Name	Billing Class	Employee No.	Item Line Class	Transaction Date	Job No.	Customer	Service Item	Notes	Payroll Item	Billable	Employee Paid Day Rate	Duration	Days	Remarks
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-01	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	timesheet // SMART Goals 
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-01	OH-034	:OH-034	OH-034-002	Alaska	Regular Pay	N		6	0	Powerpoint for FEED proposal // mtng with NOV // mtng with CPAI // reviewing NOV contract
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-01	ORLAN	:ORLAN	TSR-01806-ORLP	CRI Roller Mill Repair	Regular Pay	N		2	0	discussion with Bronco // correspondence with Sak Eng and Bronco // CTR creation
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-02	BERKUT	:BERKUT	TSR-01800-BERP	CRI-Diverter-Valve	Regular Pay	N		2	0	correspondence with vendor // creating CTR
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-02	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1.5	0	TSR mtng // general discussions
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-02	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2	0	timesheet // SMART Goals 
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-02	OH-034	:OH-034	OH-034-002	Alaska	Regular Pay	N		5	0	Powerpoint for FEED proposal // mtng with NOV // mtng with CPAI // reviewing NOV contract
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-03	BERKUT	:BERKUT	TSR-01800-BERP	CRI-Diverter-Valve	Regular Pay	N		2	0	correspondence with vendor // creating CTR
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-03	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	TSR mtng // general discussions
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-03	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	timesheet // SMART Goals 
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-03	ORLAN	:ORLAN	TSR-01806-ORLP	CRI Roller Mill Repair	Regular Pay	N		2.5	0	discussion with Bronco // correspondence with Sak Eng and Bronco // CTR creation
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-03	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01801-209L	Service Pad Eyes for HP Valves	Regular Pay	N		1.5	0	Reviewing TSR
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-04	BERKUT	:BERKUT	TSR-01800-BERP	CRI-Diverter-Valve	Regular Pay	N		1	0	correspondence with vendor // creating CTR
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-04	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		0.5	0	TSR mtng // general discussions
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-04	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	timesheet // SMART Goals 
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-04	ORLAN	:ORLAN	TSR-01806-ORLP	CRI Roller Mill Repair	Regular Pay	N		1	0	discussion with Bronco // correspondence with Sak Eng and Bronco // CTR creation
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-04	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01801-209L	Service Pad Eyes for HP Valves	Regular Pay	N		1	0	Reviewing TSR
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-07	BERKUT	:BERKUT	TSR-01800-BERP	CRI-Diverter-Valve	Regular Pay	N		3	0	correspondence with S-ENG and Bray // reviewing Bray quote // looking up tech specs to see if viable option
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-07	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	timesheet // general emails/discussions
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-07	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		0.5	0	
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-07	ORLAN	:ORLAN	TSR-01806-ORLP	CRI Roller Mill Repair	Regular Pay	N		0.5	0	correspondence with Bronco
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-07	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01801-209L	Service Pad Eyes for HP Valves	Regular Pay	N		2	0	review of TSR // create CTR // correspondence with S-ENG // working sketches
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-08	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	timesheet // general emails/discussions
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-08	ORLAN	:ORLAN	TSR-01806-ORLP	CRI Roller Mill Repair	Regular Pay	N		0.5	0	correspondence with Bronco
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-08	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01801-209L	Service Pad Eyes for HP Valves	Regular Pay	N		7	0	review of TSR // create CTR // correspondence with S-ENG // working sketches
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-09	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	timesheet // general emails/discussions
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-09	OH-034	:OH-034	OH-034-004	Aksai	Regular Pay	N		6	0	drawing for 249L climb assist assembly
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-09	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01801-209L	Service Pad Eyes for HP Valves	Regular Pay	N		3	0	review of TSR // create CTR // correspondence with S-ENG // working sketches
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-10	BERKUT	:BERKUT	TSR-01800-BERP	CRI-Diverter-Valve	Regular Pay	N		4	0	correspondence with S-ENG and Bray // reviewing Bray quote // looking up tech specs to see if viable option
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-10	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	timesheet // general emails/discussions
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-10	OH-034	:OH-034	OH-034-004	Aksai	Regular Pay	N		4	0	drawing for 249L climb assist assembly
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-11	BERKUT	:BERKUT	TSR-01800-BERP	CRI-Diverter-Valve	Regular Pay	N		4.5	0	correspondence with S-ENG and Bray // reviewing Bray quote // looking up tech specs to see if viable option
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-11	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	timesheet // general emails/discussions
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-14	BERKUT	:BERKUT	TSR-01800-BERP	CRI-Diverter-Valve	Regular Pay	N		3	0	STEP file clash check // correspondence with S-ENG and Bray
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-14	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	timesheet // general admin items // safety moment
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-14	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		0.5	0	
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-14	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		2	0	correspondence with Odoptu Staff Eng on an old TSR MTO providing clarification
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-14	ORLAN	:ORLAN	TSR-01806-ORLP	CRI Roller Mill Repair	Regular Pay	N		0.5	0	Correspondence with Bronco
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-14	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01801-209L	Service Pad Eyes for HP Valves	Regular Pay	N		2	0	coming up with concept and correspondence with S-ENG
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-15	BERKUT	:BERKUT	TSR-01785-BERP	Anchor Beam for Control Lines Sheaves	Regular Pay	N		3	0	closeout and correspondence with S-ENG
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-15	BERKUT	:BERKUT	TSR-01800-BERP	CRI-Diverter-Valve	Regular Pay	N		3	0	STEP file clash check // correspondence with S-ENG and Bray
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-15	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	timesheet // general admin items // safety moment
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-15	OH-034	:OH-034	OH-034-004	Aksai	Regular Pay	N		1.5	0	Mast assist sketch correspondence
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-15	ORLAN	:ORLAN	TSR-01806-ORLP	CRI Roller Mill Repair	Regular Pay	N		0.5	0	Correspondence with Bronco
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-16	BERKUT	:BERKUT	TSR-01800-BERP	CRI-Diverter-Valve	Regular Pay	N		1	0	STEP file clash check // correspondence with S-ENG and Bray
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-16	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2	0	timesheet // general admin items // safety moment
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-16	ORLAN	:ORLAN	TSR-01806-ORLP	CRI Roller Mill Repair	Regular Pay	N		0.5	0	Correspondence with Bronco
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-16	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01801-209L	Service Pad Eyes for HP Valves	Regular Pay	N		5	0	coming up with concept and correspondence with S-ENG
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-17	BERKUT	:BERKUT	TSR-01800-BERP	CRI-Diverter-Valve	Regular Pay	N		0.5	0	STEP file clash check // correspondence with S-ENG and Bray
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-17	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	TSR mtng
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-17	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	timesheet // general admin items // safety moment
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-17	ORLAN	:ORLAN	TSR-01806-ORLP	CRI Roller Mill Repair	Regular Pay	N		1	0	Correspondence with Bronco
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-17	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01801-209L	Service Pad Eyes for HP Valves	Regular Pay	N		5	0	coming up with concept and correspondence with S-ENG
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-18	BERKUT	:BERKUT	TSR-01800-BERP	CRI-Diverter-Valve	Regular Pay	N		1	0	STEP file clash check // correspondence with S-ENG and Bray
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-18	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	timesheet // general admin items // safety moment
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-18	ORLAN	:ORLAN	TSR-01806-ORLP	CRI Roller Mill Repair	Regular Pay	N		2	0	Correspondence with Bronco
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-18	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01801-209L	Service Pad Eyes for HP Valves	Regular Pay	N		1	0	coming up with concept and correspondence with S-ENG
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-21	OH-008	:OH-008	Overhead	All Activities	Regular Pay	N		8	0	
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-22	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	timesheet // general discussions
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-22	OH-034	:OH-034	OH-034-008	Mexico	Regular Pay	N		0.5	0	correspondence with LCM for 165L 
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-22	ORLAN	:ORLAN	TSR-01806-ORLP	CRI Roller Mill Repair	Regular Pay	N		1	0	correspondence with S-ENG and Bronco obtaining quote
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-22	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01801-209L	Service Pad Eyes for HP Valves	Regular Pay	N		6.5	0	Solidworks modeling // drawing creation // analysis
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-23	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	timesheet // general discussions
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-23	OH-034	:OH-034	OH-034-008	Mexico	Regular Pay	N		0.5	0	correspondence with LCM for 165L 
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-23	ORLAN	:ORLAN	TSR-01806-ORLP	CRI Roller Mill Repair	Regular Pay	N		1.5	0	correspondence with S-ENG and Bronco obtaining quote
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-23	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01801-209L	Service Pad Eyes for HP Valves	Regular Pay	N		6.5	0	Solidworks modeling // drawing creation // analysis
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-24	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	timesheet // general discussions
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-24	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01801-209L	Service Pad Eyes for HP Valves	Regular Pay	N		8.5	0	Solidworks modeling // drawing creation // analysis
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-25	OH-034	:OH-034	OH-034-008	Mexico	Regular Pay	N		0.5	0	correspondence with LCM for 165L 
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-25	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-02	Automation Upgrade: Engineering	Regular Pay	N		1	0	Preparing Load List for procured items
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-25	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01801-209L	Service Pad Eyes for HP Valves	Regular Pay	N		3.5	0	Solidworks modeling // drawing creation // analysis
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-28	BERKUT	:BERKUT	TSR-01800-BERP	CRI-Diverter-Valve	Regular Pay	N		2	0	correspondence with Bray
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-28	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1.5	0	timesheet // general discussion with mngr
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-28	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		0.5	0	
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-28	OH-034	:OH-034	OH-034-008	Mexico	Regular Pay	N		1	0	165L bolt and nut spec with LCM // 702/703 start-up project discussions and reviewing docs // 256L hook load and setback research
Christman, Ralph	Engineer I	32324	Christman, Ralph:Engineer I	2022-02-28	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01801-209L	Service Pad Eyes for HP Valves	Regular Pay	N		4	0	picking up drawing comments // analysis report
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-01	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		9	0	Krechet automation
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-02	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		9	0	Krechet automation
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-03	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	TSR meeting
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-03	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	timesheet
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-03	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		0.75	0	270L regulatory
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-03	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		7	0	Krechet automation
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-04	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	timesheet
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-04	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		8	0	Krechet automation
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-07	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	timesheets
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-07	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1	0	270L regulatory
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-07	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		8	0	Automation Project
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-08	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		0.5	0	270L regulatory
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-08	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		9.5	0	Automation Project
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-09	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1.5	0	270L regulatory
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-09	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		8	0	Automation Project
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-10	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.75	0	timesheets
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-10	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		8	0	Automation Project
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-11	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		6	0	Automation Project
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-14	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	timesheet
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-14	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		0.75	0	SAK meeting
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-14	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		0.25	0	270 regulatory
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-14	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		9	0	Automation Project
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-15	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		0.25	0	270 regulatory
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-15	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		9	0	Automation Project
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-16	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		1.25	0	257B Revamp discussions
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-16	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		8	0	Automation Project
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-17	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	TS weekly meeting
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-17	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1	0	ESWC Kickoff Meeting
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-17	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	timesheet
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-17	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		0.5	0	270 regulatory
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-17	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		7.5	0	Automation Project
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-18	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		8	0	Automation Project
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-21	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		0.25	0	ESWC stuff
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-21	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.25	0	timesheet and PDR
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-21	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		0.75	0	SAK meeting
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-21	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		8	0	Krechet Automation
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-22	OH-014	:OH-014	Overhead	All Activities	Regular Pay	N		1	0	Life Saving Rules
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-22	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		0.5	0	270L regulatory
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-22	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		8	0	Krechet Automation
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-23	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	timesheet and PDR
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-23	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		0.25	0	270L regulatory
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-23	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		7.5	0	Krechet Automation
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-24	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		0.25	0	ESWC stuff
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-24	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	timesheet and PDR
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-24	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		0.5	0	review cost estimates
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-24	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		0.25	0	270L regulatory
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-24	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		8.5	0	Krechet Automation
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-25	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		0.25	0	270L regulatory
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-25	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		6	0	Krechet Automation
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-28	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	timesheet
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-28	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		0.75	0	257 cost estimate review
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-28	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		0.75	0	SAK meeting
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-28	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1	0	270L regulatory
Elenburg, Tyler	Engineer II	34119	Elenburg, Tyler:Engineer II	2022-02-28	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		7.5	0	Automation project
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-01	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		4.5	0	(01/31/22) Updates to 2021 performance self appraisal.  Update with Kyle. (02/01/22) Finalized review and submitted. Annual compliance questionnaire. Update with Lam. Update with Jorge. (02/02/22) Reviewed designer goals and discussed with Kyle. Updated weekly timesheet and submitted. (02/03/22) Update with Kyle. (02/04/22) Update call with Kyle. Update call with Lam.  
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-01	OH-034	:OH-034	OH-034-004	Aksai	Regular Pay	N		1	0	(01/31/22) Updated MTO and sent to Chad for quote. (02/01/22) Discussed ramp drawing with Ralph.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-01	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		0.75	0	(02/01/22) Updated drawing list. Sent drawing number to Jorge. Discussed doghouse location with Lam and reviewed ref info. (02/02/22) Cleaned up drawing folders - saved additional dwgs Discussed door issue with Lam. Call with Tyler to discuss. (02/03/22) Reviewed windwall panel and drill floor ref piping drawings. Sent screenshots of panel info to Jorge as ref for modification drawing. 
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-01	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		2.25	0	(01/31/22) Call with Greg/Kyle to discuss drawings. (02/01/22Pulled ref piping from 247L - start spool sketch. (02/02/22) Cont spool dwg. (02/03/22) Revised diverter drawing. Saved new electrical drawings on Q. - Discussed with Kyle. Researched API flange info - discussed with Tyler. Sent clarification email to Bernie/Zhilwan (02/04/22) Cont spool details.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-02	CVX Genesis	:CVX Genesis	TSR-1725-GENP-03	Project Overhead	Regular Pay	N		0.5	0	(01/31/22) Call with Troy to discuss barge layout changes. Updated layout and sent to John for review. (02/02/22) Call with John to discuss barge drawings.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-02	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2	0	(01/31/22) Updates to 2021 performance self appraisal.  Update with Kyle. (02/01/22) Finalized review and submitted. Annual compliance questionnaire. Update with Lam. Update with Jorge. (02/02/22) Reviewed designer goals and discussed with Kyle. Updated weekly timesheet and submitted. (02/03/22) Update with Kyle. (02/04/22) Update call with Kyle. Update call with Lam.  
