Name Billing Class Employee No. Item Line Class Transaction Date Job No. Customer Service Item Notes Payroll Item Billable Employee Paid Day Rate Duration Days Remarks Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-01 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 8 0 updating RAPID punchlist // reviewing schedule // ground bearing analysis // cracked pin on sub issue Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-04 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 8 0 ground bearing analysis // drillmec correspondence // cat III prep // schedule review // mtngs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // general discussions Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-05 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 8 0 ground bearing analysis // drillmec correspondence // cat III prep // schedule review // mtngs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // general discussions Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-06 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 7 0 ground bearing analysis // drillmec correspondence // cat III prep // schedule review // mtngs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // general discussions Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-07 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 8 0 ground bearing analysis // drillmec correspondence // cat III prep // schedule review // mtngs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // general discussions Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-08 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 5 0 ground bearing analysis // drillmec correspondence // cat III prep // schedule review // mtngs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-11 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 7 0 minimum wall thickness analysis // schedule review // master equipment tracker creation // travel arrangements // mtngs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // general discussions with team Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-12 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 8 0 minimum wall thickness analysis // schedule review // master equipment tracker creation // travel arrangements // mtngs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // general discussions with team Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-13 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 8 0 minimum wall thickness analysis // schedule review // master equipment tracker creation // travel arrangements // mtngs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // general discussions with team Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-14 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 7 0 minimum wall thickness analysis // schedule review // master equipment tracker creation // travel arrangements // mtngs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR mtng Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // general discussions with team Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-15 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 4 0 minimum wall thickness analysis // schedule review // master equipment tracker creation // travel arrangements // mtngs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // general discussions with team Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-18 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 5 0 discussions with ops // wall thickness results // weld repairs // updating eqpmnt tracker Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // general discussions, correspondence Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-18 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 122L pony sub cost estimate and schedule // mtngs and emails on 122L // 165L mast repairs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-18 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01801-209L Service Pad Eyes for HP Valves Regular Pay N 1 0 drawing updates per comments // closeout Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-19 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 2 0 discussions with ops // wall thickness results // weld repairs // updating eqpmnt tracker Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // general discussions, correspondence Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-19 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 3 0 122L pony sub cost estimate and schedule // mtngs and emails on 122L // 165L mast repairs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-19 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01801-209L Service Pad Eyes for HP Valves Regular Pay N 2 0 drawing updates per comments // closeout Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-20 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 6 0 discussions with ops // wall thickness results // weld repairs // updating eqpmnt tracker Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // general discussions, correspondence Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-20 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 122L pony sub cost estimate and schedule // mtngs and emails on 122L // 165L mast repairs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-21 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 4 0 discussions with ops // wall thickness results // weld repairs // updating eqpmnt tracker Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // general discussions, correspondence Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-21 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 3 0 122L pony sub cost estimate and schedule // mtngs and emails on 122L // 165L mast repairs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-25 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 8 0 Travel to Villahermosa // supporting project Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-26 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 12 0 Travel to Villahermosa // supporting project Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-27 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 12 0 Travel to Villahermosa // supporting project Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-28 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 12 0 Travel to Villahermosa // supporting project Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-29 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 12 0 Travel to Villahermosa // supporting project Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-04-30 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 12 0 Travel to Villahermosa // supporting project ElBitar, Ahmad Engineer II ElBitar, Ahmad:Engineer II 2022-04-01 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 9 0 ElBitar, Ahmad Engineer II ElBitar, Ahmad:Engineer II 2022-04-04 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 9 0 ElBitar, Ahmad Engineer II ElBitar, Ahmad:Engineer II 2022-04-05 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 9 0 ElBitar, Ahmad Engineer II ElBitar, Ahmad:Engineer II 2022-04-06 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 9 0 ElBitar, Ahmad Engineer II ElBitar, Ahmad:Engineer II 2022-04-07 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 9 0 ElBitar, Ahmad Engineer II ElBitar, Ahmad:Engineer II 2022-04-08 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 9 0 ElBitar, Ahmad Engineer II ElBitar, Ahmad:Engineer II 2022-04-11 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 9 0 ElBitar, Ahmad Engineer II ElBitar, Ahmad:Engineer II 2022-04-12 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 9 0 ElBitar, Ahmad Engineer II ElBitar, Ahmad:Engineer II 2022-04-13 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 9 0 ElBitar, Ahmad Engineer II ElBitar, Ahmad:Engineer II 2022-04-14 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 9 0 ElBitar, Ahmad Engineer II ElBitar, Ahmad:Engineer II 2022-04-15 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 9 0 ElBitar, Ahmad Engineer II ElBitar, Ahmad:Engineer II 2022-04-18 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 9 0 ElBitar, Ahmad Engineer II ElBitar, Ahmad:Engineer II 2022-04-19 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 9 0 ElBitar, Ahmad Engineer II ElBitar, Ahmad:Engineer II 2022-04-20 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 9 0 ElBitar, Ahmad Engineer II ElBitar, Ahmad:Engineer II 2022-04-21 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 9 0 ElBitar, Ahmad Engineer II ElBitar, Ahmad:Engineer II 2022-04-22 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 9 0 ElBitar, Ahmad Engineer II ElBitar, Ahmad:Engineer II 2022-04-25 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 9 0 ElBitar, Ahmad Engineer II ElBitar, Ahmad:Engineer II 2022-04-26 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 9 0 ElBitar, Ahmad Engineer II ElBitar, Ahmad:Engineer II 2022-04-27 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 9 0 ElBitar, Ahmad Engineer II ElBitar, Ahmad:Engineer II 2022-04-28 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 9 0 ElBitar, Ahmad Engineer II ElBitar, Ahmad:Engineer II 2022-04-29 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 9 0 Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-01 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 5 0 Review TSR, review emails, review equipment manuals, create spreadsheet with information Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 270L regulatory Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-01 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 0.5 0 Automation, PFII service loop bracket design, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-04 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 5.5 0 info spreadsheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Greg handover meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-04 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.25 0 SAK Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 270L regulatory Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-04 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 0.5 0 Automation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-05 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 3.75 0 info spreadsheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-05 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3 0 257B meeting, 257B Cost Estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-05 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 1 0 MLA and WO for Titania Rig, rig sourcing info from Greg, CVX opportunity meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-05 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 1 0 Automation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-06 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 3 0 info spreadsheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-06 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2.5 0 257B meeting, 257B Cost Estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-06 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 2.5 0 MLA and WO for Titania Rig, rig sourcing info from Greg, CVX opportunity meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-06 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 0.5 0 Automation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-07 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 3 0 info spreadsheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-07 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3.5 0 257B meeting, 257B Cost Estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-07 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 0.75 0 MLA and WO for Titania Rig, rig sourcing info from Greg, CVX opportunity meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-07 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 1.5 0 Automation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-08 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 3 0 info spreadsheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-08 