Name Billing Class Employee No. Item Line Class Transaction Date Job No. Customer Service Item Notes Payroll Item Billable Employee Paid Day Rate Duration Days Remarks Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-04 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, getting phone, admin items Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-05 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 3 0 Willow mtng and prep with WJM ,review of project info Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-05 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 4 0 Reviewing drawings for 249L pallet dock ,mtng to discuss open 249L projects, fall arrest system Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR mtng Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet, getting phone, admin items Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-06 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 6 0 Reviewing drawings for 249L pallet dock ,mtng to discuss open 249L projects, fall arrest system Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, getting phone, admin items Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-07 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 6 0 Reviewing drawings for 249L pallet dock ,mtng to discuss open 249L projects, fall arrest system Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 general timekeeping and discussions with team Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-10 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 TSR mtng Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-10 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 6.5 0 developing Willow cost estimate // reviewing WJM/NOV proposal // mtngs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-10 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 climb assist project correspondence and getting quote // 258L TD presentation and mtng Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-11 BERKUT :BERKUT TSR-01800-BERP CRI-Diverter-Valve Regular Pay N 2 0 correspondence // working with suppliers for quotes Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 general timekeeping and discussions with team Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-11 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 4 0 developing Willow cost estimate // reviewing WJM/NOV proposal // mtngs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-12 BERKUT :BERKUT TSR-01800-BERP CRI-Diverter-Valve Regular Pay N 5 0 correspondence // working with suppliers for quotes Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 general timekeeping and discussions with team Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-12 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2 0 developing Willow cost estimate // reviewing WJM/NOV proposal // mtngs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-13 BERKUT :BERKUT TSR-01800-BERP CRI-Diverter-Valve Regular Pay N 4 0 correspondence // working with suppliers for quotes Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 general timekeeping and discussions with team Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-13 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 3 0 developing Willow cost estimate // reviewing WJM/NOV proposal // mtngs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-13 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 2 0 climb assist project correspondence and getting quote // 258L TD presentation and mtng Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 general timekeeping and discussions with team Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-14 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 2 0 developing Willow cost estimate // reviewing WJM/NOV proposal // mtngs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-14 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 3 0 climb assist project correspondence and getting quote // 258L TD presentation and mtng Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-17 BERKUT :BERKUT TSR-01800-BERP CRI-Diverter-Valve Regular Pay N 1 0 correspondence with Sakhalin Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // IT support Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-17 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 6 0 internal meetings on cost estimate and feed proposal // review of NOV proposal and mtng // preparation of feed proposal cover letter Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // IT support Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-18 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 6 0 internal meetings on cost estimate and feed proposal // review of NOV proposal and mtng // preparation of feed proposal cover letter Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-18 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 mtng to discuss open items // updating TD upgrade powerpoint // working with buyer on climb assist quotes Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-19 BERKUT :BERKUT TSR-01800-BERP CRI-Diverter-Valve Regular Pay N 1 0 correspondence with Sakhalin Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-19 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 6 0 internal meetings on cost estimate and feed proposal // review of NOV proposal and mtng // preparation of feed proposal cover letter Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-19 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 2 0 mtng to discuss open items // updating TD upgrade powerpoint // working with buyer on climb assist quotes Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Peer Review - Technology Group's VR/AR presentation Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-20 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 6 0 internal meetings on cost estimate and feed proposal // review of NOV proposal and mtng // preparation of feed proposal cover letter Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-20 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 2 0 mtng to discuss open items // updating TD upgrade powerpoint // working with buyer on climb assist quotes Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Peer Review - Technology Group's VR/AR presentation Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-21 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 5 0 internal meetings on cost estimate and feed proposal // review of NOV proposal and mtng // preparation of feed proposal cover letter Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-24 BERKUT :BERKUT TSR-01800-BERP CRI-Diverter-Valve Regular Pay N 1 0 emails with vendors and sakhalin engineering Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, engineering pictures Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-24 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-24 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 6.5 0 NOV subcontract // working meetings // CPAI mtng // NOV mtng // working on justification presentation // project charter Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-25 BERKUT :BERKUT TSR-01800-BERP CRI-Diverter-Valve Regular Pay N 1 0 emails with vendors and sakhalin engineering Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-25 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 6.5 0 NOV subcontract // working meetings // CPAI mtng // NOV mtng // working on justification presentation // project charter Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-25 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.5 0 getting quotes // email correspondence with ops and supply chain Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-26 BERKUT :BERKUT TSR-01800-BERP CRI-Diverter-Valve Regular Pay N 1.5 0 emails with vendors and sakhalin engineering Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 ops update mtng Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-26 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 4 0 NOV subcontract // working meetings // CPAI mtng // NOV mtng // working on justification presentation // project charter Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-26 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.5 0 getting quotes // email correspondence with ops and supply chain Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-26 ORLAN :ORLAN TSR-01806-ORLP CRI Roller Mill Repair Regular Pay N 1 0 reviewing new TSR // discussion with sak eng Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 timesheet, engineering pictures Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-27 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 5.5 0 NOV subcontract // working meetings // CPAI mtng // NOV mtng // working on justification presentation // project charter Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-27 ORLAN :ORLAN TSR-01806-ORLP CRI Roller Mill Repair Regular Pay N 1 0 reviewing new TSR // discussion with sak eng Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-28 BERKUT :BERKUT TSR-01800-BERP CRI-Diverter-Valve Regular Pay N 1 0 emails with vendors and sakhalin engineering Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-28 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 3 0 NOV subcontract // working meetings // CPAI mtng // NOV mtng // working on justification presentation // project charter Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-28 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 getting quotes // email correspondence with ops and supply chain Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-01-28 ORLAN :ORLAN TSR-01806-ORLP CRI Roller Mill Repair Regular Pay N 1 0 reviewing new TSR // discussion with sak eng Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Years Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheets Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 270L documentation submittal and organization; Berkut BOP stump replacement TSR modification Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-04 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 8.5 0 Krechet Automation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheets Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-05 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Goal training Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 270L documentation submittal and organization; Berkut BOP stump replacement TSR modification Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-05 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 BOP transport skid meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-05 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 3 0 Krechet Automation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-06 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 8.5 0 Krechet Automation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-07 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 6 0 Krechet Automation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-10 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 9 0 Krechet Automation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-11 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 OSA schedule and cost estimate, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-11 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 9 0 Krechet Automation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-12 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 0.5 0 OSA schedule and cost estimate, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-12 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 8 0 Krechet Automation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 270L Regulatory Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-13 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 8 0 Krechet Automation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-14 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 6 0 Krechet Automation Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 270L Regulatory Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-17 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 6.5 0 Automation project Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-18 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 9.5 0 Automation project Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 270L Regulatory Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-19 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 8 0 Automation project Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-20 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 8.5 0 Automation project Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-01-21 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 6 0 Automation project Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-04 ARBU :ARBU TSR-01803-ARBU CPAI Willow FEED Study Regular Pay N 1 0 (01/04/22) Call with Genesis engineering to discuss scope. (01/05/22) Searched for reference information related to fire system. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-04 BERKUT :BERKUT TSR-01800-BERP CRI-Diverter-Valve Regular Pay N 0.5 0 (01/04/22) Follow up Email to Kace - review support capacity. (01/06/22) Update with Ralph - sent emails to purchasing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-04 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 (01/04/22) Call with Lam/Kyle to discuss titleblock changes. (01/05/22) Review new titleblock changes and installation. Prints for Ripal. (01/06/22) Discussed titleblock info with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 (01/04/22). Updated timesheets for previous weeks and submitted. Update with Kyle. Update call with Lam. Scheduled meeting to discuss tblock changes. Design discussion with Kyle. (01/05/22)Reviewed LABU goal status. Search for CVX transmittal info. (01/06/22) Update call with Lam. Updated transmittal distribution matrix - sent for information. Discussed list with Kyle. (01/07/22) Update call with Lam. Update call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-04 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.75 0 (01/04/22) Reviewed emails from Robbie and sent requested drawings. (01/05/22) Call with Tyler/Kyle to review BOP skid modifications /status. Meeting to discuss general status info. Checked previous MTO for skid modifications. Update with Ralph - open 249L items and descriptions. (01/06/22) Review pallet dock redlines from Ralph. Discussed MTO with Kyle. Made changes and sent to Chad for quote. Searched for 249L mast drawings. (01/07/22) Clarification info sent to Chad - 249 BOP skid quote. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-04 Rig 165L :Rig 165L TSR-01798-165L Tesco TDS Installation Regular Pay N 2.75 0 (01/04/22) Translated info to English in support of closeout package. (01/07/22) Continued closeout package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-05 ARBU :ARBU TSR-01803-ARBU CPAI Willow FEED Study Regular Pay N 0.75 0 (01/04/22) Call with Genesis engineering to discuss scope. (01/05/22) Searched for reference information related to fire system. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 (01/04/22) Call with Lam/Kyle to discuss titleblock changes. (01/05/22) Review new titleblock changes and installation. Prints for Ripal. (01/06/22) Discussed titleblock info with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (01/04/22). Updated timesheets for previous weeks and submitted. Update with Kyle. Update call with Lam. Scheduled meeting to discuss tblock changes. Design discussion with Kyle. (01/05/22)Reviewed LABU goal status. Search for CVX transmittal info. (01/06/22) Update call with Lam. Updated transmittal distribution matrix - sent for information. Discussed list with Kyle. (01/07/22) Update call with Lam. Update call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-05 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 3.5 0 (01/04/22) Reviewed emails from Robbie and sent requested drawings. (01/05/22) Call with Tyler/Kyle to review BOP skid modifications /status. Meeting to discuss general status info. Checked previous MTO for skid modifications. Update with Ralph - open 249L items and descriptions. (01/06/22) Review pallet dock redlines from Ralph. Discussed MTO with Kyle. Made changes and sent to Chad for quote. Searched for 249L mast drawings. (01/07/22) Clarification info sent to Chad - 249 BOP skid quote. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-05 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1.25 0 (01/05/22) Call with Tyler/KPM/LTN to discuss drawworks removal options. Discussed drawing list with Tyler. (01/06/22) Review drawing redlines and info for doghouse door. Drawing discussion with Tyler. Discussed doghouse with Lam. Scheduled meeting to review model. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-06 BERKUT :BERKUT TSR-01800-BERP CRI-Diverter-Valve Regular Pay N 0.25 0 (01/04/22) Follow up Email to Kace - review support capacity. (01/06/22) Update with Ralph - sent emails to purchasing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (01/06/22) TSR status call. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 (01/04/22) Call with Lam/Kyle to discuss titleblock changes. (01/05/22) Review new titleblock changes and installation. Prints for Ripal. (01/06/22) Discussed titleblock info with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (01/04/22). Updated timesheets for previous weeks and submitted. Update with Kyle. Update call with Lam. Scheduled meeting to discuss tblock changes. Design discussion with Kyle. (01/05/22)Reviewed LABU goal status. Search for CVX transmittal info. (01/06/22) Update call with Lam. Updated transmittal distribution matrix - sent for information. Discussed list with Kyle. (01/07/22) Update call with Lam. Update call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-06 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 3.25 0 (01/04/22) Reviewed emails from Robbie and sent requested drawings. (01/05/22) Call with Tyler/Kyle to review BOP skid modifications /status. Meeting to discuss general status info. Checked previous MTO for skid modifications. Update with Ralph - open 249L items and descriptions. (01/06/22) Review pallet dock redlines from Ralph. Discussed MTO with Kyle. Made changes and sent to Chad for quote. Searched for 249L mast drawings. (01/07/22) Clarification info sent to Chad - 249 BOP skid quote. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-06 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 0.75 0 (01/06/22) Reviewed updated drawing list. Added additional category/general update. (01/07/22) Call with Lam/Jorge - Review general scope of TSR. Assigned Jorge new doghouse mod drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-06 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1.25 0 (01/05/22) Call with Tyler/KPM/LTN to discuss drawworks removal options. Discussed drawing list with Tyler. (01/06/22) Review drawing redlines and info for doghouse door. Drawing discussion with Tyler. Discussed doghouse with Lam. Scheduled meeting to review model. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-06 Rig 269L :Rig 269L TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 0.5 0 (01/06/22) Discussed camp layouts with Ripal. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (01/04/22). Updated timesheets for previous weeks and submitted. Update with Kyle. Update call with Lam. Scheduled meeting to discuss tblock changes. Design discussion with Kyle. (01/05/22)Reviewed LABU goal status. Search for CVX transmittal info. (01/06/22) Update call with Lam. Updated transmittal distribution matrix - sent for information. Discussed list with Kyle. (01/07/22) Update call with Lam. Update call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-07 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.75 0 (01/04/22) Reviewed emails from Robbie and sent requested drawings. (01/05/22) Call with Tyler/Kyle to review BOP skid modifications /status. Meeting to discuss general status info. Checked previous MTO for skid modifications. Update with Ralph - open 249L items and descriptions. (01/06/22) Review pallet dock redlines from Ralph. Discussed MTO with Kyle. Made changes and sent to Chad for quote. Searched for 249L mast drawings. (01/07/22) Clarification info sent to Chad - 249 BOP skid quote. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-07 Rig 165L :Rig 165L TSR-01798-165L Tesco TDS Installation Regular Pay N 4 0 (01/04/22) Translated info to English in support of closeout package. (01/07/22) Continued closeout package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-07 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 0.75 0 (01/06/22) Reviewed updated drawing list. Added additional category/general update. (01/07/22) Call with Lam/Jorge - Review general scope of TSR. Assigned Jorge new doghouse mod drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-10 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 (01/10/22) Converted a-frame shipping skid to CAD and added to barge layout for ref. (01/11/22) Updated barge sketch and sent to Roger. (01/12/22) Additional updates for Roger - barge plan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (01/10/22) Archived drawing files from Sakh. Review/Approve designer timesheets. Update with Kyle. Discussed Willow project. (01/11/22) Update with Lam. (01/12/22) Update with Kyle. Updated weekly timesheet and submitted for approval. Reviewed designer timesheets. Searched for ref drawing for Tyler. (01/13/22) Update call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-10 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.25 0 (01/10/22) Weekly Call. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.75 0 (01/10/22) Review Orlan bell nipple lifting tool issue. Call with Tyler to discuss. (01/11/22) Call with Ralph to discuss actuator info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-10 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1.5 0 (01/10/22) Final drawing review- pallet dock drawings. Scheduled review meeting. (01/13/22) Call with Ralph and Kyle to review item status. (01/14/22) New MTOs for 249. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-10 Rig 165L :Rig 165L TSR-01798-165L Tesco TDS Installation Regular Pay N 1 0 (01/10/22 - 01/12/22) Continued closeout updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-11 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 (01/10/22) Converted a-frame shipping skid to CAD and added to barge layout for ref. (01/11/22) Updated barge sketch and sent to Roger. (01/12/22) Additional updates for Roger - barge plan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 (01/11/22 - 01/14/22) Worked on LABU drawing clean up. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (01/10/22) Archived drawing files from Sakh. Review/Approve designer timesheets. Update with Kyle. Discussed Willow project. (01/11/22) Update with Lam. (01/12/22) Update with Kyle. Updated weekly timesheet and submitted for approval. Reviewed designer timesheets. Searched for ref drawing for Tyler. (01/13/22) Update call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.75 0 (01/10/22) Review Orlan bell nipple lifting tool issue. Call with Tyler to discuss. (01/11/22) Call with Ralph to discuss actuator info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-11 Rig 165L :Rig 165L TSR-01798-165L Tesco TDS Installation Regular Pay N 3 0 (01/10/22 - 01/12/22) Continued closeout updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-11 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 0.75 0 (01/11/22) Call to discuss equipment installation. (01/13/22) Search for stabmaster ref drawings. Updates to drawing list. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-12 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 (01/10/22) Converted a-frame shipping skid to CAD and added to barge layout for ref. (01/11/22) Updated barge sketch and sent to Roger. (01/12/22) Additional updates for Roger - barge plan. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 (01/11/22 - 01/14/22) Worked on LABU drawing clean up. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (01/10/22) Archived drawing files from Sakh. Review/Approve designer timesheets. Update with Kyle. Discussed Willow project. (01/11/22) Update with Lam. (01/12/22) Update with Kyle. Updated weekly timesheet and submitted for approval. Reviewed designer timesheets. Searched for ref drawing for Tyler. (01/13/22) Update call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-12 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 2.5 0 (01/12/22) Email to new contact at HMH - pulsation dampener info. Reviewed field info and data table. Discussed with Kyle. Updated data and resent table to the field. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-12 Rig 165L :Rig 165L TSR-01798-165L Tesco TDS Installation Regular Pay N 2 0 (01/10/22 - 01/12/22) Continued closeout updates. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 4.5 0 (01/11/22 - 01/14/22) Worked on LABU drawing clean up. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (01/10/22) Archived drawing files from Sakh. Review/Approve designer timesheets. Update with Kyle. Discussed Willow project. (01/11/22) Update with Lam. (01/12/22) Update with Kyle. Updated weekly timesheet and submitted for approval. Reviewed designer timesheets. Searched for ref drawing for Tyler. (01/13/22) Update call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-13 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.5 0 (01/10/22) Final drawing review- pallet dock drawings. Scheduled review meeting. (01/13/22) Call with Ralph and Kyle to review item status. (01/14/22) New MTOs for 249. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-13 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 0.75 0 (01/13/22) Search for agitator shaft information. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-13 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 1.25 0 (01/13/22) Searched for reference drawing. Checked doghouse door mod drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-13 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1 0 (01/11/22) Call to discuss equipment installation. (01/13/22) Search for stabmaster ref drawings. Updates to drawing list. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (01/10/22) Archived drawing files from Sakh. Review/Approve designer timesheets. Update with Kyle. Discussed Willow project. (01/11/22) Update with Lam. (01/12/22) Update with Kyle. Updated weekly timesheet and submitted for approval. Reviewed designer timesheets. Searched for ref drawing for Tyler. (01/13/22) Update call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-14 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 4 0 (01/10/22) Final drawing review- pallet dock drawings. Scheduled review meeting. (01/13/22) Call with Ralph and Kyle to review item status. (01/14/22) New MTOs for 249. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (01/17/22) General update with Kyle. Discussed SMART goals with Lam. Update call with KPM/John R. (01/18/22) Update call with Tyler. discussed 2022 goals with Kyle. CAD discussion with Lam. (01/19/22) Update with Kyle. (01/20/22) Searched for 262 electrical drawing for Tyler. Call with Tyler to discuss standard ladder info. Discussed genesis titleblock info with Lam. Update with Kyle. (01/21/22) Updated weekly timesheet. Call with Kyle to discuss barge layout info. Call with Scotty/Roger to discuss barge loading. general notes for 2021 performance review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-17 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 4.75 0 (01/17/22) Updated camp drawings for rigless proposal. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-17 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.25 0 (01/17/22) Ramp MTO. Sent pallet dock info to Jorge. (01/19/22) Cleaned up ramp drawing - PDF for signature. Cleaned up drawing folders. General status update call with Robbie. Updated MTO and sent to Chad for quote. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-17 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.25 0 (01/17/22) Saved 122L information on Q drive. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-17 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 1.25 0 (01/17/22) Back check doghouse door mod drawing from Jorge. Call with Tyler/LTN to discuss air intensifier location options. (01/19/22) Updated drawing list. Discussed drawing number with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.25 0 (01/17/22) General update with Kyle. Discussed SMART goals with Lam. Update call with KPM/John R. (01/18/22) Update call with Tyler. discussed 2022 goals with Kyle. CAD discussion with Lam. (01/19/22) Update with Kyle. (01/20/22) Searched for 262 electrical drawing for Tyler. Call with Tyler to discuss standard ladder info. Discussed genesis titleblock info with Lam. Update with Kyle. (01/21/22) Updated weekly timesheet. Call with Kyle to discuss barge layout info. Call with Scotty/Roger to discuss barge loading. general notes for 2021 performance review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-18 Rig 165L :Rig 165L TSR-01794-165L Skidding Package Regular Pay N 0.5 0 (01/18/22) Reviewed drawing info. Sent email status request email to German. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-18 Rig 269L :Rig 269L TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 5.75 0 (01/18/22) Reviewed BOP stack comments. Saved reference info to Q drive for ref. Cleaned up drawing folders. Started updates to 13-5/8" BOP drawing. (01/19/22) Updated 20-3/4" BOP stack drawing. (01/21/22) Searched for 269 rig grounding information. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-19 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 5.25 0 (01/19/22) Call with Kyle to discuss barge loading.Started checking load list info/barge layout updates to show actual CAD blocks of rig equipment. (01/20/22) Cont barge layout and spreadsheet updates. (01/21/22) Barge layout changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-19 HTSG :HTSG 2022-SMART-Goals Regular Pay N 0.5 0 (01/19/22) Meeting with designers to discuss goal options for 2022. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (01/17/22) General update with Kyle. Discussed SMART goals with Lam. Update call with KPM/John R. (01/18/22) Update call with Tyler. discussed 2022 goals with Kyle. CAD discussion with Lam. (01/19/22) Update with Kyle. (01/20/22) Searched for 262 electrical drawing for Tyler. Call with Tyler to discuss standard ladder info. Discussed genesis titleblock info with Lam. Update with Kyle. (01/21/22) Updated weekly timesheet. Call with Kyle to discuss barge layout info. Call with Scotty/Roger to discuss barge loading. general notes for 2021 performance review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-19 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1.75 0 (01/17/22) Ramp MTO. Sent pallet dock info to Jorge. (01/19/22) Cleaned up ramp drawing - PDF for signature. Cleaned up drawing folders. General status update call with Robbie. Updated MTO and sent to Chad for quote. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-19 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 0.75 0 (01/17/22) Back check doghouse door mod drawing from Jorge. Call with Tyler/LTN to discuss air intensifier location options. (01/19/22) Updated drawing list. Discussed drawing number with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-19 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 0.5 0 (01/19/22) Checked doughouse structure info - clarification of pin description. Discussed details with Tyler. (01/21/22) Call with Tyler to discuss HVAC support options. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-19 Rig 269L :Rig 269L TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 1.5 0 (01/18/22) Reviewed BOP stack comments. Saved reference info to Q drive for ref. Cleaned up drawing folders. Started updates to 13-5/8" BOP drawing. (01/19/22) Updated 20-3/4" BOP stack drawing. (01/21/22) Searched for 269 rig grounding information. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-20 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 6.75 0 (01/19/22) Call with Kyle to discuss barge loading.Started checking load list info/barge layout updates to show actual CAD blocks of rig equipment. (01/20/22) Cont barge layout and spreadsheet updates. (01/21/22) Barge layout changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (01/20/22) TSR update call. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (01/17/22) General update with Kyle. Discussed SMART goals with Lam. Update call with KPM/John R. (01/18/22) Update call with Tyler. discussed 2022 goals with Kyle. CAD discussion with Lam. (01/19/22) Update with Kyle. (01/20/22) Searched for 262 electrical drawing for Tyler. Call with Tyler to discuss standard ladder info. Discussed genesis titleblock info with Lam. Update with Kyle. (01/21/22) Updated weekly timesheet. Call with Kyle to discuss barge layout info. Call with Scotty/Roger to discuss barge loading. general notes for 2021 performance review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-21 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.5 0 (01/19/22) Call with Kyle to discuss barge loading.Started checking load list info/barge layout updates to show actual CAD blocks of rig equipment. (01/20/22) Cont barge layout and spreadsheet updates. (01/21/22) Barge layout changes. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 (01/17/22) General update with Kyle. Discussed SMART goals with Lam. Update call with KPM/John R. (01/18/22) Update call with Tyler. discussed 2022 goals with Kyle. CAD discussion with Lam. (01/19/22) Update with Kyle. (01/20/22) Searched for 262 electrical drawing for Tyler. Call with Tyler to discuss standard ladder info. Discussed genesis titleblock info with Lam. Update with Kyle. (01/21/22) Updated weekly timesheet. Call with Kyle to discuss barge layout info. Call with Scotty/Roger to discuss barge loading. general notes for 2021 performance review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-21 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 0.5 0 (01/19/22) Checked doughouse structure info - clarification of pin description. Discussed details with Tyler. (01/21/22) Call with Tyler to discuss HVAC support options. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-21 Rig 269L :Rig 269L TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 1 0 (01/18/22) Reviewed BOP stack comments. Saved reference info to Q drive for ref. Cleaned up drawing folders. Started updates to 13-5/8" BOP drawing. (01/19/22) Updated 20-3/4" BOP stack drawing. (01/21/22) Searched for 269 rig grounding information. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-25 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4.75 0 (01/25/22) Updates to barge layout. (01/26/22) Updated barge layout to show power swivel. (01/28/22) Updated barge layout to match offshore loading list from Troy. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.75 0 (01/25/22) Updated weekly timesheet and submitted for approval. Update call with Lam. Update call with Jorge. Update with Kyle. (01/26/22) Update with Kyle. Discussed goals with Lam. Follow up with Kyle. (01/27/22) Updated timesheet. Discussed design issues with Kyle. Update with Lam. Engineering group pictures. Review/approved designer timesheets. Discussed ref drawings for SAkh.-LTN Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-25 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 (01/25/22) Started 249L pallet dock MTO. Discussed MTO with Ralph. (01/26/22) Saved MTO quotes on the Q. Finalized MTO for pallet dock. (01/27/22) Saved BOP skid quotes on Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-26 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.25 0 (01/25/22) Updates to barge layout. (01/26/22) Updated barge layout to show power swivel. (01/28/22) Updated barge layout to match offshore loading list from Troy. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 (01/26/22) Townhall meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 (01/25/22) Updated weekly timesheet and submitted for approval. Update call with Lam. Update call with Jorge. Update with Kyle. (01/26/22) Update with Kyle. Discussed goals with Lam. Follow up with Kyle. (01/27/22) Updated timesheet. Discussed design issues with Kyle. Update with Lam. Engineering group pictures. Review/approved designer timesheets. Discussed ref drawings for SAkh.-LTN Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-26 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 4 0 (01/25/22) Started 249L pallet dock MTO. Discussed MTO with Ralph. (01/26/22) Saved MTO quotes on the Q. Finalized MTO for pallet dock. (01/27/22) Saved BOP skid quotes on Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-26 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 2 0 (01/26/22) Weekly design update with Tyler Weekly update with Genesis eng. Pulled ref info and assigned Jorge to windwall mod drawing. Sent ref to Jorge. Call with Exxon - HVAC GA. (01/27/22) Updated drawing list. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 (01/27/22) Searched for COPA ref info for Ralph. (01/28/22) Searched archives for heli rig pictures. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 (01/25/22) Updated weekly timesheet and submitted for approval. Update call with Lam. Update call with Jorge. Update with Kyle. (01/26/22) Update with Kyle. Discussed goals with Lam. Follow up with Kyle. (01/27/22) Updated timesheet. Discussed design issues with Kyle. Update with Lam. Engineering group pictures. Review/approved designer timesheets. Discussed ref drawings for SAkh.-LTN Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-27 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.25 0 (01/25/22) Started 249L pallet dock MTO. Discussed MTO with Ralph. (01/26/22) Saved MTO quotes on the Q. Finalized MTO for pallet dock. (01/27/22) Saved BOP skid quotes on Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-27 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.5 0 (01/27/22) Call with German to review open TSRs. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-27 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 0.25 0 (01/26/22) Weekly design update with Tyler Weekly update with Genesis eng. Pulled ref info and assigned Jorge to windwall mod drawing. Sent ref to Jorge. Call with Exxon - HVAC GA. (01/27/22) Updated drawing list. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-27 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1 0 (01/27/22) Discussed HVAC mod sketch with Lam - general update. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-27 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 (01/27/22) Discussed NOV scope with Kyle. Kick-off call with NOV. Pulled ref drawings and saved for NOV transmittal. (01/28/22) Pulled reference pics for NOV transmittal. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-28 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 (01/25/22) Updates to barge layout. (01/26/22) Updated barge layout to show power swivel. (01/28/22) Updated barge layout to match offshore loading list from Troy. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 (01/27/22) Searched for COPA ref info for Ralph. (01/28/22) Searched archives for heli rig pictures. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-01-28 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1.5 0 (01/27/22) Discussed NOV scope with Kyle. Kick-off call with NOV. Pulled ref drawings and saved for NOV transmittal. (01/28/22) Pulled reference pics for NOV transmittal. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Personnel admin ATH for project engineer timekeeping system invoice Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-02 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.75 0 CN Log Punch List Cooler installation Operations manual Emergency drawworks lowering Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-02 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 EPIRB renewal; compliance sheet update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-03 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 CN Log Punch List Cooler installation Operations manual Emergency drawworks lowering Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Personnel admin. - intake call, scheduling Title block changes software invoicing sakhalin invoicing TS update to AP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-03 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Willow FEED Study Proposal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-03 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 General TSR support for Berkut Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-03 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 249 / 258 projects Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-03 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 265L HP Valve (Justin Whitley) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-03 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 0.5 0 DW and Cabin Installtion process Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-03 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 0.5 0 General discussions with TE Review of CTR / EAMR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-03 Rig 269L :Rig 269L TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 0.5 0 Meetings with GO and AP Review of F/G layout Personnel Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-04 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 CN Log Punch List Cooler installation Operations manual Emergency drawworks lowering Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Personnel admin. - intake call, scheduling Title block changes software invoicing sakhalin invoicing TS update to AP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-04 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Willow FEED Study Proposal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 General TSR support for Berkut Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-04 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 249 / 258 projects Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-04 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1.5 0 265L HP Valve (Justin Whitley) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-04 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 0.5 0 General discussions with TE Review of CTR / EAMR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-04 Rig 269L :Rig 269L TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 0.5 0 Meetings with GO and AP Review of F/G layout Personnel Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-05 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 CN Log Punch List Cooler installation Operations manual Emergency drawworks lowering Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Personnel admin. - intake call, scheduling Title block changes software invoicing sakhalin invoicing TS update to AP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-05 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2.5 0 Willow FEED Study Proposal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-05 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 249 / 258 projects Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-05 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 265L HP Valve (Justin Whitley) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-05 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 1 0 DW and Cabin Installtion process Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-05 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 0.5 0 General discussions with TE Review of CTR / EAMR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-05 Rig 269L :Rig 269L TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 1 0 Meetings with GO and AP Review of F/G layout Personnel Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-06 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2.5 0 CN Log Punch List Cooler installation Operations manual Emergency drawworks lowering Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Personnel admin. - intake call, scheduling Title block changes software invoicing sakhalin invoicing TS update to AP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-06 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 3 0 Willow FEED Study Proposal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-06 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1.5 0 Oxy Oman Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-06 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 EPIRB renewal; compliance sheet update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-06 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 0.5 0 General discussions with TE Review of CTR / EAMR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-06 Rig 269L :Rig 269L TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 0.5 0 Meetings with GO and AP Review of F/G layout Personnel Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-07 BERKUT :BERKUT TSR-01800-BERP CRI-Diverter-Valve Regular Pay N 0.5 0 Review solution with JG Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-07 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 CN Log Punch List Cooler installation Operations manual Emergency drawworks lowering Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Personnel