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-02	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		2	0	(02/02/22) Weekly update call with Tyler. Weekly update call with Genesis. Updated doghouse dwg - sent for review. (02/03/22) Call with Genesis to discuss HVAC options.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-02	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		2.5	0	(02/01/22) Updated drawing list. Sent drawing number to Jorge. Discussed doghouse location with Lam and reviewed ref info. (02/02/22) Cleaned up drawing folders - saved additional dwgs Discussed door issue with Lam. Call with Tyler to discuss. (02/03/22) Reviewed windwall panel and drill floor ref piping drawings. Sent screenshots of panel info to Jorge as ref for modification drawing. 
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-02	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		1.5	0	(01/31/22) Call with Greg/Kyle to discuss drawings. (02/01/22Pulled ref piping from 247L - start spool sketch. (02/02/22) Cont spool dwg. (02/03/22) Revised diverter drawing. Saved new electrical drawings on Q. - Discussed with Kyle. Researched API flange info - discussed with Tyler. Sent clarification email to Bernie/Zhilwan (02/04/22) Cont spool details.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-03	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		0.75	0	(02/03/22) TSR status call.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-03	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.25	0	(01/31/22) Updates to 2021 performance self appraisal.  Update with Kyle. (02/01/22) Finalized review and submitted. Annual compliance questionnaire. Update with Lam. Update with Jorge. (02/02/22) Reviewed designer goals and discussed with Kyle. Updated weekly timesheet and submitted. (02/03/22) Update with Kyle. (02/04/22) Update call with Kyle. Update call with Lam.  
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-03	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		0.5	0	(02/02/22) Weekly update call with Tyler. Weekly update call with Genesis. Updated doghouse dwg - sent for review. (02/03/22) Call with Genesis to discuss HVAC options.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-03	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		2	0	(02/01/22) Updated drawing list. Sent drawing number to Jorge. Discussed doghouse location with Lam and reviewed ref info. (02/02/22) Cleaned up drawing folders - saved additional dwgs Discussed door issue with Lam. Call with Tyler to discuss. (02/03/22) Reviewed windwall panel and drill floor ref piping drawings. Sent screenshots of panel info to Jorge as ref for modification drawing. 
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-03	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		5	0	(01/31/22) Call with Greg/Kyle to discuss drawings. (02/01/22Pulled ref piping from 247L - start spool sketch. (02/02/22) Cont spool dwg. (02/03/22) Revised diverter drawing. Saved new electrical drawings on Q. - Discussed with Kyle. Researched API flange info - discussed with Tyler. Sent clarification email to Bernie/Zhilwan (02/04/22) Cont spool details.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-04	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	(01/31/22) Updates to 2021 performance self appraisal.  Update with Kyle. (02/01/22) Finalized review and submitted. Annual compliance questionnaire. Update with Lam. Update with Jorge. (02/02/22) Reviewed designer goals and discussed with Kyle. Updated weekly timesheet and submitted. (02/03/22) Update with Kyle. (02/04/22) Update call with Kyle. Update call with Lam.  
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-04	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		2	0	(02/04/22) Searched through ref drawings for 51B. Call with Schlumberger rep to discuss drawing scope of work.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-04	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		3.5	0	(01/31/22) Call with Greg/Kyle to discuss drawings. (02/01/22Pulled ref piping from 247L - start spool sketch. (02/02/22) Cont spool dwg. (02/03/22) Revised diverter drawing. Saved new electrical drawings on Q. - Discussed with Kyle. Researched API flange info - discussed with Tyler. Sent clarification email to Bernie/Zhilwan (02/04/22) Cont spool details.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-07	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2.5	0	(02/07/22) Approved designer timesheets. Update with Kyle. Update weekly timesheet and submitted. Update call with Lam. Scheduled goal discussion. (02/08/22) Goal discussion with Kyle. Discussed Kretchet TSR with Ralph. Update with Jorge. (02/09/22) Organized proposal drawing folders - updated spreadsheet. Update with Kyle. Update with Lam. Discussed drawing issue with Lam. Follow up scope discussion with Kyle. (02/10/22) Performance review for Lam/Jorge. (02/11/22) Worked through CAD issues with Lam.  
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-07	OH-009	:OH-009	OH-009-015	Alaska	Regular Pay	N		0.75	0	(02/07/22) Call with Kyle/Tyler B. to discuss pump drawings. Pulled drawings and sent to Tyler for ref.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-07	Rig 051B	:Rig 051B	TSR-01810-51B	Air Products Support	Regular Pay	N		1	0	(02/07/22) Reviewed presentation from Schlumberger and searched for ref drawings. (02/08/22) Call with Scotty to discuss scope. Searched for additional ref drawings. Started layout. (02/09/22) Saved ref info from Schlumberger.Cont layouts.  (02/10/22) Finalized first drawing and sent to Scotty for review. (02/11/22) Continued with additional drawings for permit package.  
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-07	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		4.25	0	(02/07/22) Suction modification spool drawing. (02/08/22) Finalized suction drawing and sent to field. Organized drawing folder. 
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-08	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1.25	0	(02/07/22) Approved designer timesheets. Update with Kyle. Update weekly timesheet and submitted. Update call with Lam. Scheduled goal discussion. (02/08/22) Goal discussion with Kyle. Discussed Kretchet TSR with Ralph. Update with Jorge. (02/09/22) Organized proposal drawing folders - updated spreadsheet. Update with Kyle. Update with Lam. Discussed drawing issue with Lam. Follow up scope discussion with Kyle. (02/10/22) Performance review for Lam/Jorge. (02/11/22) Worked through CAD issues with Lam.  
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-08	Rig 051B	:Rig 051B	TSR-01810-51B	Air Products Support	Regular Pay	N		2.25	0	(02/07/22) Reviewed presentation from Schlumberger and searched for ref drawings. (02/08/22) Call with Scotty to discuss scope. Searched for additional ref drawings. Started layout. (02/09/22) Saved ref info from Schlumberger.Cont layouts.  (02/10/22) Finalized first drawing and sent to Scotty for review. (02/11/22) Continued with additional drawings for permit package.  
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-08	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		5	0	(02/07/22) Suction modification spool drawing. (02/08/22) Finalized suction drawing and sent to field. Organized drawing folder. 
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-09	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2.25	0	(02/07/22) Approved designer timesheets. Update with Kyle. Update weekly timesheet and submitted. Update call with Lam. Scheduled goal discussion. (02/08/22) Goal discussion with Kyle. Discussed Kretchet TSR with Ralph. Update with Jorge. (02/09/22) Organized proposal drawing folders - updated spreadsheet. Update with Kyle. Update with Lam. Discussed drawing issue with Lam. Follow up scope discussion with Kyle. (02/10/22) Performance review for Lam/Jorge. (02/11/22) Worked through CAD issues with Lam.  
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-09	Rig 051B	:Rig 051B	TSR-01810-51B	Air Products Support	Regular Pay	N		5.5	0	(02/07/22) Reviewed presentation from Schlumberger and searched for ref drawings. (02/08/22) Call with Scotty to discuss scope. Searched for additional ref drawings. Started layout. (02/09/22) Saved ref info from Schlumberger.Cont layouts.  (02/10/22) Finalized first drawing and sent to Scotty for review. (02/11/22) Continued with additional drawings for permit package.  
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-09	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		0.75	0	(02/09/22) Updated drawing list. Update with Tyler.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-10	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		4	0	(02/07/22) Approved designer timesheets. Update with Kyle. Update weekly timesheet and submitted. Update call with Lam. Scheduled goal discussion. (02/08/22) Goal discussion with Kyle. Discussed Kretchet TSR with Ralph. Update with Jorge. (02/09/22) Organized proposal drawing folders - updated spreadsheet. Update with Kyle. Update with Lam. Discussed drawing issue with Lam. Follow up scope discussion with Kyle. (02/10/22) Performance review for Lam/Jorge. (02/11/22) Worked through CAD issues with Lam.  
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-10	OH-009	:OH-009	OH-009-019	Iraq	Regular Pay	N		0.25	0	(02/10/22) Cleaned up AutoCAD block of rig 265L for Genel request.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-10	Rig 051B	:Rig 051B	TSR-01810-51B	Air Products Support	Regular Pay	N		4.25	0	(02/07/22) Reviewed presentation from Schlumberger and searched for ref drawings. (02/08/22) Call with Scotty to discuss scope. Searched for additional ref drawings. Started layout. (02/09/22) Saved ref info from Schlumberger.Cont layouts.  (02/10/22) Finalized first drawing and sent to Scotty for review. (02/11/22) Continued with additional drawings for permit package.  
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-11	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	(02/07/22) Approved designer timesheets. Update with Kyle. Update weekly timesheet and submitted. Update call with Lam. Scheduled goal discussion. (02/08/22) Goal discussion with Kyle. Discussed Kretchet TSR with Ralph. Update with Jorge. (02/09/22) Organized proposal drawing folders - updated spreadsheet. Update with Kyle. Update with Lam. Discussed drawing issue with Lam. Follow up scope discussion with Kyle. (02/10/22) Performance review for Lam/Jorge. (02/11/22) Worked through CAD issues with Lam.  
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-11	Rig 051B	:Rig 051B	TSR-01810-51B	Air Products Support	Regular Pay	N		9	0	(02/07/22) Reviewed presentation from Schlumberger and searched for ref drawings. (02/08/22) Call with Scotty to discuss scope. Searched for additional ref drawings. Started layout. (02/09/22) Saved ref info from Schlumberger.Cont layouts.  (02/10/22) Finalized first drawing and sent to Scotty for review. (02/11/22) Continued with additional drawings for permit package.  
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-14	CVX Genesis	:CVX Genesis	TSR-1725-GENP-03	Project Overhead	Regular Pay	N		0.75	0	(02/14/22) Updated yard layout. (02/16/22) Updated expense report - sent for review. Call with Scotty to discuss new barge size.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-14	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1.25	0	(02/14/22) Update with Kyle. Update with Lam. (02/15/22) Update with Lam. Update with Jorge. Update with Kyle. Updated weekly timesheet. Discussed CAD- jpeg issues with Lam. (02/17/22) Update call with Kyle. Follow up call with Kyle to discuss goals/reviews Updated Jorge's review and routed. Typed all 2022 SMART goals for the design group and sent out emails.  Discussed goals with Lam.  (02/18/22) Routed design group SMART goals. Update call with Kyle. Review/approve designer timesheets.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-14	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		0.5	0	(02/14/22) Weekly Sakh update call.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-14	OH-034	:OH-034	OH-034-004	Aksai	Regular Pay	N		1	0	(02/14/22) Organized files and discussed with Kyle. Signed PDF for pallet dock drawing.  (02/16/22) Reviewed crown saver info - sent to Mark W.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-14	OH-034	:OH-034	OH-034-008	Mexico	Regular Pay	N		0.25	0	(02/14/22) Converted rig plot plan to CAD for Dan C.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-14	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		1	0	(02/14/22) Review windwall panel mod drawing.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-14	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		3.25	0	(02/14/22) Call with Tyler/Lam to discuss VFD stair location and details. Updated drawing list. Discussed stair/ref info with Lam. Call with Jorge to assign scope. (02/15/22) Review windwall ref drawing details - discussed with Lam. (02/16/22) Update call with Tyler. Reviewed HVAC windwall pen. details. (02/17/22) Discussed HVAC fabrication/design options with Tyler,
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-14	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		0.5	0	(02/14/22) Call with John R./Kyle to discuss HP piping.  (02/15/22) Reviewed existing HP piping information.Call to review NOV standpipe and ground manifold. (02/16/22) Call with NOV to discuss HP piping. Created folder - gather ref info to be transmitted to NOV (HP reference info.) Updated plot plan to show correct suitcase information.  Redlined HP P&ID. Discussed HP piping issues with Kyle and reviewed field pics. Started to build HP piping elevation view in CAD. (02/17/22) Continued new HP elevation layout.  Call with Kyle to review layout/info (02/18/22) Updated HP layout. Call with NOV to review layout and additional information -HP piping. Cleaned up drawing files for NOV use.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-15	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3	0	(02/14/22) Update with Kyle. Update with Lam. (02/15/22) Update with Lam. Update with Jorge. Update with Kyle. Updated weekly timesheet. Discussed CAD- jpeg issues with Lam. (02/17/22) Update call with Kyle. Follow up call with Kyle to discuss goals/reviews Updated Jorge's review and routed. Typed all 2022 SMART goals for the design group and sent out emails.  Discussed goals with Lam.  (02/18/22) Routed design group SMART goals. Update call with Kyle. Review/approve designer timesheets.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-15	Rig 051B	:Rig 051B	TSR-01810-51B	Air Products Support	Regular Pay	N		2.25	0	(02/15/22) Discussed email request with Kyle. Cleaned up CAD files and purged extra info. (02/16/22) Checked picture reference blocks - sent CAD files to Schlumberger.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-15	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		1.25	0	(02/14/22) Call with Tyler/Lam to discuss VFD stair location and details. Updated drawing list. Discussed stair/ref info with Lam. Call with Jorge to assign scope. (02/15/22) Review windwall ref drawing details - discussed with Lam. (02/16/22) Update call with Tyler. Reviewed HVAC windwall pen. details. (02/17/22) Discussed HVAC fabrication/design options with Tyler,
