Name Billing Class Employee No. Item Line Class Transaction Date Job No. Customer Service Item Notes Payroll Item Billable Employee Paid Day Rate Duration Days Remarks Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-03 Berkut-TSR :Berkut-TSR TSR-01776-BERP South Crane Ladder Access Regular Pay N 2 0 respond to Mio comments, send closeout to Kyle, update MTO, finished closeout Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, review of new corporate policies Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-03 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2.5 0 Willow Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-03 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 sak meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 respond to Mio questions about 270L, update 1779 MTO, review drawing, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-03 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 1.5 0 verify BOP stack components, modify design, analysis, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-04 Berkut-TSR :Berkut-TSR TSR-01776-BERP South Crane Ladder Access Regular Pay N 1.5 0 respond to Mio comments, send closeout to Kyle, update MTO, finished closeout Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-04 Berkut-TSR :Berkut-TSR TSR-01778-BERP Pipe Barn Storage Rack Regular Pay N 2.5 0 create MTO, add to analysis, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.75 0 GHG calcs and discussion with consultant, review fuel spreadsheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-04 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Willow Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-04 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 2 0 star energy catwalk Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 respond to Mio questions about 270L, update 1779 MTO, review drawing, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, review of new corporate policies Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.25 0 GHG calcs and discussion with consultant, review fuel spreadsheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-05 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Willow Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-05 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 2.5 0 star energy catwalk Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 respond to Mio questions about 270L, update 1779 MTO, review drawing, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-05 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.25 0 review clamp drawing, analysis for clamp, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-05 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 0.5 0 verify BOP stack components, modify design, analysis, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-06 Berkut-TSR :Berkut-TSR TSR-01776-BERP South Crane Ladder Access Regular Pay N 0.5 0 respond to Mio comments, send closeout to Kyle, update MTO, finished closeout Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-06 Berkut-TSR :Berkut-TSR TSR-01778-BERP Pipe Barn Storage Rack Regular Pay N 1 0 create MTO, add to analysis, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, review of new corporate policies Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-06 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 3 0 star energy catwalk Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-06 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 3 0 verify BOP stack components, modify design, analysis, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, review of new corporate policies Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-07 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 2.5 0 star energy catwalk Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-07 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 2.5 0 review clamp drawing, analysis for clamp, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-10 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 7 0 Willow and Oil Search Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-10 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 270 info and walkway MTO questions Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Help move boxes at office Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-11 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 3.5 0 Willow and Oil Search Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 270 info and walkway MTO questions Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-11 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 1 0 review with kyle and dan Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-12 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 8.5 0 Willow and Oil Search Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-12 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 0.5 0 presentation change Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 270 info and walkway MTO questions Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-12 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 1 0 review with kyle and dan Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-13 Berkut-TSR :Berkut-TSR TSR-01778-BERP Pipe Barn Storage Rack Regular Pay N 5 0 analysis report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-13 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.25 0 Diesel consumption spreadsheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-13 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Willow and Oil Search Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.25 0 270 info and walkway MTO questions Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-13 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.75 0 122 clamp drawing Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Hyatt Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-17 Berkut-TSR :Berkut-TSR TSR-01778-BERP Pipe Barn Storage Rack Regular Pay N 2.5 0 finish analysis report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 GHG spreadsheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-17 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Oil Search and Willow Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-17 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 SAK meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-17 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 SAFI model of angle, review and sign drawing, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-17 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 1 0 analysis, drawing kick off, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 GHG spreadsheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-18 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 5 0 Oil Search and Willow Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 270 stuff Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-18 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 2 0 analysis, drawing kick off, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-19 Berkut-TSR :Berkut-TSR TSR-01778-BERP Pipe Barn Storage Rack Regular Pay N 0.5 0 finish analysis report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-19 OH-002 :OH-002 Overhead All Activities Regular Pay N 3.5 0 Caroline's Grandmother Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 New Office Meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 270 stuff Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-19 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 2 0 analysis, drawing kick off, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-20 OH-002 :OH-002 Overhead All Activities Regular Pay N 8 0 Caroline's Grandmother Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-20 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Oil Search and Willow Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-21 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 4.5 0 Oil Search and Willow Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-21 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.5 0 SAFI model of angle, review and sign drawing, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-21 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 0.75 0 analysis, drawing kick off, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-24 Berkut-TSR :Berkut-TSR TSR-01778-BERP Pipe Barn Storage Rack Regular Pay N 3 0 closeout report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 GHG spreadsheet review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-24 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 3 0 Oil Search and Willow presentation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-24 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 SAK meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-24 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.5 0 review of 122 charge pump issue Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-25 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 8 0 Oil Search and Willow presentation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-25 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 1 0 Analysis review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-26 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 8 0 Oil Search and Willow presentation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-26 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 2 0 review of 122 charge pump issue Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-27 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 7.5 0 Oil Search and Willow presentation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-27 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 review of 122 charge pump issue Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-28 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 5.5 0 Oil Search and Willow presentation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-05-28 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 TSR 101 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 (05/03/21) Updated weekly timesheet and submitted for approval. Update call with Kyle(122L). Update call with Tyler. Update call with Kyle (Star Energy). Review/approve designer's timesheets. (05/04/21) Update call with Lam. Update call with Jorge. (05/05/21) Update call with Lam. (05/06/21) Update call with Tyler. (05/07/21 Assigned Jorge to 270 drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4.5 0 (05/03/21 - 05/04/21) Check walkway handrails. (05/05/21) Checked comments for crane platform. Call with Tyler/Jorge to discuss redlines. (05/06/21) Added weld symbols to walkway drawing- discussed with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-03 Rig 122-TSR :Rig 122-TSR TSR-01786-122L Derrick Escape Platform Regular Pay N 1.5 0 (05/03/21 - 05/07/21) Worked on clamp drawing. Call with Tyler/Kyle to review drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 (05/03/21) Updated weekly timesheet and submitted for approval. Update call with Kyle(122L). Update call with Tyler. Update call with Kyle (Star Energy). Review/approve designer's timesheets. (05/04/21) Update call with Lam. Update call with Jorge. (05/05/21) Update call with Lam. (05/06/21) Update call with Tyler. (05/07/21 Assigned Jorge to 270 drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-04 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 3 0 (05/04/21) Star Energy site layouts. (05/05/21) Reviewed plot plan issues. Pulled ref info for rig 253L. Call with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 (05/03/21 - 05/04/21) Check walkway handrails. (05/05/21) Checked comments for crane platform. Call with Tyler/Jorge to discuss redlines. (05/06/21) Added weld symbols to walkway drawing- discussed with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-04 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 2.5 0 (05/04/21) Searched for 256L rathole information. Call with Kyle to review 122L hoist. Call with Mexico to discuss 256L. (05/07/21) Searched for haz area drawing info. Started new drawing for 122L. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-04 Rig 122-TSR :Rig 122-TSR TSR-01786-122L Derrick Escape Platform Regular Pay N 1.75 0 (05/03/21 - 05/07/21) Worked on clamp drawing. Call with Tyler/Kyle to review drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (05/03/21) Updated weekly timesheet and submitted for approval. Update call with Kyle(122L). Update call with Tyler. Update call with Kyle (Star Energy). Review/approve designer's timesheets. (05/04/21) Update call with Lam. Update call with Jorge. (05/05/21) Update call with Lam. (05/06/21) Update call with Tyler. (05/07/21 Assigned Jorge to 270 drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-05 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 2.5 0 (05/04/21) Star Energy site layouts. (05/05/21) Reviewed plot plan issues. Pulled ref info for rig 253L. Call with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 (05/03/21 - 05/04/21) Check walkway handrails. (05/05/21) Checked comments for crane platform. Call with Tyler/Jorge to discuss redlines. (05/06/21) Added weld symbols to walkway drawing- discussed with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-05 Rig 122-TSR :Rig 122-TSR TSR-01786-122L Derrick Escape Platform Regular Pay N 4.25 0 (05/03/21 - 05/07/21) Worked on clamp drawing. Call with Tyler/Kyle to review drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (05/03/21) Updated weekly timesheet and submitted for approval. Update call with Kyle(122L). Update call with Tyler. Update call with Kyle (Star Energy). Review/approve designer's timesheets. (05/04/21) Update call with Lam. Update call with Jorge. (05/05/21) Update call with Lam. (05/06/21) Update call with Tyler. (05/07/21 Assigned Jorge to 270 drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (05/03/21 - 05/04/21) Check walkway handrails. (05/05/21) Checked comments for crane platform. Call with Tyler/Jorge to discuss redlines. (05/06/21) Added weld symbols to walkway drawing- discussed with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-06 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 7 0 (05/06/21) 265L camp changes for Genel. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (05/03/21) Updated weekly timesheet and submitted for approval. Update call with Kyle(122L). Update call with Tyler. Update call with Kyle (Star Energy). Review/approve designer's timesheets. (05/04/21) Update call with Lam. Update call with Jorge. (05/05/21) Update call with Lam. (05/06/21) Update call with Tyler. (05/07/21 Assigned Jorge to 270 drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-07 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 3 0 (05/04/21) Searched for 256L rathole information. Call with Kyle to review 122L hoist. Call with Mexico to discuss 256L. (05/07/21) Searched for haz area drawing info. Started new drawing for 122L. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-07 Rig 122-TSR :Rig 122-TSR TSR-01786-122L Derrick Escape Platform Regular Pay N 2.5 0 (05/03/21 - 05/07/21) Worked on clamp drawing. Call with Tyler/Kyle to review drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-10 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Yard visit. Jacking support discussions with Troy. Visit Loadmaster. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-10 OH-010 :OH-010 OH-010-05 Arctic, North America Offshore (ANAO) Regular Pay N 4 0 Travel to/from Houston to New Iberia. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-10 Rig 122-TSR :Rig 122-TSR TSR-01786-122L Derrick Escape Platform Regular Pay N 4.5 0 (05/10/21 - 05/13/21) Continued clamp details. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-11 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 Yard visit. Jacking support discussions with Troy. Visit Loadmaster. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-11 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2 0 (05/10/21) Rig up and SIT discussion Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-11 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 (05/12/21) Cont haz area dawing for 122L. (05/13/21) Call with Tyler to review 122L Haz area classification drawings. (05/14/21) Updated 122L air schematic and sent drawing for info. Archived 122L crown padeye drawing on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-11 Rig 122-TSR :Rig 122-TSR TSR-01786-122L Derrick Escape Platform Regular Pay N 3.5 0 (05/10/21 - 05/13/21) Continued clamp details. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-12 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 Yard visit. Jacking support discussions with Troy. Visit Loadmaster. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (05/12/21) Update call with Lam. Update call with Jorge. (05/13/21) TSR update call. (05/14/21) Update call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-12 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2.5 0 (05/12/21) Discussed AADU racking board modifications. Pulled drawings. (05/13/21) AADU racking board drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-12 OH-010 :OH-010 OH-010-05 Arctic, North America Offshore (ANAO) Regular Pay N 4.5 0 Travel to/from Houston to New Iberia. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (05/12/21) Update call with Lam. Update call with Jorge. (05/13/21) TSR update call. (05/14/21) Update call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 (05/13/21) 270 call with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-13 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 4 0 (05/12/21) Discussed AADU racking board modifications. Pulled drawings. (05/13/21) AADU racking board drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 (05/13/21) Call with Tyler/Jorge to discuss 270 drawing request - BOP cart mods. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-13 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.5 0 (05/12/21) Cont haz area dawing for 122L. (05/13/21) Call with Tyler to review 122L Haz area classification drawings. (05/14/21) Updated 122L air schematic and sent drawing for info. Archived 122L crown padeye drawing on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-13 Rig 122-TSR :Rig 122-TSR TSR-01786-122L Derrick Escape Platform Regular Pay N 2.25 0 (05/10/21 - 05/13/21) Continued clamp details. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (05/12/21) Update call with Lam. Update call with Jorge. (05/13/21) TSR update call. (05/14/21) Update call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-14 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 4.5 0 (05/14/21) Searched for 265L grounding information. 265L camp changes for Genel. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-14 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1.25 0 (05/12/21) Cont haz area dawing for 122L. (05/13/21) Call with Tyler to review 122L Haz area classification drawings. (05/14/21) Updated 122L air schematic and sent drawing for info. Archived 122L crown padeye drawing on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-17 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2.25 0 (05/17/21 - 05/21/21) Worked on overturn frame jacking layouts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-17 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (05/17/21) Review/approve designers timesheets. (05/18/21) Update call with Kyle. (05/19/21) Updated talent profile. Update call with Jorge. Update call with Lam. (05/20/21) Update call with Kyle. (05/21/21) Cleaned up drawing folders under work in progress. Call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-17 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 2 0 (05/17/21) 122L Hazardous area drawing updates per comments from filed. (05/18/21) Minor updates to haz area. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-18 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 7 0 (05/17/21 - 05/21/21) Worked on overturn frame jacking layouts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (05/17/21) Review/approve designers timesheets. (05/18/21) Update call with Kyle. (05/19/21) Updated talent profile. Update call with Jorge. Update call with Lam. (05/20/21) Update call with Kyle. (05/21/21) Cleaned up drawing folders under work in progress. Call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-18 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 (05/17/21) 122L Hazardous area drawing updates per comments from filed. (05/18/21) Minor updates to haz area. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-19 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 5.5 0 (05/17/21 - 05/21/21) Worked on overturn frame jacking layouts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (05/18/21) Clean start meeting (office move). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (05/17/21) Review/approve designers timesheets. (05/18/21) Update call with Kyle. (05/19/21) Updated talent profile. Update call with Jorge. Update call with Lam. (05/20/21) Update call with Kyle. (05/21/21) Cleaned up drawing folders under work in progress. Call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-19 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 0.5 0 (05/19/21) Call with Tyler to review drawing/design support. (05/21/21) Call with Tyler/Jorge. Reviewed drawing scope with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-20 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 5 0 (05/17/21 - 05/21/21) Worked on overturn frame jacking layouts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (05/17/21) Review/approve designers timesheets. (05/18/21) Update call with Kyle. (05/19/21) Updated talent profile. Update call with Jorge. Update call with Lam. (05/20/21) Update call with Kyle. (05/21/21) Cleaned up drawing folders under work in progress. Call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 (05/20/21 - 05/21/21) Checked 270 bop cart drawing. Sent comments to Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-20 Rig 122-TSR :Rig 122-TSR TSR-01786-122L Derrick Escape Platform Regular Pay N 1 0 (05/20/21) Updated clamp drawing. (05/21/21) Issued drawing for construction and archived files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (05/17/21) Review/approve designers timesheets. (05/18/21) Update call with Kyle. (05/19/21) Updated talent profile. Update call with Jorge. Update call with Lam. (05/20/21) Update call with Kyle. (05/21/21) Cleaned up drawing folders under work in progress. Call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-21 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2.75 0 (05/21/21) Racking board sketch - reviewed comments from field. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (05/20/21 - 05/21/21) Checked 270 bop cart drawing. Sent comments to Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-21 Rig 122-TSR :Rig 122-TSR TSR-01786-122L Derrick Escape Platform Regular Pay N 0.75 0 (05/20/21) Updated clamp drawing. (05/21/21) Issued drawing for construction and archived files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-05-21 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 0.5 0 (05/19/21) Call with Tyler to review drawing/design support. (05/21/21) Call with Tyler/Jorge. Reviewed drawing scope with Jorge. Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-05-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-05-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-05-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-05-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-05-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-05-07 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Office Lease Project Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-05-03 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule, RU & SIT Planning, travel to and from LA Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-05-04 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule, RU & SIT Planning, travel to and from LA Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-05-05 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule, RU & SIT Planning, travel to and from LA Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-05-06 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule, RU & SIT Planning, travel to and from LA Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-05-07 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 5 0 Monitor and control scope, cost, and schedule, RU & SIT Planning, travel to and from LA Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-05-10 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule, RU & SIT Planning, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-05-11 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule, RU & SIT Planning, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-05-12 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule, RU & SIT Planning, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-05-13 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule, RU & SIT Planning, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-05-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 PTO Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-05-17 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule, RU & SIT Planning, Sawyer FAT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-05-18 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule, RU & SIT Planning, Sawyer FAT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-05-19 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule, RU & SIT Planning, Sawyer FAT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-05-20 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule, RU & SIT Planning, Sawyer FAT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-05-21 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 4 0 Monitor and control scope, cost, and schedule, RU & SIT Planning, Sawyer FAT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-05-22 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 8 0 Monitor and control scope, cost, and schedule, RU & SIT Planning, Sawyer FAT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-05-24 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule, RU & SIT Planning, CAT audit Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-05-25 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule, RU & SIT Planning, CAT audit Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-05-26 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule, RU & SIT Planning, CAT audit Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-05-27 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule, RU & SIT Planning, CAT audit Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-05-28 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 8 0 Monitor and control scope, cost, and schedule, RU & SIT Planning, CAT audit Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-03 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 Chevron inquiries Loadmaster conference calls Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-03 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 1 0 Office move meetings Finalizing documentation at 5, 3 Greenway Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-03 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 1.5 0 Conference call with consultant Setting up fuel usage spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.25 0 Direct report discussion talent profile timesheet reviews reviewing/updating forecast Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-03 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 1 0 Star Energy New Build Support 253L pipe handling CC with Joe Wink Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR reviews, closeout reviews, drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-03 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 2 0 122L support 256L support PTEN 212L support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-04 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Chevron inquiries Loadmaster conference calls Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-04 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 0.5 0 Office move meetings Finalizing documentation at 5, 3 Greenway Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-04 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 1.5 0 Conference call with consultant Setting up fuel usage spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 Direct report discussion talent profile timesheet reviews reviewing/updating forecast Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-04 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 1 0 Star Energy New Build Support 253L pipe handling CC with Joe Wink Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR reviews, closeout reviews, drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-04 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 2.25 0 122L support 256L support PTEN 212L support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-05 Berkut-TSR :Berkut-TSR TSR-01779-BERP Additional Walkway Pipe Deck Regular Pay N 0.5 0 Closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-05 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Chevron inquiries Loadmaster conference calls Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-05 HTSG-TSR :HTSG-TSR TSR-01738-HTSG Review Doc Groups Regular Pay N 0.5 0 Review/comment for closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-05 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 0.5 0 Conference call with consultant Setting up fuel usage spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Direct report discussion talent profile timesheet reviews reviewing/updating forecast Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-05 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 0.5 0 Star Energy New Build Support 253L pipe handling CC with Joe Wink Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 TSR reviews, closeout reviews, drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-05 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 2 0 122L support 256L support PTEN 212L support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-06 Berkut-TSR :Berkut-TSR TSR-01779-BERP Additional Walkway Pipe Deck Regular Pay N 0.5 0 Closeout review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-06 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 1 0 Office move meetings Finalizing documentation at 5, 3 Greenway Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-06 HTSG-TSR :HTSG-TSR TSR-01738-HTSG Review Doc Groups Regular Pay N 1 0 Review/comment for closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Direct report discussion talent profile timesheet reviews reviewing/updating forecast Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-06 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1.5 0 Chevron Bangledesh Tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR reviews, closeout reviews, drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-06 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 2 0 122L support 256L support PTEN 212L support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-07 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 2.5 0 Office move meetings Finalizing documentation at 5, 3 Greenway Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Direct report discussion talent profile timesheet reviews reviewing/updating forecast Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-07 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 0.5 0 Star Energy New Build Support 253L pipe handling CC with Joe Wink Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR reviews, closeout reviews, drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-07 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1.5 0 122L support 256L support PTEN 212L support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-10 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 General discussions in New Iberia Meetings with Warehouse team Review of Electrical skids Jacking sylinder support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-10 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 3 0 Rig Up and SIT WOrkshop Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 CC with Joe Wink (RE: Bryan C. email) Bi-Weekly HTSG Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-10 OH-010 :OH-010 OH-010-05 Arctic, North America Offshore (ANAO) Regular Pay N 4 0 HOU to LA to HOU Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-10 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Preparation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-10 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Oil Search Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-10 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 Escape device clamp Hazardous area General support for Dan C. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-11 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 General discussions in New Iberia Meetings with Warehouse team Review of Electrical skids Jacking sylinder support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-11 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2 0 Rig Up and SIT WOrkshop Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-11 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 0.5 0 Updating fuel usage spreadsheet Discussion RE: path forward with TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Discussions with TE Updates to Arturo P. Direct Report CC's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-11 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Oil Search Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-11 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 2 0 Escape device clamp Hazardous area General support for Dan C. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-12 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 General discussions in New Iberia Meetings with Warehouse team Review of Electrical skids Jacking sylinder support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-12 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 0.5 0 Updating fuel usage spreadsheet Discussion RE: path forward with TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Discussions with TE Updates to Arturo P. Direct Report CC's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-12 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 Venineft_Drilling Contract Services Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-12 OH-010 :OH-010 OH-010-05 Arctic, North America Offshore (ANAO) Regular Pay N 4.5 0 HOU to LA to HOU Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-12 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Oil Search Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-12 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 Escape device clamp Hazardous area General support for Dan C. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-13 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.5 0 General discussions in New Iberia Meetings with Warehouse team Review of Electrical skids Jacking sylinder support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-13 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 0.5 0 Updating fuel usage spreadsheet Discussion RE: path forward with TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 CC with Joe Wink (RE: Bryan C. email) Bi-Weekly HTSG Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Discussions with TE Updates to Arturo P. Direct Report CC's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-13 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 Venineft_Drilling Contract Services Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-13 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1.5 0 Oil Search Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-13 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1.5 0 Escape device clamp Hazardous area General support for Dan C. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-13 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 0.5 0 Reviewing model Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-14 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 General discussions in New Iberia Meetings with Warehouse team Review of Electrical skids Jacking sylinder support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-14 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 1 0 Updating fuel usage spreadsheet Discussion RE: path forward with TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Discussions with TE Updates to Arturo P. Direct Report CC's Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-14 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 Venineft_Drilling Contract Services Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-14 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Oil Search Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-14 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 Escape device clamp Hazardous area General support for Dan C. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-14 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 0.5 0 Reviewing model Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-17 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 Rig-up access Sawyer calculation review Jacking support LM revised analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-17 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 2 0 Spreadsheet and other reporting documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Document review and approval Talent profile Defensive Driving Set-up for Technical Services Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-17 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 Venineft_Drilling Tender - document review and comment CC with NOV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-17 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1.5 0 Oil Search Tier IV Support Meeting with CAT Meeting with Alaska Ops Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR-01778/01779 document review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-17 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1.5 0 122 Manrider issue Air hoist installation Issue clamp drawing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-18 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 1 0 Spreadsheet and other reporting documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 Technology team meeting DD Conference call with NG / reviewing requirements Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Document review and approval Talent profile Defensive Driving Set-up for Technical Services Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-18 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 Venineft_Drilling Tender - document review and comment CC with NOV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-18 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1.5 0 Oil Search Tier IV Support Meeting with CAT Meeting with Alaska Ops Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR-01778/01779 document review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-18 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 2.5 0 122 Manrider issue Air hoist installation Issue clamp drawing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-19 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.5 0 Rig-up access Sawyer calculation review Jacking support LM revised analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-19 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 1.5 0 Spreadsheet and other reporting documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Technology team meeting DD Conference call with NG / reviewing requirements Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Document review and approval Talent profile Defensive Driving Set-up for Technical Services Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-19 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1.5 0 Oil Search Tier IV Support Meeting with CAT Meeting with Alaska Ops Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 TSR-01778/01779 document review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-20 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Rig-up access Sawyer calculation review Jacking support LM revised analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-20 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 2 0 Spreadsheet and other reporting documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Document review and approval Talent profile Defensive Driving Set-up for Technical Services Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-20 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2.5 0 Oil Search Tier IV Support Meeting with CAT Meeting with Alaska Ops Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-20 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 122 Manrider issue Air hoist installation Issue clamp drawing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-21 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.5 0 Rig-up access Sawyer calculation review Jacking support LM revised analysis Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-21 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 1 0 Spreadsheet and other reporting documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Document review and approval Talent profile Defensive Driving Set-up for Technical Services Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-21 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2 0 Venineft_Drilling Tender - document review and comment CC with NOV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-21 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Oil Search Tier IV Support Meeting with CAT Meeting with Alaska Ops Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-21 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 122 Manrider issue Air hoist installation Issue clamp drawing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-05-22 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.75 0 Rig-up access Sawyer calculation review Jacking support LM revised analysis Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-03 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 3 0 05/03: update model with new updated HPU from Sawyer. 05/04: preliminary concepts for installing electrical components 05/05: create skid drawing for electrical components 05/06: updated preliminary skid drawings to account for cable bend raidius; create a rig up sequence for rig-up yard. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 05/03: timesheets to ProjXsense and payroll 05/05: weekly update call with James 05/06: upload documents to Hightail to send to Sakhalin for 270L. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-03 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 05/03: weekly update meeting with Sakhalin regarding current and upcoming TSR's Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 05/03: final mark ups from Mio. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-04 Berkut-TSR :Berkut-TSR TSR-01778-BERP Pipe Barn Storage Rack Regular Pay N 3 0 05/04: continue with details and sections of the pipe rack. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-04 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 05/04: weekly status update meeting; meeting with Ripal to review transformer drawings 05/05: Electrical equipment mounting option review; meeting to explain electrical component locations 05/06: meeting with John to get model shots 05/07: meeting with Ripal to review model Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-04 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 3 0 05/03: update model with new updated HPU from Sawyer. 05/04: preliminary concepts for installing electrical components 05/05: create skid drawing for electrical components 05/06: updated preliminary skid drawings to account for cable bend raidius; create a rig up sequence for rig-up yard. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-04 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 05/04: generate report for actuals/accruals for Sakhalin TSR hours 05/05: transmit TSR-01776-DWG 05/06: transmit TSR-01738-CO; TSR-01776-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-05 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 05/04: weekly status update meeting; meeting with Ripal to review transformer drawings 05/05: Electrical equipment mounting option review; meeting to explain electrical component locations 05/06: meeting with John to get model shots 05/07: meeting with Ripal to review model Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-05 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 4 0 05/03: update model with new updated HPU from Sawyer. 05/04: preliminary concepts for installing electrical components 05/05: create skid drawing for electrical components 05/06: updated preliminary skid drawings to account for cable bend raidius; create a rig up sequence for rig-up yard. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 05/03: timesheets to ProjXsense and payroll 05/05: weekly update call with James 05/06: upload documents to Hightail to send to Sakhalin for 270L. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-05 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 05/04: generate report for actuals/accruals for Sakhalin TSR hours 05/05: transmit TSR-01776-DWG 05/06: transmit TSR-01738-CO; TSR-01776-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-06 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 05/04: weekly status update meeting; meeting with Ripal to review transformer drawings 05/05: Electrical equipment mounting option review; meeting to explain electrical component locations 05/06: meeting with John to get model shots 05/07: meeting with Ripal to review model Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-06 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 6 0 05/03: update model with new updated HPU from Sawyer. 