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1.5 0 257B meeting, 257B Cost Estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-08 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 0.5 0 MLA and WO for Titania Rig, rig sourcing info from Greg, CVX opportunity meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-08 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 0.5 0 Automation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-11 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 3 0 Technical Spreadsheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Handover with Greg/Kyle/Arturo; townhall; tech services meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheets; egg hunt stuff Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-11 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 257B cost estimate break down questions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-11 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 MOECO call Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-11 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.25 0 Update to Mio Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-11 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 1.5 0 Automation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-12 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 6.5 0 Technical Spreadsheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheets; egg hunt stuff Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-12 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 1.25 0 Automation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-13 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 2 0 Technical Spreadsheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheets; egg hunt stuff Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-13 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 257B cost estimate break down questions, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.75 0 270L regulatory wrap up Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-13 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1.5 0 Help Chad spec koomey pipe for 258L Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-13 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 2 0 Automation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-14 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 4 0 Technical Spreadsheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Handover with Greg/Kyle/Arturo; townhall; tech services meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheets; egg hunt stuff Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-14 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 Help Chad spec koomey pipe for 258L Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-14 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 1 0 Automation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-15 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Easter Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-18 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 5.75 0 lift plans technical info, drawing support, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Equipment Standardization, review tech services details with Ivan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-18 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.25 0 update to Mio Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-18 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.25 0 258L support, search for mud pump crane rating, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-18 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 0.5 0 Automation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-19 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 4 0 lift plans technical info, drawing support, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-19 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3.5 0 257B standards and explanation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-19 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Active Shooter Training Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-19 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 0.5 0 Automation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-20 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 3.5 0 lift plans technical info, drawing support, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-20 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1.75 0 257B standards and explanation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-20 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 258L support, search for mud pump crane rating, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-20 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 1.75 0 Automation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-21 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 3 0 lift plans technical info, drawing support, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Equipment Standardization, review tech services details with Ivan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-21 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2.25 0 257B standards and explanation, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-21 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1.5 0 258L support, search for mud pump crane rating, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-21 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 0.5 0 Automation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-22 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 3 0 lift plans technical info, drawing support, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Equipment Standardization, review tech services details with Ivan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-22 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 1.75 0 Review MLA for Oxy Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-22 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 0.5 0 Automation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-25 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 6 0 drawing review, analysis, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-25 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 1.5 0 Moeco opportunity Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-25 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 0.75 0 Automation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-26 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 4 0 drawing review, analysis, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.75 0 ESCW Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-26 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 1.5 0 Automation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-26 Rig 273L :Rig 273L TSR-01756-273L SCR Detailed Install Proposal (Tier IV) Regular Pay N 1 0 Pikka Project Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-27 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 3 0 drawing review, analysis, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Town Hall, New Tech Meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 ESCW Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-27 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 0.75 0 Automation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-27 Rig 273L :Rig 273L TSR-01756-273L SCR Detailed Install Proposal (Tier IV) Regular Pay N 1.5 0 Pikka Project Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-28 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 4 0 drawing review, analysis, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Town Hall, New Tech Meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 ESCW Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-28 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 0.5 0 Automation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-28 Rig 273L :Rig 273L TSR-01756-273L SCR Detailed Install Proposal (Tier IV) Regular Pay N 2 0 Pikka Project Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-29 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 5 0 drawing review, analysis, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-29 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 ESCW Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-04-29 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 0.5 0 Automation Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-01 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (04/04/22) Updated weekly timesheet. Approved design timesheets. Update with Lam. Updated open design items list. Update with Tyler. (04/05/22) Update call with Kyle. Follow up discussion with Kyle - Oil Search. (04/06/22) Update with Kyle. Update with Tyler (04/07/22) Update with Kyle. (04/08/22) Update KPM. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-04 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 6.5 0 (04/04/22) Reviewed diverter info from CVX. Searched for requested 269L relief piping information. Discussed rig grounding/lightning protection with Ripal. Sketched protection radius per vendor information. Continued roof sketch. (04/05/22) Weekly update call with Ahmad. Reviewed latest relief piping drawing from NOV. Continued roof hatch layout. (04/06/22) Pulled ref drawings and sent to Ahmad. (04/06/22) Update call with NOV.Cont roof hatch. Reviewed CVX site plan info with Kyle. Update cellar info in diverter drawing & 20-3/4" BOP. Updated wellhead info. (04/07/22) Updated drawing list. Update call with Ahmad. Call with Ahmad to discuss relief line. Update 13-5/8" BOP stack drawing. Sent updated stack drawings to Bernie for review. (04/08/22) Continued roof hatch drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 (04/04/22) Updated weekly timesheet. Approved design timesheets. Update with Lam. Updated open design items list. Update with Tyler. (04/05/22) Update call with Kyle. Follow up discussion with Kyle - Oil Search. (04/06/22) Update with Kyle. Update with Tyler (04/07/22) Update with Kyle. (04/08/22) Update KPM. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-05 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1.25 0 (04/05/22) Discussed HP piping with Kyle (249/258). Searched archived for additional HP info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-05 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 6.5 0 (04/04/22) Reviewed diverter info from CVX. Searched for requested 269L relief piping information. Discussed rig grounding/lightning protection with Ripal. Sketched protection radius per vendor information. Continued roof sketch. (04/05/22) Weekly update call with Ahmad. Reviewed latest relief piping drawing from NOV. Continued roof hatch layout. (04/06/22) Pulled ref drawings and sent to Ahmad. (04/06/22) Update call with NOV.Cont roof hatch. Reviewed CVX site plan info with Kyle. Update cellar info in diverter drawing & 20-3/4" BOP. Updated wellhead info. (04/07/22) Updated drawing list. Update call with Ahmad. Call with Ahmad to discuss relief line. Update 13-5/8" BOP stack drawing. Sent updated stack drawings to Bernie for review. (04/08/22) Continued roof hatch drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (04/04/22) Updated weekly timesheet. Approved design timesheets. Update with Lam. Updated open design items list. Update with Tyler. (04/05/22) Update call with Kyle. Follow up discussion with Kyle - Oil Search. (04/06/22) Update with Kyle. Update with Tyler (04/07/22) Update with Kyle. (04/08/22) Update KPM. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-06 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 0.75 0 (04/06/22) Barge rig drawing package for Joe L. (04/08/22) Searched for 76B stack information for Joe. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-06 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 6.75 0 (04/04/22) Reviewed diverter info from CVX. Searched for requested 269L relief piping information. Discussed rig grounding/lightning protection with Ripal. Sketched protection radius per vendor information. Continued roof sketch. (04/05/22) Weekly update call with Ahmad. Reviewed latest relief piping drawing from NOV. Continued roof hatch layout. (04/06/22) Pulled ref drawings and sent to Ahmad. (04/06/22) Update call with NOV.Cont roof hatch. Reviewed CVX site plan info with Kyle. Update cellar info in diverter drawing & 20-3/4" BOP. Updated wellhead info. (04/07/22) Updated drawing list. Update call with Ahmad. Call with Ahmad to discuss relief line. Update 13-5/8" BOP stack drawing. Sent updated stack drawings to Bernie for review. (04/08/22) Continued roof hatch drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (04/04/22) Updated weekly timesheet. Approved design timesheets. Update with Lam. Updated open design items list. Update with Tyler. (04/05/22) Update call with Kyle. Follow up discussion with Kyle - Oil Search. (04/06/22) Update with Kyle. Update with Tyler (04/07/22) Update with Kyle. (04/08/22) Update KPM. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-07 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 8.25 0 (04/04/22) Reviewed diverter info from CVX. Searched for requested 269L relief piping information. Discussed rig grounding/lightning protection with Ripal. Sketched protection radius per vendor information. Continued roof sketch. (04/05/22) Weekly update call with Ahmad. Reviewed latest relief piping drawing from NOV. Continued roof hatch layout. (04/06/22) Pulled ref drawings and sent to Ahmad. (04/06/22) Update call with NOV.Cont roof hatch. Reviewed CVX site plan info with Kyle. Update cellar info in diverter drawing & 20-3/4" BOP. Updated wellhead info. (04/07/22) Updated drawing list. Update call with Ahmad. Call with Ahmad to discuss relief line. Update 13-5/8" BOP stack drawing. Sent updated stack drawings to Bernie for review. (04/08/22) Continued roof hatch drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (04/04/22) Updated weekly timesheet. Approved design timesheets. Update with Lam. Updated open design items list. Update with Tyler. (04/05/22) Update call with Kyle. Follow up discussion with Kyle - Oil Search. (04/06/22) Update with Kyle. Update with Tyler (04/07/22) Update with Kyle. (04/08/22) Update KPM. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-08 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 (04/06/22) Barge rig drawing package for Joe L. (04/08/22) Searched for 76B stack information for Joe. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-08 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 4.75 0 (04/04/22) Reviewed diverter info from CVX. Searched for requested 269L relief piping information. Discussed rig grounding/lightning protection with Ripal. Sketched protection radius per vendor information. Continued roof sketch. (04/05/22) Weekly update call with Ahmad. Reviewed latest relief piping drawing from NOV. Continued roof hatch layout. (04/06/22) Pulled ref drawings and sent to Ahmad. (04/06/22) Update call with NOV.Cont roof hatch. Reviewed CVX site plan info with Kyle. Update cellar info in diverter drawing & 20-3/4" BOP. Updated wellhead info. (04/07/22) Updated drawing list. Update call with Ahmad. Call with Ahmad to discuss relief line. Update 13-5/8" BOP stack drawing. Sent updated stack drawings to Bernie for review. (04/08/22) Continued roof hatch drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 (04/11/22) Updated weekly timesheet. Update with Kyle - design support. Approved design timesheets. (04/11/22) Update call with Lam. Update call with Kyle. Call with Tyler to discuss lift plans. (04/13/22) Design discussion with Kyle. Call with possible replacement designer. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-11 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 0.25 0 (04/12/22) Cleaned up 265L plot plan and sent CAD file to Zhilwan for tender use. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-11 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 (04/11/22) Updated 76B stack layout for Joe L. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-11 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.75 0 (04/11/22) Searched for mast material information. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-11 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 4.75 0 (04/11/22) Call with Operations. Updated 269L diverter layout to show new height info/vent routing. Searched for additional fuel tank info (247 tank). Saved site plan info on Q. Discussed rig camp info with Kyle. Updated drawing list. (04/12/22) Update call with Ahmad. Cont roof hatch details. (04/13/22) Cont. hatch details. Assigned new drawing numbers for hatch/installation. (04/14/22) Pulled paint spec info for Ahmad. Finalized roof drawing details/checked final layout. Updated lightning protection to include second sheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (04/11/22) Updated weekly timesheet. Update with Kyle - design support. Approved design timesheets. (04/11/22) Update call with Lam. Update call with Kyle. Call with Tyler to discuss lift plans. (04/13/22) Design discussion with Kyle. Call with possible replacement designer. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-12 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 0.25 0 (04/12/22) Cleaned up 265L plot plan and sent CAD file to Zhilwan for tender use. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-12 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 0.25 0 (04/12/22) Search for 258L koomey piping information per email from Robbie. (04/13/22) Searched for additional koomey ref information - discussed layouts and drawings with Tyler. (04/14/22) Discussed koomey piping with John R. - sent ref pics/drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-12 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 6.75 0 (04/11/22) Call with Operations. Updated 269L diverter layout to show new height info/vent routing. Searched for additional fuel tank info (247 tank). Saved site plan info on Q. Discussed rig camp info with Kyle. Updated drawing list. (04/12/22) Update call with Ahmad. Cont roof hatch details. (04/13/22) Cont. hatch details. Assigned new drawing numbers for hatch/installation. (04/14/22) Pulled paint spec info for Ahmad. Finalized roof drawing details/checked final layout. Updated lightning protection to include second sheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (04/11/22) Updated weekly timesheet. Update with Kyle - design support. Approved design timesheets. (04/11/22) Update call with Lam. Update call with Kyle. Call with Tyler to discuss lift plans. (04/13/22) Design discussion with Kyle. Call with possible replacement designer. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-13 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 1.5 0 (04/12/22) Search for 258L koomey piping information per email from Robbie. (04/13/22) Searched for additional koomey ref information - discussed layouts and drawings with Tyler. (04/14/22) Discussed koomey piping with John R. - sent ref pics/drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-13 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 5.5 0 (04/11/22) Call with Operations. Updated 269L diverter layout to show new height info/vent routing. Searched for additional fuel tank info (247 tank). Saved site plan info on Q. Discussed rig camp info with Kyle. Updated drawing list. (04/12/22) Update call with Ahmad. Cont roof hatch details. (04/13/22) Cont. hatch details. Assigned new drawing numbers for hatch/installation. (04/14/22) Pulled paint spec info for Ahmad. Finalized roof drawing details/checked final layout. Updated lightning protection to include second sheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 (04/14/22) Town hall meeting. TSR update call. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-14 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 1.25 0 (04/12/22) Search for 258L koomey piping information per email from Robbie. (04/13/22) Searched for additional koomey ref information - discussed layouts and drawings with Tyler. (04/14/22) Discussed koomey piping with John R. - sent ref pics/drawings. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-14 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 4.75 0 (04/11/22) Call with Operations. Updated 269L diverter layout to show new height info/vent routing. Searched for additional fuel tank info (247 tank). Saved site plan info on Q. Discussed rig camp info with Kyle. Updated drawing list. (04/12/22) Update call with Ahmad. Cont roof hatch details. (04/13/22) Cont. hatch details. Assigned new drawing numbers for hatch/installation. (04/14/22) Pulled paint spec info for Ahmad. Finalized roof drawing details/checked final layout. Updated lightning protection to include second sheet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-15 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 (04/15/22) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (04/18/22) Update weekly timesheet and submitted. Renamed 249L drawing folders under archive. Review/Approve design timesheets. (04/19/22) Update with Lam. Discussed CAD issue. (04/20/22) Update with Kyle. Discussed design support position with KPM. Discussed new drawing register with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-18 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1.5 0 (04/18/22) Searched for air hoist pin information. Sketched pin and sent to Chad for quote. Discussed pin with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-18 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 2 0 (04/18/22) Searched for raising sheave information. Discussed drawings with Kyle. Searched harddrive for info. (04/21/22) Searched for Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-18 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 3.5 0 (04/18/22) Reviewed weekly status report. Updated drawing list. Sketched plan view of updated cellar layout. Updated plot plan with new cellar and accumulator information. (04/19/22) Weekly update call with Ahmad. Reviewed fabrication list from Bernie. Researched 247 pit dump line information. Pulled ref drawings and started walkway sketch for reserve pits. (04/20/22) Update call with NOV. Call with Bernie. Updated 269 site drawing and plot plan to reflect latest cellar and well spacing. Call with CVX. Cont walkway sketch. (04/20/22) Cont walkway layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 (04/18/22) Update weekly timesheet and submitted. Renamed 249L drawing folders under archive. Review/Approve design timesheets. (04/19/22) Update with Lam. Discussed CAD issue. (04/20/22) Update with Kyle. Discussed design support position with KPM. Discussed new drawing register with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-19 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 7.75 0 (04/18/22) Reviewed weekly status report. Updated drawing list. Sketched plan view of updated cellar layout. Updated plot plan with new cellar and accumulator information. (04/19/22) Weekly update call with Ahmad. Reviewed fabrication list from Bernie. Researched 247 pit dump line information. Pulled ref drawings and started walkway sketch for reserve pits. (04/20/22) Update call with NOV. Call with Bernie. Updated 269 site drawing and plot plan to reflect latest cellar and well spacing. Call with CVX. Cont walkway sketch. (04/20/22) Cont walkway layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.25 0 (04/20/22) Well control call with Scotty. (04/21/22) Lunch for Greg. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (04/18/22) Update weekly timesheet and submitted. Renamed 249L drawing folders under archive. Review/Approve design timesheets. (04/19/22) Update with Lam. Discussed CAD issue. (04/20/22) Update with Kyle. Discussed design support position with KPM. Discussed new drawing register with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-20 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 7.25 0 (04/18/22) Reviewed weekly status report. Updated drawing list. Sketched plan view of updated cellar layout. Updated plot plan with new cellar and accumulator information. (04/19/22) Weekly update call with Ahmad. Reviewed fabrication list from Bernie. Researched 247 pit dump line information. Pulled ref drawings and started walkway sketch for reserve pits. (04/20/22) Update call with NOV. Call with Bernie. Updated 269 site drawing and plot plan to reflect latest cellar and well spacing. Call with CVX. Cont walkway sketch. (04/20/22) Cont walkway layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (04/20/22) Well control call with Scotty. (04/21/22) Lunch for Greg. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-21 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 (04/21/22) Searched for dummy well house info - sent to Tyler B. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-21 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 1.25 0 (04/18/22) Searched for raising sheave information. Discussed drawings with Kyle. Searched harddrive for info. (04/21/22) Searched for Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-21 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 5.25 0 (04/18/22) Reviewed weekly status report. Updated drawing list. Sketched plan view of updated cellar layout. Updated plot plan with new cellar and accumulator information. (04/19/22) Weekly update call with Ahmad. Reviewed fabrication list from Bernie. Researched 247 pit dump line information. Pulled ref drawings and started walkway sketch for reserve pits. (04/20/22) Update call with NOV. Call with Bernie. Updated 269 site drawing and plot plan to reflect latest cellar and well spacing. Call with CVX. Cont walkway sketch. (04/20/22) Cont walkway layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (04/25/22) Update with Kyle. reviewed HTSG request and discussed drawing register with Kyle. (04/26/22) Updated weekly timesheet and submitted. Update call with Kyle. Call with Lam - CAD standards. (04/27/22) Update with Kyle. Update with Lam. (04/28/22) Update with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-25 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 (04/25/22) Searched for 165L drawworks information. Call with Seth - Bronco to discuss tie-downs. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-25 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 6 0 (04/25/22) Updated drawing list. Updated BOP/Diverter stack drawings. Created PDF for CVX drawing transmittal. Cleaned up drawing folders. Updated lightning protection drawing. (04/26/22) Searched for 269/247L drain line piping information. Continued walkway . (04/26/22) Continued walkway drawing - handrail details. Weekly update call with Ahmad. (04/27/22) MP roof hatch redlines from Ralph. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 (04/25/22) Update with Kyle. reviewed HTSG request and discussed drawing register with Kyle. (04/26/22) Updated weekly timesheet and submitted. Update call with Kyle. Call with Lam - CAD standards. (04/27/22) Update with Kyle. Update with Lam. (04/28/22) Update with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-26 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 6.75 0 (04/25/22) Updated drawing list. Updated BOP/Diverter stack drawings. Created PDF for CVX drawing transmittal. Cleaned up drawing folders. Updated lightning protection drawing. (04/26/22) Searched for 269/247L drain line piping information. Continued walkway . (04/26/22) Continued walkway drawing - handrail details. Weekly update call with Ahmad. (04/27/22) MP roof hatch redlines from Ralph. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (04/27/22) Town-hall meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (04/25/22) Update with Kyle. reviewed HTSG request and discussed drawing register with Kyle. (04/26/22) Updated weekly timesheet and submitted. Update call with Kyle. Call with Lam - CAD standards. (04/27/22) Update with Kyle. Update with Lam. (04/28/22) Update with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-27 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 5.25 0 (04/27/22) Review new lift plan package request from field. Discussed plans with Kyle. Started MP lift layout. (04/28/22) Searched for historical lifting data. Continued 249 MP lift layout. (04/29/22) Saved ref info on the Q. Call with Aksai to discuss lift plans. Updated MP lift plan. Started CAD block of new crane. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-27 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 (04/25/22) Updated drawing list. Updated BOP/Diverter stack drawings. Created PDF for CVX drawing transmittal. Cleaned up drawing folders. Updated lightning protection drawing. (04/26/22) Searched for 269/247L drain line piping information. Continued walkway . (04/26/22) Continued walkway drawing - handrail details. Weekly update call with Ahmad. (04/27/22) MP roof hatch redlines from Ralph. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (04/25/22) Update with Kyle. reviewed HTSG request and discussed drawing register with Kyle. (04/26/22) Updated weekly timesheet and submitted. Update call with Kyle. Call with Lam - CAD standards. (04/27/22) Update with Kyle. Update with Lam. (04/28/22) Update with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-28 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 8 0 (04/27/22) Review new lift plan package request from field. Discussed plans with Kyle. Started MP lift layout. (04/28/22) Searched for historical lifting data. Continued 249 MP lift layout. (04/29/22) Saved ref info on the Q. Call with Aksai to discuss lift plans. Updated MP lift plan. Started CAD block of new crane. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-04-29 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 6 0 (04/27/22) Review new lift plan package request from field. Discussed plans with Kyle. Started MP lift layout. (04/28/22) Searched for historical lifting data. Continued 249 MP lift layout. (04/29/22) Saved ref info on the Q. Call with Aksai to discuss lift plans. Updated MP lift plan. Started CAD block of new crane. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-01 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 Offshore rig-up support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-01 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 1 0 Drillmec support schedule review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-01 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 0.5 0 Incident lifting tongs - document review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet and approvals Personnel administration Update to AP Sakhalin personnel relocation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-01 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 0.5 0 Santos / Oilsearch Project Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-01 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 0.5 0 Oxy CCUS ELTY review meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-01 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 0.5 0 DNV Log General support Commissioning procedures Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-01 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2.5 0 Lighning protection Technical support Ahmad support Drilling scenarios Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-02 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 Offshore rig-up support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-02 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1.25 0 Lighning protection Technical support Ahmad support Drilling scenarios Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-03 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 0.5 0 General suppport Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Personnel admin. Personnel planning Status update reports Timesheet approvals GO updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-04 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Rig up support Hydraulic system flushing Personnel planning Hydradyne support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-04 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 1 0 General suppport Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Personnel admin. Personnel planning Status update reports Timesheet approvals GO updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Personnel discussions / CC with Miodrag Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-04 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 1 0 General support - commissioning documents, top drive install, top drive spares Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-04 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Meetings, drawings, technical support, Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-05 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Rig up support Hydraulic system flushing Personnel planning Hydradyne support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-05 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 1 0 General suppport Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Personnel admin. Personnel planning Status update reports Timesheet approvals GO updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-05 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Santos Weekly Meeting / Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-05 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 0.5 0 Hibernia MPD Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-05 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 KPO Slides for Sergey Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Personnel discussions / CC with Miodrag Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-05 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 1 0 General support - commissioning documents, top drive install, top drive spares Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-05 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Meetings, drawings, technical support, Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-06 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Rig up support Hydraulic system flushing Personnel planning Hydradyne support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-06 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 0.5 0 General suppport Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 MPD Meeting with AS, Brage, Chris S. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Personnel admin. Personnel planning Status update reports Timesheet approvals GO updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-06 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 0.5 0 Santos Weekly Meeting / Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-06 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 0.5 0 KPO Slides for Sergey Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-06 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 MOECO / Japan Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Personnel discussions / CC with Miodrag Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-06 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 0.5 0 General support - commissioning documents, top drive install, top drive spares Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-06 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Meetings, drawings, technical support, Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-07 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Rig up support Hydraulic system flushing Personnel planning Hydradyne support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-07 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 1 0 General suppport Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Personnel admin. Personnel planning Status update reports Timesheet approvals GO updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-07 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 0.5 0 Hibernia MPD Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-07 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 0.5 0 MOECO / Japan Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Personnel discussions / CC with Miodrag Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-07 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 1 0 General support - commissioning documents, top drive install, top drive