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-15	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		2	0	(02/14/22) Call with John R./Kyle to discuss HP piping.  (02/15/22) Reviewed existing HP piping information.Call to review NOV standpipe and ground manifold. (02/16/22) Call with NOV to discuss HP piping. Created folder - gather ref info to be transmitted to NOV (HP reference info.) Updated plot plan to show correct suitcase information.  Redlined HP P&ID. Discussed HP piping issues with Kyle and reviewed field pics. Started to build HP piping elevation view in CAD. (02/17/22) Continued new HP elevation layout.  Call with Kyle to review layout/info (02/18/22) Updated HP layout. Call with NOV to review layout and additional information -HP piping. Cleaned up drawing files for NOV use.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-16	CVX Genesis	:CVX Genesis	TSR-1725-GENP-03	Project Overhead	Regular Pay	N		0.5	0	(02/14/22) Updated yard layout. (02/16/22) Updated expense report - sent for review. Call with Scotty to discuss new barge size.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-16	OH-009	:OH-009	OH-009-018	Kazakhstan	Regular Pay	N		1	0	(02/16/22) Pre kick-off meeting for 257B with operations.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-16	OH-034	:OH-034	OH-034-004	Aksai	Regular Pay	N		0.25	0	(02/14/22) Organized files and discussed with Kyle. Signed PDF for pallet dock drawing.  (02/16/22) Reviewed crown saver info - sent to Mark W.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-16	Rig 051B	:Rig 051B	TSR-01810-51B	Air Products Support	Regular Pay	N		0.25	0	(02/15/22) Discussed email request with Kyle. Cleaned up CAD files and purged extra info. (02/16/22) Checked picture reference blocks - sent CAD files to Schlumberger.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-16	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		1.25	0	(02/14/22) Call with Tyler/Lam to discuss VFD stair location and details. Updated drawing list. Discussed stair/ref info with Lam. Call with Jorge to assign scope. (02/15/22) Review windwall ref drawing details - discussed with Lam. (02/16/22) Update call with Tyler. Reviewed HVAC windwall pen. details. (02/17/22) Discussed HVAC fabrication/design options with Tyler,
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-16	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		6.75	0	(02/14/22) Call with John R./Kyle to discuss HP piping.  (02/15/22) Reviewed existing HP piping information.Call to review NOV standpipe and ground manifold. (02/16/22) Call with NOV to discuss HP piping. Created folder - gather ref info to be transmitted to NOV (HP reference info.) Updated plot plan to show correct suitcase information.  Redlined HP P&ID. Discussed HP piping issues with Kyle and reviewed field pics. Started to build HP piping elevation view in CAD. (02/17/22) Continued new HP elevation layout.  Call with Kyle to review layout/info (02/18/22) Updated HP layout. Call with NOV to review layout and additional information -HP piping. Cleaned up drawing files for NOV use.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-17	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		0.75	0	(02/17/22) TSR call.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-17	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3.25	0	(02/14/22) Update with Kyle. Update with Lam. (02/15/22) Update with Lam. Update with Jorge. Update with Kyle. Updated weekly timesheet. Discussed CAD- jpeg issues with Lam. (02/17/22) Update call with Kyle. Follow up call with Kyle to discuss goals/reviews Updated Jorge's review and routed. Typed all 2022 SMART goals for the design group and sent out emails.  Discussed goals with Lam.  (02/18/22) Routed design group SMART goals. Update call with Kyle. Review/approve designer timesheets.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-17	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		1	0	(02/14/22) Call with Tyler/Lam to discuss VFD stair location and details. Updated drawing list. Discussed stair/ref info with Lam. Call with Jorge to assign scope. (02/15/22) Review windwall ref drawing details - discussed with Lam. (02/16/22) Update call with Tyler. Reviewed HVAC windwall pen. details. (02/17/22) Discussed HVAC fabrication/design options with Tyler,
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-17	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		4	0	(02/14/22) Call with John R./Kyle to discuss HP piping.  (02/15/22) Reviewed existing HP piping information.Call to review NOV standpipe and ground manifold. (02/16/22) Call with NOV to discuss HP piping. Created folder - gather ref info to be transmitted to NOV (HP reference info.) Updated plot plan to show correct suitcase information.  Redlined HP P&ID. Discussed HP piping issues with Kyle and reviewed field pics. Started to build HP piping elevation view in CAD. (02/17/22) Continued new HP elevation layout.  Call with Kyle to review layout/info (02/18/22) Updated HP layout. Call with NOV to review layout and additional information -HP piping. Cleaned up drawing files for NOV use.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-18	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1.25	0	(02/14/22) Update with Kyle. Update with Lam. (02/15/22) Update with Lam. Update with Jorge. Update with Kyle. Updated weekly timesheet. Discussed CAD- jpeg issues with Lam. (02/17/22) Update call with Kyle. Follow up call with Kyle to discuss goals/reviews Updated Jorge's review and routed. Typed all 2022 SMART goals for the design group and sent out emails.  Discussed goals with Lam.  (02/18/22) Routed design group SMART goals. Update call with Kyle. Review/approve designer timesheets.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-18	OH-034	:OH-034	OH-034-002	Alaska	Regular Pay	N		1	0	(02/18/22) Searched for pipe cat control info for Tyler B. Sent drawings.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-18	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		3.75	0	(02/14/22) Call with John R./Kyle to discuss HP piping.  (02/15/22) Reviewed existing HP piping information.Call to review NOV standpipe and ground manifold. (02/16/22) Call with NOV to discuss HP piping. Created folder - gather ref info to be transmitted to NOV (HP reference info.) Updated plot plan to show correct suitcase information.  Redlined HP P&ID. Discussed HP piping issues with Kyle and reviewed field pics. Started to build HP piping elevation view in CAD. (02/17/22) Continued new HP elevation layout.  Call with Kyle to review layout/info (02/18/22) Updated HP layout. Call with NOV to review layout and additional information -HP piping. Cleaned up drawing files for NOV use.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-21	OH-008	:OH-008	Overhead	All Activities	Regular Pay	N		8	0	(02/22/22)
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-22	CVX Genesis	:CVX Genesis	TSR-1725-GENP-06	Rig-Down & Transport	Regular Pay	N		7	0	(02/22/22) Travel to New Iberia. Yard visit with Mark. Review loading process. (02/23/22) Updated barge layout to reflect loading changes. Yard visit with Jacon - pics of loading progress. Walked barge and took pictures of loading configuration. Discussed loading with Scotty. (02/24/22) Updated barge layout to show final load layout.  Reviewed drawing with Scotty. Travel back to Houston. (02/25/22) Updated layout drawing to match final lift weights.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-22	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2	0	(02/22/22) Update call with Lam. Update with Mark Q. Scheduled performance review meetings. (02/23/22) Updated weekly timesheet. 2021 performance discussion with Kyle. Status update call with Kyle. (02/24/22) Update call with Kyle. Update call with Lam. Sent 249 pdf drawings to Aksai. (02/25/22) 2021 performance discussions with Lam and Jorge. 
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-22	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		0.5	0	(02/22/22) Updated drawing list. Cleaned up drawing folder. (02/23/22) Discussed Keppel electrical drawings with Lam. Weekly status update call with Tyler. Discussed piping layouts with Lam. (02/25/22) Searched for power frame work pack info for reference.(existing PF). Call with Ripal to discuss topology drawing.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-23	CVX Genesis	:CVX Genesis	TSR-1725-GENP-06	Rig-Down & Transport	Regular Pay	N		6.25	0	(02/22/22) Travel to New Iberia. Yard visit with Mark. Review loading process. (02/23/22) Updated barge layout to reflect loading changes. Yard visit with Jacon - pics of loading progress. Walked barge and took pictures of loading configuration. Discussed loading with Scotty. (02/24/22) Updated barge layout to show final load layout.  Reviewed drawing with Scotty. Travel back to Houston. (02/25/22) Updated layout drawing to match final lift weights.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-23	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2	0	(02/22/22) Update call with Lam. Update with Mark Q. Scheduled performance review meetings. (02/23/22) Updated weekly timesheet. 2021 performance discussion with Kyle. Status update call with Kyle. (02/24/22) Update call with Kyle. Update call with Lam. Sent 249 pdf drawings to Aksai. (02/25/22) 2021 performance discussions with Lam and Jorge. 
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-23	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		1.25	0	(02/22/22) Updated drawing list. Cleaned up drawing folder. (02/23/22) Discussed Keppel electrical drawings with Lam. Weekly status update call with Tyler. Discussed piping layouts with Lam. (02/25/22) Searched for power frame work pack info for reference.(existing PF). Call with Ripal to discuss topology drawing.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-24	CVX Genesis	:CVX Genesis	TSR-1725-GENP-06	Rig-Down & Transport	Regular Pay	N		7.5	0	(02/22/22) Travel to New Iberia. Yard visit with Mark. Review loading process. (02/23/22) Updated barge layout to reflect loading changes. Yard visit with Jacon - pics of loading progress. Walked barge and took pictures of loading configuration. Discussed loading with Scotty. (02/24/22) Updated barge layout to show final load layout.  Reviewed drawing with Scotty. Travel back to Houston. (02/25/22) Updated layout drawing to match final lift weights.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-24	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	(02/22/22) Update call with Lam. Update with Mark Q. Scheduled performance review meetings. (02/23/22) Updated weekly timesheet. 2021 performance discussion with Kyle. Status update call with Kyle. (02/24/22) Update call with Kyle. Update call with Lam. Sent 249 pdf drawings to Aksai. (02/25/22) 2021 performance discussions with Lam and Jorge. 
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-24	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		1	0	(02/24/22) Discussed 51B drawing package with Scotty.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-25	CVX Genesis	:CVX Genesis	TSR-1725-GENP-06	Rig-Down & Transport	Regular Pay	N		1	0	(02/22/22) Travel to New Iberia. Yard visit with Mark. Review loading process. (02/23/22) Updated barge layout to reflect loading changes. Yard visit with Jacon - pics of loading progress. Walked barge and took pictures of loading configuration. Discussed loading with Scotty. (02/24/22) Updated barge layout to show final load layout.  Reviewed drawing with Scotty. Travel back to Houston. (02/25/22) Updated layout drawing to match final lift weights.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-25	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2.25	0	(02/22/22) Update call with Lam. Update with Mark Q. Scheduled performance review meetings. (02/23/22) Updated weekly timesheet. 2021 performance discussion with Kyle. Status update call with Kyle. (02/24/22) Update call with Kyle. Update call with Lam. Sent 249 pdf drawings to Aksai. (02/25/22) 2021 performance discussions with Lam and Jorge. 
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-25	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		1.5	0	(02/22/22) Updated drawing list. Cleaned up drawing folder. (02/23/22) Discussed Keppel electrical drawings with Lam. Weekly status update call with Tyler. Discussed piping layouts with Lam. (02/25/22) Searched for power frame work pack info for reference.(existing PF). Call with Ripal to discuss topology drawing.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-25	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		1.5	0	(02/25/22) Call to review service order. Review 269 choke manifold info.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-28	CVX Genesis	:CVX Genesis	TSR-1725-GENP-03	Project Overhead	Regular Pay	N		0.25	0	(02/28/22) Cleaned up drawing folders. (03/05/22) New expense report for trip to NI.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-28	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	(02/28/22) Update with Kyle. Update call with Tyler. (03/01/22) Update with Lam. (03/02/22) Update with Kyle. (03/03/22) Review/Approve design timesheets. Update with Kyle. Update call with Jorge. (03/04/22) Call with Lam to discuss CAD issue.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-28	OH-009	:OH-009	OH-009-021	Mexico	Regular Pay	N		0.75	0	(02/28/22) Call with Mexico to discuss Trinidad rig opportunity. Discussed with Kyle.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-28	OH-034	:OH-034	OH-034-004	Aksai	Regular Pay	N		0.25	0	(02/28/22) Archived 249 ramp& palter dock drawings on the Q.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-28	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		4.75	0	(02/28/22) Checked blower motor adapter drawing.   (03/02/22) Checked VFD tie-down install. drawing. Started checking drawworks install/tie-down. (03/04/22) Cont'd checking.
Gasper, James	Supervising Designer/Checker	23139	Gasper, James:Supervising Designer/Checker	2022-02-28	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		1.5	0	(02/28/22) Started new rig grounding plan. Discussed drawing tracker with Kyle. (03/01/22) Finalized grounding details. Discussed with Kyle (03/02/22) Discussed diverter information with Kyle.  Discussed lightning plan - searched for reference drawing. (03/03/22) Discussed diverter vent line details with Kyle. Saved latest pic of diverter spool on the Q. Searched technical data for 11" flange/12" unions. Review NOV HP mud piping - converted to CAD and checked. (03/03/22) Continued to review Hp information from NOV. Call with Kyle to review HP piping drawings. Call with Greg to discuss tracker - open items. Started diverter vent line layout. (03/05/22) Cont'd vent line drawing.
