Name Billing Class Employee No. Item Line Class Transaction Date Job No. Customer Service Item Notes Payroll Item Billable Employee Paid Day Rate Duration Days Remarks Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-01 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 9.5 0 Clarification 19, follow up on CAT engines and forklifts, review HH responses and discuss details, light issue Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-01 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 SAK meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-02 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 Clarification 19, follow up on CAT engines and forklifts, review HH responses and discuss details, light issue Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-02 OH-014 :OH-014 Overhead All Activities Regular Pay N 5 0 Finish SAFI model and apply members, Apply loads with help from Reck Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-03 Berkut-TSR :Berkut-TSR TSR-01776-BERP South Crane Ladder Access Regular Pay N 3 0 Model and apply loads Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.5 0 Clarification 19, follow up on CAT engines and forklifts, review HH responses and discuss details, light issue Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Town Hall, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-03 OH-014 :OH-014 Overhead All Activities Regular Pay N 2 0 Finish SAFI model and apply members, Apply loads with help from Reck Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-04 Berkut-TSR :Berkut-TSR TSR-01776-BERP South Crane Ladder Access Regular Pay N 1.5 0 Model and apply loads Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-04 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Clarification 19, follow up on CAT engines and forklifts, review HH responses and discuss details, light issue Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-04 HTSG-TSR :HTSG-TSR TSR-01738-HTSG Review Doc Groups Regular Pay N 1 0 Review with Ivan Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Town Hall, TSR meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-04 OH-014 :OH-014 Overhead All Activities Regular Pay N 3 0 Finish SAFI model and apply members, Apply loads with help from Reck Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-05 Berkut-TSR :Berkut-TSR TSR-01776-BERP South Crane Ladder Access Regular Pay N 1 0 Model and apply loads Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-05 Berkut-TSR :Berkut-TSR TSR-01778-BERP Pipe Barn Storage Rack Regular Pay N 3 0 TSR-1778 CTR and modelling Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-05 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Clarification 19, follow up on CAT engines and forklifts, review HH responses and discuss details, light issue Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-05 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 Finish SAFI model and apply members, Apply loads with help from Reck Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-08 Berkut-TSR :Berkut-TSR TSR-01776-BERP South Crane Ladder Access Regular Pay N 1.5 0 review analysis with Kyle and Reck Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-08 Berkut-TSR :Berkut-TSR TSR-01779-BERP Additional Walkway Pipe Deck Regular Pay N 1 0 CTR, modeling for walkway Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-08 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 3 0 Dialight convo, discussion with Kyle, Joe, and Jeff, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-08 HTSG-TSR :HTSG-TSR TSR-01738-HTSG Review Doc Groups Regular Pay N 1.5 0 Update DG Groups and send to Ivan Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-08 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 SAK meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-09 Berkut-TSR :Berkut-TSR TSR-01776-BERP South Crane Ladder Access Regular Pay N 1 0 review analysis with Kyle and Reck Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-09 Berkut-TSR :Berkut-TSR TSR-01779-BERP Additional Walkway Pipe Deck Regular Pay N 6.5 0 CTR, modeling for walkway Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-09 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1 0 Dialight convo, discussion with Kyle, Joe, and Jeff, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-10 Berkut-TSR :Berkut-TSR TSR-01779-BERP Additional Walkway Pipe Deck Regular Pay N 5.5 0 CTR, modeling for walkway Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-10 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 2.5 0 Star Energy Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-10 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Safe Clean Start Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-11 Berkut-TSR :Berkut-TSR TSR-01779-BERP Additional Walkway Pipe Deck Regular Pay N 2 0 CTR, modeling for walkway Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-11 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Willow response Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-11 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 4.5 0 Star Energy Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-12 Berkut-TSR :Berkut-TSR TSR-01779-BERP Additional Walkway Pipe Deck Regular Pay N 4 0 CTR, modeling for walkway Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-12 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 3 0 Willow response Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-15 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 President's Day Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-16 Berkut-TSR :Berkut-TSR TSR-01779-BERP Additional Walkway Pipe Deck Regular Pay N 8.5 0 modeling walkway Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-16 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Polar Vortex, Arctic Storm, Winter Blast, etc. Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-18 Berkut-TSR :Berkut-TSR TSR-01779-BERP Additional Walkway Pipe Deck Regular Pay N 2 0 modeling walkway Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-18 OH-011 :OH-011 Overhead All Activities Regular Pay N 6 0 Polar Vortex, Arctic Storm, Winter Blast, etc. Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-19 Berkut-TSR :Berkut-TSR TSR-01779-BERP Additional Walkway Pipe Deck Regular Pay N 5.5 0 modeling walkway Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-19 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1.5 0 Model and analyze dumby air can Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-22 Berkut-TSR :Berkut-TSR TSR-01776-BERP South Crane Ladder Access Regular Pay N 3 0 Update model and rerun analysis, send info to Lam, discuss with Lam, analysis report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-22 Berkut-TSR :Berkut-TSR TSR-01779-BERP Additional Walkway Pipe Deck Regular Pay N 2 0 talk with Jorge and send him email, update model, handrail analysis Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-22 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2.5 0 create padeyes, run horizontal analysis, update model, reconfirm analysis, discuss with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, update CV Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-22 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 sak meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-23 Berkut-TSR :Berkut-TSR TSR-01777-BERP Choke Manifold Skid Modifications Regular Pay N 2.5 0 plate analysis, closeout review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-23 Berkut-TSR :Berkut-TSR TSR-01779-BERP Additional Walkway Pipe Deck Regular Pay N 4.5 0 talk with Jorge and send him email, update model, handrail analysis Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, update CV Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-23 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Willow questions Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-24 Berkut-TSR :Berkut-TSR TSR-01776-BERP South Crane Ladder Access Regular Pay N 2 0 Update model and rerun analysis, send info to Lam, discuss with Lam, analysis report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-24 Berkut-TSR :Berkut-TSR TSR-01779-BERP Additional Walkway Pipe Deck Regular Pay N 4 0 talk with Jorge and send him email, update model, handrail analysis Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-24 HTSG-TSR :HTSG-TSR TSR-01738-HTSG Review Doc Groups Regular Pay N 1 0 Discussion with Tommy and Ivan, email Saritha Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, update CV Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-24 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Willow questions Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-25 Berkut-TSR :Berkut-TSR TSR-01776-BERP South Crane Ladder Access Regular Pay N 7 0 Update model and rerun analysis, send info to Lam, discuss with Lam, analysis report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-25 HTSG-TSR :HTSG-TSR TSR-01738-HTSG Review Doc Groups Regular Pay N 1 0 Discussion with Tommy and Ivan, email Saritha Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-25 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Willow questions Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-26 Berkut-TSR :Berkut-TSR TSR-01777-BERP Choke Manifold Skid Modifications Regular Pay N 0.75 0 plate analysis, closeout review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-26 Berkut-TSR :Berkut-TSR TSR-01778-BERP Pipe Barn Storage Rack Regular Pay N 4 0 Model in Solidworks, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-26 HTSG-TSR :HTSG-TSR TSR-01738-HTSG Review Doc Groups Regular Pay N 0.5 0 Discussion with Tommy and Ivan, email Saritha Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet, update CV Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-02-26 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Willow questions Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-01 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 6 0 (02/01/21) Reviewed SMART goal comments. researched additional goal details and measurements. (02/02/21 & 02/04/21) Worked on clean up/disposition of files in Greenway plaza. (02/04/21) Uploaded final 2021' goals and routed. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 (02/01/21) Updated weekly timesheet and submitted for approval. Update call with LTN. (02/03/21) Saved AutoCAD blocks under template - cleaned up and scaled for future use. Update call with Ripal. Update call with Lam. (02/05/21) Worked with IT on connection issue with network drives. Update call with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 (02/01/21) Reviewed SOW for new Berkut TSR. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-02 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 6.5 0 (02/01/21) Reviewed SMART goal comments. researched additional goal details and measurements. (02/02/21 & 02/04/21) Worked on clean up/disposition of files in Greenway plaza. (02/04/21) Uploaded final 2021' goals and routed. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-02 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 2 0 (02/02/21) Genel site updates for rig 265L. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-03 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 5.5 0 (02/03/21) Updated yard rig info per comments from John R. Reviewed LM drawing showing CL well. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 (02/03/21) Town hall meeting. (02/04/21) Weekly TSR call. Update call with Tyler. Update call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (02/01/21) Updated weekly timesheet and submitted for approval. Update call with LTN. (02/03/21) Saved AutoCAD blocks under template - cleaned up and scaled for future use. Update call with Ripal. Update call with Lam. (02/05/21) Worked with IT on connection issue with network drives. Update call with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-04 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 6.75 0 (02/01/21) Reviewed SMART goal comments. researched additional goal details and measurements. (02/02/21 & 02/04/21) Worked on clean up/disposition of files in Greenway plaza. (02/04/21) Uploaded final 2021' goals and routed. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.75 0 (02/03/21) Town hall meeting. (02/04/21) Weekly TSR call. Update call with Tyler. Update call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-05 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 3.5 0 (02/05/21) Converted LM drawings to CAD. Started skidrail layout to help locate CL well. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 (02/01/21) Updated weekly timesheet and submitted for approval. Update call with LTN. (02/03/21) Saved AutoCAD blocks under template - cleaned up and scaled for future use. Update call with Ripal. Update call with Lam. (02/05/21) Worked with IT on connection issue with network drives. Update call with Tyler. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-08 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 6.5 0 (02/08/21 - 02/10/21) Yard layout with CDPU well center location. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (02/08/21) Updated weekly timesheet and submitted for approval. Update call with Tyler. (02/09/21) Review/Approve designers timesheets. (02/10/21) Update call with Tyler. Update call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-09 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1.75 0 (02/08/21 - 02/10/21) Yard layout with CDPU well center location. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-09 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 6 0 (02/09/21) Worked on clean up/disposition of files in Greenway plaza. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (02/08/21) Updated weekly timesheet and submitted for approval. Update call with Tyler. (02/09/21) Review/Approve designers timesheets. (02/10/21) Update call with Tyler. Update call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-10 Berkut-TSR :Berkut-TSR TSR-01779-BERP Additional Walkway Pipe Deck Regular Pay N 2.5 0 (02/10/21) Reviewed TSR SOW. Started converting drawing PDFs to AutoCAD for background. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-10 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1.5 0 (02/08/21 - 02/10/21) Yard layout with CDPU well center location. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-10 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 (02/10/21) Saves barge AutoCAD layouts to template for future use. Searched for requested OIME drawworks information for Bronco. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (02/08/21) Updated weekly timesheet and submitted for approval. Update call with Tyler. (02/09/21) Review/Approve designers timesheets. (02/10/21) Update call with Tyler. Update call with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-11 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-12 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-15 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 (02/16/21 - 02/17/21) Loss of power/ internet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (02/17/21) Update call with Jorge. Update call with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-17 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3 0 (02/17/21) Revision to rig camp layouts - Genel. (02/18/21 - 02/19/21) Cont 269L rig camp layout. Started new BOP layout with Cansco stack information (rig 269L) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 4 0 (02/16/21 - 02/17/21) Loss of power/ internet. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-18 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 8 0 (02/17/21) Revision to rig camp layouts - Genel. (02/18/21 - 02/19/21) Cont 269L rig camp layout. Started new BOP layout with Cansco stack information (rig 269L) Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 (02/19/21) Searched for E3000 drawing information per request from Bronco. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-02-19 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 7 0 (02/17/21) Revision to rig camp layouts - Genel. (02/18/21 - 02/19/21) Cont 269L rig camp layout. Started new BOP layout with Cansco stack information (rig 269L) Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-01 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-02 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 Global Operations Townhall; Technical Services Bi-Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Global Operations Townhall; Technical Services Bi-Weekly Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-05 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8.5 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-06 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-08 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-09 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10.5 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-12 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-12 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 0.5 0 NCOC Island Optimization Meeting Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-15 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 President's Day Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Texas Ice Storm Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Texas Ice Storm Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-18 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 8 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-20 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 MK Timesheet Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-22 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-24 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-24 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 NCOC Island Optimization Call Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 9.5 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 10 0 Office Lease Project Kuehn, Matt Project Manager 22143 Kuehn, Matt:Project Manager 2021-02-27 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 Office Lease Project Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-02-01 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule. RU & SIT Work Order, Travel to and from LA, Mast FAT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-02-02 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule. RU & SIT Work Order, Travel to and from LA, Mast FAT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-02-03 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule. RU & SIT Work Order, Travel to and from LA, Mast FAT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-02-04 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule. RU & SIT Work Order, Travel to and from LA, Mast FAT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-02-05 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 5 0 Monitor and control scope, cost, and schedule. RU & SIT Work Order, Travel to and from LA, Mast FAT Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-02-08 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule. RU & SIT Work Order, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-02-09 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule. RU & SIT Work Order, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-02-10 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule. RU & SIT Work Order, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-02-11 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule. RU & SIT Work Order, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-02-12 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 5 0 Monitor and control scope, cost, and schedule. RU & SIT Work Order, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-02-15 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 2 0 Monitor and control scope, cost, and schedule. RU & SIT Work Order, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-02-15 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Holiday Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-02-16 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 4 0 Monitor and control scope, cost, and schedule. RU & SIT Work Order, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-02-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 4 0 No power in the region Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-02-17 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 4 0 Monitor and control scope, cost, and schedule. RU & SIT Work Order, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-02-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 4 0 No power in the region Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-02-18 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 8 0 Monitor and control scope, cost, and schedule. RU & SIT Work Order, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-02-19 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 6 0 Monitor and control scope, cost, and schedule. RU & SIT Work Order, Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-02-22 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule. RU & SIT Work Order, mob work order, travel to new iberia Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-02-23 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule. RU & SIT Work Order, mob work order, travel to new iberia Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-02-24 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule. RU & SIT Work Order, mob work order, travel to new iberia Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-02-25 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Monitor and control scope, cost, and schedule. RU & SIT Work Order, mob work order, travel to new iberia Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-02-26 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 5 0 Monitor and control scope, cost, and schedule. RU & SIT Work Order, mob work order, travel to new iberia Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-01 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Clarifications / planning discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-01 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 4 0 3 Greenway / 5 Greenway document review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Review mechanical engineer resumes / prepare for interview(s) SAMRT goals for direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-02 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 2 0 Clarifications / planning discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-02 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 4 0 3 Greenway / 5 Greenway document review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-02 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Review mechanical engineer resumes / prepare for interview(s) SAMRT goals for direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-03 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Rig transport to Fouchoun Email to Jose at Chevron review barge transport quotes Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-03 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 Clarifications / planning discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-03 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 2 0 3 Greenway / 5 Greenway document review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-03 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Review mechanical engineer resumes / prepare for interview(s) SAMRT goals for direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-03 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 HOU to LA to HOU Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-04 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 Rig transport to Fouchoun Email to Jose at Chevron review barge transport quotes Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-04 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 6 0 Mast FAT Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-05 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Rig transport to Fouchoun Email to Jose at Chevron review barge transport quotes Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-05 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 Clarifications / planning discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-05 OH-010 :OH-010 Overhead All Activities Regular Pay N 4 0 HOU to LA to HOU Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-06 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Rig transport to Fouchoun Email to Jose at Chevron review barge transport quotes Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Review mechanical engineer resumes / prepare for interview(s) SAMRT goals for direct reports Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-06 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 2 0 review and revise PowerPoint presentation for Star Energy Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Technical Services Hours Summary Technology Group Interviews; evaluations Discuss forecast with Mark T. HTSG Update IHS invoicing for ITS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-08 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Correspondence with LM; emails sent to Jose @ CVX Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-08 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 4 0 Document review and dispostion Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 Technical Services Hours Summary Technology Group Interviews; evaluations Discuss forecast with Mark T. HTSG Update IHS invoicing for ITS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-08 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 0.5 0 Star Energy Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-09 Berkut-TSR :Berkut-TSR TSR-01777-BERP Choke Manifold Skid Modifications Regular Pay N 0.5 0 Review of model / weld calcs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-09 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Correspondence with LM; emails sent to Jose @ CVX Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-09 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 0.75 0 Well center drawing review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-09 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 6 0 Document review and dispostion Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-09 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Technical Services Hours Summary Technology Group Interviews; evaluations Discuss forecast with Mark T. HTSG Update IHS invoicing for ITS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-09 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Sakhalin TSR support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-10 Berkut-TSR :Berkut-TSR TSR-01777-BERP Choke Manifold Skid Modifications Regular Pay N 1 0 Review of model / weld calcs Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-10 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Correspondence with LM; emails sent to Jose @ CVX Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-10 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 1.25 0 Discuss contracting and path forward Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-10 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 2 0 Document review and dispostion Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-10 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Technical Services Hours Summary Technology Group Interviews; evaluations Discuss forecast with Mark T. HTSG Update IHS invoicing for ITS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-10 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 2.25 0 Star Energy Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-11 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Correspondence with LM; emails sent to Jose @ CVX Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Office move meeting Safe Clean Start meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Technical Services Hours Summary Technology Group Interviews; evaluations Discuss forecast with Mark T. HTSG Update IHS invoicing for ITS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-11 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 3 0 Star Energy Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-11 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1.5 0 Genel Contract support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-12 Berkut-TSR :Berkut-TSR TSR-01772-BERP Access Platform for Drill Line Stabilizer Regular Pay N 1 0 Drawing / MTO review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-12 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Correspondence with LM; emails sent to Jose @ CVX Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-12 EHBU-TSRs :EHBU-TSRs TSR-01521-EHBU Total Uganda Support Regular Pay N 0.5 0 Discuss contracting and path forward Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Technical Services Hours Summary Technology Group Interviews; evaluations Discuss forecast with Mark T. HTSG Update IHS invoicing for ITS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-12 