admin. - intake call, scheduling Title block changes software invoicing sakhalin invoicing TS update to AP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-07 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Willow FEED Study Proposal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-07 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 249 / 258 projects Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-07 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 0.5 0 General discussions with TE Review of CTR / EAMR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-07 Rig 269L :Rig 269L TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 0.5 0 Meetings with GO and AP Review of F/G layout Personnel Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-08 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 CN Log Punch List Cooler installation Operations manual Emergency drawworks lowering Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-09 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Project support; meetings; Lowering procedure HPU manual Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Dubai Project Engineer Houston Project Engineer JR Admin. Month End Reports; 0-12 forecast SAK Invoicing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-10 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Project support; meetings; Lowering procedure HPU manual Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Dubai Project Engineer Houston Project Engineer JR Admin. Month End Reports; 0-12 forecast SAK Invoicing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-10 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 3 0 Willow Support; FEED proposal OSA POB meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR Status; general discussions with team Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-10 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 265L Valve - discussions with Ron Richter at HML Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-10 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1 0 Discussions with TE; general support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-11 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Project support; meetings; Lowering procedure HPU manual Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Dubai Project Engineer Houston Project Engineer JR Admin. Month End Reports; 0-12 forecast SAK Invoicing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-11 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2.5 0 Willow Support; FEED proposal OSA POB meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR Status; general discussions with team Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-11 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1 0 Discussions with TE; general support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-11 Rig 269L :Rig 269L TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 1 0 Support; meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-12 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Project support; meetings; Lowering procedure HPU manual Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Dubai Project Engineer Houston Project Engineer JR Admin. Month End Reports; 0-12 forecast SAK Invoicing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-12 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 3 0 Willow Support; FEED proposal OSA POB meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 Update TSR tracker Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-12 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 1 0 Agitator shaft Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-12 Rig 269L :Rig 269L TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 1 0 Support; meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-13 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Project support; meetings; Lowering procedure HPU manual Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Dubai Project Engineer Houston Project Engineer JR Admin. Month End Reports; 0-12 forecast SAK Invoicing Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-13 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 4 0 Willow Support; FEED proposal OSA POB meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-13 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1 0 Discussions with TE; general support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-14 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Project support; meetings; Lowering procedure HPU manual Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Cade to School Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-16 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 HPU issues Transport planning Emergency lowering Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Performance Evaluations Self-Assessment / 2022 Goals Rig Count data Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-17 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.5 0 HPU issues Transport planning Emergency lowering Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Performance Evaluations Self-Assessment / 2022 Goals Rig Count data Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-17 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 3 0 Willow support FEED proposal / Cover letter Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-17 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-17 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 COD's for barges and crew boats Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-17 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1.5 0 Design reviews General discussions with TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-18 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 HPU issues Transport planning Emergency lowering Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-18 CVX Genesis :CVX Genesis TSR-1725-GENP-06 Rig-Down & Transport Regular Pay N 1 0 Staging layout Weight / dimensional review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Performance Evaluations Self-Assessment / 2022 Goals Rig Count data Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-18 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Willow support FEED proposal / Cover letter Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 TSR updates; resolving issues Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-18 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 COD's for barges and crew boats Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-18 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 0.5 0 Design reviews General discussions with TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-18 Rig 269L :Rig 269L TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 1 0 discussions wioth Greg and Ripal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-19 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 HPU issues Transport planning Emergency lowering Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR weekly meeting Discuss fuel consumption with MK Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Performance Evaluations Self-Assessment / 2022 Goals Rig Count data Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-19 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Willow support FEED proposal / Cover letter Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-19 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 TSR Status Update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 TSR updates; resolving issues Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-19 OH-036 :OH-036 OH-036-01 Technology Think Tank Regular Pay N 1 0 Monthly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-19 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1 0 Design reviews General discussions with TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-20 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 HPU issues Transport planning Emergency lowering Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-20 CVX Genesis :CVX Genesis TSR-1725-GENP-06 Rig-Down & Transport Regular Pay N 1 0 Staging layout Weight / dimensional review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR weekly meeting Discuss fuel consumption with MK Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Performance Evaluations Self-Assessment / 2022 Goals Rig Count data Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-20 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Willow support FEED proposal / Cover letter Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-20 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 COD's for barges and crew boats Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-20 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 0.5 0 Design reviews General discussions with TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-20 Rig 269L :Rig 269L TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 1 0 discussions wioth Greg and Ripal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-21 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.5 0 HPU issues Transport planning Emergency lowering Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-21 CVX Genesis :CVX Genesis TSR-1725-GENP-06 Rig-Down & Transport Regular Pay N 0.75 0 Staging layout Weight / dimensional review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Performance Evaluations Self-Assessment / 2022 Goals Rig Count data Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-21 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Willow support FEED proposal / Cover letter Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-21 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1 0 Design reviews General discussions with TE Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Preparation for Meeting with Brage Engineering photo shoot Dubai Project Engineer HOU Project Engineer Performance Evaluations Self-Assessment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-24 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.5 0 Loadout files Risk Assessment Workshop with CVX Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Preparation for Meeting with Brage Engineering photo shoot Dubai Project Engineer HOU Project Engineer Performance Evaluations Self-Assessment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-24 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Willow FEED Proposal - discussions with NOV and internal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-24 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 Meeting(s) with German Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-24 Rig 165L :Rig 165L TSR-01809-165L Engine-Upgrade-Study Regular Pay N 1 0 Meeting with CG Research current / proposed set-up Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-24 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 1 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-24 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1 0 Personnel Admin CC with TE General Review of Drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-25 BERKUT :BERKUT TSR-01800-BERP CRI-Diverter-Valve Regular Pay N 1 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-25 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 Loadout files Risk Assessment Workshop with CVX Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Preparation for Meeting with Brage Engineering photo shoot Dubai Project Engineer HOU Project Engineer Performance Evaluations Self-Assessment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-25 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Willow FEED Proposal - discussions with NOV and internal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-25 Rig 165L :Rig 165L TSR-01809-165L Engine-Upgrade-Study Regular Pay N 1 0 Meeting with CG Research current / proposed set-up Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-26 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Loadout files Risk Assessment Workshop with CVX Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Meeting with Brage Town Hall Geothermal Marketing Brochure Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Preparation for Meeting with Brage Engineering photo shoot Dubai Project Engineer HOU Project Engineer Performance Evaluations Self-Assessment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-26 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Willow FEED Proposal - discussions with NOV and internal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-26 ORLAN :ORLAN TSR-01806-ORLP CRI Roller Mill Repair Regular Pay N 1 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-26 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1 0 Personnel Admin CC with TE General Review of Drawings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-26 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 0.5 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-27 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Loadout files Risk Assessment Workshop with CVX Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Meeting with Brage Town Hall Geothermal Marketing Brochure Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Preparation for Meeting with Brage Engineering photo shoot Dubai Project Engineer HOU Project Engineer Performance Evaluations Self-Assessment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-27 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Willow FEED Proposal - discussions with NOV and internal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-27 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.5 0 Meeting(s) with German Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-27 Rig 165L :Rig 165L TSR-01809-165L Engine-Upgrade-Study Regular Pay N 0.5 0 Meeting with CG Research current / proposed set-up Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-27 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 1 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-27 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-28 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Loadout files Risk Assessment Workshop with CVX Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Meeting with Brage Town Hall Geothermal Marketing Brochure Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 Preparation for Meeting with Brage Engineering photo shoot Dubai Project Engineer HOU Project Engineer Performance Evaluations Self-Assessment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-28 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Willow FEED Proposal - discussions with NOV and internal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-28 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.5 0 Meeting(s) with German Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-01-28 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1 0 Personnel Admin CC with TE General Review of Drawings Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 01/04: meeting with James and Kyle regarding title block changes 01/06: bi-weekly conference call with HTSG regarding TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 01/04: timesheets to ProjXsense 01/05: updated title blocks; upload share folder with client (XOM) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-04 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.75 0 01/04: update user credentials and hierarchy; assign TSR number; transmit TSR-01725-LM-DOC; 01/06: transmit updated title blocks to Sakhalin; transmit TSR-01752-CTR-R5; submit Sakhalin billable hours to Helen Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 01/05: meeting with Tyler regarding dwks and cabin installation process. 