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-01	CVX Genesis	:CVX Genesis	TSR-1725-GENP-03	Project Overhead	Regular Pay	N		1	0	Weekly meetings
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-01	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3	0	Dubai project engineer interviews Meeting with Ripal P. (personnel) Software invoices
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-01	OH-009	:OH-009	OH-009-015	Alaska	Regular Pay	N		2	0	Meeting with CPAI (Willow) Presentation review/redline
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-01	OH-034	:OH-034	OH-034-005	Kazakhstan	Regular Pay	N		0.5	0	258L top drive research and meetings
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-01	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		2	0	Simulator discussion Electrical cable MTO discussion / formatting Excel file Scheduling discussion Call back system review
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-01	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		1	0	Electrical meeting with NOV Load List review / revision Meeting with operations
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-02	CVX Genesis	:CVX Genesis	TSR-1725-GENP-03	Project Overhead	Regular Pay	N		0.5	0	Weekly meetings
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-02	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3	0	Dubai project engineer interviews Meeting with Ripal P. (personnel) Software invoices
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-02	OH-009	:OH-009	OH-009-015	Alaska	Regular Pay	N		2	0	Meeting with CPAI (Willow) Presentation review/redline
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-02	OH-013	:OH-013	Overhead	All Activities	Regular Pay	N		1	0	TSR status update
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-02	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1	0	Discussions to review Krechet rig move
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-02	OH-034	:OH-034	OH-034-005	Kazakhstan	Regular Pay	N		0.5	0	258L top drive research and meetings
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-02	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		1.5	0	Simulator discussion Electrical cable MTO discussion / formatting Excel file Scheduling discussion Call back system review
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-03	BERKUT	:BERKUT	TSR-01797-BERP	BOP Test Stump Replacement.	Regular Pay	N		0.5	0	BOP test stump analysis review (revision 1)
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-03	CVX Genesis	:CVX Genesis	TSR-1725-GENP-03	Project Overhead	Regular Pay	N		1.5	0	Weekly meetings
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-03	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	HTSG Bi-weekly meeting
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-03	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2	0	Dubai project engineer interviews Meeting with Ripal P. (personnel) Software invoices
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-03	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1	0	Discussions to review Krechet rig move
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-03	OH-034	:OH-034	OH-034-005	Kazakhstan	Regular Pay	N		1	0	258L top drive research and meetings
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-03	OH-034	:OH-034	OH-034-008	Mexico	Regular Pay	N		1	0	Supporting Dan Colby / 122L / 165L upgrades
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-03	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		1	0	51B Air Poducts support 50B documentation (lien info from BOFA)
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-03	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		0.5	0	Simulator discussion Electrical cable MTO discussion / formatting Excel file Scheduling discussion Call back system review
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-03	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		0.5	0	Electrical meeting with NOV Load List review / revision Meeting with operations
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-04	BERKUT	:BERKUT	TSR-01797-BERP	BOP Test Stump Replacement.	Regular Pay	N		1	0	BOP test stump analysis review (revision 1)
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-04	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2	0	Dubai project engineer interviews Meeting with Ripal P. (personnel) Software invoices
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-04	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		0.5	0	Discussions to review Krechet rig move
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-04	OH-034	:OH-034	OH-034-008	Mexico	Regular Pay	N		1	0	Supporting Dan Colby / 122L / 165L upgrades
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-04	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		1	0	51B Air Poducts support 50B documentation (lien info from BOFA)
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-04	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		1	0	Simulator discussion Electrical cable MTO discussion / formatting Excel file Scheduling discussion Call back system review
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-04	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		1	0	Electrical meeting with NOV Load List review / revision Meeting with operations
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-07	CVX Genesis	:CVX Genesis	TSR-1725-GENP-03	Project Overhead	Regular Pay	N		1.25	0	General support Meetings with GOM operations
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-07	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	ARBU Bi-Weekly Meeting
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-07	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3	0	Personnel administration Performacne evaluations Dubai engineer FTE forecast report TS Hours Summary
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-07	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		0.75	0	Air Products Tender
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-07	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1	0	209l Rig Move Meetings Maestro Implementation Drawing issues / developing solution
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-07	OH-034	:OH-034	OH-034-005	Kazakhstan	Regular Pay	N		0.75	0	258L support start-up
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-07	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		0.5	0	USCG documentation
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-07	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		0.5	0	Discussions with TE Presentation for automation execution Cable register VFD House report review
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-07	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		1	0	Lightning protection Electrical documents to NOV
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-08	BERKUT	:BERKUT	TSR-01800-BERP	CRI-Diverter-Valve	Regular Pay	N		0.5	0	CTR approval
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-08	CVX Genesis	:CVX Genesis	TSR-1725-GENP-03	Project Overhead	Regular Pay	N		0.5	0	General support Meetings with GOM operations
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-08	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3	0	Personnel administration Performacne evaluations Dubai engineer FTE forecast report TS Hours Summary
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-08	OH-009	:OH-009	OH-009-015	Alaska	Regular Pay	N		0.5	0	Oilsearch Mtg. with Alaska Ops
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-08	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1.25	0	209l Rig Move Meetings Maestro Implementation Drawing issues / developing solution
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-08	OH-034	:OH-034	OH-034-005	Kazakhstan	Regular Pay	N		0.5	0	258L support start-up
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-08	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		0.5	0	USCG documentation
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-08	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		0.75	0	Presentation for automation execution Reviewing schedule
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-08	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		0.5	0	Discussions with TE Presentation for automation execution Cable register VFD House report review
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-08	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		0.5	0	Lightning protection Electrical documents to NOV
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-09	BERKUT	:BERKUT	TSR-01800-BERP	CRI-Diverter-Valve	Regular Pay	N		0.5	0	CTR approval
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-09	CVX Genesis	:CVX Genesis	TSR-1725-GENP-03	Project Overhead	Regular Pay	N		0.5	0	General support Meetings with GOM operations
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-09	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3.5	0	Personnel administration Performacne evaluations Dubai engineer FTE forecast report TS Hours Summary
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-09	OH-009	:OH-009	OH-009-015	Alaska	Regular Pay	N		0.75	0	Oilsearch Mtg. with Alaska Ops
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-09	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		0.5	0	Air Products Tender
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-09	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		0.5	0	209l Rig Move Meetings Maestro Implementation Drawing issues / developing solution
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-09	OH-034	:OH-034	OH-034-005	Kazakhstan	Regular Pay	N		1	0	258L support start-up
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-09	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		0.5	0	USCG documentation
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-09	ORLAN	:ORLAN	TSR-01806-ORLP	CRI Roller Mill Repair	Regular Pay	N		0.5	0	CTR approval Discussion with Ralph
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-09	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		0.5	0	Discussions with TE Presentation for automation execution Cable register VFD House report review
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-09	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		0.5	0	Lightning protection Electrical documents to NOV
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-10	CVX Genesis	:CVX Genesis	TSR-1725-GENP-03	Project Overhead	Regular Pay	N		1.25	0	General support Meetings with GOM operations
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-10	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2.5	0	Personnel administration Performacne evaluations Dubai engineer FTE forecast report TS Hours Summary
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-10	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		0.5	0	Air Products Tender
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-10	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		0.5	0	209l Rig Move Meetings Maestro Implementation Drawing issues / developing solution
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-10	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		1	0	USCG documentation
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-10	ORLAN	:ORLAN	TSR-01806-ORLP	CRI Roller Mill Repair	Regular Pay	N		0.5	0	CTR approval Discussion with Ralph
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-10	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		1	0	Discussions with TE Presentation for automation execution Cable register VFD House report review
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-10	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		2	0	Lightning protection Electrical documents to NOV
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-11	BERKUT	:BERKUT	TSR-01797-BERP	BOP Test Stump Replacement.	Regular Pay	N		0.5	0	revision 1 closeout
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-11	CVX Genesis	:CVX Genesis	TSR-1725-GENP-03	Project Overhead	Regular Pay	N		0.75	0	General support Meetings with GOM operations
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-11	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2	0	Personnel administration Performacne evaluations Dubai engineer FTE forecast report TS Hours Summary
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-11	OH-009	:OH-009	OH-009-023	Gulf of Mexico	Regular Pay	N		0.5	0	Air Products Tender
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-11	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		1	0	Presentation for automation execution Reviewing schedule
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-11	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		0.75	0	Discussions with TE Presentation for automation execution Cable register VFD House report review
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-11	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		1.5	0	Lightning protection Electrical documents to NOV
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-12	BERKUT	:BERKUT	TSR-01797-BERP	BOP Test Stump Replacement.	Regular Pay	N		2	0	revision 1 closeout
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-12	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		1.5	0	Presentation for automation execution Reviewing schedule
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-12	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		3	0	Discussions with TE Presentation for automation execution Cable register VFD House report review
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-13	HTSG	:HTSG	2022-SMART-Goals 		Regular Pay	N		1	0	IMS Document Revisions for ENG/DES
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-13	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2.5	0	PDR's SMART Goals Admin
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-14	CVX Genesis	:CVX Genesis	TSR-1725-GENP-03	Project Overhead	Regular Pay	N		0.75	0	Loadout support Personnel admin. / scheduling
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-14	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3	0	PDR's SMART Goals Admin
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-14	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		0.5	0	Sakhalin billing administration (incl. meetings)
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-14	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		0.75	0	Compliance
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-14	Rig 051B	:Rig 051B	TSR-01810-51B	Air Products Support	Regular Pay	N		1	0	Review drawings
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-14	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		0.5	0	Electrical deliverables - tracking
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-14	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		2	0	Lightning Protection HP Piping Service order review
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-15	CVX Genesis	:CVX Genesis	TSR-1725-GENP-03	Project Overhead	Regular Pay	N		0.75	0	Loadout support Personnel admin. / scheduling
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-15	HTSG	:HTSG	2022-SMART-Goals 		Regular Pay	N		0.5	0	IMS Document Revisions for ENG/DES
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-15	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2.5	0	PDR's SMART Goals Admin
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-15	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		0.25	0	Sakhalin billing administration (incl. meetings)
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-15	OH-034	:OH-034	OH-034-010	Gulf of Mexico (includes compliance documentation – USCG)	Regular Pay	N		1.5	0	Compliance
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-15	Rig 051B	:Rig 051B	TSR-01810-51B	Air Products Support	Regular Pay	N		0.5	0	Review drawings
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-15	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		2	0	Electrical Meeting; regulatory issues
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-15	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		1	0	Electrical deliverables - tracking
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-15	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		1.5	0	Lightning Protection HP Piping Service order review
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-16	CVX Genesis	:CVX Genesis	TSR-1725-GENP-03	Project Overhead	Regular Pay	N		1	0	Loadout support Personnel admin. / scheduling
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-16	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2.5	0	PDR's SMART Goals Admin
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-16	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		0.5	0	Sakhalin billing administration (incl. meetings)
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-16	OH-034	:OH-034	OH-034-005	Kazakhstan	Regular Pay	N		1	0	258L Start-Up support
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-16	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		1	0	Electrical Meeting; regulatory issues
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-16	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		0.75	0	Electrical deliverables - tracking
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-16	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		2.5	0	Lightning Protection HP Piping Service order review
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-17	CVX Genesis	:CVX Genesis	TSR-1725-GENP-03	Project Overhead	Regular Pay	N		0.75	0	Loadout support Personnel admin. / scheduling
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-17	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Bi-Weekly Meeting
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-17	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3	0	PDR's SMART Goals Admin
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-17	OH-013	:OH-013	Overhead	All Activities	Regular Pay	N		1	0	TSR Tracker Update
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-17	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		0.5	0	Sakhalin billing administration (incl. meetings)
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-17	OH-034	:OH-034	OH-034-005	Kazakhstan	Regular Pay	N		1	0	258L Start-Up support
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-17	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		0.75	0	Electrical deliverables - tracking
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-17	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		1.5	0	Lightning Protection HP Piping Service order review
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-18	CVX Genesis	:CVX Genesis	TSR-1725-GENP-03	Project Overhead	Regular Pay	N		0.75	0	Loadout support Personnel admin. / scheduling
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-18	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3	0	PDR's SMART Goals Admin
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-18	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		0.5	0	Sakhalin billing administration (incl. meetings)
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-18	OH-034	:OH-034	OH-034-005	Kazakhstan	Regular Pay	N		1	0	258L Start-Up support
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-18	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		1	0	Electrical Meeting; regulatory issues
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-18	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		1	0	Electrical deliverables - tracking
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-18	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		2	0	Lightning Protection HP Piping Service order review
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-19	OH-034	:OH-034	OH-034-005	Kazakhstan	Regular Pay	N		0.75	0	258L Start-Up support
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-19	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		1.5	0	Lightning Protection HP Piping Service order review
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-21	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	Performance Evaluation Meetings IHS Administration
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-21	OH-008	:OH-008	Overhead	All Activities	Regular Pay	N		8	0	Presidents Day
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-21	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1	0	209L Rig-Move Planning
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-21	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		1	0	HP Piping support Electrical Support Service Delivery tracker
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-22	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3	0	Performance Evaluation Meetings IHS Administration
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-22	OH-011	:OH-011	Overhead	All Activities	Regular Pay	N		4	0	Funeral
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-22	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1	0	209L Rig-Move Planning
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-22	OH-034	:OH-034	OH-034-005	Kazakhstan	Regular Pay	N		2	0	257B Reactivation / meetings / reviewing costs 258L start-up support
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-22	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		1	0	Power frame 2 layout Electrical cable review 
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-22	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		1	0	Personnel planning Regulatory discussions Reviewing drawings
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-23	CVX Genesis	:CVX Genesis	TSR-1725-GENP-03	Project Overhead	Regular Pay	N		1	0	Loadout Support Offshore rig-up planning
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-23	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Schlumberger - Parker De- Carbonization Technologies Presentation Meeting with Brage/AP/CS
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-23	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3.5	0	Performance Evaluation Meetings IHS Administration
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-23	OH-009	:OH-009	OH-009-015	Alaska	Regular Pay	N		1.5	0	Santos/Oilsearch Support
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-23	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1	0	209L Rig-Move Planning
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-23	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		1	0	HP Piping support Electrical Support Service Delivery tracker
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-24	CVX Genesis	:CVX Genesis	TSR-1725-GENP-03	Project Overhead	Regular Pay	N		1	0	Loadout Support Offshore rig-up planning
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-24	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Schlumberger - Parker De- Carbonization Technologies Presentation Meeting with Brage/AP/CS
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-24	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3	0	Performance Evaluation Meetings IHS Administration
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-24	OH-009	:OH-009	OH-009-015	Alaska	Regular Pay	N		0.5	0	Santos/Oilsearch Support
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-24	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		2	0	209L Rig-Move Planning
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-24	OH-034	:OH-034	OH-034-005	Kazakhstan	Regular Pay	N		0.5	0	257B Reactivation / meetings / reviewing costs 258L start-up support
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-24	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		2	0	Personnel planning Regulatory discussions Reviewing drawings
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-24	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		1	0	HP Piping support Electrical Support Service Delivery tracker
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-25	CVX Genesis	:CVX Genesis	TSR-1725-GENP-03	Project Overhead	Regular Pay	N		1	0	Loadout Support Offshore rig-up planning
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-25	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2	0	Performance Evaluation Meetings IHS Administration
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-25	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1.5	0	209L Rig-Move Planning
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-25	OH-034	:OH-034	OH-034-005	Kazakhstan	Regular Pay	N		0.5	0	257B Reactivation / meetings / reviewing costs 258L start-up support
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-25	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-01	Automation Upgrade: Project Management	Regular Pay	N		1	0	Power frame 2 layout Electrical cable review 
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-25	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		1	0	Personnel planning Regulatory discussions Reviewing drawings
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-25	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		2.5	0	HP Piping support Electrical Support Service Delivery tracker
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-26	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	Performance Evaluation Meetings IHS Administration
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-26	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		1	0	HP Piping support Electrical Support Service Delivery tracker
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-27	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	February FTE report HTSG Hours summary 
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-27	OH-034	:OH-034	OH-034-005	Kazakhstan	Regular Pay	N		4	0	258L Start-up Documents 257B reactivation support
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-28	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3.5	0	February FTE report HTSG Hours summary 
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-28	OH-009	:OH-009	OH-009-021	Mexico	Regular Pay	N		2	0	Opex Project Support and Administration
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-28	OH-014	:OH-014	Overhead	All Activities	Regular Pay	N		1	0	Life Saving Rules
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-28	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		0.5	0	Weekly meeting Meeting regarding the decision for ENL to pull out of Sakhalin I consortium
Mcmullen, Kyle	Engineering Discipline Manager	20461	Mcmullen, Kyle:Engineering Discipline Manager	2022-02-28	OH-034	:OH-034	OH-034-005	Kazakhstan	Regular Pay	N		1.5	0	258L Start-up Documents 257B reactivation support
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-01	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	01/31: timesheets to ProjXsense 02/01: find and send native DWG to Genesis 02/02-02-04: assist with IT to migrate SimLab license to new server 02/02: find native CAD for Ripal; email correspondence to Loadmaster for drawings
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-01	OH-013	:OH-013	Overhead	All Activities	Regular Pay	N		0.5	0	02/01: transmit DWG to CVX Bangladesh 02/02: process incoming transmittal; transmit Sawyer Manual to CVX 02/03: generate monthly report for Sakhalin billable hours.
