement line CTR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-26 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2.5 0 Final review of BOP transport frame Transport frame overturning analysis 257B reactivation - schedule and task list review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-27 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.75 0 General support PO approval(s) Hydraulics Vendor - Logan Industries Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-27 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 1.5 0 CC with Chelsi Meeting w/ Pat G. Updating spreadsheet / inputting data Daily drilling reports - supporting Chelsi Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet review and administration Finalizing mid-year reviews Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-27 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 NOV Meeting for Willow Conference Call with Larry Reed Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-27 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1.25 0 Chevron Bangladesh Shell Brunei Tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 BOP test stump drawing review 209L rig move and automation upgrade Berkut cement line CTR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-27 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.25 0 Final review of BOP transport frame Transport frame overturning analysis 257B reactivation - schedule and task list review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-28 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 General support PO approval(s) Hydraulics Vendor - Logan Industries Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-28 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 2.5 0 CC with Chelsi Meeting w/ Pat G. Updating spreadsheet / inputting data Daily drilling reports - supporting Chelsi Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet review and administration Finalizing mid-year reviews Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-28 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 NOV Meeting for Willow Conference Call with Larry Reed Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-28 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 0.5 0 Chevron Bangladesh Shell Brunei Tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-28 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 0.5 0 Hunt Oil Romania - Tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 BOP test stump drawing review 209L rig move and automation upgrade Berkut cement line CTR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-28 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.5 0 Final review of BOP transport frame Transport frame overturning analysis 257B reactivation - schedule and task list review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-29 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2.25 0 General support PO approval(s) Hydraulics Vendor - Logan Industries Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-29 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 0.75 0 CC with Chelsi Meeting w/ Pat G. Updating spreadsheet / inputting data Daily drilling reports - supporting Chelsi Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet review and administration Finalizing mid-year reviews Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-29 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 NOV Meeting for Willow Conference Call with Larry Reed Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-29 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1.5 0 Chevron Bangladesh Shell Brunei Tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-29 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 1.5 0 Hunt Oil Romania - Tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-29 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.5 0 Final review of BOP transport frame Transport frame overturning analysis 257B reactivation - schedule and task list review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-30 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 General support PO approval(s) Hydraulics Vendor - Logan Industries Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-30 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 1.25 0 CC with Chelsi Meeting w/ Pat G. Updating spreadsheet / inputting data Daily drilling reports - supporting Chelsi Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet review and administration Finalizing mid-year reviews Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-30 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 SLB Preparation for Meeting @ Citywest Office Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-30 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1.5 0 Chevron Bangladesh Shell Brunei Tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-30 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 0.75 0 Hunt Oil Romania - Tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-30 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 BOP test stump drawing review 209L rig move and automation upgrade Berkut cement line CTR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-07-31 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.75 0 General support PO approval(s) Hydraulics Vendor - Logan Industries Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-01 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 5 0 model sling lengths and check for clearances/clashes with lift loads. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-01 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2 0 06/28-07/02: CAD blocks of lift plans for rigging up 06/29: process as-builts from Loadmaster; meeting with Kyle and Greg. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-01 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 07/01&02: webmeeting with Greg to review crane and lift loads capability. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-02 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 model sling lengths and check for clearances/clashes with lift loads. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-02 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2 0 06/28-07/02: CAD blocks of lift plans for rigging up 06/29: process as-builts from Loadmaster; meeting with Kyle and Greg. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-02 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 07/01&02: webmeeting with Greg to review crane and lift loads capability. