Name Billing Class Employee No. Item Line Class Transaction Date Job No. Customer Service Item Notes Payroll Item Billable Employee Paid Day Rate Duration Days Remarks Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 emails, Exxon contact Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 timesheet, New Parker Wellbore reveal, IT access to Share Point Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-01 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 4 0 Willow, prep for meeting, meeting and discussions, OSA tasks, OSA schedule update, willow update with Nick, discussion with Byers NOV meeting and path forward Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-01 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 1 0 schedule and report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-04 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, PTO form, discussion with Kyle and signed letter, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-04 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 4 0 Willow, OSA pipecat call with NOV, review with Joshua, meeting with Nick, call with Larry, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-04 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 SAK meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 4 0 Update to org chart, Automation kick off meeting, update EAMR and send back to SAK, response to JR for ducting and Bookshelf access, meeting with Bo Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-04 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 2 0 Updates to report, verify status, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-05 Berkut-TSR :Berkut-TSR TSR-01797-BERP BOP Test Stump Replacement. Regular Pay N 6 0 Review, created CTR, modeled components, reviewed CTR, discussed scope with Genesis, sent RFQ, talked with Mio, review attachments sent from Mio and update Tecky Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, PTO form, discussion with Kyle and signed letter, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-05 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1.5 0 Willow, OSA pipecat call with NOV, review with Joshua, meeting with Nick, call with Larry, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-05 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.75 0 Update to org chart, Automation kick off meeting, update EAMR and send back to SAK, response to JR for ducting and Bookshelf access, meeting with Bo Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-06 Berkut-TSR :Berkut-TSR TSR-01797-BERP BOP Test Stump Replacement. Regular Pay N 4 0 Review, created CTR, modeled components, reviewed CTR, discussed scope with Genesis, sent RFQ, talked with Mio, review attachments sent from Mio and update Tecky Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 timesheet, PTO form, discussion with Kyle and signed letter, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-06 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1.5 0 Willow, OSA pipecat call with NOV, review with Joshua, meeting with Nick, call with Larry, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-06 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 Update to org chart, Automation kick off meeting, update EAMR and send back to SAK, response to JR for ducting and Bookshelf access, meeting with Bo Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-06 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 0.25 0 Updates to report, verify status, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-07 Berkut-TSR :Berkut-TSR TSR-01797-BERP BOP Test Stump Replacement. Regular Pay N 2.25 0 Review, created CTR, modeled components, reviewed CTR, discussed scope with Genesis, sent RFQ, talked with Mio, review attachments sent from Mio and update Tecky Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, PTO form, discussion with Kyle and signed letter, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-07 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2.5 0 Willow, OSA pipecat call with NOV, review with Joshua, meeting with Nick, call with Larry, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-07 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 Update to org chart, Automation kick off meeting, update EAMR and send back to SAK, response to JR for ducting and Bookshelf access, meeting with Bo Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-07 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 0.25 0 Updates to report, verify status, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-08 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Prep for Everly's Birthday Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-11 Berkut-TSR :Berkut-TSR TSR-01797-BERP BOP Test Stump Replacement. Regular Pay N 2 0 Review quote with Kyle and Tecky, update CTR, MR questions, facilitate PO, BOP weight study, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-11 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails. Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-11 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Willow activities Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-11 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 sak meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-11 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.25 0 Automation project Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-11 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 2.5 0 Meeting with Robbie/Sergey, update and correct report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-12 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 3 0 Willow activities Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-12 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 9 0 Meeting with Robbie/Sergey, update and correct report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-13 Berkut-TSR :Berkut-TSR TSR-01797-BERP BOP Test Stump Replacement. Regular Pay N 0.5 0 Review quote with Kyle and Tecky, update CTR, MR questions, facilitate PO, BOP weight study, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-13 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2.5 0 Willow activities Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-13 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.25 0 Automation project Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-13 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 5 0 Meeting with Robbie/Sergey, update and correct report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-14 Berkut-TSR :Berkut-TSR TSR-01797-BERP BOP Test Stump Replacement. Regular Pay N 0.75 0 Review quote with Kyle and Tecky, update CTR, MR questions, facilitate PO, BOP weight study, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-14 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1.5 0 Automation project Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-14 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 6 0 Meeting with Robbie/Sergey, update and correct report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-15 Berkut-TSR :Berkut-TSR TSR-01797-BERP BOP Test Stump Replacement. Regular Pay N 2.5 0 Review quote with Kyle and Tecky, update CTR, MR questions, facilitate PO, BOP weight study, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails. Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-15 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-15 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Willow activities Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-15 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Automation project Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-18 Berkut-TSR :Berkut-TSR TSR-01797-BERP BOP Test Stump Replacement. Regular Pay N 0.25 0 review and respond to Tecky, review report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 emails, meeting with Kennedy Fab Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-18 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2.5 0 meeting with Drillmec, review previous proposal, make list of questions for Conoco meeting, meeting with Conoco, discussion with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-18 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 SAK meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-18 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 review, search, and respond to Natalya for 270L reg docs, collect docs and send to Natalya, help with pressure washer TSR, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-18 Rig 209L-TSR :Rig 209L-TSR TSR-01752-209L Automation Upgrade Regular Pay N 1.75 0 respond to NOV questions for Automation project, review HVAC location concerns, weekly meeting, review other action items from meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-19 Berkut-TSR :Berkut-TSR TSR-01797-BERP BOP Test Stump Replacement. Regular Pay N 0.25 0 review and respond to Tecky, review report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 emails, meeting with Kennedy Fab Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-19 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 1.5 0 ESG discussion on new technology Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-19 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1.25 0 meeting with Drillmec, review previous proposal, make list of questions for Conoco meeting, meeting with Conoco, discussion with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2.5 0 review, search, and respond to Natalya for 270L reg docs, collect docs and send to Natalya, help with pressure washer TSR, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-19 Rig 209L-TSR :Rig 209L-TSR TSR-01752-209L Automation Upgrade Regular Pay N 2 0 respond to NOV questions for Automation project, review HVAC location concerns, weekly meeting, review other action items from meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-20 Berkut-TSR :Berkut-TSR TSR-01797-BERP BOP Test Stump Replacement. Regular Pay N 1.75 0 review and respond to Tecky, review report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.25 0 emails, meeting with Kennedy Fab Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-20 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2.5 0 meeting with Drillmec, review previous proposal, make list of questions for Conoco meeting, meeting with Conoco, discussion with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 2 0 review, search, and respond to Natalya for 270L reg docs, collect docs and send to Natalya, help with pressure washer TSR, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-20 Rig 209L-TSR :Rig 209L-TSR TSR-01752-209L Automation Upgrade Regular Pay N 2.5 0 respond to NOV questions for Automation project, review HVAC location concerns, weekly meeting, review other action items from meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-21 Berkut-TSR :Berkut-TSR TSR-01797-BERP BOP Test Stump Replacement. Regular Pay N 1.5 0 review and respond to Tecky, review report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-21 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 meeting with Drillmec, review previous proposal, make list of questions for Conoco meeting, meeting with Conoco, discussion with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-21 Rig 122-TSR :Rig 122-TSR TSR-01787-122L LP Mud System Modifications Regular Pay N 3 0 review closeout and create additional attachment Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-21 Rig 209L-TSR :Rig 209L-TSR TSR-01752-209L Automation Upgrade Regular Pay N 2.75 0 respond to NOV questions for Automation project, review HVAC location concerns, weekly meeting, review other action items from meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-21 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 1.75 0 Discussion with Kyle, Review previous schedules, propose response to Sergey, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-22 Berkut-TSR :Berkut-TSR TSR-01797-BERP BOP Test Stump Replacement. Regular Pay N 1.25 0 review and respond to Tecky, review report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-22 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 0.5 0 meeting with Drillmec, review previous proposal, make list of questions for Conoco meeting, meeting with Conoco, discussion with Kyle, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-22 Rig 122-TSR :Rig 122-TSR TSR-01787-122L LP Mud System Modifications Regular Pay N 2 0 review closeout and create additional attachment Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-22 Rig 209L-TSR :Rig 209L-TSR TSR-01752-209L Automation Upgrade Regular Pay N 1.25 0 respond to NOV questions for Automation project, review HVAC location concerns, weekly meeting, review other action items from meeting, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-25 Berkut-TSR :Berkut-TSR TSR-01797-BERP