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-01	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		7	0	01/31-02/01: blower motor adapter concept 02/01-02/03: air intensifier mounting and piping 02/03: meeting with Genesis to review HVAC clash with windwall structure. 02/04: surge drain concept
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-02	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		3.5	0	01/31: timesheets to ProjXsense 02/01: find and send native DWG to Genesis 02/02-02-04: assist with IT to migrate SimLab license to new server 02/02: find native CAD for Ripal; email correspondence to Loadmaster for drawings
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-02	OH-013	:OH-013	Overhead	All Activities	Regular Pay	N		1	0	02/01: transmit DWG to CVX Bangladesh 02/02: process incoming transmittal; transmit Sawyer Manual to CVX 02/03: generate monthly report for Sakhalin billable hours.
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-02	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		3.5	0	01/31-02/01: blower motor adapter concept 02/01-02/03: air intensifier mounting and piping 02/03: meeting with Genesis to review HVAC clash with windwall structure. 02/04: surge drain concept
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-03	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	02/03: HTSG TSR update meeting
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-03	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	01/31: timesheets to ProjXsense 02/01: find and send native DWG to Genesis 02/02-02-04: assist with IT to migrate SimLab license to new server 02/02: find native CAD for Ripal; email correspondence to Loadmaster for drawings
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-03	OH-013	:OH-013	Overhead	All Activities	Regular Pay	N		1	0	02/01: transmit DWG to CVX Bangladesh 02/02: process incoming transmittal; transmit Sawyer Manual to CVX 02/03: generate monthly report for Sakhalin billable hours.
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-03	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		5	0	01/31-02/01: blower motor adapter concept 02/01-02/03: air intensifier mounting and piping 02/03: meeting with Genesis to review HVAC clash with windwall structure. 02/04: surge drain concept
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-04	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		0.75	0	01/31: convert PDFs to CAD files 02/04: generate 209L view of DM and DSM  from model
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-04	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2	0	01/31: timesheets to ProjXsense 02/01: find and send native DWG to Genesis 02/02-02-04: assist with IT to migrate SimLab license to new server 02/02: find native CAD for Ripal; email correspondence to Loadmaster for drawings
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-04	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		5.25	0	01/31-02/01: blower motor adapter concept 02/01-02/03: air intensifier mounting and piping 02/03: meeting with Genesis to review HVAC clash with windwall structure. 02/04: surge drain concept
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-07	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		0.25	0	02/07: NOV PDF to CAD drawing 02/10: meeting with Tyler & John  to review service loop bracket; review TSR-01776 for MTO/DWG errors regarding beam size and shape; send STP model file to Sakhalin 02/11: Krechet plot plan for Kyle
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-07	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	02/07: timesheets to ProjXsense & payroll
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-07	OH-013	:OH-013	Overhead	All Activities	Regular Pay	N		1.5	0	02/07: process TSR requests; transmit NOV drawings to PKD team for review. 02/09: process drawing number requests from Davor; transmit TSR-01801-CTR & TSR-01806-CTR 02/11: transmit reference info to NOV
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-07	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		1.75	0	02/07: weekly Sakhalin meeting to discuss TSR updates; meeting with Sakhalin to review Krechet Automation concepts
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-07	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		3.5	0	02/07-02/11: create CAD drawings for blower motor adapter 02/10: power frame service loop bracket concept
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-08	OH-001	:OH-001	Overhead	All Activities	Regular Pay	N		8	0	
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-09	OH-013	:OH-013	Overhead	All Activities	Regular Pay	N		1.75	0	02/07: process TSR requests; transmit NOV drawings to PKD team for review. 02/09: process drawing number requests from Davor; transmit TSR-01801-CTR & TSR-01806-CTR 02/11: transmit reference info to NOV
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-09	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		6.25	0	02/07-02/11: create CAD drawings for blower motor adapter 02/10: power frame service loop bracket concept
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-10	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		4	0	02/07: NOV PDF to CAD drawing 02/10: meeting with Tyler & John  to review service loop bracket; review TSR-01776 for MTO/DWG errors regarding beam size and shape; send STP model file to Sakhalin 02/11: Krechet plot plan for Kyle
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-10	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		4	0	02/07-02/11: create CAD drawings for blower motor adapter 02/10: power frame service loop bracket concept
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-11	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		2	0	02/07: NOV PDF to CAD drawing 02/10: meeting with Tyler & John  to review service loop bracket; review TSR-01776 for MTO/DWG errors regarding beam size and shape; send STP model file to Sakhalin 02/11: Krechet plot plan for Kyle
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-11	OH-013	:OH-013	Overhead	All Activities	Regular Pay	N		1	0	02/07: process TSR requests; transmit NOV drawings to PKD team for review. 02/09: process drawing number requests from Davor; transmit TSR-01801-CTR & TSR-01806-CTR 02/11: transmit reference info to NOV
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-11	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		5	0	02/07-02/11: create CAD drawings for blower motor adapter 02/10: power frame service loop bracket concept
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-14	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		0.25	0	02/14: convert PDF drawing to CAD
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-14	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	02/14: timesheets to ProjXsense & payroll 02/15: locate and send DSM grasshopper drawing for Chuck. 02/16: locate and find electrical cable schedule for Chuck 02/17-02/18: CAD administration and troubleshooting network license issues 02/18: find piping schematic for TD/DWKS brake cooling.
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-14	OH-013	:OH-013	Overhead	All Activities	Regular Pay	N		1	0	02/14: transmit TSR-01797-CO & TSR-01800-CTR 02/18: process incoming transmittals (3)
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-14	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		1	0	02/14: weekly Sakhalin meeting to discuss TSR update
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-14	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		4.75	0	02/14: meeting with James to review DSM VFD stairs 02/14-02/17: preliminary drawing set for blower adapter assembly.
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-15	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	02/14: timesheets to ProjXsense & payroll 02/15: locate and send DSM grasshopper drawing for Chuck. 02/16: locate and find electrical cable schedule for Chuck 02/17-02/18: CAD administration and troubleshooting network license issues 02/18: find piping schematic for TD/DWKS brake cooling.
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-15	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		7.5	0	02/14: meeting with James to review DSM VFD stairs 02/14-02/17: preliminary drawing set for blower adapter assembly.
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-16	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	02/14: timesheets to ProjXsense & payroll 02/15: locate and send DSM grasshopper drawing for Chuck. 02/16: locate and find electrical cable schedule for Chuck 02/17-02/18: CAD administration and troubleshooting network license issues 02/18: find piping schematic for TD/DWKS brake cooling.
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-16	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		7.5	0	02/14: meeting with James to review DSM VFD stairs 02/14-02/17: preliminary drawing set for blower adapter assembly.
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-17	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	02/17: Tech Services bi-weekly update meeting.
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-17	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2	0	02/14: timesheets to ProjXsense & payroll 02/15: locate and send DSM grasshopper drawing for Chuck. 02/16: locate and find electrical cable schedule for Chuck 02/17-02/18: CAD administration and troubleshooting network license issues 02/18: find piping schematic for TD/DWKS brake cooling.
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-17	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		1	0	update Krechet model of the DSM and DM drill floor
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-17	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		4	0	02/14: meeting with James to review DSM VFD stairs 02/14-02/17: preliminary drawing set for blower adapter assembly.
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-18	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1.5	0	02/14: timesheets to ProjXsense & payroll 02/15: locate and send DSM grasshopper drawing for Chuck. 02/16: locate and find electrical cable schedule for Chuck 02/17-02/18: CAD administration and troubleshooting network license issues 02/18: find piping schematic for TD/DWKS brake cooling.
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-18	OH-013	:OH-013	Overhead	All Activities	Regular Pay	N		1	0	02/14: transmit TSR-01797-CO & TSR-01800-CTR 02/18: process incoming transmittals (3)
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-18	OH-034	:OH-034	OH-034-001	Sakhalin	Regular Pay	N		5.5	0	update Krechet model of the DSM and DM drill floor
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-21	OH-008	:OH-008	Overhead	All Activities	Regular Pay	N		8	0	President's Day
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-22	OH-001	:OH-001	Overhead	All Activities	Regular Pay	N		8	0	
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-23	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		2.5	0	02/23: revise 269L drawings with updated title blocks
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-23	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	02/23: email MTO native excel files to Mihovil. 02/24: search for work pack for Tyler 02/25: timesheets to ProjXsense; assign drawing numbers 
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-23	OH-014	:OH-014	Overhead	All Activities	Regular Pay	N		1	0	02/23: life saving rules training
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-23	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		4	0	02/23: meeting with Tyler and Jorge to discuss HVAC cut out for driller's cabin 02/24: meeting with Genesis and Tyler to discuss 2nd powerframe installation;  02/23-02/24: picked up red lines for blower adapter 02/25: topology drawing from Ripal
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-24	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2	0	02/23: email MTO native excel files to Mihovil. 02/24: search for work pack for Tyler 02/25: timesheets to ProjXsense; assign drawing numbers 
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-24	OH-013	:OH-013	Overhead	All Activities	Regular Pay	N		1	0	02/24: transmit DWGS to Aksai (249L-161-058 02/25: process incoming NOV transmittal and transmit them back out to HTSG
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-24	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		3	0	02/23: meeting with Tyler and Jorge to discuss HVAC cut out for driller's cabin 02/24: meeting with Genesis and Tyler to discuss 2nd powerframe installation;  02/23-02/24: picked up red lines for blower adapter 02/25: topology drawing from Ripal
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-24	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01801-209L	Service Pad Eyes for HP Valves	Regular Pay	N		2	0	02/24: help Ralph with design of lifting tool for TSR-01801
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-25	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	02/25: 2021 Performance review evaluations discussion.
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-25	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1.5	0	02/23: email MTO native excel files to Mihovil. 02/24: search for work pack for Tyler 02/25: timesheets to ProjXsense; assign drawing numbers 
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-25	OH-013	:OH-013	Overhead	All Activities	Regular Pay	N		1.5	0	02/24: transmit DWGS to Aksai (249L-161-058 02/25: process incoming NOV transmittal and transmit them back out to HTSG
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-25	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		4	0	02/23: meeting with Tyler and Jorge to discuss HVAC cut out for driller's cabin 02/24: meeting with Genesis and Tyler to discuss 2nd powerframe installation;  02/23-02/24: picked up red lines for blower adapter 02/25: topology drawing from Ripal
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-28	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		1	0	02/28: meeting with Mihovil to discuss TSR weekly updates and status
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-28	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		5	0	02/28: update 3D concept model for surge tank dump line 02/28-29: finalize and complete electrical topology drawing 02/29: picked up blower adapter redlines 03/02: meeting with Jorge to discuss stairs to VFD house details
Nguyen, Lam	Designer II	27172	Nguyen, Lam:Designer II	2022-02-28	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		2	0	02/28: meeting with Tyler to discuss PF surge tank; meeting with Chuck and Ripal to find cable lengths 03/03: meeting with Nance to discuss HVAC ducting concept 
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-01	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		10	0	Update weekly report.  Attend weekly mtg.  Attend CVX kickoff mtg.  Distribute puls dampener options and fluid end options.  Update weekly report.   Loadmaster Mast Analysis kickoff meeting.  Review Service delivery tracker.  Review catwalk options.  Review lightning protection spec.  Clarify drill pipe sub with CVX.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-02	OH-009	:OH-009	OH-009-028	Middle East and Asia Pacific (MEAP)	Regular Pay	N		4	0	Search for rig options for Japan and assemble rig specs and powerpoint table summary.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-02	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		6	0	Update weekly report.  Attend weekly mtg.  Attend CVX kickoff mtg.  Distribute puls dampener options and fluid end options.  Update weekly report.   Loadmaster Mast Analysis kickoff meeting.  Review Service delivery tracker.  Review catwalk options.  Review lightning protection spec.  Clarify drill pipe sub with CVX.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-03	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	TS bi-weekly mtg.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-03	OH-009	:OH-009	OH-009-028	Middle East and Asia Pacific (MEAP)	Regular Pay	N		5	0	Search for rig options for Japan and assemble rig specs and powerpoint table summary.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-03	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		4	0	Update weekly report.  Attend weekly mtg.  Attend CVX kickoff mtg.  Distribute puls dampener options and fluid end options.  Update weekly report.   Loadmaster Mast Analysis kickoff meeting.  Review Service delivery tracker.  Review catwalk options.  Review lightning protection spec.  Clarify drill pipe sub with CVX.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-04	OH-009	:OH-009	OH-009-028	Middle East and Asia Pacific (MEAP)	Regular Pay	N		2	0	Search for rig options for Japan and assemble rig specs and powerpoint table summary.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-04	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		5	0	Update weekly report.  Attend weekly mtg.  Attend CVX kickoff mtg.  Distribute puls dampener options and fluid end options.  Update weekly report.   Loadmaster Mast Analysis kickoff meeting.  Review Service delivery tracker.  Review catwalk options.  Review lightning protection spec.  Clarify drill pipe sub with CVX.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-07	OH-009	:OH-009	OH-009-028	Middle East and Asia Pacific (MEAP)	Regular Pay	N		6	0	Meet with Patterson for global dry-lease rig options.  Meet with Jelec to request newbuild budgetary quote for Argentina and geo-thermal mast and sub.  Continue developing Japan rig options and meet with BD.  Assemble Oil India 3,000Hp rig options.  
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-07	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		6	0	269 Bangladesh weekly meetings.   Review lightning protection layout, specs with team and Lightning master.  Review catwalk specs and cost with team and HH.   Update Service Delivery tracker, 
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-08	OH-009	:OH-009	OH-009-028	Middle East and Asia Pacific (MEAP)	Regular Pay	N		2	0	Meet with Patterson for global dry-lease rig options.  Meet with Jelec to request newbuild budgetary quote for Argentina and geo-thermal mast and sub.  Continue developing Japan rig options and meet with BD.  Assemble Oil India 3,000Hp rig options.  
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-08	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		6	0	269 Bangladesh weekly meetings.   Review lightning protection layout, specs with team and Lightning master.  Review catwalk specs and cost with team and HH.   Update Service Delivery tracker, 
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-09	OH-009	:OH-009	OH-009-028	Middle East and Asia Pacific (MEAP)	Regular Pay	N		4	0	Meet with Patterson for global dry-lease rig options.  Meet with Jelec to request newbuild budgetary quote for Argentina and geo-thermal mast and sub.  Continue developing Japan rig options and meet with BD.  Assemble Oil India 3,000Hp rig options.  
