Name Billing Class Employee No. Item Line Class Transaction Date Job No. Customer Service Item Notes Payroll Item Billable Employee Paid Day Rate Duration Days Remarks Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // general discussion with mngr Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-01 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 165L bolt and nut spec with LCM // 702/703 start-up project discussions and reviewing docs // 256L hook load and setback research Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-01 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01801-209L Service Pad Eyes for HP Valves Regular Pay N 6 0 picking up drawing comments // analysis report Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 timesheet // general discussion with mngr Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-02 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 3 0 165L bolt and nut spec with LCM // 702/703 start-up project discussions and reviewing docs // 256L hook load and setback research Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-02 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01801-209L Service Pad Eyes for HP Valves Regular Pay N 4 0 picking up drawing comments // analysis report Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR mtng Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // general discussion with mngr Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-03 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 4 0 165L bolt and nut spec with LCM // 702/703 start-up project discussions and reviewing docs // 256L hook load and setback research Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-03 ORLAN :ORLAN TSR-01806-ORLP CRI Roller Mill Repair Regular Pay N 2 0 closeout report Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-03 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01801-209L Service Pad Eyes for HP Valves Regular Pay N 1 0 picking up drawing comments // analysis report Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // general discussion with mngr Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-04 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 2 0 165L bolt and nut spec with LCM // 702/703 start-up project discussions and reviewing docs // 256L hook load and setback research Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-04 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01801-209L Service Pad Eyes for HP Valves Regular Pay N 2 0 picking up drawing comments // analysis report Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // gen discussion with mngr Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-07 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-07 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01801-209L Service Pad Eyes for HP Valves Regular Pay N 6.5 0 analysis report Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Sakhalin update meeting with mgmt Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // gen discussion with mngr Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-08 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01801-209L Service Pad Eyes for HP Valves Regular Pay N 7 0 analysis report Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-09 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 6 0 organizing travel // preparing RAPID punch list // reviewing contract and other project docs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // gen discussion with mngr Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-09 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 2 0 165L LCM correspondence for quoting nut for mast/sub Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-10 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 7 0 organizing travel // preparing RAPID punch list // reviewing contract and other project docs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // gen discussion with mngr Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-11 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 5 0 organizing travel // preparing RAPID punch list // reviewing contract and other project docs Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // gen discussion with mngr Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-14 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 7 0 In country support Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-15 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 4 0 In country support Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-15 OH-010 :OH-010 OH-010-03 Latin America (LATAM) Regular Pay N 8 0 travel from Houston to Villahermosa Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-16 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 12 0 In country support Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-17 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 12 0 In country support Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-18 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 12 0 In country support Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-19 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 12 0 In country support Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-20 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 12 0 on-site start up support // start-up support from houston Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-21 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 12 0 on-site start up support // start-up support from houston Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-22 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 12 0 on-site start up support // start-up support from houston Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-23 OH-010 :OH-010 OH-010-03 Latin America (LATAM) Regular Pay N 8 0 travel from Villahermosa to Houston Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-23 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 2 0 preparing high level cost estimate for pony sub for rig 122L Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-24 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 5 0 on-site start up support // start-up support from houston Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-24 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 3 0 preparing high level cost estimate for pony sub for rig 122L Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-25 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 4 0 on-site start up support // start-up support from houston Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-28 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 7 0 updating RAPID punchlist // reviewing schedule // ground bearing analysis // cracked pin on sub issue Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // general discussions with manager/team Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-29 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 7 0 updating RAPID punchlist // reviewing schedule // ground bearing analysis // cracked pin on sub issue Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // general discussions with manager/team Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-30 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 7 0 updating RAPID punchlist // reviewing schedule // ground bearing analysis // cracked pin on sub issue Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // general discussions with manager/team Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-31 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 6 0 updating RAPID punchlist // reviewing schedule // ground bearing analysis // cracked pin on sub issue Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR mtng Christman, Ralph Engineer I 32324 Christman, Ralph:Engineer I 2022-03-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet // general discussions with manager/team Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-01 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Sick Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-02 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.75 0 270L regulatory Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-02 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 7 0 Automation project Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-03 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 270L regulatory Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-03 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 6.5 0 Automation project Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.25 0 270L regulatory Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-04 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 5 0 Automation project Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, sharepoint problem, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-07 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 SAK meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-07 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 6 0 Automation closeout report and admin stuff Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-08 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 4 0 257B cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 270 regulatory Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-08 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 4 0 Automation closeout report and admin stuff Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, sharepoint problem, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-09 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 10.5 0 Trip to Corpus to assess rig for Oxy, MPD meeting with WFD Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-10 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 5 0 257B cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-10 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 3 0 Automation closeout report and admin stuff Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, sharepoint problem, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-11 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3 0 257B cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-11 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 1 0 Trip to Corpus to assess rig for Oxy, MPD meeting with WFD Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-11 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 1 0 Automation closeout report and admin stuff Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Rob's Form Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-14 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 6 0 257B cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-14 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 SAK meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-14 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 1.5 0 Automation Project; sign Chuck's timesheet, respond to WFD, meeting reschedule, review Reck's progress, review WFD quote, SGS stuff, review Ripal progress, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Equipment Standardization, meeting with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Rob's Form Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-15 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 4 0 257B cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-15 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Response to natalya about 270L, GLN number, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-15 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 1.25 0 Automation Project; sign Chuck's timesheet, respond to WFD, meeting reschedule, review Reck's progress, review WFD quote, SGS stuff, review Ripal progress, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.75 0 Equipment Standardization, meeting with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-16 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3.5 0 257B cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Response to natalya about 270L, GLN number, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-16 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 2 0 Automation Project; sign Chuck's timesheet, respond to WFD, meeting reschedule, review Reck's progress, review WFD quote, SGS stuff, review Ripal progress, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Equipment Standardization, meeting with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Rob's Form Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-17 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2 0 257B cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-17 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 1.25 0 Titania Rig 12 dry lease meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-17 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 2.5 0 Automation Project; sign Chuck's timesheet, respond to WFD, meeting reschedule, review Reck's progress, review WFD quote, SGS stuff, review Ripal progress, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.75 0 Equipment Standardization, meeting with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, Rob's Form Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-18 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1.75 0 257B cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Response to natalya about 270L, GLN number, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-18 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 3 0 Automation Project; sign Chuck's timesheet, respond to WFD, meeting reschedule, review Reck's progress, review WFD quote, SGS stuff, review Ripal progress, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-21 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 257B cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 270L regulatory Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-21 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 6.5 0 Automation project, review topology and cable schedule, SGS, NOV drawings, status update report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-22 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 meeting with Ivan, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 2022 goals Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-22 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3 0 257B cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 270L regulatory Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-22 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 2.5 0 Automation project, review topology and cable schedule, SGS, NOV drawings, status update report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 2022 goals Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-23 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 257B cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.75 0 270L regulatory Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-23 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 4 0 Automation project, review topology and cable schedule, SGS, NOV drawings, status update report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-24 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2 0 257B cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-24 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 270L regulatory Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-24 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 5 0 Automation project, review topology and cable schedule, SGS, NOV drawings, status update report, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 6 0 IADC/SLB BD meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-25 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1.5 0 257B cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.75 0 270L regulatory Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Pruitt MPD presentation, Veterans Hydraulics, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-28 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 2.5 0 257B cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-28 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Update to Mio Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.75 0 270L regulatory Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-28 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 3 0 Automation, PFII service loop bracket design, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Pruitt MPD presentation, Veterans Hydraulics, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-29 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Equipment Standardization, Safety Moment prep, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-29 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 3.5 0 Automation, PFII service loop bracket design, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 5.25 0 Equipment Standardization, Safety Moment prep, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-30 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 0.5 0 257B cost estimate Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-30 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 2.5 0 Automation, PFII service loop bracket design, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-31 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 2 0 Review TSR, review emails, review equipment manuals, create spreadsheet with information Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Pruitt MPD presentation, Veterans Hydraulics, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-31 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Equipment Standardization, Safety Moment prep, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-31 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 270L regulatory Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2022-03-31 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-01 Automation Upgrade: Project Management Regular Pay N 1 0 Automation, PFII service loop bracket design, Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (02/28/22) Update with Kyle. Update call with Tyler. (03/01/22) Update with Lam. (03/02/22) Update with Kyle. (03/03/22) Review/Approve design timesheets. Update with Kyle. Update call with Jorge. (03/04/22) Call with Lam to discuss CAD issue. