Name Billing Class Employee No. Item Line Class Transaction Date Job No. Customer Service Item Notes Payroll Item Billable Employee Paid Day Rate Duration Days Remarks Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-02 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 7 0 Standard calcs, set up department meetings, meeting with Susan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 Help Faldyn with genset info Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-02 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 SAK meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.75 0 Review of 1770 drawings, Krechet automation project meeting, send 270 HPU docs to SAK, CTR for automation project, 1770 drawing review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-03 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 5.5 0 Standard calcs, set up department meetings, meeting with Susan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-03 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Willow and Oil Search Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-03 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1.75 0 257B meeting and CTR review, address questions from Robbie, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-03 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Rignet Intelie meeting, ethic webinar, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.25 0 Review of 1770 drawings, Krechet automation project meeting, send 270 HPU docs to SAK, CTR for automation project, 1770 drawing review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-04 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 6.5 0 Standard calcs, set up department meetings, meeting with Susan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-04 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1.5 0 257B meeting and CTR review, address questions from Robbie, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Review of 1770 drawings, Krechet automation project meeting, send 270 HPU docs to SAK, CTR for automation project, 1770 drawing review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-04 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 0.5 0 update closeout and send to Kyle, respond to Robbie's questions, analysis comments, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-05 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 2.5 0 Standard calcs, set up department meetings, meeting with Susan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-05 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 0.75 0 257B meeting and CTR review, address questions from Robbie, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-05 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Rignet Intelie meeting, ethic webinar, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 Review of 1770 drawings, Krechet automation project meeting, send 270 HPU docs to SAK, CTR for automation project, 1770 drawing review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-05 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 0.75 0 update closeout and send to Kyle, respond to Robbie's questions, analysis comments, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 Review of 1770 drawings, Krechet automation project meeting, send 270 HPU docs to SAK, CTR for automation project, 1770 drawing review, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-06 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 2 0 update closeout and send to Kyle, respond to Robbie's questions, analysis comments, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-09 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 1.25 0 department meetings, spreadsheets, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 emails, coordinating New Iberia trip, SLB workshop issue, intake form Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4.5 0 Review drawing updates, automation CTR, work with SAK Doc Control on TSR update, sign 1770 drawings Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-10 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 2 0 department meetings, spreadsheets, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.75 0 Review drawing updates, automation CTR, work with SAK Doc Control on TSR update, sign 1770 drawings Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-10 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 5.5 0 pick up comments, perform calcs, update report and resend to Kyle, create MTO and send to Chad Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-11 Berkut-TSR :Berkut-TSR TSR-01789-BERP HP Cement Line Replacement Regular Pay N 4 0 Closeout report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-11 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 1 0 department meetings, spreadsheets, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.25 0 emails, coordinating New Iberia trip, SLB workshop issue, intake form Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-11 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1.75 0 response to COPA, emails to Byers and NOV, meeting with SLB Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Review drawing updates, automation CTR, work with SAK Doc Control on TSR update, sign 1770 drawings Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-12 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 2 0 department meetings, spreadsheets, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.25 0 emails, coordinating New Iberia trip, SLB workshop issue, intake form Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-12 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 3 0 response to COPA, emails to Byers and NOV, meeting with SLB Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3.5 0 Review drawing updates, automation CTR, work with SAK Doc Control on TSR update, sign 1770 drawings Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-13 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 1.25 0 department meetings, spreadsheets, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 emails, coordinating New Iberia trip, SLB workshop issue, intake form Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-13 Rig 122-TSR :Rig 122-TSR TSR-01787-122L LP Mud System Modifications Regular Pay N 1 0 review schematic Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-16 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2.5 0 meeting with Nick, talk with Adam and Aaron, discuss path forward with Kyle, meeting with NOV, discussion with SLB, article, request info from NOV, set up Alaska meeting, create presentation for CPAI Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-16 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 1 0 meeting with NCOC, discuss reactivation study and path forward, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-16 OH-014 :OH-014 Overhead All Activities Regular Pay N 3 0 OTC, TRS workshop, SPS research Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-16 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 monday meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 SAK doc control emails for automation project, 1770 closeout update, call with Bo, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-17 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 2 0 flow calc spreadsheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-17 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 0.5 0 meeting with Nick, talk with Adam and Aaron, discuss path forward with Kyle, meeting with NOV, discussion with SLB, article, request info from NOV, set up Alaska meeting, create presentation for CPAI Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-17 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 1 0 meeting with NCOC, discuss reactivation study and path forward, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-17 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 OTC, TRS workshop, SPS research Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.75 0 SAK doc control emails for automation project, 1770 closeout update, call with Bo, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-17 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 0.75 0 Review quotes and send to Robbie Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-18 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 2 0 flow calc spreadsheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.75 0 ESG meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-18 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 3 0 meeting with Nick, talk with Adam and Aaron, discuss path forward with Kyle, meeting with NOV, discussion with SLB, article, request info from NOV, set up Alaska meeting, create presentation for CPAI Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-18 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 1 0 meeting with NCOC, discuss reactivation study and path forward, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-18 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 OTC, TRS workshop, SPS research Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-19 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 0.5 0 flow calc spreadsheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-19 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 meeting with Nick, talk with Adam and Aaron, discuss path forward with Kyle, meeting with NOV, discussion with SLB, article, request info from NOV, set up Alaska meeting, create presentation for CPAI Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-19 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 2 0 meeting with NCOC, discuss reactivation study and path forward, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-19 OH-014 :OH-014 Overhead All Activities Regular Pay N 4.5 0 OTC, TRS workshop, SPS research Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-20 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1.5 0 meeting with Nick, talk with Adam and Aaron, discuss path forward with Kyle, meeting with NOV, discussion with SLB, article, request info from NOV, set up Alaska meeting, create presentation for CPAI Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-20 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 0.5 0 meeting with NCOC, discuss reactivation study and path forward, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-20 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 OTC, TRS workshop, SPS research Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-23 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 meeting with Alaska ops, discussion with SLB, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-23 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 SAK meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-23 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 5.5 0 Robbie meeting, create contact list, update action items, create equipment list, discussion with Anatra and Dan, meeting with Subsalve Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Trip to Odessa Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-25 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Trip to Odessa Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Trip to Odessa Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-26 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 1 0 Robbie meeting, create contact list, update action items, create equipment list, discussion with Anatra and Dan, meeting with Subsalve Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-08-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Trip to Odessa Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 (08/02/21) Update call with Tyler. (08/03/21) Update calls with Kyle. Update call with Jorge. Update call with Tyler. Created new AutoCAD signature block for drawing approvals. (08/04/21) Approved PTO forms. Review/Approved designers timesheets. Update call with Lam. Update call with Kyle. Redlined TSR distribution list and discussed with Lam. Updated weekly timesheet and submitted for approval. (08/05/21) Update call with Kyle. (08/06/21) Worked on cleaning up drawing files under rig 249L archive folder (drawing file renaming to match current standards.) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 (08/02/21- -08/03/21) Review revisions to Berkut drawing for C/K hose rigging padeyes. (08/05/21) Rig automation CTR review meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-02 Rig 122-TSR :Rig 122-TSR TSR-01787-122L LP Mud System Modifications Regular Pay N 2.75 0 (08/02/21 - 08/05/21) LP Mud updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-02 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 2 0 (08/02/21) Final drawing review. (08/03/21) Inserted new signature block. Created PDFs and circulated drawings for review. (08/04/21) Transmitted final drawings and archived files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (08/02/21) Update call with Tyler. (08/03/21) Update calls with Kyle. Update call with Jorge. Update call with Tyler. Created new AutoCAD signature block for drawing approvals. (08/04/21) Approved PTO forms. Review/Approved designers timesheets. Update call with Lam. Update call with Kyle. Redlined TSR distribution list and discussed with Lam. Updated weekly timesheet and submitted for approval. (08/05/21) Update call with Kyle. (08/06/21) Worked on cleaning up drawing files under rig 249L archive folder (drawing file renaming to match current standards.) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (08/02/21- -08/03/21) Review revisions to Berkut drawing for C/K hose rigging padeyes. (08/05/21) Rig automation CTR review meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-03 Rig 122-TSR :Rig 122-TSR TSR-01787-122L LP Mud System Modifications Regular Pay N 4.5 0 (08/02/21 - 08/05/21) LP Mud updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-03 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 1 0 (08/02/21) Final drawing review. (08/03/21) Inserted new signature block. Created PDFs and circulated drawings for review. (08/04/21) Transmitted final drawings and archived files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.75 0 (08/02/21) Update call with Tyler. (08/03/21) Update calls with Kyle. Update call with Jorge. Update call with Tyler. Created new AutoCAD signature block for drawing approvals. (08/04/21) Approved PTO forms. Review/Approved designers timesheets. Update call with Lam. Update call with Kyle. Redlined TSR distribution list and discussed with Lam. Updated weekly timesheet and submitted for approval. (08/05/21) Update call with Kyle. (08/06/21) Worked on cleaning up drawing files under rig 249L archive folder (drawing file renaming to match current standards.) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-04 Rig 122-TSR :Rig 122-TSR TSR-01787-122L LP Mud System Modifications Regular Pay N 5 0 (08/02/21 - 08/05/21) LP Mud updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-04 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 0.75 0 (08/02/21) Final drawing review. (08/03/21) Inserted new signature block. Created PDFs and circulated drawings for review. (08/04/21) Transmitted final drawings and archived files on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (08/05/21) Bi-Weekly TSR call. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (08/02/21) Update call with Tyler. (08/03/21) Update calls with Kyle. Update call with Jorge. Update call with Tyler. Created new AutoCAD signature block for drawing approvals. (08/04/21) Approved PTO forms. Review/Approved designers timesheets. Update call with Lam. Update call with Kyle. Redlined TSR distribution list and discussed with Lam. Updated weekly timesheet and submitted for approval. (08/05/21) Update call with Kyle. (08/06/21) Worked on cleaning up drawing files under rig 249L archive folder (drawing file renaming to match current standards.) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-05 OH-009 :OH-009 OH-009-030 Latin America (LATAM) Regular Pay N 4 0 (08/05/21) Reviewed drawing information received from Al M and compared to drawings under archive. Call with Al to discuss drawing requirements. Created new proposal plot plans for rigs 165L/256L. Sent for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (08/02/21- -08/03/21) Review revisions to Berkut drawing for C/K hose rigging padeyes. (08/05/21) Rig automation CTR review meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-05 Rig 122-TSR :Rig 122-TSR TSR-01787-122L LP Mud System Modifications Regular Pay N 2.75 0 (08/02/21 - 08/05/21) LP Mud updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 (08/02/21) Update call with Tyler. (08/03/21) Update calls with Kyle. Update call with Jorge. Update call with Tyler. Created new AutoCAD signature block for drawing approvals. (08/04/21) Approved PTO forms. Review/Approved designers timesheets. Update call with Lam. Update call with Kyle. Redlined TSR distribution list and discussed with Lam. Updated weekly timesheet and submitted for approval. (08/05/21) Update call with Kyle. (08/06/21) Worked on cleaning up drawing files under rig 249L archive folder (drawing file renaming to match current standards.) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-06 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 3 0 (08/06/21) Updates to 249L lift plan. Reviewed with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-09 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 5.25 0 (08/09/21) Updates to 122L drawings. (08/11/21) Saved additional LP mud info from the field. (08/12/21) Updates to LP mud based on latest field info. (08/13/21) Call with Tyler to review 122L LP mud system. Worked on drawing changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 (08/09/21) Updated weekly timesheet and submitted for approval. Update call with Kyle. Reviewed/approved designer timesheets. Update call with Tyler. (08/10/21) Update call with Kyle. Update call with Lam. Call with Lam to discuss rig floor GAs. Pulled various rig floor drawings per request from Chris. (08/11/21) Update call with Jorge. Update call with Lam. Update call with Kyle. (08/12/21) Call with Kyle/Lam to discuss new software. Call with Lam to discuss PDF print settings. Update call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-09 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.25 0 (08/09/21) Weekly Sakh. update call. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 (08/09/21) Call with Tyler to discuss Berkut drawing redlines. (08/10/21) Checked 209L drawing list and verified revision levels for Tyler. (08/13/21) Signed berkut drawings and sent for approval. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-09 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.25 0 (08/09/21) Sent new 249L lift plans to filed. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-09 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.5 0 (08/09/21) Call with Al Mingo to discuss Rig122L LP mud system. (08/10/21) Saved new filed comments to the Q. Started new rig grounding plan drawing for 122L based on field info. (08/11/21) Finalized 122L grounding plan. (08/12/21) Started 165L grounding plan. Compared plot plan info from filed Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (08/09/21) Updated weekly timesheet and submitted for approval. Update call with Kyle. Reviewed/approved designer timesheets. Update call with Tyler. (08/10/21) Update call with Kyle. Update call with Lam. Call with Lam to discuss rig floor GAs. Pulled various rig floor drawings per request from Chris. (08/11/21) Update call with Jorge. Update call with Lam. Update call with Kyle. (08/12/21) Call with Kyle/Lam to discuss new software. Call with Lam to discuss PDF print settings. Update call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (08/09/21) Call with Tyler to discuss Berkut drawing redlines. (08/10/21) Checked 209L drawing list and verified revision levels for Tyler. (08/13/21) Signed berkut drawings and sent for approval. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-10 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 5.5 0 (08/09/21) Call with Al Mingo to discuss Rig122L LP mud system. (08/10/21) Saved new filed comments to the Q. Started new rig grounding plan drawing for 122L based on field info. (08/11/21) Finalized 122L grounding plan. (08/12/21) Started 165L grounding plan. Compared plot plan info from filed Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-11 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 0.5 0 (08/09/21) Updates to 122L drawings. (08/11/21) Saved additional LP mud info from the field. (08/12/21) Updates to LP mud based on latest field info. (08/13/21) Call with Tyler to review 122L LP mud system. Worked on drawing changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (08/09/21) Updated weekly timesheet and submitted for approval. Update call with Kyle. Reviewed/approved designer timesheets. Update call with Tyler. (08/10/21) Update call with Kyle. Update call with Lam. Call with Lam to discuss rig floor GAs. Pulled various rig floor drawings per request from Chris. (08/11/21) Update call with Jorge. Update call with Lam. Update call with Kyle. (08/12/21) Call with Kyle/Lam to discuss new software. Call with Lam to discuss PDF print settings. Update call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-11 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 6.75 0 (08/09/21) Call with Al Mingo to discuss Rig122L LP mud system. (08/10/21) Saved new filed comments to the Q. Started new rig grounding plan drawing for 122L based on field info. (08/11/21) Finalized 122L grounding plan. (08/12/21) Started 165L grounding plan. Compared plot plan info from filed Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-12 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 5.25 0 (08/09/21) Updates to 122L drawings. (08/11/21) Saved additional LP mud info from the field. (08/12/21) Updates to LP mud based on latest field info. (08/13/21) Call with Tyler to review 122L LP mud system. Worked on drawing changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (08/09/21) Updated weekly timesheet and submitted for approval. Update call with Kyle. Reviewed/approved designer timesheets. Update call with Tyler. (08/10/21) Update call with Kyle. Update call with Lam. Call with Lam to discuss rig floor GAs. Pulled various rig floor drawings per request from Chris. (08/11/21) Update call with Jorge. Update call with Lam. Update call with Kyle. (08/12/21) Call with Kyle/Lam to discuss new software. Call with Lam to discuss PDF print settings. Update call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-12 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 2 0 (08/09/21) Call with Al Mingo to discuss Rig122L LP mud system. (08/10/21) Saved new filed comments to the Q. Started new rig grounding plan drawing for 122L based on field info. (08/11/21) Finalized 122L grounding plan. (08/12/21) Started 165L grounding plan. Compared plot plan info from filed Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-13 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 4.75 0 (08/09/21) Updates to 122L drawings. (08/11/21) Saved additional LP mud info from the field. (08/12/21) Updates to LP mud based on latest field info. (08/13/21) Call with Tyler to review 122L LP mud system. Worked on drawing changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 (08/09/21) Updated weekly timesheet and submitted for approval. Update call with Kyle. Reviewed/approved designer timesheets. Update call with Tyler. (08/10/21) Update call with Kyle. Update call with Lam. Call with Lam to discuss rig floor GAs. Pulled various rig floor drawings per request from Chris. (08/11/21) Update call with Jorge. Update call with Lam. Update call with Kyle. (08/12/21) Call with Kyle/Lam to discuss new software. Call with Lam to discuss PDF print settings. Update call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 (08/09/21) Call with Tyler to discuss Berkut drawing redlines. (08/10/21) Checked 209L drawing list and verified revision levels for Tyler. (08/13/21) Signed berkut drawings and sent for approval. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (08/16/21) Update call with Kyle. (08/17/21) Update weekly timesheet and submitted for approval. Update call with lam. Update call with Jorge. (08/18/21) Approved designer PTO forms and submitted. (08/19/21) Discussed Team meetings with Tyler. Installed Teams software. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-16 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 (08/16/21) New drawing packages for Hunt Oil - Romania (Rigs 265/269L) Updated each drawing titleblock to latest version. (08/17/21) Finalized drawing packages. Sent for information. (08/18/21) Reviewed hazardous area plans with Kyle. Checked previous haz area plans for reference. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-17 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 3 0 (08/17/21) Finalized 122L LP mud. Searched for 122L HP mud information. (08/18/21) Reviewed 165L plot plan information. (08/20/21) Started new drawing for rig 122L HP mud system. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 (08/16/21) Update call with Kyle. (08/17/21) Update weekly timesheet and submitted for approval. Update call with lam. Update call with Jorge. (08/18/21) Approved designer PTO forms and submitted. (08/19/21) Discussed Team meetings with Tyler. Installed Teams software. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 3 0 (08/16/21) New drawing packages for Hunt Oil - Romania (Rigs 265/269L) Updated each drawing titleblock to latest version. (08/17/21) Finalized drawing packages. Sent for information. (08/18/21) Reviewed hazardous area plans with Kyle. Checked previous haz area plans for reference. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-18 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 2.75 0 (08/17/21) Finalized 122L LP mud. Searched for 122L HP mud information. (08/18/21) Reviewed 165L plot plan information. (08/20/21) Started new drawing for rig 122L HP mud system. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (08/16/21) Update call with Kyle. (08/17/21) Update weekly timesheet and submitted for approval. Update call with lam. Update call with Jorge. (08/18/21) Approved designer PTO forms and submitted. (08/19/21) Discussed Team meetings with Tyler. Installed Teams software. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2.5 0 (08/16/21) New drawing packages for Hunt Oil - Romania (Rigs 265/269L) Updated each drawing titleblock to latest version. (08/17/21) Finalized drawing packages. Sent for information. (08/18/21) Reviewed hazardous area plans with Kyle. Checked previous haz area plans for reference. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-18 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 3 0 (08/18/21) Started checking 256L grounding plan. (08/19/21) Finalized drawing review for 256L. Sent comments to Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 (08/19/21) TRS workshop. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (08/16/21) Update call with Kyle. (08/17/21) Update weekly timesheet and submitted for approval. Update call with lam. Update call with Jorge. (08/18/21) Approved designer PTO forms and submitted. (08/19/21) Discussed Team meetings with Tyler. Installed Teams software. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-19 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 4 0 (08/18/21) Started checking 256L grounding plan. (08/19/21) Finalized drawing review for 256L. Sent comments to Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-20 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 6 0 (08/17/21) Finalized 122L LP mud. Searched for 122L HP mud information. (08/18/21) Reviewed 165L plot plan information. (08/20/21) Started new drawing for rig 122L HP mud system. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-23 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 2.5 0 (08/23/21)122L HP mud schematic. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (08/23/21) Update call with Kyle. (08/24/21) Review/approve designer timesheets. Update call with Kyle. Call with Prolim - software vendor. (08/25/21) Call with Jorge. Updated weekly timesheet and submitted for approval. (08/26/21) Call with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 (08/23/21) Call to review Berkut anchor beam. (Loadmaster) (08/25/21) Call - 209L automation call/TSR review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-23 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 5.25 0 (08/23/21) Reviewed new request for a man basket lift plan. Researched info for basket layout. Started new layout of man basket. (08/24/21 - 08/30/21) Continued work on basket lift plan. researched basket weight. Added load tables to drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 (08/24/21) Operations - town hall meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (08/23/21) Update call with Kyle. (08/24/21) Review/approve designer timesheets. Update call with Kyle. Call with Prolim - software vendor. (08/25/21) Call with Jorge. Updated weekly timesheet and submitted for approval. (08/26/21) Call with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-24 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 6 0 (08/23/21) Reviewed new request for a man basket lift plan. Researched info for basket layout. Started new layout of man basket. (08/24/21 - 08/30/21) Continued work on basket lift plan. researched basket weight. Added load tables to drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 (08/23/21) Update call with Kyle. (08/24/21) Review/approve designer timesheets. Update call with Kyle. Call with Prolim - software vendor. (08/25/21) Call with Jorge. Updated weekly timesheet and submitted for approval. (08/26/21) Call with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-25 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 5.75 0 (08/25/21) Searched for 51B elevation views/information. Started layout for Air products Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 (08/23/21) Call to review Berkut anchor beam. (Loadmaster) (08/25/21) Call - 209L automation call/TSR review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (08/23/21) Update call with Kyle. (08/24/21) Review/approve designer timesheets. Update call with Kyle. Call with Prolim - software vendor. (08/25/21) Call with Jorge. Updated weekly timesheet and submitted for approval. (08/26/21) Call with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-26 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 8 0 (08/26/21) Checked latest grounding plan for rig 256L. Sent info to Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-08-27 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 6 0 (08/23/21) Reviewed new request for a man basket lift plan. Researched info for basket layout. Started new layout of man basket. (08/24/21 - 08/30/21) Continued work on basket lift plan. researched basket weight. Added load tables to drawing. Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-02 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-03 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-04 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-05 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-06 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-07 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-08 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-09 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-10 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-11 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-12 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-13 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 4 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-16 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 8 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-17 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-18 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-19 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-20 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-21 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-22 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-23 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-24 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-25 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-26 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 12 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-27 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 8 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-29 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-30 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-08-31 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 9 0 Monitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-01 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.5 0 Walking down rig; supporting rig-up efforts; PO approval; PO status discussion with EJ; reviewing completed MOC's Logan Industries Discuss staffing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-01 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 0.5 0 Planning for 209L Automation Upgrade Berkut Clamp Design (changes requested by Ops) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-01 OH-010 :OH-010 OH-010-05 Arctic, North America Offshore (ANAO) Regular Pay N 4 0 HOU to LA and return Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-02 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 5 0 Walking down rig; supporting rig-up efforts; PO approval; PO status discussion with EJ; reviewing completed MOC's Logan Industries Discuss staffing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-02 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 0.75 0 Fuel data entered into spreadsheet Operating days - pulled from Hyperion and input into spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Timesheet approvals SAK invoicing Personnel forecast CC with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-02 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 0.5 0 Planning for 209L Automation Upgrade Berkut Clamp Design (changes requested by Ops) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-02 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 1.5 0 Hunt Oil Romania Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-03 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 Walking down rig; supporting rig-up efforts; PO approval; PO status discussion with EJ; reviewing completed MOC's Logan Industries Discuss staffing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-03 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 0.75 0 Fuel data entered into spreadsheet Operating days - pulled from Hyperion and input into spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Intellie Conference Call / Presentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 Timesheet approvals SAK invoicing Personnel forecast CC with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-03 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1.5 0 Planning for 209L Automation Upgrade Berkut Clamp Design (changes requested by Ops) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-03 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 1.5 0 Hunt Oil Romania Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-04 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.5 0 Walking down rig; supporting rig-up efforts; PO approval; PO status discussion with EJ; reviewing completed MOC's Logan Industries Discuss staffing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-04 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 1 0 Fuel data entered into spreadsheet Operating days - pulled from Hyperion and input into spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheet approvals SAK invoicing Personnel forecast CC with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-04 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 Planning for 209L Automation Upgrade Berkut Clamp Design (changes requested by Ops) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-04 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 0.75 0 Hunt Oil Romania Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-04 OH-010 :OH-010 OH-010-05 Arctic, North America Offshore (ANAO) Regular Pay N 4 0 HOU to LA and return Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-05 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.25 0 Walking down rig; supporting rig-up efforts; PO approval; PO status discussion with EJ; reviewing completed MOC's Logan Industries Discuss staffing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-05 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 0.75 0 Fuel data entered into spreadsheet Operating days - pulled from Hyperion and input into spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 Intellie Conference Call / Presentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet approvals SAK invoicing Personnel forecast CC with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-05 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 Planning for 209L Automation Upgrade Berkut Clamp Design (changes requested by Ops) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-05 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 0.5 0 Exxon Diana Hoover Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-05 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 0.5 0 Hunt Oil Romania Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-05 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 TBPELS Ethics Webinar for PE License CE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-05 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 1 0 Review /comment on closout and analysis report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-06 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Walking down rig; supporting rig-up efforts; PO approval; PO status discussion with EJ; reviewing completed MOC's Logan Industries Discuss staffing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-06 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 0.5 0 Fuel data entered into spreadsheet Operating days - pulled from Hyperion and input into spreadsheet Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 Timesheet approvals SAK invoicing Personnel forecast CC with direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-06 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 Planning for 209L Automation Upgrade Berkut Clamp Design (changes requested by Ops) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-06 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1.5 0 Exxon Diana Hoover Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-06 Rig 249L-TSR :Rig 249L-TSR TSR-01769-249L BOP Transport Frame Regular Pay N 1 0 Review /comment on closout and analysis report Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 August HTSG Hours Summary and Report Budget/Forecast Review (for Arturo P.) Personnel discussion with Arturo Weekly Update for HTSG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-09 Berkut-TSR :Berkut-TSR TSR-01789-BERP HP Cement Line Replacement Regular Pay N 0.5 0 Review submitted documentation Outline for Closeout Discuss with Mihovil Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-09 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 4.5 0 Rebuilding Fuel Usage Spreadsheet CC with Chelsi U. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 August HTSG Hours Summary and Report Budget/Forecast Review (for Arturo P.) Personnel discussion with Arturo Weekly Update for HTSG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-09 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1.5 0 Chevron Bangladesh Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-09 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 Weekly Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.25 0 Automation Project Planning BERKUT - TSR-01770 Drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-10 Berkut-TSR :Berkut-TSR TSR-01789-BERP HP Cement Line Replacement Regular Pay N 0.5 0 Review submitted documentation Outline for Closeout Discuss with Mihovil Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-10 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 1 0 Rebuilding Fuel Usage Spreadsheet CC with Chelsi U. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 CC with Trevor CC with John Reck Weekly meeting with AP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 NOV Audit at North Eldridge Facility Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 August HTSG Hours Summary and Report Budget/Forecast Review (for Arturo P.) Personnel discussion with Arturo Weekly Update for HTSG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-10 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1.5 0 Exxon Hoover Diana Presentation Equinor ATP Titan SPAR Presentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-11 Berkut-TSR :Berkut-TSR TSR-01789-BERP HP Cement Line Replacement Regular Pay N 1 0 Review submitted documentation Outline for Closeout Discuss with Mihovil Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-11 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 PO approval Tekla Software Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 CC with Trevor CC with John Reck Weekly meeting with AP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 August HTSG Hours Summary and Report Budget/Forecast Review (for Arturo P.) Personnel discussion with Arturo Weekly Update for HTSG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-11 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 0.5 0 Willow Project Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-11 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1.5 0 Chevron Bangladesh Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Automation Project Planning BERKUT - TSR-01770 Drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-11 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1.25 0 265L valve / drill pipe testing (documentation support) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-12 Berkut-TSR :Berkut-TSR TSR-01789-BERP HP Cement Line Replacement Regular Pay N 1 0 Review submitted documentation Outline for Closeout Discuss with Mihovil Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-12 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.5 0 PO approval Tekla Software Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-12 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 0.75 0 Rebuilding Fuel Usage Spreadsheet CC with Chelsi U. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 August HTSG Hours Summary and Report Budget/Forecast Review (for Arturo P.) Personnel discussion with Arturo Weekly Update for HTSG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-12 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Willow Project Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-12 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 0.75 0 Exxon Hoover Diana Presentation Equinor ATP Titan SPAR Presentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-12 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 Chevron Bangladesh Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Automation Project Planning BERKUT - TSR-01770 Drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-13 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 PO approval Tekla Software Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-13 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 0.75 0 Rebuilding Fuel Usage Spreadsheet CC with Chelsi U. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 CC with Trevor CC with John Reck Weekly meeting with AP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-13 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 0.75 0 Willow Project Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-13 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 0.5 0 Exxon Hoover Diana Presentation Equinor ATP Titan SPAR Presentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-13 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1.5 0 Chevron Bangladesh Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Automation Project Planning BERKUT - TSR-01770 Drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-14 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 PO approval Tekla Software Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-14 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 1 0 Hunt Oil Tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-15 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 CAT C32 Data PO Approvals Status updates Tekla Software Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 Timesheet and approvals Personnel email (TE) sent to Arturo Perez Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-15 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 1.5 0 Hunt Oil Tender Documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-16 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 CAT C32 Data PO Approvals Status updates Tekla Software Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-16 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 1 0 Finalizing spreadhseet Reviewing case study Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-16 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 CC's related to personnel / future projects Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet and approvals Personnel email (TE) sent to Arturo Perez Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-16 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 0.75 0 Titan Spar Presentation Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-16 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 CVX Bangladesh Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 CC's related to Automation project Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-16 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.75 0 Electrical support for Rig 265 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-16 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 0.5 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet and approvals Personnel email (TE) sent to Arturo Perez Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-17 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 USRC Reception - OTC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-17 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 CVX Bangladesh Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-17 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 1.25 0 Hunt Oil Tender Documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 CC's related to Automation project Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-17 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 1 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-18 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.25 0 CAT C32 Data PO Approvals Status updates Tekla Software Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-18 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 0.75 0 Finalizing spreadhseet Reviewing case study Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet and approvals Personnel email (TE) sent to Arturo Perez Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-18 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1.5 0 CVX Bangladesh Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-18 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 0.75 0 Hunt Oil Tender Documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 CC's related to Automation project Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-18 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.75 0 Electrical support for