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-09	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		8	0	269 Bangladesh weekly meetings.   Review lightning protection layout, specs with team and Lightning master.  Review catwalk specs and cost with team and HH.   Update Service Delivery tracker, 
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-10	OH-009	:OH-009	OH-009-028	Middle East and Asia Pacific (MEAP)	Regular Pay	N		2	0	Meet with Patterson for global dry-lease rig options.  Meet with Jelec to request newbuild budgetary quote for Argentina and geo-thermal mast and sub.  Continue developing Japan rig options and meet with BD.  Assemble Oil India 3,000Hp rig options.  
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-10	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		10	0	269 Bangladesh weekly meetings.   Review lightning protection layout, specs with team and Lightning master.  Review catwalk specs and cost with team and HH.   Update Service Delivery tracker, 
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-11	OH-009	:OH-009	OH-009-028	Middle East and Asia Pacific (MEAP)	Regular Pay	N		2	0	Meet with Patterson for global dry-lease rig options.  Meet with Jelec to request newbuild budgetary quote for Argentina and geo-thermal mast and sub.  Continue developing Japan rig options and meet with BD.  Assemble Oil India 3,000Hp rig options.  
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-11	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		4	0	269 Bangladesh weekly meetings.   Review lightning protection layout, specs with team and Lightning master.  Review catwalk specs and cost with team and HH.   Update Service Delivery tracker, 
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-12	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Review and respond to emails, set up meetings.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-14	OH-009	:OH-009	OH-009-028	Middle East and Asia Pacific (MEAP)	Regular Pay	N		4	0	Assemble rig options for Oil India 3,000HP rig.  Prepare for GPSS meeting and assemble Japan rig specs and options.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-14	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		8	0	Chevron bi-weekly meeting for Rig 269 upgrade and mob.  Attend NOV HP piping design meeting.  Review and plan Service Delivery tracker.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-15	OH-009	:OH-009	OH-009-028	Middle East and Asia Pacific (MEAP)	Regular Pay	N		2	0	Assemble rig options for Oil India 3,000HP rig.  Prepare for GPSS meeting and assemble Japan rig specs and options.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-15	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		10	0	Chevron bi-weekly meeting for Rig 269 upgrade and mob.  Attend NOV HP piping design meeting.  Review and plan Service Delivery tracker.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-16	OH-009	:OH-009	OH-009-028	Middle East and Asia Pacific (MEAP)	Regular Pay	N		4	0	Assemble rig options for Oil India 3,000HP rig.  Prepare for GPSS meeting and assemble Japan rig specs and options.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-16	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		8	0	Chevron bi-weekly meeting for Rig 269 upgrade and mob.  Attend NOV HP piping design meeting.  Review and plan Service Delivery tracker.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-17	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Weekly TS mtg.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-17	OH-009	:OH-009	OH-009-028	Middle East and Asia Pacific (MEAP)	Regular Pay	N		9	0	Assemble rig options for Oil India 3,000HP rig.  Prepare for GPSS meeting and assemble Japan rig specs and options.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-17	OH-014	:OH-014	Overhead	All Activities	Regular Pay	N		1	0	Attend Lifesaving training.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-17	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		1	0	Chevron bi-weekly meeting for Rig 269 upgrade and mob.  Attend NOV HP piping design meeting.  Review and plan Service Delivery tracker.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-18	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		6	0	Chevron bi-weekly meeting for Rig 269 upgrade and mob.  Attend NOV HP piping design meeting.  Review and plan Service Delivery tracker.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-21	OH-008	:OH-008	Overhead	All Activities	Regular Pay	N		8	0	
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-22	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Indonesia PT Dati mtg..  Slb de-carbon mtg.  2021 PDR review and 2022 PDR Goals.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-22	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		9	0	Update weekly report, procurement tracker, SD tracker.  Support upgrades engineering and BOP sourcing.  Send information to Chevron.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-23	OH-009	:OH-009	OH-009-028	Middle East and Asia Pacific (MEAP)	Regular Pay	N		8	0	Continue assembling rig options for MOECO.  Assemble Rig Max  3,000hp and 270 Oil India options
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-23	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		2	0	Update weekly report, procurement tracker, SD tracker.  Support upgrades engineering and BOP sourcing.  Send information to Chevron.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-24	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Indonesia PT Dati mtg..  Slb de-carbon mtg.  2021 PDR review and 2022 PDR Goals.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-24	OH-009	:OH-009	OH-009-028	Middle East and Asia Pacific (MEAP)	Regular Pay	N		9	0	Continue assembling rig options for MOECO.  Assemble Rig Max  3,000hp and 270 Oil India options
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-25	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1.5	0	Indonesia PT Dati mtg..  Slb de-carbon mtg.  2021 PDR review and 2022 PDR Goals.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-25	OH-009	:OH-009	OH-009-031	US Land (USL)	Regular Pay	N		5.5	0	Assemble Unit 326, PTEN rig, Parker rig options for Oxy CCU wells tender.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-28	OH-009	:OH-009	OH-009-031	US Land (USL)	Regular Pay	N		8	0	Review Unit 326 specs vs Oxy requirements with team.  meet with Caspian Logistics, owner of Unit 326.
Osten, Greg	Project Manager	23110	Osten, Greg:Project Manager	2022-02-28	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		2	0	Provide engineering status for weekly report, update schedule, update service delivery tracker.  Update procurement tracker.  Meet to review cost tracking path forward.  Interface with team and NOV for Top Drive sensors.  Attend bi-weekly NOV meeting.  Review NOV HP Mud Pump overhaul quote.  Attend bi-weekly CVX call.  BOP sourcing call.
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-01	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		4	0	Fire and Gas System Upgrade QA with Drazan. Talkback system meeting with Bruce Chuck and  Drazan. Talkback option reviewed.  Fire and Gas System Upgrade follow up with Nick ( DTI ) . Hoist Interlock drawing reviewed.  Parker 209 Krechet - Sequencer Functional Design Description. Krechet Automation upgrade  - Driller's Cabin A/C unit QA with NOV.  Paker/ENL Krechet Automation update meeting.  Krechet Rig 209 AC Upgrade / Sequencer - Bi-Weekly Action Item meeting.  Ripal Status Update meeting with Tyler.  Topology cable updated and sent to Lam. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-01	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		4	0	269L Power Analysis Meeting with NOV. 269L Bangladesh - Info. Requested by NOV. Rig 269 - MCC Load verification meeting with Erbil Team.   Catwalk for Bangladesh rig 269 QA with Rammohan. 269 Lightning Protection system meeting with Berny and Houston Team.  Eaton Cutler Hammer VFD Drives Capacitor Deforming  procedure sent.  Rig 269 CVX Bangladesh Fire and Gas System final plot plan from Rutledge reviewed.   SkyScan quote requested and reviewed.  269 Lightning Protection system quote from Rexel reviewed. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-02	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		3	0	Fire and Gas System Upgrade QA with Drazan. Talkback system meeting with Bruce Chuck and  Drazan. Talkback option reviewed.  Fire and Gas System Upgrade follow up with Nick ( DTI ) . Hoist Interlock drawing reviewed.  Parker 209 Krechet - Sequencer Functional Design Description. Krechet Automation upgrade  - Driller's Cabin A/C unit QA with NOV.  Paker/ENL Krechet Automation update meeting.  Krechet Rig 209 AC Upgrade / Sequencer - Bi-Weekly Action Item meeting.  Ripal Status Update meeting with Tyler.  Topology cable updated and sent to Lam. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-02	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		4	0	269L Power Analysis Meeting with NOV. 269L Bangladesh - Info. Requested by NOV. Rig 269 - MCC Load verification meeting with Erbil Team.   Catwalk for Bangladesh rig 269 QA with Rammohan. 269 Lightning Protection system meeting with Berny and Houston Team.  Eaton Cutler Hammer VFD Drives Capacitor Deforming  procedure sent.  Rig 269 CVX Bangladesh Fire and Gas System final plot plan from Rutledge reviewed.   SkyScan quote requested and reviewed.  269 Lightning Protection system quote from Rexel reviewed. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-03	OH-034	:OH-034	OH-034-006	Iraq	Regular Pay	N		2	0	 Rig 265 - Eaton Cutler Hammer VFD Drives Capacitor Deforming  procedure sent.  
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-03	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		4	0	Fire and Gas System Upgrade QA with Drazan. Talkback system meeting with Bruce Chuck and  Drazan. Talkback option reviewed.  Fire and Gas System Upgrade follow up with Nick ( DTI ) . Hoist Interlock drawing reviewed.  Parker 209 Krechet - Sequencer Functional Design Description. Krechet Automation upgrade  - Driller's Cabin A/C unit QA with NOV.  Paker/ENL Krechet Automation update meeting.  Krechet Rig 209 AC Upgrade / Sequencer - Bi-Weekly Action Item meeting.  Ripal Status Update meeting with Tyler.  Topology cable updated and sent to Lam. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-03	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		3	0	269L Power Analysis Meeting with NOV. 269L Bangladesh - Info. Requested by NOV. Rig 269 - MCC Load verification meeting with Erbil Team.   Catwalk for Bangladesh rig 269 QA with Rammohan. 269 Lightning Protection system meeting with Berny and Houston Team.  Eaton Cutler Hammer VFD Drives Capacitor Deforming  procedure sent.  Rig 269 CVX Bangladesh Fire and Gas System final plot plan from Rutledge reviewed.   SkyScan quote requested and reviewed.  269 Lightning Protection system quote from Rexel reviewed. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-04	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		2	0	Fire and Gas System Upgrade QA with Drazan. Talkback system meeting with Bruce Chuck and  Drazan. Talkback option reviewed.  Fire and Gas System Upgrade follow up with Nick ( DTI ) . Hoist Interlock drawing reviewed.  Parker 209 Krechet - Sequencer Functional Design Description. Krechet Automation upgrade  - Driller's Cabin A/C unit QA with NOV.  Paker/ENL Krechet Automation update meeting.  Krechet Rig 209 AC Upgrade / Sequencer - Bi-Weekly Action Item meeting.  Ripal Status Update meeting with Tyler.  Topology cable updated and sent to Lam. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-04	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		6	0	269L Power Analysis Meeting with NOV. 269L Bangladesh - Info. Requested by NOV. Rig 269 - MCC Load verification meeting with Erbil Team.   Catwalk for Bangladesh rig 269 QA with Rammohan. 269 Lightning Protection system meeting with Berny and Houston Team.  Eaton Cutler Hammer VFD Drives Capacitor Deforming  procedure sent.  Rig 269 CVX Bangladesh Fire and Gas System final plot plan from Rutledge reviewed.   SkyScan quote requested and reviewed.  269 Lightning Protection system quote from Rexel reviewed. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-07	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		1	0	SAK weekly meeting
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-07	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		4	0	Fire and Gas System Upgrade quote from DTI reviewed.  New VFD House GA comments from Chuck reviewed.  Krechet Automation upgrade - VFD House plug panel detail email sent to John for clarification.  New VFD House latest GA Rev03 reviewed.  Top Drive JB question and discussion with Drazan and Tyler.  Krechet Fire and Gas quote review meeting with Chuck and Tyler.  Krechet Automation upgrade - New  NOV Top Drive ( TDX-1250 ) comments form Drazan reviewed.  Paker/ENL Krechet Automation update meeting. Ripal Status Update meeting with Tyler. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-07	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		3	0	 Rig 269 CVX Bangladesh Fire and Gas System final plot reviewed.  Catwalk for Bangladesh rig 269 discussion with Berny before HH meeting.  Bangladesh Rig Lightning Protection meeting with Lightning Master.  Rig 269 CVX Bangladesh - 480V MCC verification meeting with Nelu and Berny. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-08	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		4	0	Fire and Gas System Upgrade quote from DTI reviewed.  New VFD House GA comments from Chuck reviewed.  Krechet Automation upgrade - VFD House plug panel detail email sent to John for clarification.  New VFD House latest GA Rev03 reviewed.  Top Drive JB question and discussion with Drazan and Tyler.  Krechet Fire and Gas quote review meeting with Chuck and Tyler.  Krechet Automation upgrade - New  NOV Top Drive ( TDX-1250 ) comments form Drazan reviewed.  Paker/ENL Krechet Automation update meeting. Ripal Status Update meeting with Tyler. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-08	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		4	0	 Rig 269 CVX Bangladesh Fire and Gas System final plot reviewed.  Catwalk for Bangladesh rig 269 discussion with Berny before HH meeting.  Bangladesh Rig Lightning Protection meeting with Lightning Master.  Rig 269 CVX Bangladesh - 480V MCC verification meeting with Nelu and Berny. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-09	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		7	0	Fire and Gas System Upgrade quote from DTI reviewed.  New VFD House GA comments from Chuck reviewed.  Krechet Automation upgrade - VFD House plug panel detail email sent to John for clarification.  New VFD House latest GA Rev03 reviewed.  Top Drive JB question and discussion with Drazan and Tyler.  Krechet Fire and Gas quote review meeting with Chuck and Tyler.  Krechet Automation upgrade - New  NOV Top Drive ( TDX-1250 ) comments form Drazan reviewed.  Paker/ENL Krechet Automation update meeting. Ripal Status Update meeting with Tyler. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-09	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		1	0	 Rig 269 CVX Bangladesh Fire and Gas System final plot reviewed.  Catwalk for Bangladesh rig 269 discussion with Berny before HH meeting.  Bangladesh Rig Lightning Protection meeting with Lightning Master.  Rig 269 CVX Bangladesh - 480V MCC verification meeting with Nelu and Berny. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-10	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		6	0	Fire and Gas System Upgrade quote from DTI reviewed.  New VFD House GA comments from Chuck reviewed.  Krechet Automation upgrade - VFD House plug panel detail email sent to John for clarification.  New VFD House latest GA Rev03 reviewed.  Top Drive JB question and discussion with Drazan and Tyler.  Krechet Fire and Gas quote review meeting with Chuck and Tyler.  Krechet Automation upgrade - New  NOV Top Drive ( TDX-1250 ) comments form Drazan reviewed.  Paker/ENL Krechet Automation update meeting. Ripal Status Update meeting with Tyler. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-10	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		2	0	 Rig 269 CVX Bangladesh Fire and Gas System final plot reviewed.  Catwalk for Bangladesh rig 269 discussion with Berny before HH meeting.  Bangladesh Rig Lightning Protection meeting with Lightning Master.  Rig 269 CVX Bangladesh - 480V MCC verification meeting with Nelu and Berny. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-11	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		8	0	Fire and Gas System Upgrade quote from DTI reviewed.  New VFD House GA comments from Chuck reviewed.  Krechet Automation upgrade - VFD House plug panel detail email sent to John for clarification.  New VFD House latest GA Rev03 reviewed.  Top Drive JB question and discussion with Drazan and Tyler.  Krechet Fire and Gas quote review meeting with Chuck and Tyler.  Krechet Automation upgrade - New  NOV Top Drive ( TDX-1250 ) comments form Drazan reviewed.  Paker/ENL Krechet Automation update meeting. Ripal Status Update meeting with Tyler. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-14	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		1	0	SAK weekly meeting. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-14	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		6	0	Paker/ENL Krechet Automation update weekly meeting.  Review of Topology Drawing meeting with Tyler.  Krechet Automation Upgrade -  Block Diagram clarification needed meeting with NOV.  Krechet Rig 209 AC Upgrade / Sequencer - Bi-Weekly Action Item and Status Update meeting.  Ripal Status Update meeting.  Topology Drawing completed.  Cable list completed for Topology.  Comments from Topology Meeting reviewed and reline NOV drawings.  Krechet Automation Upgrade -  Block Diagram clarification meeting with John and Chuck.  Krechet Automation - New Driller's cabin Power feed ??  QA with Drazan.  FW: H2S Sensor Location QA with DTI and Drazan.  Parker 209 Krechet - fiber connectors datasheet from NOV reviewed.  Cable Tray Study from Chuck. Need to review in detail. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-14	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		1	0	CVX Bangladesh - Rutledge final quote and GA review  meeting with Greg, Kyle and Berny.   Catwalk for Parker rig (GCEQB21124H) meeting with HH and PWB team.  Rig 269 CVX Bangladesh Fire and Gas System final quote and plot received from Sarfraz and reviewed.  Parker 269 - MCC Confirmation