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-01 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1 0 (03/01/22) Saved electrical drawing that need to be reviewed as part of upgrades. Discussed info with Lam. (03/02/22) Updated drawing list. Weekly update call with Tyler. Weekly update call with Genesis. Printed drawing package from Genesis. (03/03/22) Call with Nance (HVAC install). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-01 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01801-209L Service Pad Eyes for HP Valves Regular Pay N 3.5 0 (03/01/22) Checked drawing. Sent redlines to Ralph. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-01 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 3.5 0 (02/28/22) Started new rig grounding plan. Discussed drawing tracker with Kyle. (03/01/22) Finalized grounding details. Discussed with Kyle (03/02/22) Discussed diverter information with Kyle. Discussed lightning plan - searched for reference drawing. (03/03/22) Discussed diverter vent line details with Kyle. Saved latest pic of diverter spool on the Q. Searched technical data for 11" flange/12" unions. Review NOV HP mud piping - converted to CAD and checked. (03/03/22) Continued to review Hp information from NOV. Call with Kyle to review HP piping drawings. Call with Greg to discuss tracker - open items. Started diverter vent line layout. (03/05/22) Cont'd vent line drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (02/28/22) Update with Kyle. Update call with Tyler. (03/01/22) Update with Lam. (03/02/22) Update with Kyle. (03/03/22) Review/Approve design timesheets. Update with Kyle. Update call with Jorge. (03/04/22) Call with Lam to discuss CAD issue. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-02 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 4.25 0 (02/28/22) Checked blower motor adapter drawing. (03/02/22) Checked VFD tie-down install. drawing. Started checking drawworks install/tie-down. (03/04/22) Cont'd checking. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-02 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1.25 0 (03/01/22) Saved electrical drawing that need to be reviewed as part of upgrades. Discussed info with Lam. (03/02/22) Updated drawing list. Weekly update call with Tyler. Weekly update call with Genesis. Printed drawing package from Genesis. (03/03/22) Call with Nance (HVAC install). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-02 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 (02/28/22) Started new rig grounding plan. Discussed drawing tracker with Kyle. (03/01/22) Finalized grounding details. Discussed with Kyle (03/02/22) Discussed diverter information with Kyle. Discussed lightning plan - searched for reference drawing. (03/03/22) Discussed diverter vent line details with Kyle. Saved latest pic of diverter spool on the Q. Searched technical data for 11" flange/12" unions. Review NOV HP mud piping - converted to CAD and checked. (03/03/22) Continued to review Hp information from NOV. Call with Kyle to review HP piping drawings. Call with Greg to discuss tracker - open items. Started diverter vent line layout. (03/05/22) Cont'd vent line drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-02 Rig 273L :Rig 273L TSR-01756-273L SCR Detailed Install Proposal (Tier IV) Regular Pay N 0.5 0 (03/02/22) Rig visit discussion with Kyle/Lam. (03/03/22) General update call with Tyler E. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (03/03/22) TSR status call. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (02/28/22) Update with Kyle. Update call with Tyler. (03/01/22) Update with Lam. (03/02/22) Update with Kyle. (03/03/22) Review/Approve design timesheets. Update with Kyle. Update call with Jorge. (03/04/22) Call with Lam to discuss CAD issue. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-03 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 0.5 0 (03/01/22) Saved electrical drawing that need to be reviewed as part of upgrades. Discussed info with Lam. (03/02/22) Updated drawing list. Weekly update call with Tyler. Weekly update call with Genesis. Printed drawing package from Genesis. (03/03/22) Call with Nance (HVAC install). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-03 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 5.5 0 (02/28/22) Started new rig grounding plan. Discussed drawing tracker with Kyle. (03/01/22) Finalized grounding details. Discussed with Kyle (03/02/22) Discussed diverter information with Kyle. Discussed lightning plan - searched for reference drawing. (03/03/22) Discussed diverter vent line details with Kyle. Saved latest pic of diverter spool on the Q. Searched technical data for 11" flange/12" unions. Review NOV HP mud piping - converted to CAD and checked. (03/03/22) Continued to review Hp information from NOV. Call with Kyle to review HP piping drawings. Call with Greg to discuss tracker - open items. Started diverter vent line layout. (03/05/22) Cont'd vent line drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-03 Rig 273L :Rig 273L TSR-01756-273L SCR Detailed Install Proposal (Tier IV) Regular Pay N 0.5 0 (03/02/22) Rig visit discussion with Kyle/Lam. (03/03/22) General update call with Tyler E. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (02/28/22) Update with Kyle. Update call with Tyler. (03/01/22) Update with Lam. (03/02/22) Update with Kyle. (03/03/22) Review/Approve design timesheets. Update with Kyle. Update call with Jorge. (03/04/22) Call with Lam to discuss CAD issue. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-04 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 1 0 (02/28/22) Checked blower motor adapter drawing. (03/02/22) Checked VFD tie-down install. drawing. Started checking drawworks install/tie-down. (03/04/22) Cont'd checking. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-04 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 4.75 0 (02/28/22) Started new rig grounding plan. Discussed drawing tracker with Kyle. (03/01/22) Finalized grounding details. Discussed with Kyle (03/02/22) Discussed diverter information with Kyle. Discussed lightning plan - searched for reference drawing. (03/03/22) Discussed diverter vent line details with Kyle. Saved latest pic of diverter spool on the Q. Searched technical data for 11" flange/12" unions. Review NOV HP mud piping - converted to CAD and checked. (03/03/22) Continued to review Hp information from NOV. Call with Kyle to review HP piping drawings. Call with Greg to discuss tracker - open items. Started diverter vent line layout. (03/05/22) Cont'd vent line drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-05 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 (02/28/22) Cleaned up drawing folders. (03/05/22) New expense report for trip to NI. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-05 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1.5 0 (02/28/22) Started new rig grounding plan. Discussed drawing tracker with Kyle. (03/01/22) Finalized grounding details. Discussed with Kyle (03/02/22) Discussed diverter information with Kyle. Discussed lightning plan - searched for reference drawing. (03/03/22) Discussed diverter vent line details with Kyle. Saved latest pic of diverter spool on the Q. Searched technical data for 11" flange/12" unions. Review NOV HP mud piping - converted to CAD and checked. (03/03/22) Continued to review Hp information from NOV. Call with Kyle to review HP piping drawings. Call with Greg to discuss tracker - open items. Started diverter vent line layout. (03/05/22) Cont'd vent line drawing. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 (03/07/22) Updated weekly timesheet. Review/Approve design timesheets. Update call with Tyler. Updated PTO forms. (03/08/22) Update with Kyle. Discussed standardization goal with Kyle/Mark. (03/09/22) Update with Kyle. (03/10/22) Update with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-07 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 (03/07/22) Weekly Sakh. call. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-07 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 3 0 (03/07/22) Checked drawings from Genesis (drillers cabin install). (03/08/22) Continued checking (drill floor panels). (03/09/22 - 03/11/22) Continued checking package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-07 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 3.25 0 (03/07/22) Call with Bernie to discuss HP piping/ Diverter layout. Searched for flow line information. Lightning protection drawing. (03/08/22) Discussed flow line info with Lam. Discussed bell nipple pan designs with Kyle. Researched bell nipple/pan information. (03/09/22) Searched for additional bell nipple info. Updated diverter drawing per info from field. Updated 269 site plan. (03/10/22) Call with electrician to discuss typical grounding/lightning protection info. Continued lightning protection layout. Search for racking board drawings (crack repair). Call with Kyle to discuss. (03/11/22) Finalized electrical layouts. Call with Bernie to discuss racking board repairs. Created sketch of repair area. Sent email with details to field. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (03/08/22) Meeting with Brage to discuss Sakhalin operations. (03/09/22) Town Hall meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (03/07/22) Updated weekly timesheet. Review/Approve design timesheets. Update call with Tyler. Updated PTO forms. (03/08/22) Update with Kyle. Discussed standardization goal with Kyle/Mark. (03/09/22) Update with Kyle. (03/10/22) Update with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-08 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 3 0 (03/07/22) Checked drawings from Genesis (drillers cabin install). (03/08/22) Continued checking (drill floor panels). (03/09/22 - 03/11/22) Continued checking package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-08 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 4 0 (03/07/22) Call with Bernie to discuss HP piping/ Diverter layout. Searched for flow line information. Lightning protection drawing. (03/08/22) Discussed flow line info with Lam. Discussed bell nipple pan designs with Kyle. Researched bell nipple/pan information. (03/09/22) Searched for additional bell nipple info. Updated diverter drawing per info from field. Updated 269 site plan. (03/10/22) Call with electrician to discuss typical grounding/lightning protection info. Continued lightning protection layout. Search for racking board drawings (crack repair). Call with Kyle to discuss. (03/11/22) Finalized electrical layouts. Call with Bernie to discuss racking board repairs. Created sketch of repair area. Sent email with details to field. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (03/08/22) Meeting with Brage to discuss Sakhalin operations. (03/09/22) Town Hall meeting. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (03/07/22) Updated weekly timesheet. Review/Approve design timesheets. Update call with Tyler. Updated PTO forms. (03/08/22) Update with Kyle. Discussed standardization goal with Kyle/Mark. (03/09/22) Update with Kyle. (03/10/22) Update with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-09 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 3 0 (03/07/22) Checked drawings from Genesis (drillers cabin install). (03/08/22) Continued checking (drill floor panels). (03/09/22 - 03/11/22) Continued checking package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-09 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 4.25 0 (03/07/22) Call with Bernie to discuss HP piping/ Diverter layout. Searched for flow line information. Lightning protection drawing. (03/08/22) Discussed flow line info with Lam. Discussed bell nipple pan designs with Kyle. Researched bell nipple/pan information. (03/09/22) Searched for additional bell nipple info. Updated diverter drawing per info from field. Updated 269 site plan. (03/10/22) Call with electrician to discuss typical grounding/lightning protection info. Continued lightning protection layout. Search for racking board drawings (crack repair). Call with Kyle to discuss. (03/11/22) Finalized electrical layouts. Call with Bernie to discuss racking board repairs. Created sketch of repair area. Sent email with details to field. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (03/07/22) Updated weekly timesheet. Review/Approve design timesheets. Update call with Tyler. Updated PTO forms. (03/08/22) Update with Kyle. Discussed standardization goal with Kyle/Mark. (03/09/22) Update with Kyle. (03/10/22) Update with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-10 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 2 0 (03/07/22) Checked drawings from Genesis (drillers cabin install). (03/08/22) Continued checking (drill floor panels). (03/09/22 - 03/11/22) Continued checking package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-10 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 6.25 0 (03/07/22) Call with Bernie to discuss HP piping/ Diverter layout. Searched for flow line information. Lightning protection drawing. (03/08/22) Discussed flow line info with Lam. Discussed bell nipple pan designs with Kyle. Researched bell nipple/pan information. (03/09/22) Searched for additional bell nipple info. Updated diverter drawing per info from field. Updated 269 site plan. (03/10/22) Call with electrician to discuss typical grounding/lightning protection info. Continued lightning protection layout. Search for racking board drawings (crack repair). Call with Kyle to discuss. (03/11/22) Finalized electrical layouts. Call with Bernie to discuss racking board repairs. Created sketch of repair area. Sent email with details to field. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-11 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 2 0 (03/07/22) Checked drawings from Genesis (drillers cabin install). (03/08/22) Continued checking (drill floor panels). (03/09/22 - 03/11/22) Continued checking package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-11 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 4 0 (03/07/22) Call with Bernie to discuss HP piping/ Diverter layout. Searched for flow line information. Lightning protection drawing. (03/08/22) Discussed flow line info with Lam. Discussed bell nipple pan designs with Kyle. Researched bell nipple/pan information. (03/09/22) Searched for additional bell nipple info. Updated diverter drawing per info from field. Updated 269 site plan. (03/10/22) Call with electrician to discuss typical grounding/lightning protection info. Continued lightning protection layout. Search for racking board drawings (crack repair). Call with Kyle to discuss. (03/11/22) Finalized electrical layouts. Call with Bernie to discuss racking board repairs. Created sketch of repair area. Sent email with details to field. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (03/15/22) Update call with Kyle. Update call with Tyler. Update call with Lam. (03/16/22) Update with Kyle. Updated weekly timesheet. Introduction call with Ahmad. Renamed 269L drawing folders under archive. Update call with Ralph. Discussed CAD software with Lam. (03/17/22) Update with Kyle. Discussed travel plans with Lam. Follow up call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-15 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2 0 (03/15/22) 55B layouts with platform - checked for clearance. Calls with Mark/Scotty to discuss. (03/17/22) 55B sketch updates from Scotty. Updated rig elevation and checked archive info for interferences with platform. (03/18/22) Updated 55B elevation drawing to show platform with 4' rock pad per request from Brock H. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-15 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 (03/15/22) Saved info for trolley beam lift plan on Q. Researched crane data. (03/16/22 - 03/18/22) Pulled ref drawings from Q. Started new lift plan drawing. Sketched new crane (made CAD block). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-15 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 (03/15/22) Searched for information related to cement room details. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-15 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 1 0 (03/15/22) Finalized Genesis checking. Scanned redline package and saved on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-15 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1.25 0 (03/15/22) Pulled MP info and sent to Ahmad for reference. Cleaned up electrical layouts for Chuck. Assigned Jorge to grounding redlines. (03/16/22) Created drawing/ tracking list for project. Cleaned up drawing folders. (03/17/22) Call to review NOV transmittal info. w/Lam. Assigned Jorge to lightning protection plan updates. (03/18/22) Call with Ahmad/Greg to review tracker. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 (03/15/22) Update call with Kyle. Update call with Tyler. Update call with Lam. (03/16/22) Update with Kyle. Updated weekly timesheet. Introduction call with Ahmad. Renamed 269L drawing folders under archive. Update call with Ralph. Discussed CAD software with Lam. (03/17/22) Update with Kyle. Discussed travel plans with Lam. Follow up call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-16 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 2.5 0 (03/15/22) Saved info for trolley beam lift plan on Q. Researched crane data. (03/16/22 - 03/18/22) Pulled ref drawings from Q. Started new lift plan drawing. Sketched new crane (made CAD block). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-16 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 0.5 0 (03/16/22) Updated drawing list. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-16 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 3 0 (03/15/22) Pulled MP info and sent to Ahmad for reference. Cleaned up electrical layouts for Chuck. Assigned Jorge to grounding redlines. (03/16/22) Created drawing/ tracking list for project. Cleaned up drawing folders. (03/17/22) Call to review NOV transmittal info. w/Lam. Assigned Jorge to lightning protection plan updates. (03/18/22) Call with Ahmad/Greg to review tracker. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-17 CVX Genesis :CVX Genesis TSR-1725-GENP-06 Rig-Down & Transport Regular Pay N 1.5 0 (03/17/22) Discussed lift with Lam. Sketched platform lifting radius based on field info (skidding cyl. down). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.75 0 (03/17/22) TSR update call. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (03/15/22) Update call with Kyle. Update call with Tyler. Update call with Lam. (03/16/22) Update with Kyle. Updated weekly timesheet. Introduction call with Ahmad. Renamed 269L drawing folders under archive. Update call with Ralph. Discussed CAD software with Lam. (03/17/22) Update with Kyle. Discussed travel plans with Lam. Follow up call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-17 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1.5 0 (03/15/22) 55B layouts with platform - checked for clearance. Calls with Mark/Scotty to discuss. (03/17/22) 55B sketch updates from Scotty. Updated rig elevation and checked archive info for interferences with platform. (03/18/22) Updated 55B elevation drawing to show platform with 4' rock pad per request from Brock H. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-17 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 3 0 (03/15/22) Saved info for trolley beam lift plan on Q. Researched crane data. (03/16/22 - 03/18/22) Pulled ref drawings from Q. Started new lift plan drawing. Sketched new crane (made CAD block). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-17 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 0.75 0 (03/15/22) Pulled MP info and sent to Ahmad for reference. Cleaned up electrical layouts for Chuck. Assigned Jorge to grounding redlines. (03/16/22) Created drawing/ tracking list for project. Cleaned up drawing folders. (03/17/22) Call to review NOV transmittal info. w/Lam. Assigned Jorge to lightning protection plan updates. (03/18/22) Call with Ahmad/Greg to review tracker. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-18 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 4 0 (03/15/22) 55B layouts with platform - checked for clearance. Calls with Mark/Scotty to discuss. (03/17/22) 55B sketch updates from Scotty. Updated rig elevation and checked archive info for interferences with platform. (03/18/22) Updated 55B elevation drawing to show platform with 4' rock pad per request from Brock H. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-18 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 2 0 (03/15/22) Saved info for trolley beam lift plan on Q. Researched crane data. (03/16/22 - 03/18/22) Pulled ref drawings from Q. Started new lift plan drawing. Sketched new crane (made CAD block). Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-18 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 (03/15/22) Pulled MP info and sent to Ahmad for reference. Cleaned up electrical layouts for Chuck. Assigned Jorge to grounding redlines. (03/16/22) Created drawing/ tracking list for project. Cleaned up drawing folders. (03/17/22) Call to review NOV transmittal info. w/Lam. Assigned Jorge to lightning protection plan updates. (03/18/22) Call with Ahmad/Greg to review tracker. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (03/21/22) Updated weekly timesheet. Review/approved designer timesheets. (03/22/22) Update call with Kyle. (03/23/22) Cleaned up 269L piping folder under archive. Update with Kyle. Update with Lam. Update call with Tyler. (03/24/22) Call with Scotty T. to discuss typical relief valve install/access. Update with Lam. Discussed electrical drawings with Ripal. (03/25/22) Update call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-21 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 (03/21/22) Assigned a new proposal number for 55B Contango well and saved all reference info under bids/proposals for reference. (03/23/22) Saved Cameron wellhead info on the Q. Reviewed info. Converted file to CAD - Stated wellhead layouts. (03/25/22) Call with Scotty to discuss 55B well control schematic. Pulled ref info from 77B schematic. Created new well control for Contango proposal. Sent drawing to field for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-21 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1.5 0 (03/21/22) Continued 249L lift plan - BOP trolley beam. Assigned a new drawing number. Searched for additional load chart information. Requested sling info from the field. (03/22/22) Continued with lift plan. (03/23/22) Reviewed 249/258 MTOs - discussed with Kyle.Call with Chad to discuss 249 MTOs. (03/24/22) Updated 249 drawing register. (03/25/22) Cont crane layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-21 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 4.75 0 (03/21/22) Discussed relief piping with Kyle. Checked new CAD file from NOV against existing structural drawings. Call to discuss 269L electrical drawings. Redlined drawings per comments from Chuck and assigned to Jorge. Discussed fire/gas layouts with Ripal. Assigned new layout to Jorge. Updated 269 project drawing list. Discussed drawings with Kyle. Call with Loadmaster to discuss mast damage repairs. Researched mast scoping info. (03/22/22) Created 269L drawing modification list - reviewed existing drawings. (03/23/22) Update call with NOV. Updated drawing mod list. Sent suction piping questions to field. (03/24/22) Discussed NOV relief piping drawing with Kyle. Started layout to compare existing DPR piping to new NOV layout. Checked clearance at roof level. Update call with Ahmad. Copied 269 choke manifold to CVX proposal - sent to Ahmad for ref. Cleaned up roof hatch concept and sent to field for review. Updated drawing list. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (03/21/22) Updated weekly timesheet. Review/approved designer timesheets. (03/22/22) Update call with Kyle. (03/23/22) Cleaned up 269L piping folder under archive. Update with Kyle. Update with Lam. Update call with Tyler. (03/24/22) Call with Scotty T. to discuss typical relief valve install/access. Update with Lam. Discussed electrical drawings with Ripal. (03/25/22) Update call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-22 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 6.5 0 (03/21/22) Continued 249L lift plan - BOP trolley beam. Assigned a new drawing number. Searched for additional load chart information. Requested sling info from the field. (03/22/22) Continued with lift plan. (03/23/22) Reviewed 249/258 MTOs - discussed with Kyle.Call with Chad to discuss 249 MTOs. (03/24/22) Updated 249 drawing register. (03/25/22) Cont crane layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-22 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1.5 0 (03/21/22) Discussed relief piping with Kyle. Checked new CAD file from NOV against existing structural drawings. Call to discuss 269L electrical drawings. Redlined drawings per comments from Chuck and assigned to Jorge. Discussed fire/gas layouts with Ripal. Assigned new layout to Jorge. Updated 269 project drawing list. Discussed drawings with Kyle. Call with Loadmaster to discuss mast damage repairs. Researched mast scoping info. (03/22/22) Created 269L drawing modification list - reviewed existing drawings. (03/23/22) Update call with NOV. Updated drawing mod list. Sent suction piping questions to field. (03/24/22) Discussed NOV relief piping drawing with Kyle. Started layout to compare existing DPR piping to new NOV layout. Checked clearance at roof level. Update call with Ahmad. Copied 269 choke manifold to CVX proposal - sent to Ahmad for ref. Cleaned up roof hatch concept and sent to field for review. Updated drawing list. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 (03/21/22) Updated weekly timesheet. Review/approved designer timesheets. (03/22/22) Update call with Kyle. (03/23/22) Cleaned up 269L piping folder under archive. Update with Kyle. Update with Lam. Update call with Tyler. (03/24/22) Call with Scotty T. to discuss typical relief valve install/access. Update with Lam. Discussed electrical drawings with Ripal. (03/25/22) Update call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-23 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 (03/22/22) Searched for pony sub information on Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-23 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 2.75 0 (03/21/22) Assigned a new proposal number for 55B Contango well and saved all reference info under bids/proposals for reference. (03/23/22) Saved Cameron wellhead info on the Q. Reviewed info. Converted file to CAD - Stated wellhead layouts. (03/25/22) Call with Scotty to discuss 55B well control schematic. Pulled ref info from 77B schematic. Created new well control for Contango proposal. Sent drawing to field for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-23 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 2 0 (03/21/22) Continued 249L lift plan - BOP trolley beam. Assigned a new drawing number. Searched for additional load chart information. Requested sling info from the field. (03/22/22) Continued with lift plan. (03/23/22) Reviewed 249/258 MTOs - discussed with Kyle.Call with Chad to discuss 249 MTOs. (03/24/22) Updated 249 drawing register. (03/25/22) Cont crane layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-23 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1.5 0 (03/21/22) Discussed relief piping with Kyle. Checked new CAD file from NOV against existing structural drawings. Call to discuss 269L electrical drawings. Redlined drawings per comments from Chuck and assigned to Jorge. Discussed fire/gas layouts with Ripal. Assigned new layout to Jorge. Updated 269 project drawing list. Discussed drawings with Kyle. Call with Loadmaster to discuss mast damage repairs. Researched mast scoping info. (03/22/22) Created 269L drawing modification list - reviewed existing drawings. (03/23/22) Update call with NOV. Updated drawing mod list. Sent suction piping questions to field. (03/24/22) Discussed NOV relief piping drawing with Kyle. Started layout to compare existing DPR piping to new NOV layout. Checked clearance at roof level. Update call with Ahmad. Copied 269 choke manifold to CVX proposal - sent to Ahmad for ref. Cleaned up roof hatch concept and sent to field for review. Updated drawing list. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (03/21/22) Updated weekly timesheet. Review/approved designer timesheets. (03/22/22) Update call with Kyle. (03/23/22) Cleaned up 269L piping folder under archive. Update with Kyle. Update with Lam. Update call with Tyler. (03/24/22) Call with Scotty T. to discuss typical relief valve install/access. Update with Lam. Discussed electrical drawings with Ripal. (03/25/22) Update call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-24 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.25 0 (03/21/22) Continued 249L lift plan - BOP trolley beam. Assigned a new drawing number. Searched for additional load chart information. Requested sling info from the field. (03/22/22) Continued with lift plan. (03/23/22) Reviewed 249/258 MTOs - discussed with Kyle.Call with Chad to discuss 249 MTOs. (03/24/22) Updated 249 drawing register. (03/25/22) Cont crane layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-24 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 7.25 0 (03/21/22) Discussed relief piping with Kyle. Checked new CAD file from NOV against existing structural drawings. Call to discuss 269L electrical drawings. Redlined drawings per comments from Chuck and assigned to Jorge. Discussed fire/gas layouts with Ripal. Assigned new layout to Jorge. Updated 269 project drawing list. Discussed drawings with Kyle. Call with Loadmaster to discuss mast damage repairs. Researched mast scoping info. (03/22/22) Created 269L drawing modification list - reviewed existing drawings. (03/23/22) Update call with NOV. Updated drawing mod list. Sent suction piping questions to field. (03/24/22) Discussed NOV relief piping drawing with Kyle. Started layout to compare existing DPR piping to new NOV layout. Checked clearance at roof level. Update call with Ahmad. Copied 269 choke manifold to CVX proposal - sent to Ahmad for ref. Cleaned up roof hatch concept and sent to field for review. Updated drawing list. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 (03/21/22) Updated weekly timesheet. Review/approved designer timesheets. (03/22/22) Update call with Kyle. (03/23/22) Cleaned up 269L piping folder under archive. Update with Kyle. Update with Lam. Update call with Tyler. (03/24/22) Call with Scotty T. to discuss typical relief valve install/access. Update with Lam. Discussed electrical drawings with Ripal. (03/25/22) Update call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-25 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 4.5 0 (03/21/22) Assigned a new proposal number for 55B Contango well and saved all reference info under bids/proposals for reference. (03/23/22) Saved Cameron wellhead info on the Q. Reviewed info. Converted file to CAD - Stated wellhead layouts. (03/25/22) Call with Scotty to discuss 55B well control schematic. Pulled ref info from 77B schematic. Created new well control for Contango proposal. Sent drawing to field for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-25 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 (03/21/22) Continued 249L lift plan - BOP trolley beam. Assigned a new drawing number. Searched for additional load chart information. Requested sling info from the field. (03/22/22) Continued with lift plan. (03/23/22) Reviewed 249/258 MTOs - discussed with Kyle.Call with Chad to discuss 249 MTOs. (03/24/22) Updated 249 drawing register. (03/25/22) Cont crane layout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-28 MEAP :MEAP TSR-01813-MEAP Development of Lift Plans Regular Pay N 0.25 0 (03/28/22) Discussed request to support lift plans. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.25 0 (03/28/22) Updated weekly timesheet. Update with Lam. Update with Kyle. Update with Ralph. (03/29/22) Update call with Kyle. Call with Dan C. (crack repairs). Update call with Jorge (resignation). (03/30/22) Renamed 258L drawing folders under archive. Update with Kyle. Update call with Tyler. Follow up discussion with Kyle to discuss design department positions. (03/31/22) General update with Kyle, design discussion. Pulled reference job descriptions for the design group. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-28 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 3.75 0 (03/28/22) Finalized BOP trolley beam lift plan. (03/29/22) Started copying 249 ref drawings and converting to new 258 files. Assigned new drawing numbers and updated drawing list on the Q. (03/30/22) Searched for 258L electrical drawing per field request. Created PDF drawing package. Finalized drawing package conversion. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-28 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1.25 0 (03/28/22) Updated drawings list. Searched for fuel tank information per field request (ex 247 tanks for 269). (03/29/22) Update call with Ahmad/Kyle. Discussed NOV piping with Kyle. (03/30/22) Updated drawing list. Cleaned up drawing folders and renumbered fire/gas layout drawing. Reviewed layout from Jorge. Revised site plan to show mini camp - sent to Bernie for reference. (03/31/22) Started pulling ref information for MP roof hatch layouts. Started new drawing for hatch install. Update call with Ahmad. Pulled reference information per request from Chuck. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-28 Rig 272L :Rig 272L TSR-01751-272L Tier 4 Final Emissions Regular Pay N 1 0 (03/28/22) Searched for Pipe Barn information to update model. Discussed with Lam. (03/30/22) Follow up discussion with Lam to review layouts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.25 0 (03/28/22) Updated weekly timesheet. Update with Lam. Update with Kyle. Update with Ralph. (03/29/22) Update call with Kyle. Call with Dan C. (crack repairs). Update call with Jorge (resignation). (03/30/22) Renamed 258L drawing folders under archive. Update with Kyle. Update call with Tyler. Follow up discussion with Kyle to discuss design department positions. (03/31/22) General update with Kyle, design discussion. Pulled reference job descriptions for the design group. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-29 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 4.5 0 (03/28/22) Finalized BOP trolley beam lift plan. (03/29/22) Started copying 249 ref drawings and converting to new 258 files. Assigned new drawing numbers and updated drawing list on the Q. (03/30/22) Searched for 258L electrical drawing per field request. Created PDF drawing package. Finalized drawing package conversion. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-29 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1.75 0 (03/28/22) Updated drawings list. Searched for fuel tank information per field request (ex 247 tanks for 269). (03/29/22) Update call with Ahmad/Kyle. Discussed NOV piping with Kyle. (03/30/22) Updated drawing list. Cleaned up drawing folders and renumbered fire/gas layout drawing. Reviewed layout from Jorge. Revised site plan to show mini camp - sent to Bernie for reference. (03/31/22) Started pulling ref information for MP roof hatch layouts. Started new drawing for hatch install. Update call with Ahmad. Pulled reference information per request from Chuck. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 (03/30/22) Call with Scotty to discuss general practice for reverse circulation and cellar jetting systems. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 (03/28/22) Updated weekly timesheet. Update with Lam. Update with Kyle. Update with Ralph. (03/29/22) Update call with Kyle. Call with Dan C. (crack repairs). Update call with Jorge (resignation). (03/30/22) Renamed 258L drawing folders under archive. Update with Kyle. Update call with Tyler. Follow up discussion with Kyle to discuss design department positions. (03/31/22) General update with Kyle, design discussion. Pulled reference job descriptions for the design group. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-30 OH-014 :OH-014 Overhead All Activities Regular Pay N 0.5 0 (03/30/22) Life saving class. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-30 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 2.5 0 (03/28/22) Finalized BOP trolley beam lift plan. (03/29/22) Started copying 249 ref drawings and converting to new 258 files. Assigned new drawing numbers and updated drawing list on the Q. (03/30/22) Searched for 258L electrical drawing per field request. Created PDF drawing package. Finalized drawing package conversion. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-30 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2.75 0 (03/28/22) Updated drawings list. Searched for fuel tank information per field request (ex 247 tanks for 269). (03/29/22) Update call with Ahmad/Kyle. Discussed NOV piping with Kyle. (03/30/22) Updated drawing list. Cleaned up drawing folders and renumbered fire/gas layout drawing. Reviewed layout from Jorge. Revised site plan to show mini camp - sent to Bernie for reference. (03/31/22) Started pulling ref information for MP roof hatch layouts. Started new drawing for hatch install. Update call with Ahmad. Pulled reference information per request from Chuck. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-30 Rig 272L :Rig 272L TSR-01751-272L Tier 4 Final Emissions Regular Pay N 0.5 0 (03/28/22) Searched for Pipe Barn information to update model. Discussed with Lam. (03/30/22) Follow up discussion with Lam to review layouts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 (03/31/22) TSR status call. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.25 0 (03/28/22) Updated weekly timesheet. Update with Lam. Update with Kyle. Update with Ralph. (03/29/22) Update call with Kyle. Call with Dan C. (crack repairs). Update call with Jorge (resignation). (03/30/22) Renamed 258L drawing folders under archive. Update with Kyle. Update call with Tyler. Follow up discussion with Kyle to discuss design department positions. (03/31/22) General update with Kyle, design discussion. Pulled reference job descriptions for the design group. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2022-03-31 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 5.25 0 (03/28/22) Updated drawings list. Searched for fuel tank information per field request (ex 247 tanks for 269). (03/29/22) Update call with Ahmad/Kyle. Discussed NOV piping with Kyle. (03/30/22) Updated drawing list. Cleaned up drawing folders and renumbered fire/gas layout drawing. Reviewed layout from Jorge. Revised site plan to show mini camp - sent to Bernie for reference. (03/31/22) Started pulling ref information for MP roof hatch layouts. Started new drawing for hatch install. Update call with Ahmad. Pulled reference information per request from Chuck. Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 February FTE report HTSG Hours summary Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-01 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 2.25 0 Opex Project Support and Administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-01 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Oilsearch/Santos support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-01 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 258L Start-up Documents 257B reactivation support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-01 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 2022 COD renewal admin Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-01 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 Lightning protection, HP piping, NOV meetings, diverter set-up Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 meeting with CS and AP HTSG bi-weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet(s) Status update to Arturo Finalize 2022 goal clarificatoins Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-02 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 0.5 0 Opex Project Support and Administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-02 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly meeting Meeting regarding the decision for ENL to pull out of Sakhalin I consortium Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-02 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 1 0 Oilsearch/Santos support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-02 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 258L Start-up Documents 257B reactivation support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-02 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 2022 COD renewal admin Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-02 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Lightning protection, HP piping, NOV meetings, diverter set-up Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 meeting with CS and AP HTSG bi-weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet(s) Status update to Arturo Finalize 2022 goal clarificatoins Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-03 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1.25 0 Opex Project Support and Administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-03 OH-019 :OH-019 Overhead All Activities Regular Pay N 1.5 0 Weekly meeting Meeting regarding the decision for ENL to pull out of Sakhalin I consortium Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-03 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Oilsearch/Santos support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-03 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.5 0 258L Start-up Documents 257B reactivation support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-03 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 0.5 0 2022 COD renewal admin Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-03 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1.5 0 Lightning protection, HP piping, NOV meetings, diverter set-up Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Timesheet(s) Status update to Arturo Finalize 2022 goal clarificatoins Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-04 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1.5 0 Opex Project Support and Administration Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-04 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Weekly meeting Meeting regarding the decision for ENL to pull out of Sakhalin I consortium Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-04 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 Oilsearch/Santos support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-04 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 258L Start-up Documents 257B reactivation support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-04 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1.5 0 256L Casing Load Support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-04 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 Lightning protection, HP piping, NOV meetings, diverter set-up Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-05 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Weekly meeting Meeting regarding the decision for ENL to pull out of Sakhalin I consortium Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-05 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.5 0 258L Start-up Documents 257B reactivation support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Sakhalin invoicing On boarding of Dubai Project engineer Timesheets and reportsing FTE forecast Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.75 0 Information sent to legal and contracts regarding SAK rigs Working through path forward for SAK work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-06 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 258L Start-up support 257B reactivation support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-07 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 General support - outstanding issues; rig-up planning Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 Sakhalin invoicing On boarding of Dubai Project engineer Timesheets and reportsing FTE forecast Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-07 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 1.25 0 MPD EOI presentation meeting Reviewing historical work performed Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Information sent to legal and contracts regarding SAK rigs Working through path forward for SAK work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-07 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 258L Start-up support 257B reactivation support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-07 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1 0 Working through path forward for project - meetings with Exxon, NOV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-07 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 Lightning protection HP piping General discussions with Ops Mast leg and racking baord repairs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-08 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 General support - outstanding issues; rig-up planning Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Meeting with Brage Town Hall Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Sakhalin invoicing On boarding of Dubai Project engineer Timesheets and reportsing FTE forecast Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-08 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 0.5 0 MPD EOI presentation meeting Reviewing historical work performed Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-08 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 0.5 0 Southern Cross rig visit (mtgs) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Information sent to legal and contracts regarding SAK rigs Working through path forward for SAK work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-08 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 258L Start-up support 257B reactivation support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-08 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1 0 Working through path forward for project - meetings with Exxon, NOV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-08 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 Lightning protection HP piping General discussions with Ops Mast leg and racking baord repairs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-09 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 General support - outstanding issues; rig-up planning Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 Meeting with Brage Town Hall Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 Sakhalin invoicing On boarding of Dubai Project engineer Timesheets and reportsing FTE forecast Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-09 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 1 0 MPD EOI presentation meeting Reviewing historical work performed Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-09 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 0.5 0 Southern Cross rig visit (mtgs) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Information sent to legal and contracts regarding SAK rigs Working through path forward for SAK work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-09 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 258L Start-up support 257B reactivation support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-09 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1 0 Working through path forward for project - meetings with Exxon, NOV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-09 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1.5 0 Lightning protection HP piping General discussions with Ops Mast leg and racking baord repairs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-10 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 General support - outstanding issues; rig-up planning Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Sakhalin invoicing On boarding of Dubai Project engineer Timesheets and reportsing FTE forecast Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-10 