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 06/29: transmit TSR-01786-CO 06/30: transmit TSR-01784-CO; transmit Sawyer MRB to CVX 07/02: transmit TSR-01790-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-05 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Independence Day Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-06 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 5 0 07/06: propose bolt thru solution for safety gate on crown. 07/07: sketch counterweight weld plates with Kyle; sketch lifting arrangements for upper mast section/racking board for stage 3 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheets to ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 07/06: process incoming TSR-01770-R1 07/07: transmit TSR-01778-DWG; process Sakhalin TSR reports for May & June 07/08: transmit TSR-01778-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 07/06: meeting with LM and Sakhalin to review TSR and scope of work. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-07 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 6.25 0 07/06: propose bolt thru solution for safety gate on crown. 07/07: sketch counterweight weld plates with Kyle; sketch lifting arrangements for upper mast section/racking board for stage 3 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-07 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.75 0 07/06: process incoming TSR-01770-R1 07/07: transmit TSR-01778-DWG; process Sakhalin TSR reports for May & June 07/08: transmit TSR-01778-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-08 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 6 0 07/06: propose bolt thru solution for safety gate on crown. 07/07: sketch counterweight weld plates with Kyle; sketch lifting arrangements for upper mast section/racking board for stage 3 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 07/08: bi-weekly HTSG meeting to discuss progress, updates, and upcoming projects Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-08 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 07/06: process incoming TSR-01770-R1 07/07: transmit TSR-01778-DWG; process Sakhalin TSR reports for May & June 07/08: transmit TSR-01778-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-09 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 8 0 07/06: propose bolt thru solution for safety gate on crown. 07/07: sketch counterweight weld plates with Kyle; sketch lifting arrangements for upper mast section/racking board for stage 3 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 07/12: assist Robbie with hightail and troubleshoot issues; timesheet to ProjXsense and payroll 07/15: move/extract files from Robbie (hightail) to Q: 07/13-07/16: AutoCAD standards and RUSD automation routines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-12 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 4 0 07/12: continue rendering of Genesis platform for BD purposes Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-12 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 meeting with Mihovil for weekly TSR updates and status Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-13 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 minor model tweaks and updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 07/13: update call with James 07/14: town hall meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 07/12: assist Robbie with hightail and troubleshoot issues; timesheet to ProjXsense and payroll 07/15: move/extract files from Robbie (hightail) to Q: 07/13-07/16: AutoCAD standards and RUSD automation routines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-14 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 minor model tweaks and updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 07/13: update call with James 07/14: town hall meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 07/12: assist Robbie with hightail and troubleshoot issues; timesheet to ProjXsense and payroll 07/15: move/extract files from Robbie (hightail) to Q: 07/13-07/16: AutoCAD standards and RUSD automation routines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-15 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 5 0 07/15: check for clearance for lifting upper mast section with crown attached. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 07/12: assist Robbie with hightail and troubleshoot issues; timesheet to ProjXsense and payroll 07/15: move/extract files from Robbie (hightail) to Q: 07/13-07/16: AutoCAD standards and RUSD automation routines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-16 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 minor model tweaks and updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 07/12: assist Robbie with hightail and troubleshoot issues; timesheet to ProjXsense and payroll 07/15: move/extract files from Robbie (hightail) to Q: 07/13-07/16: AutoCAD standards and RUSD automation routines. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-19 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1.5 0 07/20-07/23: support rig up questions regarding mast raising/installtation with Troy/Roger Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 5.5 0 07/19-07/23: completing goals for CAD admin; 3D library, lisp routines. 07/20: assist with Hightail attachment to ENL Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-19 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 07/19: weekly TSR update meeting with Sakhalin. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-20 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 3 0 07/20-07/23: support rig up questions regarding mast raising/installtation with Troy/Roger Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 07/20: Drillmec virutal open house tour 07/22: bi-weekly tech services TSR update /BD meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 07/19-07/23: completing goals for CAD admin; 3D library, lisp routines. 07/20: assist with Hightail attachment to ENL Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-21 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2 0 07/20-07/23: support rig up questions regarding mast raising/installtation with Troy/Roger Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 5 0 07/19-07/23: completing goals for CAD admin; 3D library, lisp routines. 