05/04: preliminary concepts for installing electrical components 05/05: create skid drawing for electrical components 05/06: updated preliminary skid drawings to account for cable bend raidius; create a rig up sequence for rig-up yard. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 05/03: timesheets to ProjXsense and payroll 05/05: weekly update call with James 05/06: upload documents to Hightail to send to Sakhalin for 270L. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 05/04: generate report for actuals/accruals for Sakhalin TSR hours 05/05: transmit TSR-01776-DWG 05/06: transmit TSR-01738-CO; TSR-01776-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-07 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 8 0 05/03: update model with new updated HPU from Sawyer. 05/04: preliminary concepts for installing electrical components 05/05: create skid drawing for electrical components 05/06: updated preliminary skid drawings to account for cable bend raidius; create a rig up sequence for rig-up yard. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-10 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 5.5 0 05/10-11: update rig-up sequence presentation 05/12: updated model to include a-frame support stand, general updates 05/13: updated skid drawing to modify lifting eyes 05/14: prepare model for presentation, layering, blocks, and views. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 05/10: timesheet to ProjXsense 05/12: weekly update call with James Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-10 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 05/10: process incoming transmittal 05/13: update TSR list and tasks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-10 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 05/10: weekly meeting regarding TSR updates and progress. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-11 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 8 0 05/10-11: update rig-up sequence presentation 05/12: updated model to include a-frame support stand, general updates 05/13: updated skid drawing to modify lifting eyes 05/14: prepare model for presentation, layering, blocks, and views. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-12 Berkut-TSR :Berkut-TSR TSR-01778-BERP Pipe Barn Storage Rack Regular Pay N 2 0 05/12: continue with drafting details of the pipe rack Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-12 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 05/12: weekly update meeting; call with Ripal to discuss placement of equipment Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-12 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 4.5 0 05/10-11: update rig-up sequence presentation 05/12: updated model to include a-frame support stand, general updates 05/13: updated skid drawing to modify lifting eyes 05/14: prepare model for presentation, layering, blocks, and views. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 05/10: timesheet to ProjXsense 05/12: weekly update call with James Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-13 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 3 0 05/10-11: update rig-up sequence presentation 05/12: updated model to include a-frame support stand, general updates 05/13: updated skid drawing to modify lifting eyes 05/14: prepare model for presentation, layering, blocks, and views. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-13 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-13 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 05/10: process incoming transmittal 05/13: update TSR list and tasks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-14 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 8 0 05/10-11: update rig-up sequence presentation 05/12: updated model to include a-frame support stand, general updates 05/13: updated skid drawing to modify lifting eyes 05/14: prepare model for presentation, layering, blocks, and views. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-17 Berkut-TSR :Berkut-TSR TSR-01778-BERP Pipe Barn Storage Rack Regular Pay N 1.5 0 continue importing drawing onto RUSD title block and begin detailing. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-17 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 05/17: meeting with Ripal to review model and pull estimated cable lengths 05/18: weekly update meeting to discuss progress 05/19: meeting with Roger and Joshua to discuss fuel tank location and stair options Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 05/17: timesheet to ProjXsense and payroll 05/18: weekly update call with James Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 05/17: transmit TSR-01779-DWG 05/19: transmit rig 122L drawing 05/21: transmit TSR-01786-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-17 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 05/17: weekly TSR update meeting to discuss updates and progress. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-17 Rig 273L-TSR :Rig 273L-TSR TSR-01756-273L SCR Detailed Install Proposal (Tier IV) Regular Pay N 1 0 05/17: meeting with Tyler and Kyle to recollect progress since 2020. 05/20: backtrack progress and prepare for meeting with CAT; meeting with CAT and ARBU to discuss options and path forward. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-18 Berkut-TSR :Berkut-TSR TSR-01778-BERP Pipe Barn Storage Rack Regular Pay N 4 0 continue importing drawing onto RUSD title block and begin detailing. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-18 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 05/17: meeting with Ripal to review model and pull estimated cable lengths 05/18: weekly update meeting to discuss progress 05/19: meeting with Roger and Joshua to discuss fuel tank location and stair options Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-18 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2 0 05/18: update drawing of electrical skids and send to site for quote 05/19: model existing stairs in yard, discuss with Kyle options; discuss with Roger and Joshua 05/20: update model and email snaps for quotes Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 05/17: timesheet to ProjXsense and payroll 05/18: weekly update call with James Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-19 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 05/17: meeting with Ripal to review model and pull estimated cable lengths 05/18: weekly update meeting to discuss progress 05/19: meeting with Roger and Joshua to discuss fuel tank location and stair options Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-19 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 4 0 05/18: update drawing of electrical skids and send to site for quote 05/19: model existing stairs in yard, discuss with Kyle options; discuss with Roger and Joshua 05/20: update model and email snaps for quotes Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/19: Lunch & Learn: Safe Clean Start Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-19 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 05/17: transmit TSR-01779-DWG 05/19: transmit rig 122L drawing 05/21: transmit TSR-01786-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-20 Berkut-TSR :Berkut-TSR TSR-01778-BERP Pipe Barn Storage Rack Regular Pay N 2.5 0 continue importing drawing onto RUSD title block and begin detailing. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-20 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1.5 0 05/18: update drawing of electrical skids and send to site for quote 05/19: model existing stairs in yard, discuss with Kyle options; discuss with Roger and Joshua 05/20: update model and email snaps for quotes Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-20 Rig 273L-TSR :Rig 273L-TSR TSR-01756-273L SCR Detailed Install Proposal (Tier IV) Regular Pay N 4 0 05/17: meeting with Tyler and Kyle to recollect progress since 2020. 05/20: backtrack progress and prepare for meeting with CAT; meeting with CAT and ARBU to discuss options and path forward. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-21 Berkut-TSR :Berkut-TSR TSR-01778-BERP Pipe Barn Storage Rack Regular Pay N 7 0 continue importing drawing onto RUSD title block and begin detailing. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-21 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 05/17: transmit TSR-01779-DWG 05/19: transmit rig 122L drawing 05/21: transmit TSR-01786-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-24 Berkut-TSR :Berkut-TSR TSR-01778-BERP Pipe Barn Storage Rack Regular Pay N 6.5 0 05/25: finalize drawing for review 05/27-28: picked up redlines Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-24 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 05/24: process incoming tranmittal 05/25: transmit TSR-01779-CO 05/26: process incoming tranmittal Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-24 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 05/17: weekly TSR update meeting to discuss updates and progress. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-25 Berkut-TSR :Berkut-TSR TSR-01778-BERP Pipe Barn Storage Rack Regular Pay N 4 0 05/25: finalize drawing for review 05/27-28: picked up redlines Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-25 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 call with Ripal to discuss cable lengths Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-25 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2 0 05/25: update model and layout drawings 05/26: pull dimensions from rig up yard layout; convert crane data to CAD; update model 05/27: crane elevation views on north and east side of rig Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 05/24: process incoming tranmittal 05/25: transmit TSR-01779-CO 05/26: process incoming tranmittal Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-26 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 7.25 0 05/25: update model and layout drawings 05/26: pull dimensions from rig up yard layout; convert crane data to CAD; update model 05/27: crane elevation views on north and east side of rig Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 05/26: meet with Shannon to discuss Return to Office Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 05/24: process incoming tranmittal 05/25: transmit TSR-01779-CO 05/26: process incoming tranmittal Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-27 Berkut-TSR :Berkut-TSR TSR-01778-BERP Pipe Barn Storage Rack Regular Pay N 3 0 05/25: finalize drawing for review 05/27-28: picked up redlines Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-27 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 4 0 05/25: update model and layout drawings 05/26: pull dimensions from rig up yard layout; convert crane data to CAD; update model 05/27: crane elevation views on north and east side of rig Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 05/27: technical services bi-weekly meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-28 Berkut-TSR :Berkut-TSR TSR-01778-BERP Pipe Barn Storage Rack Regular Pay N 3 0 05/25: finalize drawing for review 05/27-28: picked up redlines Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-05-28 OH-014 :OH-014 Overhead All Activities Regular Pay N 5 0 defensive driving online course Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-03 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 4 0 GHG consultant mtg and GHG calcs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Review weekly report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-03 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 4 0 Star Energy conference call and clarifications. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-04 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 4 0 GHG consultant mtg and GHG calcs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-04 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 5 0 Star Energy conference call and clarifications. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-05 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 8 0 Source 3,000HP rigs for Bangladesh Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-06 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 2 0 Source 3,000HP rigs for Bangladesh Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Review weekly report. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-07 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 5 0 Source 3,000HP rigs for Bangladesh Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-10 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 1 0 Review Star Energy tech questions and ppt revisions. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-10 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 8 0 Assemble CVX Bangladesh presentation and meet with CVX. Search for and select rigs for CVX Bangladesh 4 month drilling opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-11 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 4 0 Assemble RFQ packages for Venineft 3000HP rig opportunity Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-11 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 5 0 Assemble CVX Bangladesh presentation and meet with CVX. Search for and select rigs for CVX Bangladesh 4 month drilling opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-12 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 7 0 Assemble RFQ packages for Venineft 3000HP rig opportunity Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-12 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 2 0 Assemble CVX Bangladesh presentation and meet with CVX. Search for and select rigs for CVX Bangladesh 4 month drilling opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-13 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-13 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 2 0 Assemble CVX Bangladesh presentation and meet with CVX. Search for and select rigs for CVX Bangladesh 4 month drilling opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-13 OH-009 :OH-009 OH-009-030 Latin America (LATAM) Regular Pay N 1 0 Review SierraCol technical questions for rig site layout. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-14 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 1 0 Update Pat for GHG excel file status and path forward. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-14 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 3 0 Assemble RFQ packages for Venineft 3000HP rig opportunity Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-14 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 Assemble CVX Bangladesh presentation and meet with CVX. Search for and select rigs for CVX Bangladesh 4 month drilling opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-14 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 1 0 Meet with GM UK for Norway Due Diligence formation and NME powerpoint slides. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-14 OH-009 :OH-009 OH-009-030 Latin America (LATAM) Regular Pay N 1 0 Review SierraCol technical questions for rig site layout. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-17 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 2 0 GHG template meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-17 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 4 0 Venineft 3000HP Rig build ITT. NOV clarification conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-17 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 1 0 Develop AESA HH102 high line power upgrade scope of work. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-17 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 Assemble CVX Bangladesh rig options and evaluate rig option gaps. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-18 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 2 0 GHG template meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-18 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 4 0 Venineft 3000HP Rig build ITT. NOV clarification conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-18 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 1 0 Develop AESA HH102 high line power upgrade scope of work. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-18 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 Assemble CVX Bangladesh rig options and evaluate rig option gaps. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-19 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 7 0 Venineft 3000HP Rig build ITT. NOV clarification conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-19 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 Assemble CVX Bangladesh rig options and evaluate rig option gaps. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-19 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 1 0 Plug and abandonment mtg. Norway New Market Entry conf call and Due Diligence team presentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Office move safe clean start meeting Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-20 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 5 0 Venineft 3000HP Rig build ITT. NOV clarification conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-20 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 Assemble CVX Bangladesh rig options and evaluate rig option gaps. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-20 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 2 0 Plug and abandonment mtg. Norway New Market Entry conf call and Due Diligence team presentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-21 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 4 0 Venineft 3000HP Rig build ITT. NOV clarification conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-21 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 1 0 Assemble Star Energy On Parker powerpoint presentation Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-21 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 Assemble CVX Bangladesh rig options and evaluate rig option gaps. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-24 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 8 0 Respond to Rig builder questions. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-25 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 8 0 Respond to Rig builder questions. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Return to office meeting. Tech Services weekly meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-26 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 3 0 Respond to Rig builder questions. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-26 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 2 0 Assemble Star Energy powerpoint slides for June 8th meeting with Star Energy. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-26 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 2 0 Review CVX 3000HP rig options and logistics. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-26 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 0.5 0 Provide Northern Offshore for CVX Nigeria jackup opportunity. Norway new market entry. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Return to office meeting. Tech Services weekly meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-27 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 3 0 Respond to Rig builder questions. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-27 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 2 0 Assemble Star Energy powerpoint slides for June 8th meeting with Star Energy. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-27 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 2 0 Review CVX 3000HP rig options and logistics. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-27 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 0.5 0 Provide Northern Offshore for CVX Nigeria jackup opportunity. Norway new market entry. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-28 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-28 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 Respond to Rig builder questions. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-05-28 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 0.5 0 Provide Northern Offshore for CVX Nigeria jackup opportunity. Norway new market entry. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-03 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 SAK weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-03 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2 0 Rig 265- Budgetary Quote Rig-265 MCC -follow up Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-03 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 5 0 Genesis Spar - 3D Model final review. Genesis Spar - EMI shipping Address for Vanturetech Cable . Genesis Spar - Gaitronics J-Box re location. Images for PPT for installation of electrical components. Genesis Spar - Wellbay camera quote from Royal . Genesis Spar - Safety Cable and 2 Inch Beam Clamp info. PRELIMINARY: support frame/skid for electrical components on Genesis. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-04 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 CVX Genesis Tech Services Status Meet. Sawyer CVX Genesis Weekly Status Meeting. Interface Meeting. Construction Bi-Weekly Status Call. Genesis Spar - Electrical equipment mounting option review . Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-04 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2 0 Rig 265- Budgetary Quote Rig-265 MCC -follow up Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-04 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Genesis Spar - 3D Model final review. Genesis Spar - EMI shipping Address for Vanturetech Cable . Genesis Spar - Gaitronics J-Box re location. Images for PPT for installation of electrical components. Genesis Spar - Wellbay camera quote from Royal . Genesis Spar - Safety Cable and 2 Inch Beam Clamp info. PRELIMINARY: support frame/skid for electrical components on Genesis. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-05 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 CVX Genesis Tech Services Status Meet. Sawyer CVX Genesis Weekly Status Meeting. Interface Meeting. Construction Bi-Weekly Status Call. Genesis Spar - Electrical equipment mounting option review . Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-05 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1 0 Rigup and SIT Procurement and Readiness Status Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-05 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Rig 265- Budgetary Quote Rig-265 MCC -follow up Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-05 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 5 0 Genesis Spar - 3D Model final review. Genesis Spar - EMI shipping Address for Vanturetech Cable . Genesis Spar - Gaitronics J-Box re location. Images for PPT for installation of electrical components. Genesis Spar - Wellbay camera quote from Royal . Genesis Spar - Safety Cable and 2 Inch Beam Clamp info. PRELIMINARY: support frame/skid for electrical components on Genesis. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-06 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 CVX Genesis Tech Services Status Meet. Sawyer CVX Genesis Weekly Status Meeting. Interface Meeting. Construction Bi-Weekly Status Call. Genesis Spar - Electrical equipment mounting option review . Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-06 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 1 0 Safety Cable MR Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-06 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2 0 Rig 265- Budgetary Quote Rig-265 MCC -follow up Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-06 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Genesis Spar - 3D Model final review. Genesis Spar - EMI shipping Address for Vanturetech Cable . Genesis Spar - Gaitronics J-Box re location. Images for PPT for installation of electrical components. Genesis Spar - Wellbay camera quote from Royal . Genesis Spar - Safety Cable and 2 Inch Beam Clamp info. PRELIMINARY: support frame/skid for electrical components on Genesis. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-07 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 3 0 Rig 265- Budgetary Quote Rig-265 MCC -follow up Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-07 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 5 0 Genesis Spar - 3D Model final review. Genesis Spar - EMI shipping Address for Vanturetech Cable . Genesis Spar - Gaitronics J-Box re location. Images for PPT for installation of electrical components. Genesis Spar - Wellbay camera quote from Royal . Genesis Spar - Safety Cable and 2 Inch Beam Clamp info. PRELIMINARY: support frame/skid for electrical components on Genesis. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-10 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Internal Rigup and SIT Plan. Sawyer CVX Genesis Weekly Status Meeting. Rigup and SIT Procurement Readiness. CVX Genesis Tech Services Status Meet. Interface Meeting. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-10 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 2 0 Inventory Walk-Down Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-10 OH-010 :OH-010 OH-010-04 US Land (USL) Regular Pay N 4 0 Travel Time to New Iberia Office Travel from New Iberia to Home Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-11 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Internal Rigup and SIT Plan. Sawyer CVX Genesis Weekly Status Meeting. Rigup and SIT Procurement Readiness. CVX Genesis Tech Services Status Meet. Interface Meeting. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-11 OH-010 :OH-010 OH-010-04 US Land (USL) Regular Pay N 4 0 Travel Time to New Iberia Office Travel from New Iberia to Home Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-12 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 Internal Rigup and SIT Plan. Sawyer CVX Genesis Weekly Status Meeting. Rigup and SIT Procurement Readiness. CVX Genesis Tech Services Status Meet. Interface Meeting. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-12 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Rig-265 MCC Update Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-12 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Conference call with Lam - Operator Cab power issue. Genesis Spar - Safety Cable and 2 Inch Beam Clamp info. Genesis Spar - LED Lights Plug / Receptacle issue. Sawyer - Layout & pictures of the cab. Genesis Spar - 150 & 75 KVA XFMR manual . Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-13 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Internal Rigup and SIT Plan. Sawyer CVX Genesis Weekly Status Meeting. Rigup and SIT Procurement Readiness. CVX Genesis Tech Services Status Meet. Interface Meeting. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS weekly meeting Return to office: HR discussion - Ripal & Shannon. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-13 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Rig-265 MCC Update Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-13 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 5 0 Conference call with Lam - Operator Cab power issue. Genesis Spar - Safety Cable and 2 Inch Beam Clamp info. Genesis Spar - LED Lights Plug / Receptacle issue. Sawyer - Layout & pictures of the cab. Genesis Spar - 150 & 75 KVA XFMR manual . Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-14 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1 0 Sawyer Systems, Test procedure peer review. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS weekly meeting Return to office: HR discussion - Ripal & Shannon. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-14 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Rig-265 MCC Update Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-14 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 5 0 Conference call with Lam - Operator Cab power issue. Genesis Spar - Safety Cable and 2 Inch Beam Clamp info. Genesis Spar - LED Lights Plug / Receptacle issue. Sawyer - Layout & pictures of the cab. Genesis Spar - 150 & 75 KVA XFMR manual . Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-17 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 CVX Genesis Tech Services Status Meet Sawyer CVX Genesis Weekly Status Meeting. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-17 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 SAK weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-17 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Rig 265 MCC follow up Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-17 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Genesis Spar - 3D Model review with Lam, DWS HPU Power Cable 3D Model review with Lam. Genesis Spar - Cable Quote needed Spar Skid drawing & Quote Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-18 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 CVX Genesis Tech Services Status Meet Sawyer CVX Genesis Weekly Status Meeting. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-18 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Rig 265 MCC follow up Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-18 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 5 0 Genesis Spar - 3D Model review with Lam, DWS HPU Power Cable 3D Model review with Lam. Genesis Spar - Cable Quote needed Spar Skid drawing & Quote Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-21 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-24 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 SAK Weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-24 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Rig 265 MCC FAT at Jelec. Rig 265 Software issue- Search for new patch update. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-24 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 6 0 Genesis Spar - New revised cable list. Rexel quote reviewed for new cable list. Sawyer Operator Cab Emergency Light issue resolved. Sawyer Filter cart power confirmed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-25 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Sawyer CVX Genesis Weekly Status Meeting. Rigup and SIT Procurement Readiness. Interface Meeting. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-25 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Rig 265 MCC FAT at Jelec. Rig 265 Software issue- Search for new patch update. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-25 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 6 0 Genesis Spar - New revised cable list. Rexel quote reviewed for new cable list. Sawyer Operator Cab Emergency Light issue resolved. Sawyer Filter cart power confirmed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-26 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Sawyer CVX Genesis Weekly Status Meeting. Rigup and SIT Procurement Readiness. Interface Meeting. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-26 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 1 0 Cornerstone Quote for Two Skids Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-26 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Rig 265 MCC FAT at Jelec. Rig 265 Software issue- Search for new patch update. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-26 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 5 0 Genesis Spar - New revised cable list. Rexel quote reviewed for new cable list. Sawyer Operator Cab Emergency Light issue resolved. Sawyer Filter cart power confirmed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-27 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Sawyer CVX Genesis Weekly Status Meeting. Rigup and SIT Procurement Readiness. Interface Meeting. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-27 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1 0 HPU Power issue resolve Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-27 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2 0 Rig 265 MCC FAT at Jelec. Rig 265 Software issue- Search for new patch update. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-27 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Genesis Spar - New revised cable list. Rexel quote reviewed for new cable list. Sawyer Operator Cab Emergency Light issue resolved. Sawyer Filter cart power confirmed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-28 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 5 0 Rig 265 MCC FAT at Jelec. Rig 265 Software issue- Search for new patch update. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-05-28 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 Genesis Spar - New revised cable list. Rexel quote reviewed for new cable list. Sawyer Operator Cab Emergency Light issue resolved. Sawyer Filter cart power confirmed. Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 Emails Timesheet System updates (5/6/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-03 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly Meeting w/ Mio (5/3/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5 0 Berkut TSR-01779 Fuze meeting w/T.E. (5/5/21) RUSD-PKE-T2-ND- 23200.1004.001-.005 (5/3-7/21) 23200.1005.001-.002 (5/3-7/21) Internal Comments Updates Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-04 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet System updates (5/6/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7.5 0 Berkut TSR-01779 Fuze meeting w/T.E. (5/5/21) RUSD-PKE-T2-ND- 23200.1004.001-.005 (5/3-7/21) 23200.1005.001-.002 (5/3-7/21) Internal Comments Updates Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Emails Timesheet System updates (5/6/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7 0 Berkut TSR-01779 Fuze meeting w/T.E. (5/5/21) RUSD-PKE-T2-ND- 23200.1004.001-.005 (5/3-7/21) 23200.1005.001-.002 (5/3-7/21) Internal Comments Updates Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet System updates (5/6/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7.5 0 Berkut TSR-01779 Fuze meeting w/T.E. (5/5/21) RUSD-PKE-T2-ND- 23200.1004.001-.005 (5/3-7/21) 23200.1005.001-.002 (5/3-7/21) Internal Comments Updates Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet System updates (5/6/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 Berkut TSR-01779 Fuze meeting w/T.E. (5/5/21) RUSD-PKE-T2-ND- 23200.1004.001-.005 (5/3-7/21) 23200.1005.001-.002 (5/3-7/21) Internal Comments Updates Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-07 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 2 0 253L-01-00-001-1-R1 (5/7/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-10 