Rig 265 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-18 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 0.5 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-19 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 CAT C32 Data PO Approvals Status updates Tekla Software Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-19 HTSG-TSR :HTSG-TSR TSR-01781-HTSG ESG Annual Report Regular Pay N 0.25 0 Finalizing spreadhseet Reviewing case study Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet and approvals Personnel email (TE) sent to Arturo Perez Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-19 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 0.75 0 Hunt Oil Tender Documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-19 OH-014 :OH-014 Overhead All Activities Regular Pay N 4 0 One Parker TRS Rig Integration Workshop Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-19 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 0.5 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-20 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 CAT C32 Data PO Approvals Status updates Tekla Software Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-21 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.75 0 CAT C32 Data PO Approvals Status updates Tekla Software Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-22 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 PO approvals Personnel planning Vendor onboarding Storm preparations Safety factor info to CVX Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-23 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.25 0 PO approvals Personnel planning Vendor onboarding Storm preparations Safety factor info to CVX Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 2.5 0 Service Delivery Meeting Service Delivery and ANAO Meeting Personnel Discussion with AP Monthly Global O&M + Services Town Hall Meeting General meeting with MQ Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 CC with Direct reports Reviewing allocations CC with Mark Todd RE allocations Timesheet approvals HTSG updates to AP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-23 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 On-going Willow discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-23 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 Chevron Bangladesh Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-23 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 Weekly call Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 CC with Bohon CC with Mio General TSR support Automation Support (209L) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-23 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 1 0 Emails / calls with ABS and vendors Setting up project folders Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-24 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 PO approvals Personnel planning Vendor onboarding Storm preparations Safety factor info to CVX Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.75 0 Service Delivery Meeting Service Delivery and ANAO Meeting Personnel Discussion with AP Monthly Global O&M + Services Town Hall Meeting General meeting with MQ Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 CC with Direct reports Reviewing allocations CC with Mark Todd RE allocations Timesheet approvals HTSG updates to AP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-24 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 Chevron Bangladesh Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-24 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 1.5 0 Hunt Oil Tender (Romania) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-24 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 CC with Bohon CC with Mio General TSR support Automation Support (209L) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-24 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 249L Lift Plan(s) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-24 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 1.25 0 Emails / calls with ABS and vendors Setting up project folders Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-25 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.5 0 PO approvals Personnel planning Vendor onboarding Storm preparations Safety factor info to CVX Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 Service Delivery Meeting Service Delivery and ANAO Meeting Personnel Discussion with AP Monthly Global O&M + Services Town Hall Meeting General meeting with MQ Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 CC with Direct reports Reviewing allocations CC with Mark Todd RE allocations Timesheet approvals HTSG updates to AP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-25 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 Air Products proposal for 51B Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-25 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 Chevron Bangladesh Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 CC with Bohon CC with Mio General TSR support Automation Support (209L) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-25 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 249L Lift Plan(s) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-25 OH-036 :OH-036 OH-036-01 Technology Think Tank Regular Pay N 1 0 Monthly meeting and discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-25 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 1 0 Emails / calls with ABS and vendors Setting up project folders Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-26 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 PO approvals Personnel planning Vendor onboarding Storm preparations Safety factor info to CVX Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Service Delivery Meeting Service Delivery and ANAO Meeting Personnel Discussion with AP Monthly Global O&M + Services Town Hall Meeting General meeting with MQ Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 CC with Direct reports Reviewing allocations CC with Mark Todd RE allocations Timesheet approvals HTSG updates to AP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-26 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 0.5 0 Chevron Bangladesh Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-26 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 1.25 0 Hunt Oil Tender (Romania) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 CC with Bohon CC with Mio General TSR support Automation Support (209L) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-26 OH-036 :OH-036 OH-036-01 Technology Think Tank Regular Pay N 0.5 0 Monthly meeting and discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-26 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 1 0 Emails / calls with ABS and vendors Setting up project folders Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-27 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2.75 0 PO approvals Personnel planning Vendor onboarding Storm preparations Safety factor info to CVX Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 CC with Direct reports Reviewing allocations CC with Mark Todd RE allocations Timesheet approvals HTSG updates to AP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-27 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 0.5 0 Chevron Bangladesh Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 CC with Bohon CC with Mio General TSR support Automation Support (209L) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-27 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 249L Lift Plan(s) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-08-27 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 0.75 0 Emails / calls with ABS and vendors Setting up project folders Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-02 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2.5 0 08/02: handrail clarifications; clash check 08/06: check clearance between spider and air can Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 08/02: timesheets to ProjXsense 08/02-04: continue drafting book updates 08/04: update call with James Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-02 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 08/02: generate report for Helen from Sakhalin billable TSR hours 08/03: reserve drawing number request. 08/04: transmit TSR-01769-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-02 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 08/02: weekly call with Sakhalin to discuss ongoing TSR progress and updates. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 7.25 0 08/02: timesheets to ProjXsense 08/02-04: continue drafting book updates 08/04: update call with James Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-03 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 08/02: generate report for Helen from Sakhalin billable TSR hours 08/03: reserve drawing number request. 08/04: transmit TSR-01769-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 6.5 0 08/02: timesheets to ProjXsense 08/02-04: continue drafting book updates 08/04: update call with James Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-04 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 08/02: generate report for Helen from Sakhalin billable TSR hours 08/03: reserve drawing number request. 08/04: transmit TSR-01769-DWG Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 08/05: bi-weekly HTSG Conference Call to discuss ongoing TSR work and updates. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6 0 08/05: all with Kyle, James, and Tyler to discuss CTR hours for TSR-01752 Automation Upgrade; review progress on TSR before cancellation Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-06 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 6 0 08/06: generate updated renders for BD group Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-06 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2 0 08/02: handrail clarifications; clash check 08/06: check clearance between spider and air can Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-09 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 08/09: correspondence with Trimble regarding Tekla quote for Genesis. 08/13: meeting with Kyle to discuss Tekla software compatibility. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-09 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 3 0 08/09: render various views of the rig; pull dimensions of HPU room 08/11-13: continue drawings of plan views of the rig for gaitronics/camera locations Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-09 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 1 0 08/09-10: complete ACAD lisp routines and menu customization for RUSA/RUSD; continue with updates to drafting handbook. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 08/09: timesheet to Payroll and ProjXsense 08-10: weekly conversation with James regarding updates and progress. 08/12: assist James/Jorge with RUSA/RUSD plot styles. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-09 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 08/09: transmit TSR-01789-CTR 08/10: process incoming TSR transmittal 08/12: transmit TSR-01789-CO 08/13: process incoming TSR transmittals; transmit TSR-01752-CTR-R1; TSR-01770-DWG-R1 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-09 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 08/09: weekly call with Sakhalin to discuss ongoing TSR progress and updates. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-10 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 6.5 0 08/09-10: complete ACAD lisp routines and menu customization for RUSA/RUSD; continue with updates to drafting handbook. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 08/09: timesheet to Payroll and ProjXsense 08-10: weekly conversation with James regarding updates and progress. 08/12: assist James/Jorge with RUSA/RUSD plot styles. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-10 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 08/09: transmit TSR-01789-CTR 08/10: process incoming TSR transmittal 08/12: transmit TSR-01789-CO 08/13: process incoming TSR transmittals; transmit TSR-01752-CTR-R1; TSR-01770-DWG-R1 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-11 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-12 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 5 0 08/09: render various views of the rig; pull dimensions of HPU room 08/11-13: continue drawings of plan views of the rig for gaitronics/camera locations Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 08/09: timesheet to Payroll and ProjXsense 08-10: weekly conversation with James regarding updates and progress. 08/12: assist James/Jorge with RUSA/RUSD plot styles. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 08/09: transmit TSR-01789-CTR 08/10: process incoming TSR transmittal 08/12: transmit TSR-01789-CO 08/13: process incoming TSR transmittals; transmit TSR-01752-CTR-R1; TSR-01770-DWG-R1 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 08/12: email correspondence with Sakhalin Document Control regarding finding latest drawing revisions. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-13 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 08/09: correspondence with Trimble regarding Tekla quote for Genesis. 08/13: meeting with Kyle to discuss Tekla software compatibility. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-13 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 4.5 0 08/09: render various views of the rig; pull dimensions of HPU room 08/11-13: continue drawings of plan views of the rig for gaitronics/camera locations Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-13 OH-013 :OH-013 Overhead All Activities Regular Pay N 3 0 08/09: transmit TSR-01789-CTR 08/10: process incoming TSR transmittal 08/12: transmit TSR-01789-CO 08/13: process incoming TSR transmittals; transmit TSR-01752-CTR-R1; TSR-01770-DWG-R1 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-16 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 4.5 0 08/16-17: complete CAD sketches of gaitronics plan views and camera locations 08/20: meeting with Joshua to update model with new AC for driller's cabin Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 08/16: timesheet to ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 08/16: transmit TSR-01635-CO 08/18: process incoming transmittal documents Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-16 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 08/16: weekly call with Sakhalin to discuss ongoing TSR progress and updates. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-17 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 7 0 08/16-17: complete CAD sketches of gaitronics plan views and camera locations 08/20: meeting with Joshua to update model with new AC for driller's cabin Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-17 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 1 0 drafting handbook goals Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-18 Berkut-TSR :Berkut-TSR TSR-01785-BERP Anchor Beam for Control Lines Sheaves Regular Pay N 0.5 0 08/18: meeting with Kyle to discuss TSR-01785 08/20: email correspondence with LM to setup kick-off meeting and meeting materials. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-18 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 6.75 0 drafting handbook goals Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-18 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 08/16: transmit TSR-01635-CO 08/18: process incoming transmittal documents Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-19 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 8 0 drafting handbook goals Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-20 Berkut-TSR :Berkut-TSR TSR-01785-BERP Anchor Beam for Control Lines Sheaves Regular Pay N 2 0 08/18: meeting with Kyle to discuss TSR-01785 08/20: email correspondence with LM to setup kick-off meeting and meeting materials. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-20 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 5 0 08/16-17: complete CAD sketches of gaitronics plan views and camera locations 08/20: meeting with Joshua to update model with new AC for driller's cabin Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-20 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 1 0 drafting handbook goals Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-23 Berkut-TSR :Berkut-TSR TSR-01785-BERP Anchor Beam for Control Lines Sheaves Regular Pay N 1.5 0 08/23: kick-off meeting with Loadmaster regarding TSR-01785 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-23 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2.5 0 model inquiries regarding dimensions and sizes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-23 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 1 0 continue revision of drafting handbook Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 08/23: timesheet to ProjXsense and payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-23 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 08/23: transmit TSR-01770-CO 08/26: reserve TSR and create folder Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-23 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 08/23: weekly call with Sakhalin to discuss ongoing TSR progress and updates. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-24 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1.5 0 model inquiries regarding dimensions and sizes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-24 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 4 0 continue revision of drafting handbook Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 08/24: Global Operations Town Hall Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-24 Rig 209L-TSR :Rig 209L-TSR TSR-01752-209L Automation Upgrade Regular Pay N 1 0 08/24: meeting with Kyle, Tyler, & James to discuss scope of work, and feasibility 08/25: follow-up meeting to review model of 209L and discuss plans moving forward Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 minor updates to 209L compiled model. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-25 Rig 209L-TSR :Rig 209L-TSR TSR-01752-209L Automation Upgrade Regular Pay N 5 0 08/24: meeting with Kyle, Tyler, & James to discuss scope of work, and feasibility 08/25: follow-up meeting to review model of 209L and discuss plans moving forward Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-26 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 08/23: transmit TSR-01770-CO 08/26: reserve TSR and create folder Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.25 0 minor updates to 209L compiled model. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-26 Rig 209L-TSR :Rig 209L-TSR TSR-01752-209L Automation Upgrade Regular Pay N 5.25 0 08/24: meeting with Kyle, Tyler, & James to discuss scope of work, and feasibility 08/25: follow-up meeting to review model of 209L and discuss plans moving forward Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-27 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2 0 model inquiries regarding dimensions and sizes. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-27 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 3 0 continue revision of drafting handbook Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-08-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 minor updates to 209L compiled model. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-01 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 0.5 0 Host clarification meetings with Lamprell, Loadmaster, Lee C Moore for CVX Bangladesh mast RFQ's. Review Shell Brunei rig options with MEAP. Attend Exxpro Malaysia MOPU opportunity meeting and perform MOPU market research for available jackup asset. Clarification meeting with CEEM for CVX Bangladesh cost estimate. Continue developing Rig 269 cost estimate and schedule for CVX Bangladesh. Review CVX Bangladesh communications and take Star Energy newbuild phone call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly predictive maintenance mtg. Attend T. Faldyn RAPID training. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-02 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Prepare Slb ppt slide. Attend SLB IPM workshop for COP Willow and Oil Search IPM opportunities Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-02 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 4 0 Host clarification meetings with Lamprell, Loadmaster, Lee C Moore for CVX Bangladesh mast RFQ's. Review Shell Brunei rig options with MEAP. Attend Exxpro Malaysia MOPU opportunity meeting and perform MOPU market research for available jackup asset. Clarification meeting with CEEM for CVX Bangladesh cost estimate. Continue developing Rig 269 cost estimate and schedule for CVX Bangladesh. Review CVX Bangladesh communications and take Star Energy newbuild phone call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-02 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 3 0 Attend Hunt oil tender meeting. Search for rig options and gather 269, 265 equipment lists, asset lists. Review Hunt OIl ITT tech requirements. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-03 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 3 0 Prepare Slb ppt slide. Attend SLB IPM workshop for COP Willow and Oil Search IPM opportunities Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-03 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 4 0 Host clarification meetings with Lamprell, Loadmaster, Lee C Moore for CVX Bangladesh mast RFQ's. Review Shell Brunei rig options with MEAP. Attend Exxpro Malaysia MOPU opportunity meeting and perform MOPU market research for available jackup asset. Clarification meeting with CEEM for CVX Bangladesh cost estimate. Continue developing Rig 269 cost estimate and schedule for CVX Bangladesh. Review CVX Bangladesh communications and take Star Energy newbuild phone call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-03 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 2 0 Attend Hunt oil tender meeting. Search for rig options and gather 269, 265 equipment lists, asset lists. Review Hunt OIl ITT tech requirements. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-03 OH-036 :OH-036 TSR-01788 HTSG-RTOC-Project Regular Pay N 1 0 Attend RigNet presentation. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly predictive maintenance mtg. Attend T. Faldyn RAPID training. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-04 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 9 0 Host clarification meetings with Lamprell, Loadmaster, Lee C Moore for CVX Bangladesh mast RFQ's. Review Shell Brunei rig options with MEAP. Attend Exxpro Malaysia MOPU opportunity meeting and perform MOPU market research for available jackup asset. Clarification meeting with CEEM for CVX Bangladesh cost estimate. Continue developing Rig 269 cost estimate and schedule for CVX Bangladesh. Review CVX Bangladesh communications and take Star Energy newbuild phone call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-04 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 1 0 Attend Hunt oil tender meeting. Search for rig options and gather 269, 265 equipment lists, asset lists. Review Hunt OIl ITT tech requirements. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-05 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Prepare Slb ppt slide. Attend SLB IPM workshop for COP Willow and Oil Search IPM opportunities Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-05 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 2 0 Attend SLB IPM workshop for Sinopec Canada IPM opportunities. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-05 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 Continue developing Exxon Hoover Diana CDPU presentation. Attend SLB IPM workshop for GOM TLP IPM opportunities Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-05 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 4 0 Host clarification meetings with Lamprell, Loadmaster, Lee C Moore for CVX Bangladesh mast RFQ's. Review Shell Brunei rig options with MEAP. Attend Exxpro Malaysia MOPU opportunity meeting and perform MOPU market research for available jackup asset. Clarification meeting with CEEM for CVX Bangladesh cost estimate. Continue developing Rig 269 cost estimate and schedule for CVX Bangladesh. Review CVX Bangladesh communications and take Star Energy newbuild phone call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-05 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 1 0 Attend SLB IPM workshop for Space X TX IPM opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-06 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 5 0 Continue developing Exxon Hoover Diana CDPU presentation. Attend SLB IPM workshop for GOM TLP IPM opportunities Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-06 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 3 0 Host clarification meetings with Lamprell, Loadmaster, Lee C Moore for CVX Bangladesh mast RFQ's. Review Shell Brunei rig options with MEAP. Attend Exxpro Malaysia MOPU opportunity meeting and perform MOPU market research for available jackup asset. Clarification meeting with CEEM for CVX Bangladesh cost estimate. Continue developing Rig 269 cost estimate and schedule for CVX Bangladesh. Review CVX Bangladesh communications and take Star Energy newbuild phone call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-06 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 1 0 Attend Hunt oil tender meeting. Search for rig options and gather 269, 265 equipment lists, asset lists. Review Hunt OIl ITT tech requirements. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-07 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 Host clarification meetings with Lamprell, Loadmaster, Lee C Moore for CVX Bangladesh mast RFQ's. Review Shell Brunei rig options with MEAP. Attend Exxpro Malaysia MOPU opportunity meeting and perform MOPU market research for available jackup asset. Clarification meeting with CEEM for CVX Bangladesh cost estimate. Continue developing Rig 269 cost estimate and schedule for CVX Bangladesh. Review CVX Bangladesh communications and take Star Energy newbuild phone call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-09 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 9 0 Meet with Wfd for Shell Brunei EOI HWO dry-lease option. Meet with NOV for CVX bangladesh quote clarifications. Meet with Ocean Oilfield for technical clarifications. Assemble rig 269 cost estimate and schedule. Met with CVX to review 269 cost estimate and schedule. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-09 OH-036 :OH-036 TSR-01788 HTSG-RTOC-Project Regular Pay N 1 0 Review RTOC actions with T. Faldyn. Various comms. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-10 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 5 0 Meet with XOM to present Hoover Diana CDPU feasability study fopr CDPU 2027 P&A option. Meet with K. Slusarchuk for GOM O&M opportunity options. Meet for Equinor and Hess GOM presentations. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-10 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 5 0 Meet with Wfd for Shell Brunei EOI HWO dry-lease option. Meet with NOV for CVX bangladesh quote clarifications. Meet with Ocean Oilfield for technical clarifications. Assemble rig 269 cost estimate and schedule. Met with CVX to review 269 cost estimate and schedule. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-11 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 9 0 Meet with Wfd for Shell Brunei EOI HWO dry-lease option. Meet with NOV for CVX bangladesh quote clarifications. Meet with Ocean Oilfield for technical clarifications. Assemble rig 269 cost estimate and schedule. Met with CVX to review 269 cost estimate and schedule. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-12 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 5 0 Meet with XOM to present Hoover Diana CDPU feasability study fopr CDPU 2027 P&A option. Meet with K. Slusarchuk for GOM O&M opportunity options. Meet for Equinor and Hess GOM presentations. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-12 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 4 0 Attend Hunt Oil tender status meeting. Review equipment list. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-13 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 7 0 Meet with Wfd for Shell Brunei EOI HWO dry-lease option. Meet with NOV for CVX bangladesh quote clarifications. Meet with Ocean Oilfield for technical clarifications. Assemble rig 269 cost estimate and schedule. Met with CVX to review 269 cost estimate and schedule. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-16 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 9 0 Bangladesh road survey results mtg and minutes. Assemble Mast RFQ tech/commercial excel file. Assemble Jelec mtg for Rig 253 camp power proposal. Review HWO options for Shell Brunei. Complete CVX Bangladesh Clarification #4. Issue HWO RFQs for Shell Brunei. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Tan Delta sensor mtg. Weekly Predictive Maintenance mtg. One Parker TRS workshop Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-17 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 8 0 Bangladesh road survey results mtg and minutes. Assemble Mast RFQ tech/commercial excel file. Assemble Jelec mtg for Rig 253 camp power proposal. Review HWO options for Shell Brunei. Complete CVX Bangladesh Clarification #4. Issue HWO RFQs for Shell Brunei. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Tan Delta sensor mtg. Weekly Predictive Maintenance mtg. One Parker TRS workshop Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-18 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 8.5 0 Bangladesh road survey results mtg and minutes. Assemble Mast RFQ tech/commercial excel file. Assemble Jelec mtg for Rig 253 camp power proposal. Review HWO options for Shell Brunei. Complete CVX Bangladesh Clarification #4. Issue HWO RFQs for Shell Brunei. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 5 0 Tan Delta sensor mtg. Weekly Predictive Maintenance mtg. One Parker TRS workshop Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-19 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 5 0 Bangladesh road survey results mtg and minutes. Assemble Mast RFQ tech/commercial excel file. Assemble Jelec mtg for Rig 253 camp power proposal. Review HWO options for Shell Brunei. Complete CVX Bangladesh Clarification #4. Issue HWO RFQs for Shell Brunei. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-20 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 6 0 Bangladesh road survey results mtg and minutes. Assemble Mast RFQ tech/commercial excel file. Assemble Jelec mtg for Rig 253 camp power proposal. Review HWO options for Shell Brunei. Complete CVX Bangladesh Clarification #4. Issue HWO RFQs for Shell Brunei. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-23 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 SDM meeting. Global Town Hall Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-23 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 8 0 Enter tech data in to Shell EOI proposal letter. Develop CVX Bangladesh Request for LOI and Clarification #5. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-24 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 9 0 Enter tech data in to Shell EOI proposal letter. Develop CVX Bangladesh Request for LOI and Clarification #5. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 SDM meeting. Global Town Hall Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-25 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 7 0 Enter tech data in to Shell EOI proposal letter. Develop CVX Bangladesh Request for LOI and Clarification #5. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-26 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 7 0 Enter tech data in to Shell EOI proposal letter. Develop CVX Bangladesh Request for LOI and Clarification #5. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-26 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 2 0 Norway NME meetring. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-08-27 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 6 0 Enter tech data in to Shell EOI proposal letter. Develop CVX Bangladesh Request for LOI and Clarification #5. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-02 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 8 0 Genesis Spar - Operator Cab replacement A/C unit - Copper pile QA Drawworks feedback cable QA. Rig pig tail extensions QA. convenience receptacles for genesis with Troy. Rexel quote reviewed - Rig floor Plug and Receptacle . Created MR for Rig floor plug/receptacle. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-03 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 8 0 Genesis Spar - Operator Cab replacement A/C unit - Copper pile QA Drawworks feedback cable QA. Rig pig tail extensions QA. convenience receptacles for genesis with Troy. Rexel quote reviewed - Rig floor Plug and Receptacle . Created MR for Rig floor plug/receptacle. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-04 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 8 0 Genesis Spar - Operator Cab replacement A/C unit - Copper pile QA Drawworks feedback cable QA. Rig pig tail extensions QA. convenience receptacles for genesis with Troy. Rexel quote reviewed - Rig floor Plug and Receptacle . Created MR for Rig floor plug/receptacle. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 209 Power issue close out initial report Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-05 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 3 0 229 Top Drive upgrade support. Rig 265 - Encoder Failure support. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-05 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Genesis Spar - Operator Cab replacement A/C unit - Copper pile QA Drawworks feedback cable QA. Rig pig tail extensions QA. convenience receptacles for genesis with Troy. Rexel quote reviewed - Rig floor Plug and Receptacle . Created MR for Rig floor plug/receptacle. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 209 Power issue close out initial report Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-06 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 4 0 229 Top Drive upgrade support. Rig 265 - Encoder Failure support. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-06 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Genesis Spar - Operator Cab replacement A/C unit - Copper pile QA Drawworks feedback cable QA. Rig pig tail extensions QA. convenience receptacles for genesis with Troy. Rexel quote reviewed - Rig floor Plug and Receptacle . Created MR for Rig floor plug/receptacle. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 209L Power Issue Closeout Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-09 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2 0 Rig 265 - Encoder Failure Again Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-09 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 5 0 Dryer Quote. Genesis Spar - 2D drawing for Gaitronics and Camera system. Genesis Spar - Gaitronics cable and Speaker Cable Genesis Spar - Royal Cable . Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-10 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 8 0 Dryer Quote. Genesis Spar - 2D drawing for Gaitronics and Camera system. Genesis Spar - Gaitronics cable and Speaker Cable Genesis Spar - Royal Cable . Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-11 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 8 0 Dryer Quote. Genesis Spar - 2D drawing for Gaitronics and Camera system. Genesis Spar - Gaitronics cable and Speaker Cable Genesis Spar - Royal Cable . Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-12 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 PKD-CleanDesign follow up Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-12 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Rig 265 - Encoder Failure Again Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-12 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 5 0 Dryer Quote. Genesis Spar - 2D drawing for Gaitronics and Camera system. Genesis Spar - Gaitronics cable and Speaker Cable Genesis Spar - Royal Cable . Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-13 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 PKD-CleanDesign follow up Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-13 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 7 0 Dryer Quote. Genesis Spar - 2D drawing for Gaitronics and Camera system. Genesis Spar - Gaitronics cable and Speaker Cable Genesis Spar - Royal Cable . Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-16 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Rig 265 -Top Drive Budgetary Quote for upgrading rig 265 communication system Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-16 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 7 0 Genesis Spar - 2D drawing for Gaitronics and Camera system. Genesis Spar - Emergency door light quote request. Loadmaster LED lights burned out issue Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-17 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 1 0 Rig 253 - Camp power. Indonesia power supply doc review Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-17 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 7 0 Genesis Spar - 2D drawing for Gaitronics and Camera system. Genesis Spar - Emergency door light quote request. Loadmaster LED lights burned out issue Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-18 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Rig 265 -Top Drive Budgetary Quote for upgrading rig 265 communication system Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-18 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 1 0 Rig 253 - Camp power. Indonesia power supply doc review Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-18 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 6 0 Genesis Spar - 2D drawing for Gaitronics and Camera system. Genesis Spar - Emergency door light quote request. Loadmaster LED lights burned out issue Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 4 0 Virtual One Parker TRS Rig Integration Workshop Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-19 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Genesis Spar - 2D drawing for Gaitronics and Camera system. Genesis Spar - Emergency door light quote request. Loadmaster LED lights burned out issue Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-23 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 3 0 Rig 265 - Top Drive AAR. Budgetary Quote for upgrading rig 265 communication system. Rig 269- Oracle work orders for AC Drilling Motors. MOC for Rig 269 VFD upgrade. Code compliance for sensors Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-23 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 5 0 Genesis Spar - Emergency door light QA. CDPU equipment grounding, Pending list for Genesis Spar. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-24 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 4 0 Rig 265 - Top Drive AAR. Budgetary Quote for upgrading rig 265 communication system. Rig 269- Oracle work orders for AC Drilling Motors. MOC for Rig 269 VFD upgrade. Code compliance for sensors Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-24 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Genesis Spar - Emergency door light QA. CDPU equipment grounding, Pending list for Genesis Spar. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-25 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2 0 Rig 265 - Top Drive AAR. Budgetary Quote for upgrading rig 265 communication system. Rig 269- Oracle work orders for AC Drilling Motors. MOC for Rig 269 VFD upgrade. Code compliance for sensors Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-25 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 6 0 Genesis Spar - Emergency door light QA. CDPU equipment grounding, Pending list for Genesis Spar. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-26 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2 0 Rig 265 - Top Drive AAR. Budgetary Quote for upgrading rig 265 communication system. Rig 269- Oracle work orders for AC Drilling Motors. MOC for Rig 269 VFD upgrade. Code compliance for sensors Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-26 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 6 0 Genesis Spar - Emergency door light QA. CDPU equipment grounding, Pending list for Genesis Spar. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-27 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 3 0 Rig 265 - Top Drive AAR. Budgetary Quote for upgrading rig 265 communication system. Rig 269- Oracle work orders for AC Drilling Motors. MOC for Rig 269 VFD upgrade. Code compliance for sensors Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-08-27 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 5 0 Genesis Spar - Emergency door light QA. CDPU equipment grounding, Pending list for Genesis Spar. Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Emails Timesheet Review tasks w/ J.G. (8/3/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-02 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting w/ Mio (8/2/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5 0 TSR - 01770 RUSD-PKE-T2-ND-27400.1018.001-.003 REV-C (8/2-3/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Review tasks w/ J.G. (8/3/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7 0 TSR - 01770 RUSD-PKE-T2-ND-27400.1018.001-.003 REV-C (8/2-3/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-04 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO (8/4-6/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO (8/4-6/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-06 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO (8/4-6/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-09 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 2 0 LABU 256L drawings (update per assigned drawing numbers) (8/9-11/21) . 256L-01-07-xxx-1-RB-grounding-plan (8/11-13/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Emails Timesheet RUSA title block print settings review w/ J.G. (8/13/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-09 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting w/ Mio (8/9/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3.5 0 TSR - 01770 RUSD-PKE-T2-ND-27400.1018.001-.003 REV-1 (8/9-11/21) Request translations (8/10-21) Update per internal comments (8/11/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-10 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 3 0 LABU 256L drawings (update per assigned drawing numbers) (8/9-11/21) . 256L-01-07-xxx-1-RB-grounding-plan (8/11-13/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet RUSA title block print settings review w/ J.G. (8/13/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4.5 0 TSR - 01770 RUSD-PKE-T2-ND-27400.1018.001-.003 REV-1 (8/9-11/21) Request translations (8/10-21) Update per internal comments (8/11/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-11 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 4.5 0 LABU 256L drawings (update per assigned drawing numbers) (8/9-11/21) . 256L-01-07-xxx-1-RB-grounding-plan (8/11-13/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet RUSA title block print settings review w/ J.G. (8/13/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 TSR - 01770 RUSD-PKE-T2-ND-27400.1018.001-.003 REV-1 (8/9-11/21) Request translations (8/10-21) Update per internal comments (8/11/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-12 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 7.5 0 LABU 256L drawings (update per assigned drawing numbers) (8/9-11/21) . 256L-01-07-xxx-1-RB-grounding-plan (8/11-13/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet RUSA title block print settings review w/ J.G. (8/13/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-13 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 4 0 LABU 256L drawings (update per assigned drawing numbers) (8/9-11/21) . 256L-01-07-xxx-1-RB-grounding-plan (8/11-13/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Emails Timesheet RUSA title block print settings review w/ J.G. (8/13/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-16 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 5 0 LABU drawings 256L-01-07-000-1-RA-grounding-plan (8/16-17/21) 256L drawings update per title block (8/17-18/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Emails Timesheet Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-16 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting w/ Mio (8/15/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-17 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 7 0 LABU drawings 256L-01-07-000-1-RA-grounding-plan (8/16-17/21) 256L drawings update per title block (8/17-18/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-18 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 7 0 LABU drawings 256L-01-07-000-1-RA-grounding-plan (8/16-17/21) 256L drawings update per title block (8/17-18/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO (8/19-20/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO (8/19-20/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-23 HTSG-TSR :HTSG-TSR 2018-SMART-Goals Regular Pay N 6.5 0 LABU drawings 256L-01-07-000-1-RA Updated per comments and additional field feedback. (8/23-27/21) 256L drawings updated per standards (8/23-26/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Timesheet Emails VPN connection troubleshoot (8/24/21) Microsoft Teams Download (8/25/21) Review tasks w/J.G (8/23 & 25/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-24 HTSG-TSR :HTSG-TSR 2018-SMART-Goals Regular Pay N 5 0 LABU drawings 256L-01-07-000-1-RA Updated per comments and additional field feedback. (8/23-27/21) 256L drawings updated per standards (8/23-26/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Global Operations Meeting (8/24/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Timesheet Emails VPN connection troubleshoot (8/24/21) Microsoft Teams Download (8/25/21) Review tasks w/J.G (8/23 & 25/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-25 HTSG-TSR :HTSG-TSR 2018-SMART-Goals Regular Pay N 7 0 LABU drawings 256L-01-07-000-1-RA Updated per comments and additional field feedback. (8/23-27/21) 256L drawings updated per standards (8/23-26/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Timesheet Emails VPN connection troubleshoot (8/24/21) Microsoft Teams Download (8/25/21) Review tasks w/J.G (8/23 & 25/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-26 HTSG-TSR :HTSG-TSR 2018-SMART-Goals Regular Pay N 7.5 0 LABU drawings 256L-01-07-000-1-RA Updated per comments and additional field feedback. (8/23-27/21) 256L drawings updated per standards (8/23-26/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails VPN connection troubleshoot (8/24/21) Microsoft Teams Download (8/25/21) Review tasks w/J.G (8/23 & 25/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-27 HTSG-TSR :HTSG-TSR 2018-SMART-Goals Regular Pay N 5 0 LABU drawings 256L-01-07-000-1-RA Updated per comments and additional field feedback. (8/23-27/21) 256L drawings updated per standards (8/23-26/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-08-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails VPN connection troubleshoot (8/24/21) Microsoft Teams Download (8/25/21) Review tasks w/J.G (8/23 & 25/21)