07/20: assist with Hightail attachment to ENL Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-21 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 07/21: transmit TSR-01785-CTR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-22 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 4 0 07/20-07/23: support rig up questions regarding mast raising/installtation with Troy/Roger Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 07/20: Drillmec virutal open house tour 07/22: bi-weekly tech services TSR update /BD meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 07/19-07/23: completing goals for CAD admin; 3D library, lisp routines. 07/20: assist with Hightail attachment to ENL Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-23 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 07/23: email correspondence with Greg regarding air can layout and models. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-23 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2 0 07/20-07/23: support rig up questions regarding mast raising/installtation with Troy/Roger Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 07/19-07/23: completing goals for CAD admin; 3D library, lisp routines. 07/20: assist with Hightail attachment to ENL Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-26 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2.5 0 07/26: model inquiry and view export for Greg 07/29-30: crane lifting clash checks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 4.5 0 07/26: timesheet to ProjXsense and payroll AutoCAD lisp routines and 3D model collection exports for annual goals Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-26 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly update meeting with Mihovil regarding TSR updates and status Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-27 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 8 0 07/27-29: edit and revise plot plan for Proposal Cindro 123L with Al Mingo. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 07/26: timesheet to ProjXsense and payroll AutoCAD lisp routines and 3D model collection exports for annual goals Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-28 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 3 0 07/27-29: edit and revise plot plan for Proposal Cindro 123L with Al Mingo. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 07/28: transmit TSR-01743-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-29 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2.5 0 07/26: model inquiry and view export for Greg 07/29-30: crane lifting clash checks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 07/26: timesheet to ProjXsense and payroll AutoCAD lisp routines and 3D model collection exports for annual goals Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-29 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 3 0 07/27-29: edit and revise plot plan for Proposal Cindro 123L with Al Mingo. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-30 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 4 0 07/26: model inquiry and view export for Greg 07/29-30: crane lifting clash checks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-07-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 07/26: timesheet to ProjXsense and payroll AutoCAD lisp routines and 3D model collection exports for annual goals Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-01 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 7 0 Assemble powerpoint for GOM CDPU opportunities. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-01 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 2 0 Review Baker Hughes geo-thermal New Mexico opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-02 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 4 0 Assemble powerpoint for GOM CDPU opportunities. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-02 OH-036 :OH-036 TSR-01788 HTSG-RTOC-Project Regular Pay N 2 0 Attend RigNet debrief with L. Wang and T. Faldyn. TanDelta sensor meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-05 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 July 4th Holiday Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-06 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 Meet with Patterson and J. Mata, F. Guaje to review Rig 210 option for Slb Pemex 1500HP rig opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-06 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 8 0 Develop CVX Bangladesh proposal letter, schedules and cost estimates for PKD Rig 270, 269 and PD Rig 83 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-07 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 Support CVX Genesis Sawyer bankruptcy mitigation plan. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-07 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 8 0 Develop CVX Bangladesh proposal letter, schedules and cost estimates for PKD Rig 270, 269 and PD Rig 83 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly TS meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-08 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 Support CVX Genesis Sawyer bankruptcy mitigation plan. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-08 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 6.5 0 Develop CVX Bangladesh proposal letter, schedules and cost estimates for PKD Rig 270, 269 and PD Rig 83 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-08 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 1 0 Norway NME bi-weekly meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly TS meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-09 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 Support CVX Genesis Sawyer bankruptcy mitigation plan. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-09 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 4 0 Develop CVX Bangladesh proposal letter, schedules and cost estimates for PKD Rig 270, 269 and PD Rig 83 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-09 OH-036 :OH-036 TSR-01788 HTSG-RTOC-Project Regular Pay N 0.5 0 Review RTOC status with A. Perez. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-12 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 8 0 Review rig 269 and 270 loads for transport to Bangladesh. Issue RFQ's for Rig 269 CVX bangladesh upgrades. Rig search for Shell Brunei EOI Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-12 OH-036 :OH-036 TSR-01788 HTSG-RTOC-Project Regular Pay N 1 0 Predictive maintenance meeting with T. Faldyn. RigNet meeting with T. Faldyn. D3O rollout meeting. RTOC recomendations. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-13 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 2 0 Receive and review Alibek fleet engine running hour report Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-13 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 7 0 Review rig 269 and 270 loads for transport to Bangladesh. Issue RFQ's for Rig 269 CVX bangladesh upgrades. Rig search for Shell Brunei EOI Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Global town hall. Weekly TS meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-14 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 6.5 0 Review rig 269 and 270 loads for transport to Bangladesh. Issue RFQ's for Rig 269 CVX bangladesh upgrades. Rig search for Shell Brunei EOI Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-14 OH-036 :OH-036 TSR-01788 HTSG-RTOC-Project Regular Pay N 1 0 Predictive maintenance meeting with T. Faldyn. RigNet meeting with T. Faldyn. D3O rollout meeting. RTOC recomendations. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-15 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 8 0 Review rig 269 and 270 loads for transport to Bangladesh. Issue RFQ's for Rig 269 CVX bangladesh upgrades. Rig search for Shell Brunei EOI Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-15 OH-036 :OH-036 TSR-01788 HTSG-RTOC-Project Regular Pay N 1 0 Predictive maintenance meeting with T. Faldyn. RigNet meeting with T. Faldyn. D3O rollout meeting. RTOC recomendations. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Global town hall. Weekly TS meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-16 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 4 0 Review rig 269 and 270 loads for transport to Bangladesh. Issue RFQ's for Rig 269 CVX bangladesh upgrades. Rig search for Shell Brunei EOI Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-16 OH-036 :OH-036 TSR-01788 HTSG-RTOC-Project Regular Pay N 2 0 Predictive maintenance meeting with T. Faldyn. RigNet meeting with T. Faldyn. D3O rollout meeting. RTOC recomendations. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-19 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 8 0 Geo-thermal rig option meeting with BD. Create and review Shell Brunei rig options presentation with BD. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-19 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 1 0 Norway NME meeting. 257 re-activation meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-20 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 1 0 Review tech options for ESG. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-20 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 4 0 Edit Hoover Diana presentation. Create CVX facilities engineering presentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-20 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 4 0 Geo-thermal rig option meeting with BD. Create and review Shell Brunei rig options presentation with BD. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Drillmec open house. SDM meeting. P&A monthly meeting and TS meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-21 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 7 0 Geo-thermal rig option meeting with BD. Create and review Shell Brunei rig options presentation with BD. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-22 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 7 0 Geo-thermal rig option meeting with BD. Create and review Shell Brunei rig options presentation with BD. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-22 OH-036 :OH-036 TSR-01788 HTSG-RTOC-Project Regular Pay N 2 0 Predictive maintenance meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Drillmec open house. SDM meeting. P&A monthly meeting and TS meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-23 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2 0 Edit Hoover Diana presentation. Create CVX facilities engineering presentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-23 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 2 0 Geo-thermal rig option meeting with BD. Create and review Shell Brunei rig options presentation with BD. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-23 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 1 0 Norway NME meeting. 257 re-activation meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-26 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 1 0 ESG conf call Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-26 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 4 0 CVX facilities ppt review. Hoover Diana powerpoint review Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-26 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 5 0 Gazprom EOI review of 269 Novos, Drillops upgrade. Continue Rig 269 Mast RFQ clarifications. Shell Brunei conf call with Swift P&A Barge company. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-27 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 4 0 CVX facilities ppt review. Hoover Diana powerpoint review Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-27 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 4 0 Gazprom EOI review of 269 Novos, Drillops upgrade. Continue Rig 269 Mast RFQ clarifications. Shell Brunei conf call with Swift P&A Barge company. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-27 OH-036 :OH-036 TSR-01788 HTSG-RTOC-Project Regular Pay N 1 0 Weekly Predictive Maintenance meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-28 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 9 0 Rig search for Hunt Oil Romania ITT. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 7/29/ 7/31 PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-30 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 On 7/29/ 7/31 PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-30 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 2 0 Gazprom EOI review of 269 Novos, Drillops upgrade. Continue Rig 269 Mast RFQ clarifications. Shell Brunei conf call with Swift P&A Barge company. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-31 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 0.5 0 Gazprom EOI review of 269 Novos, Drillops upgrade. Continue Rig 269 Mast RFQ clarifications. Shell Brunei conf call with Swift P&A Barge company. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-07-31 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 0.5 0 Rig search for Hunt Oil Romania ITT. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-07-01 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 8 0 Genesis Spar - Control Cable Connector Pinout. Genesis Spar - EMI replacement Control Cable MR Done. CVX Emergency Lighting Provisions Q/A by Ryan. MR created for Labeling machine. Mast Area J-Box control drawing reviewed. Water mist drawings reviewed for Power Substructure light and wire. Genesis Spar - Back up Plan for Operator Cab A/C. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-07-02 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 8 0 Genesis Spar - Control Cable Connector Pinout. Genesis Spar - EMI replacement Control Cable MR Done. CVX Emergency Lighting Provisions Q/A by Ryan. MR created for Labeling machine. Mast Area J-Box control drawing reviewed. Water mist drawings reviewed for Power Substructure light and wire. Genesis Spar - Back up Plan for Operator Cab A/C. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-07-05 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Holiday Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-07-06 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 8 0 Mast Area Box follow up. Genesis Spar - Back up Plan for Operator Cab A/C quote sent to Bebco & Nance HVAC company . Quote reviewed. Genesis Spar - A/C vendor verification QA Called Charlie Sawyer to discuss remain electrical item and drawing. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-07-07 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 8 0 Mast Area Box follow up. Genesis Spar - Back up Plan for Operator Cab A/C quote sent to Bebco & Nance HVAC company . Quote reviewed. Genesis Spar - A/C vendor verification QA Called Charlie Sawyer to discuss remain electrical item and drawing. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-07-08 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 8 0 Mast Area Box follow up. Genesis Spar - Back up Plan for Operator Cab A/C quote sent to Bebco & Nance HVAC company . Quote reviewed. Genesis Spar - A/C vendor verification QA Called Charlie Sawyer to discuss remain electrical item and drawing. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-07-09 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 8 0 Mast Area Box follow up. Genesis Spar - Back up Plan for Operator Cab A/C quote sent to Bebco & Nance HVAC company . Quote reviewed. Genesis Spar - A/C vendor verification QA Called Charlie Sawyer to discuss remain electrical item and drawing. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-07-12 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 8 0 Quote request for 3 Ton ( 36000BTU ) roof mount A/C unit from Loran. Online Inquiry - Request Quote for 3 Ton A/C Unit // BECC Q15253 from Bebco. Quote request for 3 Ton ( 36000BTU ) roof mount A/C unit from Nance. Reviewed Friedrich datasheet for Wall mount unit. Genesis Spar - Operator Cab drawing with dimension from Lam and Mike to send it to Vendor. Genesis Spar - A/C vendor verification from Esperanza. ELECTRICAL SUPPLIES FOR GENESIS SUBSTRUCTURE LIGHTS quote reviewed. Emergency Lights Sawyer Packages Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-07-13 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 8 0 Quote request for 3 Ton ( 36000BTU ) roof mount A/C unit from Loran. Online Inquiry - Request Quote for 3 Ton A/C Unit // BECC Q15253 from Bebco. Quote request for 3 Ton ( 36000BTU ) roof mount A/C unit from Nance. Reviewed Friedrich datasheet for Wall mount unit. Genesis Spar - Operator Cab drawing with dimension from Lam and Mike to send it to Vendor. Genesis Spar - A/C vendor verification from Esperanza. ELECTRICAL SUPPLIES FOR GENESIS SUBSTRUCTURE LIGHTS quote reviewed. Emergency Lights Sawyer Packages Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-07-14 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 8 0 Quote request for 3 Ton ( 36000BTU ) roof mount A/C unit from Loran. Online Inquiry - Request Quote for 3 Ton A/C Unit // BECC Q15253 from Bebco. Quote request for 3 Ton ( 36000BTU ) roof mount A/C unit from Nance. Reviewed Friedrich datasheet for Wall mount unit. Genesis Spar - Operator Cab drawing with dimension from Lam and Mike to send it to Vendor. Genesis Spar - A/C vendor verification from Esperanza. ELECTRICAL SUPPLIES FOR GENESIS SUBSTRUCTURE LIGHTS quote reviewed. Emergency Lights Sawyer Packages Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-07-15 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 8 0 Quote request for 3 Ton ( 36000BTU ) roof mount A/C unit from Loran. Online Inquiry - Request Quote for 3 Ton A/C Unit // BECC Q15253 from Bebco. Quote request for 3 Ton ( 36000BTU ) roof mount A/C unit from Nance. Reviewed Friedrich datasheet for Wall mount unit. Genesis Spar - Operator Cab drawing with dimension from Lam and Mike to send it to Vendor. Genesis Spar - A/C vendor verification from Esperanza. ELECTRICAL SUPPLIES FOR GENESIS SUBSTRUCTURE LIGHTS quote reviewed. Emergency Lights Sawyer Packages Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-07-16 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 8 0 Quote request for 3 Ton ( 36000BTU ) roof mount A/C unit from Loran. Online Inquiry - Request Quote for 3 Ton A/C Unit // BECC Q15253 from Bebco. Quote request for 3 Ton ( 36000BTU ) roof mount A/C unit from Nance. Reviewed Friedrich datasheet for Wall mount unit. Genesis Spar - Operator Cab drawing with dimension from Lam and Mike to send it to Vendor. Genesis Spar - A/C vendor verification from Esperanza. ELECTRICAL SUPPLIES FOR GENESIS SUBSTRUCTURE LIGHTS quote reviewed. Emergency Lights Sawyer Packages Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-07-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Drillmec Virtual Tour Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-07-19 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 7 0 Genesis Spar - Emergency door light quote request Quote request for 3 Ton ( 36000BTU ) roof mount A/C unit e-stop - Rexel follow up Quote request/reviewed for 3 Ton ( 36000BTU ) roof mount A/C unit Genesis Spar - Emergency door light MR created. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-07-20 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 8 0 Genesis Spar - Emergency door light quote request Quote request for 3 Ton ( 36000BTU ) roof mount A/C unit e-stop - Rexel follow up Quote request/reviewed for 3 Ton ( 36000BTU ) roof mount A/C unit Genesis Spar - Emergency door light MR created. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-07-21 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 8 0 Genesis Spar - Emergency door light quote request Quote request for 3 Ton ( 36000BTU ) roof mount A/C unit e-stop - Rexel follow up Quote request/reviewed for 3 Ton ( 36000BTU ) roof mount A/C unit Genesis Spar - Emergency door light MR created. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-07-22 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 8 0 Genesis Spar - Emergency door light quote request Quote request for 3 Ton ( 36000BTU ) roof mount A/C unit e-stop - Rexel follow up Quote request/reviewed for 3 Ton ( 36000BTU ) roof mount A/C unit Genesis Spar - Emergency door light MR created. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-07-23 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 8 0 Genesis Spar - Emergency door light quote request Quote request for 3 Ton ( 36000BTU ) roof mount A/C unit e-stop - Rexel follow up Quote request/reviewed for 3 Ton ( 36000BTU ) roof mount A/C unit Genesis Spar - Emergency door light MR created. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-07-26 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 8 0 Rig up and SIT support Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-07-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-07-28 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-07-29 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-07-30 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Timesheet Emails Review status w/ J.G. (7/1/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-01 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 7 0 249L-TSR-01769 249L-01-02-079-(01-04) -RA comments update(6/29/21 - 7/1/21) 249L-01-00-227-1 (revise per BOP/Frame) (6/30/21 - 7/2/21)) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails Review status w/ J.G. (7/1/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-02 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 5 0 249L-TSR-01769 249L-01-02-079-(01-04) -RA comments update(6/29/21 - 7/1/21) 249L-01-00-227-1 (revise per BOP/Frame) (6/30/21 - 7/2/21)) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-05 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 4th of July holiday Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-06 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 2 0 Review Smart Goals w/ J.G. (7/6/21) Update/Route mid-year goals (7/6/21) Review LABU drawings for 165L & 221L (7/7/21) 165L & 221L drawings update (7/7-9/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Emails Timesheet Review work w/ J.G. (7/6/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-06 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 4 0 249L-01-00-227-1 (revise per comments) (7/6/21)) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-07 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 3 0 Review Smart Goals w/ J.G. (7/6/21) Update/Route mid-year goals (7/6/21) Review LABU drawings for 165L & 221L (7/7/21) 165L & 221L drawings update (7/7-9/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Review work w/ J.G. (7/6/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-07 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 4 0 249L-01-00-227-1 (revise per comments) (7/6/21)) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-08 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 6 0 Review Smart Goals w/ J.G. (7/6/21) Update/Route mid-year goals (7/6/21) Review LABU drawings for 165L & 221L (7/7/21) 165L & 221L drawings update (7/7-9/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Technical Services meeting (7/8/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Review work w/ J.G. (7/6/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-09 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 5 0 Review Smart Goals w/ J.G. (7/6/21) Update/Route mid-year goals (7/6/21) Review LABU drawings for 165L & 221L (7/7/21) 165L & 221L drawings update (7/7-9/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Review work w/ J.G. (7/6/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-09 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 2 0 249L-01-00-227-1 (revise per comments) (7/6/21)) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Timesheet Emails Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-12 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting w/ Mio (7/12/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-12 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 5.5 0 Fuze meeting w/ J.G. & T.E. review BOP Frame modifications (7/12/21) Update 249L-01-02-079-01-04-RA & 249L-01-00-227-1 per modifications. (7/12-16/21) PDF drawing (7/16/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-13 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 7.5 0 Fuze meeting w/ J.G. & T.E. review BOP Frame modifications (7/12/21) Update 249L-01-02-079-01-04-RA & 249L-01-00-227-1 per modifications. (7/12-16/21) PDF drawing (7/16/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Town hall meeting (7/14/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-14 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 6 0 Fuze meeting w/ J.G. & T.E. review BOP Frame modifications (7/12/21) Update 249L-01-02-079-01-04-RA & 249L-01-00-227-1 per modifications. (7/12-16/21) PDF drawing (7/16/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-15 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 6.5 0 LABU 165L drawings update (7/15-16/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-15 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 1 0 Fuze meeting w/ J.G. & T.E. review BOP Frame modifications (7/12/21) Update 249L-01-02-079-01-04-RA & 249L-01-00-227-1 per modifications. (7/12-16/21) PDF drawing (7/16/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-16 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 4 0 LABU 165L drawings update (7/15-16/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-16 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 1 0 Fuze meeting w/ J.G. & T.E. review BOP Frame modifications (7/12/21) Update 249L-01-02-079-01-04-RA & 249L-01-00-227-1 per modifications. (7/12-16/21) PDF drawing (7/16/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-19 