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 1 0 Star Energy Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.75 0 Tracker update Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-12 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Sakhalin TSR support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-12 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 Genel Contract support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-13 Berkut-TSR :Berkut-TSR TSR-01772-BERP Access Platform for Drill Line Stabilizer Regular Pay N 2 0 Drawing / MTO review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-14 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 0.75 0 Star Energy Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-15 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 No power, no water Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-17 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Checking status of all direct reports Status of on-going work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 6 0 No power, no water Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-17 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 122 Mast Raising Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-18 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1 0 Air can test fixture - review and discuss with Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Checking status of all direct reports Status of on-going work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-18 OH-011 :OH-011 Overhead All Activities Regular Pay N 5 0 No power, no water Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-18 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Genel Contract - HP manifold support; add genset support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-19 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 0.5 0 Air can test fixture - review and discuss with Tyler Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Checking status of all direct reports Status of on-going work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-19 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 51B support for salt water disposal well Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-19 OH-011 :OH-011 Overhead All Activities Regular Pay N 3.5 0 No power, no water Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-19 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Genel Contract - HP manifold support; add genset support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-19 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 122 Mast Raising Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-20 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 51B support for salt water disposal well Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-20 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Genel Contract - HP manifold support; add genset support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-21 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1.5 0 Mast raising information sent to Dan Colby Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-22 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Meetings; SIT planning with RP and JR; Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Review and approve SMART goals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-22 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR support (non-billable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-22 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2.25 0 Mast weld repair (torque tube) Electrical discussions with RP - 5th genset Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-22 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1.25 0 Mast raising information sent to Dan Colby Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-23 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 0.5 0 WIllow Technical Support (CPAI email) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-23 Berkut-TSR :Berkut-TSR TSR-01779-BERP Additional Walkway Pipe Deck Regular Pay N 0.5 0 Model review; Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-23 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Meetings; SIT planning with RP and JR; Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-23 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1 0 Air Can Test Fixture Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-23 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 4 0 Documentation review and disposition OIME Drawings - Bronco Manufacturing discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-23 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Review and approve SMART goals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 TSR support (non-billable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-23 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.5 0 Mast weld repair (torque tube) Electrical discussions with RP - 5th genset Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-24 ARBU-TSRs :ARBU-TSRs TSR-01766-P01419 COPA Willow Proposal Regular Pay N 0.5 0 WIllow Technical Support (CPAI email) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-24 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 6 0 Documentation review and disposition OIME Drawings - Bronco Manufacturing discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Review and approve SMART goals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-24 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1.5 0 NCOC Island Optimization Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-24 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Mast weld repair (torque tube) Electrical discussions with RP - 5th genset Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-25 Berkut-TSR :Berkut-TSR TSR-01772-BERP Access Platform for Drill Line Stabilizer Regular Pay N 0.5 0 MTO development Conference call with Portland Bolt Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-25 Berkut-TSR :Berkut-TSR TSR-01779-BERP Additional Walkway Pipe Deck Regular Pay N 0.5 0 Model review; Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-25 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Meetings; SIT planning with RP and JR; Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-25 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 2.5 0 Documentation review and disposition OIME Drawings - Bronco Manufacturing discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Review and approve SMART goals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1 0 P&A Weekly Conference Call Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR support (non-billable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-25 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Mast weld repair (torque tube) Electrical discussions with RP - 5th genset Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-26 Berkut-TSR :Berkut-TSR TSR-01772-BERP Access Platform for Drill Line Stabilizer Regular Pay N 1 0 MTO development Conference call with Portland Bolt Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-26 Berkut-TSR :Berkut-TSR TSR-01777-BERP Choke Manifold Skid Modifications Regular Pay N 0.75 0 Closeout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-26 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 3 0 Documentation review and disposition OIME Drawings - Bronco Manufacturing discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Review and approve SMART goals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.25 0 TSR support (non-billable) Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-02-26 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Mast weld repair (torque tube) Electrical discussions with RP - 5th genset Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-02-01 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1 0 02/1: update drawing for cable connections Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-02-01 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 02/01: meeting with James to discuss SMART goals Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-02-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 RUSD title block/lisp routine integration into CAD standards Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-02-01 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.5 0 02/01: process incoming TSR transmittals and upload to Sharepoint & Q Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-02-01 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 02/01: weekly conference call with Sakhalin to discuss TSR updates and status Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-02-02 OH-007 :OH-007 Overhead All Activities Regular Pay N 8 0 parental leave Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-02-03 OH-007 :OH-007 Overhead All Activities Regular Pay N 8 0 parental leave Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-02-04 OH-007 :OH-007 Overhead All Activities Regular Pay N 8 0 parental leave Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-02-05 OH-007 :OH-007 Overhead All Activities Regular Pay N 8 0 parental leave Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-02-08 OH-007 :OH-007 Overhead All Activities Regular Pay N 8 0 parental leave Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-02-09 OH-007 :OH-007 Overhead All Activities Regular Pay N 8 0 parental leave Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-02-10 OH-007 :OH-007 Overhead All Activities Regular Pay N 8 0 parental leave Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-02-11 OH-007 :OH-007 Overhead All Activities Regular Pay N 8 0 parental leave Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-02-12 OH-007 :OH-007 