01/06: meeting with Tyler regarding air intensifier; 01/07: meeting with Tyler regarding air intensifier and new VFD layout; meeting with James and Jorge regarding doghouse modifications Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-04 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 3.75 0 01/04: find suitable placement of air intensifier tank; model piping runs; check length for suitability. 01/06-07: electrical topology drawings for Ripal; updates to rig DSM model Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-05 CVX Genesis :CVX Genesis TSR-1725-GENP-01 FEED Study/Detailed Design Regular Pay N 0.75 0 01/05: updated dimensions of drill deck layout Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-05 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.25 0 01/04: timesheets to ProjXsense 01/05: updated title blocks; upload share folder with client (XOM) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 01/05: meeting with Tyler regarding dwks and cabin installation process. 01/06: meeting with Tyler regarding air intensifier; 01/07: meeting with Tyler regarding air intensifier and new VFD layout; meeting with James and Jorge regarding doghouse modifications Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-06 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 01/04: meeting with James and Kyle regarding title block changes 01/06: bi-weekly conference call with HTSG regarding TSR updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-06 OH-013 :OH-013 Overhead All Activities Regular Pay N 2.75 0 01/04: update user credentials and hierarchy; assign TSR number; transmit TSR-01725-LM-DOC; 01/06: transmit updated title blocks to Sakhalin; transmit TSR-01752-CTR-R5; submit Sakhalin billable hours to Helen Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 01/05: meeting with Tyler regarding dwks and cabin installation process. 01/06: meeting with Tyler regarding air intensifier; 01/07: meeting with Tyler regarding air intensifier and new VFD layout; meeting with James and Jorge regarding doghouse modifications Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-06 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 3.75 0 01/04: find suitable placement of air intensifier tank; model piping runs; check length for suitability. 01/06-07: electrical topology drawings for Ripal; updates to rig DSM model Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 01/05: meeting with Tyler regarding dwks and cabin installation process. 01/06: meeting with Tyler regarding air intensifier; 01/07: meeting with Tyler regarding air intensifier and new VFD layout; meeting with James and Jorge regarding doghouse modifications Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-07 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 6.5 0 01/04: find suitable placement of air intensifier tank; model piping runs; check length for suitability. 01/06-07: electrical topology drawings for Ripal; updates to rig DSM model Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 01/10: timesheets to ProjXsense and payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-10 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 01/10: weekly update meeting with Sakhalin Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Update DM compiled model Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-10 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 4 0 01/10: meeting with Tyler to discuss air intensifier location; meeting with Ripal to discuss topology drawing; send Chuck updated VFD model layout; upload files to XOM 01/11: meeting with Chuck and HTSG to discuss installation sequence; revise topology drawing; revisit air intensifier location 01/12: continue topology drawing; 01/13: meeting with Tyler to discuss StabMaster platform 01/14: find wind wall drawings to send to Genesis Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Update DM compiled model Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-11 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 6 0 01/10: meeting with Tyler to discuss air intensifier location; meeting with Ripal to discuss topology drawing; send Chuck updated VFD model layout; upload files to XOM 01/11: meeting with Chuck and HTSG to discuss installation sequence; revise topology drawing; revisit air intensifier location 01/12: continue topology drawing; 01/13: meeting with Tyler to discuss StabMaster platform 01/14: find wind wall drawings to send to Genesis Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 01/12: process incoming transmittals and TSR requests 01/13: process incoming TSR 01/14: process incoming TSR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Update DM compiled model Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-12 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 5 0 01/10: meeting with Tyler to discuss air intensifier location; meeting with Ripal to discuss topology drawing; send Chuck updated VFD model layout; upload files to XOM 01/11: meeting with Chuck and HTSG to discuss installation sequence; revise topology drawing; revisit air intensifier location 01/12: continue topology drawing; 01/13: meeting with Tyler to discuss StabMaster platform 01/14: find wind wall drawings to send to Genesis Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-13 HTSG :HTSG 2021-SMART-Goals Regular Pay N 5 0 01/14: drafting handbook revision B Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-13 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 01/12: process incoming transmittals and TSR requests 01/13: process incoming TSR 01/14: process incoming TSR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-13 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 2 0 01/10: meeting with Tyler to discuss air intensifier location; meeting with Ripal to discuss topology drawing; send Chuck updated VFD model layout; upload files to XOM 01/11: meeting with Chuck and HTSG to discuss installation sequence; revise topology drawing; revisit air intensifier location 01/12: continue topology drawing; 01/13: meeting with Tyler to discuss StabMaster platform 01/14: find wind wall drawings to send to Genesis Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-14 HTSG :HTSG 2021-SMART-Goals Regular Pay N 5 0 01/14: drafting handbook revision B Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-14 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 01/12: process incoming transmittals and TSR requests 01/13: process incoming TSR 01/14: process incoming TSR Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-14 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 2 0 01/10: meeting with Tyler to discuss air intensifier location; meeting with Ripal to discuss topology drawing; send Chuck updated VFD model layout; upload files to XOM 01/11: meeting with Chuck and HTSG to discuss installation sequence; revise topology drawing; revisit air intensifier location 01/12: continue topology drawing; 01/13: meeting with Tyler to discuss StabMaster platform 01/14: find wind wall drawings to send to Genesis Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 01/17: timesheets to ProjXsense 01/18: assign drawing numbers for Genesis with Krechet Automation; send out new PWB title blocks 01/19: meet with Kathy to receive PWB shirt 01/20: assist Davor in finding native PDF file for Krechet; find Keppel structural standards for cage ladder on Krechet Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 01/17: transmit stackup drawing to CVX Bangladesh Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 updated compiled data model of the DM Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-17 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 4 0 01/17: meeting with Ripal to discuss topology drawings; meeting with James and Tyler to discuss doghouse cable tray and air intensifier location; create a sketch of power frame and stabmaster locations 01/19: meeting with Tyler to look at tool joint location downhole on Krechet 01/20: meeting with Ripal to find electrical fire & gas panel location on DSM 01/21: send dimensions to Genesis for VFD location on DSM Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 01/17: timesheets to ProjXsense 01/18: assign drawing numbers for Genesis with Krechet Automation; send out new PWB title blocks 01/19: meet with Kathy to receive PWB shirt 01/20: assist Davor in finding native PDF file for Krechet; find Keppel structural standards for cage ladder on Krechet Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6 0 updated compiled data model of the DM Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-19 CVX Genesis :CVX Genesis TSR-1725-GENP-06 Rig-Down & Transport Regular Pay N 4 0 01/19: convert Sawyer models into plan view CAD drawings to James Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 01/19: meeting with James and Jorge to discuss goals as a group 01/20: bi-weekly meeting to go over TSR's and BD Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 01/17: timesheets to ProjXsense 01/18: assign drawing numbers for Genesis with Krechet Automation; send out new PWB title blocks 01/19: meet with Kathy to receive PWB shirt 01/20: assist Davor in finding native PDF file for Krechet; find Keppel structural standards for cage ladder on Krechet Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 updated compiled data model of the DM Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-19 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 1 0 01/17: meeting with Ripal to discuss topology drawings; meeting with James and Tyler to discuss doghouse cable tray and air intensifier location; create a sketch of power frame and stabmaster locations 01/19: meeting with Tyler to look at tool joint location downhole on Krechet 01/20: meeting with Ripal to find electrical fire & gas panel location on DSM 01/21: send dimensions to Genesis for VFD location on DSM Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-20 HTSG :HTSG 2021-SMART-Goals Regular Pay N 2 0 revision to the drafting handbook Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 01/19: meeting with James and Jorge to discuss goals as a group 01/20: bi-weekly meeting to go over TSR's and BD Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 01/17: timesheets to ProjXsense 01/18: assign drawing numbers for Genesis with Krechet Automation; send out new PWB title blocks 01/19: meet with Kathy to receive PWB shirt 01/20: assist Davor in finding native PDF file for Krechet; find Keppel structural standards for cage ladder on Krechet Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 updated compiled data model of the DM Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-20 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 1 0 01/17: meeting with Ripal to discuss topology drawings; meeting with James and Tyler to discuss doghouse cable tray and air intensifier location; create a sketch of power frame and stabmaster locations 01/19: meeting with Tyler to look at tool joint location downhole on Krechet 01/20: meeting with Ripal to find electrical fire & gas panel location on DSM 01/21: send dimensions to Genesis for VFD location on DSM Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-21 HTSG :HTSG 2021-SMART-Goals Regular Pay N 7 0 revision to the drafting handbook Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-21 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 1 0 01/17: meeting with Ripal to discuss topology drawings; meeting with James and Tyler to discuss doghouse cable tray and air intensifier location; create a sketch of power frame and stabmaster locations 01/19: meeting with Tyler to look at tool joint location downhole on Krechet 01/20: meeting with Ripal to find electrical fire & gas panel location on DSM 01/21: send dimensions to Genesis for VFD location on DSM Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-24 BERKUT :BERKUT TSR-01785-BERP Anchor Beam for Control Lines Sheaves Regular Pay N 1.25 0 01/24: meeting with Loadmaster and Mio to discuss redlines. 01/25: email correspondence to Dragon regarding additional comments and details Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 01/24: timesheets to ProjXsense and payroll; search through SharePoint for Keppel structural basis of design document 01/26: find Keppel drawings/standard for Genesis 01/27: email correspondence with Loadmaster 01/28: performance review submittal Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-24 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 01/24: process incoming TSR 01/26: transmit TSR-01785-LM-DWG 01/28: transmit CVX Bangladesh drawings to NOV Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-24 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 01/24: weekly update meeting with Sakhalin to discuss TSR updates 01/26: process incoming TSR transmittal Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-24 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 1.75 0 01/24: update DF layout drawing to send to Ripal 01/25-01/28: update DF blower motor ducting concept; update blower motor adaptor 01/25: meeting with John to discuss concept tasks; update DSM model to reflect updated VFD model from NOV; review drawings to find F&G panel on DSM; review with Tyler optimal VFD position on DSM 01/28: meeting with Ripal to discuss electrical drawings Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-25 BERKUT :BERKUT TSR-01785-BERP Anchor Beam for Control Lines Sheaves Regular Pay N 1 0 01/24: meeting with Loadmaster and Mio to discuss redlines. 01/25: email correspondence to Dragon regarding additional comments and details Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-25 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 7 0 01/24: update DF layout drawing to send to Ripal 01/25-01/28: update DF blower motor ducting concept; update blower motor adaptor 01/25: meeting with John to discuss concept tasks; update DSM model to reflect updated VFD model from NOV; review drawings to find F&G panel on DSM; review with Tyler optimal VFD position on DSM 01/28: meeting with Ripal to discuss electrical drawings Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-26 BERKUT :BERKUT TSR-01785-BERP Anchor Beam for Control Lines Sheaves Regular Pay N 1.5 0 01/24: meeting with Loadmaster and Mio to discuss redlines. 