BOP Test Stump Replacement. Regular Pay N 1.5 0 Closeout report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-25 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 5.5 0 review Kyle's Conoco presentation and offer response, update presentation with new formatting, meeting with NOV, CPAI slides, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-25 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 weekly meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 respond to Mio's 270L question, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-25 Rig 209L-TSR :Rig 209L-TSR TSR-01752-209L Automation Upgrade Regular Pay N 0.25 0 Add Bo to meeting, request from John, meeting with Nadir, weekly meeting, hvac meeting with Lam, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-26 Berkut-TSR :Berkut-TSR TSR-01797-BERP BOP Test Stump Replacement. Regular Pay N 0.5 0 Closeout report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 0.5 0 respond to Svetlana's request Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-26 OH-009 :OH-009 OH-009-007 General Business Development Support Regular Pay N 0.5 0 review and add to Kyle's quote Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-26 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 5 0 review Kyle's Conoco presentation and offer response, update presentation with new formatting, meeting with NOV, CPAI slides, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-26 Rig 209L-TSR :Rig 209L-TSR TSR-01752-209L Automation Upgrade Regular Pay N 0.5 0 Add Bo to meeting, request from John, meeting with Nadir, weekly meeting, hvac meeting with Lam, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-26 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 1.25 0 respond to Sergey, review NCOC comments, create spreadsheet and responses, review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-27 Berkut-TSR :Berkut-TSR TSR-01797-BERP BOP Test Stump Replacement. Regular Pay N 1.5 0 Closeout report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-27 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 3.75 0 review Kyle's Conoco presentation and offer response, update presentation with new formatting, meeting with NOV, CPAI slides, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-27 Rig 209L-TSR :Rig 209L-TSR TSR-01752-209L Automation Upgrade Regular Pay N 1.5 0 Add Bo to meeting, request from John, meeting with Nadir, weekly meeting, hvac meeting with Lam, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-27 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 2.5 0 respond to Sergey, review NCOC comments, create spreadsheet and responses, review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-28 Berkut-TSR :Berkut-TSR TSR-01797-BERP BOP Test Stump Replacement. Regular Pay N 1.5 0 Closeout report Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 TSR meeting Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-28 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1.25 0 review Kyle's Conoco presentation and offer response, update presentation with new formatting, meeting with NOV, CPAI slides, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-28 Rig 209L-TSR :Rig 209L-TSR TSR-01752-209L Automation Upgrade Regular Pay N 2 0 Add Bo to meeting, request from John, meeting with Nadir, weekly meeting, hvac meeting with Lam, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-28 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 3.5 0 respond to Sergey, review NCOC comments, create spreadsheet and responses, review Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 timesheet Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-29 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 0.5 0 review Kyle's Conoco presentation and offer response, update presentation with new formatting, meeting with NOV, CPAI slides, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-29 Rig 209L-TSR :Rig 209L-TSR TSR-01752-209L Automation Upgrade Regular Pay N 2 0 Add Bo to meeting, request from John, meeting with Nadir, weekly meeting, hvac meeting with Lam, Elenburg, Tyler Engineer II 34119 Elenburg, Tyler:Engineer II 2021-10-29 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 1.75 0 respond to Sergey, review NCOC comments, create spreadsheet and responses, review Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-01 Rig 165L-TSR :Rig 165L-TSR TSR-01794-165L Skidding Package Regular Pay N 3.5 0 (09/27/21) Continued 165 skidding layout. call with Al to discuss information needed. (09/28/21) Plot plan -165 clean up. (09/29/21) Reviewed info from the field and saved on Q. Scheduled 165 review meeting with Mexico. Sent preliminary site layouts to field for review. Call with Kyle to discuss progress. (09/30/21) Saved info from field. (10/01/21) Updated layouts for meeting. Review/ status call with Mexico. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-01 Rig 165L-TSR :Rig 165L-TSR TSR-01798-165L Tesco TDS Installation Regular Pay N 2.5 0 (10/01/21) saved TSR info to the Q. Reviewed scope and pulled reference information. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.25 0 (10/04/21) Connection issue - re-mapped Q drive. Updated weekly timesheet and submitted. Review/approved designer timesheets. Update call with Jorge. (10/05/21) Review additional timesheets for designers. Update call with Kyle. (10/06/21) call with Tyler to review Berkut BOP info. (10/07/21) Update call with Jorge. Update call with Lam. Update with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-04 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 5.75 0 (10/04/21) Reviewed options for 249L pallet dock - scheduled meeting with Robbie. Checked chemical platform ramp extension drawing. (10/05/21) Sent final comments to Jorge. Sketch for 249L pallet dock. (10/06/21) Started new sketch for dock option. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-04 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 0.25 0 (10/04/21) Sent 247L electrical drawing package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-04 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.5 0 (10/04/21) 165L layout with 271L genset package - for Al. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-04 Rig 165L-TSR :Rig 165L-TSR TSR-01798-165L Tesco TDS Installation Regular Pay N 0.25 0 (10/04/21) Saved reference info to the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (10/04/21) Connection issue - re-mapped Q drive. Updated weekly timesheet and submitted. Review/approved designer timesheets. Update call with Jorge. (10/05/21) Review additional timesheets for designers. Update call with Kyle. (10/06/21) call with Tyler to review Berkut BOP info. (10/07/21) Update call with Jorge. Update call with Lam. Update with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-05 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 (10/04/21) Reviewed options for 249L pallet dock - scheduled meeting with Robbie. Checked chemical platform ramp extension drawing. (10/05/21) Sent final comments to Jorge. Sketch for 249L pallet dock. (10/06/21) Started new sketch for dock option. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-05 Rig 165L-TSR :Rig 165L-TSR TSR-01794-165L Skidding Package Regular Pay N 6.5 0 (10/05/21) Sketched jacking beams per field information. (10/06/21) Finalized beams. Reviewed 165L suitcase info and saved on the Q. Call with Al to review info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (10/04/21) Connection issue - re-mapped Q drive. Updated weekly timesheet and submitted. Review/approved designer timesheets. Update call with Jorge. (10/05/21) Review additional timesheets for designers. Update call with Kyle. (10/06/21) call with Tyler to review Berkut BOP info. (10/07/21) Update call with Jorge. Update call with Lam. Update with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-06 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 2.5 0 (10/04/21) Reviewed options for 249L pallet dock - scheduled meeting with Robbie. Checked chemical platform ramp extension drawing. (10/05/21) Sent final comments to Jorge. Sketch for 249L pallet dock. (10/06/21) Started new sketch for dock option. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-06 Rig 165L-TSR :Rig 165L-TSR TSR-01794-165L Skidding Package Regular Pay N 2.5 0 (10/05/21) Sketched jacking beams per field information. (10/06/21) Finalized beams. Reviewed 165L suitcase info and saved on the Q. Call with Al to review info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-06 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 2.5 0 (10/06/21 - 10/08/21) Continued to layout 269L LP mud mods (added pits) - CVX Bangladesh. Fire/Gas layout to Ripal - reviewed info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (10/04/21) Connection issue - re-mapped Q drive. Updated weekly timesheet and submitted. Review/approved designer timesheets. Update call with Jorge. (10/05/21) Review additional timesheets for designers. Update call with Kyle. (10/06/21) call with Tyler to review Berkut BOP info. (10/07/21) Update call with Jorge. Update call with Lam. Update with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-07 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 7 0 (10/06/21 - 10/08/21) Continued to layout 269L LP mud mods (added pits) - CVX Bangladesh. Fire/Gas layout to Ripal - reviewed info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-08 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 6 0 (10/06/21 - 10/08/21) Continued to layout 269L LP mud mods (added pits) - CVX Bangladesh. Fire/Gas layout to Ripal - reviewed info. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 (10/11/21) Updated weekly timesheet and submitted for approval. Discussed ODPL/209L drawing files with Lam/Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-11 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.25 0 (10/11/21) Weekly TSR status call. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-11 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1.5 0 (10/11/21) Created new folder and saved information for chemical pallet dock drawings on Q. Call with Robbie to review concept for pallet docks. (10/12/21) Started new sketch for pallet dock concepts. (10/13/21) Cleaned up pallet sketch. Call with Jorge to discuss scope and review pallet dock concepts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-11 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 4.75 0 (10/11/21) Updated LP piping modification drawings to show mud gun installation. Continued discharge piping layouts. (10/12/21) Started LP mud schematic. (10/13/21) Continued with LP mud schematic. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-12 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 3 0 (10/11/21) Created new folder and saved information for chemical pallet dock drawings on Q. Call with Robbie to review concept for pallet docks. (10/12/21) Started new sketch for pallet dock concepts. (10/13/21) Cleaned up pallet sketch. Call with Jorge to discuss scope and review pallet dock concepts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-12 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 5 0 (10/11/21) Updated LP piping modification drawings to show mud gun installation. Continued discharge piping layouts. (10/12/21) Started LP mud schematic. (10/13/21) Continued with LP mud schematic. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-13 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 4 0 (10/11/21) Created new folder and saved information for chemical pallet dock drawings on Q. Call with Robbie to review concept for pallet docks. (10/12/21) Started new sketch for pallet dock concepts. (10/13/21) Cleaned up pallet sketch. Call with Jorge to discuss scope and review pallet dock concepts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-13 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 1 0 (10/13/21) Checked final hoist installation drawing for 253L. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-13 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 3 0 (10/11/21) Updated LP piping modification drawings to show mud gun installation. Continued discharge piping layouts. (10/12/21) Started LP mud schematic. (10/13/21) Continued with LP mud schematic. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-14 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-18 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 (10/18/21) Updated weekly timesheet and submitted for approval. Update with Tyler. Review/Approve designer timesheets. (10/19/21) Update with Kyle. Update call with Jorge P. (10/20/21) Update with Kyle. (10/21/21) Update with Lam. Firm alarm at corp office. (10/21/21) Update with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-18 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 2 0 (10/18/21) Pulled a new proposal number and created folder on Q (Genel rigless operations-Camps) Scaled reference drawing from field. Email request for module information. (10/19/21) Started on rig camp layout. (10/20/21 - 10/21/21) Continued with camp layouts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-18 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 0.25 0 (10/18/21) Archived 253L hoist drawings on the Q. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-18 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.5 0 (10/18/21) Started general list of open items for Mexico rigs. (10/20/21) Created Mexico tracking list to track open items/progress. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-18 Rig 122-TSR :Rig 122-TSR TSR-01787-122L LP Mud System Modifications Regular Pay N 0.25 0 (10/18/21) Follow up emails with field to verify status. (10/21/21) Reviewed closeout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-18 Rig 256L-TSR :Rig 256L-TSR TSR-1799-256L Bowing on Mud Pits Regular Pay N 1.75 0 (10/18/21) Reviewed scope of TSR. Created files on Q and pulled reference information to support. (10/19/21) Call with Kyle to review scope. (10/20/21) Call with Mexico to review scope/deliverables for tech services. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-18 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 2 0 (10/18/21) Added 247L tank equipment info to LP mud schematic. (10/21/21) reviewed sensor layout drawing with Ripal. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (10/18/21) Updated weekly timesheet and submitted for approval. Update with Tyler. Review/Approve designer timesheets. (10/19/21) Update with Kyle. Update call with Jorge P. (10/20/21) Update with Kyle. (10/21/21) Update with Lam. Firm alarm at corp office. (10/21/21) Update with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-19 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6.25 0 (10/18/21) Pulled a new proposal number and created folder on Q (Genel rigless operations-Camps) Scaled reference drawing from field. Email request for module information. (10/19/21) Started on rig camp layout. (10/20/21 - 10/21/21) Continued with camp layouts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-19 Rig 165L-TSR :Rig 165L-TSR TSR-01794-165L Skidding Package Regular Pay N 0.5 0 (10/19/21) Update call with German. (10/20/21) Meeting with Lee C Moore to discuss skidding analysis. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-19 Rig 256L-TSR :Rig 256L-TSR TSR-1799-256L Bowing on Mud Pits Regular Pay N 0.5 0 (10/18/21) Reviewed scope of TSR. Created files on Q and pulled reference information to support. (10/19/21) Call with Kyle to review scope. (10/20/21) Call with Mexico to review scope/deliverables for tech services. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 (10/18/21) Updated weekly timesheet and submitted for approval. Update with Tyler. Review/Approve designer timesheets. (10/19/21) Update with Kyle. Update call with Jorge P. (10/20/21) Update with Kyle. (10/21/21) Update with Lam. Firm alarm at corp office. (10/21/21) Update with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-20 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 4.25 0 (10/18/21) Pulled a new proposal number and created folder on Q (Genel rigless operations-Camps) Scaled reference drawing from field. Email request for module information. (10/19/21) Started on rig camp layout. (10/20/21 - 10/21/21) Continued with camp layouts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-20 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 (10/18/21) Started general list of open items for Mexico rigs. (10/20/21) Created Mexico tracking list to track open items/progress. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-20 Rig 122-TSR :Rig 122-TSR TSR-01774-122L Existing BOP Hoist Installation Regular Pay N 1 0 (10/20/21) Saved new hoist load testing info to the Q. Discussed with Kyle. (10/21/21) Reviewed load test - translated to English. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-20 Rig 165L-TSR :Rig 165L-TSR TSR-01794-165L Skidding Package Regular Pay N 0.75 0 (10/19/21) Update call with German. (10/20/21) Meeting with Lee C Moore to discuss skidding analysis. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-20 Rig 256L-TSR :Rig 256L-TSR TSR-1799-256L Bowing on Mud Pits Regular Pay N 0.75 0 (10/18/21) Reviewed scope of TSR. Created files on Q and pulled reference information to support. (10/19/21) Call with Kyle to review scope. (10/20/21) Call with Mexico to review scope/deliverables for tech services. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (10/18/21) Updated weekly timesheet and submitted for approval. Update with Tyler. Review/Approve designer timesheets. (10/19/21) Update with Kyle. Update call with Jorge P. (10/20/21) Update with Kyle. (10/21/21) Update with Lam. Firm alarm at corp office. (10/21/21) Update with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-21 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 3.25 0 (10/18/21) Pulled a new proposal number and created folder on Q (Genel rigless operations-Camps) Scaled reference drawing from field. Email request for module information. (10/19/21) Started on rig camp layout. (10/20/21 - 10/21/21) Continued with camp layouts. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-21 Rig 122-TSR :Rig 122-TSR TSR-01774-122L Existing BOP Hoist Installation Regular Pay N 1.25 0 (10/20/21) Saved new hoist load testing info to the Q. Discussed with Kyle. (10/21/21) Reviewed load test - translated to English. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-21 Rig 122-TSR :Rig 122-TSR TSR-01783-122L Addition of Hoist Padeyes (crown) Regular Pay N 1.5 0 (10/21/21) Updates to closeout - sent to Kyle for review. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-21 Rig 122-TSR :Rig 122-TSR TSR-01787-122L LP Mud System Modifications Regular Pay N 0.75 0 (10/18/21) Follow up emails with field to verify status. (10/21/21) Reviewed closeout. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-21 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 0.75 0 (10/18/21) Added 247L tank equipment info to LP mud schematic. (10/21/21) reviewed sensor layout drawing with Ripal. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (10/18/21) Updated weekly timesheet and submitted for approval. Update with Tyler. Review/Approve designer timesheets. (10/19/21) Update with Kyle. Update call with Jorge P. (10/20/21) Update with Kyle. (10/21/21) Update with Lam. Firm alarm at corp office. (10/21/21) Update with Lam. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-22 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 3.75 0 (10/22/21) Pulled a new P number for 51B Air Products tender and created folders on the Q. Searched for reference drawings and saved under proposal folder. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-22 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 2 0 (10/22/21) Reviewed concept layouts from Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 (10/25/21) Updated weekly timesheet and submitted for approval. (10/27/21) Review/approved designer's timesheets. (10/28/21) Software discussion with vendor. (10/29/21) Update call with Lam. Update call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-25 OH-009 :OH-009 OH-009-023 Gulf of Mexico Regular Pay N 4.75 0 (10/25/21) Call with Scotty to discuss 51B drawing request. Started drawing package for Air Products tender. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-25 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.25 0 (10/25/21) Call with Loadmaster to review Berkut anchor beam concept. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-25 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 (10/25/21) Discussed 249L pallet dock concepts with Kyle. Call with Jorge to review design changes. (10/26/21) Reviewed updated sketch from Jorge. Sent comments. (10/27/21) Updates from Jorge. Sent sketch to Robbie for review/comment. (10/28/21) Discussed with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-25 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1.5 0 (10/25/21) Reviewed 122L sketch/info request from German. Updated hoist layout per field dimension and sent information back to the field. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-26 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 6.75 0 (10/26/21) Started Genel Sarta-6 Site layouts (Rig265). (10/27/21) Site updates. (10/28/21) Updated layouts per field comments. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-26 OH-009 :OH-009 OH-009-030 Latin America (LATAM) Regular Pay N 0.25 0 (10/26/21) Call with Kyle/Greg to discuss Pluspetrol. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-26 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 0.5 0 (10/26/21) Call with Kyle to discuss adding mud logging unit on 272L. (10/27/21) Reviewed unit location with Kyle. Discussed install with Lam. Pulled reference drawings and sketched unit location for discussion. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-26 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 (10/25/21) Discussed 249L pallet dock concepts with Kyle. Call with Jorge to review design changes. (10/26/21) Reviewed updated sketch from Jorge. Sent comments. (10/27/21) Updates from Jorge. Sent sketch to Robbie for review/comment. (10/28/21) Discussed with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.25 0 (10/25/21) Updated weekly timesheet and submitted for approval. (10/27/21) Review/approved designer's timesheets. (10/28/21) Software discussion with vendor. (10/29/21) Update call with Lam. Update call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-27 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 4.25 0 (10/26/21) Started Genel Sarta-6 Site layouts (Rig265). (10/27/21) Site updates. (10/28/21) Updated layouts per field comments. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-27 OH-034 :OH-034 OH-034-002 Alaska Regular Pay N 3 0 (10/26/21) Call with Kyle to discuss adding mud logging unit on 272L. (10/27/21) Reviewed unit location with Kyle. Discussed install with Lam. Pulled reference drawings and sketched unit location for discussion. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-27 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 1 0 (10/25/21) Discussed 249L pallet dock concepts with Kyle. Call with Jorge to review design changes. (10/26/21) Reviewed updated sketch from Jorge. Sent comments. (10/27/21) Updates from Jorge. Sent sketch to Robbie for review/comment. (10/28/21) Discussed with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 (10/28/21) Bi-weekly TSR call. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 (10/28/21) Discussed camp layouts with Ripal. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.75 0 (10/25/21) Updated weekly timesheet and submitted for approval. (10/27/21) Review/approved designer's timesheets. (10/28/21) Software discussion with vendor. (10/29/21) Update call with Lam. Update call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-28 OH-009 :OH-009 OH-009-019 Iraq Regular Pay N 4.5 0 (10/26/21) Started Genel Sarta-6 Site layouts (Rig265). (10/27/21) Site updates. (10/28/21) Updated layouts per field comments. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-28 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 0.75 0 (10/25/21) Discussed 249L pallet dock concepts with Kyle. Call with Jorge to review design changes. (10/26/21) Reviewed updated sketch from Jorge. Sent comments. (10/27/21) Updates from Jorge. Sent sketch to Robbie for review/comment. (10/28/21) Discussed with Kyle. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-28 Rig 216L-TSR :Rig 216L-TSR TSR-01760-216L LP Mud Valve Installation Regular Pay N 1 0 (10/28/21) Reviewed open TSR scope/status (216L LP mud changes). (10/29/21) Pulled reference info and saved on Q under TSR folders. Started closeout package. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.25 0 (10/25/21) Updated weekly timesheet and submitted for approval. (10/27/21) Review/approved designer's timesheets. (10/28/21) Software discussion with vendor. (10/29/21) Update call with Lam. Update call with Jorge. Gasper, James Supervising Designer/Checker 23139 Gasper, James:Supervising Designer/Checker 2021-10-29 Rig 216L-TSR :Rig 216L-TSR TSR-01760-216L LP Mud Valve Installation Regular Pay N 4.75 0 (10/28/21) Reviewed open TSR scope/status (216L LP mud changes). (10/29/21) Pulled reference info and saved on Q under TSR folders. Started closeout package. Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-10-01 OH-001 :OH-001 Overhead All Activities Regular Pay N 4 0 Lambert, Joshua Project Manager JOSHLAMBERT Lambert, Joshua:Project Manager 2021-10-02 CVX Genesis :CVX Genesis Default Default Task Regular Pay N 4 0 onitor and control scope, cost, and schedule, RU & SIT Planning and Execution, Direct rigup and commissioning managers, lead site project, O&M Work Order Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-01 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.5 0 Heat issues Punch lists PO approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-01 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Timesheets Personnel schedules - HR forms Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-01 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1.75 0 Willow Project - meetings, research Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-01 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 chevron bangladesh Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-01 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 2.5 0 122L mast Repair / 122L winch relocation 165L skidding 165L Top Drive Damage / New Top Drive Request Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-02 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Heat issues Punch lists PO approvals Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-04 Berkut-TSR :Berkut-TSR TSR-01797-BERP BOP Test Stump Replacement. Regular Pay N 0.75 0 CTR review Genesis quote review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-04 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2.5 0 Hydraulic issues Personnel administration Punch List review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 ANAO Weekly Meeting Arturo meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-04 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.75 0 Budget and Forecast Timesheet approvals Atlantic Canada Engineer Interviews Logo/Legal entity discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-04 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2.5 0 Automation CTR Meetings with Ops Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-04 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 WIllow Tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-04 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 Weekly Meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-04 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 2 0 Electrical SoW Meetings / Discussions Action item list Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-05 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Hydraulic issues Personnel administration Punch List review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-05 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 ANAO Weekly Meeting Arturo meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 2.5 0 Budget and Forecast Timesheet approvals Atlantic Canada Engineer Interviews Logo/Legal entity discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-05 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 0.5 0 Automation CTR Meetings with Ops Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-05 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 0.75 0 WIllow Tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-05 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1.5 0 122L Mast repair 165L skidding Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-05 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 0.5 0 Report review / meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-05 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 1.5 0 Electrical SoW Meetings / Discussions Action item list Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-06 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.75 0 Hydraulic issues Personnel administration Punch List review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-06 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Budget and Forecast Timesheet approvals Atlantic Canada Engineer Interviews Logo/Legal entity discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-06 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 Automation CTR Meetings with Ops Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-06 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 WIllow Tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-06 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 2 0 122L Mast repair 165L skidding Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-06 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 1 0 Report review / meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-06 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 1.5 0 Electrical SoW Meetings / Discussions Action item list Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-07 Berkut-TSR :Berkut-TSR TSR-01797-BERP BOP Test Stump Replacement. Regular Pay N 0.75 0 CTR review Genesis quote review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-07 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Hydraulic issues Personnel administration Punch List review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-07 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Budget and Forecast Timesheet approvals Atlantic Canada Engineer Interviews Logo/Legal entity discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-07 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 0.75 0 Automation CTR Meetings with Ops Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-07 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1.5 0 WIllow Tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-07 OH-014 :OH-014 Overhead All Activities Regular Pay N 1.5 0 Budget refresher training Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-07 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 1 0 Electrical SoW Meetings / Discussions Action item list Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-08 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Hydraulic issues Personnel administration Punch List review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-08 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 ANAO Weekly Meeting Arturo meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Budget and Forecast Timesheet approvals Atlantic Canada Engineer Interviews Logo/Legal entity discussions Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-08 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 WIllow Tender Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-08 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.5 0 122L Mast repair 165L skidding Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-08 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 1 0 Report review / meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-08 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 1 0 Electrical SoW Meetings / Discussions Action item list Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-11 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 PO approvals Personnel administration Hydraulic issue Punchlist items Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Technical Services 2022 Budget Worksheet Personnel administration Weekly update to Arturo Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-11 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 209L automation - pre-CTR approval support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-11 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.5 0 TSR closeout review 165L skidding 256 mud tanks Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-11 Rig 249L-TSR :Rig 249L-TSR TSR-01728-249L Chemical Platform Loading Ramp Regular Pay N 0.75 0 Drawing review / redline Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-11 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 2 0 Report review and revision Meetings with KAZ Ops Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-11 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 1 0 LP mud system sketch review Electrical scope review CC's with GO Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-12 Berkut-TSR :Berkut-TSR TSR-01797-BERP BOP Test Stump Replacement. Regular Pay N 0.5 0 Review Genesis scope of work Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-12 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 PO approvals Personnel administration Hydraulic issue Punchlist items Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Technical Services 2022 Budget Worksheet Personnel administration Weekly update to Arturo Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-12 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1.5 0 209L automation - pre-CTR approval support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-12 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 3 0 Willow meeting and preparation NOV NDA amendment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-12 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.5 0 TSR closeout review 165L skidding 256 mud tanks Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-12 Rig 249L-TSR :Rig 249L-TSR TSR-01728-249L Chemical Platform Loading Ramp Regular Pay N 0.75 0 Drawing review / redline Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-12 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 1 0 Report review and revision Meetings with KAZ Ops Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-13 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 PO approvals Personnel administration Hydraulic issue Punchlist items Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Technical Services 2022 Budget Worksheet Personnel administration Weekly update to Arturo Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-13 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1 0 209L automation - pre-CTR approval support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-13 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Willow meeting and preparation NOV NDA amendment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-13 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 2 0 Report review and revision Meetings with KAZ Ops Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-13 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 1 0 LP mud system sketch review Electrical scope review CC's with GO Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-14 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 PO approvals Personnel administration Hydraulic issue Punchlist items Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Bi-weekly technical services meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-14 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Technical Services 2022 Budget Worksheet Personnel administration Weekly update to Arturo Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-14 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1.5 0 209L automation - pre-CTR approval support Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-14 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 Willow meeting and preparation NOV NDA amendment Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-14 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.5 0 TSR closeout review 165L skidding 256 mud tanks Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-14 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 1 0 Report review and revision Meetings with KAZ Ops Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-14 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 1.5 0 LP mud system sketch review Electrical scope review CC's with GO Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-15 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-19 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Punchlist review Punchlist meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-19 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 TImesheet approvals A&E Policy Personnel administration Update to Arturo Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-19 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 0.5 0 Willow presentation for Nick Meetings to discuss path forward Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-19 OH-014 :OH-014 Overhead All Activities Regular Pay N 3 0 MPD site visit with GO and CS Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-19 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Non-billable for automation upgrade Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-19 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 0.5 0 165 skidding meeting with LCM Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-19 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 1 0 Fire and gas system Meetings with GO Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-20 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Punchlist review Punchlist meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-20 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 TImesheet approvals A&E Policy Personnel administration Update to Arturo Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-20 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Willow