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 5.5 0 LABU 221L drawings review/update (7/19-20/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Emails Timesheet Computer Updates (7/20/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-19 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting w/ Mio (7/19/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-20 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 6.5 0 LABU 221L drawings review/update (7/19-20/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Emails Timesheet Computer Updates (7/20/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Computer Updates (7/20/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-21 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 7.5 0 Fuze meeting w/ T.E. - review BOP skid & frame modifications(7/21/21) Update drawings per modifications 249L-01-00-227-1-RC 249L-01-02-079-01-04-RA (7/21-23/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Technical Services bi-weekly meeting (7/22/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Computer Updates (7/20/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6.5 0 Fuze meeting w/ T.E. review modifications (7/22/21) RUSD-PKE-T2-ND-27400.1018.001-.003 REV-C (7/22-23/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Computer Updates (7/20/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5 0 Fuze meeting w/ T.E. review modifications (7/22/21) RUSD-PKE-T2-ND-27400.1018.001-.003 REV-C (7/22-23/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Emails Timesheet Review tasks w/ T.E.. (7/26/21) Review tasks w/ J.G. (7/30/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-26 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting w/ Mio (7/26/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-26 Rig 270L-TSR :Rig 270L-TSR TSR-01743-270L-01 Operations on Rails Detailed Design - DESIGN Regular Pay N 5.5 0 270L-01-03-089-1-R0 Comments update (7/26/30) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Emails Timesheet Review tasks w/ T.E.. (7/26/21) Review tasks w/ J.G. (7/30/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6.5 0 TSR - 01770 RUSD-PKE-T2-ND-27400.1018.001-.003 REV-C (7/26-30/21) Review w/ T.E. (726,30/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Emails Timesheet Review tasks w/ T.E.. (7/26/21) Review tasks w/ J.G. (7/30/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7 0 TSR - 01770 RUSD-PKE-T2-ND-27400.1018.001-.003 REV-C (7/26-30/21) Review w/ T.E. (726,30/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-29 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Emails Timesheet Review tasks w/ T.E.. (7/26/21) Review tasks w/ J.G. (7/30/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-29 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6.5 0 TSR - 01770 RUSD-PKE-T2-ND-27400.1018.001-.003 REV-C (7/26-30/21) Review w/ T.E. (726,30/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-30 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 3 0 LABU 221L drawings review/update (7/30/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Emails Timesheet Review tasks w/ T.E.. (7/26/21) Review tasks w/ J.G. (7/30/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-07-30 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR - 01770 RUSD-PKE-T2-ND-27400.1018.001-.003 REV-C (7/26-30/21) Review w/ T.E. (726,30/21) Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-01 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, trucking and crane tickets, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-02 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, trucking and crane tickets, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-03 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, trucking and crane tickets, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-04 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Pressure test and flush hydraulics, hook up hyd consumers, install jumper hoses, System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, trucking and crane tickets, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-05 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Pressure test and flush hydraulics, hook up hyd consumers, install jumper hoses, System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, trucking and crane tickets, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-06 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Pressure test and flush hydraulics, hook up hyd consumers, install jumper hoses, System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, trucking and crane tickets, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-07 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Pressure test and flush hydraulics, hook up hyd consumers, install jumper hoses, System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, trucking and crane tickets, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-08 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Pressure test and flush hydraulics, hook up hyd consumers, install jumper hoses, System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, trucking and crane tickets, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-09 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Pressure test and flush hydraulics, hook up hyd consumers, install jumper hoses, System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, trucking and crane tickets, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-10 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Pressure test and flush hydraulics, hook up hyd consumers, install jumper hoses, System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, trucking and crane tickets, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-11 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 6 0 Pressure test and flush hydraulics, hook up hyd consumers, commission and run hydraulic system, commission HPU, cabin and drawworks, install jumper hoses, System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, trucking and crane tickets, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-11 OH-010 :OH-010 OH-010-06 HTSG / Corporate Regular Pay N 4 0 Travel to/from New Iberia to Houston Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-12 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Time off from CDPU project Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-13 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Time