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 1 0 MPD EOI presentation meeting Reviewing historical work performed Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-10 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Information sent to legal and contracts regarding SAK rigs Working through path forward for SAK work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-10 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 258L Start-up support 257B reactivation support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-10 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1 0 Working through path forward for project - meetings with Exxon, NOV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-10 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 Lightning protection HP piping General discussions with Ops Mast leg and racking baord repairs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-11 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Sakhalin invoicing On boarding of Dubai Project engineer Timesheets and reportsing FTE forecast Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Information sent to legal and contracts regarding SAK rigs Working through path forward for SAK work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-13 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 1 0 General support; reviewing documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-13 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 TSR status update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-13 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 0.5 0 258 PO Tracker meeting 258L start-up support 257B Reactivation Cost Estimate Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-13 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 Service delivery action items HP mud system review Electrical drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-14 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 CVX Genesis support; east crane loads due to skidding system issues Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-14 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 0.75 0 General support; reviewing documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheets / Approvals On-boarding new Dubai PE Status to AP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-14 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 1 0 RFI letter for upcoming tender (MPD) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-14 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 NCOC 401 meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Discussing path forward for on-going work scopes Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-14 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.75 0 258 PO Tracker meeting 258L start-up support 257B Reactivation Cost Estimate Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-14 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1 0 Project administration / developing path forward Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-14 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1.5 0 Service delivery action items HP mud system review Electrical drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-15 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 0.5 0 General support; reviewing documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Spring Break Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 Timesheets / Approvals On-boarding new Dubai PE Status to AP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-16 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.75 0 CVX Genesis support; east crane loads due to skidding system issues Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-16 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 0.75 0 General support; reviewing documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheets / Approvals On-boarding new Dubai PE Status to AP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-16 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 0.5 0 RFI letter for upcoming tender (MPD) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-16 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 TSR status update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-16 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Discussing path forward for on-going work scopes Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-16 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.5 0 258 PO Tracker meeting 258L start-up support 257B Reactivation Cost Estimate Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-16 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1 0 Project administration / developing path forward Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-16 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1.5 0 Service delivery action items HP mud system review Electrical drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-17 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 CVX Genesis support; east crane loads due to skidding system issues Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-17 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 0.75 0 General support; reviewing documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Bi-weekly TSR meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheets / Approvals On-boarding new Dubai PE Status to AP Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-17 OH-009 :OH-009 OH-009-016 Eastern Canada Regular Pay N 0.5 0 RFI letter for upcoming tender (MPD) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 TSR status update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-17 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Discussing path forward for on-going work scopes Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-17 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.5 0 258 PO Tracker meeting 258L start-up support 257B Reactivation Cost Estimate Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-17 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 0.75 0 Project administration / developing path forward Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-17 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1.5 0 Service delivery action items HP mud system review Electrical drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-18 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 0.5 0 General support; reviewing documents Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Spring Break Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-21 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Rig up support Electrical installation support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-21 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 1.5 0 Gneral support / discussions with RC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Staffing discussions Personnel admin Timesheet approvals Status updates to AP Dubai engineer support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-21 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Sakhalin Administration Meetings with HR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-21 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 257B Cost Estimate Review 258L start-up support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-21 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-21 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Electrical analysis information for NOV General meetings Discussions with Ahmad (Dubai engineer) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-22 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 Rig up support Electrical installation support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-22 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 0.5 0 Gneral support / discussions with RC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 Staffing discussions Personnel admin Timesheet approvals Status updates to AP Dubai engineer support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-22 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Sakhalin Administration Meetings with HR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-22 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 257B Cost Estimate Review 258L start-up support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-22 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 122L Support - Pony Sub Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-22 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 51B / 55B support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-22 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 0.5 0 Electrical analysis information for NOV General meetings Discussions with Ahmad (Dubai engineer) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-23 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 Rig up support Electrical installation support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-23 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 0.5 0 Gneral support / discussions with RC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Staffing discussions Personnel admin Timesheet approvals Status updates to AP Dubai engineer support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-23 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Sakhalin Administration Meetings with HR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-23 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1.5 0 257B Cost Estimate Review 258L start-up support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-23 OH-036 :OH-036 OH-036-01 Technology Think Tank Regular Pay N 0.5 0 Monthly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-23 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-23 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Electrical analysis information for NOV General meetings Discussions with Ahmad (Dubai engineer) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-24 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 Rig up support Electrical installation support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-24 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 0.5 0 Gneral support / discussions with RC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Staffing discussions Personnel admin Timesheet approvals Status updates to AP Dubai engineer support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-24 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Sakhalin Administration Meetings with HR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-24 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 257B Cost Estimate Review 258L start-up support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-24 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 122L Support - Pony Sub Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-24 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 51B / 55B support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-24 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 0.5 0 Electrical analysis information for NOV General meetings Discussions with Ahmad (Dubai engineer) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-25 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 Rig up support Electrical installation support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-25 Latin America Region :Latin America Region TSR-01811-LABU Opex Mexico Rigs 702-703 Regular Pay N 1 0 Gneral support / discussions with RC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Staffing discussions Personnel admin Timesheet approvals Status updates to AP Dubai engineer support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-25 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Sakhalin Administration Meetings with HR Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-25 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 1 0 257B Cost Estimate Review 258L start-up support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-25 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 0.5 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2022-03-25 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Electrical analysis information for NOV General meetings Discussions with Ahmad (Dubai engineer) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-01 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 8 0 02/28: update 3D concept model for surge tank dump line 02/28-29: finalize and complete electrical topology drawing 02/29: picked up blower adapter redlines 03/02: meeting with Jorge to discuss stairs to VFD house details Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-02 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 03/02: meeting with Kyle and James to discuss trip to Alaska 03/03: bi-weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 03/02: updated AutoCAD license file to 2022; support Steven with the server license update 03/04: meeting with Rene to troubleshoot Solidworks license and contact MLC-CAD systtems Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-02 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 3.5 0 02/28: update 3D concept model for surge tank dump line 02/28-29: finalize and complete electrical topology drawing 02/29: picked up blower adapter redlines 03/02: meeting with Jorge to discuss stairs to VFD house details Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 03/02: meeting with Kyle and James to discuss trip to Alaska 03/03: bi-weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 03/03: meeting with Tyler Byers to discuss design concept and tasks Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-03 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 03/03: generate Sakhalin reports for January and February Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-03 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 4 0 02/28: update 3D concept model for surge tank dump line 02/28-29: finalize and complete electrical topology drawing 02/29: picked up blower adapter redlines 03/02: meeting with Jorge to discuss stairs to VFD house details Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-03 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1 0 02/28: meeting with Tyler to discuss PF surge tank; meeting with Chuck and Ripal to find cable lengths 03/03: meeting with Nance to discuss HVAC ducting concept Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 03/02: updated AutoCAD license file to 2022; support Steven with the server license update 03/04: meeting with Rene to troubleshoot Solidworks license and contact MLC-CAD systtems Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-04 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 4.5 0 03/04: begin compiling data for the UM area of interest for TSR-01756 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 03/07: assist with getting laptop cube docks repaired/replaced; timesheets to ProjXsense and payroll Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-07 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 03/07: transmittal of TSR-01725 RPT; TSR-01785-CO 03/09: transmittal of CVX drawings to NOV; TSR-01806-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-07 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 03/07: weekly Sakhalin update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-07 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 4 0 03/07-03/09: minor model updates to incorporate automation concepts Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 03/08: Tech Services meeting with Brage regarding update in Sakhalin 03/09: Company Wide town hall meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-08 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 4 0 03/08-03/09: finalize electrical topology drawing Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-08 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 2 0 03/07-03/09: minor model updates to incorporate automation concepts Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-08 Rig 272L :Rig 272L TSR-01751-272L Tier 4 Final Emissions Regular Pay N 1 0 03/08: update meeting with Tyler Byers and Alaska team regarding TSR-01751 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 03/08: Tech Services meeting with Brage regarding update in Sakhalin 03/09: Company Wide town hall meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-09 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 03/07: transmittal of TSR-01725 RPT; TSR-01785-CO 03/09: transmittal of CVX drawings to NOV; TSR-01806-CO Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-09 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 2 0 03/08-03/09: finalize electrical topology drawing Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-09 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 3.5 0 03/07-03/09: minor model updates to incorporate automation concepts Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-10 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 8 0 03/10-03/11: gather/copy drawings all related to 272 UM for Tier 4 compliance upgrades Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-11 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 8 0 03/10-03/11: gather/copy drawings all related to 272 UM for Tier 4 compliance upgrades Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-14 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 7.5 0 03/14-03/17: model and compile data for AADU (mainly UM) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-14 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 03/14: update ProjXsense to include TSR-01811 03/17: added Ahmad ElBitar to ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-15 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 6 0 03/14-03/17: model and compile data for AADU (mainly UM) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-15 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 1 0 03/15&03/17: pick up red-lines for topology drawing Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-15 Rig 272L :Rig 272L TSR-01751-272L Tier 4 Final Emissions Regular Pay N 1 0 03/15: meeting with Tyler Byers and team to discuss upgrade progress. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 03/16: download and reorganize NOV transmittal folder; assist with IT regarding license server issues for Yuzhno office (license renewal) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-16 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 03/14-03/17: model and compile data for AADU (mainly UM) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 03/17: TSR update meeting with HTSG and BD updates Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 03/17: meeting with Kyle and James to discuss NOV piping drawings Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-17 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 4.25 0 03/14-03/17: model and compile data for AADU (mainly UM) Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-17 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.25 0 03/14: update ProjXsense to include TSR-01811 03/17: added Ahmad ElBitar to ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-17 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 0.5 0 03/15&03/17: pick up red-lines for topology drawing Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-17 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1.5 0 03/17: converted and overlaid NOV concept piping over mud pump drawing Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-20 OH-010 :OH-010 OH-010-05 Arctic, North America Offshore (ANAO) Regular Pay N 8 0 travel from IAH to ANC; ANC to Prudhoe Bay Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-21 Rig 272L :Rig 272L TSR-01751-272L Tier 4 Final Emissions Regular Pay N 12 0 03/21: office visit in Anchorage; meet with Dan 03-22-24: site visit. survey UM engine room and carrier base Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-22 Rig 272L :Rig 272L TSR-01751-272L Tier 4 Final Emissions Regular Pay N 12 0 03/21: office visit in Anchorage; meet with Dan 03-22-24: site visit. survey UM engine room and carrier base Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-23 Rig 272L :Rig 272L TSR-01751-272L Tier 4 Final Emissions Regular Pay N 12 0 03/21: office visit in Anchorage; meet with Dan 03-22-24: site visit. survey UM engine room and carrier base Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-24 Rig 272L :Rig 272L TSR-01751-272L Tier 4 Final Emissions Regular Pay N 12 0 03/21: office visit in Anchorage; meet with Dan 03-22-24: site visit. survey UM engine room and carrier base Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-25 OH-010 :OH-010 OH-010-05 Arctic, North America Offshore (ANAO) Regular Pay N 8 0 travel from IAH to ANC; ANC to Prudhoe Bay Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-26 OH-010 :OH-010 OH-010-05 Arctic, North America Offshore (ANAO) Regular Pay N 8 0 travel from IAH to ANC; ANC to Prudhoe Bay Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-28 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 03/28: meeting with Ripal to discuss cable length discrepancies. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-28 Rig 272L :Rig 272L TSR-01751-272L Tier 4 Final Emissions Regular Pay N 7 0 03/28-03/30: update 3D model with data collected from survey trip 03/29: Santos Pikka Project Internal Update Meeting; model update, and create demolition package 03/31: meeting with Tyler to discuss path forward on demolition concept package Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-29 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 03/30: transmit CVX bangladesh drawings 04/01: create a new task for TSR-01813 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-29 Rig 272L :Rig 272L TSR-01751-272L Tier 4 Final Emissions Regular Pay N 7 0 03/28-03/30: update 3D model with data collected from survey trip 03/29: Santos Pikka Project Internal Update Meeting; model update, and create demolition package 03/31: meeting with Tyler to discuss path forward on demolition concept package Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-30 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 03/30: meeting with Chris to discuss patent model/drawing path forward. 03/31: bi-weekly HTSG TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-30 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 03/30: mast "elevator" concept drawing/model for Chris Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-30 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 03/30-03/31: troubleshooting ProjXsense log in issues with Ahmad and Roger Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-30 OH-009 :OH-009 OH-009-032 Arctic, North America Offshore (ANAO) Regular Pay N 1 0 03/30: meeting with Karma and Chevron to discuss partnership for 3D VR modeling Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-30 Rig 272L :Rig 272L TSR-01751-272L Tier 4 Final Emissions Regular Pay N 5 0 03/28-03/30: update 3D model with data collected from survey trip 03/29: Santos Pikka Project Internal Update Meeting; model update, and create demolition package 03/31: meeting with Tyler to discuss path forward on demolition concept package Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-31 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 03/30: meeting with Chris to discuss patent model/drawing path forward. 03/31: bi-weekly HTSG TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-31 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 03/30: mast "elevator" concept drawing/model for Chris Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-31 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 03/30-03/31: troubleshooting ProjXsense log in issues with Ahmad and Roger Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2022-03-31 Rig 272L :Rig 272L TSR-01751-272L Tier 4 Final Emissions Regular Pay N 2.5 0 03/28-03/30: update 3D model with data collected from survey trip 03/29: Santos Pikka Project Internal Update Meeting; model update, and create demolition package 03/31: meeting with Tyler to discuss path forward on demolition concept package Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-01 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 4 0 Review K&W Unit Rig 201 backyard + mast and sub newbuild specs for Oil India 3000HP opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-01 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 4 0 Review Unit 326 specs vs Oxy requirements with team. meet with Caspian Logistics, owner of Unit 326. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-01 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Provide engineering status for weekly report, update schedule, update service delivery tracker. Update procurement tracker. Meet to review cost tracking path forward. Interface with team and NOV for Top Drive sensors. Attend bi-weekly NOV meeting. Review NOV HP Mud Pump overhaul quote. Attend bi-weekly CVX call. BOP sourcing call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-02 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 10 0 Provide engineering status for weekly report, update schedule, update service delivery tracker. Update procurement tracker. Meet to review cost tracking path forward. Interface with team and NOV for Top Drive sensors. Attend bi-weekly NOV meeting. Review NOV HP Mud Pump overhaul quote. Attend bi-weekly CVX call. BOP sourcing call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS Bi-weekly call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-03 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 9 0 Provide engineering status for weekly report, update schedule, update service delivery tracker. Update procurement tracker. Meet to review cost tracking path forward. Interface with team and NOV for Top Drive sensors. Attend bi-weekly NOV meeting. Review NOV HP Mud Pump overhaul quote. Attend bi-weekly CVX call. BOP sourcing call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-04 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 6 0 Provide engineering status for weekly report, update schedule, update service delivery tracker. Update procurement tracker. Meet to review cost tracking path forward. Interface with team and NOV for Top Drive sensors. Attend bi-weekly NOV meeting. Review NOV HP Mud Pump overhaul quote. Attend bi-weekly CVX call. BOP sourcing call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-07 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 2 0 Attend Rig 12 visit in Corpus Christi. Provide rig visit summary and respond to emails. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-07 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 10 0 Submit weekly engineering status. Update project trackers. Attend weekly mtg. Meet with new engineer. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-08 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 Attend evening Star Energy Baker Hughes conf call. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-08 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 6 0 Attend Rig 12 visit in Corpus Christi. Provide rig visit summary and respond to emails. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-08 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 3 0 Submit weekly engineering status. Update project trackers. Attend weekly mtg. Meet with new engineer. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-09 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 13 0 Attend Rig 12 visit in Corpus Christi. Provide rig visit summary and respond to emails. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-10 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 6 0 Attend Rig 12 visit in Corpus Christi. Provide rig visit summary and respond to emails. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-10 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 4 0 Submit weekly engineering status. Update project trackers. Attend weekly mtg. Meet with new engineer. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-11 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 4 0 Attend Rig 12 visit in Corpus Christi. Provide rig visit summary and respond to emails. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-11 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Submit weekly engineering status. Update project trackers. Attend weekly mtg. Meet with new engineer. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO on 3/14-3/16 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-14 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 1 0 Assemble Rig 12 re-activation scope of work. Review Rig 12 rig documents. Correspond and meet with team. Prepare Titania Rig 12, 15 and Patterson Rigs 14E & 16E brochures for Oxy and Talos opportunities. Meet with Titania and continue cost estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-14 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Attend CVX bi-weekly 269 Bangladesh mtg. Respond to emails. Review Project engineer tasks with new project engineer. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO on 3/14-3/16 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-15 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 1 0 Assemble Rig 12 re-activation scope of work. Review Rig 12 rig documents. Correspond and meet with team. Prepare Titania Rig 12, 15 and Patterson Rigs 14E & 16E brochures for Oxy and Talos opportunities. Meet with Titania and continue cost estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-15 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Attend CVX bi-weekly 269 Bangladesh mtg. Respond to emails. Review Project engineer tasks with new project engineer. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-16 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO on 3/14-3/16 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-16 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 3 0 Assemble Rig 12 re-activation scope of work. Review Rig 12 rig documents. Correspond and meet with team. Prepare Titania Rig 12, 15 and Patterson Rigs 14E & 16E brochures for Oxy and Talos opportunities. Meet with Titania and continue cost estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-16 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 3 0 Attend CVX bi-weekly 269 Bangladesh mtg. Respond to emails. Review Project engineer tasks with new project engineer. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Bi-weekly TS mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-17 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 6 0 Assemble Rig 12 re-activation scope of work. Review Rig 12 rig documents. Correspond and meet with team. Prepare Titania Rig 12, 15 and Patterson Rigs 14E & 16E brochures for Oxy and Talos opportunities. Meet with Titania and continue cost estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-17 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 5 0 Attend CVX bi-weekly 269 Bangladesh mtg. Respond to emails. Review Project engineer tasks with new project engineer. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-18 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 6 0 Assemble Rig 12 re-activation scope of work. Review Rig 12 rig documents. Correspond and meet with team. Prepare Titania Rig 12, 15 and Patterson Rigs 14E & 16E brochures for Oxy and Talos opportunities. Meet with Titania and continue cost estimate. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-21 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 4 0 Continue developing Titania Rig 12,15 and PTEN Rigs 14E & 16E spec sheets for Talos and Slb/Air Products CCU wells opportunities. Meet with Titania and team. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-21 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 6 0 Continue developing Titania Rig 12,15 and PTEN Rigs 14E & 16E spec sheets for Oxy CCU wells opportunities Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-22 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 3 0 Continue developing Titania Rig 12,15 and PTEN Rigs 14E & 16E spec sheets for Talos and Slb/Air Products CCU wells opportunities. Meet with Titania and team. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-22 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 3 0 Continue developing Titania Rig 12,15 and PTEN Rigs 14E & 16E spec sheets for Oxy CCU wells opportunities Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-22 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 6 0 Meeting with Dubai team for cost report status and project accounting gaps. Attend weekly project meeting. NOV bi-weekly project meeting. NOV schedule review meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-23 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 6 0 Meet with Apache and review Rig 12 and Rig 15 as options for Apache 2x1200HP opportunity + 6x1500hp opportunity. Meet with Titania to understand execution plan. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-23 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 2 0 Continue developing Titania Rig 12,15 and PTEN Rigs 14E & 16E spec sheets for Oxy CCU wells opportunities Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-23 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Meeting with Dubai team for cost report status and project accounting gaps. Attend weekly project meeting. NOV bi-weekly project meeting. NOV schedule review meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-24 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 Parker resignation meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-24 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 6 0 Meet with Apache and review Rig 12 and Rig 15 as options for Apache 2x1200HP opportunity + 6x1500hp opportunity. Meet with Titania to understand execution plan. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-24 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 Meeting with Dubai team for cost report status and project accounting gaps. Attend weekly project meeting. NOV bi-weekly project meeting. NOV schedule review meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-25 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 6 0 Meet with Apache and review Rig 12 and Rig 15 as options for Apache 2x1200HP opportunity + 6x1500hp opportunity. Meet with Titania to understand execution plan. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-28 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 8 0 Prepare dry-lease technical exhibits for Titania Rig 12 and 15 dry-leases. ELT meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-29 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 6 0 Prepare dry-lease technical exhibits for Titania Rig 12 and 15 dry-leases. ELT meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-29 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Weekly Parker Bangladesh meeting. Bi-weekly Chevron Bangladesh meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-30 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 6 0 Prepare dry-lease technical exhibits for Titania Rig 12 and 15 dry-leases. ELT meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-30 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Weekly Parker Bangladesh meeting. Bi-weekly Chevron Bangladesh meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-31 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO on 3/31 and 4/1 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2022-03-31 OH-009 :OH-009 OH-009-031 US Land (USL) Regular Pay N 1 0 Prepare dry-lease technical exhibits for Titania Rig 12 and 15 dry-leases. ELT meeting. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-01 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 8 0 Installation and Crimping Tools review with Chuck. Krechet - Fiber Cable Length with 3D model meeting with Lam and Chuck. DTI - Krechet Automation Fire and Gas Quote discussion with Nick Crimping Tools datasheet from Chuck reviewed. Revised Krechet Topology redline sent to Lam. Contacted GESCO for plug and Receptacle . Krechet Automation Upgrade - Block Diagram clarification needed meeting with John NOV. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-02 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 8 0 Installation and Crimping Tools review with Chuck. Krechet - Fiber Cable Length with 3D model meeting with Lam and Chuck. DTI - Krechet Automation Fire and Gas Quote discussion with Nick Crimping Tools datasheet from Chuck reviewed. Revised Krechet Topology redline sent to Lam. Contacted GESCO for plug and Receptacle . Krechet Automation Upgrade - Block Diagram clarification needed meeting with John NOV. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-03 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 8 0 Installation and Crimping Tools review with Chuck. Krechet - Fiber Cable Length with 3D model meeting with Lam and Chuck. DTI - Krechet Automation Fire and Gas Quote discussion with Nick Crimping Tools datasheet from Chuck reviewed. Revised Krechet Topology redline sent to Lam. Contacted GESCO for plug and Receptacle . Krechet Automation Upgrade - Block Diagram clarification needed meeting with John NOV. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-04 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 8 0 Installation and Crimping Tools review with Chuck. Krechet - Fiber Cable Length with 3D model meeting with Lam and Chuck. DTI - Krechet Automation Fire and Gas Quote discussion with Nick Crimping Tools datasheet from Chuck reviewed. Revised Krechet Topology redline sent to Lam. Contacted GESCO for plug and Receptacle . Krechet Automation Upgrade - Block Diagram clarification needed meeting with John NOV. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-07 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Final SAK weekly meeting . Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-07 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 7 0 Krechet Cable list Template to Chuck and discuss. Final Topology redline updated and sent to Lam for final drawing. 100% Done 209L Automation Cable Register discuss with Kyle to show progress. 75-80 % Done. Appleton and Crouse-Hinds data sheet sent to Chuck for ref. Krechet Status update meeting with Tyler. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-08 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 8 0 Krechet Cable list Template to Chuck and discuss. Final Topology redline updated and sent to Lam for final drawing. 100% Done 209L Automation Cable Register discuss with Kyle to show progress. 75-80 % Done. Appleton and Crouse-Hinds data sheet sent to Chuck for ref. Krechet Status update meeting with Tyler. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-09 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 7 0 Krechet Cable list Template to Chuck and discuss. Final Topology redline updated and sent to Lam for final drawing. 100% Done 209L Automation Cable Register discuss with Kyle to show progress. 75-80 % Done. Appleton and Crouse-Hinds data sheet sent to Chuck for ref. Krechet Status update meeting with Tyler. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-09 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 269L Bangladesh - NOV Top Drive Block Diagram drawing reviewed and send feedback and redline to NOV. Final F & G system layout reviewed and need to set up final meeting internally before revert back to Rutledge. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-10 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 6 0 Krechet Cable list Template to Chuck and discuss. Final Topology redline updated and sent to Lam for final drawing. 100% Done 209L Automation Cable Register discuss with Kyle to show progress. 75-80 % Done. Appleton and Crouse-Hinds data sheet sent to Chuck for ref. Krechet Status update meeting with Tyler. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-10 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 269L Bangladesh - NOV Top Drive Block Diagram drawing reviewed and send feedback and redline to NOV. Final F & G system layout reviewed and need to set up final meeting internally before revert back to Rutledge. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-11 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 7 0 Krechet Cable list Template to Chuck and discuss. Final Topology redline updated and sent to Lam for final drawing. 100% Done 209L Automation Cable Register discuss with Kyle to show progress. 75-80 % Done. Appleton and Crouse-Hinds data sheet sent to Chuck for ref. Krechet Status update meeting with Tyler. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-11 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 269L Bangladesh - NOV Top Drive Block Diagram drawing reviewed and send feedback and redline to NOV. Final F & G system layout reviewed and need to set up final meeting internally before revert back to Rutledge. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-14 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 SAK weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-14 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-02 Automation Upgrade: Engineering Regular Pay N 2 0 Revised Krechet Topology drawing done. 209L (Krechet) Automation Cable Register Done. Krechet Automation Upgrade - Fiber Cable Register Done. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-14 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 4 0 209L (Krechet) Automation Cable Register meeting with Chuck. AMPHENOL V06G-E-M40C-1-J-G PLUG W/CRMP SKT receptacle and plug meeting with Chuck. Topology redline sent to Lam. Krechet Automation Upgrade - Fiber Cable Schedule sent to Chuck. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-14 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 Rig 269 - Plot Plan Layout meeting with Berny and Dinesh. 269L (Bangladesh) Lightning Protection and Grounding Plan - DRAFT review. Send comments back to Sarfraz on Rig 269 CVX Bangladesh Fire and Gas System . 269L Bangladesh - NOV Top Drive Block Diagram feedback and Q A with NOV. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-15 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-02 Automation Upgrade: Engineering Regular Pay N 1 0 Revised Krechet Topology drawing done. 209L (Krechet) Automation Cable Register Done. Krechet Automation Upgrade - Fiber Cable Register Done. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-15 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 3 0 209L (Krechet) Automation Cable Register meeting with Chuck. AMPHENOL V06G-E-M40C-1-J-G PLUG W/CRMP SKT receptacle and plug meeting with Chuck. Topology redline sent to Lam. Krechet Automation Upgrade - Fiber Cable Schedule sent to Chuck. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-15 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 4 0 Rig 269 - Plot Plan Layout meeting with Berny and Dinesh. 269L (Bangladesh) Lightning Protection and Grounding Plan - DRAFT review. Send comments back to Sarfraz on Rig 269 CVX Bangladesh Fire and Gas System . 269L Bangladesh - NOV Top Drive Block Diagram feedback and Q A with NOV. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-16 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-02 Automation Upgrade: Engineering Regular Pay N 2 0 Revised Krechet Topology drawing done. 209L (Krechet) Automation Cable Register Done. Krechet Automation Upgrade - Fiber Cable Register Done. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-16 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 4 0 209L (Krechet) Automation Cable Register meeting with Chuck. AMPHENOL V06G-E-M40C-1-J-G PLUG W/CRMP SKT receptacle and plug meeting with Chuck. Topology redline sent to Lam. Krechet Automation Upgrade - Fiber Cable Schedule sent to Chuck. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-16 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 Rig 269 - Plot Plan Layout meeting with Berny and Dinesh. 269L (Bangladesh) Lightning Protection and Grounding Plan - DRAFT review. Send comments back to Sarfraz on Rig 269 CVX Bangladesh Fire and Gas System . 269L Bangladesh - NOV Top Drive Block Diagram feedback and Q A with NOV. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 ESWC Status register updated. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-17 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-02 Automation Upgrade: Engineering Regular Pay N 2 0 Revised Krechet Topology drawing done. 209L (Krechet) Automation Cable Register Done. Krechet Automation Upgrade - Fiber Cable Register Done. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-17 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 4 0 209L (Krechet) Automation Cable Register meeting with Chuck. AMPHENOL V06G-E-M40C-1-J-G PLUG W/CRMP SKT receptacle and plug meeting with Chuck. Topology redline sent to Lam. Krechet Automation Upgrade - Fiber Cable Schedule sent to Chuck. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-17 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 Rig 269 - Plot Plan Layout meeting with Berny and Dinesh. 269L (Bangladesh) Lightning Protection and Grounding Plan - DRAFT review. Send comments back to Sarfraz on Rig 269 CVX Bangladesh Fire and Gas System . 269L Bangladesh - NOV Top Drive Block Diagram feedback and Q A with NOV. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-21 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 8 0 Rig 269- Fire and Gas Plot plan drawing. Update: Rig 269 CVX Bangladesh Fire and Gas System meeting with Ahmad. Rig 269 - Lightning system Eritech 3000. 269L Bangladesh - NOV Electrical study QA review Rig 269 - Power study - Back reaming . 269 - AUX GEN Loads Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-22 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 CDPU Electrical Connection issue. Discuss issue with Sam on site. Send proposal and waiting on feedback from Spar. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-22 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 7 0 Rig 269- Fire and Gas Plot plan drawing. Update: Rig 269 CVX Bangladesh Fire and Gas System meeting with Ahmad. Rig 269 - Lightning system Eritech 3000. 269L Bangladesh - NOV Electrical study QA review Rig 269 - Power study - Back reaming . 269 - AUX GEN Loads Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-23 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 CDPU Electrical Connection issue. Discuss issue with Sam on site. Send proposal and waiting on feedback from Spar. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-23 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 6 0 Rig 269- Fire and Gas Plot plan drawing. Update: Rig 269 CVX Bangladesh Fire and Gas System meeting with Ahmad. Rig 269 - Lightning system Eritech 3000. 269L Bangladesh - NOV Electrical study QA review Rig 269 - Power study - Back reaming . 269 - AUX GEN Loads Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-24 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 CDPU Electrical Connection issue. Discuss issue with Sam on site. Send proposal and waiting on feedback from Spar. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-24 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 5 0 Rig 269- Fire and Gas Plot plan drawing. Update: Rig 269 CVX Bangladesh Fire and Gas System meeting with Ahmad. Rig 269 - Lightning system Eritech 3000. 269L Bangladesh - NOV Electrical study QA review Rig 269 - Power study - Back reaming . 269 - AUX GEN Loads Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-25 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 CDPU Electrical Connection issue. Discuss issue with Sam on site. Send proposal and waiting on feedback from Spar. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-25 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 4 0 Rig 269- Fire and Gas Plot plan drawing. Update: Rig 269 CVX Bangladesh Fire and Gas System meeting with Ahmad. Rig 269 - Lightning system Eritech 3000. 269L Bangladesh - NOV Electrical study QA review Rig 269 - Power study - Back reaming . 269 - AUX GEN Loads Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-28 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 CDPU Electrical Connection meting with Lam. 262MCM cable run from grasshopper to 480V distribution panel issue. Genesis Spar - Power Block Quote request sent to Jelec and Rexel. 480V Distribution panel material from Tory S. reviewed. LED lighting hardware and maintenance procedure request from Roger. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-28 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 4 0 269L Bangladesh - NOV Top Drive Block Diagram approved and sent to NOV. Rig 269 - Lightning system BOM & Quote review with Chuck and Kyle. Lightning Protection Datasheets reviewed for Rig 269L Bangladesh Rig 269- Fire and Gas Plot plan drawing from Jorge reviewed. 269L Bangladesh - Drilling Scenario discussion with Kyle and Ahmed for Rig 269 Rig 269 - Erico Lightning system meeting with Ray Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-29 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 6 0 CDPU Electrical Connection meting with Lam. 262MCM cable run from grasshopper to 480V distribution panel issue. Genesis Spar - Power Block Quote request sent to Jelec and Rexel. 480V Distribution panel material from Tory S. reviewed. LED lighting hardware and maintenance procedure request from Roger. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-29 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 269L Bangladesh - NOV Top Drive Block Diagram approved and sent to NOV. Rig 269 - Lightning system BOM & Quote review with Chuck and Kyle. Lightning Protection Datasheets reviewed for Rig 269L Bangladesh Rig 269- Fire and Gas Plot plan drawing from Jorge reviewed. 269L Bangladesh - Drilling Scenario discussion with Kyle and Ahmed for Rig 269 Rig 269 - Erico Lightning system meeting with Ray Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-30 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 6 0 CDPU Electrical Connection meting with Lam. 262MCM cable run from grasshopper to 480V distribution panel issue. Genesis Spar - Power Block Quote request sent to Jelec and Rexel. 