Overhead All Activities Regular Pay N 8 0 parental leave Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-02-22 OH-007 :OH-007 Overhead All Activities Regular Pay N 8 0 parental leave Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-02-23 OH-007 :OH-007 Overhead All Activities Regular Pay N 8 0 parental leave Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-02-24 OH-007 :OH-007 Overhead All Activities Regular Pay N 8 0 parental leave Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-02-25 OH-007 :OH-007 Overhead All Activities Regular Pay N 8 0 parental leave Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-02-26 OH-007 :OH-007 Overhead All Activities Regular Pay N 8 0 parental leave Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-01 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 8 0 Parker Jaguar 3rd 1500HP rig proposal meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-02 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 7 0 Star Energy 2000HP Geo-thermal Rig opportunity powerpoint slides Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-02 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 Parker Jaguar 3rd 1500HP rig proposal meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 2 0 Global Town Hall mtg. TS bi-weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-03 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 GOM and global P&A opportunity review. P&A team meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-03 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 1 0 Support NCOC proposal. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-03 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 4 0 Star Energy 2000HP Geo-thermal Rig opportunity powerpoint slides Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Global Town Hall mtg. TS bi-weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-04 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 GOM and global P&A opportunity review. P&A team meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-04 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 6 0 Star Energy 2000HP Geo-thermal Rig opportunity powerpoint slides Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 6 0 Greenway 5 Office cleanout & move prep Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-05 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 2 0 Parker Jaguar 3rd 1500HP rig proposal meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-08 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 10 0 Draft Star Energy powerpoint slides, CTR and Tech Services and O&M proposal letter Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-09 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 7 0 Draft Star Energy powerpoint slides, CTR and Tech Services and O&M proposal letter Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-09 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 Suport Jaguar 3rd rig opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-09 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 Support Genesis Mob proposal Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-10 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Support Halliburton Suriname opportunity. P&A weekly meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-10 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 6 0 Draft Star Energy powerpoint slides, CTR and Tech Services and O&M proposal letter Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-10 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Safe clean start training Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-11 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 2 0 Support Halliburton Suriname opportunity. P&A weekly meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-11 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 6 0 Draft Star Energy powerpoint slides, CTR and Tech Services and O&M proposal letter Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-11 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 Suport Jaguar 3rd rig opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-12 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 8 0 Support evaluation of NCOC island optimization study Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-15 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Presidents Day Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-16 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 12 0 Draft Star Energy powerpoint slides, CTR and Tech Services and O&M proposal letter. Conf call.s Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-17 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 5 0 Support evaluation of NCOC island optimization study. Conf calls Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-17 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 5 0 Draft Star Energy powerpoint slides, CTR and Tech Services and O&M proposal letter. Conf call.s Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Tech Services bi-weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-18 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3 0 Support evaluation of NCOC island optimization study. Conf calls Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-18 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 2 0 Attempt Columbia conf call Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-19 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 4 0 Support evaluation of NCOC island optimization study. Conf calls Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-19 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 2 0 Jaguar 3rd rig opportunity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-22 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 5 0 Assemble NCOC Kazakhstan island optimization options and present feasability study to NCOC. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-22 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 4 0 Prepare rig build engineering & construction advisory histograms and present to Star Energy. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-23 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 4 0 Assemble Suriname Halliburton Barge options and attend meetings. Attend P&A meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-23 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3 0 Assemble NCOC Kazakhstan island optimization options and present feasability study to NCOC. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-23 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 2 0 Prepare rig build engineering & construction advisory histograms and present to Star Energy. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-24 OH-009 :OH-009 OH-009-018 Kazakhstan Regular Pay N 3 0 Assemble NCOC Kazakhstan island optimization options and present feasability study to NCOC. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-24 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 2 0 Prepare rig build engineering & construction advisory histograms and present to Star Energy. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-24 OH-009 :OH-009 OH-009-022 Colombia Regular Pay N 3 0 Attend SierraCol meeting for 550HP rig opportunnity. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-24 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 1 0 Assemble GOM CVX Barge scope of work, work order, proposal letter and schedule. Attend meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-25 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 5 0 Assemble Suriname Halliburton Barge options and attend meetings. Attend P&A meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-25 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 4 0 Prepare rig build engineering & construction advisory histograms and present to Star Energy. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-25 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 3 0 Assemble GOM CVX Barge scope of work, work order, proposal letter and schedule. Attend meetings. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-26 OH-009 :OH-009 OH-009-021 Mexico Regular Pay N 1 0 Attend Jaguar 3rd rig meeting. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-02-26 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 5 0 Assemble GOM CVX Barge scope of work, work order, proposal letter and schedule. Attend meetings. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-01 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Venturetech Weekly Status Meeting. CVX Genesis Tech Services Status Meet. Sawyer CVX Genesis Weekly Status Meeting. Interface Meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-01 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 1 0 Gaitronics & Wesco cable interconnect drawing done. Royal CCTV enclosure datasheet sent to Roger for LM installation. Jelec electrical components datasheet sent to Roger to discuss mounting plan. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-01 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 SAK weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-01 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2 0 Quote follow up with Pat from Gulf Coast. Rig 265 Upgrade quote send to Azzam to review. Rig 265 Drawing set sent to Bernard as per request. Rig 265 upgrade and Rig Layout plan sent to Azzam team to review. Request 1500KVA transformer for backup plan. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-01 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 Responded to Roger Gaitronics speaker cable installation QA. 2C, 18AWG Gaitroncs speaker cable purchased from Rexel and sent to New Iberia. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-02 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Venturetech Weekly Status Meeting. CVX Genesis Tech Services Status Meet. Sawyer CVX Genesis Weekly Status Meeting. Interface Meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-02 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1 0 Meeting with Troy/Roger to use Hilti Stud gun or not to install LED light bracket. Meeting with Duwayne to come up with LED light mounting options for PKD to review. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-02 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 3 0 Quote follow up with Pat from Gulf Coast. Rig 265 Upgrade quote send to Azzam to review. Rig 265 Drawing set sent to Bernard as per request. Rig 265 upgrade and Rig Layout plan sent to Azzam team to review. Request 1500KVA transformer for backup plan. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-02 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Responded to Roger Gaitronics speaker cable installation QA. 2C, 18AWG Gaitroncs speaker cable purchased from Rexel and sent to New Iberia. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-03 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 1 0 Gaitronics & Wesco cable interconnect drawing done. Royal CCTV enclosure datasheet sent to Roger for LM installation. Jelec electrical components datasheet sent to Roger to discuss mounting plan. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-03 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1 0 Meeting with Troy/Roger to use Hilti Stud gun or not to install LED light bracket. Meeting with Duwayne to come up with LED light mounting options for PKD to review. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-03 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 3 0 Quote follow up with Pat from Gulf Coast. Rig 265 Upgrade quote send to Azzam to review. Rig 265 Drawing set sent to Bernard as per request. Rig 265 upgrade and Rig Layout plan sent to Azzam team to review. Request 1500KVA transformer for backup plan. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-03 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 Responded to Roger Gaitronics speaker cable installation QA. 2C, 18AWG Gaitroncs speaker cable purchased from Rexel and sent to New Iberia. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-04 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Venturetech Weekly Status Meeting. CVX Genesis Tech Services Status Meet. Sawyer CVX Genesis Weekly Status Meeting. Interface Meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS Bi-weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-04 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 4 0 Quote follow up with Pat from Gulf Coast. Rig 265 Upgrade quote send to Azzam to review. Rig 265 Drawing set sent to Bernard as per request. Rig 265 upgrade and Rig Layout plan sent to Azzam team to review. Request 1500KVA transformer for backup plan. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-04 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Responded to Roger Gaitronics speaker cable installation QA. 2C, 18AWG Gaitroncs speaker cable purchased from Rexel and sent to New Iberia. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-05 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 1 0 Gaitronics & Wesco cable interconnect drawing done. Royal CCTV enclosure datasheet sent to Roger for LM installation. Jelec electrical components datasheet sent to Roger to discuss mounting plan. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-05 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 3 0 Quote follow up with Pat from Gulf Coast. Rig 265 Upgrade quote send to Azzam to review. Rig 265 Drawing set sent to Bernard as per request. Rig 265 upgrade and Rig Layout plan sent to Azzam team to review. Request 1500KVA transformer for backup plan. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-05 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Responded to Roger Gaitronics speaker cable installation QA. 2C, 18AWG Gaitroncs speaker cable purchased from Rexel and sent to New Iberia. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-08 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 Review Survey Scope for Genesis. Genesis Spar QA with Ivan PDCM. Venturetech Weekly Status Meeting. CVX Genesis Tech Services Status Meet. Sawyer CVX Genesis Weekly Status Meeting. Construction Bi-Weekly Status Call. Interface Meeting. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-08 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 1 0 CCTV Oneline from Royal. Change Notice Electrical Jelec. Provide datasheet to Roger for all Electrical components. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-08 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 SAK weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-08 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Review Open MR for Rig 265 with Chad. Rig 265 Upgrade meeting - Discuss Options for upgrade . Rig 265 Upgrade Options meeting with Jelec to get MCC sections. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-08 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Meeting with Chad ( Royal) to get extra Wellbay Camera and Control. Discuss Electrical components mounting option with Roger. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-09 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Review Survey Scope for Genesis. Genesis Spar QA with Ivan PDCM. Venturetech Weekly Status Meeting. CVX Genesis Tech Services Status Meet. Sawyer CVX Genesis Weekly Status Meeting. Construction Bi-Weekly Status Call. Interface Meeting. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-09 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 1 0 CCTV Oneline from Royal. Change Notice Electrical Jelec. Provide datasheet to Roger for all Electrical components. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-09 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 2 0 Review Open MR for Rig 265 with Chad. Rig 265 Upgrade meeting - Discuss Options for upgrade . Rig 265 Upgrade Options meeting with Jelec to get MCC sections. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-09 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 Meeting with Chad ( Royal) to get extra Wellbay Camera and Control. Discuss Electrical components mounting option with Roger. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-10 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Review Survey Scope for Genesis. Genesis Spar QA with Ivan PDCM. Venturetech Weekly Status Meeting. CVX Genesis Tech Services Status Meet. Sawyer CVX Genesis Weekly Status Meeting. Construction Bi-Weekly Status Call. Interface Meeting. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-10 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1 0 Survey Scope for Genesis Check list. RACI/ Genesis Spar Ship loose cable list. Create MR for Pony Sub light cable. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-10 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 4 0 Review Open MR for Rig 265 with Chad. Rig 265 Upgrade meeting - Discuss Options for upgrade . Rig 265 Upgrade Options meeting with Jelec to get MCC sections. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-10 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Meeting with Chad ( Royal) to get extra Wellbay Camera and Control. Discuss Electrical components mounting option with Roger. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-11 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Review Survey Scope for Genesis. Genesis Spar QA with Ivan PDCM. Venturetech Weekly Status Meeting. CVX Genesis Tech Services Status Meet. Sawyer CVX Genesis Weekly Status Meeting. Construction Bi-Weekly Status Call. Interface Meeting. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-11 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1 0 Survey Scope for Genesis Check list. RACI/ Genesis Spar Ship loose cable list. Create MR for Pony Sub light cable. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-11 OH-014 :OH-014 Overhead All Activities Regular Pay N 1 0 Safe Clean Start - Lunch & Learn Session 2 Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-11 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 3 0 Review Open MR for Rig 265 with Chad. Rig 265 Upgrade meeting - Discuss Options for upgrade . Rig 265 Upgrade Options meeting with Jelec to get MCC sections. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-11 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Meeting with Chad ( Royal) to get extra Wellbay Camera and Control. Discuss Electrical components mounting option with Roger. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-12 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 4 0 Review Open MR for Rig 265 with Chad. Rig 265 Upgrade meeting - Discuss Options for upgrade . Rig 265 Upgrade Options meeting with Jelec to get MCC sections. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-12 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Meeting with Chad ( Royal) to get extra Wellbay Camera and Control. Discuss Electrical components mounting option with Roger. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-15 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Holiday Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Loss of Power , No internet, Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Loss of Power , No internet, Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-18 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2 0 Genesis Spar Electrical Cable list completed and sent to Roger for Review. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TS weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-18 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 3 0 Rig 265 Upgrade - Bill of Material & MR discussion. Rig 265 Upgrade & Rig Layout. Quote Discussion from WWP with Bernard MCC Quote from Jelec Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-18 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Zip Tie issue discussed and resolve. Review Coast Guard Standards for Zip Tie. Bug Blower follow up with Rick from LM. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-19 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 4 0 Rig 265 Upgrade - Bill of Material & MR discussion. Rig 265 Upgrade & Rig Layout. Quote Discussion from WWP with Bernard MCC Quote from Jelec Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-19 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Zip Tie issue discussed and resolve. Review Coast Guard Standards for Zip Tie. Bug Blower follow up with Rick from LM. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-22 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Venturetech Weekly Status Meeting. CVX Genesis Tech Services Status Meet. Sawyer CVX Genesis Weekly Status Meeting. Construction Bi-Weekly Status Call. Interface Meeting. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-22 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 SAK weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-22 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 4 0 Discuss Rig 265 Upgrade - WWP Quote EI4411. Rig 265 - MCC Quote. Rig 265 Upgrade - New One line and Material . Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-22 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Genesis Spar - 3D model Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-23 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Venturetech Weekly Status Meeting. CVX Genesis Tech Services Status Meet. Sawyer CVX Genesis Weekly Status Meeting. Construction Bi-Weekly Status Call. Interface Meeting. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-23 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 4 0 Discuss Rig 265 Upgrade - WWP Quote EI4411. Rig 265 - MCC Quote. Rig 265 Upgrade - New One line and Material . Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-23 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Genesis Spar - 3D model Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-24 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Venturetech Weekly Status Meeting. CVX Genesis Tech Services Status Meet. Sawyer CVX Genesis Weekly Status Meeting. Construction Bi-Weekly Status Call. Interface Meeting. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-24 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 6 0 Discuss Rig 265 Upgrade - WWP Quote EI4411. Rig 265 - MCC Quote. Rig 265 Upgrade - New One line and Material . Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-24 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Genesis Spar - 3D model Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-25 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Venturetech Weekly Status Meeting. CVX Genesis Tech Services Status Meet. Sawyer CVX Genesis Weekly Status Meeting. Construction Bi-Weekly Status Call. Interface Meeting. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-25 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 1 0 Facilities Interface Questions. Genesis Spar - SS Zip Tie for Wellbay Camera Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-25 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 5 0 Discuss Rig 265 Upgrade - WWP Quote EI4411. Rig 265 - MCC Quote. Rig 265 Upgrade - New One line and Material . Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-25 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Genesis Spar - 3D model Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-26 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2 0 Genesis Spar - Non corrosive Fan for Dog House discussion with Roger. Power Required for Dog House Fan. LM LED light for Dog House confirmed. Working on Jelec components skid layout Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-02-26 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 6 0 Discuss Rig 265 Upgrade - WWP Quote EI4411. Rig 265 - MCC Quote. Rig 265 Upgrade - New One line and Material . Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-01 OH-011 :OH-011 Overhead All Activities Regular Pay N 7 0 Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-01 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Meeting w/ Mio (02/01/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-02 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-03 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Technical Services meeting (02/04/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-04 OH-011 :OH-011 Overhead All Activities Regular Pay N 7 0 Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-05 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-08 OH-011 :OH-011 Overhead All Activities Regular Pay N 7 0 Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-08 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Meeting with Mio (2/7/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-09 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Safe & Clean - Lunch & Learn (2/10/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-10 OH-011 :OH-011 Overhead All Activities Regular Pay N 7 0 Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-11 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-12 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-15 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 President's Day (2/15/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 (Loss of poser, no water, no internet, etc…). Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 (Loss of poser, no water, no internet, etc…). Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Technical Service Meeting (2/18/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-18 OH-011 :OH-011 Overhead All Activities Regular Pay N 7 0 (Loss of poser, no water, no internet, etc…). Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-19 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 (Loss of poser, no water, no internet, etc…). Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-22 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 1 0 2021 Smart goals update/route (02/22-23/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 Emails Timesheet Review progress/tasks/goals J.G. (02/22-23/21) Review tasks T.E. (02/22 & 25/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-22 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4.5 0 Meeting w/Mio. TSR-01778 PB Storage Rack review (02/22/21) TSR-01778 PB Storage Rack Solidworks to CAD dwgs. (02/22-23/21) TSR-01779 Additional Walkway Pipe Deck Review/PDF-CAD/Background Layout (02/23-26/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-23 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 1 0 2021 Smart goals update/route (02/22-23/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-23 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Review progress/tasks/goals J.G. (02/22-23/21) Review tasks T.E. (02/22 & 25/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-23 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 6.5 0 Meeting w/Mio. TSR-01778 PB Storage Rack review (02/22/21) TSR-01778 PB Storage Rack Solidworks to CAD dwgs. (02/22-23/21) TSR-01779 Additional Walkway Pipe Deck Review/PDF-CAD/Background Layout (02/23-26/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-24 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Review progress/tasks/goals J.G. (02/22-23/21) Review tasks T.E. (02/22 & 25/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-24 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7.5 0 Meeting w/Mio. TSR-01778 PB Storage Rack review (02/22/21) TSR-01778 PB Storage Rack Solidworks to CAD dwgs. (02/22-23/21) TSR-01779 Additional Walkway Pipe Deck Review/PDF-CAD/Background Layout (02/23-26/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Emails Timesheet Review progress/tasks/goals J.G. (02/22-23/21) Review tasks T.E. (02/22 & 25/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 7 0 Meeting w/Mio. TSR-01778 PB Storage Rack review (02/22/21) TSR-01778 PB Storage Rack Solidworks to CAD dwgs. (02/22-23/21) TSR-01779 Additional Walkway Pipe Deck Review/PDF-CAD/Background Layout (02/23-26/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Review progress/tasks/goals J.G. (02/22-23/21) Review tasks T.E. (02/22 & 25/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-02-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 5 0 Meeting w/Mio. TSR-01778 PB Storage Rack review (02/22/21) TSR-01778 PB Storage Rack Solidworks to CAD dwgs. (02/22-23/21) TSR-01779 Additional Walkway Pipe Deck Review/PDF-CAD/Background Layout (02/23-26/21) Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-01 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 4 0 status update meetings, winch wire rope RFQ, trip to platform planning, staging drawing review, torques gauge mounting, well center, snatch block requirements, flushing and pressure testing Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-01 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 3.5 0 master interface register and meeting, revised commissioning form list, continued work on commissioning forms (40 total), RU/SIT hoses, Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-01 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-02 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2.5 0 status update meetings, winch wire rope RFQ, trip to platform planning, staging drawing review, torques gauge mounting, well center, snatch block requirements, flushing and pressure