off from CDPU project Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-14 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Time off from CDPU project Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-15 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 6 0 Pressure test and flush hydraulics, hook up hyd consumers, commission and run hydraulic system, commission HPU, cabin and drawworks, install jumper hoses, System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, trucking and crane tickets, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-15 OH-010 :OH-010 OH-010-06 HTSG / Corporate Regular Pay N 4 0 Travel to/from New Iberia to Houston Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-16 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Pressure test and flush hydraulics, hook up hyd consumers, commission and run hydraulic system, commission HPU, cabin and drawworks, install jumper hoses, System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, trucking and crane tickets, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-17 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Pressure test and flush hydraulics, hook up hyd consumers, commission and run hydraulic system, commission HPU, cabin and drawworks, install jumper hoses, System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, trucking and crane tickets, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-18 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 fix hydraulic hose that broke and install whipchecks/sleeves, Pressure test and flush hydraulics, hook up hyd consumers, commission and run hydraulic system, commission HPU, cabin and drawworks, install jumper hoses, System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, trucking and crane tickets, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-19 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 fix hydraulic hose that broke and install whipchecks/sleeves, Pressure test and flush hydraulics, hook up hyd consumers, commission and run hydraulic system, commission HPU, cabin and drawworks, install jumper hoses, System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, trucking and crane tickets, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-20 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 fix hydraulic hose that broke and install whipchecks/sleeves, Pressure test and flush hydraulics, hook up hyd consumers, commission and run hydraulic system, commission HPU, cabin and drawworks, install jumper hoses, System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, trucking and crane tickets, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-21 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 fix hydraulic hose that broke and install whipchecks/sleeves, Pressure test and flush hydraulics, hook up hyd consumers, commission and run hydraulic system, commission HPU, cabin and drawworks, install jumper hoses, System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, trucking and crane tickets, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-22 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 fix hydraulic hose that broke and install whipchecks/sleeves, Pressure test and flush hydraulics, hook up hyd consumers, commission and run hydraulic system, commission HPU, cabin and drawworks, install jumper hoses, System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, trucking and crane tickets, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-23 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 fix hydraulic hose that broke and install whipchecks/sleeves, Pressure test and flush hydraulics, hook up hyd consumers, commission and run hydraulic system, commission HPU, cabin and drawworks, install jumper hoses, System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, trucking and crane tickets, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-24 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 fix hydraulic hose that broke and install whipchecks/sleeves, Pressure test and flush hydraulics, hook up hyd consumers, commission and run hydraulic system, commission HPU, cabin and drawworks, install jumper hoses, System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, trucking and crane tickets, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-25 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 4 0 assisted with mast raising, install whipchecks/sleeves, hook up hyd consumers and winches, commission and run hydraulic system, commission structure and equipment, install jumper hoses, System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-25 OH-010 :OH-010 OH-010-06 HTSG / Corporate Regular Pay N 4 0 Travel to/from New Iberia yard for time off Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-26 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Time off in Houston Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-27 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Time off in Houston Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-28 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Time off in Houston Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-29 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 4 0 assisted with mast raising, install whipchecks/sleeves, hook up hyd consumers and winches, commission and run hydraulic system, commission structure and equipment, install jumper hoses, System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-29 OH-010 :OH-010 OH-010-06 HTSG / Corporate Regular Pay N 4 0 Travel to/from New Iberia yard for time off Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-30 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 assisted with mast raising, install whipchecks/sleeves, hook up hyd consumers and winches, commission and run hydraulic system, commission structure and equipment, install jumper hoses, System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment Reck, John Engineer I 29656 Reck, John:Engineer I 2021-07-31 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 assisted with mast raising, install whipchecks/sleeves, hook up hyd consumers and winches, commission and run hydraulic system, commission structure and equipment, install jumper hoses, System completion walkdowns Commissioning forms, assist with rigup sequence, module placement assistance, receive fittings and install, assist with rigup, procurement of required material, pressure test systems, commission equipment