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-15	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		4	0	Paker/ENL Krechet Automation update weekly meeting.  Review of Topology Drawing meeting with Tyler.  Krechet Automation Upgrade -  Block Diagram clarification needed meeting with NOV.  Krechet Rig 209 AC Upgrade / Sequencer - Bi-Weekly Action Item and Status Update meeting.  Ripal Status Update meeting.  Topology Drawing completed.  Cable list completed for Topology.  Comments from Topology Meeting reviewed and reline NOV drawings.  Krechet Automation Upgrade -  Block Diagram clarification meeting with John and Chuck.  Krechet Automation - New Driller's cabin Power feed ??  QA with Drazan.  FW: H2S Sensor Location QA with DTI and Drazan.  Parker 209 Krechet - fiber connectors datasheet from NOV reviewed.  Cable Tray Study from Chuck. Need to review in detail. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-15	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		4	0	CVX Bangladesh - Rutledge final quote and GA review  meeting with Greg, Kyle and Berny.   Catwalk for Parker rig (GCEQB21124H) meeting with HH and PWB team.  Rig 269 CVX Bangladesh Fire and Gas System final quote and plot received from Sarfraz and reviewed.  Parker 269 - MCC Confirmation
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-16	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		6	0	Paker/ENL Krechet Automation update weekly meeting.  Review of Topology Drawing meeting with Tyler.  Krechet Automation Upgrade -  Block Diagram clarification needed meeting with NOV.  Krechet Rig 209 AC Upgrade / Sequencer - Bi-Weekly Action Item and Status Update meeting.  Ripal Status Update meeting.  Topology Drawing completed.  Cable list completed for Topology.  Comments from Topology Meeting reviewed and reline NOV drawings.  Krechet Automation Upgrade -  Block Diagram clarification meeting with John and Chuck.  Krechet Automation - New Driller's cabin Power feed ??  QA with Drazan.  FW: H2S Sensor Location QA with DTI and Drazan.  Parker 209 Krechet - fiber connectors datasheet from NOV reviewed.  Cable Tray Study from Chuck. Need to review in detail. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-16	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		2	0	CVX Bangladesh - Rutledge final quote and GA review  meeting with Greg, Kyle and Berny.   Catwalk for Parker rig (GCEQB21124H) meeting with HH and PWB team.  Rig 269 CVX Bangladesh Fire and Gas System final quote and plot received from Sarfraz and reviewed.  Parker 269 - MCC Confirmation
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-17	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	ESWC Kickoff Meeting
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-17	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1	0	TS weekly meeting. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-17	OH-014	:OH-014	Overhead	All Activities	Regular Pay	N		1	0	Parker Life Saving Rules Training
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-17	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		4	0	Paker/ENL Krechet Automation update weekly meeting.  Review of Topology Drawing meeting with Tyler.  Krechet Automation Upgrade -  Block Diagram clarification needed meeting with NOV.  Krechet Rig 209 AC Upgrade / Sequencer - Bi-Weekly Action Item and Status Update meeting.  Ripal Status Update meeting.  Topology Drawing completed.  Cable list completed for Topology.  Comments from Topology Meeting reviewed and reline NOV drawings.  Krechet Automation Upgrade -  Block Diagram clarification meeting with John and Chuck.  Krechet Automation - New Driller's cabin Power feed ??  QA with Drazan.  FW: H2S Sensor Location QA with DTI and Drazan.  Parker 209 Krechet - fiber connectors datasheet from NOV reviewed.  Cable Tray Study from Chuck. Need to review in detail. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-17	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		1	0	CVX Bangladesh - Rutledge final quote and GA review  meeting with Greg, Kyle and Berny.   Catwalk for Parker rig (GCEQB21124H) meeting with HH and PWB team.  Rig 269 CVX Bangladesh Fire and Gas System final quote and plot received from Sarfraz and reviewed.  Parker 269 - MCC Confirmation
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-18	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		8	0	Paker/ENL Krechet Automation update weekly meeting.  Review of Topology Drawing meeting with Tyler.  Krechet Automation Upgrade -  Block Diagram clarification needed meeting with NOV.  Krechet Rig 209 AC Upgrade / Sequencer - Bi-Weekly Action Item and Status Update meeting.  Ripal Status Update meeting.  Topology Drawing completed.  Cable list completed for Topology.  Comments from Topology Meeting reviewed and reline NOV drawings.  Krechet Automation Upgrade -  Block Diagram clarification meeting with John and Chuck.  Krechet Automation - New Driller's cabin Power feed ??  QA with Drazan.  FW: H2S Sensor Location QA with DTI and Drazan.  Parker 209 Krechet - fiber connectors datasheet from NOV reviewed.  Cable Tray Study from Chuck. Need to review in detail. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-21	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		1	0	SAK weekly meeting 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-21	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		5	0	DTI - Krechet Automation  Fire and Gas Quote discussion. Krechet Automation Upgrade -  Block Diagram clarification needed. Amphenol Inline Plug Assemblies.. Krechet - Fiber Cable Length with 3D model . Paker/ENL Krechet Automation update meeting. Ripal Status Update with Tyler 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-21	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		2	0	Parker 269 - MCC Confirmation TD HPU. Toe Drive Power and Control Cables. Review any questions about Rig 269 Bangladesh Service Order meeting. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-22	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		6	0	DTI - Krechet Automation  Fire and Gas Quote discussion. Krechet Automation Upgrade -  Block Diagram clarification needed. Amphenol Inline Plug Assemblies.. Krechet - Fiber Cable Length with 3D model . Paker/ENL Krechet Automation update meeting. Ripal Status Update with Tyler 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-22	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		2	0	Parker 269 - MCC Confirmation TD HPU. Toe Drive Power and Control Cables. Review any questions about Rig 269 Bangladesh Service Order meeting. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-23	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		2	0	ESWC Supply Chain meeting with Brandy Johnson. Asset inventories and Oracle asset meeting with Mike A
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-23	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		6	0	DTI - Krechet Automation  Fire and Gas Quote discussion. Krechet Automation Upgrade -  Block Diagram clarification needed. Amphenol Inline Plug Assemblies.. Krechet - Fiber Cable Length with 3D model . Paker/ENL Krechet Automation update meeting. Ripal Status Update with Tyler 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-24	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		7	0	DTI - Krechet Automation  Fire and Gas Quote discussion. Krechet Automation Upgrade -  Block Diagram clarification needed. Amphenol Inline Plug Assemblies.. Krechet - Fiber Cable Length with 3D model . Paker/ENL Krechet Automation update meeting. Ripal Status Update with Tyler 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-24	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		1	0	Parker 269 - MCC Confirmation TD HPU. Toe Drive Power and Control Cables. Review any questions about Rig 269 Bangladesh Service Order meeting. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-25	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	ESWC Supply Chain meeting with Brandy Johnson. Asset inventories and Oracle asset meeting with Mike A
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-25	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		4	0	DTI - Krechet Automation  Fire and Gas Quote discussion. Krechet Automation Upgrade -  Block Diagram clarification needed. Amphenol Inline Plug Assemblies.. Krechet - Fiber Cable Length with 3D model . Paker/ENL Krechet Automation update meeting. Ripal Status Update with Tyler 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-25	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		3	0	Parker 269 - MCC Confirmation TD HPU. Toe Drive Power and Control Cables. Review any questions about Rig 269 Bangladesh Service Order meeting. 
Patel, Ripal	Engineer II		Patel, Ripal:Engineer II	2022-02-28	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		8	0	Installation and Crimping Tools review with Chuck.  Krechet - Fiber Cable Length with 3D model meeting with Lam  and Chuck.  DTI - Krechet Automation  Fire and Gas Quote discussion with Nick  Crimping Tools datasheet from Chuck reviewed.  Revised Krechet Topology redline sent to Lam.  Contacted GESCO for plug and Receptacle .   Krechet Automation Upgrade -  Block Diagram clarification needed meeting with John NOV.   
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-01	HTSG	:HTSG	2021-SMART-Goals		Regular Pay	N		2	0	Review and submit self assessment for 2021 SMART Goals. (1/31/22-2-1-22) Review tasks for 2022 SMART Goals.(2/1/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-01	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1.5	0	Emails Timesheet Review status w/ J.G. (2/1/22) 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-01	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		5	0	209L-01-03-661-1-RA- updates per comments (2/1/-4/22)  Windwall modifications drawing (2/1-3-22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-02	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1	0	Emails Timesheet Review status w/ J.G. (2/1/22) 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-02	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		7.5	0	209L-01-03-661-1-RA- updates per comments (2/1/-4/22)  Windwall modifications drawing (2/1-3-22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-03	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Bi-weekly technical services meeting (2/3/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-03	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1	0	Emails Timesheet Review status w/ J.G. (2/1/22) 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-03	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		6.5	0	209L-01-03-661-1-RA- updates per comments (2/1/-4/22)  Windwall modifications drawing (2/1-3-22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-04	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1	0	Emails Timesheet Review status w/ J.G. (2/1/22) 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-04	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		5	0	209L-01-03-661-1-RA- updates per comments (2/1/-4/22)  Windwall modifications drawing (2/1-3-22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-07	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		0.5	0	Remote Work Authorization meeting w/ K.P.M. & J.L. (02/07&09/22)  
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-07	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1.5	0	Emails Timesheet
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-07	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		0.5	0	Weekly meeting w/ Mio (02/07/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-07	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		6	0	Windwall modifications drawing 209L-01-03-664-1 & 2-RA  (02/07-11/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-08	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1	0	Emails Timesheet
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-08	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		7.5	0	Windwall modifications drawing 209L-01-03-664-1 & 2-RA  (02/07-11/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-09	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		0.25	0	Remote Work Authorization meeting w/ K.P.M. & J.L. (02/07&09/22)  
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-09	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1	0	Emails Timesheet
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-09	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		7.25	0	Windwall modifications drawing 209L-01-03-664-1 & 2-RA  (02/07-11/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-10	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1	0	Emails Timesheet
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-10	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		7.5	0	Windwall modifications drawing 209L-01-03-664-1 & 2-RA  (02/07-11/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-11	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1	0	Emails Timesheet
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-11	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		5	0	Windwall modifications drawing 209L-01-03-664-1 & 2-RA  (02/07-11/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-14	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		2	0	Emails  Timesheet Status meeting w/ J.G. (02/15/22) Vaccination appointment  (02/16/22) 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-14	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		0.5	0	Weekly meeting w/Mio (02/14/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-14	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		6	0	VFD house stair/background layout (02/14-15 & 18/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-15	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1.5	0	Emails  Timesheet Status meeting w/ J.G. (02/15/22) Vaccination appointment  (02/16/22) 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-15	OH-014	:OH-014	Overhead	All Activities	Regular Pay	N		0.5	0	Online Training (02/15/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-15	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		6.5	0	VFD house stair/background layout (02/14-15 & 18/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-16	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	Meeting w/ J.L. & K.P.M. (02/16/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-16	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		3	0	Emails  Timesheet Status meeting w/ J.G. (02/15/22) Vaccination appointment  (02/16/22) 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-16	OH-011	:OH-011	Overhead	All Activities	Regular Pay	N		4	0	
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-17	OH-011	:OH-011	Overhead	All Activities	Regular Pay	N		8	0	
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-18	HTSG	:HTSG	2022-SMART-Goals 		Regular Pay	N		3	0	Route 20222 Smart/Developmental GOALS (02/18/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-18	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1	0	Emails  Timesheet Status meeting w/ J.G. (02/15/22) Vaccination appointment  (02/16/22) 
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-18	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		3	0	VFD house stair/background layout (02/14-15 & 18/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-21	OH-008	:OH-008	Overhead	All Activities	Regular Pay	N		8	0	President's Day  (2/21/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-22	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		2.5	0	Timesheet Emails Compliance Survey (2/22/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-22	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		5.5	0	209L-01-03-xxx-RA-vfd-house-stair-layout (2/22-25/22)  Teams meeting w/T.E. & L.N. (2/23/22)  209L-01-03-664-1&2-RA (updates per T.E. comments from meeting. (2/23/22))  Reference NOV dwgs. from 3d to 2d for VFD and background needed for layout. (2/24/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-23	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1.5	0	Timesheet Emails Compliance Survey (2/22/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-23	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		6.5	0	209L-01-03-xxx-RA-vfd-house-stair-layout (2/22-25/22)  Teams meeting w/T.E. & L.N. (2/23/22)  209L-01-03-664-1&2-RA (updates per T.E. comments from meeting. (2/23/22))  Reference NOV dwgs. from 3d to 2d for VFD and background needed for layout. (2/24/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-24	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1	0	Timesheet Emails Compliance Survey (2/22/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-24	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		7	0	209L-01-03-xxx-RA-vfd-house-stair-layout (2/22-25/22)  Teams meeting w/T.E. & L.N. (2/23/22)  209L-01-03-664-1&2-RA (updates per T.E. comments from meeting. (2/23/22))  Reference NOV dwgs. from 3d to 2d for VFD and background needed for layout. (2/24/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-25	HTSG	:HTSG	2021-SMART-Goals		Regular Pay	N		1	0	Review 2021 SMART Goals w/J.G. (2/25/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-25	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1	0	Timesheet Emails Compliance Survey (2/22/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-25	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		6	0	209L-01-03-xxx-RA-vfd-house-stair-layout (2/22-25/22)  Teams meeting w/T.E. & L.N. (2/23/22)  209L-01-03-664-1&2-RA (updates per T.E. comments from meeting. (2/23/22))  Reference NOV dwgs. from 3d to 2d for VFD and background needed for layout. (2/24/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-28	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1.5	0	Timesheet  Emails Status call w/ J.G (03/03/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-28	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		0.5	0	Weekly meeting w/ Mio (02/28/22)
Perez, Jorge	Senior Designer	29841	Perez, Jorge:Senior Designer	2022-02-28	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-03	Automation Upgrade: Design	Regular Pay	N		6	0	209L-01-03-xxx-(1&2)RA-vfd-house-stair (02/28/22 - 03/02/22)  Review 3d NOV models and dwgs.  Create 2d dwgs. from NOV 3d model for background ref. (02/28/22 - 03/03/22)  Teams call w/L.N. review 209Lstair design and ref. files (03/03/22)