testing Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-02 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 6 0 master interface register and meeting, revised commissioning form list, continued work on commissioning forms (40 total), RU/SIT hoses, Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-03 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 status update meetings, winch wire rope RFQ, trip to platform planning, staging drawing review, torques gauge mounting, well center, snatch block requirements, flushing and pressure testing Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-03 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 5 0 master interface register and meeting, revised commissioning form list, continued work on commissioning forms (40 total), RU/SIT hoses, Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-03 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.5 0 town hall meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-04 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2.5 0 status update meetings, winch wire rope RFQ, trip to platform planning, staging drawing review, torques gauge mounting, well center, snatch block requirements, flushing and pressure testing Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-04 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 5 0 master interface register and meeting, revised commissioning form list, continued work on commissioning forms (40 total), RU/SIT hoses, Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 town hall meeting, TS meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-05 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 status update meetings, winch wire rope RFQ, trip to platform planning, staging drawing review, torques gauge mounting, well center, snatch block requirements, flushing and pressure testing Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-05 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 5 0 master interface register and meeting, revised commissioning form list, continued work on commissioning forms (40 total), RU/SIT hoses, Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-08 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 4.5 0 status update meetings, winch wire rope MR, trip to platform planning, staging drawing review, torques gauge mounting, well center, diesel to HPU, exhaust sound and muffler, grasshopper installation, critical spares, revised commissioning form list, continued work on commissioning forms (41 total) Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-08 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1 0 began RU/SIT checklist, master interface register and meeting, RU/SIT hoses, Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 assisted in SAFI training Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-08 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-09 Berkut-TSR :Berkut-TSR TSR-01777-BERP Choke Manifold Skid Modifications Regular Pay N 1 0 analysis review, began analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-09 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 7.5 0 status update meetings, winch wire rope MR, trip to platform planning, staging drawing review, torques gauge mounting, well center, diesel to HPU, exhaust sound and muffler, grasshopper installation, critical spares, revised commissioning form list, continued work on commissioning forms (41 total) Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-10 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 6.5 0 status update meetings, winch wire rope MR, trip to platform planning, staging drawing review, torques gauge mounting, well center, diesel to HPU, exhaust sound and muffler, grasshopper installation, critical spares, revised commissioning form list, continued work on commissioning forms (41 total) Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-10 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1 0 began RU/SIT checklist, master interface register and meeting, RU/SIT hoses, Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-10 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 safe clean start lunch and learn Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-11 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 6.5 0 status update meetings, winch wire rope MR, trip to platform planning, staging drawing review, torques gauge mounting, well center, diesel to HPU, exhaust sound and muffler, grasshopper installation, critical spares, revised commissioning form list, continued work on commissioning forms (41 total) Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-11 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2 0 began RU/SIT checklist, master interface register and meeting, RU/SIT hoses, Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-12 Berkut-TSR :Berkut-TSR TSR-01777-BERP Choke Manifold Skid Modifications Regular Pay N 4 0 analysis review, began analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-12 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 1 0 status update meetings, winch wire rope MR, trip to platform planning, staging drawing review, torques gauge mounting, well center, diesel to HPU, exhaust sound and muffler, grasshopper installation, critical spares, revised commissioning form list, continued work on commissioning forms (41 total) Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-12 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1 0 began RU/SIT checklist, master interface register and meeting, RU/SIT hoses, Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-15 OH-008 :OH-008 Overhead All Activities Regular Pay N 8 0 Presidents Day Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-16 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 2 0 revised commissioning form list, continued work on commissioning forms (41 total) Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-16 OH-011 :OH-011 Overhead All Activities Regular Pay N 6 0 Storm Uri Loss of power, water, and internet Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-17 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Storm Uri Loss of power, water, and internet Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-18 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 3 0 first draft of RU/SIT checklist, master interface register, RU/SIT hoses, Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-18 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly Meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-18 OH-011 :OH-011 Overhead All Activities Regular Pay N 4 0 Storm Uri Loss of power, water, and internet Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-19 Berkut-TSR :Berkut-TSR TSR-01777-BERP Choke Manifold Skid Modifications Regular Pay N 3 0 Complete first draft of analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-19 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 5 0 revised commissioning form list, continued work on commissioning forms (41 total) Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-22 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2.5 0 status meetings, trip to platform planning, winch wire rope, facilities interface questions, Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-22 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 3 0 Venturetech FAT and punch list, revised commissioning form list, continued work on commissioning forms (41 total) Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-22 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1 0 RU/SIT checklist, master interface register, RU/SIT hoses Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-22 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 weekly meeting Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-23 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 3 0 status meetings, trip to platform planning, winch wire rope, facilities interface questions, Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-23 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 3 0 Venturetech FAT and punch list, revised commissioning form list, continued work on commissioning forms (41 total) Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-23 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 1 0 RU/SIT checklist, master interface register, RU/SIT hoses Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-24 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 9 0 Venturetech FAT and punch list, revised commissioning form list, continued work on commissioning forms (41 total) Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-25 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 status meetings, trip to platform planning, winch wire rope, facilities interface questions, Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-25 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 5 0 Venturetech FAT and punch list, revised commissioning form list, continued work on commissioning forms (41 total) Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-25 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2.5 0 RU/SIT checklist, master interface register, RU/SIT hoses Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-26 Berkut-TSR :Berkut-TSR TSR-01777-BERP Choke Manifold Skid Modifications Regular Pay N 1 0 final analysis report Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-26 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 status meetings, trip to platform planning, winch wire rope, facilities interface questions, Reck, John Engineer I 29656 Reck, John:Engineer I 2021-02-26 CVX Genesis :CVX Genesis TSR-1725-GENP-04 Construction Regular Pay N 5 0 Venturetech FAT and punch list, revised commissioning form list, continued work on commissioning forms (41 total)