spares Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-07 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Meetings, drawings, technical support, Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-08 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Rig up support Hydraulic system flushing Personnel planning Hydradyne support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-08 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 0.5 0 General suppport Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Personnel admin. Personnel planning Status update reports Timesheet approvals GO updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-08 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Santos Weekly Meeting / Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-08 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 0.5 0 Hibernia MPD Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-08 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 1 0 General support - commissioning documents, top drive install, top drive spares Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-08 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Meetings, drawings, technical support, Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-10 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 Lightning system General support Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 SLB meeting about hydrogen power package HTSG bi-weekly meeting Town Hall CC with Mio and other SAK team members Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Personnel discussions March HTSG hours summary (3 reports) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 Hand over meeting with TE and GO Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-11 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1.25 0 MOECO Japan meetings with Baker CC with Moeco Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-11 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 249 mast repair support 258 top drive support Accumulator lines Top Drive Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-11 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1.5 0 Lightning system General support Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-12 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-12 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 1 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 SLB meeting about hydrogen power package HTSG bi-weekly meeting Town Hall CC with Mio and other SAK team members Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Personnel discussions March HTSG hours summary (3 reports) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-12 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1.5 0 MOECO Japan meetings with Baker CC with Moeco Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-12 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 249 mast repair support 258 top drive support Accumulator lines Top Drive Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-12 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Lightning system General support Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-13 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 2 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 SLB meeting about hydrogen power package HTSG bi-weekly meeting Town Hall CC with Mio and other SAK team members Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Personnel discussions March HTSG hours summary (3 reports) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-13 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 249 mast repair support 258 top drive support Accumulator lines Top Drive Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-13 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1.5 0 Lightning system General support Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-14 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 SLB meeting about hydrogen power package HTSG bi-weekly meeting Town Hall CC with Mio and other SAK team members Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Personnel discussions March HTSG hours summary (3 reports) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-14 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 249 mast repair support 258 top drive support Accumulator lines Top Drive Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-14 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Lightning system General support Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-15 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-15 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 Lightning system General support Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-16 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1.5 0 Lightning system General support Meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-17 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 0.5 0 Rig identification for Oil India Moeco support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-17 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 0.5 0 Schedule review Risk assessment Technical discussions (mud system) BOP stack-ups Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-18 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 1 0 Project support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 ANAO bi-weekly CC CVX Big Rig Tour Meeting GO going away luncheon General rig o&m opportunities - CC with Karma Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.25 0 Personnel administration Timesheet approvals Status updates to AP Job description Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-18 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 0.5 0 Rig identification for Oil India Moeco support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-18 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 258L Support (top drive and general) 257B support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-18 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Schedule review Risk assessment Technical discussions (mud system) BOP stack-ups Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-19 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 0.5 0 Project support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Personnel administration Timesheet approvals Status updates to AP Job description Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-19 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Oilsearch / Santos Weekly Meeting and Support Personnel discussion with JL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-19 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 Rig identification for Oil India Moeco support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-19 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3 0 258L Support (top drive and general) 257B support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-19 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1.25 0 165L Mast Repairs 122L pony sub and other upgrades Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-19 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 Schedule review Risk assessment Technical discussions (mud system) BOP stack-ups Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-20 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 1 0 Project support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 ANAO bi-weekly CC CVX Big Rig Tour Meeting GO going away luncheon General rig o&m opportunities - CC with Karma Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Personnel administration Timesheet approvals Status updates to AP Job description Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-20 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 Rig identification for Oil India Moeco support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-20 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2.5 0 258L Support (top drive and general) 257B support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-20 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.5 0 165L Mast Repairs 122L pony sub and other upgrades Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-20 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2.25 0 Schedule review Risk assessment Technical discussions (mud system) BOP stack-ups Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 ANAO bi-weekly CC CVX Big Rig Tour Meeting GO going away luncheon General rig o&m opportunities - CC with Karma Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Personnel administration Timesheet approvals Status updates to AP Job description Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-21 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Oilsearch / Santos Weekly Meeting and Support Personnel discussion with JL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-21 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 0.5 0 Rig identification for Oil India Moeco support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-21 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2.5 0 258L Support (top drive and general) 257B support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-21 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 165L Mast Repairs 122L pony sub and other upgrades Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-21 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 Schedule review Risk assessment Technical discussions (mud system) BOP stack-ups Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-22 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 0.5 0 Project support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 Personnel administration Timesheet approvals Status updates to AP Job description Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-22 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 0.5 0 Oilsearch / Santos Weekly Meeting and Support Personnel discussion with JL Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-22 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 0.5 0 Rig identification for Oil India Moeco support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-22 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 258L Support (top drive and general) 257B support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-22 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 3 0 165L Mast Repairs 122L pony sub and other upgrades Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-22 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 Schedule review Risk assessment Technical discussions (mud system) BOP stack-ups Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 CC with Arturo Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-25 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 1 0 aGeneral support CC's with RC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 EAFC P{roject Engineer Operations Support Job Description Timesheet approvals CAD software for New Iberia Gary Wilson timesheets Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-25 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 0.5 0 Santos Project Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-25 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 Moeco discussion with Karma Meeting with PTEN Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-25 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.5 0 249/258 Lift Plans Drawworks drum repair Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-25 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.5 0 165L Mast Repairs 165L drawworks tie-downs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-25 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.75 0 Crew boat documentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-25 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Electrical reports review 600V system review Schedule review Meetings TDS Status updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-26 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 0.5 0 Drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 EAFC P{roject Engineer Operations Support Job Description