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 5/10/21 Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Emails Timesheet HR benefit and payroll review (5/14/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6 0 Fuze meeting w/ T.E & J.G. (5/13/21) review 270L Operations on Skid Rails -- BOP Test Stump/Bop Cart assembly Ref. dwg. review (5/13-14/21) Berkut TSR-01779 23200.1005.001-.002 internal comments update (5/11-13/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet HR benefit and payroll review (5/14/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7 0 Fuze meeting w/ T.E & J.G. (5/13/21) review 270L Operations on Skid Rails -- BOP Test Stump/Bop Cart assembly Ref. dwg. review (5/13-14/21) Berkut TSR-01779 23200.1005.001-.002 internal comments update (5/11-13/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Technical Services (5/13/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet HR benefit and payroll review (5/14/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6 0 Fuze meeting w/ T.E & J.G. (5/13/21) review 270L Operations on Skid Rails -- BOP Test Stump/Bop Cart assembly Ref. dwg. review (5/13-14/21) Berkut TSR-01779 23200.1005.001-.002 internal comments update (5/11-13/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 Emails Timesheet HR benefit and payroll review (5/14/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5 0 Fuze meeting w/ T.E & J.G. (5/13/21) review 270L Operations on Skid Rails -- BOP Test Stump/Bop Cart assembly Ref. dwg. review (5/13-14/21) Berkut TSR-01779 23200.1005.001-.002 internal comments update (5/11-13/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 Timesheet Emails Medical Benefits & w2 info review w HR (5/17-19/21) System updates CAD crash/trouble shoot (5/19/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-17 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly Meeting w/ Mio (5/17/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5 0 TSR-01779 23200.1004 &1005 internal comments update (5/17/21) 270L BOP cart/test Stump Ass'y dwg. (5/17-21/21 ) Rview details w/ T.E (5/20/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Timesheet Emails Medical Benefits & w2 info review w HR (5/17-19/21) System updates CAD crash/trouble shoot (5/19/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6.5 0 TSR-01779 23200.1004 &1005 internal comments update (5/17/21) 270L BOP cart/test Stump Ass'y dwg. (5/17-21/21 ) Rview details w/ T.E (5/20/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 Timesheet Emails Medical Benefits & w2 info review w HR (5/17-19/21) System updates CAD crash/trouble shoot (5/19/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6 0 TSR-01779 23200.1004 &1005 internal comments update (5/17/21) 270L BOP cart/test Stump Ass'y dwg. (5/17-21/21 ) Rview details w/ T.E (5/20/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Lunch & Learn Clean Start (5/20/21) Return to Office meeting w/ HR (5/21/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7.5 0 TSR-01779 23200.1004 &1005 internal comments update (5/17/21) 270L BOP cart/test Stump Ass'y dwg. (5/17-21/21 ) Rview details w/ T.E (5/20/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Lunch & Learn Clean Start (5/20/21) Return to Office meeting w/ HR (5/21/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 TSR-01779 23200.1004 &1005 internal comments update (5/17/21) 270L BOP cart/test Stump Ass'y dwg. (5/17-21/21 ) Rview details w/ T.E (5/20/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-21 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 2 0 249L Review TSR-01769 - Meeting w/ J.G. & T.E. (5/21/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Timesheet Emails CAD crash/trouble shoot (5/25&27/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-24 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting w/ Mio (5/24/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-24 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 5.5 0 249LTSR-01769 Review Parker dwgs. (5/24/21) Review T.E. silidworks model for info (5/24-28/21) Layout for BOP Skid (5/24/21) BOP skid mod. dwgs. (5/24-28/21) Fuze meeting w/ J.G. - review BOP Skid mod. dwgs. (5/28/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Timesheet Emails CAD crash/trouble shoot (5/25&27/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-25 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 6.5 0 249LTSR-01769 Review Parker dwgs. (5/24/21) Review T.E. silidworks model for info (5/24-28/21) Layout for BOP Skid (5/24/21) BOP skid mod. dwgs. (5/24-28/21) Fuze meeting w/ J.G. - review BOP Skid mod. dwgs. (5/28/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails CAD crash/trouble shoot (5/25&27/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-26 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 7.5 0 249LTSR-01769 Review Parker dwgs. (5/24/21) Review T.E. silidworks model for info (5/24-28/21) Layout for BOP Skid (5/24/21) BOP skid mod. dwgs. (5/24-28/21) Fuze meeting w/ J.G. - review BOP Skid mod. dwgs. (5/28/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Technical Services weekly meeting (5/27/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Timesheet Emails CAD crash/trouble shoot (5/25&27/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-27 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 5.5 0 249LTSR-01769 Review Parker dwgs. (5/24/21) Review T.E. silidworks model for info (5/24-28/21) Layout for BOP Skid (5/24/21) BOP skid mod. dwgs. (5/24-28/21) Fuze meeting w/ J.G. - review BOP Skid mod. dwgs. (5/28/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails CAD crash/trouble shoot (5/25&27/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-05-28 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 5 0 249LTSR-01769 Review Parker dwgs. (5/24/21) Review T.E. silidworks model for info (5/24-28/21) Layout for BOP Skid (5/24/21) BOP skid mod. dwgs. (5/24-28/21) Fuze meeting w/ J.G. - review BOP Skid mod. dwgs. (5/28/21) Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-03 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 7.5 0 Create powerpoint for RU/SIT presentation in New Iberia, hagglund motor after action review, commissioning forms and spreadsheet, commissioning form comment clarifications, status meetings sawyer motor and contamination information and meeting, sawyer FAT prep, Electrical installation in Superstructure Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-03 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-04 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 8.5 0 Create powerpoint for RU/SIT presentation in New Iberia, hagglund motor after action review, commissioning forms and spreadsheet, commissioning form comment clarifications, status meetings sawyer motor and contamination information and meeting, sawyer FAT prep, Electrical installation in Superstructure Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-05 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 8.5 0 Create powerpoint for RU/SIT presentation in New Iberia, hagglund motor after action review, commissioning forms and spreadsheet, commissioning form comment clarifications, status meetings sawyer motor and contamination information and meeting, sawyer FAT prep, Electrical installation in Superstructure Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-06 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 5.5 0 Create powerpoint for RU/SIT presentation in New Iberia, hagglund motor after action review, commissioning forms and spreadsheet, commissioning form comment clarifications, status meetings sawyer motor and contamination information and meeting, sawyer FAT prep, Electrical installation in Superstructure Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-06 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 3 0 master interface register Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-07 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 6 0 Create powerpoint for RU/SIT presentation in New Iberia, hagglund motor after action review, commissioning forms and spreadsheet, commissioning form comment clarifications, status meetings sawyer motor and contamination information and meeting, sawyer FAT prep, Electrical installation in Superstructure Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-10 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 4 0 Internal RU/SIT powerpoint presentation in New Iberia,hose/piping walkdown in New Iberia, commissioning forms and spreadsheet, commissioning form comment clarifications, status meetings, sawyer FAT prep and review meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-10 OH-010 :OH-010 OH-010-06 HTSG / Corporate Regular Pay N 4 0 Travel to/from New Iberia Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-10 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-11 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Internal RU/SIT powerpoint presentation in New Iberia,hose/piping walkdown in New Iberia, commissioning forms and spreadsheet, commissioning form comment clarifications, status meetings, sawyer FAT prep and review meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-12 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 4 0 Internal RU/SIT powerpoint presentation in New Iberia,hose/piping walkdown in New Iberia, commissioning forms and spreadsheet, commissioning form comment clarifications, status meetings, sawyer FAT prep and review meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-12 OH-010 :OH-010 OH-010-06 HTSG / Corporate Regular Pay N 4 0 Travel to/from New Iberia Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-13 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 4 0 Internal RU/SIT powerpoint presentation in New Iberia,hose/piping walkdown in New Iberia, commissioning forms and spreadsheet, commissioning form comment clarifications, status meetings, sawyer FAT prep and review meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-13 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 3 0 master interface register Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-14 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 6 0 Internal RU/SIT powerpoint presentation in New Iberia,hose/piping walkdown in New Iberia, commissioning forms and spreadsheet, commissioning form comment clarifications, status meetings, sawyer FAT prep and review meeting, Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-17 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 7 0 prep for Sawyer FAT, Visited and began FAT in Vancouver Washington, created punch list, status update meetings, procurement register Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-17 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-20 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 4 0 prep for Sawyer FAT, Visited and began FAT in Vancouver Washington, created punch list, status update meetings, procurement register Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-20 OH-010 :OH-010 OH-010-06 HTSG / Corporate Regular Pay N 6 0 Travel to Vancouver Washington Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-21 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 10 0 prep for Sawyer FAT, Visited and began FAT in Vancouver Washington, created punch list, status update meetings, procurement register Reck, John Engineer I 29656 Reck, John:Engineer I 2021-05-22 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 10 0 prep for Sawyer FAT, Visited and began FAT in Vancouver Washington, created punch list, status update meetings, procurement register