01/25: email correspondence to Dragon regarding additional comments and details Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 01/26: export a few views of 270L from Navisworks for Greg; email correspondence with Sakhalin 01/28: email correspondence with Sakhalin regarding drawing conversions Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 01/24: timesheets to ProjXsense and payroll; search through SharePoint for Keppel structural basis of design document 01/26: find Keppel drawings/standard for Genesis 01/27: email correspondence with Loadmaster 01/28: performance review submittal Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-26 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 01/24: weekly update meeting with Sakhalin to discuss TSR updates 01/26: process incoming TSR transmittal Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-26 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 2.75 0 01/24: update DF layout drawing to send to Ripal 01/25-01/28: update DF blower motor ducting concept; update blower motor adaptor 01/25: meeting with John to discuss concept tasks; update DSM model to reflect updated VFD model from NOV; review drawings to find F&G panel on DSM; review with Tyler optimal VFD position on DSM 01/28: meeting with Ripal to discuss electrical drawings Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-27 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 01/26: Global Operations Town Hall meeting 01/27: photo session with Kathy Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 01/24: timesheets to ProjXsense and payroll; search through SharePoint for Keppel structural basis of design document 01/26: find Keppel drawings/standard for Genesis 01/27: email correspondence with Loadmaster 01/28: performance review submittal Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 01/24: process incoming TSR 01/26: transmit TSR-01785-LM-DWG 01/28: transmit CVX Bangladesh drawings to NOV Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-27 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 4.5 0 01/24: update DF layout drawing to send to Ripal 01/25-01/28: update DF blower motor ducting concept; update blower motor adaptor 01/25: meeting with John to discuss concept tasks; update DSM model to reflect updated VFD model from NOV; review drawings to find F&G panel on DSM; review with Tyler optimal VFD position on DSM 01/28: meeting with Ripal to discuss electrical drawings Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 01/26: export a few views of 270L from Navisworks for Greg; email correspondence with Sakhalin 01/28: email correspondence with Sakhalin regarding drawing conversions Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 01/24: timesheets to ProjXsense and payroll; search through SharePoint for Keppel structural basis of design document 01/26: find Keppel drawings/standard for Genesis 01/27: email correspondence with Loadmaster 01/28: performance review submittal Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-28 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 01/24: process incoming TSR 01/26: transmit TSR-01785-LM-DWG 01/28: transmit CVX Bangladesh drawings to NOV Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-01-28 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 3 0 01/24: update DF layout drawing to send to Ripal 01/25-01/28: update DF blower motor ducting concept; update blower motor adaptor 01/25: meeting with John to discuss concept tasks; update DSM model to reflect updated VFD model from NOV; review drawings to find F&G panel on DSM; review with Tyler optimal VFD position on DSM 01/28: meeting with Ripal to discuss electrical drawings Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Years Day Holiday Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-04 OH-009 :OH-009 OH-009-027 Oman Regular Pay N 4 0 Review Oxy Oman Tender rig requirements and start workover rig search. Assemble HH RFQ letter for lease to own workover rigs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-04 Rig 269L :Rig 269L TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 6 0 Present CVX Bangladesh project execution plan at project kickoff. Revise Project Execution Plan, review bid sheet, update procurement tracker. Support team to assemble reimbursable capex AFE and mob, non-reimbursable capex AFE. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-05 OH-009 :OH-009 OH-009-027 Oman Regular Pay N 4 0 Review Oxy Oman Tender rig requirements and start workover rig search. Assemble HH RFQ letter for lease to own workover rigs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-05 Rig 269L :Rig 269L TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 6 0 Present CVX Bangladesh project execution plan at project kickoff. Revise Project Execution Plan, review bid sheet, update procurement tracker. Support team to assemble reimbursable capex AFE and mob, non-reimbursable capex AFE. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-06 OH-009 :OH-009 OH-009-027 Oman Regular Pay N 2 0 Review Oxy Oman Tender rig requirements and start workover rig search. Assemble HH RFQ letter for lease to own workover rigs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-06 Rig 269L :Rig 269L TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 8 0 Present CVX Bangladesh project execution plan at project kickoff. Revise Project Execution Plan, review bid sheet, update procurement tracker. Support team to assemble reimbursable capex AFE and mob, non-reimbursable capex AFE. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-07 OH-009 :OH-009 OH-009-027 Oman Regular Pay N 2 0 Review Oxy Oman Tender rig requirements and start workover rig search. Assemble HH RFQ letter for lease to own workover rigs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-07 OH-009 :OH-009 OH-009-030 Latin America (LATAM) Regular Pay N 1 0 Support Ecuador 2000HP opportunity sourcing rig through Rig Max (Slb Rig 403 and alternate delivered ex works Houston) Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-07 Rig 269L :Rig 269L TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 7 0 Present CVX Bangladesh project execution plan at project kickoff. Revise Project Execution Plan, review bid sheet, update procurement tracker. Support team to assemble reimbursable capex AFE and mob, non-reimbursable capex AFE. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-08 OH-009 :OH-009 OH-009-030 Latin America (LATAM) Regular Pay N 1 0 Support Ecuador 2000HP opportunity sourcing rig through Rig Max (Slb Rig 403 and alternate delivered ex works Houston) Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Weekly PM mtg. 2022 SMART Goals mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-10 OH-009 :OH-009 OH-009-030 Latin America (LATAM) Regular Pay N 1 0 Support Rig 403 proposal for Slb Ecuador Tender. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-10 Rig 269L :Rig 269L TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 9 0 Revise project execution plan per team input. Comment to BOP drawings. Revise procurement tracker. Assemble weekly report. Review bid sheet with team. Support reimbursable capex AFE and non-reimbursable, mob AFE. Review dgb kit upgrade options for 269. Review BOP and drill pipe options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-11 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 4 0 Meeting with PT-Dati and Ormat for geo-thermal worldwide opportunities. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-11 Rig 269L :Rig 269L TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 8 0 Revise project execution plan per team input. Comment to BOP drawings. Revise procurement tracker. Assemble weekly report. Review bid sheet with team. Support reimbursable capex AFE and non-reimbursable, mob AFE. Review dgb kit upgrade options for 269. Review BOP and drill pipe options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-12 Rig 269L :Rig 269L TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 12 0 Revise project execution plan per team input. Comment to BOP drawings. Revise procurement tracker. Assemble weekly report. Review bid sheet with team. Support reimbursable capex AFE and non-reimbursable, mob AFE. Review dgb kit upgrade options for 269. Review BOP and drill pipe options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-13 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 4 0 Meet to review south Texas Criterion geo-thermal opportunity and rig search. Source rig options and review added equipment required. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-13 Rig 269L :Rig 269L TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 8 0 Revise project execution plan per team input. Comment to BOP drawings. Revise procurement tracker. Assemble weekly report. Review bid sheet with team. Support reimbursable capex AFE and non-reimbursable, mob AFE. Review dgb kit upgrade options for 269. Review BOP and drill pipe options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-14 OH-009 :OH-009 OH-009-030 Latin America (LATAM) Regular Pay N 2 0 Support Rig 403 proposal for Slb Ecuador Tender. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-14 Rig 269L :Rig 269L TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 8 0 Revise project execution plan per team input. Comment to BOP drawings. Revise procurement tracker. Assemble weekly report. Review bid sheet with team. Support reimbursable capex AFE and non-reimbursable, mob AFE. Review dgb kit upgrade options for 269. Review BOP and drill pipe options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-17 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 12 0 Edit change order #1 and propose mob phased fee. Support weekly report, clarify NOV PO scope of work; puls dampeners. Update SD tracker and procurement tracker. Support AFE #2 non-reimbursable capex. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-18 OH-009 :OH-009 OH-009-032 Arctic, North America Offshore (ANAO) Regular Pay N 6 0 Search for rig options for Criterion, Attend Criterion intro meeting and attend Parker Criterion meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-18 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 6 0 Edit change order #1 and propose mob phased fee. Support weekly report, clarify NOV PO scope of work; puls dampeners. Update SD tracker and procurement tracker. Support AFE #2 non-reimbursable capex. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-19 OH-009 :OH-009 OH-009-032 Arctic, North America Offshore (ANAO) Regular Pay N 12 0 Search for rig options for Criterion, Attend Criterion intro meeting and attend Parker Criterion meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-20 OH-009 :OH-009 OH-009-032 Arctic, North America Offshore (ANAO) Regular Pay N 6 0 Search for rig options for Criterion, Attend Criterion intro meeting and attend Parker Criterion meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-20 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 6 0 Edit change order #1 and propose mob phased fee. Support weekly report, clarify NOV PO scope of work; puls dampeners. Update SD tracker and procurement tracker. Support AFE #2 non-reimbursable capex. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-21 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 6 0 Edit change order #1 and propose mob phased fee. Support weekly report, clarify NOV PO scope of work; puls dampeners. Update SD tracker and procurement tracker. Support AFE #2 non-reimbursable capex. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Weekly PM mtg. Global Ops town hall. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-24 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 8 0 Propose puls dampener options to CVX. review schedule and procurement tracker with team. Continue engineering support and follow up with NOV for TD upgrade and HP mud upgrade. Plan SIT procedures. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-25 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 7 0 Search for Japan geo-thermal rig options. Attend Star Energy newbuild meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-25 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Propose puls dampener options to CVX. review schedule and procurement tracker with team. Continue engineering support and follow up with NOV for TD upgrade and HP mud upgrade. Plan SIT procedures. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Weekly PM mtg. Global Ops town hall. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-26 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 Search for Japan geo-thermal rig options. Attend Star Energy newbuild meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-26 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 7 0 Propose puls dampener options to CVX. review schedule and procurement tracker with team. Continue engineering support and follow up with NOV for TD upgrade and HP mud upgrade. Plan SIT procedures. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-27 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 4 0 Search for Japan geo-thermal rig options. Attend Star Energy newbuild meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-27 OH-009 :OH-009 OH-009-030 Latin America (LATAM) Regular Pay N 2 0 Attend Ecuador rig visit mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-27 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 3 0 Propose puls dampener options to CVX. review schedule and procurement tracker with team. Continue engineering support and follow up with NOV for TD upgrade and HP mud upgrade. Plan SIT procedures. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-28 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 4 0 Search for Japan geo-thermal rig options. Attend Star Energy newbuild meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-01-28 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Propose puls dampener options to CVX. review schedule and procurement tracker with team. Continue engineering support and follow up with NOV for TD upgrade and HP mud upgrade. Plan SIT procedures. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-03 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 SAK meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 RE: Fire and Gas System Upgrade. NOV Drawing Approvals list Revised Krechet Topology :Krechet Automation Upgrade - DW VFD House GA Krechet Automation - Driller's cabin / Rig floor plot plan Krechet Automation Upgrade - Driller's cabin A/C unit question Krechet Automation - Driller's Cabin lighting panel Questions from NOV Drawings Krechet - Automation upgrade - ADS-30D Q/A Krechet Automation - HMI power and control cable discussion with Drazan and Chuck New VFD House GA Paker/ENL Krechet Automation update meeting Krechet Rig 209 AC Upgrade / Sequencer - Bi-Weekly Action Item meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-03 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2 0 Rig 269 - Plot Plan Layout RFQ - Monitoring & Alarm Systems Latest 269L Plot Plan discuss with James CVX Bangladesh Rig Camp Layout Monitoring & Alarm Systems meeting with Rutledge Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-03 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Small Electric Motor Added to Parker Scope. RE: Power Junction Box location Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 RE: Fire and Gas System Upgrade. NOV Drawing Approvals list Revised Krechet Topology :Krechet Automation Upgrade - DW VFD House GA Krechet Automation - Driller's cabin / Rig floor plot plan Krechet Automation Upgrade - Driller's cabin A/C unit question Krechet Automation - Driller's Cabin lighting panel Questions from NOV Drawings Krechet - Automation upgrade - ADS-30D Q/A Krechet Automation - HMI power and control cable discussion with Drazan and Chuck New VFD House GA Paker/ENL Krechet Automation update meeting Krechet Rig 209 AC Upgrade / Sequencer - Bi-Weekly Action Item meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-04 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2 0 Rig 269 - Plot Plan Layout RFQ - Monitoring & Alarm Systems Latest 269L Plot Plan discuss with James CVX Bangladesh Rig Camp Layout Monitoring & Alarm Systems meeting with Rutledge Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-04 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Small Electric Motor Added to Parker Scope. RE: Power Junction Box location Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 RE: Fire and Gas System Upgrade. NOV Drawing Approvals list Revised Krechet Topology :Krechet Automation Upgrade - DW VFD House GA Krechet Automation - Driller's cabin / Rig floor plot plan Krechet Automation Upgrade - Driller's cabin A/C unit question Krechet Automation - Driller's Cabin lighting panel Questions from NOV Drawings Krechet - Automation upgrade - ADS-30D Q/A Krechet Automation - HMI power and control cable discussion with Drazan and Chuck New VFD House GA Paker/ENL Krechet Automation update meeting Krechet Rig 209 AC Upgrade / Sequencer - Bi-Weekly Action Item meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-05 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 4 0 Rig 269 - Plot Plan Layout RFQ - Monitoring & Alarm Systems Latest 269L Plot Plan discuss with James CVX Bangladesh Rig Camp Layout Monitoring & Alarm Systems meeting with Rutledge Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7 0 RE: Fire and Gas System Upgrade. NOV Drawing Approvals list Revised Krechet Topology :Krechet Automation Upgrade - DW VFD House GA Krechet Automation - Driller's cabin / Rig floor plot plan Krechet Automation Upgrade - Driller's cabin A/C unit question Krechet Automation - Driller's Cabin lighting panel Questions from NOV Drawings Krechet - Automation upgrade - ADS-30D Q/A Krechet Automation - HMI power and control cable discussion with Drazan and Chuck New VFD House GA Paker/ENL Krechet Automation update meeting Krechet Rig 209 AC Upgrade / Sequencer - Bi-Weekly Action Item meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-06 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Rig 269 - Plot Plan Layout RFQ - Monitoring & Alarm Systems Latest 269L Plot Plan discuss with James CVX Bangladesh Rig Camp Layout Monitoring & Alarm Systems meeting with Rutledge Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7 0 RE: Fire and Gas System Upgrade. NOV Drawing Approvals list Revised Krechet Topology :Krechet Automation Upgrade - DW VFD House GA Krechet Automation - Driller's cabin / Rig floor plot plan Krechet Automation Upgrade - Driller's cabin A/C unit question Krechet Automation - Driller's Cabin lighting panel Questions from NOV Drawings Krechet - Automation upgrade - ADS-30D Q/A Krechet Automation - HMI power and control cable discussion with Drazan and Chuck New VFD House GA Paker/ENL Krechet Automation update meeting Krechet Rig 209 AC Upgrade / Sequencer - Bi-Weekly Action Item meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-07 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Rig 269 - Plot Plan Layout RFQ - Monitoring & Alarm Systems Latest 269L Plot Plan discuss with James CVX Bangladesh Rig Camp Layout Monitoring & Alarm Systems meeting with Rutledge Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-10 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 SAK weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 New VFD House GA meeting with Chuck Krechet Automation Upgrade - ADS -30D Block Diagram update Krechet Automation - Equipment Installation Sequence Revised new Topology again. added Sandpipe sensor cable Krechet Automation upgrade - Stand pipe pressure transmitter location meeting Krechet Automation upgrade - ADS-30D sensor J-box location Drawworks GA Revision Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-10 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 3 0 Rig 269 CVX Bangladesh Fire and Gas System meeting Rig 269 - CVX Bangladesh - Centrifuge pump Info.from Berney F&G system, scba, safety equipment scope of supply doc review SCBA Compressor info R247 Parker, Lightning Protection SQ-646689 - REV. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 New VFD House GA meeting with Chuck Krechet Automation Upgrade - ADS -30D Block Diagram update Krechet Automation - Equipment Installation Sequence Revised new Topology again. added Sandpipe sensor cable Krechet Automation upgrade - Stand pipe pressure transmitter location meeting Krechet Automation upgrade - ADS-30D sensor J-box location Drawworks GA Revision Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-11 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 4 0 Rig 269 CVX Bangladesh Fire and Gas System meeting Rig 269 - CVX Bangladesh - Centrifuge pump Info.from Berney F&G system, scba, safety equipment scope of supply doc review SCBA Compressor info R247 Parker, Lightning Protection SQ-646689 - REV. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5 0 New VFD House GA meeting with Chuck Krechet Automation Upgrade - ADS -30D Block Diagram update Krechet Automation - Equipment Installation Sequence Revised new Topology again. added Sandpipe sensor cable Krechet Automation upgrade - Stand pipe pressure transmitter location meeting Krechet Automation upgrade - ADS-30D sensor J-box location Drawworks GA Revision Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-12 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 3 0 Rig 269 CVX Bangladesh Fire and Gas System meeting Rig 269 - CVX Bangladesh - Centrifuge pump Info.from Berney F&G system, scba, safety equipment scope of supply doc review SCBA Compressor info R247 Parker, Lightning Protection SQ-646689 - REV. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-13 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-17 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 SAK weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6 0 Driller's Cabin Talkback Solution. HVAC Calculations. Fire and Gas System Upgrade Q/A Revised Krechet Topology added Standpipe sensor cable. Krechet - Fire and Gas System Upgrade meeting with DTI. Scott. Arc Flash Studies - Krechet Automation Q/A Standpipe Pressure Sensor Info meeting with Tyler Krechet Automation - Arc Flash Study report meeting with NOV. Krechet - Automation upgrade - Plot Plan review with Lam. Discuss revised Topology and table idea for all Cable . Review Talkback System and F&G Stuff meeting with Tyler. Paker/ENL Krechet Automation update weekly meeting Parker Talkback System meeting with Bruce from Gaitronics. Krechet - Driller's Cabin GA review meeting with Chuck. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-17 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Bangladesh Lightening system meeting with John & Bernie. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 PTO Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 Driller's Cabin Talkback Solution. HVAC Calculations. Fire and Gas System Upgrade Q/A Revised Krechet Topology added Standpipe sensor cable. Krechet - Fire and Gas System Upgrade meeting with DTI. Scott. Arc Flash Studies - Krechet Automation Q/A Standpipe Pressure Sensor Info meeting with Tyler Krechet Automation - Arc Flash Study report meeting with NOV. Krechet - Automation upgrade - Plot Plan review with Lam. Discuss revised Topology and table idea for all Cable . Review Talkback System and F&G Stuff meeting with Tyler. Paker/ENL Krechet Automation update weekly meeting Parker Talkback System meeting with Bruce from Gaitronics. Krechet - Driller's Cabin GA review meeting with Chuck. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-19 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 PTO Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Driller's Cabin Talkback Solution. HVAC Calculations. Fire and Gas System Upgrade Q/A Revised Krechet Topology added Standpipe sensor cable. Krechet - Fire and Gas System Upgrade meeting with DTI. Scott. Arc Flash Studies - Krechet Automation Q/A Standpipe Pressure Sensor Info meeting with Tyler Krechet Automation - Arc Flash Study report meeting with NOV. Krechet - Automation upgrade - Plot Plan review with Lam. Discuss revised Topology and table idea for all Cable . Review Talkback System and F&G Stuff meeting with Tyler. Paker/ENL Krechet Automation update weekly meeting Parker Talkback System meeting with Bruce from Gaitronics. Krechet - Driller's Cabin GA review meeting with Chuck. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-19 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2 0 Bangladesh Lightening system meeting with John & Bernie. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-20 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 PTO Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 3 0 Driller's Cabin Talkback Solution. HVAC Calculations. Fire and Gas System Upgrade Q/A Revised Krechet Topology added Standpipe sensor cable. Krechet - Fire and Gas System Upgrade meeting with DTI. Scott. Arc Flash Studies - Krechet Automation Q/A Standpipe Pressure Sensor Info meeting with Tyler Krechet Automation - Arc Flash Study report meeting with NOV. Krechet - Automation upgrade - Plot Plan review with Lam. Discuss revised Topology and table idea for all Cable . Review Talkback System and F&G Stuff meeting with Tyler. Paker/ENL Krechet Automation update weekly meeting Parker Talkback System meeting with Bruce from Gaitronics. Krechet - Driller's Cabin GA review meeting with Chuck. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-20 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Bangladesh Lightening system meeting with John & Bernie. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-21 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 PTO Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 Driller's Cabin Talkback Solution. HVAC Calculations. Fire and Gas System Upgrade Q/A Revised Krechet Topology added Standpipe sensor cable. Krechet - Fire and Gas System Upgrade meeting with DTI. Scott. Arc Flash Studies - Krechet Automation Q/A Standpipe Pressure Sensor Info meeting with Tyler Krechet Automation - Arc Flash Study report meeting with NOV. Krechet - Automation upgrade - Plot Plan review with Lam. Discuss revised Topology and table idea for all Cable . Review Talkback System and F&G Stuff meeting with Tyler. Paker/ENL Krechet Automation update weekly meeting Parker Talkback System meeting with Bruce from Gaitronics. Krechet - Driller's Cabin GA review meeting with Chuck. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-24 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 PTO Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-24 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 SAK weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-24 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 3 0 Paker/ENL Krechet Automation update meeting. Talkback system for Krechet meeting with Bruce. Krechet Rig 209 AC Upgrade / Sequencer - Bi-Weekly Action Item meeting. Fire and Gas System Upgrade with DTI Nick. Krechet - Automation upgrade - Plot Plan Q/A with Lam. Koomey low pressure alarm Krechet Automation upgrade - Driller's Cabin A/C unit Q/A with NOV. NOV Drawings for Review and Approval. Bruce Talkback station datasheet reviewed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-25 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 PTO Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-25 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-02 Automation Upgrade: Engineering Regular Pay N 1 0 Krechet Automation upgrade - Driller's Cabin A/C unit Q/A with John. Krechet Automation upgrade - Driller's Cabin A/C unit feedback meeting with Chuck. Krechet - Automation upgrade - DQI Fire and Gas System Upgrade status update with DTI. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-25 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 3 0 Paker/ENL Krechet Automation update meeting. Talkback system for Krechet meeting with Bruce. Krechet Rig 209 AC Upgrade / Sequencer - Bi-Weekly Action Item meeting. Fire and Gas System Upgrade with DTI Nick. Krechet - Automation upgrade - Plot Plan Q/A with Lam. Koomey low pressure alarm Krechet Automation upgrade - Driller's Cabin A/C unit Q/A with NOV. NOV Drawings for Review and Approval. Bruce Talkback station datasheet reviewed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 PTO Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-26 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2 0 Eaton Cutler Hammer VFD Drives. PGM Engine #2 issue Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-26 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 2 0 Paker/ENL Krechet Automation update meeting. Talkback system for Krechet meeting with Bruce. Krechet Rig 209 AC Upgrade / Sequencer - Bi-Weekly Action Item meeting. Fire and Gas System Upgrade with DTI Nick. Krechet - Automation upgrade - Plot Plan Q/A with Lam. Koomey low pressure alarm Krechet Automation upgrade - Driller's Cabin A/C unit Q/A with NOV. NOV Drawings for Review and Approval. Bruce Talkback station datasheet reviewed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-27 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 PTO Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-27 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-02 Automation Upgrade: Engineering Regular Pay N 1 0 Krechet Automation upgrade - Driller's Cabin A/C unit Q/A with John. Krechet Automation upgrade - Driller's Cabin A/C unit feedback meeting with Chuck. Krechet - Automation upgrade - DQI Fire and Gas System Upgrade status update with DTI. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-27 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 3 0 Paker/ENL Krechet Automation update meeting. Talkback system for Krechet meeting with Bruce. Krechet Rig 209 AC Upgrade / Sequencer - Bi-Weekly Action Item meeting. Fire and Gas System Upgrade with DTI Nick. Krechet - Automation upgrade - Plot Plan Q/A with Lam. Koomey low pressure alarm Krechet Automation upgrade - Driller's Cabin A/C unit Q/A with NOV. NOV Drawings for Review and Approval. Bruce Talkback station datasheet reviewed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-28 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2 0 Eaton Cutler Hammer VFD Drives. PGM Engine #2 issue Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-01-28 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 6 0 Paker/ENL Krechet Automation update meeting. Talkback system for Krechet meeting with Bruce. Krechet Rig 209 AC Upgrade / Sequencer - Bi-Weekly Action Item meeting. Fire and Gas System Upgrade with DTI Nick. Krechet - Automation upgrade - Plot Plan Q/A with Lam. Koomey low pressure alarm Krechet Automation upgrade - Driller's Cabin A/C unit Q/A with NOV. NOV Drawings for Review and Approval. Bruce Talkback station datasheet reviewed. Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New year's holiday (1/3/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-04 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Emails Timesheet Status meeting w/ J.G. (1/7/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-04 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 8 0 249L-01-03-197(1-4) modifications & redline updates. (1/4-6/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Status meeting w/ J.G. (1/7/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-05 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 8 0 249L-01-03-197(1-4) modifications & redline updates. (1/4-6/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Status meeting w/ J.G. (1/7/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-06 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 8 0 249L-01-03-197(1-4) modifications & redline updates. (1/4-6/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Status meeting w/ J.G. (1/7/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-07 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 3 0 Review 209L Doghouse mod. w/J.G. & L.N. (1/7/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 Emails Timesheet/error New Dwg. Title block update Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-10 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Weekly meeting w/ Mio (1/11/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-10 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 5.5 0 209L Doghouse mod. dwg & update per comments.(1/10-13/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Emails Timesheet/error New Dwg. Title block update Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-11 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 7 0 209L Doghouse mod. dwg & update per comments.(1/10-13/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet/error New Dwg. Title block update Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-12 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 7.5 0 209L Doghouse mod. dwg & update per comments.(1/10-13/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-13 HTSG :HTSG 2021-SMART-Goals Regular Pay N 3.5 0 257B archive file name update (1/13-14/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet/error New Dwg. Title block update Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-13 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 4 0 209L Doghouse mod. dwg & update per comments.(1/10-13/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-14 HTSG :HTSG 2021-SMART-Goals Regular Pay N 5 0 257B archive file name update (1/13-14/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet/error New Dwg. Title block update Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-17 HTSG :HTSG 2021-SMART-Goals Regular Pay N 2.5 0 257B archive file name update(257B-01-12 & -15) (1/17-21/22) Self Assessment Review (1/21/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Emails Timesheet 2022 SMART Goals Comments (1/20/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-17 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 249L-01-03-197(1-4) redline updates.(1/17/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-17 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 3 0 209L-01-03-661-1-RA- updates per comments (1/17-&19/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-18 HTSG :HTSG 2021-SMART-Goals Regular Pay N 7.5 0 257B archive file name update(257B-01-12 & -15) (1/17-21/22) Self Assessment Review (1/21/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet 2022 SMART Goals Comments (1/20/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-19 HTSG :HTSG 2021-SMART-Goals Regular Pay N 4.5 0 257B archive file name update(257B-01-12 & -15) (1/17-21/22) Self Assessment Review (1/21/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 SMART Goals meeting w/J.G. & L.N. (1/19/22) Bi-weekly Technical Services meeting (1/20/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet 2022 SMART Goals Comments (1/20/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-19 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 2 0 209L-01-03-661-1-RA- updates per comments (1/17-&19/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-20 HTSG :HTSG 2021-SMART-Goals Regular Pay N 3.5 0 257B archive file name update(257B-01-12 & -15) (1/17-21/22) Self Assessment Review (1/21/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 SMART Goals meeting w/J.G. & L.N. (1/19/22) Bi-weekly Technical Services meeting (1/20/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Emails Timesheet 2022 SMART Goals Comments (1/20/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-21 HTSG :HTSG 2021-SMART-Goals Regular Pay N 5 0 257B archive file name update(257B-01-12 & -15) (1/17-21/22) Self Assessment Review (1/21/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet 2022 SMART Goals Comments (1/20/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-24 HTSG :HTSG 2021-SMART-Goals Regular Pay N 5 0 257B archive file name update(257B-01-12 & -15) (1/24-25/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 Emails Timesheet Teams meeting w/ J.G. (1/25/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-24 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Weekly meeting w/ Mio (1/24/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-25 HTSG :HTSG 2021-SMART-Goals Regular Pay N 6.5 0 257B archive file name update(257B-01-12 & -15) (1/24-25/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Emails Timesheet Teams meeting w/ J.G. (1/25/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Global Operations town hall meeting (1/26/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Teams meeting w/ J.G. (1/25/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-26 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 5.5 0 Wind wall modifications per doghouse opening review, layout background info. (1/26-27/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Teams meeting w/ J.G. (1/25/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-27 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 7 0 Wind wall modifications per doghouse opening review, layout background info. (1/26-27/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-01-28 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 8hrs PTO (1/28/22) Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-03 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 New Years Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-04 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Medical Leave Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-05 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Medical Leave Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-06 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Medical Leave Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-07 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Medical Leave Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-10 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Medical Leave Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-11 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Medical Leave Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-12 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2 0 Catch-up on e-mails and meetings after medical leave Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 Catch-up on e-mails and meetings after medical leave Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-13 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 3 0 Catch-up on e-mails and meetings after medical leave Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 5 0 Catch-up on e-mails and meetings after medical leave Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-14 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2 0 Catch-up on e-mails and meetings after medical leave Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 Catch-up on e-mails and meetings after medical leave Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-17 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2.5 0 Rig up and SIT meeting, create and format draft of Drwwks and HPU O&M manual, review emergency lowering, catch up on emails and meetings, RFQ for manual/drawing revision Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 SOW meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Catch-up on e-mails and meetings after medical leave Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-17 Rig 249L :Rig 249L TSR-01728-249L Chemical Platform Loading Ramp Regular Pay N 1.5 0 Drawing and MTO review Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-17 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1.5 0 Lightning Package research and meetings, revised MTO, chem-rod info, vendor info Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-18 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 3 0 Rig up and SIT meeting, create and format draft of Drwwks and HPU O&M manual, review emergency lowering, catch up on emails and meetings, RFQ for manual/drawing revision Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Catch-up on e-mails and meetings after medical leave Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-18 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 Diverter Line Coupling Research and pro/con list Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-18 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2.5 0 Lightning Package research and meetings, revised MTO, chem-rod info, vendor info Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-19 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 4 0 Rig up and SIT meeting, create and format draft of Drwwks and HPU O&M manual, review emergency lowering, catch up on emails and meetings, RFQ for manual/drawing revision Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Catch-up on e-mails and meetings after medical leave Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 IT access and scan Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-19 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 Diverter Line Coupling Research and pro/con list Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-19 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 Lightning Package research and meetings, revised MTO, chem-rod info, vendor info Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-20 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 4.5 0 Rig up and SIT meeting, create and format draft of Drwwks and HPU O&M manual, review emergency lowering, catch up on emails and meetings, RFQ for manual/drawing revision Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-20 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 SOW meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Catch-up on e-mails and meetings after medical leave Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-20 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Lightning Package research and meetings, revised MTO, chem-rod info, vendor info Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-21 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 3 0 Rig up and SIT meeting, create and format draft of Drwwks and HPU O&M manual, review emergency lowering, catch up on emails and meetings, RFQ for manual/drawing revision Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Catch-up on e-mails and meetings after medical leave Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-21 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Lightning Package research and meetings, revised MTO, chem-rod info, vendor info Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-24 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 3 0 Mobilization Risk assesment meeting, Drawworks O&M manual comments and revision, Other docs RFQ, Status meetings, barge and trucking package spreadsheet review Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 timesheet catch up and clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-24 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Weekly Meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-24 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-02 Automation Upgrade: Engineering Regular Pay N 4 0 SOW meetings, blower motor ducting and new flow box concept and review, air intensifier foundation and piping, Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-25 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 4 0 Mobilization Risk assesment meeting, Drawworks O&M manual comments and revision, Other docs RFQ, Status meetings, barge and trucking package spreadsheet review Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 timesheet catch up and clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-25 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-02 Automation Upgrade: Engineering Regular Pay N 4 0 SOW meetings, blower motor ducting and new flow box concept and review, air intensifier foundation and piping, Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-26 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2.5 0 Mobilization Risk assesment meeting, Drawworks O&M manual comments and revision, Other docs RFQ, Status meetings, barge and trucking package spreadsheet review Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-26 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Global Operations Town hall Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-26 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-02 Automation Upgrade: Engineering Regular Pay N 4.5 0 SOW meetings, blower motor ducting and new flow box concept and review, air intensifier foundation and piping, Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-27 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 3.5 0 Mobilization Risk assesment meeting, Drawworks O&M manual comments and revision, Other docs RFQ, Status meetings, barge and trucking package spreadsheet review Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-27 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Kretchet butterfly valve assistance and clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-27 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-02 Automation Upgrade: Engineering Regular Pay N 0.5 0 SOW meetings, blower motor ducting and new flow box concept and review, air intensifier foundation and piping, Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-27 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2.5 0 Lightning existing on 269 Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-28 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1 0 Mobilization Risk assesment meeting, Drawworks O&M manual comments and revision, Other docs RFQ, Status meetings, barge and trucking package spreadsheet review Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 2021 Performance evaluation, 2022 goals Reck, John Engineer I 29656 Reck, John:Engineer I 2022-01-28 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-02 Automation Upgrade: Engineering Regular Pay N 2 0 SOW meetings, blower motor ducting and new flow box concept and review, air intensifier foundation and piping,