Timesheet approvals CAD software for New Iberia Gary Wilson timesheets Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-26 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Santos Project Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-26 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 0.75 0 Moeco discussion with Karma Meeting with PTEN Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-26 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 249/258 Lift Plans Drawworks drum repair Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-26 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1.25 0 165L Mast Repairs 165L drawworks tie-downs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-26 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Electrical reports review 600V system review Schedule review Meetings TDS Status updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-27 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 0.5 0 aGeneral support CC's with RC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-27 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 0.5 0 Drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 EAFC P{roject Engineer Operations Support Job Description Timesheet approvals CAD software for New Iberia Gary Wilson timesheets Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-27 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Santos Project Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-27 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 249/258 Lift Plans Drawworks drum repair Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-27 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.5 0 165L Mast Repairs 165L drawworks tie-downs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-27 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 3 0 Electrical reports review 600V system review Schedule review Meetings TDS Status updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-28 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 0.5 0 aGeneral support CC's with RC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-28 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 0.5 0 Drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 EAFC P{roject Engineer Operations Support Job Description Timesheet approvals CAD software for New Iberia Gary Wilson timesheets Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-28 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 2 0 BP AZJ O&M Response Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-28 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 249/258 Lift Plans Drawworks drum repair Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-28 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 165L Mast Repairs 165L drawworks tie-downs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-28 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Electrical reports review 600V system review Schedule review Meetings TDS Status updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-29 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 0.5 0 aGeneral support CC's with RC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 EAFC P{roject Engineer Operations Support Job Description Timesheet approvals CAD software for New Iberia Gary Wilson timesheets Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-29 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Santos Project Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-29 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 0.5 0 BP AZJ O&M Response Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-29 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.5 0 249/258 Lift Plans Drawworks drum repair Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-29 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 165L Mast Repairs 165L drawworks tie-downs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-29 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Electrical reports review 600V system review Schedule review Meetings TDS Status updates Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-04-30 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 0.5 0 aGeneral support CC's with RC Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.25 0 03/30: transmit CVX bangladesh drawings 04/01: create a new task for TSR-01813 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-01 Rig 272L :Rig 272L TSR-01751-272L Tier 4 Final Emissions Regular Pay N 7.75 0 03/28-03/30: update 3D model with data collected from survey trip 03/29: Santos Pikka Project Internal Update Meeting; model update, and create demolition package 03/31: meeting with Tyler to discuss path forward on demolition concept package Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 04/04: timesheet to ProjXsense & payroll; download NOV transmittals to Q: drive for 269L Bangladesh 04/05-04/07: assist with Ozzy to obtain Autodesk and solidworks software for Ralph. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-04 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 04/04: transmit Electrical Power Studies to NOV for 269L Bangladesh 04/05: generate Sakhalin billable hours report for February and March 04/06: process incoming transmittal PKD-HOU-T-01208 04/07: transmit approved drawing to NOV for 269L Bangladesh Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-04 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01561-209L MAC Heaters Motor Modification Regular Pay N 4.5 0 04/04-04/06:update compiled data model with preliminary data from NC machinery Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 04/04: timesheet to ProjXsense & payroll; download NOV transmittals to Q: drive for 269L Bangladesh 04/05-04/07: assist with Ozzy to obtain Autodesk and solidworks software for Ralph. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-05 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 04/04: transmit Electrical Power Studies to NOV for 269L Bangladesh 04/05: generate Sakhalin billable hours report for February and March 04/06: process incoming transmittal PKD-HOU-T-01208 04/07: transmit approved drawing to NOV for 269L Bangladesh Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-05 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01561-209L MAC Heaters Motor Modification Regular Pay N 3.5 0 04/04-04/06:update compiled data model with preliminary data from NC machinery Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 04/06-08: create "patent" drawings for mast lifting device Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 04/04: timesheet to ProjXsense & payroll; download NOV transmittals to Q: drive for 269L Bangladesh 04/05-04/07: assist with Ozzy to obtain Autodesk and solidworks software for Ralph. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 04/04: transmit Electrical Power Studies to NOV for 269L Bangladesh 04/05: generate Sakhalin billable hours report for February and March 04/06: process incoming transmittal PKD-HOU-T-01208 04/07: transmit approved drawing to NOV for 269L Bangladesh Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-06 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01561-209L MAC Heaters Motor Modification Regular Pay N 2.5 0 04/04-04/06:update compiled data model with preliminary data from NC machinery Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-06 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 04/06: picked up red lines for plot plan lightning protection Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 4.5 0 04/06-08: create "patent" drawings for mast lifting device Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 04/04: timesheet to ProjXsense & payroll; download NOV transmittals to Q: drive for 269L Bangladesh 04/05-04/07: assist with Ozzy to obtain Autodesk and solidworks software for Ralph. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-07 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 04/04: transmit Electrical Power Studies to NOV for 269L Bangladesh 04/05: generate Sakhalin billable hours report for February and March 04/06: process incoming transmittal PKD-HOU-T-01208 04/07: transmit approved drawing to NOV for 269L Bangladesh Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 8 0 04/06-08: create "patent" drawings for mast lifting device Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-11 HTSG :HTSG 2022-SMART-Goals Regular Pay N 7 0 04/11-12: drafting handbook Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-11 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 1 0 04/11: cconvert PDF to CAD to pull dimensions. 04/12: call meeting with James and Tyler to kick off TSR 04/14: meeting with Tyler and MEAP group to discuss clarification questions; begin template of lift plans Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-12 HTSG :HTSG 2022-SMART-Goals Regular Pay N 6 0 04/11-12: drafting handbook Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-12 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 0.5 0 04/11: cconvert PDF to CAD to pull dimensions. 04/12: call meeting with James and Tyler to kick off TSR 04/14: meeting with Tyler and MEAP group to discuss clarification questions; begin template of lift plans Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-12 Rig 272L :Rig 272L TSR-01751-272L Tier 4 Final Emissions Regular Pay N 1.5 0 04/12: meeting with Tyler B, to discuss Santos Pikka Project updates 04/12-13: sketch out DEF tank Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-13 Rig 272L :Rig 272L TSR-01751-272L Tier 4 Final Emissions Regular Pay N 8 0 04/12: meeting with Tyler B, to discuss Santos Pikka Project updates 04/12-13: sketch out DEF tank Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-14 HTSG :HTSG 2022-SMART-Goals Regular Pay N 2 0 04/11-12: drafting handbook Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-14 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 3.5 0 04/11: cconvert PDF to CAD to pull dimensions. 04/12: call meeting with James and Tyler to kick off TSR 04/14: meeting with Tyler and MEAP group to discuss clarification questions; begin template of lift plans Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 04/14: Global Ops Town Hall; HTSG bi-weekly meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-14 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 04/14: transmit TSR-01798-CO; NOV approved drawings back to NOV for 269L Bangladesh Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-15 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Easter Holiday Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-25 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 4.25 0 04/25-04/29: create drawing sets for MEAP lift plan for various rental equipment Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 04/25: create OneDrive link to 258L folder Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 04/25: timesheets to ProjXsense 04/26: IT help with Rene regarding AutoCAD LT install 04/27: AutoCAD quote to Troy and corespondence Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-25 OH-013 :OH-013 Overhead All Activities Regular Pay N 2.75 0 04/25: removed Greg from timekeeping system; transmit DWGs to CVX 04/27: transmit drawings to NOV Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-26 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 4 0 04/25-04/29: create drawing sets for MEAP lift plan for various rental equipment Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 04/25: timesheets to ProjXsense 04/26: IT help with Rene regarding AutoCAD LT install 04/27: AutoCAD quote to Troy and corespondence Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-26 Rig 272L :Rig 272L TSR-01751-272L Tier 4 Final Emissions Regular Pay N 1 0 04/26: Santos Pikka Project status update meeting 04/29: clarification questions for Tyler Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-27 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 4.75 0 04/25-04/29: create drawing sets for MEAP lift plan for various rental equipment Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 04/27: Corporate Office Town Hall meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 04/25: timesheets to ProjXsense 04/26: IT help with Rene regarding AutoCAD LT install 04/27: AutoCAD quote to Troy and corespondence Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 04/25: removed Greg from timekeeping system; transmit DWGs to CVX 04/27: transmit drawings to NOV Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-28 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 8 0 04/25-04/29: create drawing sets for MEAP lift plan for various rental equipment Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-29 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 7 0 04/25-04/29: create drawing sets for MEAP lift plan for various rental equipment Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-04-29 Rig 272L :Rig 272L TSR-01751-272L Tier 4 Final Emissions Regular Pay N 1 0 04/26: Santos Pikka Project status update meeting 04/29: clarification questions for Tyler Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-04-01 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO on 3/31 and 4/1 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-04-04 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 8 0 Continue MLA Work Order Rig 12 and 14. Continue Talos RFP 30 day CCU well option with Rig 12. Source rig for Oxy and Chevron batch drilling in Permian. Review 1000HP NOV Rapid rig available for sale in PA. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-04-04 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 Attend weekly 269 Bangladesh mtgs. Meet with PEM for handover. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-04-05 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 8 0 Continue MLA Work Order Rig 12 and 14. Continue Talos RFP 30 day CCU well option with Rig 12. Source rig for Oxy and Chevron batch drilling in Permian. Review 1000HP NOV Rapid rig available for sale in PA. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-04-05 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 Attend weekly 269 Bangladesh mtgs. Meet with PEM for handover. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-04-06 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 2 0 Handover for Japan opportunities. MOECO and GPSS. Continue sourcing 3,000HP rigs for Oil India and Colombia Canacol. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-04-06 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 6 0 Continue MLA Work Order Rig 12 and 14. Continue Talos RFP 30 day CCU well option with Rig 12. Source rig for Oxy and Chevron batch drilling in Permian. Review 1000HP NOV Rapid rig available for sale in PA. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-04-06 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 Attend weekly 269 Bangladesh mtgs. Meet with PEM for handover. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-04-07 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 7 0 Continue MLA Work Order Rig 12 and 14. Continue Talos RFP 30 day CCU well option with Rig 12. Source rig for Oxy and Chevron batch drilling in Permian. Review 1000HP NOV Rapid rig available for sale in PA. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-04-07 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Attend weekly 269 Bangladesh mtgs. Meet with PEM for handover. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-04-08 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 4 0 Continue MLA Work Order Rig 12 and 14. Continue Talos RFP 30 day CCU well option with Rig 12. Source rig for Oxy and Chevron batch drilling in Permian. Review 1000HP NOV Rapid rig available for sale in PA. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-04-08 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 Attend weekly 269 Bangladesh mtgs. Meet with PEM for handover. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-01 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 CDPU Electrical Connection meting with Lam. 262MCM cable run from grasshopper to 480V distribution panel issue. Genesis Spar - Power Block Quote request sent to Jelec and Rexel. 480V Distribution panel material from Tory S. reviewed. LED lighting hardware and maintenance procedure request from Roger. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-01 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 6 0 269L Bangladesh - NOV Top Drive Block Diagram approved and sent to NOV. Rig 269 - Lightning system BOM & Quote review with Chuck and Kyle. Lightning Protection Datasheets reviewed for Rig 269L Bangladesh Rig 269- Fire and Gas Plot plan drawing from Jorge reviewed. 269L Bangladesh - Drilling Scenario discussion with Kyle and Ahmed for Rig 269 Rig 269 - Erico Lightning system meeting with Ray Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-04 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 LED lighting maintenance for Genesis Spar. Email sent to Roger. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-04 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 7 0 269L Bangladesh - Drilling Scenario discussion for Rig 269. Lightning Protection System Quote reviewed. Rig 269 - CVX Bangladesh - Rexel Material Quote for Lightning Protection 269 - AUX GEN Loads verification. Rig 269 - CVX Bangladesh - Final F & G plot plan review. Protection Radius drawing with James. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-05 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 Rig 258 Drawings review . Feedback sent to Garry W. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-05 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 7 0 269L Bangladesh - Drilling Scenario discussion for Rig 269. Lightning Protection System Quote reviewed. Rig 269 - CVX Bangladesh - Rexel Material Quote for Lightning Protection 269 - AUX GEN Loads verification. Rig 269 - CVX Bangladesh - Final F & G plot plan review. Protection Radius drawing with James. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-06 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 Rig 258 Drawings review . Feedback sent to Garry W. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-06 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 LED lighting maintenance for Genesis Spar. Email sent to Roger. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-06 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 5 0 269L Bangladesh - Drilling Scenario discussion for Rig 269. Lightning Protection System Quote reviewed. Rig 269 - CVX Bangladesh - Rexel Material Quote for Lightning Protection 269 - AUX GEN Loads verification. Rig 269 - CVX Bangladesh - Final F & G plot plan review. Protection Radius drawing with James. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-07 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3 0 Rig 258 Drawings review . Feedback sent to Garry W. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-07 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 LED lighting maintenance for Genesis Spar. Email sent to Roger. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-07 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 4 0 269L Bangladesh - Drilling Scenario discussion for Rig 269. Lightning Protection System Quote reviewed. Rig 269 - CVX Bangladesh - Rexel Material Quote for Lightning Protection 269 - AUX GEN Loads verification. Rig 269 - CVX Bangladesh - Final F & G plot plan review. Protection Radius drawing with James. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-08 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 Rig 258 Drawings review . Feedback sent to Garry W. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-08 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 LED lighting maintenance for Genesis Spar. Email sent to Roger. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-08 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 5 0 269L Bangladesh - Drilling Scenario discussion for Rig 269. Lightning Protection System Quote reviewed. Rig 269 - CVX Bangladesh - Rexel Material Quote for Lightning Protection 269 - AUX GEN Loads verification. Rig 269 - CVX Bangladesh - Final F & G plot plan review. Protection Radius drawing with James. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-11 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 Rig 258 - CANRIG AC Top Drive Upgrade. Plugs - Receptacles - Lighting. Rig 258 Drawings reviewed Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-11 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 6 0 Update: Rig 269 CVX Bangladesh Fire and Gas System . Rig 269 - CVX Bangladesh - Material Quote for Lightning Protection review & meeting with Ray Lightning Protection System Quote. CVX Bangladesh SkyScan Lightning Detector revised and submitted. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-12 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 Rig 258 - CANRIG AC Top Drive Upgrade. Plugs - Receptacles - Lighting. Rig 258 Drawings reviewed Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-12 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Genesis Spar LED lighting maintenance care datasheet Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-12 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 5 0 Update: Rig 269 CVX Bangladesh Fire and Gas System . Rig 269 - CVX Bangladesh - Material Quote for Lightning Protection review & meeting with Ray Lightning Protection System Quote. CVX Bangladesh SkyScan Lightning Detector revised and submitted. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-13 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 4 0 Rig 258 - CANRIG AC Top Drive Upgrade. Plugs - Receptacles - Lighting. Rig 258 Drawings reviewed Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-13 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 4 0 Update: Rig 269 CVX Bangladesh Fire and Gas System . Rig 269 - CVX Bangladesh - Material Quote for Lightning Protection review & meeting with Ray Lightning Protection System Quote. CVX Bangladesh SkyScan Lightning Detector revised and submitted. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-14 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 Rig 258 - CANRIG AC Top Drive Upgrade. Plugs - Receptacles - Lighting. Rig 258 Drawings reviewed Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-14 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 6 0 Update: Rig 269 CVX Bangladesh Fire and Gas System . Rig 269 - CVX Bangladesh - Material Quote for Lightning Protection review & meeting with Ray Lightning Protection System Quote. CVX Bangladesh SkyScan Lightning Detector revised and submitted. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-15 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Holiday Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-18 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L Automation Upgrade Regular Pay N 1 0 Automation Cable Register and Topology reline and comments updated as per Tyler Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-18 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 5 0 Rig 258 - CANRIG AC Top Drive Upgrade meeting. RIG 258 TOP DRIVE & Components PO reviewed. Rig 258 Topdrive VFD House Feeder Breaker clarification and discussion with Garry. 258L Top Drive Meeting Topics (scheduled for Thursday morning - HOU time) VFD Connection to SCR - Breaker Testing - Hardware 258L Plot Plan for TD Canrig House location Rig 258 Top Drive Upgrade - Can Rig Yard Visit & Pic reviewed. Rig 258 - CANRIG Top Drive Upgrade - 1200 A Circuit Breaker Datasheet and PPT reviewed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-18 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 269L Lightning Protection Plan (nVENT Erico System 1000). Lightning Protection Presentation reviewed Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-19 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L Automation Upgrade Regular Pay N 2 0 Automation Cable Register and Topology reline and comments updated as per Tyler Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-19 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 5 0 Rig 258 - CANRIG AC Top Drive Upgrade meeting. RIG 258 TOP DRIVE & Components PO reviewed. Rig 258 Topdrive VFD House Feeder Breaker clarification and discussion with Garry. 