480V Distribution panel material from Tory S. reviewed. LED lighting hardware and maintenance procedure request from Roger. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-30 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2 0 269L Bangladesh - NOV Top Drive Block Diagram approved and sent to NOV. Rig 269 - Lightning system BOM & Quote review with Chuck and Kyle. Lightning Protection Datasheets reviewed for Rig 269L Bangladesh Rig 269- Fire and Gas Plot plan drawing from Jorge reviewed. 269L Bangladesh - Drilling Scenario discussion with Kyle and Ahmed for Rig 269 Rig 269 - Erico Lightning system meeting with Ray Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-31 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 5 0 CDPU Electrical Connection meting with Lam. 262MCM cable run from grasshopper to 480V distribution panel issue. Genesis Spar - Power Block Quote request sent to Jelec and Rexel. 480V Distribution panel material from Tory S. reviewed. LED lighting hardware and maintenance procedure request from Roger. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2022-03-31 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 3 0 269L Bangladesh - NOV Top Drive Block Diagram approved and sent to NOV. Rig 269 - Lightning system BOM & Quote review with Chuck and Kyle. Lightning Protection Datasheets reviewed for Rig 269L Bangladesh Rig 269- Fire and Gas Plot plan drawing from Jorge reviewed. 269L Bangladesh - Drilling Scenario discussion with Kyle and Ahmed for Rig 269 Rig 269 - Erico Lightning system meeting with Ray Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails Status call w/ J.G (03/03/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-01 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 7 0 209L-01-03-xxx-(1&2)RA-vfd-house-stair (02/28/22 - 03/02/22) Review 3d NOV models and dwgs. Create 2d dwgs. from NOV 3d model for background ref. (02/28/22 - 03/03/22) Teams call w/L.N. review 209Lstair design and ref. files (03/03/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-02 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails Status call w/ J.G (03/03/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-02 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-03 Automation Upgrade: Design Regular Pay N 7 0 209L-01-03-xxx-(1&2)RA-vfd-house-stair (02/28/22 - 03/02/22) Review 3d NOV models and dwgs. Create 2d dwgs. from NOV 3d model for background ref. (02/28/22 - 03/03/22) Teams call w/L.N. review 209Lstair design and ref. files (03/03/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Parker Life Saving Rules Training (03/03/22) Bi-weekly Technical Services Meeting (03/03/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails Status call w/ J.G (03/03/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-03 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 5 0 209L-01-03-xxx-(1&2)RA-vfd-house-stair (03/03/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-04 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 8 hrs PTO (03/04/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-07 HTSG :HTSG 2022-SMART-Goals Regular Pay N 4.5 0 257B-02 -15 Ducting subfolder; update file name per dwg. description (03/07-08/22) 257B-01 -01-10 subfolders; update file name per dwg. description (03/09-11/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 Timesheet Emails Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-07 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Weekly meeting w/ Mio (3/07/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-07 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1 0 209L-01-03-xxx-(1&2)RA-vfd-house-stair (03/07-08/22) comments update. Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-08 HTSG :HTSG 2022-SMART-Goals Regular Pay N 6.5 0 257B-02 -15 Ducting subfolder; update file name per dwg. description (03/07-08/22) 257B-01 -01-10 subfolders; update file name per dwg. description (03/09-11/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-08 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 1 0 209L-01-03-xxx-(1&2)RA-vfd-house-stair (03/07-08/22) comments update. Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-09 HTSG :HTSG 2022-SMART-Goals Regular Pay N 6.5 0 257B-02 -15 Ducting subfolder; update file name per dwg. description (03/07-08/22) 257B-01 -01-10 subfolders; update file name per dwg. description (03/09-11/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Company Wide ELT Town Hall meeting (3/09/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-10 HTSG :HTSG 2022-SMART-Goals Regular Pay N 7.5 0 257B-02 -15 Ducting subfolder; update file name per dwg. description (03/07-08/22) 257B-01 -01-10 subfolders; update file name per dwg. description (03/09-11/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-11 HTSG :HTSG 2022-SMART-Goals Regular Pay N 5 0 257B-02 -15 Ducting subfolder; update file name per dwg. description (03/07-08/22) 257B-01 -01-10 subfolders; update file name per dwg. description (03/09-11/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-14 HTSG :HTSG 2022-SMART-Goals Regular Pay N 6 0 257B-01 10-11 subfolders; update file name per dwg. description (03/14-15/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Emails Timesheet Online training troubleshoot (03/16/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-14 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Weekly meeting w/ MIo (03/14/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-15 HTSG :HTSG 2022-SMART-Goals Regular Pay N 3 0 257B-01 10-11 subfolders; update file name per dwg. description (03/14-15/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Online training troubleshoot (03/16/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-15 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 4.5 0 269L-P01428-171-1-RB-rig-grounding-plan (03/15-17/22) 269L-P01428-172-1-RB-rig-lightning-protection-plan (03/17-18/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Emails Timesheet Online training troubleshoot (03/16/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-16 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 7 0 269L-P01428-171-1-RB-rig-grounding-plan (03/15-17/22) 269L-P01428-172-1-RB-rig-lightning-protection-plan (03/17-18/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Bi-weekly Technical Services meeting (03/17/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-17 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Online training troubleshoot (03/16/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-17 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 6.5 0 269L-P01428-171-1-RB-rig-grounding-plan (03/15-17/22) 269L-P01428-172-1-RB-rig-lightning-protection-plan (03/17-18/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Online training troubleshoot (03/16/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-18 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 5 0 269L-P01428-171-1-RB-rig-grounding-plan (03/15-17/22) 269L-P01428-172-1-RB-rig-lightning-protection-plan (03/17-18/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 Timesheet Emails Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-21 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 6 0 269L-P01428-171-1-RB-rig-grounding-plan (3/21/22) 269L-P01428-172-1-RB-rig-lightning-protection-plan (3/21-23/22) 269L-P01428-171-(1&2)-RA-rig-gas-flame-detection-sys (3/23-25/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 Timesheet Emails Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-22 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 8 0 269L-P01428-171-1-RB-rig-grounding-plan (3/21/22) 269L-P01428-172-1-RB-rig-lightning-protection-plan (3/21-23/22) 269L-P01428-171-(1&2)-RA-rig-gas-flame-detection-sys (3/23-25/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-23 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 7.5 0 269L-P01428-171-1-RB-rig-grounding-plan (3/21/22) 269L-P01428-172-1-RB-rig-lightning-protection-plan (3/21-23/22) 269L-P01428-171-(1&2)-RA-rig-gas-flame-detection-sys (3/23-25/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-24 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 7.5 0 269L-P01428-171-1-RB-rig-grounding-plan (3/21/22) 269L-P01428-172-1-RB-rig-lightning-protection-plan (3/21-23/22) 269L-P01428-171-(1&2)-RA-rig-gas-flame-detection-sys (3/23-25/22) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2022-03-25 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 5 0 269L-P01428-171-1-RB-rig-grounding-plan (3/21/22) 269L-P01428-172-1-RB-rig-lightning-protection-plan (3/21-23/22) 269L-P01428-171-(1&2)-RA-rig-gas-flame-detection-sys (3/23-25/22) Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-01 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 0.5 0 Hydradyne RFQ and quote review, status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-01 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-02 Automation Upgrade: Engineering Regular Pay N 5 0 drawing review, ducting bracing calculations, Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-01 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 3 0 Ducting brace material and loading condition research, Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-02 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 0.5 0 Hydradyne RFQ and quote review, status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-02 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-02 Automation Upgrade: Engineering Regular Pay N 5 0 drawing review, ducting bracing calculations, Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-02 Rig 209L (Krechet) :Rig 209L (Krechet) TSR-01752-209L-04 Automation Upgrade: Overhead Items Regular Pay N 3 0 Ducting brace material and loading condition research, Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-03 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1.5 0 Hydradyne RFQ and quote review, status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS Meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-03 OH-005 :OH-005 Overhead All Activities Regular Pay N 5 0 Equipment Standardization working committee list review and teammate research Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-03 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 Standpipe and HP piping drawing review, Lightning Masters correspondence, grounding vs lightning clarifications, choke manifold clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-04 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1 0 Hydradyne RFQ and quote review, status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-04 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Equipment Standardization working committee list review and teammate research Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-04 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 4 0 Standpipe and HP piping drawing review, Lightning Masters correspondence, grounding vs lightning clarifications, choke manifold clarifications Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-07 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 Hydradyne quote and status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Managed Pressure Drilling research and video, equipment standardization team members and equipment research Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 return to office desk setup since no Q and needed laptop doc, UNUM leave clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-07 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly Meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-07 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 2.5 0 NOV drawing comments, lightning clarification and plot plan assistance Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Tech services meeting with Brage, Town hall meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 5 0 Managed Pressure Drilling research and video, equipment standardization team members and equipment research Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 return to office desk setup since no Q and needed laptop doc, UNUM leave clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-08 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1.5 0 NOV drawing comments, lightning clarification and plot plan assistance Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-09 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 Hydradyne quote and status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-09 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Tech services meeting with Brage, Town hall meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-09 OH-005 :OH-005 Overhead All Activities Regular Pay N 3.5 0 Managed Pressure Drilling research and video, equipment standardization team members and equipment research Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-09 OH-034 :OH-034 OH-034-003 Eastern Canada Regular Pay N 2 0 Hibernia MPD requirments Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-09 Rig 269L :Rig 269L TSR-01796-269L-01 CVX Bangladesh: Engineering Regular Pay N 1 0 NOV drawing comments, lightning clarification and plot plan assistance Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-10 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 0.5 0 Hydradyne quote and status updates Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 6.5 0 Managed Pressure Drilling research and video, equipment standardization team members and equipment research Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 return to office desk setup since no Q and needed laptop doc, UNUM leave clarification Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-11 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-16 OH-005 :OH-005 Overhead All Activities Regular Pay N 4 0 Equipment standardization delegation spreadsheet, equipment research Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-16 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 4 0 258 assistance: research equipment and rig move documents, create schedule, PO tracking, create commissioning forms Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-17 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 Grasshopper gasket and kit installation assistance and correspondences Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-17 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS Meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-17 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 4 0 258 assistance: research equipment and rig move documents, create schedule, PO tracking, create commissioning forms Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-18 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Grasshopper gasket and kit installation assistance and correspondences Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-18 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 7 0 258 assistance: research equipment and rig move documents, create schedule, PO tracking, create commissioning forms Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-21 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 8.5 0 Create/revise schedule, track PO updates, meeting for schedule and commissioning scope, worked on commissioning forms (air, hoisting, electrical) Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-22 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-22 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 2 0 Create/revise schedule, track PO updates, meeting for schedule and commissioning scope, worked on commissioning forms (air, hoisting, electrical) Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-23 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 8 0 Create/revise schedule, track PO updates, meeting for schedule and commissioning scope, worked on commissioning forms (air, hoisting, electrical) Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-24 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 grasshopper cable and spar interface questions Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-24 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 6 0 Create/revise schedule, track PO updates, meeting for schedule and commissioning scope, worked on commissioning forms (air, hoisting, electrical) Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-25 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 3.5 0 wall thickness research and assistance Reck, John Engineer I 29656 Reck, John:Engineer I 2022-03-25 Rig 258L :Rig 258L TSR-01812-258L Reactivation 2022 Regular Pay N 2 0 Create/revise schedule, track PO updates, meeting for schedule and commissioning scope, worked on commissioning forms (air, hoisting, electrical)