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-01	CVX Genesis	:CVX Genesis	TSR-1725-GENP-05	Rig-Up and SIT	Regular Pay	N		4.5	0	Pony Manrider and hoses/fittings, Drawworks O&M manual transmittal, Other docs RFQ, Status meetings, offshore lift spreadsheet, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-01	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-02	Automation Upgrade: Engineering	Regular Pay	N		1.5	0	Blower motor and ducting concept review, air intensifier foundation and pipe routing review, air intensifier redlines, surge tank discharge concept, status meetings
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-01	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		2	0	Blower motor and ducting concept review, air intensifier foundation and pipe routing review, air intensifier redlines, surge tank discharge concept, status meetings
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-01	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		0.5	0	Meeting with Kazakhstan, research for Lightning Masters, MTO revision, RFQ Rexel vendor info
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-02	CVX Genesis	:CVX Genesis	TSR-1725-GENP-05	Rig-Up and SIT	Regular Pay	N		5	0	Pony Manrider and hoses/fittings, Drawworks O&M manual transmittal, Other docs RFQ, Status meetings, offshore lift spreadsheet, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-02	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		2	0	Blower motor and ducting concept review, air intensifier foundation and pipe routing review, air intensifier redlines, surge tank discharge concept, status meetings
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-02	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		1.5	0	Meeting with Kazakhstan, research for Lightning Masters, MTO revision, RFQ Rexel vendor info
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-03	CVX Genesis	:CVX Genesis	TSR-1725-GENP-05	Rig-Up and SIT	Regular Pay	N		2	0	Pony Manrider and hoses/fittings, Drawworks O&M manual transmittal, Other docs RFQ, Status meetings, offshore lift spreadsheet, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-03	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	TS meeintg
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-03	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		1	0	Blower motor and ducting concept review, air intensifier foundation and pipe routing review, air intensifier redlines, surge tank discharge concept, status meetings
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-03	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		4.5	0	Meeting with Kazakhstan, research for Lightning Masters, MTO revision, RFQ Rexel vendor info
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-04	CVX Genesis	:CVX Genesis	TSR-1725-GENP-05	Rig-Up and SIT	Regular Pay	N		3.5	0	Pony Manrider and hoses/fittings, Drawworks O&M manual transmittal, Other docs RFQ, Status meetings, offshore lift spreadsheet, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-04	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		2.5	0	Meeting with Kazakhstan, research for Lightning Masters, MTO revision, RFQ Rexel vendor info
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-07	CVX Genesis	:CVX Genesis	TSR-1725-GENP-05	Rig-Up and SIT	Regular Pay	N		2	0	Status update meetings, pony manrider missing instrument, transport to Fouchon spreadsheet creation, barge layout drawing review, rigdown clarifications and assistance
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-07	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		1	0	weekly meeting
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-07	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-02	Automation Upgrade: Engineering	Regular Pay	N		0.5	0	Blower and ducting drawing assistance and review
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-07	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		3	0	drillers cabin placement of comms and buttons, comms research, placement of iron roughneck service loop, blower ducting and bracing research and materials, air intensifier concept and assistance, surge tank drain concept and information
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-07	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		2	0	Lightning Masters quote review and intro meeting, definition of lightning scope clarifications, Lightning Masters path forward, drawing and plot plan collection
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-08	CVX Genesis	:CVX Genesis	TSR-1725-GENP-05	Rig-Up and SIT	Regular Pay	N		2	0	Status update meetings, pony manrider missing instrument, transport to Fouchon spreadsheet creation, barge layout drawing review, rigdown clarifications and assistance
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-08	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-02	Automation Upgrade: Engineering	Regular Pay	N		0.5	0	Blower and ducting drawing assistance and review
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-08	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		2.5	0	drillers cabin placement of comms and buttons, comms research, placement of iron roughneck service loop, blower ducting and bracing research and materials, air intensifier concept and assistance, surge tank drain concept and information
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-08	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		3.5	0	Lightning Masters quote review and intro meeting, definition of lightning scope clarifications, Lightning Masters path forward, drawing and plot plan collection
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-09	CVX Genesis	:CVX Genesis	TSR-1725-GENP-05	Rig-Up and SIT	Regular Pay	N		2.5	0	Status update meetings, pony manrider missing instrument, transport to Fouchon spreadsheet creation, barge layout drawing review, rigdown clarifications and assistance
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-09	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-02	Automation Upgrade: Engineering	Regular Pay	N		1	0	Blower and ducting drawing assistance and review
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-09	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		1.5	0	drillers cabin placement of comms and buttons, comms research, placement of iron roughneck service loop, blower ducting and bracing research and materials, air intensifier concept and assistance, surge tank drain concept and information
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-09	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		3.5	0	Lightning Masters quote review and intro meeting, definition of lightning scope clarifications, Lightning Masters path forward, drawing and plot plan collection
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-10	CVX Genesis	:CVX Genesis	TSR-1725-GENP-05	Rig-Up and SIT	Regular Pay	N		2	0	Status update meetings, pony manrider missing instrument, transport to Fouchon spreadsheet creation, barge layout drawing review, rigdown clarifications and assistance
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-10	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-02	Automation Upgrade: Engineering	Regular Pay	N		2	0	Blower and ducting drawing assistance and review
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-10	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		2	0	drillers cabin placement of comms and buttons, comms research, placement of iron roughneck service loop, blower ducting and bracing research and materials, air intensifier concept and assistance, surge tank drain concept and information
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-10	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		2.5	0	Lightning Masters quote review and intro meeting, definition of lightning scope clarifications, Lightning Masters path forward, drawing and plot plan collection
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-11	CVX Genesis	:CVX Genesis	TSR-1725-GENP-05	Rig-Up and SIT	Regular Pay	N		2.5	0	Status update meetings, pony manrider missing instrument, transport to Fouchon spreadsheet creation, barge layout drawing review, rigdown clarifications and assistance
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-11	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-02	Automation Upgrade: Engineering	Regular Pay	N		1	0	Blower and ducting drawing assistance and review
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-11	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		0.5	0	drillers cabin placement of comms and buttons, comms research, placement of iron roughneck service loop, blower ducting and bracing research and materials, air intensifier concept and assistance, surge tank drain concept and information
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-11	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		2	0	Lightning Masters quote review and intro meeting, definition of lightning scope clarifications, Lightning Masters path forward, drawing and plot plan collection
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-14	CVX Genesis	:CVX Genesis	TSR-1725-GENP-05	Rig-Up and SIT	Regular Pay	N		2	0	status update meetings, Hydradyne RFQ, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-14	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		1	0	Weekly meeting
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-14	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-02	Automation Upgrade: Engineering	Regular Pay	N		1.5	0	Blower adapter drawing review, air intensifier and iron roughneck surge tank concept clarifications, began compiling info for structural checks
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-14	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		4	0	Lightning master quote review, status update meetings, compiled drawings for LM, manifold and HP piping meetings and clarifications, NOV drawing review, block lead time, plot plan
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-15	CVX Genesis	:CVX Genesis	TSR-1725-GENP-05	Rig-Up and SIT	Regular Pay	N		1.5	0	status update meetings, Hydradyne RFQ, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-15	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-02	Automation Upgrade: Engineering	Regular Pay	N		2.5	0	Blower adapter drawing review, air intensifier and iron roughneck surge tank concept clarifications, began compiling info for structural checks
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-15	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		4.5	0	Lightning master quote review, status update meetings, compiled drawings for LM, manifold and HP piping meetings and clarifications, NOV drawing review, block lead time, plot plan
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-16	CVX Genesis	:CVX Genesis	TSR-1725-GENP-05	Rig-Up and SIT	Regular Pay	N		1.5	0	status update meetings, Hydradyne RFQ, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-16	OH-034	:OH-034	OH-034-005	Kazakhstan	Regular Pay	N		0.5	0	258 Rig up documents and meeting
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-16	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-02	Automation Upgrade: Engineering	Regular Pay	N		2.5	0	Blower adapter drawing review, air intensifier and iron roughneck surge tank concept clarifications, began compiling info for structural checks
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-16	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		4	0	Lightning master quote review, status update meetings, compiled drawings for LM, manifold and HP piping meetings and clarifications, NOV drawing review, block lead time, plot plan
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-17	CVX Genesis	:CVX Genesis	TSR-1725-GENP-05	Rig-Up and SIT	Regular Pay	N		1.5	0	status update meetings, Hydradyne RFQ, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-17	OH-004	:OH-004	Overhead	All Activities	Regular Pay	N		1	0	TS meeting
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-17	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		1.5	0	Equipment Standardization Working Committee info and kickoff meeting
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-17	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		1	0	IT support on Microsoft Project Pro 2016 and AutoCAD
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-17	OH-034	:OH-034	OH-034-005	Kazakhstan	Regular Pay	N		1	0	258 Rig up documents and meeting
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-17	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-02	Automation Upgrade: Engineering	Regular Pay	N		0.5	0	Blower adapter drawing review, air intensifier and iron roughneck surge tank concept clarifications, began compiling info for structural checks
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-17	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		2	0	Lightning master quote review, status update meetings, compiled drawings for LM, manifold and HP piping meetings and clarifications, NOV drawing review, block lead time, plot plan
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-18	CVX Genesis	:CVX Genesis	TSR-1725-GENP-05	Rig-Up and SIT	Regular Pay	N		0.5	0	status update meetings, Hydradyne RFQ, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-18	OH-005	:OH-005	Overhead	All Activities	Regular Pay	N		0.5	0	Equipment Standardization Working Committee info and kickoff meeting
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-18	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		0.5	0	IT support on Microsoft Project Pro 2016 and AutoCAD
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-18	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-02	Automation Upgrade: Engineering	Regular Pay	N		1	0	Blower adapter drawing review, air intensifier and iron roughneck surge tank concept clarifications, began compiling info for structural checks
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-18	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		3.5	0	Lightning master quote review, status update meetings, compiled drawings for LM, manifold and HP piping meetings and clarifications, NOV drawing review, block lead time, plot plan
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-21	OH-008	:OH-008	Overhead	All Activities	Regular Pay	N		8	0	Presidents day
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-22	CVX Genesis	:CVX Genesis	TSR-1725-GENP-05	Rig-Up and SIT	Regular Pay	N		1	0	status update meetings, Hydradyne RFQ, barge loadout
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-22	OH-014	:OH-014	Overhead	All Activities	Regular Pay	N		1.5	0	Life Saving Rules
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-22	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-02	Automation Upgrade: Engineering	Regular Pay	N		2.5	0	Blower adapter drawing review, begin ducting support calcs, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-22	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		2	0	hardware coating research, material requirements 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-22	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		1.5	0	Lightning Masters drawings, Equipment list review and meetings, Service order review choke manifold clarifications, standpipe manifold drawings
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-23	CVX Genesis	:CVX Genesis	TSR-1725-GENP-05	Rig-Up and SIT	Regular Pay	N		0.5	0	status update meetings, Hydradyne RFQ, barge loadout
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-23	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-02	Automation Upgrade: Engineering	Regular Pay	N		4	0	Blower adapter drawing review, begin ducting support calcs, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-23	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		2.5	0	hardware coating research, material requirements 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-23	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		2	0	Lightning Masters drawings, Equipment list review and meetings, Service order review choke manifold clarifications, standpipe manifold drawings
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-24	CVX Genesis	:CVX Genesis	TSR-1725-GENP-05	Rig-Up and SIT	Regular Pay	N		0.5	0	status update meetings, Hydradyne RFQ, barge loadout
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-24	OH-006	:OH-006	Overhead	All Activities	Regular Pay	N		2	0	PDR Discussion and review
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-24	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-02	Automation Upgrade: Engineering	Regular Pay	N		3	0	Blower adapter drawing review, begin ducting support calcs, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-24	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		0.5	0	hardware coating research, material requirements 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-24	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		2.5	0	Lightning Masters drawings, Equipment list review and meetings, Service order review choke manifold clarifications, standpipe manifold drawings
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-25	CVX Genesis	:CVX Genesis	TSR-1725-GENP-05	Rig-Up and SIT	Regular Pay	N		0.5	0	status update meetings, Hydradyne RFQ, barge loadout
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-25	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-02	Automation Upgrade: Engineering	Regular Pay	N		0.5	0	Blower adapter drawing review, begin ducting support calcs, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-25	Rig 269L	:Rig 269L	TSR-01796-269L-01	CVX Bangladesh: Engineering	Regular Pay	N		5	0	Lightning Masters drawings, Equipment list review and meetings, Service order review choke manifold clarifications, standpipe manifold drawings
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-28	CVX Genesis	:CVX Genesis	TSR-1725-GENP-05	Rig-Up and SIT	Regular Pay	N		1	0	Hydradyne RFQ and quote review, status updates
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-28	OH-019	:OH-019	Overhead	All Activities	Regular Pay	N		1	0	Weekly Meeting
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-28	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-02	Automation Upgrade: Engineering	Regular Pay	N		3.5	0	drawing review, ducting bracing calculations, 
Reck, John	Engineer I	29656	Reck, John:Engineer I	2022-02-28	Rig 209L (Krechet)	:Rig 209L (Krechet)	TSR-01752-209L-04	Automation Upgrade: Overhead Items	Regular Pay	N		3	0	Ducting brace material and loading condition research,