258L Top Drive Meeting Topics (scheduled for Thursday morning - HOU time) VFD Connection to SCR - Breaker Testing - Hardware 258L Plot Plan for TD Canrig House location Rig 258 Top Drive Upgrade - Can Rig Yard Visit & Pic reviewed. Rig 258 - CANRIG Top Drive Upgrade - 1200 A Circuit Breaker Datasheet and PPT reviewed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-19 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 269L Lightning Protection Plan (nVENT Erico System 1000). Lightning Protection Presentation reviewed Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-20 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L Automation Upgrade Regular Pay N 2 0 Automation Cable Register and Topology reline and comments updated as per Tyler Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-20 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 4 0 Rig 258 - CANRIG AC Top Drive Upgrade meeting. RIG 258 TOP DRIVE & Components PO reviewed. Rig 258 Topdrive VFD House Feeder Breaker clarification and discussion with Garry. 258L Top Drive Meeting Topics (scheduled for Thursday morning - HOU time) VFD Connection to SCR - Breaker Testing - Hardware 258L Plot Plan for TD Canrig House location Rig 258 Top Drive Upgrade - Can Rig Yard Visit & Pic reviewed. Rig 258 - CANRIG Top Drive Upgrade - 1200 A Circuit Breaker Datasheet and PPT reviewed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-20 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 269L Lightning Protection Plan (nVENT Erico System 1000). Lightning Protection Presentation reviewed Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-21 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 5 0 Rig 258 - CANRIG AC Top Drive Upgrade meeting. RIG 258 TOP DRIVE & Components PO reviewed. Rig 258 Topdrive VFD House Feeder Breaker clarification and discussion with Garry. 258L Top Drive Meeting Topics (scheduled for Thursday morning - HOU time) VFD Connection to SCR - Breaker Testing - Hardware 258L Plot Plan for TD Canrig House location Rig 258 Top Drive Upgrade - Can Rig Yard Visit & Pic reviewed. Rig 258 - CANRIG Top Drive Upgrade - 1200 A Circuit Breaker Datasheet and PPT reviewed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-21 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 3 0 269L Lightning Protection Plan (nVENT Erico System 1000). Lightning Protection Presentation reviewed Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-22 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 8 0 Rig 258 - CANRIG AC Top Drive Upgrade meeting. RIG 258 TOP DRIVE & Components PO reviewed. Rig 258 Topdrive VFD House Feeder Breaker clarification and discussion with Garry. 258L Top Drive Meeting Topics (scheduled for Thursday morning - HOU time) VFD Connection to SCR - Breaker Testing - Hardware 258L Plot Plan for TD Canrig House location Rig 258 Top Drive Upgrade - Can Rig Yard Visit & Pic reviewed. Rig 258 - CANRIG Top Drive Upgrade - 1200 A Circuit Breaker Datasheet and PPT reviewed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-25 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 4 0 Rig 258 - VFD Connection to SCR - Breaker Testing - Hardware. Rig 258 - Topdrive Plugboard Connections. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-25 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 4 0 Rig 269 - CVX Bangladesh - NOV Power Analysis. Rig 269 - CVX Bangladesh - 250KVA Transformer feed verification 1250KVA Transformer Quote request sent to Julie. H2S/ Gas Monitoring System Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-26 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 5 0 Rig 258 - VFD Connection to SCR - Breaker Testing - Hardware. Rig 258 - Topdrive Plugboard Connections. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-26 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 3 0 Rig 269 - CVX Bangladesh - NOV Power Analysis. Rig 269 - CVX Bangladesh - 250KVA Transformer feed verification 1250KVA Transformer Quote request sent to Julie. H2S/ Gas Monitoring System Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-28 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3 0 Rig 258 - VFD Connection to SCR - Breaker Testing - Hardware. Rig 258 - Topdrive Plugboard Connections. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-28 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 5 0 Rig 269 - CVX Bangladesh - NOV Power Analysis. Rig 269 - CVX Bangladesh - 250KVA Transformer feed verification 1250KVA Transformer Quote request sent to Julie. H2S/ Gas Monitoring System Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-29 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 6 0 Rig 265 power Load Analysis. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-04-29 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Rig 269 - CVX Bangladesh - NOV Power Analysis. Rig 269 - CVX Bangladesh - 250KVA Transformer feed verification 1250KVA Transformer Quote request sent to Julie. H2S/ Gas Monitoring System Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-04-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 8 0 did not work. last week of employement. time sheet not filled out. Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-01 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 flushing requirements questions and scope clarification, hydradyne field tech and documentation status Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-01 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 RIMS Training Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-01 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 2 0 revised gantt chart and transmitted, created and revised commissioning procedure, updated tracker. EIS report Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-04 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 flushing scope of work, hydraulic fittings list, chevron meetings to clarify scope, operations assistance on ordering spares, flushing company assistance, status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-04 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 8 0 revised gantt chart and transmitted, created and revised commissioning procedure, updated tracker, EIS report, SIT work Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-05 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 249 commissioning forms clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-05 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 6.5 0 revised gantt chart and transmitted, created and revised commissioning procedure, updated tracker, EIS report, SIT work Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-06 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 flushing scope of work, hydraulic fittings list, chevron meetings to clarify scope, operations assistance on ordering spares, flushing company assistance, status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-06 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 7.5 0 revised gantt chart and transmitted, created and revised commissioning procedure, updated tracker, EIS report, SIT work Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-07 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 flushing scope of work, hydraulic fittings list, chevron meetings to clarify scope, operations assistance on ordering spares, flushing company assistance, status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 merit increase and meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-07 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 4.5 0 revised gantt chart and transmitted, created and revised commissioning procedure, updated tracker, EIS report, SIT work Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-08 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 6 0 flushing scope of work, hydraulic fittings list, chevron meetings to clarify scope, operations assistance on ordering spares, flushing company assistance, status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-09 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 flushing scope of work, hydraulic fittings list, chevron meetings to clarify scope, operations assistance on ordering spares, flushing company assistance, status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-11 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 6 0 flushing requirements, clarifications with HPU Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-11 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 2 0 Accumulator lines reworks, research on suitcases, RFQ and quote reviews, Gant chart update, commissioning form creation Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-12 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 8 0 Accumulator lines reworks, research on suitcases, RFQ and quote reviews, Gant chart update, commissioning form creation Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-13 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 8 0 Accumulator lines reworks, research on suitcases, RFQ and quote reviews, Gant chart update, commissioning form creation Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Town Hall, TS Meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-14 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 5 0 Accumulator lines reworks, research on suitcases, RFQ and quote reviews, Gant chart update, commissioning form creation Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-15 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 flushing requirements, clarifications with HPU Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-15 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Good Friday Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-16 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 flushing requirements, clarifications with HPU Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-18 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Assistance with flushing taking longer, status update on Hydradyne drawings Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-18 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 7.5 0 Commissioning and SIT meeting, revision of commissioning forms, comparison of commissioning to Start Up, accumulator line quote reviews, Top drive upgrade meeting and action items, SIt requirements, Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-19 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Assistance with flushing taking longer, status update on Hydradyne drawings Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-19 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 7.5 0 Commissioning and SIT meeting, revision of commissioning forms, comparison of commissioning to Start Up, accumulator line quote reviews, Top drive upgrade meeting and action items, SIt requirements, Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-20 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Assistance with flushing taking longer, status update on Hydradyne drawings Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-20 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 6.5 0 Commissioning and SIT meeting, revision of commissioning forms, comparison of commissioning to Start Up, accumulator line quote reviews, Top drive upgrade meeting and action items, SIt requirements, Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-21 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 Assistance with flushing taking longer, status update on Hydradyne drawings Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Greg Osten going away Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-21 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 7 0 Commissioning and SIT meeting, revision of commissioning forms, comparison of commissioning to Start Up, accumulator line quote reviews, Top drive upgrade meeting and action items, SIt requirements, Reck, John Engineer I 29656 Reck, John:Engineer I 2022-04-22 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 6 0 Commissioning and SIT meeting, revision of commissioning forms, comparison of commissioning to Start Up, accumulator line quote reviews, Top drive upgrade meeting and action items, SIt requirements,