presentation for Nick Meetings to discuss path forward Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-20 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Non-billable for automation upgrade Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-20 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 165 skidding meeting with LCM Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-20 OH-036 :OH-036 OH-036-01 Technology Think Tank Regular Pay N 0.75 0 Monthly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-20 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 0.5 0 Fire and gas system Meetings with GO Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-21 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 2 0 Punchlist review Punchlist meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-21 OH-006 :OH-006 Overhead All Activities Regular Pay N 0.5 0 TImesheet approvals A&E Policy Personnel administration Update to Arturo Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-21 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Willow presentation for Nick Meetings to discuss path forward Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-21 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Non-billable for automation upgrade Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-21 Rig 122-TSR :Rig 122-TSR TSR-01783-122L Addition of Hoist Padeyes (crown) Regular Pay N 1 0 Review closeout / approve Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-21 Rig 122-TSR :Rig 122-TSR TSR-01787-122L LP Mud System Modifications Regular Pay N 2 0 create closeout / submit for transmittal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-21 Rig 209L-TSR :Rig 209L-TSR TSR-01752-209L Automation Upgrade Regular Pay N 2 0 Weekly meeting and providing info to NOV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-21 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 1 0 Fire and gas system Meetings with GO Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-22 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Punchlist review Punchlist meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-22 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 TImesheet approvals A&E Policy Personnel administration Update to Arturo Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-22 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 Willow presentation for Nick Meetings to discuss path forward Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-22 Rig 122-TSR :Rig 122-TSR TSR-01783-122L Addition of Hoist Padeyes (crown) Regular Pay N 1 0 Review closeout / approve Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-22 Rig 122-TSR :Rig 122-TSR TSR-01787-122L LP Mud System Modifications Regular Pay N 1 0 create closeout / submit for transmittal Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-22 Rig 209L-TSR :Rig 209L-TSR TSR-01752-209L Automation Upgrade Regular Pay N 1 0 Weekly meeting and providing info to NOV Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-22 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 1 0 Fire and gas system Meetings with GO Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-24 OH-006 :OH-006 Overhead All Activities Regular Pay N 1.5 0 Technical Services Hours Summary Update report to AP IMS restructure support A&E Policy Discussion Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-24 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 1.5 0 Meeting with NOV Meetings with GO / RP ELT Meeting Scope of Work Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-25 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1.5 0 Administration meetings set-up by JL PO Approvals CN Register review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-25 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Technical Services Hours Summary Update report to AP IMS restructure support A&E Policy Discussion Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-25 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2 0 CPAI Willow Project - meetings, presentation, more meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-25 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.75 0 Weekly meeting Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR Admin Automation Unbillable Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-25 Rig 209L-TSR :Rig 209L-TSR TSR-01752-209L Automation Upgrade Regular Pay N 0.75 0 NOV Weekly Meeting HVAC Discussiion Supporting project set-up Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-25 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 1 0 Meeting with NOV Meetings with GO / RP ELT Meeting Scope of Work Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-26 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Administration meetings set-up by JL PO Approvals CN Register review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-26 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Technical Services Hours Summary Update report to AP IMS restructure support A&E Policy Discussion Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-26 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 CPAI Willow Project - meetings, presentation, more meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-26 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR Admin Automation Unbillable Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-26 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 122L Mud Tanks - review correspondence Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-26 OH-036 :OH-036 OH-036-01 Technology Think Tank Regular Pay N 1 0 GPS for Rig(s) and Equipment - CC Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-26 Rig 209L-TSR :Rig 209L-TSR TSR-01752-209L Automation Upgrade Regular Pay N 0.5 0 NOV Weekly Meeting HVAC Discussiion Supporting project set-up Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-26 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 0.5 0 NCOC Comments review Review register / meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-26 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 0.5 0 Meeting with NOV Meetings with GO / RP ELT Meeting Scope of Work Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-27 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Administration meetings set-up by JL PO Approvals CN Register review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Technical Services Hours Summary Update report to AP IMS restructure support A&E Policy Discussion Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-27 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 2.5 0 CPAI Willow Project - meetings, presentation, more meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-27 Rig 122-TSR :Rig 122-TSR TSR-01783-122L Addition of Hoist Padeyes (crown) Regular Pay N 1 0 Finalize clseout Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-27 Rig 209L-TSR :Rig 209L-TSR TSR-01752-209L Automation Upgrade Regular Pay N 0.75 0 NOV Weekly Meeting HVAC Discussiion Supporting project set-up Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-27 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 1 0 NCOC Comments review Review register / meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-27 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 2.5 0 Meeting with NOV Meetings with GO / RP ELT Meeting Scope of Work Review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-28 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Administration meetings set-up by JL PO Approvals CN Register review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-28 OH-006 :OH-006 Overhead All Activities Regular Pay N 2 0 Technical Services Hours Summary Update report to AP IMS restructure support A&E Policy Discussion Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-28 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1.5 0 CPAI Willow Project - meetings, presentation, more meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 TSR Admin Automation Unbillable Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-28 Rig 209L-TSR :Rig 209L-TSR TSR-01752-209L Automation Upgrade Regular Pay N 2 0 NOV Weekly Meeting HVAC Discussiion Supporting project set-up Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-28 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 1.5 0 NCOC Comments review Review register / meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-29 CVX Genesis :CVX Genesis TSR-1725-GENP-03 Project Overhead Regular Pay N 1 0 Administration meetings set-up by JL PO Approvals CN Register review Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-29 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 Technical Services Hours Summary Update report to AP IMS restructure support A&E Policy Discussion Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-29 OH-009 :OH-009 OH-009-015 Alaska Regular Pay N 1 0 CPAI Willow Project - meetings, presentation, more meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-29 OH-034 :OH-034 OH-034-008 Mexico Regular Pay N 1 0 122L Mud Tanks - review correspondence Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-29 Rig 209L-TSR :Rig 209L-TSR TSR-01752-209L Automation Upgrade Regular Pay N 1 0 NOV Weekly Meeting HVAC Discussiion Supporting project set-up Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-29 Rig 257B-TSR :Rig 257B-TSR TSR-01792-257B Reactivation Schedule Optimization Regular Pay N 1.5 0 NCOC Comments review Review register / meetings Mcmullen, Kyle Engineering Discipline Manager 20461 Mcmullen, Kyle:Engineering Discipline Manager 2021-10-29 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 1 0 Meeting with NOV Meetings with GO / RP ELT Meeting Scope of Work Review Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-01 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-04 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-05 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 5 0 10/05-10/07: minor model updates and reconfiguration of layers, general clean-up 10/08: model hydraulic spools and running clash check. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-05 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 10/04: timesheet to ProjXsense and payroll 10/08: assist Tyler with ACAD support and plot styles. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-05 OH-013 :OH-013 Overhead All Activities Regular Pay N 2 0 10/04: create report for Aug actuals/Sept accruals; process TSR requests and transmittals. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-06 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 4 0 10/05-10/07: minor model updates and reconfiguration of layers, general clean-up 10/08: model hydraulic spools and running clash check. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-06 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 4 0 10/06: picked up red-lines from James/Kyle Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-07 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2 0 10/05-10/07: minor model updates and reconfiguration of layers, general clean-up 10/08: model hydraulic spools and running clash check. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-07 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 6 0 10/07: find reference documentation/drawings for blower motors and platform add-on. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-08 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 5 0 10/05-10/07: minor model updates and reconfiguration of layers, general clean-up 10/08: model hydraulic spools and running clash check. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-08 OH-006 :OH-006 Overhead All Activities Regular Pay N 3 0 10/04: timesheet to ProjXsense and payroll 10/08: assist Tyler with ACAD support and plot styles. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-11 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 10/11: timesheet to ProjXsense 10/12-13: assist IT with installation of Solidworks for Andrew G; troubleshoot TSRRegCood account with IT. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-11 OH-009 :OH-009 OH-009-020 Indonesia Regular Pay N 4.25 0 10/11: updated drawings per Kyle's comments Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-11 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.75 0 10/11: process incoming TSR transmittals; transmit TSR-01797-CTR 10/12: run TSR report for 269L CVX Engineering LOI report. 10/13: process incoming transmittals; transmit drawing to Rig 253L 10/15: process incoming transmittals Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-11 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 10/11: weekly Sakhalin call with Mio Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-12 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 3.5 0 creating template for new title block and logos Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-12 OH-006 :OH-006 Overhead All Activities Regular Pay N 4 0 10/11: timesheet to ProjXsense 10/12-13: assist IT with installation of Solidworks for Andrew G; troubleshoot TSRRegCood account with IT. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-12 OH-013 :OH-013 Overhead All Activities Regular Pay N 0.5 0 10/11: process incoming TSR transmittals; transmit TSR-01797-CTR 10/12: run TSR report for 269L CVX Engineering LOI report. 10/13: process incoming transmittals; transmit drawing to Rig 253L 10/15: process incoming transmittals Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-13 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 2.75 0 creating template for new title block and logos Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-13 OH-006 :OH-006 Overhead All Activities Regular Pay N 3.5 0 10/11: timesheet to ProjXsense 10/12-13: assist IT with installation of Solidworks for Andrew G; troubleshoot TSRRegCood account with IT. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-13 OH-013 :OH-013 Overhead All Activities Regular Pay N 1.75 0 10/11: process incoming TSR transmittals; transmit TSR-01797-CTR 10/12: run TSR report for 269L CVX Engineering LOI report. 10/13: process incoming transmittals; transmit drawing to Rig 253L 10/15: process incoming transmittals Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-14 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 5.75 0 10/14-15: review pony structure and substructure "clash" with bottles Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 10/14: HTSG bi-weekly TSR update meeting Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-14 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 1.25 0 email correspondence to Mio regarding ODPL drawing numbers, and TSR-01785 Anchor Beam for cntrl line sheaves. Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-15 Berkut-TSR :Berkut-TSR TSR-01797-BERP BOP Test Stump Replacement. Regular Pay N 0.5 0 10/15: hightail files to Genesis Engineering Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-15 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 6.5 0 10/14-15: review pony structure and substructure "clash" with bottles Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-15 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 10/11: process incoming TSR transmittals; transmit TSR-01797-CTR 10/12: run TSR report for 269L CVX Engineering LOI report. 10/13: process incoming transmittals; transmit drawing to Rig 253L 10/15: process incoming transmittals Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-25 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-26 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-27 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 2.5 0 10/27: find GA plan views for Jacon and send PDFs Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-27 OH-006 :OH-006 Overhead All Activities Regular Pay N 1 0 10/27: timesheet to ProjXsense Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-27 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 2.5 0 10/29: draft the HVAC unit and ducting and find suitable placement ontop of DS doghouse 10/27-28: model various parts of DF pertaining to TSR-01752 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-27 OH-009 :OH-009 OH-009-032 Arctic, North America Offshore (ANAO) Regular Pay N 1 0 10/27: look for photos and drawings of updated walkway on MM on AADU Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-27 OH-013 :OH-013 Overhead All Activities Regular Pay N 1 0 10/27: transmit TSR-01783-122L Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 10/28: HTSG bi-weekly meeting 10/29: meeting with Tyler to discuss HVAC placement and issues for TSR-01752 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-28 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 6 0 10/29: draft the HVAC unit and ducting and find suitable placement ontop of DS doghouse 10/27-28: model various parts of DF pertaining to TSR-01752 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-28 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 10/28: search for old TSR and email Luis Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-29 OH-004 :OH-004 Overhead All Activities Regular Pay N 1.25 0 10/28: HTSG bi-weekly meeting 10/29: meeting with Tyler to discuss HVAC placement and issues for TSR-01752 Nguyen, Lam Designer II 27172 Nguyen, Lam:Designer II 2021-10-29 OH-009 :OH-009 OH-009-014 Sakhalin Regular Pay N 6.75 0 10/29: draft the HVAC unit and ducting and find suitable placement ontop of DS doghouse 10/27-28: model various parts of DF pertaining to TSR-01752 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-01 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO on 9/29-10/1 Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-04 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly PM Mtg. Norway NME. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-04 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 8 0 Update Project Cash Flow tracker, 2021 down payment spend, project schedule. Support electrical engineering scope of work. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-05 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 9 0 Update Project Cash Flow tracker, 2021 down payment spend, project schedule. Support electrical engineering scope of work. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-06 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 Present Rig 270 to Shell Brunei team Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-06 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 8 0 Update Project Cash Flow tracker, 2021 down payment spend, project schedule. Support electrical engineering scope of work. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-07 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly PM Mtg. Norway NME. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-07 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 8 0 Update Project Cash Flow tracker, 2021 down payment spend, project schedule. Support electrical engineering scope of work. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-08 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 8 0 Update Project Cash Flow tracker, 2021 down payment spend, project schedule. Support electrical engineering scope of work. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-11 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly PM meeting. TS bi-weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-11 OH-009 :OH-009 OH-009-028 Middle East and Asia Pacific (MEAP) Regular Pay N 1 0 Review Unit Rig 201 option for India Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-11 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 7 0 Revise Rig 269 schedule, cash flow forecast and capex project estimates. Revise Drill pipe TPP. Revise NOV RFQ and create HP Mud TPP. Procurement planning in Oracle. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-12 OH-009 :OH-009 OH-009-032 Arctic, North America Offshore (ANAO) Regular Pay N 1 0 Review Unit Rig 321 specs versus SMGP specs. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-12 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 8 0 Revise Rig 269 schedule, cash flow forecast and capex project estimates. Revise Drill pipe TPP. Revise NOV RFQ and create HP Mud TPP. Procurement planning in Oracle. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-13 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 8 0 Revise Rig 269 schedule, cash flow forecast and capex project estimates. Revise Drill pipe TPP. Revise NOV RFQ and create HP Mud TPP. Procurement planning in Oracle. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly PM meeting. TS bi-weekly mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-14 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 7 0 Revise Rig 269 schedule, cash flow forecast and capex project estimates. Revise Drill pipe TPP. Revise NOV RFQ and create HP Mud TPP. Procurement planning in Oracle. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-15 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 6 0 Revise Rig 269 schedule, cash flow forecast and capex project estimates. Revise Drill pipe TPP. Revise NOV RFQ and create HP Mud TPP. Procurement planning in Oracle. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-18 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 10 0 Complete IADC equipment list, continue finalizing NOV fixed quote RFQ, revise tubular estimates, revise schedule. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-19 OH-004 :OH-004 Overhead All Activities Regular Pay N 3 0 On 10/19, visit MPD shop. On 10/21, Norway NME. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-19 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 6 0 Complete IADC equipment list, continue finalizing NOV fixed quote RFQ, revise tubular estimates, revise schedule. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-20 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 9 0 Complete IADC equipment list, continue finalizing NOV fixed quote RFQ, revise tubular estimates, revise schedule. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-21 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 On 10/19, visit MPD shop. On 10/21, Norway NME. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-21 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 9 0 Complete IADC equipment list, continue finalizing NOV fixed quote RFQ, revise tubular estimates, revise schedule. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-22 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 5 0 Complete IADC equipment list, continue finalizing NOV fixed quote RFQ, revise tubular estimates, revise schedule. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-25 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly PM mtg. Tech services mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-25 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 4 0 Review TCO KZ tender and rig options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-25 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 4 0 Plan LLE procurement, continue finalizing quotes, work through schedule optimization options for equipment overhauls. Develop Fire & Gas layouts, quote. Review Sakson Rig 801 as contingency option. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-26 OH-009 :OH-009 OH-009-029 Europe, Africa, and Caspian (EAFC) Regular Pay N 2 0 Review TCO KZ tender and rig options. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-26 OH-009 :OH-009 OH-009-030 Latin America (LATAM) Regular Pay N 1 0 Review Slb Geo-thermal Bolivia 1200HP (Rig 301) and Ecuador 2,000HP (Rig 403) rig options and start gap analysis. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-26 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 7 0 Plan LLE procurement, continue finalizing quotes, work through schedule optimization options for equipment overhauls. Develop Fire & Gas layouts, quote. Review Sakson Rig 801 as contingency option. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-27 OH-009 :OH-009 OH-009-030 Latin America (LATAM) Regular Pay N 1 0 Review Slb Geo-thermal Bolivia 1200HP (Rig 301) and Ecuador 2,000HP (Rig 403) rig options and start gap analysis. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-27 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 9 0 Plan LLE procurement, continue finalizing quotes, work through schedule optimization options for equipment overhauls. Develop Fire & Gas layouts, quote. Review Sakson Rig 801 as contingency option. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Weekly PM mtg. Tech services mtg. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-28 OH-009 :OH-009 OH-009-030 Latin America (LATAM) Regular Pay N 1 0 Review Slb Geo-thermal Bolivia 1200HP (Rig 301) and Ecuador 2,000HP (Rig 403) rig options and start gap analysis. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-28 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 8 0 Plan LLE procurement, continue finalizing quotes, work through schedule optimization options for equipment overhauls. Develop Fire & Gas layouts, quote. Review Sakson Rig 801 as contingency option. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-29 OH-009 :OH-009 OH-009-030 Latin America (LATAM) Regular Pay N 2 0 Review Slb Geo-thermal Bolivia 1200HP (Rig 301) and Ecuador 2,000HP (Rig 403) rig options and start gap analysis. Osten, Greg Project Manager 23110 Osten, Greg:Project Manager 2021-10-29 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 2 0 Plan LLE procurement, continue finalizing quotes, work through schedule optimization options for equipment overhauls. Develop Fire & Gas layouts, quote. Review Sakson Rig 801 as contingency option. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-01 OH-034 :OH-034 OH-034-007 Indonesia Regular Pay N 1 0 Rig 253 Project Scope of Work Generator-SCR Rev 4. Budgetary Quote for upgrading rig 265 communication system Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-01 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Genesis Spar - Emergency door light quote request. Outstanding issue list verification. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-01 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 6 0 Rig 269 Top Drive Upgrade QA with Jelec Chevron Bangladesh - Electrical Scope of Work -Transformer Dimensions verification. MGM - 1000KVA transformer quote reviewed. Rig 269 - Analysis Scenarios Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-04 OH-019 :OH-019 Overhead All Activities Regular Pay N 1 0 SAK weekly meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 Krechet / NOV DC to AC Conversion - Kickoff Meeting Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-04 OH-034 :OH-034 OH-034-006 Iraq Regular Pay N 1 0 Budgetary Quote for upgrading rig 265 communication system Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-04 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 5 0 Chevron Bangladesh - Electrical Scope of Work. Rig 269 - Top Drive Upgrade - VFD Items - Quote 181099. CVX Bangladesh -Fire and Gas Agitators for CVX Bangladesh. Rig 269 Top Drive Upgrade ( TDS-11 SAE ) meeting with NOV. CVX Bangladesh Rig 269 - Maersk H2S Meeting for fire and Gas. 269L Plot Plan provided. Rig 269 - Gen/Eng & MCC Name Plate Pic Project Scope of Work Hydraulic catwalk Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-05 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Genesis Spar - Emergency door light needs to be return and get new quote without exit sign. Gaitronics plug pin needs to be installed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-05 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 4 0 Chevron Bangladesh - Electrical Scope of Work. Rig 269 - Top Drive Upgrade - VFD Items - Quote 181099. CVX Bangladesh -Fire and Gas Agitators for CVX Bangladesh. Rig 269 Top Drive Upgrade ( TDS-11 SAE ) meeting with NOV. CVX Bangladesh Rig 269 - Maersk H2S Meeting for fire and Gas. 269L Plot Plan provided. Rig 269 - Gen/Eng & MCC Name Plate Pic Project Scope of Work Hydraulic catwalk Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-06 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Genesis Spar - Emergency door light needs to be return and get new quote without exit sign. Gaitronics plug pin needs to be installed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-06 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 6 0 Chevron Bangladesh - Electrical Scope of Work. Rig 269 - Top Drive Upgrade - VFD Items - Quote 181099. CVX Bangladesh -Fire and Gas Agitators for CVX Bangladesh. Rig 269 Top Drive Upgrade ( TDS-11 SAE ) meeting with NOV. CVX Bangladesh Rig 269 - Maersk H2S Meeting for fire and Gas. 269L Plot Plan provided. Rig 269 - Gen/Eng & MCC Name Plate Pic Project Scope of Work Hydraulic catwalk Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-07 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 Genesis Spar - Emergency door light needs to be return and get new quote without exit sign. Gaitronics plug pin needs to be installed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-07 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 5 0 Chevron Bangladesh - Electrical Scope of Work. Rig 269 - Top Drive Upgrade - VFD Items - Quote 181099. CVX Bangladesh -Fire and Gas Agitators for CVX Bangladesh. Rig 269 Top Drive Upgrade ( TDS-11 SAE ) meeting with NOV. CVX Bangladesh Rig 269 - Maersk H2S Meeting for fire and Gas. 269L Plot Plan provided. Rig 269 - Gen/Eng & MCC Name Plate Pic Project Scope of Work Hydraulic catwalk Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-08 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 4 0 Genesis Spar - Emergency door light needs to be return and get new quote without exit sign. Gaitronics plug pin needs to be installed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-08 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 4 0 Chevron Bangladesh - Electrical Scope of Work. Rig 269 - Top Drive Upgrade - VFD Items - Quote 181099. CVX Bangladesh -Fire and Gas Agitators for CVX Bangladesh. Rig 269 Top Drive Upgrade ( TDS-11 SAE ) meeting with NOV. CVX Bangladesh Rig 269 - Maersk H2S Meeting for fire and Gas. 269L Plot Plan provided. Rig 269 - Gen/Eng & MCC Name Plate Pic Project Scope of Work Hydraulic catwalk Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-11 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Getronics cable and speaker layout . Emergency lights replacement process discuss with Troy. Gaitronics plug pin needs to be installed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-11 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 6 0 Rig 269 Top Drive Upgrade ( TDS-11 SAE ) QA with Andres ( NOV ) . Catwalk for Bangladesh rig 269. CVX Bangladesh Rig 269 mud pit capacity / Power load analysis revision / Mud pit layout revision . Updated Analysis . Rig 269- Suitcase for power cable try . Rig 269 - Plot Plan Layout sent for Fire and Gas system. H2S Gas Detection datasheet received from Bernard and reviewed . Rutledge profile reviewed for upcoming fire and gas meeting. Drill string QA sent back to NOV. NOV Revised RFQ for CVX Bangladesh reviewed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-12 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Getronics cable and speaker layout . Emergency lights replacement process discuss with Troy. Gaitronics plug pin needs to be installed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-12 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 6 0 Rig 269 Top Drive Upgrade ( TDS-11 SAE ) QA with Andres ( NOV ) . Catwalk for Bangladesh rig 269. CVX Bangladesh Rig 269 mud pit capacity / Power load analysis revision / Mud pit layout revision . Updated Analysis . Rig 269- Suitcase for power cable try . Rig 269 - Plot Plan Layout sent for Fire and Gas system. H2S Gas Detection datasheet received from Bernard and reviewed . Rutledge profile reviewed for upcoming fire and gas meeting. Drill string QA sent back to NOV. NOV Revised RFQ for CVX Bangladesh reviewed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-13 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 Getronics cable and speaker layout . Emergency lights replacement process discuss with Troy. Gaitronics plug pin needs to be installed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-13 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 6 0 Rig 269 Top Drive Upgrade ( TDS-11 SAE ) QA with Andres ( NOV ) . Catwalk for Bangladesh rig 269. CVX Bangladesh Rig 269 mud pit capacity / Power load analysis revision / Mud pit layout revision . Updated Analysis . Rig 269- Suitcase for power cable try . Rig 269 - Plot Plan Layout sent for Fire and Gas system. H2S Gas Detection datasheet received from Bernard and reviewed . Rutledge profile reviewed for upcoming fire and gas meeting. Drill string QA sent back to NOV. NOV Revised RFQ for CVX Bangladesh reviewed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-14 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 Getronics cable and speaker layout . Emergency lights replacement process discuss with Troy. Gaitronics plug pin needs to be installed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-14 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 7 0 Rig 269 Top Drive Upgrade ( TDS-11 SAE ) QA with Andres ( NOV ) . Catwalk for Bangladesh rig 269. CVX Bangladesh Rig 269 mud pit capacity / Power load analysis revision / Mud pit layout revision . Updated Analysis . Rig 269- Suitcase for power cable try . Rig 269 - Plot Plan Layout sent for Fire and Gas system. H2S Gas Detection datasheet received from Bernard and reviewed . Rutledge profile reviewed for upcoming fire and gas meeting. Drill string QA sent back to NOV. NOV Revised RFQ for CVX Bangladesh reviewed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-15 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 3 0 Getronics cable and speaker layout . Emergency lights replacement process discuss with Troy. Gaitronics plug pin needs to be installed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-15 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 5 0 Rig 269 Top Drive Upgrade ( TDS-11 SAE ) QA with Andres ( NOV ) . Catwalk for Bangladesh rig 269. CVX Bangladesh Rig 269 mud pit capacity / Power load analysis revision / Mud pit layout revision . Updated Analysis . Rig 269- Suitcase for power cable try . Rig 269 - Plot Plan Layout sent for Fire and Gas system. H2S Gas Detection datasheet received from Bernard and reviewed . Rutledge profile reviewed for upcoming fire and gas meeting. Drill string QA sent back to NOV. NOV Revised RFQ for CVX Bangladesh reviewed. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-18 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-19 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 CDPU Gaitronics Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-19 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 7 0 RFQ - Monitoring & Alarm Systems Rig 269 Upgrades meeting with NOV Chevron Bangladesh - Electrical Scope of Work. Reviewed Rutledge H2S and LEL GD layout plan. H2S Gas Detection feedback from Berny and reviewed QD2 Emergency Equipment layout. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-20 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 8 0 RFQ - Monitoring & Alarm Systems Rig 269 Upgrades meeting with NOV Chevron Bangladesh - Electrical Scope of Work. Reviewed Rutledge H2S and LEL GD layout plan. H2S Gas Detection feedback from Berny and reviewed QD2 Emergency Equipment layout. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-21 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 CDPU Gaitronics Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-21 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 6 0 RFQ - Monitoring & Alarm Systems Rig 269 Upgrades meeting with NOV Chevron Bangladesh - Electrical Scope of Work. Reviewed Rutledge H2S and LEL GD layout plan. H2S Gas Detection feedback from Berny and reviewed QD2 Emergency Equipment layout. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-22 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 CDPU Gaitronics Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-22 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 6 0 RFQ - Monitoring & Alarm Systems Rig 269 Upgrades meeting with NOV Chevron Bangladesh - Electrical Scope of Work. Reviewed Rutledge H2S and LEL GD layout plan. H2S Gas Detection feedback from Berny and reviewed QD2 Emergency Equipment layout. Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-25 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 SAK weekly meeting. Krechet Rig 209 AC Upgrade / Sequencer - Bi-Weekly Action Item and Status Update Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-25 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3 0 Rig 265 - MP Inverter issue Vacon Drive Test procedure Inverter/converter Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-25 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 4 0 Rig 269 - H2S Gas Detection system Plot plan - Fire and gas system reviewed. Rutledge Gas detection system. RFQ - Monitoring & Alarm Systems Created Scope of Work Draft Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-26 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 Rig 265 - MP Inverter issue Vacon Drive Test procedure Inverter/converter Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-26 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 CDPU Gaitronics Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-26 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 4 0 Rig 269 - H2S Gas Detection system Plot plan - Fire and gas system reviewed. Rutledge Gas detection system. RFQ - Monitoring & Alarm Systems Created Scope of Work Draft Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-27 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 Rig 265 - MP Inverter issue Vacon Drive Test procedure Inverter/converter Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-27 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 2 0 CDPU Gaitronics Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-27 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 4 0 Rig 269 - H2S Gas Detection system Plot plan - Fire and gas system reviewed. Rutledge Gas detection system. RFQ - Monitoring & Alarm Systems Created Scope of Work Draft Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-28 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 1 0 SAK weekly meeting. Krechet Rig 209 AC Upgrade / Sequencer - Bi-Weekly Action Item and Status Update Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-28 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 3 0 Rig 265 - MP Inverter issue Vacon Drive Test procedure Inverter/converter Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-28 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 4 0 Rig 269 - H2S Gas Detection system Plot plan - Fire and gas system reviewed. Rutledge Gas detection system. RFQ - Monitoring & Alarm Systems Created Scope of Work Draft Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-29 OH-034 :OH-034 OH-034-005 Kazakhstan Regular Pay N 2 0 Rig 265 - MP Inverter issue Vacon Drive Test procedure Inverter/converter Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-29 OH-034 :OH-034 OH-034-010 Gulf of Mexico (includes compliance documentation – USCG) Regular Pay N 1 0 CDPU Gaitronics Patel, Ripal Engineer II Patel, Ripal:Engineer II 2021-10-29 Rig 269L-TSR :Rig 269L-TSR TSR-01796-269L Chevron Bangladesh LOI Engineering Regular Pay N 5 0 Rig 269 - H2S Gas Detection system Plot plan - Fire and gas system reviewed. Rutledge Gas detection system. RFQ - Monitoring & Alarm Systems Created Scope of Work Draft Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-01 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Emails Timesheet Passport follow up (9/27/21) Review tasks w/ J.G. (9/28 &30/21) CAD crashed (10/01/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-01 Rig 249L-TSR :Rig 249L-TSR TSR-01728-249L Chemical Platform Loading Ramp Regular Pay N 4 0 249L-01-03-196-(1-4)-R1-chem-platform-loading-ramp-extension (9/27/21-10/01/21)) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-04 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 2.5 0 Submit IT ticket for 257B Archive access. (10/4/21) Review 257B files in Archive (10/4/21) Follow up w/ I.T. for archive access approval ticket. (10/7/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-04 OH-005 :OH-005 Overhead All Activities Regular Pay N 2.5 0 Emails Timesheet Review tasks w/ J.G. (10/4&7/21) Passport follow up (10/8/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-04 OH-034 :OH-034 OH-034-001 Sakhalin Regular Pay N 0.5 0 Weekly meeting w/ Mio (10/04/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-04 Rig 249L-TSR :Rig 249L-TSR TSR-01728-249L Chemical Platform Loading Ramp Regular Pay N 3 0 249L-01-03-196-(1-4)-R0 Redlines (10/4-7/21) Update drawings per call w/ J.G. (10/7/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-05 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 1 0 Submit IT ticket for 257B Archive access. (10/4/21) Review 257B files in Archive (10/4/21) Follow up w/ I.T. for archive access approval ticket. (10/7/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-05 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Review tasks w/ J.G. (10/4&7/21) Passport follow up (10/8/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-05 Rig 249L-TSR :Rig 249L-TSR TSR-01728-249L Chemical Platform Loading Ramp Regular Pay N 6.5 0 249L-01-03-196-(1-4)-R0 Redlines (10/4-7/21) Update drawings per call w/ J.G. (10/7/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-06 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Review tasks w/ J.G. (10/4&7/21) Passport follow up (10/8/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-06 Rig 249L-TSR :Rig 249L-TSR TSR-01728-249L Chemical Platform Loading Ramp Regular Pay N 7.5 0 249L-01-03-196-(1-4)-R0 Redlines (10/4-7/21) Update drawings per call w/ J.G. (10/7/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-07 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 2.5 0 Submit IT ticket for 257B Archive access. (10/4/21) Review 257B files in Archive (10/4/21) Follow up w/ I.T. for archive access approval ticket. (10/7/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-07 OH-005 :OH-005 Overhead All Activities Regular Pay N 1.5 0 Emails Timesheet Review tasks w/ J.G. (10/4&7/21) Passport follow up (10/8/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-07 Rig 249L-TSR :Rig 249L-TSR TSR-01728-249L Chemical Platform Loading Ramp Regular Pay N 4.5 0 249L-01-03-196-(1-4)-R0 Redlines (10/4-7/21) Update drawings per call w/ J.G. (10/7/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-08 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 1 0 Submit IT ticket for 257B Archive access. (10/4/21) Review 257B files in Archive (10/4/21) Follow up w/ I.T. for archive access approval ticket. (10/7/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-08 OH-005 :OH-005 Overhead All Activities Regular Pay N 5 0 Emails Timesheet Review tasks w/ J.G. (10/4&7/21) Passport follow up (10/8/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-11 OH-001 :OH-001 Overhead All Activities Regular Pay N 8 0 PTO (10/11/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-12 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 2 0 Follow up from I.T. for 257B archive access approval ticket. (10/12-13/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-12 OH-005 :OH-005 Overhead All Activities Regular Pay N 6 0 Emails Timesheet U.S. Passport appt. Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-13 HTSG-TSR :HTSG-TSR 2021-SMART-Goals Regular Pay N 1 0 Follow up from I.T. for 257B archive access approval ticket. (10/12-13/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-13 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet U.S. Passport appt. Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-13 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 6 0 249L -Palet Dock Teams meeting w/J.G. (10/13/21) Review J.G. Layout (10/13-14/21) Pallet dock layout per excel file specs (10/14-15/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-14 OH-004 :OH-004 Overhead All Activities Regular Pay N 1 0 Technical Services Bi-weekly meeting (10/14/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-14 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet U.S. Passport appt. Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-14 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 6 0 249L -Palet Dock Teams meeting w/J.G. (10/13/21) Review J.G. Layout (10/13-14/21) Pallet dock layout per excel file specs (10/14-15/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-15 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet U.S. Passport appt. Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-15 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 7 0 249L -Palet Dock Teams meeting w/J.G. (10/13/21) Review J.G. Layout (10/13-14/21) Pallet dock layout per excel file specs (10/14-15/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-18 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Emails Timesheet Review work status w/ J.G. (10/19/21) Dynamo tickets from Kathy (10/19-20/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-18 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Weekly meeting w/ Mio (10/18/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-18 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 6 0 Pallet dock dwgs.(sht. 1-3) (10/18-22/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-19 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 Emails Timesheet Review work status w/ J.G. (10/19/21) Dynamo tickets from Kathy (10/19-20/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-19 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 3.5 0 Pallet dock dwgs.(sht. 1-3) (10/18-22/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-19 Rig 249L-TSR :Rig 249L-TSR TSR-01728-249L Chemical Platform Loading Ramp Regular Pay N 2 0 249L-01-03-196-(1-4)-R0 Review w/ J.G. ->Redlines & update (10/19/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-20 OH-005 :OH-005 Overhead All Activities Regular Pay N 3 0 Emails Timesheet Review work status w/ J.G. (10/19/21) Dynamo tickets from Kathy (10/19-20/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-20 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 5.5 0 Pallet dock dwgs.(sht. 1-3) (10/18-22/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-21 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Review work status w/ J.G. (10/19/21) Dynamo tickets from Kathy (10/19-20/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-21 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 7.5 0 Pallet dock dwgs.(sht. 1-3) (10/18-22/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-22 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Emails Timesheet Review work status w/ J.G. (10/19/21) Dynamo tickets from Kathy (10/19-20/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-22 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 5 0 Pallet dock dwgs.(sht. 1-3) (10/18-22/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-25 OH-005 :OH-005 Overhead All Activities Regular Pay N 2 0 Timesheet Emails CAD troubleshoot. (10/27/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-25 OH-019 :OH-019 Overhead All Activities Regular Pay N 0.5 0 Weekly meeting w/ Mio (10/25/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-25 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 6 0 Pallet dock dwgs.(sht. 1-3) (10/25-29/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-26 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails CAD troubleshoot. (10/27/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-26 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 7.5 0 Pallet dock dwgs.(sht. 1-3) (10/25-29/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-27 OH-005 :OH-005 Overhead All Activities Regular Pay N 3.5 0 Timesheet Emails CAD troubleshoot. (10/27/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-27 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 5 0 Pallet dock dwgs.(sht. 1-3) (10/25-29/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-28 OH-004 :OH-004 Overhead All Activities Regular Pay N 0.5 0 Technical Services Bi-weekly meeting (10//28/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-28 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails CAD troubleshoot. (10/27/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-28 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 7 0 Pallet dock dwgs.(sht. 1-3) (10/25-29/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-29 OH-005 :OH-005 Overhead All Activities Regular Pay N 1 0 Timesheet Emails CAD troubleshoot. (10/27/21) Perez, Jorge Senior Designer 29841 Perez, Jorge:Senior Designer 2021-10-29 OH-034 :OH-034 OH-034-004 Aksai Regular Pay N 5 0 Pallet dock dwgs.(sht. 1-3) (10/25-29/21) Reck, John Engineer I 29656 Reck, John:Engineer I 2021-10-01 OH-011 :OH-011 Overhead All Activities Regular Pay N 8 0 Time off from Genesis Reck, John Engineer I 29656 Reck, John:Engineer I 2021-10-04 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 8 0 Work from Houston, Oil temp issue and path forward, punchlist consolidation, Behringer clamp, winch reservoir, HPU startup Reck, John Engineer I 29656 Reck, John:Engineer I 2021-10-05 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 8 0 Work from Houston, Oil temp issue and path forward, punchlist consolidation, Behringer clamp, winch reservoir, HPU startup Reck, John Engineer I 29656 Reck, John:Engineer I 2021-10-06 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 8 0 Work from Houston, Oil temp issue and path forward, punchlist consolidation, Behringer clamp, winch reservoir, HPU startup Reck, John Engineer I 29656 Reck, John:Engineer I 2021-10-07 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 8 0 Work from Houston, Oil temp issue and path forward, punchlist consolidation, Behringer clamp, winch reservoir, HPU startup Reck, John Engineer I 29656 Reck, John:Engineer I 2021-10-08 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 8 0 Work from Houston, Oil temp issue and path forward, punchlist consolidation, Behringer clamp, winch reservoir, HPU startup Reck, John Engineer I 29656 Reck, John:Engineer I 2021-10-11 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 8 0 Work from Houston, Oil temp issue and path forward, punchlist consolidation, HPU startup Reck, John Engineer I 29656 Reck, John:Engineer I 2021-10-12 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 8 0 Work from Houston, Oil temp issue and path forward, punchlist consolidation, HPU startup Reck, John Engineer I 29656 Reck, John:Engineer I 2021-10-13 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 8 0 Work from Houston, Oil temp issue and path forward, punchlist consolidation, HPU startup Reck, John Engineer I 29656 Reck, John:Engineer I 2021-10-14 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 8 0 Work from Houston, Oil temp issue and path forward, punchlist consolidation, HPU startup Reck, John Engineer I 29656 Reck, John:Engineer I 2021-10-15 CVX Genesis :CVX Genesis TSR-1725-GENP-05 Rig-Up and SIT Regular Pay N 3 0 Work from Houston, Oil temp issue and path forward, punchlist consolidation, HPU startup Reck, John Engineer I 29656 Reck, John:Engineer I 2021-10-15 OH-010 :OH-010 OH-010-06 HTSG / Corporate Regular Pay N 5 0 Travel to New Iberia